To:  Leadership Board
On: 18 February 2026
________________________________________________________________ 
Report by:  Director of Finance and Resources 
_______________________________________________________________ 
Heading:  Strategic Commissioning Review of Culture and Leisure
Services 
_________________________________________________________________
1. Overview and key messages
1.1. Previous updates to the Leadership Board have provided an overview of the
Strategic Commissioning Review of Culture and Leisure Services, which has
been ongoing over the course of 2025. This report provides a further update to
the Board including activity to date, and key issues for consideration. 
1.2. As outlined in previous reports, the review is being informed and guided by the
following principles:
• Services should be specified in a way that supports the Council’s agreed
priorities, along with a new suite of performance measures.
• Services should be sustainable and affordable.
• The Council and OneRen will work with communities to ensure that leisure
and culture services are planned and delivered in a fair and consistent way.
• In line with the principles of the Council’s Strategic Property Review, (SPR)
there is a presumption for the co-location of services wherever possible,
and services will be delivered from flexible, sustainable, well-designed, and
high-quality spaces.
The review also aims to - where possible - identify operational and service
efficiencies which may contribute to potential investment requirements
identified through the review.
1.3. High‑quality culture and leisure services align with the Scottish Government
and COSLA’s ‘Scotland’s Population Health Framework 2025-2035’, which
prioritises taking preventative action to improve health outcomes. Culture and
leisure services help improve physical and mental wellbeing through providing

Page 2

PUBLIC
accessible health and learning opportunities, easing the pressures on public
bodies by reducing overall demand and associated costs.
1.4. The review has clearly established that OneRen provides a broad range of
high-quality local services fully aligned with these national principles, however,
elements of the estate are aging and are not fully aligned to the SPR
objectives, which impacts on efficient and effective service delivery.  
1.5. The review has been progressed through 3 distinct workstreams, each led by
senior officers from the Council and involving relevant staff from both the
Council and OneRen. The workstreams are:
a. Workstream 1 - Community and Leisure
b. Workstream 2 - Culture and Libraries 
c. Workstream 3 - Finance and Governance 
1.6. In governance terms, OneRen is a charity established by the Council to
provide culture, leisure, and sporting opportunities to help people enjoy active
and healthy lives. It operates through a limited liability company which is
separate from (but wholly owned by) the Council, with its own Board of
Directors and management team. 
1.7. The initial focus of each workstream was to establish key information relating
to the activities of OneRen and associated Council services, to determine an
agreed baseline position for all services and facilities, including the financial
performance and business plan delivery assessments for cultural and
commercial services. Following this, a detailed critical analysis of all service
areas was undertaken to determine sustainable options for service delivery in
the longer term which meets the Council’s aims, requirements and aspirations.
1.8. The services that are currently delivered by OneRen on the Council’s behalf
are part funded through a service payment of £14.1m in 25/26 and are the
subject of a suite of formal Service Level Agreements (SLAs) between the
Council and OneRen, which have not been strategically reviewed since cultural
and community services were transferred in 2015. The review has established
that the specifications of current service requirements are outdated, do not
specify performance expectations which reflect the current and expected
operating environment, and are overly specific about input/output parameters
at the expense of realistic and measurable outcomes that contribute to Council
and community priorities. The current suite of SLAs should therefore be
revised to reflect current and future service expectations and requirements,
and to reflect any changes implemented following completion of this review.
1.9. OneRen submits an annual business plan to the Council which sets out the
agreed priorities for the delivery of commissioned cultural, leisure and sports
activities in the year ahead. The most recent business plan was approved by
the Leadership Board in April 2025. The business plan forms part of the

Page 3

PUBLIC
contractual obligations and confirms the annual service payment. OneRen
spends around £23m each year on cultural, leisure and sport activities, of
which approximately £14m is funded from the service payment and the
remaining £9m from customer charges, sales, grant income and charitable
donations. As a charitable organisation with a trading company, any surpluses
generated are reinvested in services for the benefit of the local community.
OneRen also delivers services over and above those set out in the suite of
SLAs to meet their commercial arrangements and meet changing customer
and community expectations and demand patterns, and any specific service
requests from the Council.
1.10. OneRen operates services from a range of venues across Renfrewshire.
Table 1: OneRen Services
Services  Facilities 
Library and Digital Information Services 12 Public Libraries
Culture, Heritage and Events Services 4 town halls
5 museum and heritage properties
1 arts centre
Sports Services– Leisure  10 sport venues
Sports Services– Pitches and pavilions  18 playing fields
1 golf course
5 bowling greens
Community facilities  13 Community Centres
(plus 9 community managed centres)
Sports Development, including Active
Schools 
Health & Wellbeing Referral Services 
1.11. In addition, aspects of the services listed above take place out with the
facilities listed, for example cultural and physical activity takes place across the
schools estate, within third sector organisations, health care settings and within
the public realm e.g. 10k and 3k road races.
1.12. To determine locality provision standards for services and to ensure equitable
accessibility across all population centres the review has established 5 locality
areas and mapped the provision of all OneRen venues in each. This has
enabled locality standards to be developed which could specify the services to
be provided in each community and locality, and those which are provided on a
Renfrewshire wide basis, recognising the accessibility standards to be
expected by residents in relation to traveling times. These are outlined in detail
in Section 3 below.

Page 4

PUBLIC 
Table 2: Proposed Localities
Locality Towns and Villages
1 Erskine/Bishopton/Dargavel
2 Renfrew
3 Paisley
4 Johnstone/Lochwinnoch
5 Linwood/Houston/Bridge of Weir 
1.13. The review has initially identified a number of potential service changes and
improvements that would ensure more effective, equitable and sustainable
services in the longer term. These include potential savings and investment
options, which are summarised below and explained in greater detail in the
body of the report:
1.13.1 The revision of community halls booking and let activity across OneRen
and the council and the introduction of a single online booking and scheduling
system for community lets and school hall lets.
1.13.2 Rebalancing the current level of grass vs synthetic playing fields.
1.13.3 The development of a new library service model with library provision at
the heart of the council’s Connected Communities model.
1.13.4 Further promoting and supporting the Community Asset Transfer of self-
managed community facilities. 
1.13.5 Develop options for swimming provision in Erskine and Renfrew within
those localities, recognising the challenges with the current facilities, and
considering any opportunities for co-location with other OneRen or Council
services.
1.13.6 Updating and revising the business plans for town halls and cultural
venues to reflect their specific identities and market placement, with a specific
review and analysis of the issues and costs associated with the possible
relocation of services delivered from Renfrew Library into Renfrew Town Hall.
1.13.7 Review and reposition the current suite of service level agreement to be
more outcomes focussed.
1.14. As the key recommendations and actions outlined in this paper are
progressed, more detailed consultation and engagement processes would
require to be undertaken with key stakeholders, including service users and
residents.

Page 5

PUBLIC
___________________________________________________________________
2. Recommendations
2.1 It is recommended that the Board: 
1. Notes the update as detailed in this report.
2. Notes the establishment of locality principles as detailed in Section
3, which support the provision of equitable service provision
across Renfrewshire.
3. Approves the revision to the booking and scheduling systems
utilised by OneRen and the Council and the introduction of a single
integrated online process for indoor community facilities and
community lets within the school estate.
4. Approves the active promotion of Community Asset Transfer
(CAT) for self-managed community facilities and the development
of funding options to support this.
5. Approves the development of options to improve the overall
efficiency of sports pitches, including rationalisation and
reinvestment. 
6. Agrees the recommendation in Section 3 to develop potential
future options for swimming and wider community sports provision
in Erskine and Renfrew. 
7. Notes the requirement to revise the identity and purpose for each
Town Hall and agree the introduction of dynamic opening times to
improve utilisation and reduce unnecessary operational
expenditure. 
8. Agrees to develop a costed option for the relocation of services
currently delivered within Renfrew Library to Renfrew Town Hall
9. Notes the service model for Library and Digital Information
Services, which aims to improve cross service integration and
closer alignment with the Strategic Connected Communities
review.
10. Approves in principle the revision of the Services Agreement and
Service Level Agreements to reflect the approved
recommendations from this report, and the amalgamation of the
separate Service Level Agreements into a single revised
document with improved financial and operational performance
and outcome standards, with final drafts to be reported to this
Policy Board for approval. 
3. Locality Principle for OneRen
3.1. OneRen has 66 directly managed venues located across Renfrewshire and an
additional 9 self-managed community centres. The review has developed
locality specific principles, and it is intended that these will be used as a basis
for identifying the services (and facilities) that could be provided in

Page 6

PUBLIC
communities, based on equitable and proportionate levels of accessibility for
all residents in Renfrewshire.
3.2. Utilising the GIS resources within the Council it was possible to compare
existing locality groupings and existing data sets to define 5 localities which
divide Renfrewshire on geographic boundaries (recognising as far as possible
recognised community boundaries) to provide a basis to establish service
provision standards for residents within these locality areas. The localities are
derived from intermediate data zones, which themselves are derived by
merging SIMD data zones, and the extensive data held by the Council on
households and communities could be utilised. The 5 localities are outlined
below: 
3.3. Having defined the localities, principles for the provision of services and
facilities were established, building from individual community level to
Renfrewshire as a whole. Travelling times to facilities within each of these
categories were set and measured to provide a reasonable and practicable
standard, and any recommendations made throughout the review have and will
be measured against these standards to ensure as far as possible equity of
provision across the Council.  
Locality Towns and Villages
1 Erskine/Bishopton/Dargavel
2 Renfrew
3 Paisley
4 Johnstone/Lochwinnoch
5 Linwood/Houston/Bridge of
Weir
1
2
4
5
3

Page 7

PUBLIC 
Table 3: Locality Principles
Community Offer Locality Offer Renfrewshire-wide Offer
Facility Provision
Community space Gym or studio Performance space
Sports hall Swimming Pool Cultural venues
Sports Pitch Community library Central library  
Museum  
Tennis courts  
Athletics track
Accessibility
20 minute walk 40 minute walk 
10 minute cycle 20 minute cycle 
10 minute drive 15 minute drive 20 minute drive
10 minute public transport 15 minute public transport Public transport accessible 
Workstream 1 – Community and Leisure
3.4. This workstream has reviewed the leisure, sport, active schools, and
community booking services provided by OneRen through the sport centres,
pools, pitches, golf course and community centres managed by OneRen on
behalf of the Council. 
3.5. While the actual services provided are managed and operated by OneRen, all
the facilities utilised are owned and maintained by the Council and provided to
OneRen in accordance with the conditions of a Property Agreement that is part
of the 2015 suite of documents, under which OneRen operates, in return for
the service payment from the Council. OneRen pays for buildings and grounds
maintenance at some locations which transferred as part of the cultural
services inclusion in OneRen in 2015.
3.6. Workstream 1 has examined both the services provided and the premises from
which the services operate to establish their condition, suitability, and projected
lifespan to determine opportunities for co-location or rationalisation in line with
the principles of the Review. This work included consideration of where
investment in certain facilities may be required to facilitate wider change.
Specific external reports have been commissioned on the Pitch Strategy and
Swimming Pool provision to assist in establishing current and future
requirements and this will contribute to the Council wide property lifecycle
maintenance and investment strategy.

Page 8

PUBLIC
3.7. Footfall, capacity and cost data on all service areas has been collated and
examined to support trend analysis for specific areas, to identify potential
options and efficiencies which would reduce the level of Council subsidy. In
addition to the data, service specifications and workflow analysis flowcharts
have been utilised to determine service efficiency, effectiveness and potential
for future service delivery.
Community Centres
3.8. Workflow analysis has established that the processes for community centres
and school's hall and room booking activities, arranging provision of the
facilities and resourcing cleaning, opening, maintenance and preparation of the
facilities are disjointed and in need of fundamental revision. At present
bookings are not all managed through a single system, and the main system
used for community and school bookings, Artifax, is at end of practical life and
is no longer supported. OneRen utilise their own internal system for some
sports hall bookings.  There is no integration between systems which manage
staff allocation, invoicing and payments, requiring manual entry and data
handling. 
3.9. While OneRen has operational and management responsibility for the facilities,
there are practical arrangements in place whereby the Council open, clean,
and secure the facilities. There is potential confusion for customers,
requirements for convoluted communication, and a disconnect between
systems for booking and scheduling.
3.10. Although there are systemic operational issues to address, a significant barrier
to improving the overall service is the division of the function across OneRen
and the Council, and the lack of a seamless interface between booking and
staff management systems. It is proposed that a comprehensive revision of the
booking, scheduling and resourcing is undertaken which will include
identification of a new booking system which enables online booking for a
more seamless customer experience, and back-end integration with other
council systems and processes for community facility and non-sport school let
bookings. 
3.11. As indicated in the table at Section 1.10, One Ren is responsible for 13
community centres, but an additional 9 are self-managed by third party
organisations. In practice, the self-managed centres are provided with the
same level of Council support as those controlled by OneRen – the Council
provides caretaker services, maintains the premises and retains all ownership
responsibilities but is not involved in bookings and does not collect income
from bookings to offset this cost.

Page 9

PUBLIC
3.12. The introduction of self-managed centres was intended at its inception as a
step towards full CAT transfer to the organisations who now manage them.
However, this has not progressed, and it is proposed that the Council now
pursues the CAT transfer of these centres to the organisations who operate
them as they have clearly demonstrated the ability to manage and operate the
centres for a number of years. 
3.13. To support this transition, it is proposed that the Council develops cost
estimates which would ensure all halls are in a good condition which would
incentivise the CAT process, and also offer transition support through the CAT
team, including potentially the offer of an operating cost grant to cover the
period of transition (potentially for 12-24 months) to enable the organisations to
source, bid for and obtain funding to ensure sustainable operation. Transfer of
all the self-managed halls on a CAT basis would remove a significant recurring
cost burden from OneRen and the Council. Cost estimates would be the
subject of a future update report and recommendation to this Board, however
Council has set aside £0.8m to increase community ownership in setting the
2025/26 budget and this would provide a funding source.
Pitch Strategy
3.14. A review of sports pitches has been undertaken which examined current
provision across Renfrewshire and determined the demand trends and future
requirements for both grass and synthetic pitches. As well as those operated
by OneRen, the review has considered pitches provided at schools and those
provided by private sector organisations to give a complete understanding of
availability and need. The key outcomes of this pitch review are:
3.14.1. Renfrewshire has a total of 70 pitches, split between grass
(54%) and synthetic (46%) surfaces. These are managed by OneRen,
schools, and private providers. While the overall geographic spread of
pitches is appropriate, there is an under-provision in the northwest of the
Council area, where investment is already planned (eg synthetic pitch
provision at both Dargavel Primary and Thistle Primary schools). Grass
pitch utilisation is very low, averaging 7% at peak times, primarily due to
the limited capacity of grass, maintenance requirements and weather
dependency. Player pathways and training patterns are also a factor.
3.14.2. Synthetic pitch utilisation is 79% at peak times, which is in line
with the expected 80% benchmark observed in comparable regions.
Some locations, such as Johnstone Community Sports Hub (100%),
Gryffe High School (97%) and Ralston Community Sports Hub (94%),
reach or come close to full capacity.

Page 10

PUBLIC
3.14.3. Accessibility analysis confirms that 100% of the population is
within a 10-minute drive of a sports pitch. Grass and synthetic pitches
have high accessibility rates of 99% and 94%, respectively.
3.14.4. The data supports the case for shifting more usage to synthetic
pitches without negatively impacting accessibility.
3.15. Consideration of the findings of the pitch review clearly indicate the developing
transition from grass to synthetic surfaces, due in part to their ability to support
diverse and wider utilisation throughout the year. The review has therefore
undertaken an assessment and developed options for pitches which are
underutilised, unsuitable or unsustainable including assessing the impact of a
reduction in the number of pitches.
3.16. There are 3 playing fields where pitches have been identified as not being
sustainable due to very low or no use as outlined in Appendix 1. It is proposed
that low use pitches are removed from pitch categorisation and alternative
uses are identified which align with council and national strategies. 
3.17. Application of the same principles which led to the proposal to promote CAT
transfer of self-managed community centres would indicate that those pitches
which are operated by particular clubs on a licence to operate basis should
progress to CAT transfer. These pitches are occupied by clubs who operate
and manage them, but the Council continues to maintain and support this use
at no cost. As with the community halls it is proposed that the Council develops
options for transition support through the CAT team, potentially with additional
support via an operating cost grant to cover the period of transition to enable
the organisations to source, bid for and obtain funding to ensure continued
operation. 
Swimming Pools
3.18 A comprehensive review of swimming pool provision across Renfrewshire has
also been undertaken by an external provider, involving analysis of capacity,
condition, long term viability and accessibility of all existing OneRen pools and
the capacity provided by private facilities and accessible neighbouring
provision. The Council currently operates 5 swimming pools: Erskine,
Johnstone, the Lagoon, On-X and Renfrew Victory Baths.
3.19 The ON-X, Lagoon, and Johnstone Community Sports Hub are in satisfactory
condition (Grade B) but require substantial M&E and compliance-related
investment as part of ongoing lifecycle maintenance. These facilities are
integrated with other services – the Lagoon and On-x with sports, leisure and
community facilities and Johnstone with sports, leisure and school facilities. As
such these venues operate in line with the preferred model the Council has

Page 11

PUBLIC
agreed.  Investment in both centres is ongoing, with the creation of the TAG
Active at the Lagoon, and creating indoor football pitches at the ON-X in order
to drive income generation and increased footfall.  
3.20 The current condition of these integrated venues is broadly satisfactory and the
cost per use is lower than standalone swimming pools; they are therefore
considered sustainable in the medium to long term. However, investment is
required in the fabric of these venues as part of ongoing lifecycle maintenance
requirements. 
3.21 In Erskine, the existing buildings are 25/35 years old and require significant
investment or replacement.  Erskine Pool is rated Grade B and is a stand-alone
facility, as is Erskine Sports Centre. Erskine library is being moved to a
temporary location pending identification of a permanent location.  It is
therefore proposed that options to modernise provision should be developed by
officers as part of the wider review programme.
3.22 Renfrew Victory Baths is in poor condition (Grade D), with urgent structural,
and M&E issues requiring major investment to enable the building to remain
operational. As elected members will be aware from wider reports to policy
boards, planned investment of £0.6m will be undertaken to address these
immediate issues.  As a Common Good asset, the building itself is now over
100 years old and it is recognised that the level of investment to modernise and
develop the facility is likely to be significant, with any works likely to be
exceptionally challenging due to the historic fabric and age of the building.  As
part of the review, it is proposed that options are developed in relation to the
provision of a pool in Renfrew to allow for further consultation to take place on
future provision.
Indoor Sports Facilities
3.23 OneRen operates 10 sports venues with 8 providing indoor sports and leisure
facilities. As outlined above, these must be considered in tandem with the
swimming pools as there are integrated facilities providing both swimming and
dry side activities, and at Park Mains and Johnstone the facilities are integrated
with the schools.
Table 4: Indoor Sports Facilities
Venue Category
Erskine Community Sports Centre Stand Alone
Ferguslie Sports Centre Stand Alone
Johnstone Community Sports Hub Integrated with swimming pool and school
Lagoon Leisure Centre Integrated with swimming pool

Page 12

PUBLIC
ON-X Sport and Community Centre Integrated with swimming pool
Park Mains Sports Complex Integrated with school
Ralston Community Sports Centre Stand Alone
Renfrew Leisure Centre Stand Alone 
3.24 Accessibility and location of these indoor sports venues has been mapped
and analysed utilising the Council GIS resource and it can be seen from the
map below that the current locations satisfy the locality principles established
for this review, and this is further enhanced by the many schools and
community facilities which provide sport and leisure spaces in addition to
these dedicated venues. 
Mode Minutes %Pop’n
Walk 0-5
5-10
10-15
5%
16%
31%
Cycle 0-5
5-10
10-15
36%
74%
90%
Drive 0-5
5-10
10-15
92%
100%
100% 
3.25 The condition of the current indoor sports facilities is outlined below – only
Ferguslie is rated A. There is currently no condition rating data available for
Renfrew or Ralston but it may be assumed that Renfrew will be a similar rating
to Erskine and Ralston may be best rated as C due to its age and condition.
3.25.1 Johnstone school rating is C – no rating directly for sports
elements but some minor maintenance required
3.25.2 Park Mains school rating is B (no rating directly for sports
elements)
3.25.3 Ferguslie is Rated A (due to recent investment)
3.25.4 On-x is rated B 
3.25.5 Lagoon is rated B 
3.25.6 Erskine is rated B

Page 13

PUBLIC
3.26 As outlined above in the swimming pool section of the report, the integrated
facilities meet the locality principles and also the SPR principles of co-location
and avoidance of stand-alone venues. Other than ensuring the lifecycle
maintenance requirements are met these facilities are sustainable for the
longer term, subject to Net Zero investment in future years.
3.27 As standalone facilities, both Erskine and Renfrew Sports Centres will require
further investment and ongoing review to ensure the offering available meets
service user requirements.  As noted above in relation to swimming provision,
options will be developed for wider sports and swimming facility provision for
consideration as part of the review.
3.28 Ferguslie Sports Centre is the only venue rated A for both condition and EPC
and has recently been updated with significant investment of £570K which has
resulted in the lower operating costs. Cost data would indicate that this is
currently a sustainable stand-alone venue.
3.29 Ralston Community Sports Centre has generally low operating costs, but utility
costs are high. Some interest in CAT transfer has been expressed in relation to
the centre, and this will continue to be progressed.
3.30 OneRen operates a golf course at Barshaw Park and has responsibility for 5
bowling greens at Gallowhill, Lochside, Robertson Park, Johnstone and
Woodlands. Robertson Park is directly operated by OneRen but the others are
committee controlled, although the Council does undertake necessary
maintenance activities at a cost of £53,000 per annum. No use figures are
available for the Bowling Greens as they are predominantly committee
controlled.   
3.31 The provision of the golf course will also be fully explored through the review,
with options developed for consideration by elected members.
4 Workstream 2 – Culture and Libraries
4.1 This workstream has reviewed the Library Information, heritage, cultural and
events services provided through the Libraries, Museums, Town Halls and Arts
Centre. Similar to the Leisure and Sports services being reviewed in
Workstream 1, the actual services provided are managed and operated by
OneRen, and all the facilities utilised are owned and maintained by the Council
and provided to OneRen in accordance with the conditions of the Property
Agreement.
Heritage, Cultural and Events Services
4.2 Heritage, cultural and events services have benefited from significant
investment in recent years. This has resulted in transformational enhancement
of Paisley Town Hall, Renfrew Town Hall, Paisley Museum and Paisley Arts

Page 14

PUBLIC
Centre as part of the Future Paisley culture-led regeneration programme and
earlier new builds at Johnstone Town Hall and Tweedie Hall in Linwood.
4.3 Following the significant investment in the Cultural Quarter in Paisley
commercial business plans were drafted to provide a baseline operating
strategy for the venues, and to project footfall, income and expenditure as part
of driving footfall into the town centre as a cultural and tourism destination for
the West of Scotland which is raising the profile of the region and attracting
inward investment, awards and recognition. These plans were prepared for
Paisley venues which received investment. Town Halls in Renfrew, Johnstone
and Linwood were not included in the business planning exercise at that time.
Work has therefore been undertaken to develop business plans for these
venues which are appropriate to their location and to identify a clear core offer. 
4.4 Data on footfall, income, expenditure and condition of all town halls was
collated to enable an assessment of the utilisation and sustainability of each
town hall to be undertaken and potential service change options developed for
each. This demonstrates that all four town halls have significant overheads for
property, utility and staffing costs. Analysis indicates that there is a mixed
picture across the four venues in terms of income generation and utilisation,
and therefore cost recovery.
4.5 Paisley Town Hall continues to develop as a stage for major new events
including the Paisley Book Festival and Paisley Comedy Festival. Johnstone
Town Hall is also recovering its place at the centre of its community following
the pandemic disruption with performances and venue hire. Both Paisley and
Johnstone Town Halls are realising increased income generated due to the
events and festivals programme delivered by OneRen. Renfrew and Tweedie
Halls have experienced much lower footfall/bookings than have been
anticipated in recent years.
4.6 Following the analysis undertaken, each of the town halls have been reviewed
both individually and holistically to understand each venue’s role and profile
within the wider Renfrewshire cultural sector and to ensure that the venues are
not inadvertently in competition with one another in terms of growing business
and audiences. The goal is for each venue to have a clear purpose and vision
that allows for targeted growth as well as meeting the wider OneRen objectives
and values.  It is proposed that the review now looks to establish a unique
identity and purpose for Renfrew, Tweedie and Johnstone town halls to
maximise attendance and use, and to introduce new functions where
appropriate to attract different activities to those halls where the current
traditional model is not delivering sustainable use, and to adapt the operating
model to better align with the type and timing of events and activities taking
place.
4.7 Adopting this approach will ensure increased activity and use at each Town
Hall and increase income over time to reduce the level of subsidy required.
After reviewing audience data the proposed unique identity and purpose of
each Town Hall has been proposed by OneRen as follows.

Page 15

PUBLIC 
Table 5: Proposed Town Hall Identity and Purpose
Town Hall Potential Identity and Purpose
Paisley Premium events venue and one of Scotland’s best
performance spaces.
Johnstone Integrated community and town centre venue, providing
performance spaces for popular theatre, community drama,
dance shows, weddings and parties as well as  library, cafe
and council services  
Renfrew Town centre cultural and community hub including
community museum, library and local arts / activity
organisation/s all under one roof.
Tweedie Business oriented hub in the centre of Renfrewshire that can
support local business owners, community organisations and
entrepreneurs offering affordable space. 
4.8 Utilising the data available for each Town Hall, it is proposed to identify growth
opportunities for each venue in line with the refreshed brand identities,
optimising the facilities and USPs for each venue. The focus moving forward
will be on ensuring delivery of revised business plan objectives and outcomes
as these facilities become re-established and adapting the plans as usage data
that is representative of expected and sustainable demand becomes available.
As outlined above, and in support of the vision above, there is an option to
explore in the relatively short term an option to relocate services currently
delivered from Renfrew Library to Renfrew Town Hall. Renfrew Library is in a
structural condition rated as poor and requiring significant investment in the
building fabric. It is proposed that a costed option for this proposal is
developed with a report back to this Board. 
4.9 In addition, an analysis has been undertaken of dynamic opening times,
involving a flexible scheduling system where OneRen retains the ability to
adjust operating hours based on factors such as customer demand,
seasonality, events, or staff availability which allows for greater adaptability
and efficiency. This approach can enhance customer satisfaction by better
matching availability to demand while optimising operational costs. However, it
requires clear communication and reliable technology to keep customers
informed of changing hours, and will require a change to the current service
requirements which are as follows:

Page 16

PUBLIC
Table 6: Current Town Hall Specified Opening Hours 
Paisley Renfrew Johnstone Tweedie
Mon
-
Sat
8.45am
to
4.45pm
Mon -
Fri
9.00am
to
4.45pm
Mon,
Wed,
Fri
8.45am
to
5.00pm
Mon –
Sat
9.00am
to
5.00pm  
Sat 10.00am
to
2.00pm
Tues,
Thur
8.45am
to
8.00pm      
Sat 9.00am
to
5.00pm  
Also, outwith specified hours dependant on bookings and performance programme 
4.10 Usage data and analysis demonstrates that an initial re-working of the Town
Halls core opening times will provide operational efficiencies for OneRen whilst
maintaining customer access and the availability of services and programmes
within these venues. 
4.11 It also is important also to recognise the significant investment that the Council
has made in other facilities, specifically in Paisley Central Library, Museum and
Arts Centre. These investments reflect the focus of the Council in terms of
improving health and wellbeing and wider cultural and economic regeneration
through a programme of step change which is very different to other local
authority areas across Scotland. Each is an individual facility with specific
offerings and ongoing review of the facilities in the cultural quarter will need to
recognise and reflect this, tracking the business plans and revisiting the
assumptions made where necessary. 
4.12 Heritage services are incorporated under Renfrewshire Museums Service,
which manages the museum collections and heritage archives, both subject to
a separate agreement between the Council and OneRen. The Council has
made significant investment with the museum store at the Secret Collection in
2018 and the new Paisley Museum campus opening in 2026, which
incorporates Coats Observatory and will also include the Heritage Centre when
the Museum reopens. The fifth heritage venue is Renfrew Museum located
within Renfrew Town Hall and was refurbished in 2012. The Paisley Museum
Reimagined project has enabled significant development in Renfrewshire
Museums Service developing skilled community collaboration practice and
enhanced research and collections development expertise which will continue
to benefit the wider region after Paisley Museum is launched.
Library and Digital Information Services
4.13 Workstream 2 has examined library and digital information services provided
through the existing 12 library facilities, the home delivery service and the
schools’ library service. This has involved detailed analysis of the costs of each
aspect of the service, the usage across each, and the measurable service
outputs from each location.

Page 17

PUBLIC
4.14 Libraries are one of the UK’s most trusted service providers. They are socially
important, helping people navigate an increasingly complex world through a
variety of systems and resources. Libraries provide open and accessible
support to build social inclusion through safe spaces and access to
information, acting as a help-point for residents and visitors and providing
access to information through a wide variety of staff skills, media, and spaces,
both physical and virtual.
4.15 It is clear from the data gathered to date that library provision has developed
considerably in the last 25 years, in response to the changing requirements of
local citizens and communities, but also in response to factors such as COVID
and the cost of living crisis.  This can be evidenced through footfall data which
indicates a significant number of visits take place in relation to social
connection or cultural opportunities or to access digital facilities and support, in
addition to book lending itself.
4.16 It is recognised nationally through research undertaken that the provision of
library services can faciltate social, cultural, economic and learning outcomes
for citizens: 
• Cultural and creative enrichment 
• Increased reading and literacy 
• Improved digital access and literacy 
• Helping everyone achieve their full potential 
• Healthier and happier lives 
• Greater prosperity 
• Stronger, more resilient communities. 
These outcomes do not currently underpin the service requirements for library
provision that the Council asks OneRen to deliver through the service
agreement, with performance measures currently focusing on outputs such as
book lending and opening hours rather than how libraries can support
individual and community wellbeing and learning.
4.17 To address these changed demands and expectations the library delivery
model has developed to  provide a focus beyond the traditional library model
reflecting the practices being observed and the data collated as part of this
review. The aim is to modernise services and increase impact while reducing
cost. As well as book lending and literacy support, the service delivery model
encompasses:
• Increasing digital services and assistance
• Increased gateway function to wider services
• Increased links to schools, employment and skills
• Increased social hub functionality

Page 18

PUBLIC
4.18 This revised model is complimentary to the developing outcomes of the wider
strategic Connected Communities review and indicates that the Library Service
could be an integral element of wider colocation and service integration model.
4.19 A modern library service covers four key areas as identified in the Carnegie
model: 
Library as a
SOCIAL HUB 
• Support and
services offered
on a joined up
basis
• Tackling isolation
• Promoting
connection
• Promoting health
and wellbeing
Library as a
LEARNING HUB 
• Supporting
literacy
• Promoting
digital skills
• Early years
support
• Lifelong
learning
activities
• English
Language Skills
Library as a 
CULTURAL
CENTRE 
• Access to
literature and
the arts
• Creative spaces
• Small events
spaces
• Access to local
heritage
resources
Library as an
ECONOMIC
ENABLER 
• Access to
employment
• Money Advice
and support
• Support for
enterprise 
4.20 The outcomes above could be enhanced through potential co-location of
physical provision with other services, by exploring the potential for library and
information provision to be a core element of the early help and intervention
model being developed through the Council’s wider Connected Communities
Programme, as well as opportunities to develop provision by testing new ideas
or technologies which support the needs of local citizens. The focus will be on
the services delivered rather than the buildings they are provided from.
4.21 The review has identified a number of property related issues with the
provision of library services. SPR indicators highlight that 9 of the 12
standalone libraries are deemed to be Category 3 – with low demand, poor
condition, location issues, unsuitability for new service delivery models, etc. In
particular, Erskine Library is in the final year of its lease and temporary
arrangements are being put in place to maintain porvision within Erskine, whilst
(as outlined above) Renfrew Library is in a structural condition rated as poor
and requiring significant investment in the building fabric. Others such as
Ferguslie Library are situated in leased premises rather than a Council facility
and will require consideration as part of the wider SPR.
4.22 The number of current library locations has also been examined and mapped
to the locality principles outlined in Section 3 of this report. It is apparent that
the provision and location of library services has been based on the historic
location of stand-alone library buildings and based on a book lending model
which is becoming less of a focus for the new delivery model.

Page 19

PUBLIC 
4.23 The number of libraries in Renfrewshire exceeds the standards specified in the
locality principles, but this is explained by the need for provision of the library
services in the villages of Lochwinnoch, Bridge of Weir and Bishopton. In
addition, the locality principles would require provision of a library in Erskine,
Renfrew, Paisley, Johnstone and Linwood and the Central library in Paisley is
classified as a Council wide resource. 
4.24 As the library model is adapted, this would provide the opportunity to review
the library estate to focus on service delivery in localities rather than physical
dedicated locations. Options may emerge for reducing the dedicated stand-
alone library estate which is a core principle of the review and integrating wider
services within the remaining library locations, or relocating library provision to
more appropriate co-located facilities to develop and deliver this integrated
approach, which has been demonstrated to be very successful at Johnstone
and Ferguslie. The library model would be an integral element of the place-
based provision of access and support - as part of a wider integration of
services in co-located facilities in line with the review principles. This work
remains ongoing with officers from both OneRen and the Council continuing to
focus on identifying specific opportunities to ensure the library and information
model is financially sustainable, delivers agreed outcomes and is built on the
foundations of co-location and collaboration
5 Workstream 3 – Finance and Governance 
5.1 This workstream is reviewing the financial impact of the current delivery model
from both a Council and OneRen perspective, undertaking cost analysis,
leading a review of service level agreements, and examining how supporting
services within OneRen and those provided by the Council are operating, with
a view to assessing their effectiveness. This includes direct costs incurred by
OneRen, indirect costs incurred by OneRen, and direct costs incurred by
Renfrewshire Council related to these venues and activities. 
5.2 When cultural services were transferred to Renfrewshire Leisure Limited in
2015, a suite of 10 legally binding supporting documents were signed by the
Council and Renfrewshire Leisure Limited (RLL) to specify the nature and
extent of services to be provided by RLL under its trading name OneRen, the
Locality Library
Provision
1 Erskine/Bishopton/Dargavel 2
2 Renfrew 1
3 Paisley 5
4 Johnstone/Lochwinnoch 2
5 Linwood/Houston/Bridge of
Weir 2
Accessibility
15 minute walk 50%
10 minute drive 100%

Page 20

PUBLIC
provision and maintenance of properties to be utilised by OneRen, the
management of museum collections owned by the Council, and governance
of the relationship and support provided by the Council. These agreements
are listed in Table 7 below. 
Table 7: Governance Documentation 
5.3 There are 4 SLAs within the 2015 suite that govern the provision of services
to OneRen by the Council – Support services, Building Services, Caretaking,
and Grounds Maintenance & Transport. These agreements are still applied
and adhered to, but they do require to be updated and respecified to match
the advances in services implemented within the Council since 2015.
5.4 Given that 10 years has passed since the SLAs were approved, it also is
considered prudent to review the corporate support arrangements between
OneRen and the Council to determine if improved arrangements can be
implemented and if any duplication in activity can be reduced. 
5.5 All of the documents in the suite will have to be revised to move to a more
comprehensive outcome specification that can better support a flexible and
agile approach to service provision, and to enable the Council to define
challenging service improvement and enhancement targets and indicators,
which are not part of the current arrangements. This will entail significant effort
within the Council across all the services impacted, led by Legal Services and
specialist external legal advisors where required. Any new monitoring
requirements will include robust performance and financial scrutiny measures.  
Document Date
1  Phase 1 Transfer Agreement July 2015
2  Services Agreement July 2015
3  Collections Agreement July 2015
4  Property Agreement July 2015
5   Phase 2 Transfer Agreement November 2015
6  Supplementary Agreement November 2015
7  RC to RLL Support SLA July 2015
8  RC to RLL Building Services SLA July 2015
9  RC to RLL Caretaking SLA July 2015
10  RC to RLL Grounds Maintenance and Transport
SLA
July 2015

Page 21

PUBLIC
5.6 The review of the documents will commence as the review establishes clear
direction for services and facilities as each service change will have to be
addressed within the various agreements, and a process of governance of
interim changes will be developed to ensure effective and compliant service
provision is continued until the final agreements are in place at the end of the
review. This will enable appropriate changes to be introduced as the review
progresses rather than waiting until its conclusion, supporting an agile
implementation methodology and enabling service improvements, efficiencies,
and changes to be approved and delivered on a rolling basis.
5.7 All proposed changes to the Transfer, Services, Collections and Property
Agreements (Items 1-6 in Table 7) will be presented to this Policy Board for
consideration and will require Board approval before implementation. The
Head of Policy and Partnerships has monitoring responsibility for OneRen on
behalf of the Council and shall approve and agree appropriate changes to the
Agreements and SLAs with OneRen to implement the decisions of the Policy
Board following approval.
___________________________________________________________________
Implications of the Report  
1. Financial –Costs asscoiated with the development of a costed option for the
provision of services currently delivered from Renfrew Library will be funded
from existing Change Fund provision. The indicative proposals for service
changes will be subject to further Board approaval at which point the financial
implications will be outlined.
2. HR & Organisational Development – none
3. Community/Council Planning – OneRen are a key community planning
partner, and a key focus of the review will be in relation to maximising the
outcomes that OneRen is able to deliver in partnership with he Council 
4. Legal – the report outlines the complexity of the current governance and
monitoring arrangements between the Council and OneRen, and proposes
fundamental review.
5. Property/Assets – a number of recommendations in the report may improve
the overall efficiency of the OneRen and Council property portfolio.
6. Information Technology – the report outlines a recommendation to improve
booking systems which may require investment in updated ICT systems.
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report because it provides a summary of

Page 22

PUBLIC
key actions being progressed only. Specific proposals will be subject to
detailed equality impact assessments were relevant.
8. Health & Safety – none
9. Procurement – none directly related to the recommendations in the report
10. Risk – none
11. Privacy Impact – none
12. COSLA Policy Position – the report outlines recommendations which would
support the Council to align with recommendation in the Scottish Government
and COSLA’s ‘Scotland’s Population Health Framework 2025-2035’
document.
13. Children’s Rights – none
14. Climate Change – the recommendations within the report may result in
changes in the propoerty estate which would deliver efficieincies, potentially
supporting the Council’s aim of reduced carbon emmissions.

Page 23

PUBLIC 
Appendix 1
Workstream 1 – Pitch Provision and Accessibility   
OneRen Private Total
Synthetic 18 14 32
Grass 35 3 38
Total 53 17 70 
Synthetic  Grass
Accessibility
47% in 20 minute walk  75% in 20 minute walk
95% in 10 minute drive  99% in 10 minute drive
Usage
79% use at peak times  7% use at peak times
Johnstone 100%, Gryff 97% and Ralston 94%  
Future Options
Investment planned in current pitches  Release 3 lowest used playing fields
£800K committed to provide 2 additional pitches  Promote CAT strategy for LTO playing fields
Learning estate investment will increase 3G capacity  Identify opportunities for LDP

Page 24

PUBLIC 
Grass Pitch Proposed Options
Retain CAT CAT - Potential Potential Release
Mixed use sites/high
demand Complete or Ongoing Currently have LTO or lease
with local teams Low/No use or demand
Ferguslie Park  Kirklandneuk Playing 
Fields King George V (Johnstone) Morar
King George V  (Renfrew) Barwood Park Moredun  Glenpatrick (1 pitch)
Ralston  Lochwinnoch   Inchinnan Durrockstock
Seedhill   Thomas Shanks 
St James   Todholm Playing Fields
(aka The Marshes) 
Viewfield Park 
Bishopton Playing Fields 
Glenpatrick (1 pitch)