___________________________________________________________________
To:  Leadership Board
On:  4 December 2024
___________________________________________________________________
Report by:  Chief Executive 
___________________________________________________________________
Heading: Council Plan 2022/27 – six monthly progress update
___________________________________________________________________
1. Summary 
1.1 In September 2022, the Council approved a new Council Plan for
Renfrewshire, which set the strategic direction and vision for Renfrewshire,
covering the period 2022 to 2027. The Plan replaced the previous Council
Plan for 2017 to 2022.  In order to best reflect the current context, a refreshed
plan was approved by Leadership Board in June 2024, with an updated
performance framework. 
1.2 The Council Plan sits alongside a refreshed Community Plan. This covers the
longer period of 2017 to 2027, but was revised in 2022 to consider how to
respond to and recover from the unique challenges over the last few years.
The Community and Council Plans work in harmony, aligning the framework
for improving community outcomes with the priorities for the Council. 
1.3 The Council Plan sets out five strategic outcomes which the Council will work
towards, grouped as Place, Economy, Fair, Green, and Living Our Values.
Additionally, the Plan outlines a cross-cutting theme of improving outcomes
for children and families, which underpins the delivery of the five strategic
outcomes. 
1.4 Alongside this, each Council service prepares a Service Improvement Plan,
themed around the Council Plan’s strategic outcomes, demonstrating how the
services will contribute to the delivery of the Council Plan. Progress is
regularly scrutinised by the relevant Policy Boards.

Page 2

1.5 The reporting framework for the Council Plan includes an action plan and
performance scorecard, and is reported to Leadership Board biannually,
which ensures actions are adaptable to any emerging national or local
changes in circumstance while delivering agreed outcomes. This update
report covers the 37 high level actions and 35 performance and data
indicators in the Council Plan.   
1.6 This report provides an update on progress made in the six months since the
refreshed Council Plan was approved in June 2024. Council services have
made good progress delivering the five strategic outcomes and cross-cutting
theme, as outlined in section 4 of this report. A detailed summary of progress
against the action plan and key performance indicators is provided in
Appendix 1. 
2.  Recommendations 
2.1 It is recommended that members of the Leadership Board: 
• note the progress achieved since June 2024; and
• note that progress reports will continue to be presented to the Leadership
Board every 6 months. 
3. Background 
3.1 Our Council Plan 2022-2027 was refreshed in mid 2024, reflecting that
priorities may have changed since the original draft which still reflected the
immediate recovery from the pandemic.  Much of the context – financial
challenges for the public sector, the cost of living crisis – remains the same
and we have streamlined our priorities to reflect a closer focus on particular
areas. 
3.2 The Council’s vision to 2027, as described in the Council Plan is ‘Creating a
fairer Renfrewshire built on innovation, wellbeing, and opportunity’. The five
strategic outcomes which the council is working with partners, communities,
and businesses to deliver are:
• Place: working together to enhance wellbeing across communities;
• Economy: building an inclusive, green, and resilient economy;
• Fair: nurturing bright, happy, and healthy futures for all;
• Green: leading Renfrewshire to Net Zero; and
• Living Our Values: making a difference together.   
3.3 Each of these outcomes is being delivered in a way that directly contribute to
the cross-cutting theme Improving outcomes for children and families. Within

Page 3

the appendix, actions which significantly contribute to this cross-cutting theme
are highlighted with a ‘CF’ and there is a section in the performance scorecard
with indicators relating to this theme. 
3.4 Council Plan activity also sits alongside the Council’s arrangements in relation
to progressing and achieving Best Value. Updates on our Best Value
arrangements are regularly reported to Board and there is also a dedicated
page on the Council’s website with copies of relevant reports, such as the
annual thematic audits of Leadership in 2022/23 and Workforce Innovation in
2023/24. The Council will also undergo a Best Value Audit in early 2025. 
4. Progress of delivery of the Council Plan during 2024 
4.1 As outlined in Section 1, our Council Plan was refreshed in June 2024 and
this is the first update on progress on the streamlined plan.  It provides an
overview of recent achievements, progress with actions, and gives information
on any areas of action where progress has been delayed.   
Strategic Outcome 1: Place 
4.2 The Council continues to deliver major infrastructure projects across the area,
significantly investing in local communities. For example, the Council is
currently in Year 3 of our 10-year, £100m housing regeneration and renewal
programme. Various phases of demolition are being progressed following the
purchase of non-council owned properties in particular blocks, which are now
vacant. 
4.3 Work also continues on Renfrewshire’s learning estate - a comprehensive and
refreshed approach to strategically planning for the learning estate as a whole
was approved by the Education and Children’s Services Policy Board in
August 2024. In terms of current projects, the new Paisley Grammar School
Community Campus remains on track to be completed by summer 2026, and
design work on Thorn Primary is at an early stage and consultation is
scheduled to take place with the school community. 
4.4 The Regeneration team continue to support work on our town centres.  
Erskine town centre’s strategy is currently being reviewed and work is
underway to develop proposals for its public spaces and greenspaces. 
Further feasibility work will be commissioned for Johnstone, Linwood and
Renfrew.  New initiatives such as the Historic Buildings in Villages grant
scheme have proven popular and it was over-subscribed in its first year. A
new round of the Retail Improvement Scheme is underway, a grant scheme to
support repairs, improvements, upgrading, or restoration to the front of shops,
businesses, or commercial premises in Renfrewshire.

Page 4

4.5 The Council is currently developing Travel Renfrewshire 2035, our new
Transport Strategy for the area, aligned to the regional and national
programmes, and has appointed a technical consultant to support this work.
There is a programme of stakeholder engagement to inform the strategy
development and this was launched in May 2024.  A draft strategy will be
available in 2025. This strategy also aligns closely with our Plan for Net Zero,
which has a specific sustainable transport theme. 
4.6 Membership of our Local Partnerships has been refreshed and inductions
have taken place for community representatives.  During the summer, Local
Partnerships held workshops to update their local priorities and these will now
inform the work of the Local Partnerships moving forward.  A new Local
Partnerships Development Officer has been appointed and will have a key
role in supporting the development of partnerships going forward. 
4.7 Work has been progressed to develop a new Connected Communities
function within the Chief Executive’s Service, transforming how we support,
collaborate and engage with our communities. The first phase of this, which
will bring together staff from the existing Community Learning and
Development and Partnership and Inequalities teams, is well underway after a
programme of engagement and consultation over the summer months. 
Strategic Outcome 2: Economy 
4.8 Community Wealth Building is a key strand of our work to support local
economic growth and in June the Council held Renfrewshire’s Economy
Conference. It drew attendees from across the public, private and third
sectors. Following this, the Anchor Supply Chain event in October 2024 was
the latest in a series of events targeting local businesses and offering support
and guidance on tendering for public contracts. The event was supported by
key partners – the NHS, University of the West of Scotland and Scotland
Excel. 
4.9 Employability services are supporting hundreds of Renfrewshire residents to
gain skills and qualifications and move into employment.  This year we have
already welcomed over 300 new service users and continue to support 400
who joined us in 2023/24.  There is good progression through the service into
sustained paid employment.  The Council also creates apprenticeships and
traineeships and has taken on 27 new trainees so far this year. 
4.10 In relation to the Advanced Manufacturing Innovation District Scotland, known
as AMIDS, the joint venture continues to work well, and work on the Tech
Terrace development is progressing, with the first occupier expected by early
2026.  The innovative fifth generation district heating system in AMIDS was

Page 5

recently recognised at the COSLA Awards, winning the Scottish
Government’s Delivering Excellence Award. 
4.11 City Region funding has invested in improved connectivity between AMIDS and
the wider region, including the new Renfrew Bridge. In the summer the first test
of the bridge was completed. Further testing is underway ahead of its opening
later this year. The bridge connects the communities of Renfrew and Yoker and
is the first opening and closing road bridge across the river Clyde. 
Strategic Outcome 3: Fair 
4.12 The Fairer Renfrewshire programme continues to deliver a range of supports
and interventions aimed at tackling poverty and inequality.  The School
Support service is in place in all of our secondary schools, and the Family
Support service can provide advice and support to families with younger
children.  Our Winter Connections programme is now in its third year,
providing opportunities for communities to come together and enjoy a variety
of activities with some food and drink. Our Summer of Fun programme also
had another successful year and the insight of our Lived Experience Panel
helped shape our plans.   
4.13 Work continues on a place-based approach to tackling child poverty and the
current focus area is Gallowhill.  A community needs assessment is being
carried out and a range of public and third sector agencies are committed to
partnership working to tackle the issue. 
4.14 A recent focus of Trauma Informed and Responsive Renfrewshire programme
has been on the development of a Level 1 online training resource, and on
refreshing the membership of the steering group.  In order to build a wider
network of staff able to deliver training, colleagues are being supported to
apply for national ‘train the trainer’ events.  In Housing, almost 100 staff have
completed trauma training in 2024 and are embedding it in practice. 
4.15 The recent census releases have provided a significantly updated picture of
Renfrewshire’s communities – work is well underway to analyse this data, with
a detailed presentation shared with the full Chief Officers Team in September.  
Other bespoke presentations have been shared on request and following the
final census release on health and wellbeing in October, a full pack of data, by
electoral ward will be produced.

Page 6

Strategic Outcome 4: Green 
4.16 The Council is working with our partners in Glasgow City Region to develop a
strategy and investment model for future electric vehicle (EV) charging
provision.  A procurement process is underway with the contract expected to
be awarded by the end of the year. 
4.17 Our Plan for Net Zero is being progressed. Climate considerations are already
built into our procurement processes and the current area of focus is on ‘heat
and fleet’.  The Council has developed an initial carbon budget, with interim
organisational targets to 2030-31. Identifying emissions by service area will be
key in improving our understanding of how our emissions relate to the
services we provide and the reductions we need to aim for in order to adapt to
delivering the same high quality local services in a way that is fit for a resilient,
net zero future. 
Strategic Outcome 5: Living Our Values 
4.18 The Council is committed to developing a new Engagement Policy to support
authentic and consistent approaches to engaging with our residents and
providing opportunities for them to contribute to decision-making. 
Documentation, including a toolkit and checklist, are being developed to
support best practice in relation to external consultation and engagement.   
4.19 Supporting the wellbeing of employees is an ongoing area of focus. Our
RenTalk series for staff has recently featured a session on menopause and
one on men’s health issues.  Additional training for our mental health first
aiders is planned for the end of the year and will focus on specific mental
health conditions. Good progress is being made in the implementation of the
new Equality, Diversity and Inclusion Plan, and an updated report was
presented to the Finance, Resources and Customer Services Policy Board in
November 2024. 
4.20 In terms of our ongoing commitment to continuous improvement and
delivering Best Value, a corporate improvement plan has been developed by
the Corporate Management Team following a programme of corporate self-
assessment activity. The next phase of self-assessment is being developed
and will reflect work recently undertaken, such as the development of staff
forums and the staff survey. 
4.21 Linked to this, throughout 2023/24 all local authorities were subject to an
external audit on workforce planning and innovation as part of the national
Best Value thematic programme.  Auditors were positive about the work being
undertaken by Renfrewshire Council in this regard, and workforce planning

Page 7

activity will continue to be monitored and reported through our service
improvement planning processes. 
Cross-cutting theme: Improving outcomes for children and families 
4.22 As described in the Council Plan, every strategic outcome contributes to
improving the lives of Renfrewshire’s children and their families as this lies at
the heart of our vision for Renfrewshire and underpins the Council Plan
strategic direction. In the appended action plan, actions which directly support
this are noted with ‘(CF)’. Within the append performance scorecard, indicators
which directly link to this cross-cutting theme are also grouped together. All
Service Improvement Plans also have this focus to enable progress to support
this cross-cutting theme to be closely monitored. 
4.23 As part of an ongoing national programme of inspections, the Care
Commission notified Renfrewshire Council earlier this year that a joint
inspection on services provided by the Renfrewshire Children's Services
Partnership to children and young people at risk of harm. Renfrewshire’s
Inspection report was published on the Care Inspectorate website on 22
October. The report is extremely positive and the grade of ‘Very Good’ has
been awarded. An evaluation of Very Good applies to performance that
demonstrates major strengths in supporting positive outcomes for people.
There are very few areas for improvement and those that do exist will have
minimal adverse impact on people’s experiences and outcomes.
4.24 Renfrewshire’s Promise Keeper Network continues to grow and there has
been a strong communication plan to promote the network across
Renfrewshire Children’s Services Partnership and Community Planning
Partners and there has been publicity and marketing produced promoting the
Promise Keeper Network, the Promise i-learn module and The Promise itself.
This work has been very well received with positive engagement feedback.
There is strong linkage and alignment with the work on The Promise and the
Whole Family Wellbeing programmes. 
5. Performance Indicators 
5.1 The Council Plan performance framework has 34 indicators, of which 20 have
targets; the remainder provide contextual information.  Of the twenty
indicators with targets, 9 are meeting or exceeding the target, 5 are narrowly
missing the target, and 7 are behind target.

Page 8

5.2 Areas of strong performance include: 
• Supporting people dealing with homelessness, with our targets continuing to
be exceeded for work in this area despite growing demands locally. The
growing demand reflects the national picture with growing pressure on
housing and homelessness service across Scotland;
• Our employability services continue to perform well, with 268 people
sustained in paid employment for at least six months after accessing support;
• Our focus on keeping looked after children in community, rather than
residential, settings. The most up to date figures at a national level show
Renfrewshire performing above the national average in this regard;
• Our communications and marketing performance information shows a strong
reach on positive stories about Renfrewshire;
• Affordable housing completions within Renfrewshire highlights 196 more units
were completed in 2023/24; 
• Previously an area where we were missing the target, we have had a focus on
increasing the uptake of free school meals. Performance has improved
following enhanced activity in the schools, specifically targeting primary 5,
where we have previously seen a low uptake. Menus are being changed
regularly in line with survey feedback from teacher, parents, children and
catering staff and taster sessions are also run in schools with particularly low
uptake; 
• Our complaints handling, where we continue to resolve issues for customer at
the frontline wherever possible. 
5.3 We are narrowly missing our annual targets in the following areas: 
• Overall attainment for school leavers – attainment continues to be a core
focus for the Council with work undertaken to analyze attainment data.
Targeted support is in place in our learning establishments to improve
outcomes for all children and young people;
• The number of new business start-ups being supported narrowly missed
target last year but saw a but a significant increase from the year before; 
• CO2 emissions from the public vehicle fleet again slightly missed target - ‘heat
and fleet’ are key areas of focus for the delivery of the Council’s Plan for Net
Zero;
• The number of potholes repaired within the target timescale. 
5.4 Areas for further improvement and development in the remainder of 2024/25 
are:
• Continuing to focus on the poverty-related attainment gap, as noted above,
targeted support is in place across learning establishments to improve
outcomes for all children and young people;

Page 9

• Progressing work to ensure all Council housing stock complies with the
Scottish Housing Quality Standards – this indicator is impacted by
requirements on smoke detectors and fire alarms and delays to planned
works following the pandemic;
• Managing staff absence levels, which remain high, through our improved
processes and increased support for staff;
• Increasing our procurement spend with local suppliers, whilst recognizing the
challenges of how this measure is calculated, and our duty to comply with
procurement rules. Further analysis on this indicator has shown that while
local suppliers accounted for 19.3% of the Council’s total spend, a further
46% of our spend was with businesses located in bordering local authorities,
therefore 64% of the council’s total spend of approx. £252.3m is spent within
Renfrewshire and our neighbouring council areas. 
6.  Focus for the next 6 months 
6.1 As noted above, the Council Plan was refreshed in summer 2024 in order to
hone our priorities further— recognising the challenges that our communities
continue to face and identifying the areas where we as a Council can help to
make the biggest difference. 
6.2 Our areas of specific focus for the next 6 months include: 
• Building on the significant savings already achieved, continue to develop
options and deliver savings to support the Council’s ongoing financial
sustainability;
• Linked to this, further develop the Council’s transformation portfolio, ensuring
appropriate resources are in place to support the key priority projects which
will support the delivery of the Council Plan; 
• Deliver Fairer Renfrewshire priorities, including work on child 
Poverty, the place-based project in Gallowhil and our Winter Connections
programme;
• Further develop our Connected Communities approach, establishing
new and innovative ways to work with our communities, with a focus on
completing phase 1 to roll out a new structure as the enabling work to this
wider transformational project;
• Continue to deliver our £100m housing-led regeneration programme as this
moves towards the middle phases of the programme, with a focus on
rehousing and on the purchase of private homes, alongside ongoing
engagement with communities;
• Continue to progress our City Deal projects including maximizing the
opportunities within AMIDS, and Renfrewshire’s connectivity with the new
Renfrew Bridge opening later this year;

Page 10

• Finalise works on the new, transformed and world-class Paisley Museum,
ready for reopening in 2025;
• Progress our strategic learning estate planning following the approval of our
new approach earlier this year;
• Implement the next phase of actions needed to continue to target Net Zero by
2030;
• Develop and implement a new Engagement Policy to support council services
deliver a consistent, authentic approach to engagement and consultation and
to encourage residents to shape decision making;
• Further develop our workforce planning and innovation, following our positive
thematic audit, ensuring monitoring and reporting is well embedded in service
planning processes across all services; and
• Continue to roll out self-assessment and continuous improvement activity,
linked to our ongoing external scrutiny regime, including our Best Value Audit
in 2025. 
6.3      In addition to the above priority areas, on 18 November 2024, the Care
Inspectorate, His Majesty’s Inspectorate of Constabulary in Scotland and
Healthcare Improvement Scotland wrote to Renfrewshire Council and
Renfrewshire HSCP to inform that under section 115 of part 8 of the Public
Services Reform (Scotland) Act 2010, that they will undertake a joint adult
support and protection inspection in the Renfrewshire partnership area. This
is a follow-up of the inspection that was interrupted by the COVID-19
pandemic and will therefore be proportionate and will take place over three
phases. This will be a core focus of activity for the Council and HSCP over the
following timescales. Phase 1, which will take place during December 2024
will include professional discussion, staff survey and pre-inspection case file
return. Phase 2, which will take place during January 2025 will include
uploading evidence, position statement and case files which will be followed
by on-site activity including focus groups and file reading. Phase 3 will take
place during February and March 2025 and will include feedback from
inspectors, factual accuracy check and final publication of the report.
Thereafter, a further update will be provided to Leadership Board. 
Implications of the Report
1. Financial – updates in the appended report relate to areas that fall under the
remit of Finance, particularly relating to supporting the Council’s financial
sustainability workstreams 
2. HR & Organisational Development – updates in the appended report relate
to areas that fall under the remit of HR and Organisational Development,
particularly under strategic outcome 5, Living our Values

Page 11

3. Community/Council Planning – the content of the report relates specifically
to the delivery of the Council Plan and the appendix shows the associated
progress for the latter half of 2024/25. 
4. Legal - none 
5. Property/Assets – the report provides an update on actions relating to
property owned by the Council. 
6. Information Technology – the report provides update on actions relating to
IT provision. 
7. Equality and Human Rights - The Recommendations contained within this
report have not been assessed in relation to their impact on equalities and
human rights because the report provides an update on progress with current
actions and is for noting only.  Impact assessments will be carried out by
relevant services in relation to actions which require them. 
8. Health and Safety - none 
9.  Procurement – updates in the appended report relate to areas that fall under
the remit of the procurement team, under both the strategic outcomes relating
to ‘economy’ and ‘green’. 
10. Risk – none 
11.  Privacy Impact – none 
12. Climate Risk – the Council Plan priorities are underpinned by actions which
will directly support the Council’s response to the climate emergency – ‘green’
has a particular focus on activities supporting this priority area.  
13. Children’s Rights – the Council Plan includes a number of actions targeted
at improving outcomes for children and young people.  The Council is
committed to complying with UNCRC and this will be reflected in our activity. 
14. COSLA Policy Position – none 
Appendices: Six-month update report December 2024 
Author:  Lisa Fingland, Policy Manager (Organisation),
lisa.fingland@renfrewshire.gov.uk

Page 12

No embedded text on this page.

Page 13

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Council Plan
Six monthly progress update
December 2024

Page 14

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Welcome to the six month update on our Council Plan 
As Chief Executive of Renfrewshire Council, I’m delighted to welcome you to the latest six-month update
on our Council Plan.
Our 2022-2027 Council Plan set out our priorities for Renfrewshire Council - areas our customers, citizens,
communities and partners told us mattered to them, and where our data and research showed a need for
the services and projects we are well placed to deliver. We grouped these into 5 main strategic outcomes
of place, economy, fair, green and living our values. Underpinning our priorities is a cross-cutting strategic
outcome to improve the lives of Renfrewshire’s children and their families - this drives all that we do.As
part of our commitment to continuous improvement, we refreshed the plan in June 2024 to reflect current
priorities.
In this latest update, there are spotlights on our Housing Regeneration and Renewal work, our  Economy
Conference and the ongoing success of our partnership approach to digital inclusion.  We celebrate
another successful Summer of Fun programme and the launch of Winter Connections, our award-winning
District Heating Network and the strength of our communities who continue to support Team Up to Clean
Up.  We also reflect on our commitment to staff wellbeing.
Detailed updates on all of our activity in delivering the Council Plan can be found later in this update,
along with information on how we are performing against key indicators.
Local government continues to face real financial challenges, and I am proud of what we continue to
achieve together even in difficult times.
Place
Economy
Fair
Green
Living our Values
Improving
outcomes for
Children and
Families

Page 15

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
How we report progress
• This update reflects on the past six months of delivering our Council Plan, highlighting areas where
we’re already making progress and some areas we’d like to focus on more, perhaps because
performance isn’t moving in the direction we anticipated or because of other pressures or factors
that makes this even more of a priority for us. We previously reported on our progress in June 2024,
and you can read that here.
• The following pages shine a spotlight on some great projects or practice but for balance also
highlight those areas where we’d like to improve or develop further. Towards the end of this
document, you’ll find a full update against all the actions and performance indicators we use to
measure progress.
• Many of our performance indicators are high-level, annual indicators – our Council Plan spans a 5-
year time period so it might take some time to show some trends and patterns, but to reassure you,
the Council reports a wide range of performance indicators to our Council Boards through our
Service Improvement Plans and also through regular operational performance updates – you can
access these reports here.

Page 16

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
HOLDING SLIDE FOR THE OVERALL PICTURE HERE

Page 17

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place: Working together to enhance wellbeing across communities
Spotlight: Housing Regeneration and Renewal
Positive progress is being made across all areas of
Renfrewshire’s £100m Housing Regeneration and Renewal
Programme. This involves rehousing people and also
purchasing privately owned homes to allow the regeneration
to progress. Phases of demolition are also being taken forward
as blocks become fully owned by the Council and vacant.
This extensive programme sits alongside the Council’s ongoing
investment in Council homes, with £41m allocated over this
year for improvements such as new kitchens and bathrooms
and energy efficient heating systems.
Homelessness
Housing continues to be a focus at a national and a local
level, and we have reduced the use of B&Bs as temporary
accommodation to support people who have found
themselves homeless. The average length of time it takes the
Council to complete our homeless duty has not risen despite
the increase in homeless applications.  We have also
invested in wraparound support initiatives such as My Life
Ahead, which supports people who use alcohol or drugs to
sustain settled housing.
Renfrew Bridge
In the summer the first test of the
Renfrew Bridge was completed.
Further testing is to be completed
ahead of its opening. The bridge
connects the communities of Renfrew
and Yoker and is the first opening and
closing road bridge across the river
Clyde. It is part of the Council’s City
Region projects.

Page 18

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Economy: building an inclusive, green and resilient economy
Spotlight: Local economy events
A series of cross-sector events have been held over the past
six months including the Renfrewshire Economy Conference
in June . This event brought together key stakeholders from
across the public, private and third sectors and had a focus
on Community Wealth Building. Community Wealth
Building is where organisations, such as the Council, can
maximise the opportunities to benefit our local
communities through the products and services we buy.
The discussions from the conference will help us to
strengthen our work with partners to deliver this.
An Anchor Supply Chain event was held in October,
alongside our partners from NHS Greater Glasgow and
Clyde, The University of the West of Scotland and Scotland
Excel. The event aimed to encourage Renfrewshire’s local
market to tender for public contracts. This helps to support
the local economy and feeds into our Community Wealth
Building vision.
Employment opportunities for young people
We have a focus on supporting our young people with their next steps
into employment and deliver work placement programmes in schools.
Employers continue to offer a range of opportunities such as site
visits, training and long-term work placements for young people in
the senior phase. 'My Futures Pathways' provision now includes an
additional class group supporting Flexible Learning Resource pupils. A
Principal Teacher has been appointed to support partnership working
with West College Scotland and to enhance future pathways provision
with a particular focus on our care experienced young people.

Page 19

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair: nurturing bright, happy and healthy futures for all
Spotlight: Digital inclusion
Renfrewshire Council’s work on digital inclusion is sector-leading. As part of the DigiRen network, we have
created Digizones where people can access devices, connectivity and skills training. This helps to ensure
everyone can access the opportunities available online regardless of their circumstances or experience
with using digital.  We have rolled out full fibre broadband which now covers almost all of Renfrewshire.
Our RenSafe Online programme works with local public and third sector organisations to promote online
safety.
A national audit report by Audit Scotland on Tackling Digital Exclusion recently highlighted
Renfrewshire’s approach as best practice. A case study highlighted the £40m private investment secured
to deliver the full fibre coverage, the innovative and inclusive work of the DigiRen network, and the Citizen
Voice forum which supports the co-design of digital inclusion solutions. 
Winter Connections
Our Winter Connections programme is about to enter its third year.  The 2023/24 programme distributed
£85,000 in small grants (up to £2000) to local organisations to support them to provide activities in warm
and welcoming spaces across Renfrewshire.  The programme helps people feel less isolated, learn new
skills, take part in creative activities and have fun. It also helps tackle food poverty in a dignified way. The
2024/25 programme launched in November and activities will continue through to March 2025. 
For more information, please visit our Winter Connections site

Page 20

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Green: leading Renfrewshire to Net Zero
Spotlight: Renfrewshire's District Heating Network
Renfrewshire is home to the Advanced Manufacturing Innovation District
Scotland, known as AMIDS. As part of this development a fifth-generation
renewable energy network has been built. This network converts treated
water into low temperature heat, which is boosted with low carbon
technology to provide heating and hot water to the District.
This is the first of its kind in Scotland and the first in the UK supplying a
mixed-used development. It is also the first low temperature loop in the UK
connecting to a wastewater treatment works – a sustainable system which
really supports the circular economy, turning waste into heat. 
This innovative project was recently recognised at the COSLA Awards
winning the Scottish Government’s Delivering Excellence Award.
Team Up to Clean Up
Litter is recognised by the World Wildlife Federation (WWF) as having a negative impact on climate change
due to marine plastic pollution greenhouse gas emissions created through the breakdown of litter and litter
choking out plant life.   Team Up To Clean Up continues to generate significant community contributions,
with 6400 members on the Facebook page.

Page 21

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living our Values: making a difference together
Trauma Informed and Responsive Renfrewshire –
Housing Services Training
Teams from Housing Services have completed Level 1
(Trauma informed) and Level 2 (Trauma Skilled)
Training with almost 100 staff participating in 2024 so
far.
Trauma informed approaches already aligned closely
with the ethos and values of the teams, but the
additional training has highlighted opportunities to
build on existing good practice, not only in terms of
working with service users but also in supporting
colleagues.
Spotlight: Workforce Wellbeing
We have a strong focus on supporting employee wellbeing,
with a suite of updated policies and supports in place to help
our employees to balance work and life and know where to
get help when they need it. 
Recently, we have offered RenTalk sessions on men’s health
and wellbeing and on menopause support. 
We have a range of colleagues across services who are
Mental Health First Aiders, trained to support their
colleagues who may be struggling and need someone to
listen with care and in confidence.
Ongoing training is provided to our Mental Health First
Aiders, including on specific conditions before the end of the
year.
Officers are also working with the RCA Trust to provide
specialist training and support on gambling addiction.
The Council’s recent Best Value thematic focus on workforce
innovation highlighted a number of areas of good practice,
including our approach to supporting health and wellbeing.

Page 22

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Improving Outcomes for Children and Families
Spotlight on: Inspection into the services provided to children and young people at risk of harm and their families
In October, the Care Inspectorate gave a Very Good grade in its joint inspection on services provided by the Renfrewshire
Children's Services Partnership, made up of Renfrewshire Council's Children's Services, Renfrewshire Health and Social Care
Partnership, Police Scotland, Scottish Children's Reporter Association, Children's Hearing System, and third sector organisations.
A group of young people were involved in the inspection, helping to assess Renfrewshire's services and the support they provide
children, young people and families.
Among many other strengths, the inspection report highlighted how services listened to children, young people and families,
ensuring their voices were heard at every stage and making them feel confident their views mattered.
The close working relationships between organisations, the strength of leadership, and the multi-agency approach taken were
stated to have resulted in early intervention for children, young people and families.
The positive and nurturing relationships staff have with families was confirmed as a key strength, as well as the collaborative
culture between staff, managers and leaders.
Keeping The Promise
The Annual Promise Keeper Conference takes place on 5 December, which will bring together our network of
Promise Keepers, to hear about ongoing work and share best practice.
The annual Christmas Present Drive has also recently launched, supported by Youth Services. This aims to
help make the festive holidays a little bit less daunting and more uplifting for care experienced young
people living in Renfrewshire

Page 23

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Actions and indicators
Full list
December 2024

Page 24

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place
What we will do Due
Date
Status Progress update
Progress Renfrewshire’s Housing-
led Regeneration and Renewal
programme
31 Mar 2027
Positive progress is being made across all areas where the agreed timeline shows works scheduled in year 3
of this 10-year programme. As reported to the Communities and Housing Board in August 2024, the
acquisition and rehousing strategy is performing as planned and various phases of demolition are being
taken forward as blocks become fully council owned and vacant. We have reduced the use of B&B and
ensured the average length of time to complete duty has not risen despite the increase in homeless
applications (in line with national trends.) Wrapround support initiatives continue to be provided, including
MyLA (MyLife Ahead) which supports those with alcohol/drug issues to sustain settled housing.
Support our citizens to access
affordable cross-tenure homes
that are digitally enabled and
meet community needs
31 Mar 2025
As part of our Local Housing Strategy, Renfrewshire’s local housing need and demand assessment has been
completed and identifies the 5-year affordable housing estimates for each area in Renfrewshire, offering a
profile of the property types and sizes that would be most effective in meeting housing need. Linked to this,
the Renfrewshire Strategic Housing Investment Plan 2024-2029 has been the subject of consultation and
engagement following discussions with the Scottish Government and Registered Social Landlords operating
in Renfrewshire.  The Strategic Housing Investment Plan (SHIP) is updated annually to take account of
progress and completions in relation to delivering the affordable housing programme in Renfrewshire. Work
is progressing to prepare the SHIP for 2025/2030, and this draft was approved by the Communities and
Housing Policy Board in August 2024.
Work continues on the development of a Business Case for Smart Social Assets across Renfrewshire. Due
diligence is being undertaken to verify assumptions around recurring costs and potential savings. The
Council is also investigating potential funding opportunities to support any one-off investment costs.
Design a new Connected
Communities service model for
the Council, transforming how we
support, collaborate and engage
with our communities
31 Dec 2025
Work has been progressed to develop a new Connected Communities function within the Chief Executive’s
Service which will bring together staff from the existing Community Learning and Development and
Partnership and Inequalities teams.
Phase one of this work which focuses on the enabling internal restructure is progressing well and a more
detailed update on the new structure will be provided by the end of the calendar year.

Page 25

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place
What we will do Due
Date
Status Progress update
Deliver the ambitions in our long-
term place visions for our key
settlements and town centres 31 Mar 2026
The Regeneration Team will be looking to refresh our town centre strategies to reflect changes that have
taken place in a post pandemic environment.  These strategies will align with the guidance and principles
outlined in NPF4. The team has been outlining potential regeneration priorities and projects, including
developing a new Vision for Johnstone which looks to improve the town centre, enhance public spaces, and
support local businesses to create a more vibrant and sustainable community.
Another commission for Erskine is currently in progress to develop proposals to make public spaces and
greenspaces more appealing as part of a review of the Centre Strategy for Erskine and short, medium and
long-term actions have been identified.  Going forward the team will look commission further feasibility work
in Johnstone, focussed specifically on the two civic squares, re-imagining of the town hall and the
development of a heritage trail.  Feasibility studies to develop proposals in Renfrew and Linwood will also be
commissioned.  Finally, a wayfinding strategy for Paisley will also be developed.
The transformation of Paisley following delivery of the Action Plan is advancing at pace, with achievements
such as creating an international culture and heritage destination and acting as a stimulus for property
investment, development and re-use. Completed regeneration projects include the refurbishment of the Town
Hall and Arts Centre and the creation of a new Culture and Learning Hub on the High Street. The other major
project is the restoration of the Paisley Museum which is due to be completed next year.  The publication of
the Paisley Vision document acts as a further catalyst to inspire future development in and around the town
centre. The Liberal Club, which was identified as a key building in the Vision, has recently been renovated,
securing its long-term status.
Overall, the team will continue to bring forward regeneration proposals across our town centres.

Page 26

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place
What we will do Due
Date
Status Progress update
Deliver Renfrewshire’s strategic
capital investment programmes,
including cultural, infrastructure,
housing and school estate, and
maximise the long-term benefits
for our communities
31 Mar 2025
The General Services capital budget was approved on 29th February 2024, including £147.8m for delivery in
2024/25. Since then, projects have been reprofiled to other financial years and the revised budget is currently
£107.2m (Period 6). To date, £30.2m has been spent, representing 28% of the revised budget.
Paisley Grammar School Community Campus construction is on track to be completed by summer 2026.
Thorn Primary School is at the early stages of design, with consultation set to take place with the school
community.
Develop Travel Renfrewshire
2035, our Transport Strategy,
supported by revised Active Travel
and Public Transport Strategies
and aligned to the regional and
national travel strategies
31 Mar 2027
A draft strategy is being produced, informed by a far-reaching data gathering engagement exercise. This
included online surveys, stakeholder workshops and pop-up engagement sessions at supermarkets and
direct in person workshops with community organisations. We specifically engaged with group representing
people with disabilities and those who are particularly affected by the cost of living crisis. The draft strategy
will be issued for further consultation.
Deliver the next phase of Local
Partnerships development,
through our new Local Plans,
Local Priorities and Local Voices
programme
31 Mar 2025
A membership refresh has been carried out across all Local Partnerships, with a number of new Community
Representatives appointed. An induction was carried out for new and existing community representatives,
which is being developed into an information pack for all Local Partnership members. In June, Local
Partnerships held their special meetings to agree funding applications following the approval of updated
guidance. Over the summer, Local Partnerships held workshop sessions to refresh their Local Priorities. The
Local Partnership Development Officer started in post in October 2024 and will play a key role in delivering
the development programme moving forward.

Page 27

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Q1 2024/25 Q2 Explanation of performance
Value Target Value Target Value Target Value Target
Opportunities to
see or hear
something positive
about Paisley and
Renfrewshire
204,638,6
68
240,000,0
00
268,082,8
49
240,000,0
00
62,965,34
0
37,500,00
0
101,030,4
08
37,500,00
0
Q2 marketing activity focused on promoting summer events in
addition to content on cultural venues and wider and things to
do in Renfrewshire. Media highlights include Sma’ Shot Day,
Anya Gallaccio exhibition, Opening of Paisley Arts Centre,
Paisley Central Library shortlisted for awards, Doors Open Day
and Paisley Halloween Festival Launch.
Amount of vacant
and derelict land
(hectares)
248 Data only * Data
only Not measured for quarters
The vacant and derelict land survey is undertaken each year
and reflects the position at a point in time. The total amount of
vacant and derelict land continues to reduce across
Renfrewshire with a 6 hectare reduction since last year. 
*The latest audit is ongoing and data is not yet available.
Percentage of
Council housing
stock which meets
the Scottish
Housing Quality
Standard
68.31% 100% 68.55% 100% Not measured for quarters
The Annual figure is the final figure to be returned to the
Scottish Housing regulator as part of our ARC return. Our pass
rate is still materially affected by EICR & Smoke Detector fails
and by EESSH fails. A contract has recently started to enforce
EICRS/Smoke detector installs and we expect the position to
improve as a result, for next year’s compliance rate.

Page 28

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Q1 2024/25 Q2 Explanation of performance
Value Target Value Target Value Target Value Target
Affordable housing
completions 369 200 196 159 Not measured for quarters
The affordable housing completion figure is based on SHIP completions
rather than housing land audit completions, and has therefore been
updated to 196 rather than the previously recorded 158.
Percentage pothole
repairs completed
within timescales
95% 80% 94% 95% Not measured for quarters
The 2023/24 % of potholes repaired was 94% falling just short of the
95% target. The service recently changed the Roads Inspector model,
moving away from having carriageway inspectors, footway inspectors,
statutory inspectors and capital inspectors. We now have a bank of
inspectors that cover all disciplines within their set area. It has taken
time to get everyone trained up, and for a while, some of the inspectors
that hadn’t covered carriageways before, were raising emergency lines
for potholes that weren’t an emergency.

Page 29

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Economy
What we will do Due
Date
Status Progress update
Develop an Investment Proposition
for Renfrewshire that is clear on our
economic ambitions for our place
31 Mar 2025
Two reports have been commissioned to analyse Renfrewshire’s Growth Sectors.  The first highlighted that there are
several opportunities which Renfrewshire needs to capitalise on to support the growth of its economy further.  The
second report aims to reconcile existing priorities, team capacity and skills engaged in the economic development and
regeneration functions of the Chief Executive’s Department, with the future opportunities and challenges outlined in the
first report and the Council’s Economic Strategy.  This report highlights that there is a requirement to grow and
increase visibility of Renfrewshire’s inward investment proposition to drive future economic growth and development. 
A new web page has been created which signposts the area’s main investment locations.
(https://www.renfrewshire.gov.uk/article/13818/Renfrewshire-investment-prospectus)  
Future works includes looking at developing a dedicated investment page on the Invest Renfrewshire webpage. 
Moreover, a dedicated website to drive investment at AMIDS has been launched.
Monitor the benefits of City Deal
Projects, including Glasgow Airport
Investment Area, Clyde Waterfront
and Renfrew Riverside and City
Region wide employment
programmes
31 Mar 2025
Monitoring of benefits reported through the City Region Programme Management Office is ongoing.

Page 30

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Economy
What we will do Due Date Status Progress update
Fully participate in the AMIDS joint venture 31 Jul 2024
AMIDS joint venture fully established and operational, Council is fully participating. This action is now noted
as complete.
Complete the Tech Terrace development
and attract the first large occupier 31 Mar 2026
This is an AMIDS joint venture obligation and the Council is fully participating to support this.
Develop a Community Wealth Building Plan
for Renfrewshire 31 Mar 2025
The Renfrewshire Economy Conference was held in June 2024 with attendance from key stakeholders
across Renfrewshire’s public, private and third sectors. Community Wealth Building featured as part of the
key economic themes and agendas with a keynote presentations on CWB and the Wellbeing Economy by
the Council’s Economic Development Manager and a CWB stakeholder engagement workshop delivered by
the Council’s CWB Coordinator. Feedback from the workshop will be used to inform next steps in
progressing the CWB agenda across Renfrewshire through building a partnership approach.
Renfrewshire’s Anchor Supply Chain event delivered by Renfrewshire Council’s economic development
department in partnership with the council’s procurement team alongside anchor procurement partners from
NHS Greater Glasgow and Clyde, University of the West of Scotland and Scotland Excel was held in
October 2024. The aim of the event was to develop the local supply chain in Renfrewshire to respond to
procurement opportunities available in the public sector. The event highlighted public sector opportunities
suitable for local SME's and focused on how local SME’s can develop their procurement capability as a
supplier. Businesses were encouraged to register on PCS and to develop their understanding of public
procurement and the opportunities that bidding for public sector contracts can unlock. Procurement leads
alongside business support organisations provided information and guidance on requirements for bidding
and support available for local businesses.

Page 31

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Economy
What we will do Due
Date
Status Progress update
Continue to support local
employment through the delivery
of targeted support through the
Council’s employability
programme
31 Mar 2027
Our employability programmes support hundreds of people each year to access skills development and
progress towards qualifications and/or employment.    Our service has welcomed 347 new clients in the
second quarter of 2024/25 on top of 400 people who started accessing support during 2023/24.  Almost 300
people have been supported to gain qualifications this year so far, and more than 250 have been supported
into paid employment.
Continue to progress core actions
to support local and regional
economic growth.
31 Mar 2027
A range of actions undertaken by the Council are supporting economic growth.  The AMIDS development is
expanding with the addition of Tech Terrace likely to be completed by 2026.  Procurement and Economic
Development work closely on community wealth building and on supporting local businesses to become
suppliers to the public sector.  Our employability work helps hundreds of people each year with skills
development that supports them into work.  As a Council, we are also committed to this and set ourselves a
target in relation to traineeships.

Page 32

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Economy
Indicator Current
Status
Short
term
trend
Long
term
trend
2021/22 2022/23 2023/24 Explanation of performance
Value Target Value Target Value Target
Percentage of
council
procurement
spend spent on
local enterprises
18.87% 23% 19.3% 23% * 23%
In the period 2022-2023 Renfrewshire Council recorded direct
spend of £45,925,656.61 with businesses based locally. This
accounted for 19.3% of the Council’s total spend. A further 46% of
our spend was with businesses located in bordering local
authorities (Glasgow, Inverclyde, North Ayrshire, East
Renfrewshire and West Dunbartonshire), therefore 64% of the
council’s total spend of approx. £252.3m is spent within
Renfrewshire and our neighbouring council areas.
Increasing direct spend with local businesses is a key element of
Community Wealth Building and we are working to identify ways in
which we can support local businesses with tendering for council
contracts. The update to our Standing Orders Relating to Contracts
in June 2023 included increasing the threshold for the use of
Quick Quote for Works contracts up to £500k with a requirement
that where possible, a minimum of 75% local businesses should be
invited to quote.  We have held a number of events for local
suppliers to provide advice and support on tendering for public
contracts.  The most recent event was engagement with local sub-
contractors in relation to the Paisley Grammar Community Campus
and Bishopton Dargavel Satellite Facility.
*The figure for 2023/24 is expected to be published before the end
of the year. This is an annual indicator.

Page 33

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Economy
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Q1 2024/25 Q2 Explanation of performance
Value Target Value Target Value Target Value Target
Gross Value
Added (GVA) per
capita
£23,75
7.92
Data
only * Data
only Not measured for quarters
In terms of performance, this has increased year on
year.  It is hoped that this trend will continue as new
developments, such as AMIDS, further drive economic
growth in key sectors. 
*Data for 2023/24 will be available in early 2025.
Number of
people
supported,
sustained in work
at 6 Months
through
Renfrewshire
Council
Employability
Programme
(INVEST)
340 180 268 180 Not measured for quarters
Of those moving into work 268 have responded to say
they are still in employment. The actual number may
be higher than this, not all people respond / are in
contact.
Number of new
business start-
ups in
Renfrewshire
with Business
Gateway support
206 320 305 320 81 80 68 80
During 23/24, 305 new businesses have started
trading with the support of Business Gateway. This is
slightly below the target set but a significant increase
from the year before.
The team work with and support considerably more
businesses over the year but don’t have control over
when they start to trade.

Page 34

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Economy
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Q1 2024/25 Q2 Explanation of performance
Value Target Value Target Value Target Value Target
Renfrewshire
Claimant Count 3,755 Data
only 3,590 Data
only 3670
Data
only 3670
Data
only
This measure is a snapshot and as of September 2024
there were 3670 people in Renfrewshire claiming
unemployment-related benefits.  The number had been
reducing but has recently increased.
Percentage of
Renfrewshire
population working
age (16-64)
64.3% Data
only 63.9% Data
only Not measured for quarters
This figure has remained relatively stable but is
beginning to decline, in line with national trends and an
ageing population.
Percentage of
Renfrewshire
population working
age (16–64) who
are economically
inactive
25.9% Data
only 22.4% Data
only 24.6%
Data
only *
Data
only
This figure is measured for calendar years, and in June
2024, 24.6% of the Renfrewshire working age
population was economically inactive.  This is above
the national average of 22.7%
*Q2 data has not yet been published

Page 35

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
What we will do Due
Date
Status Progress update
Deliver the Fairer Renfrewshire
programme, working with partners to
support Renfrewshire residents
through the cost-of-living crisis
31 Mar 2027
The Fairer Renfrewshire Sub-Committee has been meeting since August 2022 and a Fairer Renfrewshire Officers
Group from across services is meeting monthly. In March 2023 existing funds were brought together into a single
resource for Fairer Renfrewshire at around £5million, and partners are working together to further develop the
programme.
There are four key emerging themes which are shared across all elements of the programme, under which key
projects are being funded:
·       Improving financial security
·       Advancing equality of opportunity
·       Building community capacity and resilience
·       Listening to lived experience
The new School Support service is now in place across all Renfrewshire secondary schools. This service, provided by
Renfrewshire Citizens Advice Bureau (RCAB), embeds advice workers in schools, and referrals can be received by
pupils over 16, parents/carers, and school staff.
Advice Works is providing a Family Support service to families with younger children, which can be accessed by
telephone or online.
Both services provide support to maximise family income and both also receive referrals under the new school meal
debt processes, which prioritises supporting families.
Winter Connections ran for a 2nd year in Winter 23/24, providing opportunities for communities to come together and
take part in free activities and including food. This has contributed to wellbeing over the winter.
The Fairer Renfrewshire Panel has provided insight in a number of areas including holiday provision in Renfrewshire,
with the Panel contributing to the plans for our ‘Summer of Fun’, both for summer 23 and 24, the Council’s new School
Meal Debt processes, digital exclusion employability, especially parental employability.

Page 36

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
What we will do Due
Date
Status Progress update
Develop mechanisms for
supporting individuals with lived
experience of poverty to
influence policy in this area
31 Mar 2024
The Fairer Renfrewshire panel, facilitated by STAR Project, continues to meet with officers across Council
services to ensure the voice of those with lived experience of poverty informs Council’s policy and
practice.
The Panel has provided insight in a number of areas. The initial discussion was around holiday provision
in Renfrewshire, with the Panel contributing to the plans for our ‘Summer of Fun’, providing feedback on
what is useful for low-income families, eg, provision of food in all settings, provision for siblings, local
provision so there are no transport costs and provision for older teenagers.
The Panel has also fed into the Council’s new School Meal Debt processes, which now include earlier
referral to available supports. They have met the Digital Strategy Delivery Manager to discuss digital
exclusion and have provided feedback and ideas to our Climate Emergency Lead Officer around
Renfrewshire’s Net Zero Delivery Plan.
Discussions with the panel around employability, especially parental employability have been used to
inform events, and target work.
As part of the Council Tax Debt Pilot, the panel were consulted with, to help those engaged in the Pilot to
understand barriers to accessing support, such as advice, and to review correspondence associated with
collection of Council Tax as well as potential for enhancing collection processes in general.
The Panel has met with the Convenor and Depute of the Fairer Renfrewshire Sub-Committee and we also
intend to bring the Panel together with the full Sub-Committee and Fairer Renfrewshire Officers Group to
discuss Panel priorities and their future plans.
Developing new and radical
approaches to tackling child
poverty in Renfrewshire (CF)
31 Mar 2025
Work continues to develop place-based models to tackle child poverty. A Community Needs Assessment
is currently being carried out and will inform the next phase.

Page 37

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
What we will do Due
Date
Status Progress update
The Promise Strategic Oversight
Board and workstreams will
progress and ensure
Renfrewshire ‘Keeps the Promise’
and delivers improved outcomes
for individuals who are care
experienced, wherever possible
keeping children within their
families (CF)
31 Mar 2025
Renfrewshire’s Childrens Services response to the implementation of The Promise continues to progress
against several priority areas identified in the Promise Plan 21-24. This activity is being closely monitored via
the Renfrewshire Promise Mapping Tool. Considerable effort has been made to support Promise Scotland’s
work around Plan 24-30 and the implications for Renfrewshire’s Promise Plans and direction as we move
forward. Closer working relations have been forged with Promise Scotland Representatives around all aspect
of The Promise in particular around supporting greater understanding and awareness of Promise Plan 24-30
and around the role the wider corporate parents to Keep The Promise. We will continue to feedback to
Promise Scotland on the 24-30 Plan.
There are a couple of high profile Keep The Promise Fund Projects entering their second year and both, in
Education, are on track and are progressing well. Early Planning and consideration has begun around any
potential future funding for Promise related projects and where the focus/priorities should be. Renfrewshire’s
Promise Keeper Network continues to grow and there has been a strong communications plan to promote
the network across the RCSP and Community Planning Partners and there has been publicity and marketing
produced promoting the Promise Keeper Network, the Promise i-learn module and The Promise itself. This
work has been very well received with positive engagement feedback.
There is strong linkage and alignment with the work on The Promise and the Whole Family Wellbeing
programmes with senior officers involved in both oversight/steering groups ensuring the appropriate cross
working.
Build local capacity for
transformational whole systems
change and to scale up and drive
the delivery of holistic whole
family support services (CF)
31 Mar 2025
The Whole Family Wellbeing Service continues to make significant progress, the restructure of the service is
now complete with positive evaluations from key stakeholders. The FORT referral system is now live. The
family launch took place in November 2024.

Page 38

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
What we will do Due
Date
Status Progress update
Develop the Trauma Informed
and Responsive Renfrewshire
Programme
31 Mar 2025
Recent focus has been on the development of a Level 1 Trauma Informed resource for iLearn.  This is
nearing completion and will be launched before the end of the year.  The course is designed to be suitable
for all staff.  The steering group membership is being refreshed to ensure appropriate representation from
across services.  Colleagues are being signposted to training opportunities.
Progress the design and delivery
of the Curriculum, Learning,
Teaching and Assessment; the
Families and Communities; and
the Inclusion Portfolios within
Children’s Services (CF)
31 Mar 2025
Portfolio plans are in place for this session and have been developed through robust self-evaluation and
engagement with key stakeholders. Plans are reflective of service priorities and include our work to support
schools in closing the poverty related attainment gap and raising attainment for all, inclusion and supporting
whole family wellbeing. Impact will be reported throughout the session.
Deliver mental health and
wellbeing support, including
Ren10 mental health and
wellbeing network to support
children, young people and their
families (CF)
31 Mar 2025
Work is ongoing to merge Ren10 platforms with the FORT system so there is one request for assistance.
This work will be prioritised as FORT becomes live. In terms of impact, Ren10 approaches and interventions
are supporting children and young people’s mental health and wellbeing. We are seeing improvements in
health and wellbeing measures following the Health & Wellbeing Census and this is due to the range of
support available through Ren10.

Page 39

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
What we will do Due
Date
Status Progress update
Deliver strategic and operational
responses to migration and
asylum, supporting individuals
and families into settled
accommodation (CF)
31 Mar 2026
The recent census releases have provided a significantly updated picture of Renfrewshire’s
communities – work is well underway to analyse this data, with a detailed presentation shared with the
full Chief Officers Team at the away day in September.
Other bespoke presentations have been shared on request and following the final census release on
health and wellbeing in October, a full pack of data by electoral ward will be produced.

Page 40

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Q1 2024/25 Q2 Explanation of performance
Value Target Value Target Value Target Value Target
Percentage of
children living
in poverty
(after housing
costs)
24% Data
only * Data
only Not measured for quarters
The figure for this indicator is derived from the Local
Government Benchmarking Framework indicator
CHN24 '% of children living in poverty (after housing
costs)'. The percentage in Renfrewshire in 2022/23
was 24%, compared to 23.3% in 2021/22.
Renfrewshire had the second-lowest rate amongst its
family group for this indicator, while the Scottish
average was 21.8%.
*2023/24 data has not yet been published
Proportion of
people earning
less than the
real living
wage
12.5% Data
only * Data
only
Not measured for quarters
This is a considerable improvement on previous years;
the figure for 2021/22 was 19.8%. 
*2023/24 data has not yet been published
Percentage
uptake of free
school meals
in primary
schools
53.4% 52% 52.5% 60% 53.4% 60% 61.0% 60%
Menus are being changed regularly in line with survey
feedback from teacher, parents, children and catering
staff, with a new menu in June 2024.Taster sessions
being run in schools with particularly low uptake. Also
working with Head Teachers looking at ways to
improving the dining experience, staggered lunches
being considered, this will allow longer for children to
eat. In Q3 of 23/24 3 kitchens changed from import to
cooking kitchens, so that increased the uptake too.

Page 41

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Q1 2024/25 Q2 Explanation of performance
Value Target Value Target Value Target Value Target
Number of
children in
receipt of
school
clothing
grants
6104 Data
only 5860 Data
only Not measured for quarters
The number of FSM/CG applications in 2023/24 fell by
approximately 12% compared to 2022/23, with the number
of children being awarded a Clothing Grant in 2023/24 falling
by 4% compared to 2022/23.
Whilst it cannot be definitively determined why there has
been a reduction in the number of children being awarded a
Clothing Grant, it appears that the primary reason is due to
parental income exceeding the Clothing Grant eligibility
thresholds for earned income within tax credits or Universal
Credit.
We would suggest that this could be a combination of three
reasons: natural and managed migration from tax
credits/legacy benefits to Universal Credit where earned
income thresholds are less generous, higher pay
settlements as a consequence of inflationary rate pressures
increasing wages, and/or parents taking on additional
working hours to help alleviate cost of living pressures.
Average time
from
household
presenting
themselves as
homeless to
completion of
duty (number
of weeks)
21.74 24 21.23 26 23.09 26 * 26
Given the record high number of homeless applications
during 2023/24 and the number of homeless applicants still
staying in temporary accommodation (‘live’ cases), it is
anticipated that this figure is likely to increase in the long
run. A strong focus will continue to be required on social
housing lets to those who are homeless.
*Q2 data is not yet available

Page 42

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Green
What we will do Due
Date
Status Progress update
Develop costed, targeted
interventions and actions to
support our net zero journey
within the Council and working in
partnership with key stakeholders
(CF)
31 Mar 2026
Priority projects have been identified to support our net zero journey within the Council and working in
partnership with key stakeholders , with a focus on reducing emissions from “heat and fleet”. These projects
will form part of our costed delivery plans.
Development of Low Emissions /
Electrification Strategy 31 Mar 2026
To support the delivery of a regional approach to Public Electric Vehicle Charging, a regional procurement
exercise has been undertaken with the contract likely to be awarded to a commercial partner in December
2024.
Develop a Strategic Property
Review of Council operational,
non-operational and surplus
assets
31 Mar 2026
Work continues to review and understand all buildings across the Renfrewshire Council property portfolio. A
matrix has been used to identify which buildings remain as core, which are surplus, and which properties
should be reviewed further. Renfrewshire Council need to reduce the number of buildings within the portfolio.
An update report will be taken to the Infrastructure, Land and Environment Policy Board at the first
opportunity.
Develop a funding strategy to
support the resourcing of actions
to deliver net zero
31 Mar 2026
Priority projects have been identified to support our net zero journey within the Council and working in
partnership with key stakeholders , with a focus on reducing emissions from “heat and fleet”. These projects
will form part of our costed delivery plans.

Page 43

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Green
What we will do Due
Date
Status Progress update
Establish a carbon budget for
Renfrewshire Council 31 Dec 2025
The Council has developed an initial carbon budget, with interim organisational targets to 2030-31.
Identifying emissions by service area will be key in improving our understanding of how our emissions
relate to the services we provide and the reductions we need to aim for in order to adapt to delivering the
same high quality local services in a way that is fit for a resilient, net zero future.
Review opportunities within the
Council’s infrastructure pipeline
projects to align with the skills
transition and green skills
development for local people
31 Dec 2025
This action was new in 23-24 and will be developed following phase 2 of the Plan for Net Zero which sets
out the phased road map and costed, area-based delivery plans. Phase 2 is currently underway and the
infrastructure pipeline of projects and the identification of skills gaps will follow on once the outcomes
and the phasing are known.  As this work is ongoing, the due date has been extended by one year, to 31
December 2025.
West College Scotland was recently awarded up to £100k from the Business Challenge Fund to allow
local businesses to train staff in net zero / sustainability for free to contribute to this agenda. The
programme will run financial year 24-25

Page 44

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Green
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25  Q1 2024/25  Q2 Explanation of performance
Value Target Value Target Value Target Value Target
CO2
Emissions
area wide per
capita
4.4 Data
only * Data
only Not measured for quarters
This indicator is part of the Local Government Benchmarking
Framework and there is a considerable lag in data being
provided. 
* Data for 2023/24 is not yet available but more recent data
relating to the Council’s emissions can be found in our annual
Public Bodies Climate Change Duties Reporting – here.
CO2
Emissions
area wide:
emissions
within scope
of LA per
capita
3.8 Data
only * Data
only
Not measured for quarters
This indicator is part of the Local Government Benchmarking
Framework and there is a considerable lag in data being
provided.
* Data for 2023/24 is not yet available but more recent data
relating to the Council’s emissions can be found in our annual
Public Bodies Climate Change Duties Reporting – here.
Amount of
CO2 emitted
by the public
vehicle fleet
3267 3000 3118 3000 792.35 750 900.07 750
The total for the first 6 months of the year is 1,692.42 tonnes of
CO2e. If this trend continues, whilst comparatively small, the
emissions would be slightly over target of 3,000 tonnes of CO2e.
Amount of
CO2 emitted
from public
space lighting
1138 1500 1,216 1,100 Not measured for quarters Emissions levels are anticipated to level out year on year as the
LED programme is substantially complete

Page 45

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Green
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Q1 2024/25 Q2 Explanation of performance
Value Target Value Target Value Target Value Target
Amount of CO2
emitted from
Council
buildings
NEW INDICATOR
This is a new indicator introduced in 2024 -
baseline data is being collected and this will be
reported from 2025/26.
Percentage of
household waste
Recycled
(Calendar year
data)
53.7% 50% * 50% * 50% * 50%
*This data has not yet been made available and
we are awaiting feedback from SEPA.  This has
been an area of strong performance in recent
years.

Page 46

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living our Values
What we will do Due
Date
Status Progress update
Implement the next phase of
transformation through the
actions arising from the Council’s
financial sustainability and
improvement workstreams
31 Mar 2027
The aim of this action is that the Council is able to maintain a balanced budget by 31 March 2027 within
the context of a challenging financial environment. This has so far been achieved for the first of the three
financial years in scope. Of the savings targets set in 24/25, including residual balances from 23/24, 85%
has been achieved so far.
Deliver self-assessment activity
across the organisation in line
with revised best value audit
methodology
31 Mar 2026
Following the successful delivery of the Corporate Self-Assessment programme, a corporate improvement
plan has been developed by CMT to support the Council’s approach to best value and continuous
improvement.
The next phase of self-assessment is currently being developed - this will align closely with reflective work
already undertaken, such as through the staff survey and the development of the new staff forums
Continue to develop our
approaches and activities in
relation to Equality, Diversity and
Inclusion, responding to the
needs and views of our
workforce
31 Mar 2027
Good progress continues to be made with implementing year 1 priorities of the new Equality, Diversity and
Inclusion Plan. A full and positive update on progress was presented to the Finance, Resources and
Customer Services Policy Board 21 November 2024 as part of the Council’s People Strategy Progress
update.
Develop new approaches to
consultation and engagement
with our communities,
underpinned by our values.
31 Mar 2025
The Council is committed to developing a new Engagement Policy to support authentic and consistent
approaches to engaging with our residents and providing opportunities for them to contribute to decision-
making.  Documentation, including a toolkit and checklist, are being developed to support best practice in
relation to external consultation and engagement.

Page 47

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living our Values
What we will do Due
Date
Status Progress update
Lead implementation of the
council brand, ensuring council
communications are responsive,
informed, inclusive and accessible
(CF)
31 Mar 2025
The aim of the council brand is to continually reinforce the council’s values, explain who we are and what we
do, and help people to recognise (and access) the services that are provided by the council. The following
has been completed in Q3:
Progress on the creative development of the visual identity, including colour palette, typography, layout and
mark. The new brand will be more accessible, sustainable and economical.
An audit of the ‘as is’ visual identity and peer comparison have been completed. An application, function and
service audit are in progress.
Future focus will include work being undertaken on graphic devices, icons, motion, film, photography and
social media.
Qualitative audience research has been completed with residents, businesses and tenants to help
understand perceptions of the council and how we can improve communication and engagement. Further
work will be completed in Q4 to develop an audience segmentation model which will inform the new council
marketing and communications strategy.
Deliver a refreshed approach to
workforce planning and workforce
innovation, with a focus on
recruitment and retention;
learning and development; and
career pathways.
31 Mar 2027
Over the summer of 2024, the Accounts Commission, as part of its best value work, appointed an external
auditor to assess how the Council was responding to workforce planning challenges, in particular around
workforce innovation. The report produced by the auditors was very positive and was presented to the
Council’s Audit, Risk & Security Board in September 2024. Actions to continuously improve in this area are
taken forward by the Council's Workforce Planning Group and will continue to be reported through Service
Improvement Plans across all Council services.

Page 48

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our Values
What we will do Due
Date
Status Progress update
Embed our Wellbeing Strategy,
meeting the current and future
needs of our workforce
31 Mar 2025
Training for colleagues who are already mental health first aiders on how to support colleagues with specific
types of mental health conditions has been developed and is scheduled to be rolled out before December
2024.
To support World Menopause Day and Menopause Awareness month (October 2024), information and
training was provided to managers and colleagues strengthening the support provisions already available
across the Council. Additionally, a RenTalk training session for all colleagues took place on 22 October
2024 to continue raising awareness of menopause. Council officers are currently working in collaboration
with RCA Trust to provide colleagues with specialist support, training and advice on gambling addiction.
On 4 September 2024, a RenTalk interactive session was delivered providing a holistic approach to men’s
general health and wellbeing. Areas discussed included sleep and stress management, the importance of
attending medical screenings, key flag symptoms of serious conditions to look out for and basic information
relating to Cognitive Behavioural Therapy (CBT).
Drive improved attendance and
reduced absence across the
organisation
31 Mar 2025
The Council’s new managing absence policy was launched earlier this year with digital training provided to
managers on the key changes of the policy, along with training on how to record absences in the Council’s
ERP Business World system. Additional guidance and a new training programme for all colleagues is
anticipated to be launched before the end of the year.

Page 49

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living Our Values
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Q1 2024/25 Q2 Explanation of performance
Value Target Value Target Value Target Value Target
Average
number of
work days
lost through
sickness
absence per
employee
13.57 9.9 13.01 9.9 3.27 2.1 2.81 2.1
The continued strategic and operational drive within the Council,
focussing on short- and long-term absence interventions, has led to
a decrease in sickness absence overall.  The new Managing
Absence policy places a focus on early intervention and regular
communication and includes enhanced support provisions for
employees to enable them to remain at work or support them to
return to work, all supported by the Council’s fair, inclusive and
consistent processes.  The New Health, Safety and Wellbeing Plan
was approved by elected members in February 2024.  This Plan
identifies two particular themes – physical and mental – which
continue to impact significantly on sickness absence levels. 
Informed by our absence data, we have increased interventions,
providing psychological and musculo-skeletal support by targeting
known hotspot areas within services and have provided more
bespoke support such as:  increasing the number of trained Mental
Health first aiders to 91; enhanced Occupational Health supports
such as physiotherapy and CBT, Advice Works and Employee
Benefits/Savings, with greater focus on frontline colleagues.
Council data suggests that sickness absences continue to be
impacted due to lengthier NHS treatment waiting times.  Working in
collaboration with service representatives, People & OD will, as
part of a planned review, evaluate and realign the Council and
service sickness absence targets during 2024/25.

Page 50

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living Our Values
Indicator Current
Status
Short
term
trend
Long
term
trend
2021/22 2022/23 2023/24 Explanation of performance
Value Target Value Target Value Target
Percentage of posts of
the highest 5% of
earners among
employees (excl.
Teachers) who are
women
58.15% Data
only 56.84% Data
only 57.59% Data
only
Total number of employees = 6,406
Total number of employees in top 5% = 323
(per guidance value 320 has been increased to 323 due to
numbers on the salary point)
Total number of women in top 5% = 186 (57.59%)
This indicator is helping to measure and monitor the percentage
of women in senior posts in the Council. The increase in this
indicator from 56.84% in 2022/23 to 57.59% in 2023/24 has
arisen due to turnover activity within the Council.
We will continue to monitor this indicator as part of our equality
monitoring processes to ensure that our recruitment, training,
development, and retention processes treat everyone in an equal
and consistent basis. We also now provide senior officers with
frequent statistics inclusive of attrition & retention to help create
awareness of where potential challenges may exist whilst offering
a range of interventions.
Due to a number of external factors out with the council’s control
it is difficult to predict future impact, however, based on the
council’s trends and interventions over recent years it is
anticipated that we will continue to make improvements via
recruitment and retention training and provision of statistical
information.
This is an annual indicator.

Page 51

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living Our Values
Indicator Current
Status
Short
term
trend
Long
term
trend
2021/22 2022/23 2023/24 Explanation of performance
Value Target Value Target Value Target
Percentage gender pay
gap between average
hourly rate of pay for
male and female
employees
2.29 Data
only 0.48 Data
only 0.44 Data
only
The pay gaps were calculated using the difference between male
and female’s average hourly rate which excludes overtime.
Average hourly rate of pay (Male) = £20.33
Average hourly rate of pay (Female) = £20.24
Gender Pay Gap % = 0.44%
The Council’s pay gap of 0.44% was calculated as at 31st March
2024 and highlights the pay gaps between male and female
employees.  The pay gaps were calculated using the difference
between male and female’s average hourly rate which excludes
overtime.
Whilst recruitment and turnover will have a continuous impact on
the gender pay gap due to external factors out with the council’s
control, the revised pay & grading model and service reviews
together have reduced the gap.
As with the previous indicator, due to a number of external factors
out with the council’s control it is difficult to predict future impact,
however, based on the council’s trends and interventions over
recent years it is anticipated that we will continue to make
improvements.
This is an annual indicator.

Page 52

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living Our Values
Indicator Curren
t
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Q1 2024/25 Q2 Explanation of performance
Value Targe
t
Value Targe
t
Value Target Value Target
Complaints closed at
Frontline Resolution
as a percentage of
all complaints
89.2% 85% 82.8% 85% 95.4% 85% 95% 85%
In Q2, 2928 complaints were received and 2781 were dealt
with at the frontline.  This is an increase on previous years. 
Complex complaints will continue to be dealt with as
investigations to allow sufficient time to consider all factors.

Page 53

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living Our Values
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Q1 2024/25 Q2 Explanation of performance
Value Target Value Target Value Target Value Target
Percentage of
FOI requests
completed within
timescale
93.6% 90% 89.9% 90% 92% 90% 91% 90%
91% FOI requests due in Q2 were completed on
time. 407 requests were received with 369
completed within timescale.
Percentage of
LGBF indicators
performing in the
top 2 quartiles
56% Previously
data only * 56% Not measured for quarters
The Council produces an annual report, presented
to the Audit, Risk and Scrutiny Board, which
details performance relative to other Councils. 
LGBF data is also scrutinised by the Corporate
Management Team who identify areas for further
consideration and monitoring.  As data is released
and updated throughout the year, percentages
reflect the position at the point of reporting to
elected members. 
*A figure for 2023/24 will be available in early 2025
in line with the release of this information from the
Improvement Service.  This has previously been a
‘data only’ indicator but targets have been
introduced for 2023/24 onward.

Page 54

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Improving Outcomes for Children and Families
Indicator Current
Status
Short
term
trend
Long
term
trend
2021/22 2022/23 2023/24 Explanation of performance
Value Target Value Target Value Target
Percentage Point
Gap in % Pupils
Achieving Expected
Level for their stage
in Literacy between
pupils living in 30%
Most Deprived areas
and those living in
70% Least Deprived
Areas (SIMD)
15.4 7 16 10 * 10
The percentage point gap between the attainment in literacy
of pupils living in the most and least deprived areas has
increased to 16 percentage points, in comparison to 15.4
percentage points in 2021/22.
*Data for the 2023/24 school term will be available in
December 2024.
Percentage Point
Gap in % Pupils
Achieving Expected
Level for their stage
in Numeracy
between pupils living
in 30% Most
Deprived areas and
those living in 70%
Least Deprived Areas
(SIMD)
13.4 6 11 9 * 9
The percentage point gap between the attainment in
numeracy of pupils living in the most and least deprived
areas has decreased to 11 percentage points, after a slight
increase between 2021 and 2022.
*Data for the 2023/24 school term will be available in
December 2024.

Page 55

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Improving Outcomes for Children and Families
Indicator Current
Status
Short
term
trend
Long
term
trend
2021/22 2022/23 2023/24 Explanation of performance
Value Target Value Target Value Target
Average total tariff
score of leavers
living in SIMD 30%
most deprived areas
745 770 681 700 * 700
It is not possible to make a like for like comparison to
previous years within this measure due to the cancellation of
exam diets in 2020 and 2021. Renfrewshire’s data follows
national trends with an increase during this period which is
now returning to post-pandemic levels. Renfrewshire is
consistently ahead of the national figure in this measure but
remains marginally below the virtual comparator. The latest
data is marginally below 2018/19 leavers cohort, which was
674. Targets for this measure were set before the
pandemic.
*Data for the 2023/24 leavers cohort will be available in
Spring 2025.
Average total tariff
score of all school
leavers in
Renfrewshire
984 959 933 960 * 965
It is not possible to make a like for like comparison to
previous years within this measure due to the cancellation of
exam diets in 2020 and 2021. Renfrewshire’s data follows
national trends with an increase during this period which is
now returning to post-pandemic levels. Renfrewshire is
consistently ahead of the national figure in this measure but
remains marginally below the virtual comparator. The latest
data is marginally ahead of 2018/19 leavers cohort, which
was 923. Targets for this measure were set before the
pandemic.
*Data for the 2023/24 leavers cohort will be available in
Spring 2025.

Page 56

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Improving Outcomes for Children and Families
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Q1 2024/25 Q2 Explanation of performance
Value Target Value Target Value Target Value Target
Proportion of
children being
looked after in
the community
91.7% 89.9% 90.9% 89.9% 90.2% 89.9% 90.8% 89.9%
The percentage of children looked after in the
community has increased by 0.4pp compared
with Q3 of 2023/24, and has remained between
90% and 91% throughout the past 12 months.
The majority of children looked after in
Renfrewshire continue to live in a community
setting either with their own family or with an
alternative family. A residential house or school
can be more suitable for a small number of
children and young people based on their
particular needs, but the service will always seek
to have a child live in a family setting where
appropriate.
Please note, this indicator is also reported
annually and the figure is derived from the Local
Government Benchmarking Framework indicator
CHN9 'Proportion of children being looked after
in the community’. The last data published for
this indicator is for 2021/22; the percentage
children looked after in Renfrewshire living with
families in the community was 91.4%, above the
Scotland average of 89.8%.

Page 57

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level