Original council PDF · Download plain text

Page 1

PUBLIC 
___________________________________________________________________
To: Leadership Board
On: 16 September 2026
___________________________________________________________________
Report by: Chief Officer, Renfrewshire Health and Social Care Partnership
___________________________________________________________________
Heading: Adult Social Care: 2025/26 Annual Update
___________________________________________________________________
1. Summary 
1.1 Adult Social Work Services were delegated to Renfrewshire Integration Joint
Board (IJB) on 1 April 2016. These services are managed through the Health
and Social Care Partnership (HSCP). 
1.2 This annual update report to Leadership Board, together with Renfrewshire’s
Integration Joint Board Annual Performance Report 2025/26 provides an
overview of adult social care activity and performance. 
___________________________________________________________________ 
2. Recommendations
2.1  It is recommended that members:
• Note the contents of this report updating activity and performance of adult
social work services delegated to the IJB; and
• Note that the next six-monthly update report will be presented to the
Leadership Board in February 2027.
_________________________________________________________
3. Background 
3.1  The list of functions that must be delegated by the Local Authority to the IJB is
set out in the Public Bodies (Joint Working) (Prescribed Local Authority
Functions, etc) (Scotland) Regulations 2014, and is noted in Annex 2, part 1 of
Renfrewshire’s Integration Scheme. These include:
• Social work services for adults and older people.
• Services and support for adults with physical disabilities and learning
disabilities.
• Mental health services.

Page 2

PUBLIC
• Drug and alcohol services.
• Adult protection and domestic abuse.
• Carers’ support services.
• Community care assessment teams.
• Support services.
• Care home services.
• Adult placement services.
• Health improvement services.
• Aspects of housing support.
• Day services.
• Respite provision.
• Occupational therapy services.
• Reablement services, equipment, and telecare. 
3.2 Whilst regular reporting in relation to these services is provided to the
Integration Joint Board (IJB), 6 monthly updates are also provided to the
Leadership Board.  This ensures oversight of the key activities and wider
context relating to the delivery of these services. 
4. Renfrewshire IJB’s Annual Performance Report   
4.1 Renfrewshire IJB’s Annual Performance Report 2025-26 provides a
comprehensive reflection on the HSCP’s performance against local and
national performance indicators. A summary of the 2025/26 year-end status of
the IJB’s full 53 performance indicators is provided in the table below and is
compared with 2024/25 performance. 
Status 2023/24 2024/25 2025/26  % Change from
2024/25
Red 9 (32%) 4 (14%) 5 (16%)  +2%
Amber 6 (21%) 8 (28%) 5 (16%) -8%
Green 13 (46%) 17 (59%) 21 (68%) +9%
Info only 20 21 22 -
Total 48 50 53 - 
4.2 This year’s Annual Performance Report reflects the HSCP’s strong overall
performance and continued growth against a number of key performance
indicators, despite the challenging operating context. Overall, there has
been an improvement in performance in 2025/26 compared with 2024/25
with a 9% increase in green status indicators. In addition to two indicators
improving status from amber to green, 16 of the 21 green indicators
maintained their status at year-end 2025/26 from 2024/25, 12 of these also
reporting improvement in performance compared to 2024/25. 
4.3 Despite the challenging operating environment, the HSCP has sustained
positive performance. A summary of some key achievements includes: 
• Renfrewshire maintained its position as the highest performing HSCP in
Scotland for Standard Delayed Discharge for the fourth year running, and
second position for code 9 delayed discharges, up from 9th position.

Page 3

PUBLIC
• The HSCP held its first Staff Health and Wellbeing Event in October 2025.
Over 140 staff attended a full programme of wellbeing support including in-
person and online sessions on ADHD, menopause, and peer support. 
• The Home First Response Team assessed 1,019 patients living with frailty
who presented at the Royal Alexandra Hospital compared with 988 in
2024/25. 59.8% were discharged home or to a homely setting compared
with 54% in 2024/25, while 42.7% were followed up by community
colleagues.
• The HSCP Independent Living Team (HILT) collaborated with
Renfrewshire Carers Centre and Engage Renfrewshire to help support
people accessing Self-Directed Support (SDS). A successful networking
event was held in October 2025, helping build positive relationships with
supported people, unpaid carers, HILT, and local providers.
• Of 131 care home residents at risk during Apr 2025-March 2026, the Care
Home Call Before You Convey Pathway avoided 96.3% of hospital
admissions with only 3.7% admitted, which equates to 5 residents.
• The Hospital at Home Team enabled 149 patients to receive acute hospital
level care at home since the service began in May 2025, with excellent
patient feedback. This has saved a total of 975 bed days in hospital
settings.
• There was 14% increase in new adult carers supported by Renfrewshire
Carers Centre, 1,089 compared with 958 in 2024/25. In addition, 630
adult support plans were completed for carers by the HSCP and
Renfrewshire Carers Centre, above the target of 497.
• A Community Officer within Engage was funded to deliver prevention
activity on tobacco, youth vaping, and second-hand smoke prevention.
Activity included 10 vaping awareness sessions to 13 organisations, 101
staff and volunteers trained, and outreach Quit Your Way and recovery
services. 
5. Adult Social Work Performance Overview 
5.1 Adult Social Work Services are managed and monitored via regular internal
HSCP professional governance and operational management arrangements,
including meetings, case management, and regular service and case reviews.
These meetings involve Heads of Service and Service Managers and cover a
variety of local and national strategic and operational indicators. They allow
managers to scrutinise and discuss performance data, agree remedial action,
timescales for improvement, and consider future challenges which may affect
services, to allow planned actions and mitigation where appropriate. 
5.2 In addition to internal scrutiny, performance is reported at all IJB meetings, with
the Performance Scorecard presented twice-yearly providing a detailed picture
of what is working well, current challenges and intended remedial action where
necessary. The Scorecard includes adult social care indicators alongside a
variety of local and national health service indicators.

Page 4

PUBLIC
5.3 There are 17 adult social care indicators, details of the performance are
provided in Appendix 1, however a summary is included in the tables below. 
Performance Indicator Status No. 
Green - Target achieved 1 
Amber - Warning (less than 10% variance of target) 0 
Red - Alert (more than 10% variance of target) 2 
Data only (no target) 14 
5.3.1 Adult Social Care Indicators with targets 
This section will provide an overview of improvement work taken forward
on the 3 adult social care indicators with targets, highlighting our focus on
continued improvement. 
Status Direction
of Travel Performance Indicator 23/24
Value 
24/25
Value 
25/26
Value Target  
Number of adult support plans completed
for carers (age 18+) by HSCP and
Renfrewshire Carers Centre
568 694 630 497
This is a new indicator for 2025-26 and combines indicators for both the HSCP and Renfrewshire
Carers centre to allow for more reliability in data collection and a better understanding of the
outcome. The positive result of having 630 adult support plans completed (26.7% above the
target), shows continued efforts to provide support for our carers in Renfrewshire. There is
however a continuing emphasis from the Renfrewshire Carers Centre and HSCP Social Work
teams to ensure that support plans can be put in place for all carers that require them to achieve
the supported person’s outcomes. 
There is update on the refresh of the Adult Carers Strategy later in this paper.    
Sickness absence rate for HSCP
Renfrewshire Council staff (workdays lost
per FTE)
19.51 22.05 20.33 15.3 
Despite being in red status and above the target for 2025/26 there was improvement in the
absence rate in comparison to 2024/25, reducing from 22.05 workdays lost to 20.33 workdays
lost.
Action Taken: Work continues across the Partnership to address sickness absence, with
performance monitored and discussed regularly at the Senior Management Team Workforce
Business Meeting. Heads of Service maintain ongoing discussions with their direct reports
regarding sickness absence, enabling underlying causes to be understood and ensuring
appropriate support, guidance, and action planning are put in place, including agreed
improvement targets where required.
In addition, work commenced towards the end of 2025/26 to refresh and extend the Workforce
Plan for a further year with a set of focused objectives and actions included.  This will also enable
the extended Plan to align with the final year of the IJB’s refreshed Strategic Plan 2025-27.
A longer-term plan will be developed for implementation onwards to align with the IJB’s next
Strategic Plan which will be a 10-year plan implemented from September 2027. 
A Short Life Working Group has been established, chaired by the HSCP Chief Officer, to
strengthen oversight and drive improvement. The remit of the group is to: 
o Undertake a data-informed deep dive into the factors impacting absence
o Identify priority areas for improvement
o Set clear goals and closely monitor progress; and 
o Oversee and coordinate improvement activity aimed at reducing absence across the HSCP.

Page 5

PUBLIC
Status Direction
of Travel Performance Indicator 23/24
Value 
24/25
Value 
25/26
Value Target  
% of HSCP Renfrewshire Council staff
completed mandatory training courses - 74.3
%
89.83
% 100%
This is a new indicator added to the suite of performance indicators for 2025/26 and aligns with
the training indicators for NHS staff. However, the 100% target set by the Council is exceptionally
challenging, in comparison to an 80% target for training set by NHSGGC. Performance in terms
of compliance has increased from 74.30% in 2024/25 to 89.83% in 2025/26, and work continues
to monitor this going forward. 
Action Taken: Regular compliance reporting has increased to monthly reports to ensure all areas
are working towards a higher compliance rate. 
5.3.2  Adult Social Care Data Only Indicators 
There are 14 Adult Social Care performance indicators which do not have
targets assigned. For some of these indicators it is not appropriate to prescribe
a target due to the nature of the measure, such as the Percentage of Children
who have previously been on the Child Protection Register in the last two
years. For others the development of robust targets can only be achieved
through trend analysis over a minimum period of three years, and they have
only been included for the past two years. It is however possible to note some
notable key changes in performance in 2025/26:
- Balance of Care: Total number of hours provided for clients receiving
personal care & Number of open community placements for 65+: Both
of these indicators saw an increase in total hours and number of open
community placements in 2025/26 from 2024/25. This is expected and
consistent with our policy of caring for people at home. People are living
longer with significantly higher levels of disability, and this trend is likely to
continue with people seeking to exercise choice and control over the care
they receive. 
- Total Mental Health Officer service activity: This indicator highlights the
activity, by count of statutory tasks, for the specialised registered social
worker who safeguards the rights and well-being of individuals experiencing
mental disorders. The increase from 1,458 to 1,608 is an indication of
increased demand on the mental health officer services in Renfrewshire.
- Number of Adult Support and Protection referrals: There was an
increase in the number of referrals from 1,522 in 2024/25 to 2,040 in
2025/26. This is mainly due to an increase in referrals from Care Homes, the
Third Sector, Scottish Fire and Rescue Service, Scottish Ambulance
Service, and NHS Primary Care Service. The significant increase from care
homes is a result of cautious reporting in specific care homes; there are now
supports in place to address these cases which are not being viewed as
appropriate referrals, which included providing additional training. The
reasons for the increases from other services are still being explored and
the Renfrewshire Adult Protection Committee has restored a Data Subgroup
to support multi-agency analyses of ASP data and to provide increase
understanding of key findings, trends, and risks. Referrals will continue to be
monitored throughout this year.

Page 6

PUBLIC
6. Key Activities
6.1 A summary of the key activities undertaken during the last six months relating
to the delegated services is detailed in the section below.   
Strategic Plan Refresh 
6.2 During 2025/26, the IJB agreed the need for service reform in line with the
direction set out by the Scottish Government, namely through three 10-year
interconnected frameworks: Public Service Reform Strategy, Population Health
Framework and Health and Social Care Service Renewal Framework. The
scale of ambition set out nationally requires a significant shift beyond safe,
incremental steps, to embrace a bolder culture of reform. Locally, this has been
reflected through the establishment of a Foundations of Transformation
Programme, which will inform the development of a new Strategic Plan and set
out how Renfrewshire will scale up collaboration with staff, communities, and
partners to deliver whole system change at the pace required over the next
decade and beyond. 
6.3 In this context, the development of a 10-year Strategic Plan has been
approved. This longer-term approach will enable the IJB to incorporate national
ambitions while creating a clear set of transformational priorities which are
relevant to the local needs of Renfrewshire. However, achieving these
ambitions will require an ongoing focus on monitoring, measurement, and
review. The strategic priorities must remain relevant to changing local
demographic needs, emerging demand, and the wider operating context. This
includes ensuring that delivery remains aligned to both long-term ambitions and
the immediate realities of service provision, including financial constraints and
fluctuations in demand. 
6.4 To support this, it is proposed that three key supporting documents are
developed and maintained to support delivery of the 10-year Strategic Plan.
Together, these elements will create a framework that supports the delivery of
the IJB’s ambitions while ensuring it remains in touch with the evolving needs of
Renfrewshire’s population. 
• Joint Strategic Needs Assessment (JSNA): To be refreshed every three-
years (or more frequently in response to exceptional circumstances). This
will provide a comprehensive assessment of the current and future needs
of Renfrewshire’s population. It will bring together data and information
from the local authority, NHS, public health teams and our social care
services. 
• Strategic Delivery Plan: A three-year delivery plan will outline the short-
term priorities required to progress the longer-term ambitions of the
Strategic Plan. It will take account of current operational challenges,
including financial pressures, workforce capacity, and any unscheduled
shifts in demand. This will enable Officers to prioritise resources and make
adjustments in line with demand.
• Performance Scorecard: The annual performance scorecard will measure
progress against agreed targets and outcomes. This will be refreshed in-
line with the three-year cycle of the JSNA and will be representative of the
new Strategic Plan.

Page 7

PUBLIC
6.5 The HSCP is seeking to align the development of the Strategic Plan with
Renfrewshire’s new Community Plan and the next Council Plan. As these Plans
are not due to be in place until September 2027, the IJB has agreed that the
development of the new Strategic Plan will align with these timescales. 
6.6 In aligning the HSCP’s approach with the wider plans and timescales, officers
have begun to work in partnership with the Council and other community
planning partners to undertake early community engagement together and
collaboratively develop the Joint Strategic Needs Assessment. Further details
regarding the ‘Your Voice Matters’, engagement campaign is provided in
sections 6.27 and 6.28 below.  
Foundations of Transformation Programme
6.7 As stated previously, the Foundations of Transformation Programme will inform
the development of a new Strategic Plan. Initial planning is based around the
following six work strands which are largely based on the national principles of
reform: 
• Strategic Building Blocks. 
• Evidence-base and Intelligence. 
• Community: Proactive community-based interventions. 
▪ Prevention across the continuum of care Community: Proactive community-
based interventions. 
• People and Population: Care designed around people and places. 
• Digital: Better access and accessibility.
6.8 Alongside these work strands, the Programme will also develop a number of
key supporting strategies and plans to enable the delivery of the Strategic Plan,
namely: 
• Participation, Communication and Engagement Strategy. 
• Strategic Workforce Plan. 
• Developing our leaders and building the right organisational culture.
6.9 A Transformation Officers Group, chaired by the Head of Strategic Planning
and Health Improvement, has been implemented to oversee the delivery of this
Programme.
6.10 There remains a strong commitment across the HSCP to delivering high-quality
services, fostering innovation and building on the positive culture, relationships
and outcomes already evident across local services.
Sustainable Futures Programme
6.11 During the reporting period, the HSCP developed a series of service redesign
proposals for consideration by the IJB, with the aim of delivering savings whilst
minimising risk to people’s outcomes and service performance. Nine proposals
with supporting detailed Integrated Impact Assessments (IIAs) were submitted
to the IJB for decision-making in September 2025, of which one was approved
for the redesign of the District Nursing and Care at Home Out of Hours model. 
No decision was reached on eight further proposals:

Page 8

PUBLIC
• The redesign of Older Adults Day Services. 
• Redesign of Learning Disability and Physical Disability Services with the
development of integrated community hubs
• Review of the Learning Disability Respite model.
• Closure of Flexicare.
• Redesign of Childsmile.
• Health Visiting – reduction of vacant posts.
• Removal of the Assertive Outreach model.
• Closure of Autism Connections.
6.12 During Spring 2026, these proposals were reviewed, with supporting Integrated
Impact Assessments updated to reflect recent service data, additional policies
and strategies, and any relevant developments since September 2025. 
Changes were made to the proposal for Older Adults Day Services to allow for
greater flexibility in session timings and further embed digital provision within
the service model.  Significant changes were made to the redesign of
Childsmile to enable a more targeted model of support to be implemented.
6.13 These proposals and IIAs were subsequently submitted to the IJB in June
2026.  Added to each of the proposals was a position statement which was
provided by the HSCP Senior Management Team. These were supplemented
by a cumulative Integrated Impact Assessment. 
6.14 Due to emerging discussions in relation to Childsmile with the Scottish
Government, this was removed from consideration however the remaining
seven proposals were agreed.   Work to support implementation of these
agreed changes is now underway.
6.15 More widely, a proportion of savings previously agreed by the IJB to be
delivered in 2025/26 were re-phased into 2026/27, resulting in a final savings
target of £7.37m for 2025/26. At the end of the financial year, £8.10m of
savings were delivered by the HSCP. This is 110% of the revised savings target
and includes over-delivery against several savings initiatives, representing
continued strong progress.
6.16 Regular reporting to the IJB continues to reflect that the financial position
remains extremely challenging. Should the IJB be unable to set a balanced
budget in future, and/or there are insufficient reserves available to bridge the
forecast funding gap, it will need to enter a period of Financial Recovery. This
will entail a series of restrictive cost saving and cost containment measures, in
order to ensure that the IJB incurs no new commitments or expenditure without
an agreed and available budget, whilst continuing to meet and manage existing
contractual and statutory liabilities. 
6.17 A detailed Integrated Impact Assessment setting out the potential impact of
Financial Recovery has been developed and was considered by the IJB at its
meeting in June 2026.

Page 9

PUBLIC
Winter Pressures
6.18 As previously reported to Leadership Board, each year, Renfrewshire HSCP
develops plans to ensure the resilience of critical services over the winter
period. The planning process for winter 2025/26 was undertaken across all
HSCP internal and hosted services. 
6.19 The HSCP will submit its winter plan for 2026/27 to the IJB in November 2026.
The key priorities for this year’s plan are currently being reviewed alongside
consideration of the winter planning conducted by Renfrewshire Council and
NHSGGC. However, it is anticipated that the HSCP’s winter plan will broadly
continue to focus on understanding and preparing our response to the risks
associated with the following scenarios: 
• Disruptive weather and the ability for staff to get to work.
• Staffing cover, resilience and maintaining health and wellbeing.
• The impact of disruptive weather or other events on the HSCP’s supply chain.
• The impact of weather or other events on the ability to provide services and/or
carry out community visits.
• The loss of use of a building or space.
• Disruption to infrastructure e.g. a loss of power, systems and/or data. 
6.20 The Winter Plan will ensure that staffing levels are maintained over the winter
period to support timely access to services, whilst maintaining an ongoing focus
on the wellbeing of staff and unpaid carers. Proactive plans and monitoring will
be in place to identify emerging issues and support services to respond to sever
weather scenarios. 
6.21 The HSCP continues to engage with partners through existing resilience
arrangements regionally and locally. As part of these arrangements, HSCP
officers contribute to the development and review of the IJB’s partner
organisations’ respective Winter Plans. These plans also inform local planning
activity undertaken by the partnership. 
6.22 For Winter 2025/26, NHSGGC adopted a streamlined approach to developing
its Winter Plan reflecting on the good practice, successes and learning from the
whole system approach adopted in previous two years. This Winter Plan has
been created in a more accessible format which clearly outlines the actions to
be taken over coming months and was shared with HSCPs to ensure relevant
actions were captured.
6.23 The HSCP also continues to work closely with colleagues within Renfrewshire
Council, with a focus on communications as part of the ‘Ready for Winter’
programme and in support of the fourth year of the Winter Connections
programme. Following the process undertaken in previous years, the HSCP
presented an update on winter planning preparations, alongside Civil
Contingencies Service colleagues, to the Council’s Corporate Management
Team (CMT). 
IJB Adult Carers Strategy 2026-27 
6.24 Supporting unpaid carers is a priority for the HSCP and we recognise that the

Page 10

PUBLIC
care they provide is vital to the people they care for and the sustainability of
HSCP services. In June 2025, IJB approved recommendations to review and
refresh its existing Adult Carers Strategy 2022 -2025. During 2025/26, the
HSCP, working with carers, the Carers Centre and partners, developed a draft
strategy which acknowledges the growing demands and personal impact of
caring. It aims to uphold carers’ rights, respond to their needs, and support
them to continue in their caring role - if they choose to do so. Developed in
partnership with carers and the organisations that support them, the draft
strategy reflects lived experiences and prioritises meaningful, actionable
change. 
6.25 In preparing a local carers strategy, the Carers Act requires the IJB to “consult
such persons and bodies representative of carers as they consider appropriate,
and…to involve relevant carers.” The following activities have been undertaken
to achieve a streamlined but meaningful consultation process: 
• Published the consultation draft on the HSCP website / consultation site.
• Developed alternative versions including paper copies, summary, easy read
and consider a child-friendly approach. 
• Promoted the consultation via a range of existing communication channels,
including HSCP staff channels, media release (local / national), and social
media (supported by Council and NHS sites).
• Encouraged partner organisations (through the Strategic Planning Group)
to promote the consultation through their own communication channels.
• Utilised existing forums and governance structures, where they exist, to
engage with all other prescribed consultees. Where related forums don’t
have meetings scheduled during the period of the consultation, the HSCP
will strive to engage in the most effective way for stakeholders.
• Issued targeted communications to other consultees inviting them to share
their feedback on the consultation. 
6.26 The consultation period has now concluded, and the refreshed strategy will be
presented to the IJB in September 2026 for approval. 
Your Voice Matters
6.27 In partnership with Renfrewshire Council and wider community planning
partners, the HSCP devised a public engagement programme is open to people
across Renfrewshire. “Your Voice Matters” aims to inform a range of emerging
strategies, including the IJB’s Strategic Plan, the Council Plan, Community Plan
and Children’s Partnership Plan, ensuring alignment with community needs and
priorities. 
6.28 This collaborative approach provides an opportunity to engage early with
communities on a range of topics and is designed to help identify what matters
most to people across Renfrewshire, encourage civic participation in decision-
making, improve service efficiency, and build stronger, more cohesive
communities. The programme features three phases of engagement: 
1. The first phase is designed to raise awareness of the programme and to
invite participants to share their opinion, based upon three key questions.
This phase is now well underway.

Page 11

PUBLIC
2. Phase two will involve a range of more targeted engagement activities,
including community workshops, partner-led listening sessions and
conversations with other representative groups. 
3. Phase three will involve deeper listening, to gain additional insight from
targeted groups and existing service networks. 
The overarching aim of this approach is to ensure that the future direction of the
wider council family is informed by listening to what matters most to people in
our communities, and that this insight is clearly reflected in strategic priorities
and service delivery. This will also support the best use of available resources,
promote alignment around shared priorities, and create opportunities for a more
coordinated whole-system approach across partners.
Inspection Findings
6.29 The HSCP provides services subject to a rolling programme of independent
inspection from the Care Inspectorate. Inspection assures us that services are
working well and highlights areas for improvement Inspectors examine the
overall quality of care and support, the staffing, the management and
leadership, and the environment in which the care is provided 
6.30 The HSCP is subject to both unannounced and anticipated inspections carried
out at HSCP operated services, using the ‘Six Point Quality Scale’ where 1 is
unsatisfactory and 6 is excellent. Inspectors look at a selection of the quality
indicators depending on the type of inspection, the quality of the service, the
intelligence they hold about the service, and any risk factors they may identify
6.31 An unannounced inspection of the Care at Home Service took place between 8-
12 December 2025. The table below details the grades received from the Care
Inspectorate. 
How well do we support people's wellbeing?  5 – Very good
People's health and wellbeing benefits from their care and support 5 – Very good
How good is our staff team?  4 - Good
Staffing arrangements are right and staff work well together 4 - Good
6.32 The key messages from this inspection include:
• People were treated with dignity and respect. 
• Staff felt well-supported and trained. 
• Teamwork strengths and collaboration had led to improvements in the
service.
• Digital systems improved care delivery
• People were kept safe by improvements to risk management.
• Personal support plans were clear and person-centred. 
• Staff shortages affected continuity of support for some people living in
extra care housing and those who received overnight support.

Page 12

PUBLIC
• Improvement is needed to ensure people receiving care at home know
who will be providing their planned support.
6.33 The Weavers Linn Respite Unit, is a residential short-break service for adults
with learning disabilities and autism, received an unannounced visit on 24-26
June 2025. The table below details the grades received from the Care
Inspectorate. 
How well do we support people's wellbeing?  5 – Very good
People's health and wellbeing benefits from their care and support 5 – Very good
How good is our staff team?  4 - Good
Staffing arrangements are right and staff work well together 4 - Good
How good is our setting? 4 - Good
People experience high quality facilities 4 - Good
6.34 The key messages from this inspection include: 
• We followed up on four previous areas for improvement which were met. 
• People looked forward to their stay and regarded it as 'a wee holiday'.
• Care and support observed was person-centred and people told us staff
were wonderful.
• Staff were supported well with training and supervision aiding staff
development.
• Relatives advised that communication was very good with staff which
gave them assurance.
• Visiting professionals praised staff for their commitment and
professionalism.
• Managers had worked hard to improve communication to ensure people
experienced a stay which met their outcomes.
• Some environmental improvements were needed to continue to offer
people high quality, safe facilities.
6.35 Hunterhill Care Home is registered to provide support to 60 older people,
some of whom have cognitive impairments and/or dementia, and received an
unannounced visit on 14, 15 and 19 May 2025 and a follow-up visit on 14
August 2025. The table below details the grades received from the Care
Inspectorate.
How well do we support people's wellbeing?  4 – Good
People's health and wellbeing benefits from their care and support 4 – Good
How good is our leadership? 3 - Adequate
Quality assurance and improvement is led well 3 - Adequate
How good is our staff team?  4 - Good
Staffing arrangements are right and staff work well together 4 - Good

Page 13

PUBLIC
How good is our setting? 4 - Good
People experience high quality facilities 4 - Good
6.36 The key messages from this inspection include: 
• We followed up on a requirement made at the last inspection; this has not
been met. We have agreed to extend the timescale for this. (This is in
relation to quality assurance)
• We followed up on three areas for improvement made at the last
inspection, one has been met and two were not met. (Two unmet areas for
improvement were: fluid/hydration charts; and senior staff confidence in
using the dependency tool to evidence decisions about staff deployment). 
• The introduction of hydration and snack stations promoted independence
and choice.
• The expansion of meal options has enhanced people's dietary variety.
• Quality assurance audits were taking place and well-intentioned, but
limited by inconsistent follow up and consistency of use
6.37 The HSCP strives to continuously improve services, and work is already
underway to meet any requirements and areas for improvement identified
during these inspections.  
7.  National Policy Context
Extension of Integration Joint Board Voting Rights
7.1  Members will be aware that Integration Joint Boards (IJBs) are responsible for
the strategic planning, commissioning and oversight of community health and
social care services. IJB membership includes representatives from the third
sector, unpaid carers and service users, collectively referred to as “lived
experience representatives.”
7.2  As lived experience representatives did not previously hold voting rights, the
Independent Review of Adult Social Care recommended that voting rights be
extended to all public partners. Consequently, amendments to the Public
Bodies (Joint Working) (Scotland) Act 2014 provide third sector, unpaid carer
and service user representative members with voting rights from 1 September
2026.
7.3  The Scottish Government established a national working group to consider the
practical implementation of these changes, including arrangements for
recruitment, governance, codes of conduct, and training and development. At
the time of writing, the Scottish Government’s guidance has not yet been
published; however, it is anticipated that this will be available by late August
2026.
7.4 In preparation for the introduction of voting rights for lived experience
representatives, the HSCP has been working closely with colleagues in the
Council’s Legal Services. This engagement will continue as amendments to the
Standing Orders and the Integration Scheme will be required to reflect the
legislative changes.

Page 14

PUBLIC
Preventing Harm, Promoting Recovery: Scotland's Alcohol & Drugs Strategic
Plan 2026-2035
7.5 On 10 March 2026, the Scottish Government and COSLA published Preventing
Harm, Promoting Recovery: Scotland's Alcohol & Drugs Strategic Plan 2026-
2035, a 10-year strategy that sets out Scotland's long-term approach to
reducing alcohol and drug-related harm. The plan builds on previous national
frameworks and supports wider public health priorities, including the Population
Health Framework and Service Renewal Framework.
7.6 In response, Renfrewshire Alcohol and Drug Partnership (ADP) is refreshing its
local alcohol and drugs strategy to align with the national plan, Partnership
Delivery Framework and National Specification. This will ensure that local
priorities, outcomes, and commissioning arrangements support national
ambitions.
7.7 Renfrewshire has a strong partnership governance structure in place to provide
oversight, accountability and performance management across prevention,
treatment, recovery, and system improvement. This framework will support the
implementation of national priorities and monitor progress, risks, quality, equity,
and outcomes.
7.8 To deliver the strategy locally, the ADP will develop a delivery plan outlining
specific actions, milestones, responsibilities, and success measures. The plan
will be reviewed regularly to respond to emerging needs, insights from people
with lived and living experience, and policy developments. Both the refreshed
strategy and delivery plan will be presented alongside the ADP Annual
Reporting Survey at a future meeting.
National Care Service Charter of Rights
7.9 On 25 March 2026, the Scottish Government published the National Care
Service Charter of Rights, with further updates made in April and May 2026.
The Charter sets out information on people’s existing rights and what they
should expect when accessing, or waiting to access, social care, social work,
and community health support. It does not create new rights or alter existing
rights, but brings together information to support people, carers, families, and
representatives to understand what they can expect from support and what they
can do if they feel their rights are not being met. 
7.10 The Charter is relevant to the HSCP’s ongoing work to strengthen rights based,
person-centred and accessible support, including Self-Directed Support, public-
facing service standards, participation and engagement, and local policy
development. Key themes include clear and accessible information,
involvement in decisions, choice and control, dignity, safety, and routes for
feedback and complaints. 
7.11 The Charter will be considered as part of relevant local guidance, policy, and
improvement work to support consistent practice and clearer information for
people accessing support in Renfrewshire.

Page 15

PUBLIC
Delayed Discharge 
7.12 Reducing delays in discharge is a national priority. With a revised remit aligning
to the Operational Improvement Plan from September 2025, the fortnightly
Collaborative Response and Assurance Group continues to meet, chaired by
the Cabinet Secretary and with attendance from all Chief Officers, Scottish
Government, Care Inspectorate and COSLA. All HSCPs are categorised as
Low, Moderate or Major based on performance improvement required. 
7.13 Renfrewshire is the best performing HSCP in Scotland for standard delays for a
fourth consecutive year, with a rate of 1,148.7 per 100,000 population for
Standard Delays (across all HSCPs in Scotland). This equates to a 34.5%
reduction in total bed days lost to delayed discharge – 3,805 bed days – and is
82.7% lower than the national average – 22,036.
8. Next Steps 
8.1  The next performance report on delegated Adult Social Care functions will be
reported to the Leadership Board in February 2027. 
___________________________________________________________________
Implications of the Report
1. Financial – Although there are no direct costs associated with this report, the
IJB is operating in an increasingly challenging environment with increases in
both the level of demand and service delivery costs. The Sustainable Futures
Programme has been established and will aim to deliver best value by
modernising services as well as identifying savings to reduce the financial gap
in a sustainable way and where feasible with the least possible impact.
2. HR & Organisational Development – The Sustainable Futures Programme is
currently underway and could potentially have an impact following its
conclusion. 
3. Community/Council Planning – none
4. Legal – none.
5. Property/Assets – none 
6. Information Technology – none 
7. Equality & Human Rights - The recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights.
No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report because it is for noting only. If
required following implementation, the actual impact of the recommendations
and the mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website. 
8. Health & Safety – none

Page 16

PUBLIC
9. Procurement – none
10. Risk – none 
11. Privacy Impact – none
12. Cosla Policy Position – none.
13. Children’s Rights – Although this report has a key focus on the delegated
functions of adult social care, the HSCP is committed to complying with
UNCRC and this is reflected in our activity.
14. Climate Risk – The HSCP is committed to tackling the climate emergency and
actively participates in Renfrewshire’s Plan for Net Zero. 
_________________________________________________________
List of Background Papers 
Adult Social Care: 6 Monthly Update, Leadership Board, February 2026
___________________________________________________________________ 
Author:       
Yvonne Farquhar, Policy Manager, Chief Executive’s Service
Yvonne.farquhar@renfrewshire.gov.uk

Page 17

PUBLIC
Appendix 1
Performance Indicators
The 17 adult social care services’ indicators in the updated scorecard are as follows: 
Performance Indicator Status No.  Direction of Travel 
Green - Target achieved 1  Improvement 
Amber - Warning (less than 10% variance of target) 0  Deterioration 
Red - Alert (more than 10% variance of target) 2  Same as previous reporting period 
Data only 14 
Status Direction
of Travel Performance Indicator 23/24
Value 
24/25
Value 
25/26
Value Target  
Sickness absence rate for HSCP Renfrewshire Council staff
(workdays lost per FTE) 19.51 22.05 20.33 15.3 
% of HSCP Renfrewshire Council staff completed mandatory
training courses - 74.3% 89.83% 100%  
Number of adult support plans completed for carers (age
18+) by HSCP and Renfrewshire Carers Centre 568 694 630 497 
Data Only Indicators 
Performance Indicator 23/24
Value
2024/25
Value
2025/26
Value
Direction of
Travel
Total Mental Health Officer service activity (count of activity) 1,499 1,458 1,608 
Number of Chief Social Worker Guardianships (as at position) 124 157 140 
Number of Private Guardianship Applications 126 143 158

Page 18

PUBLIC
Performance Indicator 23/24
Value
2024/25
Value
2025/26
Value
Direction of
Travel
Balance of Care: Total number of hours provided for clients receiving personal
care * 18,521 19,229 21,158 
Balance of Care: Total number of hours provided for clients receiving non-personal
care * 375.5 351.25 504.00 
Balance of Care: Number of open community placements for 65+ (Care at Home
vs residential) * 1,786 (64%) 2,217 (60%) 2,937 (65%) 
Balance of Care: Number of open residential placements for 65+ (Care at Home vs
residential) * 1,006 (36%) 1,469 (40%) 1,554 (35%) 
Population of clients receiving Telecare (75+) - Rate per 1,000 **   32.8 
Population of clients receiving Telecare (all ages) Rate per 1,000 **    4.1 
Number of people accessing Community Alarms (all ages) **   3,807 
Number of people accessing Community Alarms (75+) **   2,757 
Percentage of Adult Support and Protection referrals where investigatory powers
are used 43% 53% 53% 
Percentage of Children registered in this period who have previously been on the
Child Protection Register in the last two years 8.0% 16.0% 10.9% 
Number of Adult Support and Protection referrals 
(please see table below for source) 1,527 1,522 2,040 
*Balance of care previously reported as two indicators and now separated into four
**No direct comparison with previous years as the method of collation has been revised

Page 19

PUBLIC
Number of Adult Support and Protection (ASP) referrals
ASP Referrals Source 23/24 2024/25 2025/26 
Care Inspectorate 32 16 5 
Office of the Public Guardian 6 4 6 
Police Scotland 294 315 485 
NHS 24 24 20 20 
NHS Primary Care 44 46 66 
NHS Acute Services 72 76 74 
NHS Specialist Drug and Alcohol Services 2 1 0 
Community Health Services 11 29 38 
Mental Health Services – Hospital and Community 49 53 20 
Other Health (Public, Private and Prison) 5 2 0 
Social Work Adults (inc Mental Health Officers) 143 142 181 
Social Work Children and Families 12 8 4 
Out of region social work / other (external) local authority
Reported by
source from
2024/25
3 6 
Other local authority service (internal) excluding social work
Reported by
source from
2024/25
1 22 
Scottish Ambulance Service 8 65 137

Page 20

PUBLIC
ASP Referrals Source 23/24 2024/25 2025/26 
Scottish Fire and Rescue 72 31 42 
Care Home 370 280 445 
Care at Home Provider 183 194 209 
Housing 120 128 132 
Education 1 4 3 
Self (Adult at Risk) 6 4 6 
Unpaid Carer 1 0 0 
Friend, Relative, Neighbour (not an unpaid carer) 21 33 46 
Other Member of the Public 1 0 0 
Third Sector Organisation 17 18 50 
Financial Institution 0 1 0 
Department of Work and Pensions 0 0 4 
Anonymous 2 9 12 
Other 31 39 26