24/0872/PP - Report by Chief Planning Officer
Planning and Climate Change Policy Board: 18th March 2025 
Reference No 24/0872/PP
Application Type Planning Permission - Full
Proposal Erection of a three-storey Primary School with integrated sports
and assembly halls, cycle storage, parking and drop-off facilities,
hard and soft landscaping and an external 3G full-size flood-lit
sports pitch.
Location Former Royal Ordnance Site - Area E1, Station Road, Bishopton
Ward 11 – Bishopton, Bridge of Weir and Langbank
Community
Council
Bishopton Community Council
Applicant Renfrewshire Council
Recommendation Grant subject to conditions
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=documents&keyVal=SO2SGYMWMA300 
This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of
The Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013. 
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation.  In this instance, the application relates to a major
development as defined within the Town and Country Planning (Hierarchy of Development)
(Scotland) Regulations 2009 and therefore requires to be considered at determined by the
Planning and Climate Change Policy Board. 
Proposal
This application seeks planning permission for the erection of a three-storey primary school
with integrated sports and assembly halls, cycle storage, parking and drop-off facilities, hard
and soft landscaping and an external 3G full-size flood-lit sports pitch on development plot
E1 at Dargavel Village. 
The primary school is accessed from the western link road which bounds the application site
to the southwest. There are two vehicular points of access proposed, one which provides
access to a drop off and one which provides access to a car park which is located within the
southeast corner of the site. There are additional pedestrian connections on the
southeastern boundary of the site. These connect with an active travel route which will be
delivered as part of the residential development on plot E2 which bounds the site to the
southeast. 
The primary school building is positioned on the northwestern half of the site. The
northwestern end of the building is set approx. 13m back from the road. The footprint of the
building then tapers away from the road, with the southeastern end set approx. 40m back
from the road. Outdoor play facilities are located to the front and rear of the building. The 3G
sports pitch is located in the southeastern half of the site between the car park and a
community garden which is located in the northeast corner of the site. 
The primary school building is predominantly three stories in height, with a two-storey
section at the southeastern end of the building. External finishing materials predominantly
comprise of clay facing brick, with small areas of fibre cement cladding around window
openings and above doorways on the south elevation. The perimeter fence comprises of a

Page 2

1.8m tall weldmesh fence to the north and east boundaries, with 1.5m high steel railing to
the south boundary. The 3G pitch is bound by a 5m high ball stop fence behind each goal,
with a 3m high ball stop fence to the sides. 
The requirement for an additional primary school to serve Dargavel Village was identified by
the Council after it had been established that capacity at the current Dargavel Primary
School would be insufficient to accommodate the pupil yield expected from the Dargavel
Village development. Development Plot E1 was identified as the optimum location for the
new primary school, and the masterplan for Dargavel Village was updated in September
2023 to reflect this.   
The proposed development has been screened against The Town and Country Planning
(Environmental Impact assessment) (Scotland) Regulations 2017. It has been determined
that although the proposal would fall within Schedule 2 of the 2017 Regulations, it is not
likely that the proposed works would have significant environmental effects which would
require an Environmental Impact Assessment to be undertaken.     
Site Description
Development plot E1 is located centrally within the Dargavel Village Core Development
Area. It is bound by residential development plot E2 to the south, Central Park to the east
and north, and the western link road to the west with residential development plots beyond. 
The plot extends to 1.12 hectares in area and is relatively flat. Remediation of the plot has
been undertaken by BAE Systems in accordance with planning permission 09/0527/PP
which covers remediation and bulk earthworks. It should also be noted that planning
permission for enabling works to form the platform for the proposed primary school has been
granted via application 24/0854/PP. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
Pre-application discussions have taken place, focusing on the following matters: 
The site access requirements including the wider active travel network, landscaping, and
building design and positioning. 
Negotiated Improvements
Following submission, the following changes have been negotiated between officers and the
applicant: 
No changes have been negotiated. 
Site History  
Application No:  24/0854/PP
Description:  Proposed earthworks, platforming and ancillary works
Decision:  Granted subject to conditions 
Application No:  24/0928/NMV
Description: Variation to planning permission 20/0630/PP to some of the footpath
routes in the northern sector of Central Park, including a change in the
width of paths, surfacing and lighting
Decision Pending Decision

Page 3

Application No: 24/0609/AMC
Description: Approval of Matters Specified in Condition 7 of planning permission in
principle 06/0602/PP (and Condition 7 in planning permissions in
principle 12/0584/PP and 17/0025/PP) together with Condition 9 of
planning permission in principle 17/0393/PP and Condition 9 of
planning permission in principle 17/0394/PP - Design Code for West
Central Plots.
Decision: Granted 
Application No:  17/0394/PP
Description:  Use of land within the Core Development Area for residential
development.
Decision:   Granted subject to conditions and a Section 75 agreement. 
Application No: 18/0666/PP
Description: Erection of primary school with associated access, parking,
landscaping, external play areas and fencing
Decision: Granted subject to conditions. 
Application No:  17/0393/PP
Description:  Use of land within the Core Development Area for residential
development (in principle) with associated SUDS pond.
Decision:   Granted subject to conditions and a Section 75 agreement. 
Application No:  09/0527/PP
Description:   Engineering operations comprising remediation and bulk earthworks
Decision:   Granted subject to conditions 
Application No:  06/0602/PP
Description:   Regeneration of the site to form a mixed-use community growth area.
(NEW HOUSING DEVELOPMENT)
Decision:   Granted subject to conditions and a S75 agreement. 
Consultations   
▪ Glasgow Airport Safeguarding - No response received at the time of writing this report. 
▪ Environment, Housing & Infrastructure (Env. Protection) - No objection subject to
conditions relating to control of noise from fixed plant and machinery, restriction in
operating hours for the outdoor pitch, submission of a scheme detailing the proposed
ventilation and filtration system to disperse cooking fumes, submission of a site
investigation report, and submission of a lighting survey. 
▪ Chief Executive's Service (Roads Development) – No objection subject to conditions
relating to the site access design, provision of pedestrian crossings, and swept path
analysis. 
▪ Scottish Water – No objections. 
▪ National Air Traffic Services (NATS) - No objections. 
Representations
The application has been publicised in line with the requirements of the relevant legislation. 
No representations were received at the time of writing this report.

Page 4

Policy Context   
In making any determination under the Planning Acts, regard is to be had to the
development plan unless material considerations indicate otherwise. In this instance the
Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire
Local Development Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the
determination of this application: 
National Planning Framework 4 
▪ Policy 1 – Tackling the climate and nature crisis
▪ Policy 2 – Climate mitigation and adaptation
▪ Policy 3 – Biodiversity 
▪ Policy 9 – Brownfield land, vacant and derelict land and empty buildings
▪ Policy 13 – Sustainable transport
▪ Policy 14 – Design, quality and place
▪ Policy 15 – Local living and 20-minute neighbourhoods
▪ Policy 21 – Play, recreation and sport
▪ Policy 22 – Flood risk and water management 
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
▪ Policy P7 – Dargavel Village
▪ Policy I1 – Connecting Places
▪ Policy I3 – Flooding and Drainage
▪ Policy I7 – Zero and Low carbon Buildings
▪ Policy ENV2 – Natural heritage 
New Development Supplementary Guidance
▪ Delivering the Infrastructure Strategy – Connecting Places, Flooding and Drainage
▪ Delivering the Places Strategy – Creating Places
▪ Delivering the Environment Strategy – Natural Heritage 
Full details relating to the policies of the LDP can be found online. 
Submitted Reports and Assessments
The following reports and assessments were submitted in support of the application: 
▪ Pre-Application Consultation Report (December 2024) – Provides a summary of the pre-
application consultation undertaken by the applicant. Two public events were held at
Dargavel Primary School, and a series of focus groups were undertaken. Feedback
topics included sports and community facilities, traffic management, car parking and
access, and ensuring outdoor areas promote biodiversity. The feedback was taken on
board and used to inform the development proposals. 
▪ Design and Access Statement (December 2024) – Provides background on the design
vision and the site analysis with regard to both the Dargavel Village masterplan and the
historic development of Bishopton. Site opportunities and constraints are also noted.
Initial concepts and precedent studies are also presented. An analysis of the final design
is also provided with regard to the learning concept and classbases, proposed internal
and external visuals, wellbeing and accessibility. It is concluded that the primary school
will be a positive addition to the area, and that the design provides an exciting and
efficient building which will be valued by pupils, staff and the community.

Page 5

▪ Landscape Statement (December 2024) – Sets out the landscape strategy for the site,
and how it has informed the landscape plan. Key elements of the plan such as the main
entrance, central space, natural play, suds and the community garden are described in
detail. A summary of the planting palate, tree planting and biodiversity, hardscape,
boundaries and furniture are also provided. 
▪ Site Logistics Phasing Plan – Provides an outline of the construction phased logistics
including material storage area, contractor parking, welfare and access. 
▪ Noise Impact Assessment (November 2024) – States that the fixed plant will comply with
Renfrewshire Council noise rating requirements. Noise from the sports pitch is expected
to be around 55 dB which is in line with SportScotland recommendations. However,
noise mitigation measures may need to be developed if the pitch is to be floodlit and
used in the evening. 
▪ Energy Statement – States that the building has been designed to exceed the
requirements of Policy P7 in delivering a greater than 15% reduction in CO2 emissions
compared to the 2007 building regulations through the use of low or zero carbon
technologies in the development. 
▪ Traffic Management Plan – Sets out the route for construction traffic. Traffic would
access the site from the M8 motorway at junction 29a via the western link road,
Barrangary Road and Greenock Road (A8). 
▪ Preliminary Ecological Appraisal (October 2024) – The development area supports
predominantly bare ground with remediated bunds and ditches, with small areas of semi-
improved grassland and perennial species. These habitats are noted to have limited
ecological value, and their loss is not considered to be ecologically significant. It is noted
that the habitat could be suitable for ground nesting birds, and pre-construction surveys
are recommended should avoidance of the bird nesting season not be possible.
Mitigation measures are also recommended regarding mammals, foraging bats,
amphibians, and protection of water courses. Finally, a range of biodiversity
enhancement measures are recommended. These include planting for wildlife and
providing homes for wildlife. 
▪ Transport Statement (December 2024) – Provides a trip generation forecast for the
school, and how these journeys would be accommodated. 
▪ Drainage Strategy Report (December 2024) – Surface water from landscaped areas
along the northern boundary will drain to the Cordite Burn. Surface water from hard
surfaces and other landscape areas will drain via a network of swales to the surface
water sewer on the western link road. Foul water will also drain to the western link road. 
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any
Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the
grant of planning permission) and Regulation 33 (Directions requiring consideration of
condition) of The Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development)
of The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. 
None.

Page 6

Planning Assessment
Section 25 of the Town and Country Planning (Scotland) Act requires decisions on planning
applications to be made in accordance with the development plan unless material
considerations indicate otherwise.  The Development Plan comprises the National Planning
Framework 4 (2023) and the adopted Renfrewshire Local Development Plan (2021). 
Policy P7 of the Local Development Plan (LDP) states that the Council will support and
encourage development within Dargavel Village where it supports the principles set out in
the approved masterplan for the site. 
The masterplan for Dargavel Village was updated in September 2023 to allocate
development plot E1 as the site for the new Dargavel Primary School. The proposed
development aligns with the masterplan and complies with Policy P7. 
The development also aligns with Policy 15 of National Planning Framework 4 (NPF4) which
seeks to promote local living and 20-minute neighbourhoods where there is good
interconnectivity and local access (preferably by walking, cycling and wheeling) to schools
and community facilities. 
The Dargavel Masterplan provides a strategic framework of walking and cycling routes. It
should be noted that the links to the application site have been strengthened further through
development of both the Design Code for the western neighbourhoods (application
24/0609/AMC) and an improvement to the path network within Central Park which bounds
the site to the north (application 24/0928/NMV). The strength of the active travel network will
contribute to achieving the forecast trip generation as set out in the Transport Statement,
and ensure the primary school is accessible via sustainable transport modes. 
The Roads Development Officer has offered no objection to the development. The matters
raised by the officer can be managed via suitably worded planning conditions. 
In view of the above, the Service are also satisfied that the development complies with
policies 13 of NPF4 and I1 of the LDP. 
The development is supported by Policy 9 of NPF4 which seeks to encourage, promote and
facilitate the reuse of brownfield land. 
Policy 9 states that the biodiversity value of brownfield land must be taken into account. In
this instance and as noted in the Preliminary Ecological Appraisal (PEA), the application site
is predominantly bare ground following the remediation works undertaken by BAE Systems.
While some areas of semi-improved grassland remain, the site is considered to be of low
ecological value. 
The PEA includes mitigation measures to safeguard protected species during the
construction phase and this includes checks for ground nesting birds. A condition will be
applied to ensure these mitigations are implemented on site. This in turn will ensure the
development complies with Policy ENV2 of the LDP. 
The PEA also includes recommendations on biodiversity enhancement, and it is noted that a
comprehensive landscape strategy has been developed at the site which will contribute to
delivering biodiversity net gain. This includes creating a green and biodiverse planting
setting for the school through a mix of native, naturalised and exotic plant species. While the
final detailed landscape plan can be requested via condition, it has been satisfied that the
landscape strategy and the PEA recommendations will ensure biodiversity gain is delivered
in accordance with policy 3 of NPF4.

Page 7

The landscape strategy, boundary treatments and the quality of the building design and
finish will ensure the development contributes positively to the place in accordance with
policy 14 of NPF4. The landscape strategy in particular provides for a good quality frontage
to the site, with provision for avenue tree planting to the front of the school, and a landscape
buffer to screen the car park in the southeast corner of the site. 
The developer has demonstrated compliance with Policy I7 of the LDP via the Energy
Statement. 
The development makes provision for community use through the outdoor pitch and the
community gardens which are located in the northeastern corner of the site. These will
enhance provision for play, recreation and sport in accordance with policy 21 of NPF4. 
It is noted that the masterplan for Dargavel Village makes provision for residential
development on plot E2 to the southeast, and plots W1-W5 on the opposite side of the
western link road. While planning permission is not in place for the development of these
sites, the amenity of future residents on these plots (and on plots N1 and N2 to the
northwest) is a material consideration. 
Environmental Protection have recommended conditions to mitigate potential nuisance
impacts at the primary school with regard to noise, odours and lighting. This includes a
restriction in the operating hours of the sports pitch. These conditions will be attached to
ensure the amenity of future residents is protected. 
A sustainable drainage strategy for the site has been developed which integrates into the
wider strategic drainage and flooding strategies which have been developed at Dargavel
Village. The site is not considered to be at risk from fluvial or pluvial flooding. The
development is considered to comply with policies 22 of NPF4 and I3 of the LDP. 
Finally, as the development constitutes the sustainable redevelopment of a brownfield site in
accordance with the approved masterplan for Dargavel Village, it is considered to align with
policies 1 and 2 of NPF4.               
Section 75 Obligations
The Council is required to provide a summary of the terms of any planning obligation which
is required to be entered into under Section 75 of the Town and Country Planning (Scotland)
Act in relation to the grant of permission for the proposed development: 
None. 
Conclusion
In view of the above, it is considered that the proposal would accord with the relevant
provisions of the Development Plan. There are no other material considerations. Planning
permission should therefore be granted subject to conditions. 
Recommendation
Grant subject to conditions 
Reason(s) for Recommendation 
1. The proposal accords with the provisions of the Development Plan and there were no
material considerations which outweighed the presumption in favour of development
according with the Development Plan 
Condition(s)

Page 8

1. That the development hereby permitted must be begun within three years of the date of
this permission. 
Reason: To be in compliance with Section 58 of The Town and Country Planning
(Scotland) Act 1997 as amended by Section 32 of The Planning (Scotland) Act 2019 
2. No development shall commence on site until written approval of: 
a) a Site Investigation report (characterising the nature and extent of any soil, water and
gas contamination within the site); and, if remedial works are recommended therein
b) a Remediation Strategy and Implementation Plan setting out the proposed methods
for implementing all remedial recommendations contained with the site investigation
report and including (where relevant) a materials management plan
prepared in accordance with current authoritative technical guidance, has been provided
by the Planning Authority. 
Reason: To ensure that the site will be made suitable for its proposed use. 
3. That prior to occupation of the primary school: 
a) a Verification Report confirming completion of the works specified within the approved
Remediation Strategy and Implementation Plan; and/or
b) where remediation works are not required but soils are to be imported to site, a
Verification Report confirming imported materials are suitable for use
shall be submitted to the Planning Authority and approved in writing. 
Reason: To demonstrate that works required to make the site suitable for use have been
completed. 
4. The design, installation and operation of any plant, machinery or equipment shall be
such that noise associated with the development does not exceed Noise Rating Curve
NR25 between the hours of 2300 to 0700 hours and NR 35 at all other times OR NR35
between the hours of 0700 and 2300 hours with no plant operating outwith these times,
when measured within any dwelling in the vicinity of the development. Structure borne
vibration from the proposed development shall be imperceptible within any dwelling in
the vicinity of the development. For an explanation of noise rating curves, refer to BS
8233:2014 Sound insulation and noise reduction in buildings- code of practice, Annex B. 
Reason: In the interests of safeguarding residential amenity. 
5. That the sports pitch hereby approved shall not operate past 10pm Monday to Friday
and 6pm Saturday and Sunday unless otherwise first agreed in writing with the Planning
Authority. 
Reason: In the interests of safeguarding residential amenity. 
6. That prior to the occupation of the primary school, a scheme detailing the proposed
ventilation and filtration systems to be used to disperse cooking fumes emanating from
the premises shall be submitted to and approved in writing by the planning authority. Any
such scheme shall take cognisance of the Defra Publication “Guidance on the Control of
Odour and Noise from Commercial Kitchen Exhaust – 2005.” The scheme shall include
details of the servicing and maintenance requirements for the mechanical extract system
and shall take cognisance of the manufacturer’s recommendations. The approved
scheme shall thereafter be installed at the primary school and made operational prior to

Page 9

it being occupied and shall remain operational for duration that the primary school is
operational. 
Reason: In the interests of safeguarding residential amenity. 
7. That prior to the occupation of the primary school, the applicant shall undertake a survey
to determine the impact of floodlighting from the proposed development using the
principles set out in British Standard BS EN 12193:2007 Light & Lighting - Sports
Lighting, or a method agreed by the Planning Authority. The survey shall be submitted to
and approved by the Planning Authority and shall include details of: 
- a description of the proposed lighting units including height, type, shape and
luminous flux of the floodlights. 
- the luminance levels, both horizontal and vertical, on the illuminated part of the site to
demonstrate that obtrusive light and glare does not adversely affect neighbouring
properties. 
- the direction and aiming angle of each floodlight and the upward waste light ratio for
each light. 
- the Environmental Zone, as defined in the Institution of Lighting Engineers
Publication – Guidance Notes for the Reduction of Obtrusive Light, within which the
site falls 
The works which form part of the approved lighting scheme shall thereafter be
implemented on site before the development becomes operational, and maintained
thereafter for the life of the development, unless otherwise agreed in writing with the
Planning Authority. 
Reason: In the interests of safeguarding residential amenity. 
8. That prior to the commencement of any construction works, the applicant shall provide a
specification for the written approval of the Planning Authority detailing the location,
design, materials and colour of all boundary fences, gates, walls (including retaining
walls), or other method of enclosure to be installed at the site. Only the boundary fences,
gates, walls, or other methods of enclosure within the approved specification shall
thereafter be used in the development of the site. 
Reason: To ensure the methods of enclosure are of a suitable design in the interests of
visual amenity. 
9. That prior to the commencement of any construction works, full details of soft and water
landscaping works shall be submitted to and approved in writing by the Planning
Authority.  The details shall include: 
- Details of any existing trees or hedgerows and methods for their protection during the
construction phase. 
- The species, number and spacing of all proposed trees, shrubs, hedgerows, areas of
grass/wildflower seeding, and turfing. 
- All areas of hard standing including location and materials.

Page 10

- All areas of surface water including ponds, and measures for the sustainable
management and drainage of surface water where applicable.  
- All biodiversity and habitat enhancements taking cognisance of the recommendations
set out in appendix 10 of the Preliminary Ecological Appraisal by Wild Surveys dated
21st October 2024. 
- A timetable for the implementation of the soft and water landscaping works. 
- A strategy for the future management and maintenance of all landscaped areas
including provision for replacement of trees, shrubs, hedgerows and areas of
grass/wildflower seeding and turfing if they were to become diseased, die, become
seriously damaged or are removed within 5 years of being planted. 
The scheme shall thereafter be implemented as approved. No subsequent alterations to
the approved landscaping scheme are to take place unless submitted to and approved in
writing by the Planning Authority. 
10. That the recommendations set out in section 5.2 of the approved Preliminary Ecological
Appraisal by Wild Surveys dated 21st October 2024 shall be implemented on site during
the full construction phase of the primary school hereby approved. 
Reason: To safeguard protected species. 
11. That prior to the commencement of any construction works on site, the applicant shall
first submit for the written approval of the Planning Authority, a plan and specification
detailing the location and design of a controlled pedestrian crossing (including any such
temporary arrangements) over the western link road to connect the application site with
development plots N1 and N2. The approved controlled pedestrian crossing (including
any such temporary arrangements) shall thereafter be implemented in accordance with
the approved details prior to the occupation of the primary school. 
Reason: To ensure there is a safe connection between the school and the residential
plots to the northwest. 
12. That prior to the commencement of any works on site, the applicant shall submit for the
written approval of the Planning Authority a swept path analysis which demonstrates that
the site can be serviced by a 9.93m long refuse collection vehicle. The vehicle must be
able to enter and exit the site in a forward gear. Any modifications to the layout to
accommodate the refuse collection vehicle must thereafter be implemented as part of the
development to the satisfaction of the Planning Authority. 
Reason: To ensure the site can be accessed by a refuse collection vehicle in a safe
manner. 
13. That prior to the commencement of any works on site, the applicant shall submit for the
written approval of the Planning Authority a plan and specification detailing the final
design of all site access and egress points. The plan and specification shall detail the
access and egress design, geometry, associated kerbing and surface finish. Only the
approved access and egress designs shall thereafter be implemented on site as part of
the development. 
Reason: To ensure the site can be accessed in a safe manner. 
Advisory Note(s)

Page 11

None. 
Schedule of Plans Determined
Drawing Number Revision Drawing/Document Title
WS4913.24  Preliminary Ecological Appraisal by Wild
Surveys dated 21st October 2024.
P81-ZZ-ZZ-01-DR-A-PL0002 P02 Location Plan
P81-ACM-ZZ-ZZ-DR-PL-
000010
P01 Site Location Plan
P81-ACM-ZZ-ZZ-DR-PL-
000101
P01 Proposed Finish Levels
P81-ACM-ZZ-ZZ-DR-PL-
000102
P01 Proposed Hardworks Layout
P81-ACM-ZZ-ZZ-DR-C-000103 P01 Proposed Kerbing Layout
P81-ACM-ZZ-ZZ-DR-PL-
000111
P01 Swept Path Analysis Standard Rigid Bus
P81-ACM-ZZ-ZZ-DR-PL-
000112
P01 Swept Path Analysis Fire Tender
P81-ACM-ZZ-ZZ-DR-PL-
000250
P01 Proposed Drainage Layout
P81-ACM-ZZ-ZZ-DR-PL-
000251
P01 Exceedance Flood Routing Plan
P81-ACM-ZZ-ZZ-DR-PL-
000252
P01 Info drainage Schematic Layout
P81-ACM-ZZ-ZZ-DR-PL-
000300
P01 Proposed Earthworks Layout
P81-ERZ-ZZ-ZZ-DR-L-0001 P09 Landscape Plan
P81-ERZ-ZZ-ZZ-DR-L-0002 P03 Softworks Plan
P81-ERZ-ZZ-ZZ-DR-L-0003 P05 Boundaries Plan
P81-ERZ-ZZ-ZZ-DR-L-0004 P04 Furniture Plan
P81-ERZ-ZZ-ZZ-DR-L-0005 P04 Hardworks Plan
P81-ERZ-ZZ-ZZ-DR-L-1000  Elevation and Section
P81-JMA-01-00-DR-A-PL0001 P01 Proposed GA Plan Level 00
P81-JMA-01-01-DR-A-PL0001 P01 Proposed GA Plan Level 01
P81-JMA-01-02-DR-A-PL0001 P01 Proposed GA Plan Level 02
P81-JMA-01-RL-DR-A-PL0001 P01 Proposed GA Plan Roof Level
P81-JMA-01-ZZ-DR-A-PL1001 P01 Proposed Sections
P81-JMA-01-ZZ-DR-A-PL2001 P01 Proposed Elevations
P81-JMA-01-ZZ-DR-A-PL2002 P01 Proposed Bay Study Elevations 1 of 2 
P81-JMA-01-ZZ-DR-A-PL2003 P01 Proposed Bay Study Elevations 2 of 2
P81-JMA-XX-ZZ-DR-A-PL1001 P01 Proposed Site Sections
P81-JMA-ZZ-00-DR-A-PL0001 P02 Proposed Site Plan
P81-JMA-ZZ-ZZ-DR-PL0003 P02 Existing Site Plan 
For further information please contact James Weir, Development Standards Team, Email:
james.weir@renfrewshire.gov.uk