Democracy Spraffa

DRAFT Petition for the Renovation of Our Lady of Peace School

Renfrewshire Council · 24 March 2025
Back to Petitions Board — 24 March 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

To: Petitions Board 
On: 24 March 2025
Report by: Director of Finance and Resources 
Heading: Petition for the Renovation of Our Lady of Peace School 
1. Summary 
1.1 The Council has agreed procedures in relation to the submission of petitions
including parameters for determining valid petitions and those areas where
petitions would not be valid. 
1.2 All petitions are to be submitted to the Board for consideration. Where the
Head of Corporate Governance does not consider a petition to be valid in
terms of the Council’s Petitions Procedure a summary will be provided to
the Board outlined the reasons why. However, it is for the Board to
determine the validity of such petitions. 
1.3 A petition containing 749 signatures has been received from Ms D
Asenova in the following terms: -  
“Petition for Renovation of Our Lady of Peace School 
Dear Parents, Guardians, and Members of the Community, 
I am reaching out to seek your support in advocating for renovations at
Our Lady of Peace School. While some efforts, such as repainting, and
rewiring after repainting have been made recently, significant issues
remain unaddressed. These directly affect the safety, comfort, and overall
quality of the learning environment for our children. 
Urgent Issues Needing Attention 
Carpets: The carpets are heavily worn, stained, and unhygienic. They are
well past their intended lifespan and emit unpleasant odors. We are
requesting that all carpets be replaced with linoleum flooring, which is
durable, easy to maintain, and better suited for a modern educational
setting. The Linoleum of the corridors also needs to be replaced, along
with the coat racks and the hooks should be adjusted to ensure the
children have enough space and easy access to their belongings without

Page 2

causing clutter. With a proper assessment, this issue can be effectively
resolved. 
Sink Units: The units under the sinks and the double basin sinks and the
units for extra storage  in classrooms are in critical condition. They are
unsafe and no longer fit for purpose. We urgently call for their replacement
to ensure compliance with health and safety standards. 
Football Pitch: The current pitch is in poor condition, making it unsuitable
for use in various weather conditions. This limits the children’s ability to
engage in outdoor sports, an essential part of their physical development.
We propose the pitch be upgraded to meet modern standards, ensuring it
is usable year-round. 
Gym/Lunch Hall Curtains: The large blue curtains separating the indoor
gym hall from the lunch area are clearly worn out and require replacement.
Upon closer inspection, it is evident that they are not securely attached to
the curtain rods, posing a potential safety risk. 
Legal Framework Supporting this Petition 
Scottish law sets clear standards that local councils must meet to ensure
children are provided with safe, high-quality educational environments.
The following legislation is particularly relevant: 
Education (Scotland) Act 1980: Councils are required to provide and
maintain adequate school facilities for both physical and academic
development. 
Example: The condition of the football pitch and gym hall curtains falls
short of these requirements. 
Scottish Schools (Parental Involvement) Act 2006: This act promotes
active parental involvement in decisions related to school facilities and
ensures a supportive learning environment. 
Example: Parents and the wider community have concerns about unsafe
and outdated infrastructure, yet these remain unresolved. 
Standards in Scotland’s Schools Act 2000: Every child is entitled to an
education in an environment that supports their well-being and academic
growth. 
Example: Worn-out carpets, unsafe sink units, and damaged gym curtains
compromise the quality of the environment, directly impacting children’s
daily experiences. 
Education (Additional Support for Learning) (Scotland) Act 2004: Facilities
must meet the diverse needs of all pupils, including those requiring safe,
accessible spaces. 
Example: Poor flooring and inadequate fixtures create unnecessary
barriers to learning for children with additional support needs.

Page 3

Our Demands 
We are calling on the council to: 
• Replace all carpets with linoleum flooring. 
• Replace the sink units in all classrooms with safe, modern
alternatives. 
• Renovate the football pitch to meet modern standards and enable
year-round use. 
• Replace the blue curtains in the gym/lunch hall with secure and
durable new ones. 
Call to Action 
The council is legally obligated under the above legislation to provide and
maintain facilities that ensure the safety and well-being of our children.
We strongly urge the council to: 
• Fully assist in addressing these critical issues. 
• Take full responsibility and action to make these renovations a
reality. 
• Provide expected start dates for the work and a timeline for
completion to ensure transparency and accountability. 
• Your support is essential to make this happen. 
Join Us 
By signing this petition, you help amplify our voices and demonstrate to
the council that the entire community stands united in demanding these
much-needed improvements. 
Together, we can create a better, safer, and more inspiring environment
for our children to learn, grow, and thrive. Please sign the petition and
share it widely within your network. Every signature brings us closer to
making this vision a reality. 
Thank you for your time, your support, and your commitment to improving
Our Lady of Peace School for the benefit of all.” 
1.4 The Head of Corporate Governance has reviewed this petition and has
considers it valid in terms of the procedures. 
1.5 The Council’s Education Manager (Resources) has provided a response
to the concerns raised in the petition and where appropriate suggested
actions to resolve them as outlined below: -

Page 4

Renfrewshire Council has an agreed Learning Estate Strategy that
continues to develop and seeks to address all schools in Renfrewshire.
This offers an objective approach to prioritising how future investment will
be made for major intervention in our schools. It is recognised however,
that this overarching strategy is a long-term initiative and investment in our
schools must continue. 
Our Lady of Peace Primary School has received significant funding in
recent years, in excess of £800,000. This investment has allowed a full
building rewire, plastering and decoration, new lighting, and new ceiling
tiles. With the financial pressure that the Council is under, it is not possible
to invest to the level that school communities would like, and the Council
must manage this to ensure that schools building is safe, and suitable for
delivering the curriculum.  Renfrewshire Council does however, continue to
invest in light of financial pressure, and in recognition of the important
matters raised in the petition, further work will now be progressed.  
Council officers have visited the school to assess the specific points raised
as part of this petition, and a further budget in excess of £100,000 has been
applied to address these points. Whilst work remains ongoing to determine
exactly what will be possible to achieve with this budget, it will specifically
consider: 
• Carpets
• Sink units 
• Sports pitch 
The school receives a devolved budget each year which can be used for
matters such as curtain improvement, of which the school will consider
moving forward to allow the additional budget to be prioritised for the
matters raised above. The school have assessed the curtains and do not
deem these to be a safety risk. 
This further intervention will enhance the recent improvement works at Our
Lady of Peace Primary School and will take a positive step forward in
enhancing the environment for learning and teaching. 
1.6 The role of the Board is to consider the petition and take the appropriate
action in respect of the petition which will be one of the following: 
(a) that no action is taken, in which case the reasons will be specified
and intimated to the petitioner; 
(b) that the petition be referred to the relevant director/and or policy board
for further investigation, with or without any specific recommendation; or 
(c) refer the petition to another organisation if the petition relates to that
organisation. 
1.7 The principal petitioner, together with one supporter has been invited to
attend the meeting.

Page 5

2 Recommendation 
2.1 That the Board considers the petition. 
3. Implications of the Report 
1. Financial – none 
2. HR & Organisational Development – none 
3. Community/Council Planning - none 
4. Legal – none 
5. Property/Assets – none 
6. Information Technology - none. 
7. Equality & Human Rights - none 
The Recommendations contained within this report have been
assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report. If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of
the assessment will be published on the Council’s website. 
8. Health & Safety - none 
9. Procurement - none 
10. Risk - none. 
11. Privacy Impact - none 
12. Cosla Policy Position – not applicable. 
13. Climate Risk – not applicable 
List of Background Papers 
(a) Background Paper -  Petition 
Author: Euan Gray, Senior Committee Services Officer

Page 6

Tel: 0141 487 1099 Email: euan.gray@renfrewshire.gov.uk