Democracy Spraffa

Agenda Document Pack - Planning and Climate Change Policy Board - 20/05/2025

Renfrewshire Council · 20 May 2025
Back to Planning and Climate Change Policy Board — 20 May 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

14/05/2025 
Notice of Meeting and Agenda
Planning and Climate Change Policy Board 
Date Time Venue
Tuesday, 20 May 2025 13:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN               
Membership 
Councillor Jim Paterson (Convener):     Councillor Bruce MacFarlane (Depute Convener):    
Councillor Jennifer Adam:  Councillor Alison  Ann-Dowling:  Councillor Andy Doig:  Councillor
Chris Gilmour:  Councillor Neill Graham:  Councillor Anne Hannigan:  Councillor Kenny
MacLaren:  Councillor Jamie McGuire:  Councillor Marie McGurk:  Councillor John McNaughtan: 
Councillor Iain Nicolson:  Councillor John Shaw:  Councillor Ben Smith:   
Hybrid Meeting
Please note that this meeting is scheduled to be held in the Council Chambers.  However, it is a
hybrid meeting and arrangements have been made for members to join the meeting remotely
should they wish. 
Members of the Press and Public
Members of the press and public wishing to attend the meeting should report to the customer
service centre where they will be met and directed to the meeting. 
Further Information
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior to the
meeting at the Customer Service Centre, Renfrewshire House, Cotton Street, Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk 
MARK CONAGHAN
Head of Corporate Governance

Page 2

14/05/2025 
Webcasting of Meeting
This meeting will be filmed for live or subsequent broadcast via the Council’s internet site – at
the start of the meeting the Convener will confirm if all or part of the meeting is being filmed.  To
find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home

Page 3

14/05/2025 
Items of business      
Apologies
Apologies from members. 
Declarations of Interest and Transparency Statements
Members are asked to declare an interest or make a transparency
statement in any item(s) on the agenda and to provide a brief
explanation of the nature of the interest or the transparency statement. 
1 Update on Renfrewshire’s Climate Change Action
Report by Director of Environment Housing and Infrastructure. 
1 - 8 
2 Public Bodies Climate Change Duties: Proposed Updated
Draft Guidance
Report by Director of Environment, Housing and Infrastructure. 
9 - 18 
3 Planning Applications
List of planning applications to be determined by the Board. 
19 - 20 
3(a)  24/0800/PP - Demolition of rear hall, erection of two
storey rear extension, conversion of building to form
three residential units and associated alterations at 19
Lawn Street, Paisley PA1 1HD by  the Kirk Session of
Paisley Abbey 
21 - 28 
3(b)  24/0801/LB - Demolition of rear hall, erection of rear
extension and conversion of front building to form
residential units and associated external alterations at 19
Lawn Street, Paisley PA1 1HD by the Kirk Session of
Paisley Abbey 
29 - 34 
3(c)  24/0829/LB - Demolition of Grade C Listed former
dormitory building at St Joseph's Nursing Home, Kilbirnie
Road, Lochwinnoch, PA12 4DY by Graisley Investments
Ltd 
35 - 42

Page 4

14/05/2025 
3(d) 25/0007/EAC - Formation of up to 750MW Battery Energy
Storage Facility, comprising of up to 88 battery storage
container blocks and associated infrastructure, storage
containers, welfare facility, diesel generators, CCTV and
lighting columns and associated access, internal access
roads, hard and soft landscaping, SuDS Basin and
perimeter fence at Neilston Grid Electricity Sub-station
Complex, Gleniffer Road, Paisley by Energy Consents
Unit.
43 - 66 
3(e)  25/0032/PP - Demolition of single storey commercial units
and redevelopment of yard comprising of the erection of
a two story office, workshop and storage facility with
associated access, parking, fencing and associated
works at 108 Hawkhead Road, Paisley PA2 7BA  by Mr
Greg Chalmers Lambert + Son Properties Ltd . 
67 - 74 
3(f)  25/0059/PP - Erection of sub-station with associated
apparatus, fencing, de-mountable floodlights and access
track at BAE Land UK - Environmental Test Facility,
Glenluce Drive, Bishopton by Scottish Power Energy
Networks. 
75 - 102

Page 5

1 
___________________________________________________________________
To:  Planning and Climate Change Policy Board
On:  20 May 2025
___________________________________________________________________
Report by: Director of Environment Housing and Infrastructure
___________________________________________________________________
Heading: Update on Renfrewshire’s Climate Change Action
___________________________________________________________________    
1. Summary 
1.1 In August 2022, Renfrewshire’s Plan for Net Zero (Ren Zero) was published in
response to a Climate Emergency being declared in Renfrewshire in 2019. Since
then, significant progress has been made towards achieving the commitment to
working towards Net Zero by 2030 for both the Renfrewshire area as a whole and
Renfrewshire Council as an organisation. 
1.2 Renfrewshire’s Plan for Net Zero sets out the strategic framework required to work
towards our ambitious climate change targets in Renfrewshire. The plan outlines the
strategic direction in Renfrewshire and highlights the importance of working together
across the Council and beyond to ensure projects, programmes and approaches
complement each other; optimise expertise and experience; and maximise resources
while closely aligning with our Council and Community Plans, and national and local
policies and strategies. 
1.3 With the overarching strategy in place, a detailed delivery plan is required which
outlines the priority areas and specific activities which will be taken forward in the
short to medium term to support our strategic, climate related objectives. This
captures and builds upon the range of climate related activity already underway in
Renfrewshire. 
1.4 This report outlines the progress made to date in Renfrewshire and the priority areas
and planned activity moving forward. Alongside this paper, the Climate Change
Duties Report provides an overview of the draft updated statutory guidance in
Scotland, and Renfrewshire’s current position in relation to the draft targets and
commitments.   
Item 1
PACC200525 Page 1 of 102

Page 6

2 
2.  Recommendations 
It is recommended that members of the Planning and Climate Change Policy Board:
2.1  Notes that this report provides a summary of the climate action undertaken and
progress to date; and
2.2  Notes the priority areas and specific activity to be taken forward to support
Renfrewshire’s strategic climate objectives. 
3.  Background 
3.1 The Scottish Government has made a legislative commitment to reach Net Zero
emissions by 2045. The commitment was made under the Climate Change
(Scotland) Act 2019. The Act was amended in November 2024, and in place of
annual and interim targets, a five-year carbon budgeting system has been
introduced. From 2026 onwards, each year will be covered by a carbon budget
relating to the amount of greenhouse gases permitted during that 5-year period.  This
shift aims to provide a more realistic framework for long-term climate planning.
Despite this change, the Scottish government has reaffirmed its commitment to
achieving net-zero emissions by 2045. 
3.2 Renfrewshire’s Plan for Net Zero aligns with the key priorities at national level and
there have been a range of success stories to date locally including joint working with
communities in establishing the community climate fund, delivering active travel
infrastructure across the area and early work looking at alternative energy sources
such as waste heat recovery used in the AMIDS district heating network. 
3.3 However, it is recognised that to achieve our long-term objectives, the scale and
pace of change to be delivered over the coming years has to be accelerated. To do
so, clear priority areas and tangible actions to be developed and delivered have been
identified. 
4  Strategic priority areas 
4.1 Renfrewshire’s Plan for Net Zero is centred around 5 main themes: 
 Clean Energy – minimising energy demand, maximising energy efficiency and
transforming our energy systems to deliver clean, affordable energy for all.
 Sustainable Transport – Maximising sustainable transport opportunities to
deliver an inclusive, affordable transport system that provides choices for all.
 Resilient Place – Optimising biodiversity and nature locally to enhance our
natural environment and maximising green economic opportunities while planning
and preparing for impacts of climate change.
 Circular Economy – Making Renfrewshire a circular economy society:
minimising waste and maximising reuse, recycling and recovery of resources
rather than treating them as waste.
 Connected Communities – Empowering communities by ensuring an inclusive
and just transition to net zero with social justice and health and wellbeing at its
core for current and future generations.
Page 2 of 102

Page 7

3 
4.2 Recognising the enormity of the Climate Change agenda and the commitment to
achieving significant, ambitious objectives, the Plan stressed the importance of
everyone in Renfrewshire playing their part alongside increased partnership working
and collaboration to optimise opportunities. As such, Renfrewshire Council aims to
play a leadership role by striving to become a net zero organisation while working
closely with businesses, partners and stakeholders to make radical, but essential,
changes in Renfrewshire. Climate Change cannot be tackled with solely internal
transformation within the Council – Renfrewshire Council makes up around 2.5% of
the emissions of the area but can influence around 33% of the area’s emissions
through sectors that are directly shaped by local authority practice, policy or
partnerships. 
4.3 Therefore, in the short to medium term the Council intends to focus its efforts on a
number of key areas, both in terms of its own practices and to support communities
and all stakeholders to contribute. These include: 
 Transforming our approach to the provision of clean, renewable energy and
sustainable transport in Renfrewshire. This will include decarbonising our public
buildings and ensuring our fleet and travel behaviours are as sustainable as they
can be. 
 Continuing to think innovatively, to explore external funding and investment
opportunities and to identify new ways to bring cost savings and generate
revenue to reinvest in sustainable practices. 
 Improving our local community areas by greening our estate and footprints,
directed by a local Offsetting Strategy which will be incorporated within a newly
developed Adaptation Plan, and 
 Informing, educating and upskilling our staff and communities to support them to
contribute to climate action. This will include the development of a Ren Zero
community engagement programme, reiterating the importance of climate action
being everyone’s business. 
4.4 The priority areas are not exhaustive, and the Council will continue to explore
opportunities and develop supporting plans across each of the themes, building on
the work already completed or in progress. 
5.  Current activity / progress to date 
5.1 Since the publication of Renfrewshire’s Plan for Net Zero, significant activity has
been undertaken locally to support our climate change objectives. 
5.2 Establishing a Sustainability Team 
As part of enhancing the Council’s structure in response to the climate challenge, a
centralised Sustainability Team has been established in the Environment, Housing
and Infrastructure Service. The team will lead on the climate responsibilities the
Page 3 of 102

Page 8

4 
Council has and advance our net zero aspirations further. This will involve working
across the Council with the aim of decarbonising our public buildings and ensuring
our fleet and travel behaviours are as sustainable as they can be. 
5.3 Local Heat & Energy Efficiency Strategy (LHEES) 
Following the successful delivery of the Advanced Manufacturing Innovation District
Scotland (AMIDS) district heating network, feasibility studies have been completed to
expand the current network as well as exploring additional district heating networks in
Paisley. Renfrewshire Council has been successful in securing Scottish Government
grant funding to take these feasibility studies to develop Outline business Cases for
potential heat networks in Paisley Central and an extension of AMIDS, with
partnership working to optimise the opportunities including UWS, OneRen, NHS,
Scottish Water and Glasgow Airport 
5.4 Sustainable Travel 
A review of the current Sustainable Travel pool car system is underway with plans to
relaunch a Sustainable Travel Initiative which will include a focus on reducing
business travel. The project will focus on a planning model which will encourage a
more sustainable travel culture across the council by providing staff with a reviewed
hierarchy of travel, a review of the current electric vehicle pool vehicles, re-
introduction of pool bikes and looking at the possibility of introducing new staff
incentives. The project will support several objectives including reduced spend on
annual business miles claims, decreased carbon emissions through sustainable
practices and enhanced employee accessibility to shared transport options. 
5.5 Sustainable Planned Infrastructure Works  
The Sustainability team are working closely with colleagues across other Council
Services to ensure sustainability is prioritised within major infrastructure programmes
of work. This includes Housing Regeneration, the development of our Learning
Estate and the decarbonisation of our public buildings. Renfrewshire Council are one
of four local authorities in the West of Scotland who are working with BE-ST and Hub
West to develop individual route maps for Local Authorities, share and collaborate 
best practice but also to deliver a review of data and allow a representation of
architypes of buildings across the West Region to prevent duplication of work across
the local authorities. 
5.6 Ensuring Climate Change Considerations inform Strategic Planning 
Renfrewshire Council is currently developing processes and tools in relation to
ensuring climate change considerations are mainstreamed across the organisation
and that climate change systemically informs strategic investment planning and
decision-making processes - through carbon literacy training as well as the
development and piloting of Climate Change Impact Assessments. 
5.7 Climate Change Impact Assessments are a support tool to demonstrate how policies,
plans and proposed projects being developed by the Council will impact wider
emissions and the wider environment. They also help to raise awareness. They’re
Page 4 of 102

Page 9

5 
designed to provide value in determining how decision making will impact emissions,
the main climate impacts and benefits of any given decision and measure how these
decisions align with the Council’s net zero commitment principles in practice and the
impact on targets and progress. The impact assessment is currently being piloted
across a number of projects, prior to being finalised and rolled out across the Council. 
5.8 Carbon Literacy Training has been rolled out to Managers across the Council, with 95
Managers/Lead Officers having completed the course. Officers are currently
exploring options around developing this training into an online training module with a
view of rolling this out to all employees. 
5.9 Carbon Budget. 
An overarching Council carbon budget is being developed to improve understanding
of how our emissions relate to the services we provide and reductions needed in
order to adapt to delivering the same high quality local services in a way that is fit for
a resilient, net zero future ensure. It enables monitoring of progress and also ensures
cross-Service accountability, with departments identifying actions and projects that
contribute to targets. 
5.10 Local Renewable Energy Systems 
The Council is exploring large scale renewable energy generation in collaboration
with multiple internal services and external specialists to evaluate sites in
Renfrewshire that could be commercially viable. This aims to optimise locally
generated energy opportunities and maximise the renewable energy generated
locally being used locally. This approach increases energy security and resilience,
brings about increased emissions reductions; provides opportunities for increased
energy cost savings at a local level; more cost effective, locally sourced energy,
revenue generation and enhanced community benefits. 
5.11 Internal Recycling Projects 
The Sustainability Team are currently working with colleagues to maximise recycling
opportunities across the Council estate. Following a successful rollout across the
school estate, an initial public buildings project is focussing on the implementation of
full recycling facilities within Renfrewshire House, which would then be rolled out
across the learning estate. 
5.12 Public EV Charging Infrastructure 
As part of the Glasgow City Region, Renfrewshire will benefit from a share of £3.5
million of funding to accelerate the delivery of public EV Charging Infrastructure,
which should see over 3,000 additional charge points installed over the coming
years. The project is currently being scoped out, with suitable locations being
identified and prioritised based on clear metrics such as deprivation, flood risk and
existing local infrastructure. 
Page 5 of 102

Page 10

6 
6 Planned activity 
6.1 A number of supporting strategies and plans are currently being developed as set out
as priority actions within the approved Plan for Net Zero. The plans will set out our
strategic approach to reduce carbon emissions, address the local impacts of climate
change and accelerate more sustainable use of resources. 
6.2 A new Carbon Management Plan is current being developed which will outline the
key actions and set targets for reducing carbon across the organisation including
waste, street lighting, utilities within our estate, transport and staff travel. The Plan is
expected to be finalised for approval in late summer 2025. 
6.3 An Adaptation Plan will capture adaptation solutions and outline a phased
programme of priority actions which are designed to respond to and address the local
impacts of climate change that are already happening, as well as prepare for future
climate risks across the Renfrewshire area. These actions will be centred around
communities, security and resilience, infrastructure and our local environment. The
plan is expected to be finalised in April 2026. 
6.4 A Circular Economy Strategy will set out a transformational approach to accelerate
more sustainable use of resources across the waste hierarchy to reduce emissions
associated with resources and waste. The Strategy will prioritise and focus on key
actions to meet local and national targets based on data, local priorities and
stakeholder engagement. The plan is expected to be finalised in 2026. 
7 Capital funding programme 
7.1 The Council has received capital funding of £1.167m from the Scottish Government
to support projects which reduce our carbon emissions. Several potential projects
have been identified which are considered to be most impactful in terms of the
associated benefits balanced with the investment required to implement. The projects
are outlined as part of a proposed three-year delivery plan, detailing the indicative
investment and the projected benefits. 
Project Indicative
Investment
Projected Benefits
Building Management Systems (BMS) 
Installation and upgrade of BMS across
the estate to maximise energy efficiency
£560k Drive efficiencies within utility
usage and have a positive impact
on the Council’s emissions.
Solar PV (Photovoltaic) Expansion 
Extension of Solar PV Array across 15
existing public buildings and installing a
new system at St Fillan's Primary School.
£815k Expansion of renewables will
deliver a reduction in the
Council’s emissions.
Airgon Units Implementation 
Implementation of air reduction
technology across 68 properties.
£408k Reduce maintenance of heating
systems and increase energy
efficiency across public buildings.
Page 6 of 102

Page 11

7 
Windfarm Feasibility 
Progressing a feasibility study to identify
opportunities and benefits of a potential
largescale windfarm in Renfrewshire.
£100k Such projects can offer significant
benefits including renewable and
clean energy, cost-effectiveness
and land use.
Linwood Moss Solar Farm 
Progressing a feasibility study into an
Investment Grade Business Case to
deliver a large-scale solar farm on
Linwood Moss former landfill site.
£50k Increased production of clean,
renewable energy and opportunity
for savings on energy costs.
Electric Vehicle (EV) Fleet Expansion 
Purchase of additional EVs to expand the
Council’s existing EV fleet.
£380k Supporting the Council’s objective
to ensure our fleet and travel
behaviours are as sustainable as
they can be.
EV Infrastructure Improvements/
Expansion 
Expanding and improving the Council’s
existing EV charging infrastructure.
£380k Supporting the Council’s objective
to ensure our fleet and travel
behaviours are as sustainable as
they can be.
Set Up Costs for Recycling Related
Projects 
Maximising recycling opportunities across
the Council - Initial project to implement
full recycling facilities within Renfrewshire
House.
£25k Supports the Council to minimise
the impact of waste and raises
awareness of sustainable
practices amongst staff.
Marketing and Communications £50k Supports communication and
engagement with communities
and stakeholders through the
delivery of a Ren Zero community
engagement programme. 
7.2 The total indicative investment of the areas identified above is £2.765m. The
available capital budget of £1.167m will support partial delivery in 2025/26, however
future additional funding will be required to implement all aspects of the delivery plan
in its entirety over the three-year period. 
7.3 As progress continues in the delivery and implementation of the outlined areas within
this report, frequent updates will be provided to the Planning and Climate Change
Policy Board. 
Page 7 of 102

Page 12

8 
Implications of the Report
1. Financial – None directly arising from this report. 
2. HR & Organisational Development – None directly arising from this report. 
3. Community/Council Planning – None directly arising from this report.   
4. Legal - None directly arising from this report. 
5. Property/Assets - None directly arising from this report. 
6. Information Technology – None directly arising from this report. 
7. Equality and Human Rights - The Recommendations contained within this report have been
assessed in relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report because it is for noting only. If
required following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the assessment will be
published on the Council’s website.   
8. Health and Safety – None directly arising from this report. 
9.  Procurement – None directly arising from this report. 
10. Risk – None directly arising from this report. 
11.  Privacy Impact – None directly arising from this report. 
12. Climate Risk – this report details work being undertaken and progress made by Renfrewshire
Council in response to the climate emergency. 
13. Children’s Rights - None directly arising from this report. 
14.  COSLA Policy Position – this work aligns with COSLA’s current work alongside the Scottish
Government in response to the climate emergency.
___________________________________________________________________ 
List of Background Papers:
None 
Author:  Jamie Robertson, Sustainability Manager 
Environment, Housing and Infrastructure 
Page 8 of 102

Page 13

___________________________________________________________________
To:  Planning and Climate Change Policy Board
On:  20 May 2025
___________________________________________________________________
Report by: Director of Environment, Housing and Infrastructure
___________________________________________________________________
Heading: Public Bodies Climate Change Duties: Proposed Updated Draft
Guidance
___________________________________________________________________    
1. Summary 
1.1 Public Bodies Climate Change Reporting Duties place a legal requirement on public
bodies to set target dates for emission reductions; report on how spending and
resource will contribute to these targets; and contribution to Scotland’s Climate
Change Adaptation Programme.   
1.2 Scottish Ministers are required to provide public bodies with guidance, to support
them in putting their climate change duties into practice. Statutory guidance for public
bodies was originally published in 2011 and requires to be updated in line with
related legislation and increased knowledge around carbon reporting. 
1.3 There is currently a live public consultation regarding proposed updated draft
statutory guidance, which focuses on how public bodies should approach putting
climate change duties into practice, including importance of leadership and
governance. A response to the consultation will be submitted on Renfrewshire
Council’s behalf prior to the closing date of 23 May 2025. 
1.4 This paper outlines the proposed recommendations within the draft statutory
guidance for each of the climate change duties that public bodies must comply with -
setting out Renfrewshire Council’s current position, including areas that the Council is
already fully compliant and work areas already being progressed within the Council
that would demonstrate compliance for any proposed future changes.     
2. Recommendations 
It is recommended that the Planning and Climate Change Policy Board: 
Item 2
PACC200525 Page 9 of 102

Page 14

2.1 Note that this report provides a summary of the draft statutory guidance for Public
Bodies Climate Change Duties; and 
2.2 Note the alignment with Renfrewshire’s Plan for Net Zero and the areas already
being strengthened ahead of any proposed changes in line with the draft statutory
guidance. 
2.3 Note the Council’s proposed position of being broadly supportive in response to the
draft statutory guidance consultation. 
3 Background 
3.1 It is acknowledged that the public sector plays a vital role in enabling Scotland’s aim
of a just transition to net zero and climate resilience. The Climate Change (Scotland)
Act 2009 places statutory duties on relevant public bodies, known as the public
bodies climate change duties. 
3.2 The three climate change duties that public bodies must comply with relate to acting
in a way that:
 is best calculated to contribute to the delivery of emissions reduction
targets (also known as mitigation)
 is best calculated to help deliver Scotland’s Climate Change Adaptation
Programme, and
 is considered most sustainable. 
3.3 To comply with the requirements of the Climate Change (Duties of Public Bodies:
Reporting Requirements) (Scotland) Order 2015 as amended by the Climate Change
(Duties of Public Bodies: Reporting Requirements) (Scotland) Amendment Order
2020, Renfrewshire Council is required to prepare an Annual Report detailing
progress in mitigation and adaptation to climate change. 
3.4 Reporting year 2021-22 saw updates to the statutory reporting template as a result of
the Climate Change (Duties of Public Bodies: Reporting Requirements) (Scotland)
Amendment Order 2020, specifically new reporting requirements on:
• emissions targets, and
• how spend and resources are aligned with targets. 
3.5 Scottish Ministers are required to provide public bodies with guidance, to support
them in putting their climate change duties into practice. Statutory guidance for public
bodies was originally published in 2011 and requires to be updated as, since then,
related legislation in key areas including emission reduction targets and knowledge
and methodologies around carbon reporting have moved forward significantly. 
3.6 There is currently a consultation regarding proposed updated draft statutory
guidance, which focuses on how public bodies should approach putting climate
change duties into practice, including importance of leadership and governance. The
guidance also has a focus on the importance of mainstreaming and embedding
climate action and how to take climate change into account in decision making. The
Council is broadly supportive of the draft guidance and plans to reflect this in
Page 10 of 102

Page 15

response to the high-level questions contained within the consultation which closes
on 23 May 2025. 
3.7 In order to identify any potential implications for the Council, the proposed draft
guidance and recommendations have been cross-referenced with Renfrewshire’s
Plan for Net Zero and existing Council processes and activities as well as against
new actions currently being undertaken, in order to benchmark and demonstrate
compliance with the proposed new statutory obligations and identify areas that
require to be strengthened. 
3.8 As this paper highlights, Renfrewshire Council is already either fully compliant or is
already addressing the key recommendations to demonstrate compliance within the
draft statutory guidance ahead of time. Additional requirements proposed in the draft
guidance had already largely been identified by Officers as areas that could be
strengthened, based on best practice and development of improved processes and
additional tools to support decision making and monitor and evaluate progress are
already underway. 
3.9 The additional requirements and action being taken by the Council are highlighted in
the paper for consideration, setting out the alignment with the proposed statutory
guidance ahead of time. 
4. Updated Draft Statutory Guidance 
4.1 Public bodies subject to the climate change duties are legally required to have regard
to the statutory guidance. Dedicated chapters on each of the three climate change
duties, as well as guidance on Leadership and Governance, highlight the key steps
to demonstrate compliance for each within the draft guidance. 
Leadership and Governance 
4.2 Public sector governance, leadership and commitment is vital to ensure climate
targets and commitments are met at a local and national level. The table below sets
out the steps to demonstrate compliance of the updated draft statutory guidance in
relation to Leadership and Governance, with further detail on the Renfrewshire
Council context in sections 4.3 to 4.4. 
LEADERSHIP & GOVERNANCE
RENFREWSHIRE
COUNCIL
CONTEXT
publishing a formal declared commitment to action on climate
change 
ensuring climate change governance is integrated into the existing
corporate governance approach 
embedding climate change into the management of risks and
opportunities across the organisation 
reflecting climate action in the organisation’s corporate plans and
annual reporting mechanisms 
ensuring that climate change considerations are mainstreamed
across the organisation
ALREADY IN
PROGRESS 
Page 11 of 102

Page 16

ensuring that climate change systemically informs strategic investment
planning and decision-making processes
ALREADY IN
PROGRESS
ensure that taking effective climate action is a corporate priority, with
commitment across the organisation 
actively seeking opportunities for partnership working with other
public bodies 
embedding climate change and sustainable development within
corporate learning and development programmes 
4.3 Already Fully Compliant: 
Renfrewshire Council has strong climate related governance in place through the
Climate Change Policy Board and the RenZero Oversight Group. Climate
consideration is included within key Council policies and extensive engagement is
undertaken with a range of stakeholders. 
4.4 Areas in Progress: 
Although there is not currently a specific legal requirement for Councils to do so,
Renfrewshire Council is currently developing processes and tools in relation to
ensuring that climate change considerations are mainstreamed across the
organisation and ensuring that climate change systemically informs strategic
investment planning and decision-making processes - through carbon literacy
training previously mentioned as well as the development and piloting of Climate
Change Impact Assessments. 
The First Duty: Reducing Emissions (Climate Change Mitigation) 
4.5 The table below sets out the steps to demonstrate compliance of the First Duty in the
updated draft statutory guidance with further detail on the Renfrewshire Council
context in sections 4.6 to 4.9. 
THE FIRST DUTY: REDUCING EMISSIONS
RENFREWSHIRE
COUNCIL
CONTEXT
develop a climate change strategy that includes net zero and other
relevant targets and has regard to just transition principles 
develop and implement a carbon management plan or equivalent ALREADY IN
PROGRESS
develop action plans to deliver key elements of the carbon
management plan, detailing interim steps, costs, timescales and
dependencies
ALREADY IN
PROGRESS
set up a process of monitoring and reporting, to report on
performance against targets and action plans
ALREADY IN
PROGRESS
ensure mitigation actions maximise co-benefits, e.g. improved public
health, reduced inequalities and enhanced biodiversity, and minimise
unintended consequences 
undertake the above giving due consideration to physical assets
including buildings, land and fleet; staff and service users; and the
services we deliver 
Page 12 of 102

Page 17

4.6 Already Fully Compliant: 
Renfrewshire Council has a climate change strategy with net zero targets, and a new
carbon management plan is currently being developed. 
4.7 Areas in Progress: 
The 3 areas which are in progress relate to the new Climate Change Plan template
for Local Authorities that is proposed within the draft guidance. Within the
Sustainability team, a new carbon management plan was already being developed
with action plans sitting within that and monitoring and evaluation of progress. The
Carbon Management Plan currently has a focus on Council emissions mainly
(electricity, gas, water, fleet, waste, streetlighting and business miles). 
4.8 The Climate Change Plan template in the draft guidance is more comprehensive than
just the Council’s emissions. To ease resourcing pressures and for efficiencies, it is
recommended for the future to incorporate our statutory requirements of the Climate
Change Plan set out in the draft guidance into the Council’s Carbon Management
Plan so there is one source of reporting, updating, etc. This would mean, if the
guidance is accepted as it stands, the need to incorporate not just our own
operational emissions, but also area-wide activities and emissions that may lie out-
with our control, but that are within the Council’s sphere of influence. 
4.9 All 32 Councils currently participate in the Scottish Climate Intelligence Service,
which is a centralised data platform, tailored using data specifically for each local
authority to understand, design, manage, prioritise and deliver action using a
consistent methodology across organisational as well as area-wide emissions. The
proposed Climate Change Plan template within the draft guidance aligns with the
Scottish Climate Intelligence Service data and capabilities and will ensure consistent
reporting across local authorities. 
The Second Duty: Adaptation 
4.10 Public bodies have a duty to act in the best way calculated to help deliver the
Scottish National Adaptation Plan. The table below sets out the steps to demonstrate
compliance of the Second Duty in the updated draft statutory guidance with further
detail on the Renfrewshire Council context in sections 4.11 to 4.14. 
THE SECOND DUTY: ADAPTATION
RENFREWSHIRE
COUNCIL
CONTEXT
undertake a climate related risk assessment or assessments ALREADY IN
PROGRESS
develop and implement an adaptation plan or plans with, as best
practice, regard to just transition principles
ALREADY IN
PROGRESS
ensure that appropriate climate risks are included on corporate risk
registers 
note specific adaptation actions assigned in Scotland’s National
Adaptation Plan (SNAP3) and align our work with these
ALREADY IN
PROGRESS
actively seek to work in partnership with other organisations to
develop and implement wider placed-based adaptation plans 
Page 13 of 102

Page 18

undertake the above giving due consideration to physical assets
including buildings, land and fleet; staff and service users; and the
services we deliver 
4.11 Already Fully Compliant: 
As previously outlined, Renfrewshire Council are already compliant with regards to
corporate risk registers, partnership opportunities and action around our assets,
people and services. 
4.12 Areas in Progress: 
One of the key actions within Renfrewshire’s Plan for Net Zero was to develop an
Adaptation Plan for Renfrewshire. This is currently being developed and has a just
transition, wellbeing and addressing inequalities at its core - with internal
engagement and initial community engagement undertaken to date. It aims to
develop adaptation solutions and implement a phased programme of priority actions
that are designed to respond to and address the local impacts of climate change that
are already happening, as well as prepare for future climate risks across the
Renfrewshire area. 
4.13 These actions will be centred around communities, security and resilience,
infrastructure and our local environment. Data informed and data-led climate change
risk assessments will be undertaken, but the draft statutory guidance also has a
focus on lived experience and qualitative data that is harder to quantify. 
4.14 When developing the Adaptation Plan it will align with relevant SNAP3 actions and
indicators around nature, communities, public services, economies, industries and a
just transition, including mainstreaming adaptation and embedding nature-based
solutions when planning our local spaces. 
The Third Duty: Acting in the most sustainable way 
4.15 The table below sets out the steps to demonstrate compliance of the Third Duty in
the updated draft statutory guidance with further detail on the Renfrewshire Council
context in sections 4.16 and 4.17. 
THE THIRD DUTY: ACTING IN THE MOST SUSTAINABLE WAY
RENFREWSHIRE
COUNCIL
CONTEXT
align their work to the National Performance Framework and
delivery of the National Outcomes and, as best practice, to the just
transition principles 
ensure that sustainable development is embedded in strategies,
policies, plans and projects
ALREADY IN
PROGRESS
integrate a sustainable development impact assessment, or
equivalent, process into decision-making processes, including
financial decisions
ALREADY IN
PROGRESS
ensure that procurement activities are undertaken in line with relevant
legislation and the Sustainable Procurement Duty 
monitor and evaluate policy implementation and outcomes against the
five principles of the UK Shared Framework for Sustainable
Development 
Page 14 of 102

Page 19

4.16 Already Fully Compliant: 
 Scotland’s National Performance Framework is the overarching framework within
which our work takes place, requiring us to align our work to the delivery of the
national outcomes and just transition principles. The Council’s procurement
activities are all undertaken in line with relevant legislation and Sustainable
Procurement Duty. 
 Renfrewshire Council doesn’t actively evaluate against the 5 principles of the
Shared Framework for Sustainable Development, but we do apply all the
principles: living within environmental limits; ensuring a strong, healthy and just
society; achieving a sustainable economy; using sound science responsibly; and
promoting good governance. 
4.17 Areas in Progress: 
The use of Climate Change Impact Assessments will ensure that sustainable
development is embedded in strategies, policies, plans and projects and can be
incorporated into decision making. 
Reporting of Scope 3 Emissions 
4.18 The final additional requirement for public bodies in the draft guidance relates to
increased reporting of Scope 3 emissions. Currently Scope 1 and 2 emissions are
mandatory, while Scope 3 are largely voluntary:
 Scope 1: sources controlled or owned by the Council, e.g. natural gas to heat our
buildings, fuel in vehicles
 Scope 2: indirect emissions associated with the purchase of electricity 
 Scope 3: are emissions we are indirectly responsible for as a result of our
activities, but sources are not owned or controlled by us, e.g. business travel,
waste collection and disposal, homeworking. 
4.19 There are 15 categories of Scope 3 emissions – some we already report on as a
Council; some categories which are not relevant for public bodies; and others that
have huge complexities of methodology and accounting. Already it was expected that
by 2027 local authorities would be reporting on additional Scope 3 emissions that
were classed as Group 1, deemed to be “Practical and Feasible” – reasonably simple
to collect data and report that would have a positive impact on monitoring and
reducing emissions. This is the emissions outlined in the table below: 
Page 15 of 102

Page 20

AS A BASELINE, SCOPE 3 REPORTING EXPECTED TO INCLUDE
GROUP 1 (PRACTICAL AND FEASIBLE)
RENFREWSHIRE
COUNCIL
CONTEXT
consumption of mains water 
waste and waste water 
business travel, including overnight stays PARTIALLY
REPORT 
commuting and homeworking PARTIALLY
REPORT
fuel and energy-related emissions not included in scopes 1 and 2 
4.20 Already Fully Compliant: 
Renfrewshire Council already include detail in annual Public Bodies Climate Change
Duties reporting the consumption of mains water, waste and waste water and fuel
and energy related activities not in scope 1 or 2. 
4.21 Areas of Partial Reporting: 
 Renfrewshire Council currently report annually on business miles, but don’t
currently report on bus, train, plane travel or hotel stays. We will consider the
means for collating this data and aim to ensure it is reported on moving forward. 
 The Council currently report on homeworking – Scottish Government provide a
formula to calculate this to ensure all local authorities are reporting consistently.
The assumption is that a similar methodology would be provided for commuting,
which we don’t currently report and which is more complex to calculate. 
4.22 Renfrewshire Council have been working in collaboration with Scottish Government
and the other local authorities to set out a practical approach with a balance between
mandating reporting; what is technically feasible; and the value of data obtained and
whether this adds value to the work undertaken to take action to reduce emissions. 
4.23 This collaborative work is ongoing on Group 2 “Collaboration and Resource”. These
categories are not as easy as Group 1 but produce significant amounts of carbon
emissions Scope 3 emissions and so are equally important, but additional work is
needed to set out standardised approaches and robust methodology. The key Group
2 category is Purchased Goods and Services. Currently the methodology is largely
spend-based, which brings limitations - and advice states that this means it should
not be used for target setting. The aim is to move to hybrid methodology combining
spend-based with supplier specific data. This category is anticipated to have a
significant impact due to levels of public sector spending. 
4.24 The remaining Scope 3 categories (Group 3) were determined unlikely to be relevant
to local authorities, but further research will be undertaken at a national level to
confirm this. 
Page 16 of 102

Page 21

5. Implications of Draft Statutory Guidance 
5.1 The Council Plan, approved actions within Renfrewshire’s Plan for Net Zero and the
existing core Council priorities and processes already undertake actions which
address the majority of the key recommendations to demonstrate compliance with
the draft statutory guidance. 
5.2 There are also additional areas that are already being progressed by the Council that
will ensure processes are in place ahead of time, including development of an
Adaptation Plan; piloting Climate Change Impact Assessments; development of a
carbon budget; and development of action plans with metrics for monitoring and
evaluation. Potential to strengthen these actions, such as incorporating the Climate
Change Plan template set out in the statutory guidance into the Council’s Carbon
Management Plan, have also been identified. 
5.3 These identified improvements to internal processes alongside developing additional
tools to support decision-making will help us in our goal of working towards net zero
emissions in an open and transparent way as well as ensuring compliance with
additional statutory requirements within public bodies duties. 
5.4 Overall, due to the processes and work streams already in place, the implications for
Renfrewshire Council with regards to compliance with the draft statutory guidance
are limited as we are largely compliant ahead of any changes proposed for 2027 and
all other areas we are already progressing ahead of time.   
Page 17 of 102

Page 22

Implications of the Report 
1. Financial – None directly arising from this report. 
2. HR & Organisational Development – None directly arising from this report. 
3. Community/Council Planning – None directly arising from this report.   
4. Legal - None directly arising from this report. 
5. Property/Assets - None directly arising from this report. 
6. Information Technology – None directly arising from this report. 
7. Equality and Human Rights - The Recommendations contained within this report have been
assessed in relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report because it is for noting only. If
required following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the assessment will be
published on the Council’s website.   
8. Health and Safety – None directly arising from this report. 
9.  Procurement – None directly arising from this report. 
10. Risk – None directly arising from this report. 
11.  Privacy Impact – None directly arising from this report. 
12. Climate Risk – this report details work being undertaken and progress made by Renfrewshire
Council in response to the climate emergency and statutory obligations. 
13. Children’s Rights - None directly arising from this report. 
14.  COSLA Policy Position – this work aligns with COSLA’s current work alongside the Scottish
Government in response to the climate emergency. 
___________________________________________________________________ 
List of Background Papers:
None 
Author:  Jamie Robertson, Sustainability Manager 
Environment, Housing and Infrastructure 
Page 18 of 102

Page 23

SUMMARY OF APPLICATIONS TO BE CONSIDERED BY
THE PLANNING AND CLIMATE CHANGE POLICY BOARD
ON 20/05/2025
RENFREWSHIRE COUNCIL
Item No.PROPOSAL:LOCATION:APPLICANT: WARD:
APPN. NO:
24/0800/PP The Kirk Session of
Paisley Abbey
Paisley Abbey
Abbey Close
Paisley
PA1 1JG
19 Lawn Street
Paisley
PA1 1HD
Demolition of rear hall, erection of
two storey rear extension,
conversion of building to form 3
residential units and associated
external alterations
Ward 5
RECOMMENDATION: Grant Subject to Conditions
1
24/0801/LB The Kirk Session of
Paisley Abbey
Paisley Abbey
Abbey Close
Paisley
PA1 1JG
19 Lawn Street
Paisley
PA1 1HD
Demolition of rear hall, erection of
rear extension and conversion of
front building to form residential
units and associated external
alterations
Ward 5
RECOMMENDATION: Grant Subject to Conditions
2
24/0829/LB Graisley Investments
Ltd
57 High Street
Wednesfield
Wolverhampton
V11 3ST
St Joseph's Nursing
Home
Kilbirnie Road
Lochwinnoch
PA12 4DY
Demolition of Category C Listed,
former dormitory building.
Ward 9
RECOMMENDATION: Grant Subject to Conditions
3
25/0007/EAC Julie Carlyle
Energy Consents Unit
Scottish Government
5 Atlantic Quay
150 Broomielaw
Glasgow
G2 8LU
Neilston Grid
Electricity Sub -
Station Complex
Gleniffer Road
Paisley
Formation of up to 750MW
Battery Energy Storage Facility,
comprising of up to 88 battery
storage container blocks and
associated infrastructure, storage
containers, welfare facility, diesel
generators, CCTV and lighting
columns and associated access,
internal access roads, hard and
soft landscaping, SuDS Basin
Ward 7
RECOMMENDATION: No Objection with Provisions
4
25/0032/PP Mr Greg Chalmers
Lambert + Son
Properties Ltd
9 Glasgow Road
Paisley
PA1 3QS
108 Hawkhead
Road
Paisley
PA2 7BA
Demolition of single storey
commercial units and
redevelopment of yard comprising
of the erection of a two story
office, workshop and storage
facility with associated access,
parking, fencing and associated
works
Ward 5
RECOMMENDATION: Refuse
5
Item 3
PACC200525 Page 19 of 102

Page 24

Item No.PROPOSAL:LOCATION:APPLICANT: WARD:
APPN. NO:
25/0059/PP Mr Matthew Castle
Scottish Power Energy
Networks
Unit B4
Southcraig Avenue
Rowallan Business
Park
BAE Land UK -
Environmental Test
Facility
Glenluce Drive
Bishopton
Erection of substation with
associated apparatus, fencing,
de-mountable floodlights and
access trackWard 11
RECOMMENDATION: Grant Subject to Conditions
6
Total Number of Applications to be considered =  6
Page 20 of 102

Page 25

Planning and Climate Change Policy Board: 20 May 2025
Report by Chief Planning Officer 
Reference No 24/0800/PP
Application Type Planning Permission (Local)
Proposal Demotion of rear hall, erection of two storey rear extension,
conversion of building to form 3 residential units and associated
external alterations.
Location 19 Lawn Street, Paisley, PA1 1HD
Ward 5 - Paisley East and Central
Community Council Paisley West and Central Community Council
Applicant The Kirk Session of Paisley Abbey
Recommendation Grant Subject to Conditions
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=summary&keyVal=SMMXLTMWLMW00 
This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of
The Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013. 
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation.  In this instance, the application requires to be considered
and determined by board as a result of proposed demolition to part of a listed building. 
Proposal
This application seeks planning permission for the erection of a two-storey extension to the
rear of the Paisley Abbey Halls building on Lawn Street, Paisley. The extension would
enable the building to be converted into three flats, with the applicant also proposing to make
associated external alterations to the property. 
The existing rear portion of the building, which is used as an activity hall, would be
demolished and replaced with a two-storey extension that would measure approximately 9.3
metres in depth by 7.3 metres in width. The structure would have a flat roof that would
measure 7.2 metres in height to the tallest point. 
Three flats would be formed across the existing building and the extension, with one on the
ground floor and two on the first floor. Private garden ground for each of the three flats would
be formed to the rear. 
In terms of external alterations, the applicant proposes to replace a window on the front
elevation with louvres, install replacement windows across the property and install a
replacement rooflight on the rear roof plane. 
The applicant also proposes to renew the roof using slate and replace existing cast iron
rainwater goods on a like for like basis. This work is considered to constitute permitted
development and, as such, is not assessed in this report. 
Site Description
The application site is located within Paisley Town Centre and fronts a road to the east. A
mixture of residential and commercial properties are found nearby. 
Item 3(a)
PACC200525 Page 21 of 102

Page 26

The C listed building was designed by Thomas Graham Abercrombie and dates from the late
19th Century. The two-storey sandstone building features an ornate front elevation while a
more basic brick building, currently used as an activity hall, projects from the rear. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
No pre-application discussions have taken place. 
Negotiated Improvements
No changes have been negotiated. 
Site History 
The planning history for the site is as follows; if no history is listed then planning has no
record of previous applications for the site. 
Application No: 24/0801/LB 
Description: Demolition of rear hall, erection of rear extension and conversion of front
building to form residential units and associated external alterations
Decision: Pending Decision 
Consultations   
▪ West Of Scotland Archaeology Service - no objection subject to condition requiring an
archaeological watching brief. 
▪ Environment, Housing & Infrastructure (Env. Protection) - no objection subject to a
condition relating to the installation of glazing that would reduce internal noise to an
acceptable level. 
▪ Chief Executive's Service (Roads Development) - no objection subject to provision of
cycle storage. 
▪ The Mining Remediation Authority - no objection following the submission and review of
a Coal Mining Risk Assessment. 
▪ Children’s Services - no contribution required with regard to the impact of the
development on the education estate. 
Representations
The application has been publicised in line with the requirements of the relevant legislation. 
No representations were received.
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the
development plan unless material considerations indicate otherwise. In this instance the
Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire
Local Development Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the
determination of this application: 
Page 22 of 102

Page 27

National Planning Framework 4  
▪ Policy 1 - Tackling the climate and nature crises
▪ Policy 2 - Climate mitigation and adaptation
▪ Policy 9 - Brownfield, vacant and derelict land and empty buildings
▪ Policy 13 - Sustainable transport
▪ Policy 15 - Local Living and 20-minute neighbourhoods
▪ Policy 27 - City, town, local and commercial centres
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
▪ Policy C1 - Renfrewshire's Network of Centres
▪ Policy P1 - Renfrewshire's Places
Full details relating to the policies of the LDP can be found online. 
Other relevant policies and guidance
▪ Delivering the Centres Strategy - Strategic Centres and Core Town Centres
▪ Delivering the Places Strategy - Re-Use/Redevelopment of Institutional Premises 
Submitted Reports and Assessments
The following reports and assessments were submitted in support of the application: 
Supporting Statement - sets out the applicant's justification for the proposal. 
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any
Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the
grant of planning permission) and Regulation 33 (Directions requiring consideration of
condition) of The Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development)
of The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. 
None. 
Planning Assessment
The main issues that must be assessed in this application are the impact the development
would have on Paisley Town Centre and those who live nearby as well as the amenity
afforded to those who would live in the flats. The impact the proposal would have on the
listed building will be considered in the associated Listed Building Consent application
(24/0801/LB). 
In terms of the impact on Paisley Town Centre, Policy C1 of the Local Development Plan
states that development that enhances centres in line with their role within the Network of
Centres will be supported provided it is compatible with existing uses. Policy P1 of the Local
Development Plan supports development that is compatible with, and complimentary to, the
existing built environment while the associated Supplementary Guidance supports the re-use
of institutional premises. Similarly, Policy 27 of NPF4 provides support for residential
developments in Town Centres, including the conversion of vacant premises to housing. 
Residential properties are found to the north, south and west of the application site so the
proposal would not introduce a new use into the area while the flats would not have a
negative impact on any commercial uses that are found nearby. In line with Policy 15 of
Page 23 of 102

Page 28

NPF4, the provision of additional residential accommodation would help support existing
facilities and services within Paisley Town Centre. 
The two-storey extension would have a flat roof with aluminium coping, would be finished in
buff facing brick and would feature grey framed windows and doors. The extension would
not be highly visible within the streetscape given its location at the rear of the property and
would compliment the design of nearby newbuild flats. Although the proposal involves the
part demolition of a listed building, the portion of the property that is to be demolished is in
poor condition and is not as ornate as the section that fronts onto Lawn Street. The
demolition of the hall to the rear and erection of the extension would therefore help improve
the visual amenity of the area as well as allowing the front portion of the building to be
brought back into active use. 
An area of private garden ground would be provided for each flat, with the amount of space
acceptable for a town centre location. A condition can be added to ensure full details of all
hard and soft landscaping as well as all fencing is provided prior to work starting on site. 
In terms of privacy, the nearest window on a property to the north would be approximately 20
metres away while the nearest window on the commercial properties to the east would be 13
metres away. The windows on the rear elevation of the extension would be 17 metres from
the nearest window on the flats to the west. 
An existing boundary wall would screen the ground floor openings on the southern side
elevation from nearby properties. Although the first-floor openings on the southern elevation
would introduce a new view into the rear curtilage of the residential properties to the south,
the overlooking experienced would be minimal and would be in line with what is to be
expected in a town centre location. 
Overall, the level of privacy afforded to residents of the development and the impact on the
privacy of those living nearby is considered acceptable. 
Environment, Housing & Infrastructure (Env. Protection) have not raised any concerns in
relation to smell or natural light. They have, however, requested that the glazing installed
within bedrooms and living rooms should reduce internal noise levels to no more than 40dB
in the daytime and 30dB at night. A condition can be added to ensure this is in place prior to
the units being occupied. 
Children’s Services have confirmed that no contribution is required in respect of the impact
the development would have on the school estate. 
In line with Policy 13 of NPF4, the Town Centre location means those living within the flats
would be well served by existing public transport and active travel links. Dedicated parking
spaces are therefore not required. Roads Development have asked for secure covered cycle
storage to be provided for each of the units. A condition can be added to ensure this is in
place prior to the units being occupation. 
Space to store bins would be found on the ground floor of the property. The window that
currently serves the room where the bins would be stored would be replaced with louvres.
The impact the change would have on the overall appearance of the listed building would be
minimal and would ultimately help allow the building to be brought back into active use. A
condition can be added to ensure the appearance of the louvres is appropriate for a listed
building. 
Following the submission of a Coal Mining Risk Assessment, the Mining Remediation
Authority have no objection to the proposal while environmental health have not raised any
Page 24 of 102

Page 29

concerns in respect of contaminated land. The site is therefore deemed to be safe for the
proposed new use in line with the requirements of Policy 9 of NPF4. 
The West of Scotland Archaeology Service have requested a condition be added requiring
the implementation of an archaeological watching brief during all ground disturbance. A
condition can be added to ensure this is place to the satisfaction of the Archaeological
Service prior to works commencing. 
In terms of the replacement windows and rooflight, the applicant has advised that the
existing single glazed windows are in poor condition, with the frames rotting and some of the
panes of glass beginning to come loose. Installing new double glazed units would therefore
help improve the energy efficiency of the building, in line with Policies 1 and 2 of NPF4, and
would help bring the property back into active use. New windows for several rooms are also
necessitated by the condition relating to internal noise levels requested by Environmental
Protection. The installation of new windows is therefore considered acceptable, with it
possible to add a condition requiring full details of each frame to be provided prior to
installation to ensure the design is appropriate. 
Overall, the proposal complies with Policies C1 and P1 of the Local Development Plan and
the associated Supplementary Guidance, as well as Policy 27 of NPF4, in that it would
enhance Paisley Town Centre and provide an acceptable level of amenity for residents
without disturbing existing uses. In addition, the proposal is considered to comply with Policy
9 of NPF4 in that it would result in the restoration and reuse of a vacant building. 
Representations
No representations were received. 
Planning Obligations
The Council is required to provide a summary of the terms of any planning obligation which
is required to be entered into under Section 75 of the Town and Country Planning (Scotland)
Act in relation to the grant of permission for the proposed development: 
None. 
Conclusion
In view of the above, it is considered that the proposal would accord with the relevant
provisions of the Development Plan. There are no other material considerations. Planning
permission should therefore be granted subject to conditions. 
Recommendation
Grant Subject to Conditions. 
Reason(s) for Recommendation 
1. The proposal accords with the provisions of the Development Plan and there
were no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Condition(s)         
1. That the development hereby permitted must be begun within three years of the
date of this permission.   
Reason: To be in compliance with Section 58 of The Town and Country Planning
(Scotland) Act 1997 as amended by Section 32 of The Planning (Scotland) Act
2019. 
Page 25 of 102

Page 30

2. Prior to the occupation of the first unit, full details of the secure covered cycle
store provision for each of the flats shall be submitted to, and approved by, the
Planning Authority.  Thereafter the cycle store provision shall be implemented as
approved.   
Reason: To ensure appropriate cycle storage is provided for the development. 
3. Prior to the commencement of development, full details of all windows and
rooflights to be installed shall be submitted to, and approved by, the Planning
Authority.  Thereafter only the approved windows and rooflights shall be used.   
Reason: To safeguard the character of the Listed Building. 
4. All glazing installed within bedrooms and living rooms shall reduce internal noise
levels, with windows closed, to no more than 40dB during the daytime and 30dB
at night-time, measured as LAeq,T.   
Reason: In the interests of residential amenity. 
5. Prior to the commencement of development, full details of the louvres to be
installed shall be submitted to, and approved by, the Planning Authority. 
Thereafter only the approved louvres shall be used.   
Reason: To safeguard the character of the Listed Building. 
6. Prior to the commencement of development, a scheme of landscaping shall be
submitted to, and approved by, the Planning Authority. The scheme shall include:     
(a) full details of all hard and soft landscaping 
(b) full details of all boundary treatments 
(c) details of the phasing of these works   
The approved landscaping scheme shall thereafter be implemented in the first
planting season and seeding seasons following the completion of the
development, unless otherwise agreed in writing with the Planning Authority.       
Reason: To safeguard the character of the Listed Building and in the interests of
residential amenity. 
7. The developer shall secure the implementation of an archaeological watching
brief, to be carried out by an archaeological organisation acceptable to the
Planning Authority, during all ground disturbance. The retained archaeological
organisation shall be afforded access at all reasonable times and allowed to
record, recover and report items of interest and finds.   
A method statement for the watching brief will be submitted by the applicant,
agreed by the West of Scotland Archaeology Service, and approved by the
Planning Authority prior to commencement of the watching brief.  The name of
the archaeological organisation retained by the developer shall be given to the
Planning Authority and to the West of Scotland Archaeology Service in writing
not less than 14 days before development commences.   
Reason: To ensure that any archaeological remains which may be disturbed can
be identified, excavated and recorded. 
Page 26 of 102

Page 31

Advisory Note(s)   
1. None required. 
Schedule of Plans Reviewed 
Drawing Number Revision Drawing/Document Title
EX01  Site Location Plan
EX04  Existing Block Plan
EX05  Existing Ground Plan
EX06  Existing First Plan
EX07  Existing Roof Plan
EX10  Existing Sections
EX20  Existing East Elevation
EX21  Existing Elevations 2
PR02  Ground Downtakings
PR03  First Downtakings
PR04  Proposed Block Plan
PR05  Proposed Ground Plan
PR06  Proposed First Plan
PR07  Proposed Roof Plan
PR10  Proposed Sections
PR11  Proposed Sections 2
PR20  Proposed East Elevation
PR21  Proposed West Elevation 
For further information please contact James McCafferty, Development Standards Team,
Email: james.mccafferty@renfrewshire.gov.uk 
Page 27 of 102

Page 32

Page 28 of 102

Page 33

Planning and Climate Change Policy Board: 20 May 2025
Report by Chief Planning Officer 
Reference No 24/0801/LB
Application Type Listed Building Consent
Proposal Demolition of rear hall, erection of rear extension and conversion
of front building to form residential units and associated external
alterations
Location 19 Lawn Street, Paisley, PA1 1HD
Ward 5 - Paisley East and Central
Community Council Paisley West and Central Community Council
Applicant The Kirk Session of Paisley Abbey
Recommendation Grant Subject to Conditions
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=summary&keyVal=SMMXMCMWLN000 
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation.  In this instance, it is because the application involves the
part demolition of a listed building. 
Proposal
This application seeks listed building consent for the part demolition of the Paisley Abbey
Halls building on Lawn Street, Paisley. 
The existing rear portion of the building, which is used as an activity hall, would be
demolished and replaced with a two-storey extension that would measure approximately 9.3
metres in depth by 7.3 metres in width. The structure would have a flat roof that would
measure 7.2 metres in height to the tallest point. 
The demolition and subsequent extension would enable the property to be converted into
three flats, with one on the ground floor and two on the first floor. Private garden ground for
each of the three flats would be formed to the rear of the property. 
Alterations to the internal layout of the original building would be made to allow the
conversion. 
The applicant also proposes to replace a window on the front elevation with louvres, install
replacement windows across the property, install a replacement rooflight on the rear roof
plane and renew the roof. 
Site Description
The application site is located within Paisley Town Centre and fronts a road to the east. A
mixture of residential and commercial properties are found nearby. 
The C listed building was designed by Thomas Graham Abercrombie and dates from the late
19th Century. The two storey sandstone building features an ornate front elevation while a
more basic brick building, currently used as an activity hall, projects from the rear. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.  
Item 3(b)
PACC200525 Page 29 of 102

Page 34

No pre-application discussions have taken place. 
Negotiated Improvements
No changes have been negotiated. 
Site History 
The planning history for the site is as follows; if no history is listed then planning has no
record of previous applications for the site. 
Application No: 24/0800/PP 
Description: Demotion of rear hall, erection of two storey rear extension, conversion of
building to form 3 residential units and associated external alterations
Decision: Pending Decision 
Consultations   
▪ Historic Environment Scotland - no objection. 
Representations
The application has been publicised in line with the requirements of the relevant legislation. 
No representations were received.
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the
development plan unless material considerations indicate otherwise. In this instance the
Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire
Local Development Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the
determination of this application: 
National Planning Framework 4  
▪ Policy 7 - Historic assets and places
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
▪ Policy ENV3 - Built and Cultural Heritage
Full details relating to the policies of the LDP can be found online. 
Other relevant policies and guidance
▪ Delivering the Environment Strategy - Listed Buildings
▪ Historic Environment Scotland: Managing Change in the Historic Environment Guidance 
Submitted Reports and Assessments
The following reports and assessments were submitted in support of the application: 
▪ Supporting Statement - sets out the applicant's justification for the proposal. 
Planning Assessment
The Town and Country Planning (Listed Buildings and Conservation Areas) (Scotland) Act
1997 states that in considering whether to grant listed building consent special regard must
Page 30 of 102

Page 35

be had to the desirability of preserving the listed building and its setting as well as any
features of special architectural or historic merit. 
In terms of Development Plan policy, Policy 7 of NPF4 and Policy ENV3 of the LDP are
similar in that they both require works to listed buildings to respect their character. The
relevant supplementary guidance, as well as Historic Environment Scotland's guidance
notes, also require works to be undertaken in a sensitive manner and recognise that the
continued occupation of listed buildings is the best way to secure their long term future. 
Demolition and Extension
The rear portion of the building is of a standard rectangular shape, is finished in render and
facing brick and has a dual pitched slate roof. The poor condition of the structure is visible
upon inspection of the exterior, with the applicant advising that internal repairs are also
required. The applicant also advises that as the market for paying lets has shrunk in recent
years it is not economically viable to repair the building for use as an activity hall. 
The demolition of the hall would have a limited impact on the overall architectural merit of the
property as the ornate front portion would remain unaffected. On balance, it is considered
that the demolition of the hall is acceptable given the economic situation and the fact that the
part demolition would enable the wider restoration and reuse of the building. A condition can
be added to ensure the exterior sections of the rear elevation that would be exposed
following demolition are restored in a manner that is appropriate for a listed building. 
The two-storey extension would have a flat roof with aluminium coping, would be finished in
buff facing brick and would feature grey framed windows and doors. The extension would be
proportionate in scale to the remaining portion of the building and would not result in the
overdevelopment of the plot. 
The extension would not be highly visible within the streetscape and would not impact the
ornate principal elevation of the property. The design of the extension would mirror that of
newbuild flats found nearby. 
An area of private garden ground would be provided for each flat. A condition can be added
to ensure full details of all hard and soft landscaping as well as all fencing is provided prior to
works starting on site. 
The internal alterations largely comprise of the creation and infilling of door openings and the
removal and erection of sections of wall to enable the flats to be formed. The work would
have minimal impact on the overall character of the listed building, with it also noted that
various piecemeal additions have reduced the quality of the interior of the building. The
fireplace that would be removed is not ornate and contributes little to the overall architectural
merit of the interior. The internal alterations are therefore considered acceptable given they
would have minimal impact of the historic importance of the building and would help enable it
to return to active use. 
External Alterations
While guidance from Historic Environment Scotland encourages the retention and repair of
existing windows and rooflights, it also acknowledges that in some circumstances it is
necessary to replace them. In this instance, the applicant has advised that the existing single
glazed windows are in poor condition, with the frames rotting and some of the panes of glass
beginning to come loose. Furthermore, a condition on the associated planning application
requires the installation of glazing that reduces internal noise levels. 
The replacement windows would be timber framed, double glazed units that closely mirror
the style, opening mechanism and colour of the existing frames. The rooflight that would be
Page 31 of 102

Page 36

installed would be conservation style. However, full details of the windows and rooflight that
are to be installed have not been provided. It is therefore considered appropriate to add a
condition requesting that this information is provided prior to installation. 
A window on the front elevation would be replaced with louvres. The impact this change
would have on the overall appearance of the listed building would be minimal and would help
allow the building to be brought back into active use. A condition can be added to ensure the
appearance of the louvres is appropriate for a listed building. 
Finally, the roof would be stripped back, repaired and re-roofed with slates found on the
existing building. A condition can be added to ensure any additional slates that may be
required are in keeping with the existing slates to protect the architectural merit of the
property. 
Historic Environment Scotland have echoed the above assessment, accepting that the front
portion of the building is the most significant from an architectural perspective and that the
package of works would help facilitate its reuse and longer-term survival. 
Representations
No representations were received. 
Conclusion
In view of the above, it is considered that the proposal would accord with the relevant
provisions of the Development Plan. There are no other material considerations. Listed
building consent should therefore be granted subject to conditions. 
Recommendation
Grant Subject to Conditions. 
Reason(s) for Recommendation
1. The proposal accords with the provisions of the Development Plan and there
were no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Condition(s)         
1. The proposal accords with the provisions of the Development Plan and there
were no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Condition(s)         
1. Prior to the commencement of development, full details of all windows and
rooflights to be installed shall be submitted to, and approved by, the Planning
Authority.  Thereafter only the approved windows and rooflights shall be used.   
Reason: To safeguard the character of the Listed Building. 
2. Prior to the commencement of development, full details of the louvres to be
installed shall be submitted to, and approved by, the Planning Authority. 
Thereafter only the approved louvres shall be used.   
Reason: To safeguard the character of the Listed Building. 
3. Full details of any new slate to be used on the building shall be submitted to, and
approved by, the Planning Authority.  Thereafter only the approved slate shall be
used. 
Page 32 of 102

Page 37

Reason:  To safeguard the character of the Listed Building. 
4. Prior to the demolition of the hall, details of the materials that will be used to
repair the fabric of the property exposed following demolition shall be submitted
to, and approved by, the Planning Authority. Thereafter only the approved
materials shall be used.   
Reason: To safeguard the character of the Listed Building. 
Advisory Note(s)   
1. None required. 
Schedule of Plans Reviewed 
Drawing Number Revision Drawing/Document Title
EX01  Site Location Plan
EX04  Existing Block Plan
EX05  Existing Ground Plan
EX06  Existing First Plan
EX07  Existing Roof Plan
EX10  Existing Sections
EX20  Existing East Elevation
EX21  Existing Elevations 2
PR02  Ground Downtakings
PR03  First Downtakings
PR04  Proposed Block Plan
PR05  Proposed Ground Plan
PR06  Proposed First Plan
PR07  Proposed Roof Plan
PR10  Proposed Sections
PR11  Proposed Sections 2
PR20  Proposed East Elevation
PR21  Proposed West Elevation 
For further information please contact James McCafferty, Development Standards Team,
Email: james.mccafferty@renfrewshire.gov.uk 
Page 33 of 102

Page 38

Page 34 of 102

Page 39

Planning and Climate Change Policy Board: 20 May 2025
Report by Chief Planning Officer 
Reference No 24/0829/LB
Application Type Listed Building Consent
Proposal Demolition of Category C Listed, former dormitory building.
Location St Joseph's Nursing Home, Kilbirnie Road, Lochwinnoch
Ward 9 - Johnstone North, Kilbarchan, Howwood and Lochwinnoch
Community Council Lochwinnoch Community Council
Applicant Graisley Investments Ltd
Recommendation Grant Subject to Conditions
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=summary&keyVal=SNHYD2MWLYP00 
This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of
The Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013. 
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation.  In this instance, this is a listed building application which
seeks consent to demolish a category C listed building. 
Proposal
This application seeks Listed Building Consent for the demolition of a Category C listed
building, 'the dormitory building', located within the former St Joseph's College Missionary
site, which until its closure in 2005 operated as a Care Home. 
The principal reason for seeking the demolition of the dormitory building is due to its poor
condition.  Structural surveys undertaken conclude that the dormitory building is a dangerous
building, and economic repair is not viable.   
The building is described in its listing as an 8 bay, 3 storey, rectangular-plan hospital ward
block of plain Art-Deco style built in 1936 as a later addition to the site.   
The frontage of the rectangular block remains along with a later addition of a stairwell/lift
shaft which is conventional and utilitarian in its appearance. 
Rear elements of the building have fallen away, with the rubble remaining as mounds to the
rear of the building leaving internal areas exposed. 
This application constitutes a second request for listed building consent for the demolition of
this dormitory building.  Listed building consent for its demolition was previously granted by
the Planning and Climate Change Policy Board in January 2022 (Reference: 20/0813/LB)
however, that consent has now expired.  In this regard, this current application for listed
building consent is to effectively renew that consent.  Additionally, both planning permission
(reference: 23/0565/PP) and listed building consent (reference: 23/0566/LB) for the
residential redevelopment of the application site and wider site, including the renovation and
conversion of the Category C listed chapel into residential flats, were granted, subject to
conditions, by Planning and Climate Change Board in November 2024.  In this context, this
application for listed building consent would also in part facilitate the already approved
redevelopment of the site. 
Site Description
Item 3(c)
PACC200525 Page 35 of 102

Page 40

The application site extends to approximately 0.89 hectares and is located on the
southwestern edge of Lochwinnoch.  Immediately to the north, the application site is
bounded by a series of single storey buildings forming the Forest View Primary School
beyond which Corsefield Road links back to Lochwinnoch.  Further to the northeast there is
an area of open land which is subject of a planning application for a residential development
(Reference: 24/0892/PP).  To the east are landscaped grounds under the ownership of the
applicant which extend to the A760 Kilbirnie Road and comprise mature woodland and shrub
planting.  To the south is an area of open land, also under the ownership of the applicant
which extends to Auchenhean Road.  The site lies within the southern boundary of the Clyde
Muirshiel Regional Park. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
No pre-application discussions have taken place. However, this application for Listed
Building Consent follows a previous listed building consent in which consent for the
demolition of the building was granted.  Since then and as previously outlined, planning
permission and listed building consent have also been granted for the residential
redevelopment of both the site and the wider surrounding area. 
Negotiated Improvements
No changes have been negotiated. 
Site History 
The planning history for the site is as follows; if no history is listed then planning has no
record of previous applications for the site. 
Application No: 23/0565/PP 
Description: Erection of 25 retirement flats with communal facilities and the conversion
of the chapel into 5 retirement flats with associated roads, parking and
landscaping.
Decision: Grant subject to conditions 
Application No: 23/0566/LB 
Description: Alterations and conversion of former chapel building to form 5 retirement
flats.
Decision: Grant subject to conditions 
Application No: 20/0813/LB 
Description: Demolition of C listed dormitory block.
Decision: Grant subject to conditions 
Application No: 13/0007/PP 
Description: Conversion of existing building to form 30 flats and selective demolition of
outbuildings, upgrading of access roads, car parking and associated
landscaping. (amendment to Condition No. 1 of 07/0724/PP to extend the
time period of consent). 
Decision: Withdrawn 
Application No: 13/0011/LB 
Description: Vary condition one of previous application 07/0724/PP to extend the time
period of consent.
Page 36 of 102

Page 41

Decision: Withdrawn 
Application No: 07/0725/LB 
Description: Conversion of existing building to form 30 flats and selective demolition of
outbuildings, upgrading of access roads, car parking and associated
landscaping.
Decision: Grant subject to conditions 
Application No: 07/0724/PP 
Description: Conversion of existing building to form 30 flats and selective demolition of
outbuildings, upgrading of access roads, car parking and associated
landscaping.
Decision: Grant subject to conditions 
Application No: 95/0509/PP 
Description: Erection of new office buildings.
Decision: Grant subject to conditions 
Application No: 94/0838/LB 
Description: Subdivision of existing multi bedrooms and wards to form single bedrooms.
Decision: Withdrawn 
Application No: 03/0709/PP 
Description: Construction of a 7/8 bedroom residential care home, extension to existing
access and formation of parking.
Decision: Grant subject to conditions 
Application No: 02/0905/PP 
Description: Demolition of existing wing of nursing home and erection of new building to
form extension to existing nursing home.
Decision: Grant subject to conditions 
Consultations   
▪ Historic Environment Scotland – Highlight the special interest of the building and the
potential opportunities for reuse but advise that in overall terms the proposals do not
raise historic environment issues of national significance.  They conclude that they have
no objection to the proposal. 
Representations
The application has been publicised in line with the requirements of the relevant legislation. 
No representations were received.
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the
development plan unless material considerations indicate otherwise. In this instance the
Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire
Local Development Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the
determination of this application: 
National Planning Framework 4  
▪ Policy 7 - Historic assets and places
Page 37 of 102

Page 42

Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
▪ Policy ENV3 - Built and Cultural Heritage 
Full details relating to the policies of the LDP can be found online. 
Other relevant policies and guidance
▪ New Development Supplementary Guidance
▪ Delivering the Environment Strategy: Built Heritage 
Material considerations:
▪ Historic Environment Scotland's Historic Environment Policy for Scotland (HEPS) and
associated "Managing Change in the Historic Environment" guidance note on demolition. 
Submitted Reports and Assessments
The following reports and assessments were submitted in support of the application: 
▪ Statement of Justification for Demolition – This was prepared by Convery Prenty Shields
Architects Ltd who are the agent for this listed building consent application.  This report
provides information to demonstrate that the building is not of special interest; the
building is capable of repair; that its repair is not economically viable and has been
marketed for a reasonable period and that; its demolition is essential to delivering
significant benefits to economic growth and the wider community. 
▪ Dormitory Inspection Report – This was prepared by Goodman Associates who are a
civil and structural engineering consulting firm.  The report comprises of an assessment
of buildings ongoing structural condition and includes supporting photograph records
with annotations, recommendations and conclusions based on the inspections
undertaken. 
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any
Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the
grant of planning permission) and Regulation 33 (Directions requiring consideration of
condition) of The Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development)
of The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. 
None. 
Planning Assessment 
In the case of applications for the demolition of listed buildings the Historic Environment
Scotland Policy Statement states that no listed building should be demolished unless it can
be clearly demonstrated that every effort has been made to retain it.   
Historic Environmental Scotland's Policy sets out that Planning Authorities should only
approve such applications where they are satisfied that: 
(a) The building is not of special interest; or  
Page 38 of 102

Page 43

(b) The building is incapable of repair; or 
(c) The demolition of the building is essential to delivering significant benefits to economic
growth or the wider community; or  
(d) The repair of the building is not economically viable and that it has been marketed at a
price reflecting its location and condition to potential restoring purchasers for a reasonable
period. 
These four tests are re-stated in Renfrewshire Council's New Development Supplementary
Guidance. 
Historic Environmental Scotland's Policy Statement and the New Development
Supplementary Guidance requires that only one of these four tests be satisfied. 
When the proposed demolition is assessed against these requirements the following
conclusions can be made: 
(a) The building is not of special interest. 
The dormitory building is different in character to the main buildings which were on this site,
which comprised Garthland Mansion House and the chapel building built in 1943. 
It is the largest structure on the site and the building now stands alone after the demolition of
Garthland House due to its structural condition.   
It is considered that the building does not contribute to the original grouping or setting and
does not relate well to the chapel building which remains on site. 
The renovation that would be required to bring this unit back into use would essentially
amount to re-build.   
Historic Environment Scotland have considered the condition and the character and
appearance of the building along with the likely costs of a meaningful restoration, and whilst
they highlight the special interest of the building and the potential opportunities for reuse,
they ultimately conclude that this proposal does not raise any significant historic environment
issues and that on this basis they do not raise an objection to the proposal. 
Having regard to the evidence submitted in support of this application, together with the
overall position of Historic Environment Scotland, it is considered that test (a) is satisfactorily
met as the building, in its current condition, is not regarded as being of special interest in its
own or as a contributory element to the remaining grouping.   
(b) The building is incapable of repair. 
Reports have been submitted alongside the application which seek to demonstrate that the
repair works required would be so invasive that any architectural character left in this
building would be lost. 
The building is in very poor condition and is not accessible for internal inspection. The
justification report submitted in support of the application states that the last inspection
carried out internally in 2006 revealed extensive dry and wet rot and evidence of significant
water ingress.  External inspection also identified significant degradation of stonework with
exposed wall heads and deterioration of metal casement windows. Reports also highlight
Page 39 of 102

Page 44

major structural inadequacies and defects due to years of vacancy, general neglect,
vandalism, and weathering. 
The submitted reports evidence that the building is incapable of repair and conversion. 
Having regard to the evidence submitted in support of this application, together with the
overall position of Historic Environment Scotland, it is considered that test (b) is satisfactorily
met.   
(c) The demolition of the building is essential to delivering significant benefits to economic
growth or the wider community. 
Regarding benefits to the wider community, it is recognised that the building in its current
condition, detracts from the visual quality of the immediate environment and potentially
presents safety concerns in terms of accesibility.  Furthermore, the area surrounding the site
forms part of a regularly used route for local residents, including dog walkers. 
The demolition of the building and its replacement with an appropriate residential scheme,
as approved in 2024, (reference: 23/0565/PP and reference: 23/0566/LB) would significantly
enhance the visual amenity of the immediate area, support the renovation and
redevelopment of the Category C listed chapel, the only remaining listed building on the
wider site of significant architectural quality, considered capable of beneficial use, and
facilitate the comprehensive redevelopment of the St Joseph's site as a whole.  This would
include the refurbishment and renovation of the structures around the elevated walled
garden which forms an integral component of the broader redevelopment proposal.   
Historic Environment Scotland and Renfrewshire Council policies and guidance require that
cognisance is taken of the importance of the building to the character or appearance of the
area, and of proposals for the future of the cleared site. 
The approved residential redevelopment proposal for the site demonstrates a high standard
of design, with due consideration given to the character of the local built and natural
environment and the setting of the chapel building.   
Given the above, the demolition of this listed building is required to facilitate the
redevelopment of the site which has already been approved by the Planning and Climate
Change Policy Board. On this basis test (c) has therefore been met.  A condition can be
added to any grant of listed building consent that it will require to be demonstrated that
signed and binding contracts are in place to secure the redevelopment of the site following
demolition. 
(d) The repair of the building is not economically viable and that it has been marketed at a
price reflecting its location and condition to potential restoring purchasers for a reasonable
period   
Historic Scotland's Managing Change Guidance Note acknowledges that consent may be
granted for the demolition of a listed building that is capable of repair but where the costs of
doing so mean that its repair would not be viable.   
The supporting information includes viability appraisals and addresses the condition of the
building. 
Permission was granted for the re-development of the original Garthland House and
Dormitory block in 2007.  However, shortly after consent was granted the economic
environment for residential development became unfavourable due to the global financial
Page 40 of 102

Page 45

crash of 2008.  In the subsequent period, the deterioration in the condition of the building,
further eroded the economic viability. The justification report and Dormitory Inspection
Report concludes that the dormitory building is in a poor state of repair and that renovation is
not viable.   
Given that the building is considered to be incapable of repair and there is evidence provided
in the supporting documents to demonstrate that associated costs are prohibitive, it is
concluded that the building is not economically viable to retain or restore. 
It is considered that the evidence that accompanies this application demonstrates that test
(d) has therefore also been met. 
Conclusion
It has been demonstrated through the accompanying supporting information that all potential
scenarios for restoration have been appropriately considered and that an alternative scheme
for the resultant cleared site has been approved. Due weight is also given to the planning
history to the site including the previous Listed Building Consent granted for the removal of
the same dormitory building and the subsequent Planning Permission and Listed Building
Consent application for the redevelopment of the site which will be facilitated by this
proposal.   
The proposal accords with the relevant provisions of the Adopted Renfrewshire Local
Development Plan and Scottish Historic Environment Policy Statement as sufficient
evidence has been provided to satisfy the relevant tests in relation to demolition of listed
buildings and it has been demonstrated that St Joseph's dormitory building is beyond viable
conversion, refurbishment, or reuse. 
Recommendation
Grant Subject to Conditions. 
Reason(s) for Recommendation 
1. The proposal accords with the provisions of the Development Plan and there
were no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Condition(s)          
1. That prior to any demolition works taking place, details and evidence demonstrating
that signed and binding contracts are in place to secure the redevelopment of the site
immediately following demolition shall be submitted and approved in writing by the
Planning Authority. 
Reason: In the interest of amenity and to ensure that the listed building is not
demolished unless approved development is to take place on the cleared site
immediately following its demolition. 
2. That prior to any demolition works taking place, a detailed inventory shall be
submitted and approved in writing by the Planning Authority itemising those
architectural elements which are to be retained as architectural salvage which may
be re-used or incorporated into the redevelopment of the site.  For the avoidance of
doubt, the details shall include a method statement setting out the measures for the
careful downtaking of those elements which may be reused and the arrangements for
their safe storage (on or off site), until being required for incorporation into the
redevelopment scheme. Thereafter, only the approved details shall be implemented
on site. 
Page 41 of 102

Page 46

Reason: To ensure that architectural features of note are saved and capable of reuse
in the redevelopment of the site. 
Advisory Note(s)   
None required. 
Schedule of Plans Reviewed 
Drawing Number Revision Drawing/Document Title
2051_105  Location Plan
2051_111  Dormitory Ground Floor Plan As Existing
showing downtakings
2051_112  Dormitory Elevations as Existing showing
downtakings  
Statement of Justification for Demolition 
Dormitory Inspection Report 
For further information please contact Clare Murray, Development Standards Team, Email:
clare.murray@renfrewshire.gov.uk 
Page 42 of 102

Page 47

Planning and Climate Change Policy Board: 20 May 2025
Report by Chief Planning Officer 
Reference No 25/0007/EAC
Application Type Electricity Act Consultation
Proposal Formation of up to 750MW Battery Energy Storage Facility,
comprising of up to 88 battery storage container blocks and
associated infrastructure, storage containers, welfare facility, diesel
generators, CCTV and lighting columns and associated access,
internal access roads, hard and soft landscaping, SUDS Basin and
perimeter fence.
Location Neilston Grid Electricity Sub Station Complex, Gleniffer Road,
Paisley
Ward 7 Paisley Southwest
Community
Council
Elderslie Community Council
Applicant Energy Consents Unit
Recommendation No Objection Subject to Conditions and/or a Planning Obligation
All plans, reports, documents and representations relating to this application can be
viewed in full online at
https://www.energyconsents.scot/ApplicationDetails.aspx?cr=ECU00004988 
The purpose of this report is to present for the consideration of the Planning and Climate
Change Policy Board a formal consultation from the Energy Consents Unit (ECU) on an
application made under Section 36 of the Electricity Act 1989 for a 750MW battery energy
storage system (BESS) on land to the southeast of the Neilston Grid Electricity Sub Station
Complex on Gleniffer Road, Paisley.  The Section 36 application includes an application for
deemed planning permission for the same development under Section 57(2) of The Town
and Country Planning (Scotland) Act 1997. 
Scottish Ministers are responsible, under Section 36 of the Electricity Act 1989, for the
authorisation of any new, or extensions to existing, electricity generation schemes with a
generation capacity in excess of 50 Megawatts (MW).  As the proposed BESS would have a
maximum installed capacity of 750MW, Renfrewshire Council has been formally consulted
on the proposed development by the ECU in terms of Section 36 of the Electricity Act 1989. 
The Council is a formal consultee in this process and not the determining or consenting
authority.  Scottish Ministers are the determining authority.  In procedural terms the Council,
as Planning Authority, requires to provide a consultation response to the ECU that would
then be taken into consideration as part of the overall consenting process. 
The consultation request from the ECU was received on 13thJanuary 2025, with an initial
response deadline of 9th May 2025.  The deadline has subsequently been extended to 30th
May to allow the consultation request to be considered by the Planning and Climate Change
Policy Board. 
In response to the ECU consultation the Council can either: 
▪ Offer no objections to the Section 36 application as submitted; 
Item 3(d)
PACC200525 Page 43 of 102

Page 48

▪ Offer no objections subject to the imposition of appropriate conditions and/or legal
agreement or planning obligations it considered necessary to make the development
acceptable (it should be noted that responsibility for discharging conditions and/or the
legal obligations would fall upon the Council), or; 
▪ Object to the application, stating the grounds on which the objection is made.  Members
should note at this point that a decision to object to the application would trigger a public
local enquiry in terms of Section 62 and Schedule 8 of the Electricity Act 1989. 
While the consultation response would normally fall within the scheme of delegation to be
determined by officers, the scheme of delegation allows for officers to refer applications to
the Board.  The application has been referred in this instance to allow the proposed
development to be fully considered given the scale of the development and the potential
environmental matters associated with battery energy storage facilities. 
It should be noted that the development of a BESS on this site was previously proposed
under planning application 21/0034/PP.  This application was refused by the Council in
November 2021, however, it was subsequently granted planning permission subject to
conditions by the Department of Planning and Environmental Appeals (DPEA) on in April
2022. 
The first phase of the BESS (up to 50MW capacity) is being built out in the northwest corner
of the site under approved application 21/0034/PP and associated Non-Material Variation
23/0497/NMV, and further application 23/0224/PP for a cable connection and HV yard.
However, as the maximum generating capacity of the overall BESS development now
proposed is in excess of 50MW, consent from the ECU is also required for the scheme.  The
phase 1 area is included within the S36 application so that the entirety of the site would
benefit from a single consent, thereby simplifying the overall planning status. 
It should also be noted that the BESS under consideration now differs to that approved on
appeal under application 21/0034/PP.  While the extent of the application site boundary is
the same, the scale of the development is reduced.  Under application 21/0034/PP the
footprint of the BESS covered the entire site area, and there were a number of pieces of
additional transforming equipment.  For the purposes of this submission the footprint of the
BESS has been reduced with no development proposed underneath the transmission lines
which cross the site, and the extent of transforming equipment being proposed has also
reduced in number.         
Proposal
The proposed development is for the formation of up to 750MW Battery Energy Storage
Facility, comprising of up to 88 battery storage container blocks and associated
infrastructure, storage containers, welfare facility, diesel generators, CCTV and lighting
columns and associated access, internal access roads, hard and soft landscaping, SuDS
basin and a perimeter fence. 
As noted above, the first phase of the BESS is already under construction in the
northeastern corner of the site.  This includes the site access from Gleniffer Road.  For the
purposes of this submission the proposed development is essentially split into three sections
across the site.  Further battery units will be installed along the northeastern boundary
behind the existing phase 1 area. Then moving southwest there will be a break in the
development to take into account the overhead electricity lines. There will be a further row of
battery units before another break again due to overhead lines. Finally adjacent to the
southwestern boundary there will be further battery units and a 400Kv yard in the western
corner. 
Page 44 of 102

Page 49

The undeveloped areas under the overhead lines will be sown with a native wildflower mix.
Native hedgerows, trees and woodland edge planting are proposed along the southeastern,
southwestern and northwestern boundaries.  The boundary treatment also includes a 3.4-
metre-high palisade style fence. 
There are three types of battery unit being proposed. Type A units, which are located in the
northwest corner, measure 26 metres in length by 16.8 metres in width by 3.8 metres in
height.  Type B units, which are located in the northeast corner and the central part of the
site, also measure 26 metres in length by 16.8 metres in width by 3.8 metres in height. 
Finally type C units, which are located along the southwestern boundary, measure 38 metres
in length by 15 metres in width by 3.8 metres in height. 
The 400Kv High Voltage yard has a footprint of 65 metres in length by 40 metres in width
and is a maximum height of 10.8 metres.  There are also various ancillary buildings and
plant including Medium Voltage rooms which are 3.8 metres in height, substation control
buildings, welfare buildings and stores.  The SUDS basin is located in the southwest corner
of the site. 
It is noted that the initial submission included the route for a connecting cable between the
application site and the Neilston substation on the opposite side of Gleniffer Road to the
northwest.  However, the connecting cable has now been removed from the scheme and no
longer forms part of the submission. 
Site Description
The application site extends to approximately 14 hectares in area.  It primarily comprises of
grassland, and the topography is gently sloping uphill from the northwest to the southeast
boundary. 
The site is directly opposite Neilston substation.  A mature strip of woodland bounds the site
to the northeast, with rolling agricultural land to the southeast and grassland to the
southwest. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
A pre-application meeting was held on the 21st December 2023 during which the proposed
development which would be the subject of the S36 application was presented by the
applicants.  A comparison was provided between the proposed submission and the
development consented under application 21/0034/PP, and discussions were undertaken on
the Councils procedures relating to S36 requests and the likely supporting information
required. 
Negotiated Improvements
Following submission, the following changes have been negotiated between officers and the
applicant: 
No changes have been negotiated. 
Site History  
The planning history for the site is as follows; if no history is listed then planning has no
record of previous applications for the site.
Application No: 23/0497/NMV
Page 45 of 102

Page 50

Description: Removal of HV Yard and Energy Management Buildings, and installation of 23
additional battery storage units in northwest corner of site
Decision: Granted 
Application No: 23/0697/EA
Description: Request for screening opinion for an Environmental Impact Assessment relating
to the proposed construction and operation of an Battery Energy Storage System (BESS)
with installed capacity in excess of 50 megawatts (MW)  (Consultation request from Energy
Consents Unit)
Decision: Scottish Ministers determined that an Environmental Assessment was not
required. 
Application No: 23/0224/PP
Description: Installation of buried cable connection and HV yard, and repositioning of site
access.
Decision: Granted subject to conditions 
Application: 21/0034/PP 
Description: Installation of greener grid park including energy management and battery
storage containers with associated access, landscaping and fencing.
Decision; Granted subject to conditions via appeal. 
Application: 20/0440/EO 
Description: Request for screening opinion as to the requirement for an Environmental
Impact Assessment relating to the erection of an Energy Management Facility
Decision; Environmental Assessment not Required. 
Application No: 20/0353/NO 
Description: Erection of an Energy Management Facility
Decision; Accepted.  
Application No: 19/0735/NO
Description: Request for screening opinion as a requirement for a Environmental Impact
Assessment relating to the erection of an Energy Management Facility
Decision: Environmental Assessment not Required 
Consultations   
▪ Glasgow Airport Safeguarding - No objection. 
▪ Environment, Housing & Infrastructure (Env. Protection) - No objections subject to
conditions relating to noise. 
▪ Chief Executive's Service (Roads Development) – No objections subject to conditions
relating to sightlines, forward visibility, submission of a road safety audit, construction
traffic management plan, and assessment of proposed routes for construction traffic. 
▪ Scottish Power Distribution Plc – No objections in principle.  Advise of overhead line in
the vicinity of the proposals and therefore reserve the right to protect and or deviate the
apparatus at the applicant’s expense. 
▪ National Air Traffic Services (NATS) - No objections. 
▪ Ironside Farrar Ltd (IFL) (Council’s Independent Consultants) - IFL were initially asked to
review and provide a stage 1 audit comment on the following reports submitted by the
applicants in support of the development.
Page 46 of 102

Page 51

Biodiversity Enhancement and Management Plan (BEMP) by Tetra Tech dated December
2024 – IFL advise that clarification is required on a number of matters including loss of
habitat within the cable route area and associated compensation, appointment of Ecological
Clerk of Works, turf and soil management, pollution prevention, and a timetable and ongoing
maintenance plan for landscaped areas. 
Landscape and Visual Appraisal by TGP landscape architects dated 3rd December 2024 –
IFL agree with the conclusion of the LVA that the landscape and visual effects of the
proposed development would be no more than, and perhaps somewhat less than, the
previously consented scheme. 
Preliminary Ecological Appraisal (PEA) by Tetra Tech dated December 2024– IFL note that
the report is well structured and provides an adequate level of detail for a preliminary
ecological appraisal.  However, it incorporates aspects of a full ecological impact
assessment without sufficient supporting data with limitations in survey timing, seasonal bias
and data gaps. 
Following review of the stage 1 audit response a meeting was held on 1st April 2025 between
the Council, IFL and the applicants to discuss the responses to the BEMP and the PEA. 
Following this meeting, an updated version of the BEMP, PEA and Landscape and Ecology
Management Plan (LEMP) were submitted to the Council.  These updated documents were
considered to satisfactorily address the stage 1 audit comments, and it was not considered
neccesary for IFL to undertake a stage 2 audit on these documents. 
The ECU consulted widely on the Section 36 application and a list of those who have
responded (and who have not also been consulted by the Council), along with a summary of
their comments, as shown on the ECU website, are provided below. 
▪ Ministry of Defence (MoD) – No objections. 
▪ NatureScot – Provide advice on measures that would help ensure impacts on natural
heritage interests are minimised. Do not consider that the integrity of any SSSI’s will be
adversely affected. There is currently no requirement for a species licence to be
obtained. Mitigation is required with regard to breeding birds. No statutory landscape
designations will be impacted. 
▪ Transport Scotland – No objection subject to conditions relating to routing and movement
of abnormal loads, and requirement for any additional signage or temporary traffic
control measures. 
▪ Scottish Environmental Protection Agency (SEPA) – No site-specific comments on the
application. Reference should be made to the relevant standing advice. 
▪ Historic Environment Scotland (HES) – Have reviewed the submission and have no
comments. 
▪ BT – The project should not cause interference to BT’s current and presently planned
radio network. 
▪ Scottish Gas Networks (SGN) – Have reviewed the submission and have no comments. 
Page 47 of 102

Page 52

▪ Health and Safety Executive (HSE) Land Use Planning Team - Have reviewed the
submission and have no comments. 
▪ Scottish Water – No objections. 
Representations
The application has been publicised in line with the requirements of the relevant legislation.
The ECU, as the determining authority, publicise the consent application, and
representations can be submitted directly to them via their website.  At the time of writing
there are no letters of representation.
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the
development plan unless material considerations indicate otherwise. In this instance the
Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire
Local Development Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the
determination of this application: 
National Planning Framework 4 
▪ Policy 1 – Tackling the climate and nature crisis
▪ Policy 2 - Climate mitigation and adaptation
▪ Policy 3 – Biodiversity
▪ Policy 4 - Natural places
▪ Policy 6 - Forestry, woodland and trees
▪ Policy 7 - Historic assets and places
▪ Policy 8 - Green belts
▪ Policy 11 - Energy
▪ Policy 13 - Sustainable transport
▪ Policy 14 - Design, quality and place
▪ Policy 22 - Flood risk and water management 
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
▪ Policy ENV1 - Green Belt
▪ Policy ENV2 - Natural Heritage
▪ Policy ENV3 - Built and Cultural Heritage
▪ Policy I1 - Connecting Places
▪ Policy I3 - Flooding and Drainage
▪ Policy I4 - Renewable and Low Carbon Energy Developments 
New Development Supplementary Guidance
▪ Renfrewshire New Development Supplementary Guidance 2022
▪ Delivering the Environment Strategy: Green Belt Development Criteria
▪ Delivering the Infrastructure Strategy: Renewable and Low Carbon Energy
Developments 
Full details relating to the policies of the LDP can be found online. 
Submitted Reports and Assessments
The following reports and assessments were submitted in support of the application:
Page 48 of 102

Page 53

▪ Landscape and Ecology Management Plan (LEMP) by Tetra Tech revision V2 dated 15th
April 2025 – Report has been updated following feedback from the Council and IFL.  The
aims of the LEMP are to reduce impacts on retained habitats on site and to detail post-
construction habitat creation measures to secure biodiversity enhancement.  The report
notes that a Biodiversity Champion will be appointed to ensure activities during the
construction and operational phase are in line with the recommendations of the LEMP. 
The recommendations relate to pre and mid construction habitat management strategy
with regard to habitats and watercourses, and post construction habitat creation and
management strategy with regard to general maintenance, hedgerows, trees, woodland
scrub mix, wildflower grassland, SUDS and Monitoring. 
▪ Preliminary Ecological Appraisal (PEA) by Tetra Tech revision V2 dated 15th April 2025 –
Report has been updated following feedback from the Council and IFL.  It is considered
unlikely that the proposed development will lead to adverse impacts on designated sites. 
However, the site has potential to support several protected species including nesting
birds, badger and reptiles.  A suite of recommendations are made with regard to further
survey and assessment, mitigation and enhancement. 
▪ Biodiversity Enhancement and Management Plan (BEMP) by Tetra Tech revision V2
dated 15th April - Report has been updated following feedback from the Council and IFL –
Summarises the baseline information at the site including habitats and protected or
notable species. Several pre and mid construction enhancements are recommended
with regard to bats, nesting birds, red squirrels, amphibians, invertebrates, and
hedgehogs.  A strategy for post construction monitoring is also included. 
▪ Landscape and Visual Appraisal by TGP Landscape Architects dated 3rd December 2024
– Proposed development would be located on an area of undulating farmland which is
substantially influenced by existing electricity infrastructure. The proposed scheme
shares many similarities to the previously consented scheme. However previously
consented synchronous condenser units have been removed from the scheme, and
there are greater areas of open space within the site layout. In comparison to the
consented scheme, the proposed layout would not result in any increase to the level of
effect upon the landscape character, Gleniffer Braes Country Park, or the green belt. 
The influence would also steadily soften over time as the landscape planting matures. 
The proposed development could be accommodated at the site with relatively limited and
localised effects on landscape character and visual amenity. 
▪ Breeding Bird Survey Report by Tetra Tech version V1 dated 2nd December 2024 –
Swallows were confirmed to be breeding on the site, and several other species were
considered to possibly be breeding on the site. The proposed development is considered
to be of low impact to breeding bird population due to the abundance of similar habitat
nearby and provided mitigations are incorporated. This includes timing of vegetation
clearance, noise and lighting. Enhancements in the form of landscape planting and bird
boxes are also recommended. 
▪ Pre-Application Consultation Report by Statkraft revision R3 dated 27th November 2024
– Summarises the pre-application consultation measures undertaken in line with the
ECU document titled Good Practice Guidance for Applications under Section 36 and 37
of the Electricity Act 1989.  In this instance the consultation comprised of 2 public
exhibitions, 1 virtual public exhibition, 1 newspaper and resident letters.  Councillors for
ward 7, George Adam and Tom Arthur MSP and Foxbar and Elderslie CC were also
Page 49 of 102

Page 54

notified of the public events.  A project website was also established.  Public events were
held at Foxbar Community centre on 1st February and 7th March 2024.  A summary of
consultation responses is also provided. 
▪ Outline Construction Environment Management Plan by Statkraft revision R1 dated 27th
November 2024 – Outlines a suite of outline construction environmental issues including
management of site waste, sewage disposal, car parking, lighting, noise, dust, pollution
control and traffic management and the associated procedures t ensure these issues are
appropriately controlled. 
▪ Noise Impact Assessment by Statkraft revision R0 dated 20th August 2024 – Noise
impact has been modelled based on all plant and colling equipment operating
concurrently and at 100% capacity.  However, in reality this will not occur. There is only
one residential receptor close to the development.  The assessment concludes that due
to the difference between the rating level and the background noise level and the context
of the development it is concluded that the development is not expected to have an
adverse impact in terms of noise. 
▪ Planning, Design and Access Statement by Statkraft revision R2 dated 27th November
2024 – The development would result in an improvement to the reliability and stability of
the electrical network, and allow increasing levels of renewable energy generation to be
more fully integrated into the electrical system.  A summary of the planning history on the
site is provided, noting the previous scheme consented on appeal. The various
components of the scheme and the associated layout are also set out. A review of the
development against the relevant renewable energy policy and the development plan is
also undertaken. 
▪ Planning Guidance Note by Statkraft revision R2 dated 27th November 2024 – Primarily
provides a review of the planning history and a comparison between the proposed
scheme and the previously consented scheme. The main differences notes are the
omission of the synchronous condensers which were due to be houses in 6m high
buildings, removal of battery units from underneath the overhead cables, provision of a
secondary access for emergency purposes, provision of a SUDS pond, and provision of
additional landscaping. 
▪ Transport Statement and Construction Traffic Management Plan by Pell Frishmann
Revision 04 dated 3rd December 2024 – Considered the likely impact of traffic generated
by the proposed development on the local road network. Traffic management procedures
have been proposed to ensure the safe operation of the approach route to the site during
construction. Operational traffic is expected to be minimal as the site will not be manned. 
The impact of operational traffic is expected to be negligible. 
▪ Lighting Plan Review Technical Note by Tetra Tech – Summarises the review of the
proposed lighting scheme and its compliance the Institute of Lighting Professionals/Bat
Conservation Trust guidance on bats and artificial lighting at night with the view to
limiting the risk of adverse impacts to ecological receptors. The lighting scheme is inward
facing with low levels of light spill. PIR sensors are used to lighting is only triggered by
people, and would only be switched on occasionally and on a small section of the site
during night time maintenance.  The effect on bats or nesting birds is expected to be
minimised to within the accepted levels stipulated in the guidance.
Page 50 of 102

Page 55

▪ Detailed Drainage Strategy by Vazquez Besada Consulting revision 02 dated 21st August
2024 - Surface water treatment will be provided via filter drains and a new proposed
SUDS basin. The SUDS basin will provide attenuation volume for all new impermeable
areas. No flooding water is expected to leave the site boundary for any of the storm
events considered. Safe access and egress is provided at all times. No proposed foul
water connection is required. 
▪ Landscape Specification by TGP Landscape Architects dated 10th June 2024 – Provides
a specification for the ground preparation, panting and ongoing maintenance of the
landscaping scheme.   
▪ Landscape Management Plan by TGP Landscape Architects dated 9th December 2024 –
Sets out a management and maintenance schedule for the landscaped areas.     
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any
Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the
grant of planning permission) and Regulation 33 (Directions requiring consideration of
condition) of The Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development)
of The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. 
None. 
Planning Assessment
The application for the battery energy storage system has been submitted to the ECU under
Section 36 of the Electricity Act 1989.  Unlike a planning application, there is no requirement
that the application be determined in accordance with the development plan.  Instead, the
development plan is one of a number of material considerations which require to be taken
into account by the ECU in their determination of the application. 
The Council is one of a number of consultees to the process. To inform the Council’s
consultation response to the ECU, the development plan represents the appropriate
document against which to base the Council’s assessment of the application. The
development plan comprises of the National Planning Framework 4 (NPF4) and the adopted
Renfrewshire Local Development Plan 2022 (LDP).   
A key material consideration in the Councils assessment is also the planning history
associated with the site. As noted above and in the applicants Planning Guidance Note, a
BESS has previously been granted consent on this site via appeal under planning
application 21/0034/PP.  For the previous consented application and this S36 application, the
application site is the same. However, for the purposes of the S36 proposal the footprint of
the development has been reduced as battery units are no longer proposed underneath the
overhead lines.  Additionally, some of the ancillary infrastructure associated with the previous
consented scheme has also been omitted. On balance it is considered that the visual impact
of the proposed S36 scheme would be no more than, and perhaps somewhat less than, the
previously consented scheme. 
Turning to the development plan, the application site is located within the green belt. 
Policies ENV1 of the LDP and 8 of NPF4 both consider essential infrastructure to be an
acceptable form of development within the green belt in principle.
Page 51 of 102

Page 56

Battery storage systems are a key component in the decarbonisation of the electricity grid,
and the transition towards greater electricity generation from renewable sources. The battery
systems will store excess energy during times of surplus generation.  This is then fed back
into the grid during times of demand. This provides for a more resilient and stable energy
supply. 
It is considered that the proposal does constitute essential infrastructure and complies in
principle with policies ENV1 of the LDP and 8 of NPF4 relating to the green belt. 
The development is also considered to comply with policies 1 and 2 of NPF4 relating to
climate mitigation and tackling the climate crisis. 
The proposal must thereafter be assessed against the detailed development criteria set out
within the green belt policies.  This includes the green belt development criteria set out within
the new development supplementary guidance which will be assessed in turn as follows. 
The development will not result in the loss of prime quality agricultural land or agricultural
land of lesser quality that is locally important. 
The development does not have any implications for areas of wild land. 
The Roads Development officer has not objected to the development. They have listed
several matters that would need to be considered by the developer to ensure that the site
can be accessed safely.  This includes matters relating to sightlines, construction traffic, and
forward visibility.  Conditions relating to these matters can be recommended to the ECU. 
There is no anticipated effect on public water supply or water courses from pollution risk.  A
detailed Construction Environmental Management Plan (CEMP) can be requested through
condition which would ensure pollution control measures are implemented during the
construction phase.  The submission also includes a drainage strategy which will ensure all
surface water is managed appropriately.   
The development does not impinge upon any existing active travel routes. 
Regarding visual impact and landscape character, IFL agree with the conclusion of the LVA
that the landscape and visual effects of the proposed development would be no more than,
and perhaps somewhat less than, the previously consented scheme. 
It is noted that the scheme includes planting of a mixed hedge and trees along the
northwestern, southwestern and south eastern boundaries. The southwest boundary
includes provision for a buffer strip approximately 25 metres wide which will be planted with
a native woodland edge mix.  The tallest element of the scheme, the HV yard, is located in
the western corner of the site which is the lowest part of the site in terms of ground levels
and is also screened by existing vegetation which is adjacent to Gleniffer Road. The HV yard
is also set back from the road, with provision for additional hedge and tree planting adjacent
to the proposed emergency access. 
The submission also indicates that the battery units will be finished in green.  This will help
mitigate the visual impact of the battery units. It is acknowledged that the battery units within
the 1st phase are finished in white.  However, these units will be partly screened by the later
phases of the development and the associated landscaping. 
The submission indicates that the site would also be bound by a 3.4-metre-high perimeter
fence.  The grouping of the batteries and the siting of the HV yard is considered to be
Page 52 of 102

Page 57

acceptable.  The incorporation of two strips of grassland under the overhead lines will help to
break up the footprint of the site and reduce its visual impact in comparison to the previously
consented scheme. 
It is considered that the development will not have a significant impact on local landscape
character and on balance the impact will be less than that associated with the previously
consented scheme. 
With respect to cumulative visual impact, the development would be adding to an extensive
energy landscape. The additional effects of the development would not be significant against
this baseline and would be less than that associated with the previously consented scheme. 
Visual impact would be further reduced by the mitigation planting. It is considered that the
development is acceptable with regard to cumulative visual impact. 
There is no requirement to incorporate access to open space, and the development does not
impinge upon any existing areas of accessible open space. 
It is anticipated that the development will require a second cable connection to the Neilston
substation in addition to that approved under application 23/0224/PP.  While a cable route
originally formed part of the S36 submission, it has now been omitted, and the applicants
advise that the cable route would be the subject of a standalone planning application once a
suitable routing option has been identified. 
With regard to ecology, IFL note that the PEA report is well structured and provides an
adequate level of detail for a preliminary ecological appraisal. The PEA has been updated in
response to the consultation from IFL, and notes that the site has the potential to support
several protected species however detrimental impacts on designated sites is not
anticipated.  It is considered that potential impacts on protected species can be mitigated via
the recommendations within the PEA. 
The BEMP recommends a number of enhancements which can be undertaken at the site
with regard to biodiversity. This document has also been updated in response to the
consultation from IFL, namely the appointment of a biodiversity champion to monitor the
implementation of the measures set out within the BEMP, LEMP and PEA. 
The updates to these documents and the discussions undertaken between the Council, the
applicants and IFL are considered to constitute a level of assessment that is proportionate to
the development being proposed again noting that a larger scheme can be implemented
under the previous planning permission without further assessment of ecological matters. A
condition can be recommended to ensure the mitigations and enhancements set out within
the BEMP, LEMP and PEA are implemented on the site. 
The development does not include proposals to convert any existing buildings. 
In view of the above it is considered that the development complies with the green belt
development criteria set out within the supplementary guidance. 
The criteria set out within Policy 8 of NPF4 which have not already been discussed above,
are as follows. 
The green belt location is neccesary in this instance given its proximity to the Neilston
substation to which a connection to the grid network can be made. Proximity to a substation
where a grid connection is available is critical for BESS developments. BESS schemes are
considered to constitute essential infrastructure, and the acceptability of a BESS scheme at
this location has been established under application 21/0034/PP.
Page 53 of 102

Page 58

The development is for essential infrastructure in an area already characterised by electricity
infrastructure. It is considered that the purpose of the green belt at this location (which is to
maintain identity of settlements, protect landscape setting, and promote access opportunities
to open space) will not be undermined. 
There will not be any significant long-term impact on the environmental quality of the green
belt. It should be noted at this stage that a condition would be recommended to restrict the
time period of consent to 40 years at which point the development will be decommissioned
and the site restored (unless otherwise agreed in writing with the Council).  However, the
landscape planting and biodiversity enhancements will be retained, and on balance the long-
term environmental quality of the green belt will be safeguarded. 
In view of the above assessment, it is considered that the development is fully compliant with
the green belt policies ENV1 of the LDP and 8 of NPF4 and should be considered as a
suitable development at this green belt location. 
Policies I4 of the LDP and 11 of NPF4 seek to support development proposals for renewable
and low carbon energy developments in principle. This includes energy storage. 
Policy I4 includes several detailed assessment criteria which will be considered in turn as
follows. 
The potential impact of the development with respect to local environment, landscape
character and the natural environment has been discussed above. 
There are no above ground-built heritage designations in or in close proximity of the site. 
The presence of a WW2 bunker is noted however this feature is not listed or covered by any
statutory designation. Nevertheless, the proposed site plan indicates that it will be
safeguarded as part of the development layout. 
Potential impact on the water environment can be mitigated through the incorporation of a
strategy to manage surface water and pollution control during the construction phase. A
condition is recommended with respect to the implementation of the surface water drainage
strategy. 
With regard to amenity of neighbouring residential receptors, the Environmental Protection
Team have offered no objections to the development however a condition is recommended
with respect to limiting noise levels associated with the plant and machinery at the site. 
There are no implications with regard to air quality, glare or shadow flicker and visual impact
has already been discussed above. It is considered that the amenity of neighbouring
residential receptors will not be detrimentally impacted in this regard and again the impacts
are likely to be less than that associated with the previously consented scheme. 
The development will not have a detrimental impact on outdoor sport or recreation interest. 
Matters relating to transport infrastructure and road safety have been discussed above. 
There have been no objections from Roads Development Officer or Transport Scotland with
regard to potential impact on the local and trunk road network. 
Glasgow Airport Safeguarding and NATS have also offered no objections to the development
with regard to the safe and efficient use of Glasgow Airport. 
The site is not within a potential heat network opportunity area. 
Page 54 of 102

Page 59

The relevant criteria within the new development supplementary guidance on renewable and
low carbon energy developments (not already discussed above) are assessed as follows. 
Conditions can be used to ensure arrangements are in place to restore the site to an
acceptable standard after the operation of the BESS has ceased.  This includes the
submission of decommissioning and restoration strategies, and also a bond or other financial
guarantee to ensure funds are set aside for decommissioning and that the Council can call
upon these funds to undertake the work if neccesary. This application is welcomed as it is
noted the previous consent 21/0034/PP does not include provision for a financial guarantee
to ensure decommissioning works are undertaken. 
The development will contribute to renewable energy generation and carbon emission
reduction targets by providing 750MW of storage capacity. This will allow energy from
renewable sources to be stored at times where supply exceeds demand, and then fed back
into the grid at times when demand exceeds supply. This will contribute to the further
decarbonisation of the electricity supply, and also provide stability to the electricity grid. 
The criteria set out within Policy 11 of NPF4 which have not already been discussed above,
are as follows. 
The applicant identifies the following socio-economic benefits associated with the
development:
- Direct effects on employment levels during construction, operation and
decommissioning.
- Indirect effects on economic activity such as the supply chain and economic stimulus
from expenditure of additional employment income.
- Induced effects including additional employment created by the spend of additional
employment income. 
The planning statement also notes that the scheme could have an economic impact through
the potential to significantly reduce energy bills.  The development will make an important
contribution to decarbonising the electricity supply and provide stability to the grid system. 
There will be no detrimental impact on international or national designated sites. 
It is not anticipated that there will be any detrimental impacts on telecommunications and
broadcasting installations. 
There are no trees within the site which would be removed to accommodate the
development. A condition can be used to ensure appropriate measures are put in place to
protect trees on the edge of the site during the construction phase. 
The site is not at risk of flooding. Appropriate management of surface water will ensure that
flood risk does not increase elsewhere. 
In view of the above, it is considered that the development complies with Policies I4 of the
LDP and 11 of NPF4. 
The above assessment broadly demonstrates compliance with the other relevant
development plan policies as follows. 
The development will contribute to the enhancement of biodiversity at the site in accordance
with the requirements of Policy 3 of NPF4. The proposed appointment of a biodiversity
champion is noted in this regard. 
Page 55 of 102

Page 60

The development will not have an unacceptable impact on the natural environment and will
not have a significant impact on any national or local designated sites in accordance with
Policy 4 of NPF4 and ENV2 of the LDP.   
There are no trees which will be removed to accommodate the development, and measures
will be put in place to protect existing trees on the periphery of the site boundary. The
development accords with Policy 6 of NPF4 and ENV2 of the LDP. 
There are no above ground designated historic environment assets within or on the
boundary of the site that would be impacted by the development. The development complies
with policy 7 of NPF4 and ENV3 of the LDP. 
Recommended conditions in respect of construction traffic management, sight lines and road
safety audit will ensure that the site can be accessed safely, and that the operation of the
local road network will be safeguarded during the construction and operational phases of the
development. The development has a low trip generation during its operational phase and
does not require accessibility via public transport or active travel routes.  The development
complies with policy 13 of NPF4 and I1 of the LDP. 
The proposed landscape planting that will form part of the scheme will contribute to
screening the development over time. It is acknowledged that in the short term and before
the landscaping matures the development will be visible. However, this impact can be
mitigated via the external colour associated with the component infrastructure. The
development complies with policy 14 of NPF4. 
The application site is not at risk of flooding, and the implementation of a sustainable
drainage strategy for the management of surface water will not increase flood risk
elsewhere.  The development complies with policy 22 of NPF4 and I3 of the LDP. 
The Council is required to provide a summary of the terms of any planning obligation which
is required to be entered into under Section 75 of the Town and Country Planning (Scotland)
Act in relation to the grant of permission for the proposed development: 
A legal agreement or other form of planning obligation (potentially a suitably worded planning
condition(s)) is required to secure decommissioning of the development and the restoration
of the site.   
Conclusion
The approach to the assessment and recommendations within this report reflect the fact that
the Council is a consultee under the Electricity Act 1989 and that the ECU are the
determining authority. 
In conclusion, the proposed development is considered to be compliant with the
development plan subject to planning conditions and/or a planning obligation to secure
decommissioning of the development and the restoration of the site.  All other consultation
responses noted to date indicate that the proposed development would be acceptable. 
It is therefore recommended that the Council raises no objections to the development. The
position of the Council as a statutory consultee to this Section 36 application of no objections
is subject to and reliant upon the matters and topics set out in the conditions listed in this
report and also the requirements for the matters associated with decommissioning of the
development and the restoration of the site being appropriately secured. For clarity, should
conditions and/or a planning obligation covering each of these matters and topics not be
imposed by the Energy Consent Units (ECU), then the Council’s position as a statutory
consultee would be one of objection. 
Page 56 of 102

Page 61

In wording the conditions it is noted that phase 1 of the development has already
commenced and is managed via conditions attached to the other consents listed above. For
the purposes of the S36 response the conditions shall therefore refer to commencement of
development within phase 2 (development of the remainder of the site) with respect to the
substantive matters still to be addressed. 
Recommendation
No objection subject to the conditions listed below being applied to any decision should the
ECU be minded to approve the Section 36 application. 
The position of the Council as a statutory consultee to this Section 36 application of no
objections is subject to and reliant upon the matters and topics set out in the conditions listed
in this report and also the requirements for the matters associated with decommissioning of
the development and the restoration of the site being appropriately secured. For clarity,
should conditions and/or a planning obligation covering each of these matters and topics not
be imposed by the Energy Consent Units (ECU), then the Council’s position as a statutory
consultee would be one of objection. 
Reason(s) for Recommendation 
1. The proposed development is compliant with the development plan subject to
planning conditions and a form of planning obligation (condition and/or legal
agreement) to secure appropriate funding for the decommissioning of the
development and the restoration of the site. All other consultation responses noted to
date indicate that the proposed development would be acceptable. 
Condition(s)   
1. The development to which this permission relates must be begun not later than the
expiration of three years from the date of its grant. 
Reason: This condition is for the purpose of the good planning of the area, to ensure
that the permission will lapse if it is not implemented within three years. 
2. The development is hereby approved for a temporary period of 40 years from the
date of final commissioning of the development.  Written confirmation of the date of
first commissioning shall be provided to the Planning Authority no later than one
calendar month after that date. 
Reason: In order to retain effective planning control. 
3. That within 3 months of the date of the consent the developer shall submit a phasing
plan for the written approval of the Planning Authority.  The plan shall include phase
1 of the project which is defined as the area currently under construction in the
northwest corner of the application site, and all subsequent phases of development
thereafter. 
Reason: In the interests of retaining effective planning control.   
4. Prior to the commencement of any development within phase 2 of the BESS as
defined within the phasing plan approved under condition 3 above, an outline
decommissioning, site restoration and aftercare strategy shall be submitted to and
Page 57 of 102

Page 62

approved in writing by the Planning Authority.  The strategy shall, without limitation,
detail proposals for: 
(a)  The removal of all above and below ground elements of the development; 
(b)  The treatment of all ground surfaces, including any sub surface areas, hard standing
and access tracks which would restore the site to its former condition or other such
condition as agreed by the Council as Planning Authority; 
(c)  The phasing and timing of the works, including any environmental management
provisions; 
(d)  Details relating to how and when the strategy will be reviewed. 
Reason: To ensure the decommissioning and removal of the development is in an
appropriate and environmentally acceptable manner and the restoration and
aftercare of the site, in the interests of safety, amenity and environmental protection. 
5. No later than 3 years prior to decommissioning of the development or the expiration
of this consent (whichever is the earlier) a detailed decommissioning, restoration, and
aftercare plan, based upon the principles of the approved outline decommissioning,
restoration, and aftercare strategy, shall be submitted to the Planning Authority for
written approval. 
The detailed decommissioning, restoration and aftercare plan shall include (but not
be limited to the) provisions in respect of the following matters: 
▪ Decommissioning and removal of the battery energy storage system units including
treatment of liquid bearing components 
▪ Removal of any in-situ foundations including removal to a depth of at least 1m
underground
▪ Removal of all above ground infrastructure and buildings including but not limited to
substations, HV Yard and associated buildings, containers, fencing, lighting masts,
internal tracks, equipment and hard standings  
▪ Cable removal 
▪ Provision of Decommissioning Environmental Management Plan (DEMP) to be based
on relevant elements of the Construction Environmental Management Plan (CEMP)
▪ A Traffic Management Plan (TMP) related to activities for decommissioning,
demolition, and removal of infrastructure 
▪ Locations of temporary stockpiles for decommissioned materials and equipment 
▪ Treatment of disturbed ground surfaces resulting from decommissioning of
infrastructure including cable removal and any sub-surface elements to restore the
land to its pre-construction status or such condition as agreed in writing with the LPA
▪ Restoration proposals including ecological and biodiversity enhancement works such
as (but not limited to) provision of bird boxes, insect refuge and use of native seed
mixes to deliver biodiversity gains and measures to safeguard all landscaping on the
site which for the avoidance of doubt shall be retained.
▪ An aftercare plan to monitor success of restoration measures with scope for
interventions if required 
▪ A Decommissioning Timetable 
Page 58 of 102

Page 63

Thereafter the detailed decommissioning, site restoration and aftercare plan shall be
undertaken in accordance with the approved plan, unless otherwise agreed in writing
by the Planning Authority. 
Reason: To ensure the decommissioning and removal of the development in an
appropriate and environmentally acceptable manner and the restoration and
aftercare of the site, in the interests of safety, amenity and environmental protection. 
6. Prior to the commencement of any development within phase 2 of the BESS as
defined within the phasing plan approved under condition 3 above, a bond to cover
the costs of decommissioning, site restoration and aftercare, as required by
conditions 4 and 5 of this consent, shall be submitted for the written approval of the
Planning Authority.   The acceptability of such bond shall be at the sole discretion of
the Planning Authority. The bond must: 
A) be granted in favour of the Planning Authority and shall be maintained in favour
of the Planning Authority throughout the duration of this consent and until the
completion of all decommissioning, site restoration and aftercare obligations as
required by conditions 4 and 5 of this consent;
B) be granted by a bank or insurance company (whose identity and covenant
strength shall firstly have been approved by the Council and shall have at least
an A - rating) and who shall be capable of fulfilling the obligations under the
guarantee;
C) be for an amount which covers the value of all decommissioning, site restoration
and aftercare liabilities, such amount to be determined by the Planning Authority
at the commencement of Development;
D) be subject to a review every five years from the date of this consent, or other
such intervals as agreed by the Planning Authority.  Each review shall be
undertaken by a suitably qualified independent professional who has relevant
experience in such matters and who has been agreed in writing beforehand by
the Planning Authority.  The review shall be submitted no later than three months
prior to the expiry of the existing bond, for the written approval of the Planning
Authority. 
Thereafter and at least 28 days prior to the expiry of the existing bond, a
replacement bond in favour of and in terms acceptable to the Planning Authority
and for the value advised by the review noted above, shall be submitted for the
written approval of the Planning Authority.   
E) come into effect on or before the date of commencement of Development, and
expire no earlier than 24 months after the end of the aftercare period. 
No work shall begin at the site until both: 
written approval of the Planning Authority has been given to the terms of such
bond and; 
the validly executed guarantee has been delivered to the Planning Authority. 
In the event that the bond becomes invalid for any reason, no operations will be
carried out on site until a replacement bond completed in accordance with the
terms of this condition is lodged with the Planning Authority. 
Page 59 of 102

Page 64

Reason: In the interests of amenity and in order to retain effective planning
control. 
7. In the event that the financial guarantee becomes invalid, has expired, or is
terminated for any reason following the commencement of operations at the site, all
operations at the site shall cease no later than three months from the date the
financial guarantee became invalid, expired or terminated. If a replacement financial
guarantee, which meets the requirements of condition 6, is approved by the Planning
authority and duly executed before the end of the three-month period, the operations
may continue. If the operations have ceased due to this clause, they may
recommence only upon the approval and execution of a replacement financial
guarantee. 
Reason: In the interests of amenity and in order to retain effective planning control. 
8. Prior to the commencement of any development within phase 2 of the BESS as
defined within the phasing plan approved under condition 3 above, the developer
shall submit a Construction Traffic Management Plan (CTMP) for the written approval
of the Planning Authority. The CTMP shall include (but not be limited to) details in
respect of; 
- Details of the design, layout, geometry, surface finish and sight lines of the
access including geometry for the construction and post construction phase of
the development and swept path to demonstrate that the largest expected vehicle
can access the site.
- The additional signage on both public roads where access will be taken to inform
drivers of the construction vehicles.
- Details of proposed temporary site compound for storage of materials, machinery,
and designated car parking.
- Details of construction traffic routing, vehicle types and number of journeys,
taking into account the axle weights/amounts as a model against the type of road
and its age.   
The details set out within the approved CTMP shall thereafter be implemented on site
during the construction phase. 
Reason: To ensure traffic impacts are mitigated during the construction phase, and
that the construction phase is undertaken safely. 
9. Prior to the commencement of any development within phase 2 of the BESS as
defined within the phasing plan approved under condition 3 above, either enabling
works or construction works, a Construction Environmental Management Plan
(CEMP) shall be submitted to and approved in writing by the Planning Authority.  The
CEMP shall include (but not be limited to) provisions in respect of: 
▪ Project Title Page – Defines the project and applicant details 
▪ Distribution List – Includes external recipients chiefly LPA and internal distribution
such as contractors; to ensure familiarity with the consented requirements 
▪ Introduction – Project overview, site description, scope of proposed works,
programme of works, details of any previous environmental assessments 
Page 60 of 102

Page 65

▪ Roles and Responsibilities – Organisational Chart of project personnel and key
contacts plus training and competencies and communication procedures 
▪ Environmental Management Policy Statement – To include any accreditations or EM
Systems followed 
▪ Regulations and Requirements – Legislation, Regulations and Technical Guidance
applicable to the nature and scope of the development 
▪ Identification of Environmental Assets and Impacts: 
▪ Emissions to air – dust, noise, vibration, traffic/ vehicle movements on site and to/
from site 
▪ Land and Water (extends to surface and ground water) – discharges from
construction activities, i.e. pollution, substance contamination, damage, waste
management 
▪ Archaeology and heritage features 
▪ Ecological features including habitats and species 
▪ Environmental Mitigation Measures and control plans with regard to identified
environmental assets and the potential impacts arising from construction; to take
cognisance of relevant Legislation and Regulations and follow appropriate Technical
Guidance/ best practice 
▪ Inclusion of an Emergency/ Incident Response Plan 
▪ Monitoring and Auditing – Procedures for audits (internal and external), monitoring
and inspections, environmental performance monitoring e.g. KPIs, monitoring/
inspection reporting 
▪ The measures set out within the approved CEMP shall thereafter be implemented on
site during the construction phase. 
Reason: To ensure environmental impacts are mitigated during the construction
phase, and that the construction phase is undertaken safely. 
10. The design, installation and operation of any plant, machinery or equipment shall be
such that noise associated with the development does not exceed Noise Rating
Curve NR25 between the hours of 2300 to 0700 hours and NR 35 at all other times,
when measured within any dwelling in the vicinity of the development. Structure
borne vibration from the proposed development shall be imperceptible within any
dwelling in the vicinity of the development. 
For an explanation of noise rating curves, refer to BS 8233:2014 Sound insulation
and noise reduction in buildings- code of practice, Annex B 
Reason: To mitigate potential noise impact on sensitive receptors within the vicinity
of the site boundary. 
11. In the event that the Council receives a complaint relating to noise emissions from
the development, the operator shall at its own expense and at the Councils request
Page 61 of 102

Page 66

employ an independent noise consultant to undertake a noise impact assessment to
determine the level of noise emissions at any noise sensitive receptor in the vicinity
of the development. Prior to undertaking the noise impact assessment, the
parameters, methodology and acceptable noise limits shall first be agreed in writing
with the Planning Authority. The noise impact assessment shall provide, if required,
mitigation measures and an associated timetable for their implementation to be
implemented to ensure noise emissions do not exceed the agreed noise limits. The
mitigation measures shall thereafter be implemented in accordance with the agreed
timetable. 
Reason: To mitigate potential noise impact on sensitive receptors within the vicinity
of the site boundary.   
12. Prior to the commencement of any development within phase 2 of the BESS as
defined within the phasing plan approved under condition 3 above, the developer
shall submit a site plan and section drawing(s) and associated specification for the
written approval of the Planning Authority detailing the existing and proposed ground
levels within the site including the requirement for any associated wall retention, cut
and fill, earth moving and mounding. Only the approved details shall thereafter be
implemented on site. 
Reason: In the interests of visual amenity. 
13. That prior to the facility hereby approved being brought into use, the developer shall
submit a road safety audit and traffic management plan and for the written approval
of the Planning Authority. The management plan shall identify measures to reduce
the speed of vehicles along the stretch of Gleniffer Road conterminous with the
visibility splay area, and a timetable for the installation of the measures. The
measures shall thereafter be implemented in accordance with the agreed upon
timetable. 
Reason: To reduce traffic speeds in the interests of traffic safety. 
14. All works associated with the construction of the vehicular access hereby approved
shall ensure a visibility splay measuring 4.5m x 215m x 1.05m is provided prior to the
facility being brought into use and forward visibility of 215m shall be provided for
vehicles turning right into the site. The splay shall thereafter be maintained
throughout the life of the development to ensure that no features within the splay
shall exceed 1.05m in height. 
Reason: To ensure the site can be accessed safely. 
15. That the drainage strategy set out in the Detailed Drainage Strategy by Vazquez
Besada Consulting revision 02 dated 21st August 2024 shall be implemented on site
and made operational prior to phase 2 of the BESS as defined within the phasing
plan approved under condition 3 above is energised. The drainage strategy shall be
maintained thereafter for the life of the development in accordance with section 5.7
and appendix H of the Detailed Drainage Strategy by Vazquez Besada Consulting
revision 02 dated 21st August 2024. 
Reason: To ensure the drainage strategy is implemented in the interests of the
sustainable management of surface water.
Page 62 of 102

Page 67

16. That all recommendations set out in section 4 of the Preliminary Ecological Appraisal
(PEA) by Tetra Tech revision V2 dated 15th April 2025 shall be implemented on site
during the construction phase.
Reason: In the interests of safeguarding protected species.
17. That any lighting scheme to be installed at the BESS shall be designed in
accordance with the specification set out within the Lighting Plan Review Technical
Note by Tetra Tech Revision V2 dated 5th December 2024. 
Reason: To ensure the lighting scheme is sensitive to ecological receptors at the site. 
18. Prior to the commencement of any development within phase 2 of the BESS as
defined within the phasing plan approved under condition 3 above, the developer
shall first submit for the written approval of the Planning Authority a detailed phasing
plan for the implementation of all landscaping as detailed in drawing L01 revision C
titled Landscape Planting Plan – Main Compound. The landscaping shall thereafter
be implemented in accordance with the approved phasing plan and the Landscape
Specification by TGP Landscape Architects dated 10th June 2024, and maintained
for the life of the development in accordance with the Landscape Management Plan
by TGP Landscape Architects dated 9th December 2024, the Landscape and
Ecology Management Plan (LEMP) by Tetra Tech revision V2 dated 15th April 2025,
and the Biodiversity Enhancement and Management Plan (BEMP) by Tetra Tech
revision V2 dated 15th April. 
Reason: To ensure the approved landscaping is implemented and maintained
appropriately for the life of the development. 
19. That the external finish colour of all above ground elements of the development (with
the exception of the HV Yard) including (but not limited to) all battery units, buildings,
containers, plant, and other component infrastructure, and all boundary fencing and
gates to be developed at the site shall be RAL 6003 Olive Green unless otherwise
agreed in writing with the Planning Authority. 
Reason: To ensure the components are of an appropriate external finishing colour in
the interests of visual amenity.   
Schedule of Plans Determined 
Drawing Number Revision Drawing/Document Title 
V2 Landscape and Ecology Management
Plan (LEMP) by Tetra Tech dated 15th
April 2025 
V2 Preliminary Ecological Appraisal (PEA) by
Tetra Tech dated 15th April 2025 
V2 Biodiversity Enhancement and
Management Plan (BEMP) by Tetra Tech
dated 15th April  
Landscape and Visual Appraisal by TGP
Landscape Architects dated 3rd December
2024 
V1 Breeding Bird Survey Report by Tetra Tech
Page 63 of 102

Page 68

dated 2nd December 2024  
Pre-Application Consultation Report by
Statkraft revision R3 dated 27th November
2024 
R1 Outline Construction Environment
Management Plan by Statkraft dated 27th
November 2024 
R0 Noise Impact Assessment by Statkraft
dated 20th August 2024 
R2 Planning, Design and Access Statement
by Statkraft dated 27th November 2024 
R2 Planning Guidance Note by Statkraft dated
27th November 2024 
04 Transport Statement and Construction
Traffic Management Plan by Pell
Frishmann dated 3rd December 2024 
V2 Lighting Plan Review Technical Note by
Tetra Tech dated 5th December 2024 
02 Detailed Drainage Strategy by Vazquez
Besada Consulting dated 21st August
2024  
Landscape Specification by TGP
Landscape Architects dated 10th June
2024  
Landscape Management Plan by TGP
Landscape Architects dated 9th December
2024
15957-024 0 Site Location Plan
15957-025 11 Proposed Site Layout
15957-026 6 Existing Site Layout Plan 500 scale
15957-026 6 Existing Site Layout Plan 1250 scale
1597-008 0 Diesel Generator
15957-009 0 Auxillary Transformer
15957-010 0 Control and Switchgear Buildings
15957-011 0 HV Yard
15957-012 0 Type B BESS
15957-013 0 Type C BESS
15957-014 0 Stores and Welfare Buildings
15957-015 0 MV Room
15957-016 0 External Fence
15957-021 0 Underground Water Tank
15957-027 0 Type A BESS
15957-028 0 Genset
15957-033 0 CCTV Pole
0900 P02 Artic SPA
0100 P07 Overall Site Layout
0101 P07 Compound Layout Sheet 1 of 2
0102 P07 Compound Layout Sheet 2 of 2
0200 P07 Site Sections 1 of 6
0201 P07 Site Sections 2 of 6
0202 P07 Site Sections 3 of 6
0203 P07 Site Sections 4 of 6
0204 P07 Site Sections 5 of 6
Page 64 of 102

Page 69

0205 P07 Site Sections 6 of 6
0206 P05 Access Road Under Over Headline sheet
1
0207 P03 Access Road Under Over Headline Sheet
2
For further information please contact James Weir, Development Standards Team, Email:
james.weir@renfrewshire.gov.uk 
Page 65 of 102

Page 70

Page 66 of 102

Page 71

Planning and Climate Change Policy Board: 20 May 2025
Report by Chief Planning Officer 
Reference No 25/0032/PP
Application Type Planning Permission (Local)
Proposal Demolition of single storey commercial units and redevelopment
of yard comprising of the erection of a two-storey office,
workshop and storage facility with associated access, parking,
fencing and associated works
Location 108 Hawkhead Road, Paisley, PA2 7BA
Ward 5 - Paisley East and Central
Community Council Paisley East and Whitehaugh Community Council
Applicant Mr Greg Chalmers Lambert + Son Properties Ltd
Recommendation Refuse
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=summary&keyVal=SQHCWWMWN3S00 
This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of
The Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013. 
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation.  In this instance, Cllrs Mylet, Devine and McNaughton have
requested that the application be determined by the Planning and Climate Change Policy
Board due to the number of local objections received. 
Proposal
This application seeks planning permission for the erection of a two-storey office, workshop
and storage facility with associated access, parking, fencing at a commercial yard off
Hawkhead Road, Paisley. 
The structure would be located to the south of the site, with 10 parking spaces found to the
north of the building. Existing single storey commercial units located at the southern end of
the site would be demolished to accommodate the proposal. 
The building would measure 16.5 meters in width by 24.3 metres in depth and would feature
a shallow dual pitched roof that would measure 5.5 metres in height to the eaves and 6.3
metres to the ridge. 
An application for the same development was withdrawn by the applicant in January 2025. 
Site Description
The application site is flat and is currently used as a commercial yard, with several single
storey buildings that have been developed in a piecemeal fashion located at the south of the
site. 
Access is taken onto Hawkhead Road from the northeast though the site does not front onto
the road. 
Residential properties are found on all sides. Commercial properties owned by the applicant
are also found to the east. 
Pre-Application Consultation with Officers
Item 3(e)
PACC200525 Page 67 of 102

Page 72

The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
No pre-application discussions have taken place. 
Negotiated Improvements
Following submission of the first application, the overall height of the structure was reduced
from 8.1 metres to 6.3 metres in light of concerns raised by planning that the structure was
too tall. However, as the structure would sit in close proximity to the boundary of residential
properties the reduction was not considered sufficient and the building is still considered to
be too tall for the location. 
Site History 
The planning history for the site is as follows; if no history is listed then planning has no
record of previous applications for the site. 
Application No: 24/0390/PP 
Description: Erection of two storey office, workshop and storage facility
Decision: Withdrawn 
Application No: 24/0391/PP 
Description: Change of use of office (Class 4) to hot food take away (sui generis), shop
(Class 1A) and two flats (sui generis) and associated external alterations
Decision: Grant subject to conditions 
Consultations   
▪ Chief Executive's Service (Roads Development) - no objection subject to the provision of
cycle storage, the repositioning of gates and upgrades to the site access. 
▪ Environment, Housing & Infrastructure (Env. Protection) - no objection subject to the
remediation of the site and submission of Noise Impact Assessment. 
▪ Scottish Environmental Protection Agency (SEPA) - no objection. 
Representations
The application has been publicised in line with the requirements of the relevant legislation. 
The following representations were received: 
▪ Object - 117
▪ Support - 21
▪ Neutral - 0 
The issues raised in support can be summarised as follows:
1. The proposal would improve the appearance of the site
2. The development would allow an existing company to expand
3. The business may need to leave the area if consent is refused 
The issues raised can be summarised as follows:
1. The development is not suitable for the location
2. Road safety concerns
3. Insufficient parking would be provided
4. Privacy concerns
Page 68 of 102

Page 73

5. Future residents may not be aware of the proposal
6. Nearby properties would be overshadowed
7. Noise would negatively impact residential amenity
8. Light pollution would negatively impact nearby properties
9. House prices would be negatively impacted
10. Potential for air and water pollution
11. Construction work would negatively impact nearby properties
12. The application should not have been validated
13. The proposal would increase flood risk to nearby properties
14. The business should move to the nearby industrial estate
15. Those who do not live nearby should not be able to comment
16. The development would impact on views from residential properties
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the
development plan unless material considerations indicate otherwise. In this instance the
Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire
Local Development Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the
determination of this application: 
National Planning Framework 4  
▪ Policy 2 - Climate mitigation and adaptation
▪ Policy 9 - Brownfield, vacant and derelict land and empty buildings
▪ Policy 11 - Energy
▪ Policy 13 - Sustainable transport
▪ Policy 14 - Design, quality and place
▪ Policy 22 - Flood risk and water management
▪ Policy 26 - Business and industry 
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
▪ Policy P1 - Renfrewshire's Places 
Full details relating to the policies of the LDP can be found online. 
Other relevant policies and guidance
▪ Delivering the Places Strategy - Creating Places 
Submitted Reports and Assessments
The following reports and assessments were submitted in support of the application: 
▪ Supporting Statement - provides the applicant's justification for the development. 
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any
Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the
grant of planning permission) and Regulation 33 (Directions requiring consideration of
condition) of The Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development)
Page 69 of 102

Page 74

of The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. 
None. 
Planning Assessment
Policy P1 of the Local Development Plan supports the continuance of the built form, where
the development would be compatible with and complementary to surrounding uses.
Similarly, Policy 26 of NPF4 states that proposals for business and industry should consider
the impact the development would have on the residential amenity of surrounding properties. 
The relevant Supplementary Guidance sets out five criteria for the creation of successful
places. The application can be assessed against these five criteria to establish whether it is
acceptable for the location: 
Access and Connectivity
The proposal would make use of an existing access off Hawkhead Road and is well served
by the public road network. 
Sufficient parking within the curtilage of the development would be provided for the size of
building and the development would benefit from nearby public transport options in line with
the requirements of Policy 13 of NPF4. As the site is already used for commercial purposes
it is not considered that the development would place additional pressure on the existing
road network. 
Roads Development have, however, raised concerns regarding plans to reposition the gates
at the entrance to the site and have asked that space to store bicycles is provided in line with
the provisions of the National Roads Development Guidance. Roads Development have also
asked that the existing access be redesigned to make it safer for pedestrians. These issues
could be addressed via the submission of revised plans or conditioned but these have not
been pursued or progressed due to other issues which are considered in detail further in this
assessment section below. 
Environment and Community
The building would be located within an existing commercial yard and would not introduce a
new use into the area. Furthermore, the Hawkhead Local Industrial Area is found to the
northeast of the site. 
The site is not within a high-risk area with respect of coal mining and, subject to the
remediation of the site, Environment, Housing & Infrastructure (Env. Protection) have not
raised any concerns regarding contaminated land. The site can therefore be made safe for
the proposed development in line with the requirements of Policy 9 of NPF4. 
Environment, Housing & Infrastructure (Env. Protection) have requested the submission of a
Noise Impact Assessment given the proximity of the site to residential properties. This could
be requested prior to determination or conditioned but similar to Roads Development
matters, it is superseded by other issues which are discussed below. 
A condition could also be added to control any lighting that would be installed at the site but
again this is superseded by issues addressed below. 
Given the amount of hardstanding at the site would not change it is not considered that the
proposal would increase the likelihood of surface water flooding in the area. Furthermore,
SEPA have not objected in respect of fluvial flood risk. The proposal is therefore considered
to comply with Policy 22 of NPF4.
Page 70 of 102

Page 75

In line with Policies 2 and 11 of NPF4 which seek to reduce carbon emissions solar panels
would be installed on the roof of the building. 
Buildings and Design
The two-storey building would sit approximately 1.6 metres from the western site boundary
and 4.8 metres from the eastern site boundary. Given the building would measure 6.3
metres in height at its tallest point, the proposal would represent the overdevelopment of the
plot and would have an unacceptable impact on the amenity afforded to the residential
properties that share a boundary with the application site. 
An assessment undertaken by the applicant suggests that the building would overshadow
approximately 4 metres of garden ground belonging to the residential properties to the west.
Although it is acknowledged that the overshadowing would be limited in duration, given the
garden ground of these properties measures only 12 metres in depth it is considered that the
overshadowing would have an unacceptable impact on the residential amenity afforded to
these properties. 
Following discussions with the applicant and agent after the submission of the initial
application the overall height of the structure was reduced from 8.1 metres to 6.3 metres.
However, despite the reduction it is still considered that the building is too tall for the
location. 
Furthermore, the first-floor windows on the northern and southern elevations of the building
would result in an overbearing impact and an unacceptable loss of privacy for the residential
properties to the north and south as the garden ground of these dwellings would be
overlooked from close range. 
The structure would be finished with grey cladding and would feature dark grey windows and
doors while the shallow pitched roof would be finished in dark grey cladding. The choice of
finishing materials raises no design concerns. 
As the two-storey structure would replace a collection of single storey units that have been
developed in a piecemeal arrangement, it is considered that the overall appearance of the
site be rationalised and would improve as a result of the development. However, as the site
is not readily visible from Hawkhead Road the overall benefit to the wider streetscape is
minimal. 
Given the above the proposal is considered to be contrary to Policy P1 of the Local
Development Plan and Policy 26 of NPF4 in that the building, by way of its height, proximity
to boundaries and window placement, would not be compatible with nearby residential
properties. The proposal is also contrary to Policy 14 of NPF4 in that it would not be
conducive to the creation of a pleasant place for the same reasons. 
Context and Character
While it is accepted that commercial activity is long established at the site and predates the
construction of the residential development found to the north, south and west, for the
reasons discussed above the two-storey structure would not respect the current character of
the area. 
Layout and Form
The structure would be located to the south of the site and would replace a collection of
existing single storey units that have been developed in a piecemeal manner. Parking would
be found to the north of the building and the amount of hardstanding within the site would
not change as a result of the development.
Page 71 of 102

Page 76

There are no concerns with the proposed layout of the development in this regard. 
Representations
The potential for the development to affect house prices or to impact on views from nearby
properties are not material planning considerations. The impact construction work may have
on residential amenity is also not a material planning consideration. 
The application has been validated in line with the requirements of The Town and Country
Planning (Development Management Procedure) (Scotland) Regulations 2013. In line with
the Regulations there are no restrictions on who can comment on a proposal. 
While support for business is provided throughout the Development Plan, the site must be
suitable for the business in question and the impact the proposal would have on nearby uses
must be considered. The fact that the business could have to leave the area if consent is
refused or that there may be other sites nearby that could accommodate the proposal are
not material considerations in the determination of this application. 
Given the scale of the development and the existing use of the land it is not considered that
the proposal would raise any air or water pollution concerns. 
All other issues have been addressed in the above report. 
Planning Obligations
The Council is required to provide a summary of the terms of any planning obligation which
is required to be entered into under Section 75 of the Town and Country Planning (Scotland)
Act in relation to the grant of permission for the proposed development: 
None. 
Conclusion
In view of the above assessment, it is not considered that the proposal would accord with the
relevant provisions of the Development Plan. The proposal is contrary to Policy P1 of the
Local Development Plan and Policy 26 of NPF4 in that it would not be compatible with the
existing built environment and would have an unacceptable impact on the amenity of
surrounding residential properties. The proposal is also contrary to Policy 14 of NPF4 for the
same reasons. There are no other material considerations. Planning permission should
therefore be refused. 
Recommendation
Refuse. 
Reason(s) for Recommendation 
1. The development is contrary to Policy P1 of the Local Development Plan, the
New Development Supplementary Guidance on Creating Places and Policies 14
and 26 of NPF4 in that the proposal, by way of its height, proximity to boundaries
and window placement, would not be compatible with the existing built
environment and would have an unacceptable impact on the amenity of the
surrounding residential area. 
Condition(s)         
1. None required. 
Advisory Note(s)  
1. None required.
Page 72 of 102

Page 77

Schedule of Plans Reviewed 
Drawing Number Revision Drawing/Document Title
00-001  Location Plan
00-002  Block Plan as Existing & Proposed
00-003 D Site Section A-A as Proposed
02-001 B Site Plan as Proposed
02-002 B Ground Floor Plan as Proposed
02-003 B First Floor Plan as Proposed
02-004 B Roof Plan as Proposed
02-005 C North & West Elevations as Proposed
02-006 B South & East Elevations as Proposed 
For further information please contact James McCafferty, Development Standards Team,
Email: james.mccafferty@renfrewshire.gov.uk 
Page 73 of 102

Page 78

Page 74 of 102

Page 79

Planning and Climate Change Policy Board: 20 May 2025
Report by Chief Planning Officer 
Reference No 25/0059/PP
Application Type Planning Permission (Local)
Proposal Erection of substation with associated apparatus, fencing, de-
mountable floodlights and access track
Location BAE Land UK - Environmental Test Facility, Glenluce Drive,
Bishopton
Ward 11 – Bishopton, Bridge of Weir and Langbank
Community
Council
Bishopton Community Council
Applicant Scottish Power Energy Networks
Recommendation Grant Subject to Conditions
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=documents&keyVal=SQWMX2MWFL000 
This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of
The Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013. 
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation.  In this instance the application would normally fall within
the Council's scheme of delegation to be determined by an appointed officer. However, a
request was submitted by Cllr Colin McCulloch, Cllr James MacLaren and Cllr Fiona Airlie-
Nicolson, within 21 days of the application appearing on the weekly list, that the matter be
removed from the scheme of delegation for determination by the Board due to the due to the
possible effect on badger sets as well as the visual impact of the development.   
Proposal
This application seeks planning permission for the erection of a substation with associated
apparatus, fencing, de-mountable floodlights and access track on land on the southeastern
edge of the Dargavel Village core development area. 
The proposed substation has a total footprint of approximately 1,176 square metres which is
defined by the 2.5-metre-high timber fence which demarcates the external boundary.
Approximately 1.8 metre behind the timber fence there is a secondary boundary treatment
proposed comprising of a 2.5-metre-high palisade fence. 
The substation comprises of two 33/11kV transformers which are a maximum of
approximately 4.5 metre in height and are positioned in the eastern half of the site. In the
western half there is one 11kV switchgear board and associated housing which is a
maximum of 4 metre in height, and one secondary 6.6kV/11kV substation which is a
maximum of 2.6 metre in height. Two 5-metre-high demountable lights are positioned along
the eastern boundary. 
The substation includes a 5-metre-wide internal access road and turning area. This will in
turn connect to a 6-metre-wide access road which connects the site to an existing turning
head located between the BAE site offices and number 65 Abbington Circle and 31 Glenluce
Drive. The access road is approximately 127 metre in length. The access road route passes
through an area of trees and over a water course. 
Item 3(f)
PACC200525 Page 75 of 102

Page 80

The applicant confirms that the development is required to supply the increased electricity
demand from further residential developments in Bishopton and the new school
development at Dargavel Village (approved under planning application 24/0872/PP). It is
also stated that the proposed development will enhance the reliability of the local electricity
supply. It is noted that part of this increased demand derives from The Building (Scotland)
Amendment Regulations 2023 which prohibit the use of direct emission heating systems for
new buildings. 
It is noted that site clearance works have taken place. This includes realignment of the
Environmental Test Facility (ETF) boundary fence, removal of the concrete platforms at the
site of the proposed substation, removal of grassland, formation of a temporary access over
the watercourse including removal of trees, and removal of trees and other vegetation to
form an area for a compound. 
Site Description
The application site is located approximately 45 metres to the southeast of the Dargavel
Village Core Development area as defined in the Dargavel Village Masterplan, and 60
metres to the southeast of the front elevation of the nearest residential properties on
Abbington Circle. The BAE site offices and the BAE Environmental Test Facility (ETF) are
located approximately 120 metres to the southwest.   
The proposed substation site straddles the boundary of the ETF. It comprises a mix of hard
standing and rough grassland. The access road is within an area of rough grassland with
shrubs and young trees. The site of the substation is flat, however, the land to the west and
southwest has an undulating topography. The land also rises to the north, with Barrangary
Road approximately 86 metres away occupying a higher ground level. The site is bound to
the east by the ETF facility which at this location comprises of woodland. It is noted that the
Georgetown Wood (ROF) Site of Importance for Nature Conservation is located
approximately 130 metres to the southeast. 
It is also noted that approximately 10 metres to the southeast of the application site there is
an electricity substation and switching room building which was approved under planning
application 11/0851/PP. 
The applicant has advised that the site selection for the substation is based on a number of
criteria, and that this location was most optimum of the five sites considered with regard to
accessibility, proximity to cable network, ecological constraints, proximity to residential
properties, visual impact, compliance with ETF constraints, land ownership and topography. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
Pre-application feedback was issued in April 2022. The feedback noted that such
installations would be considered as essential infrastructure which is acceptable within the
green belt in principle. However, it was advised that the development would require
assessment against the green belt development criteria, and matters relating to visual
impact, noise, and loss of existing vegetation were raised. It is also noted that for the
purposes of the pre-application response the proposed site was to the northeast of the
application site and approximately 80 metres from the nearest residential properties on
Abbington Circle. 
Negotiated Improvements
Page 76 of 102

Page 81

Following submission, the following changes have been negotiated between officers and the
applicant: 
The application now includes provision for landscaping and screening on the land between
the application site and the properties on Abbington Circle. 
Site History  
The planning history for the site is as follows; if no history is listed then planning has no
record of previous applications for the site. 
Application Number: 17/0394/PP 
Description: Use of land within the Core Development Area for residential development. 
Decision: Granted subject to conditions and a Section 75 agreement 
Application Number: 17/0393/PP
Description: Use of land within the Core Development Area for residential development (as
part of north west residential neighbourhood) with associated SUDS pond (in principle). 
Decision: Granted subject to conditions and a Section 75 agreement. 
Application Number: 12/0584/PP
Description: Variation of Condition 12 of planning consent 06/0602/PP to change the point at
which the proposed M8 junction at Bishopton will be constructed and brought into use.
Decision: Granted subject to conditions and a Section 75 agreement. 
Application Number: 09/0527/PP 
Description: Engineering operations comprising remediation and bulk earthworks. 
Decision: Granted subject to conditions. 
Application Number: 06/0602/PP 
Description: Regeneration of the site to form a mixed use community growth area. 
Decision: Granted subject to conditions and a Section 75 agreement 10/08/2009.  
Consultations   
▪ Glasgow Airport Safeguarding – No objections. Advisory note required with regard to the
potential use of cranes. 
▪ Environment, Housing & Infrastructure (Env. Protection) - No objection subject to
condition relating to noise. 
▪ Chief Executive's Service (Roads Development) - No objection subject to conditions
relating to submission of a Construction Traffic Management Plan and a cable network
plan. 
▪ National Air Traffic Services (NATS) - No objections. 
▪ Regeneration and Place (Placemaking Officer) – A review of the Preliminary Ecological
Appraisal and the Protected Species Survey has been undertaken and the response
advises that they are reasonable and include appropriate measures which would mitigate
impacts of the development and support biodiversity net gain in line with NPF4. 
▪ Explosives Inspectorate – Have reviewed the submission and have no comments to
make on the basis that the development is not classed as a vulnerable building. The
development does not meet the definition of a vulnerable building in this regard. 
Page 77 of 102

Page 82

▪ Health and Safety Executive Land Use Planning – Development does not cross any
consultation zones. 
Representations
The application has been publicised in line with the requirements of the relevant legislation.
The Council has undertaken two rounds of neighbour notification, one initial notification on
validation of the planning application and another round of notification following the
submission of additional information by the applicant to comply with Section 32A Subsection
4) of the Town and Country Planning (Scotland) Act 1997. 
The following representations were received:
▪ Object - 121
▪ Support - 0
▪ Neutral – 0 
The points raised in the representations can be summarised as follows. 
1 - Electro Magnetic Field (EMF) emitted from the substation poses a health risk, and
development should be at least 100 metres from residential properties, and to be closer than
100 metres is contrary to the applicant’s own guidance. 
2 - Noise and vibration during construction and operation. A noise impact assessment has
not been undertaken.
3 - Fire Risk, electrical faults and explosions posing risk to nearby homes.
4 - Visual impact and development will detract from the character of area, no information
provided on any other design mitigations such as housing.
5 - Decline in property value and mortgages being declined for properties near substations.
6 - Environment desktop assessment is not undertaken by independent consultant and is not
representative of the area, further ecological impact assessment is required.
7 - Loss of habitat and trees and impact on protected species and wildlife. A tree survey has
not been undertaken.
8 - Proposal to plant oak trees will not be sufficient to screen the development.
9 - Potential flood risk and disruption of surface water drainage.
10 - Impact from flood lights on neighbours and wildlife.
11 – Neighbours were advised at time of house purchase that land would remain
undeveloped and form part of the community woodland park as noted in the development
plan.
12 - Impact of additional construction and operational traffic through residential areas and
associated safety concerns and damage to road network.
13 - More suitable brownfield sites are available further away from residential areas.
14 - No requirement for the development.
15 - What is the purpose of the substation and why has this area been selected.
16 - Potential for further overhead line construction and pylons.
17 - Time period and timeline for construction.
18 - Safety risk to children who play in the area and people who use the area for dog
walking, loss of access to the open space.
19 - Land has already been cleared and works have commenced.
20 – The substation is some distance from the required load point, and the substation should
be built closer to the development that it will supply.
21 – Daylight, overshadowing and loss of privacy, loss of amenity to existing residents.
22 – Risk associated with children accessing the site.
23 – There has been no public engagement or consultation. Requirement for substation
should have been presented as part of the consultation on the new primary school.
24 – Impact on the green network.
25 – Proposal is contrary to the development plan.
Page 78 of 102

Page 83

26 – Proposal does not meet minimum recommended distance between substation and
residential properties.
27 – The cross-section drawings do not consider views from upper floor windows
28 – An archaeological assessment has not been undertaken.
29 – Contamination of water courses.
30 – The initial submission was not comprehensive and lacked information.
31 – Inconsistencies and inaccuracies in the submitted plans and non-compliance with
Heads of Planning Scotland guidance.
32 – The additional documents do not lessen concerns raised above.
33 – The proposed landscaping is not acceptable mitigation and there is a lack of
information on the bund, who will implement the landscaping and who will maintain it.
34 – The justification in the planning statement is contrary to SPENs liaison officer who
advised that the substation was to provide additional capacity for the additional houses being
built and BAE systems and not the new primary school. 
35 – The site selection process is not robust nor has it been undertaken in good faith. The
exercise was undertaken by BAE alone, and other sites further away from family homes
need to be considered. Other potential sites have not been fully investigated.
36 – The application site is now designated as part of the community woodland park and is
used for informal recreation, and the fact that historically it was industrial land is not relevant.
37 – SPEN are tenants of land in the surrounding area and should build the substation on
this land.
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the
development plan unless material considerations indicate otherwise. In this instance the
Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire
Local Development Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the
determination of this application: 
National Planning Framework 4 
▪ Policy 1 - Tackling the climate and nature crises
▪ Policy 2 - Climate mitigation and adaptation
▪ Policy 3 – Biodiversity
▪ Policy 4 – Natural Places
▪ Policy 5 - Soils
▪ Policy 6 – Forestry, woodland and trees
▪ Policy 8 – Green Belts
▪ Policy 9 – Brownfield Land, Vacant and Derelict Land and Empty Buildings
▪ Policy 11 – Energy
▪ Policy 13 – Sustainable transport
▪ Policy 14 – Design, Quality and Place
▪ Policy 18 – Infrastructure first
▪ Policy 19 – Heating and Cooling
▪ Policy 20 – Blue and green infrastructure
▪ Policy 22 – Flood risk and water management
▪ Policy 23 – Health and Safety Principles 
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
▪ Policy ENV1 – Green Belt
▪ Policy ENV2 - Natural Heritage
▪ Policy ENV4 – The Water Environment
Page 79 of 102

Page 84

▪ Policy ENV6 – Natural Resources (Minerals and Soil)
▪ Policy I1 – Connecting Places
▪ Policy I3 – Flooding and Drainage
▪ Policy I4 – Renewable and Low Carbon Energy Developments
▪ Policy P5 – Green/Blue Network
▪ Policy P6 – Open Space
▪ Policy P7 – Dargavel Village 
New Development Supplementary Guidance
▪ Delivering the Environment Strategy – Green Belt, Green belt Development Criteria,
Natural Heritage and the water Environment
▪ Delivering the Infrastructure Strategy – Connecting Places, Renewable and Low Carbon
Energy Developments, Flooding and Drainage
▪ Delivering the Places Strategy – Creating Places, Green/Blue Network and Open Space 
Full details relating to the policies of the LDP can be found online. 
Other relevant policies and guidance
▪ PAN 1/2011 Planning and Noise
▪ PAN 50 Planning, Environmental Protection and Regulation
▪ PAN 60 Planning for Natural heritage
▪ PAN 61 Planning and Sustainable Urban Drainage Systems
▪ PAN 79 Water and Drainage 
Submitted Reports and Assessments
The following reports and assessments were submitted in support of the application: 
▪ Planning Statement (SP Energy Networks dated 09/042025) - Provides information on
the development, site selection process and the requirements for the development,
access and infrastructure and transport. There is a review of the development against
policies 1, 2 and 3 of NPF4, and policies ENV1 and I1 of the LDP. With regard to
ecology, a summary is provided in respect of designated sites and habitats, protected
species, and biodiversity enhancements. Finally, a response to some of the points raised
in the letters of representation is also provided. 
▪ Site Selection (SP Energy Networks dated 09/042025) – Provides a summary of the
considerations associated with the site selection process. Five sites were considered
against the selection criteria which consists of site requirements (accessibility and cable
network) and constraints (ecological, residential, Environmental Test Facility (ETF)
constraints, and other miscellaneous such as land ownership and topography 
▪ Protected Species Statement (Bowland Ecology, dated 12/03/2025) – Provides details of
the relevant protected species and recommended mitigation measures following a
survey undertaken by the Ecological Clerk of Works (ECOW) on 7th March 2025. 
There is potential for nesting birds to use habitats within the proposed construction area.
Mitigation includes timing of clearance works outside the bird nesting season, and pre-
start checks. 
While otters are known to use the wider site, no otter holts/couches have been identified
within the water course which crosses the access road. Mitigation includes no flood
lighting, excavations to be covered or a means of escape provided, capping of exposed
pipes, and implementation of pollution prevention measures. 
Page 80 of 102

Page 85

Badgers may use the area, however there are no active sets within 30 metres of the
development. Mitigations include pre-start checks no flood lighting, excavations to be
covered or a means of escape provided, capping of exposed pipes. 
▪ Preliminary Ecological Appraisal (Bowland Ecology, dated March 2025) – The habitat
survey advises that the site comprises of bare cleared ground which was formerly semi-
improved grassland. The clearance extends to the area associate with the access road,
with vegetation along the access route cleared and pipes installed in the drainage
channel. It is noted that pre-start checks were undertaken by the ECOW. 
With regard to protected species, great crested newts have never been recorded at the
site and are considered absent. Common amphibians are likely to use suitable terrestrial
habitat within the area. There are no active badger setts within 30 metres however the
area is a known and well-established commuting route for badgers. There are no
habitats suitable for roosting bats, however the area has moderate suitability for foraging
and commuting bats. Habitats are also suitable for nesting birds and small mammals. No
otter field signs or holts/couches were identified within the water course. 
Mitigations and opportunities are set out. This includes pollution prevention measures
during the construction phase, and mitigations to protect amphibians, bats, badgers,
birds, otters and other species. Proposed enhancement measures include new
hedgerow planting, woodland creation, habitat creation within the remediated compound
area, and hibernacula for hedgehogs. 
▪ Environmental Desktop Assessment (Connicks, dated 15th November 2024) – Notes the
presence of a possible disused badger sett in the woodland to the east of the site. 
The desktop survey examined the area for environmental, ecological and archaeological
constraints. The site survey then focused on the area designated for the construction
compound which includes the area for the proposed substation.  Within the substation
boundary the land is primarily composed of species poor grassland including old
foundations indicating a building was present in the past. To the east is a mature birch
woodland. To the north, west and south is a mix of species poor grassland, scrub and
trees. 
The protected species survey includes species records from datasets, and species data
from the site survey. Recommendations and mitigations are set out with regard to birds
and badgers. This includes additional survey work for badgers. 
▪ Flood Risk Assessment (Kiloh, dated 15th November 2024) – The site is considered to be
at little to no risk from all sources of flooding subject to management of surface water
flows reaching the northern and western boundary. It is therefore recommended that a
surface water management strategy is developed and that surface water interception is
developed along the northern and western boundaries.   
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any
Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the
grant of planning permission) and Regulation 33 (Directions requiring consideration of
condition) of The Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development)
of The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. 
Page 81 of 102

Page 86

None. 
Planning Assessment
Section 25 of the Town and Country Planning (Scotland) Act requires decisions on planning
applications to be made in accordance with the development plan unless material
considerations indicate otherwise.  The Development Plan comprises the National Planning
Framework 4 (2023) (NPF4) and the adopted Renfrewshire Local Development Plan (2021)
(LDP). 
The application site is within the Dargavel Village Community Growth Area as designated
within the LDP proposals map C for Bishopton, Erskine and Inchinnan. The community
growth area is covered by two policies. Policy P7 Dargavel Village relates to the core
development area, with the remainder of the growth area covered by Policy ENV1 Green
Belt. 
The application site is out with the core development area and within the area designated as
green belt. While the land is allocated as greenbelt it is relevant to note that the land on
which the substation will be located historically accommodated forms of infrastructure and/or
buildings with this evident from the existing areas of hardstanding. The site of the substation
can therefore be considered as brownfield land in character. However, as the green belt
policy applies, the development must be assessed against the provisions of the green belt
policies ENV1 of the LDP and the associated new development supplementary guidance,
and 8 of NPF4. 
Policy ENV1 sets out a list of developments that are considered to be appropriate within the
green belt in principle. This includes essential infrastructure such as electricity grid
connections. 
The applicant has advised within the Planning Statement that the development is required to
meet the growing electricity demand associated with the implementation of the masterplan at
Dargavel Village. Electricity demand has increased in part through The Building (Scotland)
Amendment Regulations 2023 which prohibit the use of direct emission heating systems for
new buildings. This would include the remaining residential development plots and the new
primary school which was recently approved under planning application 24/0872/PP. There
are also additional electricity demands arising from EV charging for example.   
As the development is required to facilitate the implementation of the Dargavel Village
masterplan including development of the remaining residential development plots and the
new primary school it is considered to constitute essential infrastructure and is therefore an
appropriate development within the green belt in principle. 
All developments must thereafter be assessed against the New Development
Supplementary Guidance on green belt development with respect to the site-specific
considerations. Each of the assessment criteria will be considered in turn. 
There will be no loss of prime quality agricultural land or agricultural land of lesser quality
that is locally important. 
There will be no adverse impact on the qualities of wild land. 
The development includes a new access road which will connect the proposed substation to
an existing turning head adjacent to the BAE site offices. The access road crosses a water
course. It is noted that a temporary access across the water course has already been
formed, and trees have been removed to facilitate this. 
Page 82 of 102

Page 87

Removal of the trees to accommodate the access road is accepted on the basis that the
proposal now includes a landscape scheme which specifies areas of woodland planting to
the west of the substation. The proposed woodland mix includes Holly, Birch, Elder and
Hawthorn, and will compensate for the loss of the trees to facilitate the access road and the
compound area. It is noted that the area of proposed compensation is greater than the area
of tree loss however a final landscape plan which fully reflects the recommendations set out
in the PEA will be requested via condition.     
A Construction Environmental Management Plan (CEMP) can be covered via a condition to
ensure the water course is protected from sediment pollution during the construction phase. 
The applicant has advised that the access road will be 6 metres in width, and a 600mm
diameter pipe will be installed to allow the road to cross the water course. The final design
and surface finish of the access road can be requested via condition. 
The development will not give rise to significant effect on public water supply or the water
environment from any pollution risk during both the construction and operational phases. As
noted above, a CEMP will be requested via condition to ensure pollution risk is managed
during the construction phase. A drainage strategy will also be requested via condition to
ensure surface water is managed during the operational phase. 
Given the nature of the development there is no requirement to link the site to the active
travel network or the green network. The development does not reduce or unduly
compromise access to any existing active travel routes or the green network. 
The land to the east of Abbington Circle is accessible and includes an informal footpath
which provides access towards Barrangary Road to the north. A number of letters of
representation note that the area is used informally for dog walking or for children playing.
The development of the substation, the access road and the associated landscaping will
result in the loss of some of this land. It is noted that within the Dargavel Park Strategic Plan,
which was approved under the Section 75 agreement associated with the Planning
Permission in Principle applications for the Dargavel Village masterplan, the land is
designated as an informal recreation zone. Additionally, it should be noted that the land on
which the substation itself will be sited straddles the previous boundary of the ETF before it
was realigned. Approximately two thirds of this area was therefore previously behind the ETF
boundary fence and not accessible. The submitted plans show the realignment of the ETF
boundary fence to the rear of the substation, and the applicants have advised that this work
has already been undertaken. The submitted plans also show retention of the informal
footpath. On balance and taking into account the specific characteristics of the land subject
to the application, it is not considered that existing access to the land will be significantly
impacted. 
The development will be visible from Barrangary Road to the north and Abbington Circle to
the west. The development is approximately 100 metres from Barrangary Road, and its
visual impact will be mitigated by the topography of the intervening land. The topography of
the land to the west will also partly obscure the development from Abbington Circle. 
The applicant has provided sections which indicate how the visual impact of the
development will be further mitigated when viewed from Abbington Circle to the west through
additional mounding and landscaping comprising of woodland mix planting. The planting
comprises of a woodland core, edge and wetland mix with additional areas of scrub mix. The
species mix includes shrubs and tree, and the shrubs will be planted at a density of 1.5m
centres which is considered to be an acceptable density of planting. The sections show the
landscaping at years 5 and 15. Most of the plants which form part of the landscaping
Page 83 of 102

Page 88

scheme will be 40-60cm in height when planted with the exception of gorse which will be 30-
40cm, and Downy Birch trees which will be 250-300cm. 
The visual impact of the development will be mitigated by the woodland to the east. To the
south the site is bound by the ETF, the BAE site offices and other ancillary buildings
including an existing substation housing. 
Due to a combination of the above factors, it is not considered that the development will
have a significant detrimental impact on local landscape character. 
The applicant has provided detail on the site selection process which has been undertaken.
It is noted that five sites had been considered but were discounted on a range of criteria
including accessibility, visual impact and ecology. As noted above, the impact of the
proposed site for the development will be further mitigated through the proposed landscape
strategy. Appropriate landscaping proposals have been incorporated in this regard. 
With regard to services, the proposed location has in part been informed by operational
requirements and in particular the location of the existing 33kv cable that will power the
substation. 
The potential impact of the development on nature conservation interests has been
assessed by the applicant through the Environmental Desktop Assessment, the Preliminary
Ecological Appraisal (PEA) and the Protected Species Statement (PSS). A review of the
Preliminary Ecological Appraisal and the Protected Species Survey has been undertaken by
the Councils Regeneration and Place Service who advise that they are reasonable and
include appropriate measures which would mitigate impacts of the development and support
biodiversity net gain. 
Both the PEA and the PSS include mitigations to safeguard natural heritage and protected
species and promote biodiversity gain during the construction and operation of the
development. A condition can be applied to ensure these mitigations are implemented and
fulfilled. 
The development does not include the conversion of any buildings. 
The development must also be assessed against policy 8 of NPF4. This policy also includes
a list of acceptable development proposals and again this includes essential infrastructure.
The proposed development is considered to constitute essential infrastructure as noted
above specifically to meet the increased demand associated with the development of the
masterplan for Dargavel Village, namely the remaining residential plots and the new primary
school (approved under planning application 24/0872/PP), and to provide greater reliability
and resilience to the electricity supply. 
All proposals must thereafter be assessed against the following requirements. 
The applicant has provided detail on the site selection process. It is noted that all five site
locations considered are within the green belt and were grouped in close proximity to the
existing 33kv cable which would feed the substation. Proximity to the existing cable network
appears to be the key site selection criteria in this regard given its fundamental to allowing it
to function. However, it is also recognised that there would potentially be additional issues
associated with locating a development of this nature within alternative sites outwith the
green belt. On balance a green belt location is considered to be acceptable in principle for a
development of this nature. 
Page 84 of 102

Page 89

It is not considered that the purpose of the green belt at this location would be undermined.
The LDP states that the green belt in Renfrewshire maintains the identity of settlements,
protects and enhances the landscape setting of an area and protects and promotes access
opportunities to open space. It is not considered that the development would undermine
these objectives. 
Matters relating to landscape character, external appearance have been addressed above.
On balance it is considered that there will not be a long-term detrimental impact on the
environmental quality of the green belt. 
Policy P7 states that the Council will support development within Dargavel Village where it
supports the principles set out in Figure 13 and the approved masterplan. 
Figure 13 of the LDP indicates that the development site falls within the Community
Woodland Park which bounds the core development area. 
The masterplan for Dargavel Village was most recently updated in September 2023 to reflect
the requirement for the new primary school approved under planning application
24/0872/PP. This update to the masterplan also indicates that the site falls within Dargavel
Park. Although it is noted above that part of the site also falls within the ETF boundary. 
Dargavel Park is covered by the Dargavel Park Strategic Plan which forms part of the
Section 75 agreement for Dargavel Village. The strategic plan sets out thirteen strategic
objectives and five key considerations to be taken into account to ensure the objectives are
met. These are management of woodland, enhancement of habitat, landscape, open water
and watercourses, access, community and recreation, and heritage. 
The Dargavel Park Strategic Plan further identifies the application site as falling within the
informal recreation zone which wraps around Dargavel Village and will absorb the majority of
informal recreation pressures generated by the local population. However, it is also noted
that part of the site falls within the previous ETF area which is not included within the park
strategy area. Accessibility has been discussed above, and on balance it is not considered
that the development would undermine the Dargavel Park Strategic Plan objectives and
considerations. It does not therefore conflict with the masterplan for Dargavel Village. 
Policy I4 of the LDP states that development proposals which deliver increased energy
efficiency and the recovery of energy that would otherwise be lost will be supported. While
the development does not generate electricity, it is associated with the transmission and
distribution of electricity. The assessment criteria set out under policy I4 are therefore
considered to be relevant and will be assessed in turn. 
Matters relating to local environment, landscape character, natural heritage and the water
environment have been discussed above. 
It is not considered that the development will have an impact on any built or cultural heritage
assets. There are no listed buildings, scheduled monuments or archaeological sensitive
areas that will be impacted by the development. 
The amenity of neighbouring residential properties is a key consideration. The consultation
response from Environmental Protection notes the requirement for a condition to limit noise
and structure borne vibration, and this condition would be applied accordingly. 
It is noted that the development includes provision for lighting columns. The applicant has
advised that the floodlighting will only be operational intermittently during maintenance.
Page 85 of 102

Page 90

Floodlights are also operated manually rather than via passive infrared. Environmental
Protection has not made any comment on the lighting scheme. 
It is noted that the majority of the representations list potential health risk from EMF
associated with the development. While potential health risks are out with the scope of the
planning assessment, the applicant has advised that all equipment is manufactured to
current European Standards and is CE (European Conformity) compliant and operates at set
standards that pose no risk to health. 
Environmental Protection has not made any comment on other potential amenity impacts
relating to air quality, glare or shadow flicker. 
Potential noise and vibration issues arising during the construction phase can be managed
through the CEMP.       
Matters relating to the potential impact of the development on the recreational value of the
land have been discussed above. 
With regard to potential impact on the local road network, Roads Development has
requested submission of a Construction Traffic Management Plan (CTMP) to ensure the
introduction of additional construction traffic associated with the development has minimal
interaction with pedestrians, cyclists, public transport and private vehicles using the local
road network. This includes swept path to demonstrate that the largest anticipated vehicle
can safely access and egress the site. 
Roads Development have also requested submission of a cable network plan should any
new cables need to be installed on a prospectively adopted or adopted road. However these
matters would be controlled via other legislation (namely the Roads (Scotland) Act), and a
planning condition to control this matter is not required. 
The development is not at a location or of a scale that triggers consultation with Transport
Scotland or Network Rail. It is not anticipated that the development would have a detrimental
impact on the trunk road or railway network in this regard. 
Finally, both NATS and Glasgow Airport Safeguarding have not objected to the development.
The development will not therefore have a detrimental impact on the safe and efficient
operation of Glasgow Airport. 
Regarding the relevant criteria on Renewable and Low Carbon Energy Developments as set
out within the new development supplementary guidance, it is considered that significant
visual intrusion within the landscape has been minimised. 
There will be no significant unacceptable adverse impact on the natural or historic
environment. 
The selection of the proposed site has been justified, and consideration has been given to
alternative sites. 
It is not considered that there will be a significant unacceptable impact on the amenity of
nearby residential properties in terms of statutory air quality objectives, noise or other
nuisances including glare and shadow flicker. The consultation response from Environmental
Protection is again noted in this regard, and as previously outlined, potential health issues
relating to EMF are outwith the scope of the planning assessment. 
Page 86 of 102

Page 91

There will be no significant unacceptable impacts on the transport network including
Glasgow Airport. 
It is not considered that there are any cumulative impacts associated with the development
and any other existing or proposed developments. The presence of an existing substation to
the south is noted. However, this is of a much smaller scale and visual impact as it is
concealed within a housing. 
Matters relating to access routes and open space have been addressed above. 
NPF4 policy 11 seeks to encourage and facilitate all forms of renewable energy development
including new and replacement transmission and distribution infrastructure. While the
development does not generate electricity, the assessment criteria set out within policy 11
are still considered to be of relevance as the development relates to the transmission and
distribution of energy. 
The assessment criteria within policy 11 are broadly similar to those set out within policy I3
and the associated new development supplementary guidance. With regard to the additional
criteria set out within policy 11, the development will not give rise to any impact on
telecommunications or broadcasting installations with regard to transmission links. 
The Regeneration and Place Service has advised that the mitigations set out within the PEA
and the PSS will support biodiversity net gain. The mitigations will also ensure impact on
birds is minimised through the timing of works outwith the bird breeding season, and/or
prestart checks on site before works commence. 
The development will not have an impact on the woodland to the east given the separation
distance. The woodland will also remain within the ETF site boundary. 
It is acknowledged that trees have been removed to accommodate a temporary access road
and that this temporary road reflects the alignment of the proposed access road. However,
the proposed landscaping scheme ensures this loss will be compensated for. 
It is also noted that an area of scrub and trees have been cleared to form the construction
compound. Plans for the remediation of the compound area will be require as part of the
CEMP, with the PEA and PSS noting the opportunity for associated ecological
improvements. 
Turning to the remaining development plan policies, NPF4 policy 3 seeks to protect
biodiversity, reverse biodiversity loss, and deliver positive effects from development.
Proposals for local development will include appropriate measures to conserve, restore and
enhance biodiversity in accordance with national and local guidance. Measures should be
proportionate to the nature and scale of development. 
Section 5.15 of the PEA sets out biodiversity enhancement measures which include new
hedgerow planting around the boundary of the substation, native woodland creation and
planting of scattered groups of native trees to the east and west, post construction
remediation of the compound area to provide habitat creation opportunities, and hibernacula
for hedgehogs. 
As noted above, the application includes woodland mix planting to the west of the
substation. This is primarily in response to the visual impact of the development. However,
this planting is also in line with the native woodland creation enhancement measure
recommended above and will compensate for the loss of woodland associated with the
Page 87 of 102

Page 92

formation of the access road. Notwithstanding this, it is considered that a further landscaping
strategy should be submitted which fully reflects and delivers the enhancements noted in the
PEA. This matter can be managed via condition. The Councils Regeneration and Place
Service has advised that implementation of the enhancement measures will support
biodiversity net gain. 
NPF4 policy 4 seeks to protect, restore and enhance natural assets making best use of
nature-based solutions. 
In view of the above assessment, it is not considered that the development proposal by
virtue of its type, scale or location will have an unacceptable impact on the natural
environment. There are no local, regional or national designated sites that will be impacted
by the development. The substation will be located on an area previously comprising of
hardstanding and rough grassland. The applicant indicates that there was previously a
substation at this location. However, satellite imagery indicates the site has been vacant
since at least 2009. The access road and the construction compound will be developed over
rough grassland, areas of scrub and young trees, and over a watercourse. Site clearance
works and a temporary crossing over the water course have already been undertaken as
noted above. 
The PEA states that the existing habitats within the site are species poor and commonly
occurring. Construction of the substation will primarily affect areas of former hard standing. It
is noted that ground clearance works have already taken place. However, the PEA indicates
that impact on the existing habitat is minimal, and most of the habitats will be retained post
construction. There are also opportunities for enhancement as noted above. Permanent
losses are largely restricted to the access road as the substation will be developed on an
area which was previously hard standing. 
The PEA and PSS also set out set out the survey for protected species which was
undertaken. The potential impact on amphibians, badgers, bats, birds, otters and other
mammals has been considered. While not all these species were observed, it was noted that
the land could still be used for foraging and commuting purposes for example in respect of
bats and badgers. A range of mitigations are therefore set out to ensure species are
protected during construction and operation phases. These mitigations range from pollution
prevention measures to the timing of vegetation clearance. A condition can be applied to
ensure the mitigations are implemented at the construction phase as part of the CEMP, and
the ongoing operation of the substation. 
As noted above, the PEA and the PSS have been reviewed by the Councils Regeneration
and Place Service who has advised they are reasonable and include appropriate measures
which would mitigate impacts of the development.   
Policy 6 of NPF4 seeks to protect and expand forests, woodland and trees. Development
proposals that enhance, expand and improve woodland and tree cover will be supported.
Proposals will not be supported where they result in loss of ancient woodland, native
woodland, hedgerows and trees of high biodiversity value, fragmenting or severing woodland
habitats, or conflict with restocking direction.           
The development will result in the loss of some trees to facilitate the formation of the access
road. It is noted that these trees have already been removed. However, the trees were not
within any of the categories set out within Policy 6 with respect to age or biodiversity value.
Compensation for the loss of trees will be delivered via the landscaping scheme and this is
greater than those which require to be felled 
Page 88 of 102

Page 93

The PEA notes that Georgetown Wood SINC is located approximately 120 metres to the
southeast of the proposed substation boundary. The SINC overlaps an area of ancient
woodland situated approximately 90 metres to the east. Considering the intervening distance
and scale of the development the risk of impact the designated site and woodland is
considered to be low. It is noted that some connectivity between the site and these
designated areas may be present via the water course which may provide a pathway for silts
or other pollutants. However, pollution control measures will be implemented during the
construction phase via the CEMP, and the operational phase via the drainage scheme. 
Policy ENV2 of the LDP states that development proposals should protect and restore
degraded habitats, enhance and promote access to the natural environment and minimise
any adverse impact on habitats, species, network connectivity or landscape character.
Proposals must not have an adverse effect on the integrity of sites protected for their nature
conservation interest or wider biodiversity value. The above assessment is considered to
demonstrate compliance with Policy ENV2 and the associated new development
supplementary guidance. 
Policy 5 of NPF4 seeks to protects carbon rich soils, restore peatlands and minimise
disturbance to soils from development. While the protection of prime quality agricultural land
and land of lesser quality that is locally important is the primary focus of the policy, the policy
also seeks to avoid and then minimise the disturbance to soils on undeveloped land. 
Section 3.5 of the PEA notes the presence of peat (up to 300mm deep) on the site of the
substation following site clearance works. It is noted that the site has previously been
developed and is brownfield. Redevelopment of the site would not therefore be contrary to
policy 5 and it is relevant to note that the site does not constitute prime quality agricultural
land. However, the presence of peat must be considered with regard to protecting carbon
rich soils. Submission of a peat management plan is therefore considered to be reasonable
to ensure any peat on the site is managed appropriately. The management plan can be
secured by condition 
Policy ENV6 of the LDP also seeks to minimise the impact on peat and other carbon rich
soils. The submission of a peat management plan would also satisfy the terms of this policy. 
Policy 9 of NPF4 seeks to encourage, promote and facilitate the reuse of brownfield, vacant
and derelict land and empty buildings. Development proposals that will result in the
sustainable reuse of brownfield land will be supported. 
In this instance it is noted that part of the substation footprint will be located on an area
which previously contained hard standing (it is noted that the hard standing has since been
removed in association with the realignment of the ETF boundary fence). The applicant has
advised that the hard standing was previously associated with a substation. However,
satellite imagery indicates the site has been vacant since at least 2009. Notwithstanding this
the presence of the hard standing indicates that the site has been previously developed and
would be considered brownfield. 
Policy 9 also states that the biodiversity value of the brownfield land which has been
naturalised should be taken into account. Matters relating to biodiversity have been
addressed above. 
Policy 13 of NPF4 primarily seeks to encourage, promote and facilitate developments that
prioritise walking, wheeling and cycling and public transport for everyday travel and reduce
the need to travel unsustainably. However, in this instance the development will not generate
a significant number of journeys when in use. Additionally, it will not have a detrimental
impact on the strategic transport network. 
Page 89 of 102

Page 94

Policy I1 of the LDP also seeks to ensure good accessibility and connectivity to walking,
cycling and public transport use. Development proposals require to ensure appropriate
provision and accessibility in this regard. Again as noted above, the development will not
generate a significant number of journeys when in use and on this basis there is no
requirement to ensure connectivity and accessibility to walking, cycling and public transport. 
Regarding the associated new development supplementary guidance, Roads Development
has offered no objections to the development subject to a condition requiring submission of a
CTMP to ensure construction traffic is managed appropriately. 
Policy 14 of NPF4 states that development proposals will be designed to improve the quality
of an area whether in an urban or rural location and regardless of scale. Development
proposals will also be supported where they are consistent with the six qualities of
successful place. 
In this instance and as noted above, the development includes measures to mitigate its
impact on amenity and the quality of the area. This includes the mounding and landscaping
along the western boundary, and the additional biodiversity enhancements noted in the PEA.
Matters relating to residential amenity have also been discussed above. On balance it is
acknowledged that the substation will have an impact on the quality of the area primarily in
relation to visual impact and character although this will be reduced over time as the
landscaping matures. Due weight is also given to the fact that the development constitutes
essential infrastructure for which the site-specific demand has been demonstrated with
regard to meeting the demand associated with the remaining residential development plots
and the new primary school. The mitigations noted above will ensure the impact on the
quality of the place is reduced. 
Policy 18 of NPF4 seeks to encourage, promote and facilitate an infrastructure first approach
to land use planning. Proposals which provide (or contribute to) infrastructure in line with that
identified as neccesary in LDP’s and their delivery programmes will be supported. 
The applicant has justified the need for the development, and it is considered to constitute
essential infrastructure which is required to serve the final phases of the Dargavel Village
masterplan as defined within the LDP namely the development of the remaining residential
plots and the new primary school. The need for additional electricity transmission and
distribution infrastructure to serve the final phases of the development arises from the
adoption of decarbonised heating solutions for all new buildings. The development will also
provide greater reliability and resilience to the electricity supply, and there is a demonstrable
need for the development in this regard. 
Similarly to policy 18, policy 19 of NPF4 states that development which supports
decarbonised solutions to heat and cooling demand should be encouraged and promoted.
The development will support this policy by providing a reliable and resilient electricity supply
to new buildings within Dargavel where a decarbonised heating solution has been adopted.       
Policy 20 of NPF4 seeks to protect and enhance blue and green infrastructure and their
networks. The impact on accessibility and open space has been noted above. While the
development will result in a net loss of open space it is not considered to be significant, nor
will it result in or exacerbate a deficit in blue or green infrastructure provision or the overall
integrity of the network. As noted above approx. two thirds of the footprint of the substation
was on previously inaccessible land behind the ETF boundary fence. The ETF boundary
fence has now been realigned. The net loss of open space and the green network relates to
the remaining footprint of the substation and the access road. The construction compound
will be remediated as part of the CEMP and the landscape strategy. Potential impact on blue
Page 90 of 102

Page 95

infrastructure, namely the water course, will be mitigated via the CEMP and associated
pollution prevention plan. 
Policy P5 of the LDP and the associated new development supplementary guidance also
states that development which protects, maintains or enhances the quality and connectivity
of green/blue networks including rights of access and open space, will be supported. 
The proposed plans show retention of the informal footpath, and it is not considered that
access to the open space will be restricted by the development. The net loss of open space
has been discussed above.   
Policy P6 of the LDP refers specifically to areas of valuable and functional open space,
recreation provision and amenity space as shown on the LDP proposals maps will be
protected from development. Development proposals which result in a net loss of open
space not identified in the proposals map will be assessed in relation to the criteria set out in
the new development supplementary guidance. 
As the application site is identified on the proposals plans as green belt and not open space,
the criteria within the new development supplementary guidance are relevant and will be
considered in turn. 
The development is not for recreational or physical activity use. 
There is a long-term strategy (Leisure Services Strategy and Dargavel Park Strategic Plan)
for provision of open space at Dargavel Village. This includes the structural landscaping
within the core development area, and the woodland park. The strategies aim to ensure
provision of open space of recreational and amenity value. The development will not
undermine these strategies with respect to provision of open space in the wider area. 
It is not considered that the development will lead to a significant net loss of open space. 
There is not considered to be a significant adverse impact on the amenity of nearby
residents. Matters relating to the retention of existing facilities and redevelopment of the
surplus section of the site are not relevant. 
There are alternative existing and proposed areas of open space of equal or greater value at
other locations within Dargavel Village. This includes Central Park and the other areas of
Dargavel Park which will be delivered in accordance with the park strategy. 
The benefits of the proposed development have been set out above, namely that the
development will support the transition to decarbonised sources of heating for all new
buildings within Dargavel Village including the remaining residential plots and the new
primary school. The letters of representation note the value of the open space fronting
Abbington Circle for recreation. However, it is noted that the open space will not be lost in its
entirety, and land surrounding the substation will still be accessible for dog walking. In terms
of security, it is noted the substation includes two forms of boundary fence, a 2.5-metre-high
timber fence and a 2.5-metre-high palisade fence which will ensure the substation is secure.
There will not be a significant net loss or overall deficit in open space provision in this regard. 
Finally, it is not considered that the amenity of the surrounding area will be significantly
affected by the loss of a small part of the open space or by the nature of the proposed
development. It is acknowledged that the substation will have an impact on the quality of the
area primarily in relation to visual impact and character although this will be reduced over
time as the landscaping matures and on balance when taking the mitigations into account
the impact is not considered to be significant.
Page 91 of 102

Page 96

Policy 22 of NPF4 seeks to strengthen resilience to flood risk by promoting avoidance as a
first principle and reducing the vulnerability of existing and future development to flooding. 
The application is accompanied by a Flood Risk Assessment which notes that the site is at
little to no risk of flooding from river or coastal sources. The source of flood risk relative to
the site is surface water, with surface water flows reaching the northern and western
boundary. It is therefore recommended that a surface water management strategy is
developed, and that surface water interception is developed along the northern and western
boundaries.   
The surface water management strategy can be submitted via condition. The strategy will
ensure surface water is managed appropriately with regard to pollution risk and the risk of
flooding elsewhere. Policy 22 states that all surface water should be manged through
sustainable urban drainage systems (SUDS) which should form part of the existing
blue/green infrastructure. 
The provisions of policy 22 are also reflected in LDP policy I3 and the associated new
development supplementary guidance which also supports the use of SUDS and integration
into blue/green infrastructure. 
Policy ENV4 of the LDP states that here will be support for proposals which encourage
protection of the existing water environment, improvements to the control and management
of water and enhancement of biodiversity surrounding blue corridors. In this instance the
water environment will be safeguarded via the pollution prevention measures which form
part of the CEMP. Surface water will be managed sustainably via the drainage strategy.
Matters relating to biodiversity have been addressed above.   
Policy 23 of NPF4 seeks to protect people and places from environmental harm, mitigate
risks arising from safety hazards and encourage, promote and facilitate development that
improves health and wellbeing. 
A key consideration in the assessment of health impacts is the consultation response from
Environmental Protection. In this instance, Environmental Protection have not objected to
the development and have recommended a condition to mitigate noise impact. No concerns
have been raised in relation to air quality. As noted above, matters relating to the potential
health impacts associated with EMF are considered to be outwith the scope of the planning
assessment. The development also includes two boundary fences which will ensure that the
substation is secure. On this basis, it is considered that the development is not likely to have
a significant adverse effect on health within the scope of matters that can be assessed as
part of the planning application. 
There have been no objections to the development from the Health and Safety Executive
Land Use Planning team or the Explosives Directorate. 
The development has been screened against The Town and Country Planning
(Environmental Impact Assessment) (Scotland) Regulations 2017 to determine if it should be
accompanied by an environmental impact assessment. In this instance, the development
does not fall within schedule 1 or schedule 2 of the regulations. An environmental impact
assessment is not therefore required.     
The majority of the matters raised in the letters of representation have been addressed in the
foregoing assessment however a summary of the points raised is also set out below with a
response below each highlighted in bold. 
Page 92 of 102

Page 97

1 - EMF poses a health risk, and development should be at least 100 metres from residential
properties, and to be closer than 100 metres is contrary to the applicant’s own guidance. 
Matters relating to EMF have been considered in the foregoing assessment. 
2 - Noise and vibration during construction and operation. A noise impact assessment has
not been undertaken. 
Matters relating to noise and vibration have been considered during the foregoing
assessment. 
3 - Fire Risk, electrical faults and explosions posing risk to nearby homes. 
The potential for the facility to combust is not in itself a material planning
consideration, and planning decisions cannot be based on the likelihood of a facility
catching fire. 
4 - Visual impact and development will detract from the character of area, no information
provided on any other design mitigations such as housing. 
Matters relating to visual impact have been considered in the foregoing assessment. 
5 - Decline in property value and mortgages being declined for properties near substations. 
Impact on property value is not a material planning consideration. 
6 - Environment desktop assessment is not undertaken by independent consultant and is not
representative of the area, further ecological impact assessment is required. 
A Preliminary Ecological Appraisal and Protected Species Statement have been
submitted in addition to the Environmental Desktop Assessment. 
7 - Loss of habitat and trees and impact on protected species and wildlife. A tree survey has
not been undertaken. 
Matters relating to trees, habitats and protected species have been considered in the
foregoing assessment. 
8 - Proposal to plant oak trees will not be sufficient to screen the development. 
Matters relating to the provision of landscaping and screening have been considered
in the foregoing assessment. 
9 - Potential flood risk and disruption of surface water drainage. 
Matters relating to flood risk and surface water drainage have been considered in the
foregoing assessment. 
10 - Impact from flood lights on neighbours and wildlife. 
Matters relating to flood lights have been considered in the foregoing assessment. 
11 – Neighbours were advised at time of house purchase that land would remain
undeveloped and form part of the community woodland park as noted in the development
plan.
Page 93 of 102

Page 98

This is a civil/legal matter between house purchasers and the seller and is not a
material planning consideration. 
12 - Impact of additional construction and operational traffic through residential areas and
associated safety concerns and damage to road network. 
Matters relating to construction traffic have been considered in the foregoing
assessment. 
13 - More suitable brownfield sites are available further away from residential areas. 
The suitability or availability of other sites does not make the application site
unsuitable. The application must be assessed on its own merits against the
provisions of the development plan. 
14 - No requirement for the development. 
The applicant has demonstrated a requirement for the development. 
15 - What is the purpose of the substation and why has this area been selected. 
The purpose of the development and the site selection process have been considered
in the foregoing assessment. 
16 - Potential for further overhead line construction and pylons. 
The applicant has advised that overhead lines will not be required, and the substation
will utilise new and existing underground cables. 
17 - Time period and timeline for construction. 
Ultimately the time period and commencement date for the construction phase is not
a material consideration. Planning permissions must be implemented within 3 years
of the date of the consent. Potential impacts associated with the construction phase
will be mitigated through the CEMP and the CTMP. A condition will be applied to
restrict working hours. 
18 - Safety risk to children who play in the area and people who use the area for dog
walking, loss of access to the open space. 
Matters relating to access have been considered in the foregoing assessment. 
19 - Land has already been cleared and works have commenced. 
This has been noted and is reflected in the above assessment. It is noted that land
clearance works can be undertaken without requiring planning permission. 
20 - The substation is some distance from the require load point, and the substation should
be built closer to the development that it will supply. 
Matters relating to site selection have been considered in the foregoing assessment. 
21 – Daylight, overshadowing and loss of privacy, loss of amenity to existing residents. 
Page 94 of 102

Page 99

It is not considered that the development raises any issues relating to daylight,
overshadowing or loss of privacy given the nature of the development and the
separation distance to residential properties. 
22 – Risk associated with children accessing the site. 
Ultimately this is a risk that needs to be managed by the operator however it is noted
in the foregoing assessment that the substation has two boundary fences which
secure and enclose the site. 
23 – There has been no public engagement or consultation. Requirement for substation
should have been presented as part of the consultation on the new primary school. 
Pre-application consultation with the local community is not required as part of the
planning process as the development falls within the ‘local’ category of development.
It is understood that separate and additional community consultation outwith the
scope of planning requirements has been undertaken following a request from an
MSP. 
24 – Impact on the green network. 
Matters relating to the green network have been considered in the foregoing
assessment. 
25 – Proposal is contrary to the development plan. 
The development has been assessed against the development plan in the foregoing
assessment. 
26 - Proposal does not meet minimum recommended distance between substation and
residential properties. 
The development has been assessed against the development plan which does not
specify a minimum separation distance. 
27 – The cross-section drawings do not consider views from upper floor windows 
The cross section drawings have been updated to consider upper floor windows. 
28 – An archaeological assessment has not been undertaken. 
The application site is not within an archaeological trigger zone, and the West of
Scotland Archaeology Service (WoSAS) have not submitted a consultation response. 
29 – Contamination of water courses. 
Matters relating to water contamination have been considered in the foregoing
assessment. 
30 – The initial submission was not comprehensive and lacked information. 
Additional information has been requested in line with Section 24 of The Town and
Country Planning (Development Management Procedure) (Scotland) Regulations
2013. Following receipt of this additional information, a further Neighbour Notification
was undertaken in line with procedural planning requirements. 
Page 95 of 102

Page 100

31 – Inconsistencies and inaccuracies in the submitted plans and non-compliance with
Heads of Planning Scotland guidance. 
The initial form and content of the submission complies with the requirements of
section 6 of The Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013. The application site boundary is clearly set out on the
Location Plan regarding the extent of land associated with the application. Neighbour
Notification has also been undertaken on the basis of the red line set out on the
Location Plan.   
32 – The additional documents do not lessen concerns raised above. 
Matters relating to the additional documentation and all above matters have been
discussed in the foregoing assessment. 
33 – The proposed landscaping is not acceptable mitigation and there is a lack of
information on the bund, who will implement the landscaping and who will maintain it. 
The proposed landscaping has been considered in the foregoing assessment. A
planning condition will be used to ensure the landscaping is delivered and
maintained. Section 41 of The Town and Country Planning (Scotland) Act 1997 states
that conditions may be imposed on any land under the control of the applicant
whether or not it is land in respect of which the application was made. The fact that
the area of landscaping falls outwith the red line site boundary does not prohibit a
planning condition in this regard. 
34 – The justification in the planning statement is contrary to SPENs liaison officer who
advised that the substation was to provide additional capacity for the additional houses being
built and BAE systems and not the new primary school. 
The Council was not party to the discussions with SPEN’s liaison officer and must
base the assessment of the application on the information that has been provided.
Ultimately as noted in the foregoing assessment there is an increased electricity
demand associated with the development of the masterplan at Dargavel both in terms
of the remaining residential development plots and the new primary school. Demand
from the ETF may be a factor as well as this is an established operation at this
location. The substation will ensure this demand can be met and provide a more
reliable and resilient electricity supply. 
35 – The site selection process is not robust nor has it been undertaken in good faith. The
exercise was undertaken by BAE alone, and other sites further away from family homes
need to be considered. Other potential sites have not been fully investigated. 
Matters relating to site selection have been discussed in the forgoing assessment. 
36 – The application site is now designated as part of the community woodland park and is
used for informal recreation, and the fact that historically it was industrial land is not relevant. 
Matters relating to the status of the land, the Dargavel park strategy and accessibility
have been discussed in the foregoing assessment. 
37 - SPEN are tenants of land in the surrounding area and should build the substation on
this land. 
Page 96 of 102

Page 101

The proposed development must be assessed on its own merits against the
development plan. 
The Council is required to provide a summary of the terms of any planning obligation which
is required to be entered into under Section 75 of the Town and Country Planning (Scotland)
Act in relation to the grant of permission for the proposed development: 
None. 
Conclusion
In view of the above, it is considered that the proposal would accord with the relevant
provisions of the Development Plan. There are no other material considerations. Planning
permission should therefore be granted subject to conditions. 
Recommendation
Grant Subject to Conditions. 
Reason(s) for Recommendation 
The proposal accords with the provisions of the Development Plan and there were no
material considerations which outweighed the presumption in favour of development
according with the Development Plan. 
Condition(s)   
1. That the development hereby permitted must be begun within three years of the date
of this permission. 
Reason: To be in compliance with Section 58 of The Town and Country Planning
(Scotland) Act 1997 as amended by Section 32 of The Planning (Scotland) Act 2019. 
2. The design, installation and operation of any plant, machinery or equipment shall be
such that noise associated with the development does not exceed Noise Rating
Curve NR25 between the hours of 2300 to 0700 hours and NR 35 at all other times
OR NR35 between the hours of 0700 and 2300 hours with no plant operating outwith
these times, when measured within any dwelling in the vicinity of the development.
Structure borne vibration from the proposed development shall be imperceptible
within any dwelling in the vicinity of the development. For an explanation of noise
rating curves, refer to BS 8233:2014 Sound insulation and noise reduction in
buildings- code of practice, Annex B. Should any of the above ratings be exceeded
the operator shall agree mitigation in writing with the Planning Authority and
thereafter implement the mitigation as agreed. 
Reason: In the interests of residential amenity. 
3. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place (s) as may first be agreed in
writing by the Planning Authority), shall be carried out between the following hours
unless otherwise approved in writing by the Planning Authority: 
- Monday to Fridays: 08.00-18.00
- Saturdays: 08.00-13.00
- Sundays and public holidays: No working 
Reason: In the interests of residential amenity. 
Page 97 of 102

Page 102

4. That prior to the commencement of development, a Construction Environmental
Management Plan (CEMP) shall be submitted to and approved in writing by the
Planning Authority.  The CEMP shall include (but not be limited to) provisions in
respect of: 
- mitigation measures for potential dust, noise, and vibration impacts on nearby
sensitive receptors and nationally and locally designated sites,
- waste management, pollution control, and mitigation to prevent pollution of ground,
air and water courses,
- the design of the access road including provision for crossing the water course, 
- a plan showing existing drainage pipes and other utilities within the site and
procedures for how they will be safeguarded during construction,
- surface water management,
- tree protection measures for trees to be retained both within and on the edge of the
site boundary,
- the location and layout of all site compounds, 
- procedures for monitoring compliance and dealing with any breaches of the
approved plan,
- the additional signage to be installed where access will be taken to inform drivers of
the construction vehicles.
- details of proposed temporary site compound for storage of materials, machinery,
and designated car parking. 
The measures set out within the approved CEMP shall thereafter be implemented on
site during the construction phase. 
Reason: To ensure environmental impacts are mitigated during the construction
phase, and that the construction phase is undertaken safely. 
5. That prior to the commencement of development on site, the developer shall submit
for the written approval of the Planning Authority a detailed drainage strategy for the
site. The strategy shall set out the SUDS measures to be implemented at the site to
ensure that surface water is managed sustainably and shall include a maintenance
plan for all SUDS features. The drainage strategy as approved in writing by the
Planning Authority shall thereafter be implemented on site and maintained thereafter
for the life of the development. 
Reason: To ensure effective drainage infrastructure is installed on site and
maintained appropriately in the interests of effective surface water management. 
6. That prior to the commencement of development on site, the developer shall submit
a Construction Traffic Management Plan (CTMP) for the written approval of the
Planning Authority. The CTMP shall include (but not be limited to) details in respect
of; 
- Details of the design, layout, geometry and surface finish of the access including
geometry for the construction and post construction phase of the development
and swept path to demonstrate that the largest expected vehicle can access the
site.
- The additional signage on both public roads where access will be taken to inform
drivers of the construction vehicles.
- Details of proposed temporary site compound for storage of materials, machinery,
and designated car parking.
Page 98 of 102

Page 103

- Details of construction traffic routing, vehicle types and number of journeys,
identifying potential points of conflict between construction traffic and pedestrians
and cyclists and measures to mitigate any impact.   
The details set out within the approved CTMP shall thereafter be implemented on site
during the construction phase. 
Reason: To ensure traffic impacts are mitigated during the construction phase, and
that the construction phase is undertaken safely. 
7. That prior to the commencement of development on site, the developer shall submit
a specification for the written approval of the Planning Authority which details the final
design and finishing colour of all above ground elements of the development
including (but not limited to) all transformers, housing, floodlights, boundary fencing
and gates, and any other plant or machinery to be developed at the site. The
development shall thereafter be undertaken in accordance with the details within the
approved specification. 
Reason: To ensure the colour of all built elements within the site is reflective of the
landscape setting in the interests of visual amenity. 
8. That prior to the commencement of development on site, full details of all
landscaping works shall be submitted as part of a landscape strategy for the written
approval of the Planning Authority. The landscape strategy shall include both the
landscape proposals set out in approved drawing 715-3371 revision C and 715-2912
revision J, and also shall include all enhancement measures set out in section 5.15 of
the Preliminary Ecological Appraisal by Bowland Ecology, dated March 2025 in
respect of: 
- all existing trees, hedgerows, and boundary treatments both within and on the
edge of the site to be retained including the management of these features and
protection measures to be implemented during the construction phase 
- confirmation of any hedgerows or trees that need to be removed including any to
form the visibility splays associated with the access sightlines, 
- all proposed trees, shrubs, hedgerows, areas of grass/wildflower seeding, turfing
including size, species, spacing and location, 
- all earthworks including mounding specifying existing and proposed ground
levels, 
- the location and surface finish of all areas of hard standing including the access
road, 
- all areas of surface water including ponds, and measures for the sustainable
management and drainage of surface water where applicable, 
- a timetable for the implementation of the landscape strategy, 
- a strategy for the future management and maintenance of all landscaped areas
including provision for replacement of trees, shrubs, hedgerows and areas of
grass/wildflower seeding and turfing if they were to become diseased, die,
become seriously damaged or are removed within 5 years of being planted. 
Page 99 of 102

Page 104

The approved landscape strategy shall thereafter be implemented on site in
accordance with the approved timetable and shall be managed and maintained
thereafter for the duration that the solar park is operational. 
Reason: To ensure a robust landscaping strategy is implemented in the interests of
visual amenity, landscape character and biodiversity. 
9. That all mitigations set out in section 5.2 – 5.14 of the Preliminary Ecological
Appraisal by Bowland Ecology, dated March 2025 and the outline mitigation
measures set out in the Protected Species Statement by Bowland Ecology, dated
12/03/2025 shall be implemented on site during the construction and operation of the
development hereby approved. 
Reason: In the interests of safeguarding protected species. 
10. That prior to the commencement of development on site, the developer shall submit
a Peat Management Plan for the written approval of the Planning Authority. The
management plan will set out the means by which the disturbance of peat has been
avoided, and thereafter detail methods for the handling, storage and compensatory
reinstatement of peat that will be disturbed. The approved Peat Management Plan
shall thereafter be implemented on site to the satisfaction of the Planning Authority. 
Reason: To ensure peat on the site is protected and any detrimental impacts are
mitigated in the interests of safeguarding carbon rich soils.   
Advisory Note(s) 
1. Glasgow Airport Safeguarding has observed that given the nature of the proposed
development it is possible that a crane may be required during its construction. In the
circumstances, your attention is drawn to the requirement within the British Standard
Code of Practice for the safe use of cranes, for crane operators to consult the
aerodrome before erecting a crane in close proximity to an aerodrome. This is
explained further in Advice Note 4 - Cranes (available at
https://www.aoa.org.uk/policy-campaigns/operations-safety). 
Schedule of Plans Determined 
Drawing Number Revision Drawing/Document Title  
Preliminary Ecological Appraisal by
Bowland Ecology, dated March 2025  
Protected Species Statement Bowland
Ecology, dated 12/03/2025
715-3371  C Primary Substation Landscape Proposals
715-3372 B Primary Substation Landscape Sections
715-2912 J Planting Schedules
SP4189001 0.G Proposed Substation Layout &
Construction Laydown Area
SP4189002 0.F Proposed Land Purchase Layout
SP4189003 0.H Location Plan
SP4189004 0.F Block Plan
SP4189005 0.B Existing Site Plan
SP4189006 0.E Proposed Site Plan
SP4189007 0.E Existing and Proposed Elevations
Page 100 of 102

Page 105

SP4190120 0.A Visual Display of Similar Substation at
Another Site   
For further information please contact James Weir, Development Standards Team, Email:
james.weir@renfrewshire.gov.uk. 