Page 1

09/09/2026 
Notice of Meeting and Agenda
Leadership Board 
Date Time Venue
Wednesday, 16 September
2026
13:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN               
Membership 
Councillor Iain Nicolson (Convener): Councillor Jacqueline Cameron (Depute Convener):  
Councillor Alison Ann-Dowling: Councillor Graeme Clark: Councillor Audrey Doig: Councillor Neill
Graham: Councillor Anne Hannigan: Councillor Colin McCulloch: Councillor David McGonigle:
Councillor Marie McGurk: Councillor Iain McMillan: Councillor Jim Paterson: Councillor Emma
Rodden: Councillor John Shaw: Councillor Andy Steel: 
Hybrid Meeting
Please note that this meeting is scheduled to be held in the Council Chambers.  However, it is a
hybrid meeting and arrangements have been made for members to join the meeting remotely
should they wish. 
Members of the Press and Public
Members of the press and public wishing to attend the meeting should report to the customer
service centre where they will be met and directed to the meeting. 
Webcasting of Meeting
This meeting will be filmed for live or subsequent broadcast via the Council’s internet site – at
the start of the meeting the Convener will confirm if all or part of the meeting is being filmed.  To
find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home
MARK CONAGHAN
Head of Corporate Governance
Page 1 of 130

Page 2

09/09/2026 
Further Information
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior to the
meeting at the Customer Service Centre, Renfrewshire House, Cotton Street, Paisley and online
at  http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk   
Page 2 of 130

Page 3

09/09/2026 
Items of business      
Apologies
Apologies from members. 
Declarations of Interest and Transparency Statements
Members are asked to declare an interest or make a transparency
statement in any item(s) on the agenda and to provide a brief
explanation of the nature of the interest or the transparency statement. 
1 Revenue and Capital Budget Monitoring as at 19 June
2026
Joint report by Chief Executive, Director of Finance & Resources and
Chief Finance Officer Renfrewshire HSCP. 
5 - 16 
2 Fairer Renfrewshire Sub-committee
Minute of meeting of the Fairer Renfrewshire Sub-committee held on 2
September 2026. 
17 - 20 
3 Fairer Renfrewshire Update
Report by Chief Executive 
21 - 42 
4 Best Value – Corporate Improvement Plan
Report by Chief Executive 
43 - 60 
5 Reshaping Renfrewshire –Transformation and Change
Programme – Update Report
Joint report by Chief Executive and Director of Finance & Resources 
61 - 80 
6 Responsible and Ethical Expansion of Artificial
Intelligence (AI) in Renfrewshire Council
Report by Director of Finance & Resources 
81 - 86 
7 AMIDS Enabling Works – Cost Underwrite
Joint report by Chief Executive and Director of Finance & Resources 
87 - 92 
8 Adult Social Care: 2025/26 Annual Update
Report by Chief Officer, Renfrewshire Health and Social Care
Partnership 
93 - 112 
9 OneRen Update
Report by Chief Executive 
113 - 124
Page 3 of 130

Page 4

09/09/2026 
10  Renfrewshire’s Tourism Plan - Update
Report by Chief Executive 
125 - 130 
Page 4 of 130

Page 5

PUBLIC 
___________________________________________________________________
To: Leadership Board
On: 16 September 2026
___________________________________________________________________
Report by: Chief Executive, Director of Finance and Resources, and Chief Finance
Officer Renfrewshire HSCP
___________________________________________________________________
Heading: Revenue and Capital Budget Monitoring as at 19 June 2026
___________________________________________________________________
1. Summary
1.1. At the close of reporting Period 3 on 19 June 2026, the projected revenue
outturn at 31 March 2026 for those services reporting to the Leadership Board
was a deficit position of £5.076m.  This is mainly due to Adult Services
(HSCP) projecting a year-end deficit of £5.081m against a planned deficit
position of £7.849m.
1.2. The projected capital outturn at 19 June 2026 for projects reporting to the
Leadership Board is a break-even position against the revised budget for the
year.
1.3. This is summarised in the tables below and further analysis is provided in the
Appendices. 
Revised
Annual
Budget
£000
Projected
Outturn
£000
Budget
Variance
(Adv)/Fav
£000
Budget
Variance
%
Revenue    
Adult Services 118,809 123,890 (5,081) (4.3%)
Chief Executive’s Service 25,527 25,522 5 0.0%
Total 144,336 149,412 (5,076) (3.5%)
Capital 32,418 32,418 0 0% 
Item 1
Page 5 of 130

Page 6

PUBLIC
2. Recommendations
2.1. Members are requested to:
a) Note the projected Revenue outturn deficit position of £5.076m;
b) Note the projected Capital outturn break-even position; 
c) Note the budget adjustments detailed at section 6.3.
_________________________________________________________
3. Revenue Budget Projection – deficit of £5.076m by 31 March 2027
3.1. The tables in Appendix 1 present the projected year-end position for all
services reporting to this board, by both subjective analysis (what the budget
is spent on) and objective analysis (which division is spending the budget).
Significant variances affecting the projected position are analysed further
below.
3.2. It should be noted that the projected outturn position reported here is based
on the latest information available, which is subject to change during the
financial year. 
4. Objective Analysis – Significant Variances
4.1. Adult Services - £5.081m deficit
The approved Adult Services revenue budget for 2026/27 estimated a deficit
position of £7.849m, meaning that there was an expectation that services
would overspend to this level during the year, and that this would be funded
from reserves. 
The movement in the forecast deficit position (£2.768m) is mainly due to a
reduction in employee costs through vacancy management and ongoing
recruitment and retention challenges. 
The main budget pressure and driver of the deficit position remains increased
costs within external Care at Home (CAH) packages for Older People and
those with Physical or Sensory Disabilities. Higher patient acuity on discharge
from hospital combined with more complex care needs has resulted in a
requirement for more intensive CAH support to enable people to remain in
their own homes. This together with further overspends within Adult Care
Placements for those with Learning Disabilities reflecting increased demand
levels alongside greater complexity and acuity of service user needs. 
Ongoing action is being taken by HSCP management to try and mitigate
these cost drivers where possible, and any revisions to this position will be
updated in future board reports.
Page 6 of 130

Page 7

PUBLIC
5. Subjective Analysis – Significant Variances
5.1. Employee Costs - £2.506m underspend 
This forecast underspend predominantly arises within Adult Services
(£2.500m) from ongoing recruitment and retention challenges across several
service areas, as well as the impact of recent savings proposals approved by
the Integration Joint Board. 
5.2. Third Party Payments - £7.410m overspend 
This forecast pressure relates fully to Adult Services as outlined in the
Objective Analysis. 
6. Revenue Budget Virements
6.1. Under the Council’s financial regulations, Directors and their nominated
officers, in consultation with the Director of Finance and Resources, have
certain delegated authority to transfer sums between subjective budget
headings within a service division to enable budget management throughout
the financial year. This is known as budget virement. 
6.2. Transfers between divisions of the same service / department in excess of
£100,000, and transfers between services / departments must be authorised
by the respective service Director and the Director of Finance and Resources
for submission to the relevant policy board for approval. 
6.3. Budget adjustments, for noting only, processed since the approval of the
Revenue Estimates amount to £1.409m.  Of this, £0.491m relates to Adult
Services and £0.918m relates to the Chief Executive’s Service.   
6.4. Adult Services - £0.491m relates mainly to the Council’s share of an additional
Scottish Government allocation for the Real Living Wage uplift for workers
providing direct adult social care £0.507m. 
Revenue Budget Adjustments
Objective
Heading
Subjective
Heading
Amount
(£m)
Reason
Adult
Services
Transfer
Payments 0.507
Proportionate share of the
Scottish Government additional
allocation for the Real Living
Wage in Adult Social Care 
6.5. Chief Executive’s Service - £0.918m comprises £0.070m being the Council’s
share of the Scottish Government funding allocation for Adopt and Adapt
under the Fairer Futures programme, together with a net drawdown of
Page 7 of 130

Page 8

PUBLIC
£0.848m from ringfenced reserves to support the delivery of Council strategic
programmes. 
Revenue Budget Adjustments
Objective
Heading
Subjective
Heading
Amount
(£m)
Reason
Chief
Executive’s
Service
Transfer
Payments 0.070
Renfrewshire Council’s share of
the Scottish Government
allocation for Adopt and Adapt 
Revenue Budget Adjustments
Chief Executive’s Service – Drawdown / (Contribution to) Reserves
Programme Amount
(£m)
Drawdown from reserves to fund the delivery of the Fairer
Renfrewshire Programme 0.685
Return to reserves of multi-year funding approved in the
Council Motion in February 2026 to deliver year 2 of the Visitor
Destination programme
(0.173)
Return to reserves of multi-year funding approved in the
Council Motion in February 2026 to deliver future years of the
Events programme
(0.225)
Drawdown of funding for final payment of the Concessionary
Swim Programme delivered by OneRen 0.008
Drawdown from the Council’s Service Modernisation and
Reform reserve to deliver an improved digital experience for
citizens and local communities
0.553
7. Capital Budget Projection - break even position by 31 March 2027 
7.1. The Capital Investment Programme 2026/27 to 2030/31 was approved by the
Council on 14 May 2026. The approved capital budget for 2026/27 was
£27.900m. 
7.2. The in-year Capital budget is forecast to break even by 31 March 2027;
however, this will be monitored as the projects progress. Further details of the
programme can be found in the Capital Monitoring report at Appendix 2. 
7.3. Budget adjustments totalling £4.518m have taken place between years to
reflect revised programming of capital projects since the budget approval. The
revised capital spend for 2026/27 is £32.418m, and details of these
adjustments are as follows: 
Page 8 of 130

Page 9

PUBLIC
Capital Budget Adjustments
Budget carried forward into 2026/27 to reflect cashflow update
Project Amount (£m)
Community Halls (Council Motion) 0.479
Steeple Hall Kilbarchan Refurbishment 0.440
Lagoon Internal Play Centre 0.496
Linwood Running Track 0.046
Artificial Pitches Fund 0.781
Glasgow Airport Investment Area 0.146
Clyde Waterfront & Renfrew Riverside 0.693
AMIDS: Public Realm Phase 1 Netherton Square 0.078
AMIDS: South 0.884
Budget decelerated in 2026/27
AMIDS: Public Realm Phase 1 Netherton Square (0.116)
AMIDS: South (0.400)
Budget reallocated between programmes 2026/27
Glasgow Airport Investment Area 0.020
AMIDS: Public Realm Phase 1 Netherton Square 0.038
AMIDS: South (0.057)
Budget Increase 2026/27
Council Motion - Leisure Facilities Upgrade 2.000
Budget Decrease 2026/27 to reflect updated programming 
AMIDS: South (1.010)
Total 4.518 
Implications of the Report
1. Financial 
The projected budget outturn position for the Leadership Revenue budget is a
deficit of £5.076m (3.5%) at 31 March 2027.  Income and expenditure will
continue to be monitored closely for the rest of the financial year and as far as
possible, steps will be taken by services to mitigate any overspend.  
The projected outturn position for the Leadership Capital budget is break-even,
after the adjustments outlined at section 7.     
2. HR & Organisational Development 
None directly arising from this report. 
Page 9 of 130

Page 10

PUBLIC
3. Community/Council Planning
Community Plan
Our Renfrewshire is thriving The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Our Renfrewshire is well 
Our Renfrewshire is fair 
Our Renfrewshire is safe
Council Plan
Reshaping our place, our
economy and our future The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Building strong, safe and resilient
communities
Tackling inequality, ensuring
opportunities for all
Creating a sustainable
Renfrewshire for all to enjoy
Ongoing revenue and capital budget
monitoring is a tool to enable good
financial management so that the Council
has resources now and in the future for
continued service delivery.
Working together to improve
outcomes 
4. Legal 
There are no direct implications arising from the recommendations in this
report. 
5. Property/Assets 
The capital expenditure noted in this report will result in new assets (City Deal),
regeneration (AMIDS) and refurbishment and improvement of leisure and
culture assets. 
6. Information Technology 
While ICT assets and revenue costs are included within these reported
budgets, there are no direct implications arising from the recommendations in
this report. 
7. Equality & Human Rights 
While certain areas of spend may impact on particular groups, any such impact
would be assessed prior to the spend being incurred, therefore there are no
direct implications arising from the recommendations in this report. 
8. Health & Safety 
The capital expenditure noted in this report will result in lifecycle maintenance
improvements to existing properties and replacement of ICT assets, which may
in some cases rectify health and safety issues. 
Page 10 of 130

Page 11

PUBLIC
9. Procurement 
While Procurement is a key consideration prior to the Council incurring any
revenue or capital spend, there are no direct implications arising from the
recommendations in this report. 
10. Risk 
The potential financial risk that the Council will overspend its approved revenue
budgets for the year is managed at a Council-wide level by the Chief Executive
and Directors. 
11. Privacy Impact 
There are no direct implications arising from the recommendations in this report 
12. Cosla Policy Position 
There are no direct implications arising from the recommendations in this
report. 
13. Children’s Rights 
There are no direct implications arising from the recommendations in this
report. 
14. Climate Change 
The Council aims to reduce its carbon and other emissions to net zero by 2030,
however there are no direct implications arising from the recommendations in
this report. 
_________________________________________________________ 
List of Background Papers
Revenue Budget and Council Tax 2026/27, Council 26 February 2026
2026/27 Delegated Health and Social Care Budget, Renfrewshire Integration Joint
Board, 27 March 2026
Non-Housing Capital Investment Programme, Prudential Framework and Treasury
Management Strategy, and Capital Strategy 2026/27 – 2035/36, Council 26
February 2026
___________________________________________________________________ 
Authors:  Revenue - Valerie Howie, Finance Business Partner and Alison Burns,
Corporate Finance Manager
Capital – Linsey McGregor, Senior Accountant
Page 11 of 130

Page 12

No embedded text on this page.

Page 13

Appendix 1 
PUBLIC
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2026/27
1 April 2026 to 19 June 2026              
POLICY BOARD:  LEADERSHIP BOARD              
Objective Summary
Approved
Annual Budget
Budget
Adjustments
Revised
Annual
Budget at
Period 3
Projected
Outturn
Budget Variance 
(Adverse) or
Favourable  
£000 £000 £000 £000 £000 %
Adult Services 118,318 491 118,809 123,890 (5,081) (4.3%)
Chief Executive's Service 24,609 918 25,527 25,522 5 0.0%
NET EXPENDITURE 142,927  1,409 144,336 149,412  (5,076) (3.5%)              
Subjective Summary
Approved
Annual Budget
Budget
Adjustments
Revised
Annual
Budget at
Period 3
Projected
Outturn
Budget Variance 
(Adverse) or
Favourable  
£000 £000 £000 £000 £000 %
Employees 48,460 2,277 50,737 48,231 2,506 4.9%
Premises Related 774 10 784 784 (0) (0.1%)
Transport Related 596 1 597 598 (1) (0.2%)
Supplies and Services 20,436 (101) 20,335 20,450 (115) (0.6%)
Third Party Payments 74,061 20,728 94,789 102,199 (7,410) (7.8%)
Transfer Payments 28,941 (18,750) 10,191 10,192 (1) 0.0%
Support Services 151 3 154 155 (1) (0.9%)
Depreciation and Impairment Losses 0 0 0 0 0 0.0%
GROSS EXPENDITURE 173,419  4,168 177,587  182,610  (5,023) (2.8%)
Income (30,492) (2,759) (33,251) (33,197) (54) (0.2%)
NET EXPENDITURE 142,927  1,409 144,336  149,412  (5,076) (3.5%)
Page 13 of 130

Page 14

Appendix 1 
PUBLIC 
Objective Summary
Approved
Annual Budget
Budget
Adjustments
Revised
Annual Budget
at Period 3
Projected
Outturn
£000 £000 £000 £000 £000 %
Older People 66,959 (2,601) 64,358 64,760 (402) (0.6%)
Physical or Sensory Disabilities 15,486 511 15,997 17,621 (1,624) (10.2%)
Learning Disabilities 28,749 2,349 31,098 33,925 (2,827) (9.1%)
Mental Health Needs 6,297 202 6,499 6,697 (198) (3.0%)
Addiction Services 827 30 857 887 (30) (3.5%)
NET EXPENDITURE 118,318                      491 118,809 123,890 (5,081) (4.3%)
Subjective Summary
Approved
Annual Budget
Budget
Adjustments
Revised
Annual Budget
at Period 3
Projected
Outturn
£000 £000 £000 £000 £000 %
Employees 42,378 1,766 44,144 41,644 2,500 5.7%
Premises Related 373 10 383 383 (0) (0.1%)
Transport Related 595 1 596 597 (1) (0.2%)
Supplies and Services 3,823 (215) 3,608 3,723 (115) (3.2%)
Third Party Payments 74,061 20,728 94,789 102,199 (7,410) (7.8%)
Transfer Payments 27,033 (19,398) 7,635 7,636 (1) 0.0%
Support Services 61 3 64 64 (0) (0.6%)
GROSS EXPENDITURE 148,324 2,895 151,219 156,247 (5,028) (3.3%)
Income (30,006) (2,404) (32,410) (32,356) (54) (0.2%)
NET EXPENDITURE 118,318 491 118,809 123,890 (5,081) (4.3%)
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2026/27
1 April 2026 to 19 June 2026
Budget Variance
(Adverse) or Favourable
Budget Variance
(Adverse) or Favourable
POLICY BOARD:  LEADERSHIP BOARD - ADULT SERVICES
Page 14 of 130

Page 15

Appendix 1 
PUBLIC
Objective Summary
Approved
Annual Budget
Budget
Adjustments
Revised
Annual Budget
at Period 3
Projected
Outturn
£000 £000 £000 £000 £000 %
Chief Executive and Management 467 0 467 463 4 0.9%
Policy and Partnerships 5,220 755 5,975 5,975 0 0.0%
Marketing and Communications 4,110 156 4,266 4,265 1 0.0%
City Deal & Infrastructure 86 0 86 86 0 0.0%
Leisure Services (incl Renfrewshire Leisure) 14,726 7 14,733 14,733 0 0.0%
NET EXPENDITURE 24,609 918 25,527 25,522 5 0.0%
Subjective Summary
Approved
Annual Budget
Budget
Adjustments
Revised
Annual Budget
at Period 3
Projected
Outturn
£000 £000 £000 £000 £000 %
Employees 6,082 511 6,593 6,587 6 0.1%
Premises Related 401 0 401 401 0 0.0%
Transport Related 1 0 1 1 0 0.0%
Supplies and Services 16,613 114 16,727 16,727 0 0.0%
Third Party Payments 0 0 0 0 0 0.0%
Transfer Payments 1,908 648 2,556 2,556 0 0.0%
Support Services 90 0 90 91 (1) (1.1%)
GROSS EXPENDITURE 25,095 1,273 26,368 26,363 5 0.0%
Income (486) (355) (841) (841) 0 0.0%
NET EXPENDITURE 24,609 918 25,527 25,522 5 0.0%
Budget Variance
(Adverse) or Favourable
Budget Variance
(Adverse) or Favourable
REVENUE BUDGET MONITORING STATEMENT 2026/27
RENFREWSHIRE COUNCIL
1 April 2026 to 19 June 2026
POLICY BOARD:  LEADERSHIP BOARD - CHIEF EXECUTIVE'S SERVICE
Page 15 of 130

Page 16

Appendix 2 
PUBLIC 
Prior Years Approved  Budget Revised Projected Total Approved Projected
Expenditure Budget Adjustments Budget Outturn Budget Outurn
Project Title to 31/03/2026 2026-27 since previous 2026-27 2026-27 to 31-Mar-31 to 31-Mar-31
Board report
£000 £000 £000 £000 £000 £000 £000
LEISURE SERVICES
Community Halls(Council Motion) 0 680 479 1,159 1,159 0 0% 1,159 1,159 0 0%
Steeple Hall Kilbarchan Refurbishment 299 0 440 440 440 0 0% 739 739 0 0%
Lagoon Internal Play Centre 4 500 496 996 996 0 0% 1,000 1,000 0 0%
Council Motion Leisure Facilities Upgrade 0 0 2,000 2,000 2,000 0 0% 2,000 2,000 0 0%
Linwood Running Track at On-X 0 0 46 46 46 0 0% 46 46 0 0%
Artificial Pitches Fund 19 0 781 781 781 0 0% 800 800 0 0%
Total Leisure Services 322 1,180 4,242 5,422 5,422 0 0% 5,744 5,744 0 0%
CHIEF EXECUTIVES
City Deal Projects
Glasgow Airport Investment Area 46,221 2,000 166 2,166 2,166 0 0% 48,387 48,387 0 0%
Clyde Waterfront & Renfrew Riverside 116,991 140 693 833 833 0 0% 117,823 117,823 0 0%
Economic Development
AMIDS: Public Realm Phase 1 Netheron Square 3,817 0 0 0 0 0 0% 3,933 3,933 0 0%
AMIDS: South 16,906 24,580 (583) 23,997 23,997 0 0% 59,405 59,405 0 0%
Total Chief Executives 183,935 26,720 276 26,996 26,996 0 0% 229,548 229,548 0 0%
TOTAL LEADERSHIP BOARD 184,257 27,900 4,518 32,418 32,418 0 0% 235,292 235,292 0 0%
Budget Variance
(Adverse) or
Favourable
Budget Variance
(Adverse) or
Favourable
RENFREWSHIRE COUNCIL
CAPITAL INVESTMENT STRATEGY - NON-HOUSING SERVICES
1st April to 19th June 2026
POLICY BOARD: LEADERSHIP
Current Year 2026-27 Full Programme - All years
Page 16 of 130

Page 17

Minute of Meeting
Fairer Renfrewshire Sub-committee 
Date Time Venue
Wednesday, 02 September
2026
10:00 Via Teams, 
Present: Councillor Jacqueline Cameron, Councillor Graeme Clark, Councillor Neill Graham,
Councillor Anne Hannigan, Councillor Iain Nicolson, Councillor Andy Steel 
Chair
Councillor Jaqueline Cameron, Convener, presided. 
In Attendance
L McIntyre, Head of Policy & Partnerships, N Canavan, Senior Policy Officer, J Connelly,
Senior Communications Officer, D Dunn, Social Renewal Lead Officer, L Fingland, Service
Planning & Policy Development Manager, A Walter, Connected Communities Officer (all
Chief Executive’s); and J Barron, Senior Committee Services Officer (Finance &
Resources). 
Also in Attendance
S Hand, Chief Executive Officer, Active Communities. 
Webcasting of Meeting
Prior to the commencement of the meeting the Convener intimated that this meeting of the
Sub-committee would be filmed for live or subsequent broadcast via the Council's internet
site.  
Item 2
Page 17 of 130

Page 18

Declarations of Interest and Transparency Statements
There were no declarations of interest or transparency statements intimated prior to
the commencement of the meeting. 
1(a)  Cost of Living Update
There was submitted a report by the Chief Executive relative to an overview of the
key context and evidence around current pressures on household finances, both in
terms of household income and expenditure. 
DECIDED: That the report be noted.   
1(b)  Cost of Living Dashboard
There was submitted a report by the Chief Executive relative to an overview of key
indicators and their movement from the last reporting period, supported by additional
statistical information, analysis and graphs which illustrated longer-term trends. 
DECIDED:   
(a) That the report be noted; and 
(b) That the Head of Policy & Partnerships submit a report to a future meeting of the
Fairer Renfrewshire Sub-Committee on energy and resources.   
2 Fairer Renfrewshire Programme Update
There was submitted a report by the Chief Executive relative to key projects being
progressed through the Fairer Renfrewshire Programme. The report provided
updates on current projects, highlighted future key priorities and gave an overview of
the proposals, priorities and next steps for the next two years. 
DECIDED:   
(a)  That the report be noted. 
(b)  That the Head of Policy & Partnerships submit a report to a future meeting of the
Fairer Renfrewshire Sub-Committee on “Good Food Nation”.   
3 Update on Gallowhill Community Development - Presentation
The Chief Executive, Active Communities gave a presentation which outlined
growing community health and wellbeing in the Gallowhill area. The Chief Executive
responded to questions regarding the presentation.
Page 18 of 130

Page 19

DECIDED: That the content of the presentation be noted.   
4 Update on Trauma Informed and Responsive Renfrewshire -
Presentation
The Senior Policy Officer, Chief Executive's, gave a presentation which outlined
trauma issues, turning principals into practice and next steps.   
DECIDED: That the content of the presentation be noted.   
Page 19 of 130

Page 20

Page 20 of 130

Page 21

PUBLIC 
___________________________________________________________________
To:  Leadership Board
On:  16 September 2026
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Fairer Renfrewshire Update
___________________________________________________________________
1. Summary 
1.1 The Council and its partners continue to work together to progress the Fairer Renfrewshire
Programme, with a strong shared focus currently on the local response to the cost-of-living
crisis. A Fairer Renfrewshire Action Plan was agreed by the Leadership Board in December
2025, which sets out the priority actions that the council and its partners will progress to
reduce poverty and inequality in Renfrewshire over the next 18 months. 
1.2 Regular reports are provided to the Fairer Renfrewshire Sub-Committee on the Fairer
Renfrewshire Programme and Action Plan, with the most recent meeting on 2 September
2026 discussing some of the key developments over the last quarter in relation to the cost
of living crisis, including the continuing impacts of the conflict in the Middle East on
household income and expenditure in Renfrewshire. 
1.3 This paper provides: 
• a summary of the issues as reported to the Fairer Renfrewshire Sub-Committee on 2
September 2026 including the cost of living and programme updates. 
• An update with regard to the Summer of Fun Programme. 
• An update on plans for Winter Connections 26/27 and proposed approval process. 
• Details of the proposed Renfrewshire Voices small grants programme, as part of the
Fairer Renfrewshire Programme’s Advancing Equality of Opportunity Workstream. 
1.4 Priorities for the next quarter to end June 2026, as identified in the Fairer Renfrewshire
Action Plan are as follows: 
Item 3
Page 21 of 130

Page 22

PUBLIC 
• The Winter Connections programme will be finalised and launched prior to 1 October.
• Subject to approval, the Renfrewshire Voices small grant programme will be launched.
• A schedule to drive uptake of welfare benefits will be developed.
• The evaluation of the Fairer Renfrewshire Panel will be carried out and brought to a
future Sub-Committee.
• Sources of Energy Advice across Renfrewshire will be identified and promoted.
___________________________________________________________________
2.  Recommendations 
2.1 It is recommended that elected members: 
• Note the content of the report and the work being undertaken to progress the Fairer
Renfrewshire programme;
• Note the update provided on the Summer of Fun programme in Section 5, with detailed
information on all funded applications provided in Appendix 1.
• Approve the guidance for the Winter Connections 2025/26 programme and associated
implementation arrangements as detailed in Section 5 and Appendix 2; and 
• Agree that authority is delegated to the Head of Policy and Partnerships to award Winter
Connections grant funding, in consultation with the Council Leader and in line with the
guidance attached at Appendix 2. 
• Approve the guidance and arrangements for the proposed Renfrewshire Voices small
grant programme, including the allocation of £20,000 for the programme which would
run as a pilot in 26/27 as detailed in section 6 and Appendix 3.
___________________________________________________________________
3.  Background 
3.1 The Fairer Renfrewshire Programme was developed in order to bring together targeted
programmes of work being progressed by the Council and its partners to tackle poverty and
inequality in Renfrewshire. As the cost of living crisis has developed, the programme has
continued to evolve in response, and at Leadership Board on 3 December 2025 a Fairer
Renfrewshire Action Plan detailing the priorities and programme of work to be undertaken
over the next 18-24 months was approved. This plan refreshes and sharpens focus on the
priorities for the Fairer Renfrewshire Programme.   
3.2 Over the next two years, we will concentrate on four strategic priorities: 
• Improving Financial Security 
Helping households maximise income, reduce costs, and access early help to prevent
crisis. 
• Strengthening Health, Wellbeing and Community 
Supporting families and communities through sustainable models of care, food security,
and place-based approaches. 
• Embedding Equality and Inclusion 
Page 22 of 130

Page 23

PUBLIC
Ensuring services are accessible, inclusive, and shaped by the voices of those who are
often unheard. 
• Using Insight and Evidence for Impact 
Harnessing data, feedback, and lived experience to drive better decisions and deliver
measurable change. 
3.3 Regular updates on the programme are provided to the Fairer Renfrewshire sub-committee
and subsequently to the Leadership Board. 
4  Update from the Fairer Renfrewshire Sub-Committee 
4.1 At its meeting on 2 September 26, the sub-committee considered: 
• The most recent programme update including information on recent statistics and
research in relation to the cost-of-living crisis, including the dashboard developed locally. 
• Progress updates in relation to Advice Provision, Equalities Actions, Summer of Fun and
the Fairer Renfrewshire Panel.
• Presentations on the Community Development Programme in Gallowhill and the Trauma
Informed and Responsive Renfrewshire Programme. 
4.2  Officers gather information from a variety of sources at both a local and national level to
inform discussion at the sub-committee. Key statistics and information discussed at its most
recent meeting are provided in table 1 below. 
Table 1 
Key National Statistics
• The rate of inflation is standing at 2.9% in June, increasing from 2.6% the previous
month and has been above the target rate of 2% set by the UK Government for the
Bank of England since October 2024, when it reached 2.3%
• The inflation rate for food has decreased to 1.7% in June, down 0.2% from last
month. It is now lower than overall inflation, however the outlook for food prices is
unstable, with prices expected to rise more quickly again in the coming months. 
• The Bank of England interest rate was held at 3.75% in July due to the conflict in
the Middle East and associated inflation fluctuations and forecasts.
• The Energy Price Cap, originally introduced by Ofgem in January 2019 to set limits
on the underlying rates energy suppliers, is currently set at £1,862 from 1 July,
with continued conflict in the Middle East leading to an uncertain energy
disinflation path according to economists. 
Cost of living research (national)
The latest insights into the cost of living from the Office of National Statistics for the
period 3rd to 28th June 2026 found: 
• that 88% of those surveyed reported the cost of living as the most important issue
facing the UK today, and around 60% reported that their cost of living had
increased compared with a month ago. Around 6 in 10 adults (63%) reported being
very or somewhat worried about their costs of living. 
Page 23 of 130

Page 24

PUBLIC
• Around 1 in 3 (35%) adults who pay energy bills reported finding it very or
somewhat difficult to afford these bills. 
• 1 in 5 (20%) adults reported that they had borrowed more money or used more
credit than usual in the past month compared with a year ago. 
• In the period 7 January 2026 to 29 March 2026, among adults currently paying rent
or mortgage payments, around 1 in 3 (35%) reported finding it very or somewhat
difficult to afford these payments. 
• Just over 1 in 20 (6%) adults reported they had been unable to pay a direct debit,
standing order, or bill in the past month. 
• 13% of adults disagree or strongly disagree that their household income covers
their minimum living expenses. 
• The ONS also publishes statistics for the UK on Direct Debit failure. The most
recent statistics for June 2026 shows a default rate on loans of 4.95%.   
• Within Scotland, according to the Scottish Government Public Insight Monitor 81%
took some form of action to help manage their household finances over the last 6
months: 
• 55% of adults had spent less on non-essential items to help manage their
household finances
• 34% had used savings and 18% had cut back on essentials such as food. 
• 45% had also taken steps to reduce energy use in the home, eg. less heating
and hot water. 
Employment and Income
• According to the ONS, the Claimant Count in June 2026, which is taken
from JobcentrePlus administration systems, for those claiming unemployment-
related benefits in Renfrewshire is 3,470 people – 2095 men and 1280 women
aged between 16 and 64. This is an increase from the 3,445 last reported. The
Renfrewshire unemployment rate of 2.9% is less than the Scotland rate (3.1%). 
• Over the long term, average weekly earnings for both total and regular pay show a
steady increase. Average weekly earnings were estimated at £749 for total
earnings and £699 for regular earnings in May 2026. 
Food costs / insecurity
• Food inflation was 1.7% in June, down from 2.2% in May. Prices rose the fastest
for fish (9.1%), preserved fruit (8.6%) and water (8.2%) and confectionary products
(6.4%). Prices fell for 16 categories, with the largest drops for pizza (-6.7%), butter
(-6.6%) and flours (-5.1%). The ONS, however, found that although food inflation
has reduced, the price of food has increased by 30.1% since April 2022.
• Foodbank statistics for Quarter 1 show that 1,085 vouchers were issued,
supporting 1,440 adults and 676 children. This is a decrease on the same time last
year when 1,342 vouchers were issued supporting 1,775 adults and 854 children. 
• Single adult households accounted for 594 vouchers, and those for whom benefits
was their only income accounted for 910.
Page 24 of 130

Page 25

PUBLIC
• Rising cost of essentials was the reason a voucher was issued in 412 cases, and
continues to be the most cited reason for voucher issue with other unexpected
expense at 245 and debt, when priority and non-priority debt is taken together,
accounted for 177 vouchers.
Housing
• Private rent prices in Renfrewshire were an average £795 in June 2026, down
from an average of £826 in March 2026, and an annual decrease of 1.4% from
£807 in June 25 
5 Fairer Renfrewshire Programme Update 
5.1 Since the last update to Leadership Board in June 2026, a range of activities have
continued to be progressed by officers and partners. A summary is provided in the sections
below. 
Improving Financial Security 
Advice  
5.2 During quarter 1, Renfrewshire Council’s Advice Works Service received 903 referrals,
including self-referrals and assisted 718 new clients. Within the quarter, they supported
3,278 benefit claims and won 26 appeals, with Client Financial Gain for the quarter being
£3,059,751, and debt under management £545,367. 
5.3 For Family Advice, 95 new referrals were received this quarter, 45 of these being from the 6
Child Poverty Priority Groups and financial gain of £21,752 made. 88 benefits checks were
done, and the gain included Universal Credit of £11,544 and Scottish Child Payment of
£8,580. 
5.4 For Renfrewshire Citizens Advice Bureau (RCAB)’s School Support Service for quarter 1:
• 94 contacts were made with clients (76 in person, 15 by telephone and 3 by email). 
• 55 families were assisted during the quarter, including 25 new clients.  
The service secured a total of £18,083.71 in Client Financial Gains for families during the
quarter. This included £6804 from Child Disability Payment. 
5.5 With regard to Child Poverty Priority Groups, across both the Advice Works and RCAB
advice for families services, the following number of families in priority groups were
supported:
• 37 lone parent families. 
• 28 families with a child or adult with a disability
• 6 families with three or more children. 
• 17 minority ethnic families. 
• 7 families with a child under one year old. 
• 2 mothers aged under 25 
5.6 For RCAB’s general service in quarter 1, 2,882 individuals sought advice, with 1,163 being
seen and financial gain of £399,003. Total debt under management at the moment,
Page 25 of 130

Page 26

PUBLIC
including existing debt is £2,124,519 and 134 clients reached a debt solution this quarter.
There were also 103 legal clients this quarter, with most of these coming forward with
issues around housing (34) and homelessness (18). Debt accounted for 22 client contacts. 
5.7  The contract with RCAB to provide free general and legal advice to Renfrewshire residents
was approved at Finance, Resources and Customer Services Policy Board on 11 June, and
commenced on 1 July. 
5.8 A number of meetings have taken place since between Council Officers and the RCAB
Chief Executive in line with both the new service specification and Fairer Renfrewshire
Action Plan. 
5.9 A specific meeting regarding outreach has taken place, with Advice Works and RCAB
looking at how they can best work together to agree, provide and review outreach advice at
locations across Renfrewshire. This includes looking at gaps, duplication and ensuring
outreach is fully utilised 
Strengthening Health, Wellbeing and Community 
Community Development in Gallowhill 
5.10 Progress has been made on the community development work in Gallowhill, with a number
of activities supported by Active Communities now taking place regularly within the area
and a detailed update on this work was delivered by Active Communities as part of the
agenda for the September Fairer Renfrewshire Sub-Committee 
5.11 Recent activities in Gallowhill include:
• Friday Lunch
• Two community litter picks each week (community led)
• A walking group which is using the new walking routes in Gallowhill
• Weekly exercise class
• Weekly art activities for young people 
5.12 In addition, utilising Summer of Fun funding, Active Communities ran a programme of free
fun activities for the children over the summer holidays which included a healthy lunch.
Children had the opportunity to be involved in the preparation of lunch and learn basic
cooking skills. Whilst the children were in this club parents enjoyed their normal weekly
Friday lunch club which has activities suitable for them.  
5.13 In July Active Communities met with Council Officers from the Transport team to discuss
issues that had been raised by the community, for example with regard to road safety,
parking and accessibility as well as things like bus shelters in poor condition. It has been
arranged that Shopmobility will carry out an accessibility audit on main routes in Gallowhill,
including from the schools to shops and to the Community Centre and the result will be
share with Transport colleagues to take forward the findings. 
5.14 Active Communities were also advised of upcoming initiatives such as Beat the Street
which launches in September to share with the Gallowhill community. 
Page 26 of 130

Page 27

PUBLIC 
5.15 Looking forward, Active Communities are planning a community sharing event in autumn to
look at issues that have been previously raised by community members through the earlier
needs assessment and what has been done, focus and promote the new activities
happening in Gallowhill and also encourage community to come forward with ideas on how
to improve the area. 
Summer of Fun 
5.16 Funding was allocated to another Summer of Fun programme in 2026 from the Fairer
Renfrewshire budget, with additional funding from Scottish Government’s Summer of Sport
initiative providing further support to the programme. As with previous years programmes,
this is a partnership programme of events across Renfrewshire including the direct
provision of holiday camps and a small grants programme to allow third and community
sector partners to deliver local, targeted provision to low-income families across
Renfrewshire. 
5.17 Grants of up to £3,000 were available for community organisations for projects to deliver
activities over the summer holidays which reach communities that might be underserved by
mainstream activities. As in previous years the programme was quickly over-subscribed. 
5.18 Applications were reviewed by a partnership panel, including members from Engage
Renfrewshire and Renfrewshire HSCP along with Council officers. Delegated authority had
been provided to the Head of Policy and Partnerships to award grant funding in consultation
with the Council Leader, and out of the £50,000 available, £49,999.32 was allocated. 
5.19 In total 22 organisations received funding for activities which included:
• Summer clubs for families/children
• Outdoor activities
• Art and music activities
• Sports and fitness activities 
5.20 As part of Summer of Fun, a small amount of funding was made available to OneRen
Libraries to provide activities in areas where no organised activities were taking place, with
summer storytelling and other activities being organised in these areas. 
5.21 Invest in Renfrewshire and OneRen libraries were also linked with the organisations
receiving funding so, where applicable, they could discuss their services. In OneRen’s case,
this was to carry out conversations with as many people as possible as part of the
development of a new Skoobmobile service. 
5.22 Summer holiday camps were provided across Renfrewshire by both Connected
Communities staff and Street Stuff. As approved at Leadership Board on 17 June, funding
of £8,000 was also provided to the Tannahill Centre to extend their service over the
summer, and employ 2 sessional workers and provide food, including a hot lunch, and
snacks for attendees. This was in place of the CLD summer camp in Glencoats Primary
School. 
Page 27 of 130

Page 28

PUBLIC
5.23 The full Summer of Fun programme will be evaluated and a report brought to elected
members at the next Leadership Board. A full list of awards and activities is at Appendix 1.   
Winter Connections 
5.24 Recognising the success of the Winter Connections programme since 2022/23, £75,000 of
Fairer Renfrewshire funding was allocated as part of the Council’s budget to support the
delivery of a Winter Connections programme for 26/27. Winter Connections provides a
network of local places and spaces where people can connect to others in their community
over the winter. 
5.25 Originally established as a response to the cost of living crisis, the Winter Connections
programme is now in its fifth year and has proven to be much valued within communities
over the winter months. An evaluation of the 2025/26 programme was carried out and
reported to Leadership Board in June 2026. 
5.26 As with previous years, it is recommended that authority is delegated to the Head of Policy
and Partnerships to award funding in consultation with the Council Leader and in line with
the guidance, to enable timely awards. All awards will be reported back to Leadership
Board. 
5.27 Guidance has been drafted as detailed at Appendix 2, and if approved by Leadership
Board, it is intended that the funding will go live for applications from 17 September, with
awards being made from October 2026. 
Embedding Equality and Inclusion 
Equalities Outcomes Action Plan and equality actions  
5.28 After the success of the first session on 12 May, an additional RenTalk has been delivered
with the Equalities Development Officer and Engage Renfrewshire’s IN-Ren Network
Facilitator on inclusive and intercultural communications for employees. The additional talk
was delivered after positive feedback at the first session and was designed to reach those
who weren’t able to attend the first session. The session supports staff to meet the needs of
any service user who is not a native English speaker or who needs a different kind of
communication style. Between both sessions, almost 200 staff members have been
reached. 
5.29 Diversity Equality Alliance Renfrewshire (DEAR) Group recently reviewed their Terms of
Reference and membership. At the DEAR group meeting in May it was agreed which
organisations would be invited to join the group to expand the membership. Over June and
July several organisations have been contacted and added to the membership of the DEAR
group including: My Baby and I, Jubilee House, Scottish Fire and Rescue Service, RAMH,
West College Scotland and Inspiring Families. 
5.30 Expressions of interest from British Sign Language (BSL) users for the BSL User group
hosted by the Council closed at the end of July 2026. The BSL user group will bring
Page 28 of 130

Page 29

PUBLIC
together BSL users to give feedback on Council services to improve these for the Deaf and
Deafblind community. The group has been advertised through the British Deaf Association
newsletter, Alliance Scotland, West Scotland BSL social media, several community
networks, and social media. Several expressions of interest have been received with a wide
range of individuals interested in joining the group. Once those who have expressed an
interest have been contacted, it is intended to hold a first meeting in October or November. 
Advice Posters and Leaflets in other languages 
5.31 Working with Advice Works and RCAB, posters and leaflets have been developed in 5
languages other than English, encouraging anyone who is struggling with money worries to
come forward for advice. The 5 most common languages used by clients contacting the
Council through use of Language Line are Arabic, Farsi, Polish, Sorani and Ukrainian, so
the posters and leaflets were developed in those languages as likely to be most common in
Renfrewshire. 
5.32 These were distributed at the IN-Ren Newsy launch on 23 July to a number of organisations
which support ethnically diverse clients, including Community Learning and Development
colleagues and partners, to distribute at ESOL classes. They will also be distributed to
libraries and health settings. 
5.33 In June 2026, partners in Renfrewshire hosted a Building Stronger Communities session to
discuss how we can work together to strengthen connection across our communities,
particularly in relation to culturally and ethnically diverse communities. Over 40 people
attended the session, with follow up sessions to be held during September to progress
some of the ideas discussed. 
Using Insight and Evidence for Impact 
Child Poverty Accelerator Fund 
5.34 Work continues on the Child Poverty Accelerator Fund project, which will create a locally
governed 'Insight Partnership' that uses existing data to identify families showing early signs
of child poverty risk. The partnership will then connect these families quickly to the right
support, including income maximisation, employability help, cost of living advice and family
wellbeing services. 
5.35 The initial stage of this project examined the type of data that is held across Council
services to decide what could be useful to the project. Work has now progressed to
ensuring the technical details within a Data Protection Impact Assessment fully satisfy
Information Governance requirements, creating an Equality Impact Assessment and
finalising a project plan. The steering group, comprised of officers from across relevant
Council areas, that has been established to oversee the project has met three times, and
the first monitoring and evaluation meeting with the Scottish Government took place on 13th
of August 2026. 
Lived Experience Panel 
Page 29 of 130

Page 30

PUBLIC 
5.36 Elected Members have been given a number of updates relating to work of the Fairer
Renfrewshire Panel. Since the last Fairer Renfrewshire Sub-Committee meeting, the Panel
have met with the HSCP Health Improvement Team around the ‘Ask and Act’ pilot they are
developing and with Invest in Renfrewshire team to input on Renfrewshire’s proposals for
the Scottish Government Parental Transport funding investment. Going forward, the Panel
will meet with CLD to discuss services for young people in Renfrewshire. 
5.37 The specification for the contract with STAR Project to facilitate and support the Panel for
another year has been agreed, with a new contract starting in July 2026. 
5.38 It has been agreed that the Panel will be evaluated during August and September, with an
officer from the Fairer Renfrewshire team carrying this out. She will speak to Panel
members, STAR Project staff and Council Services which have engaged with the Panel to
examine how well the Panel is working, what changes have been made due to Panel
feedback and any areas for improvement. 
6 Renfrewshire Voices 
6.1 Renfrewshire Council is committed to reducing inequalities and advancing equality of
opportunity. However, gaps in local evidence and understanding mean that the experiences
of some equality groups are not consistently reflected in policy, service design, and
decision-making. Developing stronger insight into the barriers faced by diverse communities
is essential if we are to ensure that our response to inequality is informed, targeted and
effective. 
6.2 In February 2024, Leadership Board recognised the requirement to further develop the
Council’s understanding of, and response to, inequality locally and agreed the allocation of
£150,000 to establish a dedicated equalities workstream within the Fairer Renfrewshire
Programme. This allocation was made to support staffing capacity and expertise to
progress this workstream and to commission work to ensure the Council’s response to
inequality is shaped by the lived experience of equalities groups. 
6.3 Furthermore, within the Fairer Renfrewshire Action Plan which has been agreed in
December 2025, a specific action to “Develop a small grant programme to commission local
organisations who engage with/represent equalities groups to share the experiences and
perspectives of diverse groups” was included. It is proposed, therefore, that Renfrewshire
Voices, a small grants programme designed to address these gaps in knowledge and
gather and share community insight, is approved. 
6.4 The aim of the programme is to: 
•  Improve understanding of the experiences of local equalities groups. 
•  Increase involvement of people with lived experience in policy and service design. 
•  Enhance relationships between public bodies and equality-led organisations. 
•  Improve our evidence base to support equality-related decision making. 
Page 30 of 130

Page 31

PUBLIC
6.5 Elected members will be aware that the following Equality Outcomes, updated after
consultation, were approved at Leadership Board in April 2026:
• Outcome 1: New Scots and our ethnically and culturally diverse communities feel
welcomed, supported, and have equity of opportunity to thrive in our communities.
• Outcome 2: Disabled and older people experience improved access to public
buildings, services, and transport, ensuring greater independence and participation
in community life.
• Outcome 3: Improved economic prospects for women, ethnic minority people and
disabled people.
• Outcome 4: All residents can access information and services in an inclusive and
accessible manner.
• Outcome 5: Our workforce better reflects the diversity of our community, in terms of
ethnicity and disability.
• Outcome 6: People with lived experience of inequality and exclusion will be more
involved in informing and co-designing policy and practice that affects them. 
6.6 An action plan was developed utilising the consultation responses and was approved at
Leadership Board in April 2026. The consultation and prior local engagement identified
several gaps in our knowledge and lesser heard voices within Renfrewshire. It is proposed
these gaps inform the planned small grant programme. Gaps include: 
• Information on barriers experienced due to faith 
• Information on the LGBT+ community
• Information on intersectional equalities communities e.g. New Scots who are parents or
disabled LGBT+ individuals
• Information barriers and experiences due to using BSL as a primary language 
6.7 Renfrewshire Voices will help provide the information we need with regard to these
communities, and findings gathered through Renfrewshire Voices will be used to inform
policy development, service design, Equality Impact Assessments, future development of
the Fairer Renfrewshire Action Plan and the monitoring of Equality Outcomes. 
6.8 Success will be measured through:
• the number and diversity of organisations funded;
• the extent to which identified evidence gaps are addressed;
• participation from people with lived experience;
• how findings are subsequently used to inform policy, services and equality outcomes. 
6.9 Applications for the small grants programme would be invited for proposed projects which
provide insight into at least one of the Equality Outcomes for 2025 – 2029 (detailed in 6.5)
and/or provide insight into one of the equalities groups for which we do not have local and
up to date information (detailed in 6.6).   
6.10 A total funding amount of £20,000 is proposed to run the small grant programme as a pilot
in 2026/27, with the potential for a further tranche of funding to be considered if the pilot
was successful. Funding up to £4,000 will be available to organisations led by, working with,
or representing equalities groups to support the costs associated with proposals. 
Page 31 of 130

Page 32

PUBLIC
6.11 The timeline proposed for the programme is 
• It is envisaged that the fund will open in September 2026, with recommendations for
funding being brought to Leadership Board in December 2026 for decision after
scrutiny by a Panel to examine the applications comprising colleagues from within
the Council, as well as Renfrewshire HSCP and Engage Renfrewshire, with
applicants being informed shortly thereafter. 
• Organisations are expected to run their projects between January and June 2027,
however flexibility will be allowed dependant on the scope and design of the project
with outcomes reported to Leadership Board in late 2027 or early 2028. An
evaluation of the programme will also be brought to Leadership Board. 
6.12 Commissioned organisations will be expected to join the Diversity and Equality Alliance
Renfrewshire (DEAR) networking Group. This networking will allow funding recipients to:
• Share the commissioned work being delivered through the grant funding to highlight
best practice 
• Network with local public sector organisations, charities and community groups who
they may wish to work more closely with 
• Engage with equalities led organisations in areas of policy and practice development
across the Council and its partners 
6.13 Renfrewshire Voices Draft Guidance is attached in Appendix 3.
____________________________________________________________________
Implications of the Report
1. Financial – It is proposed that £20,000 of Fairer Renfrewshire funding is allocated to
support the Renfrewshire Voices programme. 
2. HR & Organisational Development – none 
3. Community/Council Planning – This report provides a summary of current partnership
activities being progressed through the Fairer Renfrewshire programme, with a key focus
on tackling the inequalities that exist in Renfrewshire. 
4. Legal - none 
5. Property/Assets - none 
6. Information Technology - none 
7. Equality and Human Rights – The report seeks approval of a small grant programme
which is designed to further develop the Council’s understanding of, and response to,
inequality locally and as such is expected to have a positive impact with regards to equality
and on equalities groups. 
8. Health and Safety - none 
9.  Procurement – none 
Page 32 of 130

Page 33

PUBLIC
10. Risk – none 
11.  Privacy Impact – none 
12. COSLA Policy Position – none 
13. Climate Risk – none 
___________________________________________________________________
Author: Laura McIntyre, Head of Policy and Partnerships 
Page 33 of 130

Page 34

PUBLIC 
Appendix 1 
Organisation  Area Purpose Funding
approved
Brick Lane
Music
Academy CIC
Paisley Musical Maestros/Rock Pop and
Rap Workshops/Star Struck
Summer 
£2,900
Erskine Arts Erskine An Erskine Arts Summer  £2,927.32
KLAS Care Linwood Summertime Fun 2026  £2,652
STAR Project Paisley STAR Summer of Fun  £3,000
Ralston Out of
School Care
Paisley Activity Club  £1,100
CREATE
Paisley
Paisley and
Johnstone
Go CREATE Summer Programme  £2,945
Paisley St
George’s
Church of
Scotland
Paisley Paisley St George’s Summer
Holiday Club 
£2,715
Active
Communities
Paisley
Gallowhill
Gallowhill Children’s Club  £2,900
School of
African
Cultures
Paisley  KOLA (Meaning Grow in Lingala)
Summer Holiday Camp
£3,000
Friends of
Howwood Park
Howwood Children’s Summer Holiday
Activity Programme 
£2,900
Youth Inspired Linwood YI Summer Connections  £2,957
Renfrew
YMCA
Renfrew Summer of Fun 2026  £2,500
Loud n Proud Paisley Every Kid Shall Rock  £1,700
Sewing2gether
All Nations
Paisley Summer Sewing2gether  £752
Johnstone
Castle
Learning
Centre
Johnstone
Castle
Johnstone Castle Chaos Club  £2,100
Renfrewshire
Women’s Aid
Paisley Safe Summer Connections  £2,700
Active
Communities
Howwood
Road
Summer Fun Day  £1,100 
Home-Start
Renfrewshire
and Inverclyde
Paisley Summer Connections  £1,331
Renfrewshire
Effort to
Empower
Minorities
Paisley Summer Project  £3,000
Stronger
Communities
Glenburn
Paisley
Glenburn
Fun in the Sun  £1,000 
Bring Unity to
Communities 
Paisley
Foxbar
FUSION – a series of fun workshops
for young people and families
£1,420
Bishopton
Sports and
Social Club
Bishopton Summer Clubs  £1,500
Page 34 of 130

Page 35

PUBLIC
OneRen
Libraries
Bishopton,
Bridge of
Weir and
Lochwinnoch
Summer Storytelling, Messy Play
and Board games
£900   
£49,999.30 
Page 35 of 130

Page 36

PUBLIC
Appendix 2 
WINTER CONNECTIONS PROGRAMME FUND 
Winter Connections is a network of local places and spaces where people can connect to others in
their community this winter through taking part in organised activities. 
Winter Connections will co-ordinate and promote a programme of group events and activities
across Renfrewshire that everyone can access. Winter Connections are always free, open to all, in
every neighbourhood and can guarantee a warm welcome. 
We want to work with local groups and organisations who can host Winter Connections in their
community. The Winter Connections Fund can provide small grants of up to £2,000 to
organisations to help with the additional costs of making venues, activities and sessions open as
part of the Winter Connections Programme. 
Who can apply?
The fund is open to voluntary and community organisations that are constituted and have a bank
account.
The Fund is not open to applications to support individuals. 
What we will fund
The Fund can cover a range of project costs, such as equipment, food, energy costs, costs to rent
a space for the activity, cleaning, and staffing costs to cover increased activity. 
Examples of projects that can be funded include:
• A new cooking project where
ingredients are provided 
• Projects that bring people from
different backgrounds together
through a shared activity, such
as different cultures or age
groups
• Tablet or device classes for
older people
• Choirs or singing groups
• Projects supporting people
living with mental illness
• Lunch clubs with an activity
• Crafting or ‘making’ activities
• Classes with a focus on
physical activity
• Classes which provide and
show how to install simple
energy efficiency measures 
A guide to Winter
Connections funding and
how to apply
Page 36 of 130

Page 37

PUBLIC
We welcome applications from community venues as well as groups who run activities. We can help to
connect venues with groups who can offer activities and vice-versa, if this would be helpful. 
Grant funding must be spent by the end of March 2027.
What your application should cover
Applications should describe the specific activity the organisation wants to host, how it meets the
needs of the local community and how it meets the Winter Connections principles to make sure the
programme is inclusive, safe, and stigma-free.
Projects and activities should be:
• Open, free and easy to access (although this can mean open to all within a particular age or
targeted group) 
• Inclusive, welcoming, respectful, and safe
• Able or willing to provide connections to other services and supports 
• Able to offer warm drinks/snacks/food along with activities, where possible
We want Winter Connections activities to be available in every neighbourhood in Renfrewshire, as well
as available at different times and for residents of all ages. This may affect the funding decisions that
we make. 
While we recognise that many organisations will be closed over the Christmas period, we would
welcome applications that will deliver activities during the festive period.
What cannot be funded?
Winter Connections will not fund:
• One-off activities, like an open or fun day
• Activities that are not free 
• Events to raise funds for other charities
• Costs for activities that have already taken place
• Projects where no activities are available/will take place 
How to apply
Applications will be open from 17 September 2026 using an online application process. If you need a
paper copy or any support to make an application, please get in touch.
Awards will be made from mid-October, and the fund will remain open until the available funding has
been used. Demand for this fund is usually high so we would advise that you apply as early as
possible.
The online application form can be found here Winter Connections Application 2026
We will be in touch for a copy of your constitution, a recent bank statement and a copy of your accounts
(or income/expenditure statement) if we don’t have a recent copy of these already on file. Please have
these ready so applications can be processed promptly. 
How much funding is available from the Winter Connections Fund?
Grants of up to a maximum of £2,000 are available, however as funding is limited, please do not apply
for more than you will need for your project. 
Page 37 of 130

Page 38

PUBLIC
If you are co-ordinating several events in partnership with a range of local groups (for example as a
bigger community venue), we can use some discretion to make larger awards. Please get in touch to
discuss this. 
How we will make decisions 
Applications will be reviewed by a panel of staff from Renfrewshire Council, Renfrewshire Health and
Social Care Partnership and Engage Renfrewshire before a decision is made. We will assess and
award applications on a ‘rolling’ basis until the funding has been spent. 
We will get in touch with you to let you know if your application has been successful as soon as
possible, and we may also get in touch for further information about your project before making a
decision. 
While we endeavour to pay awards as quickly as possible, if due to the decision-making process, you
receive your grant later than expected you can start your programme later and run it beyond the 31st
March if necessary.
Conditions of grant 
If you are successful in your application, you must accept and comply with Renfrewshire Council’s
standard grant terms and conditions. 
You will be asked to report back on the impact the project has had once the funds are spent.
Projects which receive funding from Renfrewshire Council will be promoted as part of the Renfrewshire
Winter Connections programme. You will also be asked to make clear your project is part of the
programme when promoting your project. 
In addition to complying with the Council’s grant terms and conditions, organisations should consider
the Scottish Government’s Fair Work First Guidance. The current guidance stipulates that from
01/07/2023 all organisation receiving Public Sector Grants should be paying staff at least the Real
Living Wage and providing effective channels for employee voice. 
Contact us 
If you would like to discuss the priorities, application process or alternative funding opportunities please
contact Andrena Faulkner at andrena.faulkner@renfrewshire.gov.uk. 
Page 38 of 130

Page 39

PUBLIC
Appendix 3 
RENFREWSHIRE VOICES PROGRAMME FUND 
What Renfrewshire Voices is
Renfrewshire Voices commissions projects which will gather and share the experiences and perspectives of
equality groups.
The aim of the programme is to share research and insight into diverse communities in Renfrewshire with
Renfrewshire Council, our Community Planning Partners and the wider Renfrewshire community,
particularly on unmet needs and provide opportunities to capture and amplify lesser heard voices.
Renfrewshire Voices offers small grants of up to £4,000 to organisations to help with the cost of running
projects which gather and share information on equality groups. 
Who can apply for this fund? 
The fund is open to any organisation led by, representing, or working with equalities groups. An equalities
group is a group which may face discrimination, such as disabled people, ethnically diverse communities,
older people or those within the LGBTQ+ community. 
Invitations are welcomed from informal and non-constituted groups, but any funding application would
need to be hosted and managed by a constituted organisation with a bank account. 
We recognise that organisations supporting equalities groups may be national or regional organisations.
Proposals would be accepted from national organisations but the grant must be used on activity focused
on engaging Renfrewshire residents to gain local insight.  
What can funding be used for?
The fund can cover a range of project costs such as: 
• Upskilling, training and development costs. For example, upskilling or training in research or
engagement skills
• Access costs. For example, interpreters, translators, childcare accessibility, reasonable participation
costs and expenses 
A guide to Renfrewshire
Voices funding and how to
apply
Page 39 of 130

Page 40

PUBLIC
• Costs associated with hosting and facilitating activities and sessions. For example, costs for a survey
tool, catering, or a venue. 
• Staff costs for carrying out the proposals within the application
Examples of projects that could be funded include
Exploring the experiences of LGBTQ+ residents in Renfrewshire – an organisation could facilitate peer
discussion groups, workshops or a community survey to gather insight on issues such as inclusion, mental
wellbeing, safety, access to services or community connections, sharing findings with partners to inform
future service development.
Understanding intersectional experiences of inequality - An organisation working with groups such as
disabled New Scots, LGBTQ+ carers or ethnically diverse women could undertake targeted engagement to
explore how multiple aspects of identity shape people's experiences and identify opportunities to improve
local support.
Improving accessibility to employment for disabled residents - A project could disabled residents to
identify barriers to accessing information, support and opportunities around employability and make
recommendations for improving accessibility and communication.
Understanding the experiences of local faith communities - A faith organisation could run focus groups,
interviews or community conversations with members to better understand barriers to accessing local
services, community facilities, employment opportunities or support networks, and produce a short report
with key findings and recommendations.
Funding up to £4,000 will be available which is expected to be spent by June 2027, however this can be
extended if necessary if a specific project is expected to take longer.  
What cannot be funded? 
Renfrewshire Voices is not recurring funding and will not support recurring revenue costs for existing
services. The funding will only facilitate the running of short-term projects which will gather further insight
into gaps and areas for development. 
What your application should cover
Proposals should describe the specific project the organisation wishes to run, how it provides insight into
at least one of the Equality Outcomes for 2025 – 2029 (listed below) and/or provide insight into one of the
equalities groups which we do not have local and up to date information (listed below). 
Proposals should also: 
• Develop capacity to carry out and share research and insight on diverse communities in
Renfrewshire, particularly on unmet needs or;
• Provide opportunities for local equalities communities to boost their voice and influence 
Equality Outcomes for 2025- 2029: 
• Outcome 1: New Scots and our ethnically and culturally diverse communities feel welcomed,
supported, and have equity of opportunity to thrive in our communities.
• Outcome 2: Disabled and older people experience improved access to public buildings, services,
and transport, ensuring greater independence and participation in community life.
• Outcome 3: Improved economic prospects for women, ethnic minority people and disabled people.
Page 40 of 130

Page 41

PUBLIC
• Outcome 4: All residents can access information and services in an inclusive and accessible manner.
• Outcome 5: Our workforce better reflects the diversity of our community, in terms of ethnicity and
disability.
• Outcome 6: People with lived experience of inequality and exclusion will be more involved in
informing and co-designing policy and practice that affects them.
Equalities groups which we do not have local and up to date information on: 
• Information on barriers experienced due to faith 
• Information on the LGBT+ community
• Information on intersectional equalities communities e.g. New Scots who are parents or disabled
LGBT+ individuals
• Information barriers and experiences due to using BSL as a primary language
How to apply
Applications will open from 16 September 2026 using an online application process. If you need a paper
copy or any support to make an application, please get in touch (details below). The fund will remain open
until 28 October. Awards will be made from December 2026. 
The online application form can be found here Renfrewshire Voices Application 2026. 
We will be in touch for a copy of your constitution, a recent bank statement and a copy of your accounts
(or income/expenditure statement) if we don’t have a recent copy of these already on file. Please have
these ready so applications can be processed promptly. 
How we will make decisions
A panel of staff from Renfrewshire Council, Engage Renfrewshire, and Renfrewshire Health and Social Care
Partnership will review your application. Recommendations for funding will be approved by Renfrewshire
Council’s Leadership Board. 
Our decision making on funding will take into account how well your application meets the outcomes and
the gaps in our knowledge, and also relevance to and alignment with Council services and priorities.
We will also look at how your project:
• Will engage with the particular equalities group you intend to work with
• Will improve understanding of the experiences of local equalities groups. 
• Will increase involvement of people with lived experience in policy and service design 
Your application should describe your expected outputs, for example reports, videos or events. This will
also inform our decision making.
We'll get in touch with you by email to let you know if your application has been successful or unsuccessful
in late December 2026 and we may also get in touch for further information about your project before
making a decision. 
What support can Renfrewshire Council offer successful applicants? 
In-kind support will be offered to successful organisations to support their project including: 
• Networking through the DEAR group (more information below) 
• Advice and guidance on survey tools, consultation, and engagement 
Page 41 of 130

Page 42

PUBLIC
• Where possible, the use of venues for research activity (e.g hosting focus groups), however this
cannot be guaranteed. 
Conditions of grant 
If you are successful in your application, you must accept and comply with Renfrewshire Council’s standard
grant terms and conditions. 
You will be asked to report back on the impact your project has had once it has come to an end. We will
send you a feedback form to complete and may visit your project.
Commissioned organisations will be expected to join the Diversity and Equality Alliance Renfrewshire
(DEAR) networking Group. This networking will allow funding recipients to:
• Share the commissioned work being delivered through the grant funding to highlight best practice 
• Network with local public sector organisations, charities and community groups who they may wish
to work more closely with 
• Engage with equalities led organisations in areas of policy and practice development across the
Council and its partners
In addition to complying with the Council’s grant terms and conditions, organisations should consider the
Scottish Government’s Fair Work First Guidance. The current guidance stipulates that from 01/07/2023 all
organisation receiving Public Sector Grants should be paying staff at least the Real Living Wage and
providing effective channels for employee voice.
Contact us 
If you would like to discuss the priorities, application process or alternative funding opportunities please
contact Astrid Smallenbroek at astrid.smallenbroek@renfrewshire.gov.uk. 
Page 42 of 130

Page 43

PUBLIC 
___________________________________________________________________
To:  Leadership Board
On:  16 September 2026
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Best Value – Corporate Improvement Plan  
___________________________________________________________________    
1.  Summary
1.1  The duty of Best Value applies to all public bodies in Scotland and requires
organisations to ensure that there is good governance and effective
management of resources, whilst also ensuring activities focus on
improvement and deliver the best possible outcomes for the public. 
1.2 This paper provides an update to Elected Members on the ongoing activities
within the organisation to support the delivery of Best Value through our
continuous improvement focus.
1.3 A range of high-level actions are grouped together in a Corporate
Improvement Plan (CIP), which was last reported to the Leadership Board in
February 2026. The CIP has been updated to reflect activity and progress in
over the six-month period between February 2026 and September 2026. 
1.4 Significant Best Value activity has been undertaken by the Council over this
period, as detailed in section 3. A report detailing the outcome of auditing by
our external auditors, Azets, in relation to the effectiveness of asset
management arrangements, will be presented to the Audit Risk and Scrutiny
Board and any recommendations will be added as actions to the Corporate
Improvement Plan. 
1.5 The full Corporate Improvement Plan is attached to this report as Appendix 1
and this updated version will also be published on the Council’s website. The
next progress report will be presented to Leadership Board in February 2027. 
Item 4
Page 43 of 130

Page 44

PUBLIC 
___________________________________________________________________
2.  Recommendations
2.1 Members are requested to:
• note the progress of the Corporate Improvement Plan as outlined in
the appendix. 
___________________________________________________________________
3.  Background
3.1 A core value of Renfrewshire Council is ‘We Value Learning’ and the Council
has established an ongoing programme of self-assessment to learn and
improve. This helps to ensure that all elements of Best Value are being
delivered and to drive forward corporate improvement activities in line with our
commitment to continuous improvement as an organisation. 
3.2  Within the new Best Value approach, our first phase of self-evaluation
focused on a Corporate Self-Assessment which was rolled out in 2022/23 and
2023/24 and resulted in the development of Corporate Improvement Plan
(CIP). This CIP has been enhanced with additional areas for improvement
identified via the ongoing external audit processes, including our Annual Audit
Report, the Best Value thematic reviews and our self-assessment which
focused on organisational culture (Renfrewshire’s Cultural Assurance Model).  
3.3 The CIP was first reported to Leadership Board in February 2025, noting that
the vast majority of existing actions were completed or nearing completion
and represented a significant programme of work across the range of Best
Value themes. Further updates have been reported to Board every 6 months. 
3.4 Since the previous update to Leadership Board, one further Best Value review
has been undertaken - on Asset Management - and there has been a
particular focus on Fairness and Equalities this year within the ongoing best
value audit activity undertaken by the external audit team from Azets.
3.5 Asset Management was selected as the subject of the national thematic
review, following previous years’ themes of Leadership, Workforce Innovation
and Transformation. This work was completed by officers in February and
March this year and aligned to the two Board reports reported to February’s
Leadership Board – the Corporate Asset Management Strategy 2026 to
20230 and the Corporate Assets Overview of Progress 2021 to 2026. 
3.6 The Council also received a request from our auditors to undertake work on a
Fairness and Equalities theme which was completed by officers in April and
May this year. This theme is audited by each Council’s external auditing
teams once over the 5-year rolling programme of audit and is reported via the
Annual Audit Report. The Annual Audit Report and thematic audit report in
relation to asset management will be considered by the Audit Risk and
Scrutiny Board on 21st September.
Page 44 of 130

Page 45

PUBLIC
3.7 More broadly, demonstrating our commitment to Best Value is an ongoing
process, particularly through the Annual Audit reporting, the annual Best
Value thematic reviews and our own self-evaluation activity. The focus for the
organisation remains firmly on continuous improvement – reflected both in the
Corporate Improvement Plan approach, but also wider activity, such as the
officer Performance Board and the Consultation and Engagement Advisory
Group. Any relevant improvement actions flowing from these groups are also
captured in the CIP as appropriate.
3.8  The Council also participates in the national work around Best Value and self-
assessment, including being part of the new National Self-Evaluation
Framework (NSEF) Learning Network which seeks to support Councils to
assess their readiness for implementing the new NSEF approach. Officers are
also part of the national review group for Public Sector Improvement
Framework (PSIF) for the 3rd cycle, streamlining and developing PSIF,
particularly to align with the new NSEF model. 
3.9 Finally, as previously noted, the CIP is a dynamic document, and completed
actions are reported once to Board and then retired and new actions are also
added on an ongoing basis. Progress on the recommendations from our
external auditors will also continue to be reported to the Audit, Risk and
Scrutiny Board as part of the ongoing reporting arrangements in relation to
Best Value. 
___________________________________________________________________
Implications of the Report 
1. Financial – none   
2.  HR & Organisational Development – none 
3. Community/Council Planning – our commitment to Best Value and the
delivery of many of the activities (including self-assessment) is clearly
established within our Council Plan, particularly through the Living Our Values
strategic priority. 
4.         Legal - none 
5.         Property/Assets – none 
6.         Information Technology - none 
7.         Equality and Human Rights – there are no negative impacts on equality
groups or potential for infringement of individuals’ human rights arising from
the recommendations contained in the report, as this report is for noting only.
There is an action in relation to equalities and our refreshed approach to
impact assessments in the appended Corporate Improvement Plan. In
addition, reference is made to the Fairness and Equalities audit, although new
Page 45 of 130

Page 46

PUBLIC
actions have not been developed yet, pending the publication of the auditors’
report and any recommendations.   
8.         Health and Safety - none 
9.         Procurement – none 
10.       Risk – none 
11.       Privacy Impact – none 
12.       COSLA Policy Position – none 
13. Climate Risk – none 
14. Children’s Rights – none, but there is an action in relation to engagement with
children and young people in the appended Corporate Improvement Plan. 
Author:         Pauline Moss, Strategy, Policy and Insight Manager 
Page 46 of 130

Page 47

PUBLIC
Appendix 1
Renfrewshire Council - Corporate Improvement Plan - update September 2026
References:
RR prefix – Resident Research, December 2025     BV prefix - Best Value Audit Report, June 2025    
IF prefix - Interim Follow Up Report, April 2025    CAM prefix - Cultural Assurance Model, 2024/25    
SA prefix - Corporate Self-Assessment, 2023       
Ref Action/recommendation Update Timescales Status 
RR.1 Cascade and share key
findings and resources
relating to the Resident
Research to colleagues
across the organisation
and community partners.
Key findings were published on the council website in December
2025 and reported to Leadership Board (3rd December). This was
also supported by communications and marketing activity which
included internal communications cascade, press release, poster
in libraries, distribution to Council’s e-news, social media and a
toolkit to elected members and community groups and partners.
The following engagement was carried out 
• Development and delivery of Ren Talk 
• Our Leaders Forum – 22 January 
• Data Advisory Group – 28 January
• Consultation and Engagement Advisory Group – 2 February
• Renfrewshire Communications and Marketing partnership
Group – February
A summary document of the Resident Research findings can be
found in Appendix 2. 
The full report and focus group findings are published at
www.renfrewshire.gov.uk/consultations/resident-research 
All actions have been completed.
31 March 2026 Complete 
Page 47 of 130

Page 48

PUBLIC
RR.2 Scope and develop ways
of further improving
transparency and
communication around
the council’s performance
and evidence of listening.   
Work has been undertaken to improve the visibility of performance
reporting through a series of communications and marketing
activities in 2026.
This will enhance the existing performance reporting including
through our Public Performance Report interactive storymap and
our wide range of regular performance reporting to Policy Boards,
Leadership Board and Audit Risk and Scrutiny Boards.
For listening, the Council recently launched Your Voice Matters
(YVM), an engagement programme to gather views from people
across Renfrewshire on what’s important to them and what they
think the priorities should be for the Council, HSCP and
community planning partners for the next 5 to 10 years.
YVM aims to ensure residents and communities can play an active
role in decisions about the future of Renfrewshire and can shape
future decisions on services and investment. It also aims to
explain how the Council and IJB have to make decisions, the
public-service challenges we face and demonstrate that we are
committed to listening to the people of Renfrewshire and what
matters to them most.
31 March 2026 Complete
RR.3 Gather further insight on
lesser heard voices
including commissioning
additional focus groups
and linking with
established groups such
as lived experience,
children and young people
and people with
disabilities. 
Five additional focus groups were carried out in March 2026.
Focus group participants were recruited from resident
representative groups in Renfrewshire. These were the Disability
Resource Centre (x2 focus groups), the Lived Experience Panel
and Renfrewshire Youth Voice (x2 focus groups). Participants were
from a range of equalities groups and voices from across
Renfrewshire including young people, young carers, minority
ethnic groups, those from more deprived communities, LGBTQI
and disabled. Results from the focus groups are published online
at www.renfrewshire.gov.uk/consultations/resident-research. 
31 March 2026 Complete 
RR.4 Scope options for Elected
Member engagement to
further consider resident
Your Voice Matters programme (also outlined in RR.2) includes a
Local Partnership Conference, to which all Elected Members have
31 March 2027  In progress 
Page 48 of 130

Page 49

PUBLIC
needs and perceptions,
linked to Strategic Needs
Assessment for new
Council and Community
Plans, future resident
surveys etc 
been invited and will also include Members Briefings on findings to
date and the development of the programme. 
Updates on the programme and also key themes from the
Strategic Needs Assessment will continue to be reported to
Leadership Board, through the Cross-Party Sounding Board and
any other Members briefings as required.
The due date for this action has been extended to align with the
YVM programme.  
RR.5 Explore options for future
engagement opportunities
including repeating the
resident research, a
potential citizen’s panel,
linked to being a listening
Council and the agreed
consultation and
engagement policy
An opportunity to build on the pilot and ensure listening and
improved dialogue with residents and communities is embedded
into future strategies and plans. This includes the Resident
Research exercise being repeated in 2027 and the learning from
the Your Voice Matters programme. As part of YVM officers have
been asking participants if they wish to be involved in future
conversations and workshops. 
This action is closely linked to BV4.
31 March 2027  In progress
BV.1 Embed Cultural Assurance
Model approach into cycle
of continuous
improvement
5 priority actions identified from the Cultural Assurance Model
(CAM) have been included in this Corporate Improvement Plan and
where relevant have been included in Service Improvement Plans.
Cultural Assurance Model action progress is noted below with the
remaining outstanding action prefixed CAM. 
Further work is being undertaken to reflect further on the CAM, the
findings from the Employee Engagement Survey, aligning and
building on these insights particularly in relation to cross-cutting
programmes, for example Connected Communities. 
In addition, the approach used for the CAM has now been used to
develop a new self-assessment model for trauma-informed
practice, we believe this is a first nationally and it is being piloted
with the Chief Officer’s Team in the first instance. 
31 March 2027 Complete 
Page 49 of 130

Page 50

PUBLIC
A timeline for future phases of the CAM is currently being
developed, to best align with the next stage of self-assessment,
PSIF and the new National Self-Evaluation Framework. 
BV.4 Evidence community
engagement within
decision making, policy
development and service
planning
The Consultation and Engagement policy was approved at
Leadership Board in February 2025, setting out standards and
guidance for planning, conducting and learning from public
engagement. 
A further update was reported to Leadership Board in December
2025, as part of the Resident Research update, noting the
governance arrangements and outlining key activities. 
A Consultation and Engagement Co-ordination Group has been
established to provide strategic oversight and guidance.  
A Consultation and Engagement Advisory Group (CEAG) has also
been established to act as a community of practice, providing
training, support, and driving improvements across the
organisation. 
Key activities over the previous months include:
• The development of a consultation and engagement toolkit
to support officers across the organisation and to ensure
consistency of quality. 
• A rapid review and triage of activities and plans that involve
consultation and engagement, to ensure support is offered
throughout the process.
• Linked to the above, development of a consultation
calendar and mapping exercise (working with the CEAG) to
help avoid significant overlap of consultation and
engagement activities and any duplication.
• Developing potential options for a citizen’s panel approach
to further explore the issues and suggestions raised in the
resident research survey and focus groups. 
31 March 2027 Complete 
Page 50 of 130

Page 51

PUBLIC
The findings from the Residents Survey continue to support
decision making and service planning, acting as a baseline for
engagement and priority setting. 
This has been significantly enhanced by the launch of Your Voice
Matters engagement programme outlined above under actions
RR.2 and RR.5, which commenced with a summer of community
engagement, with officers attending gala days and other
community events to discuss priorities and future aspirations with
Renfrewshire citizens. To date more than 160 conversations have
taken place.  This engagement is a foundational element of the
Council and Community Plan development process with local
voices directly influencing and shaping these key strategic
documents. 
Updates will continue to be provided to the Leadership Board on a
six-monthly basis as part of Council Plan updates. 
BV.7 Continue to monitor
performance and the
impact of decisions on
service performance and
wider community
outcomes
A programme of work strengthening the Council’s approach to
performance scrutiny is now well-established. The officer
performance group has  been meeting on a four-weekly basis for
over a year, to drive improved performance across Council Plan
strategic outcomes, explore the LGBF and other benchmarking in
more depth and undertake ‘deep dives’ on Council-wide
performance, with a particular focus on outcomes and the golden
thread between performance and priorities. 
Deep dives have been undertaken on the following areas –
planning and building control, absence, complaints and enquiries,
justice social work, waste and recycling, school meals and school
meal debt.  Deep dives on economy indicators, procurement and
school exclusions are planned for the coming months. 
Reporting on LGBF indicators to the Audit Risk and Scrutiny Board
has been increased to six-monthly. 
31 December 2026 Complete 
Page 51 of 130

Page 52

PUBLIC
Work is also underway to review the approach to Service
Improvement and Council Plan reporting, with a view to
strengthening the ‘golden thread’.
IF.1 Consider how options are
presented to Elected
Members to improve
decision making
effectiveness and
openness
The Council has further strengthened its approach to the
development of business cases and the project management
processes associated with these, including reporting
arrangements. An officer Transformation Board has been
established which regularly reviews the development and progress
of a range of significant corporate and service projects across the
council, with regular reporting to both the Corporate Management
Team and Leadership Board on the issues discussed. The
Transformation Board approach is informed by an agreed
‘gateway’ approach which includes clear stages projects must
adhere to in terms of identifying requirements, clarifying scope,
considering options for how objectives can be met and clearly
defining how delivery will be achieved. The regular reporting of
business cases to allow elected member decision making can
clearly be demonstrated in examples such as the business case
framework approach for the learning estate (see report to the
Education and Children’s Service Policy Board in May 2025); and
the progression of an AI business case which will enable broad AI-
enabled transformation across the Council as reported to the
Leadership Board in April 2026.
31 March 2026 Complete
CAM.5 Develop transformation
page on website, with
clear definition of what
this means for
Renfrewshire, links to
Reshaping Renfrewshire
report and summary
comms and introducing
the new Transformation
Board approach. 
This action has been extended to cover wider information on the
Council website outlining key information about the Council
including its decision-making groups, which includes the
Transformation Board as well as groups such as CMT. 
A short-life working group has been established to progress this
alongside wider transparency and performance key actions,
mostly relating to performance reporting and enhanced content
both for the website and intranet.   
31 December 2026 Ongoing 
Page 52 of 130

Page 53

PUBLIC
The timescale for this action has been extended to 31 December
2026. 
SA6.1 Develop an Integrated
Impact Assessment
process, roll out
appropriate training and
agree roles and
responsibilities at a
service level. 
This should also include
climate impact
assessment process
(linked to climate budget
work)
The approach has been adjusted to keep Equality Impact
Assessments and Climate Impact Assessments separate at this
time, particularly given the datasets used to consider impact and
the processes are quite different. 
The Equality and Human Rights Impact Assessment form and
guidance have been updated to better integrate human rights and
care experienced community considerations. 
Additional resources have also been developed to support
colleagues to fill out impact assessments to a good standard
including several factsheets on different equality groups and the
general Renfrewshire population (for comparison). The Equality
and Human Rights Impact Assessment iLearn course has also
been reviewed and updated to better support colleagues in
completing impact assessments. 
These updated forms and resources were launched at the recent
RenTalk on Equality and Human Rights Impact Assessments which
allowed colleagues to gain a better understanding of what impact
assessments are, when they are needed, and what support is
available in filling out the impact assessment. This RenTalk was
recorded and uploaded onto iLearn to allow anyone unable to
attend to catch up at a later date. Further inputs have also been
made at team and service meetings such as the Project
Management Unit knowledge share and Education Managers
meetings to further highlight the importance of completing impact
assessments and offering further support. 
The webpage to publish summaries of completed Equality and
Human Rights Impact Assessments has also been updated to
31 December 2026 Ongoing 
Page 53 of 130

Page 54

PUBLIC
clarify why these are published and where individuals can find
additional information. A standardised format has also been
developed to publish summaries of completed Equality and
Human Rights Impact Assessment with communication
colleagues. 
Future work includes the embedding of children’s rights within the
equality and human rights impact assessment. 
The due date for this has been extended to allow for the work the
include children’s rights. 
Please note, there were no formal recommendations made as part of Renfrewshire Council’s Controller of Audit Best Value Report or the Accounts
Commissions findings. Within the Accounts Commissions findings, a number of areas of ‘watching briefs’ were identified and these are captured in
the action plan above, in the section with the prefix BV. 
Please also note, in order to ensure this is a ‘live’ plan, completed actions which have been reported to Board as complete are thereafter ‘retired’
from the plan and new actions are added. 
Page 54 of 130

Page 55

Summary of findings
Renfrewshire Resident
Research 2025–26
Page 55 of 130

Page 56

Renfrewshire Resident Research 2025–26
The purpose of the research was to:
How they 
feel about 
where they live
The services 
the council 
provides
Changes 
that could be 
made to services 
in the future
Measure 
perceptions of and
satisfaction with
council services
Inform planning 
and decision-making
in Council budget
decisions
Benchmark 
against the 
Scottish Household
Survey in 2023
Access new
information, ideas
and suggestions
Support the
introduction of the
new Consultation
and Engagement
Policy
It has helped us identify which services residents want to prioritise—and it will inform future spending decisions.
The research findings were reported to Leadership Board in December 2025. 
The full report and findings are available to read at:  www.renfrewshire.gov.uk/consultations/resident-research
We carried out research with Renfrewshire residents to find out:
This document summarises the Resident Research undertaken during 2025–26. 
The research undertaken included an interview-led (telephone or
face-to-face) survey conducted across all areas of Renfrewshire with a
representative sample of the Renfrewshire population. To explore the key
themes from the survey in more detail, a small number of Renfrewshire
residents were recruited from the larger survey sample and invited to
participate in focus groups. In early 2026, further focus groups were
conducted with representatives from equalities groups.
As part of the Council’s ongoing programme of self-assessment to
learn and improve, it was agreed a Resident Research survey should
be undertaken to highlight our ongoing commitment to improving our
dialogue with residents.
2
Page 56 of 130

Page 57

www.renfrewshire.gov.uk/consultations/resident-research
Key findings
People rate Renfrewshire
highly as a place to live and
are proud of their own their
neighbourhood.
More than half (61%) of
respondents agree the council
provides high-quality services
and does the best with the
money available.
Parks, gardens and open spaces
are the most used services each
month, followed by household
waste recycling centres and
sport and leisure facilities.
Satisfaction is highest 
with schools and nurseries,
children’s play areas, parks,
gardens and open spaces 
and libraries.
To help balance its budget,
the council should prioritise
making better use of its
buildings and target resource
to places and people with the
greatest need.
Supporting older 
and vulnerable people,
children and families and
maintaining roads, open and
public spaces are among the
most essential priorities.
3
Page 57 of 130

Page 58

Survey in 
summer 2025
• 1,016 responses in-person
with interviewer (face-to-face
or telephone)
• 1,029 responses online (local
residents completing the
survey online)
• Face-to-face and telephone
sample was representative of
the Renfrewshire population
What you told us—key findings from face-to-face 
and telephone interviews
Your overall satisfaction with place is very high, but
you have mixed views on how the Council is doing.
93% of respondents rate Renfrewshire as a good
place to live, with strong positive perceptions of
neighbourhood safety, pride and community.
Perceptions of Council performance are more
moderate (around 53–62%), especially on listening to
residents (44%).
Your general satisfaction with Council services is
strong—although there are areas where you would
like to see improvement.
High satisfaction with schools, parks, libraries and
leisure services (84–94%).
Higher rates of dissatisfaction with roads maintenance
(39%), street cleaning (64%), and refuse services (73%).
You prioritise essential and preventative services.
Support for older/vulnerable people, roads and
infrastructure, and support for child and family
wellbeing (95–97%) are your strongest priorities.
Measures to achieve Net Zero are the least important
priority (49%).
Budget approach: more support for efficiency, less
for cuts or charges.
You showed strongest backing for better use of
buildings and assets (82%) and targeting resources to
those most in need (81%).
You showed less support for discontinuing some
services (46%) or introducing charges (33%).
A note on benchmarking
Benchmarking is when we measure and evaluate
council services in comparison with the other 31
councils in Scotland. The survey used questions
based on the national Scottish Household Survey
2023 so that we could benchmark against the
national average—but asking a larger and locally
more representative group. Overall, the survey
showed that Renfrewshire residents feel more
positive about their neighbourhoods and Council
services than the national average.
4
Page 58 of 130

Page 59

What you told us
You are broadly positive about Renfrewshire and
the quality of your local environment is critical.
Residents enjoy living in Renfrewshire due to
community, transport links, and local amenities.
Quality of life is strongly affected by cleanliness, roads,
and neighbourhood appearance.
You strongly support prioritising core services and
vulnerable groups.
Top priorities are roads, pavements, and public spaces;
support for vulnerable people and older residents; and
support for child and family wellbeing. Residents also
emphasised early intervention and joined-up services,
especially for supporting mental health and supporting
vulnerable households.
Targeting resources by need is widely supported—
but must be fair and balanced.
You strongly support prioritising older people, disabled
residents, low-income households, carers, and
vulnerable children. But you did stress that need can be
hidden in more affluent areas, and targeting should not
lead to exclusion of other communities.
You are willing to pay for non-essential services—
if the charge is fair and local benefit is clear.
Residents opposed charges for essential or statutory
services (for example, education, care, or general
refuse collection) but were in support of some services
being means-tested and targeting resources to those
in greatest need. Residents want greater clarity on
what services are statutory (council is legally obliged to
provide) or discretionary (council is not legally obliged
to provide).
You would like us to improve communication,
transparency and listening.
Some residents find the Council website difficult to use,
think there is too much reliance on automated systems,
and feel that there is limited evidence that feedback
influences decisions. There is strong demand for
multiple communication channels to be used to keep
residents informed. You would also like clearer updates
on decisions, spending, and outcomes.
Focus groups in
autumn 2025
To provide a further level of detail,
six focus groups were held with
a cross-section of Renfrewshire
population chosen at random—
from survey respondents who
expressed an interest in taking
part and sharing their views.
5
Page 59 of 130

Page 60

Go to www.renfrewshire.gov.uk/consultations/resident-research 
to read the full Resident Research reports and focus group results.
Focus groups 
in spring 2026
Five focus groups were
conducted with representatives
from equalities groups—
Renfrewshire Youth Voice,
service users of the Disability
Resource Centre, and the Lived
Experience Panel.
What you told us
You have strong pride in place, but there are
significant inequalities in lived experience.
Participants across equalities groups feel a strong
connection to Renfrewshire, valuing community,
culture, and green spaces. However, experiences
vary widely, with disabled people, young people and
deprived communities facing greater barriers in daily
life.
Safety is a fundamental need.
Feeling unsafe was a consistent issue across all
groups, affecting mobility and independence, mental
wellbeing, and willingness to leave home. There are
some concerns about poor infrastructure in places
(lighting or pavements), antisocial behaviour and a lack
of safe public and social spaces.
The loss of accessible community spaces can drive
isolation.
People do experience increased isolation, boredom,
and mental health challenges. This can be alleviated
with free or low-cost, accessible community hubs and
spaces, open on evenings and weekends and suitable
for all ages and abilities
Supporting vulnerable people is the top priority.
Vulnerability is seen as widespread and increasing,
not limited to a single group. Key issues include long
waiting times, complex systems with gaps between
services, and rising poverty and mental health
needs. There should be a strong emphasis on early
intervention and stable, long-term support, especially
for children and families.
Residents feel unheard and want meaningful
involvement.
Participants felt consultation often happens too late
and feedback does not lead to visible change.  There is
strong demand for co-design of services and evidence
that engagement leads to real outcomes.
What’s next?
The feedback received from the research will help
inform future decisions and planning. We will also
show how consultation results influence decisions
and provide “you said, we did” updates to residents.
6
Page 60 of 130

Page 61

PUBLIC 
___________________________________________________________________
To:  Leadership Board
On:  16 September 2026
_________________________________________________________________________
Report by: Chief Executive and Director of Finance & Resources
_________________________________________________________________________
Heading: Reshaping Renfrewshire –Transformation and Change Programme –
Update Report
_________________________________________________________________________   
1.  Summary 
1.1  In February 2026, a report was presented to the Leadership Board providing an
update on progress of Renfrewshire Council’s transformation programme,
named Reshaping Renfrewshire. Given the scale of the programme, updates
centre primarily on areas with relevant and substantive progress. 
1.2 Similar to previous phases of transformation, Reshaping Renfrewshire
continues to have a focus on the development and modernisation of the
organisation, but is also strongly aligned to the Council’s strategic priorities.   
1.3 Reshaping Renfrewshire continues to support the financial planning objective
to deliver recurring financial savings and or generation of additional income to
secure longer-term financial sustainability; harnessing the rapidly changing
advancements in digital technology to transform how we deliver services in the
future; building upon key strategic partnerships and relationships, collaborating
to deliver better outcomes for communities; and continuing to shift the focus of
our service provision to prevention to help reduce future need and cost. 
1.4 As outlined in the 2026/27 Revenue Estimates report presented to the Council
in February, the transformation programme along with more traditional service-
based savings workstreams (many of which will be supported by
transformational activity) continue to provide the key routes to support the
Council’s drive toward longer-term financial sustainability. 
1.5 This report provides updates for members as to the wide range of projects
which are in progress and which will support delivery of key Council priorities. 
___________________________________________________________________ 
Item 5
Page 61 of 130

Page 62

PUBLIC
2.  Recommendations 
2.1   It is recommended that the Board: 
• Note the update provided in the report on the progress of key areas within
Reshaping Renfrewshire. 
• Note that regular reports will continue to be brought to the Board at
appropriate key junctures as the overall programme is progressed. 
___________________________________________________________________ 
3.  Background 
3.1  Reshaping Renfrewshire is the fifth phase of the Council’s ongoing strategic
commitment to transformation, which has been focused on ensuring a
financially sustainable long-term future, whilst improving outcomes for
communities. 
3.2 As summarised above, Reshaping Renfrewshire is strongly aligned to the
Council’s wider strategic plan and objectives with a strengthened outward focus
supporting the development and delivery of key strategies that will: -   
• reshape how we use council assets, reimagining the role they serve within
our communities. 
• drive long term economic growth and address the climate transition journey. 
• develop our strategic partnerships (including with our communities) to
support delivery of shared goals; and 
• secure a digital agenda that drives the delivery of large-scale savings whilst
also transforming how we work, how we use data to inform our decisions,
and improve our service delivery to, and choice for our citizens. 
3.3  As previously reported, in addition to providing regular updates to Leadership
Board, and alongside existing governance arrangements across strategic
programmes, a Transformation Board (officer group) has been established to
provide strategic oversight of the Reshaping Renfrewshire programme. Chaired
by the Director of Finance and Resources, this group has a membership of
senior officers across the Council and reviews the progress of all major projects
and programmes across the organisation, explores and manage
interdependencies, shares learning and supports the management and
prioritisation of resources across the programme. 
3.4 The Transformation Board is utilising well-established six stage Gateway
Review Process for monitoring and managing delivery of all key transformation
projects. The Gateway review process summarised in the table below provides
a structured approach to manage projects from inception through to completion
and ultimately delivery of benefits – both financial and non-financial benefits. 
Page 62 of 130

Page 63

PUBLIC 
3.5 In addition to projects presenting at Transformation Board at these key stage
gates, some projects are utilising the opportunity to present Interim Updates
(attending the Transformation Board part way through a stage), to get the
benefit of regular review, collaboration, and support and advice from the board
members.  This is especially useful for major projects where the Delivery stage
may take many months, as it allows regular visibility at board level of the
projects as they deliver, and allows the projects to seek advice, support and
guidance mid-stage when addressing particularly challenging elements of
project delivery.   
In addition to major corporate level projects attending Transformation Board,
we are seeing a growing interest in Service-Lead projects seeking the
opportunity of review at Transformation Board, utilising the collaborative
support that the board brings.   Furthermore, projects are engaging earlier and
more regularly with key specialists across the council, ahead of attending the
Transformation Board, providing earlier and greater opportunities for identifying
opportunities, resolving challenges and bringing the right skills at the right time
to projects. 
4.  Digital Programme Update 
4.1 Technology has evolved significantly in recent years and continues to advance
at pace. To ensure we capitalise on emerging opportunities and remain aligned
with best practice, we are delivering a broad programme of digitally enabled
transformation initiatives in line with the Digital Strategy approved in April 2025.
These initiatives are designed to support the continued delivery of efficient and
effective services, drive value for money and financial efficiencies, enhance the
customer experience, and future-proof our services. The following section
provides an update on a number of key programmes, including the AI
Programme, Smart Social Housing, and the Digital Experience Programme.  
Page 63 of 130

Page 64

PUBLIC 
4.2  Artificial Intelligence (AI) Overview 
4.2.1  As part of the Council’s Digital Strategy, approved in April 2025, there is an
action to leverage advanced analytics, artificial intelligence and cutting-edge
technologies to deliver value across all facets of Council operations and ensure
sustainable growth for the future. 
4.2.2 The Council carried out an AI Transformation Assessment in consultation with
a wide range of employees from across all Council services to understand and
identify how a range of AI solutions can improve services, enhance efficiency
and reduce costs.  
In April 2026, the Leadership Board approved a 3-year AI Transformation
Programme across all Council areas.   
4.2.3 Therefore, the Council has a new requirement to appoint a supplier who will
work with the Council to provide the following- 
• AI software licensing and maintenance;
• Business change consultancy services to encourage AI adoption across
the Council; and
• Implementation consultancy to implement AI software across Council
services. 
4.2.4 At the time of writing this report, the Council is concluding the appointment of a
supplier to support the Council’s AI Transformation Programme. 
4.2.5 Regular updates on the AI Transformation Programme will be brought to this
Board at key points throughout the programme. A six-monthly ‘AI Transparency
Report’ will also be presented to this Board starting in September 2026 outlining
the AI tools used by the Council, the purpose, and function of each system, any
data-protection or equality assessments undertaken, changes since the
previous report, and any identified risks, mitigations or recommendations for
future deployment. 
4.3 Digital Experience Programme 
4.3.1 Updated and enhanced council and HSCP website and intranet content for the
public and employees are pre-requisites for the AI Transformation Programme.
To address this urgent requirement, arrangements between the content team
and Digital First have been put in place to complete the migration and update
of all remaining content to the new council website in the next 3
months.  The intranet will also see significant improvements, with priority
content being rewritten and moved to enhance internal communications and
resources. 
Page 64 of 130

Page 65

PUBLIC 
4.3.2 Lists of existing website and intranet pages have been distributed to
directorates to identify key content owners. MS Copilot is being used to assist
in redrafting existing  web pages in line with required standards, with the content
team undertaking final edits, content design and publication. Appropriate
operational officers are  validating content before and after the AI re-write. 
Where appropriate, old and out of date pages will not be migrated to the new
platform. 
4.4 Smart Social Housing Update 
4.4.1 Renfrewshire Council own and maintain circa 12,000 social housing properties,
managing planned and reactive maintenance budgets, as well as investment
programmes that seek to improve our housing stock and meet Scottish
Government standards, such as the Scottish Housing Quality Standard
(SHQS), the upcoming Social Housing Net Zero Standard in Scotland (SHNZS)
and compliance with all regulatory standards, including the introduction of
Awaab’s Law from October 2026. 
4.4.2 Since 2020, the Council have been monitoring the internal conditions of their
housing stock through the installation of Indoor Environmental Sensors,
specifically those which collect indoor temperatures, relative humidity and CO2. 
To date, around 1,200 homes have been installed with environmental sensors 
which are being actively monitored. 
4.4.3 The Council own a private Long-Range Wide Area Network (LoRaWAN) which
provides connectivity across Renfrewshire via a series of gateways installed in
multi-story blocks and other Council owned buildings.  This network is operated
and maintained by the current contractor who provides an end-to-end service
to the Council. The majority of the properties where Environmental Sensors
have been installed are connected via this LoRaWAN network.  The remainder
of the Environmental Sensors are connected via Low Power Narrow Band IoT
(NB-IoT) solution. 
4.4.4 As previously reported to the Leadership Board, the Smart Social Housing
(SSH) project set out an ambition to develop a business case opportunity to
secure the deployment of market leading fibre broadband connectivity and
smart sensor assets into the Council’s social housing units at no cost to the
tenant. The underlying financial premise on which the business case has been
developed is delivering investment that secures broadband connectivity and
environment sensors at-scale into 10,000 social homes. However, after
detailed scrutiny, the business case has failed to demonstrate value for money,
with significant up front and ongoing costs outweighing the potential benefits. 
4.4.5 Whilst the ambition of fibre broadband connectivity set out in the report to the
Leadership Board will no longer be pursued, the installation of environmental
sensors in our housing stock remains a key investment priority for Housing
Services, with financial resources already built into the Housing Revenue
Account (HRA) Business Plan for sensor deployment. 
Page 65 of 130

Page 66

PUBLIC
4.4.6 Housing Services will undertake a programme of sensor deployment across all
housing stock, to monitor the internal environmental conditions within each
property and gather the associated data from the environmental sensors. The
data collected will primarily be used to ensure the internal environmental
conditions within the housing stock do not promote and accelerate damp and
mould growth and other related conditions, as well as informing future
maintenance and investment programmes. 
4.4.7 The data insights will be embedded into business processes, supporting
proactive maintenance, tenancy sustainment, energy efficiency and improved
customer outcomes. 
4.4.8 The Head of Housing Services will provide regular updates to the Communities
and Housing Policy Board as this initiative is developed, with updates also
provided to the Leadership Board as part of the Council’s transformation
programme. 
4.5 Housing Innovations Project 
4.5.1 The Housing Innovations Project (HIP) is a two-phase implementation with
Phase 1 being transition from OHMS, a twenty-year-old housing management
on-premise system, to NEC Housing as a cloud-based service.  Phase 1
focuses on housing management and creating a streamlined, integrated and
scalable management system harnessing modern technology to provide a
better user experience and ultimately benefiting our tenants by providing a
more streamlined, aligned service. 
4.5.2 Since contract signing with NEC and kick off in January 2025, the project team
has conducted over 70 solution design and configuration sessions across rents,
allocations, estates, anti-social behaviour, customer services, servicing and
interfaces and integrations with finance, GIS and document management. 
The team have also embedded a benefits realisation approach, completed test
cycle 1 and developed a training programme for end users.  Phase 1 of the
project continues to progress and has just entered its second test cycle. A nine
week training programme begins in August. The anticipated go live for Phase 1
remains Q3 2026. 
4.5.3 January 2026 saw the commencement of Phase 2 activities, including
solution design and configuration sessions for the areas not in scopes for
phase 1 which include repairs, assets and cycling maintenance, servicing,
homelessness, CRM and housing online services and dashboards.   Phase 2
is gathering momentum with design workshops underway across both repairs
and asset workstreams. 
Page 66 of 130

Page 67

PUBLIC
4.6 P2P 
4.6.1 The Procure to Pay (P2P) service, comprising the new operating model and
Business World Procurement Module, has now been successfully embedded
for eight months. The phased withdrawal of PECOS continues, with the system
being decommissioned for standard users in June 2026. 
4.6.2 Key achievements:
• The No Purchase Order, No Pay policy is successfully implemented
ensuring that all expenditure is reviewed and approved by budget holders
prior to commitment.
• A significant reduction in manual intervention within invoice processing has
been achieved, with automation continuing to drive efficiencies.
• Enhanced controls and improved data quality are supporting efficiencies
and decision-making within services
• Compliance with mandatory training has been strong, supported by ongoing
engagement with the CPU drop-in sessions and support arrangements.
4.6.3 While the detailed scope of Phase 2 of the programme is still being developed,
it will focus on maximising the use and accessibility of management information
and reporting, reviewing and enhancing Purchasing Card processes, and
supporting the alignment of other purchasing systems to the new P2P operating
model.
5.  Connected Communities 
5.1 Officers are continuing to progress the Connected Communities Programme –
a 3–5-year programme of change which will seek to strengthen relationships
between the Council and communities, ensuring that we work as closely
together as possible to make the most of the resources we have in
Renfrewshire. 
5.2 There are several key areas of focus that have been identified for initial
progression, as these are seen as being key enablers to unlock potentially
much more significant improvements in outcomes.  5 initial workstreams have
been established and these are exploring how we can build on what we are
already doing to enhance community capacity and investment, how we use
voice and influence, how we work with communities in relation to their “place”,
and how we work with citizens individually or as families when they contact the
Council, particularly for advice and support.   
5.3 Progress since the last update is provided as follows:  
Page 67 of 130

Page 68

PUBLIC 
Community investment 
5.3.1 This workstream is looking at how the Council supports the development of
community capacity across Renfrewshire.  It will look at the funding we provide
to local groups and organisations and what support is needed going forward for
local groups and organisations that are contributing to a range of local
outcomes across the area – including many early intervention type supports
which may prevent citizens and families from requiring formal support from
statutory services. 
5.3.2 A key initial activity has been to review the processes by which grants are
managed within the Council, with a specific focus on grants management and
co-ordination lead by the Policy and Partnerships team, with hundreds of grants
being co-ordinated every year to local groups and organisations. We are
working to develop new processes, including a grants management system to
support co-ordination and monitoring.  Work is also underway to review the
conditions of grants which require to be met in relation to all grant funding
awards, in order to ensure these reflect the current grants landscape.  Guidance
and policy developments in this area will also be progressed by the Policy and
Partnerships, with a temporary postholder being recruited to support the
implementation. 
Place based approaches 
5.3.3 This workstream is exploring how we work with communities in relation to their
place.  This might relate to how we engage with communities about
developments in their communities, or how we think across services about the
activities we are all undertaking across Renfrewshire or within specific
communities.  We are currently exploring potential opportunities to test new
approaches linked to some of the wider review programmes being progressed
by the Council, such as the review of services commissioned by OneRen, and
considering whether there are opportunities to work even more closely together
in local spaces.  For example, Community Learning and Development with
library provision. 
Voice and Influence 
5.3.4 Services across the Council have been working to strengthen the way in which
engagement and consultation is undertaken.  The Consultation and
Engagement Policy approved in 2024 provides a strong foundation for this, with
a range of different examples recognised nationally through awards or at a local
level by our external auditors.  It is important to note that strengthening voice
and influence is an important enabler of Connected Communities. 
5.3.5 A key recent development is the Your Voice Matters programme – a new
programme of engagement we have launched with partners to shape
Renfrewshire’s future priorities for the next 5 to 10 years, with the feedback we
get being used to inform the development of a new Council Plan, a Community
Plan and Strategic Plan for Renfrewshire Integration Joint Board.  
Page 68 of 130

Page 69

PUBLIC
Over the summer, we have been having conversations with residents from
across Renfrewshire as part of our Your Voice Matters engagement programme
and will continue this engagement to the end of this year. 
Every Conversation Matters 
5.3.6 As mentioned above the foundation of the Connected Communities programme
is stronger relationships between the Council, communities and citizens.   A key
enabler of this approach is our Every Conversation Matters programme which
is focused on making sure that every human to human interaction with the
Council provides as an opportunity to deliver meaningful, joined-up support -
going beyond individual tasks to best meet the needs of our residents. 
5.3.7 Work is progressing on a campaign across our workforce which will reinforce
the Council’s commitment to our values and a ‘One Council’ approach - this
means working together across the organisation, so our residents have a
seamless experience regardless of how they contact the Council. To deliver
this, we will roll-out training and development opportunities which will support
our people to continue to deliver people-centred services and work closely
across services.  This will include aspects such as developing knowledge and
practice in relation to trauma and reducing stigma in our response to any
interaction we have.  A timeline for this programme is being developed and
elected members will receive future updates as this is implemented.  Early
engagement with trade unions has also been undertaken, with much more
extensive engagement across the workforce planned. 
Early Help and Support 
5.3.8 With a focus on early intervention and prevention we will work with partners to
ensure local people can access advice and support that meets their needs. 
Initial work within the workstream has focused on understanding how citizens
contact the Council and what support is available, and to map out the customer
journeys that they may have to access this support. 
5.3.9 This is a very exciting and important workstream within the programme, with
opportunities to build on this work to consider how more person centred and
holistic forms of support might be offered in the future.   
6. Consultation and Engagement 
6.1      The introduction of a Resident Survey in 2025 supported a pilot approach as
part of the Council’s commitment to self-assessment and improving our
dialogue with our residents and communities and was carried out to inform the
council’s approach to financial sustainability and budget decisions. The
purpose of the resident research exercise was to: 
• measure perceptions of and satisfaction with Council services
• inform planning and decision-making in relation to budget decisions
• benchmark against results from the Scottish Household Survey (2023)
• access new information, ideas and suggestions
Page 69 of 130

Page 70

PUBLIC
• support the introduction of the new Consultation and Engagement Policy
• build on the knowledge and insight gathered from existing consultation
and engagement exercises  
6.2 The survey findings and evaluation were presented to Leadership Board in
December 2025 and are also available on the Council website. It is the intended
the results of the survey will be used by the Council and community planning
partners alongside other community and citizen engagement feedback and
insight to inform future strategies and plans, including the development of
budget proposals. 
6.3 As a further piece of work, focus group research was conducted with equalities
groups to augment the findings of the 2025 survey exercise and focus group
research with sample populations of the Renfrewshire public. Specifically, focus
groups were professionally facilitated with the council’s Lived Experience
Panel, young people from Renfrewshire Youth Voice and clients of the Disability
Resource Centre. 
6.4 The equalities focus groups highlighted that while Renfrewshire is valued as a
place, inequality, safety concerns, and a perceived lack of accessible spaces
can significantly impact quality of life. Participants were clear that improving
outcomes requires:
• Safe and inclusive environments
• Enhanced access to support
• Genuine involvement in decision-making
• A stronger focus on equity, co-design, and preventative support 
6.5 The findings from the equalities focus groups are now integrated with the
previously reported findings from the 2025 exercise to help inform the
Corporate Improvement Plan and future strategies and plans. 
6.6 Moving into a further phase of engagement, the Council recently launched Your
Voice Matters engagement programme in partnership with Renfrewshire
HSCP, which seeks to have valued conversations with our citizens about the
things that matter to them most and their vision for a future Renfrewshire. While
this has only recently launched at the end of June 2026, to date over 100 face
to face conversations have already taken place with our citizens over the
summer at local gala days and events, and these have been constructive, rich
and insightful. There will be further themed conversations with a wide range of
stakeholders and partners, including the Council’s workforce up to the end of
this year. This engagement and the earlier Resident Research will shape our
Council and Community Plans and will also be used by the Integrated Joint
Board to inform their Strategic Plan. 
6.7 These programmes sit alongside our established consultation and engagement
through programmes such as You Decide, Tenants Decide and Celebrating
Renfrewshire, and service-specific consultation, for example our Learning
Estate programme. 
Page 70 of 130

Page 71

PUBLIC
The Council’s consultation and engagement activity is coordinated via the
Consultation and Engagement Advisory Group who have been developing a
consultation calendar and a best practice toolkit to support officers undertaking
consultation. 
7.  Place Based Programmes 
7.1 Learning Estate Strategy 
7.1.1 The Learning Estate Strategy report, submitted to the Education and Children’s
Services Policy Board in August, detailed the progress of the ongoing Learning
Estate Programme and highlighted key developments. 
7.1.2 Delivery of the new Paisley Grammar School Community Campus has been
successfully completed on time and on budget through to formal closure of the
project. 
7.1.3 Park Mains High School is undergoing a major programme of construction
works, including the development of two new teaching blocks within the school
grounds to enhance learning and teaching facilities. In addition, a new car park
has been created, along with significant alterations and an expansion of the bus
drop-off and pick-up area, improving capacity, traffic flow, and access to the
school site. 
7.1.4 The construction works at Thistle Primary School are progressing well, with the
building moving towards becoming fully wind and watertight. Installation of
windows is ongoing, while brickwork and external cladding continue to advance
across the site. In addition, work is now commencing on the construction of the
full-size artificial sports pitch, marking another significant milestone in the
development of the new school facilities. 
7.1.5 A significant and comprehensive engagement process has been underway
since May for the Johnstone learning estate, which has seen officers facilitate
events for all school staff, parents/carers, pupils, and the local community.
This has been supplemented with a survey offering the ability for anyone to
provide their views. Officers have also been engaging internally with all
Council services to understand operational views on any of the shortlisted
options for Johnstone projects, which will be vital to understand any
implications of shortlisted sites at this early stage. 
7.1.6 The public engagement process for Trinity High School replacement will
commence following agreement by the Education and Children’s Services
Policy Board on site options. 
7.1.7 Following the most recent detailed update in March 2026 on the progress of the
Learning Estate Strategy, approval was subsequently granted by the Education
& Children’s Services Policy Board to progress the Trinity High School,
Johnstone High School and Johnstone Primary Schools projects to Full
Business Case stage. 
Page 71 of 130

Page 72

PUBLIC
Since then, work has continued to further develop and refine the emerging
options for each project, supported by the procurement of key technical
consultants to provide specialist input and appraisal. This work will inform the
detailed assessment of options and ensure that robust evidence underpins the
development of the Full Business Cases. The aim remains to identify and
present a single preferred option for each project for approval in 2027. 
7.1.8 To support the Scottish Government’s priorities for expanding funded Gaelic
Medium Early Learning and Childcare (ELC), a recommended option for
providing an Early Years Gaelic provision was presented to the August meeting
of the Education & Children’s Services Policy Board. 
7.2 Housing-led Regeneration and Renewal Programme 
7.2.1 The Housing-led Regeneration and Renewal programme has advanced into its
fifth year of a ten-year plan where significant progress has been realised in
several key areas that supports the enhancement of council stock, acquisition
of key premises and demolition of empty properties to support wider
transformation opportunities throughout Renfrewshire. 
7.2.2 The scope, complexity and timescales for delivery of regeneration activity differ
in each of the regeneration areas across the programme. Works continue in
line with the phasing strategy developed to take account of delivery timescales,
rehousing requirements, contractor availability, maximising grant support for
owner participation and consideration of wider development constraints. 
7.2.3 External improvement works is underway within several regeneration areas
including the replacement of windows and doors, External Wall Insulation
(EWI), rendering upgrades, roofing replacement and improvements and solar
PV. 
The window and door replacement programme across regen areas continues
to maintain consistent momentum with nearly 400 properties having received
triple glazed windows. 
7.2.3 Officers are working across Council services and with tenants, residents and
local community groups to ensure the voice of each community is represented
for each regeneration and renewal area. The approach continues to be tailored
to the needs and circumstances of each area, going beyond housing and the
immediate external environment, and taking account of broader issues such as
links to health and wellbeing, access to outdoor space and sustainable travel
and employment or training opportunities that maximise the benefits achievable
for local residents. 
7.3 Council New Build Housing Programme 
7.3.1 The Council’s new build housing programme is progressing well, with
developments on site at Gallowhill, Paisley and Howwood Road, Johnstone.
The Howwood Road Area development is making steady progress with timber
kits and roofing works almost complete. 
Page 72 of 130

Page 73

PUBLIC 
Construction of the newbuild homes at the Gallowhill development remain on
programme with the majority of timber kits and facing brick finish now
completed, giving an indication of how the site will look on completion. The first
set of newbuild homes are programmed for handover towards the end of this
year / early 2027. 
7.4 Housing Asset and Investment Programme 
7.4.1 Over the next five years the Council will invest £147M on improvements to
council housing stock, including kitchen and bathroom refurbishments, rewiring,
heating systems, windows, roofs, external insulation, and solar panels. 
7.4.2 Investment in external work to buildings across Renfrewshire continues to focus
on enhancing building performance through measures such as external wall
insulation (EWI), roofing and rendering improvements, window and door
replacements, and the installation of air source heating and solar PV. These
works have supported compliance with the Energy Efficiency Standard for
Social Housing (EESSH) and the Scottish Housing Quality Standard (SHQS). 
7.4.3 Investment in internal work to Renfrewshire’s housing stock includes the
replacement of kitchens, bathrooms, heating systems and electrical rewiring
where required. Kitchen, bathroom, heating replacements and rewires have
been carried out by both Building Services and the Council’s appointed
contractors. Key internal investment works undertaken during 2025/26 has
included the completion of 293 properties across kitchen, bathroom and
rewiring workstreams. New heating systems/boiler installs have been realised
in 795 properties exceeded the target of 750 within the 2025/26 period. 
7.4.4 Drilling of the borehole network and significant groundworks milestones were
successfully achieved at the Gallowhill Ground Source site in May 2026. The
next phase of works includes the riser installation which will carry the ground
sourced heat into all 180 homes. Following this, each flat will have new heat
pumps and radiators installed and the existing gas heating system removed,
with the new system expected to be fully operational by early 2027.
8.  Climate and Net Zero 
8.1 Delivery of the Council’s approved 3-year programme of climate activity
continues to progress, with a focus on transforming our approach to the
provision of clean, renewable energy and sustainable travel in Renfrewshire. 
The Climate Action Plan set out key areas to be taken forward, centred around
the 5 main themes within the Plan for Net Zero; Clean Energy, Sustainable
Transport, Resilient Place, Circular Economy and Connected Communities.
Since the previous update report to the board significant progress has been
made across several projects.  
Page 73 of 130

Page 74

PUBLIC
8.2  Local Heat & Energy Efficiency Strategy (LHEES) 
Renfrewshire Council has worked alongside technical consultants to develop
Outline Business Cases (OBCs) for potential heat networks in central Paisley
and an extension of the existing AMIDS network to Glasgow Airport. Both
proposals directly support Renfrewshire’s Plan for Net Zero, Local Heat &
Energy Efficiency Strategy and wider Scottish Government climate
commitments, responding to the need for significant reductions in greenhouse
gas emissions from domestic and non-domestic buildings.  
Following completion of the OBC, the next stage would typically involve
progression to detailed project development, including customer engagement,
technical design refinement, commercial and funding development, and
preparation of a Full Business Case. 
8.3  Building Management Efficiency 
Improving efficiency across our buildings and utilities is key to reducing
emissions and energy related costs.  The Council continue to identify the most
impactful measures in which to do so and has successfully upgraded Building
Management Systems (BMS) across 26 buildings, with a further 17 planned
this year. BMS allows temperature, air conditioning and ventilation to be
monitored and controlled remotely.  
Additionally, the Council has been selected to take part in the Scottish
Government-funded Energy Invest to Save programme. The 12-month
programme commenced in July 2026 and aims to improve energy efficiency
across local authority estates by installing low-cost Internet of Things (IOT)
technology. 
This will produce actionable data to help optimise energy use across the
selected properties, supporting national carbon reduction ambitions and
contributing to best practice in public sector sustainability. The properties
selected were Renfrewshire House, Underwood Road Depot, Lagoon Leisure
Centre, Johnstone Community Sports Hub and Erskine Swimming Pool. 
8.4 Sustainable Infrastructure 
Sustainability continues to be a key consideration within major infrastructure
programmes of work. This includes Housing Regeneration, the development of
our Learning Estate and the decarbonisation of our public buildings. The new
Paisley Grammar School Community Campus has been built in line with
Passivhaus standard accreditation and has been designed to minimise energy
use throughout with low carbon heating systems and to meet net zero
standards.  
The decarbonisation of Council buildings is essential to achieving both local
and national net zero objectives by 2045. 
Page 74 of 130

Page 75

PUBLIC
However, this remains one of the most significant challenges facing the Council
due to the scale of the estate, the age and complexity of many assets, reliance
on fossil fuel heating systems and the substantial investment required to retrofit
buildings with low-carbon technologies. Addressing these challenges will be
critical in reducing operational emissions, improving energy efficiency and
demonstrating leadership in the transition to a low-carbon future. As part of the
Hub West Scotland Collaborative Group, the building decarbonisation route-
map has been developed, which will outline the breadth and scale of work
required and provide an indicative plan of how this could be achieved.  
8.5  Renewable Energy 
The Council continues to explore renewable energy opportunities both in terms
of its own building infrastructure and larger scale energy generation
opportunities across Renfrewshire. Over the next 12 months extended Solar
PV Array will be installed across 13 Council buildings, supporting significant
reductions in energy related emissions. More broadly, it is recognised that
locally generated energy opportunities can offer significant benefits to the area
thus the Council are continuing to carry out investigatory work into various
solutions including large-scale wind and solar. 
The development and delivery of such ventures come with significant potential
challenges including land suitability, capital investment requirements and
national grid capacity. 
8.6 Carbon Budgets 
A carbon budget approach is being developed to understand how our emissions
relate to the services we provide, and reductions needed to deliver the same
high-quality local services in a way that is fit for a resilient, net zero future. It
enables monitoring of progress and ensures cross-service accountability, with
departments identifying actions and projects that contribute to targets.  
A model has been developed and is being trialled for three council buildings:
Renfrewshire House, Gryffe High School, and Lagoon Leisure Centre. The
carbon budget for each building is based on electricity, gas and water
consumption with the aim to reduce consumption by 5% each year. The pilot of
these buildings will begin in Autumn 2026 with the Sustainability Team
providing support to help understand what measures could be taken to help
meet the carbon budget target. If successful, the approach will be rolled out
more widely across Council buildings. 
8.7 Sustainable Travel Project 
8.7.1 Since the launch of the Sustainable Travel Project, several initiatives have been
completed to encourage a more sustainable travel culture within the Council
and help to reduce carbon emissions: 
Page 75 of 130

Page 76

PUBLIC
• An updated staff travel hierarchy for staff to follow when travelling on
Council business, to ensure the most Sustainable and practical travel
choice. 
• A relaunch of the Electric Vehicle pool car scheme. 
• A review of the existing EV pool fleet and procurement of new vehicles
through capital funding to replace petrol/diesel vehicles that had reached
the end of their lease. 
• A relaunch of the Council’s pool bikes based at Renfrewshire House 
• The introduction of ‘Calcommuter’ which gives staff potential lower
carbon and lower cost options for travelling to and from work. 
• The identification of new locations across Renfrewshire for the
expansion of EV charging infrastructure to support fleet with the
transition from petrol and diesel vehicles to electric vehicles. 
8.7.2  Work is ongoing in several areas on this project including: 
• Clear emission reduction targets set within our CMP including reduced
business mileage and increased use of Hydro-vegetable oil (HVO) in our
large fleet. 
• An Outline Business Case for the introduction of an Electric Vehicle
Salary Sacrifice scheme for staff, to encourage the transition to low
carbon fuel while also making a financial saving for the Council, has
been developed. 
8.8  Glasgow City Region Electric Vehicle Charging Infrastructure 
Work is continuing to develop a public EV charging networking on local
authority owned assets within each local authority area in the Glasgow City
Region. For Renfrewshire this includes 75 existing chargers, and the installation
of over 200 new chargers across the area in the coming years. The project is
currently at procurement invitation to tender stage, with a new operator
expected to be appointed in early 2027. 
8.9  Active Travel Infrastructure Projects 
8.9.1 The council has undertaken a significant programme of active travel investment
in recent years, with the aim of making walking, wheeling and cycling safer,
more accessible and more attractive for everyday journeys. The Council's
Travel Renfrewshire 2035 Local Transport Strategy places active travel at the
heart of its transport vision and commits to expanding a safe, accessible active
travel network across the area. The Council has progressed a number of major
infrastructure projects designed to connect communities, employment areas
and transport hubs.    
Page 76 of 130

Page 77

PUBLIC
8.9.2 We’ve added new and improved walking and cycling routes right across
Renfrewshire, including the first ever dedicated route between Paisley and
Renfrew. We’re working with local communities in Elderslie to improve walking
and cycling options and developing an active travel route between Paisley and
neighbouring East Renfrewshire.    
8.9.3 The council has successfully attracted substantial external funding from the
Scottish Government for active travel projects.  Over the last financial year, the
Council secured £1.6 million from the Active Travel Infrastructure Fund to
extend walking and cycling routes between Inchinnan and Erskine. The council
also secured funding for the Gallowhill Link through the same programme, both
projects have been completed recently for local communities to use and enjoy.  
8.9.4 The Council's active travel programme is focused not only on increasing route
availability but also on improving safety and accessibility. Current and planned
works include: 
• New shared-use paths and widened pavements. 
• Improved pedestrian crossing facilities. 
• Better access to schools, town centres, railway stations and employment
sites. 
• Enhanced connections to existing path networks and National Cycle
Routes. 
We will continue work with a clear commitment to active travel through
strategic planning, successful funding bids and delivery of new infrastructure.
The programme aims to provide healthier, safer and more sustainable travel
options, improve connectivity between communities and employment centres,
and contribute to wider environmental and public health objectives   
8.9.5 Work will continue through 2026 and beyond to fully deliver the outlined
projects, and to explore other opportunities to ensure our public buildings and
transport are as sustainable as they can be. 
9.   Waste Services Programme 
9.1 Packaging & Recycling Handling Facility - Linwood
The service is progressing a detailed Business Case for the construction of a
packaging and recycling handling facility at Middleton Road, Linwood. This
facility would be able to handle materials from the blue, brown and green bins,
street sweepings and gulley cleanings, bulky items from special uplifts, waste
upholstered domestic seating and white goods etc. In addition, the construction
would include a new secure bin store with a wash and repair facility. 
Page 77 of 130

Page 78

PUBLIC
10. Alignment to Medium Term Financial Plan 
10.1 As outlined in the 2026/27 Revenue Estimates report presented to the Council
in February, the transformation programme along with more traditional service-
based savings workstreams (many of which will be supported by
transformational activity) continue to provide the key routes to support the
Council’s drive toward longer term financial sustainability. It was also reported
at that time that the Council’s ability to generate further recurring transformation
and efficiency savings at this scale without impacting on service delivery or
quality will be increasingly challenging, given the £190m savings already
achieved since 2010. 
A full Medium-term Financial Outlook will be reported to the Council in
September giving further detail. 
11.  National developments 
11.1  On 1 September, the First Minister presented the Scottish Government’s
Programme for Government 2026-2031.  The Programme for Government
notes the significant challenges facing Scotland public services including
increased costs, complexity and demand for services across the population. It
sets out a range of proposals to “rewire” public services in Scotland by reducing
the number of public bodies that are operating across the country and
specifically reducing the number of health boards to 2. 
Linked to these proposals, the First Minister also set out proposals to reform
local government arrangements more broadly, and to consider the implications
for the provision of social care.  
At present, detailed information has not yet been provided on the specific nature
of the reform proposals.  A rapid period of engagement is proposed by the
Scottish Government over the next 3 months with relevant stakeholders, and
there will be a requirement to report back on the implications of any proposed
reforms to elected members as this information becomes available, and on a
regular basis as the reform agenda progresses. We are also committed to
keeping our employees informed as details emerge.  
Officers also continue to engage with the national transformation programme
for local government which is being co-ordinated by the Improvement
Service.  There will clearly be a requirement to consider the implications of any
proposed local government reforms on the ongoing implementation of this
programme. 
12. Next steps 
12.1 Alongside the regular updates for each individual workstream to the relevant
Policy Boards, overview progress updates on the Reshaping Renfrewshire
programme will continue to be reported to Leadership Board alongside the
financial reporting to Council and the Finance, Resources and Customer
Services Policy Board. 
Page 78 of 130

Page 79

PUBLIC
___________________________________________________________________ 
Implications of the Report 
1. Financial – the transformation programme will continue to play a key role in
improving service delivery and supporting the Council’s medium term financial
sustainability. 
2.  HR & Organisational Development – none. 
3. Community/Council Planning – the transformation programme focuses
resources on the delivery of priority outcomes as outlined in the Council Plan. 
4.         Legal - none 
5.        Property/Assets – section 7, 8 and 9 of the report provides an update on
investment in council properties and infrastructure. 
6.        Information Technology – section 4 notes a number of progress updates related
to the Digital and ICT agenda. 
7.         Equality and Human Rights – there are no negative impacts on equality groups
or potential for infringement of individuals’ human rights arising from the
recommendations contained in the report. 
8.         Health and Safety - none 
9.        Procurement – section 4 includes an update on the P2P project as part of the
overall transformation programme. Several of the individual workstreams and
projects will have associated procurement elements to their delivery and which
will be managed through the Council’s well established procurement
arrangements to secure best value. 
10.       Risk – the transformation programme is a key element of mitigating the
medium-term financial challenge for the Council. 
11.       Privacy Impact – none 
12.       COSLA Policy Position – none 
13. Climate Risk – section 8 of the report provides an update in relation to Net Zero. 
14. Children’s Rights – section 7 provides an update on the Learning Estate
Strategy which will directly impact children and young people. When
considering any future school provision, the impact this will have on children is
a key consideration, and any work will be based around the direct needs of
children to allow their education experience to thrive. 
Author:         Karen Mann – Strategic Change Manager 
Alastair MacArthur - Director of Finance & Resources
Page 79 of 130

Page 80

Page 80 of 130

Page 81

PUBLIC 
___________________________________________________________________
To:  Leadership Board
On:  16 September 2026
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Responsible and Ethical Expansion of Artificial Intelligence (AI) in
Renfrewshire Council
___________________________________________________________________
1. Summary 
1.1.  A council motion entitled “Responsible and Ethical Expansion of Artificial
Intelligence (AI) in Renfrewshire Council” was approved by elected members
in December 2025. 
1.2. Members agreed that a bi-annual report on AI would be provided to the
Leadership Board. This is the first report and will provide the background and
set the scene for future updates. 
1.3. The ICT service supported by other key stakeholders will create and maintain 
an on-going log outlining all AI tools utilised by the Council, their purpose and 
function, safeguards and any identified risks. 
1.4. This log will inform the bi-annual report to elected members to ensure safe, 
transparent and responsible use of AI. 
1.5. The Council is the first authority in Scotland to implement an AI-powered 
customer support solution and based on this experience the Council has 
agreed to further use of AI tools in public service delivery. 
1.6. A corporate wide AI Transformation Assessment has been undertaken with 
the help of an external partner. Output from the activity is the catalyst for the 
establishment of the Council approved AI Transformation Programme 2026 – 
2030. 
Item 6
Page 81 of 130

Page 82

PUBLIC 
1.7. A key part of this programme is the establishment of an AI Governance 
Board to monitor and control the use of AI across the Council.
___________________________________________________________________ 
2. Recommendations 
2.1 Members are asked to note the contents of this Report. The next update will
be in February 2027 which will be prior to the start of the first phase of the AI
Transformation Programme 2026 – 2030. This update will include the initial
log outlining AI tools utilised by the Council, their purpose and function,
safeguards and any identified risks. 
_________________________________________________________
3. Background
3.1 The following Council Motion was approved in December 2025.
“Council acknowledges the successful introduction of the award-winning
Millie, Renfrewshire Council’s AI-powered customer support system and that it
has improved access to services, reduced waiting times, and supported staff
by handling routine enquiries. It demonstrates our commitment to digital
innovation and notes that Renfrewshire is ahead of many Scottish local
authorities in adopting practical, resident-focused AI tools. 
Council recognises that as AI becomes a larger part of public service delivery,
ethical governance and transparent safeguards are essential to protect
residents’ rights, prevent bias, and ensure AI continues to support key
services and our valued workforce. As AI technologies learn over time,
ongoing oversight and regular updates to elected members are necessary to
ensure safe, transparent and responsible use as these systems evolve. 
Council agrees that a 6-monthly ‘AI Transparency Report’ be made to the
relevant board, outlining all AI tools utilised by the council the purpose and
function of each system, any data-protection or equality assessments
undertaken, changes since the previous report, and any identified risks,
mitigations or recommendations for future deployment. 
Renfrewshire can be a national leader in ethical, transparent, resident-focused
AI, and that Millie as an example represents a foundation on which to build the
confidence and transparency in our use of AI technology and one that the
public can have trust in. 
Council believes that people should have a choice to use AI or speak to a
person when calling Renfrewshire council. Council asks the IT department to
investigate changing the initial start of a call with this option as soon as
possible. This will give people a choice to use AI or speak to a real person at
the beginning of a call.” 
Page 82 of 130

Page 83

PUBLIC
3.2 Following the successful launch of Millie for our citizens and the internal roll-
out of Microsoft Co-pilot Chat as a tool for employees, last year Council
officers completed an AI transformation assessment in consultation with more
than 100 senior leaders, managers and employees from services from across
the Council. This assessment was carried out with support from an external
partner, ICS.AI. 
3.3 An AI transformation assessment is designed to support a Council to evaluate 
current AI readiness, identify opportunities for AI-driven improvements, and 
develop a structured roadmap for adopting AI technologies where appropriate. 
This assessment included significant employee engagement, workshops and 
analysis to identify and understand if and how potential AI solutions could 
improve service delivery for citizens, reduce operating costs and enhance our 
efficiency, as well as support our workforce by freeing them up from repetitive 
tasks for more high value work. 
3.4 We are also learning from the experiences of other UK local authorities in 
implementing a range of AI solutions. Derby City Council have welcomed 
establishing a working relationship with Renfrewshire Council and have been 
open and highly collaborative in sharing their journey to develop their AI 
capability. This working partnership will provide future opportunities to share 
best practice. 
3.5 A business case has now been developed and tested by senior officers from
across all services. It provides a clear understanding of the scale of
opportunity and the key priorities for building on successful implementation of
other technological developments to further improve local service delivery. It is
also expected to make a significant contribution to the Council achieving
longer term financial sustainability. 
3.6 The AI Transformation Programme 2026 – 2030 was approved by the
Leadership Board in April 2026 and will be delivered in three phases
beginning with solutions already in place and which will have the maximum
impact, benefitting all teams and employees across the Council. 
3.7 A key part of the business case is the requirement for strong governance
arrangements. The Council recognises that as AI becomes a larger part of
public service delivery, ethical governance and transparent safeguards are
essential to protect residents’ rights, prevent bias, and ensure AI continues to
support key services and our valued workforce. The business case also
establishes the requirement for human oversight even in the deployment of
technologies to support administrative tasks. 
3.8 A clear and transparent governance framework will support informed decision
making, maintain employee and public trust and ensure that AI adoption
complies with the Council’s policies, legal obligations and information
governance standards. 
Page 83 of 130

Page 84

PUBLIC
3.9 As AI technologies continue to develop over time, ongoing oversight and
regular updates to elected members will be necessary to provide transparency
in safe, and responsible deployment and use as these systems evolve. 
3.10 The following chart sets out the proposed governance arrangements: 
AI Strategic Programme Officer Board – strategic direction, financial
oversight and risk management. 
AI Programme Delivery Team – day‑to‑day operational control, compliance
and usage monitoring 
Ethics and Assurance Board – GDPR compliance, DPIAs, fairness,
transparency, accountability and human oversight. 
3.11 The terms of reference for the above groups will be developed in the coming
months, with those developed for the ethics and assurance board being
provided to the Board for information in the next update. 
3.12 Clear communication and engagement with services and colleagues is 
essential for successful adoption. Activity will focus on preparing employees 
and building confidence to support the required change. This will include a 
combination of engagement, briefings, training and change support across all 
audience groups. 
Page 84 of 130

Page 85

PUBLIC
___________________________________________________________________
Implications of the Report
1. Financial - The AI Transformation Programme 2026 – 2030 will support the
Council’s ongoing financial sustainability which is dependent on the ability of
the Council to transform and modernise services.   
2. HR & Organisational Development - Requirement for awareness and
training of staff as new AI solutions are implemented. This will help build
confidence and support change across Renfrewshire Council. 
3. Community/Council Planning – The AI Transformation Programme 2026 -
2030 focuses the delivery of priority outcomes as outlined in the Council Plan.  
4. Legal - Requirement for support for the Ethics and Assurance Board. 
5. Property/Assets – None. 
6. Information Technology - Requirement for support for the implementation of
the AI Transformation Programme 2026 - 2030. 
7. Equality & Human Rights - An EQIA will be undertaken in developing this
next stage of the AI Transformation Programme 2026 – 2030. 
8. Health & Safety - None. 
9. Procurement – The AI Transformation Programme 2026 – 2030 is subject to
an appropriate procurement exercise. This is being managed through the
Council’s well established procurement arrangements to secure best value. 
10. Risk - The AI Transformation Programme 2026 – 2030 is a key element of
mitigating the medium-term financial challenge for the Council. 
11. Privacy Impact – None. 
12. Climate Risk – None. 
13. Children’s Rights – None. 
14. Cosla Policy Position – None.
_______________________________________________________
List of Background Papers 
None.
___________________________________________________________________ 
Author:       Patrick Murray, Head of Digital, Transformation and Customer Services 
Page 85 of 130

Page 86

Page 86 of 130

Page 87

PUBLIC 
To: Leadership Board
On: 16 September 2026 
Report by: The Chief Executive and Director of Finance and Resources 
Heading: AMIDS Enabling Works – Cost Underwrite 
1. Summary
1.1 The purpose of this report is to seek approval from the Board for the
Council to underwrite enabling costs associated with the expansion of the
AMIDS District Heating Network (DHN), together with the associated costs
required to develop the full business case for Tech Terrace Phase 2. 
2. Recommendations 
2.1 It is recommended that the Board authorise the Director of Finance &
Resources to enter into underwrite agreements with AMIDS (Renfrewshire)
LLP in relation to (i) enabling works costs associated with the expansion of
the AMIDS DHN and (ii) development of the Full Business Case (FBC) for
Tech Terrace Phase 2. 
3. Background
3.1 The Council appointed a Development Partner (Tarras Park Properties Ltd)
to jointly form the AMIDS (Renfrewshire) LLP in May 2023. The
Development Partner is required to deliver the first phase of commercial
space development on a speculative basis, targeted at start-up companies
and SMEs, which will be known as Tech Terrace.  
Item 7
Page 87 of 130

Page 88

PUBLIC
3.2 Tech Terrace will create approximately 5,388 sqm of modern, flexible,
speculative new build space, specifically designed for small and medium-
sized enterprises (SMEs) in the advanced manufacturing sector. The space
will be designed to accommodate:
• Companies seeking proximity to neighbouring innovation centres:
National Manufacturing Institute Scotland (NMIS) or the Medicines
Manufacturing Innovation Centre (MMIC)
• Companies expanding research projects initiated at NMIS/MMIC
• University spin-outs
• SMEs, micro-SMEs, and scale-ups in the advanced manufacturing
sector
3.3 The delivery of Tech Terrace will be undertaken in two phases. Phase 1 will
be part funded by the Development Partner, with support from a grant
provided by Scottish Enterprise (SE). Phase 2 will also be part funded by the
Development Partner together with grant support from the City Deal
Enabling Commercial Space Programme. It is intended that this funding will
also be used to extend the existing DHN to serve both phases, and support
any other infrastructure works which would secure further development of the
site. The Enabling Commercial Space (ECS) grant allocated to the Council
totals £8.5m. While this funding has been agreed in principle by Cabinet, the
release of funds is contingent on agreement of Full Business Cases. Up to
£0.5m of the grant allocation may be drawn down to support development of
FBCs. An indicative allocation of the total grant is outlined in the table below,
subject to Board and GCR approval: 
3.4 The design and operating proposals for Tech Terrace Phase 1 and 2 are
based on the assumption that occupiers will connect to the AMIDS DHN.
Phase 1 is approaching a critical decision point as the development moves
from design into procurement and delivery. Planning permission for Phase
1 of the scheme has recently been secured. The Phase 1 programme
estimates construction will start in October 2026 with practical completion
July 2027. 
Indicative Allocations
ECS grant -
advance
drawdown
ECS grant -
project
spend
Total
£m £m £m
DHN Extension FBC 0.1 0.2 0.3
DHN enabling works 1.5 1.5
DHN construction 1.5 1.5
Tech Terr Ph 2 FBC 0.4 0.4
Tech Terr Ph 2 construction 4.5 4.5
Other AMIDS Infrastructure 0.3 0.3
0.5 8 8.5
Page 88 of 130

Page 89

PUBLIC 
4. Underwrite agreements
Full Business Case Development
4.1 There are two FBCs which require to be developed:
• The extension to the existing DHN to service both Phases of Tech
Terrace (commissioned by the Council and planned for completion in
Spring 2027)
• The development of Tech Terrace Phase 2 design to RIBA stage 3
(including site investigation, design and engineering support which will
be commissioned by the JV and planned for completion in Summer
2027) 
As outlined above, the ECS grant will not be released to the Council until
these FBCs have been prepared and subsequently approved by the City
Region Chief Executive’s Group. These FBCs would also need to be
considered by the Council's Leadership Board. 
4.2 There is a cap (£0.5m as mentioned above) on the amount of grant funding
available for FBC development. It is estimated the costs which may be
incurred in the development of both FBCs could exceed the development
funding amount by up to £0.3m ie it is expected the FBCs may cost up to
£0.8m to develop in total. This total cost will be funded from the grant
assuming both FBCs are approved, however there is some risk that the FBCs
may not be approved. Officers consider this risk to be low given the strategic
importance of the project, the funding allocation already identified for
Renfrewshire, and the robust appraisal process that will be undertaken prior
to approval.
DHN Enabling Works
4.3 The construction programme for Tech Terrace Phase 1 is aligned to the
Scottish Enterprise timescales for grant drawdown. This is progressing
ahead of the FBC timescales for expansion of the DHN. It is therefore
proposed that the Development Partner undertakes the DHN enabling
infrastructure works (ie installing the below-ground pipework) for both phases
of Tech Terrace as part of the Phase 1 construction programme. This
approach will avoid construction programme conflicts and reduce the risk of
additional cost when Phase 2 is under construction. The estimated cost of
these works is the subject of a formal tender process, however an indicative
estimate of £1.5m has been suggested by professional advisers. Should this
enabling infrastructure be installed at a later date, this would result in
additional costs and disruption as newly constructed roads, landscaping and
utility infrastructure would require excavation, diversion and reinstatement.  
Page 89 of 130

Page 90

PUBLIC
4.4 The proposed approach would also mitigate the scenario whereby, should
the DHN network not be extended in line with the Phase 1 construction
schedule, then an alternative interim heating solution would require to be
developed – potentially air source heat pumps. In that scenario, the buildings
may then be unlikely to connect to the DHN in the foreseeable future, if at
all.
4.5 It is proposed that the Council enter into underwrite agreements in relation
to the FBC development costs and the DHN enabling infrastructure works.
The potential total underwrite value is £1.8 million, consisting of up to £1.5
million estimated cost for the DHN enabling infrastructure and up to £0.3
million for the costs for developing the Phase 2 design to enable the FBC
production. 
Implications of the Report
1. Financial - The report outlines the proposal for the Council to underwrite up
to £1.8m to enable the Development Partner to progress with Tech Terrace
Phase 2 and the DHN extension. There is a financial risk for the Council in
the event the FBCs are not approved, however Officers consider this risk to
be low given the strategic importance of the project, the funding allocation
already identified for Renfrewshire, and the robust appraisal process that will
be undertaken prior to approval. There is a further risk should the DHN
extension not proceed as planned, as the spend on the enabling
infrastructure may ultimately not result in an operational asset. In this case,
the spend incurred would unlikely be eligible for grant support, resulting in
the Council requiring to fund the spend via revenue resource. In this scenario
a funding source would require to be identified and agreed by elected
members. 
2. HR & Organisational Development - None arising directly from this
report. 
3. Community/Council Planning – 
• Reshaping our place, our economy and our future - The Tech
Terrace development represents a key component of the AMIDS
vision, providing high-quality commercial accommodation for
advanced manufacturing businesses, supporting business growth,
innovation and job creation within Renfrewshire and the wider
Glasgow City Region.
Page 90 of 130

Page 91

PUBLIC 
4. Legal – Council officers will secure appropriate legal advice in relation to
the proposed underwrite agreements 
5. Property/Assets – Improvement to Council AMIDS DHN and potential
enhancement in value of developability of land owned by the Council. 
6. Information Technology - None arising directly from this report.
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the recommendations
contained in the report.
8. Health & Safety - None arising directly from this report.
9. Procurement – Any procurement activity required to be undertaken by the
Council will be conducted in accordance with the Council’s Standing Orders
relating to Contracts, the GCR Sustainable Procurement Strategy and Public
Procurement Regulations.
10. Risk - as set out in report. Project specific risks will be kept under regular
review and reported to the Council’s internal Major Infrastructure Board.
11. Privacy Impact - None arising directly from this report.
12. Climate Risk – Improving the AMIDS DHN contributes to the sustainability
and net-zero strategy, aiming to:
• Reduce carbon emissions compared with traditional building heating systems.
• Provide a secure and efficient shared energy solution for occupiers.
• Support the long-term development of AMIDS by creating a scalable energy
network that can connect future phases and buildings.
• Improve the attractiveness of the site to advanced manufacturing, innovation
and technology businesses seeking low-carbon premises. 
13. Children’s Rights – None arising directly from this report.
14. Cosla Policy Position – None arising directly from this report. 
Author: Alastair MacArthur, Director
Page 91 of 130

Page 92

Page 92 of 130

Page 93

PUBLIC 
___________________________________________________________________
To: Leadership Board
On: 16 September 2026
___________________________________________________________________
Report by: Chief Officer, Renfrewshire Health and Social Care Partnership
___________________________________________________________________
Heading: Adult Social Care: 2025/26 Annual Update
___________________________________________________________________
1. Summary 
1.1 Adult Social Work Services were delegated to Renfrewshire Integration Joint
Board (IJB) on 1 April 2016. These services are managed through the Health
and Social Care Partnership (HSCP). 
1.2 This annual update report to Leadership Board, together with Renfrewshire’s
Integration Joint Board Annual Performance Report 2025/26 provides an
overview of adult social care activity and performance. 
___________________________________________________________________ 
2. Recommendations
2.1  It is recommended that members:
• Note the contents of this report updating activity and performance of adult
social work services delegated to the IJB; and
• Note that the next six-monthly update report will be presented to the
Leadership Board in February 2027.
_________________________________________________________
3. Background 
3.1  The list of functions that must be delegated by the Local Authority to the IJB is
set out in the Public Bodies (Joint Working) (Prescribed Local Authority
Functions, etc) (Scotland) Regulations 2014, and is noted in Annex 2, part 1 of
Renfrewshire’s Integration Scheme. These include:
• Social work services for adults and older people.
• Services and support for adults with physical disabilities and learning
disabilities.
• Mental health services.
Item 8
Page 93 of 130

Page 94

PUBLIC
• Drug and alcohol services.
• Adult protection and domestic abuse.
• Carers’ support services.
• Community care assessment teams.
• Support services.
• Care home services.
• Adult placement services.
• Health improvement services.
• Aspects of housing support.
• Day services.
• Respite provision.
• Occupational therapy services.
• Reablement services, equipment, and telecare. 
3.2 Whilst regular reporting in relation to these services is provided to the
Integration Joint Board (IJB), 6 monthly updates are also provided to the
Leadership Board.  This ensures oversight of the key activities and wider
context relating to the delivery of these services. 
4. Renfrewshire IJB’s Annual Performance Report   
4.1 Renfrewshire IJB’s Annual Performance Report 2025-26 provides a
comprehensive reflection on the HSCP’s performance against local and
national performance indicators. A summary of the 2025/26 year-end status of
the IJB’s full 53 performance indicators is provided in the table below and is
compared with 2024/25 performance. 
Status 2023/24 2024/25 2025/26  % Change from
2024/25
Red 9 (32%) 4 (14%) 5 (16%)  +2%
Amber 6 (21%) 8 (28%) 5 (16%) -8%
Green 13 (46%) 17 (59%) 21 (68%) +9%
Info only 20 21 22 -
Total 48 50 53 - 
4.2 This year’s Annual Performance Report reflects the HSCP’s strong overall
performance and continued growth against a number of key performance
indicators, despite the challenging operating context. Overall, there has
been an improvement in performance in 2025/26 compared with 2024/25
with a 9% increase in green status indicators. In addition to two indicators
improving status from amber to green, 16 of the 21 green indicators
maintained their status at year-end 2025/26 from 2024/25, 12 of these also
reporting improvement in performance compared to 2024/25. 
4.3 Despite the challenging operating environment, the HSCP has sustained
positive performance. A summary of some key achievements includes: 
• Renfrewshire maintained its position as the highest performing HSCP in
Scotland for Standard Delayed Discharge for the fourth year running, and
second position for code 9 delayed discharges, up from 9th position. 
Page 94 of 130

Page 95

PUBLIC
• The HSCP held its first Staff Health and Wellbeing Event in October 2025.
Over 140 staff attended a full programme of wellbeing support including in-
person and online sessions on ADHD, menopause, and peer support. 
• The Home First Response Team assessed 1,019 patients living with frailty
who presented at the Royal Alexandra Hospital compared with 988 in
2024/25. 59.8% were discharged home or to a homely setting compared
with 54% in 2024/25, while 42.7% were followed up by community
colleagues.
• The HSCP Independent Living Team (HILT) collaborated with
Renfrewshire Carers Centre and Engage Renfrewshire to help support
people accessing Self-Directed Support (SDS). A successful networking
event was held in October 2025, helping build positive relationships with
supported people, unpaid carers, HILT, and local providers.
• Of 131 care home residents at risk during Apr 2025-March 2026, the Care
Home Call Before You Convey Pathway avoided 96.3% of hospital
admissions with only 3.7% admitted, which equates to 5 residents.
• The Hospital at Home Team enabled 149 patients to receive acute hospital
level care at home since the service began in May 2025, with excellent
patient feedback. This has saved a total of 975 bed days in hospital
settings.
• There was 14% increase in new adult carers supported by Renfrewshire
Carers Centre, 1,089 compared with 958 in 2024/25. In addition, 630
adult support plans were completed for carers by the HSCP and
Renfrewshire Carers Centre, above the target of 497.
• A Community Officer within Engage was funded to deliver prevention
activity on tobacco, youth vaping, and second-hand smoke prevention.
Activity included 10 vaping awareness sessions to 13 organisations, 101
staff and volunteers trained, and outreach Quit Your Way and recovery
services. 
5. Adult Social Work Performance Overview 
5.1 Adult Social Work Services are managed and monitored via regular internal
HSCP professional governance and operational management arrangements,
including meetings, case management, and regular service and case reviews.
These meetings involve Heads of Service and Service Managers and cover a
variety of local and national strategic and operational indicators. They allow
managers to scrutinise and discuss performance data, agree remedial action,
timescales for improvement, and consider future challenges which may affect
services, to allow planned actions and mitigation where appropriate. 
5.2 In addition to internal scrutiny, performance is reported at all IJB meetings, with
the Performance Scorecard presented twice-yearly providing a detailed picture
of what is working well, current challenges and intended remedial action where
necessary. The Scorecard includes adult social care indicators alongside a
variety of local and national health service indicators. 
Page 95 of 130

Page 96

PUBLIC
5.3 There are 17 adult social care indicators, details of the performance are
provided in Appendix 1, however a summary is included in the tables below. 
Performance Indicator Status No. 
Green - Target achieved 1 
Amber - Warning (less than 10% variance of target) 0 
Red - Alert (more than 10% variance of target) 2 
Data only (no target) 14 
5.3.1 Adult Social Care Indicators with targets 
This section will provide an overview of improvement work taken forward
on the 3 adult social care indicators with targets, highlighting our focus on
continued improvement. 
Status Direction
of Travel Performance Indicator 23/24
Value 
24/25
Value 
25/26
Value Target  
Number of adult support plans completed
for carers (age 18+) by HSCP and
Renfrewshire Carers Centre
568 694 630 497
This is a new indicator for 2025-26 and combines indicators for both the HSCP and Renfrewshire
Carers centre to allow for more reliability in data collection and a better understanding of the
outcome. The positive result of having 630 adult support plans completed (26.7% above the
target), shows continued efforts to provide support for our carers in Renfrewshire. There is
however a continuing emphasis from the Renfrewshire Carers Centre and HSCP Social Work
teams to ensure that support plans can be put in place for all carers that require them to achieve
the supported person’s outcomes. 
There is update on the refresh of the Adult Carers Strategy later in this paper.    
Sickness absence rate for HSCP
Renfrewshire Council staff (workdays lost
per FTE)
19.51 22.05 20.33 15.3 
Despite being in red status and above the target for 2025/26 there was improvement in the
absence rate in comparison to 2024/25, reducing from 22.05 workdays lost to 20.33 workdays
lost.
Action Taken: Work continues across the Partnership to address sickness absence, with
performance monitored and discussed regularly at the Senior Management Team Workforce
Business Meeting. Heads of Service maintain ongoing discussions with their direct reports
regarding sickness absence, enabling underlying causes to be understood and ensuring
appropriate support, guidance, and action planning are put in place, including agreed
improvement targets where required.
In addition, work commenced towards the end of 2025/26 to refresh and extend the Workforce
Plan for a further year with a set of focused objectives and actions included.  This will also enable
the extended Plan to align with the final year of the IJB’s refreshed Strategic Plan 2025-27.
A longer-term plan will be developed for implementation onwards to align with the IJB’s next
Strategic Plan which will be a 10-year plan implemented from September 2027. 
A Short Life Working Group has been established, chaired by the HSCP Chief Officer, to
strengthen oversight and drive improvement. The remit of the group is to: 
o Undertake a data-informed deep dive into the factors impacting absence
o Identify priority areas for improvement
o Set clear goals and closely monitor progress; and 
o Oversee and coordinate improvement activity aimed at reducing absence across the HSCP. 
Page 96 of 130

Page 97

PUBLIC
Status Direction
of Travel Performance Indicator 23/24
Value 
24/25
Value 
25/26
Value Target  
% of HSCP Renfrewshire Council staff
completed mandatory training courses - 74.3
%
89.83
% 100%
This is a new indicator added to the suite of performance indicators for 2025/26 and aligns with
the training indicators for NHS staff. However, the 100% target set by the Council is exceptionally
challenging, in comparison to an 80% target for training set by NHSGGC. Performance in terms
of compliance has increased from 74.30% in 2024/25 to 89.83% in 2025/26, and work continues
to monitor this going forward. 
Action Taken: Regular compliance reporting has increased to monthly reports to ensure all areas
are working towards a higher compliance rate. 
5.3.2  Adult Social Care Data Only Indicators 
There are 14 Adult Social Care performance indicators which do not have
targets assigned. For some of these indicators it is not appropriate to prescribe
a target due to the nature of the measure, such as the Percentage of Children
who have previously been on the Child Protection Register in the last two
years. For others the development of robust targets can only be achieved
through trend analysis over a minimum period of three years, and they have
only been included for the past two years. It is however possible to note some
notable key changes in performance in 2025/26:
- Balance of Care: Total number of hours provided for clients receiving
personal care & Number of open community placements for 65+: Both
of these indicators saw an increase in total hours and number of open
community placements in 2025/26 from 2024/25. This is expected and
consistent with our policy of caring for people at home. People are living
longer with significantly higher levels of disability, and this trend is likely to
continue with people seeking to exercise choice and control over the care
they receive. 
- Total Mental Health Officer service activity: This indicator highlights the
activity, by count of statutory tasks, for the specialised registered social
worker who safeguards the rights and well-being of individuals experiencing
mental disorders. The increase from 1,458 to 1,608 is an indication of
increased demand on the mental health officer services in Renfrewshire.
- Number of Adult Support and Protection referrals: There was an
increase in the number of referrals from 1,522 in 2024/25 to 2,040 in
2025/26. This is mainly due to an increase in referrals from Care Homes, the
Third Sector, Scottish Fire and Rescue Service, Scottish Ambulance
Service, and NHS Primary Care Service. The significant increase from care
homes is a result of cautious reporting in specific care homes; there are now
supports in place to address these cases which are not being viewed as
appropriate referrals, which included providing additional training. The
reasons for the increases from other services are still being explored and
the Renfrewshire Adult Protection Committee has restored a Data Subgroup
to support multi-agency analyses of ASP data and to provide increase
understanding of key findings, trends, and risks. Referrals will continue to be
monitored throughout this year. 
Page 97 of 130

Page 98

PUBLIC
6. Key Activities
6.1 A summary of the key activities undertaken during the last six months relating
to the delegated services is detailed in the section below.   
Strategic Plan Refresh 
6.2 During 2025/26, the IJB agreed the need for service reform in line with the
direction set out by the Scottish Government, namely through three 10-year
interconnected frameworks: Public Service Reform Strategy, Population Health
Framework and Health and Social Care Service Renewal Framework. The
scale of ambition set out nationally requires a significant shift beyond safe,
incremental steps, to embrace a bolder culture of reform. Locally, this has been
reflected through the establishment of a Foundations of Transformation
Programme, which will inform the development of a new Strategic Plan and set
out how Renfrewshire will scale up collaboration with staff, communities, and
partners to deliver whole system change at the pace required over the next
decade and beyond. 
6.3 In this context, the development of a 10-year Strategic Plan has been
approved. This longer-term approach will enable the IJB to incorporate national
ambitions while creating a clear set of transformational priorities which are
relevant to the local needs of Renfrewshire. However, achieving these
ambitions will require an ongoing focus on monitoring, measurement, and
review. The strategic priorities must remain relevant to changing local
demographic needs, emerging demand, and the wider operating context. This
includes ensuring that delivery remains aligned to both long-term ambitions and
the immediate realities of service provision, including financial constraints and
fluctuations in demand. 
6.4 To support this, it is proposed that three key supporting documents are
developed and maintained to support delivery of the 10-year Strategic Plan.
Together, these elements will create a framework that supports the delivery of
the IJB’s ambitions while ensuring it remains in touch with the evolving needs of
Renfrewshire’s population. 
• Joint Strategic Needs Assessment (JSNA): To be refreshed every three-
years (or more frequently in response to exceptional circumstances). This
will provide a comprehensive assessment of the current and future needs
of Renfrewshire’s population. It will bring together data and information
from the local authority, NHS, public health teams and our social care
services. 
• Strategic Delivery Plan: A three-year delivery plan will outline the short-
term priorities required to progress the longer-term ambitions of the
Strategic Plan. It will take account of current operational challenges,
including financial pressures, workforce capacity, and any unscheduled
shifts in demand. This will enable Officers to prioritise resources and make
adjustments in line with demand.
• Performance Scorecard: The annual performance scorecard will measure
progress against agreed targets and outcomes. This will be refreshed in-
line with the three-year cycle of the JSNA and will be representative of the
new Strategic Plan.
Page 98 of 130

Page 99

PUBLIC
6.5 The HSCP is seeking to align the development of the Strategic Plan with
Renfrewshire’s new Community Plan and the next Council Plan. As these Plans
are not due to be in place until September 2027, the IJB has agreed that the
development of the new Strategic Plan will align with these timescales. 
6.6 In aligning the HSCP’s approach with the wider plans and timescales, officers
have begun to work in partnership with the Council and other community
planning partners to undertake early community engagement together and
collaboratively develop the Joint Strategic Needs Assessment. Further details
regarding the ‘Your Voice Matters’, engagement campaign is provided in
sections 6.27 and 6.28 below.  
Foundations of Transformation Programme
6.7 As stated previously, the Foundations of Transformation Programme will inform
the development of a new Strategic Plan. Initial planning is based around the
following six work strands which are largely based on the national principles of
reform: 
• Strategic Building Blocks. 
• Evidence-base and Intelligence. 
• Community: Proactive community-based interventions. 
▪ Prevention across the continuum of care Community: Proactive community-
based interventions. 
• People and Population: Care designed around people and places. 
• Digital: Better access and accessibility.
6.8 Alongside these work strands, the Programme will also develop a number of
key supporting strategies and plans to enable the delivery of the Strategic Plan,
namely: 
• Participation, Communication and Engagement Strategy. 
• Strategic Workforce Plan. 
• Developing our leaders and building the right organisational culture.
6.9 A Transformation Officers Group, chaired by the Head of Strategic Planning
and Health Improvement, has been implemented to oversee the delivery of this
Programme.
6.10 There remains a strong commitment across the HSCP to delivering high-quality
services, fostering innovation and building on the positive culture, relationships
and outcomes already evident across local services.
Sustainable Futures Programme
6.11 During the reporting period, the HSCP developed a series of service redesign
proposals for consideration by the IJB, with the aim of delivering savings whilst
minimising risk to people’s outcomes and service performance. Nine proposals
with supporting detailed Integrated Impact Assessments (IIAs) were submitted
to the IJB for decision-making in September 2025, of which one was approved
for the redesign of the District Nursing and Care at Home Out of Hours model. 
No decision was reached on eight further proposals:
Page 99 of 130

Page 100

PUBLIC
• The redesign of Older Adults Day Services. 
• Redesign of Learning Disability and Physical Disability Services with the
development of integrated community hubs
• Review of the Learning Disability Respite model.
• Closure of Flexicare.
• Redesign of Childsmile.
• Health Visiting – reduction of vacant posts.
• Removal of the Assertive Outreach model.
• Closure of Autism Connections.
6.12 During Spring 2026, these proposals were reviewed, with supporting Integrated
Impact Assessments updated to reflect recent service data, additional policies
and strategies, and any relevant developments since September 2025. 
Changes were made to the proposal for Older Adults Day Services to allow for
greater flexibility in session timings and further embed digital provision within
the service model.  Significant changes were made to the redesign of
Childsmile to enable a more targeted model of support to be implemented.
6.13 These proposals and IIAs were subsequently submitted to the IJB in June
2026.  Added to each of the proposals was a position statement which was
provided by the HSCP Senior Management Team. These were supplemented
by a cumulative Integrated Impact Assessment. 
6.14 Due to emerging discussions in relation to Childsmile with the Scottish
Government, this was removed from consideration however the remaining
seven proposals were agreed.   Work to support implementation of these
agreed changes is now underway.
6.15 More widely, a proportion of savings previously agreed by the IJB to be
delivered in 2025/26 were re-phased into 2026/27, resulting in a final savings
target of £7.37m for 2025/26. At the end of the financial year, £8.10m of
savings were delivered by the HSCP. This is 110% of the revised savings target
and includes over-delivery against several savings initiatives, representing
continued strong progress.
6.16 Regular reporting to the IJB continues to reflect that the financial position
remains extremely challenging. Should the IJB be unable to set a balanced
budget in future, and/or there are insufficient reserves available to bridge the
forecast funding gap, it will need to enter a period of Financial Recovery. This
will entail a series of restrictive cost saving and cost containment measures, in
order to ensure that the IJB incurs no new commitments or expenditure without
an agreed and available budget, whilst continuing to meet and manage existing
contractual and statutory liabilities. 
6.17 A detailed Integrated Impact Assessment setting out the potential impact of
Financial Recovery has been developed and was considered by the IJB at its
meeting in June 2026. 
Page 100 of 130

Page 101

PUBLIC
Winter Pressures
6.18 As previously reported to Leadership Board, each year, Renfrewshire HSCP
develops plans to ensure the resilience of critical services over the winter
period. The planning process for winter 2025/26 was undertaken across all
HSCP internal and hosted services. 
6.19 The HSCP will submit its winter plan for 2026/27 to the IJB in November 2026.
The key priorities for this year’s plan are currently being reviewed alongside
consideration of the winter planning conducted by Renfrewshire Council and
NHSGGC. However, it is anticipated that the HSCP’s winter plan will broadly
continue to focus on understanding and preparing our response to the risks
associated with the following scenarios: 
• Disruptive weather and the ability for staff to get to work.
• Staffing cover, resilience and maintaining health and wellbeing.
• The impact of disruptive weather or other events on the HSCP’s supply chain.
• The impact of weather or other events on the ability to provide services and/or
carry out community visits.
• The loss of use of a building or space.
• Disruption to infrastructure e.g. a loss of power, systems and/or data. 
6.20 The Winter Plan will ensure that staffing levels are maintained over the winter
period to support timely access to services, whilst maintaining an ongoing focus
on the wellbeing of staff and unpaid carers. Proactive plans and monitoring will
be in place to identify emerging issues and support services to respond to sever
weather scenarios. 
6.21 The HSCP continues to engage with partners through existing resilience
arrangements regionally and locally. As part of these arrangements, HSCP
officers contribute to the development and review of the IJB’s partner
organisations’ respective Winter Plans. These plans also inform local planning
activity undertaken by the partnership. 
6.22 For Winter 2025/26, NHSGGC adopted a streamlined approach to developing
its Winter Plan reflecting on the good practice, successes and learning from the
whole system approach adopted in previous two years. This Winter Plan has
been created in a more accessible format which clearly outlines the actions to
be taken over coming months and was shared with HSCPs to ensure relevant
actions were captured.
6.23 The HSCP also continues to work closely with colleagues within Renfrewshire
Council, with a focus on communications as part of the ‘Ready for Winter’
programme and in support of the fourth year of the Winter Connections
programme. Following the process undertaken in previous years, the HSCP
presented an update on winter planning preparations, alongside Civil
Contingencies Service colleagues, to the Council’s Corporate Management
Team (CMT). 
IJB Adult Carers Strategy 2026-27 
6.24 Supporting unpaid carers is a priority for the HSCP and we recognise that the
Page 101 of 130

Page 102

PUBLIC
care they provide is vital to the people they care for and the sustainability of
HSCP services. In June 2025, IJB approved recommendations to review and
refresh its existing Adult Carers Strategy 2022 -2025. During 2025/26, the
HSCP, working with carers, the Carers Centre and partners, developed a draft
strategy which acknowledges the growing demands and personal impact of
caring. It aims to uphold carers’ rights, respond to their needs, and support
them to continue in their caring role - if they choose to do so. Developed in
partnership with carers and the organisations that support them, the draft
strategy reflects lived experiences and prioritises meaningful, actionable
change. 
6.25 In preparing a local carers strategy, the Carers Act requires the IJB to “consult
such persons and bodies representative of carers as they consider appropriate,
and…to involve relevant carers.” The following activities have been undertaken
to achieve a streamlined but meaningful consultation process: 
• Published the consultation draft on the HSCP website / consultation site.
• Developed alternative versions including paper copies, summary, easy read
and consider a child-friendly approach. 
• Promoted the consultation via a range of existing communication channels,
including HSCP staff channels, media release (local / national), and social
media (supported by Council and NHS sites).
• Encouraged partner organisations (through the Strategic Planning Group)
to promote the consultation through their own communication channels.
• Utilised existing forums and governance structures, where they exist, to
engage with all other prescribed consultees. Where related forums don’t
have meetings scheduled during the period of the consultation, the HSCP
will strive to engage in the most effective way for stakeholders.
• Issued targeted communications to other consultees inviting them to share
their feedback on the consultation. 
6.26 The consultation period has now concluded, and the refreshed strategy will be
presented to the IJB in September 2026 for approval. 
Your Voice Matters
6.27 In partnership with Renfrewshire Council and wider community planning
partners, the HSCP devised a public engagement programme is open to people
across Renfrewshire. “Your Voice Matters” aims to inform a range of emerging
strategies, including the IJB’s Strategic Plan, the Council Plan, Community Plan
and Children’s Partnership Plan, ensuring alignment with community needs and
priorities. 
6.28 This collaborative approach provides an opportunity to engage early with
communities on a range of topics and is designed to help identify what matters
most to people across Renfrewshire, encourage civic participation in decision-
making, improve service efficiency, and build stronger, more cohesive
communities. The programme features three phases of engagement: 
1. The first phase is designed to raise awareness of the programme and to
invite participants to share their opinion, based upon three key questions.
This phase is now well underway.
Page 102 of 130

Page 103

PUBLIC
2. Phase two will involve a range of more targeted engagement activities,
including community workshops, partner-led listening sessions and
conversations with other representative groups. 
3. Phase three will involve deeper listening, to gain additional insight from
targeted groups and existing service networks. 
The overarching aim of this approach is to ensure that the future direction of the
wider council family is informed by listening to what matters most to people in
our communities, and that this insight is clearly reflected in strategic priorities
and service delivery. This will also support the best use of available resources,
promote alignment around shared priorities, and create opportunities for a more
coordinated whole-system approach across partners.
Inspection Findings
6.29 The HSCP provides services subject to a rolling programme of independent
inspection from the Care Inspectorate. Inspection assures us that services are
working well and highlights areas for improvement Inspectors examine the
overall quality of care and support, the staffing, the management and
leadership, and the environment in which the care is provided 
6.30 The HSCP is subject to both unannounced and anticipated inspections carried
out at HSCP operated services, using the ‘Six Point Quality Scale’ where 1 is
unsatisfactory and 6 is excellent. Inspectors look at a selection of the quality
indicators depending on the type of inspection, the quality of the service, the
intelligence they hold about the service, and any risk factors they may identify
6.31 An unannounced inspection of the Care at Home Service took place between 8-
12 December 2025. The table below details the grades received from the Care
Inspectorate. 
How well do we support people's wellbeing?  5 – Very good
People's health and wellbeing benefits from their care and support 5 – Very good
How good is our staff team?  4 - Good
Staffing arrangements are right and staff work well together 4 - Good
6.32 The key messages from this inspection include:
• People were treated with dignity and respect. 
• Staff felt well-supported and trained. 
• Teamwork strengths and collaboration had led to improvements in the
service.
• Digital systems improved care delivery
• People were kept safe by improvements to risk management.
• Personal support plans were clear and person-centred. 
• Staff shortages affected continuity of support for some people living in
extra care housing and those who received overnight support. 
Page 103 of 130

Page 104

PUBLIC
• Improvement is needed to ensure people receiving care at home know
who will be providing their planned support.
6.33 The Weavers Linn Respite Unit, is a residential short-break service for adults
with learning disabilities and autism, received an unannounced visit on 24-26
June 2025. The table below details the grades received from the Care
Inspectorate. 
How well do we support people's wellbeing?  5 – Very good
People's health and wellbeing benefits from their care and support 5 – Very good
How good is our staff team?  4 - Good
Staffing arrangements are right and staff work well together 4 - Good
How good is our setting? 4 - Good
People experience high quality facilities 4 - Good
6.34 The key messages from this inspection include: 
• We followed up on four previous areas for improvement which were met. 
• People looked forward to their stay and regarded it as 'a wee holiday'.
• Care and support observed was person-centred and people told us staff
were wonderful.
• Staff were supported well with training and supervision aiding staff
development.
• Relatives advised that communication was very good with staff which
gave them assurance.
• Visiting professionals praised staff for their commitment and
professionalism.
• Managers had worked hard to improve communication to ensure people
experienced a stay which met their outcomes.
• Some environmental improvements were needed to continue to offer
people high quality, safe facilities.
6.35 Hunterhill Care Home is registered to provide support to 60 older people,
some of whom have cognitive impairments and/or dementia, and received an
unannounced visit on 14, 15 and 19 May 2025 and a follow-up visit on 14
August 2025. The table below details the grades received from the Care
Inspectorate.
How well do we support people's wellbeing?  4 – Good
People's health and wellbeing benefits from their care and support 4 – Good
How good is our leadership? 3 - Adequate
Quality assurance and improvement is led well 3 - Adequate
How good is our staff team?  4 - Good
Staffing arrangements are right and staff work well together 4 - Good
Page 104 of 130

Page 105

PUBLIC
How good is our setting? 4 - Good
People experience high quality facilities 4 - Good
6.36 The key messages from this inspection include: 
• We followed up on a requirement made at the last inspection; this has not
been met. We have agreed to extend the timescale for this. (This is in
relation to quality assurance)
• We followed up on three areas for improvement made at the last
inspection, one has been met and two were not met. (Two unmet areas for
improvement were: fluid/hydration charts; and senior staff confidence in
using the dependency tool to evidence decisions about staff deployment). 
• The introduction of hydration and snack stations promoted independence
and choice.
• The expansion of meal options has enhanced people's dietary variety.
• Quality assurance audits were taking place and well-intentioned, but
limited by inconsistent follow up and consistency of use
6.37 The HSCP strives to continuously improve services, and work is already
underway to meet any requirements and areas for improvement identified
during these inspections.  
7.  National Policy Context
Extension of Integration Joint Board Voting Rights
7.1  Members will be aware that Integration Joint Boards (IJBs) are responsible for
the strategic planning, commissioning and oversight of community health and
social care services. IJB membership includes representatives from the third
sector, unpaid carers and service users, collectively referred to as “lived
experience representatives.”
7.2  As lived experience representatives did not previously hold voting rights, the
Independent Review of Adult Social Care recommended that voting rights be
extended to all public partners. Consequently, amendments to the Public
Bodies (Joint Working) (Scotland) Act 2014 provide third sector, unpaid carer
and service user representative members with voting rights from 1 September
2026.
7.3  The Scottish Government established a national working group to consider the
practical implementation of these changes, including arrangements for
recruitment, governance, codes of conduct, and training and development. At
the time of writing, the Scottish Government’s guidance has not yet been
published; however, it is anticipated that this will be available by late August
2026.
7.4 In preparation for the introduction of voting rights for lived experience
representatives, the HSCP has been working closely with colleagues in the
Council’s Legal Services. This engagement will continue as amendments to the
Standing Orders and the Integration Scheme will be required to reflect the
legislative changes.
Page 105 of 130

Page 106

PUBLIC
Preventing Harm, Promoting Recovery: Scotland's Alcohol & Drugs Strategic
Plan 2026-2035
7.5 On 10 March 2026, the Scottish Government and COSLA published Preventing
Harm, Promoting Recovery: Scotland's Alcohol & Drugs Strategic Plan 2026-
2035, a 10-year strategy that sets out Scotland's long-term approach to
reducing alcohol and drug-related harm. The plan builds on previous national
frameworks and supports wider public health priorities, including the Population
Health Framework and Service Renewal Framework.
7.6 In response, Renfrewshire Alcohol and Drug Partnership (ADP) is refreshing its
local alcohol and drugs strategy to align with the national plan, Partnership
Delivery Framework and National Specification. This will ensure that local
priorities, outcomes, and commissioning arrangements support national
ambitions.
7.7 Renfrewshire has a strong partnership governance structure in place to provide
oversight, accountability and performance management across prevention,
treatment, recovery, and system improvement. This framework will support the
implementation of national priorities and monitor progress, risks, quality, equity,
and outcomes.
7.8 To deliver the strategy locally, the ADP will develop a delivery plan outlining
specific actions, milestones, responsibilities, and success measures. The plan
will be reviewed regularly to respond to emerging needs, insights from people
with lived and living experience, and policy developments. Both the refreshed
strategy and delivery plan will be presented alongside the ADP Annual
Reporting Survey at a future meeting.
National Care Service Charter of Rights
7.9 On 25 March 2026, the Scottish Government published the National Care
Service Charter of Rights, with further updates made in April and May 2026.
The Charter sets out information on people’s existing rights and what they
should expect when accessing, or waiting to access, social care, social work,
and community health support. It does not create new rights or alter existing
rights, but brings together information to support people, carers, families, and
representatives to understand what they can expect from support and what they
can do if they feel their rights are not being met. 
7.10 The Charter is relevant to the HSCP’s ongoing work to strengthen rights based,
person-centred and accessible support, including Self-Directed Support, public-
facing service standards, participation and engagement, and local policy
development. Key themes include clear and accessible information,
involvement in decisions, choice and control, dignity, safety, and routes for
feedback and complaints. 
7.11 The Charter will be considered as part of relevant local guidance, policy, and
improvement work to support consistent practice and clearer information for
people accessing support in Renfrewshire.
Page 106 of 130

Page 107

PUBLIC
Delayed Discharge 
7.12 Reducing delays in discharge is a national priority. With a revised remit aligning
to the Operational Improvement Plan from September 2025, the fortnightly
Collaborative Response and Assurance Group continues to meet, chaired by
the Cabinet Secretary and with attendance from all Chief Officers, Scottish
Government, Care Inspectorate and COSLA. All HSCPs are categorised as
Low, Moderate or Major based on performance improvement required. 
7.13 Renfrewshire is the best performing HSCP in Scotland for standard delays for a
fourth consecutive year, with a rate of 1,148.7 per 100,000 population for
Standard Delays (across all HSCPs in Scotland). This equates to a 34.5%
reduction in total bed days lost to delayed discharge – 3,805 bed days – and is
82.7% lower than the national average – 22,036.
8. Next Steps 
8.1  The next performance report on delegated Adult Social Care functions will be
reported to the Leadership Board in February 2027. 
___________________________________________________________________
Implications of the Report
1. Financial – Although there are no direct costs associated with this report, the
IJB is operating in an increasingly challenging environment with increases in
both the level of demand and service delivery costs. The Sustainable Futures
Programme has been established and will aim to deliver best value by
modernising services as well as identifying savings to reduce the financial gap
in a sustainable way and where feasible with the least possible impact.
2. HR & Organisational Development – The Sustainable Futures Programme is
currently underway and could potentially have an impact following its
conclusion. 
3. Community/Council Planning – none
4. Legal – none.
5. Property/Assets – none 
6. Information Technology – none 
7. Equality & Human Rights - The recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights.
No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report because it is for noting only. If
required following implementation, the actual impact of the recommendations
and the mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website. 
8. Health & Safety – none 
Page 107 of 130

Page 108

PUBLIC
9. Procurement – none
10. Risk – none 
11. Privacy Impact – none
12. Cosla Policy Position – none.
13. Children’s Rights – Although this report has a key focus on the delegated
functions of adult social care, the HSCP is committed to complying with
UNCRC and this is reflected in our activity.
14. Climate Risk – The HSCP is committed to tackling the climate emergency and
actively participates in Renfrewshire’s Plan for Net Zero. 
_________________________________________________________
List of Background Papers 
Adult Social Care: 6 Monthly Update, Leadership Board, February 2026
___________________________________________________________________ 
Author:       
Yvonne Farquhar, Policy Manager, Chief Executive’s Service
Yvonne.farquhar@renfrewshire.gov.uk
Page 108 of 130

Page 109

PUBLIC
Appendix 1
Performance Indicators
The 17 adult social care services’ indicators in the updated scorecard are as follows: 
Performance Indicator Status No.  Direction of Travel 
Green - Target achieved 1  Improvement 
Amber - Warning (less than 10% variance of target) 0  Deterioration 
Red - Alert (more than 10% variance of target) 2  Same as previous reporting period 
Data only 14 
Status Direction
of Travel Performance Indicator 23/24
Value 
24/25
Value 
25/26
Value Target  
Sickness absence rate for HSCP Renfrewshire Council staff
(workdays lost per FTE) 19.51 22.05 20.33 15.3 
% of HSCP Renfrewshire Council staff completed mandatory
training courses - 74.3% 89.83% 100%  
Number of adult support plans completed for carers (age
18+) by HSCP and Renfrewshire Carers Centre 568 694 630 497 
Data Only Indicators 
Performance Indicator 23/24
Value
2024/25
Value
2025/26
Value
Direction of
Travel
Total Mental Health Officer service activity (count of activity) 1,499 1,458 1,608 
Number of Chief Social Worker Guardianships (as at position) 124 157 140 
Number of Private Guardianship Applications 126 143 158 
Page 109 of 130

Page 110

PUBLIC
Performance Indicator 23/24
Value
2024/25
Value
2025/26
Value
Direction of
Travel
Balance of Care: Total number of hours provided for clients receiving personal
care * 18,521 19,229 21,158 
Balance of Care: Total number of hours provided for clients receiving non-personal
care * 375.5 351.25 504.00 
Balance of Care: Number of open community placements for 65+ (Care at Home
vs residential) * 1,786 (64%) 2,217 (60%) 2,937 (65%) 
Balance of Care: Number of open residential placements for 65+ (Care at Home vs
residential) * 1,006 (36%) 1,469 (40%) 1,554 (35%) 
Population of clients receiving Telecare (75+) - Rate per 1,000 **   32.8 
Population of clients receiving Telecare (all ages) Rate per 1,000 **    4.1 
Number of people accessing Community Alarms (all ages) **   3,807 
Number of people accessing Community Alarms (75+) **   2,757 
Percentage of Adult Support and Protection referrals where investigatory powers
are used 43% 53% 53% 
Percentage of Children registered in this period who have previously been on the
Child Protection Register in the last two years 8.0% 16.0% 10.9% 
Number of Adult Support and Protection referrals 
(please see table below for source) 1,527 1,522 2,040 
*Balance of care previously reported as two indicators and now separated into four
**No direct comparison with previous years as the method of collation has been revised 
Page 110 of 130

Page 111

PUBLIC
Number of Adult Support and Protection (ASP) referrals
ASP Referrals Source 23/24 2024/25 2025/26 
Care Inspectorate 32 16 5 
Office of the Public Guardian 6 4 6 
Police Scotland 294 315 485 
NHS 24 24 20 20 
NHS Primary Care 44 46 66 
NHS Acute Services 72 76 74 
NHS Specialist Drug and Alcohol Services 2 1 0 
Community Health Services 11 29 38 
Mental Health Services – Hospital and Community 49 53 20 
Other Health (Public, Private and Prison) 5 2 0 
Social Work Adults (inc Mental Health Officers) 143 142 181 
Social Work Children and Families 12 8 4 
Out of region social work / other (external) local authority
Reported by
source from
2024/25
3 6 
Other local authority service (internal) excluding social work
Reported by
source from
2024/25
1 22 
Scottish Ambulance Service 8 65 137 
Page 111 of 130

Page 112

PUBLIC
ASP Referrals Source 23/24 2024/25 2025/26 
Scottish Fire and Rescue 72 31 42 
Care Home 370 280 445 
Care at Home Provider 183 194 209 
Housing 120 128 132 
Education 1 4 3 
Self (Adult at Risk) 6 4 6 
Unpaid Carer 1 0 0 
Friend, Relative, Neighbour (not an unpaid carer) 21 33 46 
Other Member of the Public 1 0 0 
Third Sector Organisation 17 18 50 
Financial Institution 0 1 0 
Department of Work and Pensions 0 0 4 
Anonymous 2 9 12 
Other 31 39 26 
Page 112 of 130

Page 113

PUBLIC 
___________________________________________________________________
To:  Leadership Board
On:  16 September 2026
___________________________________________________________________
Report by:  Chief Executive 
___________________________________________________________________
Heading: OneRen Update
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to provide an update in relation to several
matters which relate to the provision of services through OneRen. 
Specifically: 
• An update relating to the forthcoming opening of the Lagoon Adventure
Zone.
• A progress update on the final stages of the Paisley Museum Re-Imagined
Project ahead of its completion. 
• The development of an operational agreement through which OneRen will
manage the operation of community facilities within Paisley Grammar
School Community Campus.
• An update on the reprovisioning of library provision in Erskine. 
___________________________________________________________________ 
2. Recommendations 
2.1  It is recommended that Elected Members: 
• Note the content of the report.
• Note the progress in terms of the Lagoon Adventure Zone, which is
scheduled to open during October.
• Note that the Paisley Museum fitout and install is due to complete in
December ahead of a formal opening to the public early in the new year
Item 9
Page 113 of 130

Page 114

PUBLIC
and that Elected Members will be kept updated regarding the opening
programme. 
• Agree a short-term suspension of the provision of library services in
Erskine as detailed in paragraph 6.5 of this report to facilitate the decant
of Erskine Library from Bridgewater Shopping Centre to the temporary
building at Erskine Sports Centre.
___________________________________________________________________
3. Background 
3.1 Regular updates are provided to Leadership Board on the activities and
performance reported in relation to the services and activities which OneRen
deliver in line with its service agreement with the Council. Additional reports
are submitted to board to cover any matters arising or requiring decisions
outwith planned reporting cycles. 
3.2 As outlined in section 1 of the report, several specific operational matters are
currently being progressed by officers and require the provision of an update
to elected members. These relate to: 
• The forthcoming opening of the new Lagoon Adventure Zone facility.
• A progress update on the final stages of Paisley Museum Re-Imagined
Project ahead of its completion.
• The development of an operational agreement through which OneRen will
manage the operation of community facilities within Paisley Grammar
School Community Campus.
• The reprovisioning of library provision in Erskine. 
4. Lagoon Adventure Zone – Lagoon Leisure Centre 
4.1 The Lagoon Adventure Zone will offer a vibrant multi-age play experience
featuring an interactive TAG active arena, the first of its kind in Scotland, a
dedicated sensory area supporting people with additional support needs, a
baby and toddler area, party room, spacious seating and an enhanced café
offering. The facility has been developed through £1million of investment by
the Council in inclusive play facilities, and will be operated by OneRen. 
4.2 The Certificate of Practical Completion is pending subject to final
requirements, and the project remains on schedule for launch in October, with
final fit-out works and operational commissioning to be completed. 
4.3 A number of centre improvements are being delivered to support the
investment, including enhanced toilet and baby-changing facilities, and
upgraded CCTV to strengthen safeguarding arrangements. 
4.4 Operational readiness is progressing well, with specialist product, safety, and
RoSPA training scheduled ahead of opening. 
4.5 A flexible operating model has been developed to manage variations in
demand throughout the week, and a dedicated brand and marketing
Page 114 of 130

Page 115

PUBLIC
campaign has been developed to initiate the launch of this new offer over the
coming weeks. Catering, delivered by local supplier, Brew & Bite, will be
launched to support a full menu of hot food and beverages in the play
experience during opening hours. 
4.6 A phased programme of testing and soft-launch activity with key stakeholders
will take place prior to the official public opening in October 2026. 
4.7 Investment in the new Adventure Zone play offer supports access to inclusive
play facilities, and is part of our approach to making Renfrewshire fairer and
more inclusive for children and families across Renfrewshire.  The
development of the facility, will also promote the Lagoon as a visitor
destination and supports the wider economic regeneration of Paisley. 
5. Paisley Museum Reimagined 
5.1 Paisley Museum has been completely reimagined through rebuild, redisplay,
and new practices evolved by collaborative decision-making and co-production
with over 70 local groups and over 4000 conversations. This collaborative
approach has shaped a new offer designed as a world-class destination telling
the inspirational stories of Renfrewshire’s people and places as well as
showcasing its internationally significant collections including the Paisley
pattern. 
5.2 The redesigned offer includes the Grade A-listed Museum building and Grade
A-listed Coats Observatory & Observatory House, as well as Transit House and
the Oakshaw buildings. The original Museum building is the work of the practice
of Honeyman, Keppie & Mackintosh. Through the lifetime of the project, the
influence of Charles Rennie Mackintosh on the design of later parts of the
building has become more apparent. 
5.3 Following practical completion earlier this year, the second and third phases of
the project of exhibition fitout and installation of the Museum have been
underway. Contractors have been working to make up time from the delayed
construction phase and are due to complete by the end of this year ahead of a
formal opening to the public early in the new year. A further update will be
brought to the next Leadership Board to provide further detail on the opening
programme. 
5.4 The major redevelopment has brought the historic buildings up to modern
standards to safeguard their long-term future and increased the amount of
space available to showcase Renfrewshire’s internationally significant
collections as a visitor destination to place Paisley Museum firmly among
Europe’s leading museums. 
5.5. The new design provides for 21st Century facilities with lift access to all areas,
toilets on every level, a café facility with picnic area, a changing places toilet,
lockers, water fountains, buggy park and the introduction of a public courtyard
ensuring street level access for everyone. 
Page 115 of 130

Page 116

PUBLIC
5.6. A new outdoor garden has been created opening up previously hidden views
of the Coats Observatory, the first publicly accessible Observatory in Scotland
and spectacular views towards the High Street and the hills beyond. 
5.7. The newly extended galleries will allow more of Renfrewshire’s remarkable
collections to be displayed with a 100% increase in objects on display. 
Main Works 
5.8 Practical Completion was achieved on 9 February 2026 and handover of the
museum site from Construction Contractor Kier to the Exhibition Fit-out
Contractor, Hub Build was confirmed. 
5.9 The completion of the construction phase marked a significant milestone and
the realisation of the architectural vision. The design has taken opportunities
to improve the operational efficiency of the campus as well as resolve
significant access issues including: 
• Improving the energy efficiency and lowering the carbon footprint of the
building, including upgrading the insulation where possible, the use of
energy LED efficient lighting, specifying for reduced energy consumption
and sustainability of materials and using natural ventilation where
environmental conditions allow. 
• All 24 historic roofs have been replaced or restored with brand new, high-
performance materials that are sympathetic to the historic fabric and to
maximise operational sustainability. Replacement roof tiles have been
carefully salvaged from Scottish heritage sites or sourced from working
Welsh slate mines. 
• Modern accretions removed to reveal historic details in the restored
galleries, allowing and through the development of a lighting strategy
daylight has been reintroduced to the galleries while simultaneously
reducing solar gain. 
• The museum features step-free, full level access directly from the street
through the main entrance into a new entrance lobby.  The interior of the
building is fully accessible with lifts serving all public floors, ensuring
unrestricted movement between the gallery spaces, exhibition zones, and
amenities. 
5.10 Kier continue to maintain an onsite presence to complete snagging works.
These are programmed to avoid disruption to the fit-out progress. 
5.11 Renfrewshire Council’s Facilities Management team and OneRen Estates
team are working together on ensuring statutory and planned maintenance
inspections which are scheduled in conjunction with the fitout contractor Hub
Build. 
Page 116 of 130

Page 117

PUBLIC 
Left: New red drum entrance and replaced rooflights in Grade A-listed main
building 
Right: West extension Garden Gallery with view to Observatory and Garden
Exhibition Fitout and Install 
5.12 Following a period of site set-up, the fitout contractor Hub Build commenced daily
deliveries of setworks and showcases from the storage facility in Linwood. 
5.13 The Exhibition Fit-out contract has progressed into all areas of the museum and
nearing completion in 60% of the galleries. Sectional completion has been
successfully achieved in the upper galleries of the Main Building and Coats
Observatory. 
Both images: Click Netherfield, case manufacturer, install cases in the upper
galleries ahead of object install. 
Object Preparation and Install Schedule 
5.14 Approximately 80% of objects selected for display required conservation
treatment. 23 separate conservation studios or individuals across the UK were
contracted to conserve 1050 objects. All work has now been completed ahead
of object install.   
5.15 The completion of the conservation programme has benefited from several
key national and international partnerships agreements with organisations
such as the American Museum of Natural History, New York, The Royal
Page 117 of 130

Page 118

PUBLIC
Armouries, Leeds, The Centre for Textile Conservation (CTC), Glasgow and
The People’s History Museum, Manchester. 
5.16 Nearly 20% of conservation costs have been sourced from external grant
bodies including Museums Galleries Scotland, the Henry Moore Foundation
and the National Manuscript Conservation Trust. 
Left: Centre for Textile Conservation student with child’s dress prepared for
display
Right: Buddie the Lion crated ahead of move back to Museum 
5.17 By the end of August, the majority of display objects have been packed in
preparation for install. Ahead of the main install programme large or complex
install objects have been moved to the museum. All object displays require
multi-trades and specialist input in an increasingly complex building layout as
display cases and display furniture fitout continues. 
Left: Museum team install Steven Campbell’s 3m long painting The Golden City 
Right: Dr Dan Coughlan completes the installation of the Jacquard Binary Loom 
Page 118 of 130

Page 119

PUBLIC
Feedback and Recognition 
5.18 In 2024 the project design won the Architecture Review’s Cultural
Regeneration category at the Future Awards.  The prestigious award
recognises the significant role the project is playing in the town and wider
region’s cultural regeneration. The shortlist included the Prado Museum in
Madrid, the Shanghai Opera House, and the Bilbao Fine Arts Museum. 
5.19 In 2026 the project secured its second major industry accolade winning
Scotland’s top heritage project at the Royal Institution of Chartered Surveyors
(RICS) award. The project was shortlisted alongside The Canna House, The
National Trust, Preston Tower Doocot, and John O’Groats Mill. The project
will now go forward to compete at the RICS UK Grand Final in October. 
5.20 The National Lottery Heritage Fund has been a major funder since 2017.
Caroline Clark, Director for Scotland recently noted that: 
“The Paisley Museum project is a serious re-imagining of the role of the
museum. It would be enough to deliver an international quality museum as a
heritage destination, but this project has had the ambition to deliver much
more and aim to fulfil a wider role, inherent to the vibrancy and wellbeing of
Paisley. The design supports this approach, welcoming in the whole
community whether to explore the collections or simply to enjoy the museum
environment. There has been a deeply thoughtful and innovative approach to
what a museum can offer the people of Paisley, and its visitors”.
5.21 International Museum Consultant Elaine Heumann Gurian has worked in
museums for over 50 years including The United States Holocaust Memorial
Museum, The Children’s Museum, Boston, The Powerhouse Museum,
Sydney, and Te Papa The National Museum of New Zealand.  In 2004 the
American Association of Museums honoured her with the Distinguished
Service to Museums Awards, the most prestigious recognition in the American
museum profession. Visiting Paisley last year she noted: 
“The impact is clear. It is going to make ‘place’ an important part of our
conversation. This museum is using every inclusive technique they can think
of to go about doing their work. Outsiders are going to come to watch how a
real place for a real community works and have that joy spread to them as
well’
5.22 During February stakeholder site visits with local businesses were organised.
Feedback was extremely positive with one business owner writing: 
“I have got to say I’m completely blown away by what has been done to the
museum. The museum is state of the art but somehow and I don’t know how,
you have all managed to keep that true feeling of Paisley, it’s a people’s
place, it’s calm, it’s inviting, it’s exciting, it’s exactly what Paisley needs.”
Page 119 of 130

Page 120

PUBLIC
Community Engagement 
5.23 The Schools Learning Programme has been co-created through work with
every Primary school in Renfrewshire so that it meets the needs of local
teachers and pupils. Over 500 primary and secondary pupils have been
involved in the testing and development of activities. 
5.24 As part of the development of the Museum’s public programme, over 70 local
services, organisations and groups were consulted through an ‘Active Listening’
programme to ensure that the museum could serve their needs. 27 community
and partner organisations involved in creating and testing new approaches to
and creation of resources for audience engagement. Over 500 participants
attended test events, workshops and coproduction activities. 
5.25 The development of the main displays involved 2500 participations with direct
engagement with over 600 people including consultation for research and
content development purposes to the delivery and build of interpretation and
interactives. 50 of the 88 displays have either been co-produced, or involved
consultation with experts and audiences. 
Operational Readiness
5.26 OneRen has adopted an inclusive, informal, and community-focused
approach to recruitment. Local community partners were asked for their
advice on how to recruit in a way that removes barriers and gives everyone an
equal opportunity to succeed. The result is a values-based approach that
encourages open communication before the advert is live and an opportunity
to demonstrate the value that individuals could bring the organisation in
practical ways. 
5.27 230 people attended the initial recruitment day information session held at
Paisley Town Hall. Formal evaluation of the process has shown that the
events successfully encouraged applications from those who attended, with
particularly positive perceptions of the approach among disabled applicants,
applicants with long-term health conditions and care-experienced applicants. 
5.28 499 applications were received for the initial recruitment phase. Recruitment
has now concluded for the majority of Visitor Operations staff including Visitor
Assistants, Visitor Operations Supervisors, Visitor Operations Manager,
Archivist and Retail Manager. Further recruitment for the Heritage Archive
Centre staff will take place in August and September and a programme of
training and familiarisation has been organised. 
Page 120 of 130

Page 121

PUBLIC
6. Update on reprovisioning of library services in Erskine 
6.1 At its meeting on 18 June 2025, the Leadership Board considered an update
paper relating to the Reshaping Renfrewshire programme, which included
information relating to the current review of leisure and culture services
commissioned by the Council and delivered by One Ren. The paper highlighted
that the current lease for Erskine Library at Bridgewater Shopping Centre was
due to expire in May 2026, and that the landlord had indicated that they would
not be willing to extend the current lease beyond that date. 
6.2 Whilst the provision of library services is a key element of the ongoing One Ren
review process, it was recognised that a short to medium term solution would
require to be identified to ensure that library provision in Erskine could continue
whilst the wider review progresses. The report at that time, outlined that officers
from One Ren and the Council would progress arrangements to commission
new temporary modular buildings at the Erskine Sports Centre site, in order that
these could support the reprovisioning of Erskine library when the current lease
comes to an end. 
6.3 Following a tendering exercise, a contract authorisation report was approved
by the Finance, Resources and Customer Service Policy Board in November
2025 to award a contract to Portakabin in relation to these works.  Due to
procurement and legal issues, there was an extended period required to
formally appoint Portkabin to install the temporary library facility at Erskine
Sports Centre.  This has had an impact on the previously planned project
timescales, which had been set to allow for the new facility to be on site before
the end of the current lease at Bridgwater Shopping Centre in May 2026. 
6.4 In order to ensure there was no disruption or gap in library provision in Erskine,
a short term extension of the current lease at Bridgwater Shopping Centre was
put into place to allow additional time for the new buildings to be put into place
and for One Ren to ensure all necessary statutory and operational
arrangements were made to support the opening of the new facility. 
6.5 Following completion of all regulatory processes, groundworks commenced at
the site in August 2026, with the targeted date for installation of the new
temporary building being mid-September 2026.  A programme is now in place
to formally decant the library facility to the temporary building, which will involve
a short closure period. The decant will necessitate a short-term suspension of
the provision of library services in Erskine. Officers will work with OneRen to
endeavour to minimise the duration of the suspension. Engagement with the
local community on the planned opening date for the new facility will be
undertaken.  Subject to final completion, this is being targeted for October
2026. 
6.6 Ongoing updates will continue to be provided to ward members ahead of the
opening date, with wider updates on the OneRen review being reported on a
regular basis to Leadership Board. 
Page 121 of 130

Page 122

PUBLIC
7. Operational agreement – Community facilities within Paisley Grammar
School Community Campus (PGSCC) 
7.1  As elected members will be aware, Paisley Grammar School Community
Campus opened on 20 August 2026 and provides facilities for community use,
the co-ordination of which will be managed operationally by One Ren. This
includes community rooms, the football pitch, gym hall and games hall,
including at weekends and will be operational from 29 September 2026 (after
September weekend) to allow the school and staff to settle in. OneRen have
updated let holders and are currently recruiting staff to work at the facility. 
7.2 In April 2026, elected members were asked to note that the current Services
Agreement between One Ren and the Council will require to be updated to
reflect this operational change, however, OneRen have agreed in principle to
undertake this.  Work has been undertaken to develop an initial operational
agreement between the Council and One Ren which supports the day to day
running of the community facilities, with agreements to be developed for
formal approval by the Council and the OneRen Board.  It is anticipated that
this approach will be replicated to support operational arrangements at other
facilities operated by One Ren within a shared campus arrangement. 
___________________________________________________________________
Implications of the Report
1. Financial – none within this report 
2. HR & Organisational Development – None 
3. Community/Council Planning – the projects and facilities highlighted
within the report will provide a significant positive impact for specific
local communities and on a Renfrewshire wide basis. 
4. Legal – A service agreement is in place between OneRen and the
Council which clearly identifies the requirements that OneRen must
fulfil in relation to the service payment.  As noted within the paper, this
will require to be updated in light of the developments being
progressed. 
5. Property/Assets – As outlined in the paper, there a range of property
related developments ongoing at present which require to be closely
managed by OneRen and the Council. 
6. Information Technology – not applicable 
7. Equality & Human Rights – N/A 
8. Health & Safety – not applicable 
9. Procurement – not applicable
Page 122 of 130

Page 123

PUBLIC 
10. Risk – not applicable 
11. Privacy Impact - not applicable 
12.                Climate Risk – not applicable
13.                Children’s Rights – not applicable.
14. Cosla Policy Position – not applicable
_________________________________________________________ 
List of Background Papers
___________________________________________________________________ 
Author: Laura McIntyre, Head of Policy and Partnerships
Page 123 of 130

Page 124

Page 124 of 130

Page 125

PUBLIC 
___________________________________________________________________
To: Leadership Board
On: 16 September 2026
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Renfrewshire’s Tourism Plan - Update
___________________________________________________________________
1 Summary 
1.1 The purpose of this report is to inform the Leadership Board of progress in
delivery of Renfrewshire’s Tourism Today: Tourism Plan 2024 - 2027. 
Renfrewshires_Tourism_Today_-_Tourism_Plan.pdf 
2 Recommendations
2.1 It is recommended that the Board:
(i) Notes the strong progress in actions supporting the delivery of the
Renfrewshire Tourism Plan, as set out in Section 4; 
(ii) Notes that further progress on delivery of the plan, including a proposed
review and refresh of priorities and actions, will be reported to the Board
as appropriate.
_________________________________________________________
3 Background 
3.1 Renfrewshire’s Tourism Plan 2024 – 2027 was approved by the Leadership
Board in December 2023.  Developed in consultation with national and local
partners within the tourism and hospitality sectors, and endorsed by
VisitScotland, the Plan sets out a range of themes and priorities to support the
growth of the visitor economy across Renfrewshire.   
3.2 Key priorities identified within the Plan include support for greater collaboration
between public, private and third sector organisations, growing tourism
opportunities in rural Renfrewshire and building on the strengths of Paisley as
a destination and the gateway to wider Renfrewshire.
Item 10
Page 125 of 130

Page 126

PUBLIC
_______________________________________________________
4 Tourism Plan – Progress 
4.1 Strong progress has been made in delivering actions and supporting
development of the Tourism Plan over the lifetime of the document.  This has
led to a 24% increase of the economic impact of tourism on the local economy
since 2023, representing some £307.6m (Scottish Tourism Economic Activity
Monitor figures).  Key outcomes from the four key objectives identified within
the plan are set out below. 
Tourism Industry Collaboration 
4.2 Key outcomes include:- 
• The formation of an industry-led Tourism Leadership Group, chaired
independently by the University of the West of Scotland and with
membership representing attractions, accommodation providers,
hospitality, events, third sector, public sector and VisitScotland.  This has
been crucial in driving forward priorities and actions identified within the
Tourism Plan; 
• Establishment of the Renfrewshire Tourism Network (RTN), comprising
approximately 200 contacts across the visitor economy. The network has
facilitated regular engagement events, workshops, business referrals,
collaborative opportunities and industry representation; 
• Direct support for businesses across the sector, with over 300 recorded
business support interventions, referrals, introductions and networking
opportunities.  Emphasis has also been placed on facilitating collaboration
between local businesses.   
Paisley 
4.3 Key outcomes under this theme include:- 
• Collaboration with the Tourism Leadership Group and RTN in respect of
destination marketing, communication and promotion of Paisley’s visitor and
heritage offer.   
• Continuing investment in the £113m cultural infrastructure programme
including completion of Paisley Town Hall, Paisley Arts Centre and with
Paisley Museum’s refurbishment nearing completion.   
• Continued investment in events including Paisley Halloween, Food and
Drink Festival and Sma’ Shot Day, most recently noted by this Board on 18
February 2026; 
• Development of a digital heritage trail for the Oakshaw area.   
Page 126 of 130

Page 127

PUBLIC
Rural Renfrewshire 
4.4 Key outcomes for historic towns and villages include:- 
• A series of infrastructure improvements at Castle Semple Visitor Centre,
Lochwinnoch, including a new visitor hub and path enhancements, as well
as the development of dark skies stargazing experiences in Muirshiel
Country Park and Castle Semple; This has included projects from
VisitScotland’s Rural Tourism Infrastructure Fund as well as commissions
with the Glasgow Science Centre. In addition, RSPB Lochwinnoch has
developed facilities using the Sustainable Communities Fund; 
• Successful programme of dark sky stargazing events in collaboration with
OneRen, in addition to supporting and highlighting rural and agritourism
experiences including engaging with Scottish Agritourism; 
• Completion of major external repair works at the Steeple Hall, Kilbarchan in
February 2026, with a second phase of works focussing on the
refurbishment and reconfiguration of the interior anticipated to begin in early
2027, with the aim of returning the building to sustainable use; 
• Securing funding from Historic Environment Scotland and National Lottery
Heritage Fund to develop “Cornerstones”, a project to support the
regeneration of Lochwinnoch town centre through investment in its built
heritage and promotion of the village’s history, reported to the Economy and
Regeneration Board of 26 May 2026; 
• Development of a Johnstone Heritage Trail celebrating the town’s rich
heritage, as part of the wider Johnstone Town Centre Vision.  The trail is
anticipated to be launched in autumn 2026. 
Business Tourism and Trade Travel 
4.5 Key outcomes supporting the plan’s business tourism theme include:- 
• Representation at VisitScotland Connect 2026, Scotland's premier travel
trade event, facilitating approximately 250 business-to-business meetings
with domestic and international tour operators and travel trade buyers, all
also given wider destination messaging; 
• Funding and expert support for six local businesses to participate in Connect
2026, with three ‘familiarisation’ trips as part of the national event visiting
Paisley Abbey, Paisley Museum and Mar Hall; 
• Hosting two VisitScotland PR visits from media organisations (UK and
international), supporting increased awareness of Renfrewshire as a
destination. 
Visitor Marketing
4.6 Visitor Marketing is identified as a cross-cutting theme in the Tourism Plan. 
4.7 Key outcomes for Visitor Marketing are outlined below:
Page 127 of 130

Page 128

PUBLIC
• Following Leadership Board approval in April 2026, a two-year Discover
Renfrewshire marketing and communications campaign has been
developed to strengthen Renfrewshire's profile as a destination and
increase engagement among local residents and regional visitors. 
• The campaign adopts a coordinated, place-based approach, bringing
together the strengths of Renfrewshire's towns, villages, attractions and
experiences under a shared narrative. The approach aims to encourage
residents to explore more of the area, while supporting growth in regional
visitation, dwell time and visitor spend. 
• The campaign has been informed by engagement with the tourism, leisure
and cultural sectors and has received strong support from key partners,
including the Renfrewshire Tourism Leadership Group and VisitScotland. It
reflects a more collaborative model of destination marketing, with industry
partners playing an active role in shaping and amplifying promotional
activity. 
• Ongoing engagement with businesses, attractions and wider stakeholders
will continue throughout the implementation period to ensure the campaign
remains aligned with sector priorities, supports participation, and maximises
opportunities for partnership working and shared promotion. Discover
Renfrewshire marketing and communications activity will begin mid-
September. Elected Members will be kept up-to-date with the development
of the campaign and the key milestones.
_________________________________________________________
5 Next Steps
5.1 In partnership with the Tourism Leadership Group, a review of the Tourism Plan
is anticipated to commence in late 2026.  This will support a refresh of priorities
and actions, ensuring that the strong progress to date is sustained and
continues to enable a collaborative, sustainable and growing visitor economy
across Renfrewshire.  Development of the refreshed Plan will be reported to
the Board as appropriate at a later date.
___________________________________________________________________
Implications of the Report
1. Financial – None. The Tourism Plan is funded through existing approved
Council Directorate budgets and arrangements with external organisations.
2. HR & Organisational Development - None
3. Community/Council Planning – 
4. Legal – None
5. Property/Assets - None
6. Information Technology - None
Page 128 of 130

Page 129

PUBLIC
7. Equality & Human Rights The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report because for example it is for noting
only.   
8. Health & Safety - None.
9. Procurement – None
10. Risk - None
11. Privacy Impact - None 
12. COSLA Policy Position – Not Applicable.
13. Climate Risk – Not Applicable.
14. Children’s Rights – Not Applicable
________________________________________________________________ 
Background Papers 
(a) Renfrewshire’s Tourism Today – Tourism Plan 2024 – 2027, Leadership
Board, 9 December 2023
(b) Council Event Planning and Programming, Leadership Board, 18 February
2026
(c) Visitor Marketing Campaign – Next Steps, Leadership Board, 29 April 2026
(d) Cornerstones Project, Lochwinnoch, Economy and Regeneration Board, 26
May 2026
(e) Regeneration Projects 2026, Economy and Regeneration Board, 25 August
2026 
___________________________________________________________________ 
Author: Euan Shearer, Regeneration and Place Manager
euan.shearer@renfrewshire.gov.uk 
Page 129 of 130

Page 130

Page 130 of 130