To:  Planning and Climate Change Policy Board
On:  18 March 2025
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Local Place Plans
___________________________________________________________________
1. Summary 
1.1 Local Place Plans are community-led plans setting out proposals for the
development and use of land. Introduced by the Planning (Scotland) Act
2019, these plans will set out a community’s aspirations for its future
development. To encourage communities to prepare Local Place Plans the
Council has prepared a How-to Guide, attends community group meetings
and runs a monthly drop-in advice sessions. 
1.2 A Local Place Plan fund of £100,000 has been made available in 2025/26 to
support communities to prepare a plan for their area.
___________________________________________________________________
2. Recommendations
2.1 It is recommended that the Board approve:
1) the updated Local Place Plans How-to Guide;
2) the proposed approach to distributing the Local Place Plan fund to
communities set out in Section 5 of this report;
3) delegated authority for the Head of Economy and Development, in liaison
with the Convenor and Vice-Convenor of Planning and Climate Change
Policy Board, to approve the allocation of Local Place Plan funding to
eligible community groups.
___________________________________________________________________

Page 2

3. Background
3.1 Local Place Plans are community-led plans setting out proposals for the
development and use of land. Introduced by the Planning (Scotland) Act
2019, these plans will set out a community’s aspirations for its future
development. Once completed and then registered by the planning authority,
they are to be taken into account when a local development plan is being
prepared.
3.2 The Council issued an invitation to relevant community groups to prepare a
Local Place Plan in May 2023, and held information sessions in March 2024.
Planning staff have visited several community groups across Renfrewshire to
provide presentations on Local Place Plans. Planning staff also run a monthly
drop-in session with community groups interested in preparing a Local Place
Plan to allow them to seek advice from the Council and each other.
___________________________________________________________
4. Local Place Plan How-to Guide
4.1 A pilot Local Place Plan was developed for the Foxbar area of Paisley in
2018, co-produced with the local community. As part of the pilot, a Local
Place Plans How-to Guide was prepared. This was at a time when the
Planning (Scotland) Act 2019 was still being considered by the Scottish
Parliament and the statutory basis for Local Place Plans and the associated
Scottish Government Circular had not been approved yet.
4.2 The How-to Guide has now been updated to reflect the current statutory
position and lessons learned from recent place strategies co-produced with
local communities.
4.3 The updated How-to Guide is attached at Appendix 1.
___________________________________________________________________
5. Local Place Plan fund
5.1 At the Council meeting of 27 February 2025, it was agreed that a fund be
established to support communities to prepare Local Place Plans, with
£100,000 available for financial year 2025/26.
5.2 It is necessary to establish some parameters to maximise the effectiveness of
the fund in supporting the preparation of Local Place Plans and some
processes to ensure that this funding can be applied for by community
groups.
5.3 It is proposed that funding is capped at £10,000 per Local Place Plan.
Funding will be prioritised towards Local Place Plans covering a recognised
neighbourhood/community area. This could include a town or village centre.
Funding will not be made available to different community groups preparing
Local Place Plans for the same area. Eligible costs may include research,
community consultation, professional services (e.g., planning consultants,
graphical support), events/venue hire and report/webpage production. Funded
Local Place Plans would need to be submitted by 31 March 2026, with Local
Place Plan funding spent in financial year 2025/26.

Page 3

5.4 To apply for funding, a two-stage process is proposed. Firstly, there would be
an expression of interest stage, so that the Council can be made aware of the
level of interest in the fund. The second stage (the application stage) would
seek additional information from each community group that has submitted an
eligible expression of interest. The additional information would include what
work has already been undertaken towards preparing a Local Place Plan, how
the fund would be spent including a breakdown of anticipated costs, and an
indicative timeline. Suggested expression of interest and application forms are
attached as Appendix 2. If the fund is over-subscribed, then applications for
Local Place Plan funding may need to be considered competitively with some
communities not receiving the full amount sought and potentially some being
unsuccessful. It is proposed that the assessment of funding bids and the
allocation of funding is undertaken by the Head of Economy and
Development, in liaison with the Convenor and Vice-Convenor of Planning
and Climate Change Policy Board.
5.5 The indicative timeline for applying for Local Place Plan funding is as follows:
• 24 March 2025 – notification of fund and publication/distribution of
expression of interest form.
• 18 April 2025 – closing date for submission of expression of interest
forms
• 25 April 2025 – invitation to apply for Local Place Plan funding sent to
groups who have submitted an eligible expression of interest form.
• 23 May 2025 – closing date for submission of application form.
• 30 May 2025 – notify community groups of outcome of application.
5.6 A report on the allocation of Local Place Plan funding will be brought back to
Board.
_________________________________________________________________
Implications of the Report
1. Financial – A £100,000 Local Place Plan fund has been established for
2025/26. This will be managed by staff within the Economy and Development
Service.
2. HR & Organisational Development – None.
3. Community/Council Planning – Local Place Plans are primarily focused on
the development and use of land but can also have a wider remit. For this
reason there is potential for Local Place Plans to be relevant for all
Community Plan priorities and Council Plan outcomes. Council support for
communities preparing Local Place Plans closely aligns with the ‘Place’
outcome of communities being involved in the shaping of their future and
ensuring that a wide range of voices and views are heard, and with the ‘Well’
outcome of the Community Plan which has a priority of enabling communities
to have their voice heard and influence the places and services that affect
them.

Page 4

4. Legal – The Council has met legal requirements with regard to inviting local
communities to prepare Local place Plans and providing information on
assistance available. The Councill will update local communities on the date
by which Local Place Plans are to be submitted for them to be taken account
of in the preparation of the Local development Plan.
5. Property/Assets – No direct implications, although funded Local Place Plans
could include proposals for Council property/assets.
6. Information Technology – None.
7. Equality & Human Rights – The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report. Local Place Plans are community-
prepared plans. This report relates to funding being made available to
community groups to help support the preparation of plans. All eligible
community groups will be able to apply for Local Place Plan funding. If
required following implementation, the actual impact of the recommendations
and the mitigating actions will be reviewed and monitored, and the results of
the assessment will be published on the Council’s website.
8. Health & Safety – None.
9. Procurement – There would be no direct procurement by the Council.
Community groups would be required to demonstrate best value in the use of
funds, including the procurement of professional support to help prepare Local
Place Plans.
10. Risk – There is a risk that a funded community group does not produce a
Local Place Plan. This will be mitigated by the careful management of fund
payments to community groups by Council staff.
11. Privacy Impact – None.
12. Climate Risk – None.
13. Children’s Rights – The Local Place Plan fund has the potential to have a
positive impact on children’s rights if community groups that have been
awarded funding include consultation with children and young people in its
Local Place Plan process. This would support UNCRC Article 12 – respect for
the views of the child.
14. Cosla Policy Position – None.
_______________________________________________________
Appendices 
Appendix 1 – Renfrewshire Local Place Plan How-to Guide
Appendix 2 – Suggested expression of interest and application forms for Local Place
Plan fund.

Page 5

List of Background Papers
None
___________________________________________________________________
AW
12 March 2025
Author: Alan Williamson, Strategy & Place Manager,
alan.williamson@renfrewshire.gov.uk, 07811 053968

Page 6

No embedded text on this page.

Page 7

1
Local Place Plans
‘How To’ Guide‘How To’ Guide

Page 8

No embedded text on this page.

Page 9

‘How To’ Guide for Local
Place Plans in Renfrewshire
2
CONTENTS
Summary       3
1 What is a Local Place Plan?         4
2 Why prepare a Local Place Plan?        6
3 Getting ready         8
4 Preparing the Local Place Plan       10
5 How should a Local Place Plan look?      16
6 Delivering the Local Place Plan       20

Page 10

3
Summary
The Planning (Scotland) Act 2019 provides for the introduction of Local Place
Plans. This reflects a new approach which considers land use planning and
community action, supporting local people to become more involved in
shaping their places. 
The Council supports the principle of Local Place Plans and is keen to support
communities across Renfrewshire in preparing Local Place Plans to shape
their neighbourhoods.
This ‘How To Guide’ explains the key requirements of a Local Place Plan
and steps in their preparation. The Guide is based on the experience of
early plans developed with communities across Renfrewshire, including the
neighbourhoods of Foxbar and Ferguslie Park in Paisley.

Page 11

‘How To’ Guide for Local
Place Plans in Renfrewshire
4
1  What is a
Local Place Plan?

Page 12

5
Actions
Area
Aspiration
Inclusive
Local Place Plans present local areas spatially. They outline areas of            
potential change, identify enhancements and prioritise areas of vacant or
derelict land for new or alternative uses.
Plans should also assist the Council and Community Planning Partners to
have an improved understanding of local aspirations. This will help to align
community and land use planning to achieve better outcomes.
Geographical Focus
Plans should relate to a recognisable area or community, for example a
neighbourhood or village.
Reflect Community Aspirations
Plans should be prepared by or with the local community. They must be
led by local communities, to ensure that they reflect community
aspirations. 
Inclusive Engagement
Community engagement to inform the plan must be as broad as possible,
ensuring that everyone has an opportunity to be involved.
Community Vision
Plans require to reflect the local vision for the area.  In setting out the
vision it is important to note that Local Place Plans must have regard
to the spatial strategy and policies within the Renfrewshire Local
Development Plan.
Action Focus
It is important that plans focus on delivery of the community vision and                 
contain a series of actions. These should be realistic and capable of      
being delivered.  Actions within the plan will assist in identifying resources
or priorities for delivery.

Page 13

2   Why Prepare a
Local Place Plan?

Page 14

7
Renfrewshire Council and its partners strongly support empowering local  
communities to have a greater say in the design and enhancement of their
places.
The preparation of a Local Place Plan provides an opportunity for communities
to work with the Council and Community Planning Partners to strengthen the
look and feel of their place. 
Once validated and registered by the Council, Local Place Plans are taken into
account in the preparation of the Local Development Plan.
Shaping the Local Community
A plan can include physical,  
social, economic or environmental
actions which reflect the aspirations
of a local community.
Support Community Action
The process of preparing a         
Local Place Plan can support and    
stimulate community action.  The
plan can provide a framework for
actions which are delivered by
the community with assistance
from partners and in turn help to        
secure funding.
Demonstrating Aspirations
In clearly showing community
aspirations for an area, the plan
will help the Council, Community
Planning Partners and funding
organisations to better                           
understand local issues.
Partnership Working
Preparation of the plan can assist
in creating positive and strong                  
relationships within the local         
community and with partners such
as the Council and Community
Planning organisations. This in
turn stimulates and supports 
delivery of identified actions.
Community
Engagement
Delivery of
Outcomes
RENFREWSHIRE COMMUNITY PLANNING PARTNERSHIP
Our Renfrewshire
Renfrewshire’s Community Plan 2017-2027 
Our Renfrewshire is the Community Plan for the ten years 2017-2027 and is also Renfrewshire’s Local
Outcome Improvement Plan, as required by the Community Empowerment (Scotland) Act 2015. 
Renfrewshire’s
Community
Plan 2017 - 27
Renfrewshire
Local Development Plan
(LDP2) 2021
National
Planning
Framework
(NPF4)
Local Place 
Plan

Page 15

3  Getting Ready

Page 16

9
There are a number of key steps to be considered ahead of a decision to
prepare a Local Place Plan.  This includes identifying key stakeholders and
ensuring that sufficient commitment, support and funding is available.
One community group should act as ‘lead’ organisation. This could involve
chairing a local steering group of all interested organisations and bringing
everyone together. Constituted groups such as Community Councils or
Community Development Trusts are ideally placed to take this role.
Local Place Plans must be prepared by a community-controlled body
as defined by the Community Empowerment (Scotland) Act 2019 or a
community council.
At the start of the process, it is important that the timescales involved in
preparation and delivery of the plan are considered. While the plan may
require around 6 months to prepare, delivery may be over several years.
It is also important to engage the Council and other partners at an early
stage in the process to secure support and guidance.
Early Discussion
Discussions between community partners should take place to identify
support for a plan, the potential scope and the level of resources and
commitment needed. 
Resources
Sufficient resources need to be in place to produce the plan. This could
include financial resources, staff time or volunteer capacity. Specialist
support may also be required to assist with design, graphics or community
engagement.
Guiding the Plan Process
To guide preparation of the plan, a small Steering Group should be established.
This should include a mix of representatives from the local community.
Getting Started
As an initial step, a month by month programme for preparing the plan
will be required.  This should carefully consider how to engage with and
involve the local community in the plan.
Getting Ready
12 Months Ten Years
Preparing the Plan Flexible Delivery
1 2 3 4 5 6 7 8 9 10 11 12 Ten years +

Page 17

4   Preparing the
Local Place Plan

Page 18

11
This section sets out how a Local Place
Plan might be prepared. It is important to
note that there is no ‘correct’ approach
and that this can be designed to reflect
individual communities and local context.
The approach identified in the example
adjacent shows a typical six month
process over three discrete stages. Each
stage has a number of key steps, shown
on the following pages.
1
ASPIRATIONS &
ISSUES
Understanding the Local
Community
2
SETTING THE
AGENDA
Develop Local
Place Plans through
community engagement
3
MAKING
IT HAPPEN 
Transition to delivery
Initial Engagement
Establish steering group with
community representation 
Agree community engagement 
Meet key organisations 
Online engagement
Research
Understand previous studies 
Socio-economic analysis
Map community activities 
Identify opportunities
and constraints
Drop-in 1: Vision, Ideas & Projects
What are our long term aspirations?
What should the community be like in the future?
What are the individual projects?
What should we focus on?
Drop-in 2: Actions
Refine projects from previous community engagement.
What will have the most impact?
Who wants to be involved?
Finalising the Plan
Steering Group agree content and sign off plan
Collaborative Delivery
Community works with partners to deliver plan

Page 19

‘How To’ Guide for Local
Place Plans in Renfrewshire
12
1
ASPIRATIONS
& ISSUES
Understanding the
Local Community
2
SETTING
THE AGENDA
Develop Local Place
Plans through community
engagement
3
MAKING
IT HAPPEN
Transition to delivery
1
ASPIRATIONS
& ISSUES
Understanding the
Local Community
The aim of this stage is to begin to understand the local community and local context, as a basis for the plan.
Previous Engagement 
A useful starting point is to determine whether previous consultation exercises have been undertaken within the area in
recent years.  This can provide helpful information on active local community groups, issues and aspirations.    
Desktop Research
Reviewing background information and documents will also be helpful in understanding the local area. This can
include data from the census and Scottish Index of Multiple Deprivation (SIMD) and documents such as the Renfrewshire
Local Development Plan, Renfrewshire Community Plan and other Community Planning Partner plans and strategies.
Community Engagement Plan
Effective community engagement is crucial to the success of the plan.  This should seek to include as many sections
of the community as possible, using a range of techniques, locations and times.  The table overleaf shows a typical
approach to consultation.  There are many sources of good practice in community engagement online, including a
number of web-based resources specific to Scotland:-
PAS SP+EED
National Standards for Community Engagement
Place Standard
Early Meetings
As an early part of the community engagement plan, discussions with community groups, businesses and Community
Planning Partners will give helpful insights into local issues and community activity.  Early meetings will also be helpful
in raising awareness of the plan with local people.

Page 20

13
Description Participants
Local
organisations
One to one contact.  Discussions may include:-
What is the organisation already doing locally?
What are their aspirations?
How might the plan help to deliver their objectives?
Ask all to promote the development of the Plan.
Key community organisations.  This
could include the local Community
Council, Community Centres and
those using community facilities,
libraries, shops, churches and those
using church halls, uniformed youth
organisations, care homes.
Councillors Briefing meeting and subsequent contact as required. Local Ward Councillors
Community
Planning
Partners and
other
stakeholders
One to one contact.  Discussions may include:
What is the organisation already doing locally?
What are their aspirations?
How might the plan help to deliver their objectives?
How might they help to deliver the plan?
Key organisations and local stake-
holders. This could include Council
Services, Engage Renfrewshire, local
Housing Associations, emergency
services, Health and Social Care 
Partnership, Renfrewshire Leisure
and third sector organisations. 
Community
survey
Short survey suitable for all ages.  Distribute online and hard copy via
community groups, local network, social media and local ‘on street’
events.
Potential to combine with event flyer.
Everybody in the local community
Schools and
youth
organisations
Sessions and or/surveys to help understand aspirations. 
Primary and Secondary Schools
Youth groups
‘On Street’
Events
Events at key local facilities such as shops, community halls,
community events, bus stops, local library and health clinics. 
Use discussions to complete surveys and distribute flyers.
Everybody in the local community
Social Media
Regular publicity and updates.  Use existing pages or create a new
page if appropriate.  Link to others to increase publicity and aware-
ness. 
Everybody in the local community
Desktop
Research and
Analysis
Review of any previous studies, Council and Community Planning
Partner plans and strategies.  Review of opportunities and constraints. Place Plan Steering Group.
Example of Typical Stage 1 Activities

Page 21

‘How To’ Guide for Local
Place Plans in Renfrewshire
14
14
The aim of this stage is to develop the plan with the local community, building on early engagement. 
Approach and Priorities
It is important the local community set the approach and priorities for the plan – they should set the agenda for the
future of their place.  At the same time key stakeholders such as the Council, Community Planning Partners and key
stakeholders must also be actively involved to assist in the production and delivery of the plan.
Encouraging Engagement
The plan should be developed through a series of well promoted events and online engagement.  The aim should be
to encourage as many people as possible to participate.  Careful thought should be given to the sequence and format
of events – welcoming and more informal ‘drop in’ events are often the most successful.  Social media can also be very
effective form of engagement. 
Communicating Ideas
Using graphics such as drawings, plans and images is often the best and most simple approach to communicate ideas. 
Examples are shown in Section 5. 
1
ASPIRATIONS
& ISSUES
Understanding the
Local Community
2
SETTING
THE AGENDA
Develop Local Place
Plans through community
engagement
3
MAKING
IT HAPPEN
Transition to delivery
2
SETTING
THE AGENDA
Develop Local Place
Plans through community
engagement

Page 22

15
The aim of this stage is to prepare the plan and move towards delivery.
Finalising the Plan
The plan should be based on outcomes from community engagement, with content agreed and finalised by the     
Steering Group.  Ideally, the plan should be a short, visual document to help communicate ideas and priorities quickly. 
Vision
The plan should set a long term vision for the area (5-10 years) and deliverable actions, with enough flexibility to          
accommodate changing circumstances over that time.  This should help the Council and Community Planning Partners
to inform their plans and strategies. 
Be Realistic
The focus of the plan should be on priorities and actions which are deliverable.  Short term actions and ‘quick wins’ will
help to deliver the plan and build momentum.  More ambitious, long term actions can also be included even though
resources might not yet be available.  In considering longer term actions, the key is to consider whether a realistic    
delivery route may exist in the future.
Community Led Action
The focus of Local Place Plans should be on the local community – how it can lead on actions and change the        
neighbourhood.
Promote the Plan
Once the plan is complete, this should be circulated and promoted widely within the local community and key partners. 
This is important to help generate community support and mobilise local groups and volunteers to deliver projects.  
1
ASPIRATIONS
& ISSUES
Understanding the
Local Community
2
SETTING
THE AGENDA
Develop Local Place
Plans through community
engagement
3
MAKING
IT HAPPEN
Transition to delivery
3
MAKING
IT HAPPEN
Transition to delivery

Page 23

5   How Should a
Local Place Plan Look?

Page 24

17
The Planning (Scotland) Act 2019 requires that Local Place Plans must:-
• Identify the community body which produced the plan
• Contain a map of the area covered by the plan
• Contain a statement of proposals for the development of use of land
• Identify the land and building subject to proposals
There are a variety of ways to achieve this and no ‘correct’ approach on the look of a place plan.
Generally, plans will share some similar elements and should where possible be visual in showing
ideas and actions.
Short and Succinct
Plans should be written in a way which
avoids jargon and be as short and succinct
as possible. Typical content might include:-
community assets and aspirations, overall
vision, priority projects and delivery.
Graphic and Visual
Plans should be highly visual, using graphics,
plans and diagrams to communicate main
points. Detailed information considered
important can be included within appendices. 
Local Context
Each plan should reflect local context and
community aspirations. Renfrewshire is a
diverse area and each community has unique
assets and aspirations.
Vision
Each plan should have an overall vision
which captures community aspirations for
the future, and specific individual actions to
assist in achieving that vision. Actions should
be flexible enough to adjust to changing
circumstances.
1 - The Making of: Ferguslie Park - sketch diagram

Page 25

‘How To’ Guide for Local
Place Plans in Renfrewshire
18
2
2 - Sample Projects Matrix
Priority projects should
be developed during the
engagement process. Using
symbols  and colours is a
simple way to illustrate the
actions and their link to the 
vision for the area.

Page 26

3
4 5
4 / 5 - Sample Project: Civic Squares
Each priority project should be allocated a page within the
document,  with mapping and images used to explain the
key information. This project page was accompanied with a
summary and visualisation to illustrate the future aspirations.
3 - Sample Key Plan
Each of the “priority projects” should
be mapped onto a key plan. This
approach is a clear and visual way
of communicating outcomes.

Page 27

6  Delivering the Plan

Page 28

21
Delivery of the plan is just as important as preparation and it is important to
move quickly from planning to action.
Quick Wins 
It is important to identify at least one
action which can be delivered easily and
quickly – for example a litter pick. This will     
demonstrate success, build momentum
and encourage more people to get 
involved.
Working Together
The local community and key stakeholders
should continue to work together to
support delivery of actions in the plan.
Changing the role of the Steering Group
to a Delivery Group is a good way of doing
this.
Communication
Communicating progress with the plan and
successes is also key, and can be through
a variety of means. Good communication
and delivery of actions is vital to building 
momentum, support and capacity within
the local community and key stakeholders.

Page 29

‘How To’ Guide for Local
Place Plans in Renfrewshire
22
The Council is keen to encourage local  communities to produce their own Local
Place Plans. If your community is interested, please contact:
Strategy and Place Team
Chief Executive’s Service
Renfrewshire Council
localplanconsultation@renfrewshire.gov.uk

Page 30

Local Place Plan fund – expression of interest form
1. Name of community group seeking funding and leading on the preparation of the Local Place
Plan
2. Contact details for community group seeking funding
3. Is this a community council or a community-controlled body within the definition in section 19
of the Community Empowerment (Scotland) Act 2015
(https://www.legislation.gov.uk/asp/2015/6/section/19).
Groups will be required to answer yes to this question to have their expression of interest accepted.
4. Please confirm that you have read the following documents
Planning Circular 1/2022: Local Place Plans ☐
(https://www.gov.scot/publications/circular-1-2022-local-place-plans/)
Renfrewshire Council Local Placer Plan How-to guide ☐
(https://www.renfrewshire.gov.uk/article/8667/Local-Place-Plans)
Groups will be expected to have read these documents to have their expression of interest accepted.
5. Please describe the boundaries of the area to be covered by the Local Place Plan. Funding
will be prioritised towards Local Place Plans covering a recognised neighbourhood/community
area. This could include town or village centres. Funding will not be provided to different
groups seeking to prepare separate Local Place Plans for the same area. In this situation,
groups will be encouraged to collaborate on a single bid and plan.
6. How much funding is being sought to support the preparation of the Local Place Plan?
Funding awards will be capped at £10,000 per Local Place Plan.
7. What is the estimated date for submission of your Local Place Plan to the Council? Local
Place Plan funding will need to be claimed and spent in financial year 2025/26 (ending
31/03/2026) and Local Place Plans submitted to the Council no later than 31 March 2026.
Appendix 2

Page 31

Local Place Plan fund – application form
1. Name of community group seeking funding and leading on the preparation of the Local Place
Plan
2. Contact details for community group seeking funding
3. Is this a community council or a community-controlled body within the definition in section 19
of the Community Empowerment (Scotland) Act 2015
(https://www.legislation.gov.uk/asp/2015/6/section/19).
Groups will be required to answer yes to this question to have their application considered.
4. Please confirm that you have read the following documents
Planning Circular 1/2022: Local Place Plans ☐
(https://www.gov.scot/publications/circular-1-2022-local-place-plans/)
Renfrewshire Council Local Placer Plan How-to guide ☐
(https://www.renfrewshire.gov.uk/article/8667/Local-Place-Plans)
Groups will be expected to have read these documents to have their application considered.
5. Please describe the boundaries of the area to be covered by the Local Place Plan. Funding
will be prioritised towards Local Place Plans covering a recognised neighbourhood/community
area. This could include town or village centres. Funding will not be provided to different
groups seeking to prepare separate Local Place Plans for the same area. In this situation,
groups will be encouraged to collaborate on a single bid and plan.
6. How much funding is being sought to support the preparation of the Local Place Plan?
Funding awards will be capped at £10,000 per Local Place Plan.
7. Please advise what discussions and/or work has already been undertaken by your group
towards preparing a Local Place Plan, including any evidence of community need, support
and involvement. Please include names of the core group who will be leading the preparation
of the Local Place Plan.

Page 32

8. Please outline how the fund would be used to support preparation of your Local Place Plan?
Eligible costs may include research, community consultation, professional services (e.g.,
planning consultants, graphical support), events/venue hire and report/webpage production.
Please include an indicative breakdown of how the fund will be used.
9. Please set out an indicative timeline for preparing your Local Place Plan including completion
dates for key stages. Local Place Plan funding will need to be claimed and spent in financial
year 2025/26 (ending 31/03/2026) and Local Place Plans submitted to the Council no later
than 31 March 2026.
If the fund is oversubscribed, Council Officers may seek discussions to seek further information on
your proposed Local Place Plan fund application including your organisation’s understanding of, and
readiness to undertake the process, and greater detail on how the fund is to be spent.