ARGYLL AND BUTE COUNCIL                                             OBAN, LORN AND THE
ISLES AREA COMMITTEE     
ROADS AND INFRASTRUCTURE                               JUNE 2022
SERVICES                     
ROADS AND INFRASTRUCTURE SERVICES UPDATE 
1.0 INTRODUCTION 
1.1 This report format and frequency for these reports were agreed as part of the
previous Council. The purpose of the report is to provide a general update on
key activities of the Service over recent months and to enable a discussion on
key, high level topics and projects. As part of developing future committee
structure and workplans the purpose and effectiveness of this standing item
should be reviewed. 
1.2 As part of the Member Induction Programme the Head of Roads and
Infrastructure gave a brief overview of the huge range of work ongoing across
the Service area to Members at the Corran Halls in Oban on 17th May. The
slides from that presentation are available on the Member Zone system   
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Area Committee note and consider the contents of this
report, and provide feedback on the content, format and frequency. 
3.0 DETAIL 
COVID absence 
3.1 For the period of the previous report in March, although we were seeing some
easing of COVID restrictions, absence rates, as a result of self-isolation
requirements, remained high. With the recent changes to COVID restrictions,
absence rates are now more in line with pre-COVID trends.   
Capital Roads Reconstruction Programme 
3.2 The focus of the roads reconstruction programme is to recover the network
through the delivery of a mix of carriageway resurfacing schemes,
patching/surface dressing and in-situ road surface recycling, which follow the
principles set out within the Roads Asset Management Plan.

Page 2

3.3 This Council has approximately £100M of backlog maintenance in the road
network. This means that over £100M would need to be invested to bring the
road network up to an A1 standard. Most councils are in a very similar position.
Clearly in the current financial climate we are not going to see the level of
investment required to bring the road network up to an A1 condition. However,
over the last decade there has been a carefully applied strategy of delivering
revenue and capital funding collectively and delivering a series of works
designed to minimise reactive work, carry out right first time repairs wherever
possible and to deliver surfacing techniques and specifications which
maximizes the amount of repairs and resurfacing which is delivered. As with
almost all council services there is insufficient funding available to treat all the
sections of road that we’d like to do, the focus being on treating sections where
we can maximise the financial return and in so doing reduce the amount of
reactive repairs varied out. 
3.4 The total programme for this financial year for roads reconstruction is £8M Council
capital allocation and £1.6M from the Strategic Timber Transport Scheme, which
is used to match fund existing schemes on the council network where timber
extraction is programmed to be carried out. 
3.5 Oil and bitumen prices have increased significantly over recent months. Coated
roadstone used for surfacing our road and footways has increased by
approximately 20%. This will impact our programmes of work. A report detailing
the implications of the recent price increases was presented to the Environment,
Development and Infrastructure Committee (EDI) at its meeting in June. 
3.6 The Council capital allocation for the OLI area is £2,972,850, and details of
individual schemes are available on the Council website at: https://www.argyll-
bute.gov.uk/roads-capital-programme-202223 
Winter Maintenance  
3.7 This winter maintenance season ran from Friday 29th October 2021 to Friday 15th
April 2022. The annual policy will be presented to EDI Committee in September.
When freezing conditions are forecast our teams pre-treat over 750 miles of road,
which is roughly the equivalent of driving from Lochgilphead to Paris. 
3.8 Key facts from this winter season: 
 65 full fleet runs
 2,049 individual vehicle runs
 Highest turned out route A819 Inveraray to Dalmally
 Total distance travelled 105,024 miles
 Salt used 11,030 tonnes
 Total spend £2,258,228.59. 
Bridge Inspections and Capital Works 
3.9 The Infrastructure Design team continue to carry out bridge inspections to all
approx 900 structures on a rolling programme across Argyll and Bute to ensure

Page 3

they are safe and fit for purpose. This inspection regime identifies necessary
remedial works which are programmed for delivery. 
3.10 The team were also successful in a highly competitive bidding process for the
Scottish Government’s £32M Local Bridge Maintenance Fund, receiving a
funding award of £5,5M. We are currently in the process of putting a capital
programme in place to utilise this welcome funding. The fund will be used to
undertake proportionate works on bridges in need of repair, identified through
our inspection programme/records. 
LED project 
3.11 Argyll and Bute Council has 14462 street lights as part of the adopted network
of public roads. The vast majority of these have been changed over to LED.
The final stages of the project were paused as a result of the COVID pandemic
(falling into the non-essential works category). When restrictions were lifted we
encountered resourcing issues associated to staff turnover, and a backlog of
streetlighting maintenance meaning we were unable to run our normal
maintenance works concurrently with the LED scheme. We intend to complete
the remainder of the scheme utilising external labour. The final stage of the LED
installations will be completed this year. This will see the final 1,000 old-style
luminaries mainly in the Oban area changed over to LED. We expect our
contractor to start on site by the beginning of June and work through the
programme which is expected to take between six and eight weeks. 
4.0 CONCLUSION 
4.1 This report provides a general update to local members on recent Roads and
Infrastructure activities. 
5.0 IMPLICATIONS 
5.1 Policy – various policies referred to within the body of the report 
5.2 Financial – none 
5.3  Legal – the Council has various statutory obligations which are the
responsibility of RIS and set out in various Acts, such as the Roads Scotland
Act 1984. The services provided are in line with our statutory obligations 
5.4  HR – none known 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – none known 
5.5.2   Socio-economic Duty – none known 
5.5.3 Islands – none known

Page 4

5.6. Climate Change – none 
5.7  Risk – none known 
5.8  Customer Service - none 
Executive Director with responsibility for Roads and Infrastructure Services – 
Kirsty Flanagan 
Policy Lead for Roads and Infrastructure Services – Councillor Andrew Kain 
Policy Lead for Climate Change and Environment Services – Councillor Ross
Moreland 
May 2022                                                  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services