Agenda Document Pack - Planning and Climate Change Policy Board - 21/01/2025
Renfrewshire Council · 21 January 2025
Back to Planning and Climate Change Policy Board — 21 January 2025 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
15/01/2025 Notice of Meeting and Agenda Planning and Climate Change Policy Board Date Time Venue Tuesday, 21 January 2025 13:00 Council Chambers (Renfrewshire), Council Headquarters, Renfrewshire House, Cotton Street, Paisley, PA1 1AN Membership Councillor Jim Paterson (Convener): Councillor Bruce MacFarlane (Depute Convener): Councillor Jennifer Adam: Councillor Alison Ann-Dowling: Councillor Andy Doig: Councillor Chris Gilmour: Councillor Neill Graham: Councillor Anne Hannigan: Councillor Kenny MacLaren: Councillor Jamie McGuire: Councillor Marie McGurk: Councillor John McNaughtan: Councillor Iain Nicolson: Councillor John Shaw: Councillor Ben Smith: Further Information This is a meeting which is open to members of the public. A copy of the agenda and reports for this meeting will be available for inspection prior to the meeting at the Customer Service Centre, Renfrewshire House, Cotton Street, Paisley and online at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx For further information, please email democratic-services@renfrewshire.gov.uk Members of the Press and Public Members of the press and public wishing to attend the meeting should report to the customer service centre where they will be met and directed to the meeting. Hybrid Meeting Please note that this meeting is scheduled to be held in the Council Chambers. However, it is a hybrid meeting and arrangements have been made for members to join the meeting remotely should they wish. MARK CONAGHAN Head of Corporate Governance
Page 2
15/01/2025 Webcasting of Meeting This meeting will be filmed for live or subsequent broadcast via the Council’s internet site – at the start of the meeting the Convener will confirm if all or part of the meeting is being filmed. To find the webcast please navigate to https://renfrewshire.public-i.tv/core/portal/home
Page 3
15/01/2025 Items of business Apologies Apologies from members. Declarations of Interest and Transparency Statements Members are asked to declare an interest or make a transparency statement in any item(s) on the agenda and to provide a brief explanation of the nature of the interest or the transparency statement. 1 Revenue and Capital Budget Monitoring 2024/25 as at 8 November 2024 Joint report by Chief Executive and Director of Finance & Resources. 1 - 6 2 Local Development Plan Delivery Programme Update Report by Chief Executive. 7 - 62 Planning Applications Members must deal with planning applications in an objective manner to ensure that they cannot be challenged with accusations of bias or predetermination. Votes on planning applications must be seen to be impartial and not influenced by party political issues. 3 Planning Applications Details of planning application to be determined by the Board. 63 - 64 3(a) 24/0221/PP - Section 42 application to vary conditions 3 and 4 (to clarify the types of waste operations permitted within the site and include for the handling of non- hazardous solid industrial and commercial waste) of planning permission 11/0431/PP at49 Burnbrae Road Linwood Paisley by Mr Paul O'Brien. 65 - 76 3(b) 24/0444/PP - Infilling and regrading of land at Glenfield Road Caplethill Road Paisley by Miller Homes Ltd 77 - 82 3(c) 24/0851/TP - Treeworks application to include tree removal and pruning atMain Building And Grounds 83 - 92
Page 4
15/01/2025 Dykebar Hospital Grahamston Road Paisley PA2 7DE by Mrs Carolynne Penman CALA Management Ltd by 3(d) 24/0653/FUR - Section 42 application to modify conditions of planning permission 19/0444/PP relating to the erection of residential development comprising 15 dwellinghouses with associated access road, drainage and landscaping at Greenhead Nursery and adjacent vacant land at Old Greenock Road Inchinnan by Greenhead Homes Limited. 93 - 106
Page 5
___________________________________________________________________ To: Planning and Climate Change Policy Board On: 21 January 2025 ___________________________________________________________________ Report by: Chief Executive and Director of Finance and Resources ___________________________________________________________________ Heading: Revenue and Capital Budget Monitoring 2024/25 at 8 November 2024 ___________________________________________________________________ 1. Summary 1.1 At the close of reporting Period 8 on 8 November 2024, the projected revenue outturn at 31 March 2025 for those services reporting to the Planning and Climate Change Policy Board was a break-even position against the revised budget for the year. 1.2 There are no capital projects reporting to the Planning and Climate Change Policy Board. 1.3 This is summarised in the table below and further analysis is provided in the report and appendices. Revised Annual Budget £000 Projected Outturn £000 Budget Variance (Adv)/Fav £000 Budget Variance % Revenue Planning Services 584 584 0 0.0% 2. Recommendations 2.1 Members are requested to note the projected Revenue outturn break-even position. 3. Revenue Budget Projection – break-even by 31 March 2025 3.1 The tables in Appendix 1 present the projected year-end position for all services reporting to this board, by both subjective analysis (what the budget Item 1 PACC210125 Page 1 of 106
Page 6
is spent on) and objective analysis (which division is spending the budget). Significant variances affecting the projected position are analysed further below. 3.2 It should be noted that the projected outturn position reported here is based on the latest information available, which is subject to change during the financial year. The impact of any change on this projection will be updated at each board cycle until the close of reporting Period 10. Budget holders are obliged to seek mitigating action to minimise significant budget variances. 4. Objective Analysis – Significant Variances 4.1 There are no significant variances to report at this stage in the financial year. 5. Subjective Analysis – Significant Variances 5.1 Supplies and Services - £0.067m overspend by 31 March 2025 This reflects the impact of an award of expenses relating to a planning appeal concerning the site at UWS Thornly Park Campus at Caplethill Road, Paisley. 5.2 Income - £0.060m underspend (over-recovery) by 31 March 2025 This reflects the impact of a projected over-recovery in Planning income of £0.060m (9.6%), with a projected break-even position on Building Standards income. Due to the very demand-led nature of the income stream, which is impacted by the current economic and financial climate, the level of Planning and Building Standards income can vary over the course of the financial year, which can make it challenging to determine trends for income projection. The current level of projected income remains consistent with levels reported in the second quarter, reflecting a reasonable forecast at this stage in the financial year. 6. Revenue Budget Virements 6.1. Under the Council’s financial regulations, Directors and their nominated officers, in consultation with the Director of Finance and Resources, have certain delegated authority to transfer sums between subjective budget headings within a service division to enable budget management throughout the financial year. This is known as ‘budget virement’. Transfers between divisions of the same service / department in excess of £100,000, and transfers between services / departments must be authorised by the respective service Director/Chief Executive and the Director of Finance and Resources for submission to the relevant policy board for Page 2 of 106
Page 7
approval. Future reports may therefore ask the board to approve budget adjustments that are deemed necessary for good budget management. No budget adjustments have been processed since the previous report to board. Implications of the Report 1. Financial The projected budget outturn position for the Planning and Climate Change Revenue budget is break-even at 31 March 2025. Income and expenditure will continue to be monitored closely for the rest of the financial year and as far as possible, steps will be taken to mitigate any overspend. 2. HR & Organisational Development While staffing budgets form a significant proportion of the Council’s revenue budgets, there are no direct implications arising from the recommendations in this report. 3. Community/Council Planning Community Plan Our Renfrewshire is thriving The Council’s revenue and capital spend ensures that its facilities are fit for purpose and safe for the community, to maximise accessibility. Our Renfrewshire is well Our Renfrewshire is fair Our Renfrewshire is safe Council Plan Reshaping our place, our economy and our future The Council’s revenue and capital spend ensures that its facilities are fit for purpose and safe for the community, to maximise accessibility. Building strong, safe and resilient communities Tackling inequality, ensuring opportunities for all Creating a sustainable Renfrewshire for all to enjoy Ongoing revenue and capital budget monitoring is a tool to enable good financial management so that the Council has resources now and in the future for continued service delivery. Working together to improve outcomes 4. Legal There are no direct implications arising from the recommendations in this report. Page 3 of 106
Page 8
5. Property/Assets There are no direct implications arising from the recommendations in this report. 6. Information Technology There are no direct implications arising from the recommendations in this report. 7. Equality & Human Rights There are no direct implications arising from the recommendations in this report. 8. Health & Safety There are no direct implications arising from the recommendations in the report. 9. Procurement While Procurement is an important consideration prior to the Council incurring any revenue or capital spend, there are no direct implications arising from the recommendations in this report. 10. Risk The potential financial risk that the Council will overspend its approved revenue budgets for the year is managed at a Council-wide level by the Chief Executive and Directors. 11. Privacy Impact There are no direct implications arising from the recommendations in this report. 12. Cosla Policy Position N/a 13. Climate Change The Council aims to reduce its carbon and other emissions to net zero by 2030, however there are no direct implications arising from the recommendations in this report. 14. Children’s Rights There are no direct implications arising from the recommendations in this report. Page 4 of 106
Page 9
List of Background Papers • Revenue Budget and Council Tax 2024/25, Council 29 February 2024 Author: Valerie Howie, Finance Business Partner Page 5 of 106
Page 10
Appendix 1 RENFREWSHIRE COUNCIL REVENUE BUDGET MONITORING STATEMENT 2024/25 1 April 2024 to 8 November 2024 POLICY BOARD: PLANNING SERVICES Objective Summary Annual Budget at Period 6 Budget Adjustments Revised Annual Budget at Period 8 Projected Outturn Budget Variance (Adverse) or Favourable Previous Projected Outturn Variance Movement £000 £000 £000 £000 £000 % £000 £000 Planning Strategy & Place 530 0 530 530 0 0.0% 0 0 Development Management 225 0 225 225 0 0.0% (5) 5 Building Standards (171) 0 (171) (171) 0 0.0% 0 0 NET EXPENDITURE 584 0 584 584 0 0.0% (5) 5 Subjective Summary Annual Budget at Period 3 Budget Adjustments Revised Annual Budget at Period 6 Projected Outturn Budget Variance (Adverse) or Favourable Previous Projected Outturn Variance Movement £000 £000 £000 £000 £000 % £000 £000 Employees 1,598 0 1,598 1,591 7 0.4% 0 7 Premises Related 1 0 1 1 0 0.0% 0 0 Transport Related 15 0 15 15 0 0.0% 0 0 Supplies and Services 193 0 193 260 (67) (34.7%) (66) (1) Third Party Payments 0 0 0 0 0 0.0% 0 0 Transfer Payments 91 0 91 91 0 0.0% 1 (1) Support Services 317 0 317 317 0 0.0% 0 0 Depreciation and Impairment Losses 0 0 0 0 0 0.0% 0 0 GROSS EXPENDITURE 2,215 0 2,215 2,275 (60) (2.7%) (65) 5 Income (1,631) 0 (1,631) (1,691) 60 3.7% 60 0 NET EXPENDITURE 584 0 584 584 0 0.0% (5) 5 Page 6 of 106
Page 11
___________________________________________________________________ To: Planning and Climate Change Policy Board On: 21 January 2025 ___________________________________________________________________ Report by: Chief Executive ___________________________________________________________________ Heading: Local Development Plan (LDP2) Delivery Programme Update ___________________________________________________________________ 1. Summary 1.1 There is a statutory requirement for Local Development Plans to be accompanied by a Delivery Programme and for this to be updated every two years. A Draft LDP2 Delivery Programme update was consulted on in November/December 2024, and a finalised Delivery Programme Update has now been prepared for approval by Board, reflecting comments received. ___________________________________________________________________ 2. Recommendations 2.1 It is recommended that the Board: 1) approve the Local Development Plan (LDP2) Delivery Programme Update set out in Appendix 1. _________________________________________________________ 3. Background 3.1 There is a statutory requirement for Local Development Plans to be accompanied by a Delivery Programme and for this to be updated every two years. A Delivery Programme (then known as an Action Programme) associated with the current Local Development Plan (LDP2) was published in 2022. A Delivery Programme is required to include: ▪ A list of actions required to deliver each of the plan’s policies and proposals and an explanation as to how those actions are to be taken. ▪ The timescale for the conclusion of each action; and Item 2 PACC210125 Page 7 of 106
Page 12
▪ The expected sequencing of, and timescales for, delivery of housing on sites allocated by the local development plan. ___________________________________________________________________ 4. Local Development Plan (LDP2) Delivery Programme 4.1 The 5 November 2024 meeting of this Board approved a Draft Delivery Programme Update for consultation purposes. This document provided an update on progress and future action in relation to the actions set out in the 2022 Action Programme. The consultation commenced on 14 November 2024 and ran until 20 December 2024. Appendix 2 sets out a summary of the consultation responses received and the Council’s reply to these. 4.2 Most responses were from key agencies or government agencies (SEPA, Scottish Forestry, NatureScot, Strathclyde Partnership for Transport and Historic Environment Scotland), who welcomed reference to their involvement in actions set out in the Delivery Programme and sought minor clarifications or had no comment. 4.3 Buccleuch Property responded regarding the AMIDS site providing wording to clarify and update Action 1. The owners of Braehead Shopping Centre and Retail Park and the Xsite leisure attraction responded to advise the current masterplan is dated and unlikely to be implemented and seeks to work with the Council to prepare a new masterplan, possibly including residential development. 4.4 Bridge of Weir Community Council commented that it was difficult to discern an overall vision for Renfrewshire which includes a clear role for the villages. It is responded that the vision for Renfrewshire’s places is to be found in the Local Development Plan rather than the Delivery Programme itself. A concern is raised regarding maintenance of core paths, and an action has been included in this regard. In response to another comment, ‘local interest groups’ have been added to the partner list for delivery of the Green Network Strategy. 4.5 Homes for Scotland offer several comments on behalf of the housebuilding industry. They suggest that the Delivery Programme is updated annually, that actions should be specified in relation to each housing site, that developer contribution rates should be specified in relation to each site, and that site briefs or masterplans should be provided for medium- or long-term allocations. The Council response is that this is likely to be the last Delivery Programme associated with LDP2, as the new proposed Local Development Plan (LDP3) will have a Proposed Delivery Programme published alongside it in 2026, and to focus resources on providing more detail in the LDP2 Delivery Programme would divert from the new Local Development Plan process. 4.6 With reference to Action 8 on Paisley Town Centre Action Plan, a reference has been added in relation to the preservation and enhancement of listed buildings. Page 8 of 106
Page 13
4.7 Having had regard to the responses received, the finalised Delivery Programme associated with LDP2 is attached as Appendix 1 for approval. ___________________________________________________________________ Implications of the Report 1. Financial – Whilst some of the actions set out in the Delivery programme do need funding for delivery, inclusion in the Delivery Programme does not commit the Council to funding these actions. 2. HR & Organisational Development – None. 3. Community/Council Planning – The local development plan is a wide-ranging document and is considered to support the priorities of the Renfrewshire Community Plan and the Council’s strategic outcomes. 4. Legal – the preparation of a local development plan and associated delivery programme is a statutory requirement for planning authorities. The Council is following statutory procedures in preparing the plan and associated documents. 5. Property/Assets – None. 6. Information Technology – None. 7. Equality & Human Rights – an Equalities Impact Assessment was prepared in respect of the Local Development Plan (LDP2) that this Delivery programme Update is associated with. It is available to view at https://www.renfrewshire.gov.uk/article/3070/Renfrewshire-Development-Plan 8. Health & Safety – None. 9. Procurement – None. 10. Risk – None 11. Privacy Impact – None. 12. Climate Risk – None 13. Children’s Rights – this report does not cover a new policy, function or strategy nor a substantive change to an existing policy, function or strategy which will have an impact on children’s rights. 14. Cosla Policy Position – None _______________________________________________________ Appendices Appendix 1 – Renfrewshire Local Development Plan (LDP2) Delivery Programme Update (2024) Page 9 of 106
Page 14
Appendix 2 – Responses to consultation on the Renfrewshire Local Development Plan (LDP2) Draft Delivery Programme Update List of Background Papers None ___________________________________________________________________ Author: Alan Williamson, Strategy & Place Manager, Alan.williamson@renfrewshire.gov.uk, 07811 053968 Page 10 of 106
Page 15
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 1 Contents Renfrewshire Local Development Plan (LDP2) Delivery Programme Update 2024 Appendix 1Page 11 of 106
Page 16
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 2 Contents Page 12 of 106
Page 17
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 3 Contents Introduction 4 Programme of Delivery Delivering the Economy Strategy 6 Delivering the Centres Strategy 13 Delivering the Places Strategy 18 Delivering the Infrastructure Strategy 29 Delivering the Environment Strategy 34 Estimated housing site delivery programme 41 Page 13 of 106
Page 18
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 4 Introduction Introduction This Delivery Programme Update relates to the Renfrewshire Local Development Plan (LDP2, adopted 2021) and provides an update on the actions and partnerships required to successfully implement the Plan’s Spatial Strategy, it’s policies and assist in delivering its proposals. In accordance with Section 21 of the Town and Country Planning (Scotland) Act 1997 and associated Regulations, the Delivery Programme Update sets out: • A list of actions required to deliver each of the plan’s policies and proposals and an explanation as to how those actions are to be taken; • The timescale for the conclusion of each action; and • The expected sequencing of, and timescales for, delivery of housing on sites allocated by the local development plan. The Delivery Programme Update follows the five themes of the Renfrewshire Local Development Plan: Economy; Centres; Infrastructure; Places; Environment. The Delivery Programme will be updated every two years with information from key stakeholders, key agencies, developers, investors and funders and from carrying out regular reviews. Page 14 of 106
Page 19
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 5 Delivering the Economy Strategy Programme of Delivery Page 15 of 106
Page 20
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 6 Delivering the Economy Strategy Advanced Manufacturing and Innovation District Scotland (AMIDS) Action 1 Support delivery of the Advanced Manufacturing and Innovation District Scotland (AMIDS). AMIDS will create an internationally recognised centre for innovation, research and advanced manufacturing. A Strategic Economic Investment Location with the core site adjacent to Glasgow Airport. Includes over 50 hectares of developable space to assist in the delivery of advanced manufacturing, industrial, office, aviation services and ancillary supporting uses. Timescales Glasgow Airport Investment Area (GAIA) infrastructure: Construction complete 2022. National Manufacturing Institute Scotland (NMIS) and CPIs Medicines Manufacturing Innovation Centre (MMIC) opened in 2022/2023. Oligonucleotide Manufacuring Centre of Excellence (OMICE) has started in 2024 within the MMIC, with a new facility to commence on ground in 2025. AMIDS core site commercial development from 2025 to 2035. Policy/Proposal E1, E2, E5, I1, I2, I3, I7, P1, ENV2, ENV3, ENV4 & ENV5 Lead/Partners Commercial development to be undertaken by a joint venture between Renfrewshire Council and Tarras Park Ltd (Buccleuch Property) working with a range of key stakeholders including the Scottish Government, Scottish Enterprise, Glasgow Airport, Glasgow City Region and Strathclyde University. Page 16 of 106
Page 21
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 7 Delivering the Economy Strategy Delivering the Economy Strategy - Advanced Manufacturing and Innovation District Scotland (AMIDS) Funding AMIDS is supported by over £200 million public sector investment to date to deliver infrastructure including improvements to the local road network and a district heating network owned and operated by Renfrewshire Council, NMIS, MMIC & OMICE.) Commitment to include AMIDS within Glasgow City Region’s Investment Zone with details to be finalised in 2025. Commercial development to be funded through Buccleuch Property and supported by public grants and investments where these are available to aid delivery of advanced manufacturing accommodation. Private sector input to be in the region of £250m+ Progress and future actions The enabling infrastructure was completed in 2022 and Planning Permission in Principle is in place for the AMIDS masterplan. £9m Lightweight Manufacturing Centre, opened in 2018 to support the aerospace and automotive industries. Work on the initial infrastructure to support development was completed in 2022. The NMIS facility opened in June 2023 and the MMIC opened in November 2022. OMICE commended construction in 2024. Marketing of available development opportunities is ongoing. Delivery likely to be a mix of speculative and build to suit development with several AMSC applications forthcoming from 2025. These may require expansion of current site infrastructure and District Heating Network provisions. AMIDS Strategic Advisory Group, jointly chaired by Renfrewshire Council and Scottish Enterprise and attended by key stakeholders including Scottish Government, Strathclyde University, NMIS, SDS, Buccleuch and others support the delivery of the next phases of AMIDS. There requires to be on-going investigation of access enhancement to/from the site incorporating improvements into the surrounding travel and transport network together with future key infrastructure upgrades/expansion programmes. Page 17 of 106
Page 22
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 8 Delivering the Economy Strategy Delivering the Economy Strategy – Clyde Waterfront and Renfrew Riverside Action 2 Support delivery of the Clyde Waterfront and Renfrew Riverside. The Clyde Waterfront & Renfrew Riverside (CWRR) Project aims to regenerate the Clyde Waterfront to support existing and promote new residential, commercial and environmental opportunities. The proposals include the construction of a new opening road bridge across the River Clyde, the construction of the Renfrew North Development Road and improved cycle connections. Timescales Construction work commenced in 2022. Completion of CWRR project infrastructure expected in 2025. Policy/Proposal E1, E2, E3, I1, I3, P1, P2, ENV2, ENV4 & ENV5 Lead/Partners Led by Renfrewshire Council in partnership with a range of key stakeholders including the Scottish Government, Renfrewshire Council, Glasgow City Region, other land owners and stakeholders. Page 18 of 106
Page 23
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 9 Delivering the Economy Strategy Delivering the Economy Strategy – Clyde Waterfront and Renfrew Riverside s Funding CWRR Project is supported by £90.7 million City Deal funding and funding from Renfrewshire Council for the initial infrastructure to enable development. Regeneration and development of the Clyde Riverfront will come through private investment. £282 million private sector investment into the CWRR Project is expected. Progress and future actions Construction started in 2022 and will complete in 2025. Page 19 of 106
Page 24
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 10 Delivering the Economy Strategy Action 3: Deliver actions/interventions set out Renfrewshire’s Economic Strategy 2020-2030 Policy/Proposal: E1, E2, E3, E4, E5, C1, I1, I2, I5, P1, P2, ENV3, ENV5 & ENV7 Lead/ Partners: Renfrewshire Council & Renfrewshire business community. Progress and future actions: Renfrewshire’s Economic Strategy was published covering the period 2020-2030. Strategy to support economic activity and employment opportunities as well as social and cultural development for Renfrewshire. Officers from Economy and Development are currently carrying out a review of the Strategy, to determine progress against each of the challenges identified in the Strategy and to re-evaluate the Strategy in a post-pandemic environment. Action 4: Assist to deliver and monitor Hillington Business Park Simplified Planning Zone (SPZ) Policy/Proposal: E1, I1, I2, I3 & I5 Lead/Partners: Renfrewshire Council, Glasgow City Council, Frasers Property (majority landowner) and local businesses. Progress and future actions: Hillington Park Simplified Planning Zone (SPZ) was adopted in 2014 and ended on 1 October 2024. There are no future actions. A report on what was achieved during the period of the Simplified Planning Zone was reported to the Council’s Planning and Climate Change Policy Board on 5 November 2024. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 20 of 106
Page 25
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 11 Delivering the Economy Strategy Action 5: Prepare a Development Framework for area to north of Paisley Town Centre to facilitate a co-ordinated approach to re-development and enhance the gateway between Paisley Town Centre and Glasgow Airport Policy/Proposal: E2, E3, I1, I3, P1, ENV3, ENV4 & ENV5 Lead/ Partners: Renfrewshire Council, local business community, various land owners within the area and West College Scotland. Progress and future actions: Development Framework to be prepared. There is continuing assessment of the potential delivery mechanisms and funding for this project. Renfrewshire Council's AMIDS South project, which includes a 1.7km 'gateway route' along the White Cart river, has been awarded £38.7million from the UK Government Levelling Up Fund. Action 6: Prepare development frameworks to guide investment in Transition Areas and Economic Investment Locations Policy/Proposal: E1, E2, E3, I1, I3, I4, I5, I7, P1, P2, P5, P6, ENV3, ENV5 & ENV7 Lead/ Partners: Renfrewshire Council, landowners and local community. Progress and future actions: Development frameworks have not been prepared and their preparation is not within the current work programme. LDP2 Transition Areas and Economic Investment Locations will be reviewed as part of LDP3 preparation. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 21 of 106
Page 26
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 12 Delivering the Economy Strategy Action 7: Support Delivery of Renfrewshire’s Tourism Plan 2024-2027 (action updated 2024) Policy/Proposal: E4, C1, I1, P1, P5, P6, ENV2 & ENV3 Lead/ Partners: Renfrewshire Council, OneRenStrategic Tourism Leadership Group, VisitScotland, Scottish Enterprise, Renfrewshire Chamber of Commerce and Glasgow City Region. Progress and future actions: Renfrewshire Council worked with partners to develop a Tourism Plan (2024-2027) with work now ongoing to deliver the Plan. The Tourism Plan identified 5 key priorities, cross cutting themes and a series of targets to grow Renfrewshire’s visitor economy. The first key step for the plan was to set up a Tourism Leadership Group, which will support and drive growth in Renfrewshire’s tourism economy. The Group had its first meeting in September 2024. Work will now be progressed to deliver tourism related development including projects to boost the tourism potential of Paisley Town Centre as set out in Paisley Vision 2030. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 22 of 106
Page 27
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 13 Delivering the Centres Strategy Paisley Town Centre Action Plan Action 8 Delivery of Paisley Town Centre Action Plan and Paisley Vision 2030. Proposals are being taken forward to transform Paisley's town centre venues and cultural infrastructure while supporting work to promote Paisley as a visitor destination and drive new footfall into the town centre and preserve the areas architectural heritage and culture. Paisley was chosen by the Scotland’s Town Partnership and the Scottish Government to be a pilot case for a piece of work reimagining how a town centre could be redesigned to better meet future needs. Paisley Vision 2030 builds on the actions in the Town Centre Action Plan. Policy Proposal C1, I1, P1, ENV3 & ENV5 Lead/ Partners Renfrewshire Council, Paisley First BID Group, Renfrewshire Economic Leadership Panel & Renfrewshire business community. Page 23 of 106
Page 28
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 14 Delivering the Centres Strategy Paisley Town Centre Action Plan Progress and future actions Within Paisley High Street and University Campus a number of properties have been improved through the Townscape Heritage/Conservation Area Regeneration Scheme. Updates on other key projects: Paisley Museum - a £42m transformation to showcase the town's unique heritage and collections, predicted to bring around 125,000 visitors a year. The museum closed in September 2018 and will reopen in 2025. Paisley Town Hall - a £22m internal refurbishment to become a landmark entertainment venue. The Town Hall reopened in 2023 and is proving to be a great success with a number of acts booked to perform at the venue.. Learning and Cultural Hub – the £7m Learning and Cultural Hub opened in 2023 and is designed to promote education, culture and community engagement. It combines library services, learning spaces, and cultural activities under one roof, offering a variety of resources such as books, digital media, study areas, and event spaces.. Paisley Arts Centre - a £3m upgrade of the existing building to improve the performance facilities completed in June 2024. Paisley Centre – Planning permission in principle approved for a masterplan which includes retail space, residential, hotel, healthcare facility and enhanced public spaces. The owner is in ongoing discussions with the Council and Scottish Government about potential funding options to deliver the masterplan. The Council will work with owners of listed buildings to encourage their preservation and enhancement. Page 24 of 106
Page 29
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 15 Delivering the Centres Strategy Braehead Master Plan Action 9 Support the delivery of Braehead Master Plan Braehead continues to be a key economic driver and has supported the wider regeneration of the Clyde Waterfront delivering urban renewal and environmental transformation. A masterplan has been granted planning consent as part of the centre’s evolution to provide a range and choice of uses and activities. Timescales The development continues to evolve in line with the changing markets and economic circumstances – planning permission for the masterplan was granted consent in 2016. Policy Proposal E1, C1, I1 & P1 Lead/ Partners Braehead owners and Renfrewshire Council. Progress and future actions A change in ownership and investment strategy has resulted in the focus of investment at Braehead being on internal spaces. The current masterplan is unlikely to be implemented and consideration will be given to the preparation of a new masterplan as part of the LDP3 process. Page 25 of 106
Page 30
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 16 Delivering the Centres Strategy Action 10: Prepare and review Centre Visions, Strategies and Action Plans for Renfrewshire’s Network of Centres. Policy/Proposal: C1, I1, P1, ENV3 & ENV5 Lead/ Partners: Renfrewshire Council, Community Councils, Community Organisations, local residents and businesses. Progress and future actions: A new vision for Johnstone was published in May 2024 and is a strategic initiative aimed at revitalising the town centre. It focuses on enhancing public spaces and supporting local businesses to create a more vibrant and sustainable community. The vision seeks to promote economic growth, boost tourism, and enhance the quality of life for residents by developing infrastructure, improving transport links, and creating a sense of community pride. The initiative is part of broader efforts to rejuvenate towns in the region, making them more attractive and liveable for future generations. Another commission in Erskine is currently in progress to develop proposals to make public spaces and greenspaces more appealing as part of a review of the Centre Strategy for Erskine and short, medium and long-term actions have been identified. Officers are also looking to appoint a consultant to prepare landscape design proposals which support the delivery of enhancements within an area of open space to the south of Linwood town centre, known as ‘Linwood Lade’. Action 11: Monitor and review Renfrew Town Centre Simplified Planning Zone (SPZ) Policy/Proposal: C1, I1, P1, ENV3 & ENV5 Lead/ Partners: Renfrewshire Council and Local Businesses. Progress and future actions: The SPZ, which was adopted on 25 August 2015, offers flexibility to help Renfrew town centre businesses to grow and adapt as well as encouraging new business opportunities to locate in the town centre. There have been 8 SPZ notifications received in the period since adoption. The Council will 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 26 of 106
Page 31
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 17 Delivering the Centres Strategy continue to monitor development activity within the SPZ and prepare a final report on its impact once the SPZ period has ended (25 August 2025). Action 12: Identify opportunities and initiatives for housing development projects which would assist in increasing the number of people living in and using Renfrewshire’s town centres Policy/Proposal: C1, P1, I7 & ENV3 Lead/ Partners: Renfrewshire Council, local businesses, Registered Social Landlords. Progress and future actions: Good progress has been made within Paisley Town Centre encouraging more people to live and use the town centre. The Link Group have completed the fourth phase of the redevelopment of the former Arnott’s department store site in Paisley providing 81 affordable flats. Thirty-four flats have been developed by Nixon Blue at Bridge Street in Paisley. These projects alongside the other 269 residential units that have been completed since 2016 are contributing to the wider regeneration of Paisley town centre, adding to the tenure diversification and increased residential provision within this key central location. Proposals continue to be progressed to deliver new homes in and around town centres and will continue to be considered and promoted through the preparation of Centre Strategies and the delivery of the Strategic Housing Investment Plan. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 27 of 106
Page 32
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 18 Delivering the Places Strategy Dargavel Village Community Growth Area Action 13 Support the successful implementation of the Dargavel Village Community Growth Area through a partnership approach. Delivery of Dargavel Village is through a masterplanned approach to remediate and re-develop the site. Planning consents are in place for a range of uses including 4,000 new homes, a woodland park, education and health facilities, recreation and open space facilities, retail provision and associated infrastructure including a motorway junction. Timescales Works commenced at the site in 2012 and development is forecast to reach completion by 2037. Policy/Proposal E1, P1, P2, P3, P5, P6, P7, C1, I1, ENV2, ENV3 & ENV4 Lead/ Partners BAE Systems, Renfrewshire Council, Transport Scotland, Strathclyde Partnership for Transport, Forestry and Land Scotland, local community organisations and various developers. Funding Funding secured through approved s75 agreement. Page 28 of 106
Page 33
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 19 Delivering the Places Strategy Dargavel Village Community Growth Area Progress and future actions Work is progressing well on site and has delivered: Major road and drainage infrastructure, including a new motorway junction; Extensive earthworks and remediation activity; Structural landscaping and new greenspaces including the formation of a ‘village square’; Over 2500 new homes delivered, including 138 new Social Rented homes Traffic management and environmental enhancements; Village retail centre with foodstore anchor, and new foodstore under construction; New school and nursery complete, and additional primary school proposed; First phase of park and ride facilities at Bishopton rail station, with second phase scheduled for completion by June 2025; New local play areas and early phases of a new ‘Central Park’ serving the development; Initial phases of a 400 hectare community Woodland Park as a key asset for the area; and, Satellite health centre currently under construction. Introduction of bus service between Dargavel and Braehead Page 29 of 106
Page 34
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 20 Delivering the Places Strategy Strategic Housing Investment Plan Projects Action 14 Support the delivery of the Strategic Housing Investment Plan (SHIP) projects. The Strategic Housing Investment Plan sets out how investment in affordable housing will be targeted to meet the objectives of Renfrewshire’s Local Housing Strategy. Projects within the Strategic Housing Investment Plan are prioritised to reflect project deliverability in terms of local needs assessments, site availability, strategic priorities and funding availability from both a programme prospective and the housing developers’ own financial capacity. Timescales The SHIP is reviewed and updated annually and submitted to the Scottish Government by 31 October each year. The SHIP contains expected timescales for completion of projects subject to the availability of grant funding. Policy/Proposal P1, P2 & P3 Lead/ Partners Scottish Government, Registered Social Landlords and Renfrewshire Council. Page 30 of 106
Page 35
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 21 Delivering the Places Strategy Strategic Housing Investment Plan Projects Funding The Scottish Government allocates grant funding to local authority areas through the Affordable Housing Supply Programme. Funding for financial year 2024/25 was lower than originally anticipated, and there is uncertainty over future year’s funding meaning delivery of the programme is likely to be impacted. Progress and future actions The SHIP continues to provide funding to deliver a range of affordable housing developments across Renfrewshire including the delivery in 2023/24 of 101 new homes by the Council at Ferguslie Park, Paisley, and 81 homes at Abbey Quarter in Paisley and 14 homes at Woodend House in Houston, both development by Link Group. New affordable homes are being developed to the ensure they are energy efficient to help tackle fuel poverty and the Council and partners continue to develop options around the achievement of low carbon, energy efficient homes that meet our climate change aspirations through innovation and technology. Throughout the lifetime of the SHIP the Council will continue to explore options around innovative delivery mechanisms to expand the supply of affordable housing focusing on the regeneration of brownfield and previously used land. Page 31 of 106
Page 36
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 22 Delivering the Places Strategy Action 15: Support local communities to prepare and deliver Place Plans for their area Policy/Proposal: P1, P5, P6, C1, I1, ENV2 & ENV7 Lead/ Partners: Local community groups, residents, local businesses, Development Trusts, Renfrewshire Council and Community Councils. Progress and future actions: A community led Pilot Local Place Plan for Foxbar in Paisley was completed in 2018 with the assistance of the Scottish Government ‘Making Places’ initiative. The outcomes and principles emerging from this process informed the preparation of a ‘How to Guide’ providing a template to support communities to deliver Local Place Plans across Renfrewshire. In May 2023, an invitation was issued to communities across Renfrewshire to prepare a Local Place Plan. Information sessions were held in March 2024, and further information drop-in sessions were held in August and September 2024, as well as one-to-one meetings with interested organisations. As at September 2024, 13 community organisations have expressed an interest in preparing a Local Place Plan for their area. The Council will work to support local communities if they decide to prepare a plan for their area. Action 16: Prepare Advice Note on how settlements across Renfrewshire can learn from the example of Dargavel Village in integrating walking and cycling provision in new development Policy/Proposal: C1, P1, P5, P6, P7, I1 & ENV2 Lead/Partners: Renfrewshire Council, Scottish Forestry, Local Outdoor Access Forum, land owners and public. Progress and future actions: Advice note to be prepared. This is not within the current work programme. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 32 of 106
Page 37
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 23 Delivering the Places Strategy Action 17: Assist with the implementation of the Community Growth Area at Johnstone South West Policy/Proposal: P1, P2, P3, P5, P6 I1,I3, I7 & ENV4 Lead/ Partners: Renfrewshire Council, various house builders and Registered Social Landlords. Progress and future actions: A masterplan was produced for the Johnstone South West area in 2012 with a range of local residents, community representatives and key stakeholders involved in a 'charrette' exercise supported by the Scottish Government. As at 2024, 222 houses have been developed on sites identified in the masterplan, including 183 private houses either side of Beith Road at Fordbank, and 39 houses by Renfrewshire Council at Auchengreoch Road. A new early learning and childcare centre has also been delivered in the area. The Howwood Road regeneration and renewal area sits within the Community Growth Area. Two phases of new build housing are planned for this area, with a planning application for the first phase of 70 houses submitted. Other housing development opportunities have still to be brought forward. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 33 of 106
Page 38
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 24 Delivering the Places Strategy Action 18: Review social rented housing stock, undertake option appraisal and develop area-based strategies to ensure good placemaking in Renfrewshire’s existing places Policy/Proposal: P1, P3, P5, P6, I1 & I7 Lead/Partners: Renfrewshire Council, Local Communities and Registered Social Landlords. Progress and future actions: The Housing-led Regeneration and Renewal Programme is focused on eight regeneration areas within Renfrewshire (Auchentorlie, Howard Street, Waverley Road, Ferguslie/Broomlands, Springbank/Mossvale, Thrushcraig, all Paisley, Howwood Road in Johnstone, and Moorpark in Renfrew). The programme will deliver modern, high quality, energy efficient, affordable Council housing and contribute to the wider transformation of communities across Renfrewshire. Within each area, there is a different scope of regeneration activity and timescales, within a 10-year programme that commenced in 2022. Regeneration activity involves a mix of investment in existing properties, demolition, new-build, and environmental improvements. The programme involves a new approach to community neighbourhood renewal, going beyond housing and taking account of broader issues such as health and wellbeing, and access to open space, sustainable travel, and employment/training opportunities. A detailed update setting out progress and future activity in each area was reported to the 20 August 2024 Communities and Housing Policy Board. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 34 of 106
Page 39
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 25 Delivering the Places Strategy Action 19: Consider the need to identify new sites to meet the housing needs of key groups Policy/Proposal: P1, P2, P3, P4, I3, I4 & ENV4 Lead/ Partners: Key housing groups, developers, Key Agencies, Local Community Organisations, Registered Social Landlords, adjoining Local Authorities and Renfrewshire Council. Progress and future actions: Strategic Priority 5 of the Local Housing Strategy 2023-28 is that ‘people can live independently for as long as possible in their own home and the different housing needs of people across Renfrewshire are being met’. Whilst recognising a general need of housing for particular needs, the Local Housing Strategy does not specify the need for specific sites for key groups. However, opportunities to deliver new homes for key groups are continually investigated through the annual review of the Strategic Housing Investment Programme. The Local Housing Strategy also sets a requirement for 10% of dwellings in new residential proposals to be designed to be easily adaptable for wheelchair users, and 5% to be designed to be wheelchair accessible. LDP2 provides a framework for the consideration of new small privately-owned sites to accommodate Gypsies/Travellers and Travelling Showpeople, whether transit or permanent. The requirement for the identification of land/sites for Gypsy/Traveller housing needs is being considered as part of the new Local Development Plan (LDP3) process. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 35 of 106
Page 40
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 26 Delivering the Places Strategy Action 20: Prepare development briefs to support the delivery of key sites including housing regeneration sites and Council owned sites Policy/Proposal: P1, P2 & P3 Lead/ Partners: Renfrewshire Council. Progress and future actions: Development briefs have been prepared for eleven sites under LDP2 and will continue to be prepared as required. Development briefs are available at https://www.renfrewshire.gov.uk/article/12717/Site-development-briefs. Action 21: In partnership with local communities develop and implement local regeneration strategies for Johnstone Castle, Paisley West End, and Ferguslie Park Policy/Proposal: P1, P3, P5, P6 & I1 Lead/Partners: Renfrewshire Council, Local Communities and Registered Social Landlords. Progress and future actions: 95 new energy efficient Council homes were delivered as part of Phase I of the regeneration of Johnstone Castle, Johnstone in April 2021. Link Group are now on site with Johnstone Castle Phase II which will provide 68 new social rented homes, with these homes due to complete in August 2026. 101 new affordable homes were completed in the Tannahill regeneration area in Ferguslie Park in July 2023. These 95 Council homes and 6 homes for shared equity low-cost home ownership included a mix of 1 and 2 bed cottage flats and bungalows and 2, 3 and 4 bedroom homes. To complement the housing development, the Council worked in partnership with the local community to prepare ‘The Making of Ferguslie’, which sets out a vision for the future of Ferguslie over 5-10 years from 2021. Sanctuary Scotland in partnership with the Council and Scottish Government are progressing plans for the regeneration of Paisley West End. Phase 1 of the new 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 36 of 106
Page 41
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 27 Delivering the Places Strategy build programme will deliver 35 units for social rent at Sutherland Street, Paisley with these new homes due to complete in February 2025. Plans are also progressing to deliver 120 additional new social rented homes in the West End with significant demolition due to take place in late 2024 and early 2025 to facilitate delivery of the West End Regeneration Masterplan. Action 22: Update and refresh Renfrewshire’s Places Design Guidance Policy/Proposal: P1, P2, P3, P5, P6, I1 & I7 Lead/ Partners: Renfrewshire Council. Progress and future actions: Renfrewshire’s Places Design Guidance sets out the objectives of sustainable placemaking, design and achieving high-quality design. The current guidance, dating from 2015, is still in use and many of the principles it sets out are still relevant. An update of the guidance is not currently within the work programme. Action 23: Work with local communities to support the delivery of community asset transfer projects Policy/Proposal: P1, P5, P6 & ENV7 Lead/Partners: Renfrewshire Council, Local Community/Voluntary Organisations and Development Trusts. Progress and future actions: Renfrewshire Council is committed to building strong, safe and resilient communities. In 2022 the Council created a dedicated single point of contact for community asset transfer and reviewed our policy and procedures. The result has been an increase in the number of asset transfer requests, better support for community organisations and management of the process through the Council and an increase in success. Since Part 5 of the Community Empowerment (Scotland) Act 2015 came into force in 2017, Renfrewshire Council has processed 22 full CAT requests. 11 of the applications were processed in the period 2017-22 of which 3 were refused 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 37 of 106
Page 42
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 28 Delivering the Places Strategy and 2 subsequently withdrawn. Of the 11 applications processed since 2022, 10 were approved and 1 refused. The time taken for asset transfer requests to be determined and completed has also significantly reduced with fully validated applications receiving a decision within 12 weeks. Future actions include a more strategic approach and integration with the Council’s review of assets and development of a social value toolkit to aid in the evaluation and assessment of applications and to measure community benefit from asset transfer. Action 24: Develop a standard for affordable housing in Renfrewshire Policy/Proposal: P1, P3 P5, P6, I1 & I7 Lead/Partners: Renfrewshire Council, Registered Social Landlords. Progress and future actions: The preparation of the guidance was halted owing to changing sustainability standards, and issues that other local authorities were having in implementing similar guidance. The need for guidance will be reviewed with Housing Services. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 38 of 106
Page 43
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 29 Delivering the Infrastructure Strategy Action 25: Support the delivery of major Infrastructure Projects: Clyde Waterfront and Renfrew Riverside (CWRR) and Glasgow Airport Investment Area (GAIA). Policy/Proposal: E1, E2, E5, I1, I2, I3, P1, ENV2, ENV3, ENV4 & ENV5 Lead/ Partners: Renfrewshire Council leading delivery of projects and working with stakeholders including Scottish Government, Scottish Enterprise, Glasgow City Region, Strathclyde Partnership for Transport (SPT), and land owners. Progress and future actions: GAIA Infrastructure project is complete. CWRR project commenced in 2022 and will complete in 2025. AMIDS AMIDS South is expected to commence construction in 2025 and will provide a new gateway route between AMIDS and Paisley Town Centre (enhance airport route too). The Council are working with other local authorities and key stakeholders across the city region to look at the feasibility of a Glasgow Metro scheme which would look to improve public transport connectivity across the region and enhance access to Glasgow Airport. Action 26: Promote enhanced public transport facilities at Braehead Policy/Proposal: I1 & C1 Lead/ Partners: Renfrewshire Council, Strathclyde Partnership for Transport. Progress and future actions: Improved public transport facilities and links to Braehead will be investigated as part of the Clyde Metro proposal. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 39 of 106
Page 44
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 30 Delivering the Infrastructure Strategy Action 27: Support preparation and delivery of Flood Risk and Drainage Management Plans. Policy/Proposal: I3 Lead/ Partners: Renfrewshire Council, Scottish Environment Protection Agency, Scottish Government and adjoining local authorities. Progress and future actions: Renfrewshire Council continues to work in partnership to support the delivery of the actions identified in the Clyde and Loch Lomond Flood Risk Management Plan, the Scotland and Clyde Area River Basin Management Plans as well as the Metropolitan Glasgow Strategic Drainage Plan. Action 28: Investigate feasibility to improve circulation and access to/from Paisley Town Centre Policy/Proposal: I1, E3 & C1 Lead/ Partners: Renfrewshire Council. Progress and future actions: Completion of renewal of urban traffic control system plus upgrade of strategic signal junction equipment and controllers expected to bring efficiencies to traffic management and control which should smooth traffic flow in Paisley. AMIDS South project will provide a new gateway between AMIDS and Paisley town centre. Action 29: Support preparation and implementation of Council’s Plan for Net Zero Policy/Proposal: I4, I7, P1 & ENV5 Lead/ Partners: Renfrewshire Council, Community Planning partners local residents, communities, organisations and businesses, private, public, key regional and national stakeholder organisations, Scottish Government Progress and future actions: Renfrewshire’s Plan for Net Zero was approved at Planning and Climate Change Policy Board in August 2022, aiming to end Renfrewshire’s contribution to climate change within a generation and committing us to work towards net zero emissions by 2030 for Renfrewshire Council as an organisation and the Renfrewshire Council area as a whole. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 40 of 106
Page 45
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 31 Delivering the Infrastructure Strategy The most up to date reporting year (2023-24) has seen Renfrewshire Council’s emissions reduce to 18,889t tCO2e – a reduction of 3.3% compared with the previous year and an overall reduction of 64.6% against the baseline year of 2012- 13. Internally, projects which feed into the Plan for Net Zero continue to be delivered as a Council across all 5 themes (clean energy, sustainable transport, circular economy, connected communities and resilient place). Work is also progressing on the preparation of priority projects which will build on the policy framework in the Local Development Plan to provide a strategic framework to meet our climate change targets. These projects will take into consideration the key plans and policies to provide the direction and scale we need to work towards net zero emissions. The Local Development Plan provides a spatial strategy and policy framework to support Renfrewshire’s Plan for Net Zero, which will be kept under review, including the preparation of additional planning guidance if required. Action 30: Investigate the potential for Low Carbon and Renewable Energy Developments Policy/Proposal: I1, I4, I7, & ENV2 Lead/ Partners: Renfrewshire Council, Progress and future actions: A renewable energy district heating system has been installed at the Advanced Manufacturing and Innovation District Scotland (AMIDS) site. The Council has published planning guidance on solar farm developments. A number of solar farms and battery energy storage system applications have been approved in Renfrewshire. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 41 of 106
Page 46
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 32 Delivering the Infrastructure Strategy Action 31: Work in partnership to increase accessibility to digital connectivity for all areas Policy/Proposal: I1 Lead/ Partners: Renfrewshire Council, Scottish Government and Digital Infrastructure Providers. Progress and future actions: Enhanced wi-fi connectivity has been provided to 80% (at July 2024) of Council (including schools), One Ren, and HSCP buildings, with free public wi-fi available across Johnstone, Paisley and Renfrew town centres. There has been extensive and ongoing rollout of full fibre broadband across Renfrewshire. Action 32: Investigate potential Heat Network opportunities across Renfrewshire Policy/Proposal: I4 Lead/ Partners: Renfrewshire Council, Scottish Environment Protection Agency, developers and local businesses. Progress and future actions: Renfrewshire’s Local Heat and Energy Efficiency Strategy (LHEES) and Delivery Plan (LHEEDP) were both approved and published in 2024. Renfrewshire also received funding to carry out feasibility studies across the Renfrewshire area. Following the conclusion of the studies funding has also been secured from Scottish Government to progress two potential district heating networks to Investment Grade Business Case. Further work to be carried out to identify opportunities for renewable and low carbon infrastructure and to explore more innovative and collaborative delivery models across stakeholders, including potential for joint ventures and partnership projects. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 42 of 106
Page 47
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 33 Delivering the Infrastructure Strategy Action 33: Monitor and Review Infrastructure Considerations Map to identify potential capacity constraints in Schools across Renfrewshire Policy/Proposal: P2 Lead/ Partners: Renfrewshire Council. Progress and future actions: There is ongoing liaison between the Planning Service and Children’s Services on school capacity and school pupil projections based on new housing development. Children’s Services has produced a School Estate Management Plan (2024) and are developing a Learning Estate Strategy is being developed. Action 34: Investigate potential measures to improve traffic flows on the Strategic Road Network Policy/Proposal: I1, E1 & E2 Lead/ Partners: Renfrewshire Council, Transport Scotland, and Strathclyde Partnership for Transport. Progress and future actions: A transport appraisal considering the strategic road network will be prepared as part of the new LDP3. Action 35: Investigate health care provision capacity across Renfrewshire Policy/Proposal: P1 & P2 Lead/ Partners: NHS Greater Glasgow and Clyde, Renfrewshire Health and Social Care Partnership, Renfrewshire Council. Progress and future actions: Health care provision capacity is being investigated as part of the new Local Development Plan (LDP3) process. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 43 of 106
Page 48
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 34 Delivering the Environment Strategy Renfrewshire’s Growing Grounds Forum Action 36 Renfrewshire’s Growing Grounds Forum work with local communities to support local growing activities and to increase the quantity and quality of community growing opportunities across the Council area. Part 9 of the Community Empowerment (Scotland) Act 2015 places duties on local authorities to support the provision of allotments and other community growing opportunities. Managed jointly by Renfrewshire Council and Renfrewshire Health and Social Care Partnership, the Growing Grounds Forum provides a valuable support and guidance network for local communities. Timescales Ongoing Policy Proposal: E3, P1, P5, P6, ENV2 & ENV7 Lead/Partners: Renfrewshire Council, Renfrewshire Health and Social Care Partnership, community groups and local residents. Page 44 of 106
Page 49
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 35 Delivering the Environment Strategy Renfrewshire’s Growing Grounds Forum Progress and future actions: Renfrewshire’s Growing Grounds Forum works to support local residents and community groups to increase the quantity and quality of growing ground opportunities. The Forum has applied a collaborative and comprehensive approach to community growing across Renfrewshire. This has supported the reuse of vacant land, the creation of sustainable places and deliver of community ambitions in line with the Spatial Strategy in the Local Development Plan. The Forum has had a significant impact, with support and direction provided to members. This has included assistance in securing leases, funding advice and specialist growing guidance. A key element has also been to encourage peer learning between members. The Forum meets on a regular basis and continues to support growing opportunities across Renfrewshire. Page 45 of 106
Page 50
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 36 Delivering the Environment Strategy Renfrewshire’s Green Network Strategy Action 37 Preparation and delivery of Green Network Strategy incorporating access, open space and biodiversity to support the creation of sustainable places. A Green Network Startegy is to be developed to identify greenspaces across Renfrewshire and opportunities for their protection and enhancement. Timescales: .TBC Policy Proposal: E4, C1, I1, P5, P6, ENV1, ENV2, ENV4, ENV6 & ENV7 Lead/Partners: Renfrewshire Council, Glasgow and Clyde Valley Green Network Partnership, Renfrewshire Growing Grounds Forum, Central Scotland Green Network, Scottish Forestry, Scottish Environment Protection Agency, Transport Scotland, local interest groups and local developers. Page 46 of 106
Page 51
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 37 Delivering the Environment Strategy Renfrewshire’s Green Network Strategy Funding Details: It is anticipated that projects will be funded through a variety of sources and organisations, such as national grant schemes as well as those funding streams available to voluntary and third sector bodies. Progress and future actions: Several pieces of work that would inform a Green Network Strategy have been completed or commenced. These include an updated Core Paths Plan (2022) and Biodiversity Action Plan (2024). An open space audit and work to identify a nature network is being undertaken to inform LDP3. There is now a statutory requirement to prepare an Open Space Strategy, although Regulations to inform its preparation are still awaited. It is likely that an Open Space Strategy could cover much of the same content of a Green Network Strategy. The preparation of a separate Green Network Strategy is therefore not within the current work programme and the need for a separate strategy will be kept under review.. Page 47 of 106
Page 52
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 38 Delivering the Environment Strategy Action 38: Review and deliver actions within Renfrewshire’s Biodiversity Action Plan 2018-2022 Policy/Proposal: P1, P5, P6, ENV1, ENV2, ENV3, ENV4, ENV5, ENV6 & ENV7 Lead/ Partners: Local Biodiversity Steering Group Progress and future actions: The Renfrewshire Biodiversity Duty Report 2021- 2023 highlights the actions undertaken to support biodiversity over that period. A new Biodiversity Plan for Renfrewshire was approved on 28 May 2024. Some actions identified within the plan are already underway including progress on the restoration of more than 200 hectares of peatland at Clyde Muirshiel Regional Park, a feasibility study considering potential enhancements to the Candren Burn and a range of conservation activities developed by the Friends of Jenny’s Well Local Nature Reserve. Progress on delivery of the Biodiversity Action Plan will be monitored by the Council and its partners through the LBAP Steering Group, with updates reported to the relevant Council Board. Action 39: Reviewing and working with partners to deliver actions within the Renfrewshire Vacant and Derelict Land Strategy Policy/Proposal: E1, E3, E5, C1, C2, I1, I5, P1, P2, P5, P6, ENV5, ENV6 & ENV7 Lead/ Partners: Developers, local businesses land owners, land owners, Scottish Government and Renfrewshire Council. Progress and future actions: The Vacant and Derelict Land Strategy was updated in 2024. This reports a reduction in vacant and derelict land of 18.9% since 2017, with a decrease in the amount of vacant and derelict land of 33.41 hectares since 2022. The Council will continue work on the actions set out in the Vacant and Derelict Land Strategy. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 48 of 106
Page 53
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 39 Delivering the Environment Strategy Action 40: Review of Local Nature Conservation Sites (referred to as SINCs in LDP2) and Local Nature Reserve (LNRs) Policy/Proposal: E4, P5, ENV1, ENV2, ENV3, ENV4, ENV5 & ENV6 Lead/ Partners: Renfrewshire Council, NatureScot, Scottish Forestry, landowners, land managers and local residents. . Progress and future actions: A review of Local Nature Conservation Sites will be considered as part of the new local development plan (LDP3) process. A review of Local Nature Reserves is not within the current work programme. Action 41: Support delivery of access and biodiversity interests through Outdoor Access Forum and LBAP Steering Group. Policy/Proposal: P1, I1, P5, P6, ENV1, ENV2, ENV3, ENV4, ENV5 & ENV6 Lead/Partners: The Local Access Forum represents land owners and managers, community groups, local or national organisations and the general public. The Local Biodiversity Action Plan Steering Group consists of a range of local/national organisations and individuals with an interest and knowledge of biodiversity. Progress and future actions: The LBAP Steering Group meets quarterly and supports work with statutory bodies, third sector and voluntary groups with an interest biodiversity to deliver actions with the Renfrewshire Biodiversity Action Plan. The Renfrewshire Local Outdoor Access Forum advise on access rights, rights of way and core paths.The Forum has most recently supported a revision of the Renfrewshire Core Paths Plan, approved by the Council in 2022. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 49 of 106
Page 54
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 40 Delivering the Environment Strategy Action 42: Core Path Plan Policy/Proposal: C1, E4, P1, P5, P6, I1, ENV2 Lead/ Partners: Renfrewshire Council, Sustrans, Forestry and Land Scotland, NatureScot, Local Outdoor Access Forum, Land owners and public. Progress and future actions: Renfrewshire’s Core Paths Plan 2022 was adopted by the Council on 18th January 2022. The Plan sets out a strategic network of over 300 key access routes across Renfrewshire which connect communities and provide opportunities for active travel to schools, work and local amenities. The plan also identifies routes which connect people with areas of nature and greenspace, promoting and encouraging healthy lifestyles. The Council will encourage maintenance of core paths and undertake its own maintenance where it has responsibility and resources allow. 2021/22 2022/23 2023/24 2024/25 2025/26 Post 2026 Page 50 of 106
Page 55
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 41 Estimated housing site delivery programme LDP2 ref/HLA ref Site Address Planning Status Tenure Brownfield/ Greenfield Capacity Past CompleƟons Projected Delivery Comments/ constraints to delivery Town centre site? Short term Medium term Long term Pipeline 24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Post 34 RFRF0907B LINWOOD ROAD PHOENIX PARK PAISLEY UNDER CONSTRUCTION PRIVATE BROWNFIELD 198 164 34 0 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF0989 FORMER BASF SITE 144 HAWKHEAD ROAD PAISLEY (MILLER) UNDER CONSTRUCTION PRIVATE BROWNFIELD 234 201 33 0 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF0989A FORMER BASF SITE 144 HAWKHEAD ROAD PAISLEY (TW) UNDER CONSTRUCTION PRIVATE BROWNFIELD 209 187 22 0 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1012 THE MILL HOUSE BRIDGE ST PAISLEY UNDER CONSTRUCTION PRIVATE BROWNFIELD 34 16 18 0 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. YES RFRF0988 PRINTERS PLACE PAISLEY UNDER CONSTRUCTION PRIVATE BROWNFIELD 49 10 20 19 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1042 MAIN BUILDING CASTLEHEAD CHURCH MAIN ROAD PAISLEY UNDER CONSTRUCTION PRIVATE BROWNFIELD (CONVERSION) 7 0 7 0 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF0870 HAWKHEAD HOSPITAL ACCORD PLACE PAISLEY UNDER CONSTRUCTION PRIVATE BROWNFIELD 291 254 10 27 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1058 17 GLASGOW ROAD PAISLEY UNDER CONSTRUCTION PRIVATE BROWNFIELD (CONVERSION) 4 0 4 0 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1096 13A MOSS STREET PAISLEY UNDER CONSTRUCTION PRIVATE BROWNFIELD (CONVERSION) 4 0 4 0 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. YES RFRF1049 3 COUNTY PLACE PAISLEY UNDER CONSTRUCTION PRIVATE BROWNFIELD (CONVERSION) 4 1 3 0 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. YES RFRF1056 MAIN BUILDING LIBERAL CLUB HIGH STREET PAISLEY CONSENT PRIVATE BROWNFIELD (CONVERSION) 22 0 0 0 10 12 0 0 0 0 0 0 0 Programming agreed in HLA 24. YES RFRF1078 6-8 HIGH STREET PAISLEY CONSENT PRIVATE BROWNFIELD (CONVERSION) 8 0 0 0 0 0 0 0 0 0 0 0 8 Planning permission 21/1479/PP granted 16/12/21. Pipeline site as uncertainty over implementaƟon of planning consent. Will be kept under review in preparing LDP3. YES RFRF1080 2 LONEND PAISLEY CONSENT PRIVATE BROWNFIELD 67 0 0 20 20 27 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1084 IN SHOPS MANAGERS OFFICE PAISLEY CENTRE PAISLEY CONSENT PRIVATE BROWNFIELD 80 0 0 0 0 0 0 0 0 30 30 20 0 21/1668/PP. Site has Planning Permission in Principle and key regeneraƟon priority for the Council. Programming will be kept under review in preparing LDP3. YES RFRF0971 PAISLEY SOUTH UWS PAISLEY CONSENT PRIVATE BROWNFIELD 179 0 0 36 36 36 36 35 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF0971A PAISLEY SOUTH DYKEBAR PAISLEY CONSENT PRIVATE BROWNFIELD 603 0 0 30 45 60 90 90 90 90 90 18 0 Programming agreed in HLA 24. NO RFRF1082 7 CAUSEYSIDE STREET PAISLEY CONSENT PRIVATE BROWNFIELD (CONVERSION) 4 0 0 4 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. YES RFRF1086 6 ORR SQUARE PAISLEY CONSENT PRIVATE BROWNFIELD (CONVERSION) 4 0 0 0 4 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1033 57 AMOCHRIE ROAD PAISLEY CONSENT PRIVATE BROWNFIELD 4 0 0 0 0 0 0 0 0 0 0 0 4 18/0852/PP. Uncertainty over implementaƟon of planning consent. Will be kept under review in preparing LDP3. NO RFRF0706 THE INSTITUTE MAXWELLTON STREET PAISLEY LDP2 SITE PRIVATE BROWNFIELD 40 0 0 0 0 0 0 0 0 15 15 10 0 24/0563/PP. New applicaƟon submiƩed, delivery expected within 10 year period. Programming will be kept under review. Site capacity will be updated if applicaƟon is approved. NO RFRF1028 WEST BRAE PAISLEY LDP2 SITE PRIVATE BROWNFIELD 4 0 0 0 0 0 0 0 0 0 0 0 4 Planning consent expired. Pipeline site, will be kept under review in preparing LDP3 NO Page 51 of 106
Page 56
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 42 Estimated housing site delivery programme LDP2 ref/HLA ref Site Address Planning Status Tenure Brownfield/ Greenfield Capacity Past CompleƟons Projected Delivery Comments/ constraints to delivery Town centre site? Short term Medium term Long term Pipeline 24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Post 34 RFRF0880 STATION ROAD PAISLEY LDP2 SITE PRIVATE BROWNFIELD 147 121 0 0 0 0 0 0 0 0 0 0 26 Uncertainty over implementaƟon of planning consent. Will be kept under review in preparing LDP3. NO RFRF1048 PRIORY PARK NURSING HOME 19-21 MAIN ROAD PAISLEY WINDFALL PRIVATE BROWNFIELD (CONVERSION) 17 0 0 0 0 0 0 0 0 0 0 0 17 24/0316/PP. Planning applicaƟon sƟll to be determined. Will be kept under review in preparing LDP3. NO RFRF1001 HUNTER STREET PAISLEY LDP2 SITE PRIVATE BROWNFIELD 7 0 0 0 0 0 0 0 0 0 0 0 7 Planning consent expired. Pipeline site, will be kept under review in preparing LDP3 NO RFRF1034 21 GORDON STREET PAISLEY LDP2 SITE PRIVATE BROWNFIELD (CONVERSION) 15 0 0 0 0 0 0 0 0 0 0 0 15 Planning consent expired. Pipeline site, will be kept under review in preparing LDP3 NO RFRF1044 SITE BETWEEN 2&8 STANELY CRESCENT PAISELY WINDFALL PRIVATE BROWNFIELD 24 0 0 0 0 0 0 0 0 0 0 0 24 Planning consent expired. Pipeline site, will be kept under review in preparing LDP3 NO RFRF1014 BLACKHALL STREET PAISLEY LDP2 SITE PRIVATE BROWNFIELD 59 0 0 0 0 0 0 0 0 0 0 0 59 Planning consent expired. Pipeline site, will be kept under review in preparing LDP3 NO RFRF1040 LAND TO SOUTH OF ST JAMES INTERCHANGE BURNSIDE PLACE PAISLEY LDP2 SITE PRIVATE BROWNFIELD 180 0 0 0 0 0 0 0 0 0 0 0 180 22/0569/PP. Planning applicaƟon refused at appeal. Pipeline site, will be kept under review in preparing LDP3 NO RFRF0981 20 HIGH STREET PAISLEY LDP2 SITE PRIVATE BROWNFIELD (CONVERSION) 6 0 0 0 0 0 0 0 0 0 0 0 6 Planning consent expired. Pipeline site, will be kept under review in preparing LDP3 YES RFRF0851 CALSIDE FORMER RAH PAISLEY LDP2 SITE PRIVATE BROWNFIELD (CONVERSION) 81 0 0 0 0 20 30 31 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1007 FORMER TENNIS COURTS GLENCOURSE ROAD PAISLEY LDP2 SITE PRIVATE BROWNFIELD 50 0 0 0 0 0 0 0 0 0 0 0 50 Constrained site. Pipeline site, will be kept under review in preparing LDP3. NO RFRF1050 LAND SW OF STANELY PARK HOME STANELY ROAD PAISLEY WINDFALL PRIVATE BROWNFIELD 31 0 0 0 0 0 0 0 0 10 10 11 0 19/0831/PP. Planning consent granted following compleƟon of HLA24. Programming will be reviewed in HLA25. NO RFRF1081 41 GAUZE STREET PAISLEY CONSENT PRIVATE BROWNFIELD (CONVERSION) 14 0 0 0 7 7 0 0 0 0 0 0 0 22/0747/PP. Programming agreed in HLA 24. YES RFRF0711B SUTHERLAND STREET PAISELY UNDER CONSTRUCTION SOCIAL RENTED BROWNFIELD 35 0 35 0 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF0950 CARTHA CRESCENT PAISLEY UNDER CONSTRUCTION SOCIAL RENTED BROWNFIELD 33 0 12 21 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF0870A HAWKHEAD HOSPITAL ACCORD PLACE PAISLEY UNDER CONSTRUCTION SOCIAL RENTED BROWNFIELD 30 0 0 30 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1077 EAST LANE PAISLEY UNDER CONSTRUCTION SOCIAL RENTED BROWNFIELD 48 0 48 0 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF0671 DEE DRIVE PAISLEY LDP2 SITE SOCIAL RENTED BROWNFIELD 45 0 0 0 0 0 0 0 0 20 25 0 0 Site in SHIP and programming reflects expected funding availability NO RFRF0671A DON DRIVE PAISLEY LDP2 SITE SOCIAL RENTED BROWNFIELD 40 0 0 0 0 0 0 20 20 0 0 0 0 Programming agreed in HLA 24. Site in SHIP and programming reflects expected funding availability NO Page 52 of 106
Page 57
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 43 Estimated housing site delivery programme LDP2 ref/HLA ref Site Address Planning Status Tenure Brownfield/ Greenfield Capacity Past CompleƟons Projected Delivery Comments/ constraints to delivery Town centre site? Short term Medium term Long term Pipeline 24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Post 34 RFRF0711 WEST BRAE OAKSHAW PAISLEY (west end regeneraƟon phase 2) LDP2 SITE SOCIAL RENTED BROWNFIELD 120 0 0 0 0 20 30 30 40 0 0 0 0 Programming agreed in HLA 24. Site in SHIP and programming reflects expected funding availability. Planning applicaƟon 24/0078/PP. to be determined. NO RFRF0773 ALMOND CRESCENT PAISLEY LDP2 SITE SOCIAL RENTED BROWNFIELD 20 0 0 0 0 0 0 0 0 0 0 0 20 Pipeline site. Site not currently in SHIP, review in preparing LDP3. NO RFRF0839 HERIOT AVENUE PAISLEY LDP2 SITE SOCIAL RENTED BROWNFIELD 35 0 0 0 0 0 0 0 0 0 0 0 35 Pipeline site. Site not currently in SHIP, review in preparing LDP3. NO RFRF0954 ARKLESTON ROAD PAISLEY LDP2 SITE SOCIAL RENTED BROWNFIELD 65 0 0 0 30 35 0 0 0 0 0 0 0 Site in SHIP. ConstrucƟon expected to commence next year. Programming agreed in HLA 24. NO RFRF1004 NEW SNEDDON STREET PAISLEY LDP2 SITE SOCIAL RENTED BROWNFIELD 30 0 0 0 0 0 0 0 0 0 0 0 30 Pipeline site. Site not currently in SHIP, review in preparing LDP3. NO RFRF1013 HIGH CALSIDE PAISLEY LDP2 SITE SOCIAL RENTED BROWNFIELD 20 0 0 0 0 0 0 0 0 0 0 0 20 Pipeline site. Site not currently in SHIP, review in preparing LDP3. NO RFRF0934 GARTHLAND LANE PAISLEY LDP2 SITE SOCIAL RENTED BROWNFIELD 32 0 0 0 0 0 0 0 0 0 16 16 0 Site in SHIP and programming reflects expected funding availability NO RFRF1071 STATION ROAD PAISLEY WINDFALL SOCIAL RENTED BROWNFIELD 45 0 0 0 0 0 0 0 0 0 0 0 45 Planning applicaƟon refused at appeal. Pipeline site, will be kept under review in preparing LDP3 NO RFRF1072 WESTBURN AVENUE/BLACKSTOUN ROAD PAISLEY WINDFALL SOCIAL RENTED BROWNFIELD 22 0 0 0 0 0 0 0 0 0 0 22 0 Site in SHIP and programming reflects expected funding availability. NO RFRF1074 THRUSHCRAIGS CRESCENT PAISLEY WINDFALL SOCIAL RENTED BROWNFIELD 50 0 0 0 0 0 30 20 0 0 0 0 0 Programming agreed in HLA 24. Part of Council’s regeneraƟon programme. Site in SHIP and programming reflects expected funding availability NO RFRF1075 BROOMLANDS PAISLEY (LocaƟon: Carbrook St) (LocaƟon: Ferguslie Main Road) WINDFALL SOCIAL RENTED BROWNFIELD 43 0 0 0 0 0 0 0 43 0 0 0 0 Programming agreed in HLA 24. Part of Council’s regeneraƟon programme. Site in SHIP and programming reflects expected funding availability NO RFRF1076 SPRINGBANK ROAD AREA PAISLEY WINDFALL SOCIAL RENTED BROWNFIELD 100 0 0 0 0 65 0 0 35 0 0 0 0 Programming agreed in HLA 24. Part of Council’s regeneraƟon programme. Site in SHIP and programming reflects expected funding availability NO RFRF0952 GRAMPIAN AVENUE/LOMOND CRESCENT PAISLEY LDP2 SITE SOCIAL RENTED BROWNFIELD 30 0 0 0 0 0 0 0 0 0 0 0 30 Pipeline site. Site not currently in SHIP, review in preparing LDP3. NO RFRF1043 WRIGHT STREET RENFREW UNDER CONSTRUCTION PRIVATE BROWNFIELD 39 37 2 0 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF0864 KINGS INCH ROAD OLD POWER STATION RENFREW UNDER CONSTRUCTION PRIVATE BROWNFIELD 248 129 49 63 7 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1083 LAYMOOR AVENUE RENFREW UNDER CONSTRUCTION PRIVATE BROWNFIELD 122 0 65 33 24 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1093 74 FULBAR STREET RENFREW CONSENT PRIVATE BROWNFIELD 8 0 0 8 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO Page 53 of 106
Page 58
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 44 Estimated housing site delivery programme LDP2 ref/HLA ref Site Address Planning Status Tenure Brownfield/ Greenfield Capacity Past CompleƟons Projected Delivery Comments/ constraints to delivery Town centre site? Short term Medium term Long term Pipeline 24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Post 34 RFRF1018 26 HIGH STREET RENFREW LDP2 SITE PRIVATE BROWNFIELD (CONVERSION) 9 0 0 0 0 0 0 0 0 0 0 0 9 Planning consent expired. Pipeline site, will be kept under review in preparing LDP3 YES RFRF1019 24 HIGH STREET RENFREW LDP2 SITE PRIVATE BROWNFIELD (CONVERSION) 11 0 0 0 0 0 0 0 0 0 0 0 11 Planning consent expired. Pipeline site, will be kept under review in preparing LDP3 YES RFRF0769B CLYDE WATERFRONT & RENFREW RIVERSIDE AREA 1 LDP2 SITE PRIVATE BROWNFIELD 142 0 0 0 0 0 0 0 0 50 50 42 0 Key regeneraƟon priority. Recent City Deal investment delivering new bridge crossing across River Clyde and Renfrew North development road providing access to Advanced Manufacturing and InnovaƟon District. Programming to be reviewed in preparing LDP3 NO RFRF0860 INCHINNAN ROAD BLYTHSWOOD RENFREW LDP2 SITE PRIVATE BROWNFIELD 85 0 0 0 0 0 0 0 0 0 0 0 85 Pipeline site, will be kept under review in preparing LDP3 NO RFRF0994 CLYDE WATERFRONT & RENFREW RIVERSIDE AREA 2 LDP2 SITE PRIVATE BROWNFIELD 434 0 0 0 0 0 0 0 0 0 0 0 434 Key regeneraƟon priority. Pipeline site, will be kept under review in preparing LDP3 NO RFRF1051A ROW AVENUE RENFREW CONSENT SOCIAL RENTED BROWNFIELD 57 0 0 0 0 0 0 0 0 0 0 0 57 Site removed from SHIP. Pipeline site, will be kept under review in preparing LDP3 NO RFRF1064 LDP2057 GOLF DRIVING RANGE RANNOCH ROAD JOHNSTONE CONSENT PRIVATE GREENFIELD 88 0 0 0 20 25 23 20 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1025 CORSEFORD AVENUE JOHNSTONE CONSENT PRIVATE GREENFIELD 49 0 0 15 15 19 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1052 16 WALKINSHAW STREET JOHNSTONE WINDFALL PRIVATE BROWNFIELD 6 0 0 0 0 0 0 0 0 0 0 0 6 Planning consent expired. Pipeline site, will be kept under review in preparing LDP3 NO RFRF1041 30 CAMPBELL STREET JOHNSTONE LDP2 SITE PRIVATE BROWNFIELD 7 0 0 0 0 0 0 0 0 0 0 0 7 Planning consent expired. Pipeline site, will be kept under review in preparing LDP3 NO RFRF0667 BARBUSH MILLVIEW CRESCENT JOHNSTONE LDP2 SITE PRIVATE BROWNFIELD 86 74 0 0 0 0 0 0 0 0 0 0 12 Pipeline site, will be kept under review in preparing LDP3 NO RFRF0796A HIGH STREET PATON’S MILL JOHNSTONE LDP2 SITE PRIVATE BROWNFIELD 40 0 0 0 0 0 0 0 0 0 0 0 40 Planning consent expired. Pipeline site, will be kept under review in preparing LDP3 NO RFRF0940 BARBUSH FARM JOHNSTONE LDP2 SITE PRIVATE GREENFIELD 65 0 0 0 0 0 0 0 0 20 20 25 0 Developer has confirmed intenƟon to deliver this site through the recent Call for Ideas process. Will be kept under review in preparing LDP3 NO RFRF1024 FORDBANK OFF BEITH ROAD JOHNSTONE LDP2 SITE PRIVATE GREENFIELD 100 0 0 0 0 0 0 0 0 30 30 4 0 Allocated LDP2 site which would conƟnue recent development in Beith Road area of Johnstone. Developer sƟll to be idenƟfied, will be kept under review in preparing LDP3. NO RFRF0912H MAPLE DRIVE JOHNSTONE UNDER CONSTRUCTION SOCIAL RENTED BROWNFIELD 68 0 20 30 18 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO Page 54 of 106
Page 59
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 45 Estimated housing site delivery programme LDP2 ref/HLA ref Site Address Planning Status Tenure Brownfield/ Greenfield Capacity Past CompleƟons Projected Delivery Comments/ constraints to delivery Town centre site? Short term Medium term Long term Pipeline 24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Post 34 RFRF0164_AH LDP2057 GOLF DRIVING RANGE RANNOCH ROAD JOHNSTONE CONSENT SOCIAL RENTED GREENFIELD 8 0 0 0 0 0 8 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF0759 RYEFIELD AVENUE JOHNSTONE CONSENT SOCIAL RENTED BROWNFIELD 36 0 0 0 0 0 0 16 20 0 0 0 0 Programming agreed in HLA 24. Consent for 31 units 21/1087/PP and applicaƟon 23/0482/PP for a further 5 units sƟll to be determined. Site in SHIP and programming reflects expected funding availability NO RFRF0972A MACDOWALL STREET MILL BRAE JOHNSTONE LDP2 SITE SOCIAL RENTED BROWNFIELD 35 0 0 0 0 0 0 0 0 0 15 20 0 Site in SHIP and programming reflects expected funding availability NO RFRF0819B NORTH ROAD EAST GIBSON CRESCENT JOHNSTONE LDP2 SITE SOCIAL RENTED BROWNFIELD 28 0 0 0 0 0 0 0 28 0 0 0 0 Programming agreed in HLA 24. Site in SHIP and programming reflects expected funding availability. NO RFRF0912E HOWWOOD ROAD JOHNSTONE LDP2 SITE SOCIAL RENTED BROWNFIELD 130 0 0 0 20 30 40 40 0 0 0 0 0 Programming agreed in HLA 24. Site in SHIP and part of Council’s regeneraƟon programme. ConstrucƟon expected to commence next year. NO RFRF0911E DARGAVEL VILLAGE TOWN CENTRE SITE H4B, 4C, M2, H11, H32, H29, 33. BISHOPTON- DV UNDER CONSTRUCTION PRIVATE BROWNFIELD 320 319 1 0 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1037 DARGAVEL VILLAGE AREA H13&14 BISHOPTON-DV UNDER CONSTRUCTION PRIVATE BROWNFIELD 249 169 50 30 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1047 DARGAVEL VILLAGE SITE S1 &S3 BISHOPTON-DV UNDER CONSTRUCTION PRIVATE BROWNFIELD 150 120 30 0 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1087 DARGAVEL VILLAGE SITE H24 AREA W10 STATION ROAD BISHOPTON-DV UNDER CONSTRUCTION PRIVATE BROWNFIELD 172 67 50 30 25 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1088 DARGAVEL VILLAGE SITE H24 STATION ROAD AREA W BISHOPTON-DV UNDER CONSTRUCTION PRIVATE BROWNFIELD 135 16 0 0 30 30 30 29 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1095 DARGAVEL SITE MC BISHOPTON-DV UNDER CONSTRUCTION PRIVATE BROWNFIELD 49 0 0 0 0 0 0 0 0 0 0 49 0 Programming agreed in HLA 24. NO RFRF0911X REMAINING CAPACITY BISHOPTON-DV CONSENT PRIVATE BROWNFIELD 315 0 0 0 0 0 0 0 0 47 200 68 0 Programming agreed in HLA 24. NO RFRF0911Y REMAINING CAPACITY BISHOPTON-DV CONSENT PRIVATE BROWNFIELD 90 0 0 0 0 27 33 30 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF0911Z REMAINING CAPACITY BISHOPTON-DV CONSENT PRIVATE BROWNFIELD 435 0 0 0 0 0 42 73 167 153 0 0 0 Programming agreed in HLA 24. NO RFRF1090 DARGAVEL VILLAGE SITE N1 OFF CRAIGTON DRIVE BISHOPTON-DV CONSENT PRIVATE BROWNFIELD 213 0 0 40 20 40 40 40 33 0 0 0 0 Programming agreed in HLA 24. NO RFRF1091 DARGAVEL VILLAGE SITE N2 BISHOPTON-DV CONSENT PRIVATE BROWNFIELD 286 0 10 60 73 60 55 28 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF0911J DARGAVEL VILLAGE PHASE 3 BISHOPTON- DV CONSENT SOCIAL RENTED BROWNFIELD 62 0 0 0 30 32 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1090A DARGAVEL VILLAGE PHASE 4A SITE N1 OFF CRAIGTON DRIVE BISHOPTON-DV CONSENT SOCIAL RENTED BROWNFIELD 20 0 0 0 0 20 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1091A DARGAVEL VILLAGE PHASE 4B SITE N2 OFF CRAIGTON DRIVE BISHOPTON-DV CONSENT SOCIAL RENTED BROWNFIELD 23 0 0 0 0 23 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO Page 55 of 106
Page 60
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 46 Estimated housing site delivery programme LDP2 ref/HLA ref Site Address Planning Status Tenure Brownfield/ Greenfield Capacity Past CompleƟons Projected Delivery Comments/ constraints to delivery Town centre site? Short term Medium term Long term Pipeline 24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Post 34 RFRF1054 MAR HALL BISHOPTON CONSENT PRIVATE GREENFIELD 25 0 0 0 0 0 0 0 0 0 0 0 25 21/1022/PP. Current planning consent, however, uncertainty over whether consent will be implemented as alternaƟve development has recently been approved on the site. Review in preparing LDP3 NO RFRF0752 INGLISTON DRIVE BISHOPTON LDP2 SITE PRIVATE GREENFIELD 20 0 0 0 0 0 0 0 0 0 0 0 20 Pipeline site. Site not currently being marketed by the Council. Will review in preparing LDP3. NO RFRF0979 STATION ROAD BISHOPTON LDP2 SITE PRIVATE BROWNFIELD 50 0 0 0 0 0 0 0 0 0 0 0 50 Pipeline site, will be kept under review in preparing LDP3 NO RFRF1053 TORR FARM HOUSE TORR ROAD BRIDGE OF WEIR UNDER CONSTRUCTION PRIVATE BROWNFIELD (CONVERSION) 8 0 0 4 4 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1026 STATION ROAD BRIDGE OF WEIR CONSENT PRIVATE BROWNFIELD 39 0 0 0 0 0 0 0 0 0 0 0 39 19/0456/PP – Site has planning consent but currently constrained which is impacƟng on deliverability. Will be kept under review in preparing LDP3. NO RFRF1092 27 MAXWELL PLACE BRIDGE OF WEIR CONSENT PRIVATE BROWNFIELD 4 0 0 0 0 4 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1021 HOUSTON STATION HOUSE BAROCHAN ROAD BROOKFIELD UNDER CONSTRUCTION PRIVATE GREENFIELD 24 16 8 0 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1032 3 WOODSIDE ROAD BROOKFIELD WINDFALL PRIVATE BROWNFIELD 10 0 0 0 5 5 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1039 NAPIER STEET LINWOOD UNDER CONSTRUCTION PRIVATE BROWNFIELD 28 24 4 0 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1060 EAST FULTON FARM DARLUITH ROAD LINWOOD CONSENT PRIVATE GREENFIELD 49 0 0 0 0 0 20 29 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1017 35 NAPIER STREET LINWOOD LDP2 SITE PRIVATE BROWNFIELD 12 0 0 0 0 0 0 0 0 0 0 0 12 Planning consent expired. Pipeline site, will be kept under review in preparing LDP3 NO RFRF1039A NAPIER STREET LINWOOD UNDER CONSTRUCTION SOCIAL RENTED BROWNFIELD 51 23 28 0 0 0 0 0 0 0 0 0 0 SHIP site. Programming agreed in HLA 24. NO RFRF0967A LAND SURROUNDING ST BRENDAN’S SOCIAL CLUB STIRLING DRIVE LINWOOD LDP2 SITE SOCIAL RENTED BROWNFIELD 65 0 0 0 0 32 33 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1061 LAND EAST OF NEWTON COTTAGE AT ELDERSLIE GOLF CLUB CONSENT PRIVATE GREENFIELD 27 0 0 5 10 12 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1067 LDP2024 SOUTH OF WOODEND HOUSE HOUSTON ROAD HOUSTON UNDER CONSTRUCTION PRIVATE GREENFIELD 43 27 16 0 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1094 CHAPEL FARM HOUSE CHAPEL ROAD HOUSTON CONSENT PRIVATE BROWNFIELD (CONVERSION / NEWBUILD) 4 0 0 4 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1065 LDP2033 WEST OF BAROCHAN ROAD HOUSTON LDP2 SITE PRIVATE GREENFIELD 59 0 0 0 0 0 20 20 19 0 0 0 0 Programming agreed in HLA 24. NO RFRF0840 HILLFOOT DRIVE CARSEWOOD HOUSE HOWWOOD UNDER CONSTRUCTION PRIVATE BROWNFIELD 10 0 5 5 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF0936 BLEACH WORKS 64 MIDTON ROAD HOWWOOD LDP2 SITE PRIVATE GREENFIELD 19 0 0 0 0 0 0 0 0 0 0 0 19 Planning consent expired. Pipeline site, will be kept under review in preparing LDP3 NO Page 56 of 106
Page 61
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 47 Estimated housing site delivery programme LDP2 ref/HLA ref Site Address Planning Status Tenure Brownfield/ Greenfield Capacity Past CompleƟons Projected Delivery Comments/ constraints to delivery Town centre site? Short term Medium term Long term Pipeline 24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Post 34 RFRF1036 KILBARCHAN WEST PARISH CHURCH CHURCH STREET KILBARCHAN UNDER CONSTRUCTION PRIVATE BROWNFIELD (CONVERSION) 18 0 0 0 0 0 0 0 0 0 0 0 18 Site has planning consent but is being marketed again for sale. Pipeline site, will be kept under review in preparing LDP3 NO RFRF1038 11 STEEPLE STREET KILBARCHAN LDP2 SITE PRIVATE BROWNFIELD 5 0 0 0 0 0 0 0 0 0 0 0 5 Planning consent expired. Pipeline site, will be kept under review in preparing LDP3 NO RFRF1066 LDP2037 BARHILL CRESCENT, KILBARCHAN LDP2 SITE PRIVATE GREENFIELD 60 0 0 0 0 0 20 20 20 0 0 0 0 Programming agreed in HLA 24. NO RFRF1068 LDP2032 WEST OF BURNFOOT ROAD LOCHWINNOCH LDP2 SITE PRIVATE GREENFIELD 92 0 0 0 0 20 40 32 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1089 44 HIGH STREET LOCHWINNOCH WINDFALL PRIVATE BROWNFIELD 10 0 0 0 0 10 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF0977 NORTHBARR ERSKINE UNDER CONSTRUCTION PRIVATE GREENFIELD 195 141 37 17 0 0 0 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1079 TORRANCE HOUSE ERSKINE HARBOUR ERSKINE CONSENT PRIVATE BROWNFIELD 42 0 0 0 0 0 15 15 12 0 0 0 0 Programming agreed in HLA 24. NO RFRF1063 LDP2046 NORTHBAR PHASE 2 SITE BETWEEN SANDIELAND WOOD AND FLORISH ROAD ERSKINE CONSENT PRIVATE GREENFIELD 59 0 0 0 0 0 33 26 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1063A LDP2046 NORTHBAR PHASE 2 SITE BETWEEN SANDIELAND WOOD AND FLORISH ROAD ERSKINE CONSENT SOCIAL RENTED GREENFIELD 24 0 0 0 0 0 24 0 0 0 0 0 0 Programming agreed in HLA 24. NO RFRF1045 GREENHEAD NURSERY OLD GREENOCK ROAD INCHINNAN WINDFALL PRIVATE BROWNFIELD 15 0 0 0 0 0 0 0 0 5 10 0 0 Planning consent has expired but new planning applicaƟon is expected. Will be kept under review in preparing LDP3. NO RFRF1069 LDP2094 LAND AT BEARDMORE COTTAGES INCHINNAN LDP2 SITE PRIVATE GREENFIELD 10 0 0 0 0 0 0 0 0 0 0 0 10 Council not currently markeƟng site. Will be reviewed in preparing LDP3. NO Page 57 of 106
Page 62
Renfrewshire Local Development Plan – Delivery Programme | 2024 | 48 Appendix 1 – Housing Sites This publication can be made available in braille, large print or audio. If you would like information in another language please ask us. 0300 300 0144 LocalPlanConsultation@renfrewshire.gov.uk Page 58 of 106
Page 63
Appendix 2 Responses to consulta�on on the Renfrewshire Local Development Plan (LDP2) Dra� Delivery Programme Update Respondent Response summary Proposed Renfrewshire Council response SEPA SEPA welcomes its inclusion in ac�ons rela�ng to flood risk and drainage, heat networks and the prepara�on of a green network strategy, with the sugges�on that the strategy should consider blue infrastructure (water) as well as green. Noted. No change to the LDP2 Delivery programme is proposed in relation to this comment. Bridge of Weir Community Council It is difficult to discern an overall vision for Renfrewshire which includes a clear role for the villages. It is not the role of the Delivery Plan to set a vision for Renfrewshire. This is for the Local Development Plan itself. The comment is noted and we will work with Bridge of Weir Community Council and other communi�es to develop visions for all areas in the new Local Development Plan (LDP3). No change to the LDP2 Delivery programme is proposed in relation to this comment. Ac�on re Core Paths Plan, does this include maintenance? Around Bridge of Weir path maintenance is becoming a concern with seemingly no clear responsibility. This ac�on primarily relates to the iden�fica�on of the core path network and the update of the Core Paths Plan which was approved in 2022. However, an ac�on has been added rela�ng to the maintenance of core paths. It should be noted that there is no statutory duty to maintain core paths, nor is the Council responsible for the maintenance of all paths in the core path network, some of which are not in Council ownership. Where the Council is responsible for a path, maintenance can be undertaken subject to available resources. The Green Network Strategy ac�on should also include groups such as Crea�ng a Sustainable Gryffe. It is recognised that local interest groups will have a role in developing and implemen�ng a green network strategy or similar. Rather than name a specific group, ‘local interest groups’ will be added to the list of partners in Ac�on 37. Page 59 of 106
Page 64
Respondent Response summary Proposed Renfrewshire Council response Turley Associates represen�ng Buccleuch Property Wording provided to clarify and update Ac�on 1 rela�ng to Advanced manufacturing Innova�on District Scotland (AMIDS). The changes suggested have been incorporated into the finalised LDP2 Delivery Programme Update. Sco�sh Forestry Advises that Sco�sh Forestry look forward to seeing more detail on how the Council proposes to manage, protect and enhance its trees, woodland and forest resources to address the biodiversity and climate emergencies. The Council will be preparing a Forestry and Woodland Strategy as part of its Local Development Plan (LDP3) processes. No change to the LDP2 Delivery programme is proposed in relation to this comment. Homes for Scotland It is suggested that the Delivery Programme is updated annually to account for changes to capital programmes and new development pressures. This is likely to be the last Delivery Programme associated with LDP2 as a Proposed Delivery Programme will be published alongside the Proposed LDP3 in 2026. No change to the LDP2 Delivery programme is proposed in relation to this comment. The Council should detail specific ac�ons that are required to deliver development sites, �mescales for this and who is responsible for addressing the ac�on. Whilst recognising that this could be beneficial, it is considered that to do this for each of the 120 housing sites listed in the LDP2 Delivery Programme would be resource intensive and would divert from the prepara�on of the new local development plan (LDP3). This will be considered as part of the Proposed Delivery Programme will be published alongside the Proposed LDP3 in 2026 No change to the LDP2 Delivery programme is proposed in relation to this comment. The Delivery Programme should include accurate costs for poten�al contribu�on rates per house as well as the likely split of costs between lead and suppor�ng delivery partners. Greater certainty on poten�al direct and indirect developer contribu�ons will allow developers to factor this into their viability assessments and for the Council to understand where �mescales for delivery do not align. Whilst recognising that this could be beneficial, it is considered that to do this for each of the 120 housing sites listed in the LDP2 Delivery Programme would be resource intensive and would divert from the prepara�on of the new local development plan (LDP3). This will be considered as part of the Proposed Delivery Programme will be published alongside the Proposed LDP3 in 2026 No change to the LDP2 Delivery programme is proposed in relation to this comment. Page 60 of 106
Page 65
Respondent Response summary Proposed Renfrewshire Council response Medium or long term alloca�ons should have a site brief or masterplan. The Delivery Programme should include hyperlinks to masterplans. The Council should include details where design briefs of further masterplans may be prepared along with other poten�al interven�ons. Whilst recognising that this could be beneficial, it is considered that to do this for many of the housing sites listed in the LDP2 Delivery Programme would be resource intensive and would divert from the prepara�on of the new local development plan (LDP3). This will be considered as part of the Proposed Delivery Programme will be published alongside the Proposed LDP3 in 2026 No change to the LDP2 Delivery programme is proposed in relation to this comment. When reviewing alloca�ons within LDP2, where there is no planning permission or live applica�on for a site, the Council should write to the landowner/promoter to understand their inten�ons. The Council will contact land owners/promoters of all sites being suggested/considered for inclusion in LDP3 as part of its site assessment exercise. No change to the LDP2 Delivery programme is proposed in relation to this comment. NatureScot Note NS is iden�fied as a lead/partner in rela�on to Ac�on 16 and will be content to input as required. Noted. However, NatureScot’s role in rela�on to this ac�on would be limited, so will be removed from list of partners. The ac�on is not currently within the Council’s work programme. Welcome being included in Ac�on 40 rela�ng to a review of sites for importance for nature conserva�on (SINCs) and Local Nature Reserves. Advise that SINCs are now known as Local Nature Conserva�on Sites. Noted. Reference changed to Local Nature Conserva�on Sites. Note NS is iden�fied as a lead/partner in rela�on to Ac�on 42 (Core Paths Plan). Noted. This ac�on is considered to be complete. No change to the LDP2 Delivery programme is proposed in relation to this comment. Welcome Ac�on 38 (Renfrewshire Biodiversity Ac�on Plan) and 41 (Support delivery of access and biodiversity interests through the Outdoor Access Forum and LBAP Steering Group). Noted. No change to the LDP2 Delivery programme is proposed in relation to this comment. Profectus Planning represen�ng XPE Braehead Ltd and XPE Braehead Leisure Ltd Respondents are owners of Xsite leisure atrac�on. The Braehead Masterplan referenced in the dra� Delivery Programme Update (Ac�on 9) is now somewhat dated and unlikely to be implemented in its previously envisaged form. Noted. The Delivery programme will be updated to reflect that the current masterplan is unlikely to be implemented and a revised masterplan will be considered as part of the LDP3 process. Page 61 of 106
Page 66
Respondent Response summary Proposed Renfrewshire Council response The owners would be keen to work with Renfrewshire Council to prepare a new masterplan for the Braehead strategic centre. This may involve residen�al development, which would be consistent with Ac�on 12. Support is offered for Ac�on 26 re enhancing public transport facili�es at Braehead, and Ac�on 34 re the inves�ga�on of poten�al measures to improve traffic flows on the strategic road network, and that these maters will be addressed through LDP3. Support for other ac�ons is noted. Profectus Planning represen�ng Braehead Glasgow Ltd and Braehead Park Investments Ltd Respondents are owners of Braehead Shopping Centre and Braehead Retail Park. The Braehead Masterplan referenced in the dra� Delivery Programme Update (Ac�on 9) is now somewhat dated and unlikely to be implemented in its previously envisaged form. The owners would be keen to work with Renfrewshire Council to prepare a new masterplan for the Braehead strategic centre. This may involve residen�al development, which would be consistent with Ac�on 12. Support is offered for Ac�on 26 re enhancing public transport facili�es at Braehead, and Ac�on 34 re the inves�ga�on of poten�al measures to improve traffic flows on the strategic road network, and that these maters will be addressed through LDP3. Support is offered for Ac�on 7 regarding the delivery of the Renfrewshire Tourism Plan, as Braehead is a key part of Renfrewshire’s tourist and visitor economy. Noted. The Delivery programme will be updated to reflect that the current masterplan is unlikely to be implemented and a revised masterplan will be considered as part of the LDP3 process. Support for other ac�ons is noted. Strathclyde Partnership for Transport and Historic Environment Scotland responded to advise that they had no comments on the Dra� Delivery Programme Update. Page 62 of 106
Page 67
SUMMARY OF APPLICATIONS TO BE CONSIDERED BY THE PLANNING AND CLIMATE CHANGE POLICY BOARD ON 21/01/2025 RENFREWSHIRE COUNCIL Item No.PROPOSAL:LOCATION:APPLICANT: WARD: APPN. NO: 24/0221/PP Mr Paul O'Brien Enva 49 Burnbrae Road Linwood Paisley PA3 3BD 49 Burnbrae Road Linwood Paisley Section 42 application to vary conditions 3 and 4 (to clarify the types of waste operations permitted within the site and include for the handling of non-hazardous solid industrial and commercial waste) of planning permission 11/0431/PP Ward 10 RECOMMENDATION: Grant Subject to Conditions A 24/0444/PP Miller Homes Ltd Clydesdale House 300 Springhill Parkway Bailleston Glasgow G69 6GA Land At Glenfield Road Caplethill Road Paisley Infilling and regrading of land Ward 6 RECOMMENDATION: Refuse B 24/0851/TP Mrs Carolynne Penman CALA Management Ltd McLellan Works 274 Sauchiehall Street Glasgow G2 3EH Main Building And Grounds Dykebar Hospital Grahamston Road Paisley PA2 7DE Treeworks application to include tree removal and pruning Ward 6 RECOMMENDATION: Grant C 24/0653/FUR Greenhead Homes Limited 59 Bonnygate Cupar Fife KY15 4BY Greenhead Nursery And Adjacent Vacant Land Old Greenock Road Inchinnan Section 42 application to modify conditions of planning permission 19/0444/PP relating to the erection of residential development comprising 15 dwellinghouses with associated access road, drainage and landscaping Ward 12 RECOMMENDATION: Grant Subject to Conditions & S75 D Total Number of Applications to be considered = 4 Item 3 PACC210125 Page 63 of 106
Page 68
Page 64 of 106
Page 69
Report by Chief Planning Officer Planning and Climate Change Policy Board: 21 January 2025 Reference No 24/0221/PP Application Type Planning Permission-Full Proposal Section 42 application to vary conditions 3 and 4 (to clarify the types of waste operations permitted within the site and include for the handling of non-hazardous solid industrial and commercial waste) of planning permission 11/0431/PP Location 49 Burnbrae Road, Linwood, Paisley Ward 10 - Houston, Crosslee and Linwood Community Council Elderslie Community Council Applicant Mr Paul O'Brien Enva Recommendation Grant subject to conditions All plans, reports, documents and representations relating to this application can be viewed in full online at https://pl-bs.renfrewshire.gov.uk/online- applications/applicationDetails.do?activeTab=summary&keyVal=SAL4XGMWG9L00. This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013. The report is presented to the Planning and Climate Change Policy Board in line with the Council's Scheme of Delegation. While the application would normally fall within the scheme of delegation to be determined by officers, the scheme of delegation allows for officers to refer applications to the board. The application has been referred in this instance to allow the application to be fully considered given the site history and the potential environmental matters associated with waste management facilities. Proposal This application seeks permission under Section 42 of The Town and Country Planning (Scotland) Act 1997 (as amended) to vary conditions 3 and 4 of planning permission 11/0431/PP which relates to waste management operations at the ENVA facility on Burnbrae Road, Linwood. Planning permission 11/0431/PP sought to vary conditions associated with the original planning permission 97/0920/PP with respect to changing the boundary whereby waste can be stored, recycled and transferred, and the types of waste which can be handled at the site. Condition 3 of planning permission 11/0431/PP relates to areas where the reception, storage and handling of municipal solid waste shall be restricted to. It is worded as follows: That all activities related to the reception, storage, and handling of municipal solid waste (MSW) shall be restricted to, and contained entirely within, the building coloured green and marked "Proposed Building" on Drawing Number 76/000/PA/04 Revision A and as detailed in Drawing Numbers 76/000/PA/07, 76/000/PA/08 and 76/000/PA/09. Reason: In the interest of amenity and to define the permission. Condition 4 relates to the types of waste that can be processed at the site. It is worded as follows: That the materials which can be received, handled, sorted, crushed, shredded, processed and stored on the site shall be restricted to waste cardboard, plastics, glass, tiles, brick, Item 3(a) PACC210125 Page 65 of 106
Page 70
concrete, aggregate and waste arising from construction or demolition works and shall exclude clinical waste or special waste other than waste electrical or electronic equipment (WEEE) items which contain some components which classify the items as special wastes unless otherwise restricted or allowed for by reference to conditions 2 and 3 above. Reason: To define the permission and in the interests of amenity. The proposed variation seeks to broaden the types of waste which can be handled at the site, and specifically the ability to accept non-hazardous solid industrial and commercial wastes (NHSICW). This will allow the operator to future proof its services and provide more flexibility to respond to commercial demands. The immediate intention is to start accepting leather waste from a local manufacturer. The leather waste would be shredded, and then sent offsite to an energy from waste plant. The variation to the wording of conditions 3 and 4 as proposed by the applicant is therefore as follows: Condition 3 That all activities related to the reception, storage and handling of municipal solid waste (MSW) and non-hazardous solid industrial and commercial waste (NHSICW) shall be restricted to, and contained entirely within the building coloured green and marked "Proposed Building" on Drawing Number 761000/PA/04 Revision A and as detailed in Drawing Numbers 761000/PA/07, 761000/PA/089 and 761000/PA/09. It is noted that the drawings references on condition 3 contain a typographical error whereby / has replaced 1. This has been corrected. Condition 4 That the materials which can be received, handled, sorted, crushed, shredded, processed and stored on the site shall be restricted to waste cardboard, plastics, glass, tiles, brick, concrete, aggregate, waste arising from construction or demolition works, and other non- hazardous solid industrial and commercial waste (NHSICW). Clinical waste or special waste (other than waste electrical or electronic equipment (WEEE) items which contain some components which classify the items as special wastes) shall not be received within the site unless otherwise allowed for by reference to condition 3 above. It should be noted that the inclusion of NHSICW would allow for a range of additional wastes to be processed at the site, provided they were from industrial and commercial sources, non- hazardous and in a solid state. However as per condition 3 any wastes that fall within this category would still need to be received, stored, and handled within a building. The applicant advises that the leather waste they are proposing to process at the site is approx. 800 tonnes a year. This equates to approx. 82 additional deliveries a year. The applicant further advises that the SEPA waste management licence at the site allows a maximum of 500,000 tonnes of waste to be received in total each year. However, over the last five years the actual amounts received have ranged between 171,000 tonnes and 267,000 tonnes per annum. Site Description The ENVA facility is located within the Burnbrae local industrial area. It comprises of a mix of buildings spread over the 10.6 hectare site area. The site is bound by a railway line and cycle path to the south and south west, a logistics warehouse to the west, Burnbrae Road to the north with open space beyond, and Old Patrick Wate to the east with a long stay car park Page 66 of 106
Page 71
beyond. The nearest residential properties are on Old Road in Elderslie which are located on the opposite side of the railway line to the south of the site. Pre-Application Consultation with Officers The Scottish Government strongly encourages constructive pre-application discussions between prospective applicants and the planning authority. Pre-application discussions seek to identify key planning considerations at an early stage and help inform what supporting information is required to support a subsequent application. Pre-application discussions have taken place, focusing on the following matters: ▪ The requirement for a Section 42 application to vary the conditions, and a list of information required to support the application. Negotiated Improvements Following submission, the following changes have been negotiated between officers and the applicant: No changes have been negotiated. Site History Application No: 09/0535/PP Description: Erection of building to accommodate a biomass power plant and installation of associated plant and equipment. Decision: Grant subject to conditions Application No: 11/0431/PP Description: Amendments to planning consent 97/0920/PP: 1. Change of planning boundary to incorporate an area to the west of the existing boundary for the recovery, recycling, storage and transfer of wastes; 2. Amendment of Condition 2 regarding the type of waste to b Decision: Grant subject to conditions Application No: 10/0433/EO Description: Amendment to Condition 5 of planning permission 97/0920/PP to extend operating hours to 0600 hours to 2300 hours Mondays to Fridays, 0700 hours to 2200 hours Saturdays and 0800 hours to 2200 hours Sundays and amendment to Condition 2 regarding type of was Decision: Withdrawn Application No: 10/0769/NO Description: Amendment of Condition 2 of planning consent 97/0920/PP regarding the type of waste to be handled on the site, to allow for receipt, storage and processing of municipal solid waste; Amendment of Condition 5 to extend operating hours of timber process to t Decision: Accepted; Application No: 10/0033/PP Description: Erection of new enclosure to baling plant. Decision: Grant subject to conditions Application No: 09/0296/SC Page 67 of 106
Page 72
Description: Request for scoping opinion for erection of biomass power plant Decision: Offer Observations Application No: 09/0117/EO Description: Request for screening opinion on need for Environmental Impact Assessment for erection of biomass power plant Decision: Environmental Assessment Required Application No: 08/1111/EO Description: Request for Screening Opinion in respect of the need for a Statutory Environmental Statement for biomass power plant Decision: Withdrawn Application No: 07/1270/VR Description: Modification of condition 2 of planning consent 97/0920/PP to read "That waste handled on the site shall exclude special, clinical, putrescible or general household waste and shall include household waste only as arising from construction or demolition wo Decision: Grant Consultations Glasgow Airport Safeguarding - No objection. S.E.P.A. - No comments. Application does not meet threshold for consultation. Environment, Housing & Infrastructure (Env. Protection) - No comments. Chief Executive's Service (Roads Development) – No objection to increasing the tonnage at the site to 500,000 tonnes per annum. Enhancements are sought to the surrounding transport network which would improve active travel to the site. Scottish Water – No response received. Network Rail - No objections. NATS - No objections. The Coal Authority - No comments. Representations The application has been publicised in line with the requirements of the relevant legislation. The following representations were received: Object - 0 Support - 0 Neutral - 0 Policy Context In making any determination under the Planning Acts, regard is to be had to the development plan unless material considerations indicate otherwise. In this instance the Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire Local Development Plan (2021) (LDP). Page 68 of 106
Page 73
The following provisions of the Development Plan are considered relevant to the determination of this application: National Planning Framework 4 Policy 1 - Tackling the climate and nature crises Policy 2 - Climate mitigation and adaptation Policy 3 - Biodiversity Policy 12 - Zero waste Policy 13 - Sustainable transport Policy 22 - Flood risk and water management Policy 26 - Business and industry Full details relating to the policies of the NPF4 can be found online. Renfrewshire Local Development Plan Policy E1 - Renfrewshire's Economic Investment Locations Policy ENV2 - Natural Heritage Policy ENV4 - The Water Environment Policy ENV5 - Air Quality Policy I1 - Connecting Places Policy I5 - Waste Management New Development Supplementary Guidance Delivering the Economic Strategy – Economic Investment Locations Delivering the Environment Strategy – Natural Heritage, The Water Environment, and Air Quality Delivering the Infrastructure Strategy – Connecting Places Full details relating to the policies of the LDP can be found online. Other relevant policies and guidance Scotland's Zero Waste Plan Submitted Reports and Assessments The following reports and assessments were submitted in support of the application: Planning Statement - Provides further background and context to the proposed variation of condition, and an assessment against the applicable development plan policies and guidance. Transport Statement – Primary purpose of the statement was to assess the implications of processing 500,000 tonnes of waste at the site on the road network. The statement also reviews accessibility to the site for all transport modes. The statement concludes that the anticipated level of traffic generation associated with an annual tonnage of 500,000 would have a minimal impact on the road network. While a review of accessibility has been undertaken, any proposals to enhance accessibility are considered by the applicant to fall outwith the scope of the assessment of this application. Scottish Ministers Direction In determining a planning application, the Council is required to provide details of any Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation), Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the grant of planning permission) and Regulation 33 (Directions requiring consideration of condition) of The Town and Country Planning (Development Management Procedure) Page 69 of 106
Page 74
(Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development) of The Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2017. None. Planning Assessment This application has been submitted under Section 42 of the Town and Country Planning (Scotland) Act 1997. In this respect, the Council may only take into consideration the acceptability of any existing and proposed conditions. However, in some cases this does not preclude the consideration of the overall effect of granting a new planning permission primarily where the previous permission has lapsed or is incapable of being implemented. ENVA is an established recycling facility that processes a range of materials in accordance with the relevant planning conditions. In land use terms its location is consistent in principle with policies 21 of NPF4 and E1 of the LDP which provide support for a wide range of employment generating uses. Policy I5 of the LDP and 12 of NPF4 seek to promote and facilitate development that is consistent with the waste hierarchy and would support delivery of the zero waste plan. ENVA is licensed for waste management processes by SEPA. The proposal to process non- hazardous solid industrial and commercial waste (NHSICW) would further diversify the waste streams that are recycled at the facility in accordance with the waste hierarchy and the zero waste plan. NHSICW potentially covers a broad range of waste types. However, in this instance the applicant has made specific reference to processing leather waste. This waste would be shredded within the Refuse Derived Fuel (RDF) facility and then sent for onward transport to an energy from waste facility. The applicant advises that the leather waste is not odorous. The Environmental Protection Team have not made any comment on the application. SEPA have advised that the application falls below their threshold for providing specific advice. It is noted that environmental matters at the site are regulated by SEPA via the waste management licence. On the basis that the NHSICW waste stream is non hazardous, the waste will be sorted and processed within a building, and there have been no objections from the Environmental Protection Team or SEPA, I am satisfied that the processing of NHSICW at the site will not have a detrimental impact on the amenity of surrounding land uses or the environment. It is acknowledged that the introduction of NHSICW at the site could result in waste streams other than leather from being processed at the site. Environmental matters arising from these other wastes would be a matter for SEPA to monitor through the waste management licence. The applicant has advised that an amendment to the waste management licence is required to accommodate the NHSICW. Again, there has been no objection from SEPA to this application. There are no significant built heritage or natural environment impacts associated with the development, and there will be no adverse effect on the integrity of any European sites. In view of the above, it is considered that the development complies with Policies 3 and 22 of NPF4 and ENV2, ENV4 and ENV5 of the LDP as there are no significant impacts anticipated with regard to the natural environment, water environment, air quality, or biodiversity. Page 70 of 106
Page 75
It is also considered that the facility will be able to co-exist with existing neighbouring uses and is compatible with the core role and function of the Burnbrae local industrial area. It is noted that there are several other waste transfer and recycling facilities along Burnbrae Road. The development is therefore also compliant with policies 21 of NPF4 and E1 of the LDP. The Roads Development Officer has advised that the additional trips associated with processing the leather waste will not have a significant detrimental impact on the local road network. The additional trips amount to approx. 82 additional deliveries a year. However as noted above the introduction of NHSICW at the site could result in waste streams other than leather from being processed at the site. This in turn could generate additional trips to the site. At present the tonnage allowances at the site are set out within the waste management license only, and there are no planning conditions that place a limit on the tonnage which can be processed at the site. While the Roads Development Officer has not objected to the scale of the current operations, or the increase associated with the processing of leather waste (noted as approx. 800 tonnes per annum), the initial submission did not include an assessment of the potential impact of 500,000 tonnes of waste being processed at the site in accordance with the SEPA licence. The applicant was initially advised that the Council would seek to introduce a condition limiting the tonnage allowance at the site in the interests of the safe and efficient operation of the road network and to retain control over the scale of the development. The applicant advised that the maximum tonnage received by the facility in the last five years is 267,000 tonnes. Taking the additional NHSICW into account it was considered reasonable to restrict the tonnage which can be received by the facility to 300,000 tonnes per year. The applicant was advised of the intention to attach a condition limiting throughout to 300,000 tonnes per year unless they could justify that throughput in excess of this would be acceptable with regard to the impact on the road network. In response the applicant has submitted a Transport Statement which seeks to justify a throughput of 500,000 tonnes in pine with the allowance as set out in the waste management licence. The Transport Statement concludes that a throughput of 500,000 tonnes would not have a significant impact on the road network. The Roads Development officer has not objected to the conclusions within the Transport Statement. On this basis the condition restricting throughput at the site can be set at 500,000 tonnes per annum. The Roads Development Officer has also sought enhancements to the surrounding transport network to support active travel to the site. These include upgrading footways, and forming a direct connection between the site and the National Cycle Network which is located to the south west. While such enhancements would be desirable, it is noted that the scope of the proposed variation relates to the types of waste being handled at the site. The proposed conditions seek to manage the operation of the site in this regard. It is considered that seeking enhancements to the wider transport network would be outwith the scope of the assessment of this application. In view of the above, it is considered that the development complies with policies 13 of NPF4 and I1 of the LDP. With regard to the remaining assessment criteria set out in NPF4 policy 12, the applicant has advised that they are exploring ways in which carbon emissions at the site can be reduced. This includes EV's for deliveries, and using a renewable energy provider for the facility. Page 71 of 106
Page 76
The railway line acts as a suitable buffer zone between the site and neighbouring residential properties to the south. There are no additional buildings being proposed, and it is not considered neccesary to require any additional landscaping. There is a requirement to provide a restoration and aftercare scheme (including appropriate financial mechanisms) to ensure the site is suitably decommissioned and appropriately restored should the site close. Conditions can be applied which require such a scheme to be agreed with the Council. As this is an established site the criteria relating to co-location with end users of outputs is not wholly relevant. However, it is noted that the site is located within a local industrial area where related industrial uses would be acceptable in principle. The proposed variation to condition 3 and 4 will bring environmental benefits by allowing an established recycling facility to process additional waste in a manner that does not have a detrimental impact on the environment or amenity of neighbouring properties. It is considered that the variation complies with policies I5 of the LDP and 12 of NPF4. Finally, the development is considered to be consistent with policies 1 and 2 of NPF4 as it contributes to provision of a circular economy whereby the non-hazardous solid industrial and commercial waste (NHSICW) is recycled as opposed to being disposed of. If successful, the effect of a Section 42 application to modify a planning condition or conditions is to grant a further planning permission for the whole development again but with the amended condition or conditions replacing those that were previously issued, or with conditions removed if required. All other conditions, if relevant, are also required to be attached to any new planning permission. A review of the conditions attached to the previous planning permission 11/0431/PP has therefore been carried out. Condition 1 specified that the planning permission would lapse on the expiration of a period of 3 years unless the development to which it relates is begun. It is not neccesary to retain this condition as the time period for the consent is specified in the Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 (as amended) and is deemed to be imposed in this regard. Conditions 3 and 4 will be varied as per the above assessment. Condition 5 relates to the submission of a Bird Hazard Management Plan. This condition has previously been discharged. The condition will therefore be amended to ensure the approved Bird Hazard Management Plan continues to remain in force for the life of the development.. It is also noted that Glasgow Airport Safeguarding have not objected to the application. Conditions 2, 6, 7 and 8 shall be retained as previously worded. Additional conditions shall be imposed with regard to a restriction in the tonnage allowance which can be processed at the site, and the requirement to agree a restoration and aftercare scheme with appropriate financial mechanism. Section 75 Obligations Page 72 of 106
Page 77
The Council is required to provide a summary of the terms of any planning obligation which is required to be entered into under Section 75 of the Town and Country Planning (Scotland) Act in relation to the grant of permission for the proposed development: None. Conclusion In view of the above, it is considered that the proposal would accord with the relevant provisions of the Development Plan. There are no other material considerations. Planning permission should therefore be granted subject to conditions. Recommendation Grant subject to conditions Reason(s) for Recommendation 1. The proposal accords with the provisions of the Development Plan and there were no material considerations which outweighed the presumption in favour of development according with the Development Plan Condition(s) 1. That the activities which may take place in the "extension" area, (shown hatched in blue on the attached plan), either within buildings or on open ground, shall be restricted solely to the storage of materials and equipment. Details shall be submitted for the prior written approval of the planning authority in respect of the position, height and screening arrangements for any materials which are to be stored externally. Reason: In the interests of amenity. 2. That all activities related to the reception, storage and handling of municipal solid waste (MSW) and non-hazardous solid industrial and commercial waste (NHSICW) shall be restricted to, and contained entirely within the building coloured green and marked "Proposed Building" on Drawing Number 761000/PA/04 Revision A and as detailed in Drawing Numbers 761000/PA/07, 761000/PA/089 and 761000/PA/09. Reason: In the interest of amenity and to define the permission. 3. That the materials which can be received, handled, sorted, crushed, shredded, processed and stored on the site shall be restricted to waste cardboard, plastics, glass, tiles, brick, concrete, aggregate, waste arising from construction or demolition works, and other non-hazardous solid industrial and commercial waste (NHSICW). Clinical waste or special waste (other than waste electrical or electronic equipment (WEEE) items which contain some components which classify the items as special wastes) shall not be received within the site unless otherwise allowed for by reference to conditions 1 and 2 above. Reason: To define the permission and in the interests of amenity. 4. That the Bird Hazard Management Plan discharged via letter dated the 6th November 2013 shall remain in force for the life of the development. No subsequent alterations to the Bird Hazard Management Plan shall take place unless first submitted to and approved in writing by the Planning Authority. Page 73 of 106
Page 78
Reason: It is neccesary to manage the site in order to minimise its attractiveness to birds which could endanger the safe movement of aircraft and the operation of Glasgow Airport. 5. Lighting schemes required during construction and for the completed development shall be of a flat glass, full cut off design, mounted horizontally, and shall ensure that there is no light spill above the horizontal. Reason: To avoid endangering the safe operation of aircraft through confusion with aeronautical ground lights or glare. 6. That the operating hours for the wood recovery plant shall be restricted to 08.00 a.m. to 20.00 p.m. on Monday to Fridays, and 08.00 a.m. to 17.00 p.m. on Saturdays. Reason: In the interest of amenity. 7. Timber shall not be stored above the height of the front face of the bunker. Reason: In the interest of visual amenity. 8. The total volume of materials handled at the facility shall not exceed 500,000 tonnes per annum irrespective of the combination of materials handled at the site. Reason: To define the consent in the interests of amenity and traffic. 9. That within 3 months of the date of this planning permission, the operator shall submit a Closure, Restoration and Aftercare Management Plan for the written approval of the Planning Authority. The plan shall detail all measures associated with the decommissioning, cleaning, and rendering safe the facility following cessation of the waste management operations at the site and shall provide a timetable within which these measures will be undertaken and an aftercare plan to monitor success of restoration measures with scope for interventions if required. The restoration measures shall include (but not be limited to) the removal of all raw materials, wastes and other potentially contaminating substances present on the site to ensure the site does not pose a risk to public health, safety, the environment, and amenity. Reason: To ensure the decommissioning and removal of the waste materials is undertaken in an appropriate and environmentally acceptable manner and the restoration and aftercare of the site, in the interests of safety, amenity and environmental protection. 10. That within 6 months of the date of this planning permission, a financial guarantee to cover the costs of decommissioning, site restoration and aftercare, as required by condition 9 of this consent, shall be submitted for the written approval of the Planning Authority. The acceptability of such financial guarantee shall be at the sole discretion of the Planning Authority. The financial guarantee must: A) be granted in favour of the Planning Authority and shall be maintained in favour of the Planning Authority throughout the duration of this consent and until the completion of all decommissioning, site restoration and aftercare obligations as required by condition 9 of this consent. B) must be provided by an independent financial body with at least an A - rating who will be capable of fulfilling the obligations set out within the financial guarantee. Page 74 of 106
Page 79
C) be for an amount which covers the value of all decommissioning, site restoration and aftercare liabilities, such amount to be determined by the Planning Authority. D) be subject to a review every five years from the date of this consent, or other such intervals as agreed by the Planning Authority. Each review shall be undertaken by a suitably qualified independent professional who has relevant experience in such matters, the identity of whom has been agreed in writing by the Planning Authority prior to the review of the financial guarantee commencing. The review of the financial guarantee shall be submitted no later than three months prior to the expiry of the existing financial guarantee, for the written approval of the Planning Authority. Thereafter and at least 28 days prior to the expiry of the existing financial guarantee, the replacement financial guarantee in favour of and in terms acceptable to the Planning Authority and for the value advised by the review noted above, shall be submitted for the written approval of the Planning Authority. E) come into effect within 24 weeks of any Non-hazardous solid industrial and commercial wastes (NHSICW) being brought onto the site, and expire no earlier than 24 months after the end of the aftercare period. Reason: In the interests of amenity and in order to retain effective planning control. 11. In the event that the financial guarantee becomes invalid, has expired, or is terminated for any reason following the commencement of operations at the site, all operations at the site shall cease no later than three months from the date the financial guarantee became invalid, expired or terminated. If a replacement financial guarantee, which meets the requirements of condition 10, is approved by the Planning authority and duly executed before the end of the three-month period, the operations may continue. If the operations have ceased due to this clause, they may recommence only upon the approval and execution of a replacement financial guarantee. Reason: In the interests of amenity and in order to retain effective planning control. Advisory Note(s) None Schedule of Plans Determined Drawing Number Revision Drawing/Document Title 761000/PA/01 0 Site Location Plans For further information please contact James Weir, Development Standards Team, Email: james.weir@renfrewshire.gov.uk Page 75 of 106
Page 80
Page 76 of 106
Page 81
Report by Chief Planning Officer Planning and Climate Change Policy Board: 21 January 2025 Reference No 24/0444/PP Application Type Planning Permission Proposal Infilling and regrading of land Location Land at Glenfield Road, Caplethill Road, Paisley Ward 6 - Paisley Southeast Community Council Glenburn Community Council Applicant Miller Homes Ltd Recommendation Refuse All plans, reports, documents and representations relating to this application can be viewed in full online at https://pl-bs.renfrewshire.gov.uk/online- applications/applicationDetails.do?activeTab=summary&keyVal=SFQPGZMWIF900. This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013. The report is presented to the Planning and Climate Change Policy Board in line with the Council's Scheme of Delegation. In this instance, officers have declined to exercise delegated authority given the complex planning history of the site. Proposal This application seeks planning permission for the re-grading and infilling of land to the south of Caplethill Road, Paisley. The infill and regarding of the land would involve material of a volume of approximately 10,000m3 being deposited on the application site. The applicant in support of the application, has stated that the proposal is necessary due to a proposed footpath on the south side of Caplethill Road which forms part of the off-site works for an approved residential development on the north side of Caplethill Road, immediately adjacent to the site (20/0510/PP). The levelling of the land would mitigate health and safety concerns with the existing slope in proximity to the footpath. The materials would be imported from the adjacent housing site (20/0510/PP) which is currently under construction. Site Description The application site is located to the south of Paisley, on the edge of the town and immediately adjacent to an approved housing site which is currently under construction (20/0510/PP). The application site relates to an area of ground situated between Capltehill Road to the north and core path GB/9 to the east and core path SP/32 to the south. The ground slopes away from Capltehill Road and the core paths. The centre of the site is low lying wetland. Pre-Application Consultation with Officers The Scottish Government strongly encourages constructive pre-application discussions between prospective applicants and the planning authority. Pre-application discussions seek to identify key planning considerations at an early stage and help inform what supporting information is required to support a subsequent application. No pre-application discussions have taken place. Negotiated Improvements No changes have been negotiated. Site History Item 3(b) PACC210125 Page 77 of 106
Page 82
The planning history for the site is as follows; if no history is listed then planning has no record of previous applications for the site. None. It is of significance to note the planning history of the adjacent site: Application Number: 20/0510/PP Description: Erection of residential development comprising of 179 units with associated access, landscaping and ancillary works. Decision: Granted subject to conditions and S75 (Planning Appeal PPA-350-2041) Consultations NatureScot – No response. Environment, Housing & Infrastructure (Env. Protection) - No objections subject to conditions. Chief Executive's Service (Roads Development) - No objections subject to conditions. S.E.P.A. - No comments. There may be regulatory authorisation's required to undertake the engineering works in the water environment. Representations The application has been publicised in line with the requirements of the relevant legislation. The following representations were received: Object - 2 Support -0 Neutral - 0 The issues raised can be summarised as follows: 1. Evidence of protected species on site. The applicant has not provided any ecological assessment. 2. Potential concerns with regards to SEPA for the infilling of wetland. 3. The proposed footpath for the housing development (20/0510/PP) is not suitable as a safe route to school. Policy Context In making any determination under the Planning Acts, regard is to be had to the development plan unless material considerations indicate otherwise. In this instance the Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire Local Development Plan (2021) (LDP). The following provisions of the Development Plan are considered relevant to the determination of this application: National Planning Framework 4 Policy ENV1 - Green Belt Policy 3 - Biodiversity Full details relating to the policies of the NPF4 can be found online. Renfrewshire Local Development Plan Page 78 of 106
Page 83
Policy ENV1 - Green Belt Policy ENV2 - Natural Heritage Full details relating to the policies of the LDP can be found online. New Development Supplementary Guidance Delivering the Environment Strategy - Green Belt Development Criteria, Natural Heritage, Biodiversity. Submitted Reports and Assessments The following information was sought by the case officer: ▪ Purpose of infilling including the source/nature/volume testing of the materials; ▪ Ecological Survey; ▪ Details relating to the drainage of the site; ▪ Impact of the proposed development on trees; ▪ Details of proposed landscaping; and ▪ Details of how the site would be accessed. No reports or assessments were submitted in support of the application. Scottish Ministers Direction In determining a planning application, the Council is required to provide details of any Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation), Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the grant of planning permission) and Regulation 33 (Directions requiring consideration of condition) of The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development) of The Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2017. None. Planning Assessment Section 25 of the Town and Country Planning (Scotland) Act requires decisions on planning applications to be made in accordance with the development plan unless material considerations indicate otherwise. The Development Plan comprises the National Planning Framework 4 (2023) and the adopted Renfrewshire Local Development Plan (2021). The fourth National Planning Framework (NPF4) provides the long-term national spatial strategy for planning in Scotland. It sets out the Scottish Government's current view on delivering sustainable, liveable and productive places through the application of spatial principles. As the application site in this case is situated at a rural location which is designated as green belt in the adopted Renfrewshire Local Development Plan (LDP), Policy 8 and Policy ENV1 of the LDP are relevant to the assessment of this application as they set out specific circumstances in new will be supported in principle in green belt and rural areas. A summary of acceptable development includes: ▪ Development associated with agriculture, woodland creation, forestry and existing woodland; ▪ Residential accommodation required and designed for a key worker in a primary industry within the immediate vicinity of their place of employment; ▪ Horticulture; ▪ Outdoor recreation, play and sport or tourism uses; and developments that provide opportunities for access into the open countryside; ▪ Flood risk management; Page 79 of 106
Page 84
▪ Essential infrastructure or new cemetery provision; ▪ Minerals operations and renewable energy developments; ▪ Intensification of established uses; ▪ The reuse, rehabilitation and conversion of historic assets; or ▪ One-for-one replacements of existing permanent homes. It has not been demonstrated that the proposed development relates to any of the above development as an acceptable greenbelt use and as such, the proposal would not comply with Policy 8 and ENV1. Notwithstanding this, the New Development Supplementary Guidance, Green Belt Development Criteria sets out several criteria against which all development proposals within the green belt will be assessed. When the proposal is assessed, the following conclusions can be made. ▪ There would be no loss of prime quality agricultural land or of lesser quality that is locally important - The site is not characterised as prime agricultural land and there is no evidence that it is a locally important area of agricultural land. ▪ Adverse impacts on the qualities of wild land that cannot be overcome by siting, design, and other mitigation - the application is not supported by any information which demonstrates that the proposal /or landscaping would mitigate any impact on wild land. For clarity the site is considered to be defined as wild land. ▪ Traffic and access infrastructure can be sensitively accommodated - No details have been provided in respect of how the site would be accessed and material transported to the site. ▪ No significant effects on public water supply and water environment from any pollution risk - no evidence has been provided to suggest that the proposal would not result in significant pollution of any water supply. ▪ The development links to existing green network and active travel routes or provides new enhanced routes - The proposed development would not link to any active travel route, nor would it provide enhanced routes. ▪ Proposals to protect and provide access to open space have been incorporated - the proposal would not impact on any existing access to open space. However, it is considered that the proposal would result in the loss of an area of designated greenbelt land. ▪ Development will not have a significant detrimental impact on the local landscape character. Development layout, design and siting must reflect local landscape character and respect and incorporate important landscape features such as traditional field enclosures, water courses, woodlands, and skyline - given the low- lying nature of the site, it is unlikely that the development would have a significant detrimental impact on the local landscape character, however, no details have been provided in relation to the proposed landscaping associated with the proposed development or details relating to the removal of the existing landscaping including the removal of trees and shrubs. ▪ It can be demonstrated that there is careful consideration of the siting, design, scale and grouping of any buildings and infrastructure – There are no buildings proposed. Page 80 of 106
Page 85
▪ Appropriate landscaping proposals have been incorporated including the provision of well-designed boundary treatment - Policy ENV 2 advises that in considering tree or woodland removal, proposals should minimise any adverse impacts on habitats, species, network connectivity or landscape character. Policy 3 also states that proposals for local development should include appropriate measures to conserve, restore and enhance biodiversity, in accordance with national and local guidance. No landscaping or biodiversity enhancement scheme has been provided including details on any trees to be removed. ▪ There are adequate services available for the development, or this can be provided - due to the nature of the proposal, this would not be applicable. ▪ There is no significant detrimental effect on identified nature conservation interests, including species and habitats - The applicant has failed to submit Habitat /wildlife surveys in support of the application and therefore it cannot be concluded that there will be no significant detrimental impact on nature or conservation interests as a result of the application proposal. In conclusion, it is considered that there is insufficient justification to allow for the proposed development at this location, given the green belt designation of the application site. A suitable locational need for the development has not been demonstrated and none of the relevant Development Plan policies or guidance outlined above are considered to offer suitable support in principle to allow the proposed development at this location. Additionally, the application does not satisfy that the proposal would not adversely affect biodiversity including protected species. Therefore, the proposal is also found to be contrary to the relevant Development Plan policies and guidance on this point. For these reasons, it is therefore recommended that planning permission is refused. Representations Consideration of the representations received are noted below: 1. The applicant has failed to demonstrate that the proposed development would not have a detrimental impact on biodiversity. 2. SEPA have been consulted and advise that their Standing Advice would be relevant. 3. The principle of the footpath in relation to the off-site works for the housing development is not applicable to the proposal subject to this report. Planning Obligations The Council is required to provide a summary of the terms of any planning obligation which is required to be entered into under Section 75 of the Town and Country Planning (Scotland) Act in relation to the grant of permission for the proposed development: None. Conclusion In view of the above, it is considered that the proposal would not accord with the relevant provisions of the Development Plan and there are no other material considerations that would outweigh the provisions of the development plan. Planning permission should therefore be refused, Recommendation Refuse Reason(s) for Recommendation Page 81 of 106
Page 86
1. The proposal is contrary to the Policy 8 of NPF 4 and Policy ENV 1 of the Renfrewshire Local Development Plan and the associated New Development Supplementary Guidance as it has not been demonstrated that the proposal is an acceptable green belt use nor that it has a specific location need. 2. The proposed development is considered contrary to Policy 3 of NPF4 and Policy ENV2 of the Renfrewshire Local Development Plan and the associated New Development Supplementary Guidance as the applicant has failed to demonstrate that the proposed development would not have a detrimental impact on biodiversity and natural heritage, Condition(s) 1. None required. Advisory Note(s) 1. None required. Schedule of Plans Determined Drawing Number Revision Drawing/Document Title Stamped Drawing TP-01 Location Plan SK1000 Ground Re-Profiling Plan and Sections For further information please contact Fiona Knighton, Development Standards Team, Email: fiona.knighton@renfrewshire.gov.uk Page 82 of 106
Page 87
Report by Chief Planning Officer Planning and Climate Change Policy Board: 21 January 2025 Reference No 24/0851/TP Application Type Treeworks (TPO) Proposal Treeworks application to include tree removal and pruning Location Main Building and Grounds, Dykebar Hospital, Grahamston Road Ward 6 - Paisley Southeast Community Council Hawkhead and Lochfield Community Council Applicant Mrs Carolynne Penman CALA Management Ltd Recommendation Grant All plans, reports, documents and representations relating to this application can be viewed in full online at https://pl-bs.renfrewshire.gov.uk/online- applications/applicationDetails.do?activeTab=summary&keyVal=SNPCY2MWM3W00. This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013. The report is presented to the Planning and Climate Change Policy Board in line with the Council's Scheme of Delegation. In this instance, the application would normally fall within the Council's scheme of delegation to be determined by an appointed officer. In this instance Councillors Bruce MacFarlane, Kenny MacLaren and Mags MacLaren have requested that the application be determined by the Board, rather than officers due to the trees being protected by a Tree Preservation Order (TPO) and NPF4 Policy. Proposal Tree works consent is sought for tree felling and pruning works along the north and east boundary of the Dykebar Hospital grounds, where planning permission was approved at appeal by the Scottish Government for the erection of 603 dwellinghouses in March 2023 subject to suspensive conditions (19/0810/PP - PPA-350-2-38). As part of the application a detailed tree survey and arboricultural constraint report (August 2018 and updated August 2020) which identified eleven woodland areas and five scrub woodland areas across the wider hospital site, totalling 13.22 Ha, in addition to recording 336 individual specimen trees. The tree felling approved across the wider site as part of planning permission 19/0810/PP equates to 5.68Ha or thereby of woodland, comprising of 207 individual trees. This application was also subject to an Environmental Impact Assessment during the appeal process. The tree removal for the current tree work application is identified within areas W2, W4 and W9 and would comprise of the removal of approx. 1.17Ha woodland removal and 24 individual trees. As detailed above, the tree works as detailed in the current application have already been approved as part of planning application (19/0810/PP). However, the applicant wishes to carry out advanced arboricultural works to prepare the site for the commencement of development at the most suitable time of the year to minimise ecological impacts. Given the presence of the TPO, works to protected trees cannot be implemented until such time as all pre- commencement conditions have been discharged. The applicant has therefore submitted the current application and if approved, will enable advanced arboricultural works to be undertaken both, in advance of all pre-commencement conditions being discharged and at the most suitable time due to ecological constraints. The trees are protected by virtue of being located within Dykebar East Tree Preservation Order (Ref:93/9). Item 3(c) PACC210125 Page 83 of 106
Page 88
Site Description The trees included in the application are located along the north and east boundary of Dykebar Hospital grounds which is located to the south-east of Paisley, to the west of Grahamston Road. Pre-Application Consultation with Officers The Scottish Government strongly encourages constructive pre-application discussions between prospective applicants and the planning authority. Pre-application discussions seek to identify key planning considerations at an early stage and help inform what supporting information is required to support a subsequent application. No pre-application discussions have taken place. Negotiated Improvements Following submission, No changes have been negotiated. Site History The planning history for the site is as follows; if no history is listed then planning has no record of previous applications for the site. Application No: 22/0732/TP Description: Various works to multiple trees including felling of one Horse Chestnut and crown reduction of one Sycamore and one Ash Decision: Grant Application No: 24/0456/TP Description: Fell 1 x tree and treeworks to 3 x trees Decision: Grant subject to conditions Application No: 24/0678/NMV Description: Non-material variation of planning application 19/0810/PP to reposition apartment blocks, amend parking courts and include bin stances for apartment blocks Decision: Grant Application No: 24/0813/TP Description: Felling of seven trees Decision: Under Consideration Application No: 18/0392/NO Description: Erection of residential development with associated access and ancillary works Decision: Accepted; Application No: 19/0810/PP Description: Erection of 603 dwellinghouses with associated access, parking and landscaping. Decision: Refused Application No: 18/0491/EO Description: Request for a screening opinion for residential development. Decision: EIA not required Page 84 of 106
Page 89
Application No: 17/0828/TP Description: Removal of nine trees comprising four sycamore, four horse chestnut and one beech sapling and pruning works to 42 trees to include height reduction of one sycamore and one horse chestnut, crown reduction of one beech and one sweet chestnut and crown lift. Decision: Grant Application No: 15/0754/LB Description: Part demolition of hospital ward comprising the removal of walls and chimney stacks from front, sides and rear of building (in retrospect). Decision: Grant Application No: 15/0755/LB Description: Demolition of hospital ward. Decision: Grant Application No: 10/0339/PP Description: Change of use from former hospital ward to offices. Decision: Grant subject to conditions Application No: 09/0005/PP Description: Erection of external access ramps and internal alterations Decision: Grant subject to conditions Application No: 08/0817/PP Description: Erection of smokers' shelters, bike stand and ancillary works Decision: Grant subject to conditions Application No: 08/0947/TP Description: Felling of 12 no. trees and pruning of 4 no. trees Decision: Grant subject to conditions Application No: 09/0017/LB Description: Internal alterations and installation of new external ramps Decision: Grant subject to conditions Application No: 05/1344/PP Description: External alterations to form window openings from window and door openings. Decision: Grant subject to conditions Application No: 02/0548/TP Description: Crown lifting of 1 sycamore tree involving 4 branches. Decision: Grant subject to conditions Application No: 01/0587/PP Description: Erection of 22 dwelling houses (part amendment to planning consent 99/757/PP). Decision: Grant subject to conditions Application No: 05/1029/PP Description: Erection of 30 bed in-patient secure hospital facility. Decision: Grant subject to conditions Page 85 of 106
Page 90
Application No: 05/1061/TP Description: Various tree works to include felling of 7 trees, crown removal of 2 and pruning of 5 trees. Decision: Grant subject to conditions Application No: 95/1054/LB Description: Internal works to second floor to form six no. offices and separate toilet accommodation. Decision: Grant subject to conditions Application No: 95/0629/LB Description: Internal alterations and change of use of ward to form office. Decision: Grant subject to conditions Application No: 95/1133/PP Description: Erection of a conservatory as extension to day rooms. Decision: Grant subject to conditions Application No: 95/1224/PP Description: Extension and alterations to wards 1 & 2. Decision: Grant subject to conditions Application No: 94/1132/PP Description: Erection of a glazed courtyard canopy. Decision: Grant subject to conditions Application No: 94/1171/PP Description: Alterations and extension to existing hospital. Decision: Grant subject to conditions Application No: 93/1331/PP Description: Erection of extension to hospital offices. Decision: Grant subject to conditions Application No: 93/1310/PP Description: Extension to dayroom of Ward 8. Decision: Grant subject to conditions Application No: 94/0902/PP Description: Alteration and extension of wards 3 & 4. Decision: Grant subject to conditions Application No: 04/0163/PP Description: Erection of a single storey extension to north elevation of ward one incorporating new ramped entrance and reception area. Application No: 93/0965/TP Description: Felling of 50 trees. Decision: Permission Not required Application No: 93/0900/PP Description: Alterations to existing hospital ward to form office accommodation. Decision: Grant subject to conditions Application No: 93/0899/LB Page 86 of 106
Page 91
Description: Alterations to existing hospital ward to form office accommodation. Decision: Grant subject to conditions Consultations None. Representations The application has been publicised in line with the requirements of the relevant legislation. One representation was received where concerns were raised with regards to: - 1. Loss of trees through the development of the Dykebar Hosiptal site (19/0810/PP); 2. Up to date surveys should e in place by ecologists and protection measures in place to lessen impact on wildlife; 3. Contrary to NPF4 and Local Development Plan; 4. Concerns over accuracy of description for W4 within the Arboricultural Method Statement with regards to tree types; 5. Loss of recreational value. There are well used paths through the woodlands and they are not indicated on the Arboricultural Method Statement; 6. Loss of sense of arrival, Master Plan amended to retain trees at northern entrance to the housing development (19/0801/PP). The submitted Arboricultural Method Statement does not reflect this. Policy Context In making any determination under the Planning Acts, regard is to be had to the development plan unless material considerations indicate otherwise. In this instance the Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire Local Development Plan (2021) (LDP). The following provisions of the Development Plan are considered relevant to the determination of this application: National Planning Framework 4 Policy 6 - Forestry, woodland and trees Full details relating to the policies of the NPF4 can be found online. Renfrewshire Local Development Plan Policy ENV2 - Natural Heritage Full details relating to the policies of the LDP can be found online. Other relevant policies and guidance Renfrewshire New Development Supplementary Guidance - Delivering the Environment Strategy - Trees, Woodlands and Forestry Renfrewshire Planning & Development Tree Policy - 2022 The tree works approved under planning approval 19/0810/PP is also a material consideration. Submitted Reports and Assessments The following reports and assessments were submitted in support of the application: Tree Works Application Supporting Statement - Contains details of the planning history of the site, including details of TPO and proposed works. Page 87 of 106
Page 92
Documents that were approved as part of planning consent 19/0810/PP were also submitted including: - Arboricultural Method Statement, Dykebar Place Making Strategy and Dykebar Maintenance Plan. Scottish Ministers Direction In determining a planning application, the Council is required to provide details of any Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation), Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the grant of planning permission) and Regulation 33 (Directions requiring consideration of condition) of The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development) of The Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2017. None. Planning Assessment Section 159 of the Town and Country Planning (Scotland) Act 1997 places a duty on a planning authority to include appropriate provisions for the preservation and planting of trees within its area. Tree Preservation Orders (TPOs) are confirmed where the Council has decided that a tree or group of trees are worthy of protection. Works to trees in TPOs therefore need to demonstrate that the proposed works are required either in the interest of safety or that they would not have a negative effect on the TPO. With respect to planning policy, National Planning Framework 4 (NPF4) provides the long- term national spatial strategy for planning in Scotland. It sets out the Scottish Government's current view on delivering sustainable, liveable and productive places through the application of spatial principles. It is considered that the proposals comply with the overall scope of NPF4. Policy 6 (Forestry, woodland and trees) of NPF4 outlines a commitment to support the protection, expansion and improvement of tree and woodland cover for its nature conservation value. Policy ENV 2 of the Adopted Renfrewshire Local Development Plan (2021) and the New Development Supplementary Guidance (2022) also support these principles, while Renfrewshire Council's Tree Policy provides additional guidance including a recommendation that all proposed tree felling should be justified in writing by reputable tree surgeon confirming that. As discussed above, the tree works were previously approved by the Scottish Government through planning permission 19/0810/PP - PPA-350-2-38. The approved development design was informed by detailed tree surveys, which were the basis of the forestry chapter of the Environmental Impact Assessment that was carried out during the planning appeal process. The approved development also includes the requirement for compensatory planting both within and off-site that would result in a net increase in tree planting of 0.74Ha. Condition 18 of planning permission 19/0810/PP also required an arboricultural method statement and long term tree/woodland management and maintenance plan for the wider site. This included details of how retained trees would be protected on site through construction and future use of the site and the tree/woodland and maintenance of newly planted trees. Following consultation with Scottish Forestry, this was also deemed to be acceptable. The advanced arboricultrual works would allow for the preparation of the approved development at the appropriate time. It is considered that the proposed works have been fully considered and approved as part of planning permission 19/0810/PP which was also subject Page 88 of 106
Page 93
to an Environmental Impact Assessment. Due to ecological constraints with regards to the timing of these works and given the existing planning permission, given the existing consent it is considered reasonable that the proposed treeworks could be undertaken in advance of the full discharge of pre-commencement conditions for the approved application. Representations In response to the concerns raised in the representation, this is summarised as follows: - 1. Loss of trees through the development of the Dykebar Hosiptal site (19/0810/PP); As discussed above, the tree works were previously approved by the Scottish Government through planning permission 19/0810/PP - PPA-350-2-38. The approved development design was informed by detailed tree surveys, which were the basis of the forestry chapter of the Environmental Impact Assessment that was carried out during the planning appeal process. The approved development also includes the requirement for compensatory planting both within and off-site that would result in a net increase in tree planting of 0.74Ha. 2. Up to date surveys should be in place by ecologists and protection measures in place to lessen impact on wildlife; The Supporting Statement submitted with the application states that a variety of ecological surveys have been carried out on site from 2018 to the present day to ensure accurate knowledge of the site’s flora and fauna. Works would also be carried out in consultation and under the supervision of the project ecologist; where requires, and NatureScot to ensure that the works accord with the site-specific Badger and Bat Protection Plans and associated ecological legislation, guidance and best practice for the constraints from nesting birds. The necessary licences would also be obtained from NatureScot. 3. Contrary to NPF4 and Local Development Plan; As discussed above, the proposed treeworks have been previously been assessed and approved by the Scottish Government through planning permission 19/0810- PPA- 350-2-38 which is a significant material consideration in the assessment of the proposal. As such, it is considered reasonable that the current treeworks application is approved in-line with this consent. The advanced arboricultrual works would allow for the preparation of the approved development at the appropriate time. It is considered that the proposed works have been fully considered and approved as part of planning permission 19/0810/PP which was also subject to an Environmental Impact Assessment. 4. Concerns over accuracy of description for W4 within the Arboricultural Method Statement with regards to tree types; As discussed above, the proposed treeworks align with the treeworks already approved under application 19/0810/PP which was fully assessed and considered by the Scottish Government. 5. Loss of recreational value. There are well used paths through the woodlands and they are not indicated on the Arboricultural Method Statement; Page 89 of 106
Page 94
The impact of recreational routes and the loss of trees was fully considered and assessed by the Scottish Government as part of the consented development (19/0810/PP) 6. Loss of sense of arrival, Master Plan amended to retain trees at northern entrance to the housing development (19/0801/PP). The submitted Arboricultural Method Statement does not reflect this. Noted. A revised Arboricultural Method Statement has been submitted to reflect this. Planning Obligations The Council is required to provide a summary of the terms of any planning obligation which is required to be entered into under Section 75 of the Town and Country Planning (Scotland) Act in relation to the grant of permission for the proposed development: None. Conclusion In view of the above, it is considered that the proposal would accord with the relevant provisions of the Development Plan. There are no other material considerations. The tree works application should therefore be approved. Recommendation Grant Reason(s) for Recommendation 1. The proposal accords with treeworks approved under planning application 19/0810- PPA-350-2-38, and the advanced arboricultrual works would allow for the preparation of the approved development at the appropriate time. Condition(s) 1. None required. Advisory Note(s) 1. None required. Schedule of Plans Determined Drawing Number Revision Drawing/Document Title Stamped Drawing 0251-006 Location Plan V2 Supporting Statement Advanced Arboricultural Works Supporting Statement Dykebar Arboricultual Method Statement Dykebar Placemaking Strategy Dykebar Tree Maintenance Plan Page 90 of 106
Page 95
For further information please contact Fiona Knighton, Development Standards Team, Email: fiona.knighton@renfrewshire.gov.uk Page 91 of 106
Page 96
Page 92 of 106
Page 97
Report by Chief Planning Officer Planning and Climate Change Policy Board: 21 January 2025 Reference No 24/0653/FUR Application Type Further Application Proposal Section 42 application to modify conditions of planning permission 19/0444/PP relating to the erection of residential development comprising 15 dwellinghouses with associated access road, drainage and landscaping Location Greenhead Nursery And Adjacent Vacant Land, Old Greenock Road, Inchinnan Ward 12 - Erskine and Inchinnan Community Council Inchinnan Community Council Applicant Greenhead Homes Limited Recommendation Grant Subject to Conditions & S75 All plans, reports, documents and representations relating to this application can be viewed in full online at https://pl-bs.renfrewshire.gov.uk/online- applications/applicationDetails.do?activeTab=summary&keyVal=SJWPI9MWKD100 This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013. The report is presented to the Planning and Climate Change Policy Board in line with the Council's Scheme of Delegation. In this instance, officers have declined to exercise delegated authority given the recent enforcement case relating to the site and public interest in the proposed development. Proposal This application seeks permission under Section 42 of The Town and Country Planning (Scotland) Act 1997 (as amended) to modify the conditions attached to planning permission 19/0444/PP which relates to the erection of a residential development comprising 15 dwellinghouses with associated access road, drainage and landscaping at a site on Old Greenock Road, Inchinnan, known as the former Greenhead Nursery. The proposal seeks to amend the conditions as follows: ▪ Introduce a new condition which requires the consent to be implemented within three years of the date of the consent; ▪ Modify condition 4 to reflect landscaping proposals which have been submitted and considered to be acceptable to the Planning Authority. The condition would reference the landscaping plan in question. ▪ Modify condition 6 to reflect the details relating to facing materials which have been submitted and considered to be acceptable to the Planning Authority. The condition would reference the facing materials in question. ▪ Amalgamate conditions 7 and 8 into one condition to reflect that the boundary treatments have been submitted and are considered acceptable to the Planning Authority. The condition would require the boundary treatments to be implemented in line with the submitted details. It is proposed that conditions 2, 3 and 5 as attached to planning consent 19/0444/PP would be reattached in their existing form. Item 3(d) PACC210125 Page 93 of 106
Page 98
Site Description The site is currently disused and overgrown and sits between Inchinnan Playing Fields and an existing housing development accessed from Ladyacres. It is relatively flat with existing areas of hardstanding associated with the previous use. There are three private residencies within immediate vicinity of the site, namely Greenhead Farm, Greenhead Cottage and Craigdene. The former nursery was accessed by vehicles via the existing road access off Old Greenock Road, which services the residential properties of Greenhead Cottage, Craigdene and Greenhead Farm. The site is bounded to the south and southeast by open agricultural fields, to the north across Old Greenock Road by Inchinnan Primary School and a care for the elderly and to the west by Inchinnan playing fields. It should be noted that development on the site has commenced with evidence of the formation of an access road and aspects relating to drainage proposals. Background Planning consent was granted in December 2019 subject to conditions, which included five pre-commencement conditions, each of which required to be satisfied prior to the commencement of the development in question. It is significant to note that shortly after the grant of planning application 19/0444/PP, a number of national lockdowns were implemented as a result of the coronavirus pandemic and as such this delayed the submission of details relating to the pre-commencement conditions and ultimately the implementation of the consent. As a result of emergency coronavirus legislation, planning consents due to expire within the emergency period (7th April 2020 to 30th September 2022) were granted an extended implementation date of 31st March 2023. In applying the emergency legislation to planning consent 19/0444/PP it is significant to note that the consent was due to expire outwith the emergency period as prescribed by the aforementioned emergency legislation and in this regard the planning consent required to be implemented by 22nd December 2022. It should be noted that all pre-commencement conditions had not been discharged prior to the expiry date of 22nd December 2022 and the consent was therefore not implemented and in this regard planning consent 19/0444/PP lapsed on 22nd December 2022. Notwithstanding the above, it is important to note that the applicant had sought to discharge condition 2 relating to the need for a site investigation report and remediation strategy and implementation plan prior to the expiry of the planning consent in question - the initial submission of a Site Investigation Report was received on 30th January 2022. As a result of delays and resource pressures in dealing with contaminated land matters at the time, condition 2 was not satisfied prior to the expiry of the planning consent. An initial response was provided in respect of the site investigation report on 18th May 2022 which sought the submission of further details. Further details were later received however condition 2(a) was not discharged prior to the expiry of the consent in December 2022. This is an unfortunate circumstance and as such apologies are offered in respect of such delays however this does not change the fact that the expiry of the planning consent was known as 22nd December 2022 albeit it is accepted that some confusion may have existed, in relation to the emergency period which was provided by the emergency coronavirus legalisation at the time in question. In addition to the above, it should also be noted that submission and approval of other pre-commencement conditions did not take place until early 2023, after the expiry of the consent, while no submission has ever been received in respect of planning condition 2(b) which relates to a remediation strategy and implementation plan. Page 94 of 106
Page 99
It should be noted that no S42 application was submitted prior to the expiry of planning consent 19/0444/PP which sought to extend the life of the consent in question. The applicant sought to commence works in June 2024 and as such on review of the case file and the details noted above, it was concluded that the consent was not implemented prior to the expiry date. A temporary stop notice was issued on 16th August 2024. In light of all of the above, the applicant has chosen to submit a Section 42 application which seeks to modify conditions attached to the original consent. In this regard, it is significant to note the circumstances in which this Section 42 application has been submitted. Planning consent 19/0444/PP was granted without a period of implementation being specified as a condition. In such circumstances Section 58 of the Town and Country Planning (Scotland) Act 1997 (as it existed on the day of the grant of planning permission) provided that where no period of implementation was specified in a grant of planning permission then a statutory period of three years for implementation would apply. The statutory period of three years was to be treated as a condition only in respect of Sections 43A(8)(b) and 47(1)(a), (3) and (4)(a) of the 19997 Act. In effect this means, at least for the purposes of a Section 42, the previous permission was not granted subject to a condition as to the time within which the development to which it related was to be begun. In turn this means Section 42(4) does not apply in respect of the now lapsed permission, and therefore it enables a Section 42 application to be submitted and considered. Pre-Application Consultation with Officers The Scottish Government strongly encourages constructive pre-application discussions between prospective applicants and the planning authority. Pre-application discussions seek to identify key planning considerations at an early stage and help inform what supporting information is required to support a subsequent application. Pre-application discussions have taken place, focusing on the commencement of development, legality of development without discharge of conditions before expiry of consent and the way forward including various issues which have arisen as a result. Negotiated Improvements Following submission, further consideration has been given to landscaping, screening, headlight glare and drainage. Site History The planning history for the site is as follows; if no history is listed then planning has no record of previous applications for the site. Application No: 19/0444/PP Description: Erection of residential development comprising 15 dwellinghouses with associated access road, drainage and landscaping Decision: Grant subject to conditions Consultations Chief Executive's Service (Roads Development) - No objection subject to a condition requiring the submission of plans illustrating the provision of appropriate kerbing, screening and levelling of land adjacent to the access road to the site. Children's Services - No objection subject to a S75 to secure financial contributions in respect of Park Mains High School and Trinity High School. Page 95 of 106
Page 100
Scottish Water - No response received. The application has been publicised in line with the requirements of the relevant legislation. The following representations were received: Object - 12 Support - 6 Neutral - 0 The issues raised can be summarised as follows: 1. Overlooking due to lack of screening of access road 2. Pavement provision on main road is inadequate. 3. Kerbing on access road inadequate to allay any safety concerns. 4. Lack of drainage. 5. Private stone wall, not part of application site, has been removed. 6. Using private farm road for industrial use has left road in need of repair. 7. Noise levels during construction are unacceptable. 8. Having street lights directly behind properties now invades private properties with artificial light. 9. Developers are using land not within the approved development area to dump over burden and dirt affecting safety and wildlife. 10. Houses facing access road are too high and will result in overlooking. 11. The stamped approved plans do not reflect what is currently developed. Policy Context In making any determination under the Planning Acts, regard is to be had to the development plan unless material considerations indicate otherwise. In this instance the Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire Local Development Plan (2021) (LDP). The following provisions of the Development Plan are considered relevant to the determination of this application: National Planning Framework 4 Policy 1 - Tackling the climate and nature crises Policy 2 - Climate mitigation and adaptation Policy 3 - Biodiversity Policy 9 - Brownfield, vacant and derelict land and empty buildings Policy 13 - Sustainable transport Policy 14 - Design, quality and place Policy 15 - Local Living and 20 minute neighbourhoods Policy 16 - Quality homes Full details relating to the policies of the NPF4 can be found online. Renfrewshire Local Development Plan Policy P1 - Renfrewshire's Places Policy I1 - Connecting Places Policy I3 - Flooding and Drainage Policy I8 - Developer Contributions Full details relating to the policies of the LDP can be found online. Other relevant policies and guidance Page 96 of 106
Page 101
New Development Supplementary Guidance 2022 Delivering the Places Strategy - Creating Places Delivering the Environment Strategy Delivering the Infrastructure Strategy Renfrewshire's Places Design Guide Draft Developer Contributions (Education) Planning Guidance Submitted Reports and Assessments The following reports and assessments were submitted in support of the application: Section 42 Supporting Statement - Outlines the basis for the application, suggests amended conditions to enable development to proceed and provides information to demonstrate compliance with remaining conditions. Development Plan Assessment - provides an assessment against all relevant current planning policies and guidance setting out the supporting context for the redevelopment of this brownfield site for residential development. Scottish Ministers Direction In determining a planning application, the Council is required to provide details of any Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation), Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the grant of planning permission) and Regulation 33 (Directions requiring consideration of condition) of The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development) of The Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2017. None. Planning Assessment The S42 application seeks to extend the timescale of the consent through the addition of a time limit condition and seeks to amend conditions regarding landscaping, materials and roads requirements. The justification for this application is explained in the introduction to this report which refers to legislation that was in place at the time of the original consent, 19/0444/PP. The conditions to be added and modified are as follows: To reflect the fact that section 58 of the 1997 Act has been amended since the date of the grant of planning permission, a new condition 1 is proposed, requiring that the permission be implemented within 3 years of the date of the grant of this consent. Landscaping Existing Condition 4 'Landscaping', states: That before any development of the site commences a scheme of landscaping shall be submitted to and approved in writing by the Planning Authority; the scheme shall include:- (a) details of any earth moulding and hard landscaping, grass seeding and turfing; (b) a scheme of tree and shrub planting, incorporating details of the number, variety and size of trees and shrubs to be planted; (c) an indication of all existing trees and hedgerows, plus details of those to be retained, and measures for their protection in the course of development, and (d) details of the phasing of these works; Page 97 of 106
Page 102
Reason: In the interests of the visual amenity of the site. To reflect the fact that the landscaping proposals previously submitted to and approved by the Council are to be adjusted to reflect overlooking and glare concerns expressed by local residents, condition 4 is proposed to be modified so that it makes specific reference to the drawing which incorporates the mitigation measures that have been discussed. It is proposed that the condition is amended to read as follows: That before any development on the site commences a scheme of landscaping (incorporating the measures detailed in Drawing No. [GH IR 100.22 SL-01 Rev D] available in Document 2.1) shall be submitted to and approved in writing by the planning authority; the scheme shall include:- (a) details of any earth moulding and hard landscaping, grass seeding and turfing; (b) a scheme of tree and shrub planting incorporating details of the number, variety and size of trees and shrubs to be planted; (c) an indication of all existing trees and hedgerows, plus details of those to be retained, and measures for their protection in the course of the development and (d) details of the phasing of those works. Reason: In the interests of the visual amenity of the site. Facing Materials Existing condition 6 'Facing Materials' states: That before development starts, full details and/or samples of the facing materials to be used on all external walls and roofs shall be submitted to, and approved in writing by, the Planning Authority. Thereafter only the approved materials shall be used in the development of the site. Reason: These details have not been submitted. This application, if approved, would result in a new consent therefore an amended condition is considered appropriate to reflect the plans and materials already considered acceptable. It is proposed that the condition is amended to read as follows: That all external walls and roofs within the development hereby permitted shall be constructed in accordance with the details and using the external finishes and facing materials shown in drawings contained in Drawings No. [A892-W05, A1215-W24, A1215- W34, A1215-W44, A1215-W05, A1215-W14, GHG-NOR-05-ZZ-DR-A-00-1001, A1215-W54] available in Document 2.2. Reason: In the interests of the visual amenity of the site. Boundary Treatments Existing conditions 7 & 8 'Boundary Treatments', state: That before development starts, full details of the design and location of all fences and walls to be erected on the site shall be submitted to, and approved in writing by, the Planning Authority. Reason: These details have not been submitted. Page 98 of 106
Page 103
That before any of the dwellinghouses situated on a site upon which a fence is to be erected is occupied, the fence, or wall, for which the permission of the Planning Authority has been obtained under the terms of conditions 7 above, shall be erected. Reason: To safeguard the amenity of future residents. Given that the details of the design of the boundary walls and fences that are to be constructed within the site have been approved by the Council, it is proposed that conditions 7 and 8 (which respectively required such approval to be in place before development was allowed to commence and thereafter that the development be implemented in accordance with the approved detail) be removed and replaced with a single condition which requires that the walls and fences are erected in the approved locations and in accordance with the approved design. Again, this application, if approved, would result in a new consent therefore an amended condition is considered appropriate to reflect the plans and materials already considered acceptable. It is proposed that the condition is amended to read as follows: That before any dwellinghouse situated in the site upon which a boundary fence and/or wall is to be erected is occupied, the relevant fences and walls shall be erected in accordance with the design details and in the locations shown in Drawing No. [A1215-BT01] available in Document 2.3. Reason: To safeguard the amenity of future residents. Roads Traffic/ Safety Condition 9 'Roads/Traffic Calming', states: That before development starts, full details of the traffic calming measures, crossing point and footway enhancements shall be submitted to, and approved in writing by, the Planning Authority. Thereafter the details as approved shall be implemented prior to the occupation of any dwelling. Reason: In the interests of pedestrian and road safety. To reflect the fact that the roads measures previously submitted to and approved by the Council are to be adjusted to reflect safety and glare concerns expressed by local residents, requirements relative to surface drains, and issues raised through consultation with the councils roads engineers, condition 9 is proposed to be modified to take these matters into account. It is proposed that the condition is amended to read as follows: That prior to any development commencing, full details of the traffic calming measures, crossing point and footway enhancements shall be submitted to, and approved in writing by, the Planning Authority. These should include: 1. Provision of suitably retained minimum 1m wide flat shoulder verge to the outside of the new road from Old Greenock Road to Greenhead Farm House with maximum 1in2 side slopes in accordance with the Design Manual for Roads and Bridges. 2. Details of a strained post and wire fence to BS 1722 along the new curved section of road between Old Greenock Road to Greenhead Farm House to provide an additional temporary vehicle restraint for a period of 3 years or until the hedging matures. 3. Details of planting and or screening to prevent headlight glare from passing vehicles to the houses beyond. Page 99 of 106
Page 104
4. Details of connections to the surface water outfall to a positively drained network leading to a watercourse to the approval of Scottish water. Thereafter the details as approved shall be implemented prior to the occupation of any dwelling. Reason: In the interests of pedestrian and road safety. In addition to these proposed amendments, it has become apparent that the appropriate drainage of the site may not be achievable through connection to the Scottish Water Network. Therefore, it is proposed to attach a further condition requiring that an appropriate drainage assessment be undertaken and a drainage strategy submitted for the agreement of the council in consultation with Scottish Water, prior to the commencement of development. The following condition is proposed. That prior to the commencement of the development hereby approved, a Drainage Impact Assessment shall be submitted and approved by Renfrewshire Council as Planning Authority. The Drainage Impact Assessment shall accord with the 'Council's Drainage Assessment - Notes for Guidance'. Thereafter, the Assessment as approved shall be implemented prior to the completion of the development and maintained thereafter to the satisfaction of Renfrewshire Council as Planning Authority. For the avoidance of doubt, the Drainage Impact Assessment should include full details of the drainage strategy for the development hereby approved. Reason: To ensure adequate provision for drainage associated with the development. It is proposed that conditions 2, 3 and 5 as attached to planning consent 19/0444/PP would be reattached in their existing form. In addition, given that this is a new application, any changes to planning policy or other relevant material considerations also require consideration. In this regard, planning permission 19/0444/PP was granted on the 23rd December 2019 under Renfrewshire Local Development Plan 2014 and taking account of the Proposed Renfrewshire Local Development Plan 2019 which was a material consideration at that time. The proposal was assessed as being compliant with the relevant policies and considerations subject to conditions. Since the submission of that application, Scotland's Fourth National Planning Framework (NPF4) has replaced NPF3, Scottish Planning Policy (SPP) and the Strategic Development Plan (SDP) and now forms part of the statutory Development Plan alongside the now adopted Renfrewshire Local Development Plan 2021. Therefore, the Development Plan now comprises NPF4 (adopted 13th February 2023) and Renfrewshire Local Development Plan 2021. National Planning Framework 4 (NPF4) provides the long-term national spatial strategy for planning in Scotland. It sets out the Scottish Government's current view on delivering sustainable, liveable, and productive places through the application of spatial principles. When the application proposal is assessed against the relevant policies of NPF4, the following conclusions can be made. Policy 1 & 2 - Tackling the Climate and Nature Crisis/Climate Mitigation and Adaption - Policy 1 gives weight to the global climate and nature crisis when considering development Page 100 of 106
Page 105
proposals. The application site is a brownfield site within a sustainable location which will integrate with active travel routes and public transport and see the development of energy efficient homes with landscaping. As such it can be considered that the proposed satisfactory addresses the requirements of Policies 1 and 2. Policy 3 - Biodiversity - Policy 3 seeks to protect biodiversity loss, deliver positive effects from development and strengthen nature networks. The proposal seeks to develop a brownfield site within a residential locale where degraded remnants of past uses were evident. The proposal includes landscaping reflective of the surrounding area and seeks to maintain connections proportionate to the nature and scale of the development proposed. Policy 9 - Brownfield, Vacant and Derelict Land, Empty Buildings - Policy 9 seeks to encourage, promote and facilitate the reuse of brownfield, vacant and derelict land and empty buildings, and to help reduce the need for greenfield development and states that development proposals that will result in the sustainable reuse of brownfield and derelict land will be supported. In determining whether the reuse is sustainable, the biodiversity value of brownfield land which has naturalised should be taken into account. The existing site in this instance, has minimal biodiversity value, however it is considered that biodiversity would be enhanced through landscaping proposals. Policy 13 - Sustainable Transport - Policy 13 seeks to encourage, promote and facilitate developments that prioritise walking, wheeling, cycling and public transport for everyday travel and reduce the need to travel unsustainably. It states that development proposals will be supported where it can be demonstrated that the transport requirements generated have been considered in line with the sustainable travel and investment hierarchies. The development proposed increases permeability with the inclusion of designated pedestrian and cycle routes from Old Greenock Road into the site providing more convenient access to the nearby school and other facilities. It has been demonstrated through App ref No: 19/0444/PP, that the development encourages active travel and supports the travel hierarchy at this location. Policy 14 - Design, Quality and Place - Policy 14 seeks to encourage, promote and facilitate well designed development that makes successful places by applying the Place Principle, taking account of the local context, characteristics and connectivity of the area. In this regard it has been accepted through the approval of App ref No: 19/0444/PP that the consented development reflects the surrounding area where there is a mix of house types in terms of age, size and design, is acceptable for this location and delivers an active street frontage in the redevelopment of a brownfield site. The materials used ties with the surrounding residential area whilst enabling the development to have an individual character. Policy 15 - Local Living & 20 Minute Neighbourhoods - Policy 15 encourages, promotes and seeks to facilitate the application of the Place Principle and create connected and compact neighbourhoods where people can meet the majority of their daily needs within a reasonable distance from their home, preferably by walking, wheeling or cycling or using sustainable transport options. To establish this, consideration will be given to existing settlement pattern, and the level and quality of interconnectivity of the proposed development with the surrounding area. In this regard the development would support local living and would have convenient and sustainable access to a range of existing amenities, recreational facilities, public transport hubs and places of education, all as set out in the statement submitted in support of the application. Policy 16 - Quality Homes - The intention of Policy 16 is to encourage, promote and facilitate the delivery of more high quality, affordable and sustainable homes, in the right locations, providing choice across tenures that meet the diverse housing needs of people and communities and states that development proposals for new homes on land allocated for Page 101 of 106
Page 106
housing in LDP's will be supported. Within the Renfrewshire Local Development Plan 2021, the site is allocated as uncoloured land in the in the Proposals map. LDP Policy P1; Renfrewshire's Places states that within uncoloured areas of the Proposals map, there will be a general presumption in favour of the continuance of the built form. The other aspects of policy 16 The proposal is therefore in compliance with policy 16. Regarding the appropriate Local Development Plan, Renfrewshire Local Development Plan 2021 is now the adopted Local Development Plan, and its policies and guidance are not markedly different to the policies against which App Ref No: 19/0444/PP was assessed and considered acceptable (Renfrewshire Local Development Plan 2014 & Renfrewshire proposed Local Development Plan 2019). Only one new additional policy relative to developer contributions requires consideration. Policy I8 states that contributions will be sought to address infrastructure capacity, including education, that arise as a direct result of new development. Children's Services (Education) were consulted in respect of this S42 application and have no objection to the proposed development subject to a S75 agreement to secure developer contributions in respect of Park Mains High and Trinity High. In this regard the terms of the Draft Developer Contributions (Education) Planning Guidance requires to be applied. In applying the guidance a financial contribution totalling £162,400 is required and can be broken down as £44,800 in respect of Trinity High School and £117,600 in respect of Park Mains High School. Therefore, it can be concluded that the proposal complies with the relevant policies and guidance of the Adopted Renfrewshire local Development Plan. Representations The issues raised through consultation are addressed below. Objectors have raised concerns regarding the height of the new access road, its proximity to existing dwellings and the potential impacts which could occur regarding safety, privacy and glare. Although the council's roads engineers offered no objection to the access road through their consultation response on application 19/0444/PP being satisfied with its position, design and appropriateness within its surroundings, in discussion with the applicant it has been recognised that these concerns should be addressed. As a result, conditions attached to the grant of the previous consent are proposed to be amended to ensure that privacy, safety and glare are addressed. Drainage of the application site has also been raised. It should be noted that an additional condition is proposed to ensure that drainage proposals for the site are submitted for the written approval of the planning authority in consultation with Scottish Water, prior to the commencement of development. Regarding the height of the dwelling houses being too high, it should be noted that the application was assessed against all the relevant considerations of the Development Plan at the time, including heights and separation distances, and found to be acceptable. There are no additional material considerations which would contradict this assessment which remains valid and satisfactory. Noise during construction is unfortunately inevitable and unavoidable, however, should it prove to be excessive or evident at unacceptable times, Environmental Protection officers can be asked to investigate. Street lighting is accepted infrastructure within towns and villages and is often seen as a necessity within residential areas. Page 102 of 106
Page 107
There is concern that the plans submitted as part of this application do not reflect what has been built on the site. Should this application be granted, it would in effect comprise a new planning consent and development of the site would require to comply with this consent and the stamped approved plans and the new and amended conditions attached. The layout of the development and the dwellings proposed are not affected by any changes to the development plan or other material considerations and therefore remain as originally proposed. The new and amended conditions reflect issues raised by objectors, and seek to ensure that their concerns have been addressed. This will be reflected in the information required to satisfy the requirements of the new and amended conditions. Finally regarding damage to existing private roads through commercial vehicle activity, this is considered a civil matter between the landowners and those utilising the road in question. Those in support of the application have welcomed the use of a brownfield site within a residential area and the positive contribution this development would make to this area and its economy. Planning Obligations The Council is required to provide a summary of the terms of any planning obligation which is required to be entered into under Section 75 of the Town and Country Planning (Scotland) Act in relation to the grant of permission for the proposed development: A Section 75 Agreement requires to be concluded to secure financial contributions in respect of Park Mains High School and Trinity High School. Conclusion In view of the above, it is considered that the proposal would accord with the relevant provisions of the Development Plan. There are no other material considerations. Planning permission should therefore be granted/granted subject to conditions. Recommendation Grant subject to conditions & S75 agreement. Reason(s) for Recommendation The proposal accords with the provisions of the Development Plan and there were no material considerations which outweighed the presumption in favour of development according with the Development Plan. Condition(s) 1. The development to which this permission relates must be commenced no later than 3 years from the date of the permission. Reason: In order to comply with the provisions of Section 58 of the Town and Country Planning (Scotland) Act 1997, as amended. 2. No development shall commence on site until written approval of: a) a Site Investigation report (characterising the nature and extent of any soil, water and gas contamination within the site); and, if remedial works are recommended therein a Remediation Strategy and Implementation Plan identifying the proposed methods for implementing all remedial recommendations contained within the site investigation report all prepared in accordance with current authoritative technical guidance, have been submitted to and approved in writing by Renfrewshire Council as Planning Authority. Reason: To ensure that the site will be made suitable for its proposed use. Page 103 of 106
Page 108
3. That prior to the occupation of any residential unit on the site: a) a Verification Report confirming completion of the works specified within the approved Remediation Strategy and Implementation Plan; or b) where remediation works are not required but soils are to be imported to site, a Verification Report confirming imported materials are suitable for use shall be submitted to and approved in writing by Renfrewshire Council as Planning Authority. Verification Reports shall not be submitted on a phased basis unless first agreed in writing with the Planning Authority. Reason: To demonstrate that works required to make the site suitable for use have been completed. 4. That before any development on the site commences a scheme of landscaping (incorporating the measures detailed in Drawing No. [GH IR 100.22 SL-01 Rev D] available in Document 2.1) shall be submitted to and approved in writing by the planning authority; the scheme shall include: a) details of any earth moulding and hard landscaping, grass seeding and turfing; b) a scheme of tree and shrub planting incorporating details of the number, variety and size of trees and shrubs to be planted; c) an indication of all existing trees and hedgerows, plus details of those to be retained, and measures for their protection in the course of the development and d) details of the phasing of those works. Reason: In the interests of the visual amenity of the site. 5. That prior to occupation of the last dwellinghouse within each phase of the development hereby permitted, all planting, seeding turfing and earth moulding included in the scheme of landscaping and planting, approved under the terms of condition 4 above for that phase, shall be completed; and any trees, shrubs, or areas of grass which die, are removed, damaged, or diseased within 5 years of the completion of the development, shall be replaced in the next planting season with others of a similar size and species; Reason: In the interests of amenity. 6. That all external walls and roofs within the development hereby permitted shall be constructed in accordance with the details and using the external finishes and facing materials shown in drawings contained in Drawings No. [A892-W05, A1215-W24, A1215-W34, A1215-W44, A1215-W05, A1215-W14, GHG-NOR-05-ZZ-DR-A-00-1001, A1215-W54] available in Document 2.2. Reason: In the interests of the visual amenity of the site. 7. That before any dwellinghouse situated in the site upon which a boundary fence and/or wall is to be erected is occupied, the relevant fences and walls shall be erected in accordance with the design details and in the locations shown in Drawing No. [A1215- BT01] available in Document 2.3. Reason: To safeguard the amenity of future residents. 8. That prior to the commencement of the development hereby approved, a Drainage Impact Assessment shall be submitted and approved by Renfrewshire Council as Planning Authority. The Drainage Impact Assessment shall accord with the 'Council's Drainage Assessment - Notes for Guidance'. Thereafter, the Assessment as approved shall be implemented prior to the completion of the development and maintained Page 104 of 106
Page 109
thereafter to the satisfaction of Renfrewshire Council as Planning Authority. For the avoidance of doubt, the Drainage Impact Assessment should include full details of the drainage strategy for the development hereby approved. Reason: To ensure adequate provision for drainage associated with the development. 9. That prior to any development commencing, full details of the traffic calming measures, crossing point and footway enhancements shall be submitted to, and approved in writing by, the Planning Authority. These should include: a) Provision of suitably retained minimum 1m wide flat shoulder verge to the outside of the new road from Old Greenock Road to Greenhead Farm House with maximum 1in 2 side slopes in accordance with the Design Manual for Roads and Bridges. b) Details of a strained post and wire fence to BS 1722 along the new curved section of road between Old Greenock Road to Greenhead Farm House to provide an additional temporary vehicle restraint for a period of 3 years or until the hedging matures. c) Details of planting and or screening to prevent headlight glare from passing vehicles to the houses beyond. d) Details of connections to the surface water outfall to a positively drained network leading to a watercourse to the approval of Scottish water. Thereafter the details as approved shall be implemented prior to the occupation of any dwelling. Reason: In the interests of pedestrian and road safety. Advisory Note(s) None. Schedule of Plans Determined Drawing Number Revision Drawing/Document Title A1215-LP30 Location Plan GHG-NOR-02-ZZ-DP03 Existing site plan with topographical survey GHG-NOR-02-ZZ-DP03 Existing site sections GHG-NOR-02-ZZ-DP04 Proposed site plan GHG-NOR-02-ZZ-DP05 Phase 1,proposed site, plot 1 to 7 GHG-NOR-02-ZZ-DP04 Phase 2, proposed site, plot 8 to 15 DR-A-90-2001 P04 Proposed site sections GHG-NOR-02-ZZ-DP04 Floor plans house type 01 GHG-NOR-02-ZZ-DP04 Elevations house type 01 GHG-NOR-02-ZZ-DP03 Floor plan house type 02 GHG-NOR-02-ZZ-DP03 Elevations house type 02 GHG-NOR-02-ZZ-DP03 Floor plans house type 03 GHG-NOR-02-ZZ-DP03 Elevations house type 03 GHG-NOR-02-ZZ-DP03 Floor plans house type 04A GHG-NOR-02-ZZ-DP04 Elevations house type 04A GHG-NOR-02-ZZ-DP03 Floor plans house type 04B GHG-NOR-02-ZZ-DP03 Elevations house type 04B GHG-NOR-02-ZZ-DP03 Floor plans house type 4C GHG-NOR-02-ZZ-DP03 Elevations house type 4C GHG-NOR-02-ZZ-DP03 Floor plans house type 05 GHG-NOR-02-ZZ-DP03 Elevations house type 05 GHG-NOR-02-ZZ-DP03 Floor plans house type 06 GHG-NOR-02-ZZ-DP03 Elevations house type 06 Page 105 of 106
Page 110
E15-012-VT2 Large refuse vehicle (11m) tracking entrance to site E15-012-003 Rev B Access proposals showing visibility splay E15-012-VT3 Large refuse vehicle tracking exit from site E15-12-110 Rev A Road layout For further information please contact Clare Murray, Development Standards Team, Email: clare.murray@renfrewshire.gov.uk Page 106 of 106