Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
1 March 2023 
NOTICE OF MEETING 
A meeting of the OBAN LORN & THE ISLES AREA COMMITTEE will be held in the ON A
HYBRID BASIS BY MICROSOFT TEAMS AND IN THE MCCAIG SUITE, CORRAN HALLS,
OBAN on WEDNESDAY, 8 MARCH 2023 at 10:30 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Oban, Lorn and the Isles Area Committee - 14 December 2022 (Pages 3 - 8) 
(b) Oban, Lorn and the Isles Area Community Planning Group - 8 February 2023
(Pages 9 - 18) 
4. PUBLIC QUESTION TIME 
5. AREA SCORECARD FQ3 2022/23 (Pages 19 - 54)  
Report by Executive Director with responsibility for Customer Support Services 
6. PUPIL VOICE 
Verbal Presentation by Pupil Representatives from Oban High School, Tiree High
School and Tobermory High School 
7. ROADS AND INFRASTRUCTURE SERVICES UPDATE (Pages 55 - 58)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
8. HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING INVESTMENT
PLAN (SHIP) - ANNUAL UPDATE (Pages 59 - 72)  
Report by Executive Director with responsibility for Development and Economic
Growth 
Public Document Pack

Page 2

REPORTS FOR NOTING 
9. DRAFT OBAN, LORN AND THE ISLES AREA COMMITTEE WORKPLAN (Pages
73 - 76) 
REPORT FOR DECISION 
10. GIBRALTAR STREET PUBLIC REALM PROJECT - CONSIDERATION OF
OPTIONS (Pages 77 - 86)  
Report by Executive Director with responsibility for Development and Economic
Growth 
(a) Appendix 1 - Final Design Option (Pages 87 - 88) 
(b) Appendix 2 - Original Designs Presented at June 2022 Consultation (Pages 89 -
90) 
E1  (c) Appendix 3 - Gibraltar Street Public Realm Project Estimate Costs (Pages 91 - 92) 
The Council will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraphs are:-
E1  Paragraph 8  The amount of any expenditure proposed to be incurred by the authority under
any particular contract for the acquisition of property or the supply of goods or services. 
Oban Lorn & The Isles Area Committee 
Councillor Kieron Green (Vice-Chair) Councillor Amanda Hampsey
Councillor Willie Hume Councillor Andrew Kain (Chair)
Councillor Jim Lynch Councillor Luna Martin
Councillor Julie McKenzie Councillor Andrew Vennard   
Contact: Stuart Mclean, Committee Manager - 01436 658717  Karen Campbell 01631 567855

Page 3

MINUTES of MEETING of OBAN LORN & THE ISLES AREA COMMITTEE held in the
MICROSOFT TEAMS 
on WEDNESDAY, 14 DECEMBER 2022 
Present: Andrew Kain  (Chair) 
Councillor Kieron Green 
Councillor Jim Lynch 
Councillor Andrew Vennard
Councillor William Hume
Councillor Luna Martin 
Attending: Stuart Green, Corporate Support Manager
Michelle Mundie, Chief Executive, Argyll Housing Community Housing
Association (ACHA)
Douglas Whyte, Housing Strategy Team Leader
Mark Calder, Project Manager
Stuart McLean, Committee Manager 
1. APOLOGIES FOR ABSENCE 
The Chair welcomed everyone to the meeting. 
Apologies for absence were received from Councillors Julie McKenzie and Amanda
Hampsey. 
2. DECLARATIONS OF INTEREST 
Councillor Andrew Vennard declared a non-financial interest in item 9 of the agenda
(ACHA Annual Update), by virtue of his Council appointment to the Board of ACHA.
He advised that he would remain in the meeting during consideration of this item. 
3. MINUTES 
(a) Oban, Lorn and the Isles Area Committee - 14 September 2022 
The Minute of the Oban, Lorn and the Isles Area Committee, held on 14
September was approved as a correct record. 
(b) Oban, Lorn and the Isles Area Community Planning Group - 9
November 2022 
The Minute of the Oban, Lorn and the Isles Area Community Planning
Group, held on 9 November was noted. 
(c) Oban Common Good Fund - 22 November 2022 
The Minute of the Oban Common Good Fund, held on 22 November, was
noted. 
Page 3 Agenda Item 3a

Page 4

4. PUBLIC QUESTION TIME 
There were no public questions submitted.   
5. PERFORMANCE REPORT UPDATE 
The Corporate Support Manager provided a short presentation on the Performance
Excellence project.  He outlined the findings of the Council’s Best Value Audit which
took place in 2020 and highlighted key points from the Best Value Improvement
Action Plan.  Mr Green advised that as a result of recommendations agreed by
Council in September 2021, a new suite of Corporate Outcome Indicators will be
reported on annually and that other improvements to the system were underway.  He
outlined the new hierarchy of performance reporting and confirmed that the Pyramid
system previously used for performance reporting will be decommissioned by the
end of this financial year.   
Decision 
The Oban, Lorn and the Isles Area Committee agreed to note the information
provided.   
(Reference:  Presentation by Business Support Manager, submitted) 
6. AREA SCORECARD FQ2 2022/23 
Consideration was given to the Area Performance Report for financial quarter 2 of
2022/23 (July to September 2022) which illustrated the agreed performance
measures for this period. 
Decision 
The Oban, Lorn and the Isles Area Committee:- 
1. noted and considered the performance and supporting commentary as
presented; 
2. agreed that upon receipt of the Quarterly Performance Report, the Area
Committee contact either the Responsible Named Officer or Sonya Thomas with
any queries; 
3. noted that work was ongoing and to respond to Sonya Thomas with requests or
comments regarding the layout and format of the Performance Report; 
(Reference:  Report by Executive Director with responsibility for Customer Support
Services, dated 20 October 2022, submitted) 
7. ROADS AND INFRASTRUCTURE SERVICES UPDATE 
The Committee gave consideration to a report which provided an update on the
recent activities of Roads and Infrastructure Services and highlighted works being
undertaken which were relevant to the Oban, Lorn and the Isles area. 
Page 4

Page 5

Decision 
The Oban, Lorn and the Isles Area Committee noted and considered the contents of
the report. 
(Reference: Report by Executive Director with responsibility for Roads and
Infrastructure Services, dated November 2022, submitted) 
8. HSCP ANNUAL PERFORMANCE REPORT 2021 
The Committee gave consideration to a report which presented the Argyll and Bute
HSCP Annual Performance Report for 2021. 
Decision 
The Oban, Lorn and the Isles Area Committee considered and noted the Annual
Performance Report for the Health and Social Care Partnership for the year 2021,
which was presented to the Integration Joint Board (IJB) at its meeting on 23
November 2022.   
(Reference: Report by Head of Strategic Planning, Performance and Technology,
dated 14 December 2022, submitted) 
9. ACHA ANNUAL UPDATE 
Consideration was given to a presentation by the Chief Executive of ACHA, which
provided an update on a number of areas including the investment programme for
2022/23; the Warm Homes Fund; the Business, Energy, Industrial Strategy (BEIS)
Whole House Retrofit Programme; the replacement of wet electric heating systems;
the Exemplar Estates initiative and a number of new build and refurbishment sites
across the locality.  Further information was provided in respect of Welfare Rights;
the Rent Consultation for 2023/24; ACHA’s 10 10 10 initiative and ACHA’s
Community Action Fund.   
Decision 
The Oban, Lorn and the Isles Area Committee agreed to note the information
provided. 
(Reference:  Presentation by Chief Executive of ACHA, submitted)   
10. LOCAL HOUSING STRATEGY (LHS) 2022-27 - ANNUAL UPDATE 
Members gave consideration to a report which presented the Argyll and Bute Local
Housing Strategy (LHS) Annual Report for 2022.  It was noted that a further report
with area specific information would be provided to the Committee at their meeting in
March 2023.   
Decision 
The Oban, Lorn and the Isles Area Committee considered and noted the contents of
the report.  
Page 5

Page 6

(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth, dated  10 October 2022, submitted)   
11. CHARITABLE TRUSTS, BEQUESTS AND TRUST FUNDS 
The Committee gave consideration to a report which provided details of a number of
Trusts and Bequests that remain active in the Oban, Lorn and the Isles area and
sought agreement on the proposed distribution methods. 
Decision 
The Oban, Lorn and the Isles Area Committee:- 
1. noted the financial position of the Charitable Trusts, Bequests and Trust
Funds as of December 2022, 
2. agreed that the charities and trust funds, that have historically been awarded
to Council Departments and Allied Partners, are awarded on the basis
outlined in paragraph 5.5 and defined within appendix 1, and 
3. noted that officers are in ongoing dialogue with representatives from the Lord
Advocates office to establish appropriate methods of distributing those funds
that have no established distribution arrangements. 
(Reference:  Report by Executive Responsibility for Legal and Regulatory Support,
dated August 2022, submitted) 
12. DRAFT OBAN, LORN AND THE ISLES AREA COMMITTEE WORKPLAN 
The Committee gave consideration to the Area Committee workplan for future
meetings. 
Decision 
The Oban, Lorn and the Isles Area Committee considered and noted the contents of
the workplan. 
(Reference:  Area Committee Workplan, dated 14 December 2022, submitted) 
13. JOHN OF LORN BEQUEST AWARD RECOMMENDATIONS 
The Committee gave consideration to a report which provided information regarding
forty-nine applications that had been received for support from the John of Lorne
Bequest. Of the applications received 8 were refused as they did not meet the criteria
with £3.6k being awarded to 41 applicants. 
Decision 
The Oban, Lorn and the Isles Area Committee noted and considered the number of
awards made since 14 September 2022. 
Page 6

Page 7

(Reference: Report by Executive Director with Responsibility for Legal and
Regulatory Support, dated November 2022, submitted) 
Page 7

Page 8

This page is intentionally left blank

Page 9

MINUTES of MEETING of OBAN LORN & THE ISLES COMMUNITY PLANNING GROUP held
by TEAMS 
on WEDNESDAY, 8 FEBRUARY 2023 
Present: Kevin Champion  (Chair)
Stuart McLean, Committee Manager, Argyll and Bute Council
Councillor Kieron Green, Argyll and Bute Council
Councillor Andrew Vennard, Argyll and Bute Council
Councillor Amanda Hampsey, Argyll and Bute Council
Joan Best, Crossroads
Jen Broadhurst, Citizens Advice Bureau
Robert Kincaid, Oban Community Harbour Development Association
Duncan Martin, Oban Community Council
Sue Barnard, Oban Community Council
Jen Metcalf, Coll Community Council
Robert Taylor, Scottish Fire and Rescue
Susan McRae, Skills Development Scotland
Kirsty McLuckie, Community Development Officer, Argyll and Bute Council
Maureen Evans, Community Learning, Live Argyll
Sergeant Matthew Shaw, Police Scotland
Catriona Petit, New Hope Oban
Judith Hawcroft, Crossroads 
Attending: Jackie Westerman, Home Energy Efficiency, Project Officer Argyll and Bute
Council 
Rachel McNicol, ALIenergy
Robbie Layden, Land and Field Scotland
Isla McCulloch, Adventure Oban, Sustaining Choices
Andrew Galloway, Local Democracy Reporter, Helensburgh Advertiser
John McLuckie, Partnerships Lead – Community Services, Argyll and Bute
Council
Kirsty McLuckie, Community Development Officer, Argyll and Bute Council 
1. WELCOME AND APOLOGIES 
The Chair welcomed everyone to the meeting. 
Apologies were intimated on behalf of:- 
Ryan MacIntyre, Member of Scottish Youth Parliament
Michelle Mundie, Chief Executive ACHA
Fergus Murray, Development and Economic Growth, Argyll and Bute Council
PC Laura Evans, Police Scotland
Inspector Lee Page, Police Scotland
Ronnie Kelly, Department of Work and Pensions
Andrew Spence, BIDS4Oban
Carol Flett, Living Well Network (Mull, Coll and Tiree)
Councillor Jim Lynch, Argyll and Bute Council 
Page 9 Agenda Item 3b

Page 10

2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTES 
The minutes of the Oban, Lorn and the Isles Area Community Planning Group
meeting held on Wednesday, 9 November 2022 were approved as a correct record. 
4. GOVERNANCE 
(a) Area Community Planning Group Governance Arrangements 
The Group considered a report which asked Members to review the
updated Terms of Reference for the Group, the membership of the Group
and the planned future meeting dates until May 2024. 
It was noted that any other suggestions for new organisations to join the
Group could be submitted to Stuart McLean by email following the
meeting. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group: 
1. considered and adopted the Terms of Reference submitted at
Appendix 1 of the report and to agree that they would be reviewed
on an annual basis to ensure their ongoing currency and
appropriateness for the work of the Area CPG as it developed over
time; 
2. consider and agree the membership of the group at Appendix 2 off
the report and agree the membership of the group would be
reviewed on an annual basis to ensure currency and
appropriateness for the work of the group as it developed over
time; and 
3. Noted the dates for future meetings of Wednesday 10 May 2023,
Wednesday 16 August 2023, Wednesday 8 November 2023,
Wednesday 7 February and Wednesday 8 May 2024. 
(Reference: Report by Committee Manager, Argyll and Bute Council,
dated 8 February 2023, submitted) 
(b) Appointment of Chair to the Oban, Lorn and the Isles Area
Community Planning Group 
Page 10

Page 11

The Group considered a report providing information relating to the
appointment of a Chair of the Oban, Lorn and the Isles Area Community
Planning Group and outlining the expected time commitment and
information about the role. 
Kevin Champion, current Chair,  advised that he would be moving from
the area during the summer of 2023 and volunteered to continue as Chair
for the next meeting in May. 
It was noted that Community Councillors, within the locality could hold the
position of Chair and should be advised accordingly.  There were no other
nominations for the position of Chair during the meeting.     
Decision 
The Oban, Lorn and the Isles Area Community Planning Group agreed 
1. Kevin Champion be re-appointed as Chair for next meeting. 
(Reference: Report by Committee Manager, Argyll and Bute Council,
dated 8 February 2023, submitted) 
5. PARTNER UPDATE 
(a) Scottish Fire & Rescue 
The Group considered a report highlighting the Scottish Fire and Rescue
Service’s (SFRS) FQ3 review of local performance across Oban, Lorn and
the Isles for the period 2022-23. The report also included information on
the Services’ new Policy covering Unwanted Fire Alarm Signals which will
go live from May 2023, where fire alarm signals received must be backed
up with a phone call or the service will not attend. The report included
information on the local firefighter training plan, incidents during this time
period and recent community engagement activities. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided. 
(Reference: Report by Scottish Fire and Rescue Service, submitted) 
Page 11

Page 12

(b) Police Scotland 
Consideration was given to an update by Sergeant Matthew Shaw, who
advised that the Policing Framework within the Mid Argyll, Kintyre and the
Islands and Oban, Lorn and the Isles had changed, with more emphasis
on Community Focus. 
The update also included information on the ‘Not At Home Protocol’ which
launched locally on the 9th of January 2023; The Distress Brief
Intervention which is being rolled out throughout Argyll and Bute; the
‘Rural Watch Scotland’ extension of the Neighbourhood Watch Scotland
movement; 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided. 
(Reference: Report by Police Scotland, submitted) 
(c) Public Health 
The Group gave consideration to a report which provided an update on
ongoing wellbeing and prevention activity overseen and delivered by the
HSCP Public Health Team in Argyll and Bute. The report provided
information on the launch of year 4 of the Living Well (Self-Management)
community capacity building fund; the Community Link Working service
which is commissioned by Argyll and Bute HSCP and delivered by the
Third Sector and the launch of a new website which contains information
about the Living Well Strategy and the wider health improvement work.
The website can be assessed at https://www.ablivingwell.org. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided. 
(Reference: Report by Argyll and Bute HSCP - Public Health, submitted) 
(d) Living Well Network 
The Group gave consideration to a written report from the Living Well
Network. As no-one was in attendance from the Living Well Network, the
Committee Manager advised that he would relay any questions back to
them with regards to the report. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided. 
Page 12

Page 13

(Reference: Report by Living Well Network, submitted) 
(e) Community Learning Services - Live Argyll 
The Group considered a report from Community Learning Services, where
Maureen Evans highlighted that the Community Learning Services is in a
state of transition at the moment with a new Team Leader, Wendy Reid,
recently being appointed. 
Maureen advised that there are  Youth and Adult work support drop in
sessions at Oban Library on Mondays from 10am -12pm to assist people
with job applications and CVs and that this service may be extended to
include an afternoon session. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided. 
(Reference: Report by Community Learning Services, Live Argyll,
submitted) 
(f) Oban Community Harbour Development Association 
The Group gave consideration to a report from Oban Community Harbour
Development Authority (OCHDA),  highlighting that Argyll and Bute
Council had submitted the Harbour Revision Order to Transport Scotland
with further information expected to be shared at the next Harbour Board,
scheduled for 2nd March.  Mr Kincaid advised that OCHDA would welcome
greater local influence over the Port. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided. 
(Reference: Report by Oban Community Harbour Development
Association, submitted) 
(g) Department of Works and Pensions 
Consideration was given to an update from the Department of Work and
Pensions (DWP), which provided information on the number of claimants
for Universal Credit and legacy benefits.  Further information was
provided in relation to a number of targeted packages of support for the
most vulnerable which included the benefit uprating; the new cost of living
payments; the benefit cap rise and employment and support allowance. 
As no-one was in attendance from DWP, the committee Manager advised
that he would relay any questions back to them with regard to the report. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
Page 13

Page 14

considered and noted the information provided. 
(Reference: Report by Department of Work and Pensions, submitted) 
(h) Argyll & Bute Citizens Advice Bureau 
Consideration was given to a report which provided an update in relation to
current work streams of the Citizen’s Advice Bureau within Argyll and Bute. 
The report included information on the ongoing rise in the number of clients
seeking support with the energy costs as the cost of living crisis continues
and the additional supports available in the forms of grants available within
the ; Oban, Lorn and the Isles area. 
The report also highlighted the recruitment campaign about to begin for the
spring cohort of volunteer trainee advisers and the the annual consultation
exercise with partner organisations in order to review the work of the bureau. 
Partners noted that they could participate in the consultation which could be
found at: 
https://www.smartsurvey.co.uk/s/ABCABCommunityPartnersSurvey 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided. 
(Reference: Report by Argyll and Bute Citizens Advice, submitted) 
(i) Community Contacts - Carr Gomm 
The Group gave consideration to a written report from Community
Contacts – Carr Gomm. As no-one was in attendance from Carr Gomm
the Committee Manager advised that he would relay any questions back
to them with regards to the report. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided. 
(Reference: Report by Community Contacts, Carr Gomm submitted) 
(j) North Argyll Carers Centre 
The Group gave consideration to a report from North Argyll Carers Centre
highlighting the increase in demand for their services, with 29 new adult
carers and 15 new young carers being registered since the last meeting.
The Health and Social Care Partnership  have awarded funding to support
a pilot which will enable the Carers Centre to put in place regular home-
help type preventative supports for carers, to reduce the risk of them
reaching crisis point. 
Page 14

Page 15

Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided. 
(Reference: Report by North Argyll Carers Centre, submitted) 
(k) Argyll and Bute TSI 
The Group gave consideration to a written update by Argyll and Bute TSI
which included information on the Argyll & Bute Community Directory’s Self
Service Function which will allow organisations to update and maintain their
listing themselves; useful resources and warm spaces information in relation
to the Cost of Living Crisis; the TSI Inveraray Hub which is being offered as a
warm space for Organisations; fully funded distance learning qualifications
with Skills Network training and All our Children Network and the TSI Social
Enterprise Network meetings on the 14th and 15th of February 2023. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided. 
(Reference: Report by Argyll and Bute TSI, submitted) 
(l) Opportunity for verbal updates by Community Planning Partners 
Joan Best, Crossroads 
Joan Best advised that Crossroads are settling in to their new premises at
Gibralter Street, with lots of people visiting.  The official open day was
held to coincide with their 20th Anniversary at the end of November, which
was well attended. Joan reported that Crossroads continue to support 64
carers and have received referrals from Cuan, Luing and Seil and that a
Bucksfizz and Bacon morning was held for unpaid carers.   
Catriona Petit, New Hope Kitchen 
Catriona Petit reported that there has been an increased demand on the
service with a number of activities going on.  Catriona advised that she is
also on the Alcohol and Drug Addiction Forum, which has facilitated  more
trauma support working in partnership with Carr Gomm, who have moved
in to an adjacent premises. New Hope Kitchen have also formed working
relationships with Atlantis Leisure, ALIenergy, Youth Cafe and Winter
warmer spaces. 
Susan MacRae, Skills Development Scotland 
Susan McCrae of Skills Development Scotland provided the Group with a
verbal update on the ongoing work of the service. She highlighted the work
ongoing with senior pupils within the schools and with students entering the
senior years, specifically advice regarding the subject choices.  Susan also
provided information on the current Partnership Action for Continuing
Page 15

Page 16

Employment (PACE) situation. 
6. CLIMATE CHANGE 
(a) Report by Chair of Climate Change Working Group 
Consideration was given to a report which highlighted the ongoing work of
the Climate Change Working Group. The report outlined the proposal to
produce a strategic Action Plan as a means to address the climate
emergency in Argyll and Bute; the development of governance arrangements
and structures to support the Climate Change Project Officer post. It was
highlighted that they are actively pursuing the recruitment of a Project
Manager to start this Action Plan work and hope to have someone in post
before the end of the financial year. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the update.   
(Reference: Report by Chair of the Climate Change Working Group, dated
20 January 2023 submitted) 
(b) Home Energy Efficiency 
Jackie Westerman, Home Energy Efficiency Project Officer for Argyll and
Bute Council provided the Group with a verbal presentation on Home Energy
Efficiency and the funds available to people within Argyll and Bute. Jackie
highlighted that the premise of the Energy Efficient Scotland Scheme is to
reduce carbon emissions to contribute to the Scottish Governments aim to
have 0% emissions by 2040, adding that fuel poverty has been an important
aspect of her work. Jackie reported that the Energy Efficient Scotland Area
Based Scheme is available to home owners or private rented tenants with
grant amounts dependent on property type and personal circumstances, with
awards starting at £8,500 for a flat and a maximum of £13,500 for a detached
property. 
Jackie highlighted that from July 2022 until now, £1.12million has been spent
in Argyll and Bute and that more than 140 households in Argyll and Bute
have been insulated in this year’s programme. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group considered
and noted the information provided. 
(Reference: Verbal report by Jackie Westerman, Home Energy Efficiency
Project Officer, Argyll and Bute Council) 
(c) ALIenergy 
An update was considered by the group from Rachel McNicol from
Page 16

Page 17

ALIenergy on the affordable warmth services provided.  The update
included information on what they are working on including Affordable
Warmth, Education and Local Energy Projects.  The update also included
information on fuel poverty around Scotland with communities with Argyll
and Bute being rated as one of the most at risk.  It was also highlighted
that the majority of households across North West Scotland are now likely
to be suffering with fuel poverty or will in the near future.  It was also
highlighted that oil is not a problem as it is considerably cheaper that
electric heating. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the presentation. 
(Reference: Presentation by Rachel McNicol, ALIenergy) 
(d) Forestry and  Land Scotland 
The Group gave consideration to a report  from Robbie Layden, which
highlighted the ongoing workstreams of Forestry and Land Scotland within
the Oban, Lorn and the Isles (OLI) locality.  Information on Land
Management Plans; Renewable Energy plans;  the ongoing peatland
restoration programme; removal of Larch Trees infected by disease;
proposals to introduce car parking charges to a number of sites within the
locality with the busiest sites being charged £3 per day or £1 per hour was
highlighted. 
Decision 
The Oban, Lorn and the Isles considered and noted the report. 
(Ref. Presentation by Robbie Layden, Forestry and Land Scotland) 
7. COMMUNITY FOCUS 
(a) Sustaining Choices - Active Travel Plan Oban 
Isla McCulloch, a trustee with Adventure Oban, advised that they work in 
partnership with Sustaining Choices.  Isla delivered a presentation on the
Active Travel Plan for Oban and highlighted the key actions proposed in
Oba: Safer such as Safer Cycle Routes to Schools, Improvement on
signage and lighting for active travel routes, ensuring pavements meet the
needs of people with additional access needs, maintenance of the general
appearance of Oban’s greenspace, pavements and shop fronts. 
Decision 
The Oban, Lorn and the Isles Area Community Planning group considered
and noted the Presentation.
Page 17

Page 18

(Presentation by Isla McCulloch, Adventure Oban, Sustaining Choices) 
8. COMMUNITY PLANNING PARTNERSHIP MANAGEMENT COMMITTEE
UPDATE 
Consideration was given to a report which provided information on matters discussed
during a meeting of the Community Planning Partnership (CPP) Management
Committee, held on 7 December 2022. The Committee Manager outlined a number of
key highlights from the meeting, with it being noted that the closing date for the
consultation survey being conducted by the MSYP’s had been extended until 14
February 2023.  Partners were encouraged to take part in the consultation, which can be
found at:- tinyurl.com/3yf3xe8   
Decision 
The Oban, Lorn and the Isles Area Community Planning Group considered and
noted the report. 
(Reference: Report by Committee Manager, Argyll and Bute Council, dated 7
February 2023, submitted) 
9. DATE OF NEXT MEETING - 10 MAY 2023 
The Chair thanked everyone in attendance at the meeting, and thanked all partners
for their continued proactive work in the community. 
The Group noted that the next meeting of the Oban, Lorn  and the Isles Area
Community Planning Group would take place on Wednesday, 10 May 2023 at 10am. 
Page 18

Page 19

1 
ARGYLL AND BUTE COUNCIL OBAN, LORN AND THE ISLES
AREA COMMITTEE 
CUSTOMER SUPPORT SERVICES   8 MARCH 2023 
AREA PERFORMANCE REPORT – FQ3 2022/23 
1 Background 
1.1 This paper presents the Area Performance Report for Financial Quarter 3 2022/23
(October to December 2022) and illustrates the agreed performance measures. 
1.2 The features of the Performance Report are as follows:- 
 Indicators are grouped by Corporate Outcome.
 The data table for each indicator is coded to identify the level of reporting.
o Area level measures are blue
o Council level measures are grey
o COI measures are white 
 Each indicator details the
o Target, Actual and Performance status (Green / Red / No Target) for the
current and three previous financial quarters.
o Commentary for the current financial quarter only.
o Narrative explaining the performance trend e.g. This indicator is above
Target and performance has improved since the last reporting period.
o Where appropriate a Performance Trend Line has been added.
o The name of the responsible officer.
o Where possible performance is presented at both Area and Council
level. 
It should be noted that Pyramid remains live and all measures can be navigated
as usual through the front screen. If support to navigate Pyramid is required please
email pyramid@argyll-bute.gov.uk 
1.3 The commentary for each indicator helps ‘Tell Our Story’ and enables Elected
Members to put the performance data into perspective and understand if an issue is
local in nature or should be escalated up to a Strategic Committee. 
1.4 To improve the response to performance queries, it is requested that either the
Responsible Named Officer or Sonya Thomas are contacted once the Quarterly
Performance Report is received with any queries. This should enable some
queries being resolved or clarified prior to the Area Committee meeting, and
therefore being carried forward as Actions at a subsequent meeting. 
2 Recommendations 
Page 19 Agenda Item 5

Page 20

2 
2.1 It is recommended that the Area Committee – 
a) Notes and considers the performance and supporting commentary as
presented. 
b) Upon receipt of the Quarterly Performance Report the Area Committee
contact either the Responsible Named Officer or Sonya Thomas with any
queries. 
c) Note that work is ongoing and to respond to Sonya Thomas with requests
or comments regarding the layout and format of the Performance Report. 
3.0 IMPLICATIONS 
3.1 Policy: None
3.2 Financial: None
3.3 Legal: None
3.4 HR: None
3.5 Fairer Scotland Duty: No impact assessment required for this report. 
3.5.1 Equalities: None. If requested the Area Committee Performance Report
can be supplied in a different format.
3.5.2 Socio-economic Duty: None
3.5.3 Islands: None 
3.6 Climate Change: None
3.7 Risk: None
3.8 Customer Service: None 
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services 
Jane Fowler
Head of Customer Support Services
8 February 2023 
For further information, please contact:
Sonya Thomas
Organisation Development Officer - Performance and Improvement
Customer Support Services
01546 604454 
Appendix 1: FQ3 2022/23 OLI Performance Report 
Page 20

Page 21

Appendix 1
Page 1 
Performance Reporting
Performance Reporting .............................................................................................................................................................................................................................. 1
All Areas .................................................................................................................................................................................................................................................. 4
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 5
COI – Maximise distribution of Scottish Welfare Fund ................................................................................................................................................................. 5
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 6
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention ...................... 6
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 7
Number of parking penalty notices issued – Oban, Lorn and the Isles......................................................................................................................................... 7
Number of parking penalty notices issued – Argyll and Bute ....................................................................................................................................................... 7
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 8
Car parking income to date – Oban, Lorn and the Isles................................................................................................................................................................. 8
Car parking income to date – Argyll and Bute ............................................................................................................................................................................... 9
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................. 10
Dog fouling – total number of complaints – Oban, Lorn and the Isles ....................................................................................................................................... 10
Dog fouling – total number of complaints – Argyll and Bute ...................................................................................................................................................... 10
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 11
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place .... 11
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 12
COI – Provide quality meals with cost margins to all pupils ....................................................................................................................................................... 12
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all .......................................................................................................... 13
Maximise the percentage of 16-19 years olds participating in education, training or employment – Oban, Lorn and the Isles ............................................ 13
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and Bute ................ 13
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 14
Page 21

Page 22

Appendix 1
Page 2 
Number of affordable social sector new builds completed per annum – Oban, Lorn and the Isles ......................................................................................... 14
Number of affordable social sector new builds completed per annum – Argyll and Bute ........................................................................................................ 14
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 16
Percentage of pre-planning application enquiries processed within 20 working days – Oban, Lorn and the Isles .................................................................. 16
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute ................................................................................ 16
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 17
Householder planning applications – average number of weeks to determine – Oban, Lorn and the Isles ............................................................................. 17
Householder planning applications – average number of weeks to determine – Argyll and Bute ........................................................................................... 17
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 19
COI – The number of new homeless applicants who required temporary accommodation this period .................................................................................. 19
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 20
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal .................................................... 20
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 21
COI – Increase the number of community benefits that are delivered through contracts we award locally ........................................................................... 21
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 22
Street lighting – percentage of faults repaired within 10 days – Oban, Lorn and the Isles ....................................................................................................... 22
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute .......................................................................................... 23
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 24
Total number of complaints regarding waste collection – Lorn ................................................................................................................................................. 24
Total number of complaints regarding waste collection – Mull ................................................................................................................................................. 24
Total number of complaints regarding waste collection – Argyll and Bute ............................................................................................................................... 25
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 26
COI – Percentage of waste recycled, composted and recovered ................................................................................................................................................ 26
Shanks – Percentage of waste recycled, composted and recovered .......................................................................................................................................... 26
Islands – Percentage of waste recycled, composted and recovered .......................................................................................................................................... 27
Page 22

Page 23

Appendix 1
Page 3 
H&L – Percentage of waste recycled, composted and recovered ............................................................................................................................................... 28
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 29
COI – The number of tonnes of waste sent to landfill ................................................................................................................................................................. 29
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 30
LEAMS (Local Environment Audit and Management System) – Lorn ......................................................................................................................................... 30
LEAMS (Local Environment Audit and Management System) – Mull ......................................................................................................................................... 30
LEAMS (Local Environment Audit and Management System) – Argyll and Bute ....................................................................................................................... 31
Making It Happen.............................................................................................................................................................................................................................. 32
Teacher sickness absence – Oban, Lorn and the Isles ................................................................................................................................................................. 32
Teacher sickness absence – Argyll and Bute ................................................................................................................................................................................ 32
Making It Happen.............................................................................................................................................................................................................................. 33
LGE staff (non-teacher) sickness absence – Oban, Lorn and the Isles ........................................................................................................................................ 33
LGE staff (non-teacher) sickness absence – Argyll and Bute ....................................................................................................................................................... 33
Making It Happen.............................................................................................................................................................................................................................. 34
COI – Increase the percentage of all self-service automated contacts ....................................................................................................................................... 34 
Page 23

Page 24

Appendix 1
Page 4 
All Areas 
FQ3 2022/23 Overall Performance Summary 
The information presented is a summary of the measures that are available on Pyramid. 
Unless stated otherwise, performance is presented at both Area and Council-wide levels. 
The measures show the performance against target for the current and previous three reporting periods with an explanation of performance trend. 
The data table for each indicator is colour coded to identify the level of reporting: 
 Area level measures are blue.
 Council level measures are grey.
 Corporate Outcome Indicators (COIs) are white. 
Where the measure is appropriate a Performance Trend Line has been added to illustrate performance over the reporting period. 
Page 24

Page 25

Appendix 1
Page 5 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Maximise distribution of Scottish Welfare Fund 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ4 2021/22 95.3% 120.7% Green
FQ1 2022/23 95.3% 87.5% Red
FQ2 2022/23 95.3% 115.1% Green
FQ3 2022/23 95.3% 129.2% Green 
The Performance has exceeded target and actual has increased since the last reporting period. 
FQ3 Comment 
The Council is maximising the distribution of this fund to support vulnerable people on low incomes tackle the cost of living challenges. As at 31 December spend
on the fund is £444,000 and is projected to increase to £624,000 by the end of March 2023. This is well above the annual budget of £458,338. The Scottish
Government has distributed more grant funding to Councils nationally to support them with the overspend and there is specific grant funding in earmarked
reserves to cover the overspend this year. Therefore there is no issue with the position in terms of overall available finance the importance is ensuring as many
households are support as possible during challenging times.   
Responsible person: Fergus Walker 
Page 25

Page 26

Appendix 1
Page 6 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and
intervention 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ4 2021/22 100% 100% Green
FQ1 2022/23 100% 100% Green
FQ2 2022/23 100% 100% Green
FQ3 2022/23 100% 100% Green 
This indicator for FQ3 has met the target with no change in performance since the last reporting period. 
FQ3 Comment
All of the clients provided with a Personal Debt Recovery Action Plan were satisfied. Out of 11 surveys issued 11 were returned showing 100% of clients satisfied. 4
of the 11 survey returns had comments showing their appreciation of the service and how it had helped them.
Responsible person: Lee Roberts 
Page 26

Page 27

Appendix 1
Page 7 
Corporate Outcome No.2 – People live in safer and stronger communities 
Number of parking penalty notices issued – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 135 No target 
FQ1 2022/23 No target 322 No target
FQ2 2022/23 No target 240 No target
FQ3 2022/23 No target 153 No target 
The indicator for FQ3 shows the number of parking penalty notices has decreased since the last reporting period. 
FQ3 Comment
Free car parking at Christmas time extended from two weeks to 16 days, Winter Festival – free car parking for 10 days. Fairground took over Corran Halls car park
for two weeks.
Responsible person: Hugh O’Neill 
Number of parking penalty notices issued – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 1,188 No target 
FQ1 2022/23 No target 2,043 No target
FQ2 2022/23 No target 2,124 No target
FQ3 2022/23 No target 1,343 No target 
This indicator for FQ3 shows the number of parking penalty notices has decreased since the last reporting period. 
FQ3 Comment
Free parking before Christmas extended to 16 days, Pier Car Park in Helensburgh unenforceable at present and various lining issues throughout Argyll and Bute.
Responsible person: Hugh O’Neill 
Page 27

Page 28

Appendix 1
Page 8 
Corporate Outcome No.2 – People live in safer and stronger communities 
Car parking income to date – Oban, Lorn and the Isles 
Performance is presented cumulatively for both Area and Council-wide levels. For individual car parks, the income is presented on a quarterly basis. 
Reporting Period
2022/23
Target
(Cumulative)
Actual
(Cumulative)
Status
FQ4 2021/22 £478,497 £454,017 Red
FQ1 2022/23 £170,832 £84,992 Red
FQ2 2022/23  £426,247 £286,288 Red
FQ3 2022/23 £554,026 £423,730 Red 
This indicator for FQ3 shows the cumulative amount of income collected is significantly lower than the cumulative target. There is no Performance Trend Line as
this data is cumulative. 
FQ3 Comment
The figures to date show an under-recovery of £130,296. It is difficult to ascertain the exact reasons for under-recovery in parking income however it can be
affected by such things as events, weather, commuting and a delay in processing of cash or credit/debit card payments can also be a factor. The impact of the
waiving of charges for events in car parks, waiving charges in off-street car parks during winter festivals will likely have affected outturn.  
Responsible person: Hugh O’Neill 
Actual Quarterly Income collected in Oban, Lorn and Isles during FQ2 and FQ3. 
Car Park Location FQ2 Actual FQ3 Actual
Corran No.1, Oban £19,666 £8,773
North Pier, Oban £29,249 £20,209
Corran No.2, Oban £12,181 £5,883
Longsdale, Oban £5,803 £2,578
Non-trunk, Oban £52,949 £50,120
Lochavullin, Oban £8,133 £5,588
Ganavan, Oban £1,424 £3,240
Trunk, Oban £11,463 £8,162
Albany Street, Oban £8,721 £3,291
Page 28

Page 29

Appendix 1
Page 9 
Car Park Location FQ2 Actual FQ3 Actual
Oban £2,791 £2,987
Tweedale Street, Oban £29,582 £17,641
Market Street, Oban £2,019 £1,065
Esplanade, Oban £1,310 £2,305
Ledaig, Tobermory £361 £0
Craignure, Mull £387 £532
Fionnphort, Mull £15,256 £5,066 
Car parking income to date – Argyll and Bute 
Performance is presented cumulatively for both Area and Council-wide levels. 
Reporting Period  Target
(Cumulative)
Actual
(Cumulative)
Status
FQ4 2021/22 £807,078 £801,606 Red
FQ1 2022/23 £250,661 £165,678 Red
FQ2 2022/23 £625,430 £491,453 Red
FQ3 2022/23 £812,919 £709,585 Red 
This indicator for FQ3 shows the cumulative amount of income collected is significantly lower than the cumulative target. There is no Performance Trend Line as
this data is cumulative. 
FQ3 Comment 
Improved income in both MAKI and H&L areas but overall there is an under-recovery in income of £103,334. It is difficult to ascertain the exact reasons for under-
recovery in parking income however it can be affected by such things as events, weather, commuting and a delay in processing of cash or credit/debit card
payments can also be a factor. The impact of the waiving of charges for events in car parks, waiving charges in off-street car parks during winter festivals will likely
have affected outturn.  
Responsible person: Hugh O’Neill 
Page 29

Page 30

Appendix 1
Page 10 
Corporate Outcome No.2 – People live in safer and stronger communities 
Dog fouling – total number of complaints – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 20 No target 
FQ1 2022/23 No target 9 No target
FQ2 2022/23 No target 4 No target
FQ3 2022/23 No target 6 No target 
This indicator for FQ3 shows the number of dog fouling complaints has increased since the last reporting period. 
FQ3 Comment
There were 5 dog fouling complaints received for the Oban area this quarter, this is very good and the Warden Service will continue to monitor and patrol. There
was only 1 dog fouling complaint received for the Isle of Mull, this is very good and the Warden Service will ensure they continue with their patrols as often as can
be assigned.
Responsible person: Tom Murphy 
Dog fouling – total number of complaints – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 81 No target 
FQ1 2022/23 No target 61 No target
FQ2 2022/23 No target 45 No target
FQ3 2022/23 No target 47 No target 
This indicator for FQ3 shows the number of dog fouling complaints has increased slightly since the last reporting period. 
FQ3 Comment
There were a total of 47 dog fouling complaints received this quarter, although this is down slightly on last quarter, the Warden service will continue monitoring,
patrolling and educating on the issues of dog fouling in an attempt to reduce the number of complaints further, however it is difficult to catch a person committing
an offence as the majority of the complainants wish to remain anonymous.
Responsible person: Tom Murphy 
Page 30

Page 31

Appendix 1
Page 11 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring
plans in place 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ4 2021/22 100% 100% Green
FQ1 2022/23 100% 100% Green
FQ2 2022/23 100% 100% Green
FQ3 2022/23 100% 100% Green 
This indicator for FQ3 is on track with no change in performance since the last reporting period. 
FQ3 Comment
There is individual tracking and monitoring in place on SEEMIS in schools for care experienced children and young people. In addition to this, the Principal Teacher
for care experienced children and young people monitors the information in SEEMIS and has subsequent conversations with staff in schools to ensure care
experienced children and young people are receiving all the support they need to achieve and that the staff in school have the right strategies in place to help the
child remain engaged with their education attainment and achievement. Often the care experienced health and wellbeing officers are used to provide extra
support for the child and the family.
Responsible person: Louise Lawson 
Page 31

Page 32

Appendix 1
Page 12 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Provide quality meals with cost margins to all pupils 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 5.00% -4.00% Green 
FQ1 2022/23 5.00% 3.77% Green
FQ2 2022/23 5.00% 0.98% Green
FQ3 2022/23 5.00% 6.09% Red 
This indicator for FQ3 is above target and performance has decreased since the last reporting period. 
FQ3 Comment
Total Percentage variance for Argyll and Bute 6.09%. This is slightly over the target variance of 5%. We will continue to monitor any locations continuing to have
food cost percentages over this target.
Responsible person: Jayne Jones 
Page 32

Page 33

Appendix 1
Page 13 
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all 
Maximise the percentage of 16-19 years olds participating in education, training or employment – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 94.00% 94.14% Green 
FQ1 2022/23 94.00% 95.95% Green
FQ2 2022/23 94.00% 95.48% Green
FQ3 2022/23 94.00% 95.34% Green 
This indicator for FQ3 is above target however, performance has decreased slightly since the last reporting period. 
FQ3 Comment
As of 09/12/2022, the participation figure for OLI was 95.34%. This is 1.44% above the Argyll and Bute Participation figure of 93.90% for 2021/22.
Responsible person: Simon Easton 
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and
Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 94.00% 93.80% Red 
FQ1 2022/23 94.00% 94.00% Green
FQ2 2022/23 94.00% 93.90% Red
FQ3 2022/23 94.00% 93.90% Red 
This indicator for FQ3 is slightly below target. 
FQ3 Comment
The Annual Participation Measure for 2021/22 was released on 31st August 2022. In Argyll and Bute 93.90% of young people aged 16-19 were participating (in
work, training or education). This figure is 0.4% above the national average, (which is 93.5%). In total 3.8% of 16-19 year olds were not participating, which is 0.2%
below the national average, and 2.3% were unconfirmed, which is 1.3% below the national average.
As of 9 December 2022, the most up to date participation figure for Argyll and Bute stood at 93.92%.
Responsible person: Simon Easton
Page 33

Page 34

Appendix 1
Page 14 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Number of affordable social sector new builds completed per annum – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 37 37 Green 
FQ1 2022/23 18 18 Green
FQ2 2022/23 38 38 Green
FQ3 2022/23 36 36 Green 
This indicator for FQ3 has met the target for the reporting period. 
FQ3 Comment
Link Group Development at Dunbeg
34 General Needs (2 x 1 Bed 2 Person Flat, 2 x 2 Bed 4 Person Flat, 20 x 2 Bed 4 Person House, 7 x 3 Bed 6 Person House, 3 x 4 Bed 7 person House)
1 Amenity (1 x 1 bed 2 Person Amenity Flat)
1 wheelchair accessible (1 x 1 Bed 2 Person Wheelchair Flat)
Responsible person: Allan Brandie 
Number of affordable social sector new builds completed per annum – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 45 45 Green 
FQ1 2022/23 36 36 Green
FQ2 2022/23 48 48 Green
FQ3 2022/23 37 37 Green 
This indicator for FQ3 has met the target for the reporting period. 
FQ3 Comment
37 units were completed in FQ3.
Responsible person: Alan Brandie 
Bute and Cowal – no units were completed.
Page 34

Page 35

Appendix 1
Page 15 
Helensburgh and Lomond – no units were completed.
Mid Argyll, Kintyre and Islay – Argyll Community Housing Association Development at Millknowe: 1 wheelchair accessible (1 x 2 Bed Ground Floor Wheelchair Flat)
Oban, Lorn and The Isles – Link Group Development at Dunbeg: 34 General Needs (2 x 1 Bed 2 Person Flat, 2 x 2 Bed 4 Person Flat, 20 x 2 Bed 4 Person House, 7 x 3
Bed 6 Person House, 3 x 4 Bed 7 person House), 1 Amenity (1 x 1 bed 2 Person Amenity Flat), 1 wheelchair accessible (1 x 1 Bed 2 Person Wheelchair Flat) 
Page 35

Page 36

Appendix 1
Page 16 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Percentage of pre-planning application enquiries processed within 20 working days – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 75.0% 75.0% Green 
FQ1 2022/23 75.0% 75.0% Green
FQ2 2022/23 75.0% 86.2% Green
FQ3 2022/23 75.0% 76.9% Green 
This indicator for FQ3 is above target however performance has decreased since the last reporting period. 
FQ3 Comment
The team processed 76.9% of pre-applications enquiries within 20 working days – the fourth consecutive quarter of above target performance.
Responsible person: Peter Bain 
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 75.0% 56.3% Red 
FQ1 2022/23 75.0% 60.5% Red
FQ2 2022/23 75.0% 64.7% Red
FQ3 2022/23 75.0% 52.5% Red 
This indicator for FQ3 is below target however performance has decreased since the last reporting period. 
FQ3 Comment
With 52.5% of pre-applications being processed within the target of 20 working days, it is accepted that the performance of handling of pre apps is currently below
expected standards it should however be recognised that the service is currently operating with reduced resource and high volume of statutory case work. Pre
applications are non-statutory case work items and therefore afforded a lower priority in relation to statutory casework and is reflected in reduced standard of
performance at this time.
Responsible person: Peter Bain 
Page 36

Page 37

Appendix 1
Page 17 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Householder planning applications – average number of weeks to determine – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 8.0 weeks 9.2 weeks Red 
FQ1 2022/23 8.0 weeks 9.4 weeks Red
FQ2 2022/23 8.0 weeks 8.5 weeks Red
FQ3 2022/23 8.0 weeks 7.7 weeks Green 
This indicator for FQ3 has met the target and performance has improved since the last reporting period. 
FQ3 Comment
This measure only relates to planning applications received for alterations to existing premises.
The team recorded an impressive average turnaround time of 7.7 weeks for householder applications during this financial quarter. The best result in two years.
Responsible person: Peter Bain 
Householder planning applications – average number of weeks to determine – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 8.0 weeks 13.8 weeks Red 
FQ1 2022/23 8.0 weeks 12.4 weeks Red
FQ2 2022/23 8.0 weeks 13.1 weeks Red
FQ3 2022/23 8.0 weeks 12.0 weeks Red 
This indicator for FQ3 has not met the target however performance has improved since the last reporting period. 
FQ3 Comment
This measure only relates to planning applications received for alterations to existing premises.
Although a reduction of 1 week in average turnaround time was achieved on the last FQ, the headline performance figure of 12 weeks remains 50% above target.
Much of this is attributable to the MAKI team where the Development Manager continues to perform the role of Area Team Leader in addition to his own duties,
as has been the case for well over a year now. Whilst Officers may be processing householder applications timeously they are being held up awaiting managerial
scrutiny and sign off.
Page 37

Page 38

Appendix 1
Page 18 
Responsible person: Peter Bain 
Benchmarking
The year-end statistics from The Scottish Government were published on 31st August. FY21/22 benchmarking figures have now been updated and FY22/23 have
been forward projected in the usual way. Readers should note that our own Pyramid data in Development Management measures is "unadjusted", whereas that
of the benchmarks (represented by the blue and green columns on the graph) is adjusted for "clock-stopping". Clock-stopping is where The Scottish Government
allow for the removal of specific time periods for identified applications where delays were out with the control of the Local Planning Authority. 
Page 38

Page 39

Appendix 1
Page 19 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – The number of new homeless applicants who required temporary accommodation this period 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 37 No target 
FQ1 2022/23 No target 32 No target
FQ2 2022/23 No target 28 No target
FQ23 2022/23 No target 41 No target 
This indicator for FQ3 shows the number of applicants has increased since the last reporting period. 
FQ3 Comment
During FQ3, the housing service provided temporary accommodation for 41 new homeless households.
Responsible Person: Morven Macintyre 
Bute and Cowal – 15
Helensburgh and Lomond – 7
Oban, Lorn and the Isles – 15
Mid Argyll, Kintyre and Islay – 4 
Page 39

Page 40

Appendix 1
Page 20 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 20.0% 13.5% Red 
FQ1 2022/23 20.0% 13.2% Red
FQ2 2022/23 20.0% 22.2% Green
FQ3 2022/23 20.0% 19.4% Red 
This indicator for FQ3 is below target and performance has decreased since the last reporting period. 
FQ3 Comment
19.4% - of the 11 bids made by local contractors, 7 were awarded the contract with a total value of over £139k. A summary of all contracts awarded in FQ3 is
available on Pyramid. The Procurement, Commercial and Contract Management Team continue to support local suppliers by providing useful information on the
Council’s website i.e. pre-recorded webinars on how to bid for Council contracts, hints and tips for tendering as well as our contract plan, details of upcoming
supplier development events and our category officer’s contact details all of which enable local suppliers to be able to bid for our contracts.
Responsible person: Anne MacColl-Smith 
Page 40

Page 41

Appendix 1
Page 21 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Increase the number of community benefits that are delivered through contracts we award locally 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ4 2021/22 No target 40 No target
FQ1 2022/23 No target - No target
FQ2 2022/23 No target 30 No target
FQ3 2022/23 No target - No target 
This indicator for FQ2 shows the number of community benefits since the last reporting period. 
FQ2 Comment
This indicator is reported in FQ2 and FQ4.
The team has been working closely with their suppliers to deliver additional social, economic and environmental value and achieved 30 community benefits
through Contract Management, Contract Awards and the Request List from 1st April 2022 to 30th September 2022. A summary of all contracts awarded in FQ2 is
available on Pyramid.
Responsible person: Anne MacColl-Smith 
Page 41

Page 42

Appendix 1
Page 22 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Street lighting – percentage of faults repaired within 10 days – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 75% 31% Red 
FQ1 2022/23 75% 38% Red
FQ2 2022/23 75% 39% Red
FQ3 202/23 75% 25% Red 
This indicator for FQ3 is below target and performance has decreased since the last reporting period. 
FQ3 Comment
We provide a network of almost 15,000 streetlights across the Council area which is maintained by a team of 3 full time electricians and 1 apprentice electrician. In
this last quarter we had 383 reported faults which means the performance in terms of the percentage of the network operational is in the region of 97.5%.     
In this quarter we have completed 79% more jobs than in the last quarter (383 vs 214). While the percentage of jobs completed on time has dropped, the overall
number of jobs completed has increased significantly.     
As well as attending to the day-to-day fault reports our street lighting team are progressing with the final stages of the LED scheme which will see all of our
network upgraded to a more energy efficient, more cost effective – this has already significantly reduced our carbon footprint. We will also be progressing a street
lighting capital programme of column replacements thanks to last year’s budget allocation.     
Overall the street lighting team performs well in both maintaining and improving the network. This particular performance indicator is not necessarily reflective of
the good work of the team and consideration is being given to other measures which could provide Members with a more comprehensive indication of lighting
performance. 
Responsible person: Tom Murphy 
Page 42

Page 43

Appendix 1
Page 23 
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 75% 28% Red 
FQ1 2022/23 75% 29% Red
FQ2 2022/23 75% 48% Red
FQ3 2022/23 75% 30% Red 
This indicator for FQ3 is below target and performance has decreased significantly since the last reporting period. 
FQ3 Comment
We provide a network of almost 15,000 streetlights across the Council area which is maintained by a team of 3 full time electricians and 1 apprentice electrician. In
this last quarter we had 383 reported faults which means the performance in terms of the percentage of the network operational is in the region of 97.5%.     
In this quarter we have completed 79% more jobs than in the last quarter (383 vs 214). While the percentage of jobs completed on time has dropped, the overall
number of jobs completed has increased significantly.     
As well as attending to the day-to-day fault reports our street lighting team are progressing with the final stages of the LED scheme which will see all of our
network upgraded to a more energy efficient, more cost effective – this has already significantly reduced our carbon footprint. We will also be progressing a street
lighting capital programme of column replacements thanks to last year’s budget allocation.     
Overall the street lighting team performs well in both maintaining and improving the network. This particular performance indicator is not necessarily reflective of
the good work of the team and consideration is being given to other measures which could provide Members with a more comprehensive indication of lighting
performance. 
Responsible person: Tom Murphy 
Page 43

Page 44

Appendix 1
Page 24 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Total number of complaints regarding waste collection – Lorn 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 6 No target 
FQ1 2022/23 No target 14 No target
FQ2 2022/23 No target 12 No target
FQ3 2022/23 No target 8 No target 
This indicator for FQ3 shows the number of waste collection complaints has decreased since the last reporting period. 
FQ3 Comment
There were 8 waste collection complaints received this quarter for the Lorn area. Given the number of domestic and commercial properties serviced and taking
into account operational issues, this is still a good service.
Responsible person: Tom Murphy 
Total number of complaints regarding waste collection – Mull 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 0 No target 
FQ1 2022/23 No target 0 No target
FQ2 2022/23 No target 0 No target
FQ3 2022/23 No target 0 No target 
This indicator for FQ3 shows the number of waste collection complaints has remained the same as the last reporting period. 
FQ3 Comment
Again, this quarter there were no waste collection complaints received for the Isle of Mull, this is an excellent level of service.
Responsible person: Tom Murphy 
Page 44

Page 45

Appendix 1
Page 25 
Total number of complaints regarding waste collection – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 40 No target 
FQ1 2022/23 No target 58 No target
FQ2 2022/23 No target 65 No target
FQ3 2022/23 No target 35 No target 
This indicator for FQ3 shows the number of waste collection complaints has decreased significantly since the last reporting period. 
FQ3 Comment
The number of waste collection complaints has dropped from 65 last quarter to 35 this quarter. The Helensburgh/Lomond area received the majority of
complaints with 23, however given the operational and staffing difficulties and the number of domestic and commercial properties serviced this is still a good level
of service.
Responsible person: Tom Murphy 
Page 45

Page 46

Appendix 1
Page 26 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 45.0% 48.3% Green 
FQ1 2022/23 45.0% 52.1% Green
FQ2 2022/23 45.0% 50.5% Green
FQ3 2022/23 45.0% 56.7% Green 
This indicator for FQ3 is above target and performance has increased since the last reporting period. 
FQ3 Comment
56.7% recycling/composting and recovery (39.7% recycling composting and 17.0% recovery). Recovery is higher than normal this quarter due to a trial by Renewi
(formerly Shanks), who have taken some residual general waste for disposal from their Moleigh (by Oban) and Dalinlongart (by Dunoon) facilities to an energy
from waste (EFW) plant near Edinburgh. This has reduced landfill overall and has more than offset the reduction in recovery from the Helensburgh and Lomond
area following on from The Scottish Government Landfill Tax Abatement Order (which commenced from 1st July 2022), whereby Barr Environmental no longer
carry out any recovery from mixed residual general waste.
Responsible person: John Blake 
Shanks – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 49.7% No target 
FQ1 2022/23 No target 54.4% No target
FQ2 2022/23 No target 58.1% No target
FQ3 2022/23 No target 67.4% No target 
This indicator for FQ3 shows the percentage of waste recycled has increased since the last reporting period.
Page 46

Page 47

Appendix 1
Page 27 
FQ3 Comment
67.4.% recycling/composting and recovery (40.0% recycling/composting and 27.4% recovery). Recovery is higher than normal this quarter due to a trial by Renewi
(formerly Shanks), who have taken some residual general waste for disposal from their Moleigh (by Oban) and Dalinlongart (by Dunoon) facilities to an energy
from waste (EFW) plant near Edinburgh.
Responsible person: John Blake 
Islands – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 38.4% No target 
FQ1 2022/23 No target 33.3% No target
FQ2 2022/23 No target 34.7% No target
FQ3 2022/23 No target 43.5% No target 
This indicator for FQ3 shows the percentage of waste recycled has increased since the last reporting period. 
FQ3 Comment
43.5% recycling/composting and recovery (43.5% recycling/composting and 0% recovery). Landfill has reduced this quarter mainly due to seasonality i.e. less
landfilled during late autumn/winter months with fewer visitors on islands. Year to date recycling/composting and recovery figure is 37.0% (i.e. 36.7% recycling/
composting and 0.3% recovery).
Responsible person: John Blake 
Page 47

Page 48

Appendix 1
Page 28 
H&L – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 48.9% No target 
FQ1 2022/23 No target 53.6% No target
FQ2 2022/23 No target 41.0% No target
FQ3 2022/23 No target 37.5% No target 
This indicator for FQ3 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ3 Comment
37.5% recycling/composting and recovery (37.5% recycling/composting and 0% recovery). Following a Scottish Government Landfill Tax Abatement Order (which
commenced from 1st July 2022), Barr Environmental no longer carry out any recovery from mixed general waste delivered to them from Helensburgh and Lomond
area. Year to date figures for H&L are 43.5% recycling/composting and recovery (40.6% recycling/composting and 2.9% recovery).
Responsible person: John Blake 
Page 48

Page 49

Appendix 1
Page 29 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – The number of tonnes of waste sent to landfill 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 5,000 4,252 Green 
FQ1 2022/23 5,850 4,546 Green
FQ2 2022/23 5,550 4,947 Green
FQ3 2022/23 5,100 3,882 Green 
This indicator for FQ3 is below target (lowest is best) and performance has increased since the last reporting period. 
FQ3 Comment
Landfill tonnages have dropped this quarter partly due to seasonality but mainly because of a trial by Renewi (formerly Shanks), who have taken some residual
general waste for disposal from their Moleigh (by Oban) and Dalinlongart (by Dunoon) facilities to an energy from waste (EFW) plant near Edinburgh. This has
reduced landfill overall and has more than offset the reduction in recovery from the Helensburgh and Lomond area following on from The Scottish Government
Landfill Tax Abatement Order (which commenced from 1st July 2022), whereby Barr Environmental no longer carry out any recovery from mixed residual general
waste.
Responsible person: John Blake 
Page 49

Page 50

Appendix 1
Page 30 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
LEAMS (Local Environment Audit and Management System) – Lorn
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 73 82 Green 
FQ1 2022/23 73 84 Green
FQ2 2022/23 73 86 Green
FQ3 2022/23 73 88 Green 
This indicator for FQ3 is above target and performance has improved since the last reporting period. 
FQ3 Comment
The street cleanliness for the Lorn area this quarter remains high, October and November scoring 87 and December 89. This is a very good level of performance.
Responsible person: Tom Murphy 
LEAMS (Local Environment Audit and Management System) – Mull
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 73 92 Green 
FQ1 2022/23 73 94 Green
FQ2 2022/23 73 85 Green
FQ3 2022/23 73 88 Green 
This indicator for FQ3 is above target and performance has increased since the last reporting period. 
FQ3 Comment
Again, this quarter the street cleanliness on the Isle of Mull is very high and well exceeds both the National Standard and Benchmark figure.
Responsible person: Tom Murphy 
Page 50

Page 51

Appendix 1
Page 31 
LEAMS (Local Environment Audit and Management System) – Argyll and Bute
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 73 79 Green 
FQ1 2022/23 73 85 Green
FQ2 2022/23 73 82 Green
FQ3 2022/23 73 83 Green 
This indicator for FQ3 is above target and performance has increased since the last reporting period. 
FQ3 Comment
The level of street cleanliness for the whole area remains high, this is excellent and the role of the Amenity Warden has had a key influence around littering and
dog fouling to assist in maintaining the very good level of performance.
Responsible person: Tom Murphy 
Page 51

Page 52

Appendix 1
Page 32 
Making It Happen 
Teacher sickness absence – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 1.70 days No target 
FQ1 2022/23 No target 1.80 days No target
FQ2 2022/23 No target 1.59 days No target
FQ3 2022/23 No target 1.52 days No target 
This indicator for FQ3 shows the number of sickness absence days has decreased slightly since the last reporting period. 
FQ3 Comment
Work days lost is the same as last quarter and about a third of a day less than the same quarter last year.
Responsible person: Simon Easton 
Teacher sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 1.77 days No target 
FQ1 2022/23 No target 1.79 days No target
FQ2 2022/23 No target 1.22 days No target
FQ3 2022/23 No target 1.70 days No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment
Work days lost have increased by almost half a day on last quarter but are similar to the same quarter last year. The top three reasons for sickness absence are: 
infections, stress/depression/mental health and stomach/liver/kidney & digestion.  Education have a dedicated Attendance Assistant that supports Head Teachers
to manage attendance.  To support with Stress related absences the Wellbeing Team have been trailing Active Care - a week one referral service to the Employee
Assistance Programme to support employees with appropriate interventions in early days of absence.  The Wellbeing Team have also co-ordinated the Recalibrate
Programme which was 12 weeks’ worth of online coaching attended by over 80 employees to support them to improve their own wellbeing.  The Wellbeing Team
have also just launched an online physiotherapy pilot and it is hoped members of Education will benefit from group sessions regarding musculoskeletal health.
Responsible person: Simon Easton
Page 52

Page 53

Appendix 1
Page 33 
Making It Happen 
LGE staff (non-teacher) sickness absence – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 2.84 days No target 
FQ1 2022/23 No target 3.52 days No target
FQ2 2022/23 No target 4.07 days No target
FQ3 2022/23 No target 4.17 days No target 
This indicator for FQ3 shows the number of sickness absence days has increased slightly since the last reporting period. 
FQ3 Comment
Work days lost is slightly more than the last quarter and almost a day more than the same quarter last year. 
Responsible person: Carolyn Cairns 
LGE staff (non-teacher) sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 3.42 days No target 
FQ1 2022/23 No target 3.57 days No target
FQ2 2022/23 No target 3.66 days No target
FQ3 2022/23 No target 3.65 days No target 
This indicator for FQ3 shows the number of sickness absence days has decreased slightly since the last reporting period. 
FQ3 Comment
The top three reasons for absence were Stress/Depression/Mental Health; Heart, Blood Pressure and Circulatory and Other Musculoskeletal problems.  To support
with Stress related absences the Wellbeing Team have been trailing Active Care - a week one referral service to the Employee Assistance Programme to support
employees with appropriate interventions in early days of absence.  The Wellbeing Team have also co-ordinated the Recalibrate Programme which was 12 weeks’
worth of online coaching attended by over 80 employees to support them to improve their own wellbeing.  The Wellbeing Team have also just launched an online
physiotherapy pilot and it is hoped members of Roads and Infrastructure and HSCP will benefit from
Responsible person: Carolyn Cairns
Page 53

Page 54

Appendix 1
Page 34 
Making It Happen 
COI – Increase the percentage of all self-service automated contacts 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 70.0% 73.1% Green 
FQ1 2022/23 70.0% 79.4% Green
FQ2 2022/23 70.0% 75.4% Green
FQ3 2022/23 70.0% 72.5% Green 
This indicator for FQ3 is above target however performance has decreased since the last reporting period. 
FQ3 Comment
In FQ3 there were 33,921 transactions dealt with by customer service agents (27.5%) and 89,449 automated or self-service transaction (72.5%) so the 70% target
was exceeded. FQ3 2021/22 2022/23 Mediated 36,387 33.921 Automated 94,272 89,449.
Responsible person: Robert Miller 
Page 54

Page 55

ARGYLL AND BUTE COUNCIL                                        OBAN, LORN AND THE
ISLES AREA COMMITTEE                                                                                                         
ROADS AND INFRASTRUCTURE                          01 MARCH 2023
SERVICES                     
ROADS AND INFRASTRUCTURE SERVICES UPDATE 
1.0 INTRODUCTION 
1.1 A Roads and Infrastructure standing report was a fixture on Area Committee
agendas throughout the life of the last Council. In the first two rounds of Area
Committee meetings in the new Council feedback was sought on the value of
these updates, and their format and frequency. Generally Members felt having a
standard item was beneficial and it was acknowledged that the Roads and
Infrastructure weekly briefings issued to all members each Friday afternoon
provide for the main sources of live information on current activities. On top of
these briefings there is a bank of resources on the new Member Zone system
which include the weekly briefings, subject specific briefings, ad hoc short
briefings on issues, relevant previous committee reports, operational service
procedures, legislation and Council policies. 
1.2 In the last Council the purpose of these reports was to provide an update on
service activities but since weekly briefings were introduced around 18 months
ago [at the time of writing this report we are on to briefing Edition 81] these have
largely superseded the original stated purpose of these reports. 
1.3 On the basis of the above this new format has been agreed through the
December round of area committees for this standing item. This format 
removes duplication for Officers and rather links to existing published
information, with additional updates only in the body of the reports if these are
specifically requested/noted from previous meetings. The report remains as a
standing item and continues to provide the opportunity for Officer engagement at
the committee meetings.   
2.0 RECOMMENDATIONS 
It is recommended that the Area Committee: 
2.1 Note and consider the contents of this report. 
3.0 DETAIL
Page 55 Agenda Item 7

Page 56

3.1 Roads and Infrastructure Services provides Members with weekly briefings on
topical service activities which are all available here.   
3.2 As part of the resources on the new Member Zone system there are various key
documents available in an online library here. 
3.3  At a recent Area Committee Business Day, Elected Members, Officers and
members of the Oban Community Council met on site at Ganavan to discuss
local community concerns about the use of the site and instances of anti-
social behaviour. It was agreed that it would be useful to have a way of
evidencing this behaviour, with the result that it was agreed to investigate the
possibility of installing CCTV covering the site. 
4.0 CONCLUSION 
4.1 This report provides links to existing published information on service activities
and provides for the opportunity for Officer attendance and engagement at
committee meetings. 
5.0 IMPLICATIONS 
5.1 Policy – none 
5.2 Financial – none 
5.3  Legal – none 
5.4  HR – none known 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – none known 
5.5.2   Socio-economic Duty – none known 
5.5.3 Islands – none known 
5.6. Climate Change – none 
5.7  Risk – none known 
5.8  Customer Service - none 
Executive Director with responsibility for Roads and Infrastructure Services,
Kirsty Flanagan 
Page 56

Page 57

Policy Lead for Roads and Transport, Councillor Andrew Kain 
January 2023                                                  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services; or Mark Calder, Project
Manager 
Page 57

Page 58

This page is intentionally left blank

Page 59

ARGYLL AND BUTE COUNCIL  OBAN LORN AND THE ISLES AREA
COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
8 MARCH 2023 
HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) – ANNUAL UPDATE 
1.0 EXECUTIVE SUMMARY
1.1 The main purpose of this report is to update Members of Housing Services 
activity and progress with the Local Housing Strategy for the Oban, Lorn and
the Isles area. 
This report will detail the following housing activity:-
 Housing Need and Demand
 Homelessness
 Affordable Housing Supply - Strategic Housing Investment Programme
(SHIP)
 Empty Homes
 Private Sector Housing Grant Adaptations
 Private Sector Housing Grant Repairs and Improvements
 Energy Efficiency - Home Energy Efficiency Programme: Area Based
Scheme(HEEP:ABS)
 Local Housing Strategy 
2.0 RECOMMENDATIONS
2.1 Members are asked to consider the content of the report. 
Page 59 Agenda Item 8

Page 60

ARGYLL AND BUTE COUNCIL  OBAN LORN AND THE ISLES AREA
COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
8 MARCH 2023 
HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) – ANNUAL UPDATE 
3.0 INTRODUCTION
3.1 The main purpose of this report is to update Members of Housing Services 
activity and progress on the Local Housing Strategy within the Oban, Lorn and
the Isles area. 
This report will detail the following housing activity:-
 Housing Need and Demand
 Homelessness
 Affordable Housing Supply - Strategic Housing Investment Programme
(SHIP)
 Empty Homes
 Private Sector Housing Grant Adaptations
 Private Sector Housing Grant Repairs and Improvements
 Energy Efficiency - Home Energy Efficiency Programme: Area Based
Scheme
 Local Housing Strategy 
4.0 RECOMMENDATIONS
4.1 Members are asked to consider the content of this report. 
5.0 DETAIL
5.1 As the Strategic Housing Authority for this area, the Council has a series of
important statutory housing functions to fulfil. A Housing Need and Demand
Assessment (HNDA) is carried out every 5 years which enables Scottish
Government funding to be brought into Argyll and Bute primarily to deliver
affordable housing. A comprehensive revision of the local HNDA was
approved as “robust and credible” by the Scottish Government’s Centre for
Housing Market Analysis in December 2021. The Council also produces a
Local Housing Strategy (LHS) every 5 years. The LHS 2022-27 was approved
by Full Council in December 2021.   
Page 60

Page 61

The LHS has been developed in accordance with Scottish Government guidance
and local priorities as identified in the new HNDA. .This sets out the vision for
Argyll and Bute: “Everyone in Argyll & Bute has access to a suitable, high
quality home which is affordable and located within a vibrant, sustainable
and connected community.” This report will detail the housing activity taking
place in Oban, Lorn and the Isles. 
5.2 HOUSING NEED & DEMAND IN OBAN, LORN & THE ISLES 
HOMEArgyll WAITING LIST November 2022 – Active
Applicants   (excluding applicants with 0 points i.e. no need)                                                                                                                       
Minimum Bedroom Size Required TOTAL
0/1beds 2beds 3beds 4+beds
Lorn 327 133 88 37 585
Mull & Iona 48 14 3 4 69
Coll & Tiree 14 5 3 2 24
OLI Totals 389 152 94 43 678 
In addition there was a registered demand from almost 307 applicants who
received nil points according to the Common Allocation Policy and therefore
would be deemed not to have a defined housing need. This included 271
applicants for Lorn; 30 for Mull & Iona; and 6 for Coll & Tiree. 
For the Oban Lorn and Isles area as a whole, the majority of applicants (57%)
require one bedroom and 23% require 2 bedrooms.14% require 3 bedrooms
and 6% need 4 bedrooms or more. 
However, to establish actual need, the available supply must be factored 
into this, based on the available lets within the RSL stock during a year. 
Applicants per available RSL Let (Pressure Ratios) 
HOMEArgyll
Applicants
RSL Lets 2021/22
(HOMEArgyll  only)
Pressure Ratio
Lorn 585 199 3:1
Mull & Iona 69 16 4:1
Coll & Tiree 24 0 24:1
OLI Totals 678 215 3:1
(NB. 2020/21 lets were partially constrained due to covid measures) 
While the pressure ratios are only one factor in determining need and
demand, they are useful indicators of areas where further analysis may
be required. 
The fully revised Argyll & Bute HNDA 2021 takes account of a wide range of
factors to determine existing need and future demand for new build housing,
and demographic projections have a critical role in this assessment. Although
the default population projections suggest a significant and continuous decline
across Argyll and Bute, and consequently minimal or zero requirement for new
Page 61

Page 62

build housing,  the council has developed ambitious Housing Supply Targets
based on an alternative, positive growth scenario for all areas. In this instance,
28% of the Argyll & Bute Housing requirement would be apportioned to Lorn;
4% to Mull & Iona; and around 1% to Coll & Tiree. Over the next 5 years this
could amount to at least 480 new builds across all tenures for the OLI area as
a whole. 
5.3 HOMELESSNESS 
Homeless applications across the area increased by 22% (74 up to 90) in the
Oban, Lorn and the Isles area during 2021/22. These applications included 1
homeless application on Mull. 
During 2021/22 there were 81 homeless cases closed in the Oban, Lorn and
the Isles area. 78 of the cases were in the Oban and Lorn area 2 cases on Coll
and Tiree, and 1 case was on Mull. 
The figures below illustrate the number of homeless applications and cases
closed for the period from 2017/18 to 2021/22. 
The main reasons for presenting as Homeless last year were “disputes with
family/relationship breakdown – non-violent, “asked to leave” and ‘other action
by landlord resulting in the termination of tenancy’.  
0
20
40
60
80
100
120
Applications Cases Closed Applications Cases Closed Applications Cases Closed
Coll and Tiree Lorn Mull and Iona
Homeless Applications and Cases Closed
2017/18 -2021/22
2017/18 2018/19 2019/20 2020/21 2021/22
Page 62

Page 63

Rough Sleeping 
The Oban, Lorn and Isles area experienced an increase in the incidence of rough
sleeping over the same period last year, with 7 cases (+2) in total across the area
reporting that they slept rough the night preceding their presentation and 13 (+8)
reporting that they had slept rough in the 3 months preceding their homeless
application. These were disaggregated as follows:- 
AREA Number of Rough Sleepers in 2021/22
Night Before Application 3 Months Prior to Application
Oban, Lorn area 7 13
Mull and Iona 0 0
Coll and Tiree 0 0
OLI Total 7 13
Argyll & Bute 17 28 
0 2 4 6 8 10 12 14 16 18 20
1. Termination of tenancy/mortgage due to rent
arrears/default on payments
10. Dispute with household/relationship breakdown:
non-violent
11. Fleeing non-domestic violence
12. Harassment
13. Overcrowding
14. Asked to leave
15. Other reason for leaving accommodation/household
2. Other action by landlord resulting in the termination of
the tenancy
3. Applicant terminated secure accommodation
4. Loss of service/tied accommodation
5. Discharge from prison/hospital/car/other institution
7. Forced division and sale of matrimonial home
8. Other reasons for loss of accommodation
9. Dispute with household violent or abusive
Oban, Lorn and The Isles Combined Reasons for Homelessness
2021/22
Page 63

Page 64

5.4 AFFORDABLE HOUSING SUPPLY 
This continues to be a very challenging period for the construction sector and
there is ongoing slippage in the new build programme due to disruption and
shortages with materials and staffing. The Strategic Housing Investment Plan
(SHIP) delivered 119 new affordable homes in Lorn in 2021/22. 
RSL PROJECT Units Funding 
WHHA
Kirk Road, Dunbeg 
(conversion) 4  £257,362
LINK Dunbeg Phase 3 115 £63,687,000
Oban, Lorn and the Isles Total 119  £63,944,362 
The Council recognises that households in the area have difficulty in affording to buy
property for principal occupation and in that regard the Council encourages RSL’s to
deliver Shared Equity properties in their developments. The Shared Equity model
enables eligible households to obtain mortgages from as low as 60% of the value of
the property with the Scottish Government retaining the remaining equity in the
property. 40 Shared Equity properties are being delivered in Dunbeg as part of the
LINK phase 3 development. 
Further sites/projects in the Oban, Lorn and the Isles area which are in early stages
of development and may be programmed in the SHIP include: 
ACHA North Connel  Phase 2(2 units currently on hold)
Mull – Craignure, Salen, Dervaig – subject to further feasibility
Appin & Connel – pending further analysis
LINK “Hospital Site”, Oban (50 units – subject to further feasibility)
Lonan Drive, Oban (44 units by 2024)
Dunbeg, Phases 4,5 & 6 (150 units in total by 2025)
Glencruitten, Oban (100 units in total by 2026 subject to agreement)
WHHA Tobermory, Mull Phase 3 (12 units)
Port Appin (6 units) 
Page 64

Page 65

5.5 EMPTY HOMES 
In 2021/22 there were 11 private empty homes brought back into use in OLI,
with the assistance of the Empty Homes Officer, amounting to 29% all the
empty homes brought back into use across Argyll and Bute last year (38).              
Council Tax Information on Empty Homes 
The following table breaks down the numbers of empty homes including those
subject to premium Council Tax charge across the OLI area.  The table does
not include properties which are empty and exempt from Council Tax. The
numbers of recorded empty homes can vary from day to day due to natural
changes and reported numbers are snapshot from November reports.   
Council Tax Exemptions
There are also a number of empty properties which are on the Council Tax
register which are exempt from paying council tax.  In OLI there are 238
properties which are empty and exempt from Council Tax. The categories for
empty properties include: 
 Class 4A = Properties recently occupied but now empty and unfurnished
(123)
 Class 7A = Dwellings Empty Under Statute – Closing or Demolition Order
(12)
 Class 6A = Deceased owners – where estate has not been settled (76)
 Class 5A= Living/detained elsewhere (19); 
 Class 2A= Unoccupied-Renovation (8)
 Class 6A= Deceased owner (76) 
Second Homes 
As at 1st November 2022 there were 785 registered second homes in Oban,
Lorn and the Isles. This figure represents 28% of the total number of second
homes in Argyll and Bute (2,815).           
OLI
Council tax data as
at 01.11.22
Number of
properties on
Council Tax
register
Empty
Homes
Properties
subject to 200%
council tax levy
Total 
EMPTY
Lorn 8,924 100 87 187
Mull & Iona 1,923 22 37 59
Coll & Tiree 700 6 14 20
OLI TOTAL 11,547 128 138 266
Page 65

Page 66

Self-Catering Lets
As at 3rd November 2022 there were 982 self-catering lets on the Rates register
in the Oban, Lorn and the Isles area 42% of the Argyll and Bute total (2,321). 
5.6 PRIVATE SECTOR HOUSING GRANT – ADAPTATIONS 
In 2021/22, there were 21 private sector properties adapted with PSHG aid in 
OLI, and a total of 23 individual adaptations installed.  
5.7 PRIVATE SECTOR HOUSING GRANT – REPAIRS AND IMPROVEMENTS 
In 2021/22, there was a total of 1 PSHG repair and improvement grants 
completed in OLI, (across Argyll and Bute, the total was 19). 
5.8 ENERGY EFFICIENCY (HOME ENERGY EFFICIENCY PROGRAMME:
AREA BASED SCHEME – HEEPS:ABS) 
There were 252 energy efficiency measures installed across Argyll and Bute in
2021/22 via the HEEPS:ABS programme; and 7% of these measures (18) were
in Oban, Lorn & the Isles. In total, 13 properties were improved across the Oban,
Lorn and the Isles area, at a total cost of £68,658. Grant aid in support of this work
amounted to £67,953, 99% of the total costs. 
Current estimates of Fuel Poverty are based on Home Analytics data:-
Area Likelihood of Households in 
Fuel Poverty Extreme Fuel Poverty
Lorn 33% 34%
Mull and Iona 26% 30%
Coll and Tiree 30% 41%
Argyll and Bute 30% 25%
Scotland (SHCS) 25% 12%
OLI 
Rates data as at 03.11.22
Number of self-catering
properties
Lorn 529
Mull & Iona 365
Coll & Tiree 88
OLI TOTAL  982
PSHG ADAPTATION COMPLETIONS 2021 -2022
HMA Grant Value Works Value ADAPTATION INSTALLED      
Ramp Stairlift Access Bathroom
Adaptation Hoist Wash &
Dry Unit
Oban,
Lorn &
Isles  £ 94,292.32   £ 119,926.15 
0 2 5 12 1 3
TOTALS  £ 94,292.32   £ 119,926.15  0 2 5 12 1 3
Page 66

Page 67

5.9 LOCAL HOUSING STRATEGY (LHS) 2022-2027 
As the strategic housing authority for Argyll and Bute, the Council has a
statutory duty to develop, implement and monitor a Local Housing Strategy over
a five-year planning cycle, based on a robust and credible Housing Need and
Demand Assessment (HNDA) for the area.  Following completion of the
previous Argyll and Bute LHS  (2016-2021) last year, a comprehensive revision
and update of the strategy has been approved by the council and formally
launched in March 2022. The planning process was based on a robust process
of consultation and stakeholder engagement, which has been acknowledged
as an exemplar model for other local authorities by the Scottish Government,
the CHMA, and the Scottish Housing Network LHS Forum.   
The revised HNDA was approved as “robust and credible” by the Scottish
Government’s CHMA in 2021, and this has informed the revised Housing
Supply Targets set out in the new LHS. These targets are based on a positive
demographic and economic growth scenario for Argyll & Bute and include
ambitious and challenging Housing Supply Targets for the Lorn, Mull & Iona,
and Coll & Tiree HMAs over the next 5 years and beyond. 
6.0 CONCLUSION
6.1 This report provides the detail of the Council Housing Services team activity in the
Oban, Lorn and the Isles area and an overview of the progress achieved with the
Local Housing Strategy Action Plan. There are a variety of housing issues within
the area which are being tackled by Housing Services and partner agencies with
the aim of delivering a functioning housing system which meets the needs of the
communities we serve.   
7.0 IMPLICATIONS
7.1 Policy - Complies with approved SHIP and Local Housing Strategy.
7.2 Financial - none arising from this report.
7.3  Legal - we have a statutory duty to deliver statutory housing functions.
7.4  HR – none.
7.5  Fairer Scotland Duty: positive in terms of delivering affordable housing. 
7.5.1  Equalities - protected characteristics – none. 
7.5.2  Socio-economic Duty - positive in terms of delivering affordable
housing. 
7.5.3  Islands – positive in terms of delivering affordable housing on the
islands
7.6. Climate Change – the strategy and housing service deliver positive impacts for
energy efficiency and climate change.
7.7 Risk – none.
7.8  Customer Service – none. 
Page 67

Page 68

Kirsty Flanagan
Executive Director with the responsibility for Development and Economic
Growth 
Councillor Robin Currie 
Policy Lead for Strategic Development 
January 2023 
For further information contact: 
Douglas Whyte
Team Lead – Housing Strategy 
E-mail: douglas.whyte@argyll-bute.gov.uk
Tel: 01546 604 785 
APPENDICES  
Appendix 1 – Extract from LHS 2022 - 2027 (data as of 2021) Lorn
Appendix 2 – Extract from LHS 2022 - 2027 (data as of 2021) Mull & Iona
Appendix 3 – Extract from LHS 2022 - 2027 (data as of 2021) Coll & Tiree  
Page 68

Page 69

Appendix 1 - Extract from LHS 2022 - 2027 (data as of 2021) Lorn 
LORN HMA is centred on Oban and includes a number of the small, inner isles such as
Easdale, Luing and Lismore. Despite the influence of in-migration, it is the most self-contained
housing market in Argyll & Bute with 64% of house sales going to local residents. There was
limited interaction with neighbouring HMAs in the local authority (3%) but over 17% of demand
is from the rest of Scotland and over 13% from the UK. Overseas house purchasers have only
marginal impact in this area, at just over 1% of sales. Average house prices are comparatively
high and affordability remains an issue, with a high price-to-income ratio of 6.7 (lower quartile). 
There has been significant development activity in recent years, and the total dwelling stock
increased by 8% between 2015 and 2020, with significant new builds in development or in the
pipeline, particularly at Dunbeg. Lorn has 18% of the total housing stock in Argyll and Bute.
However, 8% of the stock comprises second/holiday homes and long-term vacant properties.
With 1,649 RSL homes in 2020 the area also has the highest provision of social rented stock
– over 19% of the authority total. Nevertheless, this area still has the largest waiting list in
Argyll and Bute by far, as well as one of the higher levels of homelessness (30% and 18%
respectively of the authority totals). In addition HNDA analysis suggests that this area has the
second greatest level of backlog need (21% of total backlog need). 
Population                                     
Households                                   
Dwellings                                       
Ineffective Stock (%)  
RSL Stock  
Waiting List Applicants  
RSL Lets (2019/20) 
Pressure Ratio  
Lower Quartile House Price 
Lower Quartile Income  
LQ Affordability Ratio 
16,053
7,648
8,604
8%
1,649
737
139
5:1
£120,000
£17,892
6.7 
Lorn
Key issues for Lorn HMA: 
Increasing the supply of affordable housing remains a critical priority for this HMA.
The provision of Housing Options advice and information; and targeted Tenancy Support
also remains important.
Fuel poverty is an issue and improving energy efficiency will be important too.
Ensuring that sufficient specialist provision (accommodation, adaptations, support
services etc.) is available to meet the requirements of the ageing population and those
with particular needs will also be key to a well-balanced, effective housing system.
Page 69

Page 70

Appendix 2 – Extract from LHS 2022 - 2027 (data as of 2021) Mull & Iona 
MULL AND IONA are combined for planning purposes as one HMA. As a housing market
area, these islands exhibit the lowest level of self-containment in the authority area apart from
Coll & Tiree, with less than 45% of house sales going to local purchasers. Around 16% of
properties are bought by persons from elsewhere in Scotland; and over a third of all sales
(34%) are to purchasers originating elsewhere in the UK, by far the highest proportion of any
HMA in Argyll and Bute. Interaction with the rest of the authority is minimal with only 1.4% of
sales originating in another local HMA. Mull & Iona have among the highest house prices in
Argyll & Bute, well above the average for the authority as a whole and 3 times higher than
Bute for example; and along with Islay, Jura & Colonsay; and Coll & Tiree, this is one of the
least affordable housing markets for local residents. This area has seen less than 1% rate of
growth in total stock, between 2015 to 2020; despite a range of RSL and community-led
projects being proposed and progressed in recent years. This still amounts to only 4% of the
total dwellings in Argyll & Bute. There is also a high proportion of ineffective stock here, with
second/holiday homes and long-term vacant properties making up 15% of the total (albeit this
is significantly lower than the last census recorded).  The social rented sector totalled 236
homes in 2020, less than 3% of the sector total for Argyll & Bute as a whole and around 13%
of the total housing stock on the two islands. There are around 6 applicants for every available
let in the area, one of the higher pressure ratios in the authority. 
Population                                     
Households                                   
Dwellings                                       
Ineffective Stock (%)  
RSL Stock  
Waiting List Applicants  
RSL Lets (2019/20) 
Pressure Ratio  
Lower Quartile House Price 
Lower Quartile Income  
LQ Affordability Ratio   
3,054
1,524
1,851
15%
236
113
20
6:1
£129,375
£18,189
7.1 
Mull & Iona
Key issues for Mull & Iona HMA: 
A small-scale targeted programme of affordable new build housing will help to sustain
remote island communities.
Tackling fuel poverty and improving energy efficiency remain key targets; and ensuring
sufficient specialist provision is available to meet the requirements of those with particular
needs will also be important.
Page 70

Page 71

Appendix 3 – Extract from LHS 2022 - 2027 (data as of 2021) Coll & Tiree 
Coll & Tiree constitute the smallest HMA in the authority, and are most affected by house
purchasers from out with the area – less than 20% of sales are to local residents, with almost
half of purchasers originating elsewhere in Scotland and a further quarter from elsewhere in
the UK. More house buyers originate from overseas (5.6%) than from the rest of Argyll & Bute
itself (1.4%). Average house prices have been among the highest in Argyll & Bute (albeit the
number of sales are very small)   and this area has been one of the least affordable to local
households with the highest price–to-income  affordability ratio of 7.7.  Since 2015, the total
number of dwellings on the islands increased by almost 8% while the number of households
increased by around 12%. Proportionately, this HMA has the highest level of ineffective stock
in Argyll & Bute, by far, with almost a third being second/holiday homes or long-term vacant
properties.  In 2020 there were 54 social rented homes, which amounts only 0.6% of the total
RSL sector in the authority. Demand for RSL properties is numerically low but given the limited
turnover in existing stock the pressure ratio remains high at 6:1 (i.e. 6 applicants per available
let). 
Population                                     
Households                                   
Dwellings                                       
Ineffective Stock (%)  
RSL Stock  
Waiting List Applicants  
RSL Lets (2019/20) 
Pressure Ratio  
Lower Quartile House Price 
Lower Quartile Income  
LQ Affordability Ratio   
753
452
680
32%
54
19
3
6:1
£128,750
£16,644
7.7 
Coll & Tiree
Key issues for Coll & Tiree HMA: 
There is evidence of unmet need on these islands and minimal new build in recent years.
Small-scale development of affordable housing for social rent could help to address the
demand. 
The requirement for some form of specialist provision, particularly on Tiree, remains a
potential gap which could be addressed by joint working between Housing and the Health &
Social Care Partnership.
Fuel poverty and energy efficiency also remain priorities for this area.
Page 71

Page 72

This page is intentionally left blank

Page 73

Oban, Lorn and the Isles Area Committee
Workplan 2022-23 
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/consideration
Date for Reports to
Committee Services
Additional Comment
8 March 2023
8 March 2023 Quarterly Performance
Scorecard FQ3 22/23
Improvement and
HR – Sonya
Thomas 
Quarterly Report 13 February 2023 
8 March 2023 Roads and
Infrastructure Service
Update
Development and 
Infrastructure
Jim Smith
Quarterly Report 13 February 2023 
8 March 2023 Secondary School
Pupils
Oban High School
Peter Bain
Attending to discuss their
learners journeys 
Please see e-mail from
Simon Easton
03/02/2023
8 March Highlight Report
Gibralter Street
Adrian Jackson-
Stark – ARC
Report on plans for
Gibralter Street Oban  
8 March 2023 Strategic Housing
investment plan
(SHIP)
Director of 
Development
and Infrastructure – 
Douglas Whyte
Annual Report 13 February 2023 
8 March 2023 Area Committee
Workplan
Stuart McLean For updating 13 February 2023 
14 June 2023
14 June 2023 Quarterly Performance
Scorecard FQ4 22/23
Improvement and
HR – Sonya
Thomas
Quarterly Report 22 May 2023 
Page 73
Agenda Item
9

Page 74

Oban, Lorn and the Isles Area Committee
Workplan 2022-23
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/consideration
Date for Reports to
Committee Services
Additional Comment
14 June 2023 Roads and
Infrastructure Service
Update
Development and 
Infrastructure
Jim Smith
Quarterly Report 22 May 2023 
14 June 2023 HSCP Bi-Annual
Update Report
Health & Social Care 
Partnership – 
Charlotte Craig 
Bi-Annual Report 22 May 2023 
14 June 2023 Secondary School
Reports - Oban High
School
Head Teacher
Peter Bain
Annual Report  
14 June 2023 Secondary School
Reports - Tiree High
School
Head Teacher 
Peter Bain
Annual Report  
14 June 2023 Secondary School
Reports - Tobermory
High School
Head Teacher
Shelly Carmichael
Annual Report  
14 June 2023 Primary School Report
2022/23 
Education Services
Wendy Brownlie
Annual Report 22 May 2023 
14 June 2023 John of Lorn Bequest -
Applications
Legal and
Regulatory Support
As required 22 May 2023 Cut off for applications
15 May 2023
14 June 2023 Supporting
Communities Fund
Applications
Rona Gold/Antonia
Baird
Chief Executive
Annual Report 22 May 2023 
14 June 2023 Supporting
Communities Fund –
End of Project
Rona Gold/Antonia
Baird
Chief Executive
Annual Report 22 May 2023 
Page 74

Page 75

Oban, Lorn and the Isles Area Committee
Workplan 2022-23
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/consideration
Date for Reports to
Committee Services
Additional Comment
Monitoring 21/22
14 June 2023 Area Committee
Workplan
Stuart McLean For updating 22 May 2023 
September 2023
September 2023 Quarterly Performance
Scorecard FQ1 23/24
Performance
Management and
Improvement Officer   
September 2023 Roads and
Infrastructure Service
Update
Development and 
Infrastructure
Jim Smith   
September 2023 Annual Recycling
Performance Report
Jim Smith
Roads and
Infrastructure
Services
Annual Report  
September 2023 Area Committee
Workplan
Stuart McLean For updating  
December 2023
December 2023 Quarterly Performance
Scorecard FQ2 23/24 
Performance
Management and
Improvement Officer
Quarterly report  
December 2023 Roads and
Infrastructure Service
Update
Development and 
Infrastructure
Jim Smith
Quarterly report  
Page 75

Page 76

Oban, Lorn and the Isles Area Committee
Workplan 2022-23
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/consideration
Date for Reports to
Committee Services
Additional Comment
December 2023 Charitable Trusts,
Bequests and Trust
Funds
Legal & Regulatory 
Support – Stuart
McLean 
Annual Report  
December 2023 ACHA Annual Update Chief Executive
ACHA
Annual Report  
December 2023 HSCP Bi-Annual
Update Report
Charlotte
Craig/Fiona Davies
Argyll and Bute Health and Social Care Partnership 
Annual  
December 2023 John of Lorn
Bequest Applications
Legal & Regulatory 
Support – Stuart
McLean
As required   
December 2023 Local Housing
Strategy Annual
Update
Director of 
Development
and Infrastructure – 
Douglas Whyte
Annual Report  
December 2023 Area Committee
Workplan
Stuart McLean For updating    
Page 76

Page 77

ARGYLL AND BUTE COUNCIL       OBAN LORN AND ISLES
AREA COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH      8 MARCH 2023 
GIBRALTAR STREET PUBLIC REALM PROJECT - CONSIDERATION OF
OPTIONS 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to allow the Oban, Lorn and the Isles Area Committee
to consider the possible options for the Gibraltar Street public realm project and
agree the preferred option to be progressed to implementation. 
1.2 Argyll and Bute Council agreed to allocate £250,000 of Place Based Investment
(PBI) Programme Funding to Gibraltar Street, Oban to enhance the public realm
and improve access to Oban Town Centre given the function of this space as a
key pedestrian thoroughfare linking a key centre of retail to the town centre. 
1.3 TGP Landscape Architects were commissioned in January 2022 to create design
options, test design concepts with community and stakeholders and cost design
proposals. 
1.4 Public consultation was carried out during 2022.  However it did not provide clear
support for a single option as presented and raised some additional concerns
about the proposed scheme. TGP Landscape Architects have taken on board
comments received and working within the constraints presented by the site have
presented a revised design (Option A - Appendix 1).  This option has been costed
and is estimated to exceed the available budget due to ground conditions and
rising construction costs. The complexity of the works would also require the
works to go out to tender which will incur a further delay in implementation. Full
details of these costs have been included in Appendix 3 of this report which is
marked exempt given it contains sensitive financial information that may impact
on any future tender exercise. 
Page 77 Agenda Item 10

Page 78

1.5 Given the above and reviewing all the information including comments received
during the public consultation, Officers have put forward an alternative option for
members to consider.  This option is referred to as Option B of this report and is
the preferred option as recommended by Officers. This option would essentially
retain the site as is and carry out comprehensive resurfacing works with a good
quality surface finish as well as provide upgraded street furniture and enhanced
street lighting. 
RECOMMENDATIONS 
It is recommended that the Oban, Lorn and the Isles Area Committee: 
1. Note the content of this report and the feedback provided as a result of public
consultation during 2022 and specifically in November 2022; 
2. Note the issues identified in relation to Option A; 
3. Agree that Officers continue to progress Option B which retains existing site
levels and looks to resurface the existing streetscape, renew street furniture and
improve street lighting. 
4. Agree that delegated authority be afforded to the Executive Director with
responsibility for Development and Economic Growth for the delivery of the
project to completion including agreeing a final design.  
Page 78

Page 79

ARGYLL AND BUTE COUNCIL       OBAN LORN AND ISLES
AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH    8 MARCH 2023 
GIBRALTAR STREET PUBLIC REALM PROJECT - CONSIDERATION OF
OPTIONS FOR 
2.0 INTRODUCTION 
2.1 On the 12th August 2021, Argyll and Bute Council agreed to allocate £250,000 of
Place Based Investment (PBI) Programme Funding to Gibraltar Street, Oban to
enhance the public realm and improve access to Oban town centre. 
2.2 TGP Landscape Architects were commissioned in January 2022 to create
design options, test design concepts with community and stakeholders and cost
design proposals. The latest public consultation on the proposals was held in
November 2022. This report outlines the progress made with the project to date,
brings to member’s attention Option A which is a revised design for Gibraltar
Street taking into account public consultation comments received and explains
the thinking in terms of Option B which Officers consider to be the preferred
option to take forward.
2.3  Oban, Lorn and the Isles Area Committee are therefore asked to consider the
report and approve Option B to be taken forward and instruct officers to
progress this option through delegated powers. 
3.0 RECOMMENDATIONS 
It is recommended that the Oban, Lorn and the Isles Area Committee: 
3.1  Note the content of this report and the feedback provided as a result of public
consultation during 2022 and specifically in November 2022; 
3.2   Note the issues identified in relation to Option A; 
Page 79

Page 80

3.3  Agree that Officers continue to progress Option B which retains existing site
levels and looks to resurface the existing streetscape, renew street furniture and
improve street lighting. 
3.4 Agree that delegated authority be afforded to the Executive Director with
responsibility for Development and Economic Growth for the delivery of the
project to completion including agreeing a final design.  
Page 80

Page 81

4.0 DETAIL 
4.1 On 12th August 2021, Argyll and Bute Council agreed to allocate £250,000 of
Place Based Investment (PBI) Programme funding to Gibraltar Street, Oban to
enhance the public realm and improve the access to Oban town centre. The total
council budget for the project is £250,000, with a potential £10,000 contribution
from Bid4Oban. Remaining budget for construction is £210,000. 
4.2 Gibraltar Street is a key pedestrian intersection between Oban Town Centre and
edge of town retailers via the Tesco car park that has recently been refurbished.
The main objective of this piece of work is to improve the public realm of Gibraltar
Street to create an enhanced pedestrian space that encourages people into Oban
town centre, and provides an attractive, pedestrian environment in which
businesses can operate their business. Despite its short length Gibraltar Street is
a complex site with considerable levels changes from both north to south and
west to east.  Gibraltar Street also has a number of residential and business
accesses, at which levels determine how the open space meets these various
accesses.  In addition there is uncertainty over a number of underground utilities
that have emerged during the detailed design process.
4.3 TGP Landscape Architects were commissioned in January 2022 to create design
solutions, test design concepts with the community and other stakeholders;
deliver to RIBA work stage 5 and cost design proposals.
4.4 Initial design options were produced in March 2022 with an internal workshop
taking place in April 2022 with colleagues from Roads and Infrastructure Services
and Elected Members. A subsequent external workshop took place with relevant
stakeholders such as BID4Oban, Tesco, local businesses, Oban Community
Council and the Oban Access Panel.
4.5 Based upon feedback from all stakeholders, designs were refined and an initial
public consultation took in June 2022. Feedback from the public was generally
positive and the majority of the comments received were around widening the
access at the bottleneck of Tesco; making the area more accessible friendly;
increasing planting/greenspace and seating; and ensuring the space is
brightened with public art work and improved lighting.
4.6 Initial designs concepts included redevelopment of both council maintained area
of Gibraltar Street into the car park and pedestrian link owned by Tesco. There
was initial support from Tesco to resolve the bottleneck on the site and make the
space more user friendly and visually attractive, however Tesco later withdrew
from the project which reduced the potential impact of the future transformation of
the Street particularly with regard to addressing the problematic levels.
4.7  As a result of exclusion of the Tesco area, the site for redevelopment has
significantly reduced in size.  With the Tesco site included, there was a longer
distance over which to achieve a gentler slope. Exclusion of the Tesco land has
Page 81

Page 82

resulted in a more complex arrangement being proposed to accommodate levels
within the site. The main issue has been the need to design around the slope
running through the site and the resulting different level areas that had to be
created across the site to ensure compliance with British Standards for
Accessibility in external spaces. This has resulted in a significant change to the
design and a much more complex design than was originally anticipated.
4.8 The revised design options were presented to DMT and Oban, Lorn and Isles
Elected Members in October 2022, and went out to consultation in November
2022. 217 responses were received to the online consultation and over 100
people attended the in person public consultation event on the day. The majority
of online responses (47%) were in favour of what was referred to as Design
Option 1, however, a significant number of responses chose neither of the designs
presented (37%) with opposition to both plans communicated by stakeholders
such as Bossards, Oban Community Council, Bid4Oban, CrossRoads and Oban
Hospice. 
4.9 Comments received in regard to the design and in order of recurrence were as
follows: Increase the space for Bossards café (32); Public money should be used
for other priorities/areas of Oban (19); Space does not require upgrade, light touch
improvement such as tidying up and resurfacing (12); Concerns for future
maintenance of the space (10); Improvement on the original designs and support
of what looks like a more attractive space for all users (10); Concerns whether
space will be able to sustain amount of traffic/is it fully equipped for people with
disabilities and those who use mobility scooters (8); and more.
Option A: Revised Design
4.10 Following the consultation, TGP Landscape Architects were instructed to make
changes to Design Option 1 (presented at the November 2022 consultation) that
would maximise the space for the existing cafe to have an outdoor area for their
use immediately outside the business and thereby hopefully alleviate concerns of
stakeholders and public. The final design option (Option A) has been appended
– see Appendix 1 – and represents the best option for allocating usable space to
the café, although it does result in a further division of the space.
4.11 The indicative scheme has been costed but is not expected to be able to be
delivered within the budget currently available. Oban, Lorn and Isles Area
Committee is asked to note that initial costs are on a very broad estimate and in
addition to construction costs professional fees, tender price inflation beyond
Q1/23, lighting and power installations, potential adverse ground conditions,
alterations to services and contingency could all add to the overall cost of
delivering the project. Additional budget will therefore be required if this design
option (Option A) is to be taken forward. Estimated costs are contained within
Appendix 3 of this report which is marked as exempt given the sensitivity of the
figures included which could impact negatively on any future tender process.
Should this option be progressed we would work to confirm unknown costs as
soon as practicable.
Page 82

Page 83

4.12 The advantages of the new design option are that it has the ability to transform
Gibraltar Street by visually enhancing the space and ensuring the pedestrian
footway is compliant for all users.  The designed option addresses the various
levels restrictions and accesses onto the open space, whilst providing grades that
meet the British Standard requirements for Accessibility in external spaces. The
design option does however subdivide the site up into various platforms/sections
and it may feel less open than it does at present and be less flexible as a
thoroughfare.
4.13 Officers in Roads and Infrastructure Services have been consulted throughout the
entirety of the project and have indicated that they would not have capacity to
implement Option A at this time due to the complexity of the construction but will
be able to take forward Option B. Option B is outlined in the following paragraphs.
Option B: Resurfacing option
4.14 Following on from the consultation feedback suggesting a lighter touch option and
comments from the Oban Community Council whom ‘urges that the proposal
reverts as nearly as possible to the Gibraltar Street area of the original plan, so
that a suitable seating area can be available to Bossard’s customers’ (see
Appendix 2 – Original Designs Presented June 2022 Consultation), an option
could be considered which simply focuses on the site as it is with no change to
levels but instead looked to significantly upgrade the surface finishes, provide high
quality furniture and improved street lighting.
4.15 The resurfaced option (Option B) would focus on replacing existing materials and
street furniture to provide a refreshed space, with repairs made to the steps and
lighting could also be provided. 
4.16 Initial discussions with Roads and Infrastructure colleagues indicate that the
works could be delivered within the budget available (although a full cost
breakdown is still to be drawn up) – including replacing the existing paviours with
new high quality paving; repairs to steps; and the addition of new high quality
street furniture and lighting. Roads and Infrastructure colleagues have advised
that the project could be completed within circa 6 weeks, starting on-site after the
tourist season – September/October 2023.
4.17 The advantages of the resurfacing option (Option B) is that it can be delivered
within the existing budget; the council have delivered similar schemes; the
scheme would be completed within a shorter timeframe which would help with
public support and minimise disruption to businesses; feedback from consultation
in regard to light touch improvements and space for café owner would be met. 
4.18  It is anticipated that a period of work would be required to confirm final finishes on
paving, street furniture and lighting before works could be agreed. 
4.19 If Oban, Lorn and the Isles Area Committee chooses to proceed with the light
touch resurfacing project (Option B) with the site remaining as is, agree that
officers will progress to implementation and work with officers in Roads and
Infrastructure Services.
Page 83

Page 84

4.20 Delegated authority is requested to be afforded to the Executive Director with
responsibility for Development and Economic Growth to progress the delivery
of the project via the option confirmed at Committee to completion, including
agreeing any procurement process as may be necessary.
5.0 CONCLUSION
5.1 The consultation process carried out in 2022 did not provide clear support for a
single option and raised some concerns about the proposed scheme. Whilst the
design team have tried to address these, they have not been shared with
stakeholders at this stage and so there is no further feedback to share. Further
feedback on the deliverability of the project and costs of construction have led to
officers recommending that Option B, essentially a resurfacing option which would
be delivered by Roads and Infrastructure Service.  It is anticipated that this option
can be delivered within the budget available but this will be subject to a detailed
costing.
5.2 If Oban, Lorn and the Isles Area Committee decide to proceed with Option B,
officers will progress to implementation and work with officers in Roads and
Infrastructure Services.  
5.3  Following Area Committee decision, officers will progress the preferred option,
update local stakeholders and progress with delivering the project to an
appropriate timescale. 
6.0 IMPLICATIONS
6.1 Policy – the works would support Oban Town Centre which in turn will support
the overarching objective and long term outcomes of the Council’s
Corporate Plan, Argyll and Bute Outcome Improvement Plan, the Local
Development Plan and the Economic Strategy. Capital works must be in
line with the Place Based Investment Programme criteria.
6.2 Financial - £250,000 of Place Based Investment funding has been allocated to
the project. Budget remaining for construction costs is £210,000. If
Option A is progressed additional funding will be required to be sought
from the Policy and Resources Committee with estimated costs in
Appendix 3 of this report which is marked exempt. 
6.3  Legal – None.
6.4  HR – None.
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics – None. 
6.5.2   Socio-economic Duty – The project supports local economy and
community through place-based regeneration activity. 
6.5.3  Islands - None.
Page 84

Page 85

6.6 Climate Change – Construction works undertaken will result in carbon emission
although it is anticipated that these will be restricted to the construction
period. 
6.7 Risk – As with all construction projects a number of risks will be ongoing and a
risk register will be maintained. Delivering Option A may lead to higher
risks as referenced to in section 4.11 of the report. 
6.8  Customer Service – None. 
Kirsty Flanagan
Executive Director with responsibility for Development and Economic Growth
Policy Lead for Strategic Development, Councillor Robin Currie
13 February 2023                                                  
For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
Fergus.Murray@argyll-bute.gov.uk 
Adrian Jackson-Stark, Lorn Arc Regeneration Project Manager 
Adrian.Jackson-Stark@argyll-bute.gov.uk 
Genna Lugue, Economic Regeneration Officer
Genna.Lugue@argyll-bute.gov.uk 
APPENDICES
Appendix 1 – Final Design Option
Appendix 2 – Original Designs Presented at June 2022 Consultation
Appendix 3 – Gibraltar Street Public Realm Project Estimate Costs – EXEMPT 
Page 85

Page 86

This page is intentionally left blank

Page 87

APPENDIX 1 – Final Design Option (OPTION A) 
Page 87 Agenda Item 10a

Page 88

This page is intentionally left blank

Page 89

APPENDIX 2 – ORIGINAL DESIGNS PRESENTED AT JUNE 2022
CONSULTATION 
Page 89 Agenda Item 10b

Page 90

This page is intentionally left blank

Page 91

Document is Restricted
Page 91 Agenda Item 10cNOT FOR PUBLICATION by virtue of paragraph(s) 6
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 92

This page is intentionally left blank