Democracy Spraffa

Agenda Document Pack - Planning and Climate Change Policy Board - 21/01/2025

Renfrewshire Council · 21 January 2025
Back to Planning and Climate Change Policy Board — 21 January 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

15/01/2025 
Notice of Meeting and Agenda
Planning and Climate Change Policy Board 
Date Time Venue
Tuesday, 21 January 2025 13:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN               
Membership 
Councillor Jim Paterson (Convener):     Councillor Bruce MacFarlane (Depute Convener):    
Councillor Jennifer Adam:  Councillor Alison  Ann-Dowling:  Councillor Andy Doig:  Councillor
Chris Gilmour:  Councillor Neill Graham:  Councillor Anne Hannigan:  Councillor Kenny
MacLaren:  Councillor Jamie McGuire:  Councillor Marie McGurk:  Councillor John McNaughtan: 
Councillor Iain Nicolson:  Councillor John Shaw:  Councillor Ben Smith:   
Further Information
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior to the
meeting at the Customer Service Centre, Renfrewshire House, Cotton Street, Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk 
Members of the Press and Public
Members of the press and public wishing to attend the meeting should report to the customer
service centre where they will be met and directed to the meeting. 
Hybrid Meeting
Please note that this meeting is scheduled to be held in the Council Chambers.  However, it is a
hybrid meeting and arrangements have been made for members to join the meeting remotely
should they wish.
MARK CONAGHAN
Head of Corporate Governance

Page 2

15/01/2025 
Webcasting of Meeting
This meeting will be filmed for live or subsequent broadcast via the Council’s internet site – at
the start of the meeting the Convener will confirm if all or part of the meeting is being filmed.  To
find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home

Page 3

15/01/2025 
Items of business      
Apologies
Apologies from members. 
Declarations of Interest and Transparency Statements
Members are asked to declare an interest or make a transparency
statement in any item(s) on the agenda and to provide a brief
explanation of the nature of the interest or the transparency statement. 
1 Revenue and Capital Budget Monitoring 2024/25 as at 8
November 2024
Joint report by Chief Executive and Director of Finance & Resources. 
1 - 6 
2 Local Development Plan Delivery Programme Update
Report by Chief Executive. 
7 - 62  
Planning Applications
Members must deal with planning applications in an objective manner to
ensure that they cannot be challenged with accusations of bias or
predetermination. Votes on planning applications must be seen to be
impartial and not influenced by party political issues. 
3 Planning Applications
Details of planning application to be determined by the Board. 
63 - 64 
3(a)  24/0221/PP - Section 42 application to vary conditions 3
and 4 (to clarify the types of waste operations permitted
within the site and include for the handling of non-
hazardous solid industrial and commercial waste) of
planning permission 11/0431/PP at49 Burnbrae Road
Linwood Paisley by Mr Paul O'Brien. 
65 - 76 
3(b)  24/0444/PP - Infilling and regrading of land at Glenfield
Road Caplethill Road Paisley by Miller Homes Ltd 
77 - 82 
3(c)  24/0851/TP - Treeworks application to include tree
removal and pruning atMain Building And Grounds 
83 - 92

Page 4

15/01/2025 
Dykebar Hospital Grahamston Road Paisley PA2 7DE by
Mrs Carolynne Penman CALA Management Ltd by 
3(d)  24/0653/FUR - Section 42 application to modify conditions
of planning permission 19/0444/PP relating to the erection
of residential development comprising 15 dwellinghouses
with associated access road, drainage and landscaping at
Greenhead Nursery and adjacent vacant land at Old
Greenock Road Inchinnan by Greenhead Homes Limited. 
93 - 106

Page 5

___________________________________________________________________
To: Planning and Climate Change Policy Board
On: 21 January 2025
___________________________________________________________________
Report by: Chief Executive and Director of Finance and Resources
___________________________________________________________________
Heading: Revenue and Capital Budget Monitoring 2024/25 at 8 November 2024
___________________________________________________________________
1. Summary
1.1 At the close of reporting Period 8 on 8 November 2024, the projected
revenue outturn at 31 March 2025 for those services reporting to the
Planning and Climate Change Policy Board was a break-even position
against the revised budget for the year. 
1.2 There are no capital projects reporting to the Planning and Climate Change
Policy Board. 
1.3  This is summarised in the table below and further analysis is provided in the
report and appendices. 
Revised
Annual
Budget
£000
Projected
Outturn
£000
Budget
Variance
(Adv)/Fav
£000
Budget
Variance
%
Revenue    
Planning Services 584 584 0 0.0% 
2. Recommendations
2.1 Members are requested to note the projected Revenue outturn break-even
position. 
3. Revenue Budget Projection – break-even by 31 March 2025
3.1 The tables in Appendix 1 present the projected year-end position for all
services reporting to this board, by both subjective analysis (what the budget
Item 1
PACC210125 Page 1 of 106

Page 6

is spent on) and objective analysis (which division is spending the budget).
Significant variances affecting the projected position are analysed further
below. 
3.2 It should be noted that the projected outturn position reported here is based
on the latest information available, which is subject to change during the
financial year. The impact of any change on this projection will be updated at
each board cycle until the close of reporting Period 10. Budget holders are
obliged to seek mitigating action to minimise significant budget variances. 
4. Objective Analysis – Significant Variances
4.1 There are no significant variances to report at this stage in the financial year. 
5. Subjective Analysis – Significant Variances
5.1 Supplies and Services - £0.067m overspend by 31 March 2025
This reflects the impact of an award of expenses relating to a planning
appeal concerning the site at UWS Thornly Park Campus at Caplethill Road,
Paisley. 
5.2 Income - £0.060m underspend (over-recovery) by 31 March 2025
This reflects the impact of a projected over-recovery in Planning income of
£0.060m (9.6%), with a projected break-even position on Building Standards
income. Due to the very demand-led nature of the income stream, which is
impacted by the current economic and financial climate, the level of Planning
and Building Standards income can vary over the course of the financial
year, which can make it challenging to determine trends for income
projection. The current level of projected income remains consistent with
levels reported in the second quarter, reflecting a reasonable forecast at this
stage in the financial year. 
6. Revenue Budget Virements
6.1. Under the Council’s financial regulations, Directors and their nominated
officers, in consultation with the Director of Finance and Resources, have
certain delegated authority to transfer sums between subjective budget
headings within a service division to enable budget management throughout
the financial year. This is known as ‘budget virement’. 
Transfers between divisions of the same service / department in excess of
£100,000, and transfers between services / departments must be authorised
by the respective service Director/Chief Executive and the Director of
Finance and Resources for submission to the relevant policy board for
Page 2 of 106

Page 7

approval. Future reports may therefore ask the board to approve budget
adjustments that are deemed necessary for good budget management. 
No budget adjustments have been processed since the previous report to
board. 
Implications of the Report
1. Financial
The projected budget outturn position for the Planning and Climate Change
Revenue budget is break-even at 31 March 2025.  Income and expenditure will
continue to be monitored closely for the rest of the financial year and as far as
possible, steps will be taken to mitigate any overspend. 
2. HR & Organisational Development 
While staffing budgets form a significant proportion of the Council’s revenue
budgets, there are no direct implications arising from the recommendations in
this report. 
3. Community/Council Planning
Community Plan
Our Renfrewshire is thriving The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Our Renfrewshire is well 
Our Renfrewshire is fair 
Our Renfrewshire is safe
Council Plan
Reshaping our place, our
economy and our future The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Building strong, safe and resilient
communities
Tackling inequality, ensuring
opportunities for all
Creating a sustainable
Renfrewshire for all to enjoy
Ongoing revenue and capital budget
monitoring is a tool to enable good
financial management so that the Council
has resources now and in the future for
continued service delivery.
Working together to improve
outcomes 
4. Legal 
There are no direct implications arising from the recommendations in this
report. 
Page 3 of 106

Page 8

5. Property/Assets 
There are no direct implications arising from the recommendations in this
report. 
6. Information Technology 
There are no direct implications arising from the recommendations in this
report. 
7. Equality & Human Rights 
There are no direct implications arising from the recommendations in this
report. 
8. Health & Safety 
There are no direct implications arising from the recommendations in the report. 
9. Procurement 
While Procurement is an important consideration prior to the Council incurring
any revenue or capital spend, there are no direct implications arising from the
recommendations in this report. 
10. Risk 
The potential financial risk that the Council will overspend its approved revenue
budgets for the year is managed at a Council-wide level by the Chief Executive
and Directors. 
11. Privacy Impact 
There are no direct implications arising from the recommendations in this
report. 
12. Cosla Policy Position 
N/a 
13. Climate Change
The Council aims to reduce its carbon and other emissions to net zero by 2030,
however there are no direct implications arising from the recommendations in
this report.
14. Children’s Rights
There are no direct implications arising from the recommendations in this
report.
Page 4 of 106

Page 9

List of Background Papers 
• Revenue Budget and Council Tax 2024/25, Council 29 February 2024 
Author:           Valerie Howie, Finance Business Partner
Page 5 of 106

Page 10

Appendix 1
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2024/25
1 April 2024 to 8 November 2024                  
POLICY BOARD:  PLANNING SERVICES                  
Objective Summary
Annual Budget
at Period 6
Budget
Adjustments
Revised Annual
Budget at
Period 8
Projected
Outturn
Budget Variance 
(Adverse) or Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Planning Strategy & Place 530 0 530 530 0 0.0% 0 0
Development Management 225 0 225 225 0 0.0% (5) 5
Building Standards (171) 0 (171) (171) 0 0.0% 0 0
NET EXPENDITURE 584  0 584  584  0 0.0% (5) 5                  
Subjective Summary
Annual Budget
at Period 3
Budget
Adjustments
Revised Annual
Budget at
Period 6
Projected
Outturn
Budget Variance 
(Adverse) or Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Employees 1,598 0 1,598 1,591 7 0.4% 0 7
Premises Related 1 0 1 1 0 0.0% 0 0
Transport Related 15 0 15 15 0 0.0% 0 0
Supplies and Services 193 0 193 260 (67) (34.7%) (66) (1)
Third Party Payments 0 0 0 0 0 0.0% 0 0
Transfer Payments 91 0 91 91 0 0.0% 1 (1)
Support Services 317 0 317 317 0 0.0% 0 0
Depreciation and Impairment Losses 0 0 0 0 0 0.0% 0 0
GROSS EXPENDITURE 2,215  0 2,215  2,275  (60) (2.7%) (65) 5
Income (1,631) 0 (1,631) (1,691) 60 3.7% 60 0
NET EXPENDITURE 584  0 584  584  0 0.0% (5) 5 
Page 6 of 106

Page 11

___________________________________________________________________
To:  Planning and Climate Change Policy Board
On:  21 January 2025
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Local Development Plan (LDP2) Delivery Programme Update
___________________________________________________________________
1. Summary
1.1 There is a statutory requirement for Local Development Plans to be
accompanied by a Delivery Programme and for this to be updated every two
years.  A Draft LDP2 Delivery Programme update was consulted on in
November/December 2024, and a finalised Delivery Programme Update has
now been prepared for approval by Board, reflecting comments received.
___________________________________________________________________ 
2. Recommendations
2.1 It is recommended that the Board:
1) approve the Local Development Plan (LDP2) Delivery Programme
Update set out in Appendix 1.
_________________________________________________________
3. Background
3.1 There is a statutory requirement for Local Development Plans to be
accompanied by a Delivery Programme and for this to be updated every two
years.  A Delivery Programme (then known as an Action Programme)
associated with the current Local Development Plan (LDP2) was published in
2022.  A Delivery Programme is required to include:
▪ A list of actions required to deliver each of the plan’s policies and proposals
and an explanation as to how those actions are to be taken.
▪ The timescale for the conclusion of each action; and
Item 2
PACC210125 Page 7 of 106

Page 12

▪ The expected sequencing of, and timescales for, delivery of housing on sites
allocated by the local development plan.
___________________________________________________________________ 
4. Local Development Plan (LDP2) Delivery Programme
4.1 The 5 November 2024 meeting of this Board approved a Draft Delivery
Programme Update for consultation purposes.  This document provided an
update on progress and future action in relation to the actions set out in the
2022 Action Programme.  The consultation commenced on 14 November
2024 and ran until 20 December 2024. Appendix 2 sets out a summary of the
consultation responses received and the Council’s reply to these.
4.2 Most responses were from key agencies or government agencies (SEPA,
Scottish Forestry, NatureScot, Strathclyde Partnership for Transport and
Historic Environment Scotland), who welcomed reference to their involvement
in actions set out in the Delivery Programme and sought minor clarifications or
had no comment.
4.3 Buccleuch Property responded regarding the AMIDS site providing wording to
clarify and update Action 1.  The owners of Braehead Shopping Centre and
Retail Park and the Xsite leisure attraction responded to advise the current
masterplan is dated and unlikely to be implemented and seeks to work with
the Council to prepare a new masterplan, possibly including residential
development.
4.4 Bridge of Weir Community Council commented that it was difficult to discern
an overall vision for Renfrewshire which includes a clear role for the villages. 
It is responded that the vision for Renfrewshire’s places is to be found in the
Local Development Plan rather than the Delivery Programme itself.  A
concern is raised regarding maintenance of core paths, and an action has
been included in this regard.  In response to another comment, ‘local interest
groups’ have been added to the partner list for delivery of the Green Network
Strategy.
4.5 Homes for Scotland offer several comments on behalf of the housebuilding
industry.  They suggest that the Delivery Programme is updated annually, that
actions should be specified in relation to each housing site, that developer
contribution rates should be specified in relation to each site, and that site
briefs or masterplans should be provided for medium- or long-term
allocations.  The Council response is that this is likely to be the last Delivery
Programme associated with LDP2, as the new proposed Local Development
Plan (LDP3) will have a Proposed Delivery Programme published alongside it
in 2026, and to focus resources on providing more detail in the LDP2 Delivery
Programme would divert from the new Local Development Plan process.
4.6 With reference to Action 8 on Paisley Town Centre Action Plan, a reference
has been added in relation to the preservation and enhancement of listed
buildings.
Page 8 of 106

Page 13

4.7 Having had regard to the responses received, the finalised Delivery
Programme associated with LDP2 is attached as Appendix 1 for approval.
___________________________________________________________________
Implications of the Report
1. Financial – Whilst some of the actions set out in the Delivery programme do
need funding for delivery, inclusion in the Delivery Programme does not
commit the Council to funding these actions.
2. HR & Organisational Development – None.
3. Community/Council Planning –
The local development plan is a wide-ranging document and is considered to
support the priorities of the Renfrewshire Community Plan and the Council’s
strategic outcomes.
4. Legal – the preparation of a local development plan and associated delivery
programme is a statutory requirement for planning authorities. The Council is
following statutory procedures in preparing the plan and associated
documents.
5. Property/Assets – None.
6. Information Technology – None. 
7. Equality & Human Rights – an Equalities Impact Assessment was prepared
in respect of the Local Development Plan (LDP2) that this Delivery
programme Update is associated with. It is available to view at
https://www.renfrewshire.gov.uk/article/3070/Renfrewshire-Development-Plan
8. Health & Safety – None.
9. Procurement – None.
10. Risk – None
11. Privacy Impact – None.
12. Climate Risk – None
13. Children’s Rights – this report does not cover a new policy, function or
strategy nor a substantive change to an existing policy, function or strategy
which will have an impact on children’s rights.
14. Cosla Policy Position – None
_______________________________________________________
Appendices 
Appendix 1 – Renfrewshire Local Development Plan (LDP2) Delivery Programme
Update (2024)
Page 9 of 106

Page 14

Appendix 2 – Responses to consultation on the Renfrewshire Local Development
Plan (LDP2) Draft Delivery Programme Update 
List of Background Papers 
None 
___________________________________________________________________ 
Author: Alan Williamson, Strategy & Place Manager,
Alan.williamson@renfrewshire.gov.uk, 07811 053968 
Page 10 of 106

Page 15

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 1
Contents 
Renfrewshire Local Development Plan (LDP2)
Delivery Programme Update 2024 
Appendix 1Page 11 of 106

Page 16

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 2
Contents
Page 12 of 106

Page 17

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 3
Contents 
Introduction         4
Programme of Delivery 
Delivering the Economy Strategy      6 
Delivering the Centres Strategy      13 
Delivering the Places Strategy      18
Delivering the Infrastructure Strategy     29 
Delivering the Environment Strategy     34 
Estimated housing site delivery programme    41 
Page 13 of 106

Page 18

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 4
Introduction 
Introduction
This Delivery Programme Update relates to
the Renfrewshire Local Development Plan
(LDP2, adopted 2021) and provides an update
on the actions and partnerships required to
successfully implement the Plan’s Spatial
Strategy, it’s policies and assist in delivering
its proposals. 
In accordance with Section 21 of the Town
and Country Planning (Scotland) Act 1997
and associated Regulations, the Delivery
Programme Update sets out:
• A list of actions required to deliver
each of the plan’s policies and
proposals and an explanation as to
how those actions are to be taken;
• The timescale for the conclusion of
each action; and 
• The expected sequencing of, and
timescales for, delivery of housing on
sites allocated by the local
development plan. 
The Delivery Programme Update follows the
five themes of the Renfrewshire Local
Development Plan: 
 Economy; 
 Centres; 
 Infrastructure; 
 Places; 
 Environment.
The Delivery Programme will be updated
every two years with information from key
stakeholders, key agencies, developers,
investors and funders and from carrying out
regular reviews.
Page 14 of 106

Page 19

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 5
Delivering the Economy Strategy  Programme of Delivery 
Page 15 of 106

Page 20

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 6
Delivering the Economy Strategy
Advanced Manufacturing and Innovation District Scotland (AMIDS) 
Action 1 
Support delivery of the Advanced Manufacturing and Innovation District Scotland
(AMIDS). 
AMIDS will create an internationally recognised centre for innovation, research and
advanced manufacturing. 
A Strategic Economic Investment Location with the core site adjacent to Glasgow
Airport. Includes over 50 hectares of developable space to assist in the delivery of
advanced manufacturing, industrial, office, aviation services and ancillary supporting
uses.  
Timescales 
Glasgow Airport Investment Area (GAIA) infrastructure: Construction complete 2022. 
National Manufacturing Institute Scotland (NMIS) and CPIs Medicines Manufacturing
Innovation Centre (MMIC) opened in 2022/2023. Oligonucleotide Manufacuring Centre
of Excellence (OMICE) has started in 2024 within the MMIC, with a new facility to
commence on ground in 2025. 
AMIDS core site commercial development from 2025 to 2035. 
Policy/Proposal 
E1, E2, E5, I1, I2, I3, I7, P1, ENV2, ENV3, ENV4 & ENV5 
Lead/Partners 
Commercial development to be undertaken by a joint venture between Renfrewshire
Council and Tarras Park Ltd (Buccleuch Property) working with a range of key
stakeholders including the Scottish Government, Scottish Enterprise, Glasgow Airport,
Glasgow City Region and Strathclyde University. 
Page 16 of 106

Page 21

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 7
Delivering the Economy Strategy
Delivering the Economy Strategy - Advanced Manufacturing and Innovation District Scotland (AMIDS) 
Funding 
AMIDS is supported by over £200 million public sector investment to date to deliver
infrastructure including improvements to the local road network and a district heating
network owned and operated by Renfrewshire Council, NMIS, MMIC & OMICE.) 
Commitment to include AMIDS within Glasgow City Region’s Investment Zone with
details to be finalised in 2025. 
Commercial development to be funded through Buccleuch Property and supported by
public grants and investments where these are available to aid delivery of advanced
manufacturing accommodation. Private sector input to be in the region of £250m+ 
Progress and future actions 
The enabling infrastructure was completed in 2022 and Planning Permission in
Principle is in place for the AMIDS masterplan. £9m Lightweight Manufacturing Centre,
opened in 2018 to support the aerospace and automotive industries. 
Work on the initial infrastructure to support development was completed in 2022. The
NMIS facility opened in June 2023 and the MMIC opened in November 2022. OMICE
commended construction in 2024. 
Marketing of available development opportunities is ongoing. Delivery likely to be a mix
of speculative and build to suit development with several AMSC applications
forthcoming from 2025. These may require expansion of current site infrastructure and
District Heating Network provisions. 
AMIDS Strategic Advisory Group, jointly chaired by Renfrewshire Council and Scottish
Enterprise and attended by key stakeholders including Scottish Government,
Strathclyde University, NMIS, SDS, Buccleuch and others support the delivery of the
next phases of AMIDS. 
There requires to be on-going investigation of access enhancement to/from the site
incorporating improvements into the surrounding travel and transport network together
with future key infrastructure upgrades/expansion programmes.
Page 17 of 106

Page 22

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 8
Delivering the Economy Strategy
Delivering the Economy Strategy – Clyde Waterfront and Renfrew Riverside 
Action 2
Support delivery of the Clyde Waterfront and Renfrew Riverside.
The Clyde Waterfront & Renfrew Riverside (CWRR) Project aims to
regenerate the Clyde Waterfront to support existing and promote new
residential, commercial and environmental opportunities.
The proposals include the construction of a new opening road bridge
across the River Clyde, the construction of the Renfrew North
Development Road and improved cycle connections.
Timescales
Construction work commenced in 2022.
Completion of CWRR project infrastructure expected in 2025.
Policy/Proposal
E1, E2, E3, I1, I3, P1, P2, ENV2, ENV4 & ENV5 
Lead/Partners
Led by Renfrewshire Council in partnership with a range of key
stakeholders including the Scottish Government, Renfrewshire Council,
Glasgow City Region, other land owners and stakeholders. 
Page 18 of 106

Page 23

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 9
Delivering the Economy Strategy
Delivering the Economy Strategy – Clyde Waterfront and Renfrew Riverside 
s
Funding 
CWRR Project is supported by £90.7 million City Deal funding and
funding from Renfrewshire Council for the initial infrastructure to enable
development. Regeneration and development of the Clyde Riverfront will
come through private investment.
£282 million private sector investment into the CWRR Project is
expected.
Progress and future actions
Construction started in 2022 and will complete in 2025.
Page 19 of 106

Page 24

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 10
Delivering the Economy Strategy  
Action 3: Deliver actions/interventions set out Renfrewshire’s Economic Strategy 2020-2030
Policy/Proposal: E1, E2, E3, E4, E5, C1, I1, I2, I5, P1, P2, ENV3, ENV5 & ENV7
Lead/ Partners: Renfrewshire Council  & Renfrewshire
business community. 
Progress and future actions: Renfrewshire’s Economic Strategy was published
covering the period 2020-2030. Strategy to support economic activity and
employment opportunities as well as social and cultural development for
Renfrewshire. 
Officers from Economy and Development are currently carrying out a review of the
Strategy, to determine progress against each of the challenges identified in the
Strategy and to re-evaluate the Strategy in a post-pandemic environment. 
Action 4: Assist to deliver and monitor Hillington Business Park Simplified Planning Zone (SPZ)
Policy/Proposal:  E1, I1, I2, I3 & I5
Lead/Partners: Renfrewshire Council, Glasgow City Council,
Frasers Property (majority landowner) and local businesses. 
Progress and future actions: Hillington Park Simplified Planning Zone (SPZ) was
adopted in 2014 and ended on 1 October 2024. There are no future actions. A report
on what was achieved during the period of the Simplified Planning Zone was
reported to the Council’s Planning and Climate Change Policy Board on 5 November
2024. 
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 20 of 106

Page 25

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 11
Delivering the Economy Strategy 
Action 5: Prepare a Development Framework for area to north of Paisley Town Centre to facilitate a co-ordinated approach to re-development and
enhance the gateway between Paisley Town Centre and Glasgow Airport
Policy/Proposal:  E2, E3, I1, I3, P1, ENV3, ENV4 & ENV5 
Lead/ Partners:  Renfrewshire Council, local business
community, various land owners within the area and West
College Scotland.
Progress and future actions: Development Framework to be prepared. There is
continuing assessment of the potential delivery mechanisms and funding for this
project.
Renfrewshire Council's AMIDS South project, which includes a 1.7km 'gateway route'
along the White Cart river, has been awarded £38.7million from the UK Government
Levelling Up Fund. 
Action 6: Prepare development frameworks to guide investment in Transition Areas and Economic Investment Locations
Policy/Proposal: E1, E2, E3, I1, I3, I4, I5, I7, P1, P2, P5, P6, ENV3, ENV5 & ENV7
Lead/ Partners: Renfrewshire Council, landowners and
local community. 
Progress and future actions: Development frameworks have not been prepared and
their preparation is not within the current work programme. LDP2 Transition Areas
and Economic Investment Locations will be reviewed as part of LDP3 preparation. 
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 21 of 106

Page 26

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 12
Delivering the Economy Strategy
Action 7:  Support Delivery of Renfrewshire’s Tourism Plan 2024-2027 (action updated 2024)
Policy/Proposal: E4, C1, I1, P1, P5, P6, ENV2 & ENV3 
Lead/ Partners: Renfrewshire Council, OneRenStrategic
Tourism Leadership Group, VisitScotland, Scottish
Enterprise, Renfrewshire Chamber of Commerce and
Glasgow City Region. 
Progress and future actions: Renfrewshire Council worked with partners to develop a
Tourism Plan (2024-2027) with work now ongoing to deliver the Plan. 
The Tourism Plan identified 5 key priorities, cross cutting themes and a series of targets
to grow Renfrewshire’s visitor economy.  The first key step for the plan was to set up a
Tourism Leadership Group, which will support and drive growth in Renfrewshire’s
tourism economy. The Group had its first meeting in September 2024. 
Work will now be progressed to deliver tourism related development including projects
to boost the tourism potential of Paisley Town Centre as set out in Paisley Vision 2030. 
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 22 of 106

Page 27

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 13
Delivering the Centres Strategy
Paisley Town Centre Action Plan 
Action 8 
Delivery of Paisley Town Centre Action Plan and Paisley Vision 2030. 
Proposals are being taken forward to transform Paisley's town centre
venues and cultural infrastructure while supporting work to promote
Paisley as a visitor destination and drive new footfall into the town centre
and preserve the areas architectural heritage and culture. 
Paisley was chosen by the Scotland’s Town Partnership and the Scottish
Government to be a pilot case for a piece of work reimagining how a town
centre could be redesigned to better meet future needs. Paisley Vision 2030
builds on the actions in the Town Centre Action Plan. 
Policy Proposal 
C1, I1, P1, ENV3 & ENV5 
Lead/ Partners 
Renfrewshire Council, Paisley First BID Group, Renfrewshire Economic
Leadership Panel & Renfrewshire business community.
Page 23 of 106

Page 28

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 14
Delivering the Centres Strategy
Paisley Town Centre Action Plan  
Progress and future actions 
Within Paisley High Street and University Campus a number of properties have
been improved through the Townscape Heritage/Conservation Area Regeneration
Scheme. 
Updates on other key projects: 
 Paisley Museum - a £42m transformation to showcase the town's unique
heritage and collections, predicted to bring around 125,000 visitors a year.
The museum closed in September 2018 and will reopen in 2025. 
 Paisley Town Hall - a £22m internal refurbishment to become a landmark
entertainment venue.  The Town Hall reopened in 2023 and is proving to be a
great success with a number of acts booked to perform at the venue.. 
 Learning and Cultural Hub – the £7m Learning and Cultural Hub opened in
2023 and is designed to promote education, culture and community
engagement. It combines library services, learning spaces, and cultural
activities under one roof, offering a variety of resources such as books, digital
media, study areas, and event spaces.. 
 Paisley Arts Centre - a £3m upgrade of the existing building to improve the
performance facilities completed in June 2024. 
 Paisley Centre – Planning permission in principle approved for a masterplan
which includes retail space, residential, hotel, healthcare facility and
enhanced public spaces. The owner is in ongoing discussions with the Council
and Scottish Government about potential funding options to deliver the
masterplan. 
The Council will work with owners of listed buildings to encourage their
preservation and enhancement.
Page 24 of 106

Page 29

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 15
Delivering the Centres Strategy
Braehead Master Plan 
Action 9 
Support the delivery of Braehead Master Plan 
Braehead continues to be a key economic driver and has supported
the wider regeneration of the Clyde Waterfront delivering urban
renewal and environmental transformation. A masterplan has been
granted planning consent as part of the centre’s evolution to provide a
range and choice of uses and activities. 
Timescales 
The development continues to evolve in line with the changing
markets and economic circumstances – planning permission for the
masterplan was granted consent in 2016. 
Policy Proposal 
E1, C1, I1 & P1 
Lead/ Partners 
Braehead owners and Renfrewshire Council. 
Progress and future actions 
A change in ownership and investment strategy has resulted in the
focus of investment at Braehead being on internal spaces. The current
masterplan is unlikely to be implemented and consideration will be
given to the preparation of a new masterplan as part of the LDP3
process.
Page 25 of 106

Page 30

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 16
Delivering the Centres Strategy
Action 10: Prepare and review Centre Visions, Strategies and Action Plans for Renfrewshire’s Network of Centres.
Policy/Proposal:  C1, I1, P1, ENV3 & ENV5 
Lead/ Partners: Renfrewshire Council, Community
Councils, Community Organisations, local residents
and businesses. 
Progress and future actions:  A new vision for Johnstone was published in May
2024 and is a strategic initiative aimed at revitalising the town centre. It focuses on
enhancing public spaces and supporting local businesses to create a more vibrant
and sustainable community. 
The vision seeks to promote economic growth, boost tourism, and enhance the
quality of life for residents by developing infrastructure, improving transport links,
and creating a sense of community pride. The initiative is part of broader efforts to
rejuvenate towns in the region, making them more attractive and liveable for future
generations. 
Another commission in Erskine is currently in progress  to develop proposals to
make public spaces and greenspaces more appealing as part of a review of the
Centre Strategy for Erskine and short, medium and long-term actions have been
identified. 
Officers are also looking to appoint a consultant to prepare landscape design
proposals which support the delivery of enhancements within an area of open space
to the south of Linwood town centre, known as ‘Linwood Lade’. 
Action 11:  Monitor and review Renfrew Town Centre Simplified Planning Zone (SPZ)
Policy/Proposal: C1, I1, P1, ENV3 & ENV5 
Lead/ Partners: Renfrewshire Council and Local
Businesses. 
Progress and future actions: The SPZ, which was adopted on 25 August 2015,
offers flexibility to help Renfrew town centre businesses to grow and adapt as well
as encouraging new business opportunities to locate in the town centre. There have
been 8 SPZ notifications received in the period since adoption. The Council will
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 26 of 106

Page 31

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 17
Delivering the Centres Strategy
continue to monitor development activity within the SPZ and prepare a final report
on its impact once the SPZ period has ended (25 August 2025). 
Action 12: Identify opportunities and initiatives for housing development projects which would assist in increasing the number of people
living in and using Renfrewshire’s town centres
Policy/Proposal: C1, P1, I7 & ENV3
Lead/ Partners:  Renfrewshire Council, 
local businesses, Registered Social Landlords. 
Progress and future actions: Good progress has been made within Paisley Town
Centre encouraging more people to live and use the town centre.  The Link Group
have completed the fourth phase of the redevelopment of the former Arnott’s
department store site in Paisley providing 81 affordable flats. Thirty-four flats have
been developed by Nixon Blue at Bridge Street in Paisley. These projects alongside
the other 269 residential units that have been completed since 2016 are contributing
to the wider regeneration of Paisley town centre, adding to the tenure diversification
and increased residential provision within this key central location. Proposals
continue to be progressed to deliver new homes in and around town centres and will
continue to be considered and promoted through the preparation of Centre
Strategies and the delivery of the Strategic Housing Investment Plan. 
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 27 of 106

Page 32

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 18
Delivering the Places Strategy
Dargavel Village Community Growth Area 
Action 13
Support the successful implementation of the Dargavel Village
Community Growth Area through a partnership approach.
Delivery of Dargavel Village is through a masterplanned approach
to remediate and re-develop the site.  Planning consents are in
place for a range of uses including 4,000 new homes, a woodland
park, education and health facilities, recreation and open space
facilities, retail provision and associated infrastructure including a
motorway junction.  
Timescales
Works commenced at the site in 2012 and development is forecast
to reach completion by 2037. 
Policy/Proposal 
E1, P1, P2, P3, P5, P6, P7, C1, I1, ENV2, ENV3 & ENV4
Lead/ Partners
BAE Systems, Renfrewshire Council, Transport Scotland,
Strathclyde Partnership for Transport, Forestry and Land Scotland,
local community organisations and various developers.
Funding
Funding secured through approved s75 agreement. 
Page 28 of 106

Page 33

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 19
Delivering the Places Strategy
Dargavel Village Community Growth Area 
Progress and future actions
Work is progressing well on site and has delivered: 
 Major road and drainage infrastructure, including a new
motorway junction;
 Extensive earthworks and remediation activity;
 Structural landscaping and new greenspaces including the
formation of a ‘village square’;
 Over 2500 new homes delivered, including 138 new Social
Rented homes
 Traffic management and environmental enhancements;
 Village retail centre with foodstore anchor, and new foodstore
under construction;
 New school and nursery complete, and additional primary school
proposed;
 First phase of park and ride facilities at Bishopton rail station,
with second phase scheduled for completion by June 2025;
 New local play areas and early phases of a new ‘Central Park’
serving the development;
 Initial phases of a 400 hectare community Woodland Park as a
key asset for the area; and,
 Satellite health centre currently under construction.
 Introduction of bus service between Dargavel and Braehead 
Page 29 of 106

Page 34

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 20
Delivering the Places Strategy
Strategic Housing Investment Plan Projects 
Action 14
Support the delivery of the Strategic Housing Investment Plan
(SHIP) projects.
The Strategic Housing Investment Plan sets out how investment in
affordable housing will be targeted to meet the objectives of
Renfrewshire’s Local Housing Strategy.
Projects within the Strategic Housing Investment Plan are prioritised
to reflect project deliverability in terms of local needs assessments,
site availability, strategic priorities and funding availability from both
a programme prospective and the housing developers’ own financial
capacity.  
Timescales
The SHIP is reviewed and updated annually and submitted to the
Scottish Government by 31 October each year. The SHIP contains
expected timescales for completion of projects subject to the
availability of grant funding.
Policy/Proposal
P1, P2 & P3
Lead/ Partners
Scottish Government, Registered Social Landlords and
Renfrewshire Council. 
Page 30 of 106

Page 35

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 21
Delivering the Places Strategy
Strategic Housing Investment Plan Projects 
Funding
The Scottish Government allocates grant funding to local
authority areas through the Affordable Housing Supply
Programme. Funding for financial year 2024/25 was lower than
originally anticipated, and there is uncertainty over future year’s
funding meaning delivery of the programme is likely to be
impacted.
Progress and future actions
The SHIP continues to provide funding to deliver a range of
affordable housing developments across Renfrewshire including
the delivery in 2023/24 of 101 new homes by the Council at
Ferguslie Park, Paisley, and 81 homes at Abbey Quarter in
Paisley and 14 homes at Woodend House in Houston, both
development by Link Group.
New affordable homes are being developed to the ensure they
are energy efficient to help tackle fuel poverty and the Council
and partners continue to develop options around the
achievement of low carbon, energy efficient homes that meet
our climate change aspirations through innovation and
technology.   
Throughout the lifetime of the SHIP the Council will continue to
explore options around innovative delivery mechanisms to
expand the supply of affordable housing focusing on the
regeneration of brownfield and previously used land.
Page 31 of 106

Page 36

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 22
Delivering the Places Strategy
Action 15: Support local communities to prepare and deliver Place Plans for their area 
Policy/Proposal: P1, P5, P6, C1, I1, ENV2 & ENV7
Lead/ Partners: Local community groups, residents,
local businesses, Development Trusts, Renfrewshire
Council and Community Councils. 
Progress and future actions: A community led Pilot Local Place Plan for Foxbar
in Paisley was completed in 2018 with the assistance of the Scottish Government
‘Making Places’ initiative. 
The outcomes and principles emerging from this process informed the preparation
of a ‘How to Guide’ providing a template to support communities to deliver Local
Place Plans across Renfrewshire. 
In May 2023, an invitation was issued to communities across Renfrewshire to
prepare a Local Place Plan. Information sessions were held in March 2024, and
further information drop-in sessions were held in August and September 2024, as
well as one-to-one meetings with interested organisations. As at September 2024,
13 community organisations have expressed an interest in preparing a Local
Place Plan for their area. The Council will work to support local communities if
they decide to prepare a plan for their area. 
Action 16: Prepare Advice Note on how settlements across Renfrewshire can learn from the example of Dargavel Village in integrating
walking and cycling provision in new development
Policy/Proposal: C1, P1, P5, P6, P7, I1 & ENV2
Lead/Partners: Renfrewshire Council, 
Scottish Forestry, Local Outdoor Access Forum, land
owners and public. 
Progress and future actions: Advice note to be prepared. This is not within the
current work programme. 
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 32 of 106

Page 37

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 23
Delivering the Places Strategy
Action 17: Assist with the implementation of the Community Growth Area at Johnstone South West
Policy/Proposal: P1, P2, P3, P5, P6 I1,I3, I7 & ENV4 
Lead/ Partners: Renfrewshire Council, various house
builders and Registered Social Landlords. 
Progress and future actions: A masterplan was produced for the Johnstone
South West area in 2012 with a range of local residents, community
representatives and key stakeholders involved in a 'charrette' exercise supported
by the Scottish Government.  As at 2024, 222 houses have been developed on
sites identified in the masterplan, including 183 private houses either side of Beith
Road at Fordbank, and 39 houses by Renfrewshire Council at Auchengreoch
Road. A new early learning and childcare centre has also been delivered in the
area. 
The Howwood Road regeneration and renewal area sits within the Community
Growth Area. Two phases of new build housing are planned for this area, with a
planning application for the first phase of 70 houses submitted. Other housing
development opportunities have still to be brought forward. 
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 33 of 106

Page 38

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 24
Delivering the Places Strategy
Action 18: Review social rented housing stock, undertake option appraisal and develop area-based strategies to ensure good
placemaking in Renfrewshire’s existing places
Policy/Proposal: P1, P3, P5, P6, I1 & I7
Lead/Partners: Renfrewshire Council, Local
Communities and Registered Social Landlords. 
Progress and future actions: The Housing-led Regeneration and Renewal
Programme is focused on eight regeneration areas within Renfrewshire
(Auchentorlie, Howard Street, Waverley Road, Ferguslie/Broomlands,
Springbank/Mossvale, Thrushcraig, all Paisley, Howwood Road in Johnstone, and
Moorpark in Renfrew). The programme will deliver modern, high quality, energy
efficient, affordable Council housing and contribute to the wider transformation of
communities across Renfrewshire. 
Within each area, there is a different scope of regeneration activity and
timescales, within a 10-year programme that commenced in 2022. Regeneration
activity involves a mix of investment in existing properties, demolition, new-build,
and environmental improvements. 
The programme involves a new approach to community neighbourhood renewal,
going beyond housing and taking account of broader issues such as health and
wellbeing, and access to open space, sustainable travel, and employment/training
opportunities. 
A detailed update setting out progress and future activity in each area was
reported to the 20 August 2024 Communities and Housing Policy Board. 
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 34 of 106

Page 39

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 25
Delivering the Places Strategy
Action 19: Consider the need to identify new sites to meet the housing needs of key groups
Policy/Proposal: P1, P2, P3, P4, I3, I4 & ENV4
Lead/ Partners: Key housing groups, developers, Key
Agencies, Local Community Organisations, Registered
Social Landlords, adjoining Local Authorities and
Renfrewshire Council. 
Progress and future actions: Strategic Priority 5 of the Local Housing Strategy
2023-28 is that ‘people can live independently for as long as possible in their own
home and the different housing needs of people across Renfrewshire are being
met’. Whilst recognising a general need of housing for particular needs, the Local
Housing Strategy does not specify the need for specific sites for key groups. 
However, opportunities to deliver new homes for key groups are continually
investigated through the annual review of the Strategic Housing Investment
Programme. 
The Local Housing Strategy also sets a requirement for 10% of dwellings in new
residential proposals to be designed to be easily adaptable for wheelchair users,
and 5% to be designed to be wheelchair accessible. 
LDP2 provides a framework for the consideration of new small privately-owned
sites to accommodate Gypsies/Travellers and Travelling Showpeople, whether
transit or permanent. 
The requirement for the identification of land/sites for Gypsy/Traveller housing
needs is being considered as part of the new Local Development Plan (LDP3)
process. 
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 35 of 106

Page 40

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 26
Delivering the Places Strategy
Action 20: Prepare development briefs to support the delivery of key sites including housing regeneration sites and Council owned sites
Policy/Proposal: P1, P2 & P3
Lead/ Partners: Renfrewshire Council.  Progress and future actions: Development briefs have been prepared for
eleven sites under LDP2 and will continue to be prepared as required.
Development briefs are available at
https://www.renfrewshire.gov.uk/article/12717/Site-development-briefs. 
Action 21: In partnership with local communities develop and implement local regeneration strategies for Johnstone Castle, Paisley West
End, and Ferguslie Park
Policy/Proposal: P1, P3, P5, P6 & I1
Lead/Partners: Renfrewshire Council, Local
Communities and Registered Social Landlords. 
Progress and future actions: 95 new energy efficient Council homes were
delivered as part of Phase I of the regeneration of Johnstone Castle, Johnstone
in April 2021. Link Group are now on site with Johnstone Castle Phase II which
will provide 68 new social rented homes, with these homes due to complete in
August 2026. 
101 new affordable homes were completed in the Tannahill regeneration area in
Ferguslie Park in July 2023. These 95 Council homes and 6 homes for shared
equity low-cost home ownership included a mix of 1 and 2 bed cottage flats and
bungalows and 2, 3 and 4 bedroom homes. 
To complement the housing development, the Council worked in partnership with
the local community to prepare ‘The Making of Ferguslie’, which sets out a vision
for the future of Ferguslie over 5-10 years from 2021. 
Sanctuary Scotland in partnership with the Council and Scottish Government are
progressing plans for the regeneration of Paisley West End. Phase 1 of the new
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 36 of 106

Page 41

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 27
Delivering the Places Strategy
build programme will deliver 35 units for social rent at Sutherland Street, Paisley
with these new homes due to complete in February 2025. 
Plans are also progressing to deliver 120 additional new social rented homes in
the West End with significant demolition due to take place in late 2024 and early
2025 to facilitate delivery of the West End Regeneration Masterplan. 
Action 22: Update and refresh Renfrewshire’s Places Design Guidance 
Policy/Proposal:  P1, P2, P3, P5, P6, I1 & I7
Lead/ Partners: Renfrewshire Council. Progress and future actions: Renfrewshire’s Places Design Guidance sets out
the objectives of sustainable placemaking, design and achieving high-quality
design. The current guidance, dating from 2015, is still in use and many of the
principles it sets out are still relevant. An update of the guidance is not currently
within the work programme. 
Action 23: Work with local communities to support the delivery of community asset transfer projects
Policy/Proposal: P1, P5, P6 & ENV7
Lead/Partners: Renfrewshire Council, Local
Community/Voluntary Organisations and Development
Trusts. 
Progress and future actions: Renfrewshire Council is committed to building
strong, safe and resilient communities. In 2022 the Council created a dedicated
single point of contact for community asset transfer and reviewed our policy and
procedures. The result has been an increase in the number of asset transfer
requests, better support for community organisations and management of the
process through the Council and an increase in success. 
Since Part 5 of the Community Empowerment (Scotland) Act 2015 came into
force in 2017, Renfrewshire Council has processed 22 full CAT requests. 11 of
the applications were processed in the period 2017-22 of which 3 were refused
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 37 of 106

Page 42

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 28
Delivering the Places Strategy
and 2 subsequently withdrawn. Of the 11 applications processed since 2022, 10
were approved and 1 refused. The time taken for asset transfer requests to be
determined and completed has also significantly reduced with fully validated
applications receiving a decision within 12 weeks. 
Future actions include a more strategic approach and integration with the
Council’s review of assets and development of a social value toolkit to aid in the
evaluation and assessment of applications and to measure community benefit
from asset transfer. 
Action 24: Develop a standard for affordable housing in Renfrewshire
Policy/Proposal: P1, P3 P5, P6, I1 & I7
Lead/Partners: Renfrewshire Council, Registered
Social Landlords. 
Progress and future actions: The preparation of the guidance was halted
owing to changing sustainability standards, and issues that other local authorities
were having in implementing similar guidance. The need for guidance will be
reviewed with Housing Services. 
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 38 of 106

Page 43

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 29
Delivering the Infrastructure Strategy
Action 25: Support the delivery of major Infrastructure Projects: Clyde Waterfront and Renfrew Riverside (CWRR) and Glasgow Airport
Investment Area (GAIA).
Policy/Proposal: E1, E2, E5, I1, I2, I3, P1, ENV2, ENV3, ENV4 & ENV5
Lead/ Partners: Renfrewshire Council leading
delivery of projects and working with stakeholders
including Scottish Government, Scottish Enterprise,
Glasgow City Region, Strathclyde Partnership for
Transport (SPT), and land owners. 
Progress and future actions: GAIA Infrastructure project is complete. 
CWRR project commenced in 2022 and will complete in 2025.
AMIDS 
AMIDS South is expected to commence construction in 2025 and will provide a
new gateway route between AMIDS and Paisley Town Centre (enhance airport
route too). 
The Council are working with other local authorities and key stakeholders across
the city region to look at the feasibility of a Glasgow Metro scheme which would
look to improve public transport connectivity across the region and enhance access
to Glasgow Airport. 
Action 26: Promote enhanced public transport facilities at Braehead
Policy/Proposal: I1 & C1
Lead/ Partners: Renfrewshire Council, Strathclyde
Partnership for Transport.   
Progress and future actions: Improved public transport facilities and links to
Braehead will be investigated as part of the Clyde Metro proposal. 
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 39 of 106

Page 44

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 30
Delivering the Infrastructure Strategy
Action 27: Support preparation and delivery of Flood Risk and Drainage Management Plans. 
Policy/Proposal: I3
Lead/ Partners: Renfrewshire Council, Scottish
Environment Protection Agency, Scottish Government
and adjoining local authorities. 
Progress and future actions: Renfrewshire Council continues to work in
partnership to support the delivery of the actions identified in the Clyde and Loch
Lomond Flood Risk Management Plan, the Scotland and Clyde Area River Basin
Management Plans as well as the Metropolitan Glasgow Strategic Drainage Plan. 
Action 28: Investigate feasibility to improve circulation and access to/from Paisley Town Centre
Policy/Proposal: I1, E3 & C1
Lead/ Partners: Renfrewshire Council.  Progress and future actions: Completion of renewal of urban traffic control
system plus upgrade of strategic signal junction equipment and controllers
expected to bring efficiencies to traffic management and control which should
smooth traffic flow in Paisley. AMIDS South project will provide a new gateway
between AMIDS and Paisley town centre. 
Action 29: Support preparation and implementation of Council’s Plan for Net Zero 
Policy/Proposal: I4, I7, P1 & ENV5
Lead/ Partners:  Renfrewshire Council, Community
Planning partners
local residents, communities, organisations and
businesses, private, public, key regional and national
stakeholder organisations,
Scottish Government 
Progress and future actions: Renfrewshire’s Plan for Net Zero was approved at
Planning and Climate Change Policy Board in August 2022, aiming to end
Renfrewshire’s contribution to climate change within a generation and committing
us to work towards net zero emissions by 2030 for Renfrewshire Council as an
organisation and the Renfrewshire Council area as a whole.  
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 40 of 106

Page 45

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 31
Delivering the Infrastructure Strategy 
The most up to date reporting year (2023-24) has seen Renfrewshire Council’s
emissions reduce to 18,889t tCO2e – a reduction of 3.3% compared with the
previous year and an overall reduction of 64.6% against the baseline year of 2012-
13. 
Internally, projects which feed into the Plan for Net Zero continue to be delivered as
a Council across all 5 themes (clean energy, sustainable transport, circular
economy, connected communities and resilient place). Work is also progressing on
the preparation of priority projects which will build on the policy framework in the
Local Development Plan to provide a strategic framework to meet our climate
change targets. These projects will take into consideration the key plans and
policies to provide the direction and scale we need to work towards net zero
emissions. 
The Local Development Plan provides a spatial strategy and policy framework to
support Renfrewshire’s Plan for Net Zero, which will be kept under review, including
the preparation of additional planning guidance if required. 
Action 30: Investigate the potential for Low Carbon and Renewable Energy Developments
Policy/Proposal: I1, I4, I7, & ENV2
Lead/ Partners: Renfrewshire Council,  Progress and future actions: A renewable energy district heating system has
been installed at the Advanced Manufacturing and Innovation District Scotland
(AMIDS) site. The Council has published planning guidance on solar farm
developments. A number of solar farms and battery energy storage system
applications have been approved in Renfrewshire. 
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 41 of 106

Page 46

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 32
Delivering the Infrastructure Strategy
Action 31: Work in partnership to increase accessibility to digital connectivity for all areas
Policy/Proposal: I1
Lead/ Partners: Renfrewshire Council, Scottish
Government and Digital Infrastructure Providers.
Progress and future actions: Enhanced wi-fi connectivity has been provided to
80% (at July 2024) of Council (including schools), One Ren, and HSCP buildings,
with free public wi-fi available across Johnstone, Paisley and Renfrew town centres.
There has been extensive and ongoing rollout of full fibre broadband across
Renfrewshire.   
Action 32: Investigate potential Heat Network opportunities across Renfrewshire
Policy/Proposal: I4
Lead/ Partners: Renfrewshire Council, Scottish
Environment Protection Agency, developers and local
businesses. 
Progress and future actions: Renfrewshire’s Local Heat and Energy Efficiency
Strategy (LHEES) and Delivery Plan (LHEEDP) were both approved and published
in 2024.  Renfrewshire also received funding to carry out feasibility studies across
the Renfrewshire area.  Following the conclusion of the studies funding has also
been secured from Scottish Government to progress two potential district heating
networks to Investment Grade Business Case.  Further work to be carried out to
identify opportunities for renewable and low carbon infrastructure and to explore
more innovative and collaborative delivery models across stakeholders, including
potential for joint ventures and partnership projects. 
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 42 of 106

Page 47

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 33
Delivering the Infrastructure Strategy
Action 33: Monitor and Review Infrastructure Considerations Map to identify potential capacity constraints in Schools across Renfrewshire
Policy/Proposal: P2
Lead/ Partners: Renfrewshire Council.  Progress and future actions: There is ongoing liaison between the Planning
Service and Children’s Services on school capacity and school pupil projections
based on new housing development. Children’s Services has produced a School
Estate Management Plan (2024) and are developing a Learning Estate Strategy is
being developed. 
Action 34: Investigate potential measures to improve traffic flows on the Strategic Road Network
Policy/Proposal: I1, E1 & E2
Lead/ Partners: Renfrewshire Council, Transport
Scotland, and Strathclyde Partnership for Transport. 
Progress and future actions: A transport appraisal considering the strategic road
network will be prepared as part of the new LDP3. 
Action 35: Investigate health care provision capacity across Renfrewshire 
Policy/Proposal: P1 & P2 
Lead/ Partners: NHS Greater Glasgow and Clyde,
Renfrewshire Health and Social Care Partnership,
Renfrewshire Council. 
Progress and future actions: Health care provision capacity is being investigated
as part of the new Local Development Plan (LDP3) process. 
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 43 of 106

Page 48

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 34
Delivering the Environment Strategy
Renfrewshire’s Growing Grounds Forum 
Action 36 
Renfrewshire’s Growing Grounds Forum work with local communities
to support local growing activities and to increase the quantity and
quality of community growing opportunities across the Council area. 
Part 9 of the Community Empowerment (Scotland) Act 2015
places duties on local authorities to support the provision of
allotments and other community growing opportunities. Managed
jointly by Renfrewshire Council and Renfrewshire Health and Social
Care Partnership, the Growing Grounds Forum provides a valuable
support and guidance network for local communities. 
Timescales 
Ongoing 
Policy Proposal: 
E3, P1, P5, P6, ENV2 & ENV7 
Lead/Partners: Renfrewshire Council, Renfrewshire Health and
Social Care Partnership, community groups and local residents. 
Page 44 of 106

Page 49

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 35
Delivering the Environment Strategy
Renfrewshire’s Growing Grounds Forum 
Progress and future actions: 
Renfrewshire’s Growing Grounds Forum works to support local
residents and community groups to increase the quantity and quality of
growing ground opportunities. 
The Forum has applied a collaborative and comprehensive approach
to community growing across Renfrewshire. This has supported the
reuse of vacant land, the creation of sustainable places and deliver of
community ambitions in line with the Spatial Strategy in the Local
Development Plan.   
The Forum has had a significant impact, with support and direction
provided to members. This has included assistance in securing leases,
funding advice and specialist growing guidance. A key element has
also been to encourage peer learning between members. The Forum
meets on a regular basis and continues to support growing
opportunities across Renfrewshire. 
Page 45 of 106

Page 50

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 36
Delivering the Environment Strategy
Renfrewshire’s Green Network Strategy  
Action 37 
Preparation and delivery of Green Network Strategy incorporating
access, open space and biodiversity to support the creation of
sustainable places. 
A Green Network Startegy is to be developed to identify greenspaces
across Renfrewshire and opportunities for their protection and
enhancement. 
Timescales: .TBC 
Policy Proposal: 
E4, C1, I1, P5, P6, ENV1, ENV2, ENV4, ENV6 & ENV7 
Lead/Partners: 
Renfrewshire Council, Glasgow and Clyde Valley Green Network
Partnership, Renfrewshire Growing Grounds Forum, Central Scotland
Green Network, Scottish Forestry, Scottish Environment Protection
Agency, Transport Scotland, local interest groups and local developers. 
Page 46 of 106

Page 51

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 37
Delivering the Environment Strategy
Renfrewshire’s Green Network Strategy 
Funding Details: 
It is anticipated that projects will be funded through a variety of
sources and organisations, such as national grant schemes as well as
those funding streams available to voluntary and third sector bodies. 
Progress and future actions: 
Several pieces of work that would inform a Green Network Strategy
have been completed or commenced. These include an updated Core
Paths Plan (2022) and Biodiversity Action Plan (2024). An open space
audit and work to identify a nature network is being undertaken to
inform LDP3. 
There is now a statutory requirement to prepare an Open Space
Strategy, although Regulations to inform its preparation are still
awaited. It is likely that an Open Space Strategy could cover much of
the same content of a Green Network Strategy. The preparation of a
separate Green Network Strategy is therefore not within the current
work programme and the need for a separate strategy will be kept
under review..
Page 47 of 106

Page 52

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 38
Delivering the Environment Strategy
Action 38: Review and deliver actions within Renfrewshire’s Biodiversity Action Plan 2018-2022
Policy/Proposal: P1, P5, P6, ENV1, ENV2, ENV3, ENV4, ENV5, ENV6 & ENV7
Lead/ Partners: Local Biodiversity Steering Group  Progress and future actions: The Renfrewshire Biodiversity Duty Report 2021-
2023 highlights the actions undertaken to support biodiversity over that period. 
A new Biodiversity Plan for Renfrewshire was approved on 28 May 2024. Some
actions identified within the plan are already underway including progress on the
restoration of more than 200 hectares of peatland at Clyde Muirshiel Regional
Park, a feasibility study considering potential enhancements to the Candren Burn
and a range of conservation activities developed by the Friends of Jenny’s Well
Local Nature Reserve. 
Progress on delivery of the Biodiversity Action Plan will be monitored by the
Council and its partners through the LBAP Steering Group, with updates reported
to the relevant Council Board. 
Action 39: Reviewing and working with partners to deliver actions within the Renfrewshire Vacant and Derelict Land Strategy
Policy/Proposal: E1, E3, E5, C1, C2, I1, I5, P1, P2, P5, P6, ENV5, ENV6 & ENV7
Lead/ Partners: Developers, local businesses land
owners, land owners, Scottish Government and
Renfrewshire Council. 
Progress and future actions:  The Vacant and Derelict Land Strategy was
updated in 2024. This reports a reduction in vacant and derelict land of 18.9%
since 2017, with a decrease in the amount of vacant and derelict land of 33.41
hectares since 2022. The Council will continue work on the actions set out in the
Vacant and Derelict Land Strategy. 
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 48 of 106

Page 53

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 39
Delivering the Environment Strategy 
Action 40: Review of Local Nature Conservation Sites (referred to as SINCs in LDP2) and Local Nature Reserve (LNRs)
Policy/Proposal: E4, P5, ENV1, ENV2, ENV3, ENV4, ENV5 & ENV6
Lead/ Partners: Renfrewshire Council, NatureScot,
Scottish Forestry, landowners, land managers and local
residents.
.
Progress and future actions: A review of Local Nature Conservation Sites will
be considered as part of the new local development plan (LDP3) process. A
review of Local Nature Reserves is not within the current work programme. 
Action 41: Support delivery of access and biodiversity interests through Outdoor Access Forum and LBAP Steering Group.
Policy/Proposal:  P1, I1, P5, P6, ENV1, ENV2, ENV3, ENV4, ENV5 & ENV6
Lead/Partners: The Local Access Forum represents
land owners and managers, community groups, local or
national organisations and the general public. 
The Local Biodiversity Action Plan Steering Group
consists of a range of local/national organisations and
individuals with an interest and knowledge of
biodiversity. 
Progress and future actions:  The LBAP Steering Group meets quarterly and
supports work with statutory bodies, third sector and voluntary groups with an
interest biodiversity to deliver actions with the Renfrewshire Biodiversity Action
Plan. 
The Renfrewshire Local Outdoor Access Forum advise on access rights, rights of
way and core paths.The Forum has most recently supported a revision of the
Renfrewshire Core Paths Plan, approved by the Council in 2022. 
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 49 of 106

Page 54

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 40
Delivering the Environment Strategy 
Action 42: Core Path Plan 
Policy/Proposal: C1, E4, P1, P5, P6, I1, ENV2
Lead/ Partners: Renfrewshire Council, Sustrans,
Forestry and Land Scotland, NatureScot, Local
Outdoor Access Forum, Land owners and public. 
Progress and future actions: 
Renfrewshire’s Core Paths Plan 2022 was adopted by the Council on 18th January
2022.   
The Plan sets out a strategic network of over 300 key access routes across
Renfrewshire which connect communities and provide opportunities for active
travel to schools, work and local amenities.   
The plan also identifies routes which connect people with areas of nature and
greenspace, promoting and encouraging healthy lifestyles. 
The Council will encourage maintenance of core paths and undertake its own
maintenance where it has responsibility and resources allow. 
2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026
Page 50 of 106

Page 55

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 41
Estimated housing site delivery programme
LDP2
ref/HLA
ref
Site Address Planning
Status
Tenure Brownfield/
Greenfield
Capacity Past
CompleƟons
Projected Delivery Comments/
constraints to
delivery
Town centre
site? 
Short term Medium term Long term Pipeline   
24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Post 34  
RFRF0907B LINWOOD ROAD
PHOENIX PARK PAISLEY
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD 198 164 34 0 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24. 
NO
RFRF0989 FORMER BASF SITE 144
HAWKHEAD ROAD
PAISLEY (MILLER)
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD 234 201 33 0 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF0989A FORMER BASF SITE 144
HAWKHEAD ROAD
PAISLEY (TW)
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD 209 187 22 0 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24. 
NO
RFRF1012 THE MILL HOUSE
BRIDGE ST PAISLEY
UNDER
CONSTRUCTION
PRIVATE  BROWNFIELD 34 16 18 0 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24. 
YES
RFRF0988 PRINTERS PLACE
PAISLEY
UNDER
CONSTRUCTION 
PRIVATE BROWNFIELD 49 10 20 19 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24. 
NO
RFRF1042 MAIN BUILDING
CASTLEHEAD CHURCH
MAIN ROAD PAISLEY
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD
(CONVERSION)
7 0 7 0 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24. 
NO
RFRF0870 HAWKHEAD HOSPITAL
ACCORD PLACE PAISLEY
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD 291 254 10 27 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24. 
NO
RFRF1058 17 GLASGOW ROAD
PAISLEY
UNDER
CONSTRUCTION 
PRIVATE BROWNFIELD
(CONVERSION)
4 0 4 0 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24. 
NO
RFRF1096 13A MOSS STREET
PAISLEY
UNDER
CONSTRUCTION 
PRIVATE BROWNFIELD
(CONVERSION)
4 0 4 0 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
YES
RFRF1049 3 COUNTY PLACE
PAISLEY
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD
(CONVERSION)
4 1 3 0 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
YES
RFRF1056 MAIN BUILDING
LIBERAL CLUB HIGH
STREET PAISLEY
CONSENT PRIVATE BROWNFIELD
(CONVERSION)
22 0 0 0 10 12 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
YES
RFRF1078 6-8 HIGH STREET
PAISLEY
CONSENT PRIVATE BROWNFIELD
(CONVERSION)
8 0 0 0 0 0 0 0 0 0 0 0 8 Planning permission
21/1479/PP granted
16/12/21. Pipeline site as
uncertainty over
implementaƟon of
planning consent. Will be
kept under review in
preparing LDP3. 
YES
RFRF1080 2 LONEND PAISLEY CONSENT PRIVATE BROWNFIELD 67 0 0 20 20 27 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1084 IN SHOPS MANAGERS
OFFICE PAISLEY CENTRE
PAISLEY
CONSENT PRIVATE BROWNFIELD 80 0 0 0 0 0 0 0 0 30 30  20 0 21/1668/PP.  Site has
Planning Permission in
Principle and key
regeneraƟon priority for
the Council. Programming
will be kept under review
in preparing LDP3.
YES
RFRF0971 PAISLEY SOUTH UWS
PAISLEY
CONSENT  PRIVATE BROWNFIELD 179 0 0 36 36 36 36 35 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF0971A PAISLEY SOUTH
DYKEBAR PAISLEY
CONSENT PRIVATE BROWNFIELD 603 0 0 30 45 60 90 90 90 90 90 18 0 Programming agreed in
HLA 24.
NO
RFRF1082 7 CAUSEYSIDE STREET
PAISLEY
CONSENT PRIVATE  BROWNFIELD
(CONVERSION)
4 0 0 4 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
YES
RFRF1086 6 ORR SQUARE PAISLEY CONSENT PRIVATE BROWNFIELD
(CONVERSION)
4 0 0 0 4 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1033 57 AMOCHRIE ROAD
PAISLEY
CONSENT PRIVATE BROWNFIELD 4 0 0 0 0 0 0 0 0 0 0 0 4 18/0852/PP.  Uncertainty
over implementaƟon of
planning consent. Will be
kept under review in
preparing LDP3.
NO
RFRF0706 THE INSTITUTE
MAXWELLTON STREET
PAISLEY
LDP2 SITE PRIVATE BROWNFIELD 40 0 0 0 0 0 0 0 0 15 15 10 0 24/0563/PP. New
applicaƟon submiƩed,
delivery expected within
10 year period.
Programming will be kept
under review. Site capacity
will be updated if
applicaƟon is approved.
NO
RFRF1028 WEST BRAE PAISLEY LDP2 SITE PRIVATE BROWNFIELD 4 0 0 0 0 0 0 0 0 0 0 0 4 Planning consent expired. 
Pipeline site, will be kept
under review in preparing
LDP3
NO
Page 51 of 106

Page 56

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 42
Estimated housing site delivery programme
LDP2
ref/HLA
ref
Site Address Planning
Status
Tenure Brownfield/
Greenfield
Capacity Past
CompleƟons
Projected Delivery Comments/
constraints to
delivery
Town centre
site? 
Short term Medium term Long term Pipeline   
24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Post 34  
RFRF0880 STATION ROAD PAISLEY LDP2 SITE PRIVATE BROWNFIELD 147 121 0 0 0 0 0 0 0 0 0 0 26 Uncertainty over
implementaƟon of
planning consent. Will be
kept under review in
preparing LDP3.
NO
RFRF1048 PRIORY PARK NURSING
HOME 19-21 MAIN
ROAD PAISLEY
WINDFALL PRIVATE BROWNFIELD
(CONVERSION)
17 0 0 0 0 0 0 0 0 0 0 0 17 24/0316/PP. Planning
applicaƟon sƟll to be
determined. Will be kept
under review in preparing
LDP3.
NO
RFRF1001 HUNTER STREET
PAISLEY
LDP2 SITE PRIVATE BROWNFIELD 7 0 0 0 0 0 0 0 0 0 0 0 7 Planning consent expired. 
Pipeline site, will be kept
under review in preparing
LDP3
NO
RFRF1034 21 GORDON STREET
PAISLEY
LDP2 SITE PRIVATE BROWNFIELD
(CONVERSION)
15 0 0 0 0 0 0 0 0 0 0 0 15 Planning consent expired. 
Pipeline site, will be kept
under review in preparing
LDP3
NO
RFRF1044 SITE BETWEEN 2&8
STANELY CRESCENT
PAISELY
WINDFALL PRIVATE BROWNFIELD 24 0 0 0 0 0 0 0 0 0 0 0 24 Planning consent expired. 
Pipeline site, will be kept
under review in preparing
LDP3
NO
RFRF1014 BLACKHALL STREET
PAISLEY
LDP2 SITE PRIVATE  BROWNFIELD 59 0 0 0 0 0 0 0 0 0 0 0 59 Planning consent expired. 
Pipeline site, will be kept
under review in preparing
LDP3
NO
RFRF1040 LAND TO SOUTH OF ST
JAMES INTERCHANGE
BURNSIDE PLACE
PAISLEY
LDP2 SITE PRIVATE BROWNFIELD 180 0 0 0 0 0 0 0 0 0 0 0 180 22/0569/PP. Planning
applicaƟon refused at
appeal. Pipeline site, will
be kept under review in
preparing LDP3
NO
RFRF0981 20 HIGH STREET PAISLEY LDP2 SITE PRIVATE BROWNFIELD
(CONVERSION)
6 0 0 0 0 0 0 0 0 0 0 0 6 Planning consent expired. 
Pipeline site, will be kept
under review in preparing
LDP3
YES
RFRF0851 CALSIDE FORMER RAH
PAISLEY
LDP2 SITE PRIVATE  BROWNFIELD
(CONVERSION)
81 0 0 0 0 20 30 31 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1007 FORMER TENNIS
COURTS GLENCOURSE
ROAD PAISLEY
LDP2 SITE PRIVATE BROWNFIELD 50 0 0 0 0 0 0 0 0 0 0 0 50 Constrained site. Pipeline
site, will be kept under
review in preparing LDP3.
NO
RFRF1050 LAND SW OF STANELY
PARK HOME STANELY
ROAD PAISLEY
WINDFALL PRIVATE  BROWNFIELD 31 0 0 0 0 0 0 0 0 10 10 11 0 19/0831/PP. Planning
consent granted following
compleƟon of HLA24.
Programming will be
reviewed in HLA25.
NO
RFRF1081 41 GAUZE STREET
PAISLEY
CONSENT PRIVATE BROWNFIELD
(CONVERSION)
14 0 0 0 7 7 0 0 0 0 0 0 0 22/0747/PP. Programming
agreed in HLA 24.
YES
RFRF0711B SUTHERLAND STREET
PAISELY
UNDER
CONSTRUCTION
SOCIAL
RENTED
BROWNFIELD 35 0 35 0 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF0950 CARTHA CRESCENT
PAISLEY 
UNDER
CONSTRUCTION
SOCIAL
RENTED
BROWNFIELD 33 0 12 21 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF0870A HAWKHEAD HOSPITAL
ACCORD PLACE PAISLEY
UNDER
CONSTRUCTION 
SOCIAL
RENTED
BROWNFIELD 30 0 0 30 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24. 
NO
RFRF1077 EAST LANE PAISLEY UNDER
CONSTRUCTION
SOCIAL
RENTED
BROWNFIELD 48 0 48 0 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF0671 DEE DRIVE PAISLEY LDP2 SITE SOCIAL
RENTED
BROWNFIELD 45 0 0 0 0 0 0 0 0 20 25 0 0 Site in SHIP and
programming reflects
expected funding
availability 
NO
RFRF0671A DON DRIVE PAISLEY LDP2 SITE SOCIAL
RENTED
BROWNFIELD 40 0 0 0 0 0 0 20 20 0 0 0 0 Programming agreed in
HLA 24. Site in SHIP and
programming reflects
expected funding
availability
NO
Page 52 of 106

Page 57

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 43
Estimated housing site delivery programme
LDP2
ref/HLA
ref
Site Address Planning
Status
Tenure Brownfield/
Greenfield
Capacity Past
CompleƟons
Projected Delivery Comments/
constraints to
delivery
Town centre
site? 
Short term Medium term Long term Pipeline   
24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Post 34  
RFRF0711 WEST BRAE OAKSHAW
PAISLEY (west end
regeneraƟon phase 2)
LDP2 SITE SOCIAL
RENTED
BROWNFIELD 120 0 0 0 0 20 30 30 40 0 0 0 0 Programming agreed in
HLA 24. Site in SHIP and
programming reflects
expected funding
availability. Planning
applicaƟon 24/0078/PP. to
be determined.
NO
RFRF0773 ALMOND CRESCENT
PAISLEY
LDP2 SITE SOCIAL
RENTED
BROWNFIELD 20 0 0 0 0 0 0 0 0 0 0 0 20 Pipeline site. Site not
currently in SHIP, review in
preparing LDP3.
NO
RFRF0839 HERIOT AVENUE
PAISLEY
LDP2 SITE SOCIAL
RENTED 
BROWNFIELD 35 0 0 0 0 0 0 0 0 0 0 0 35 Pipeline site. Site not
currently in SHIP, review in
preparing LDP3.
NO
RFRF0954 ARKLESTON ROAD
PAISLEY
LDP2 SITE SOCIAL
RENTED
BROWNFIELD 65 0 0 0 30 35 0 0 0 0 0 0 0 Site in SHIP. ConstrucƟon
expected to commence
next year. Programming
agreed in HLA 24.
NO
RFRF1004 NEW SNEDDON STREET
PAISLEY
LDP2 SITE SOCIAL
RENTED
BROWNFIELD 30 0 0 0 0 0 0 0 0 0 0 0 30 Pipeline site. Site not
currently in SHIP, review in
preparing LDP3.
NO
RFRF1013 HIGH CALSIDE PAISLEY LDP2 SITE SOCIAL
RENTED
BROWNFIELD 20 0 0 0 0 0 0 0 0 0 0 0 20 Pipeline site. Site not
currently in SHIP, review in
preparing LDP3.
NO
RFRF0934 GARTHLAND LANE
PAISLEY
LDP2 SITE SOCIAL
RENTED
BROWNFIELD 32 0 0 0 0 0 0 0 0 0 16 16 0 Site in SHIP and
programming reflects
expected funding
availability
NO
RFRF1071 STATION ROAD PAISLEY WINDFALL SOCIAL
RENTED
BROWNFIELD 45 0 0 0 0 0 0 0 0 0 0 0 45 Planning applicaƟon
refused at appeal. Pipeline
site, will be kept under
review in preparing LDP3
NO
RFRF1072 WESTBURN
AVENUE/BLACKSTOUN
ROAD PAISLEY
WINDFALL SOCIAL
RENTED
BROWNFIELD 22 0 0 0 0 0 0 0 0 0 0 22 0 Site in SHIP and
programming reflects
expected funding
availability.
NO
RFRF1074 THRUSHCRAIGS
CRESCENT PAISLEY
WINDFALL SOCIAL
RENTED
BROWNFIELD 50 0 0 0 0 0 30 20 0 0 0 0 0 Programming agreed in
HLA 24.  Part of Council’s
regeneraƟon programme.
Site in SHIP and
programming reflects
expected funding
availability
NO
RFRF1075  BROOMLANDS PAISLEY
(LocaƟon: Carbrook St)
(LocaƟon: Ferguslie
Main Road)
WINDFALL SOCIAL
RENTED
BROWNFIELD 43 0 0 0 0 0 0 0 43 0 0 0 0 Programming agreed in
HLA 24.  Part of Council’s
regeneraƟon programme.
Site in SHIP and
programming reflects
expected funding
availability
NO
RFRF1076 SPRINGBANK ROAD
AREA PAISLEY
WINDFALL SOCIAL
RENTED
BROWNFIELD 100 0 0 0 0 65 0 0 35 0 0 0 0 Programming agreed in
HLA 24.  Part of Council’s
regeneraƟon programme.
Site in SHIP and
programming reflects
expected funding
availability
NO
RFRF0952 GRAMPIAN
AVENUE/LOMOND
CRESCENT PAISLEY 
LDP2 SITE SOCIAL
RENTED
BROWNFIELD 30 0 0 0 0 0 0 0 0 0 0 0 30 Pipeline site. Site not
currently in SHIP, review in
preparing LDP3.
NO
RFRF1043 WRIGHT STREET
RENFREW
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD 39 37 2 0 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF0864 KINGS INCH ROAD OLD
POWER STATION
RENFREW
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD 248 129 49 63 7 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1083 LAYMOOR AVENUE
RENFREW
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD 122 0 65 33 24 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1093 74 FULBAR STREET
RENFREW
CONSENT PRIVATE BROWNFIELD 8 0 0 8 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
Page 53 of 106

Page 58

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 44
Estimated housing site delivery programme
LDP2
ref/HLA
ref
Site Address Planning
Status
Tenure Brownfield/
Greenfield
Capacity Past
CompleƟons
Projected Delivery Comments/
constraints to
delivery
Town centre
site? 
Short term Medium term Long term Pipeline   
24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Post 34  
RFRF1018 26 HIGH STREET
RENFREW
LDP2 SITE PRIVATE BROWNFIELD
(CONVERSION)
9 0 0 0 0 0 0 0 0 0 0 0 9 Planning consent expired. 
Pipeline site, will be kept
under review in preparing
LDP3
YES
RFRF1019 24 HIGH STREET
RENFREW
LDP2 SITE PRIVATE BROWNFIELD
(CONVERSION)
11 0 0 0 0 0 0 0 0 0 0 0 11 Planning consent expired. 
Pipeline site, will be kept
under review in preparing
LDP3
YES
RFRF0769B CLYDE WATERFRONT &
RENFREW RIVERSIDE
AREA 1
LDP2 SITE PRIVATE BROWNFIELD 142 0 0 0 0 0 0 0 0 50 50 42 0 Key regeneraƟon priority.
Recent City Deal
investment delivering new
bridge crossing across
River Clyde and Renfrew
North development road
providing access to
Advanced Manufacturing
and InnovaƟon District.
Programming to be
reviewed in preparing
LDP3 
NO
RFRF0860 INCHINNAN ROAD
BLYTHSWOOD
RENFREW
LDP2 SITE PRIVATE BROWNFIELD 85 0 0 0 0 0 0 0 0 0 0 0 85 Pipeline site, will be kept
under review in preparing
LDP3
NO
RFRF0994 CLYDE WATERFRONT &
RENFREW RIVERSIDE
AREA 2
LDP2 SITE PRIVATE BROWNFIELD 434 0 0 0 0 0 0 0 0 0 0 0 434 Key regeneraƟon priority.
Pipeline site, will be kept
under review in preparing
LDP3
NO
RFRF1051A  ROW AVENUE
RENFREW
CONSENT SOCIAL
RENTED
BROWNFIELD 57 0 0 0 0 0 0 0 0 0 0 0 57 Site removed from SHIP. 
Pipeline site, will be kept
under review in preparing
LDP3
NO
RFRF1064
LDP2057
GOLF DRIVING RANGE
RANNOCH ROAD
JOHNSTONE
CONSENT PRIVATE GREENFIELD 88 0 0 0 20 25 23 20 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1025 CORSEFORD AVENUE
JOHNSTONE
CONSENT PRIVATE GREENFIELD 49 0 0 15 15 19 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1052 16 WALKINSHAW
STREET JOHNSTONE
WINDFALL PRIVATE BROWNFIELD 6 0 0 0 0 0 0 0 0 0 0 0 6 Planning consent expired. 
Pipeline site, will be kept
under review in preparing
LDP3
NO
RFRF1041 30 CAMPBELL STREET
JOHNSTONE
LDP2 SITE PRIVATE BROWNFIELD 7 0 0 0 0 0 0 0 0 0 0 0 7 Planning consent expired. 
Pipeline site, will be kept
under review in preparing
LDP3
NO
RFRF0667 BARBUSH MILLVIEW
CRESCENT JOHNSTONE
LDP2 SITE PRIVATE BROWNFIELD 86 74 0 0 0 0 0 0 0 0 0 0 12 Pipeline site, will be kept
under review in preparing
LDP3
NO
RFRF0796A HIGH STREET PATON’S
MILL JOHNSTONE
LDP2 SITE PRIVATE BROWNFIELD 40 0 0 0 0 0 0 0 0 0 0 0 40 Planning consent expired. 
Pipeline site, will be kept
under review in preparing
LDP3
NO
RFRF0940 BARBUSH FARM
JOHNSTONE
LDP2 SITE PRIVATE GREENFIELD 65 0 0 0 0 0 0 0 0 20 20 25 0 Developer has confirmed
intenƟon to deliver this
site through the recent
Call for Ideas process. Will
be kept under review in
preparing LDP3
NO
RFRF1024  FORDBANK OFF BEITH
ROAD JOHNSTONE
LDP2 SITE PRIVATE  GREENFIELD 100 0 0 0 0 0 0 0 0 30 30 4 0 Allocated LDP2 site which
would conƟnue recent
development in Beith
Road area of Johnstone.
Developer sƟll to be
idenƟfied, will be kept
under review in preparing
LDP3.
NO
RFRF0912H MAPLE DRIVE
JOHNSTONE
UNDER
CONSTRUCTION
SOCIAL
RENTED
BROWNFIELD 68 0 20 30 18 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
Page 54 of 106

Page 59

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 45
Estimated housing site delivery programme
LDP2
ref/HLA
ref
Site Address Planning
Status
Tenure Brownfield/
Greenfield
Capacity Past
CompleƟons
Projected Delivery Comments/
constraints to
delivery
Town centre
site? 
Short term Medium term Long term Pipeline   
24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Post 34  
RFRF0164_AH
LDP2057
GOLF DRIVING RANGE
RANNOCH ROAD
JOHNSTONE
CONSENT SOCIAL
RENTED
GREENFIELD 8 0 0 0 0 0 8 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF0759 RYEFIELD AVENUE
JOHNSTONE
CONSENT SOCIAL
RENTED
BROWNFIELD 36 0 0 0 0 0 0 16 20 0 0 0 0 Programming agreed in
HLA 24. Consent for 31
units 21/1087/PP and
applicaƟon 23/0482/PP
for a further 5 units sƟll to
be determined. Site in
SHIP and programming
reflects expected funding
availability
NO
RFRF0972A MACDOWALL STREET
MILL BRAE JOHNSTONE
LDP2 SITE SOCIAL
RENTED
BROWNFIELD 35 0 0 0 0 0 0 0 0 0 15 20 0 Site in SHIP and
programming reflects
expected funding
availability
NO
RFRF0819B NORTH ROAD EAST
GIBSON CRESCENT
JOHNSTONE
LDP2 SITE SOCIAL
RENTED
BROWNFIELD 28 0 0 0 0 0 0 0 28 0 0 0 0 Programming agreed in
HLA 24.  Site in SHIP and
programming reflects
expected funding
availability.
NO
RFRF0912E HOWWOOD ROAD
JOHNSTONE
LDP2 SITE SOCIAL
RENTED
BROWNFIELD 130 0 0 0 20 30 40 40 0 0 0 0 0 Programming agreed in
HLA 24.  Site in SHIP and
part of Council’s
regeneraƟon programme.
ConstrucƟon expected to
commence next year. 
NO
RFRF0911E DARGAVEL VILLAGE
TOWN CENTRE SITE
H4B, 4C, M2, H11, H32,
H29, 33. BISHOPTON-
DV
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD 320 319 1 0 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1037 DARGAVEL VILLAGE
AREA H13&14
BISHOPTON-DV
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD 249 169 50 30 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1047 DARGAVEL VILLAGE SITE
S1 &S3 BISHOPTON-DV
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD 150 120 30 0 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1087 DARGAVEL VILLAGE SITE
H24 AREA W10 STATION
ROAD BISHOPTON-DV
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD 172 67 50 30 25 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1088 DARGAVEL VILLAGE SITE
H24 STATION ROAD
AREA W BISHOPTON-DV
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD 135 16 0 0 30 30 30 29 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1095 DARGAVEL SITE MC
BISHOPTON-DV
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD 49 0 0 0 0 0 0 0 0 0 0 49 0 Programming agreed in
HLA 24.
NO
RFRF0911X REMAINING CAPACITY
BISHOPTON-DV
CONSENT PRIVATE BROWNFIELD 315 0 0 0 0 0 0 0 0 47 200 68 0 Programming agreed in
HLA 24.
NO
RFRF0911Y REMAINING CAPACITY
BISHOPTON-DV
CONSENT PRIVATE  BROWNFIELD 90 0 0 0 0 27 33 30 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF0911Z REMAINING CAPACITY
BISHOPTON-DV
CONSENT PRIVATE BROWNFIELD 435 0 0 0 0 0 42 73 167 153 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1090 DARGAVEL VILLAGE SITE
N1 OFF CRAIGTON
DRIVE BISHOPTON-DV
CONSENT PRIVATE BROWNFIELD 213 0 0 40 20 40 40 40 33 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1091 DARGAVEL VILLAGE SITE
N2 BISHOPTON-DV
CONSENT PRIVATE BROWNFIELD 286 0 10 60 73 60 55 28 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF0911J DARGAVEL VILLAGE
PHASE 3 BISHOPTON-
DV
CONSENT SOCIAL
RENTED
BROWNFIELD 62 0 0 0 30 32 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1090A DARGAVEL VILLAGE
PHASE 4A SITE N1 OFF
CRAIGTON DRIVE
BISHOPTON-DV
CONSENT SOCIAL
RENTED
BROWNFIELD 20 0 0 0 0 20 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1091A DARGAVEL VILLAGE
PHASE 4B SITE N2 OFF
CRAIGTON DRIVE
BISHOPTON-DV
CONSENT SOCIAL
RENTED
BROWNFIELD 23 0 0 0 0 23 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
Page 55 of 106

Page 60

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 46
Estimated housing site delivery programme
LDP2
ref/HLA
ref
Site Address Planning
Status
Tenure Brownfield/
Greenfield
Capacity Past
CompleƟons
Projected Delivery Comments/
constraints to
delivery
Town centre
site? 
Short term Medium term Long term Pipeline   
24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Post 34  
RFRF1054 MAR HALL BISHOPTON CONSENT PRIVATE GREENFIELD 25 0 0 0 0 0 0 0 0 0 0 0 25 21/1022/PP. Current
planning consent,
however, uncertainty over
whether consent will be
implemented as
alternaƟve development
has recently been
approved on the site.
Review in preparing LDP3
NO
RFRF0752 INGLISTON DRIVE
BISHOPTON
LDP2 SITE PRIVATE GREENFIELD 20 0 0 0 0 0 0 0 0 0 0 0 20 Pipeline site. Site not
currently being marketed
by the Council. Will review
in preparing LDP3.
NO
RFRF0979 STATION ROAD
BISHOPTON
LDP2 SITE PRIVATE BROWNFIELD 50 0 0 0 0 0 0 0 0 0 0 0 50 Pipeline site, will be kept
under review in preparing
LDP3
NO
RFRF1053 TORR FARM HOUSE
TORR ROAD BRIDGE OF
WEIR
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD
(CONVERSION)
8 0 0 4 4 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1026  STATION ROAD BRIDGE
OF WEIR
CONSENT PRIVATE BROWNFIELD 39 0 0 0 0 0 0 0 0 0 0 0 39 19/0456/PP – Site has
planning consent but
currently constrained
which is impacƟng on
deliverability. Will be kept
under review in preparing
LDP3.
NO
RFRF1092 27 MAXWELL PLACE
BRIDGE OF WEIR
CONSENT PRIVATE BROWNFIELD 4 0 0 0 0 4 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1021 HOUSTON STATION
HOUSE BAROCHAN
ROAD BROOKFIELD
UNDER
CONSTRUCTION
PRIVATE GREENFIELD 24 16 8 0 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1032 3 WOODSIDE ROAD
BROOKFIELD
WINDFALL  PRIVATE BROWNFIELD 10 0 0 0 5 5 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1039 NAPIER STEET
LINWOOD
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD 28 24 4 0 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1060 EAST FULTON FARM
DARLUITH ROAD
LINWOOD
CONSENT  PRIVATE  GREENFIELD 49 0 0 0 0 0 20 29 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1017 35 NAPIER STREET
LINWOOD
LDP2 SITE PRIVATE BROWNFIELD 12 0 0 0 0 0 0 0 0 0 0 0 12 Planning consent expired. 
Pipeline site, will be kept
under review in preparing
LDP3
NO
RFRF1039A NAPIER STREET
LINWOOD
UNDER
CONSTRUCTION
SOCIAL
RENTED
BROWNFIELD 51 23 28 0 0 0 0 0 0 0 0 0 0 SHIP site. Programming
agreed in HLA 24.
NO
RFRF0967A LAND SURROUNDING
ST BRENDAN’S SOCIAL
CLUB STIRLING DRIVE
LINWOOD
LDP2 SITE SOCIAL
RENTED
BROWNFIELD 65 0 0 0 0 32 33 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1061 LAND EAST OF NEWTON
COTTAGE AT ELDERSLIE
GOLF CLUB
CONSENT PRIVATE GREENFIELD 27 0 0 5 10 12 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1067
LDP2024
SOUTH OF WOODEND
HOUSE HOUSTON ROAD
HOUSTON
UNDER
CONSTRUCTION
PRIVATE GREENFIELD 43 27 16 0 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1094 CHAPEL FARM HOUSE
CHAPEL ROAD
HOUSTON
CONSENT PRIVATE BROWNFIELD
(CONVERSION /
NEWBUILD)
4 0 0 4 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1065
LDP2033
WEST OF BAROCHAN
ROAD HOUSTON
LDP2 SITE PRIVATE GREENFIELD 59 0 0 0 0 0 20 20 19 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF0840 HILLFOOT DRIVE
CARSEWOOD HOUSE
HOWWOOD
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD 10 0 5 5 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF0936 BLEACH WORKS 64
MIDTON ROAD
HOWWOOD
LDP2 SITE PRIVATE GREENFIELD 19 0 0 0 0 0 0 0 0 0 0 0 19 Planning consent expired. 
Pipeline site, will be kept
under review in preparing
LDP3 
NO
Page 56 of 106

Page 61

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 47
Estimated housing site delivery programme
LDP2
ref/HLA
ref
Site Address Planning
Status
Tenure Brownfield/
Greenfield
Capacity Past
CompleƟons
Projected Delivery Comments/
constraints to
delivery
Town centre
site? 
Short term Medium term Long term Pipeline   
24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Post 34  
RFRF1036 KILBARCHAN WEST
PARISH CHURCH
CHURCH STREET
KILBARCHAN
UNDER
CONSTRUCTION
PRIVATE BROWNFIELD
(CONVERSION)
18 0 0 0 0 0 0 0 0 0 0 0 18 Site has planning consent
but is being marketed
again for sale.  Pipeline
site, will be kept under
review in preparing LDP3
NO
RFRF1038 11 STEEPLE STREET
KILBARCHAN
LDP2 SITE PRIVATE BROWNFIELD 5 0 0 0 0 0 0 0 0 0 0 0 5 Planning consent expired. 
Pipeline site, will be kept
under review in preparing
LDP3
NO
RFRF1066
LDP2037
BARHILL CRESCENT,
KILBARCHAN
LDP2 SITE PRIVATE GREENFIELD 60 0 0 0 0 0 20 20 20 0 0 0 0 Programming agreed in
HLA 24. 
NO
RFRF1068
LDP2032
WEST OF BURNFOOT
ROAD LOCHWINNOCH
LDP2 SITE PRIVATE GREENFIELD 92 0 0 0 0 20 40 32 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1089 44 HIGH STREET
LOCHWINNOCH
WINDFALL PRIVATE  BROWNFIELD 10 0 0 0 0 10 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF0977 NORTHBARR ERSKINE UNDER
CONSTRUCTION
PRIVATE GREENFIELD 195 141 37 17 0 0 0 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1079 TORRANCE HOUSE
ERSKINE HARBOUR
ERSKINE
CONSENT PRIVATE BROWNFIELD 42 0 0 0 0 0 15 15 12 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1063
LDP2046
NORTHBAR PHASE 2
SITE BETWEEN
SANDIELAND WOOD
AND FLORISH ROAD
ERSKINE
CONSENT PRIVATE GREENFIELD 59 0 0 0 0 0 33 26 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1063A
LDP2046
NORTHBAR PHASE 2
SITE BETWEEN
SANDIELAND WOOD
AND FLORISH ROAD
ERSKINE
CONSENT SOCIAL
RENTED
GREENFIELD 24 0 0 0 0 0 24 0 0 0 0 0 0 Programming agreed in
HLA 24.
NO
RFRF1045 GREENHEAD NURSERY
OLD GREENOCK ROAD
INCHINNAN
WINDFALL PRIVATE BROWNFIELD 15 0 0 0 0 0 0 0 0 5 10 0 0 Planning consent has
expired but new planning
applicaƟon is expected.
Will be kept under review
in preparing LDP3.
NO
RFRF1069
LDP2094
LAND AT BEARDMORE
COTTAGES INCHINNAN
LDP2 SITE PRIVATE GREENFIELD 10 0 0 0 0 0 0 0 0 0 0 0 10 Council not currently
markeƟng site. Will be
reviewed in preparing
LDP3.
NO 
Page 57 of 106

Page 62

Renfrewshire Local Development Plan – Delivery Programme | 2024 | 48
Appendix 1 – Housing Sites 
This publication can be made available in braille, large print or audio. 
If you would like information in another language please ask us.











0300 300 0144

LocalPlanConsultation@renfrewshire.gov.uk
Page 58 of 106

Page 63

Appendix 2
Responses to consulta�on on the Renfrewshire Local Development Plan (LDP2) Dra� Delivery Programme Update
Respondent Response summary Proposed Renfrewshire Council response
SEPA SEPA welcomes its inclusion in ac�ons rela�ng to flood risk and
drainage, heat networks and the prepara�on of a green
network strategy, with the sugges�on that the strategy should
consider blue infrastructure (water) as well as green.
Noted.
No change to the LDP2 Delivery programme is proposed in
relation to this comment.
Bridge of Weir
Community Council
It is difficult to discern an overall vision for Renfrewshire which
includes a clear role for the villages.
It is not the role of the Delivery Plan to set a vision for
Renfrewshire. This is for the Local Development Plan itself.
The comment is noted and we will work with Bridge of
Weir Community Council and other communi�es to
develop visions for all areas in the new Local Development
Plan (LDP3).
No change to the LDP2 Delivery programme is proposed in
relation to this comment.
Ac�on re Core Paths Plan, does this include maintenance?
Around Bridge of Weir path maintenance is becoming a concern
with seemingly no clear responsibility.
This ac�on primarily relates to the iden�fica�on of the core
path network and the update of the Core Paths Plan which
was approved in 2022. However, an ac�on has been added
rela�ng to the maintenance of core paths. It should be
noted that there is no statutory duty to maintain core
paths, nor is the Council responsible for the maintenance
of all paths in the core path network, some of which are
not in Council ownership. Where the Council is responsible
for a path, maintenance can be undertaken subject to
available resources.
The Green Network Strategy ac�on should also include groups
such as Crea�ng a Sustainable Gryffe.
It is recognised that local interest groups will have a role in
developing and implemen�ng a green network strategy or
similar. Rather than name a specific group, ‘local interest
groups’ will be added to the list of partners in Ac�on 37.
Page 59 of 106

Page 64

Respondent Response summary Proposed Renfrewshire Council response
Turley Associates
represen�ng Buccleuch
Property
Wording provided to clarify and update Ac�on 1 rela�ng to
Advanced manufacturing Innova�on District Scotland (AMIDS).
The changes suggested have been incorporated into the
finalised LDP2 Delivery Programme Update.
Sco�sh Forestry Advises that Sco�sh Forestry look forward to seeing more
detail on how the Council proposes to manage, protect and
enhance its trees, woodland and forest resources to address the
biodiversity and climate emergencies.
The Council will be preparing a Forestry and Woodland
Strategy as part of its Local Development Plan (LDP3)
processes.
No change to the LDP2 Delivery programme is proposed in
relation to this comment.
Homes for Scotland It is suggested that the Delivery Programme is updated annually
to account for changes to capital programmes and new
development pressures.
This is likely to be the last Delivery Programme associated
with LDP2 as a Proposed Delivery Programme will be
published alongside the Proposed LDP3 in 2026.
No change to the LDP2 Delivery programme is proposed in
relation to this comment.
The Council should detail specific ac�ons that are required to
deliver development sites, �mescales for this and who is
responsible for addressing the ac�on.
Whilst recognising that this could be beneficial, it is
considered that to do this for each of the 120 housing sites
listed in the LDP2 Delivery Programme would be resource
intensive and would divert from the prepara�on of the new
local development plan (LDP3). This will be considered as
part of the Proposed Delivery Programme will be published
alongside the Proposed LDP3 in 2026 
No change to the LDP2 Delivery programme is proposed in
relation to this comment.
The Delivery Programme should include accurate costs for
poten�al contribu�on rates per house as well as the likely split
of costs between lead and suppor�ng delivery partners. Greater
certainty on poten�al direct and indirect developer
contribu�ons will allow developers to factor this into their
viability assessments and for the Council to understand where
�mescales for delivery do not align.
Whilst recognising that this could be beneficial, it is
considered that to do this for each of the 120 housing sites
listed in the LDP2 Delivery Programme would be resource
intensive and would divert from the prepara�on of the new
local development plan (LDP3). This will be considered as
part of the Proposed Delivery Programme will be published
alongside the Proposed LDP3 in 2026 
No change to the LDP2 Delivery programme is proposed in
relation to this comment.
Page 60 of 106

Page 65

Respondent Response summary Proposed Renfrewshire Council response
Medium or long term alloca�ons should have a site brief or
masterplan. The Delivery Programme should include hyperlinks
to masterplans. The Council should include details where design
briefs of further masterplans may be prepared along with other
poten�al interven�ons.
Whilst recognising that this could be beneficial, it is
considered that to do this for many of the housing sites
listed in the LDP2 Delivery Programme would be resource
intensive and would divert from the prepara�on of the new
local development plan (LDP3). This will be considered as
part of the Proposed Delivery Programme will be published
alongside the Proposed LDP3 in 2026 
No change to the LDP2 Delivery programme is proposed in
relation to this comment.
When reviewing alloca�ons within LDP2, where there is no
planning permission or live applica�on for a site, the Council
should write to the landowner/promoter to understand their
inten�ons.
The Council will contact land owners/promoters of all sites
being suggested/considered for inclusion in LDP3 as part of
its site assessment exercise.
No change to the LDP2 Delivery programme is proposed in
relation to this comment.
NatureScot Note NS is iden�fied as a lead/partner in rela�on to Ac�on 16
and will be content to input as required.
Noted. However, NatureScot’s role in rela�on to this ac�on
would be limited, so will be removed from list of partners.
The ac�on is not currently within the Council’s work
programme.
Welcome being included in Ac�on 40 rela�ng to a review of
sites for importance for nature conserva�on (SINCs) and Local
Nature Reserves. Advise that SINCs are now known as Local
Nature Conserva�on Sites.
Noted. Reference changed to Local Nature Conserva�on
Sites.
Note NS is iden�fied as a lead/partner in rela�on to Ac�on 42
(Core Paths Plan).
Noted. This ac�on is considered to be complete.
No change to the LDP2 Delivery programme is proposed in
relation to this comment.
Welcome Ac�on 38 (Renfrewshire Biodiversity Ac�on Plan) and
41 (Support delivery of access and biodiversity interests through
the Outdoor Access Forum and LBAP Steering Group).
Noted.
No change to the LDP2 Delivery programme is proposed in
relation to this comment.
Profectus Planning
represen�ng XPE
Braehead Ltd and XPE
Braehead Leisure Ltd
Respondents are owners of Xsite leisure atrac�on.
The Braehead Masterplan referenced in the dra� Delivery
Programme Update (Ac�on 9) is now somewhat dated and
unlikely to be implemented in its previously envisaged form.
Noted. The Delivery programme will be updated to reflect
that the current masterplan is unlikely to be implemented
and a revised masterplan will be considered as part of the
LDP3 process.
Page 61 of 106

Page 66

Respondent Response summary Proposed Renfrewshire Council response
The owners would be keen to work with Renfrewshire Council
to prepare a new masterplan for the Braehead strategic centre.
This may involve residen�al development, which would be
consistent with Ac�on 12.
Support is offered for Ac�on 26 re enhancing public transport
facili�es at Braehead, and Ac�on 34 re the inves�ga�on of
poten�al measures to improve traffic flows on the strategic road
network, and that these maters will be addressed through
LDP3. 
Support for other ac�ons is noted.
Profectus Planning
represen�ng Braehead
Glasgow Ltd and
Braehead Park
Investments Ltd
Respondents are owners of Braehead Shopping Centre and
Braehead Retail Park.
The Braehead Masterplan referenced in the dra� Delivery
Programme Update (Ac�on 9) is now somewhat dated and
unlikely to be implemented in its previously envisaged form.
The owners would be keen to work with Renfrewshire Council
to prepare a new masterplan for the Braehead strategic centre.
This may involve residen�al development, which would be
consistent with Ac�on 12.
Support is offered for Ac�on 26 re enhancing public transport
facili�es at Braehead, and Ac�on 34 re the inves�ga�on of
poten�al measures to improve traffic flows on the strategic road
network, and that these maters will be addressed through
LDP3.
Support is offered for Ac�on 7 regarding the delivery of the
Renfrewshire Tourism Plan, as Braehead is a key part of
Renfrewshire’s tourist and visitor economy. 
Noted. The Delivery programme will be updated to reflect
that the current masterplan is unlikely to be implemented
and a revised masterplan will be considered as part of the
LDP3 process.
Support for other ac�ons is noted. 
Strathclyde Partnership for Transport and Historic Environment Scotland responded to advise that they had no comments on the Dra� Delivery Programme
Update.
Page 62 of 106

Page 67

SUMMARY OF APPLICATIONS TO BE CONSIDERED BY
THE PLANNING AND CLIMATE CHANGE POLICY BOARD
ON 21/01/2025
RENFREWSHIRE COUNCIL
Item No.PROPOSAL:LOCATION:APPLICANT: WARD:
APPN. NO:
24/0221/PP Mr Paul O'Brien
Enva
49 Burnbrae Road
Linwood
Paisley
PA3 3BD
49 Burnbrae Road
Linwood
Paisley
Section 42 application to vary
conditions 3 and 4 (to clarify the
types of waste operations
permitted within the site and
include for the handling of
non-hazardous solid industrial
and commercial waste) of
planning permission 11/0431/PP
Ward 10
RECOMMENDATION: Grant Subject to Conditions
A
24/0444/PP Miller Homes Ltd
Clydesdale House
300 Springhill Parkway
Bailleston
Glasgow
G69 6GA
Land At Glenfield
Road
Caplethill Road
Paisley
Infilling and regrading of land
Ward 6
RECOMMENDATION: Refuse
B
24/0851/TP Mrs Carolynne Penman
CALA Management Ltd
McLellan Works
274 Sauchiehall Street
Glasgow
G2 3EH
Main Building And
Grounds
Dykebar Hospital
Grahamston Road
Paisley
PA2 7DE
Treeworks application to include
tree removal and pruning
Ward 6
RECOMMENDATION: Grant
C
24/0653/FUR Greenhead Homes
Limited
59 Bonnygate
Cupar
Fife
KY15 4BY
Greenhead Nursery
And Adjacent
Vacant Land
Old Greenock Road
Inchinnan
Section 42 application to modify
conditions of planning permission
19/0444/PP relating to the
erection of residential
development comprising 15
dwellinghouses with associated
access road, drainage and
landscaping
Ward 12
RECOMMENDATION: Grant Subject to Conditions & S75
D
Total Number of Applications to be considered =  4
Item 3
PACC210125 Page 63 of 106

Page 68

Page 64 of 106

Page 69

Report by Chief Planning Officer
Planning and Climate Change Policy Board: 21 January 2025 
Reference No 24/0221/PP
Application Type Planning Permission-Full
Proposal Section 42 application to vary conditions 3 and 4 (to clarify the
types of waste operations permitted within the site and include for
the handling of non-hazardous solid industrial and commercial
waste) of planning permission 11/0431/PP
Location 49 Burnbrae Road, Linwood, Paisley
Ward 10 - Houston, Crosslee and Linwood
Community Council Elderslie Community Council
Applicant Mr Paul O'Brien Enva
Recommendation Grant subject to conditions
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=summary&keyVal=SAL4XGMWG9L00. 
This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of
The Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013. 
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation.  While the application would normally fall within the scheme
of delegation to be determined by officers, the scheme of delegation allows for officers to
refer applications to the board.  The application has been referred in this instance to allow
the application to be fully considered given the site history and the potential environmental
matters associated with waste management facilities. 
Proposal
This application seeks permission under Section 42 of The Town and Country Planning
(Scotland) Act 1997 (as amended) to vary conditions 3 and 4 of planning permission
11/0431/PP which relates to waste management operations at the ENVA facility on Burnbrae
Road, Linwood. 
Planning permission 11/0431/PP sought to vary conditions associated with the original
planning permission 97/0920/PP with respect to changing the boundary whereby waste can
be stored, recycled and transferred, and the types of waste which can be handled at the site. 
Condition 3 of planning permission 11/0431/PP relates to areas where the reception, storage
and handling of municipal solid waste shall be restricted to. It is worded as follows: 
That all activities related to the reception, storage, and handling of municipal solid waste
(MSW) shall be restricted to, and contained entirely within, the building coloured green and
marked "Proposed Building" on Drawing Number 76/000/PA/04 Revision A and as detailed in
Drawing Numbers 76/000/PA/07, 76/000/PA/08 and 76/000/PA/09. 
Reason: In the interest of amenity and to define the permission. 
Condition 4 relates to the types of waste that can be processed at the site. It is worded as
follows: 
That the materials which can be received, handled, sorted, crushed, shredded, processed
and stored on the site shall be restricted to waste cardboard, plastics, glass, tiles, brick,
Item 3(a)
PACC210125 Page 65 of 106

Page 70

concrete, aggregate and waste arising from construction or demolition works and shall
exclude clinical waste or special waste other than waste electrical or electronic equipment
(WEEE) items which contain some components which classify the items as special wastes
unless otherwise restricted or allowed for by reference to conditions 2 and 3 above. 
Reason: To define the permission and in the interests of amenity. 
The proposed variation seeks to broaden the types of waste which can be handled at the
site, and specifically the ability to accept non-hazardous solid industrial and commercial
wastes (NHSICW).  This will allow the operator to future proof its services and provide more
flexibility to respond to commercial demands.  The immediate intention is to start accepting
leather waste from a local manufacturer.  The leather waste would be shredded, and then
sent offsite to an energy from waste plant. 
The variation to the wording of conditions 3 and 4 as proposed by the applicant is therefore
as follows: 
Condition 3
That all activities related to the reception, storage and handling of municipal solid waste
(MSW) and non-hazardous solid industrial and commercial waste (NHSICW) shall be
restricted to, and contained entirely within the building coloured green and marked
"Proposed Building" on Drawing Number 761000/PA/04 Revision A and as detailed in
Drawing Numbers 761000/PA/07, 761000/PA/089 and 761000/PA/09. 
It is noted that the drawings references on condition 3 contain a typographical error whereby
/ has replaced 1. This has been corrected. 
Condition 4 
That the materials which can be received, handled, sorted, crushed, shredded, processed
and stored on the site shall be restricted to waste cardboard, plastics, glass, tiles, brick,
concrete, aggregate, waste arising from construction or demolition works, and other non-
hazardous solid industrial and commercial waste (NHSICW). Clinical waste or special waste
(other than waste electrical or electronic equipment (WEEE) items which contain some
components which classify the items as special wastes) shall not be received within the site
unless otherwise allowed for by reference to condition 3 above. 
It should be noted that the inclusion of NHSICW would allow for a range of additional wastes
to be processed at the site, provided they were from industrial and commercial sources, non-
hazardous and in a solid state.  However as per condition 3 any wastes that fall within this
category would still need to be received, stored, and handled within a building. 
The applicant advises that the leather waste they are proposing to process at the site is
approx. 800 tonnes a year.  This equates to approx. 82 additional deliveries a year. 
The applicant further advises that the SEPA waste management licence at the site allows a
maximum of 500,000 tonnes of waste to be received in total each year.  However, over the
last five years the actual amounts received have ranged between 171,000 tonnes and
267,000 tonnes per annum. 
Site Description
The ENVA facility is located within the Burnbrae local industrial area.  It comprises of a mix
of buildings spread over the 10.6 hectare site area.  The site is bound by a railway line and
cycle path to the south and south west, a logistics warehouse to the west, Burnbrae Road to
the north with open space beyond, and Old Patrick Wate to the east with a long stay car park
Page 66 of 106

Page 71

beyond.  The nearest residential properties are on Old Road in Elderslie which are located
on the opposite side of the railway line to the south of the site. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
Pre-application discussions have taken place, focusing on the following matters: 
▪ The requirement for a Section 42 application to vary the conditions, and a list of
information required to support the application. 
Negotiated Improvements
Following submission, the following changes have been negotiated between officers and the
applicant: 
No changes have been negotiated. 
Site History   
Application No: 09/0535/PP 
Description: Erection of building to accommodate a biomass power plant and
installation of associated plant and equipment.
Decision: Grant subject to conditions 
Application No: 11/0431/PP 
Description: Amendments to planning consent 97/0920/PP:
1. Change of planning boundary to incorporate an area to the west of the
existing boundary for the recovery, recycling, storage and transfer of
wastes;
2. Amendment of Condition 2 regarding the type of waste to b
Decision: Grant subject to conditions 
Application No: 10/0433/EO 
Description: Amendment to Condition 5 of planning permission 97/0920/PP to extend
operating hours to 0600 hours to 2300 hours Mondays to Fridays, 0700
hours to 2200 hours Saturdays and 0800 hours to 2200 hours Sundays
and amendment to Condition 2 regarding type of was
Decision: Withdrawn 
Application No: 10/0769/NO 
Description: Amendment of Condition 2 of planning consent 97/0920/PP regarding the
type of waste to be handled on the site, to allow for receipt, storage and
processing of municipal solid waste;
Amendment of Condition 5 to extend operating hours of timber process to t
Decision: Accepted; 
Application No: 10/0033/PP 
Description: Erection of new enclosure to baling plant.
Decision: Grant subject to conditions 
Application No: 09/0296/SC 
Page 67 of 106

Page 72

Description: Request for scoping opinion for erection of biomass power plant
Decision: Offer Observations 
Application No: 09/0117/EO 
Description: Request for screening opinion on need for Environmental Impact
Assessment for erection of biomass power plant
Decision: Environmental Assessment Required 
Application No: 08/1111/EO 
Description: Request for Screening Opinion in respect of the need for a Statutory
Environmental Statement for biomass power plant
Decision: Withdrawn 
Application No: 07/1270/VR 
Description: Modification of condition 2 of planning consent 97/0920/PP to read "That
waste handled on the site shall exclude special, clinical, putrescible or
general household waste and shall include household waste only as
arising from construction or demolition wo
Decision: Grant 
Consultations   
Glasgow Airport Safeguarding - No objection. 
S.E.P.A. - No comments. Application does not meet threshold for consultation. 
Environment, Housing & Infrastructure (Env. Protection) - No comments. 
Chief Executive's Service (Roads Development) – No objection to increasing the tonnage
at the site to 500,000 tonnes per annum.  Enhancements are sought to the surrounding
transport network which would improve active travel to the site.   
Scottish Water – No response received. 
Network Rail - No objections. 
NATS - No objections. 
The Coal Authority - No comments. 
Representations
The application has been publicised in line with the requirements of the relevant legislation. 
The following representations were received: 
Object - 0
Support - 0
Neutral - 0
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the
development plan unless material considerations indicate otherwise. In this instance the
Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire
Local Development Plan (2021) (LDP). 
Page 68 of 106

Page 73

The following provisions of the Development Plan are considered relevant to the
determination of this application: 
National Planning Framework 4 
Policy 1 - Tackling the climate and nature crises
Policy 2 - Climate mitigation and adaptation
Policy 3 - Biodiversity
Policy 12 - Zero waste
Policy 13 - Sustainable transport
Policy 22 - Flood risk and water management
Policy 26 - Business and industry 
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
Policy E1 - Renfrewshire's Economic Investment Locations
Policy ENV2 - Natural Heritage
Policy ENV4 - The Water Environment
Policy ENV5 - Air Quality
Policy I1 - Connecting Places
Policy I5 - Waste Management 
New Development Supplementary Guidance
Delivering the Economic Strategy – Economic Investment Locations
Delivering the Environment Strategy – Natural Heritage, The Water Environment, and Air
Quality
Delivering the Infrastructure Strategy – Connecting Places 
Full details relating to the policies of the LDP can be found online. 
Other relevant policies and guidance
Scotland's Zero Waste Plan 
Submitted Reports and Assessments
The following reports and assessments were submitted in support of the application: 
Planning Statement - Provides further background and context to the proposed variation of
condition, and an assessment against the applicable development plan policies and
guidance. 
Transport Statement – Primary purpose of the statement was to assess the implications of
processing 500,000 tonnes of waste at the site on the road network. The statement also
reviews accessibility to the site for all transport modes. 
The statement concludes that the anticipated level of traffic generation associated with an
annual tonnage of 500,000 would have a minimal impact on the road network.  While a
review of accessibility has been undertaken, any proposals to enhance accessibility are
considered by the applicant to fall outwith the scope of the assessment of this application.   
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any
Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the
grant of planning permission) and Regulation 33 (Directions requiring consideration of
condition) of The Town and Country Planning (Development Management Procedure)
Page 69 of 106

Page 74

(Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development)
of The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. 
None. 
Planning Assessment
This application has been submitted under Section 42 of the Town and Country Planning
(Scotland) Act 1997.  In this respect, the Council may only take into consideration the
acceptability of any existing and proposed conditions.  However, in some cases this does not
preclude the consideration of the overall effect of granting a new planning permission
primarily where the previous permission has lapsed or is incapable of being implemented. 
ENVA is an established recycling facility that processes a range of materials in accordance
with the relevant planning conditions.  In land use terms its location is consistent in principle
with policies 21 of NPF4 and E1 of the LDP which provide support for a wide range of
employment generating uses. 
Policy I5 of the LDP and 12 of NPF4 seek to promote and facilitate development that is
consistent with the waste hierarchy and would support delivery of the zero waste plan. 
ENVA is licensed for waste management processes by SEPA.  The proposal to process non-
hazardous solid industrial and commercial waste (NHSICW) would further diversify the
waste streams that are recycled at the facility in accordance with the waste hierarchy and
the zero waste plan. 
NHSICW potentially covers a broad range of waste types.  However, in this instance the
applicant has made specific reference to processing leather waste.  This waste would be
shredded within the Refuse Derived Fuel (RDF) facility and then sent for onward transport to
an energy from waste facility.  The applicant advises that the leather waste is not odorous. 
The Environmental Protection Team have not made any comment on the application.  SEPA
have advised that the application falls below their threshold for providing specific advice.  It
is noted that environmental matters at the site are regulated by SEPA via the waste
management licence. 
On the basis that the NHSICW waste stream is non hazardous, the waste will be sorted and
processed within a building, and there have been no objections from the Environmental
Protection Team or SEPA, I am satisfied that the processing of NHSICW at the site will not
have a detrimental impact on the amenity of surrounding land uses or the environment. 
It is acknowledged that the introduction of NHSICW at the site could result in waste streams
other than leather from being processed at the site.  Environmental matters arising from
these other wastes would be a matter for SEPA to monitor through the waste management
licence.  The applicant has advised that an amendment to the waste management licence is
required to accommodate the NHSICW.  Again, there has been no objection from SEPA to
this application. 
There are no significant built heritage or natural environment impacts associated with the
development, and there will be no adverse effect on the integrity of any European sites. 
In view of the above, it is considered that the development complies with Policies 3 and 22 of
NPF4 and ENV2, ENV4 and ENV5 of the LDP as there are no significant impacts anticipated
with regard to the natural environment, water environment, air quality, or biodiversity. 
Page 70 of 106

Page 75

It is also considered that the facility will be able to co-exist with existing neighbouring uses
and is compatible with the core role and function of the Burnbrae local industrial area.  It is
noted that there are several other waste transfer and recycling facilities along Burnbrae
Road.  The development is therefore also compliant with policies 21 of NPF4 and E1 of the
LDP.     
The Roads Development Officer has advised that the additional trips associated with
processing the leather waste will not have a significant detrimental impact on the local road
network.  The additional trips amount to approx. 82 additional deliveries a year. 
However as noted above the introduction of NHSICW at the site could result in waste
streams other than leather from being processed at the site.  This in turn could generate
additional trips to the site. 
At present the tonnage allowances at the site are set out within the waste management
license only, and there are no planning conditions that place a limit on the tonnage which
can be processed at the site.  While the Roads Development Officer has not objected to the
scale of the current operations, or the increase associated with the processing of leather
waste (noted as approx. 800 tonnes per annum), the initial submission did not include an
assessment of the potential impact of 500,000 tonnes of waste being processed at the site in
accordance with the SEPA licence. 
The applicant was initially advised that the Council would seek to introduce a condition
limiting the tonnage allowance at the site in the interests of the safe and efficient operation of
the road network and to retain control over the scale of the development.  The applicant
advised that the maximum tonnage received by the facility in the last five years is 267,000
tonnes.  Taking the additional NHSICW into account it was considered reasonable to restrict
the tonnage which can be received by the facility to 300,000 tonnes per year.   
The applicant was advised of the intention to attach a condition limiting throughout to
300,000 tonnes per year unless they could justify that throughput in excess of this would be
acceptable with regard to the impact on the road network.  In response the applicant has
submitted a Transport Statement which seeks to justify a throughput of 500,000 tonnes in
pine with the allowance as set out in the waste management licence. 
The Transport Statement concludes that a throughput of 500,000 tonnes would not have a
significant impact on the road network.  The Roads Development officer has not objected to
the conclusions within the Transport Statement.  On this basis the condition restricting
throughput at the site can be set at 500,000 tonnes per annum. 
The Roads Development Officer has also sought enhancements to the surrounding transport
network to support active travel to the site.  These include upgrading footways, and forming
a direct connection between the site and the National Cycle Network which is located to the
south west.  While such enhancements would be desirable, it is noted that the scope of the
proposed variation relates to the types of waste being handled at the site.  The proposed
conditions seek to manage the operation of the site in this regard.  It is considered that
seeking enhancements to the wider transport network would be outwith the scope of the
assessment of this application.   
In view of the above, it is considered that the development complies with policies 13 of NPF4
and I1 of the LDP. 
With regard to the remaining assessment criteria set out in NPF4 policy 12, the applicant has
advised that they are exploring ways in which carbon emissions at the site can be reduced.
This includes EV's for deliveries, and using a renewable energy provider for the facility. 
Page 71 of 106

Page 76

The railway line acts as a suitable buffer zone between the site and neighbouring residential
properties to the south. 
There are no additional buildings being proposed, and it is not considered neccesary to
require any additional landscaping. 
There is a requirement to provide a restoration and aftercare scheme (including appropriate
financial mechanisms) to ensure the site is suitably decommissioned and appropriately
restored should the site close.  Conditions can be applied which require such a scheme to
be agreed with the Council. 
As this is an established site the criteria relating to co-location with end users of outputs is
not wholly relevant.  However, it is noted that the site is located within a local industrial area
where related industrial uses would be acceptable in principle. 
The proposed variation to condition 3 and 4 will bring environmental benefits by allowing an
established recycling facility to process additional waste in a manner that does not have a
detrimental impact on the environment or amenity of neighbouring properties.  It is
considered that the variation complies with policies I5 of the LDP and 12 of NPF4. 
Finally, the development is considered to be consistent with policies 1 and 2 of NPF4 as it
contributes to provision of a circular economy whereby the non-hazardous solid industrial
and commercial waste (NHSICW) is recycled as opposed to being disposed of. 
If successful, the effect of a Section 42 application to modify a planning condition or
conditions is to grant a further planning permission for the whole development again but with
the amended condition or conditions replacing those that were previously issued, or with
conditions removed if required.  All other conditions, if relevant, are also required to be
attached to any new planning permission.  A review of the conditions attached to the
previous planning permission 11/0431/PP has therefore been carried out. 
Condition 1 specified that the planning permission would lapse on the expiration of a period
of 3 years unless the development to which it relates is begun.  It is not neccesary to retain
this condition as the time period for the consent is specified in the Town and Country
Planning (Development Management Procedure) (Scotland) Regulations 2013 (as
amended) and is deemed to be imposed in this regard. 
Conditions 3 and 4 will be varied as per the above assessment. 
Condition 5 relates to the submission of a Bird Hazard Management Plan. This condition has
previously been discharged. The condition will therefore be amended to ensure the
approved Bird Hazard Management Plan continues to remain in force for the life of the
development.. It is also noted that Glasgow Airport Safeguarding have not objected to the
application. 
Conditions 2, 6, 7 and 8 shall be retained as previously worded. 
Additional conditions shall be imposed with regard to a restriction in the tonnage allowance
which can be processed at the site, and the requirement to agree a restoration and aftercare
scheme with appropriate financial mechanism. 
Section 75 Obligations
Page 72 of 106

Page 77

The Council is required to provide a summary of the terms of any planning obligation which
is required to be entered into under Section 75 of the Town and Country Planning (Scotland)
Act in relation to the grant of permission for the proposed development: 
None. 
Conclusion
In view of the above, it is considered that the proposal would accord with the relevant
provisions of the Development Plan. There are no other material considerations. Planning
permission should therefore be granted subject to conditions. 
Recommendation
Grant subject to conditions 
Reason(s) for Recommendation 
1. The proposal accords with the provisions of the Development Plan and there were no
material considerations which outweighed the presumption in favour of
development according with the Development Plan 
Condition(s)   
1. That the activities which may take place in the "extension" area, (shown hatched in blue
on the attached plan), either within buildings or on open ground, shall be restricted
solely to the storage of materials and equipment. Details shall be submitted for the prior
written approval of the planning authority in respect of the position, height and screening
arrangements for any materials which are to be stored externally.  
Reason: In the interests of amenity. 
2. That all activities related to the reception, storage and handling of municipal solid waste
(MSW) and non-hazardous solid industrial and commercial waste (NHSICW) shall be
restricted to, and contained entirely within the building coloured green and marked
"Proposed Building" on Drawing Number 761000/PA/04 Revision A and as detailed in
Drawing Numbers 761000/PA/07, 761000/PA/089 and 761000/PA/09.  
Reason: In the interest of amenity and to define the permission. 
3. That the materials which can be received, handled, sorted, crushed, shredded,
processed and stored on the site shall be restricted to waste cardboard, plastics, glass,
tiles, brick, concrete, aggregate, waste arising from construction or demolition works,
and other non-hazardous solid industrial and commercial waste (NHSICW). Clinical
waste or special waste (other than waste electrical or electronic equipment (WEEE)
items which contain some components which classify the items as special wastes) shall
not be received within the site unless otherwise allowed for by reference to conditions 1
and 2 above.  
Reason: To define the permission and in the interests of amenity. 
4. That the Bird Hazard Management Plan discharged via letter dated the 6th November
2013 shall remain in force for the life of the development. No subsequent alterations to
the Bird Hazard Management Plan shall take place unless first submitted to and
approved in writing by the Planning Authority. 
Page 73 of 106

Page 78

Reason: It is neccesary to manage the site in order to minimise its attractiveness to
birds which could endanger the safe movement of aircraft and the operation of Glasgow
Airport. 
5. Lighting schemes required during construction and for the completed development shall
be of a flat glass, full cut off design, mounted horizontally, and shall ensure that there is
no light spill above the horizontal.  
Reason: To avoid endangering the safe operation of aircraft through confusion with
aeronautical ground lights or glare. 
6. That the operating hours for the wood recovery plant shall be restricted to 08.00 a.m. to
20.00 p.m. on Monday to Fridays, and 08.00 a.m. to 17.00 p.m. on Saturdays.  
Reason: In the interest of amenity. 
7. Timber shall not be stored above the height of the front face of the bunker.  
Reason: In the interest of visual amenity. 
8. The total volume of materials handled at the facility shall not exceed 500,000 tonnes per
annum irrespective of the combination of materials handled at the site.  
Reason: To define the consent in the interests of amenity and traffic. 
9. That within 3 months of the date of this planning permission, the operator shall submit a
Closure, Restoration and Aftercare Management Plan for the written approval of the
Planning Authority. The plan shall detail all measures associated with the
decommissioning, cleaning, and rendering safe the facility following cessation of the
waste management operations at the site and shall provide a timetable within which
these measures will be undertaken and an aftercare plan to monitor success of
restoration measures with scope for interventions if required. The restoration measures
shall include (but not be limited to) the removal of all raw materials, wastes and other
potentially contaminating substances present on the site to ensure the site does not
pose a risk to public health, safety, the environment, and amenity. 
Reason: To ensure the decommissioning and removal of the waste materials is
undertaken in an appropriate and environmentally acceptable manner and the
restoration and aftercare of the site, in the interests of safety, amenity and environmental
protection. 
10. That within 6 months of the date of this planning permission, a financial guarantee to
cover the costs of decommissioning, site restoration and aftercare, as required by
condition 9 of this consent, shall be submitted for the written approval of the Planning
Authority. The acceptability of such financial guarantee shall be at the sole discretion of
the Planning Authority. The financial guarantee must: 
A) be granted in favour of the Planning Authority and shall be maintained in favour of the
Planning Authority throughout the duration of this consent and until the completion of all
decommissioning, site restoration and aftercare obligations as required by condition 9 of
this consent. 
B) must be provided by an independent financial body with at least an A - rating who will
be capable of fulfilling the obligations set out within the financial guarantee. 
Page 74 of 106

Page 79

C) be for an amount which covers the value of all decommissioning, site restoration and
aftercare liabilities, such amount to be determined by the Planning Authority. 
D) be subject to a review every five years from the date of this consent, or other such
intervals as agreed by the Planning Authority.  Each review shall be undertaken by a
suitably qualified independent professional who has relevant experience in such
matters, the identity of whom has been agreed in writing by the Planning Authority
prior to the review of the financial guarantee commencing.  The review of the
financial guarantee shall be submitted no later than three months prior to the expiry
of the existing financial guarantee, for the written approval of the Planning Authority.
Thereafter and at least 28 days prior to the expiry of the existing financial guarantee,
the replacement financial guarantee in favour of and in terms acceptable to the
Planning Authority and for the value advised by the review noted above, shall be
submitted for the written approval of the Planning Authority. 
E) come into effect within 24 weeks of any Non-hazardous solid industrial and
commercial wastes (NHSICW) being brought onto the site, and expire no earlier
than 24 months after the end of the aftercare period. 
Reason: In the interests of amenity and in order to retain effective planning control. 
11. In the event that the financial guarantee becomes invalid, has expired, or is terminated
for any reason following the commencement of operations at the site, all operations at
the site shall cease no later than three months from the date the financial guarantee
became invalid, expired or terminated. If a replacement financial guarantee, which
meets the requirements of condition 10, is approved by the Planning authority and duly
executed before the end of the three-month period, the operations may continue. If the
operations have ceased due to this clause, they may recommence only upon the
approval and execution of a replacement financial guarantee. 
Reason: In the interests of amenity and in order to retain effective planning control. 
Advisory Note(s)
None 
Schedule of Plans Determined 
Drawing Number Revision Drawing/Document Title
761000/PA/01 0 Site Location Plans 
For further information please contact James Weir, Development Standards Team, Email:
james.weir@renfrewshire.gov.uk 
Page 75 of 106

Page 80

Page 76 of 106

Page 81

Report by Chief Planning Officer
Planning and Climate Change Policy Board: 21 January 2025 
Reference No 24/0444/PP
Application Type Planning Permission
Proposal Infilling and regrading of land
Location Land at Glenfield Road, Caplethill Road, Paisley
Ward 6 - Paisley Southeast
Community Council Glenburn Community Council
Applicant Miller Homes Ltd
Recommendation Refuse
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=summary&keyVal=SFQPGZMWIF900. 
This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of The
Town and Country Planning (Development Management Procedure) (Scotland) Regulations
2013. 
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation.  In this instance, officers have declined to exercise delegated
authority given the complex planning history of the site. 
Proposal
This application seeks planning permission for the re-grading and infilling of land to the south
of Caplethill Road, Paisley.  The infill and regarding of the land would involve material of a
volume of approximately 10,000m3 being deposited on the application site. The applicant in
support of the application, has stated that the proposal is necessary due to a proposed
footpath on the south side of Caplethill Road which forms part of the off-site works for an
approved residential development on the north side of Caplethill Road, immediately adjacent
to the site (20/0510/PP).  The levelling of the land would mitigate health and safety concerns
with the existing slope in proximity to the footpath. The materials would be imported from the
adjacent housing site (20/0510/PP) which is currently under construction. 
Site Description
The application site is located to the south of Paisley, on the edge of the town and immediately
adjacent to an approved housing site which is currently under construction (20/0510/PP).  The
application site relates to an area of ground situated between Capltehill Road to the north and
core path GB/9 to the east and core path SP/32 to the south.  The ground slopes away from
Capltehill Road and the core paths. The centre of the site is low lying wetland. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
No pre-application discussions have taken place. 
Negotiated Improvements 
No changes have been negotiated. 
Site History 
Item 3(b)
PACC210125 Page 77 of 106

Page 82

The planning history for the site is as follows; if no history is listed then planning has no record
of previous applications for the site. 
None. 
It is of significance to note the planning history of the adjacent site: 
Application Number:  20/0510/PP
Description:  Erection of residential development comprising of 179 units with associated
access, landscaping and ancillary works.
Decision:  Granted subject to conditions and S75 (Planning Appeal PPA-350-2041) 
Consultations   
NatureScot – No response. 
Environment, Housing & Infrastructure (Env. Protection) - No objections subject to
conditions. 
Chief Executive's Service (Roads Development) - No objections subject to conditions. 
S.E.P.A. - No comments.  There may be regulatory authorisation's required to undertake the
engineering works in the water environment. 
Representations
The application has been publicised in line with the requirements of the relevant legislation. 
The following representations were received: 
Object - 2
Support -0
Neutral - 0 
The issues raised can be summarised as follows:
1. Evidence of protected species on site. The applicant has not provided any ecological
assessment.
2. Potential concerns with regards to SEPA for the infilling of wetland.
3. The proposed footpath for the housing development (20/0510/PP) is not suitable as a
safe route to school.
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the development
plan unless material considerations indicate otherwise. In this instance the Development Plan
consists of National Planning Framework 4 (NPF4) and the Renfrewshire Local Development
Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the determination
of this application: 
National Planning Framework 4  
Policy ENV1 - Green Belt
Policy 3 - Biodiversity 
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
Page 78 of 106

Page 83

Policy ENV1 - Green Belt
Policy ENV2 - Natural Heritage 
Full details relating to the policies of the LDP can be found online. 
New Development Supplementary Guidance
Delivering the Environment Strategy - Green Belt Development Criteria, Natural Heritage,
Biodiversity. 
Submitted Reports and Assessments
The following information was sought by the case officer:   
▪ Purpose of infilling including the source/nature/volume testing of the materials;
▪ Ecological Survey;
▪ Details relating to the drainage of the site;
▪ Impact of the proposed development on trees;
▪ Details of proposed landscaping; and
▪ Details of how the site would be accessed. 
No reports or assessments were submitted in support of the application. 
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any Direction
made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the grant
of planning permission) and Regulation 33 (Directions requiring consideration of condition) of
The Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013, or under Regulation 50 (that development is EIA development) of The Town
and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2017. 
None. 
Planning Assessment
Section 25 of the Town and Country Planning (Scotland) Act requires decisions on planning
applications to be made in accordance with the development plan unless material
considerations indicate otherwise.  The Development Plan comprises the National Planning
Framework 4 (2023) and the adopted Renfrewshire Local Development Plan (2021). 
The fourth National Planning Framework (NPF4) provides the long-term national spatial
strategy for planning in Scotland.  It sets out the Scottish Government's current view on
delivering sustainable, liveable and productive places through the application of spatial
principles.  As the application site in this case is situated at a rural location which is designated
as green belt in the adopted Renfrewshire Local Development Plan (LDP), Policy 8 and Policy
ENV1 of the LDP are relevant to the assessment of this application as they set out specific
circumstances in new will be supported in principle in green belt and rural areas.  A summary
of acceptable development includes: 
▪ Development associated with agriculture, woodland creation, forestry and existing
woodland;
▪ Residential accommodation required and designed for a key worker in a primary industry
within the immediate vicinity of their place of employment;
▪ Horticulture;
▪ Outdoor recreation, play and sport or tourism uses; and developments that provide
opportunities for access into the open countryside;
▪ Flood risk management;
Page 79 of 106

Page 84

▪ Essential infrastructure or new cemetery provision;
▪ Minerals operations and renewable energy developments;
▪ Intensification of established uses;
▪ The reuse, rehabilitation and conversion of historic assets; or
▪ One-for-one replacements of existing permanent homes. 
It has not been demonstrated that the proposed development relates to any of the above
development as an acceptable greenbelt use and as such, the proposal would not comply with
Policy 8 and ENV1. 
Notwithstanding this, the New Development Supplementary Guidance, Green Belt
Development Criteria sets out several criteria against which all development proposals within
the green belt will be assessed.  When the proposal is assessed, the following conclusions
can be made. 
▪ There would be no loss of prime quality agricultural land or of lesser quality that is
locally important - The site is not characterised as prime agricultural land and there is no
evidence that it is a locally important area of agricultural land. 
▪ Adverse impacts on the qualities of wild land that cannot be overcome by siting,
design, and other mitigation - the application is not supported by any information which
demonstrates that the proposal /or landscaping would mitigate any impact on wild land. 
For clarity the site is considered to be defined as wild land. 
▪ Traffic and access infrastructure can be sensitively accommodated - No details have
been provided in respect of how the site would be accessed and material transported to
the site. 
▪ No significant effects on public water supply and water environment from any
pollution risk - no evidence has been provided to suggest that the proposal would not
result in significant pollution of any water supply. 
▪ The development links to existing green network and active travel routes or
provides new enhanced routes - The proposed development would not link to any active
travel route, nor would it provide enhanced routes.   
▪ Proposals to protect and provide access to open space have been incorporated -
the proposal would not impact on any existing access to open space. However, it is
considered that the proposal would result in the loss of an area of designated greenbelt
land. 
▪ Development will not have a significant detrimental impact on the local landscape
character.  Development layout, design and siting must reflect local landscape
character and respect and incorporate important landscape features such as
traditional field enclosures, water courses, woodlands, and skyline - given the low-
lying nature of the site, it is unlikely that the development would have a significant
detrimental impact on the local landscape character, however, no details have been
provided in relation to the proposed landscaping associated with the proposed
development or details relating to the removal of the existing landscaping including the
removal of trees and shrubs.   
▪ It can be demonstrated that there is careful consideration of the siting, design, scale
and grouping of any buildings and infrastructure – There are no buildings proposed.   
Page 80 of 106

Page 85

▪ Appropriate landscaping proposals have been incorporated including the provision
of well-designed boundary treatment - Policy ENV 2 advises that in considering tree or
woodland removal, proposals should minimise any adverse impacts on habitats, species,
network connectivity or landscape character.  Policy 3 also states that proposals for local
development should include appropriate measures to conserve, restore and enhance
biodiversity, in accordance with national and local guidance.  No landscaping or
biodiversity enhancement scheme has been provided including details on any trees to be
removed. 
▪ There are adequate services available for the development, or this can be provided
- due to the nature of the proposal, this would not be applicable. 
▪ There is no significant detrimental effect on identified nature conservation interests,
including species and habitats - The applicant has failed to submit Habitat /wildlife
surveys in support of the application and therefore it cannot be concluded that there will
be no significant detrimental impact on nature or conservation interests as a result of the
application proposal. 
In conclusion, it is considered that there is insufficient justification to allow for the proposed
development at this location, given the green belt designation of the application site.  A suitable
locational need for the development has not been demonstrated and none of the relevant
Development Plan policies or guidance outlined above are considered to offer suitable support
in principle to allow the proposed development at this location. 
Additionally, the application does not satisfy that the proposal would not adversely affect
biodiversity including protected species.  Therefore, the proposal is also found to be contrary
to the relevant Development Plan policies and guidance on this point. 
For these reasons, it is therefore recommended that planning permission is refused. 
Representations
Consideration of the representations received are noted below: 
1. The applicant has failed to demonstrate that the proposed development would not have a
detrimental impact on biodiversity.
2.  SEPA have been consulted and advise that their Standing Advice would be relevant.
3. The principle of the footpath in relation to the off-site works for the housing development is
not applicable to the proposal subject to this report. 
Planning Obligations
The Council is required to provide a summary of the terms of any planning obligation which is
required to be entered into under Section 75 of the Town and Country Planning (Scotland) Act
in relation to the grant of permission for the proposed development: 
None. 
Conclusion
In view of the above, it is considered that the proposal would not accord with the relevant
provisions of the Development Plan and there are no other material considerations that would
outweigh the provisions of the development plan. Planning permission should therefore be
refused, 
Recommendation
Refuse 
Reason(s) for Recommendation 
Page 81 of 106

Page 86

1. The proposal is contrary to the Policy 8 of NPF 4 and Policy ENV 1 of the
Renfrewshire Local Development Plan and the associated New Development
Supplementary Guidance as it has not been demonstrated that the proposal is an
acceptable green belt use nor that it has a specific location need. 
2. The proposed development is considered contrary to Policy 3 of NPF4 and Policy
ENV2 of the Renfrewshire Local Development Plan and the associated New
Development Supplementary Guidance as the applicant has failed to demonstrate
that the proposed development would not have a detrimental impact on
biodiversity and natural heritage, 
Condition(s)         
1. None required. 
Advisory Note(s)  
1. None required. 
Schedule of Plans Determined 
Drawing Number Revision Drawing/Document Title Stamped 
Drawing
TP-01  Location Plan 
SK1000  Ground Re-Profiling Plan and
Sections 
For further information please contact Fiona Knighton, Development Standards Team, Email: 
fiona.knighton@renfrewshire.gov.uk 
Page 82 of 106

Page 87

Report by Chief Planning Officer
Planning and Climate Change Policy Board: 21 January 2025 
Reference No 24/0851/TP
Application Type Treeworks (TPO)
Proposal Treeworks application to include tree removal and pruning
Location Main Building and Grounds, Dykebar Hospital, Grahamston Road
Ward 6 - Paisley Southeast
Community Council Hawkhead and Lochfield Community Council
Applicant Mrs Carolynne Penman CALA Management Ltd
Recommendation Grant
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=summary&keyVal=SNPCY2MWM3W00. 
This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of The
Town and Country Planning (Development Management Procedure) (Scotland) Regulations
2013. 
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation.  In this instance, the application would normally fall within
the Council's scheme of delegation to be determined by an appointed officer.  In this instance
Councillors Bruce MacFarlane, Kenny MacLaren and Mags MacLaren have requested that
the application be determined by the Board, rather than officers due to the trees being
protected by a Tree Preservation Order (TPO) and NPF4 Policy.     
Proposal
Tree works consent is sought for tree felling and pruning works along the north and east
boundary of the Dykebar Hospital grounds, where planning permission was approved at
appeal by the Scottish Government for the erection of 603 dwellinghouses in March 2023
subject to suspensive conditions (19/0810/PP - PPA-350-2-38).  As part of the application a
detailed tree survey and arboricultural constraint report (August 2018 and updated August
2020) which identified eleven woodland areas and five scrub woodland areas across the wider
hospital site, totalling 13.22 Ha, in addition to recording 336 individual specimen trees.  The
tree felling approved across the wider site as part of planning permission 19/0810/PP equates
to 5.68Ha or thereby of woodland, comprising of 207 individual trees.  This application was
also subject to an Environmental Impact Assessment during the appeal process. 
The tree removal for the current tree work application is identified within areas W2, W4 and
W9 and would comprise of the removal of approx. 1.17Ha woodland removal and 24 individual
trees. 
As detailed above, the tree works as detailed in the current application have already been
approved as part of planning application (19/0810/PP).  However, the applicant wishes to carry
out advanced arboricultural works to prepare the site for the commencement of development
at the most suitable time of the year to minimise ecological impacts.  Given the presence of
the TPO, works to protected trees cannot be implemented until such time as all pre-
commencement conditions have been discharged.  The applicant has therefore submitted the
current application and if approved, will enable advanced arboricultural works to be
undertaken both, in advance of all pre-commencement conditions being discharged and at the
most suitable time due to ecological constraints. 
The trees are protected by virtue of being located within Dykebar East Tree Preservation Order
(Ref:93/9).
Item 3(c)
PACC210125 Page 83 of 106

Page 88

Site Description
The trees included in the application are located along the north and east boundary of Dykebar
Hospital grounds which is located to the south-east of Paisley, to the west of Grahamston
Road. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
No pre-application discussions have taken place. 
Negotiated Improvements
Following submission, 
No changes have been negotiated. 
Site History 
The planning history for the site is as follows; if no history is listed then planning has no
record of previous applications for the site. 
Application No: 22/0732/TP 
Description: Various works to multiple trees including felling of one Horse Chestnut and
crown reduction of one Sycamore and one Ash
Decision: Grant 
Application No: 24/0456/TP 
Description: Fell 1 x tree and treeworks to 3 x trees
Decision: Grant subject to conditions 
Application No: 24/0678/NMV 
Description: Non-material variation of planning application 19/0810/PP to reposition
apartment blocks, amend parking courts and include bin stances for
apartment blocks
Decision: Grant 
Application No: 24/0813/TP 
Description: Felling of seven trees
Decision: Under Consideration 
Application No: 18/0392/NO 
Description: Erection of residential development with associated access and ancillary
works
Decision: Accepted; 
Application No: 19/0810/PP 
Description: Erection of 603 dwellinghouses with associated access, parking and
landscaping.
Decision: Refused 
Application No: 18/0491/EO 
Description: Request for a screening opinion for residential development.
Decision: EIA not required
Page 84 of 106

Page 89

Application No: 17/0828/TP 
Description: Removal of nine trees comprising four sycamore, four horse chestnut and
one beech sapling and pruning works to 42 trees to include height reduction
of one sycamore and one horse chestnut, crown reduction of one beech and
one sweet chestnut and crown lift.
Decision: Grant 
Application No: 15/0754/LB 
Description: Part demolition of hospital ward comprising the removal of walls and
chimney stacks from front, sides and rear of building (in retrospect).
Decision: Grant 
Application No: 15/0755/LB 
Description: Demolition of hospital ward.
Decision: Grant 
Application No: 10/0339/PP 
Description: Change of use from former hospital ward to offices.
Decision: Grant subject to conditions 
Application No: 09/0005/PP 
Description: Erection of external access ramps and internal alterations
Decision: Grant subject to conditions 
Application No: 08/0817/PP 
Description: Erection of smokers' shelters, bike stand and ancillary works
Decision: Grant subject to conditions 
Application No: 08/0947/TP 
Description: Felling of 12 no. trees and pruning of 4 no. trees
Decision: Grant subject to conditions 
Application No: 09/0017/LB 
Description: Internal alterations and installation of new external ramps
Decision: Grant subject to conditions 
Application No: 05/1344/PP 
Description: External alterations to form window openings from window and door
openings.
Decision: Grant subject to conditions 
Application No: 02/0548/TP 
Description: Crown lifting of 1 sycamore tree involving 4 branches.
Decision: Grant subject to conditions 
Application No: 01/0587/PP 
Description: Erection of 22 dwelling houses (part amendment to planning consent
99/757/PP).
Decision: Grant subject to conditions 
Application No: 05/1029/PP 
Description: Erection of 30 bed in-patient secure hospital facility.
Decision: Grant subject to conditions 
Page 85 of 106

Page 90

Application No: 05/1061/TP 
Description: Various tree works to include felling of 7 trees, crown removal of 2 and
pruning of 5 trees.
Decision: Grant subject to conditions 
Application No: 95/1054/LB 
Description: Internal works to second floor to form six no. offices and separate toilet
accommodation.
Decision: Grant subject to conditions 
Application No: 95/0629/LB 
Description: Internal alterations and change of use of ward to form office.
Decision: Grant subject to conditions 
Application No: 95/1133/PP 
Description: Erection of a conservatory as extension to day rooms.
Decision: Grant subject to conditions 
Application No: 95/1224/PP 
Description: Extension and alterations to wards 1 & 2.
Decision: Grant subject to conditions 
Application No: 94/1132/PP 
Description: Erection of a glazed courtyard canopy.
Decision: Grant subject to conditions 
Application No: 94/1171/PP 
Description: Alterations and extension to existing hospital.
Decision: Grant subject to conditions 
Application No: 93/1331/PP 
Description: Erection of extension to hospital offices.
Decision: Grant subject to conditions 
Application No: 93/1310/PP 
Description: Extension to dayroom of Ward 8.
Decision: Grant subject to conditions 
Application No: 94/0902/PP 
Description: Alteration and extension of wards 3 & 4.
Decision: Grant subject to conditions 
Application No: 04/0163/PP 
Description: Erection of a single storey extension to north elevation of ward one
incorporating new ramped entrance and reception area.   
Application No: 93/0965/TP 
Description: Felling of 50 trees.
Decision: Permission Not required 
Application No: 93/0900/PP 
Description: Alterations to existing hospital ward to form office accommodation.
Decision: Grant subject to conditions 
Application No: 93/0899/LB 
Page 86 of 106

Page 91

Description: Alterations to existing hospital ward to form office accommodation.
Decision: Grant subject to conditions 
Consultations   
None. 
Representations
The application has been publicised in line with the requirements of the relevant legislation. 
One representation was received where concerns were raised with regards to: - 
1. Loss of trees through the development of the Dykebar Hosiptal site (19/0810/PP);
2. Up to date surveys should e in place by ecologists and protection measures in place to
lessen impact on wildlife;
3. Contrary to NPF4 and Local Development Plan;
4. Concerns over accuracy of description for W4 within the Arboricultural Method Statement
with regards to tree types;
5. Loss of recreational value. There are well used paths through the woodlands and they are
not indicated on the Arboricultural Method Statement;
6. Loss of sense of arrival, Master Plan amended to retain trees at northern entrance to the
housing development (19/0801/PP). The submitted Arboricultural Method Statement does
not reflect this.
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the development
plan unless material considerations indicate otherwise. In this instance the Development Plan
consists of National Planning Framework 4 (NPF4) and the Renfrewshire Local Development
Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the determination
of this application: 
National Planning Framework 4  
Policy 6 - Forestry, woodland and trees 
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
Policy ENV2 - Natural Heritage 
Full details relating to the policies of the LDP can be found online. 
Other relevant policies and guidance
Renfrewshire New Development Supplementary Guidance - Delivering the Environment
Strategy - Trees, Woodlands and Forestry 
Renfrewshire Planning & Development Tree Policy - 2022 
The tree works approved under planning approval 19/0810/PP is also a material consideration. 
Submitted Reports and Assessments
The following reports and assessments were submitted in support of the application: 
Tree Works Application Supporting Statement - Contains details of the planning history of
the site, including details of TPO and proposed works.
Page 87 of 106

Page 92

Documents that were approved as part of planning consent 19/0810/PP were also submitted
including: - 
Arboricultural Method Statement, Dykebar Place Making Strategy and Dykebar Maintenance
Plan. 
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any Direction
made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the grant
of planning permission) and Regulation 33 (Directions requiring consideration of condition) of
The Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013, or under Regulation 50 (that development is EIA development) of The Town
and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2017. 
None. 
Planning Assessment
Section 159 of the Town and Country Planning (Scotland) Act 1997 places a duty on a planning
authority to include appropriate provisions for the preservation and planting of trees within its
area.  Tree Preservation Orders (TPOs) are confirmed where the Council has decided that a
tree or group of trees are worthy of protection.  Works to trees in TPOs therefore need to
demonstrate that the proposed works are required either in the interest of safety or that they
would not have a negative effect on the TPO. 
With respect to planning policy, National Planning Framework 4 (NPF4) provides the long-
term national spatial strategy for planning in Scotland.  It sets out the Scottish Government's
current view on delivering sustainable, liveable and productive places through the application
of spatial principles. It is considered that the proposals comply with the overall scope of NPF4. 
Policy 6 (Forestry, woodland and trees) of NPF4 outlines a commitment to support the
protection, expansion and improvement of tree and woodland cover for its nature conservation
value.  Policy ENV 2 of the Adopted Renfrewshire Local Development Plan (2021) and the
New Development Supplementary Guidance (2022) also support these principles, while
Renfrewshire Council's Tree Policy provides additional guidance including a recommendation
that all proposed tree felling should be justified in writing by reputable tree surgeon confirming
that. 
As discussed above, the tree works were previously approved by the Scottish Government
through planning permission 19/0810/PP - PPA-350-2-38.  The approved development design
was informed by detailed tree surveys, which were the basis of the forestry chapter of the
Environmental Impact Assessment that was carried out during the planning appeal process. 
The approved development also includes the requirement for compensatory planting both
within and off-site that would result in a net increase in tree planting of 0.74Ha. 
Condition 18 of planning permission 19/0810/PP also required an arboricultural method
statement and long term tree/woodland management and maintenance plan for the wider site. 
This included details of how retained trees would be protected on site through construction
and future use of the site and the tree/woodland and maintenance of newly planted trees. 
Following consultation with Scottish Forestry, this was also deemed to be acceptable. 
The advanced arboricultrual works would allow for the preparation of the approved
development at the appropriate time.  It is considered that the proposed works have been fully
considered and approved as part of planning permission 19/0810/PP which was also subject
Page 88 of 106

Page 93

to an Environmental Impact Assessment.  Due to ecological constraints with regards to the
timing of these works and given the existing planning permission, given the existing consent
it is considered reasonable that the proposed treeworks could be undertaken in advance of
the full discharge of pre-commencement conditions for the approved application. 
Representations 
In response to the concerns raised in the representation, this is summarised as follows: - 
1. Loss of trees through the development of the Dykebar Hosiptal site (19/0810/PP); 
As discussed above, the tree works were previously approved by the Scottish
Government through planning permission 19/0810/PP - PPA-350-2-38.  The approved
development design was informed by detailed tree surveys, which were the basis of
the forestry chapter of the Environmental Impact Assessment that was carried out
during the planning appeal process.  The approved development also includes the
requirement for compensatory planting both within and off-site that would result in a
net increase in tree planting of 0.74Ha. 
2. Up to date surveys should be in place by ecologists and protection measures in place
to lessen impact on wildlife; 
The Supporting Statement submitted with the application states that a variety of
ecological surveys have been carried out on site from 2018 to the present day to
ensure accurate knowledge of the site’s flora and fauna. Works would also be carried
out in consultation and under the supervision of the project ecologist; where requires,
and NatureScot to ensure that the works accord with the site-specific Badger and Bat
Protection Plans and associated ecological legislation, guidance and best practice for
the constraints from nesting birds. The necessary licences would also be obtained from
NatureScot. 
3. Contrary to NPF4 and Local Development Plan; 
As discussed above, the proposed treeworks have been previously been assessed
and approved by the Scottish Government through planning permission 19/0810- PPA-
350-2-38 which is a significant material consideration in the assessment of the
proposal. As such, it is considered reasonable that the current treeworks application is
approved in-line with this consent.  
The advanced arboricultrual works would allow for the preparation of the approved
development at the appropriate time.  It is considered that the proposed works have
been fully considered and approved as part of planning permission 19/0810/PP which
was also subject to an Environmental Impact Assessment.   
4. Concerns over accuracy of description for W4 within the Arboricultural Method
Statement with regards to tree types; 
As discussed above, the proposed treeworks align with the treeworks already
approved under application 19/0810/PP which was fully assessed and considered by
the Scottish Government. 
5. Loss of recreational value. There are well used paths through the woodlands and they
are not indicated on the Arboricultural Method Statement; 
Page 89 of 106

Page 94

The impact of recreational routes and the loss of trees was fully considered and
assessed by the Scottish Government as part of the consented development
(19/0810/PP) 
6. Loss of sense of arrival, Master Plan amended to retain trees at northern entrance to
the housing development (19/0801/PP). The submitted Arboricultural Method
Statement does not reflect this. 
Noted. A revised Arboricultural Method Statement has been submitted to reflect this. 
Planning Obligations
The Council is required to provide a summary of the terms of any planning obligation which is
required to be entered into under Section 75 of the Town and Country Planning (Scotland) Act
in relation to the grant of permission for the proposed development: 
None. 
Conclusion
In view of the above, it is considered that the proposal would accord with the relevant
provisions of the Development Plan. There are no other material considerations. The tree
works application should therefore be approved. 
Recommendation
Grant 
Reason(s) for Recommendation 
1. The proposal accords with treeworks approved under planning application
19/0810- PPA-350-2-38, and the advanced arboricultrual works would allow for
the preparation of the approved development at the appropriate time.   
Condition(s)         
1. None required. 
Advisory Note(s)  
1. None required. 
Schedule of Plans Determined 
Drawing Number Revision Drawing/Document Title Stamped 
Drawing
0251-006  Location Plan 
V2 Supporting Statement 
Advanced Arboricultural Works
Supporting Statement 
Dykebar Arboricultual Method
Statement 
Dykebar Placemaking Strategy 
Dykebar Tree Maintenance Plan 
Page 90 of 106

Page 95

For further information please contact Fiona Knighton, Development Standards Team, Email:
fiona.knighton@renfrewshire.gov.uk 
Page 91 of 106

Page 96

Page 92 of 106

Page 97

Report by Chief Planning Officer
Planning and Climate Change Policy Board: 21 January 2025 
Reference No 24/0653/FUR
Application Type Further Application
Proposal Section 42 application to modify conditions of planning
permission 19/0444/PP relating to the erection of residential
development comprising 15 dwellinghouses with associated
access road, drainage and landscaping
Location Greenhead Nursery And Adjacent Vacant Land, Old Greenock
Road, Inchinnan
Ward 12 - Erskine and Inchinnan
Community Council Inchinnan Community Council
Applicant Greenhead Homes Limited 
Recommendation Grant Subject to Conditions & S75
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=summary&keyVal=SJWPI9MWKD100 
This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of
The Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013. 
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation.  In this instance, officers have declined to exercise
delegated authority given the recent enforcement case relating to the site and public interest
in the proposed development. 
Proposal
This application seeks permission under Section 42 of The Town and Country Planning
(Scotland) Act 1997 (as amended) to modify the conditions attached to planning permission
19/0444/PP which relates to the erection of a residential development comprising 15
dwellinghouses with associated access road, drainage and landscaping at a site on Old
Greenock Road, Inchinnan, known as the former Greenhead Nursery. 
The proposal seeks to amend the conditions as follows:
▪ Introduce a new condition which requires the consent to be implemented within three
years of the date of the consent;
▪ Modify condition 4 to reflect landscaping proposals which have been submitted and
considered to be acceptable to the Planning Authority.  The condition would reference
the landscaping plan in question.
▪ Modify condition 6 to reflect the details relating to facing materials which have been
submitted and considered to be acceptable to the Planning Authority.  The condition
would reference the facing materials in question.
▪ Amalgamate conditions 7 and 8 into one condition to reflect that the boundary treatments
have been submitted and are considered acceptable to the Planning Authority.  The
condition would require the boundary treatments to be implemented in line with the
submitted details. 
It is proposed that conditions 2, 3 and 5 as attached to planning consent 19/0444/PP would
be reattached in their existing form.   
Item 3(d)
PACC210125 Page 93 of 106

Page 98

Site Description
The site is currently disused and overgrown and sits between Inchinnan Playing Fields and
an existing housing development accessed from Ladyacres.  It is relatively flat with existing
areas of hardstanding associated with the previous use. There are three private residencies
within immediate vicinity of the site, namely Greenhead Farm, Greenhead Cottage and
Craigdene.   
The former nursery was accessed by vehicles via the existing road access off Old Greenock
Road, which services the residential properties of Greenhead Cottage, Craigdene and
Greenhead Farm.   
The site is bounded to the south and southeast by open agricultural fields, to the north
across Old Greenock Road by Inchinnan Primary School and a care for the elderly and to
the west by Inchinnan playing fields. 
It should be noted that development on the site has commenced with evidence of the
formation of an access road and aspects relating to drainage proposals. 
Background
Planning consent was granted in December 2019 subject to conditions, which included five
pre-commencement conditions, each of which required to be satisfied prior to the
commencement of the development in question.  It is significant to note that shortly after the
grant of planning application 19/0444/PP, a number of national lockdowns were implemented
as a result of the coronavirus pandemic and as such this delayed the submission of details
relating to the pre-commencement conditions and ultimately the implementation of the
consent. 
As a result of emergency coronavirus legislation, planning consents due to expire within the
emergency period (7th April 2020 to 30th September 2022) were granted an extended
implementation date of 31st March 2023.  In applying the emergency legislation to planning
consent 19/0444/PP it is significant to note that the consent was due to expire outwith the
emergency period as prescribed by the aforementioned emergency legislation and in this
regard the planning consent required to be implemented by 22nd December 2022. 
It should be noted that all pre-commencement conditions had not been discharged prior to
the expiry date of 22nd December 2022 and the consent was therefore not implemented and
in this regard planning consent 19/0444/PP lapsed on 22nd December 2022. 
Notwithstanding the above, it is important to note that the applicant had sought to discharge
condition 2 relating to the need for a site investigation report and remediation strategy and
implementation plan prior to the expiry of the planning consent in question - the initial
submission of a Site Investigation Report was received on 30th January 2022.  As a result of
delays and resource pressures in dealing with contaminated land matters at the time,
condition 2 was not satisfied prior to the expiry of the planning consent.  An initial response
was provided in respect of the site investigation report on 18th May 2022 which sought the
submission of further details.  Further details were later received however condition 2(a) was
not discharged prior to the expiry of the consent in December 2022.  This is an unfortunate
circumstance and as such apologies are offered in respect of such delays however this does
not change the fact that the expiry of the planning consent was known as 22nd December
2022 albeit it is accepted that some confusion may have existed, in relation to the
emergency period which was provided by the emergency coronavirus legalisation at the time
in question.  In addition to the above, it should also be noted that submission and approval
of other pre-commencement conditions did not take place until early 2023, after the expiry of
the consent, while no submission has ever been received in respect of planning condition
2(b) which relates to a remediation strategy and implementation plan.    
Page 94 of 106

Page 99

It should be noted that no S42 application was submitted prior to the expiry of planning
consent 19/0444/PP which sought to extend the life of the consent in question.   
The applicant sought to commence works in June 2024 and as such on review of the case
file and the details noted above, it was concluded that the consent was not implemented
prior to the expiry date.  A temporary stop notice was issued on 16th August 2024. 
In light of all of the above, the applicant has chosen to submit a Section 42 application which
seeks to modify conditions attached to the original consent.  In this regard, it is significant to
note the circumstances in which this Section 42 application has been submitted. 
Planning consent 19/0444/PP was granted without a period of implementation being
specified as a condition.  In such circumstances Section 58 of the Town and Country
Planning (Scotland) Act 1997 (as it existed on the day of the grant of planning permission)
provided that where no period of implementation was specified in a grant of planning
permission then a statutory period of three years for implementation would apply.  The
statutory period of three years was to be treated as a condition only in respect of Sections
43A(8)(b) and 47(1)(a), (3) and (4)(a) of the 19997 Act.  In effect this means, at least for the
purposes of a Section 42, the previous permission was not granted subject to a condition as
to the time within which the development to which it related was to be begun.  In turn this
means Section 42(4) does not apply in respect of the now lapsed permission, and therefore
it enables a Section 42 application to be submitted and considered. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
Pre-application discussions have taken place, focusing on the commencement of
development, legality of development without discharge of conditions before expiry of
consent and the way forward including various issues which have arisen as a result. 
Negotiated Improvements
Following submission, further consideration has been given to landscaping, screening,
headlight glare and drainage. 
Site History 
The planning history for the site is as follows; if no history is listed then planning has no
record of previous applications for the site. 
Application No: 19/0444/PP 
Description: Erection of residential development comprising 15 dwellinghouses with
associated access road, drainage and landscaping
Decision: Grant subject to conditions 
Consultations   
Chief Executive's Service (Roads Development) - No objection subject to a condition
requiring the submission of plans illustrating the provision of appropriate kerbing, screening
and levelling of land adjacent to the access road to the site. 
Children's Services - No objection subject to a S75 to secure financial contributions in
respect of Park Mains High School and Trinity High School. 
Page 95 of 106

Page 100

Scottish Water - No response received. 
The application has been publicised in line with the requirements of the relevant legislation. 
The following representations were received: 
Object - 12
Support - 6
Neutral - 0 
The issues raised can be summarised as follows:
1. Overlooking due to lack of screening of access road
2. Pavement provision on main road is inadequate.
3. Kerbing on access road inadequate to allay any safety concerns. 
4. Lack of drainage.
5. Private stone wall, not part of application site, has been removed.
6. Using private farm road for industrial use has left road in need of repair.
7. Noise levels during construction are unacceptable.
8. Having street lights directly behind properties now invades private properties with
artificial light.
9. Developers are using land not within the approved development area to dump over
burden and dirt affecting safety and wildlife.
10. Houses facing access road are too high and will result in overlooking.
11. The stamped approved plans do not reflect what is currently developed.
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the
development plan unless material considerations indicate otherwise. In this instance the
Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire
Local Development Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the
determination of this application: 
National Planning Framework 4  
Policy 1 - Tackling the climate and nature crises
Policy 2 - Climate mitigation and adaptation
Policy 3 - Biodiversity
Policy 9 - Brownfield, vacant and derelict land and empty buildings
Policy 13 - Sustainable transport
Policy 14 - Design, quality and place
Policy 15 - Local Living and 20 minute neighbourhoods
Policy 16 - Quality homes 
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
Policy P1 - Renfrewshire's Places
Policy I1 - Connecting Places
Policy I3 - Flooding and Drainage
Policy I8 - Developer Contributions 
Full details relating to the policies of the LDP can be found online. 
Other relevant policies and guidance
Page 96 of 106

Page 101

New Development Supplementary Guidance 2022
Delivering the Places Strategy - Creating Places
Delivering the Environment Strategy
Delivering the Infrastructure Strategy 
Renfrewshire's Places Design Guide 
Draft Developer Contributions (Education) Planning Guidance 
Submitted Reports and Assessments
The following reports and assessments were submitted in support of the application: 
Section 42 Supporting Statement - Outlines the basis for the application, suggests
amended conditions to enable development to proceed and provides information to
demonstrate compliance with remaining conditions. 
Development Plan Assessment - provides an assessment against all relevant current
planning policies and guidance setting out the supporting context for the redevelopment of
this brownfield site for residential development. 
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any
Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the
grant of planning permission) and Regulation 33 (Directions requiring consideration of
condition) of The Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development)
of The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. 
None. 
Planning Assessment
The S42 application seeks to extend the timescale of the consent through the addition of a
time limit condition and seeks to amend conditions regarding landscaping, materials and
roads requirements.  The justification for this application is explained in the introduction to
this report which refers to legislation that was in place at the time of the original consent,
19/0444/PP.   
The conditions to be added and modified are as follows: 
To reflect the fact that section 58 of the 1997 Act has been amended since the date of the
grant of planning permission, a new condition 1 is proposed, requiring that the permission be
implemented within 3 years of the date of the grant of this consent. 
Landscaping
Existing Condition 4 'Landscaping', states: 
That before any development of the site commences a scheme of landscaping shall be
submitted to and approved in writing by the Planning Authority; the scheme shall include:- (a)
details of any earth moulding and hard landscaping, grass seeding and turfing; (b) a scheme
of tree and shrub planting, incorporating details of the number, variety and size of trees and
shrubs to be planted; (c) an indication of all existing trees and hedgerows, plus details of
those to be retained, and measures for their protection in the course of development, and (d)
details of the phasing of these works;
Page 97 of 106

Page 102

Reason:  In the interests of the visual amenity of the site. 
To reflect the fact that the landscaping proposals previously submitted to and approved by
the Council are to be adjusted to reflect overlooking and glare concerns expressed by local
residents, condition 4 is proposed to be modified so that it makes specific reference to the
drawing which incorporates the mitigation measures that have been discussed. 
It is proposed that the condition is amended to read as follows: 
That before any development on the site commences a scheme of landscaping
(incorporating the measures detailed in Drawing No. [GH IR 100.22 SL-01 Rev D] available
in Document 2.1) shall be submitted to and approved in writing by the planning authority; the
scheme shall include:- (a) details of any earth moulding and hard landscaping, grass
seeding and turfing; (b) a scheme of tree and shrub planting incorporating details of the
number, variety and size of trees and shrubs to be planted; (c) an indication of all existing
trees and hedgerows, plus details of those to be retained, and measures for their protection
in the course of the development and (d) details of the phasing of those works. 
Reason: In the interests of the visual amenity of the site. 
Facing Materials
Existing condition 6 'Facing Materials' states: 
That before development starts, full details and/or samples of the facing materials to be used
on all external walls and roofs shall be submitted to, and approved in writing by, the Planning
Authority.  Thereafter only the approved materials shall be used in the development of the
site.   
Reason:  These details have not been submitted.   
This application, if approved, would result in a new consent therefore an amended condition
is considered appropriate to reflect the plans and materials already considered acceptable.   
It is proposed that the condition is amended to read as follows: 
That all external walls and roofs within the development hereby permitted shall be
constructed in accordance with the details and using the external finishes and facing
materials shown in drawings contained in Drawings No. [A892-W05, A1215-W24, A1215-
W34, A1215-W44, A1215-W05, A1215-W14, GHG-NOR-05-ZZ-DR-A-00-1001, A1215-W54]
available in Document 2.2. 
Reason: In the interests of the visual amenity of the site. 
Boundary Treatments
Existing conditions 7 & 8 'Boundary Treatments', state: 
That before development starts, full details of the design and location of all fences and walls
to be erected on the site shall be submitted to, and approved in writing by, the Planning
Authority. 
Reason:  These details have not been submitted. 
Page 98 of 106

Page 103

That before any of the dwellinghouses situated on a site upon which a fence is to be erected
is occupied, the fence, or wall, for which the permission of the Planning Authority has been
obtained under the terms of conditions 7 above, shall be erected.   
Reason:  To safeguard the amenity of future residents.   
Given that the details of the design of the boundary walls and fences that are to be
constructed within the site have been approved by the Council, it is proposed that conditions
7 and 8 (which respectively required such approval to be in place before development was
allowed to commence and thereafter that the development be implemented in accordance
with the approved detail) be removed and replaced with a single condition which requires
that the walls and fences are erected in the approved locations and in accordance with the
approved design. Again, this application, if approved, would result in a new consent
therefore an amended condition is considered appropriate to reflect the plans and materials
already considered acceptable.   
It is proposed that the condition is amended to read as follows: 
That before any dwellinghouse situated in the site upon which a boundary fence and/or wall
is to be erected is occupied, the relevant fences and walls shall be erected in accordance
with the design details and in the locations shown in Drawing No. [A1215-BT01] available in
Document 2.3. 
Reason: To safeguard the amenity of future residents. 
Roads Traffic/ Safety 
Condition 9 'Roads/Traffic Calming', states: 
That before development starts, full details of the traffic calming measures, crossing point
and footway enhancements shall be submitted to, and approved in writing by, the Planning
Authority. Thereafter the details as approved shall be implemented prior to the occupation of
any dwelling. 
Reason: In the interests of pedestrian and road safety. 
To reflect the fact that the roads measures previously submitted to and approved by the
Council are to be adjusted to reflect safety and glare concerns expressed by local residents,
requirements relative to surface drains, and issues raised through consultation with the
councils roads engineers, condition 9 is proposed to be modified to take these matters into
account. 
It is proposed that the condition is amended to read as follows: 
That prior to any development commencing, full details of the traffic calming measures,
crossing point and footway enhancements shall be submitted to, and approved in writing by,
the Planning Authority. These should include: 
1. Provision of suitably retained minimum 1m wide flat shoulder verge to the outside of the
new road from Old Greenock Road to Greenhead Farm House with maximum 1in2 side
slopes in accordance with the Design Manual for Roads and Bridges.
2. Details of a strained post and wire fence to BS 1722 along the new curved section of
road between Old Greenock Road to Greenhead Farm House to provide an additional
temporary vehicle restraint for a period of 3 years or until the hedging matures.
3. Details of planting and or screening to prevent headlight glare from passing vehicles to
the houses beyond.
Page 99 of 106

Page 104

4. Details of connections to the surface water outfall to a positively drained network leading
to a watercourse to the approval of Scottish water. 
Thereafter the details as approved shall be implemented prior to the occupation of any
dwelling. 
Reason: In the interests of pedestrian and road safety. 
In addition to these proposed amendments, it has become apparent that the appropriate
drainage of the site may not be achievable through connection to the Scottish Water
Network.  Therefore, it is proposed to attach a further condition requiring that an appropriate
drainage assessment be undertaken and a drainage strategy submitted for the agreement of
the council in consultation with Scottish Water, prior to the commencement of development.   
The following condition is proposed. 
That prior to the commencement of the development hereby approved, a Drainage Impact
Assessment shall be submitted and approved by Renfrewshire Council as Planning
Authority. The Drainage Impact Assessment shall accord with the 'Council's Drainage
Assessment - Notes for Guidance'. Thereafter, the Assessment as approved shall be
implemented prior to the completion of the development and maintained thereafter to the
satisfaction of Renfrewshire Council as Planning Authority.  For the avoidance of doubt, the
Drainage Impact Assessment should include full details of the drainage strategy for the
development hereby approved.                         
Reason: To ensure adequate provision for drainage associated with the development. 
It is proposed that conditions 2, 3 and 5 as attached to planning consent 19/0444/PP would
be reattached in their existing form. 
In addition, given that this is a new application, any changes to planning policy or other
relevant material considerations also require consideration. 
In this regard, planning permission 19/0444/PP was granted on the 23rd December 2019
under Renfrewshire Local Development Plan 2014 and taking account of the Proposed
Renfrewshire Local Development Plan 2019 which was a material consideration at that time.
The proposal was assessed as being compliant with the relevant policies and considerations
subject to conditions. 
Since the submission of that application, Scotland's Fourth National Planning Framework
(NPF4) has replaced NPF3, Scottish Planning Policy (SPP) and the Strategic Development
Plan (SDP) and now forms part of the statutory Development Plan alongside the now
adopted Renfrewshire Local Development Plan 2021.  Therefore, the Development Plan
now comprises NPF4 (adopted 13th February 2023) and Renfrewshire Local Development
Plan 2021.   
National Planning Framework 4 (NPF4) provides the long-term national spatial strategy for
planning in Scotland. It sets out the Scottish Government's current view on delivering
sustainable, liveable, and productive places through the application of spatial principles. 
When the application proposal is assessed against the relevant policies of NPF4, the
following conclusions can be made. 
Policy 1 & 2 - Tackling the Climate and Nature Crisis/Climate Mitigation and Adaption - Policy
1 gives weight to the global climate and nature crisis when considering development
Page 100 of 106

Page 105

proposals. The application site is a brownfield site within a sustainable location which will
integrate with active travel routes and public transport and see the development of energy
efficient homes with landscaping.  As such it can be considered that the proposed
satisfactory addresses the requirements of Policies 1 and 2. 
Policy 3 - Biodiversity - Policy 3 seeks to protect biodiversity loss, deliver positive effects
from development and strengthen nature networks.  The proposal seeks to develop a
brownfield site within a residential locale where degraded remnants of past uses were
evident. The proposal includes landscaping reflective of the surrounding area and seeks to
maintain connections proportionate to the nature and scale of the development proposed. 
Policy 9 - Brownfield, Vacant and Derelict Land, Empty Buildings - Policy 9 seeks to
encourage, promote and facilitate the reuse of brownfield, vacant and derelict land and
empty buildings, and to help reduce the need for greenfield development and states that
development proposals that will result in the sustainable reuse of brownfield and derelict
land will be supported.  In determining whether the reuse is sustainable, the biodiversity
value of brownfield land which has naturalised should be taken into account.  The existing
site in this instance, has minimal biodiversity value, however it is considered that biodiversity
would be enhanced through landscaping proposals. 
Policy 13 - Sustainable Transport - Policy 13 seeks to encourage, promote and facilitate
developments that prioritise walking, wheeling, cycling and public transport for everyday
travel and reduce the need to travel unsustainably. It states that development proposals will
be supported where it can be demonstrated that the transport requirements generated have
been considered in line with the sustainable travel and investment hierarchies.  The
development proposed increases permeability with the inclusion of designated pedestrian
and cycle routes from Old Greenock Road into the site providing more convenient access to
the nearby school and other facilities.  It has been demonstrated through App ref No:
19/0444/PP, that the development encourages active travel and supports the travel hierarchy
at this location. 
Policy 14 - Design, Quality and Place - Policy 14 seeks to encourage, promote and facilitate
well designed development that makes successful places by applying the Place Principle,
taking account of the local context, characteristics and connectivity of the area.  In this
regard it has been accepted through the approval of App ref No: 19/0444/PP that the
consented development reflects the surrounding area where there is a mix of house types in
terms of age, size and design, is acceptable for this location and delivers an active street
frontage in the redevelopment of a brownfield site. The materials used ties with the
surrounding residential area whilst enabling the development to have an individual character. 
Policy 15 - Local Living & 20 Minute Neighbourhoods - Policy 15 encourages, promotes and
seeks to facilitate the application of the Place Principle and create connected and compact
neighbourhoods where people can meet the majority of their daily needs within a reasonable
distance from their home, preferably by walking, wheeling or cycling or using sustainable
transport options.  To establish this, consideration will be given to existing settlement pattern,
and the level and quality of interconnectivity of the proposed development with the
surrounding area.  In this regard the development would support local living and would have
convenient and sustainable access to a range of existing amenities, recreational facilities,
public transport hubs and places of education, all as set out in the statement submitted in
support of the application. 
Policy 16 - Quality Homes - The intention of Policy 16 is to encourage, promote and facilitate
the delivery of more high quality, affordable and sustainable homes, in the right locations,
providing choice across tenures that meet the diverse housing needs of people and
communities and states that development proposals for new homes on land allocated for
Page 101 of 106

Page 106

housing in LDP's will be supported.  Within the Renfrewshire Local Development Plan 2021,
the site is allocated as uncoloured land in the in the Proposals map.  LDP Policy P1;
Renfrewshire's Places states that within uncoloured areas of the Proposals map, there will
be a general presumption in favour of the continuance of the built form.  The other aspects of
policy 16 The proposal is therefore in compliance with policy 16. 
Regarding the appropriate Local Development Plan, Renfrewshire Local Development Plan
2021 is now the adopted Local Development Plan, and its policies and guidance are not
markedly different to the policies against which App Ref No: 19/0444/PP was assessed and
considered acceptable (Renfrewshire Local Development Plan 2014 & Renfrewshire
proposed Local Development Plan 2019). Only one new additional policy relative to
developer contributions requires consideration.  Policy I8 states that contributions will be
sought to address infrastructure capacity, including education, that arise as a direct result of
new development. Children's Services (Education) were consulted in respect of this S42
application and have no objection to the proposed development subject to a S75 agreement
to secure developer contributions in respect of Park Mains High and Trinity High.  In this
regard the terms of the Draft Developer Contributions (Education) Planning Guidance
requires to be applied.  In applying the guidance a financial contribution totalling £162,400 is
required and can be broken down as £44,800 in respect of Trinity High School and £117,600
in respect of Park Mains High School. 
Therefore, it can be concluded that the proposal complies with the relevant policies and
guidance of the Adopted Renfrewshire local Development Plan. 
Representations
The issues raised through consultation are addressed below. 
Objectors have raised concerns regarding the height of the new access road, its proximity to
existing dwellings and the potential impacts which could occur regarding safety, privacy and
glare.  Although the council's roads engineers offered no objection to the access road
through their consultation response on application 19/0444/PP being satisfied with its
position, design and appropriateness within its surroundings, in discussion with the applicant
it has been recognised that these concerns should be addressed.  As a result, conditions
attached to the grant of the previous consent are proposed to be amended to ensure that
privacy, safety and glare are addressed.   
Drainage of the application site has also been raised.  It should be noted that an additional
condition is proposed to ensure that drainage proposals for the site are submitted for the
written approval of the planning authority in consultation with Scottish Water, prior to the
commencement of development. 
Regarding the height of the dwelling houses being too high, it should be noted that the
application was assessed against all the relevant considerations of the Development Plan at
the time, including heights and separation distances, and found to be acceptable.  There are
no additional material considerations which would contradict this assessment which remains
valid and satisfactory. 
Noise during construction is unfortunately inevitable and unavoidable, however, should it
prove to be excessive or evident at unacceptable times, Environmental Protection officers
can be asked to investigate. 
Street lighting is accepted infrastructure within towns and villages and is often seen as a
necessity within residential areas.   
Page 102 of 106

Page 107

There is concern that the plans submitted as part of this application do not reflect what has
been built on the site.  Should this application be granted, it would in effect comprise a new
planning consent and development of the site would require to comply with this consent and
the stamped approved plans and the new and amended conditions attached.  The layout of
the development and the dwellings proposed are not affected by any changes to the
development plan or other material considerations and therefore remain as originally
proposed.  The new and amended conditions reflect issues raised by objectors, and seek to
ensure that their concerns have been addressed.  This will be reflected in the information
required to satisfy the requirements of the new and amended conditions. 
Finally regarding damage to existing private roads through commercial vehicle activity, this is
considered a civil matter between the landowners and those utilising the road in question. 
Those in support of the application have welcomed the use of a brownfield site within a
residential area and the positive contribution this development would make to this area and
its economy. 
Planning Obligations
The Council is required to provide a summary of the terms of any planning obligation which
is required to be entered into under Section 75 of the Town and Country Planning (Scotland)
Act in relation to the grant of permission for the proposed development: 
A Section 75 Agreement requires to be concluded to secure financial contributions in respect
of Park Mains High School and Trinity High School. 
Conclusion
In view of the above, it is considered that the proposal would accord with the relevant
provisions of the Development Plan. There are no other material considerations. Planning
permission should therefore be granted/granted subject to conditions. 
Recommendation
Grant subject to conditions & S75 agreement. 
Reason(s) for Recommendation 
The proposal accords with the provisions of the Development Plan and there were no
material considerations which outweighed the presumption in favour of development
according with the Development Plan. 
Condition(s) 
1. The development to which this permission relates must be commenced no later than 3
years from the date of the permission. 
Reason: In order to comply with the provisions of Section 58 of the Town and Country
Planning (Scotland) Act 1997, as amended. 
2. No development shall commence on site until written approval of:
a) a Site Investigation report (characterising the nature and extent of any soil, water and
gas contamination within the site); and, if remedial works are recommended therein a
Remediation Strategy and Implementation Plan identifying the proposed methods for
implementing all remedial recommendations contained within the site investigation
report all prepared in accordance with current authoritative technical guidance, have
been submitted to and approved in writing by Renfrewshire Council as Planning
Authority. 
Reason: To ensure that the site will be made suitable for its proposed use.
Page 103 of 106

Page 108

3. That prior to the occupation of any residential unit on the site:
a) a Verification Report confirming completion of the works specified within the
approved Remediation Strategy and Implementation Plan; or
b) where remediation works are not required but soils are to be imported to site, a
Verification Report confirming imported materials are suitable for use shall be
submitted to and approved in writing by Renfrewshire Council as Planning Authority.
Verification Reports shall not be submitted on a phased basis unless first agreed in
writing with the Planning Authority. 
Reason: To demonstrate that works required to make the site suitable for use
have been completed. 
4. That before any development on the site commences a scheme of landscaping
(incorporating the measures detailed in Drawing No. [GH IR 100.22 SL-01 Rev D]
available in Document 2.1) shall be submitted to and approved in writing by the planning
authority; the scheme shall include:
a) details of any earth moulding and hard landscaping, grass seeding and turfing;
b) a scheme of tree and shrub planting incorporating details of the number, variety and
size of trees and shrubs to be planted;
c) an indication of all existing trees and hedgerows, plus details of those to be retained,
and measures for their protection in the course of the development and
d) details of the phasing of those works. 
Reason: In the interests of the visual amenity of the site. 
5. That prior to occupation of the last dwellinghouse within each phase of the development
hereby permitted, all planting, seeding turfing and earth moulding included in the scheme
of landscaping and planting, approved under the terms of condition 4 above for that
phase, shall be completed; and any trees, shrubs, or areas of grass which die, are
removed, damaged, or diseased within 5 years of the completion of the development,
shall be replaced in the next planting season with others of a similar size and species; 
Reason: In the interests of amenity. 
6. That all external walls and roofs within the development hereby permitted shall be
constructed in accordance with the details and using the external finishes and facing
materials shown in drawings contained in Drawings No. [A892-W05, A1215-W24,
A1215-W34, A1215-W44, A1215-W05, A1215-W14, GHG-NOR-05-ZZ-DR-A-00-1001,
A1215-W54] available in Document 2.2. 
Reason: In the interests of the visual amenity of the site. 
7. That before any dwellinghouse situated in the site upon which a boundary fence and/or
wall is to be erected is occupied, the relevant fences and walls shall be erected in
accordance with the design details and in the locations shown in Drawing No. [A1215-
BT01] available in Document 2.3. 
Reason: To safeguard the amenity of future residents. 
8. That prior to the commencement of the development hereby approved, a Drainage
Impact Assessment shall be submitted and approved by Renfrewshire Council as
Planning Authority. The Drainage Impact Assessment shall accord with the 'Council's
Drainage Assessment - Notes for Guidance'. Thereafter, the Assessment as approved
shall be implemented prior to the completion of the development and maintained
Page 104 of 106

Page 109

thereafter to the satisfaction of Renfrewshire Council as Planning Authority. For the
avoidance of doubt, the Drainage Impact Assessment should include full details of the
drainage strategy for the development hereby approved. 
Reason: To ensure adequate provision for drainage associated with the development. 
9. That prior to any development commencing, full details of the traffic calming measures,
crossing point and footway enhancements shall be submitted to, and approved in writing
by, the Planning Authority. These should include:
a) Provision of suitably retained minimum 1m wide flat shoulder verge to the outside of
the new road from Old Greenock Road to Greenhead Farm House with maximum 1in
2 side slopes in accordance with the Design Manual for Roads and Bridges.
b) Details of a strained post and wire fence to BS 1722 along the new curved section of
road between Old Greenock Road to Greenhead Farm House to provide an
additional temporary vehicle restraint for a period of 3 years or until the hedging
matures.
c) Details of planting and or screening to prevent headlight glare from passing vehicles
to the houses beyond.
d) Details of connections to the surface water outfall to a positively drained network
leading to a watercourse to the approval of Scottish water.  Thereafter the details as
approved shall be implemented prior to the occupation of any dwelling. 
Reason: In the interests of pedestrian and road safety. 
Advisory Note(s)  
None. 
Schedule of Plans Determined 
Drawing Number Revision Drawing/Document Title
A1215-LP30  Location Plan
GHG-NOR-02-ZZ-DP03  Existing site plan with topographical survey
GHG-NOR-02-ZZ-DP03  Existing site sections
GHG-NOR-02-ZZ-DP04  Proposed site plan
GHG-NOR-02-ZZ-DP05   Phase 1,proposed site, plot 1 to 7
GHG-NOR-02-ZZ-DP04  Phase 2, proposed site, plot 8 to 15
DR-A-90-2001 P04  Proposed site sections
GHG-NOR-02-ZZ-DP04  Floor plans house type 01
GHG-NOR-02-ZZ-DP04  Elevations house type 01
GHG-NOR-02-ZZ-DP03  Floor plan house type 02
GHG-NOR-02-ZZ-DP03  Elevations house type 02
GHG-NOR-02-ZZ-DP03  Floor plans house type 03
GHG-NOR-02-ZZ-DP03  Elevations house type 03
GHG-NOR-02-ZZ-DP03  Floor plans house type 04A
GHG-NOR-02-ZZ-DP04  Elevations house type 04A
GHG-NOR-02-ZZ-DP03  Floor plans house type 04B
GHG-NOR-02-ZZ-DP03  Elevations house type 04B
GHG-NOR-02-ZZ-DP03  Floor plans house type 4C
GHG-NOR-02-ZZ-DP03  Elevations house type 4C
GHG-NOR-02-ZZ-DP03  Floor plans house type 05
GHG-NOR-02-ZZ-DP03  Elevations house type 05
GHG-NOR-02-ZZ-DP03  Floor plans house type 06
GHG-NOR-02-ZZ-DP03  Elevations house type 06
Page 105 of 106

Page 110

E15-012-VT2  Large refuse vehicle (11m) tracking
entrance to site
E15-012-003 Rev B  Access proposals showing visibility splay
E15-012-VT3  Large refuse vehicle tracking exit from site
E15-12-110 Rev A  Road layout 
For further information please contact Clare Murray, Development Standards Team, Email:
clare.murray@renfrewshire.gov.uk 
Page 106 of 106