Compulsory Purchase Reform in Scotland – Consultation Response

Renfrewshire Council · 3 December 2025
Back to Leadership Board — 3 December 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

PUBLIC 
___________________________________________________________________
To:  Leadership Board
On:  3rd December 2025
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Compulsory Purchase Reform in Scotland – Consultation Response 
___________________________________________________________________
1. Summary 
1.1 This paper sets out the Council’s proposed response to the
consultation launched by the Scottish Government. The deadline for
submission of responses is 19th December 2025. 
1.2 The Council’s proposed response has been drafted by officers familiar
with the Compulsory Purchase process and informed by their
experiences of the current system. 
1.3 A summary of the consultation process is provided within this report
with the proposed response itself attached at Appendix 1. 
___________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that members approve the proposed response to
the Scottish Government’s Compulsory Purchase Reform in Scotland
consultation which will be submitted to the Scottish Government prior to
the deadline of 19th December 2025.

Page 2

PUBLIC
_________________________________________________________
3. Background
3.1 On 19th September 2025, the Scottish Government launched the
Compulsory Purchase Reform in Scotland consultation.  
3.2 The purpose of the consultation is to inform the Scottish Government’s
approach to the comprehensive reform they consider is required to the
Scotland’s compulsory purchase system. The consultation puts forward
a package of options and proposals for comment.
3.3 The consultation is informed by the Scottish Law Commission’s
Discussion Paper on Compulsory Purchase No 159 which consulted on
their discussion paper between December 2014 and June 2015. The
Council issued a response form to this earlier consultation. 
3.4  The Commission’s 2016 Final Report concluded that “the legislation is
old, difficult to understand and does not work effectively in a modern
context” and that those who the Commission consulted with “took the
view that the system, both procedurally and in relation to the award of
compensation, does not operate fairly”.
3.5 The Scottish Government state in their Consultation Paper that
Compulsory Purchase Orders are a powerful tool with the potential to
help drive real change for Scotland’s people and places by enabling
delivery of development and infrastructure projects. However, this
potential has not been fully realised as CPO powers are under-utilised
due to the perception that the current system is opaque, antagonistic,
costly and time consuming. The reforms aim to address some of these
issues whilst ensuring that any CPO is clearly justified as taking
someone’s home or business is a serious step.
3.6 The consultation also invites views on the associated concept of
Compulsory Sale Orders, which have been suggested as an alternative
or additional tool to complement Compulsory Purchase Orders. 
3.7  Officers from Finance and Resources, Chief Executives and
Environment, Housing and Infrastructure have prepared a draft
response which could be submitted by The Renfrewshire Council in
relation to the consultation which is attached as Appendix 1. This has
been informed by their experience of the Compulsory Purchase
process which has been utilised regularly by the Council in recent years
to support to key regeneration and infrastructure products.
___________________________________________________________________

Page 3

PUBLIC
Implications of the Report
1. Financial – there are no financial implications immediately arising from
this report, future decisions on the compulsory purchase order process
including streamlining the process for unopposed CPOs, digitalisation
and  may reduce the costs of some a compulsory purchase order
applications however the process will be similar for opposed
compulsory purchase orders and the reforms to the compensation
system may increase costs by extending eligibility for compensation in
certain circumstances. Without clarity on the specific reforms that will
be introduced, any financial analysis is premature. 
2. HR & Organisational Development - none 
3. Community/Council Planning – Compulsory Purchase powers are a
valuable tool in delivering economic growth and vital regeneration and
infrastructure projects for Renfrewshire and its people and as such any
efforts to streamline the compulsory purchase process to deliver
projects contingent on a fully assembled site will be positive and in
keeping with the principles of the Council Plan. 
4. Legal – proposed reforms to Compulsory Purchase powers will have
significant impact on the current legal framework for CPOs and may
require revisions to the Council’s governance if proposals to permit
Council’s to confirm certain unopposed CPOs themselves are
introduced however until the Scottish Government conclude the
consultation and bring forward a reform bill this is hypothetical. The
proposed introduction of Compulsory Sales Orders would grant all local
authorities additional powers to force the sale of properties where this
can be justified in the public interest. 
5. Property/Assets - the proposed reforms would not have a significant
impact on the assets of the Council however if procedures for certain
protected assets are extended to include local authority this would
make the process of acquiring Council assets compulsorily more
onerous. 
6. Information Technology – if the proposed reforms to the CPO
process to extend digitalisation are introduced, this may require the
Council utilise new applications or additional technology support to staff
working on individual compulsory purchase order applications however
until the extent to which reforms will extend the digitalisation of the
process this cannot be confirmed.

Page 4

PUBLIC
7. Equality & Human Rights -  The Recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report because this
is a report seeking approval of a consultation response to a Scottish
Government consultation.   If required following implementation, the
actual impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be
published on the Council’s website.   
8. Health & Safety - none
9. Procurement – none
10. Risk – the consultation response at Appendix 1 highlights certain
potential risks in relation to governance and finance but at this stage
this is speculative. 
11. Privacy Impact - none 
12. Climate Risk – none
13. Children’s Rights – none
14. Cosla Policy Position –not applicable.
_______________________________________________________
List of Background Papers 
none 
___________________________________________________________________ 
Author:           Declan MacAskill, Assistant Managing Solicitor (Housing Regeneration
and Development)

Page 5

PUBLIC
Compulsory Purchase Reform in Scotland –
Consultation
List of Questions
Please respond to this consultation using the Scottish Government’s consultation
hub, Citizen Space. Access and respond to this consultation online at
https://consult.gov.scot/planning-architecture/compulsory-purchase-reform/.
If you are unable to respond using Citizen Space, you can use this document to
structure your response. Please remember to include the Respondent Information
Form with your response.
1. Introduction
2. Overview: How compulsory purchase works
Legislation and guidance
Question 1: Do you agree that legislation governing compulsory purchase
procedures and compensation in Scotland should be brought into a single statute?
YES
Question 2: Do you have any specific concerns in relation to the repeal of existing
legislation on CPO procedures and compensation that we should consider?
Great care should be taken when consolidating the provisions of decades of
compulsory purchase legislation into a single statute ensuring that no gaps
are created unintentionally when repealing the existing legislation without
adequate re-provision in the new statute. If gaps are created, this creates a
need for additional regulations on top of the new statute that will create the
same issues of having to read across multiple pieces of legislation to take
forward a CPO.  
3. Enabling powers
Question 3: With the exception of the bodies referred to at paragraph 3.6, are
there any gaps in acquiring authorities’ enabling powers? Please provide specific
examples.
Existing acquiring authority enabling powers are sufficient with no reform
required in this area.
Question 4: Are local authorities’ compulsory purchase powers (set out on page
13-14) sufficiently broad to cover the circumstances in which they may need to
compulsorily acquire land in carrying out their statutory functions?
If not, please specify which powers require to be amended, clarified or
supplemented.

Page 6

PUBLIC
Existing acquiring authority enabling powers are sufficient with no reform
required in this area.
Question 5: Should there be a general power for acquiring authorities to create
new rights in land and to attach conditions to such rights?
YES
Question 6: Should there be a general power for acquiring authorities to seek
temporary possession of land?
YES
Question 7: Do you agree with the proposed list of matters that should be
addressed in any new temporary possession power? If not, please give details.
YES – however if it is likely that temporary possession powers will be used
in circumstances where voluntary agreement to occupy has been sought
but will not be forthcoming, it would be useful to have a mechanism to fast
track disputes or postpone compensation negotiations to ensure that the
necessary works can be delivered without unnecessary delays. 
Question 8: How might the use of back-to-back CPOs be further encouraged?
More detailed guidance on back-to-back CPOs would be welcomed but we
would agree that the existing Circular 6/2011 is clear in its support for this
mechanism in any case.

Page 7

PUBLIC
4. Early engagement and preliminary steps
Question 9: Do you agree that early and effective engagement is best promoted
through non-statutory measures (e.g. guidance) rather than legislative
requirements?
YES
Question 10: How might early and effective engagement between acquiring
authorities and affected parties be further encouraged?
The existing legislative framework provides flexibility which is important
given the significant variations in how compulsory purchase can be used.
There may be value, however, in providing examples of best practice, for
example, that illustrate what effective early engagement looks like for CPOs
of different scales e.g. single empty properties v large infrastructure or
regeneration projects. 
Question 11: Would it be helpful to introduce a general power for acquiring
authorities to require specified parties to provide information about ownership,
occupation and other interests in land? Please explain your views.
YES – it is likely that such a power would be used sparingly as in most
cases land referencing should be sufficient to obtain ownership information.
However, in certain circumstances where the position is more complicated
then a general power to require specified parties to provide information under
penalty would a useful means of moving forwards with a project that has
stalled due to lack of information. 
Question 12: Do you agree that acquiring authorities should have a general
power of entry prior to the making of a CPO for the purposes of surveying etc?
YES
Question 13: Does the outline proposal at paragraph 4.23 strike a reasonable
balance between the needs of acquiring authorities and rights of the
owner/occupier? If not, how should it be changed?
Yes, we are supportive of this proposal. 
5. Confirmation procedures – Making a CPO
Form and content of a CPO
Question 14: Are any changes required to the legislation which prescribes the
form and content of CPOs? If so, please give details.
NO
Question 15: Should any or all of the following documents be placed on a
statutory footing?

Page 8

PUBLIC
• Statement of Reasons - NO
• General Certificate - NO
• Protected Assets and Special Category Land Certificate - NO
Notification and advertisement of a CPO
Question 16: Do you agree that the notification requirements for CPOs should be
prescribed through secondary rather than primary legislation? YES
Question 17: Should heritable creditors be added to the list of parties who must
be individually notified of a CPO? YES Should they have the status of statutory
objectors? NO
Question 18: Are any other changes required to the list of people to be
individually notified?
No, the existing list is considered to be appropriate, the obvious gap being
heritable creditors which it is proposed will be filled. 
Question 19: Do you agree that the CPO (and map) should be published on a
suitable website, in addition to being made available for inspection at a specified
physical location?
YES
Question 20: Should newspaper notices continue to be used to publicise the
making of CPOs?
YES – on balance, there does not seem to be an alternative means of
reaching local people who may be digitally excluded. The notice must be
shorter and simpler though, the length is not only expensive it is also off-
putting and potentially confusing to the people we are trying to reach. 
Question 21: What alternative approaches might be appropriate for publicising
CPOs – either in addition to or instead of newspaper notices?
There should be greater flexibility on notice requirements, for example for
the CPO of a single vacant property should perhaps be limited to affected
persons i.e. owner, heritable creditor. Equally, local notices should be
placed at the acquiring authority’s discretion e.g. on bus shelters, local
noticeboards in community centre where they believe they will be seen by
the most people in line with the existing legislation but without obliging
newspaper notices on top of this. Newspaper advertisements should be
reserved for larger projects. 
Digitisation
Question 22: Should Scottish Ministers have a power to prescribe (through
secondary legislation) common data standards for compulsory purchase
documentation? If not, please explain your reasons. YES

Page 9

PUBLIC
Question 23: Should acquiring authorities be able to serve compulsory purchase
notices by electronic means, if a party agrees to this in writing and provides an
address for this purpose? If not, please explain your reasons. YES
6. Confirmation procedures – Deciding a CPO
Considering objections to a CPO
Question 24: Should there be a statutory time period within which an opposed
CPO should be referred to a Reporter after it has been submitted for
confirmation? If not, please explain your reasons.
YES
Question 25: If there is to be a statutory time period, how long should it be?
There may be value in setting a statutory time period on a sliding scale e.g.
3 months for 1-3 plots, 6 months for 3 – 10 plots, 9 months for 10+ plots 
Question 26: Should express provision be made in legislation for objections to be
considered through written submissions?
YES
Question 27: Should the procedural rules for hearings and written submissions
for CPO cases be set out in secondary legislation?
YES
Question 28: Do you agree that statutory objectors’ right to be heard at either a
PLI or a hearing should be retained?
YES
Question 29: Should Scottish Ministers continue to decide whether a PLI or
hearing is used? If not, in what circumstances should a PLI be required?
YES
Question 30: Should provisions on awards of expenses be extended to cover
cases where objections are considered through hearings and written
submissions?
YES
How CPOs are decided
Question 31: Does the public interest test, as currently set out in Circular 6/2011,
strike a fair balance between private and public interests? Please explain your
views.

Page 10

PUBLIC
YES – the existing test is fit for purpose and does not require specific
revision. 
Question 32: Do you agree that the public interest test should continue to be
policy-based rather than statutory?
YES
Who takes CPO decisions
Question 33: Should acquiring authorities be empowered to confirm unopposed
CPOs?
YES
Question 34: If acquiring authorities are empowered to confirm unopposed CPOs,
which approach outlined at paragraph 6.34 would be preferable – Option 1 or 2?
Please explain your views.
OPTION 2 – unopposed CPOs should be dealt with as efficiently as possible
and more radical reform is preferred here, Option 2 strikes the correct
balance between efficiency for unopposed CPOs and following due process
for CPOs with objections from statutory objectors. 
Question 35: Should Reporters be empowered to take CPO decisions, subject to
published criteria regarding delegation by Scottish Ministers? Please explain your
views.
Yes, reforms should stive to improve efficiency and speed in making CPO
decisions therefore removing double handling and empowering Reporters
to take CPO decisions is supported. 
Special category land
Question 36: Is additional scrutiny still needed for CPOs which include particular
land? If yes, which of the four current special categories of land should this apply
to?
• land owned by a local authority
• statutory undertaker land
• land held inalienably by the National Trust for Scotland (NTS)
• land forming part of a common or open space
YES
Question 37: If additional scrutiny of certain CPOs is needed, could there be
alternative ways to achieve this other than Special Parliamentary Procedure?
Please outline your suggestions
Renfrewshire Council supports applying the special procedure to local
authority land and sees an opportunity to remove inconsistencies based on

Page 11

PUBLIC
the acquiring authority, which currently create unnecessary complexity and
uncertainty.
Renfrewshire Council supports the requirement for mandatory public local
inquiries when confirming CPOs involving special category land.
Renfrewshire Council supports the extension of the restriction on
confirmation unless specific certification is received to include all special
category land. 
Replacing the need for an Act of Parliament with a motion at Scottish
Parliament would be more efficient and seems proportionate.
Question 38: Should the restriction on confirmation of CPOs that include statutory
undertaker land apply only where a relevant objection is made by the undertaker
whose land is included in the Order? If not, please explain your reasons.
YES
Question 39: Do you agree with the proposals at paragraph 6.57 regarding the
interaction between CPOs and public rights of way? If not, please explain your
reasons.
YES
Scope and timing of CPO decisions
Question 40: Should there be a mechanism that would allow statutory objections
to be addressed during the confirmation process, so avoiding unnecessary
hearings or PLIs?
YES
Question 41: If provision for such a mechanism were made, what procedures or
safeguards would need to be put in place to ensure fairness? Could either of the
suggestions in paragraph 6.62 achieve this?
Both suggestions sound reasonable and proportionate.
Question 42: Would a power to confirm CPOs subject to conditions be helpful in
terms of overall project delivery? Please explain your views.
Yes – one of the main disadvantages of the CPO process is the potential for
it add lengthy delays to delivery of a project, therefore if conditional CPOs
could be sought earlier in the process this would alleviate once of the main
challenges with for example a regeneration project reliant on fully site
assembly before funding requirement are met. 
Question 43: If conditional CPOs were taken forward, what additional procedures
and safeguards would need to be in place to ensure fair and proportionate use?

Page 12

PUBLIC
There should be no opportunity for objectors to re-visit substantial issues
settled during the confirmation process of the conditional CPO or seek to
re-litigate these issues causing delays that undermine the effectiveness of
the conditional CPO initiative. However, it is accepted that the current 3 year
implementation period is justified and proportionate and subject to specific,
limited exemptions e.g. loss funding, economic conditions there should be a
limited period for acquiring authorities to discharge conditions. 
Question 44: Do you agree that the Scottish Government should publish target
timescales for the issuing of CPO decisions, rather than having binding statutory
time limits? If not, please explain your reasons.
YES
Question 45: If targets (statutory or otherwise) are not met, what sanctions might
be appropriate?
Renfrewshire Council does not consider sanctions appropriate in these
circumstances but supports reporting obligations to promote transparency
and apply external accountability
Question 46: Should the Scottish Government be required to report on
compliance with any target timescales for CPOs?
YES
Challenges to a CPO
Question 47: Do you agree that the grounds on which a confirmed CPO may be
legally challenged should be retained? If not, please explain your reasons.
YES
Question 48: Should the 6-week period within which a confirmed CPO may be
legally challenged be retained? If not, what should the period be?
YES
Question 49: If a legal challenge is successful, should the court have discretion to
quash just the confirmation decision, rather than its only remedy being to quash
the Order itself?
YES
7. Implementation
Procedure
Question 50: Do you agree that there should be a single procedure for
implementing compulsory purchase, similar to GVD? If not, what problems do you
see with this approach?

Page 13

PUBLIC
YES
Objection to severance
Question 51: Should there be a single test for objection to severance, or a
different categorisation? If you propose different categories, please explain what
they would be.
A single test or perhaps two distinct tests for residential v
commercial/agricultural to take account of the different considerations that
are relevant between these two categories of land.
Question 52: Under the new CPVD, should a notice of objection to severance
prevent the land included in the CPO from vesting in the acquiring authority?
NO – it is vital that these notices do not delay vesting, the present system is
at risk of abuse with spurious notices issued that not only delay vesting but
also expose the acquiring authority to unnecessary additional claims by
their contractors.
Timing
Question 53: Should confirmation notices be required to be published within 6
weeks of the date on which the order is confirmed? If you disagree, what timing
would you prefer, and why?
No – while there is currently no time limit for submitting confirmation
notices, they are typically published as soon as reasonably practicable.
Given the complexity and cost of the CPO process, any delay is likely to be
justified. If a time limit is introduced, it should be significantly longer than
six weeks.
Question 54: Do you agree that the standard implementation period should
remain at three years?
YES
Question 55: Should confirming authorities be able to specify a longer or shorter
implementation period?
YES
Question 56: Do you agree that the time limit should be suspended during any
court challenge to the validity of the CPO?
YES
Question 57: Please add any comments on the time limit for implementation, if
you wish to expand on your answers to questions 53 to 56.
Question 58: Do you agree that the new CPVD should take effect six weeks after
notification that it has been made? If not, what should the period be, and why?

Page 14

PUBLIC
YES
Question 59: Is there a need for a separate stage to notify people with an interest
in the land and seek information from them?
NO
Effect on title
Question 60: Should the new CPVD provide the acquiring authority with a valid
title, removing all defects, real burdens, servitudes etc and securities? If not,
please explain your reasons.
YES
Question 61: In relation to section 107 of the Title Conditions Act, should the
legislation be amended to clarify that the acquiring authority simply has to have
relevant compulsory purchase powers? If not, please explain your reasons.
YES
Question 62: Should acquiring authorities be able to include land in a CPVD
which belongs to them, or where they are unsure if it does? If not, please explain
your reasons.
YES
Question 63: Should a note be added to the title sheet in the Land Register
stating that the title was acquired by compulsory purchase? If not, please explain
your reasons.
YES
Rights subordinate to ownership
Question 64: Would there be any difficulties in including all leases and liferents in
a CPVD, extinguishing them in return for compensation?
Clear guidance would be required in relation to valuation of a liferent for
compensation purposes. 
8. Compensation
Value of land acquired
Question 65: Do you agree that compulsory purchase compensation in Scotland
should continue to be based on the principle of equivalence? If not, please explain
your reasons.
YES

Page 15

PUBLIC
Question 66: Should compensation for land acquired compulsorily continue to be
based on an assessment of its market value (disregarding increases/decreases
attributable to the CPO scheme)? Please note that the following questions
consider potential exceptions to this approach.
YES
Question 67: Should acquiring authorities have the power to request that, for a
specific CPO, compensation would take no account of the prospect of planning
permission being granted for alternative development? It would be for Scottish
Ministers to make the decision when confirming the CPO.
YES
In what circumstances do you think this approach would be justified? In
limited cases, land costs may be so high that key regeneration or
infrastructure projects become unviable without changes to the
compensation valuation regime to enable affordable acquisition.
Question 68: Should the no-scheme principle be codified in the legislation?
YES
Question 69: If the no-scheme principle is codified, do you agree with the outline
proposal at paragraph 8.39? Are there any other matters that would need to be
addressed?
YES  - no other matters are considered necessary for inclusion.
Question 70: Should the planning assumptions be repealed and re-written?
YES
Question 71: Do you agree with the broad outline for how the planning
assumptions might be reformed set out in paragraphs 8.45 to 8.46? Do you have
any comments on the proposed changes to the planning assumptions?
YES – it is felt that the outline planning assumptions are broadly correct and
are consistent with codifying the “no-scheme” principles in the new
legislation. 
Question 72: Should CAADs be retained as a tool to establish development value
in a CPO context, or should they be abolished? Please explain your reasons.
CAAD should be retained – it has value as a transparent process with a
public decision delivered through the application process. It is felt that there
in insufficient detail in the consultation paper on the alternative proposal
should CAAD be abolished. 
Question 73: If CAADs were to be retained, how could they be made more
effective, efficient and equitable?

Page 16

PUBLIC
We have no comments to make on this proposal.
Question 74: Should Part V of the 1963 Act be repealed and not re-enacted?
YES
Injurious Affection
Question 75: Do you agree that the method of valuation for injurious affection
should be dealt with in guidance rather than set in legislation?
YES
Question 76: Should set-off of betterment continue or be removed from the
legislation? Please explain your views.
Renfrewshire Council supports retaining this provision for the reason set
out in the consultation paper: where public investment increases the value
of retained land, this uplift should be reflected in the compensation
assessment.
Question 77: Please provide details of any acquiring authorities which you
believe would need new powers to enable them to carry out accommodation
works on a discretionary basis.
The current discretionary approach to accommodation works, assessed on a
case-by-case basis, remains sufficient and does not require new powers.
Disturbance
Question 78: Do you agree that separate statutory provision should be made for
compensation for disturbance? If not please explain your reasons.
YES
Question 79: Should compensation for disturbance be able to cover losses
incurred from the date on which the notice of making of the CPO is published (and
the claimant’s duty of mitigation should apply from the same date)? 
YES
If not, from what date should compensation apply? Please explain your
reasons.
Question 80: Should compensation for disturbance be payable to those who have
a compensable interest in land included in the CPO when it is made, even if that
land is not ultimately acquired?
YES
Question 81: Should owners who do not occupy the property be able to claim a
wider range of disturbance compensation than at present?

Page 17

PUBLIC
NO
Question 82: Would it be helpful to provide guidance on compensation in cases
of complex corporate structures?
YES
Question 83: Do you agree that the impecuniosity rule should be removed?
YES
Question 84: Do you agree with the proposals on mitigation, including
compensation for business relocation and extinguishment? Please add any
comments on these issues.
YES
Question 85: Should the jurisdiction of the LTS should be extended to cover
discretionary as well as mandatory disturbance payments?
YES 
Loss Payments
Question 86: Should the minimum period of residence necessary to qualify for a
HLP (currently one year) be increased? If so, what should the period be, and
why?
NO
Question 87: How should the amount of HLP be calculated, among the options
discussed in paragraphs 8.104 to 8.110? Please add any comments on these
options or other approaches.
The current approach of calculating HLP as 10% of market value is
supported. It is less arbitrary than a flat rate and better reflects differences
in property condition and value, even within the same area. A flat rate fails
to account for these variations, and grading HLP by length of occupation
introduces unnecessary complexity and evidence gathering. Therefore, the
10% approach remains the most practical and equitable.
Question 88: If a person is displaced from an agricultural unit as a result of
compulsory purchase, should they be eligible for a loss payment regardless of
whether they continue farming elsewhere?
YES 
Question 89: Should there continue to be a minimum area of land (currently 0.5
hectares) below which a FLP is not payable? If yes, what should the minimum
area be?
YES – maintain a minimum of 0.5 hectares

Page 18

PUBLIC
Question 90: Do you agree that we should move away from the current profit-
based approach to calculating FLP?
YES
Question 91: If a new approach to calculating FLP is taken forward, which of the
options outlined at paragraph 8.118 would you prefer?
Option 1 – Market rate: base the amount of FLP on a proportion of the
market value of the land acquired. 
Question 92: Should loss payments be extended to other non-residential interests
displaced as a result of compulsory purchase? Please explain your views.
YES – the extension of loss payments to other non-residential interests is
supported provided there is sufficient detail on how this is to be calculated
as experience of existing loss payments are that they are a valuable tool in
brining negotiations to a close much more quickly. 
9. Compensation procedures
Making a claim
Question 93: Should acquiring authorities be required to advise owners of their
rights to compensation and how to claim it?
YES
Question 94: Should a statutory claim form be provided to collect more
information about the amount of compensation sought?
YES
Question 95: Should acquiring authorities be required to provide information on
their assumptions relating to compensation, if this is requested by a claimant?
NO 
Question 96: Should acquiring authorities be required to offer compensation,
rather than requiring owners to claim it?
YES
Question 97: Please provide any comments about the procedure for claiming
compensation, if you wish to expand on your responses to questions 93 to 96.
  Advising Owners of Rights:
Existing forms offer no flexibility in terms of information provided to owners,
amendments to the forms required to take this proposal forward. 
  Providing Assumptions on Request:
While supportive of greater transparency, there is currently insufficient

Page 19

PUBLIC
guidance on what assumptions acquiring authorities should make. Without
clearer direction, this requirement cannot be supported.
  Offering Compensation Proactively:
This is an area lacking guidance, and we are supportive of clearer directions
being provided to acquiring authorities.
Time limits
Question 98: Do you agree that an application to the LTS should be able to be
made from the date of vesting? If not, when should the earliest date for application
be?
YES
Question 99: Should there be a final time limit for making a claim for
compensation? If yes, what should the limit be?
YES – six years from date of vesting, as an acquiring authority we are not
supportive of maintaining an open-ended payment obligation. 
Question 100: Are any other changes needed in relation to the timing of
compensation claims?
No
Advance payments
Question 101: Are any new powers needed to enable acquiring authorities to
make discretionary advance payments, if one is sought before they take
possession?
YES – it would be beneficial for this power to be expressly stated. 
Question 102: Would it be helpful to enable advance payments to be made to
heritable creditors, with the landowner’s agreement?
YES
Question 103: What mechanisms do you think would help to ensure advance
payments are made promptly?
• enforcement through the courts
• LTS enforceable valuation
• penalty interest
• other (please explain).
Renfrewshire Council are not supportive of penalty interest or court
enforcement, as delays are often due to unrealistic or disputed claims rather
than bad faith. Of the options presented, an LTS-enforceable valuation by a

Page 20

PUBLIC
neutral third party is the most effective and balanced mechanism to ensure
timely advance payments.
Question 104: Should acquiring authorities have the power to offer advance
payments even where one is not requested? If so, should interest on the amount
of outstanding compensation be capped?
Yes - capping interest on the outstanding balance is reasonable. It avoids
financially penalising authorities acting in good faith and encourages early
engagement, while still protecting claimants' rights. 
Interest rates
Question 105: What should be the basis for the interest rate payable on
outstanding compensation?
• current rate (0.5% below standard rate)
• average rate for overdrafts
• average rate for loans
• statutory interest
• other (please give details)
Maintain the current rate (0.5% below the standard rate). This rate is
fairer than statutory interest and more straightforward to ascertain than
the other options presented and avoids unnecessary complexity in
processing time-sensitive payments.
10. Compulsory Sale and Lease Orders
Compulsory Sale Orders
Question 106: Should local authorities be able to instruct the sale of a property
without permission from the property owner? Please explain your reasons.
YES – a compulsory sale power to complement the CPO powers is
desirable. 
Question 107: In what circumstances might compulsory sale be justified, and
what benefits or drawbacks might there be?
CSOs could be used to bring into use empty or problem homes that are not
in areas with a compelling housing need, or are not suitable for social
housing due to their size, or location, or type. However, a CSO as proposed
only seeks and achieves a change of ownership. If that new owner then
leaves the property vacant and does not invest in overcoming its vacancy
then little will be achieved. 
Question 108: If a CSO process was introduced, would the procedures involved
in preparing a CSO need to be equivalent to those that apply to a CPO? If not,
how should those procedures differ?

Page 21

PUBLIC
As noted in the consultation paper, a CSO would not result in the local
authority obtaining an income bearing asset. Accordingly, whilst balancing
the public good in, for example, bring a vacant property back into use with
the ECHR considerations for deprivation of property the process needs to
be proportionate but not overly onerous for the local authority who are
essentially exercising step in rights to facilitate a sale that is in the public
interest but not benefiting directly from the end result. 
Question 109: What governance or regulatory frameworks would need to be
introduced to ensure that any future CSO process is used fairly and effectively?
Question 110: What measures could be taken to control the use of the property
by the new owner?
There may be a good reason to permit local authorities to impose conditions
on the new owner to ensure they bring the property back into use as soon
as possible. This may include a time limit for investment by the new owner
with this monitored by the local authority. One proposed measure would be
a CSO application for investment to the local authority and a
decision/certification being made prior to the change in ownership being
confirmed. There is also an argument that there should be an opportunity to
penalise a failure to comply with conditions with a simplified CSO process
to force a further sale without the same level of scrutiny on the basis a CSO
has previously been approved by the confirming authority. Any conditions
imposed must strike a balance between ensuring the CSO serves its
purpose and the negative impact that any controls or obligations that are
put on a new owner will have – reducing the potential marketability and
prospects of sale and will also detrimentally affect value of the property.
Question 111: How long should a property subject to a CSO remain on the
market? 
There are difficulties in setting a default marketing period for properties
subject to a CSO – e.g. a residential property may sell quickly with a 12 week
marketing period appropriate here however for non-residential property or
property that has been long term vacant and in a deteriorated condition a
much longer marketing period may be required. 
Question 112: What should happen if the property does not sell?
Ownership stays with the existing owner but there may be an argument for
simplified CPO powers for the local authority who obtained approval for a
CSO from the Scottish Ministers. 
Compulsory Lease Orders
Question 113: Should local authorities be able to instruct the lease of a property
without permission from the property owner? Please explain your reasons.
More detail required to be able to provide an informed view on these
matters.

Page 22

PUBLIC
Question 114: In what circumstances might compulsory lease be justified, and
what benefits or drawbacks might there be?
More detail required to be able to provide an informed view on these
matters. 
Question 115: If a CLO process was introduced, would the procedures involved in
preparing a CLO need to be more onerous than those that apply to a CPO?
Please explain your views.
More detail required to be able to provide an informed view on these
matters. 
Question 116: If you think there are any other measures or issues that we should
be aware of as part of our consideration of CLOs, please tell us more about these. 
More detail required to be able to provide an informed view on these
matters. 
Question 117: Do you think that the introduction of either Compulsory Sale
Orders or Compulsory Lease Orders in Scotland would add any benefits beyond a
reformed CPO process, as a tool for tackling long-term vacant or derelict
properties? Please provide details.
CSOs would allow local authorities to require the sale of such properties,
without the need to acquire them directly. This could:
• Reduce the financial and administrative burden on councils.
• Enable quicker action on problematic sites.
• Incentivise owners to bring properties back into use voluntarily.
In contrast, Compulsory Lease Orders (CLOs) remain underdeveloped as a
policy concept. Insufficient detail has been provided to assess their potential
effectiveness or legal viability
11. Assessment of impacts
Question 118: Do you have any comments on the draft BRIA provided in the
Annex?
No 
Question 119: Do you consider that any of the options and proposals in this
consultation document would impact (positively or negatively) on people with
protected characteristics? Please provide details.
No

Page 23

PUBLIC
Question 120: Do you consider that any of the options and proposals in this
consultation document would affect children’s rights and wellbeing? Please
provide details.
No 
Question 121: Do you consider that any of the options and proposals in this
consultation document would have significantly different impact on island
communities from other communities? Please provide details.
No 
Question 122: Do you consider that any of the options and proposals in this
consultation document would impact (positively or negatively) on people who are
socio-economically disadvantaged? Please provide details.
No