Page 1

PUBLIC 
_____________________________________________________________________________
To:  Leadership Board
On:  3 December 2025
_____________________________________________________________________________
Report by: Chief Executive 
_____________________________________________________________________________
Heading: Fairer Renfrewshire Update
___________________________________________________________________
1. Summary 
1.1 The Council and its partners continue to work together to progress the Fairer Renfrewshire
Programme, with a strong shared focus currently on the local response to the cost-of-living
crisis. 
1.2 This paper provides: 
• a summary of the issues as reported to the Fairer Renfrewshire Sub-Committee on 12
November 2025 including the cost of living and programme updates. 
• An update with regard to the Advancing Equality of Opportunity Workstream. 
• Details of the Summer of Fun programme and evaluation report. 
• An overview of all projects funded to date through this year’s Winter Connections
programme. 
1.3 This paper also presents a draft Fairer Renfrewshire Action Plan for approval, which
through consultation with key stakeholders, has been developed to guide the focus of the
Fairer Renfrewshire programme over the course of the next 18-24 months.   
___________________________________________________________________
2.  Recommendations 
2.1 It is recommended that Elected Members:

Page 2

PUBLIC
• Note the content of the report and the work being undertaken to progress the Fairer
Renfrewshire programme;
• Note the update provided on the Summer Of Fun programme, including the evaluation
report as detailed in Appendix 1; 
• Note the update provided on the Winter Connections programme in Section 6, with
detailed information on all funded applications provided in Appendix 2.
• Approves the Fairer Renfrewshire Action Plan attached at Appendix 3. 
______________________________________________________________________________
3.  Background 
3.1 The Fairer Renfrewshire Programme was developed in order to bring together targeted
programmes of work being progressed by the Council and its partners to tackle poverty and
inequality in Renfrewshire. As the cost of living crisis has continued, the programme has
continued to evolve in response, with activities being progressed across the 4 core themes: 
• Improving financial security 
• Advancing equality of opportunity 
• Building community capacity and resilience 
• Listening to lived experience 
3.2 Regular updates on the programme are provided to the Fairer Renfrewshire sub-committee
and subsequently to the Leadership Board. 
4  Update from the Fairer Renfrewshire Sub-Committee 
4.1 At its meeting on 12 November 2025, the sub-committee considered: 
• The most recent programme update including information on recent statistics and
research in relation to the cost-of-living crisis, including the dashboard developed locally. 
• Progress updates in relation to family advice provision, Summer of Fun, Community
Development in Gallowhill and the Fairer Renfrewshire Action Plan 
4.2  Officers gather information from a variety of sources at both a local and national level to
inform discussion at the sub-committee. Key statistics and information discussed at its most
recent meeting are provided in table 1 below. 
Table 1 
Key National Statistics
• The rate of inflation is standing at 3.6% in October, falling from 3.8% the previous
month and has been above the target rate of 2% set by the UK Government for the
Bank of England since October 2024, when it reached 2.3%.   
• The inflation rate for food has increased to 4.9% in October, after hitting 5.1% in
August then reducing to 4.5% in September. It remains higher than overall
inflation.

Page 3

PUBLIC
• The Bank of England interest rate was reduced to 4.00% in August 2025 and has
remained at that rate. 
• The Energy Price Cap, originally introduced by Ofgem in January 2019 to set limits
on the underlying rates energy suppliers, is currently set at £ 1775 from 1 October,
up £35 a year from the previous quarter. This will increase by 0.2% to £1758 from
1 January. 
Cost of living research (national)
The latest insights into the cost of living from the Office of National Statistics for the
period 6th to 31st August 2025 found: 
• Around 67% of adults reported that their cost of living had increased compared
with a month ago this is up from the 59% last reported. 
• The most commonly reported reason given by adults in the latest period for a rise
in their cost of living remains the price of their food shop at 96% (previously 94%),
which has been the case since they first asked the question in November 2021. 
• Around one in four (24%) adults said they had borrowed more money or used
more credit in the last month when compared with a year ago. This has remained
stable over the past three years. 
• Over one in three (36%) adults reported that they believed they would be unable to
save any money in the next 12 months. This has remained stable in the past year. 
• Around one in three (31%) adults who paid energy bills reported that they found
these bills very or somewhat difficult. 
• With regard to Direct Debit failure. The most recent statistics for September 2025
shows a default rate on loans of 5.08%. This is the highest rate since January
2024, and is only the second time the rate has been over 5% since records began
in January 2019.   
• With regard to Electricity and Gas Direct Debits, the default rate is 3%, the highest
since records began in 2019. September 2025 is the first time the rate has been as
high as 3%.   
Employment and Income
• According to the ONS, the Claimant Count in September 2025, which is taken from
JobcentrePlus administration systems for those claiming unemployment-related
benefits in Renfrewshire is 3225 people – 1935 men and 1290 women aged
between 16 and 64. This is a slight reduction from 3,360 last reported. The
Renfrewshire unemployment rate of 2.7% is less than the Scotland rate (3%)   
• Over the long term, average weekly earnings for both total and regular pay show a
steady increase. Average weekly earnings were estimated at £727 for total
earnings and £680 for regular earnings in July 2025.

Page 4

PUBLIC
Food costs / insecurity
• The latest figures show that food and drink inflation rose for the fifth month in a row
in August, increasing to 5.1% from 4.9% in July, but then fell to 4.5% in
September. Meat, butter, chocolate, coffee and milk were the items with the
biggest price rises. Beef and veal were 24.9% higher in price than this time last
year, and butter 18.9% higher. 
• The Renfrewshire Foodbank issued 1,361 vouchers in Quarter 2 of 2025/26, a
decrease of 4.1% in comparison with the 1,400 vouchers issued during the same
quarter last year. The vouchers covered 1,796 adults and 908 children this year,
which was an increase in the total number receiving assistance compared to the
same quarter last year (1,740 adults and 844 children). The number of vouchers
this quarter is also slightly more than last quarter when 1,342 vouchers were
issued covering 1,775 adults and 854 children. 
• The rising costs of essentials remains the most commonly cited factor in the
reason for voucher issue in Renfrewshire, at 572 times.
Housing
In Renfrewshire, private rental prices have continued to rise to an average of £813 across
all property sizes in August 2025, an increase of £6 per month on the last reported figure
of £807 in June 2025 and an annual increase of 8% from £752 in August 2024. 
UK Child Poverty
The Joseph Rowntree Foundation published its Poverty in Scotland report in October
2025. The report found that:  
• Poverty is deepening: nearly 1 in 10 people in Scotland are in very deep poverty
with incomes below 40% of the median (the standard poverty line is below 60%).
For families, alongside minority ethnic families, children in large families have the
highest deep (30%) and very deep poverty (19%) rates out of the child poverty
priority families. 
• In-work poverty is increasingly more common: 6 in 10 people in poverty live in a
household where someone works and nearly three-quarters of children in poverty
do. One-third of children in poverty have both their parents in work. 
• Poverty amongst disabled people remains high: when disability benefits are
excluded from the income of households where someone is disabled, the poverty
rate for people in a family where someone is in receipt of a disability benefit is
38%. Over half of all children in poverty live in a household where someone is
disabled. 
• Universal Credit (UC) rates are too low to escape poverty: 42% of people in a
family in receipt of a low-income benefit, such as UC, were trapped in poverty. 
• Housing costs are causing poverty, particularly for renters: 1 in 10 people in rented
accommodation (private or social rents) are pulled into poverty due to their housing
costs.

Page 5

PUBLIC
5 Fairer Renfrewshire Programme Update 
5.1 Since the last update to Leadership Board in June 2025, a range of activities have
continued to be progressed by officers and partners. A summary is provided in the sections
below. 
Summer of Fun 
5.2 At Leadership Board on 23 April 2025, it was agreed that the £100,000 allocated to
Summer of Fun in March’s budget be split, with 50% of the funding to be directed to deliver
holiday camp provision, and the remaining 50% being allocated to support the
establishment of a small grants programme which would allow third and community sector
partners to deliver local, targeted provision to low-income families across Renfrewshire. 
5.3 In addition to the camps and small grants programme, additional funding from a number of
different sources was used to deliver a varied programme of activities for children, families,
and young people, including Additional Support Needs (ASN) provision along with youth
work provision, a youth voice and participation programme, sports activities and an Adult
and Family Learning programme. 
5.4 Renfrewshire Libraries ran their own summer programme using some of the equipment and
games that had been previously funded by Fairer Renfrewshire as well as their own
resources. They also received £1,227 from Fairer Renfrewshire to purchase toys, healthy
snacks and drinks for children visiting the Skoobmobile and for libraries throughout
Renfrewshire.   
5.5 The Summer of Fun programme aimed to deliver free, fun activities over the summer
holidays for communities that might be underserved by mainstream activities, and
particularly low-income families. Feedback suggests that the programme was able to reach
these families, particularly those who are in the child poverty priority groups.   
5.6 The majority of families that attended the holiday camps were lone parents, while over a
third of families had 3 or more children. Feedback from the small grants funded projects
showed that they had also managed to reach families in all child poverty priority groups
through their activities. The ASN playscheme supported children who have complex needs,
and transport for this provision was welcomed by families. The Promise Champs activities
supported those who are care experienced, to develop new skills and build friendships. 
5.7 In total it is estimated that around 9,000 people, mainly children, but also their families,
benefitted from the programme that provided a range of benefits for children and their
parents/carers including: 
• providing accessible, free and fun activities that low-income families could access
• helping to reduce financial costs for families
• providing a safe environment for children and young people to socialise and learn
new skills

Page 6

PUBLIC
• having a positive impact on parents and children’s mental health through creating
connections and offering respite
• encouraging new people to engage with services
• It also provided access to food, activities and advice, providing support in a dignified
manner which reduced the potential for stigma. 
5.8 The evaluation report at Appendix 1 provides information on the whole summer programme
that took place in summer 2025 and includes key findings and recommendations. Findings
from the evaluation will be considered in future planning for similar activities. 
School Support and Family Advice Service 
5.9 Between 1 July and the 30th of September 2025, the School Support Service assisted 43
clients. This reduction in numbers from the previous quarter is to be expected due to the
school holidays.  The majority of enquiries related to benefits advice, which continues to be
the main focus of the service. 
5.10 Total client financial gains (CFGs) for the period were £151,104.37, achieved across 27
clients. Most financial gains were secured through successful benefits claims, including:  
• Universal Credit – £87,258.00
• Adult Disability Payment (Daily Living) – £24,860.05
• Child Disability Payment (Care) – £16,905.20
• Carer’s Support Payment – £4,918.60
• Carer’s Allowance – £2,129.40
• Education Maintenance Allowance – £2,940.00
• Scottish Child Payment – £1,411.80
• Best Start Grant – Early Learning Payment – £1,279.20  
5.11 Additional smaller gains were recorded from Child Benefit, Employment and Support
Allowance, and Charitable Support, totalling £9,249.12. 
5.12 The client profile for Q2 shows that the service continues to reach families facing multiple
challenges. Around 42% of clients reported a long-term health condition or disability, and a
third had caring responsibilities for children with disabilities. Most clients were women aged
25–59, with nearly a quarter unemployed and a further 19% unable to work due to ill health.
Just over half of clients lived in council or other social rented housing, reflecting strong
engagement with low-income households. 
5.13 Advice was also provided across a range of other areas, including education, housing,
energy, and finance and charitable support, reflecting the holistic nature of the project. 
5.14 For quarter 2 of 25/26, Advice Works received 113 referrals for their Family Advice Service
and completed 120 cases. Most of these clients have received a benefit check, with some
School Clothing Grant and Child Benefit applications. The majority of these referrals came
from Health Visitor teams, with a number too from Social Work and also through self-
referral and other Council teams.

Page 7

PUBLIC 
5.15 Client Financial Gain for the year to date for Family Advice is £20,007, with the total for the
year so far being almost £54,000, however even in cases where a client speaks to an
adviser and there is no financial gain made, the client benefits from the reassurance of a
benefit check. Meeting with Advice Works also opens discussion on all financial matters
that may be worrying the client, such as debts and budgeting.   
5.16 With regard to the Child Poverty Priority Groups, Advice Works have seen 60 families within
the Family Advice Service so far this year, falling into these categories. 
5.17 Officers have also been working with Advice Works and RCAB to develop a pathway to
advice for families with children of all ages, with the intention of distributing and promoting
this to Education staff and Whole Family Wellbeing teams as well as 3rd sector
organisations working with parents and children. This promotion took place as part of Talk
Money week from 3 November 2025. 
5.18 As in previous years, Advice Works and RCAB came together too in Talk Money Week to
offer appointments for clients to speak about any aspects of their finances which are
worrying them and get Income Maximisation advice. 
Winter Clothing Payment 
5.19 The £50 winter clothing payment for each eligible child, which was agreed within the
Council’s Budget in February, was paid to families on 31 October 2025. This was paid to
Renfrewshire parents and carers who have received a school clothing grant, the additional
money will help families buy additional clothing for the winter months. This year 4873
children and young people benefitted from this additional payment. 
5.20 Recipients received a message about the payment which included information about the
School Support and Family Advice Services, and Head Teachers were provided too with
information on how to support families to access financial advice and how to book a Talk
Money Week advice appointment.

Page 8

PUBLIC
5.21 In addition, a press release was issued, again with details of where families could get
advice, and about the Talk Money Week appointments. As mentioned above, these
appointments were offered by Renfrewshire Citizens Advice Bureau and Advice Works as
part of Talk Money Week which took place from 3 to 7th November. 
Community Development in Gallowhill 
5.22 As previously reported to elected members, at Leadership Board on 4 December, £50,000
of Fairer Renfrewshire funding was allocated in grant funding to Active Communities to
support the continuation of community development activity in Gallowhill following the
publication of the earlier Community Needs Assessment which took place in the area. This
is intended to provide capacity to support the development and implementation of actions
emerging from the community needs assessment and continue to improve and expand
community led activity and infrastructure in the area. 
5.23 Unfortunately, Active Communities are having to recruit a new Community Development
Officer (CDO), so this work has slowed slightly, although they still run a community session
there every Friday. Officers however, continue to work with Active Communities, and using
the Community Needs Assessment are prioritising areas of work which will make a
difference to the community. A meeting with Transport colleagues took place in late
October, and Housing Regeneration colleagues are also involved in looking at how we can
work together for maximum effect in the area. 
5.24 Recruitment for a new CDO started in November, so that more intensive work in the area
can restart as quickly as possible. Wider work will also be undertaken to develop a place-
based approach based on the learning from the CNA, with a group comprising Council and
HSCP officers and Active Communities steering this work. This group continues to meet. 
Lived Experience Panel 
5.25 Elected Members have been given a number of updates relating to work of the Fairer
Renfrewshire Panel. The Panel have met with Events and made contributions to Halloween
and Christmas events and contributed to Renfrewshire’s Employability Week through taking
part in a session with Invest, DWP and Skills Development Scotland to look at how their
services could be better promoted.  
5.26 The Panel also took part in the Fairer Renfrewshire Planning Event which took place on 8
October alongside representatives from Council services and the 3rd sector and have
supported development of the Action Plan. 
5.27 Looking forward, the Panel will meet with the Convenor and Depute of the Fairer
Renfrewshire Sub-Committee as well as the Convenor of the Communities and Housing
Policy Board before Christmas.

Page 9

PUBLIC
6. Current Priorities 
Device Recycling Pilot 
6.1 In September 2025, Leadership Board agreed to allocate £10,000 of grant funding to
Pachedu to develop a device recycling project as part of the Council’s wider digital inclusion
work. 
6.2 Officers from Renfrewshire Council and OneRen Libraries have been working with Pachedu
to have all elements of the project in place and it was launched as part of DigiKnowVember,
with the first 3 devices being donated to Pachedu via the Libraries team at the event. The
project will be piloted across 4 Renfrewshire Libraries in the first instance: Paisley Central,
Ferguslie Park, Johnstone and Renfrew with devices being dropped off by the public in
those libraries, collected by Pachedu, refurbished and donated to those who need them. 
6.3 The new service will be promoted across Libraries and the 3rd sector using the Engage
network as well as the DigiRen network more specifically. It will also be promoted through
Council Comms and will be a useful addition to the small electrical device recycling which
currently takes place within libraries. 
Winter Connections 
6.4 Recognising the success of the Winter Connections programme since 2022/23, £75,000 of
Fairer Renfrewshire funding was allocated as part of the Council’s budget to support the
delivery of a Winter Connections programme for 25/26. Winter Connections provides a
network of local places and spaces where people can connect to others in their community
over the winter. 
6.5 Funded activities must fit the criteria of Winter Connections and be:
• Open, free and easy to access (although this can mean open to all within a particular
age or targeted group) 
• Inclusive, welcoming, respectful, and safe
• Able or willing to provide connections to other services and supports 
• Able to offer warm drinks/snacks/food along with activities, where possible 
6.6 The process launched in September, with organisations able to apply for up to £2,000
funding to support free activities and was quickly oversubscribed, with 47 organisations
applying for funding. 
6.7 Funding has been fully spent and a list of organisations which have received funding to 21
November is attached at Appendix 2. 
6.8 The programme will be evaluated, and a report brought to a subsequent Board.

Page 10

PUBLIC  
Advancement of equality of opportunity – Equalities Outcomes Consultation 
6.9 The scheduled equalities outcome consultation was launched at the start of September
2025. The consultation is designed to provide those who work, live and study in
Renfrewshire with an opportunity to feedback on the Council’s draft equality outcomes and
associated actions. There are two methods for individuals to participate in the consultation,
either through one of the scheduled face to face sessions or via an online survey. 
6.10 Outreach activity has taken place to promote and enhance the response to the consultation.
3rd sector organisations, community groups and Council services which engage with
individuals who are likely to have an interest in the equality outcome consultation have been
contacted and offered an individual bespoke session. These sessions have encouraged
engagement with the consultation, and either helped individuals fill out the consultation, or
were run as a focus group. These sessions have been flexible in how they are delivered
and driven by the needs of the individuals attending them. For example, Sewing2Gether All
Nations was visited to help individuals attending fill out the online consultation form. This
was facilitated by Sewing2Gether All Nations staff who were able to translate. 
6.11 Further engagement sessions took place with:
• Active Communities Knitting Group
• the Active Communities Pantry 
• Community Learning and Development ESOL class 
• Disability Resource Centre 
• people supported by Learning Disability Services through the HSCP
• The Fairer Renfrewshire lived experience panel
• Home Start Wellbeing Group 
• Kairos Women+ 
• dates-n-mates
• RAMH 
6.12 In addition to these bespoke sessions, 4 general sessions took place. These were face to
face sessions in Johnstone, Renfrew and Paisley as well as an online Teams session and
on 29 October a session was held with the Fairer Renfrewshire Lived Experience Panel. 
6.13 The Consultation closed on 31 October 2025 and 60 consultation responses have been
received, both online and in paper format. 
7 Fairer Renfrewshire Action Plan 
7.1 It was agreed by the Fairer Renfrewshire Sub-Committee and Leadership Board that a
Fairer Renfrewshire Action Plan would be developed by the end of 2025. The Plan is
intended to provide a more formal overview of the breadth of the Fairer Renfrewshire
programme as well as set out priorities and activities to be undertaken over the next 18 – 24
month period.

Page 11

PUBLIC
7.2 Fairer Renfrewshire is an umbrella programme term for work across Renfrewshire Council,
in many cases alongside our partners. The programme currently funds a number of
longstanding projects as well as some newer projects which have received additional
funding, such as the Winter Connections and Summer of Fun programmes. With the
recruitment of an Equalities Development Officer, a renewed focus on equalities, and
defining and meeting our Equalities Outcomes also comes under the banner of Fairer
Renfrewshire. There is also some business-as-usual work, including funding of external
advice services. 
7.3 The Plan is designed to pull together all aspects of Fairer Renfrewshire work, including
planned work, in one place where they can be clearly identified, and outcomes measured. 
7.4 The Plan was developed using the voices of varied Council Services and key external
partners, including the Fairer Renfrewshire Panel. A workshop with these partners was held
in October, and gaps and areas for development were identified and prioritised, as well as
what is already available and working well. 
7.5 Using the outputs of this workshop, themes were developed and a further session with
members of the Fairer Renfrewshire Sub-Committee, looking at strengths and challenges of
the current Fairer Renfrewshire work, and future actions, drew out additional areas of focus. 
7.6 The cross-cutting themes which have been identified are: 
• Joined up working – a need for better coordination across health, housing,
employability, and engagement. 
• Data and Evidence - Improve data sharing and use of lived experience to inform
decisions. 
• Access and Inclusion - Address digital exclusion, transport barriers, and language
needs. 
• Sustainability - Secure long-term funding for community services and preventative
approaches. 
• Trust and Transparency - Communities want genuine involvement and clear
feedback on actions taken. 
7.7 Additional ‘stand alone’ themes were also identified:
• Improving Financial Security
• Health Wellbeing and Community
• Advancing Equality of Opportunity
• Developing understanding and insight

Page 12

PUBLIC
7.8 On approval of the Fairer Renfrewshire Action Plan, this will be shared with partners and
published on the Council website. The Plan will be reviewed on a quarterly basis to ensure
progression. 
7.9 It is recognised there will be a need to continue to develop this Plan and to ensure
resources are deployed effectively to support its delivery.  This will include:
• Continuing to develop and gather data and information which evidences impact and
the achievement of outcomes at a local level
• Developing external funding applications and seeking opportunities to align
partnership resources to support the delivery of the Fairer Renfrewshire programme.
• Continuing to embed live experience and voice and influence within the work that we
do – this includes monitoring the effectiveness of the Plan against its actions and
outcomes targeted.
• Ensuring specific actions are included as required to meet emerging requirements of
specific equality groups.
_______________________________________________________________________________
Implications of the Report
1. Financial – none  
2. HR & Organisational Development – none 
3. Community/Council Planning – This report provides a summary of current partnership activities
being progressed through the Fairer Renfrewshire programme, with a key focus on tackling the
inequalities that exist in Renfrewshire. 
4. Legal - none 
5. Property/Assets - none 
6. Information Technology - none 
7. Equality and Human Rights – The report provides an overview of the position around household
income and expenditure, and is for noting. As such there are no impacts arising from the
recommendation of this paper. It is however important to note that impacts on households explored
within this paper are likely to be disproportionately felt by equality groups. 
8. Health and Safety - none 
9.  Procurement – none 
10. Risk – none 
11.  Privacy Impact – none 
12. COSLA Policy Position – none 
13. Climate Risk – none 
14  Childrens Rights - the articles within UNCRC underpin the work that is being progressed in
Renfrewshire through the Fairer Renfrewshire programme, particularly in relation to rights in relation
to aspects such as life, survival and development, food, clothing and a safe home and supporting
the best interests of the child and their families. Child poverty and family wellbeing are key local
partnership priorities.
_____________________________________________________________________________
Author: Laura McIntyre, Head of Policy and Partnerships

Page 13

1
PUBLIC 
An evaluation of the Summer of Fun Programme 2025 
“We saw children who had never entered a pool finally relax and play. We saw carers cry with
relief. We saw families laugh together for the first time in weeks. It wasn’t just swimming — it
was respite, it was inclusion, it was connection. Thank you for trusting small, grassroots
organisations like ours. With this kind of funding, we can do what we do best: meet families
where they are and lift them, together.”
Just Dive In 
September 2025

Page 14

Summer of Fun 2025 Evaluation Report  2
PUBLIC 
1. Contents
2. Executive Summary ...................................................................................... 3
3. About Summer of Fun .................................................................................. 6
a. Background ...................................................................................................... 6
b. Renfrewshire Summer Holiday Camps ........................................................ 6
c. Summer of Fun Community Programme.................................................... 8
d. Additional Support Needs (ASN) Provision............................................... 12
e. Street Stuff ...................................................................................................... 12
f. Adult and Family Learning ........................................................................... 13
g. The Promise Champs Summer Programme ............................................. 15
h. One Ren Libraries .......................................................................................... 18
i. Skoobmobile .................................................................................................. 18
4. Evaluating the Summer of Fun programme .......................................... 20
a. Renfrewshire Summer Holiday Camps ...................................................... 20
b. Additional Support Needs (ASN) Provision............................................... 23
c. Skoobmobile .................................................................................................. 24
d. Summer of Fun Community Programme.................................................. 25
5. Conclusions .................................................................................................. 40
6. Appendix 1 – Organisations which received Summer of Fun small grants .............................. 43

Page 15

Summer of Fun 2025 Evaluation Report  3
PUBLIC 
2. Executive Summary 
Since 2023, Renfrewshire has been running a successful Summer of Fun programme, providing
free activities for children and young people over the Summer break.  The programme
coordinates a range of Council services and partners including a number of local 3rd sector
organisations which are funded through a small grants programme.  
In February 2025 Council allocated £100,000 through the Fairer Renfrewshire programme to
support the development of the 2025 summer holiday programme, with a focus on providing
fun activities, support and healthy food over the holiday period to low-income families. It was
agreed that £50,000 of the funding would be allocated to the provision of summer camps and
£50,000 would be allocated to the Summer of Fun Community Programme piloted in 2023. The
Fairer Renfrewshire Lived Experience Panel played a key role in directing how this funding could
be used.
The Community Learning and Development team developed the programme of activities for
children and young people through a summer camp model in partnership with Street Stuff, and
with the provision of a healthy meal. Work was undertaken to prioritise access to camp
bookings to families with low incomes, especially in the child poverty priority groups and
through referrals from Childrens Services before opening up access more widely. 
The Community Programme is a small grants programme for local community groups and
organisations to operate free activities over the summer holidays which reach communities and
particularly low-income families that might be underserved by mainstream activities.
Additional funding from a number of different sources was used to deliver a varied programme
of activities for children, families, and young people, along with youth work provision, a youth
voice and participation programme, sports activities and an Adult and Family Learning
programme. 
Summer Additional Support Needs (ASN) provision was delivered from Riverbrae School,
including the playscheme provided through Klas Care, who were funded to deliver this
programme as part of wider work through the Whole Family Wellbeing Fund (WFWF). 
One Ren delivered a summer programme in the libraries and with the Skoobmobile team.
Funding through Fairer Renfrewshire was provided to OneRen to provide toys, healthy snacks
and drinks for children visiting the Skoobmobile and for libraries throughout Renfrewshire.

Page 16

Summer of Fun 2025 Evaluation Report  4
PUBLIC
In total around 8,812 people were supported across the whole programme.
This report describes the work delivered across Renfrewshire throughout the summer holidays
as part of the 2025 Summer Holiday provision.
Key findings 
• Access to free, structured, engaging activities aimed at different ages and often including
day trips to places of interest, resulted in a successful Summer of Fun programme. The
removal of financial barriers to participation and the welcoming and inclusive nature of
activities created an accessible programme for families. 
• The Summer of Fun programme provided children with the opportunity to learn new skills,
make new friends, be creative, visit new places and make memories with their families. It
helped to create connections, reduce isolation and provide respite to parents and carers. 
• The programme was able to reach low-income families, particularly those families who are
in the child poverty priority groups who may be underserved by mainstream holiday
programmes.   
• Benefits of the Summer of  Fun programme included providing free fun activities that low-
income families could access, helping to reduce financial costs for families and encouraging
new people to engage with organisations. 
• Partnership work enabled organisations to broaden their offer of activities and bring in
community safety partners to deliver informative sessions to keep young people safe. 
• The free holiday camp places were helpful in supporting working parents with childcare
costs, particularly single parents. They provided a safe environment for children to socialise
and enjoy a range of activities over the holidays, with outdoor activities being noted as an
important benefit.   
• As identified in previous years, many parents and carers that do a block booking for holiday
camps do not show up to the camps and do not cancel their spaces. Further work is
required to make sure there is maximum take up of this provision to benefit as many
families as possible. 
• The Promise Champs programme offered care experienced young people safe spaces to
build friendships, develop new skills, enjoy nutritious food, and receive support in a positive
and youth-friendly setting.

Page 17

Summer of Fun 2025 Evaluation Report  5
PUBLIC 
• Adult & Family Learning Services ESOL group offered families lots of fun ways to practice
English by taking part in activities and games that helped to build vocabulary and boost
confidence in speaking English. 
• The Skoobmobile was very popular and worked in partnership with other Council
departments and 3rd sector partners to expand their offer and increase awareness of the
service. Being mobile, the free access to play and crafting activities was particularly
important to parents who were unable to travel and in areas where no other activities were
being delivered. 
• Additional Support Needs provision continued to identify and respond to the need for
provision for children and young people with complex additional support needs through
free engaging activities, healthy snacks and free transport for some sessions.

Page 18

Summer of Fun 2025 Evaluation Report  6
PUBLIC
3. About Summer of Fun 
a. Background
In February 2025, Council allocated £100,000 of funding through the Fairer Renfrewshire
programme to support the development of a summer holiday programme of activities,
with a focus on providing support over the holiday period to low-income families including
healthy food where appropriate.  
It was agreed that £50,000 of the funding would be allocated to the provision of summer
camps and £50,000 would be allocated to the Summer of Fun Community Programme
piloted in 2023. The Fairer Renfrewshire Lived Experience Panel played a key role in
directing how this funding could be used.
Renfrewshire’s Community Learning and Development team developed a programme of
activities for children and young people through a summer camp model in partnership
with Streetstuff, and with the provision of a healthy meal. Work was undertaken to
prioritise access to camp bookings to families with low incomes, especially in the child
poverty priority groups and through referrals from Childrens Services before opening up
access more widely. Contact was also made with Mears around attendance of Summer
Clubs for asylum seeking families.
The Community Programme is a small grants programme which allows local community
groups and organisations to operate free activities over the summer holidays which can
reach communities that might be underserved by mainstream activities, particularly low-
income families. The Programme is administered by the Fairer Renfrewshire team.
b. Renfrewshire Summer Holiday Camps
Following on from last year’s successful programme, Renfrewshire’s Community Learning
and Development team delivered a summer camp for children and young people.  The
holiday camps were held in 6 venues across Renfrewshire with a focus on reaching families
most in need of the free provision. There were 1,973 attendances at the holiday camps.
A programme was developed offering several core activities and targeted to young people
aged 5 to 14 years whose families received the school clothing grant, in addition to
separately funded youth work provision, a youth voice and participation programme,

Page 19

Summer of Fun 2025 Evaluation Report  7
PUBLIC
sports activities and youth bus delivered by Street Stuff and an Adult and Family Learning
programme that families could attend together. The approach built on the successes from
previous summer programmes and the partnership working between services.  The
summer provision also ensured a varied programme catering for families, children, and
young people across the whole of Renfrewshire. 
Information about the camps and details of how to book were sent directly to families who
were receiving free school meals and clothing grants and, although we know this
information was shared between families, the targeting of the information allowed the
service to reach low income families in the first instance. Care was also taken to work
closely with services such as Social Work, Education and other partners to identify families
and young people that would particularly benefit from organised summer activities and to
signpost them towards and sign them up for universal activities. 
The aim was to develop a programme of integrated provision to address the barriers and
isolation faced by people in the most deprived areas, but at the same time open to families
across Renfrewshire, concentrating on the Scottish Government’s child poverty priority
groups.
Camps for ages 5 to 14 years were delivered throughout the summer holidays from
Monday   to Friday from 9.30am to 3pm, twice per week in each of the following venues: 
Having fun with Street Stuff

Page 20

Summer of Fun 2025 Evaluation Report  8
PUBLIC
• Renfrew – St James’ Primary School
• Gallowhill – St Catherine’s Primary School
• Ferguslie Park – Glencoats Primary School
• Linwood – Linwood High School
• Foxbar – St Paul’s Primary School
• Johnstone – West Johnstone Shared Campus 
This summer a range of activities were delivered which included hockey, basketball, football
and dance as well as arts and crafts, board games and glitter tattoos. Children and young
people also had the opportunity to discuss issues around respect and Police Scotland and
Scottish Fire and Rescue also delivered workshops on online safety and the dangers of fire
raising. 
c. Summer of Fun Community Programme 
Utilising the allocated budget of £50,000, local community and voluntary organisations
could apply for small grants of up to £3,000 to cover costs of summer activities, including
venues, materials, food, transport and sessional staff. Smaller awards of up to £500 were
also available for organisations with existing activities over the summer to provide healthy
snacks or food. Applications were considered for single events or programmes of activities,
designed for whole families or for children and young people of a range of ages.
All projects agreed to the following principles 
• Activities must be free, with no hidden or additional costs 
• Healthy snacks should be provided, or lunch if full day activities 
• Activities should be inclusive, welcoming, respectful and safe
• Compliant with requirements around safeguarding, child protection and food
hygiene as appropriate
• Able or willing to provide connections to other services and supports 
In order to ensure that this funding was distributed as quickly as possible, authority was
delegated to the Head of Policy and Partnerships to award grants in line with the guidance,
with information on awards to be provided to the Leadership Board in consultation with the
Council Leader. 
In total 25 organisations applied for funding. Applications were assessed by a panel
consisting of officers from Renfrewshire Council, including from Youth Services,

Page 21

Summer of Fun 2025 Evaluation Report  9
PUBLIC
Renfrewshire Health and Social Care Partnership, and from Engage Renfrewshire, with the
panel meeting regularly between mid May and the beginning of June. The panel members
were able to evaluate the Summer of Fun applications based on knowledge of other
available support across localities.
Overall 20 projects were funded through Summer of Fun, with the full £50,000 utilised. This
included an allocation to One Ren libraries to provide toys which could be taken round in
the Skoobmobile to add an extra aspect to their and partners’ programmes and snacks and
drinks for children during library activities.
As the fund was oversubscribed, it was not possible to approve all applications received.
Unsuccessful applicants were signposted to other support or information about sources of
funding via Engage Renfrewshire. 
A list of the organisations that delivered Summer of Fun small grants activities can be found
in Appendix 2. 
A wide range of activities for children and young people of all ages were provided through
the funding, along with healthy snacks/ lunches and drinks. 
Activities that were offered included:
• Inflatable fun sessions
• Summer playschemes offering free childcare
• Traditional games and outdoor activities in local parks
• Day trips to local visitor attractions  
• Arts and crafts and creative activities, such as pottery painting
• Sports activities including football, snorkelling, cheerleading, swimming and
dancing
• Educational activities like cooking skills, music technology and baking 
• Music workshops and storytelling 
Day trips proved to be very popular, with young people enjoying a day with their families at
Blair Drummond Safari Park, Millport, the Sealife Centre at Loch Lomond, Monty’s Farm
Park, Glasgow Science Centre, and the beaches at Ayr and Troon.
CREATE Paisley provided drop-in sessions across Johnstone and Paisley for young people,
with outdoor creative workshops in the Finding Your Feet garden and music and dance
workshops delivered by their partners at The Soundsystem Project and Right2Dance. In
addition they delivered weekly sessions for families from the Ukraine and Syria in
partnership with Renfrewshire’s Resettlement Team.

Page 22

Summer of Fun 2025 Evaluation Report  10
PUBLIC
Just Dive In delivered a range of sensory-friendly aquatic activities including sensory splash
sessions, family float sessions, quiet swims and mermaid and snorkel tasters. These
activities were specifically designed to be accessible to children and families who may
otherwise have faced barriers to participation. 
Many of the organisations worked with partners to offer as wide a range of activities as
possible. 
Home-Start Renfrewshire and Inverclyde
partnered with St Mirren FC to organise a  visit to
St Mirren Park, giving families and volunteers
the opportunity to enjoy a stadium tour and
lunch. This was an exciting and memorable
experience for both children and parents. They
also hosted five Park Day sessions across
various locations in Renfrewshire, offering
outdoor crafts, play-based activities and healthy
snacks for both children and adults. These
activities provided vital opportunities for
connection, play and support, helping families
stay engaged with Home-Start and with each
other throughout the summer. 
Creating with nature (Home-Start
Renfrewshire and Inverclyde) 
Children participating in Fit and Fed with St Mirren FC Charitable Foundation

Page 23

Summer of Fun 2025 Evaluation Report  11
PUBLIC
Alongside delivering inclusive activities for all age groups, Active Communities brought in
partners to provide advice and information to parents. They had  visits and demonstrations
from the Fire Service, Invest, Advice Works, DigiRen and the Skoobmobile. 
The residents we work with bought into the events from the start. Once the funding was
granted, we created a seven-week programme to provide free fun family events each Friday
mornings (10-11.30am) in Gallowhill. The community centre was the focus of all events, so we
had to hire the space for the 7 weeks. Each session offered something different and ranged
from cooking lessons including American and Scottish themed food, a silent disco which the
mums loved! We held drumming and music workshops, puppet storytelling with Professor
Squozz (up to age 5), facepainting, delivery of arts and crafts sessions where families could
leave with something they made, an end of summer disco with game activity and a carnival
style day with funfair games, prizes and lots of activity.         
Active Communities 
Brick Lane Music Academy provided a range of music activities including Family Music
Sessions, Magical Musicians and Band in a Week, where children could sing and learn to play
musical instruments. Lunch provided and families with other children under 5 were able to
use their facilities, including their new sensory garden. Creche facilities were available too.
Erskine Arts delivered workshops in art, music production and performing for different age
groups. Young people were able to create, sing, act and learn practical skills in recording
and producing music.   
The STAR Project’s Summer of Fun programme enabled them to offer free spaces on their
summer trips to families who would struggle to access activities over the summer due to
financial constraints. They also held an end-of-summer Fun Day in Fountain Gardens for the
whole community. This included a picnic and BBQ, inflatables, craft activities, music and
games, and provided an opportunity for families who attended their summer programme to
“come together, share experiences and deepen their connections”.

Page 24

Summer of Fun 2025 Evaluation Report  12
PUBLIC
d. Additional Support Needs (ASN) Provision
Summer ASN provision this year was located at Riverbrae School, with Klas Care funded to
provide some places there as part of wider work through the Whole Family Wellbeing Fund
(WFWF). Riverbrae Playscheme took place between 7th July and 7th August 2025 from 10am
to 2pm Monday to Friday. There was the opportunity for up to 40 children to attend per day.
There were 212 applications received in total and 195 families took up the offer of support,
15 of whom received their funded places through Klas Care. 
Although families were allocated with 5 free spaces across the 5 weeks, additional sessions
could be purchased. 
A range of fun engaging activities and free play time was delivered throughout the summer
holiday period which included: 
• A nutritious meal and healthy snacks throughout the day
• Child led play, both indoor and outdoor activities – including sports, creative arts
and sensory experiences. 
• Much needed social interaction with other children and young people
• A high level of staffing who were able to respond to each individual child’s needs 
A nurse was available two days per week for children who required a higher level of
support/complex medical needs and for those using free spaces, transport costs were
provided. 47 families took up the offer for free transport to Playscheme for parents within
Renfrewshire. Parents were encouraged to transport their children where possible, however,
due to the location of the venue and to maximise opportunities and support for families
during the summer holiday period, there was some transport available for those who
needed it most.
e. Street Stuff
Street Stuff continued to deliver their core programme of activities in the evenings from
Monday to Saturday for young people aged 8 to 16 throughout the summer holidays which
also included the provision of healthy food.  1,800 attendances were recorded with activities
including multi-sports and the games buses with PS4 games and DJ decks. Young people
had the opportunity to mix with friends, listen to music and play fun and interactive games.

Page 25

Summer of Fun 2025 Evaluation Report  13
PUBLIC
The Street Stuff activities were delivered at the following places: 
• Linwood – Our Lady of Peace
• Foxbar – Morar Drive and Foxbar Youth Drop
in
• Erskine - Bargarran Primary School
• Johnstone – McMaster Centre
• Shortroods – Beechwood Community Centre
MUGA 
• Gallowhill Community Centre
• Glenburn – Skye Crescent 
f. Adult and Family Learning 
The Adult and Family Learning team supported 61 families in Renfrewshire to enjoy a fun-
filled summer regardless of the weather.
Four sessions a week in Southend, Foxbar, Johnstone, Renfrew and Erskine ran throughout
July and offered parents lots of fun ways to engage with their children.
Johnstone families enjoyed outdoor fun – a scavenger hunt in nature, looking for leaves,
twigs, ladybugs and four leaf clover as well as searching for fairy houses. Children played
with chalk, bubbles, bats and balls and footballs and made use of the outdoor equipment,
with some of them conquering their fear of the climbing wall.  
The children also enjoyed story times and games on the Skoobmobile as well as choosing a
library book. They also had the opportunity to get involved in some messy baking.

Page 26

Summer of Fun 2025 Evaluation Report  14
PUBLIC 
The Glasgow Science Centre hosted a day out for 7 families that included free entry, lunch,
and travel to and from the centre.   Families from Erskine took part in a variety of activities,
including lego yacht racing which they really enjoyed.

Page 27

Summer of Fun 2025 Evaluation Report  15
PUBLIC
An ESOL specific group was delivered in Moorpark and learners were able to practice their
English by taking part in a variety of fun tasks and games that helped build their vocabulary
and boost their confidence in using English. 
g. The Promise Champs Summer Programme
The Youth Services Promise Champs summer programme was funded through the Promise
Partnership Youth-Led Corra Fund to support care-experienced young people, young carers,
and their peers living in Renfrewshire to engage in a wide range of youth work opportunities
including clubs, trips, and new experiences removing common barriers such as cost and
accessibility. The programme was co-designed with existing Promise Champs, who played a
key role in shaping it, selecting residential venues, and identifying the experiences they most
wanted to access. 
Designed to run across the full six-week summer break, the programme offered young
people safe spaces to build friendships, develop new skills, enjoy nutritious food, and
receive support in a positive and youth-friendly setting.
Opportunities were widely shared through Promise Keeper, social work, and youth work
networks, with sign-ups managed via the Class4Kids platform. This ensured the offer
reached young people aged 12–17 across Renfrewshire who would benefit most.
The programme delivered 6 weekly themed youth club sessions which were attended by 10
participants, 3 summer trips attended by 36 young people, 6 drama workshops attended by
8 young people, a residential experience attended by 14 young people and a Promise Youth
Festival.

Page 28

Summer of Fun 2025 Evaluation Report  16
PUBLIC
Summer trips included visits to Glasgow Splatter Art Studio, Edinburgh Zoo and a beach day
with picnic. Packed lunches were provided for all the trips.
The Summer trips were a great way to bring the Promise Champs participants from different
communities together.  The trips encouraged exploration and fun and promoted
independence, and social development. 
Youth Services hosted an overnight residential for 14 young people at Lapwing Lodge
providing opportunities to try new challenges, create memories and strengthen peer bonds. 
Activities included high ropes, tomahawk throwing, inflatable challenges, and canoeing,
along with evening entertainment and group discussions on future Promise initiatives.
In addition, Youth Club Summer sessions were held in Paisley Methodist Church from 1 -
3pm on Mondays throughout July and August and were open to young people aged 12-17
years of age. These weekly clubs provided a consistent, safe, and fun space for young people
to take part in arts and crafts, team games, independent play, and meaningful social time
with peers. Young people enjoyed engaging, youth-led activities that boosted wellbeing and
confidence.
In partnership with Moxie Drama School, 6 drama workshops on Thursdays from 12 to 2pm
gave young people the opportunity to develop performance and storytelling skills through
improvisation, dance, singing, and script writing. These activities boosted self-confidence
and creativity, developed individual and group communication skills and empowered
young people to express themselves through voice and movement in a safe space.
The youth festival, Promise YouthyFest was held on 6th August from 11am to 7pm at Youth
Services, West Primary School and was attended by 189 young people. The festival was an
incredibly positive and enriching event, bringing together care experienced children and
young people, young carers, their friends, and families for a full day of celebration, creativity,
and community connection.
Thanks to successful external funding from the Promise Partnership Youth-led Corra Fund,
young people were able to take full ownership of the planning, design, and delivery of
YouthyFest, embedding youth voice at every stage. Festival highlights included music and
performances, funfair-style activities, creative zones,  circus skills, a silent disco and
wellbeing and chill-out areas for young people to relax, recharge, and access support if
needed. Feedback from the festival was overwhelmingly positive with attendees highlighting
the warm and welcoming environment, the quality and variety of activities for all ages, the

Page 29

Summer of Fun 2025 Evaluation Report  17
PUBLIC
efforts to making the event inclusive and barrier-free and how empowered the young
organisers were.
The following impact and positive outcomes were identified:
1. Youth Leadership and Empowerment:
• The event demonstrated the power of youth leadership. The Promise Champs led every
stage of the festival’s development—from branding to logistics—developing real-world
skills in project management, communication, and collaboration.
• Young people felt listened to, valued, and empowered, boosting their self-esteem and
sense of purpose.
2. Increased Inclusion and Accessibility:
• YouthyFest removed common barriers to participation such as cost, travel, and lack of
support, ensuring care experienced young people, young carers, and their families
could attend without stress or financial strain.
• Signposting and support throughout the day created a welcoming and inclusive
atmosphere for families of all backgrounds.
3. Strengthening Relationships and Community Bonds:
• The festival created a space where friendships flourished, families connected, and
communities came together in celebration.
• For many, it was a rare opportunity to enjoy a day out as a family unit in a safe, stigma-
free environment.
4. Promoting The Promise Values:
• Every element of the event was designed to uphold and reflect the values of The
Promise: love, safety, and respect.
• Attendees repeatedly described the day as “fun,” “inclusive,” “safe,” and “uplifting.”
5. Positive Family Experiences:
• Families reported feeling supported, connected, and uplifted by the day. Parents and
carers expressed appreciation for the thought and care that went into making the event
inclusive, relaxing, and fun for both young people and adults.

Page 30

Summer of Fun 2025 Evaluation Report  18
PUBLIC 
h. One Ren Libraries
Renfrewshire Libraries ran their own programme of events this year using equipment
bought in previous years and linked it to the annual Summer Reading Challenge “Story
Garden”.  All activities were free and focused on using recyclable materials and items that
are easily sourced. 
The Summer Reading Challenge this year had the theme of Story Garden, with 1,571
children signing up for the challenge and over half,  912 completing it.
One Ren received £1,227 from Fairer Renfrewshire to purchase toys, healthy snacks and
drinks for children visiting the Skoobmobile and for libraries throughout Renfrewshire.
i. Skoobmobile
The Skoobmobile provided access to library activities, including the Summer Reading
Challenge and information about partner organisations. With the increasing cost of summer
activities, the Skoobmobile was in more demand than ever, giving families free access to
different play and crafting opportunities without having to travel or make reservations.
A helping hand in Barshaw Park on a Home-Start
Renfrewshire and Inverclyde Park Day

Page 31

Summer of Fun 2025 Evaluation Report  19
PUBLIC
Fairer Renfrewshire provided funding for new toy provision as well as free snacks and drinks.
The mobile service visited the following locations: 
• Howwood
• Houston
• Gallowhill
• Todholm
• Barshaw Park
• Gockston Road 
The Skoobmobile has built relationships with many groups and organisations throughout
Renfrewshire to ensure that the programme reaches all communities. They joined Active
Communities’ Summer of Fun programme at Gallowhill Community Centre as well as West
Johnstone Family Group, Southend Action Centre and St Mirren Fit n Fed camps where
children were offered football themed crafts every Thursday morning over the holidays.
Toy items purchased with Fairer Renfrewshire funding were used on a free play basis at
Gallowhill, Barshaw Park, Marshes, Howwood and Houston community visits and were very
well received, especially the shape matching game.  Board games were popular with
children and facilitated interactions between children and led to friendships being made.
Feedback from children was very positive. 
“I can’t wait to be on the Skoobmobile again because its so fun”
“Loved our time on the Skoobmobile and nice to have a look at some Gaelic books too”.
“I liked playing with the new games, the shape game was fund, and it was nice to spend time
together”.
Digital Champions joined the Skoobmobile every Wednesday at Barshaw Park to raise
awareness of their service. The service was also joined by Invest in Renfrewshire on two
occasions and worked with Paisley Museum Cultural Learning Team at Sma Shot Day to
support an interactive weaving experience for visitors. 
As part of Fèis Phàislig the bus was joined by 9 adults and 12 children for a morning of
traditional music and activity for families at Barshaw Park.  
The programme faced some challenges including mechanical issues, getting relief drivers,
and weather (good and bad) impacting on attendance.

Page 32

Summer of Fun 2025 Evaluation Report  20
PUBLIC 
4. Evaluating the Summer of Fun programme 
Different parts of the programme were evaluated in different ways, but we have included
information on numbers attending and comments from staff, parents, carers and children,
below.
a. Renfrewshire Summer Holiday Camps
Over the summer period there were 1,973 recorded attendances at the Summer camps.
Participants were asked to provide their views on the Summer of Fun camps by giving the
camps a rate out of 5, with 1 being the worst and 5 being the best. Participants stated that
they enjoyed the camps and the total rating for the camps was 4.5 out of 5.  
Evaluation has shown that the free holiday camp places were helpful to families for a
number of reasons. The availability of free spaces supported working parents with childcare
costs, particularly single parents. The camps provided a safe environment for children to
meet new children, develop their social skills and try out different activities over the
holidays. The range of activities available meant that children were able to learn new skills
and the positive impact of being away from screens and participating in outdoor activities
was noted as an important benefit.   
Skoobmobile stories

Page 33

Summer of Fun 2025 Evaluation Report  21
PUBLIC
“Summer club gives my children the opportunity to meet new people, try new activities and
build up their confidence. I pay for both girls to attend summer clubs in school throughout the
week to allow me to go into the office. Therefore having this club one day a week free of charge
also helps us financially as a family.”
“They are important as I am a single mum who works and with my daughter being my only
child and not a lot of friends this allows her to be more social with kids her age. I also cannot
afford to get her back into clubs she has requested she wants to go to but this way she gets to
do this with adults who can help and teach.”
Feedback about staff was very positive, with parents commenting on how friendly and
helpful staff were. 
The table below details the characteristics of the families who responded to the questions
as part of the sign up process for the Summer Camps. The majority of families were lone
parents, while over a third of families had 3 or more children. Promotion of the camps was
done through messaging to all parents and carers in receipt of School Clothing Grants, to
ensure the camps were targeted to low income families. Although those parents passed the
booking details to friends and family, the figures show that the camps reached the targeted
groups. 
Category Yes Responses % of Families
Lone parent families 289 35.8
Families with 3 or more children 278 34.7
Families with a disability 181 22.6
Black and minority ethnic families 72 9.0
Families with a child under 1 65 8.0
Families with parents under 25 9 1.1
Percentage of children from each age
Category % of Families
Aged 5 5.4%
Aged 6 16.7%

Page 34

Summer of Fun 2025 Evaluation Report  22
PUBLIC
Aged 7 18.5
Aged 8 14.3
Aged 9 16.3
Aged 10 11.2
Aged 11 7.4
Aged 12 5.2
Aged 13 3.6
Aged 14 1.3
The overall total within the ‘Yes responses’ column is calculated by counting only those responses where an
obvious straight ‘yes’ or ‘no’ response was provided, hence the differing totals for each category. 
On a less positive note, over the summer holiday period around 1,973 attendances were
recorded out of a possible 3,150 spaces, with children and young people benefitting from
the daytime camp provision. Prior to the bookings being available, the Fairer Renfrewshire
Lived Experience Panel were engaged around how non-attendance could be reduced.
Suggestions they made around communications to parents and offering entrance to a prize
draw for attendance were taken on board, however non-attendance rates were still high.
It has been established that many parents and carers that do a block booking when the
programme launches do not show up to the camps and do not cancel their spaces. Parents
were asked to provide feedback about non attendance and cited alternative plans and
illness as reasons for not attending. Looking forward, we will do further work to examine
how we can remind parents of the camps and prompt them to cancel if they will not attend,
to allow other families to make use of the places. A waiting list is kept, so when cancellations
are made, other families can be quickly advised of spaces.
Looking at geographical coverage, there were registrations for the camps from most areas
across Renfrewshire with the exception of Bridge of Weir and Kilbarchan. We can infer that
transport may be an issue for parents and carers to get children to camps from these
villages, especially for those who don’t have a car.

Page 35

Summer of Fun 2025 Evaluation Report  23
PUBLIC 
b. Additional Support Needs (ASN) Provision
For children with additional support needs attending activities at Riverbrae, the aim was to
provide activities that focussed on providing a warm, welcoming, fun and safe environment,
allowing children and young people to build good relationships with both the staff and
other children and young people who attended the playscheme. 
Activities were child-led, with lots of outdoor play due to the good weather. The paddling
pools and water activities were very popular and children enjoyed using the outdoor
equipment on site, including swings and climbing frame and imaginative play with staff
exploring the outdoors. 
There were also arts and crafts activities, games and play opportunities offered indoors for
children who enjoyed this. Assigned quiet areas offered low stimulation, with tents, soft
furnishings and quiet activities for children and young people who required this type of
environment.

Page 36

Summer of Fun 2025 Evaluation Report  24
PUBLIC
Some families applied for places but did not use them. The service was able to
accommodate some changes due to last minute holidays and illness, however not all
families contacted the service to cancel their place and it was then not possible to offer
these places to other families. On one day there were 17 spaces unfilled. 
Parents reported that they would like the service to be equitable with the option of Pay to
Play to be available for the children and young people at Riverbrae as well as Klas Care.
c. Skoobmobile
Over the summer holidays, the mobile service made 48 visits to communities and engaged
with 572 adults and 995 children in total.
Feedback from evaluation forms indicates that 96% of people who attended enjoyed their
visit onboard, with 78% agreeing that the Skoobmobile increased reading for their child over
the holiday period. 
“My daughter is very creative and loves her
visits to the Skoobmobile. She loves
choosing her books and spends the
remaining time at the crafts table. Staff are
very friendly and helpful and it is a great
asset - very engaging to the children. We
love our visits to the Skoobmobile.” 
“It enhances my child’s reading
throughout the holidays, we both spend
time reading at night now and it is a lovely
way to switch off together at the end of a
busy day. Thank you to the Skoobmobile
staff for being great with her and always
looking to engage the children.” 
Just over half (52%) of those who provided feedback stated that they used the Skoobmobile
for the Summer Reading Challenge. When asked how they found out about the mobile
service, 44% discovered Skoobmobile  via word of mouth, 20% became aware of it through 
social media, 24% from school communication and 12% became aware of the service when
the Skoobmobile visited their local area. 
Children enjoying craft on the Skoobmobile

Page 37

Summer of Fun 2025 Evaluation Report  25
PUBLIC
d. Summer of Fun Community Programme 
In August a feedback form was sent out to every organisation that had delivered activities as
part of the Summer of Fun Community Programme to ask about their experience of
delivering activities and to gain understanding of the difference that it had made for those
who participated. 
Feedback froms were returned from every organisation that was funded.  Feedback from
organisations included photographs of activities, some of which are included in this report.
Promoting Activities
Renfrewshire Council’s Communications and Marketing team promoted the Summer of Fun
programme widely through social media and organised a poster distribution to venues
across Renfrewshire towns. All promotional materials had a QR code so that people could
scan and view the whole programme on the Council’s webpage. In line with input from the
Fairer Renfrewshire Panel, all free activites, whether Summer of Fun grant funded, through
Community Learning and Development, or through Libraries, were listed on one web page.
This included the Skoobmobile programme. 
Organisations were asked how people found out about the activities they were offering.
Most organisations used a mixed approach to ensure that they connected with new families
as well as those who were already aware of or using their services. This resulted in many of
the activities being fully or over-subscribed very quickly.
Families found out about our Summer of Fun activities through a combination of direct
communication and digital channels. Our staff shared the full itinerary of Park Day sessions
with families the week before schools finished for summer, ensuring they had time to plan and
choose the sessions that suited them best. We also promoted the activities via our Parents
Hub, a private Facebook group for families we support and through WhatsApp group chats set
up for both families and volunteers. In addition, many families were already engaged with our
services and heard about the activities through word of mouth and ongoing participation in
our regular programmes.
Home-Start Renfrewshire and Inverclyde

Page 38

Summer of Fun 2025 Evaluation Report  26
PUBLIC
While 74% of those who responded stated that people had found out about their project
mainly through social media, 58% found that word of mouth was a key factor in promoting
their activity.  Just over half of respondents (53%) related that people found out because
they were already attending other activities that the organisation delivered, while 32% cited
referrals from partner organisations. 
How did people find out about your Summer of Fun project?
Method of information %
Social media  74
Word of mouth 58
Attending other activities 53
Posters 32
Partners 32
Referral from another organisation 21
Note: All respondents provided more than one answer to this question
Due to the nature of their work, Renfrewshire Women’s Aid only invited women and children
who were already using their service to attend the summer programme.
Just Dive In distributed printed flyers to local nurseries, libraries, community centres and GP
practices to ensure that they could reach digitally excluded families. 
Paisley St George’s used their well-established relationships with local schools to promote
their activities, whilst Stronger Communities Glenburn found that most families found out
about the programme through their social media and word of mouth, with parents
recommending sessions to friends and other families.

Page 39

Summer of Fun 2025 Evaluation Report  27
PUBLIC 
Active Communities sent flyers to schools in the Gallowhill area and invited partner
organisations to send information to their group members. They also created a colourful
flyer to give to parents and distributed these around the flats, community centre and some
local shops.
Half of the organisations had received referrals and these mainly came from their links with
local nurseries and schools, statutory services such as health visitors and Social Work and

Page 40

Summer of Fun 2025 Evaluation Report  28
PUBLIC
the Whole Family Wellbeing team. Other referrals came from Engage Renfrewshire,
Barnardos, Renfrewshire Wellbeing Network and other third sector organisations.
How successful were the activity sessions? 
The continued popularity of the Summer of Fun programme is evident from the fact that
demand significantly exceeded expectations and many organisations were oversubscribed
quickly and were unable to offer places to everyone. 
The diversity of activities across the programme meant that all organisations had
consistently good attendance throughout the summer. Being able to offer free, structured,
engaging activities aimed at different ages, and often including day trips to places of
interest, resulted in a successful programme. 
The removal of financial barriers to participation, and the welcoming and inclusive nature of
activities created a more accessible programme for families that may typically feel excluded.
For the STAR Project it resulted in a “stigma-free approach where it was not evident who had
paid for a trip and who had received a free place.” 
The wider marketing of the Summer of Fun brand also created credibility which encouraged
people to attend. 
Children enjoying football at St Mirren

Page 41

Summer of Fun 2025 Evaluation Report  29
PUBLIC
The programme worked well because it was free for families to attend, which removed
financial barriers and meant everyone could take part regardless of circumstances. Offering a
mix of activities such as cinema trips, soft play, and arts & crafts gave children plenty of choice
and kept them engaged. Providing food alongside the activities worked particularly well, as it
helped ease pressure on families during the holidays and made the days feel like a complete
experience. Parents appreciated the chance to spend quality time with their children, while
children enjoyed trying new things, making  friends, and having fun in a safe and supportive
environment.
Stronger Communities Glenburn
Organisations felt that the local focus enabled them to tailor activities to the real needs of
the community and the absence of eligibility checks allowed them to support families with
dignity and ensure that there was no stigma attached to participation. 
Active Communities noticed that people in Gallowhill were “excited that they had something
to look forward to in their own area” and that activities helped to bring people together who
may not have known each other, helping to reduce isolation and loneliness. They also
encouraged participants to engage with local organisations for support. 
Home-Start Renfrewshire and Inverclyde offered families a choice of location for their Park
Days, holding sessions across Paisley including Barshaw, Brodie and Maxwellton Parks, as
well as Robertson Park in Renfrew. They also offered families flexibility through providing
Outdoor games and learning to drum with STAR Project

Page 42

Summer of Fun 2025 Evaluation Report  30
PUBLIC
morning and afternoon sessions and found that volunteers were invaluable in helping to run
activities and provide additional support to families.
For the summer trip to Heads of Ayr Farm Park we provided flexibility for travel to meet
individual needs. For one family with two children with ASN, using their own car provided
control over arrival and departure times and reduced overstimulation. Conversely, another
ASN family found the coach most suitable, as the additional pairs of hands on board provided
valuable support with their other children. This demonstrates that a flexible approach enables
families to choose what works best for them. 
Home-Start Renfrewshire and Inverclyde
CREATE Paisley found that using outdoor spaces provided a nice change of scene for
creative activities. They had a very busy programme which stretched their staff and in future
they would seek to bring in additional staffing support or reduce the amount of activity
slightly. They commented that widening out the age range for the trips and outdoor
activities allowed them to accommodate younger siblings which worked well and using
volunteers to support sessions “worked brilliantly, providing peer support and mentoring, as
well as meaningful experience for the young volunteers themselves.”   
Paisley St George’s Church divided children into different age groups which allowed leaders
and children to get to know one another and to tailor activities to suit their needs. This was
important given that children from diverse backgrounds with different needs from 10
different primary schools attended the programme. 
“From the children’s perspective, they got to know the leaders who were primarily assigned to
them and were able to form new friendships with other children in their groupThe consistency
of groups allowed the leaders who were assigned to each group to better understand the
individual personalities and needs of each child in their group.”
Paisley St George’s Church
Just Dive In discovered that managing bookings, cancellations, and reschedules became
time-consuming due to the high volume of interest and would put a dedicated admin
resource or online booking system in place. They would also like to create options for
families to sustain the benefits beyond summer, for example, through subsidised term-time
swim lessons, ongoing mermaid/snorkel sessions, or family water safety training. The
programme has also highlighted the need for dedicated small-group or ASN-only slots for
families with children who require one-to-one support.

Page 43

Summer of Fun 2025 Evaluation Report  31
PUBLIC
The learning from this year has helped shape how we will structure both our next summer
programme and our year-round delivery to better support the most vulnerable families in our
community.          
Just Dive In
How many people attended?
Organisations were asked about the number of people who attended their activities. We did
not ask organisations to keep track of numbers while delivering activities, but some did, and
others provided an estimate. The average number of people attending each session was 13
adults and 39 children (from 19 project responses). Not all projects had adults participating
and in some cases, the adults were volunteers.  Some projects had much higher attendance,
such as STAR Project (78 children per session) and Paisley St George’s (60 children per
session).
Sessions which attracted the most children were activities for toddlers, football camp and
day trips. Home-Start Renfrewshire and Inverclyde’s Park Days were attended by a  total of
31 families, comprising 82 individual family members, while their co-designed trip to Heads
of Ayr Farm Park attracted 45 families (131 parents/carers and children) and 10 volunteers. 
Thorn Athletic Community
Trust delivered 3 weeks of
community football camps
to over 100 children. 
Not all projects ran for a full
six weeks but an estimated
figure from 19 project
responses suggests that
around 726 adults and 2,233
children benefited from
Summer of Fun activities. 
The aim of the small grants programme overall was to provide a range of activities that
would be accessible to low-income families across Renfrewshire, in particular supporting
families in the six child poverty priority groups, who are at higher risk of living on a low-
Cooling down with a lollipop at Thorn Athletic Community
Trust

Page 44

Summer of Fun 2025 Evaluation Report  32
PUBLIC
income as well as Care Experienced young people. All 19 small grants funded projects that
provided feedback responded that they had managed to reach these families through their
activities. Just over a fifth of projects (21%) were able to reach families in all of the child
poverty priority groups and those with care experience, whilst 89% of projects were able to
reach families in four or more of the six child poverty priority groups. Over a third of projects
(37%) managed to reach six of the seven priority groups. 
Projects were most successful at reaching the following families:
• lone parents (100%)
• families with three or more children (95%)
• families where someone in the house has a disability (95%)
• black and minority ethnic families (84%)
• families where parents are under the age of 25 (68%)
Over half (58%) of organisations managed to reach families with a child aged under one year
old and 53% of organisations also reached care experienced children and young people. 
Who attended your Summer of Fun project? 
Number of projects  %
Lone Parents 19 100
Families with 3 or more children 18 95
Families where someone in the house has a disability 18 95
Black and minority ethnic families 16 84
Families where parents are under the age of 25 13 68
Families with a child aged under one year old 11 58
Care experienced children and young people 10 53
When asked how they were able to reach these families, whilst half of the organisations
received referrals, just over half responded that families were already known to them
through being regularly involved with their other services.  
Referrals from statutory organisations came via Renfrewshire Council’s Social Work team,
Whole Family Wellbeing team as well as schools and nurseries, health visitors and Engage
Renfrewshire. Third sector referrals were through Barnardos, STAR Project, Renfrewshire
Young Carers and other local voluntary organsiations.

Page 45

Summer of Fun 2025 Evaluation Report  33
PUBLIC
Many of the young people we already engage with live in the top 20% of areas with multiple
deprivations (SIMD Index). We have well established links with local schools, and community
partners, and shared information on our social media and with our partners to help us
publicise the activities.
CREATE Paisley
Working with trusted referral partners who had existing relationships with families living in
poverty helped organisations to identify families that would benefit most from the
programme. For Home-Start Renfrewshire and Inverclyde it was important to ensure that
low income families were targeted in an inclusive and respectful way by sharing information
about the free activities and snacks with all of the families they work with. 
The STAR Project liaised with partner organisations to identify family groups who would not
ordinarily access STAR’s services but who would benefit from gaining access to free trips.
They also promote the summer programme at events, such as Wellbeing in the Park and
World Labyrinth Day to ensure that new families are made aware of their service. 
When we released our Summer Programme and asked families to sign up for trips, we met
with each family to discern who would benefit from being offered free places. Three families,
who were identified as being particularly vulnerable to struggling financially over the summer
period were offered more than one trip for free (they were each offered 2). 
STAR Project
Active Communities hold a weekly Soup and Social on Fridays and used this opportunity to
discuss the Summer of Fun programme with attendees. Just Dive In wanted to ensure that
there were no barriers to attending so they provided non-digital booking options and simple
sign-up processes. They also promoted the programme through community hubs, libraries,
and word of mouth, ensuring that families who were digitally excluded or disengaged from
mainstream services received information about the programme.
We were intentional in removing stigma around accessing free or funded places. Our
messaging focused on inclusion, wellbeing, and fun — not hardship — which helped families
feel welcome and dignified in accessing support.This values-led approach allowed families to
participate without shame, and many expressed gratitude that the offer “felt like a treat, not a
handout.”
Just Dive In

Page 46

Summer of Fun 2025 Evaluation Report  34
PUBLIC
Feedback from families and young people themselves has also confirmed that the
programme has benefited those who needed it most. 
What difference did the small grants programme make?
Feedback from organisations about the impact of the programme was overwhelmingly
positive.  All the organisations agreed that there were several benefits for families who
attended activities. They highlighted the opportunity for low-income families to access fun
activities that were open to everyone and where their children could participate in
organised activities, socialise and make new friends in a safe environment. All organisations
reported that the programme had helped to reduce financial costs for families. Most
respondents also agreed that the programme had encouraged new people to engage with
the project (95% of respondents). Other perceived benefits were providing access to
information and advice (79% each) and helping people to learn about a new service in their
local area (79%). 
Having fun on a day out with Paisley St George’s Church

Page 47

Summer of Fun 2025 Evaluation Report  35
PUBLIC
Benefit to people attending activities  Number of responses %
Providing fun activities that low-income families
could access 
19 100 
Reducing financial costs for families 19 100
Encouraging new people to engage with the
project / organisation 
18 95
Providing access to information / advice  15 79
Helping people to learn about a new service in
their local area 
15 79 
Almost a third of organisations highlighted other benefits of the programme. Just Dive had
feedback from parents and carers that sessions gave them “a rare opportunity to relax,
socialise, or bond with their children in a supportive, non-judgemental space”, reducing
social isolation and carer burnout.
CREATE Paisley observed benefits in providing opportunities for children and young people
across Renfrewshire to learn new skills, meet new people in their community and go to new
places they may not have otherwise had access to. 
Home-Start Renfrewshire and Inverclyde saw benefits in providing new and fun experiences
for families to enjoy together across generations, while Renfrewshire Rainbow Buddies felt
that the programme supported the transition into primary school for young people who
were anxious about starting school.  
Organisations highlighted the importance of the Summer of Fun grants, without which they
would not be able to provide free activites to local children, young people and families
throughout the summer. It was clear from the feedback that organisations enjoy being part
of the programme and undoubtedly see the positive impact it has on participating families. 
The funding allowed Cherrie Children’s Daycare, run by Moorpark Community Association,
to offer much more than they would normally and to have staff in place to support the
children and families using their service.

Page 48

Summer of Fun 2025 Evaluation Report  36
PUBLIC 
For some families, it was the only structured activity that they could afford over the holidays.
Brick Lane Music Academy reported that without the funding many families who benefited
would not normally have been able to afford such activities for their children. 
Both Renfrewshire Women’s Aid, Stronger Communities Glenburn and Home-Start
Renfrewshire and Inverclyde commented on the lasting memories created for children and
their parents/carers.  
The support created opportunities for the children and families we work with to enjoy activities
they otherwise would not have been able to afford or experience. Every outing was met with
wonderful feedback, and it truly made a positive difference to the families’ summer, helping
them make cherished memories that will last far beyond the holidays. 
Renfrewshire Women’s Aid 
The Summer of Fun programme provided opportunities to have fun and children enjoyed
making new friends, visiting new places and trying new experiences. Just Dive In combined
fun with learning new skills, such as snorkelling and mermaid swimming and introduced
water safety and confidence in a way that didn’t feel like learning. Ralston Out of School
Care took children for swimming sessions which helped to keep them active during the
holidays. They also provided a day trip to Millport and for some of the children this was a
very exciting experience as they had never been to the beach before. 
Home-Start visit to St Mirren football stadium

Page 49

Summer of Fun 2025 Evaluation Report  37
PUBLIC
However, there is also feedback to suggest that as well as providing accessible and
affordable activities, the programme also helped to create connections, reduce social
isolation, with families often supporting each other. By helping to alleviate financial
pressure and offering respite to parents and guardians, the programme also supported
improvements in mental wellbeing. 
The programme not only provided fun and connection but also strengthened relationships
between families, volunteers and staff. It helped reduce isolation, supported mental wellbeing. 
Home-Start Renfrewshire and Inverclyde 
Fantastic opportunity for charities and community groups to be able to facilitate such
activities. It makes a huge difference to be able to make offers like this free to all. It removes
any stigma and helps to attract harder to reach people who may feel like they have barriers to
creative access. It also helps to spread good awareness about what we are providing locally.
It’s nice to know that you are part of a wider Renfrewshire collective providing free summer
activities. There are plenty of other ‘high cost’ activities out there for people who can afford it. 
Erskine Arts 
In some cases the benefits of participating in the programme have lasted beyond the
summer, with STAR Project noticing that some families that bonded during trips have
continued these connections, with new friendships developing between people who had
never met before.

Page 50

Summer of Fun 2025 Evaluation Report  38
PUBLIC
CREATE Paisley also found that the programme encouraged families to sustain their
involvement once the summer activities came to an end. 
The Family Club was a new initiative for us and worked really well. We offered toast, teas and
coffees and a space for parents/guardians to connect. We found this group was just as
important for parents/guardians as it was for the young people and we were thrilled with the
warm feedback from all participants. All the families were keen to join the new Family Zone
group (funded by Local Partnership funding) after the holidays. 
Paisley St George’s Church reported that the programme offered benefits for the wider
community in providing a valuable opportunity to engage volunteers of all ages. 
They were very motivated by the opportunity to contribute and have such a positive impact on
children in our community. The importance of volunteers in delivering these types of activities
free of charge for children who may not otherwise have these experiences, cannot be
overstated.     
Outdoor crafts with Brick Lane Music Academy and fun with musical
instruments at Gallowhill Community Centre

Page 51

Summer of Fun 2025 Evaluation Report  39
PUBLIC
Suggested improvements to the small grants programme
There are always ways in which we can improve upon our design, development and delivery
of the summer programme. Similarly to last year, the most common comments from
projects related to additional funding and having funding decisions made earlier. 
Organisations were positive about communication with council officers, however the
timescales between being awarded funding and delivering the programme of activities was
raised again as an issue. Several organisations suggested that earlier confirmation of
funding would have given them more time to plan and advertise activities, to get venues
booked. Having funding decisions made as early as possible would also enable
organisations to liaise with partner organisations, including schools, nurseries and health
visitors to maximise the impact of the programme for families that would benefit most. 
The funding announcement came in the final week of the school term which meant that our
programme had to be ready in a very tight timescale and couldn’t be marketed as widely as
we would have hoped so this could be looked at for future. 
Active Communities
Additional funding would help organisations to expand their activities, offer a wider range of
activities or offer free spaces to more families. The demand for activities often exceeded
what organisations were able to supply, evidenced by how quickly sessions were booked
up. Most of the organisations would like to offer more sessions but need more funding to do
this due to increasing costs for staff and overheads and are concerned that they may have to
scale back provision in future. Day trips were particularly popular, however the cost of bus
hire limits the number of families that these can be offered to.
The STAR Project supplemented their funding award with their own resources, volunteer
contributions, and in-kind donations to ensure that activities still went ahead. 
The funding was very positive and allowed us to provide free, accessible activities for
families who really benefited from them. One area for improvement could be to provide the
funding decisions earlier, which would give more time for planning and promotion. Having
the option for slightly increased or more flexible funding would also help us reach more
families and offer a wider variety of activities. Overall, the support was very valuable and
much appreciated.        
Stronger Communities Glenburn

Page 52

Summer of Fun 2025 Evaluation Report  40
PUBLIC
One organisation suggested that funding transport costs would allow them to support
families with mobility issues and thereby prevent exclusion of these families from
participating in the summer programme.
A small number of families from more remote parts of Renfrewshire or those without transport
struggled to attend. Exploring funding for travel support or outreach delivery could increase
reach and inclusion.          
Just Dive In
Another suggestion was to improve promotion of the programme to ensure that those who
are digitally excluded or new to the community can easily discover what activities are
available, for example, providing information about the programme in multi-language
posters.   
5. Conclusions 
The Summer of  Fun programme aimed to deliver free, fun activities over the summer
holidays for communities that might be underserved by mainstream activities, and
particularly low-income families. Feedback suggests that the programme was able to reach
these families, particularly those who are in the child poverty priority groups.  The majority
of families that attended the holiday camps were lone parents, while over a third of families
had 3 or more children. Feedback from the small grants funded projects showed that they
had also managed to reach families in all child poverty priority groups through their
activities. The ASN playscheme supported children who have complex needs, and free
transport for this provision was welcomed by families. The Promise Champs activities
supported those who are care experienced, to develop new skills and build friendships. 
While we don’t have exact figures, we estimate that around 9,000 people, mainly children
but also their families benefitted from the programme that provided a range of benefits for
children and their parents/carers including:
• providing accessible, free and fun activities that low-income families could access
• helping to reduce financial costs for families
• providing a safe environment for children and young people to socialise and learn
new skills 
• having a positive impact on parents and children’s mental health through creating
connections and offering respite
• encouraging new people to engage with services

Page 53

Summer of Fun 2025 Evaluation Report  41
PUBLIC
It also provided access to food, activities and advice, providing support in a dignified
manner which reduced the potential for stigma. 
Whilst the summer camps and ASN provision were successful in benefiting children and
young people from low income families, feedback indicated that some families did not turn
up due to alternative plans or illness, and spaces were left usused. Although prior to this
year’s programme we had worked with the Fairer Renfrewshire Lived Experience panel to try
and reduce the number of ‘no shows’ there is still some work to be done in this area to
maximise attendance and ensure families benefit from the provision. 
Whilst the Community Programme was successful in helping to meet demand from local
families for inclusive, affordable summer activities, it is important to take into account
feedback from organisations that could improve a future programme. Earlier confirmation
of funding would give organisations more time to plan and promote activities, and to liaise
with partner organisations to maximise the impact of the programme for families. 
Renfrewshire Council’s programme of inclusive, accessible summer activities has become
an important and eagerly anticipated part of summer, evidenced by the demand for
activities and the feedback from organisations, parents and children. 
Additional funding across the programme would increase capacity to meet demand and
allow a wider range of activities, benefitting more families and maximising the positive
impacts that this programme brings.

Page 54

Summer of Fun 2025 Evaluation Report  42
PUBLIC   
Building confidence in the water with Just Dive In

Page 55

Summer of Fun 2025 Evaluation Report  43
PUBLIC
6. Appendix 1 – Organisations which received Summer of
Fun small grants 
Active Communities
Brick Lane Music Academy
CREATE Paisley 
Erskine Arts
Home-Start Renfrewshire and Inverclyde
Johnstone Castle Learning Centre
Just Dive in CIC
KLAS Care CIC
Moorpark Community Association Cherrie Children’s Daycare
Paisley St George’s Church of Scotland
Ralston Out of School Care
Renfrewshire Rainbow Buddies
Renfrewshire Women’s Aid
STAR Project
St Mirren FC Charitable Trust
Stronger Communities Glenburn
The Art Department 
Thorn Athletic Community Trust
Twist and Hit Cheerleaders
One Ren Libraries

Page 56

Summer of Fun 2025 Evaluation Report  44
PUBLIC
to all of the organisations who provided feedback, quotes, photographs and video links for this report 
Chief Executive’s Service 
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR

Page 57

PUBLIC
Appendix 2 – Winter Connections Approved Applications 
Organisation  Area Purpose Funding
approved
Howwood
Community
Council
Howwood Winter Warmers  £2,000
Houston
Community
Council
Houston Houston Community Film Shows  £1,571
Johnstone
Castle
Learning
Centre
Johnstone Youth Sessions and Adult
Activities
£2,000
KLAS Care
CIC
Linwood Whole Family Fun  £1,417.80
Loud n Proud Paisley The Wednesday Club  £2,000
Our Place
Our Families
Renfrew  Soup for You  £1,800
CREATE
Paisley
Paisley and
Johnstone 
CREATE Winter Drop-ins  £1,820
Local Energy
Action Plan
(LEAP) SCIO
Lochwinnoch Community Cooking  £2,000
Erskine Arts Erskine Soup Sessions  £2,000
Renfrew
YMCA 
Renfrew Tuesday Soup Social  £2,000
Foxbar
Elderly Forum
Paisley Foxbar Elderly Forum
.
£2,000
Friends of
Howwood
Park
Howwood The Tuesday Club  £2,000
Paisley
Methodist
Church 
Paisley  Saturday Get Together  £2,000
St Vincents
Hospice
Howwood Winter Connection  £1,880
The Thursday
Club
Paisley Thursday Club  £2,000
Re:Hope Next
Generation
Bible Church
Paisley Re: Play – Parent & Toddler Stay
and Play 
£1,647
Dates-n-
Mates 
Paisley Dates-n-Mates Renfrewshire  £1,830
Creation
Corner
Johnstone Crafts and Connections £235
Just Dive Paisley Once Upon a Winter Swim £1,850
Total   £34050.80

Page 58

No embedded text on this page.

Page 59

OFFICIAL 
Fairer Renfrewshire Action Plan
VERSION 1.01 – NOVEMBER 2025

Page 60

OFFICIAL
Contents
Introduction .......................................................................................................................................................................................................... 2
About the Fairer Renfrewshire Action Plan .............................................................................................................................................................. 3
National Context ............................................................................................................................................................................................ 4
Local Context ................................................................................................................................................................................................ 4
Themes and priorities ............................................................................................................................................................................................ 1
Improving Financial Security .............................................................................................................................................................................. 2
Where we are now .......................................................................................................................................................................................... 2
Strategic actions ............................................................................................................................................................................................ 2
Improving Financial Security: Actions ..................................................................................................................................................................... 3
Strengthening health, wellbeing and community ................................................................................................................................................. 6
Where we are now .......................................................................................................................................................................................... 6
Strengthening health, wellbeing and community: Actions ......................................................................................................................................... 7
Embedding equality and inclusion .................................................................................................................................................................... 10
Where we are now ........................................................................................................................................................................................ 10
Strategic actions .......................................................................................................................................................................................... 10
Embedding equality and inclusion: Actions ........................................................................................................................................................... 11
Using insight and evidence for impact .............................................................................................................................................................. 13
Where we are now ........................................................................................................................................................................................ 13
Strategic actions .......................................................................................................................................................................................... 13
Using insight and evidence for impact: Actions ...................................................................................................................................................... 14

Page 61

OFFICIAL
Introduction
Renfrewshire Council is committed to making Renfrewshire a fairer place to live, where every individual and family can thrive. This Action Plan sets
out how we will work with partners, communities, and national agencies to tackle inequality and improve outcomes for those most affected by
poverty and exclusion.
Fairness is at the heart of our vision for Renfrewshire. To achieve this, we will focus on how we work together, not just what we deliver—building
stronger partnerships, listening to lived experience, and embedding inclusive approaches across all services. We aim to design our services to suit
the reality experienced by the people who use them, not around our service needs. Renfrewshire will be fairer when everyone has equal access to
opportunities, support, and resources to thrive—regardless of their background or circumstances.
We have been progressing the Fairer Renfrewshire programme now for several years – in response to feedback from local stakeholders, we have
collectively taken the opportunity to reflect on progress and to sharpen our focus and priorities.
Our Priorities
Over the next two years, we will concentrate on four strategic priorities:
• Improving Financial Security
Helping households maximise income, reduce costs, and access early help to prevent crisis.
• Strengthening Health, Wellbeing and Community
Supporting families and communities through sustainable models of care, food security, and place-based approaches.
• Embedding Equality and Inclusion
Ensuring services are accessible, inclusive, and shaped by the voices of those who are often unheard.
• Using Insight and Evidence for Impact
Harnessing data, feedback, and lived experience to drive better decisions and deliver measurable change. 
Our Approach
This plan is built on collaboration, with communities, partners, and services, and underpinned by five cross-cutting principles:
• Joined-up working across sectors.
• Data and evidence to inform action.
• Access and inclusion for all.

Page 62

OFFICIAL
• Sustainability in funding and delivery.
• Trust and transparency through genuine engagement. 
Together, we will turn insight into action, strengthen resilience, and create a Renfrewshire where fairness is not just an ambition, but a reality.
About the Fairer Renfrewshire Action Plan 
The Fairer Renfrewshire Action Plan sets out a clear and coordinated approach to tackling inequality and improving outcomes for our communities
between December 2025 and June 2027. It provides a strategic framework for action, bringing together priorities and activities that will make a
measurable difference to the lives of local people.
Fairer Renfrewshire is the umbrella for work across Renfrewshire Council and our partners to create a fairer, more inclusive Renfrewshire. It
combines targeted projects, commissioned services, and everyday practice that embeds fairness into how we deliver services. While the Council
leads this work, success depends on strong collaboration with partners across sectors—and this plan reflects that shared commitment.
Fairness is a principle that runs through all of Renfrewshire’s strategic plans and partnerships. This Action Plan does not replace those plans but
complements and connects them, ensuring alignment and avoiding duplication. Where actions sit within other programmes, this plan signposts and
supports them.
The plan has been shaped through engagement with the Fairer Renfrewshire Sub-Committee, Officer Group, Lived Experience Panel, and other key
stakeholders. As we move forward, our focus is on:
• Coordinating existing resources to maximise impact.
• Embedding successful projects into business-as-usual for long-term sustainability.
• Targeting Fairer Renfrewshire funding to drive system change and new ways of working.
• Leveraging external funding opportunities to strengthen delivery and resilience.

Page 63

OFFICIAL 
National Context 
Our work is shaped by Scotland’s national mission to tackle poverty
and inequality, supported by key strategies and legislation:
Best Start, Bright Futures
Sets out Scotland’s approach to eradicating child poverty through
targeted support for families.
Population Health Framework
Aims to address the root causes of ill health by promoting prevention
and collaboration across sectors.
Public Service Reform Strategy
Responds to rising demand and fiscal pressures by driving innovation
and efficiency in public services.
Community Wealth Building Bill
Seeks to enable communities to generate, retain, and circulate wealth
locally, reducing economic inequality.
Whole Family Wellbeing Initiative
Focuses on transforming family support services to provide holistic,
preventative help when and where it’s needed.
Local Context 
Fairness is embedded in Renfrewshire’s strategic priorities and
transformation programmes:
Council and Community Plans
Both plans place fairness and tackling inequality at the heart of local
decision-making.
Parental Employability Support
Delivered through Invest in Renfrewshire, supporting families to
access work and progress in employment.
Fairer Renfrewshire Funding
Provides targeted investment in projects addressing poverty and
exclusion.
Connected Communities Programme
A key transformation priority designed to strengthen relationships
between the Council and communities, making it easier for people to
access support and services, and embedding early intervention and
prevention.

Page 64

OFFICIAL
Themes and priorities
A clear message from our engagement has been that how we work together to make Renfrewshire fairer is just as important as what we deliver.
Achieving this ambition requires system change that goes beyond individual projects or short-term investments.
Throughout our conversations, several cross-cutting themes have emerged. These principles underpin all priorities and actions in this plan:
• Joined-up working – Stronger coordination across health, housing, employability, and community engagement.
• Data and evidence – Better sharing and use of data, combined with lived experience, to inform decisions.
• Access and inclusion – Tackling barriers such as digital exclusion, transport, and language needs.
• Sustainability – Securing long-term funding and embedding preventative approaches.
• Trust and transparency – Ensuring communities are genuinely involved and see clear feedback on actions taken. 
The Fairer Renfrewshire Action Plan focuses on four strategic priorities that will guide our work over the next two years:
• Improving Financial Security – Helping households maximise income, reduce costs, and access early help.
• Strengthening Health, Wellbeing and Community – Supporting families and communities through sustainable models and place-based
approaches.
• Embedding Equality and Inclusion – Making services accessible, inclusive, and shaped by diverse voices.
• Using Insight and Evidence for Impact – Harnessing data and lived experience to drive better decisions and measurable change. 
This report sets out each priority in detail, alongside the strategic actions and specific steps we will take to deliver them.

Page 65

OFFICIAL
Improving Financial Security
This priority focuses on supporting households to increase income and reduce essential costs, tackling the root causes of
poverty. Many actions in this theme build on Renfrewshire’s long-standing commitment to addressing poverty, alongside recent
coordinated efforts to mitigate the impact of the cost-of-living crisis.
Where we are now
Renfrewshire has a strong network of services across the public and third sectors aimed at improving financial security, with innovative interventions
for priority groups. These efforts deliver real impact—local advice services helped put over £17 million back into residents’ pockets in 2024/25.
However, demand continues to rise, and services can be oversubscribed. Residents tell us that navigating support can be challenging, as provision
is fragmented and sometimes tied to short-term funding. This lack of coordination means people don’t always get the right help at the right time. 
Strategic actions 
Improve access to
income advice and
support
Drive uptake and
access to welfare
benefits
Reduce financial
crisis and insecurity
Address barriers to
employment
Develop ‘poverty
proofing’
approaches
Develop ‘early help’
approaches to
supporting
households

Page 66

OFFICIAL
Ref What we will do Owner Due  What success looks like
Improving Financial Security: Actions
Improve access to income advice and support
1.1 Ensure the provision of money and benefits advice  Connected Communities
Advice Works
Advice Partnership
Renfrewshire
Jun
2026 
External Advice Services Contract in place
Measure: Income maximised (Client
financial gain measures) and debt under
management across key providers 
1.2 Coordinate Advice Partnership Renfrewshire to
streamline provision 
Connected Communities
Advice Partnership
Renfrewshire
Dec
2026
6 x meetings held per year and meeting
actions 
Impact measures to be developed and
monitored
1.3  Identify need and increase outreach for advice services  Connected Communities  Jun
2026 
Measure: Number and location of outreach
sessions, client numbers, client financial
gain, debt managed
1.4 Promote Family Advice Pathway across Council
services and Advice Partnership
Connected Communities
Advice Partnership 
Jun
2026 
Measure: Increase in numbers of
services/organisations referring. Increase
in numbers using family advice 
1.5 Continue targeted income maximisation for low-
income families with children 
Connected Communities
HSCP 
Dec
2026 
Evidence of service reach to priority
families groups
Drive uptake and access to welfare benefits 
2.1 Co-ordinate and support activities to drive uptake of
welfare benefits provided by DWP and Social Security
Scotland, with a particular focus this year on the new
two-child limit payment
Connected Communities  Sep
2026
Campaign schedule developed and shared
with partners
Measure: Numbers receiving support to
claim, and in receipt of, two-child limit
payment 
2.2 Drive uptake of local authority administered supports,
including free school meals and clothing grants
Connected Communities
Finance and Resources 
Sep
2026 
Measure: Numbers claiming Free School
Meals/School Clothing Grants. Numbers
receive Free School Meals/School clothing
Grants

Page 67

OFFICIAL
2.3  Explore further opportunities for automation and
passporting of benefits 
Finance and Resources  Jun
2027 
Uptake of selected benefits 
Reduce financial crisis and insecurity
3.1 Strengthen Food Support Forum and coordination of
community food initiatives. 
Connected Communities  Jun
2026 
Meetings held and meeting actions 
Food support indicators identified and
measured.
3.2 Further understanding and development required to
improve pathways and supports for those in financial
crisis – especially due to chronic low income 
Connected Communities  Dec
2026 
Mapping of financial crisis supports, 
pathways produced and numbers
accessing pathways
3.3 Provide energy advocacy and support to Renfrewshire
residents to reduce fuel costs 
Environment, Housing and
Infrastructure
Dec
2026 
Measure: Client numbers and outcomes
(energy debt write off, energy savings) 
3.3 Work with partners across Renfrewshire to identify and
promote sources of energy advice across partners
Connected Communities  Sep
2026 
Information collated and communicated
through networks
3.4 Work with partners to increase referral from other
Foodbank referrers to Foodbank to simplify client
journey
Connected Communities
Advice Partnership
Renfrewshire
Dec
2026
Increased referrals from organisations
other than Advice Works and Renfrewshire
CAB and subsequent reduction in referrals
from those organisations. Client feedback 
Address barriers to employment
4.1 Support parental employability and progression in
work. 
Invest in Renfrewshire 
Local Employability
Partnership
Dec
2026 
Measures reported through LEP (client
numbers, no securing employment, no
achieving qualifications) 
4.2  Identify and reduce barriers for those needing
additional support to move into and progress in work,
across groups identified by the Local Employability
Partnership 
Invest in Renfrewshire 
Local Employability
Partnership
Dec
2026 
Measures reported through LEP
(client demographics and commissioned
supports) 
4.3 Ensure development opportunities are delivered for
staff to encourage continuous improvement and focus
on Fairer Renfrewshire principles
HR-OD June
2026
Information sessions for staff delivered
Materials developed and cascaded

Page 68

OFFICIAL
Develop ‘poverty proofing’ approaches 
5.1 Continue to deliver the Cost of the School Day fund
across Renfrewshire schools 
Children’s Services 
Connected Communities 
Dec
2026 
Annual evaluation
Feedback from schools
5.2  Explore the potential to expand the Cost of the Nursery
Day pilot
Health and Social Care
Partnership 
Jun
2026
Measure: Number of nurseries and early
learning and childcare centres engaged
Develop ‘early help’ approaches to supporting households
6 Develop ‘early help’ approaches to supporting
households
Connected Communities  June
2026
New model identified

Page 69

OFFICIAL
Strengthening health, wellbeing and community
This priority focuses on actions focussed on strengthening health, wellbeing and community, recognising the impact of inequalities on
people’s lives. It recognises that wellbeing is shaped by more than healthcare; it depends on strong local networks, accessible services, and
opportunities for people to thrive.
Where we are now 
Renfrewshire has a strong track record of delivering coordinated programmes that tackle complex issues. The recent Alcohol and Drugs Change
Programme is a powerful example of how targeted investment and partnership working can achieve lasting system change. More recently, we have
introduced community-led approaches to understanding local needs, making promising steps towards a more collaborative model of working with
communities.
However, health inequalities remain persistent, and evidence shows that outcomes for some groups are worsening.
We know that different communities need different solutions, and a one-size-fits-all approach will not work.
Strategic actions  
Agree sustainable models
for delivery of key Fairer
Renfrewshire projects
Build community
resilience and capacity
Deliver key actions within
Renfrewshire’s Community
Learning and Development
Partnership Plan aligned to
Fairer Renfrewshire
Deliver targeted
interventions to improve
wellbeing and reduce
health inequalities
Develop place-based
joined up working and
information sharing

Page 70

OFFICIAL
Strengthening health, wellbeing and community: Actions
Agree sustainable models for delivery of key Fairer Renfrewshire projects
7.1 Review Breakfast Club provision and develop a
consistent and sustainable model of provision  
Connected
Communities
June 2026  Future model identified to help bring
consistency across provision
7.2 Develop sustainable models for the delivery of summer
holiday activities for children and young people from low-
income families
Connected
Communities
Sep 2026 Measure: Number of participants and
partners
Measure: Evidence of reach to priority
family groups 
Partners and participants report
improved outcomes
7.3 Consider longer-term sustainable service delivery
options for the Skoobmobile project
Connected
Communities
OneRen
June 2026  Future model identified
7.4 Review Peer Health (Hearty Lives) project and consider
longer-term sustainable service delivery options
Connected
Communities
Active
Communities 
June 2026  Future model identified
Build community resilience and capacity
8.1 Deliver a Good Food Nation Plan in line with Scottish
legislation
Connected
Communities 
Fair Food
Renfrewshire
Dec 2026 Renfrewshire plan produced and
approved
8.2 Develop sustainable models for supporting community
connection through the winter period, considering
longer-term model for Winter Connections programme
Connected
Communities
Mar 2027 Measure: Number of participants and
partners
Measure: Evidence of reach to priority
family groups
Partners and participants report
improved outcomes
8.3 Continue Community Development work in Gallowhill
and work with Council Services to support identified
community needs 
Connected
Communities
Dec 2026 Action Plan developed in response to
Community Needs Assessment

Page 71

OFFICIAL
Measure: No of residents involved in
design and delivery of action plan 
Community feedback 
Deliver key actions within Renfrewshire’s Community Learning and Development Partnership Plan aligned to Fairer Renfrewshire
9.1 Improve promotion and increase numbers attending
Adult and Family Learning provision
Connected
Communities -
CLD
June 2026  Measures reported through CLD Plan
Measure: Numbers attending, client
outcomes
9.2 Expand the provision of English Speakers of other
Languages (ESoL)   
Connected
Communities -
CLD
June 2026  Measures reported through CLD Plan
Measure: Numbers attending, client
outcomes
9.3 Review of youth provision across Renfrewshire, in
particular the provision of supports for young people with
high risk and/or distressed behaviours
Connected
Communities -
CLD
June 2026  Future model identified
Deliver targeted interventions to improve wellbeing and reduce health inequalities
10.1 Continue to deliver the Whole Family Wellbeing service
as part of approach to joined up, early intervention
support for families
Children’s
Services 
June 2027  Measures reported through Whole
Family Wellbeing service
10.2 Support child health and development through early
intervention, to include focus on children and young
people’s mental health 
Health and Social
Care Partnership 
Whole Family
Wellbeing 
Dec 2026  Joint actions identified 
10.3 Deliver the Health and Wellbeing Survey Action Plan Health and Social
Care Partnership
Dec 2026  Action plan produced and reported on
10.4 Pilot embedding the ‘Ask and Act’ duties around
homelessness across public and community services
and develop supporting resources
Health and Social
Care Partnership
Community
Planning
Partnership
Dec 2026 A proactive, person-centred approach
to housing and wellbeing is embedded
across Renfrewshire HSCP and its
partners
10.5 Examine mechanisms to better engage with local
Housing Associations with a view to improving housing
conditions across Renfrewshire.
Housing
Connected
Communities
Mar 2027 Improved engagement with Housing
Associations. Opportunities for
Housing Associations to hear voice of
lived experience.

Page 72

OFFICIAL
Develop place-based joined up working and information sharing 
11  Develop place-based joined up working and information
sharing 
Connected
Communities 
Dec 2026 Future model identified

Page 73

OFFICIAL
Embedding equality and inclusion 
This priority focuses on embedding equality and inclusion across all services and projects, ensuring fairness is not an add-on but a core
principle in everything we do. It aims to create systems and practices that remove barriers and enable every resident to access support and
opportunities.
This is a new and developing workstream within the Fairer Renfrewshire programme, and many of the actions will need further development
as part of the Council’s wider work to develop our corporate Equalities Outcomes. 
Where we are now
We have begun important work to better understand the needs of equalities communities in Renfrewshire. This insight will form the foundation for
actions across all themes in this plan. Renfrewshire benefits from strong networks and structures that amplify the voices of lesser-heard groups, and
these will be central to shaping our approach.
However, our communities are changing. We need to ensure we are meeting current needs, addressing gaps, and planning for the future. For
example, the New Scots Needs Assessment is underway to inform our strategic approach to supporting refugees and asylum seekers. We also
recognise emerging concerns around community cohesion, which require proactive engagement and inclusive solutions. 
Strategic actions 
Promote digital inclusion and
connectivity
Strengthen voice and
influence for lesser-heard
groups
Respond to changing
community needs
Ensure services are inclusive
and accessible

Page 74

OFFICIAL
Embedding equality and inclusion: Actions 
Promote digital inclusion and connectivity 
12.1 Continue to support Digital Champions
Programme to expand reach 
Citizens Voice Dec 2026  Measure: Number of digital champions
Measure: Number of people accessing
support and upskilling
Measure: Number of volunteer hours
12.2 Expand DigiZones as a mechanism to access
free devices, support and connectivity in line
with Digital Strategy 
Citizens Voice Dec 2026  Measure: Number of DigiZones
Measure: Numbers accessing
DigiZones
12.3 Support Device Recycling Pilot Citizens Voice Sept 2026 Measure: Number of Devices donated
Measure: Number of devices
redistributed
Measure: Volunteer Hours
Measure: Numbers upskilled
12.4 Identify and develop new supports for those
who are digitally excluded including in relation
to skills development, online safety and wider
barriers such as affordability.
Citizens Voice Mar 2027  New supports identified 
Strengthen voice and influence for lesser-heard groups
13.1 Review and refresh the membership and
purpose of the Diversity and Equality Alliance in
Renfrewshire (DEAR)
Connected Communities Jun 2026 Refreshed terms of reference 
13.2 Develop a small grant programme to
commission local organisations who engage
with/represent equalities groups to share the
experiences and perspectives of diverse groups.
Connected Communities Sep 2026  Launch of programme 
Measure: Number of partners
supporting programme 
Respond to changing community needs
14.1 Complete New Scots Needs Assessment  Strategy, Policy & Insight  Feb 2026  Needs Assessment complete
14.2 Support development of information pack for
New Scots, which is accessible for all
Strategy, Policy & Insight
Connected Communities
Jun 2026  Information pack produced 
Community feedback

Page 75

OFFICIAL
14.3 Develop New Scots Action Plan for
Renfrewshire
Connected Communities June 2026 Action plan developed with clear
milestones and resources allocated by
partners to support its delivery.
14.4 Consider further programme of work to better
understand barriers and experiences of
disabled residents 
Connected Communities Dec 2026 Programme of research complete with
opportunities identified.
Ensure services are inclusive and accessible
15.1 Analyse and respond to equalities outcome
consultation and develop a SMART action plan
Connected Communities  Feb 2026  Action plan produced and reported
15.2 Identify available supports, including
community services, for people, both digital and
physical and work with stakeholders to develop
an awareness campaign
Connected Communities  Sept 2026  Available supports mapped and
communicated 
Practitioner and community feedback 
15.3 Work with services on more inclusive
communications in line with Residents
Research findings 
Connected Communities  Dec 2026  Examples of improved
communications

Page 76

OFFICIAL 
Using insight and evidence for impact 
This priority focuses on turning data, evidence, and lived experience into action that improves outcomes for local communities. It builds on
successful approaches such as our Cost of Living dashboard and aims to strengthen collaboration across services and partners to share and
use data effectively.
Where we are now
We have demonstrated the power of targeted data use, for example, increasing uptake of holiday provision among low-income families and driving
pension credit claims by using housing benefit data.
We have also developed innovative models of participation, embedding lived experience in policy and practice. Our goal is to expand these
approaches across different communities and services.
Data sharing and interpretation can be complex—even within our own organisation—and even more so with partners. National datasets often lack
the local detail we need, making it harder to plan and deliver services at ward or community level.
We’ve had clear feedback from communities that they want to see genuine engagement and feedback mechanisms when working with the Council,
and we recognise that for some communities we need to work on building trust and openness. 
Strategic actions 
Improve data sharing and
integration
Use insight to drive targeted
action Build a culture of learning

Page 77

OFFICIAL
Using insight and evidence for impact: Actions
Improve data sharing and integration 
16.1 Develop Cost of Living dashboard and
strengthen partnerships for data exchange
Connected Communities June 2026  Dashboard produced and
shared regularly
16.2 Consider where developments in Artificial
Intelligence might support the way we use
data and systems
Finance and Resources Mar 2027  AI workstreams and
projects considered with
‘Fairer Renfrewshire’ lens 
Use insight to drive targeted action
17.1 Apply learning from lived experience and
practitioner feedback to shape services, with
a focus on customer facing services
Connected Communities
Fairer Renfrewshire Officer
Group
Dec 2026  Feedback at Fairer
Renfrewshire Officer
Group 
17.2 Ensure communities see how their input
influences decisions
Connected Communities
Communications,
marketing and events
Mar 2027 Feedback mechanisms
developed 
Community feedback 
17.3 Continue to embed lived experience and
lesser heard voices as part of corporate
approach to consultation and engagement 
Strategy Policy & Insight 
Connected Communities 
Dec 2026  Measure: Number of
people engaged in
consultation and
engagement activity, and
demographics
17.4 Ensure the voice of young people are captured
and acted upon, including Care Experienced
Young People
Childrens Services
Connected Communities
Mar 2026 and ongoing Measure reported through
Children’s Service
Partnership Plan
Build a culture of learning
18.1 Share best practice across services and
partners to improve consistency
Connected Communities Mar 2027  Feedback at Fairer
Renfrewshire Officer
Group
18.2 Consider the development of ‘No Wrong Door’
type network to support colleagues and
partners to share knowledge and learning  
Connected Communities Mar 2027 Feedback at Fairer
Renfrewshire Officer
Group
18.3 Introduce a Fairer Renfrewshire Champions
Network for staff to act as local advocates for
Connected Communities
HR/OD
December 2026 Group set up/outcomes of
meetings

Page 78

OFFICIAL
fairness and inclusion within services,
supporting cultural change and engaging with
the Fairer Renfrewshire Panel/other voice
groups, eg. DEAR
Increase Transparency
19.1 Work with the Fairer Renfrewshire Panel to
build an enhanced Dashboard so the public
can easily see how Renfrewshire is performing
across measures such as customer service
and housing.
Connected Communities Mar 2027  Dashboard developed and
online