Page 1

Planning and Climate Change Policy Board: 25 August 2026
Report by Chief Planning Officer 
Reference No 25/1024/PP
Application Type Planning Permission (Major)
Proposal Demolition of wings and rear buildings at Paisley Grammar
School and erection of flatted development on vacated land,
including conversion of original school to flats
Location Paisley Grammar School, Glasgow Road, Paisley, PA1 3RP
Ward 3 – Paisley North East and Ralston
Community Council Paisley East and Whitehaugh Community Council
Applicant Mr Richard McFadzean, NIXON Partnership Homes (PG) Ltd
Recommendation Grant subject to conditions
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=documents&keyVal=T7AWZZMWFGB00 
This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of
The Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013. 
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation. In this instance, the proposal falls within the ‘Major’
category of development as defined within The Town and Country Planning (Hierarchy of
Developments) (Scotland) Regulations 2009. 
Proposal
This application seeks planning permission for the demolition of wings and rear buildings at
Paisley Grammar School, and the erection of a flatted residential development on the
vacated land within the school grounds. The development also includes the retention and
conversion of the original school building to flats. 
Ther original school building (along with the former Janitors Lodge and boundary wall,
railings, gates and gate piers along the Glasgow Road frontage) are B listed. The alterations
to the retained school building to convert it to residential use, and the associated impact on
its character as a building of special historical and architectural significance, will be
assessed through the concurrent listed building application 25/1050/LB. 
The proposed development comprises of 115 flats. 92 flats are split across five proposed
blocks, with the conversion of the retained school building housing 23 flats. Three of the new
build blocks (blocks 2, 3 and 4) are positioned on the southern boundary of the site fronting
Crossflat Crescent. These blocks are five stories in height with dual pitched roofs and are
finished in grey concrete roof tiles and blonde facing brick. 
Two of the new build blocks (blocks 1 and 5) are positioned either side of the retained school
building fronting Glasgow Road to the north. These blocks are four stories in height with dual
pitched roofs and are finished in grey concrete roof tiles and red facing brick. 
The remainder of the proposed layout incorporates parking areas (161 spaces), internal
access roads and landscaped areas. Existing vehicular and pedestrian accesses from
Glasgow Road and Mckerrell Street are retained, with additional pedestrian access also
formed along the southern boundary. The layout also includes provision for cycle storage
and bin storage.

Page 2

Site Description
The application site extends to 1.55 hectares in area. It comprises the original school
building and the associated extensions to the sides and rear. These buildings are bound by
parking and playground space to the front and sides. There is a landscape buffer comprising
of mown grass and mature trees along the northern boundary of the site. Boundary
treatment comprises of low stone walls with railings, and hedgerows. The former Janitors
Lodge, which does not form part of the development, is positioned in the north east corner of
the site. 
The site is located within a predominantly residential area however there are also a mix of
commercial uses along Glasgow Road which bounds the site to the north. Mckerrell Street
and Crossflat Crescent, where the predominant built form is four storey tenements, bound
the site to the east, west and south. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
Pre-application discussions have taken place, focusing on the scale, design and orientation
of the flatted blocks, and the conversion of the original school building. 
Negotiated Improvements
Following submission, there have been changes to the design of the flatted blocks and the
layout of the site. Principally, blocks one and five which flank the original school building
have been reduced to four stories in height. This change was requested to address concerns
over the originally proposed five storey height of these blocks, and the associated over
dominating impact on the listed building which was of detriment to its setting. In lieu of this
change the total number of flats proposed has fallen from 123 to 115. 
The principal change within the site layout is the relocation of a portion of the parking to the
periphery of the site which in turn allows for an increase in tree planting and green space
within the interior of the site. These changes are considered to better reflect the setting of
the listed building and enhance the overall amenity of the development. The proposal has
also been updated to include off site improvement works to the surrounding road network. 
Site History 
The planning history for the site is as follows; if no history is listed then planning has no
record of previous applications for the site. 
Application No: 25/1050/LB 
Description: External and internal alterations associated with conversion of Paisley
Grammar building to residential flats comprising of installation of new
windows, reconfiguration and reinstate of existing windows, new pitch roof
gables, removal of plant room, internal reconfigurations to layout and
demolition of 1960 wing extensions to each side of the main school
building
Decision: Pending Consideration 
Application No: 23/0742/PAN 
Description: Proposal of Application Notice (PAN) for redevelopment of Paisley
Grammar School site for residential development
Decision: Accepted

Page 3

Application No: 10/0110/LB 
Description: Formation of new public and pupil reception areas including the installation
of partitions, new openings and alterations to internal layout.
Decision: Grant subject to conditions 
Application No: 08/1043/LB 
Description: Renewal / repair of existing slates, leadwork, gutters, downpipes, flat roofs
and walkways. Replacement of rooflights and repair / rendering of gables
and parapets
Decision: Grant subject to conditions 
Application No: 07/0330/LB 
Description: Re-covering of existing flat roof extensions with built up proprietary
insulated system, and replacement of existing windows with double glazed
steel and timber windows
Decision: Grant subject to conditions 
Application No: 07/0329/PP 
Description: Re-covering of existing flat roof extensions with built up proprietary
insulated system, and replacement of existing windows with double glazed
steel and timber windows.
Decision: Grant subject to conditions 
Application No: 02/0095/LB 
Description: Installation of platform stair lifts on 1st and 2nd floor (west wing) of central
building to provide wheelchair access
Decision: Grant subject to conditions 
Consultations   
▪ Councils Environmental Protection Service – No objection subject to condition relating to
submission of a site investigation and remediation strategy with respect to potential land
contamination matters. It is noted that the Noise Impact Assessment has been reviewed
and accepted. 
▪ Councils Chief Executives Roads Development – No objections. Comments made with
respect to connectivity and accessibility, servicing and bin collection, parking and off-site
improvements. 
▪ Scottish Water – No objections. 
▪ Councils Education/Children’s Services – Developer contributions are required for both
St. John Ogilvie Primary School, and St Andrew’s Academy. 
▪ Historic Environment Scotland – No comment provided as the development does not
reach the threshold for consultation (the development does not affect a category A listed
building or its setting). However, it is noted that detailed feedback has been provided for
the concurrent listed building application 25/1050/LB. 
▪ Glasgow Airport Safeguarding – No objections. Advisory note required with regard to
potential use of cranes during construction of the development. 
▪ National Air Traffic Services (NATS) – No objections.

Page 4

▪ Council’s External Independent Residential Consultancy Surveyor (Rapleys) - undertook
a review of the Financial Viability Assessment submitted by the applicant following the
consultation response received from the Council’s Education/Children’s Services
department. The review concludes that payment of the developer contribution requested
would make it harder to deliver a profitable development and would therefore reduce the
likelihood of the building returning to active use 
Representations
The application has been publicised in line with the requirements of the relevant legislation. 
The following representations were received:
▪ Object - 3
▪ Support - 0
▪ Neutral - 0 
The issues raised can be summarised as follows: 
1. The design, scale and positioning of the proposed flatted blocks do not fit with the
surrounding area and have a detrimental impact on the setting of the listed building.
2. Site layout lacks amenity and play space.
3. Lack of sunlight for north facing flats.
4. Additional trees should be planted.
5. Gates on Glasgow Road frontage need to be restored and re-hung, and split copings
need replaced.
6. No air quality assessment has been submitted.
7. Noise impact exceeds World Health Organisation guidelines, and requires ‘sealed
window’ living environment.
8. Lack of play provision.
9. Parking provision shortfall.
10. Address on proposal of Application Notice is incorrect.
11. Flood risk.
12. Application form states part of the site is an agricultural holding.
13. Design statement refers to a business centre.
14. The pre-application consultation report refers to a hotel development.
15. No Construction Environmental Management Plan has been submitted
16. No vibration assessment has been submitted.
17. No asbestos management plan has been submitted.
18. No construction noise assessment has been submitted.
19. No transport assessment has been submitted.
20. No drainage assessment has been submitted.
21. Overshadowing.
22. Loss of trees.
23. No affordable housing statement has been submitted.
24. Overdevelopment of the site to the detriment of amenity.
25. Sewage capacity
26. Risk of overheating due to south facing glazing and ‘sealed window’ living environment.
27. Traffic disruption, waste and air pollution. 
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the
development plan unless material considerations indicate otherwise. In this instance the
Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire
Local Development Plan (2021) (LDP).

Page 5

The following provisions of the Development Plan are considered relevant to the
determination of this application: 
National Planning Framework 4  
▪ Policy 1 - Tackling the climate and nature crises
▪ Policy 2 - Climate mitigation and adaptation
▪ Policy 3 - Biodiversity
▪ Policy 6 - Forestry, woodland and trees
▪ Policy 7 – Historic assets and places
▪ Policy 9 - Brownfield, vacant and derelict land and empty buildings
▪ Policy 12 - Zero waste
▪ Policy 13 - Sustainable transport
▪ Policy 14 - Design, quality and place
▪ Policy 15 - Local Living and 20-minute neighbourhoods
▪ Policy 16 - Quality homes
▪ Policy 18 – Infrastructure first
▪ Policy 19 – Heating and cooling
▪ Policy 20 – Blue and green infrastructure
▪ Policy 21 – Play, recreation and sport
▪ Policy 22 - Flood risk and water management
▪ Policy 25 – Community wealth building
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
▪ Policy ENV2 - Natural Heritage
▪ Policy ENV3 – Built Heritage
▪ Policy I1 - Connecting Places
▪ Policy I3 - Flooding and Drainage
▪ Policy I5 - Waste Management
▪ Policy I7 – Zero and Low Carbon Buildings
▪ Policy I8 – Developer Contributions
▪ Policy P1 - Renfrewshire's Places
▪ Policy P3 - Housing Mix and Affordable Housing
▪ Policy P5 – Green/Blue Network
Full details relating to the policies of the LDP can be found online. 
Other relevant policies and guidance
▪ Delivering the Infrastructure Strategy - Connecting Places
▪ Delivering the Infrastructure Strategy - Flooding and Drainage
▪ Delivering the Infrastructure Strategy - Provision for Waste Recycling in New
Developments
▪ Delivering the Places Strategy - Creating Places
▪ Delivering the Places Strategy - Open Space Provision in New Developments
▪ Delivering the Environment Strategy - Trees, Woodlands and Forestry
▪ Delivering the Environment Strategy - Biodiversity
▪ Renfrewshire Planning and Development Tree Policy
▪ Renfrewshire's Places Residential Design Guide
▪ National Roads Development Guidance
▪ Developer Contributions (Education) Planning Guidance 
Submitted Reports and Assessments

Page 6

In assessing and reporting on a planning application the Council is required to provide
details of any report or assessment submitted as set out in Regulation 16, Schedule 2,
paragraph 4(c), (i) to (iv) of the Development Management Regulations. 
The following reports and assessments were submitted in support of the application: 
▪ Design and Access Statement – Sets out an appraisal and analysis of the site and its
surroundings before presenting the proposed design solution. It is noted that a number of
different design options were tested before the proposed layout was determined to be
the best option. This included taking into consideration comments received during the
public consultation phase. The statement also includes an appraisal against relevant
planning policies, and a response to pre-application comments raised by the Planning
Authority. 
▪ Pre-Application Consultation (PAC) Report March 2026 – The PAC report provides a
summary of the feedback received at both events, and how this feedback has influenced
the design of the development. The initial public event was held at the Grammar School
on the 25th of September, with the second public event held on the 23rd of October at the
same venue. 51 people attended the initial event, with 34 attending the second. 
▪ Planning Supporting Statement April 2026 (School Conversion) – Provides further detail
on the aspects of the development specifically related to the conversion of the school.
This includes matters relating to internal and external alterations, and servicing. The
statement notes that “the proposals have been developed to retain the key elements of
the existing building wherever possible while achieving the practical and technical
requirements of a conversion”. 
▪ Stage 1 Bat Survey (Desk Study and Preliminary Roost Assessment) – The report
concludes that no historic or fresh signs of bats were found in or on the school buildings. 
▪ Arboricultural Impact Assessment and Tree Protection Plan January 2026 – Twenty-four
individual trees have been surveyed at the site. Two Sycamore trees (T477 and T484)
are recommended for removal due to their hazardous condition irrespective of the site
development. Three trees (T498, T499 and T500 will be removed to accommodate the
development. T498 is an A category tree, with T499 and T500 C category trees. It is
noted that all other trees can be retained, and a Tree Protection Plan is proposed to
safeguard this. 
It is noted that construction of new access roads and parking areas, SUDs and
replacement hardstanding lie within the root protection area of two trees on the eastern
boundary of the site, one tree on the western boundary of the site, and three teres on the
northern boundary of the site. There should be no significant impact on these trees if
excavation is undertaken by hand, with no change in ground levels. 
▪ Daylight and Sunlight Study Rev 02 – The study assesses daylight and sunlight levels
associated with the new build development and also impact on existing neighbouring
properties. The study concludes that the development will offer future occupants a good
level of daylight and sunlight, and all neighbouring properties assessed will not be
impacted by the introduction of the proposed development. The recommended criteria
for the daylight and sunlight tests as set out within the Building Research Establishment
(BRE) guidance ‘Site Layout Planning for Daylight and Sunlight: a guide to good practice’
2022 are met. 
▪ Paisley Grammar ground Investigation Report and Geotechnical Design Report Version
1 26/01/2026 – Details the intrusive ground investigations that have been undertaken at

Page 7

the site. However, it is noted that these investigations are initial, and further investigation
will be required to establish any risk to human health or the environment from
contamination. Further intrusive ground investigations are therefore recommended. 
▪ Noise Impact Assessment Rev 00 6th February 2026 – A survey of road traffic noise has
been conducted, and noise levels have been predicted. Standards for outdoor amenity
areas will be marginally exceeded however given proposal comprises of redevelopment
of land within a town centre location, no further mitigation is proposed. On most facades,
windows require to be closed to provide mitigation against road traffic noise. 
▪ Transport Statement March 2026 – The site is conveniently located in terms of access to
key amenities on foot, and a range of public transport connections. The proposed use
would generate a significant reduction in peak hour trips compared to the previous use.
Provision for parking, access and servicing can be accommodated. 
▪ Level 2 Flood Risk Assessment 15th January 2026 – The site lies outwith any flood risk
areas. A suitably designed drainage strategy will ensure that the runoff from the site into
the existing drainage infrastructure will be equal to or less than that of current conditions.
This will ensure flood risk to neighbours is not increased. 
▪ Outline Sustainable Drainage System 15th January 2026 – The proposed Suds features
will aim to provide betterment compared to the existing surface water runoff system. The
Suds design promotes elements of treatment and attenuation primarily through filer
trenches. 
▪ Affordable Housing Statement – Acknowledges the requirement for affordable homes
provision in line with the development plan requirements, and sets out in general terms
how this will be delivered. 
▪ Statement of Community Benefit July 2026 – Sets out the benefits associated with the
development in line with NPF4 policy 16 requirements relating to meeting local housing
requirements, enhancing local infrastructure, and improving residential amenity. 
▪ Viability Statement – Provides a costing of the development and anticipated returns with
regard to viability, and seeks to demonstrate that payment of any contributions, namely
education provision, would render the development unviable. The statement has been
developed in line with the Councils Planning Guidance on Developer Contributions
(relating to Education). 
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any
Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the
grant of planning permission) and Regulation 33 (Directions requiring consideration of
condition) of The Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development)
of The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. 
The Planning Authority were required to notify Scottish Ministers under the provisions of The
Town and Country Planning (Notification of Applications) (10 or more homes on non-
allocated land) (Scotland) Direction 2025. This has been fulfilled. 
Planning Assessment

Page 8

Section 25 of the Town and Country Planning (Scotland) Act 1997 requires decisions on
planning applications to be made in accordance with the Development Plan unless material
considerations indicate otherwise. The Development Plan comprises the National Planning
Framework 4 (2023) and the adopted Renfrewshire Local Development Plan (2021). The
fourth National Planning Framework (NPF4) provides the long-term national spatial strategy
for planning in Scotland.  It sets out the Scottish Government's current view on delivering
sustainable, liveable and productive places through the application of spatial principles. 
The application site is located within an area covered by Policy P1 of the Local Development
Plan (LDP). Within these areas there will be a general presumption in favour of a
continuance of the built form. New development proposals within these areas should make a
positive contribution to the Place and be compatible and complementary to existing uses and
character as set out by the New Development Supplementary Guidance and Renfrewshire’s
Places Design Guidance. 
All development proposals should also: 
- Avoid causing unacceptable impacts on the environment and/or biodiversity or a loss of
amenity within the surrounding area and/or a significant adverse effect on neighbouring
properties, in terms of use, scale, noise, disturbance and statutory air quality objectives, and, 
- Ensure that the infrastructure, connections and services required to support the
development are in place including footpath connections; provision for waste storage,
recycling and collection; lighting; access to public transport; open space provision and
access to local services and amenities. 
The proposed flatted development constitutes a continuance of the built form and is in
keeping with the predominantly residential character of the surrounding area. It is considered
to be an acceptable development in principle with regard to the requirements of Policy P1. 
To consider whether the proposal is consistent with the detailed requirements of Policy P1
and all other relevant considerations set out within the development plan, it is appropriate to
assess the application against the five criteria for creating successful place that are set out in
the Renfrewshire New Development Supplementary Guidance and the Residential Places
Design Guide. 
The criteria will be considered in turn as follows: 
Context and Character
The application site is located within 150 metres of both Paisley town centre which is to the
west, and the Paisley East End local service centre to the east. The site fronts the A761
Glasgow Road to the north. 
The built environment surrounding the site is predominantly defined by blonde sandstone
tenements. These are three stories high on the northern side of Glasgow Road, and four
stories high to the west, south and east of the site on Mckerrell Street and Crossflat
Crescent. Some of the tenements fronting Glasgow Road to the east and west have
commercial uses on the ground floor. There is also a single storey stand-alone commercial
building on the northern side of Glasgow Road. 
Within the site the defining characteristics are the category B listed buildings and boundary
treatments, and the row of mature trees which fronts Glasgow Road. The original school
building was constructed in 1895-98. It is three stories in height, with red ashlar sandstone
walls and a slate roof. The listed buildings, boundary treatments and tree coverage make a
positive contribution to the character of the place (it is noted that the former Janitors Lodge is

Page 9

included as part of the listing however this building is not within the application site
boundary). 
The original school building includes modern extensions to the sides and rear. These
extensions are three stories in height and are more functional in their appearance in
comparison to the original school building. While the 1960’s extensions which flank the
original building to the east and west are included as part of the listing, the extensions to the
rear are not. The extensions will be demolished to facilitate the redevelopment of the site,
with the original school building retained. A detailed assessment of the demolition and its
impact on the listing will be undertaken via concurrent listed building application 25/1050/LB. 
It is noted that National Planning Framework 4 (NPF4) policy 9 supports proposals for the
reuse of existing buildings, and that demolition will be regarded as the least preferred option.
However, in this instance the safeguarding and reuse of the original part of the listed
building, which is of more significant architectural and historic merit in comparison to the
extensions, is the key consideration. It is accepted that retention and conversion of the
extensions to other uses would be challenging in terms of both viability and suitability of the
buildings for conversion to an alternative use. The demolition is therefore justified on the
basis the original school building is retained as part of the redevelopment of the site, and on
balance the proposal is considered to comply with policy 9. 
Access and Connectivity
The application site is sustainably located, with a wide range of amenities and transport links
located within walking distance. This includes the amenities within Paisley town centre and
the East End local service centre, public transport links on Glasgow Road, leisure facilities at
the Lagoon, and both Williamsburgh and St John Ogilvie Primary Schools. The proposal is
fully compliant with the requirement for local living set out by NPF4 policy 15. The strength of
the 20-minute neighbourhood also ensures the density of the proposed development can be
supported at this location as residents will be able to meet the majority of daily needs without
a reliance on private car. 
Accessibility for pedestrians and cyclists has been improved with additional access points
formed along the western, eastern and southern boundaries of the site. These include a
combination of direct connections between the flatted blocks and the footway network on
Mckerrell Street and Crossflat Crescent, and stand-alone connections which enhance
permeability within the site. Existing vehicle access points are retained on both Glasgow
Road and Mckerrell Street. 
It is noted that the Roads Development Officer has recommended a suite of off-site works to
improve accessibility and connectivity on the roads surrounding the application site.
Implementation of these off-site works can be secured via condition. 
Overall, the development is considered to comply with the requirements of LDP policy I1 and
NPF4 policy 13 with regard to connecting places and sustainable transport. 
Layout and Form
Enhancements to the site layout have been negotiated at both the pre-application stage and
during the assessment of the application. These enhancements primarily relate to the
positioning of the flatted blocks, with the blocks flanking the original school building
orientated to front Glasgow Road, and the blocks to the rear realigned to better reflect the
curve of the road on Mckerrell Street and Crossflat Crescent. A proportion of the car parking
area has also been moved to the periphery to allow for additional tree planting to the rear of
the retained school building, and ancillary buildings including bin and cycle stores have been
concentrated between blocks 2 and 3 to allow for open space to be formed between block 3
and 4.

Page 10

The proposed site layout comprises of five flatted blocks positioned to the east, south and
west of the original school building. Blocks 1 and 5 flank the retained school building, with an
18-metre separation distance. These blocks mimic the 1960’s extensions with regard to their
position, and as such they are orientated to front Glasgow Road and do not project beyond
the original school building. The majority of the car parking area is located to the north of the
original school building. The layout makes use of existing car parking provision in this
regard, with some additional parking formed in the northwest corner of the site. The existing
mature trees along the Glasgow Road frontage will be retained. 
To the south of the retained school building and blocks 1 and 5 there is an internal access
road which includes additional car parking provision, and a turning head at the eastern edge
of the site. As noted above the number of parking spaces along this internal road has been
reduced to allow for additional tree planting and formation of open space. This will enhance
the environment and amenity value within the interior of the site. Blocks 2, 3 and 4 are
located along the southern boundary of the site. Associated ancillary buildings such as bin
stores, sprinkler tanks and substations have been located appropriately. 
The proposed site layout and form of the flatted development is acceptable. The layout
responds positively to the setting of the retained listed building which remains as the focal
point of the layout. Additional views of the retained school building, which are currently
blocked by the modern extensions, will also be opened up. The proposed layout is also
compatible with the streetscene and will not have a detrimental impact on the character and
appearance of Greenlaw Conservation Area which is located on the northern side of
Glasgow Road directly opposite the site. The site layout complies with the requirements of
policy ENV3 of the LDP and 7 of NPF4 with regard to respecting the setting of listed
buildings and conservation areas. 
The layout presents a positive frontage on all sides, namely Glasgow Road where the
retention of the boundaries and the trees will ensure their positive contribution to the
character of the place is maintained. Finally, the interior of the site is considered to strike an
appropriate balance between catering for parking demand whilst providing an appropriate
level of residential amenity. The additional structural tree planting and open space
incorporated into the layout are welcomed in this regard. Overall, it is considered that the
development layout and form will contribute positively to the place in accordance with NPF4
policy 14. 
A key consideration is the phasing of the development to ensure the conversion of the listed
building is undertaken at the appropriate time. It is noted that NPF4 policy 7 requires the
beneficial outcome for the historic asset to be secured early in the phasing of the
development through the use of conditions and/or legal agreements. A condition will be
applied requiring the developer to submit a detailed phasing plan prior to development
commencing. This will ensure the works to the listed building are undertaken in a timeous
manner as part of the wider development project. 
Environment and Community
The proposed development comprises of a mix of one, two, and three bedroom flats. The
mix is acceptable and appropriate for the location. The applicant has submitted an Affordable
Housing Statement which advises that the design and mix has been developed in
collaboration with a Registered Social Landlord (RSL). It is noted from the affordable
housing statement that 92 affordable housing units will be delivered at the site which is 80%
of the total provision of 115 units. The proposal is considered to comply with policies P3 of
the LDP and 16 of NPF4 with regard to provision of affordable homes. However, it is noted
that discussions with the RSL are ongoing and have not yet been concluded/finalised. In
order to secure affordable housing provision on site it is considered appropriate that a

Page 11

condition is attached to any grant of planning permission which would require the submission
of an updated affordable housing statement with finalised details and arrangements
regarding the delivery and implementation of the affordable housing. Thereafter an
appropriate legal agreement or planning mechanism would be required through the condition
to ensure the implementation of the details and arrangements set out in the approved
affordable housing statement.   
Regarding the additional requirements of policy 16, the developer has provided a Statement
of Community Benefit explaining the contribution of the development towards meeting local
housing requirements, enhancing local infrastructure, and improving residential amenity. 
It is noted that policy 16 places requirements on development proposals for new homes on
land not allocated for housing within the LDP. In this instance the proposal will be supported
by an agreed timescale for build which will be submitted via the phasing condition noted
above. The development proposal is otherwise consistent with the NPF4 spatial strategy
with regard to conserving assets, local living and compact urban growth, and constitutes a
development opportunity within the existing settlement boundary. 
It should be noted that significant weight is attached to the need for the new build residential
development to enable the retention, safeguarding and reuse of the listed school building.
Given the prominence of the site, if the building were to become vacant and potentially fall
into a state of disrepair it would have a significant detrimental impact on the character and
amenity of the area. 
Five trees at the site will be felled. It is noted that three of these will be felled to
accommodate the development, with two recommended for felling due to their condition. Of
the three trees to be felled to accommodate the development, one is a Category A Lime tree.
However, this tree is located adjacent to the vehicle access to Mckerrell Street and on the
line of the proposed internal road network which would be used to service block 1. Its
removal is therefore justified. The two other trees to be felled to accommodate the proposed
layout are Category C trees. The trees along the Glasgow Road frontage will be retained as
part of the development. As noted above, these trees make a significant positive contribution
to the character of the place, and their retention aligns with the requirements of policy P5 of
the LDP and 20 of NPF4 with regard to safeguarding the green network and open spaces. A
protection plan has been prepared to protect all retained trees during the construction phase.
The implementation of the protection plan will be required via condition. 
To compensate for the removal of the trees, the applicant has advised that 40 trees will be
planted along with provision for hedgerows and shrub planting. While the landscape
proposal requires to be updated to reflect revisions to the layout, there is sufficient scope
within the revised site layout to ensure a landscape strategy can be developed which
compensates for the removal of the trees, contributes to biodiversity gain, and creates a
good quality residential environment. An updated landscape strategy will be sought via
condition. 
Regarding impact on protected species, the applicant has submitted a bat survey which
confirms no evidence of bats within the school building. The trees identified for felling would
require to be surveyed before the work was undertaken in line with the recommendations
within the arboricultural report. It is not considered that the development will have a
significant impact on protected species. The existing ecological and natural heritage value of
the site is limited due to the presence of hard standing and buildings across the majority of
the site area. The key natural heritage assets, namely the mature trees along the Glasgow
Road boundary, will be retained. Additionally, the proposals present an opportunity for
biodiversity gain via a new landscape strategy for the site. The development is considered to
comply with policy ENV2 of the LDP and policies 3 and 6 of NPF4.

Page 12

The proposal includes a strategy for managing surface water. The strategy primarily
comprises the treatment and attenuation of surface water through filter trenches and
underground storage. It is noted that the proposal is for surface water to discharge to the
combined sewer in line with the current drainage arrangements at the site. However, the
incorporation of SUDS features will ensure that flow rates, volume and water quality are at
least equal to but will likely provide betterment on the current surface water management
arrangements and not increase the risk of surface water flooding to others. It is noted that
the proposed surface water strategy requires separate agreement with Scottish water.
However, the applicant has advised that Scottish water have confirmed acceptance of the
discharge of surface water to the combined sewer. The strategy is considered to be sufficient
for the purposes of this application and is compliant with the requirements of policy I3 of the
LDP and 22 of NPF4. The site is not at risk from river or coastal flooding.   
The proposal includes provision for communal bin storage. The bin stores are enclosed by
horizontal timber boarding measuring 1.8 metres in height. The storage areas will allow for
the segregation of waste streams, and the arrangements have been agreed with the
Councils Recycling Officer. The development is compliant with the requirements of policy 12
of NPF4 and the New development Supplementary Guidance on provision for waste
recycling in new developments.   
As noted above, the revised layout now includes provision of an additional area of open
space located between blocks 3 and 4. This will complement other areas of open space
within the layout, including areas around the retained listed building. It is noted that the
Councils Residential Design Guide seeks children’s play areas for developments that
exceed 50 units. In this instance it is noted that provision of an equipped play area was
raised as a concern during the applicants public consultation. Additionally, the site is within
close proximity to several existing areas of open space and equipped play areas including
those at Barshaw Park and East End Park. It is therefore not considered necessary to seek
provision of an equipped play area in this instance. 
Children’s Services have advised that a discussion is required on developer contributions for
both St John Ogilvie Primary School and St Andrews Academy. It is noted that the
development will generate an additional 11.88 pupils which requires a contribution of
£665,280 based on the developer contribution per pupil multiplier set out in the Councils
Planning Guidance on Developer Contributions (Education). 
In light of the request from the Council’s Education/Children's Services department, the
applicant submitted a viability assessment that sought to justify and evidence why it would
not be viable to pay the financial contribution requested. In line with the Developer
Contributions guidance, the Council’s independent external residential consultancy surveyor
(Rapleys) was appointed to consider the viability assessment and to provide a professional
view to as to whether the justification and evidence presented demonstrated that the
development would be unviable with the payment of the contribution sought. The conclusion
of the independent consultant's review of the applicant's viability case is that the payment of
the contribution would make the development more unviable and would therefore reduce the
likelihood of the proposal being delivered. In line with the provisions of the guidance the
contribution should be waived. 
Buildings and Design
The applicants have adopted a different approach to the design of blocks 1 and 5 which
flank the retained listed building, and blocks 2, 3 and 4 which are located along the southern
boundary.

Page 13

Blocks 1 and 5 are finished in red brick and grey concrete tiles to reflect the red sandstone
and slate roof finish of the retained listed building. The design also incorporates elements
which reflect the detailing and proportions of the listed building including string courses and
curved coping stones. 
Crucially it should be noted that following negotiations with the Council the height of blocks 1
and 5 were reduced from five to four stories. The originally proposed five-storey block was
considered to overdominate the retained listed building, to the detriment of its setting. The
reduction to four stories has significantly improved the relationship between the listed
building and blocks 1 and 5, and ensures the listed building retains an appropriate setting
and is viewed as the focal point of the development. 
Blocks 2, 3 and 4 are finished in blonde sandstone and grey concrete tiles to reflect the
appearance of the tenement flats on Mckerrell Street and Crossflat Crescent. It is noted that
the five-storey scale of blocks 2, 3 and 4 exceeds the predominantly four storey scale of the
surrounding built environment. However, the scale of development will not have a significant
detrimental impact on the character or appearance of the area, and as noted above the
density of the development is appropriate given the strength of the 20-minute neighbourhood
at this location. Additionally, the viability of the scheme with regard to retaining and
converting the listed building is also a consideration in support of the scale and density of the
development. 
On balance the overall design and appearance of the flatted blocks is acceptable. The
distinguishment in design and appearance between blocks 1 and 5, and blocks 2, 3 and 4
helps tie the development into the surrounding built environment by reflecting the character
and context of the area. Crucially the setting of the retained listed building is also now
considered to be acceptable following the reduction in height of blocks 1 and 5. The building
design and scale complies with the requirements of policy ENV3 of the LDP and 7 of NPF4
with regard to respecting the setting of listed buildings and conservation areas and will
contribute positively to the place in accordance with NPF4 policy 14. 
Matters relating to the works associated with the conversion of the listed building to
residential use will be assessed via the concurrent listed building application 25/1050/LB. 
The requirements set out within Policy I7 of the LDP and 19 of NPF4 relating to zero and low
carbon buildings are noted. The applicant has advised that the detailed design of the
buildings in this regard is still to be developed. Submission of an energy design analysis to
demonstrate compliance with these policies can therefore be managed via condition. 
The proposed bin stores and cycle stores are finished in horizontal timber boarding, and are
considered to be acceptable in terms of design. While details of the sprinkler tanks and
substation have not been provided, these can be requested via condition. 
The existing stone boundary wall will be retained, with the coping made good and the
railings painted black. New openings within the existing boundary wall will be formed and
dressed utilising retained stone where required. Gaps in the southern boundary created
following demolition of the existing buildings will be filled with a combination of new infill
walls constructed to match, and metal railings to match. 
The flatted blocks have been positioned to ensure there is a minimum window to window
separation distance of 18 metres. There is also an 18-metre separation distance between
blocks 2, 3 and 4 and the flats on the opposite side of Crossflat Crescent. The daylight and
sunlight assessment submitted with the application concludes that the development will offer
future occupants a good level of daylight and sunlight. As noted above, there is considered

Page 14

to be an acceptable provision of open space within the development, with each block
benefiting from an acceptable setting. 
Environmental Protection have made no objection to the development on amenity grounds
such as noise or air quality. A site investigation has been requested to manage issues
related to potential ground contamination. This can be requested via condition. 
In view of the above, it is considered that residents within the development will have an
acceptable level of amenity. 
Regarding potential impact on neighbouring properties, matters relating to privacy have been
noted above. Minimum standards relating to window-to-window separation have been
achieved. The development will not have a significant impact on sunlight as the flatted
blocks are located to the north, east and west of the existing properties on Mckerrell Street
and Crossflat Crescent. With regard to daylight, the findings within the daylight and sunlight
assessment submitted by the applicant are noted with the assessment concluding that all
neighbouring properties assessed will not be impacted by the introduction of the proposed
development and will remain to enjoy adequate daylight and sunlight levels. 
The definition of adequate levels is adherence to the recommended criteria for the daylight
and sunlight tests as set out within the Building Research Establishment (BRE) guidance
‘Site Layout Planning for Daylight and Sunlight: a guide to good practice’ 2022 which the
daylight and sunlight assessment confirms are met. 
A Construction Environmental Management Plan (CEMP) will be requested via condition.
The CEMP will propose measures to mitigate environmental impacts associated with the
construction phase, namely noise, dust and artificial lighting. 
A separate plan detailing measures to secure the site and the retained listed building with
the view to preventing unauthorised access during the construction phase will be sought via
condition. 
In view of the above assessment, the development is found to comply with the detailed
requirements of Policy P1 of the LDP. 
Regarding the other development plan policies not already addressed above, the
development is considered to comply with NPF4 policies 1 and 2 relating to tackling the
climate and nature crisis, climate mitigation and adaption. The development will provide
residential accommodation in a sustainable location. It will also facilitate the retention and
reuse of a listed building, with provision also made to enhance management or surface
water, and biodiversity. Sustainability is also incorporated into the design and construction of
the flatted blocks.   
The development has been screened against The Town and Country Planning
(Environmental Impact Assessment) (Scotland) Regulations 2017 and does not meet the
threshold by which an Environmental Impact Assessment is required. 
Representations
The matters raised in the letters of representation have been considered as part of the
assessment of the application, and a response to each matter raised is provided below in
bold. 
1 – The design, scale and positioning of the proposed flatted blocks do not fit with the
surrounding area and have a detrimental impact on the setting of the listed building.

Page 15

Matters relating to the proposed layout and setting of the listed building have been
considered and addressed in the assessment section above. 
2 – Site layout lacks amenity and play space. 
The site layout has been amended to introduce additional amenity space. 
3 – Lack of sunlight for north facing flats. 
Matters relating to daylight and sunlight have been discussed in the assessment
section above. 
4 – Additional trees should be planted. 
Planting of additional trees will be sought as part of a landscape strategy for the site. 
5 – Gates on Glasgow Road frontage need to be restored and re-hung, and split copings
need replaced. 
The boundaries drawing submitted by the applicants notes that stone copings will be
made good. Matters relating to the restoration of the gates will be addressed via the
concurrent listed building application 25/1050/LB. 
6 – No air quality assessment has been submitted. 
Environmental Protection have not requested an air quality assessment, and it is not
considered to be necessary in this regard. 
7 – Noise impact exceeds World health organisation guidelines and requires ‘sealed window’
living environment. 
Environmental Protection have advised that the Noise Impact Assessment submitted
as part of the application is acceptable. 
8 – Lack of play provision. 
Matters relating to play provision have been considered and addressed in the
assessment section above. 
9 – Parking provision shortfall. 
Parking provision is acceptable, and the Councils Roads Development Section has
not raised any objections regarding parking provision. 
10 – Address on Proposal of Application Notice is incorrect. 
The Proposal of Application Notice confirms the proposed development site as ‘Site
at Paisley Grammar School, Glasgow Road, Paisley, PA1 3RP’. The notice also
includes a location plan which identifies the site boundary, and this is consistent with
the planning application boundary. 
11 – Flood risk. 
Matters relating to flood risk have been considered and addressed in the assessment
section above.

Page 16

12 – Application form states part of the site is an agricultural holding. 
This section of the application form relates to certification of land ownership to
ensure notification is undertaken accurately and all those with an interest in the site
are notified. In this instance the applicants have certified that they do not own all the
land within the application site. Notification of the application has been undertaken in
accordance with the regulations.   
13 – Design statement refers to a business centre. 
The Design and Access Statement has been updated to remove reference to the
business centre. 
14 – The pre-application consultation report refers to a hotel development. 
The pre-application consultation report has been updated to remove reference to a
hotel development. 
15 – No Construction Environmental Management Plan has been submitted. 
A Construction Environmental Management Plan (CEMP) will be requested via a
suspensive planning condition. 
16 – No vibration assessment has been submitted. 
Environmental Protection have not requested a vibration assessment, and it is not
considered to be necessary in this regard. 
17 – No asbestos management plan has been submitted. 
Environmental Protection have not requested an asbestos management plan, and it is
not considered to be necessary in this regard. It should be noted that potential
asbestos ground contamination would be addressed via the Site Investigation.
Asbestos within the building would be a matter for Building Standards to consider as
part of the warrant to demolish the buildings. 
18 – No construction noise assessment has been submitted. 
Measures to mitigate construction noise will form part of the Construction
Environmental Management Plan (CEMP) submitted via condition. 
19 – No transport assessment has been submitted. 
A Transport Statement has been submitted, and there has been no objection to the
development from the Councils Roads Development section. 
20 – No drainage assessment has been submitted. 
Matters relating to drainage have been considered and addressed in the assessment
section above. 
21 – Overshadowing.

Page 17

Matters relating to daylight, sunlight and overshadowing have been considered and
addressed in the assessment section above. 
22 – Loss of trees. 
The extent of tree loss associated with the development has been discussed above.
There are five trees being removed and this is considered to be acceptable. A
landscape strategy will ensure compensatory planting is undertaken to offset any
loss. 
23 – No affordable housing statement has been submitted. 
An affordable housing statement has been submitted. 
24 – Overdevelopment of the site to the detriment of amenity. 
Matters relating to density, the site layout and amenity are discussed above. 
25 – Sewage capacity. 
Sewage capacity is a matter for Scottish water to consider. Scottish water has not
objected to the development. 
26 – Risk of overheating due to south facing glazing and ‘sealed window’ living environment. 
Environmental Protection has not raised any concerns over these matters. Risk of
overheating within the flats would be a matter for Building Standards to consider as
part of the building warrant.   
27 – Traffic disruption, waste and air pollution. 
Roads Development and Environmental Protection have not raised any objections
relating to traffic disruption or air pollution. Provision for segregated storage of waste
has been agreed with the Councils Recycling Officer. 
Planning Obligations
The Council is required to provide a summary of the terms of any planning obligation(s) and
any associated legal agreement(s) and/or mechanism(s) required to secure them including
those provisions under The Town and Country Planning (Scotland) Act in relation to the grant
of permission for the proposed development. 
As outlined in the assessment section above, it has been demonstrated that the education
contribution is not required and so this does not require to be secured. 
A scheme to secure the provision of affordable housing which will be secured and under the
terms of an appropriately worded planning condition as set out below (condition 12). 
Conclusion
In view of the above, it is considered that the proposal would accord with the relevant
provisions of the Development Plan. There are no other material considerations. Planning
permission should therefore be granted subject to conditions. 
Recommendation
Grant subject to conditions.

Page 18

Reason(s) for Recommendation 
1. The proposal accords with the provisions of the Development Plan and there were no
material considerations which outweighed the presumption in favour of development
according with the Development Plan. 
Condition(s)        
1. That the development hereby permitted must be begun within three years of the date of
this permission. 
Reason: To be in compliance with Section 58 of The Town and Country Planning
(Scotland) Act 1997 as amended by Section 32 of The Planning (Scotland) Act 2019. 
2. That prior to the commencement of development, a detailed phasing plan shall be
submitted for the prior written approval of Renfrewshire Council as Planning Authority.
For the avoidance of doubt, the phasing plan submitted shall show the phasing of works
to the category B listed Paisley Grammar and demonstrate how these will progress
concurrent with the works associated with the five new build residential blocks as
enabling development. Thereafter, the implementation of the development shall be
undertaken in strict accordance with the approved phasing plan unless otherwise
agreed in writing by Renfrewshire Council as Planning Authority.  
Reason: To comply with the requirements of part n) of policy 7 of National Planning
Framework 4 and to safeguard the long-term restoration and reuse of the Category B
listed Paisley Grammar in a timeous manner. 
3. That all measures set out within the approved Tree Protection Plan as detailed in
Section 6 of the approved Arboricultural Impact Assessment and Tree Protection Plan
dated January 2026 shall be implemented on site during the full construction phase of
development unless otherwise agreed in writing by Renfrewshire Council as Planning
Authority. 
Reason: To protect retained trees during the construction phase of development. 
4. Unless otherwise agreed in writing by Renfrewshire Council as Planning Authority, all
treeworks shall be undertaken in strict accordance with the specification as detailed in
Section 7 of the approved Arboricultural Impact Assessment and approved Tree
Protection Plan dated January 2026. 
Reason: To ensure treeworks are undertaken in accordance with the relevant standards. 
5. No development shall commence on site until written approval of: 
a) a Site Investigation report (characterising the nature and extent of any soil, water and
gas contamination within the site); and, if remedial works are recommended therein. 
b) a Remediation Strategy and Implementation Plan identifying the proposed methods
for implementing all remedial recommendations contained with the site investigation
report prepared in accordance with current authoritative technical guidance, has been
provided by Renfrewshire Council as Planning Authority. 
Reason: To ensure that the site will be made suitable for its proposed use. 
6. Prior to the occupation of any flatted unit within an identified phase of development, the
developer shall submit for the written approval of Renfrewshire Council as Planning
Authority:

Page 19

a) a Verification Report confirming completion of the works specified within the
approved Remediation Strategy for that phase of development; or 
b) if remediation works are not required but soils are to be imported to site, a Verification
Report confirming imported soils are suitable for use on the site shall be submitted to
the Planning Authority and approved in writing   
Reason: To demonstrate that the works necessary to make the site suitable for use have
been completed. 
7. Prior to the commencement of development on site, full details of all landscaping works 
shall be submitted as part of a landscape strategy for the written approval of
Renfrewshire Council as Planning Authority. The landscape strategy shall include (but
not be limited to) provisions in respect of: 
a.  all existing trees, hedgerows, and boundary treatments both within and on the edge
of the site to be retained;
b. confirmation of any hedgerows or trees that need to be removed including any to form
the visibility splays associated with the access sightlines; 
c. all proposed trees, shrubs, hedgerows, areas of grass/wildflower seeding, turfing
including size, species, spacing and location;
d.  all areas of hard standing including location and materials;
e.  all areas of surface water including ponds, and measures for the sustainable
management and drainage of surface water where applicable;  
g.  a timetable for the implementation of the landscape strategy; 
h.  a strategy for the future management and maintenance of all landscaped areas
including provision for replacement of trees, shrubs, hedgerows and areas of
grass/wildflower seeding and turfing if they were to become diseased, die, 
become seriously damaged or are removed within 5 years of being planted. 
The approved landscape strategy shall thereafter be implemented on site in accordance
with the approved timetable and shall be managed and maintained thereafter for the
duration that the approved residential development is occupied unless otherwise agreed
in writing by Renfrewshire Council as Planning Authority. 
Reason: To ensure a robust landscaping strategy is implemented in the interests of
visual amenity, landscape character and biodiversity 
8. That all windows to be installed within the new build flatted blocks 1 – 5 as shows in
approved drawing 202 revision G titled Site Plan as Proposed (and any subsequent
approved revisions to this drawing) hereby approved shall meet the requirements of the
specification set out in Appendix 6 of the approved Noise Impact Assessment Rev 00
dated 6th February unless otherwise agreed in writing with Renfrewshire Council as
Planning Authority. 
Reason: To ensure noise impact is mitigated in the interests of residential amenity.   
9. That prior to the occupation of any of the flats hereby approved, all of the site works as
detailed in the approved drawing 25901-NX-XX-XX-GA-AR-215 titled ‘Site Plan as
Proposed Road Alterations’ (and any subsequent approved revisions to this drawing)
shall be completed. 
Reason: To ensure the development can be accessed safely.

Page 20

10. That prior to the commencement of development on site, the developer shall submit an
Energy Design Analysis for the written approval of Renfrewshire Council as Planning
Authority demonstrating the fabric performance of the buildings and the installation of
technology that provides low or no amounts of carbon dioxide emissions, to reduce the
predicted emissions from the buildings by at least 15% below 2007 building standards
(unless otherwise agreed in writing with the Planning Authority). The Energy Design
Analysis shall also demonstrate the feasibility of connecting (or making provision for
connection at a later date) the development to a Heat Network Zone. The buildings shall
thereafter be implemented and developed in strict accordance with the approved Energy
Design Analysis unless otherwise agreed in writing by Renfrewshire Council as Planning
Authority. 
Reason: To ensure the building is designed in a manner that reduces energy
requirements and carbon emissions. 
11. That prior to the commencement of development on site, the developer shall submit a
plan and specification detailing the final location, design and finish of all substations and
sprinkler tanks (including the associated housing) to be installed at the site. Only the
approved substations and sprinkler tanks shall thereafter be installed at the site unless
otherwise agreed in writing by Renfrewshire Council as Planning Authority. 
Reason: To ensure the substations and sprinkler tanks are of an appropriate design and
finish in the interests of visual amenity. 
12. Further to the affordable housing statement submitted, no development shall take place
on the site until an updated scheme for the provision of affordable housing as part of the
development has been submitted to and approved in writing by Renfrewshire Council as
Planning Authority. The affordable housing on the site shall be provided in accordance
with the approved scheme and shall meet the definition of 'affordable housing' as set out
in National Planning Framework 4. 
The scheme shall take account of the Council's current guidance on affordable housing
and shall include: 
a)  Provisions for such other agreements (if any) as may be necessary for the delivery of
affordable housing on the site, which affordable housing shall comprise not less than 25
per cent of the total number of homes (market value homes plus affordable homes) built
on the site and which affordable housing will be provided within each phase or identified
sub-phase of the development on the site or an agreed alternative (such as payment of
contributions towards the provision of affordable housing). 
b)  The types of home (such as house, maisonette or flat) and the size of the proposed
affordable homes for rent; the density of the affordable homes; the design code (such as
'Housing for Varying Needs - A Design Guide' Parts 1 (Houses  and  Flats) and 2
(Housing with Integral Support)) (if any) for the proposed homes; the types of tenure for
the affordable homes (namely, 'social rented', 'low-cost housing for sale' (both
subsidised and unsubsidised) and 'mid-market or intermediate rent' as those terms are
defined in the Scottish Government's Planning Advice Note 2/2010: Affordable Housing
and Housing Land Audits or any future Scottish Government document that replicates
that advice) and the location of the affordable housing provision to be made on site; 5.  
c)  The timing of the occupation of the market homes within each phase or sub-phase of
the site and the delivery of the affordable homes in the relevant phase or sub-phase of
the site;

Page 21

d)  The arrangements for the transfer of affordable homes to an affordable housing
provider or for the management of the affordable homes; 
e)  The factoring and/or common maintenance regime (including charges) for affordable
homes; 
f)  The arrangements to ensure that any affordable home is affordable for both first and
subsequent occupiers of the affordable home; and  
g)  The occupancy criteria to be used for determining the identity of occupiers of the
affordable homes and the means by which such occupancy criteria shall be enforced. 
The approved scheme for the provision of affordable housing shall thereafter be
implemented on site and all affordable housing units once complete shall function and
be let/rented, occupied and maintained in strict accordance with the approved scheme
for the life of the development. No changes to the approved scheme shall take place
without the prior written approval of the Planning Authority.    
Reason: To ensure that satisfactory arrangements are made for the provision of
affordable housing on the site. 
13. That prior to the commencement of any works on site, a Construction Environmental
Management Plan (CEMP) shall be submitted to and approved in writing by
Renfrewshire Council as Planning Authority.  The CEMP shall include (but not be limited
to) provisions in respect of: 
- Organisational chart of project personnel and key contacts.
- Environmental Management Policy Statement including all relevant legislation,
regulations and technical guidance applicable to the nature and scope of the
development.
- Identification of environmental assets and the potential impacts related to noise,
dust, smoke, fumes and artificial light.
- Proposed Environmental Mitigation Measures and control plans with regard to the
environmental assets and potential impacts identified above; to take cognisance of
relevant Legislation and Regulations and follow appropriate Technical Guidance/
best practice.
- Inclusion of an Emergency/ Incident Response Plan.
- Procedures for audits (internal and external), monitoring and inspections and
environmental performance monitoring to ensure the Environmental Mitigation
Measures are implemented and potential impacts mitigated, and the site remains
secure. 
The measures set out within the approved CEMP shall thereafter be implemented on
site during the full construction phase of development unless otherwise agreed in writing
by Renfrewshire Council as Planning Authority. 
Reason: To ensure environmental impacts are mitigated during the construction phase,
and that the construction phase is undertaken safely. 
14. That all measures for the treatment and attenuation of surface water as set out in
approved drawing number 214 revision A titled ‘Site Plan as Proposed SUDs Strategy
(and any subsequent approved revisions to this drawing) shall be implemented on site
and brought into use prior to the occupation of any of the flats hereby approved. There

Page 22

shall be no revisions to this strategy or the timetable for its implementation without the
prior written approval of Renfrewshire Council as Planning Authority. 
Reason: To ensure surface water is managed sustainably. 
15. That only the finishing materials detailed in approved drawings 520 revision C titled
Typical Elevations New Build Blocks 1 and 5, 521 revision B titled Typical Elevations
New Build Block 4, and 522 titled Typical Elevations New Build Blocks 2 and 3 shall be
used in the development of the site. There shall be no revisions to the approved
schedule of finishing materials without the prior written approval of Renfrewshire Council
as Planning Authority. 
Reason: To ensure finishing materials are appropriate in the interests of visual amenity. 
16. Prior to the commencement of development, measures to secure the site and the
retained Category B listed Paisley Grammar building to prevent unauthorised access
during the construction phase shall be submitted to and approved in writing by
Renfrewshire Council as Planning Authority. The approved measures shall thereafter be
implemented on site for the duration of the full construction phase of development
unless otherwise agreed in writing by Renfrewshire Council as Planning Authority. 
Reason: In the interests of protecting the Category B listed Paisley Grammar building. 
Advisory Note(s)   
1. Glasgow Airport Safeguarding has observed that given the nature of the proposed
development it is possible that a crane may be required during its construction. In the
circumstances, your attention is drawn to the requirement within the British Standard Code
of Practice for the safe use of cranes, for crane operators to consult the aerodrome before
erecting a crane in close proximity to an aerodrome. This is explained further in Advice Note
4 - Cranes (available at https://www.aoa.org.uk/policy-campaigns/operations-safety). 
For further information please contact James Weir, Development Standards Team, Email:
james.weir@renfrewshire.gov.uk 
Schedule of Plans Reviewed 
Drawing Number Revision Drawing/Document Title  
Design and Access Statement 
March 2026 Pre-Application Consultation (PAC) Report  
Viability Statement 
April 2026 Planning Supporting Statement (School
Conversion)  
Stage 1 Bat Survey (Desk Study and
Preliminary Roost Assessment 
January 2026 Arboricultural Impact Assessment and
Tree Protection Plan 
02 Daylight and Sunlight Study 
1  Paisley Grammar ground Investigation
Report and Geotechnical

Page 23

Design Report 
00 Noise Impact Assessment 
March 2026 Transport Statement 
January 2026 Level 2 Flood Risk Assessment 
January 2026 Outline Sustainable Drainage System  
Affordable Housing Statement 
July 2026 Statement of Community Benefit
310 D Existing Building Ground Floor Plan as
Proposed
954  D Window Embrasures and Timber Panelling
900 E Boundary Details
202 G Site Plan as Proposed
206 B Cross Section Through Site North to South
207 D Long Elevation of site from Glasgow Road
214 A Site Plan as Proposed SUDS Strategy
215 - Site Plan as Proposed Road Alterations
304 - Existing Building Floor Plans as Existing
Basement Plan
314 A Existing Building Basement Floor Plan as
Proposed
410 B Section A:A as Proposed
411 A Section B:B as Proposed
412 A Section C:C as Proposed
510 C North and East Proposed Elevations
511 C South and West Proposed Elevations
955  A First Floor Plan Window Embrasures and
Timber Panelling
956 A Second Floor Plan Window Embrasures
and Timber Panelling
102 - Proposed AOV Central Hall
311 B Existing Building First Floor Plan as
Proposed
100 - Location Plan as Existing
300 - Existing Building Floor Plan as Existing
Ground Floor Plan
301 - Existing Building Floor Plans as Existing
First Floor Plan
302 - Existing Building Floor Plans as Existing
Second Floor Plan
303 - Existing Building Floor Plans as Existing
Roof Plan
312 - Existing Building Second Floor as
Proposed
313 - Existing Building Roof Plan as Proposed
400 - Section A:A as Existing
401 - Section B:B as Existing
402 - Section C:C as Existing
500 - North and East Elevations as Existing
501 - South and West Elevations as Existing
321 A New Build Floor and Roof Plans Block 1
and 5
322 F New Build Floor and Roof Plans Block 2
and 3

Page 24

323 D New Build Floor and Roof Plans Block 4
350 B New Build Flat Plans Type 1 – Typical 2
Bed
351 B New Build Flat Plans Type 2 – Typical 1
Bed
352 B New Build Flat Plan Type 3 – Typical 3
Bed
353 A New Build Flat Plans Type 4 – Typical 2
Bed Wheelchair Accessible
354 - New Build Flat Plans Type 5 – Typical 3
Bed
414 C Cross Section E-E New Build 5 Storey
416 - Cross Section G-G New Build 4 Storey
417 - Cross Section H-H New Build 4 Storey
418 - Cross Section J-J New Build 4 Storey
520 C Typical Elevations New Build Blocks 1 and
5
521 B Typical Elevations New Build Block 4
522 - Typical Elevations New Build Blocks 2 and
3
903 - Bin Store Type 2 as Proposed
413 - Cross Section D-D
415 - Cross Section F-F
902 - Cycle Store
200 - Existing Site Plan