PUBLIC
___________________________________________________________________
To:  Planning and Climate Change Policy Board
On:  4 November 2025
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Development Plan Update
___________________________________________________________________
1. Summary
1.1 This report provides an update on development planning activity. The 2025
Development Plan Scheme, which sets out the timetable for preparing the new
Local Development Plan (LDP3), and how stakeholders will be involved in its
preparation, is recommended for approval. An update on the preparation of
Local Place Plans by communities in Renfrewshire is also provided.
___________________________________________________________________ 
2. Recommendations
2.1 It is recommended that the Board:
 approve the 2025 Development Plan Scheme and Participation Statement
set out in Appendix 1 to this report.
___________________________________________________________________ 
3. Background
3.1 The current development plan for Renfrewshire comprises the Fourth National
Planning Framework (NPF4) prepared by the Scottish Government and
adopted on 13 February 2023, and the Renfrewshire Local Development Plan
(LDP2), prepared by the Council and adopted on 15 December 2021. Together
these documents set out the spatial strategy and policy for the use of land and
buildings in Renfrewshire and form the basis for the assessment of planning
applications. A new Local Development Plan (LDP3) is currently being prepared
under a new system for development planning introduced by the Planning
(Scotland) Act 2019.

Page 2

PUBLIC
4. Development Plan Scheme
4.1 The Council is required to prepare and publish a Development Plan Scheme
annually. A Development Plan Scheme is a document setting out the Council’s
programme for preparing and reviewing its Local Development Plan and must
include proposed timetabling for the preparation of the Local Development
Plan, details of what is involved at each stage of the preparation process, and
a Participation Statement setting out how stakeholders will be involved in the
preparation of the Local Development Plan. 
4.2 The 2025 Development Plan Scheme is attached for approval at Appendix 1. It
sets out the following timetable for the preparation of the new Local
Development Plan (LDP3), and notes changes in the timetable since the
preparation of the 2024 Development Plan Scheme. The Evidence Report was
approved at Council on 25 September 2025 and submitted to the Scottish
Ministers for Gate Check in October 2025. Despite some slippage in the
timetable, it is anticipated that the new Local Development Plan will be adopted
by May 2028 as expected by the Scottish Government.
Key stage Date
Publication of Evidence Report and
submission for Gate Check
October 2025
Publication of Proposed Plan and draft
Delivery Programme for consultation
January 2027
Submission of Proposed Plan to Scottish
Ministers for examination
October 2027
Expected adoption of Local Development
Plan (LDP3)
May 2028 
4.3 A draft version of the Participation Statement was published in August 2025 for
a 6-week consultation period. Eight responses were received. A summary of
the responses received and the Council’s response to these is attached as
Appendix 2. Following the consultation, a change has been made to the
Participation Statement to add local interest groups (e.g. natural and built
environment groups), the development industry and land and property
owners/managers to the list of stakeholders we will engage with when preparing
the proposed plan. All comments received will be taken into account in shaping
future engagement activity and there will also be follow up contact with
respondents to discuss their comments further. 
5. Local Place Plans
5.1 Local Place Plans are community led plans which can be prepared by a
community council, or another community body as defined by the Community
Empowerment Act. They are to be focused on proposals for the development
and use of land.

Page 3

PUBLIC
5.2 An invitation to prepare Local Place Plans was sent to community councils and
development trusts across Renfrewshire in May 2023. Information sessions
were held for these groups in March 2024, and several one-to-one meetings
with interested organisations have been held. Monthly online drop-in sessions
have been arranged to allow community groups with an interest in preparing a
local place plan to share their experience and progress to date, and an
opportunity to ask Council officers questions around process and support.
5.3 The February 2025 Full Council meeting established a Local Place Plan Fund
of £100,000 to support local communities prepare local place plans for
submission to the Council by 31 March 2026, so that they can inform the
preparation of the new Local Development Plan. The following organisations
have received funds and are progressing local place plans:
 Bridge of Weir Community Council; 
 Houston Community Council; 
 Inchinnan Development Trust; 
 Langbank Community Council; 
 Lochwinnoch Community Development Trust; 
 Paisley East & Whitehaugh Community Council; 
 Paisley West and Central Community Council; 
 Ralston Community Council; and 
 Renfrew Development Trust. 
5.4 Spateston Development Trust were offered funding but opted not to progress
with preparing a local place plan, and Bishopton Community Council have been
allocated funding, but additional information has been sought to allow a formal
offer to be made.
___________________________________________________________________
Implications of the Report 
1. Financial –There are costs associated with the Evidence Report Gate Check,
the Proposed Plan Examination and certain studies required to inform the Local
Development Plan (e.g. a transport assessment).  These costs require to be
met by the Council and will be funded from existing Council resources. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – The local development plan is a wide-ranging
document and is considered to support the priorities of the Renfrewshire
Community Plan and the Council’s strategic outcomes. 
4. Legal – the preparation of a local development plan is a statutory requirement
for planning authorities. The Council is following statutory procedures in
preparing the plan.

Page 4

PUBLIC
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - The recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights.
The impact assessment has highlighted the need to ensure that certain groups
with protected characteristics and from areas of socio-economic disadvantage
are involved in the local development plan process. Equalities monitoring of the
local development plan participant database and engagement processes will
be undertaken to monitor and highlight groups or areas where targeted
consultation may be required. A full copy of the Equality Impact Assessment
undertaken is available from the report author. Following implementation, the
actual impact of the recommendations and the mitigating actions will be
reviewed and monitored. The results of the assessment will be published on
the Council’s website.
8. Health & Safety – None.
9. Procurement – None.
10. Risk – there is a risk that the Council’s Evidence Report may be found to be
insufficient at the Gate Check stage, as eight of the thirteen Evidence Reports
that have been through Gate Check have been deemed insufficient after their
first review. To mitigate this risk, the Council consulted on its draft Evidence
Report templates, and is reviewing the Gate Check findings of other Evidence
Reports.
11. Privacy Impact – None.
12. Climate Risk – The Local Development Plan will have regard to and support
the implementation of the Council’s Plan for Net Zero.
13. Children’s Rights – through engagement with children and young people, the
approach being taken by the Council demonstrates compliance with Article 12
‘Respect for Children’s Views’.
14. Cosla Policy Position – None
_______________________________________________________
Appendices 
Appendix 1 – 2025 Development Plan Scheme and Participation Statement 
List of Background Papers 
 Renfrewshire Local Development Plan - Development Plan Scheme 2023;
Planning and Climate Change Policy Board; 29 Aug 2023
___________________________________________________________________ 
Author: Alan Williamson, Strategy & Place Manager,
alan.williamson@renfrewshire.gov.uk, 07811 053968

Page 5

1 
PUBLIC
Appendix 1
Renfrewshire Council
Local Development Plan (LDP3)
Development Plan Scheme and Par�cipa�on
Statement
November 2025

Page 6

2 
PUBLIC
Contents
Introduc�on ..................................................................................................................................................................................................................................... 3
Current development plan in Renfrewshire ..................................................................................................................................................................................... 3
Preparing the next local development plan for Renfrewshire ......................................................................................................................................................... 3
Timeline for preparing the next local development plan for Renfrewshire ..................................................................................................................................... 5
Associated assessments ................................................................................................................................................................................................................... 6
Local place plans .............................................................................................................................................................................................................................. 6
Par�cipa�on Statement ..................................................................................................................................................................... Error! Bookmark not defined.
Managing engagement ................................................................................................................................................................................................................ 7
Early engagement and evidence report prepara�on ................................................................................................................................................................... 8
Prepara�on of proposed local development plan ..................................................................................................................................................................... 12
Publica�on and consulta�on on proposed local development plan ......................................................................................................................................... 13
Examina�on and adop�on ......................................................................................................................................................................................................... 14
Engagement with children and young people – ac�vity up to August 2025 ............................................................................................................................. 15
Media�on ................................................................................................................................................................................................................................... 15
Contact us and follow us ................................................................................................................................................................................................................ 16

Page 7

3 
PUBLIC
Introduc�on
Thank you for your interest in the development plan for Renfrewshire.
The development plan sets out policy and strategy for the use of land and buildings, se�ng out how places will change into the future, including where
development should and should not happen. The planning system in Scotland is ‘plan-led’, and the development plan is the document the Council uses to
make decisions on planning applica�ons and is intended to provide certainty to communi�es and the development industry about where different types of
development will be acceptable.
This development plan scheme sets out informa�on on current development plan coverage in Renfrewshire, and on the process and �metable for preparing
a new local development plan (LDP3) for Renfrewshire, including how we will con�nue to include communi�es and organisa�ons in the prepara�on of the
plan.
Current development plan in Renfrewshire
The development plan for Renfrewshire consists of:
The Fourth Na�onal Planning Framework (NPF4) – prepared by the Sco�sh Government and adopted on 13 February 2023, NPF4 is the na�onal spa�al
strategy for Scotland. It sets out spa�al principles, regional priori�es, na�onal developments and na�onal planning policies. For more informa�on, please visit
Na�onal Planning Framework 4.
Renfrewshire Local Development Plan (LDP2) – prepared by Renfrewshire Council and adopted on 15 December 2021, LDP2 sets out the spa�al strategy for
Renfrewshire, iden�fying areas for development, improvement and protec�on. LDP2 is complemented by New Development Supplementary Guidance (2022),
which also forms part of the development plan. LDP2 is also supported by a Delivery Programme se�ng out how the policies and proposals of the plan will
be delivered. For more informa�on, and to view these documents, please visit Renfrewshire Development Plan.
Preparing the next local development plan for Renfrewshire
The Council is preparing a new local development plan for the Renfrewshire area (LDP3). Following changes introduced by the Planning (Scotland) Act 2019,
this plan will be prepared differently and will have a different look from LDP2. The new plan will be place-based, people-centred and delivery-focused. It will
be prepared with the inten�on that the spa�al strategy is set out in a collec�on of maps, development briefs and masterplans, instead of lengthy writen
text and policy. Local development plans are to be prepared collabora�vely, giving communi�es an opportunity to help shape their local neighbourhoods.

Page 8

4 
PUBLIC 
The key stages in preparing the new plan are:
Development plan scheme including par�cipa�on statement – the development plan scheme is an important communica�on tool for le�ng stakeholders
know when and how they can get involved in the prepara�on of the plan. It is updated annually.
Evidence report – the purpose of the evidence report is to support the quality and effec�veness of the local development plan. Its purpose is to front-load
the collec�on of evidence that will be used to inform the plan before the plan looks at where development should take place. It should be informed by the
views of those who will be affected by the plan.
Gate Check – this provides an independent assessment of the evidence report, assessing whether the planning authority has sufficient informa�on to prepare
its local development plan. It is carried out by a person appointed by the Sco�sh Ministers, usually a reporter from the Directorate of Planning and
Environmental Appeals.
Proposed Plan – the proposed plan iden�fies where new development should take place and where it should not, ar�cula�ng the ambi�ons and priori�es for
the future development of the area. The prepara�on of the proposed plan is to be informed by community and stakeholder engagement. The proposed plan
is published for consulta�on for a minimum 12-week period. The proposed plan can be modified following this period of consulta�on.
Delivery Programme – the delivery programme sets out how the Council proposes to implement its local development plan. A proposed delivery programme
is published alongside the proposed local development plan. The delivery programme is to set out a list of ac�ons required to deliver the polices and proposals
of the local development plan, including an explana�on of how those ac�ons are to be undertaken and the �mescale for conclusion of each ac�on. Addi�onally,
it is to include informa�on on the expected sequencing and �mescales for delivery of allocated housing sites.
Examina�on – the examina�on is an opportunity for independent considera�on of any issues raised during the formal consulta�on on the proposed plan that
have not been resolved through modifica�on. The Sco�sh Ministers will appoint a person to examine the proposed plan, usually a reporter from the
Directorate of Planning and Environmental Appeals. Once the examina�on is completed the appointed person will prepare a report se�ng out modifica�ons
to be made to the plan. There are limited circumstances for when a planning authority can decline the appointed person’s recommended modifica�ons.
Adop�on – adop�on occurs following the examina�on of the plan and the recommended modifica�ons of the examina�on report are received and considered.

Page 9

5 
PUBLIC
Timeline for preparing the next local development plan for Renfrewshire
The es�mated �meline for the prepara�on of the new local development plan and the dates for key stages are set out below (this includes reference to
financial year quarters as required by legisla�on). A �meline diagram is included in Appendix 1.
Key stage Date Change since 2024 development plan scheme
Publica�on of evidence report and submission for gate
check
October 2025 (Q3, 2025/26) The es�mated submission of the evidence report for gate
check has been delayed by two quarters.
Publica�on of proposed plan and dra� delivery
programme for consulta�on
January 2027 (Q4, 2026/27) The es�mated submission of the evidence report for gate
check has been delayed by three quarters.
Submission of proposed plan to Sco�sh Ministers for
examina�on
October 2027 (Q3, 2027/28) The es�mated submission of the proposed plan for
examina�on has been delayed by three quarters.
Expected adop�on of local development plan (LDP3) May 2028 (Q1, 2028/29) The es�mated adop�on of the local development plan has
slipped by two quarters. 
The submission of the evidence report for gate check has been delayed by two quarters compared to the �metable set out in the 2024 development plan
scheme. The evidence report is a new requirement for local development plan prepara�on and the scale of the task and issues emerging from gate checks of
other planning authority evidence reports has led to a delay in the submission for gate check. There is a knock-on effect for the submission of the proposed
plan for examina�on, which is delayed by three quarters. This also allows for local place plans submited by 31 March 2026 to be taken account of in preparing
the proposed plan. The revised programme s�ll allows for the new local development plan to be adopted by May 2028, which is the date expected by the
Sco�sh Government.

Page 10

6 
PUBLIC
Associated assessments
The prepara�on of the local development plan will be informed by the following assessments.
Equali�es Impact Assessment – local authori�es have a duty to eliminate discrimina�on; advance equality of opportunity; and foster good rela�ons between
people who share protected characteris�cs and those who don’t. The equali�es impact assessment will help the Council to consider how people of different
characteris�cs are involved in the prepara�on of the plan, and how they are affected by the proposals of the plan.
Fairer Scotland Duty Assessment – the Fairer Scotland Duty places a legal responsibility on local authori�es to ac�vely consider how they can reduce
inequali�es of outcome caused by socio-economic advantage when making strategic decisions.
Strategic Environmental Assessment – this assessment aims to ensure the environment is a primary considera�on in the prepara�on of the plan. It can benefit
the prepara�on of the plan by suppor�ng beter understanding of its environmental context and se�ng out steps to avoid, mi�gate or reduce adverse effects,
and enhance posi�ve ones.
Habitat Regula�ons Appraisal – this assessment is required if the plan is capable of having an adverse effect on a Special Protec�on Area or Special Area of
Conserva�on. These are referred to collec�vely as ‘European Sites’ and protect species and habitats. The assessment considers the implica�ons of the plan
for such designated sites in order to avoid adverse impacts.
Local place plans
Local place plans offer communi�es an addi�onal chance to shape their local area. They provide an opportunity for local communi�es to set priori�es for their
area and influence planning decisions.
In preparing the next local development plan, the Council will take into account any registered local place plans.
An invita�on to prepare local place plans was sent to local communi�es across Renfrewshire in May 2023. Communi�es have been asked to express an
interest in preparing a local place plan and iden�fy any support that may be needed from the Council and other stakeholders.
In March 2025, the Council launched its Local Place Plan fund and invited expressions of interest and applica�ons. Ten groups have been offered funding
with another offer pending. Nine of these groups have received funding and have commenced prepara�ons of their Local Place Plans.
Although they can be prepared at any �me, local place plans should be completed and submited to the Council by March 2026 so they can be taken into
account when preparing the next Local Development Plan. For more informa�on on local place plans, please visit Local Place Plans.
Everyone will have an opportunity to get involved in the prepara�on of the next Renfrewshire Local Development Plan.

Page 11

7 
PUBLIC
Par�cipa�on Statement
Effec�ve consulta�on and engagement are vital, as the Local Development Plan can affect where people live, work, visit, shop, play and travel in Renfrewshire.
Your involvement and feedback can help us understand priori�es for Renfrewshire and deliver a spa�al strategy that addresses the issues important to
communi�es.
We want to make it as easy as possible for everyone who has an interest to engage in the process.
The following pages set out how we intend to manage, facilitate and encourage engagement in the local development plan process.
Opportuni�es to become involved in the prepara�on of Local Development Plan 3 (LDP3) will be adver�sed through social media, updates on the Councils
website, emails/leters to everyone who has registered interest in the local development plan process, and no�ces in the local newspaper (when required).
Those with protected characteris�cs under the Equality Act 2010, including disability, race, age, gender, sex and sexual orienta�on, religion and people from
a range of socio-economic backgrounds and their representa�ves will be supported where required to get involved in the prepara�on of the new plan.
There are a number of key stages to get involved in the plan prepara�on. The table below sets out the engagement ac�vi�es that will be undertaken at each
stage, the purpose of it, progress at October 2025, and future ac�vity.
Managing engagement – ongoing engagement ac�vi�es
Engagement Ac�vity Purpose Progress at October 2025 Future ac�vity
Par�cipa�on statement To inform stakeholders about the
local development plan process and
involve them by providing an
opportunity for stakeholders to
shape the engagement process.
A consulta�on was undertaken in August
2023 to inform the 2023 development
plan scheme and par�cipa�on
statement, and in August/September
2024 and 2025 to inform the 2024 and
2025 par�cipa�on statements update
respec�vely. 
A consulta�on will be held on significant
changes in future annual updates of the
par�cipa�on statement.
Par�cipa�on database and
diary
Maintain a record of par�cipants
who have registered an interest in
the local development plan process.
Maintain a record of engagement
events.
Par�cipa�on registra�on form created.
As of October 2025, there were 1433
par�cipants registered in the par�cipant
database. 
Registra�on form remains open, and all
engagement ac�vity will be recorded.

Page 12

8 
PUBLIC
Engagement Ac�vity Purpose Progress at October 2025 Future ac�vity
The par�cipa�on diary had recorded 88
engagement ac�vi�es since February
2024, being a mix of mee�ngs/events
and survey launches/ no�fica�ons.
Local development plan
webpages and LDP3 hub
Promote engagement in local
development plan and make
consulta�on informa�on available.
Dra� LDP3 Evidence Report and
associated mapping uploaded to LDP3
hub for March-April 2025 public
consulta�on, and linked from webpage.
Keep webpage updated and further
develop LDP3 hub pages.
Combined equali�es
assessment
To ensure compliance with the
Equality Act 2010 and the United
Na�ons Conven�on of the Rights of
the Child.
An ini�al equali�es assessment focused
on consulta�on/engagement was
prepared in October 2024.
An equali�es assessment focused on the
content of the proposed plan will be
prepared in conjunc�on with, and
published alongside, the proposed plan. 
Early engagement and evidence report prepara�on – these ac�vi�es took place between January 2024 and August 2025
Engagement Ac�vity Purpose Progress at October 2025 Future ac�vity
‘Have your say on
Renfrewshire’s places’ survey
(based on the Place
Standard)
To involve and collaborate with
communi�es in the evidence
gathering process, enabling them to
offer comment on what is good and
what can be improved in their local
area.
The survey was launched on 28 March
2024 and was made available online and
in libraries through Renfrewshire. 261
responses have been received.
Early engagement to support evidence
report prepara�on has been completed.
Results of the have your say survey will
be reflected in the evidence report
consulta�on report.
‘Call for ideas’ survey To involve developers, landowners
and communi�es, enabling them to
submit ideas and proposals for
specific sites in Renfrewshire.
The survey was launched online on 28
March 2024, and ac�vely promoted un�l
31 May 2024. 97 responses had been
received by July 2025.  
The ini�al survey is closed and a second
stage ‘Call for ideas’ survey will be held
during the proposed plan prepara�on
period – further details below.
Children and young people
engagement
To involve children and young people
in the prepara�on of the evidence
report.
Working with Youth Services, 8 of
Renfrewshire’s secondary schools have
been visited to gather views from pupils
on what they like and do not like about
their communi�es. Over 100 pupils have
atended the workshops.
Early engagement to support evidence
report prepara�on has been completed.
Results of engagement with children and
young people will be reflected in the
evidence report consulta�on report and
play sufficiency assessment.

Page 13

9 
PUBLIC
Engagement Ac�vity Purpose Progress at October 2025 Future ac�vity
Workshops were also held with children
at the Council’s summer holiday camps.
These focused on play opportuni�es.
505 children and young people (under
18) responded to surveys during the
prepara�on of the play sufficiency
assessment. A combina�on of online
surveys and teacher-facilitated
classroom surveys was used.
Local place plans Promote local place plans as an
opportunity for communi�es to be
involved in the local development
plan process and be empowered to
decide on the content of their local
place plans.
Invita�on to prepare local place plans
was issued to community councils and
development trusts in May 2023 and
placed on webpage. 
Informa�on sessions were held in March
2024, and monthly online drop-in
sessions have been held since December
2024. 
Local place plans can be submited at any
point, but only those submited prior to
31 March 2026 will be considered in the
prepara�on of LDP3. 
In March 2025, the Council launched its
Local Place Plan fund and invited
expressions of interest and applica�ons.
Ten groups have been offered funding
with another offer pending. Nine of
these groups have received funding and
have commenced prepara�ons of their
Local Place Plans.
Early engagement to support evidence
report prepara�on has been completed.
Support for prepara�on of Local Place
Plans will con�nue as part of proposed
plan process – further details below.

Page 14

10 
PUBLIC
Engagement Ac�vity Purpose Progress at October 2025 Future ac�vity
Engagement with gypsy/
traveller and travelling
showpeople communi�es
To involve gypsy/traveller and
travelling showpeople communi�es
in iden�fying accommoda�on needs
within Renfrewshire.
Engagement with owners of
Renfrewshire’s exis�ng private
gypsy/travellers site about needs of the
wider community.
Early engagement to support evidence
report prepara�on has been completed.
Engagement with gypsy/traveller and
travelling showpeople communi�es will
con�nue as part of proposed plan
prepara�on.
Engagement with disabled
people
To involve disabled people in
iden�fying housing needs for
disabled people within
Renfrewshire.
The ‘Have your say on Renfrewshire’s
places’ survey collected equali�es data.
Of the 261 responses received, 38
respondents (15%) indicated that they
had a disability, with some responses
referring to issues associated with their
disability in their detailed responses. A
mee�ng was held with Engage
Renfrewshire in August 2025 to iden�fy
disabled organisa�ons for focused
engagement.
Early engagement to support evidence
report prepara�on has been completed.
Engagement with disabled people will be
undertaken as part of proposed plan
prepara�on.
Engagement with community
councils, development trusts
and local partnerships
To involve communi�es, iden�fying
their expecta�ons for the new local
development plan and to promote
the prepara�on of local place plans.
All community councils and
development trusts were invited to the
March 2024 informa�on sessions on
local place plans, 8 atended.
Presenta�ons have been given to and
informa�on sessions have been
atended by fourteen community
councils/development trusts since
February 2024. Addi�onally,
presenta�ons have been given to four
local partnerships.
Early engagement to support evidence
report prepara�on has been completed.
Engagement with community councils
etc will con�nue as part of proposed plan
prepara�on.
Engagement with key
agencies and government
agencies
To iden�fy evidence that key
agencies will be able to submit to
inform evidence report
Mee�ngs held with Transport Scotland,
Strathclyde Partnership for Transport,
Sco�sh Water, NHSGGC, SEPA, Sport
Scotland, Historic Environment Scotland,
Early engagement to support evidence
report prepara�on has been completed.
Engagement with key and government

Page 15

11 
PUBLIC
Engagement Ac�vity Purpose Progress at October 2025 Future ac�vity
NatureScot, GGCNHS and Sco�sh
Enterprise. These stakeholders, as well
as Marine Scotland and Forestry
Scotland, were consulted on the dra�
evidence report and provided feedback
which was taken into account when
finalising the evidence report.
agencies will con�nue as part of
proposed plan prepara�on.
Engagement with
development industry,
businesses and landowners
To iden�fy the general and site
specific ambi�ons of the
development industry and
landowners.
Ini�al ‘call for ideas’ survey produced 97
responses (not all from development
industry). Several one-to-one mee�ngs
held with developers and landowners.
Early engagement to support evidence
report prepara�on has been completed.
Second ‘call for ideas’ survey and
mee�ngs to be held during the
prepara�on of the proposed plan. 
Consult on dra� evidence
report templates
To test sufficiency of evidence, and
iden�fy disputes and gaps
Dra� evidence report templates were
published in March/April 2025 and views
sought on content. 
Registered par�cipants were no�fied of
publica�on.
Early engagement to support evidence
report prepara�on has been completed.
Publish evidence report on
council website
To make evidence report available to
stakeholders 
Publish finalised evidence report on
website. Inform stakeholders when
evidence report approved by Council and
submited to Sco�sh ministers for gate
check.
Inform stakeholders of
outcome of gate check
To advise stakeholders on the
outcome of the gate check. 
Webpage to be updated and email sent
to mailing list.

Page 16

12 
PUBLIC 
Prepara�on of proposed local development plan – these ac�vi�es are scheduled to take place between November 2025 and
November 2026
Engagement Ac�vity Purpose Progress at October 2025 Future ac�vity
Support communi�es with
finalisa�on of local place
plans
To ensure as many local place plans
as possible are finalised in �me to
inform the proposed local
development plan. 
Engage with those communi�es
preparing local place plans to encourage
and facilitate valida�on and registra�on
of local place plans and discuss how local
place plan proposals can be included in
local development plan.
Con�nue to hold monthly drop-in
sessions for as long as they are required/
purposeful for local communi�es. 
Where appropriate, use media�on to
address conflicts between local place
plans and alterna�ve proposals. 
‘Call for ideas’ survey To involve developers, landowners
and communi�es, enabling them to
submit ideas and proposals for
specific sites in Renfrewshire. 
Publicise second ‘Call for ideas’ survey to
all registered par�cipants, and more
widely. Make submission form available
online.
Consulta�on on suggested
development sites
To allow stakeholders to comment on
the Council’s assessment of sites
considered for inclusion in LDP3. 
Consult on proposed LDP3 development
sites with key agencies, local
communi�es and other stakeholders.
Prepara�on of scope/briefs of
technical reports required to
inform prepara�on of
Proposed Plan
To provide key agencies with an input
to the scope/briefs of technical
reports 
Meet/liaise with relevant key agencies
and share proposed scope/briefs for
comment.
Prepara�on of masterplans
and site briefs in
To involve stakeholders, providing
them with an opportunity for to 
Work with communi�es and developers
to inform and develop area masterplans
and development briefs for sites for

Page 17

13 
PUBLIC
Engagement Ac�vity Purpose Progress at October 2025 Future ac�vity
collabora�on with
stakeholders
inform the content of the proposed
local development plan.
inclusion in proposed local development
plan.
Ongoing engagement with
statutory stakeholders,
community councils, children
and young people, disabled
people, older people, local
interest groups (e.g. natural
and built environment
groups), the development
industry, land and property
owners/managers and
gypsy/travellers and
travelling showpeople.
To ensure statutory engagement
requirements are met and that the
proposed plan is informed by
involving these groups. 
Con�nue to engage with all stakeholders
through mee�ngs and events.
Liaise with organisa�ons who
will be responsible for ac�ons
included in the Dra� Delivery
Programme
To ensure that organisa�ons are
aware and suppor�ve of their role in
delivering the local development
plan. 
Mee�ngs with relevant organisa�ons. 
Publica�on and consulta�on on proposed local development plan – these ac�vi�es are scheduled to take place between January and
April 2026
Engagement Ac�vity Purpose Progress at October 2025 Future ac�vity
Publish proposed local
development plan for
consulta�on, dra� strategic
environmental assessment
environmental report and
dra� habitat regula�ons
appraisal
To involve communi�es and
stakeholders by providing them with
an opportunity to comment on the
proposed local development plan. 
Publish proposed local development
plan and assessment/appraisal
documents for minimum 12-week
consulta�on period. 
Make copy of proposed plan available
online, in Council offices and libraries.

Page 18

14 
PUBLIC
Engagement Ac�vity Purpose Progress at October 2025 Future ac�vity
Publicise publica�on of plan through
social media, press and posters and carry
out statutory no�fica�ons. 
No�fy neighbours of sites proposed for
development in the proposed plan. 
Atend mee�ng and events to publicise
publica�on of proposed plan
Liaise with stakeholders who
are seeking modifica�ons to
the proposed local
development plan
Consult with stakeholders to try and
resolve representa�ons/objec�ons
that are seeking changes to the
proposed plan. 
Mee�ngs with individuals/organisa�ons
that have submited
representa�ons/objec�ons. Where
appropriate use media�on to resolve
different views. 
Examina�on and adop�on – these ac�vi�es are scheduled to take place between October 2027 and May 2028
Engagement Ac�vity Purpose Progress at October 2025 Future ac�vity
Examina�on further
informa�on requests
The Reporter undertaking the
examina�on may consult
stakeholders and seek further
informa�on to fully understand
representa�ons. 
Where required, facilitate responses to
further informa�on requests.
Publish modifica�on report To inform par�cipants of
recommended changes to the
proposed plan. 
Publish modifica�on report and inform
par�cipants.
Publish adopted local
development plan
To inform par�cipants of the
adop�on of the local development
plan. 
Publish the plan and make available in
Council offices and libraries. 
No�fy par�cipants and place a press
advert.

Page 19

15 
PUBLIC
Engagement with children and young people – ac�vity up to October 2025
The Place Strategy team is working closely with Youth Services colleagues within the Council to facilitate par�cipa�on by children and young people in the
prepara�on of the local development plan (LDP3). This has involved several mee�ngs with colleagues from each service, ini�ally to explain the requirement
and benefit for children and young people involvement in the process, then to discuss the prac�cali�es of this.
The ini�al engagement event was with Renfrewshire Youth Voice (htps://www.ryv.org.uk/about-us/), which includes members of the Sco�sh Youth
Parliament. This discussion focused on how par�cipa�on with children and young people should be undertaken, and provided advice such that the place
standard tool for children and young people would be a good way to engage, but that online surveys would not be likely to generate many responses.
Based on this informa�on, contact with local secondary schools was made and engagement sessions arranged. A session plan based around the young person’s
version of the place standard tool was designed in collabora�on with Youth Services colleagues, and delivered jointly to eight secondary schools (Renfrew HS,
Johnstone HS, Gryffe HS, St Benedict’s HS, Gleniffer HS, St Andrew’s HS, Linwood HS & Park Mains HS) over this period. Sessions were atended by over 100
secondary school pupils. Informa�on was collected via maps, where par�cipants highlighted places they liked and disliked, via flipchart where place standard
ques�ons were answered, and via the place standard wheel. Work is ongoing to digi�se the informa�on collected so that it can be beter recorded and more
fully analysed.
Engagement has also taken place at the Council ‘Summer of Fun’ camps. This focused on play with ques�ons around closest and favourite play parks, and
where else children like to play. Children were engaged with at these sessions which were held in 6 loca�ons in Paisley, Linwood and Johnstone.
505 children and young people (under 18) completed surveys during the prepara�on of the play sufficiency assessment in May-June 2025. A combina�on of
online surveys and teacher-facilitated classroom surveys was used, with different surveys made available to account for age and literacy level. Ques�ons
included the availability of play opportuni�es, favourite play ac�vi�es, favourite play spaces, feelings of safety, and the a�tude of the community towards
children and young people playing out.
Media�on
The Council will work with all stakeholders to discuss any issues which could lead to poten�al challenges/concerns throughout the plan prepara�on process.
One method that can be used to support this is media�on, which can help aid discussions.
The prepara�on of the Evidence Report will provide the opportunity for any concerns/disputes in the evidence base to be discussed and nego�ated. Media�on
may also be used in the later stages of the plan prepara�on when the proposed plan is published and subject to further representa�ons.
The Council will be open to considering any requests from stakeholders to use media�on, taking into account the poten�al benefits in terms of saving �me
and cost, and fostering beter rela�onships going forward. This could be on an informal basis or through an independent third party.

Page 20

16 
PUBLIC
Contact us and follow us
Mailing list – to be added to the local development plan mailing list, email us at localplanconsulta�on@renfrewshire.gov.uk, call us on 0300 300 0144, or write
to us at Place Strategy, Renfrewshire Council, 4th Floor, Renfrewshire House, Paisley, PA1 1BR
Social media – we will share updates on the Council’s Bluesky, Instagram and Facebook pages
Website – latest updates and documents will be published on the LDP3 webpage
Mee�ngs – if you would like a presenta�on or mee�ng on the local development plan, please get in touch via localplanconsulta�on@renfrewshire.gov.uk or
0300 300 0144.

Page 21

PUBLIC
Appendix 2 
2025 draft Participation Statement consultation responses
Respondent Summary of comment Council response
Renfrewshire resident There should be more consultation with local
groups especially those trying to protect
Renfrewshire’s green spaces
A reference to local interest groups (e.g. natural
and built environment groups) has been added
to the Participation Statement.
Renfrewshire resident Comments relating to concerns about
Masterplan Consent Areas. 
The Development Plan Scheme/Participation
Statement does not make reference to
Masterplan Consent Areas, nor are any
currently proposed in Renfrewshire. The
respondent will be contacted to seek further
clarity around their concerns.
Bridge of Weir Community Council Concern that another ‘call for ideas’ could
confuse residents in areas where local place
plans are being prepared, as local place plan
processes involve effort to generate ideas.
The Council has already committed to a second
round ‘call for ideas’ which has been welcomed
by the development industry. Also, not all areas
have a local place plan being prepared and a
second ‘call for ideas’ will allow ideas for these
areas to be submitted.
The Thursday Club community group Concern around limited access that pensioners
have to the internet and suggestion that drop-in
events should be used.
The Participation Statement refers to engaging
with older people including through meetings
and events.
NewRiver REIT plc Important to involve key town centre
stakeholders in engagement. Meetings, surveys
and events appreciated.
A reference to engagement with land and
property owners/managers has been added to
the Participation Statement.
CALA Management Limited The publication of the 2024 call for ideas map
added transparency to the process. 
An updated Development Plan Scheme is
required owing to slippage in the programme. 
Noted 
An updated development Plan Scheme is
submitted to 4 November 2025 Planning and
Climate Change Policy Board for approval.

Page 22

PUBLIC
Respondent Summary of comment Council response
The creation of site briefs is useful and provide
certainty for developers and landowners
It is intended to include site briefs in the new
local development plan, and this is referenced
in the Participation Statement.
Homes for Scotland Support the commitment to publish initial/draft
assessments of proposed development sites.
This will create a transparent process and
generate more engagement. 
Welcome the commitment to work with
communities and developers to inform
masterplans and development briefs for sites in
the proposed local development plan.
Noted 
Noted
Renfrewshire resident Dissatisfaction regarding suggested
disregarding of residents’ opinions.
Noted. The respondent will be contacted to
discuss their concerns. 