___________________________________________________________________
To:  Leadership Board
On:  18 June 2025
___________________________________________________________________
Report by:  Chief Executive 
___________________________________________________________________
Heading: Council Plan 2022/27 – six monthly progress update
___________________________________________________________________
1. Summary 
1.1 In September 2022, the Council approved a new Council Plan for
Renfrewshire, which set the strategic direction and vision for Renfrewshire,
covering the period 2022 to 2027. In order to best reflect the current context, a
refreshed plan was approved by Leadership Board in June 2024, alongside
an updated performance framework. 
1.2 The Council Plan sits alongside Renfrewshire’s Community Plan. This covers
the longer period of 2017 to 2027, but was revised in 2022 to consider how to
respond to and recover from the unique challenges over the last few years.
The Community and Council Plans are closely aligned, ensuring that the
Council’s role in delivering a wide range of community outcomes is clearly
understood. 
1.3 The Council Plan sets out five strategic outcomes which the Council will work
towards, grouped as Place, Economy, Fair, Green, and Living Our Values.
Additionally, the Plan outlines a cross-cutting theme of improving outcomes
for children and families, which underpins the delivery of the five strategic
outcomes. 
1.4 Alongside this, each Council service prepares a Service Improvement Plan,
themed around the Council Plan’s strategic outcomes, demonstrating how
each service will contribute to the delivery of the Council Plan. Progress is
regularly scrutinised by the relevant Policy Boards.

Page 2

1.5 The reporting framework for the Council Plan includes an action plan and
performance scorecard, and is reported to Leadership Board biannually,
which ensures actions are adaptable to any emerging national or local
changes in circumstance while delivering agreed outcomes. This update
report covers the 37 high level actions and 34 performance and data
indicators in the Council Plan.   
1.6 This report provides an update on progress made in the six months since the
last update to Leadership Board in December 2024. Council services have
continued to make good progress in terms of delivering against the five
strategic outcomes and cross-cutting theme, as outlined in section 4 of this
report. A detailed summary of progress against the action plan and key
performance indicators is provided in Appendix 1. 
2.  Recommendations 
2.1 It is recommended that members of the Leadership Board:
• note the progress achieved since December 2024 in terms of Council Plan
delivery; and
• note that progress reports will continue to be presented to the Leadership
Board every 6 months with the next update scheduled in December 2025. 
3. Background 
3.1 Our Council Plan 2022-2027 was refreshed in mid 2024, in order to ensure
that this was reflective of the current context in which the organisation is
operating.  Priority actions and indicators were also reviewed and refined at
that time to ensure a stronger focus on key areas of delivery. 
3.2 The Council’s vision to 2027, as described in the Council Plan is ‘Creating a
fairer Renfrewshire built on innovation, wellbeing, and opportunity’. The five
strategic outcomes which the council is working with partners, communities,
and businesses to deliver are:
• Place: working together to enhance wellbeing across communities;
• Economy: building an inclusive, green, and resilient economy;
• Fair: nurturing bright, happy, and healthy futures for all;
• Green: leading Renfrewshire to Net Zero; and
• Living Our Values: making a difference together.   
3.3 Each of these outcomes is being delivered in a way that directly contribute to
the cross-cutting theme - Improving outcomes for children and families. Within
the appendix, actions which significantly contribute to this cross-cutting theme

Page 3

are highlighted with a ‘CF’ and there is a section in the performance scorecard
with indicators relating to this theme. 
3.4 Council Plan activity also sits alongside the Council’s arrangements in relation
to progressing and achieving Best Value. Updates on our Best Value
arrangements are regularly reported to Board and there is also a dedicated
page on the Council’s website with copies of relevant reports, such as the
annual thematic audits of Leadership in 2022/23 and Workforce Innovation in
2023/24. The thematic review area for 2024/25 was Transformation – the
report by the Council’s external auditors, Azets, will be published later in the
year. 
3.5 Best Value activity since the previous update to Leadership Board has
included the publication of Azets’ interim follow up audit report on the
Council’s approach to community engagement and culture change. This was
reported to the Audit, Risk and Scrutiny Board in April 2025, noting that the
report was positive, with the auditors finding the Council has made good
progress, building on a range of existing good practice alongside refreshed
approaches. 
3.6 The Controller of Audit Best Value Audit report for Renfrewshire Council was
considered by the Accounts Commission on 15 May 2025, with the final
report, including the Commission’s findings, published on 5 June 2025. This
report, alongside the Council’s response, will be considered by Council on 26
June 2025. Any agreed actions will be incorporated into the Corporate
Improvement Plan with progress reported to Leadership Board as part of the
regular ongoing updates. 
3.7 The delivery of the Council Plan is also closely aligned with the Council’s
budget setting process, with the Council Plan setting the strategic direction
and framework, the budget clearly setting out the focus of the Council’s
financial spend, and the progress monitoring of the Council Plan, through
regular reporting to Leadership Board, demonstrating progress and impact.
This golden thread flows through to the Service Improvement Plan process,
where services report delivery of Council Plan strategic outcomes at a
service-level, again with a range of actions and performance indicators
designed to demonstrate impact. 
3.8 Linked closely to this is the new phase of the Council’s transformation
programme, Reshaping Renfrewshire. This programme links the Council’s
financial challenge, and the vision for our place as described through the
Council Plan, and explores how we can continue to develop how we work and
operate and ensure a financially sustainable long-term future, while
transforming our impact across Renfrewshire and improving outcomes for our

Page 4

communities. This phase of our transformation programme also has a sharp
external focus on the needs of our communities and to ensure our vital
services are financially sustainable for the longer term – again this is closely
aligned to the Council Plan. 
3.9 The refreshed Council Plan has been translated into Gaelic and is available
on the Council’s website – this was an action noted in the Gaelic Language
Plan 2024 to 2029 which was approved at Leadership Board in February
2024. Other key strategic documents will now be translated into Gaelic too, in
line with the approach outlined in the Gaelic Language Plan. The Council has
been invited by Bòrd na Gàidhlig to submit the Council’s Gaelic Language
Plan Monitoring Report – Annual Return 2024-2025. This will report on the
progress that Renfrewshire Council has made with the delivery on the
commitments contained in our Gaelic Language Plan 2024-2029. 
3.10 Sixteen actions from the Council Plan have been completed and three new
actions have been added to the Plan, relating to our Learning Estate
programme, our new Digital Strategy and consultation and engagement
programme. The previous action in relation to consultation and engagement
has been completed following approval of the new policy at the Leadership
Board in February 2025.  The new action reflects the implementation and
monitoring of this workstream. The Learning Estate work is under the Place
and the Digital and consultation work are under Living Our Values themes. 
3.11 Two existing actions have been augmented following recent activity, both
under living our values. 
Previous action  Updated action  Comment
Implement the next phase
of transformation through
the actions arising from the
Council’s financial
sustainability and
improvement workstreams 
Implement the next phase
of transformation through
the actions arising from the
Council’s financial
sustainability and
improvement workstreams
and the new Reshaping
Renfrewshire programme 
This reflects the
Council’s new phase 
of transformation
through Reshaping
Renfrewshire, as
agreed by
Leadership Board in
February 2025 and
reflects the alignment
of the transformation
programme with the
Council Plan. 
Deliver self-assessment
activity across the
organisation in line with
Deliver improvement activity
across the organisation in
This reflects that
whilst the initial
stages of this work

Page 5

revised best value audit
methodology 
line with revised best value
audit methodology 
from 2022/23 to
2024/25 had a focus
on self-assessment
through the
Corporate Self-
Assessment and the
Cultural Assurance
Model, following
these exercises and
the range of audit
activity, the focus
now shifts to
delivering the
improvements
identified during
these processes. 
3.12  Work has been undertaken to establish new performance indicators in relation
to People and OD activities, particularly to baseline completion of mandatory
training and personal development plans and new indicators have been
included in Service Improvement Plans for 2025/26. Once these baselines
have been established and targets agreed for corporate indicators, these will
also be included in the Council Plan performance framework. 
4. Progress of delivery of the Council Plan during 2024 
4.1 This section provides an overview of recent achievements, progress with
actions, and gives information on any areas of action where progress has
been delayed.   
Strategic Outcome 1: Place 
4.2 The Council’s 10-year Housing-Led Regeneration and Renewal programme is
continues to make good progress against key milestones.  The acquisition
and rehousing element is performing as planned and various phases of
demolition work are taking place as blocks become fully council-owned and
vacant. 
4.3 The Council continues to work with owners of prominent buildings in our town
centres to identify opportunities for regeneration.  Recent investments have
included the Liberal Club, St Matthew’s Church and County Place in Paisley. 
Other town centre work includes current work on designs for civic squares in
Erskine and Johnstone.  The Retail Improvement Scheme continues to

Page 6

operate, giving business owners across Renfrewshire the opportunity to
access funding to upgrade their shopfronts. 
4.4 A draft of our proposed new Transport Strategy – Travel Renfrewshire 2035 –
was issued for public consultation in November 2024.  The strategy has been
informed by considerable stakeholder engagement including online surveys,
workshops with community organisations and pop-up engagement sessions in
supermarkets.  It is anticipated that the finalised strategy will be ready for
approval in summer 2025. 
4.5 The Business Case for Smart Social Assets is now complete with the
organisation continuing to investigate potential national funding opportunities
via strategic partners such as Commsworld, CityFibre etc. In addition to this,
work is now underway to develop other business cases that would further
supplement Smart Social Assets ensuring citizens have access to affordable
cross-tenure homes that are digitally enabled and meet community needs. 
4.6 All of our Local Partnerships have now finalised their local priorities following
a review in autumn/winter of 2024/25.  As well as receiving presentations on
matters relevant to their community, the Partnerships have recently allocated
their grant funds for 2025/26 to support groups and communities in work that
benefits the local area and its people. 
Strategic Outcome 2: Economy 
4.7 The AMIDS joint venture is progressing well and in December 2024, another
major occupier was announced.  Ground has been broken for CPI’s
Oligonucleotide Manufacturing Innovation Centre (OMICE); CPI already
operate the Medicines Manufacturing Innovation Centre on the AMIDS site. 
Work is also continuing on the Tech Terrace development. 
4.8 A “Community Wealth Building in Renfrewshire” report was approved by the
Economy and Regeneration Policy Board in March 2025.  The report set out
the aims and principles of a community wealth building approach and how this
will be progressed in Renfrewshire across the five pillars of inclusive
ownership, finance, workforce, spending and land and property.  The local
approach is already reflected in the Council Plan, the Procurement Strategy,
and the Community Learning and Development Plan, as well as in ongoing
activity through support for local business and the Renfrewshire Community
Benefits Forum.  A Renfrewshire Community Wealth Building Conference is
being planned for Autumn 2025. 
4.9 Our employability programmes support around 1,800 people each year to
access skills development and progress towards qualifications and/or

Page 7

employment. For 2024/25, around 400 people were being supported with
another 491 having secured employment and over 600 gaining new
qualifications through the service 
Strategic Outcome 3: Fair 
4.10 During 2024/25, officers continued to work with partners to progress the Fairer
Renfrewshire Programme, ensuring that residents and communities are able
to benefit from targeted advice and support, particularly in relation to the
ongoing cost of living crisis.  This has included the establishment of new
schools and family advice provision, pension credit take up campaigns, and
support for the ongoing work programme of the Fairer Renfrewshire Lived
Experience Panel, which continues to go from strength to strength. 
4.11 The Alcohol and Drug Change Programme will draw to a close by summer
2025.  The Change Programme benefitted from £2m of Council funding to
deliver on recommendations arising from the Renfrewshire Alcohol and Drug
Commission.  That funding has supported tests of change across a range of
services, some of which have now been mainstreamed.  A full final report will
be presented to Leadership Board after the summer recess. 
4.12 Additional funding has been awarded by the Leadership Board to support
community development activity in Gallowhill, as part of our place-based
approach to tackling child poverty.  This will support the delivery of actions
identified through the community needs assessment and help the continued
expansion of community-led activity in the area. 
4.13 Successful programmes for both Summer of Fun and Winter Connections ran
in 2024/25.  Funding was allocated to 21 organisations to deliver free
activities over the school summer holidays including toddler play sessions,
sports, arts and crafts and day trips to visitor attractions.  This was in addition
to a full programme delivered by Community Learning and Development
which included the provision of a healthy meal alongside a ‘summer camp’. 
Our Winter Connections programme this year allocated £75,000 of funding
agreed by Council in its budget, to 42 different organisations and groups to
run activities and, where possible, provide hot drinks and snacks. 
Strategic Outcome 4: Green 
4.14 Priority projects to support our journey to net zero continue to be identified
and current work includes sustainable travel, the Local Heating and Energy
Efficiency Strategy (LHEES) and the development of a new Carbon
Management Plan.  The Council has already developed an initial carbon
budget with interim organisations targets covering the period until 2030/31.

Page 8

Identifying emissions by service area will be key to understanding how our
emissions relate to service delivery and help us to develop initiatives to
reduce these. 
4.15 An update on the Council’s Strategic Property Review was considered by the
Infrastructure, Land and Environment Policy Board in January 2025.  A
number of buildings have already been released in order to rationalise the
estate and optimise use of our built assets. 
4.16 The action to review opportunities within pipeline projects to align with a
transition towards green skills has been extended for one year, to allow for
work on phase 2 of the Plan for Net Zero and the identification of where the
skills gaps exist. 
4.17 Informing, educating and upskilling our communities to support them to
contribute to climate action remains a key priority. A Ren Zero community
engagement programme will be developed, led by the Sustainability Lead
(Stakeholder Engagement) which is currently being recruited. 
Strategic Outcome 5: Living Our Values 
4.18 In December 2024, Renfrewshire Council launched an innovative new
approach to self-assessment focused on organisational culture, known as
Renfrewshire’s Cultural Assurance Model (CAM). The CAM was first of its
kind within the Scottish public sector and was developed in partnership with
the Improvement Service and based on the Public Service Improvement
Framework. The first phase of the assessment involved a survey element for
participants which was completed in early 2025, the results were analysed by
Council and Improvement Service officers in advance of a series of
workshops which took place in late February and early March.  The findings
were very encouraging, with respondents reflecting on a very positive
organisational culture alongside some constructive areas for improvement to
explore further.  Five key actions were developed by CMT and have been
added to the Council’s overall Corporate Improvement Plan. 
4.19 In late 2024, the Council undertook an Employee Survey covering issues
including how people felt about the Council, their job and management,
wellbeing and key HR policies.  The survey was issued to all staff and 1956
responses were received.  There were many positive results, including in
relation to line management and job satisfaction.  Areas for improvement have
been identified and were reported to the Finance, Resources and Customer
Services Policy Board in February 2025. The findings from both the CAM and
the Employee Survey will be further considered and reflected on, as the
organisation continues to develop employee engagement, training

Page 9

opportunities etc – this links closely with the Workforce Planning Group, as
outlined in 4.21 below. 
4.20 A new Consultation and Engagement Strategy was approved in February
2025 and sets out standards and guidance for planning, conducting and
learning from public engagement. It is intended to support greater consistency
in the approach to public engagement, to promote data-sharing across the
Council, and to help build trust with communities and other stakeholders. 
Updates will be provided to the Leadership Board on a six-monthly basis. 
4.21 The People and OD team continue to lead on workforce planning and
innovation, supported by the Workforce Planning Group. This includes
progressing key priorities of the People Strategy, taking forward the
recommendations from the Best Value thematic audit.  The Workforce
Planning Group is working collaboratively with the Head of People and OD to
develop and implement a strategic approach to workforce planning and OD to
establish new key priority areas over the next 5 years.  A bi-annual report on
our People Metrics was presented to FARS Board on 13 February 2025 for
noting and monitoring.   
4.22 A report was submitted to Leadership Board in 2024 to update members on
the outcome of the evaluation of place brand activity over the past five years
and the findings of an independent review, and to recommend next steps for
place promotion. Officers from marketing and communications will work with
regeneration and economic development colleagues and wider place partners
to explore the six recommended areas of activity to help drive the marketing
of Renfrewshire in future. A further report will be submitted to Leadership
Board in the autumn to update on progress. 
4.23 How we meet the health and wellbeing needs of our employees is set out in
our Wellbeing Strategy.  Recent work has included additional and specialised
training for our Mental Health First Aiders, achieving our accreditation as a
Breastfeeding Friendly Scotland employer, creating a new staff network for
those affected by menopause, and continuing our collaboration with RCA
Trust to provide support, advice and training on gambling addiction. 
Cross-cutting theme: Improving outcomes for children and families 
4.24 Our partnership Whole Family Wellbeing service has supported over 1000
families so far.  We have trialled an ICT system which allows are third sector
partners to make referrals and record wellbeing information, which is
facilitating better data-sharing.  To date, the service is able to demonstrate
positive outcomes against a range of measures, including improved parental
understanding of the needs of the child, improved participation in/engagement

Page 10

with universal services, and improvements in family functioning and
relationships. 
4.25 A comprehensive report outlining the first five years of Renfrewshire’s work to
Keep the Promise was presented to the Education and Children’s Services
Policy Board in March 2025.  Renfrewshire Council’s Promise Keeper
Network has 362 Promise Keepers and work continues to support further
growth.  This approach has attracted national interest.  Three of
Renfrewshire’s Promise-funded projects were featured in March at a Promise
Partnership Event organised by CORRA.  The projects, the Youth Services
Led Grant Programme and the two Keep The Promise Funded Education
Projects, were showcased and shared learning with partners across Scotland. 
4.26 Priority projects within the Learning Estate Strategy are being progressed. 
The new Paisley Grammar Community Campus is beginning to transition to
the fit-out stage, and remains on target for delivery in 2026.  In March 2025,
the Education and Children’s Services Policy Board approved the
commencement of options appraisal for a replacement for Thorn Primary
School. 
5. Performance Indicators 
5.1 The Council Plan performance framework has 34 indicators, of which 21 have
targets; the remainder are data only.  Of the 21 indicators with targets, 5 are
meeting or exceeding the target, 4 are narrowly missing the target, 6 are
behind target and 6 do not yet have 2024/25 data available. Within the
attached appendix, there is a graphic which shows at-a-glance the overview
of performance by Council Plan strategic outcome.   
5.2 Areas of strong performance include: 
• Promoting Renfrewshire as a great place to live, work and visit with extensive
media reach for Council activity and local events.
• Helping our citizens back into work, with 288 people supported by our
employability service sustained in paid employment for at least six months; 
• The percentage of primary school children taking up their free school meal,
which is now at over 60% following menu changes and taster session to
encourage pupils to try the meals; 
• Keeping our looked after children in family settings wherever possible, with
91.6% looked after in the community;
• The percentage of FOI requests responded to within 20 working days met our
target of 90%, despite increasing volumes and complexity of requests in
recent years.

Page 11

5.3 We are narrowly missing our annual targets in relation to tariff scores for
school leavers, both for the cohort as a whole and for those living in areas in
the 30% most deprived as measured by SIMD.  We have also narrowly
missed our target for CO2 emissions from the public fleet. 
5.4 Areas for further improvement and development in 2025/26 include: 
• The poverty-related attainment gap for both literacy and numeracy, which
have both narrowed since the pandemic but remain above our target;
• The percentage of Council housing meeting Scottish Housing Quality
Standards, which is on an improving trajectory and increased from 68.5% to
79.9% this year;
• The number of business start-ups supported by Business Gateway, which
measures business launch rather than the range of support offered and is
therefore impacted the decision of local businesses as to when to launch;
• The percentage of Council procurement spend which is with businesses
headquartered in Renfrewshire, which is around 20% though the amount
spent with bordering authorities amounts to almost another 60% reflecting the
interconnectedness of the Glasgow City Region
• The amount of CO2 emitted by public lighting, which has levelled out as the
LED programme is largely complete;
• The percentage of household waste which is recycled, which is due in part to
changes in the types of disposal which can be classed as recycling;
• The percentage of frontline complaints dealt with within five days, with 63.5%
closed within five working days against our target of 85%. 
5.5 Alongside Council Plan and Service Improvement Plan performance scrutiny, 
we are also undertaking work to focus on strengthening our understanding
across the Local Government Benchmarking Framework, to align with the
new Statutory Performance Indicator Direction as set out by Audit Scotland
(and previously highlighted to Leadership Board in February 2025). A range of
LGBF indicators are included in the Council Plan performance framework and
are clearly identified in the attached appendix. Detailed reporting on the LGBF
is presented to the Audit, Risk and Scrutiny Board alongside our public
performance reporting interactive storymap which is published on the
Council’s website. 
6.  Focus for the next 6 months 
6.1 As noted above, the Council Plan was refreshed in summer 2024 in order to
hone our priorities further— recognising the challenges that our communities
continue to face and identifying the areas where we as a Council can help to

Page 12

make the biggest difference. We continue to consider the operating context,
the core areas of focus and the latest performance information and data,
when looking ahead to the next 6 months. 
6.2 Our areas of specific corporate focus for the next 6 months include: 
• Delivering the Reshaping Renfrewshire programme to support the financial
sustainability of the organisation;
• Progressing delivery of the Corporate Improvement Plan, continuing the
Council’s commitment to Best Value;
• Delivering the next phase of the Connected Communities model,
strengthening how we work alongside our communities;
• Implementing the Council’s new Consultation and Engagement Strategy and
reflecting on the findings that emerge from the residents’ survey;
• Progressing our work on equalities, including on our equality impact
assessment processes;
• Establishing our new Performance Group, with a core focus on strengthening
our use of LGBF indicators and deep dives into areas identified for
improvement;
• Continuing to deliver our workforce actions, including improvement actions
arising from our employee survey and our Cultural Assurance Model. 
Implications of the Report
1. Financial – updates in the appended report relate to areas that fall under the
remit of Finance, particularly relating to supporting the Council’s financial
sustainability workstreams 
2. HR & Organisational Development – updates in the appended report relate
to areas that fall under the remit of HR and Organisational Development,
particularly under strategic outcome 5, Living our Values 
3. Community/Council Planning – the content of the report relates specifically
to the delivery of the Council Plan and the appendix shows the associated
progress for the latter half of 2024/25. 
4. Legal - none 
5. Property/Assets – the report provides an update on actions relating to
property owned by the Council. 
6. Information Technology – the report provides update on actions relating to
IT provision.

Page 13

7. Equality and Human Rights - The Recommendations contained within this
report have not been assessed in relation to their impact on equalities and
human rights because the report provides an update on progress with current
actions and is for noting only.  Impact assessments will be carried out by
relevant services in relation to actions which require them. 
8. Health and Safety - none 
9.  Procurement – updates in the appended report relate to areas that fall under
the remit of the procurement team, under both the strategic outcomes relating
to ‘economy’ and ‘green’. 
10. Risk – none 
11.  Privacy Impact – none 
12. COSLA Policy Position – none 
13. Climate Risk – the Council Plan priorities are underpinned by actions which
will directly support the Council’s response to the climate emergency – ‘green’
has a particular focus on activities supporting this priority area.  
14. Children’s Rights – the Council Plan includes a number of actions targeted
at improving outcomes for children and young people.  The Council is
committed to complying with UNCRC and this will be reflected in our activity. 
Appendices: Six-month update report June 2025 
Author:  Lisa Fingland, Policy Manager 
Lisa.fingland@renfrewshire.gov.uk

Page 14

No embedded text on this page.

Page 15

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Council Plan
Six monthly progress update
June 2025

Page 16

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
How we report progress
• This update reflects on the past six months of delivering our Council Plan, highlighting areas where
we’re already making progress and some areas we’d like to focus on more, perhaps because
performance isn’t moving in the direction we anticipated or because of other pressures or factors
that makes this even more of a priority for us. We previously reported on our progress in December
2024, and you can read that here.
• The following pages shine a spotlight on some great projects or practice but for balance also
highlight those areas where we’d like to improve or develop further. Towards the end of this
document, you’ll find a full update against all the actions and performance indicators we use to
measure progress.
• Many of our performance indicators are high-level, annual indicators –our Council Plan spans a 5-
year time period so it might take some time to show some trends and patterns.  The Council also
reports a wide range of performance indicators to our Council Boards through our Service
Improvement Plans and also through regular operational performance updates –you can access
these reports here.

Page 17

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Council Plan Context
• As the overarching strategic plan for the organisation, the Council Plan sets the direction and vision that the Council is working
towards and can measure itself against delivery.
• This aligns closely with the Council’s approved budget –resources are targeted at the priorities for the organisation, as outlined
in the Council Plan.
• Some key workstreams feed into the Council Plan, which have been further developed over the past 6 months:
• Reshaping Renfrewshire –the Council’s fifth phase of transformation, with a focus on how we work together with our
communities to improve outcomes
• Digital –a new digital strategy was approved in April, aligned to the Council Plan, delivering across four strategic objectives
–enabled people; corporate approach to transformation; data driven Council; and modern organisation.
• Workforce–reflecting on and taking action to address the feedback from both the Cultural Assurance Model and the
Council’s Employee Engagement Survey
• The Corporate Improvement Plan continues to progress improvement actions to support our ongoing commitment to Best Value
• To reflect the context additional actions have been included and some existing actions have been refocused –this is clearly
shown in the action plan.

Page 18

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Council Plan:  Progress at a glance

Page 19

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place: Working together to enhance wellbeing across communities
The Housing Regeneration and Renewal programme is making
positive progress across all areas.  As well as our regular Tenant
Scrutiny meetings, all residents were invited to take part in our
rent consultation survey and more than 1000 responded. The
survey was also used to give tenants information about the
participatory budgeting initiative, which will give them a say in
how some of our housing funding is spent. Over the next 3 years,
£600,000 of funding will be allocated through this approach.
In 2024/25, works were completed on the
new Renfrew-Yoker bridge and extensive
testing carried out.  The state-of-the art
bridge, the first opening road bridge over
the River Clyde, provides a new
connection to the AMIDS site as well as
offering new active travel routes across
the Clyde.  It opened to the public in May
2025.
The Council’s 2025/26 budget includes £500,000 for further
regeneration in town centres, with a particular focus on
significant buildings and sites where redevelopment has
stalled, perhaps because of conservation concerns or rising
construction costs.  Officers will work with local property
owners to identify projects which could be eligible for funding.

Page 20

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Economy: building an inclusive, green and resilient economy
Employability work is a key element of our
work to grow and sustain Renfrewshire’s
economy, with hundreds of local residents
supported to access training and paid
employment every year.  The Council is also
committed to providing opportunities directly
each year, whether this is through the creation
of trainee-type posts, modern
apprenticeships, our new traineeship
programme aimed at winter school leavers or
our ‘Career Ready’ coaching programme for
care experienced school leavers.
Another state-of-the-art facility at the AMIDS site
has been announced, with ground-breaking taking
place in December 2024.  CPI, who already operate
the Medicines Manufacturing Innovation Centre,
are establishing the Oligonucleotides
Manufacturing Innovation Centre of Excellence to
develop potentially life-saving new therapies for
otherwise untreatable diseases.
1420 new people
supported by
employability team
in 2024/25
491 people
supported into
paid work in
2024/25

Page 21

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair: nurturing bright, happy and healthy futures for all
Our Whole Family Wellbeing service formally launched in
November 2024.  This brings together Council and third-sector
support, and between them our own team and our third sector
partners have worked with almost 1100 families so far.  The
evaluation data we have already collected is demonstrating
improved family relationships, improved parental understanding
of the needs of the child, improved participation in community
facilities and universal services, improved sleep routine, and a
reduction in distressed behaviours.
The service has piloted a shared information system for referrals
and for capturing wellbeing information.  This has shown real
benefits and a procurement exercise is underway to secure a
permanent solution.  Funding for 2025/26 has already been
awarded to third sector partners, and the team is also exploring
opportunities with our Connected Communities team for more
joint working.
2533 people attended a
Winter Connections session
368 children attended at
least one of our Easter
Camp sessions
During our Pension Credit
take-up campaign with
partners, 613 older adult
households were
supported with benefit
claims, income
maximisation and advice

Page 22

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Green: leading Renfrewshire to Net Zero
Following the successful delivery of the Advanced
Manufacturing Innovation District Scotland
(AMIDS) district heating network, feasibility studies
have been completed to expand the current
network as well as exploring additional district
heating networks in Paisley. Renfrewshire Council
has been successful in securing Scottish
Government grant funding to take these feasibility
studies to develop Outline business Cases for
potential heat networks in Paisley Central and an
extension of AMIDS, with partnership working to
optimise the opportunities including UWS,
OneRen, NHS, Scottish Water and Glasgow Airport
The Council is developing an initial carbon budget, with
interim organisational targets to 2030-31.
Identifying emissions by service area will be key in
improving our understanding of how our emissions
relate to the services we provide and the reductions we
need to aim for in order to adapt to delivering the
same high quality local services in a way that is fit for a
resilient, net zero future.  Setting an annual carbon budget
will help us meet our climate targets as an organisation –
showing in an easy-to-understand way where we ‘spend’
most of our emissions and progress to net zero.

Page 23

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living our Values: making a difference together
As part of the Council’s commitment to continuous improvement and
reflecting that ‘We Value Learning’, an innovative new approach to self-
assessment focused on organisational culture, known as Renfrewshire’s
Cultural Assurance Model (CAM) was developed in 2024/25. The CAM
has been recognised as first of its kind within the Scottish public sector
and was developed in partnership with the Improvement Service, based
on the Public Service Improvement Framework.
The first phase of the assessment involved a survey element for
participants which was completed in early 2025, the results were
analysed by Council and Improvement Service officers in advance of a
series of workshops which took place in late February and early March.
The findings were very encouraging, with respondents reflecting on a
very positive organisational culture alongside some constructive areas
for improvement to explore further. 5 priority actions were identified
from this process and have been added to the Council’s overall
Corporate Improvement Plan.
Our Employee Survey
71% recommend
the Council as a
great place to work
87% think their
line manager is
supportive
21% had experienced
violence or aggression
at work in the last year

Page 24

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Improving Outcomes for Children and Families
Construction is progressing well on the Paisley Grammar School Community
Campus and remains on track to welcome pupils in 2026. This is a flagship project
for the Council, with the school being built to Passivhaus standards.
Planning has commenced on the other major projects to enhance and expand the
current learning estate. This will be the most ambitious strategic programme of
investment planning in our learning estate, underpinning an ambition to provide
the very best environments and facilities for our young people and communities,
with every single establishment being considered as part of what is envisaged will
be a programme which will span over 20 years.  An action to reflect this has been
added to the action plan.
Our local Promise Keepers Network has grown to 362 Promise Keepers, and our
approach is attracting local and national interest as an example of best practice. 
Other initiatives include our Promise Champs group, supported by Youth Services;
our Language policy; exploring options to support colleagues in our workforce who
are care experienced; and funded projects in two secondary schools.

Page 25

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Actions and indicators
Full list
June 2025

Page 26

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place
What we will do Due
Date
Status Progress update
Progress Renfrewshire’s Housing-
led Regeneration and Renewal
programme
31 Mar 2027
Positive progress is being made across all areas where the agreed  timeline shows, works scheduled in year 4 of this
10-year programme.  As reported to the Communities and Housing Board in August 2024, the acquisition and
rehousing strategy is performing as planned and various phases of demolition are being taken forward as blocks
become fully council owned and vacant. 
Support our citizens to access
affordable cross-tenure homes that
are digitally enabled and meet
community needs
31 Mar 2025
The Business Case for Smart Social Assets is now complete and has been shared internally within Renfrewshire
Council and also with Glasgow City Region (GCR). The Council continues to investigate potential national funding
opportunities via strategic partners such as Commsworld, CityFibre, etc. In addition, work is now underway with
regards to the development of other stackable business cases that would supplement Smart Social Assets.
Design a new Connected
Communities service model for the
Council, transforming how we
support, collaborate and engage
with our communities
31 Dec 2025
Work has been progressed to develop a new Connected Communities function within the Chief Executive’s Service
which will bring together staff from the existing Community Learning and Development and Partnership and
Inequalities teams. Phase one of this work which focuses on the enabling internal restructure is progressing, with
the new service structure agreed and communicated. The Connected Communities Management Team now
recruited and in place and progressing recruitment processes for the rest of the new service.

Page 27

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place
What we will do Due
Date
Status Progress update
Deliver the ambitions in our long-term
place visions for our key settlements
and town centres 31 Mar 2027
The Regeneration Team will be looking to refresh our town centre strategies to reflect changes that have taken place in a
post pandemic environment. These strategies will align with the guidance and principles outlined in NPF4. The team has
been outlining potential regeneration priorities and projects, including developing a new Vision for Johnstone which
looks to improve the town centre, enhance public spaces, and support local businesses to create a more vibrant and
sustainable community.
Another commission for Erskine has been completed to develop potential proposals to make public spaces and
greenspaces more appealing as part of a review of the Centre Strategy for Erskine and short, medium and long-term
actions have been identified.   Consultants have been commissioned to develop more detailed designs for a new civic
square in the town centre.
Going forward, the team have commissioned further feasibility work in Johnstone, focusing specifically on the two civic
squares, the re-imagining of the Town Hall, and the development of a heritage trail.
Consultants have been appointed to prepare a landscape framework for enhancements in the Linwood Lade area,
immediately south of the town centre.
In Renfrew, a consultant has been commissioned to produce detailed designs for the re-use of the former BI site as a new
community space.
The transformation of Paisley following delivery of the Action Plan is advancing at pace, with achievements such as
creating an international culture and heritage destination and acting as a stimulus for property investment, development
and re-use. Completed regeneration projects include the refurbishment of the Town Hall and Arts Centre and the
creation of a new Culture and Learning Hub on the High Street. The other major project is the restoration of the Paisley
Museum which is due to be completed next year. A new wayfinding strategy for Paisley has also been developed.
The publication of the Paisley Vision document acts as a further catalyst to inspire future development in and around the
town centre. The Liberal Club, which was identified as a key building in the Vision, has recently been renovated, securing
its long-term status.  Discussions are still ongoing with the owner of the Paisley Centre and its potential mixed-use
regeneration. 
Overall, the team will continue to bring forward regeneration proposals across our town centres.

Page 28

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place
What we will do Due
Date
Status Progress update
Deliver Renfrewshire’s strategic capital
investment programmes, including
cultural, infrastructure, housing and
school estate, and maximise the long-
term benefits for our communities
31 Mar 29
The General Services capital budget was approved on 29th February 2024, including £147.8m for delivery in 2024/25. Since then,
projects have been reprofiled to other financial years and the revised budget is currently £97.4m (Period 10). To date, £63.8m has
been spent, representing 66% of the revised budget.
Develop Travel Renfrewshire 2035, our
Transport Strategy, supported by revised
Active Travel and Public Transport
Strategies and aligned to the regional
and national travel strategies
31 Mar 2027
Our draft Local Transport Strategy, called “Travel Renfrewshire 2035” is nearing completion, informed by far-reaching data
gathering engagement exercises. This included online surveys, stakeholder workshops and pop-up engagement sessions at
supermarkets and direct in person workshops with community organisations.
We specifically engaged with group representing people with disabilities and those who are particularly affected by the cost of living
crisis.
The draft strategy was issued for further consultation in November 2025  Subject to the feedback for the consultation it is expected
that the final strategy will be ready by summer 2025.
Deliver the next phase of Local
Partnerships development, through our
new Local Plans, Local Priorities and
Local Voices programme
31 Mar 2025
The final round of Local Partnership meetings for 2024/25 took place in February 2025. All Local Partnerships have now finalised
their local priorities following the review of the previously agreed local priorities in autumn/winter 2024/25.
Local Partnerships continued to receive presentations on  subjects relevant to each area, specifically Civil Contingencies (Gleniffer
and Johnstone & Linwood), the refresh of the Villages Investment Fund (The Villages) and Winter Connections (Paisley North West
and Central).  Erskine, Inchinnan, Bishopton and Langbank Local Partnership also received an update on the development of
Renfrewshire Community Transport.
Young people’s representatives have now been nominated for Paisley North West and Central Local Partnership and an induction
programme has been agreed.
New arrangements were agreed for community members of Local Partnerships to claim expenses, which will simplify this process.
Applications for Local Partnership funding for 2025/26 were invited from 10 February to 16 March 2025. Over 130 applications for
funding were received, to be presented to the April/May 2025 round of Local Partnership meetings.  Preparation for the 2025/26
Celebrating Renfrewshire Priority Budgeting exercise to take place during spring/early summer 2025 has also been undertaken.

Page 29

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place
What we will do Due
Date
Status Progress update
Progress development work in
relation to the priority schools
identified in the Learning Estate
Management Plan.
31 August 2027
This is a new action, which is reflected in the Children’s Services SIP.
Paisley Grammar School continues to progress in construction and remains on track for 2026 delivery. Focus
of project is beginning to shift towards fit out, transition planning, and digital. Workstreams are underway.
Decision made at March 2025 Policy Board to pause the delivery of a like-for-like Thorn Primary School and
undertake an options appraisal to widen the scope of this project.

Page 30

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Explanation of performance
Value Target Value Target Value Target
Opportunities to see
or hear something
positive about Paisley
and Renfrewshire
204,63
8,668
240,000,
000
268,082
,849
240,000,
000
216,953
,038 150,000
Q4 marketing activity focused on promoting the 2025 events programme,
the Paisley Book Festival line up announcement, cultural funding grants
and the launch of Paisley Food and Drink Festival with coverage appearing
in the following titles: The National (online), The Herald, The Herald
(online) The Scotsman (online), Glasgow Times online, List.co.uk, Glasgow
Live. The Paisley Daily Express, The Gazette, What’s on network and Foodie
Explorers. Marketing paid-for opportunities to see and hear will be
available in Q2.
Amount of vacant and
derelict land
(hectares)
248 Data
only 220.39 Data
only * Data
only
*The next vacant and derelict land audit will be undertaken over quarters 1
and 2 of 2025/26.
Percentage of Council
housing stock which
meets the Scottish
Housing Quality
Standard (LGBF)
68.31
% 100% 68.55% 100% 79.9% 100%
The percentage of stock meeting SHQS has increased significantly to
79.9% from 68.6%,  performance for this indicator changed to include
compliance with the 5-yearly Electrical Installation Condition Report
(EICR), as well as the new smoke and heat detector standard. Excluding
EICR and smoke detector failures we would be 87% compliant with SHQS.

Page 31

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Explanation of performance
Value Target Value Target Value Target
Affordable housing
completions 369 200 196 159 * 159
*The 2024/25 affordable housing completion figure will be available
in Q1 2025/26.
Percentage pothole
repairs completed
within timescales
95% 80% 94% 95% * 95% *Data for 2024/25 is not yet available.  Quarterly data shows that
performance was ahead of target in Q1 and behind target in Q2.

Page 32

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Economy
What we will do Due
Date
Status Progress update
Develop an Investment Proposition
for Renfrewshire that is clear on our
economic ambitions for our place
31 Mar 2026
Two reports have been commissioned to analyse Renfrewshire’s Growth Sectors.  The first highlighted that there
are several opportunities which Renfrewshire needs to capitalise on to support the growth of its economy further. 
The second report aims to reconcile existing priorities, team capacity and skills engaged in the economic
development and regeneration functions of the Chief Executive’s Department, with the future opportunities and
challenges outlined in the first report and the Council’s Economic Strategy.  This report highlights that there is a
requirement to grow and increase visibility of Renfrewshire’s inward investment proposition to drive future
economic growth and development.  A new web page has been created which signposts the area’s main investment
locations. (https://www.renfrewshire.gov.uk/article/13818/Renfrewshire-investment-prospectus)   Future works
includes looking at developing a dedicated investment page on the Invest Renfrewshire webpage.  Moreover, a
dedicated website to drive investment at AMIDS has been launched https://amids.co.uk/
Monitor the benefits of City Deal
Projects, including Glasgow Airport
Investment Area, Clyde Waterfront
and Renfrew Riverside and City
Region wide employment
programmes
31 Mar 2025
Monitoring of benefits reported through the City Region PMO is ongoing. This is currently being transitioned to
Regeneration Team as CWRR project now complete.

Page 33

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Economy
What we will do Due Date Status Progress update
Fully participate in the AMIDS joint venture 31 Jul 2024
AMIDS joint venture fully established and operational, Council is fully participating.
Complete the Tech Terrace development
and attract the first large occupier 31 Mar 2026
This is an AMIDS JV obligation and Council is fully participating.
Develop a Community Wealth Building Plan
for Renfrewshire 31 Mar 2025
A “Community Wealth Building in Renfrewshire” paper has been produced and approved at board to set
out the way forward. Additionally, the CWB(Scotland) Bill was published in March 2025 which sets out the
way ahead for the public sector. Plans are moving forward with speed now, local events have been
organised and board is being kept up to date

Page 34

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Economy
What we will do Due
Date
Status Progress update
Continue to support local
employment through the delivery of
targeted support through the
Council’s employability programme
31 Mar 2027
Our employability programmes support around 1,800 people each year to access skills development and progress
towards qualifications and/or employment. For the 24-25 year around 400 people were still active on our
caseloads with another 491 having secured employment and over 600 gaining new qualifications through the
service
Continue to progress core actions to
support local and regional
economic growth.
31 Mar 2027
A range of actions undertaken by the Council are supporting economic growth.  The AMIDS Joint Venture is
expanding with the breaking of ground on the new OMICE site and ongoing work on Tech Terrace, which is
expected to be completed by 2026.  Procurement and Economic Development work joint to support local
suppliers through initiatives such as our Meet the Buyer events, and our second Renfrewshire Economy
Conference will take place in June 2025.   Our employability work helps hundreds of people each year with skills
development that supports them into work.  As a Council, we are also committed to this and set ourselves a target
in relation to traineeships.

Page 35

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Economy
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Explanation of performance
Value Target Value Target Value Target
Percentage of
council
procurement spend
spent on local
enterprises (LGBF)
19.3% 23% 20.15% 23% * 21%
In the period 2023-2024 Renfrewshire Council recorded direct spend of
£56.4 million with businesses based Locally.  In addition to local spend,
a further 59.38% of our spend was with businesses located in bordering
local authorities (Glasgow, Inverclyde, North Ayrshire, East
Renfrewshire and West Dunbartonshire).
The update to our Standing Orders Relating to Contracts in June 2023
included increasing the threshold for the use of Quick Quote for Works
contracts up to £500,000 with a requirement that where possible, a
minimum of 75% local businesses should be invited to quote.  In 2024,
a Quick Quote was issued inviting 100% local Renfrewshire suppliers to
bid, this procurement targeted the local market and invited 10 local
Renfrewshire suppliers to bid.  In addition, to increase engagement
with local suppliers for below £25k procurements and also the Quick
Quote process the Interim Corporate Procurement Manager and
Purchase to Pay – Programme Operational Lead delivered a RenTalk
on Understanding Procurement.  The event was a success with 266
Council staff in attendance.  Guidance for Purchased Under £25,000
was launched recently, this guidance also recommends at least 75%
local, Renfrewshire based suppliers are invited to the three quote
process.
*This is an LGBF indicator and 2024/25 data is not yet available.

Page 36

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Economy
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Explanation of performance
Value Target Value Target Value Target
Gross Value Added (GVA)
per capita (LGBF)
£23,757.
92
Data
only * Data only * Data
only
Renfrewshire had lower percentage GVA growth than the
Regional average but performed well in labour market
indicators with employment increasing while unemployment
and inactivity decreased - including a significant decrease in
the number of people inactive due to long term sickness. There
was a large decrease in the volume of residents with no
qualifications but there was also a reduction in the volume of
residents with degree level qualifications.
According to ONS figures, overall GVA in Renfrewshire grew by
£365 million between 2019 and 2022. Considering this period
included the Covid pandemic, the growth is a positive sign.
Renfrewshire also contributes the fourth highest level of GVA in
the City Region (2022).
*This is an LGBF indicator and the latest data is for 2022/23.
Number of people
supported, sustained in
work at 6 Months through
Renfrewshire Council
Employability
Programme (INVEST)
340 180 268 180 288 180
The number of people who were still in employment 6 months
after moving into work and that we have been able to collect
data on is 288 people.
Number of new business
start-ups in Renfrewshire
with Business Gateway
support
206 320 305 320 265 320
We are continuing to support individuals to launch their own
businesses. Performance can be impacted by decision of local
businesses as to when to launch.

Page 37

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Economy
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Explanation of performance
Value Target Value Target Value Target
Renfrewshire
Claimant Count 3,755 Data
only 3,590 Data
only 3,315 Data only
This measure is a snapshot figure from April 2025 and is the
number of people claiming unemployment-related benefits. 
The figure has reduced again this year.  The Council continues
to provide employability support to hundreds of people each
year.
Percentage of
Renfrewshire
population working
age (16-64)
64.3% Data
only 63.9% Data
only 64.3% Data only
Work to explore Renfrewshire’s demographics was
undertaken by officers following the census release and this
also looked at the regular data updates from the National
Records of Statistics, this showed that while Renfrewshire has
an overall ageing population (in line with the national trends),
our proportion of the population of working age is above
average and puts us in the higher end, just behind the city
authorities.
Percentage of
Renfrewshire
population working
age (16–64) who are
economically inactive
25.9% Data
only 22.4% Data
only 21.4% Data only
This figure is for the calendar year 2024. The percentage has
been falling in recent years and is lower than the figure for
Scotland (which is a positive). This measure includes those
who are students and those who are retired. Analysis on
census data also showed Renfrewshire have a higher
percentage of our economically inactive population who are
long term sick or disabled.

Page 38

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
What we will do Due
Date
Status Progress update
Deliver the Fairer Renfrewshire
programme, working with
partners to support Renfrewshire
residents through the cost-of-
living crisis
31 Mar 2027
The Fairer Renfrewshire Sub-Committee has been meeting since August 2022 and a Fairer Renfrewshire
Officers Group from across services is meeting monthly. In March 2023 existing funds were brought together
into a single resource for Fairer Renfrewshire at around £5million, and partners are working together to further
develop the programme. A further allocation of £450k to Fairer Renfrewshire was made as part of the Council
budget in March 2025, including funding for a further Winter School Clothing Payment and Summer of Fun and
Winter Connections programmes for the coming year.
The Winter Connections programme ran again in Winter 24/25, providing opportunities for communities to
come together and take part in free activities and including food. This has contributed to wellbeing over the
winter. Summer of Fun funding has been allocated for the programme for summer 25.
The Fairer Renfrewshire Panel has provided insight in a number of areas including holiday provision in
Renfrewshire, with the Panel contributing to the plans for our ‘Summer of Fun’, both for summer 23 and 24, the
Council’s new School Meal Debt processes, digital exclusion and employability, especially parental
employability.
Digital inclusion is also being supported through the introduction of DigiZones and through the Digital
Champions programme, both developed through the Citizens Voice forum.
Legacy Tackling Poverty projects continue to be funded, including School Breakfasts, Skoobmobile and the
Peer Health project, Hearty Lives which is run in schools by Active Communities.
The 2025/26 programme has been developed, and 25/26 priorities agreed with the Fairer Renfrewshire Sub-
Committee. This will be presented to Leadership Board for approval in April 2025.

Page 39

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
What we will do Due
Date
Status Progress update
Develop mechanisms for
supporting individuals with lived
experience of poverty to influence
policy in this area
31 Mar 2024
The Fairer Renfrewshire panel, facilitated by STAR Project, continues to meet with officers across Council
services to ensure the voice of those with lived experience of poverty informs Council’s policy and practice. The
Panel has provided insight in a number of areas. The initial discussion was around holiday provision in
Renfrewshire, with the Panel contributing to the plans for our ‘Summer of Fun’, providing feedback on what is
useful for low-income families, eg, provision of food in all settings, provision for siblings, local provision so there
are no transport costs and provision for older teenagers. The Panel has also fed into the Council’s new School
Meal Debt processes, which now include earlier referral to available supports. They have met the Digital Strategy
Delivery Manager to discuss digital exclusion and have provided feedback and ideas to our Climate Emergency
Lead Officer around Renfrewshire’s Net Zero Delivery Plan. Discussions with the panel around employability,
especially parental employability have been used to inform events, and target work. As part of the Council Tax
Debt Pilot, the panel were consulted with, to help those engaged in the Pilot to understand barriers to accessing
support, such as advice, and to review correspondence associated with collection of Council Tax as well as
potential for enhancing collection processes in general. The Panel has met with the Convenor and Depute of the
Fairer Renfrewshire Sub-Committee and we also intend to bring the Panel together with the full Sub-Committee
and Fairer Renfrewshire Officers Group to discuss Panel priorities and their future plans
Developing new and radical
approaches to tackling child
poverty in Renfrewshire (CF)
31 Mar 2027
Work continues to develop place-based models to tackle child poverty. A Community Needs Assessment is
currently being carried out and will inform the next phase. Funding has been allocated by Leadership Board in
November 2024 to support the continuation of community development activity in Gallowhill following the
publication of the Community Needs Assessment. This will provide capacity to support the development and
implementation of actions emerging from the community needs assessment and continue to improve and
expand community led activity and infrastructure in the area. Wider work will also be undertaken to develop a
place-based approach based on the learning from the CNA.

Page 40

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
What we will do Due
Date
Status Progress update
The Promise Strategic Oversight
Board and workstreams will progress
and ensure Renfrewshire ‘Keeps the
Promise’ and delivers improved
outcomes for individuals who are care
experienced, wherever possible
keeping children within their families
(CF)
31 Mar 2025
A comprehensive report outlining the first 5 years of Renfrewshire’s work to Keep The Promise was presented and
discussed at the Education and Children’s Services Policy Board on the 13th March 2025. The publication of this report
coincided with the 5-year midpoint of the 10-year programme to Keep The Promise by 2030. Going forward this report will
be updated on an annual basis and presented to the Board for consideration by elected members. The report has been
well received and shared across our local and national networks.
The Promise Keeper Network sits at 362 Promise Keepers with efforts taking place to grow the network. The network is
receiving both local and national interest. There has been engagement with Scottish Government’s Promise Team (Care
Experience, Children’s Services Reform & The Promise Division) around the merits and best practice nature of this
initiative.
On the 26th March three Renfrewshire Promise Funded projects were showcased at the Promise Partnership Showcase
Event in Stirling organised by CORRA. The projects, the Youth Services Led Grant Programme and the two Keep The
Promise Funded Education Projects, were showcased and shared learning with partners across Scotland.
The Promise Manager has been working with colleagues in Environment, Housing and Infrastructure (E,H&I) around how
that service will work towards Keeping The Promise and support our Care Experienced Community, and a number of
actions have been incorporated into EH&I’s 2025/26 Service Improvement Plan. 
At February’s Promise Strategic Oversight Group, it was agreed that a review of membership take place and a proposed
refreshed membership proposal be made. A suggested proposal has been produced and submitted to the Chair, for
approval.
The Supporting the Workforce workstream is actively progressing on a number of projects of note: “Promise Human
Library,” “Care Experienced network for staff and “Guaranteed Interviews” activity. A full update was provided at recent
The Promise Strategic Oversight Group.

Page 41

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
What we will do Due
Date
Status Progress update
Build local capacity for
transformational whole systems
change and to scale up and drive the
delivery of holistic whole family
support services (CF)
31 Mar 2025
FORT data shows that 636 families have been supported through the community family wellbeing service since recording
on this system began. Funded third sector organisations now using FORT to make referrals and record wellbeing
information. Three successful family wellbeing launch events in November 2024 reached 559 children and families. Third
sector evaluations now underway and outcomes will inform funding for 2025/26.
1086 families to date have been supported by the community family wellbeing team and funded third sector partner
organisations.
62% of families supported are from SIMD 1-5
Outcomes recorded include:
• Improved parental understanding of the need of child, including healthy attachment
• Improved sleep routine
• Improved parental understanding of the needs of unborn child
• Improved participation in community facilities and universal services
• Improvement in parenting, family functioning, relationships and reduction in child’s distressed behaviour
Following a successful system proof of concept, a procurement exercise is currently underway to secure a client record
system for Whole Family Wellbeing ( including partner third sector organisations) ; community learning and development
and educational psychology service
Following evaluation of partner third sector organisations, year 4 funding will be awarded to allow continuation and
development of family support work already underway, with a key focus on partnership working for added impact.
Currently exploring more joined up working with  Connected Communities.

Page 42

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
What we will do Due
Date
Status Progress update
Develop the Trauma Informed and
Responsive Renfrewshire
Programme
31 Mar 2025
The pilot of the Level 1 training will take place in the first quarter of 2025/26.  The TIRR Steering Group has a
refreshed membership and terms of reference and is meeting on a quarterly basis.  A new officer is in post to help
further roll-out the programme of work.
Progress the design and delivery of
the Curriculum, Learning, Teaching
and Assessment; the Families and
Communities; and the Inclusion
Portfolios within Children’s
Services (CF)
31 Mar 2025
All portfolios continue to focus on the actions plans which they have developed through self-evaluation activity. 
Portfolio planning teams meet regularly with heads of service to discuss progress and there is now a standing
agenda item on challenges, so discussions are solution focused.  Data continues to be shared across portfolios
to ensure continuous improvement. Portfolio action plans are being developed to align with Service
Improvement Priorities.
Deliver mental health and
wellbeing support, including Ren10
mental health and wellbeing
network to support children, young
people and their families (CF)
31 Mar 2025
A plan is in place for the next session (2025/26) and there will be a continuation of the support and resources
which are demonstrating the biggest impact on children and young people’s mental health and wellbeing. 
Work is still ongoing to merge the referral process with FORT.

Page 43

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
What we will do Due
Date
Status Progress update
Deliver strategic and operational
responses to migration and
asylum, supporting individuals
and families into settled
accommodation (CF)
31 Mar 2026
The census releases over the latter half of 2024 have provided a significantly updated picture of
Renfrewshire’s communities – work was undertaken to analyse this data, with a detailed presentation shared
with the full Chief Officers Team at the away day in September and a workshop with the wider Our Leaders
Forum group in December 2024. A detailed report was presented to the Leadership Board in December 2024
and further work has been undertaken to develop ward level profiles which will be shared with Elected
Members shortly.
A new Senior Policy Officer post with a focus on Migration and Population has recently successfully recruited
and a core task for initial focus will be to develop a strategic needs assessment in partnership with the
Strategic Migration Group.
A detailed update for Members was reported to the Leadership Board in February 2025, including specific
updates in relation to support for Ukrainian Displaced Persons and the introduction of the Afghan
Resettlement Programme from March 2025.

Page 44

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Explanation of performance
Value Target Value Target Value Target
Percentage of children
living in poverty (after
housing costs) (LGBF)
24% Data
only * Data only * Data
only
The figure for this indicator is derived from the Local
Government Benchmarking Framework indicator CHN24 '% of
children living in poverty (after housing costs)'. The percentage
in Renfrewshire in 2022/23 was 24%, compared to 23.3% in
2021/22. Renfrewshire had the second-lowest rate amongst its
family group for this indicator, while the Scottish average was
21.8%.
*This is and LGBF indicator and the 20223/23 data is the latest
available.
Proportion of people
earning less than the
real living wage (LGBF)
12.5% Data
only 16% Data only 19.3% Data
only
Proportion of people (18+) earning less than the Real Living
Wage as of 2024 was 19.3% which is an increase of 3.3% from the
previous year. This equates to approximately 14,000 employees.
The proportion in Scotland rose from 10.2% to 11.4% (288,000
employees).
It should be noted that local authority estimates are ‘workplace’
based and include all those working in each local authority area,
regardless of where they reside. Due to a methodical change,
data for 2023 and 2024 are not directly comparable with data for
2022 and earlier years.

Page 45

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Explanation of performance
Value Target Value Target Value Target
Percentage
uptake of free
school meals in
primary
schools
53.4% 52% 52.5% 60% 60.2% 60%
The uptake for 24/25 is 60.2% which is an improvement on the 23/24
uptake of 52.5%. The school meal survey is issued every February and
shared with parents, pupils and school staff. This provides detailed
feedback which is measured against school meal reporting data to
compare suggestions with current preference at each site. This is the
foundation used to create the annual menu changes in June for Primary
andSeptember for Secondary schools.
Prior to implementation, the menu is shared with the Senior Facilities
Operative- Production Cooks. They are provided with the autonomy of
trialling new recipes with the pupils to encourage recognition of
unfamiliar menu items before implementation. The Menu & Nutrition
officer engages with Pupil Councils and Pupil Parliaments, along with
the Fairer Renfrewshire Lived Experience Panel, to discuss issues
encountered in dining halls and access direct stakeholder
feedback.Pupils starting P1 & S1 are provided access to the school
meals on induction days, with parents provided with information
regarding ParentPay and available meal choice. All menus are available
via PDF on the website which aligns to the pictorial menu boards
displayed in each dining hall. The introduction of a pre-order app has
been piloted in Park Mains HighSchool with the purpose of reducing
queuing times and ensuring pupils access their preferred choices at
lunchtime. Minor issues due to digital restrictions have caused
delays, full implementation of the pre order app to be available in all
secondaries is August 2025.

Page 46

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Explanation of performance
Value Target Value Target Value Target
Number of children in
receipt of school clothing
grants
6104 Data
only 5860 Data only 5,316 Data
only
The number of FSM/CG applications in 2024/25 during the period June
to March fell by approximately 7% compared to the same period in in
2023/24, with the number of children being awarded a Clothing Grant
in 2024/25 (June to March) falling by 9% compared to the same period
during 2023/24. Whilst it cannot be definitively determined why there
has been a reduction in the number of children being awarded a
Clothing Grant, it appears that the primary reason for declinature is due
to parental income exceeding the Clothing Grant eligibility thresholds
for earned income within tax credits or Universal Credit. We would
suggest that the reduced amount in applications and awards could be a
combination of four reasons: natural and managed migration from tax
credits/legacy benefits to Universal Credit where earned income
thresholds are less generous, 40% of tax credits only recipients in
Renfrewshire choosing not to move initially onto Universal Credit as
part of managed migration between July 2023 and December 2024 and
therefore potentially losing eligibility to FSM/CGs, higher pay
settlements as a consequence of inflationary pressures increasing
wages, and/or parents taking on additional working hours to help
alleviate cost of living pressures.
There is a communications campaign currently being planned to
launch in conjunction with the 2025/26 FSM/CG applications opening
early June 2025, highlighting the amount of money that could be saved
and encouraging an increase in take-up.

Page 47

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Explanation of performance
Value Target Value Target Value Target
Average time from
household presenting
themselves as homeless
to completion of duty
(number of weeks)
21.74 24 21.23 26 * 26
Whilst the 2023/24 figure is better than target, this indicator relates to
‘closed’ cases only.  Given the record high number of homeless
applications during 2023/24and the number of homeless applicants
still staying in temporary accommodation(‘live’ cases), it is anticipated
that this figure is likely to increase in the long run. A strong focus will
continue to be required on social housing lets to those who are
homeless.
*The 2024/25 figure is still to be verified by the Scottish Government.

Page 48

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Green
What we will do Due
Date
Status Progress update
Develop costed, targeted
interventions and actions to
support our net zero journey within
the Council and working in
partnership with key stakeholders
(CF)
31 Mar 2026
Priority projects continue to be identified, costed and progressed in partnership with key service areas including
Waste, Transport and OneRen. Projects include Sustainable Travel, and Local Heating and Energy Efficiency
(LHEES). A project register will be finalised within the new Carbon Management Plan, outlining our approach to
reducing carbon emissions over a 3-year period. Once agreed the Carbon Management Plan will go to the
Planning and Climate Change Policy Board for approval in August 2025.
Development of Low Emissions /
Electrification Strategy 31 Mar 2026
The eight councils across Glasgow City Region have secured funding of up to £3.5 million from Transport Scotland
to support the acceleration of new electric vehicle chargepoints. These new chargepoints will be delivered by a
private sector operator, appointed by the councils, and include a mixture of charging speeds, installed across the
City Region.  
Over the coming months the eight councils will be working intensively to scope the shape of the proposal that
will go to the market, with the goal of enabling a comprehensive network of EV charging across the region. This
includes widening access to chargepoints for the thousands of people who live in flats and can’t charge at home,
as well as providing chargepoints in areas that typically may not be attractive to the private sector, enabling a
more just transition to zero emission forms of transport.  The eight local councils are East Dunbartonshire, East
Renfrewshire, Glasgow City, Inverclyde, North Lanarkshire, Renfrewshire, South Lanarkshire and West
Dunbartonshire Council.
The consultant Jacobs have now collated data from all the local authorities involved.   Representatives from
Glasgow City Region including Renfrewshire Council attended workshop on 30th January 2025 to review next
steps and are currently carrying out a site feasibility and grid capacity exercise with Scottish Power Energy
Networks. An exercise is now underway to identify potential, suitable chargepoint locations in Renfrewshire.

Page 49

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Green
What we will do Due
Date
Status Progress update
Develop a Strategic Property Review
of Council operational, non-
operational and surplus assets
31 Mar 2026
An updated report was taken to the Infrastructure, Land and Environment Policy Board in January 2025. A new
Asset Management Oversight Group has also been established to provide oversight and Governance for all reviews
and projects involving assets.
A lot of data gathering now complete and building categories established to allow engagement with building users,
communities and Elected Members. The plan is to rationalise the estate to make efficiencies.  Several buildings
have been released including Old Farmhouse, additional lease for Corporate Records and securing of Montrose
Care Home, Falcon Day Centre and sale/removal of staff from Robertson Centre.
Develop a funding strategy to
support the resourcing of actions to
deliver net zero
31 Mar 2026
Priority projects have been identified to support our net zero journey within the Council and working in
partnership with key stakeholders , with a focus on reducing emissions from “heat and fleet”. These projects
will form part of our costed delivery plans. Opportunities for additional investment, including external funding
continue to be explored, as do ways in which to bring cost savings and generate revenue to reinvest in sustainable
practices.

Page 50

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Green
What we will do Due
Date
Status Progress update
Establish a carbon budget for
Renfrewshire Council
31 Dec
2025
The Council is developing an initial carbon budget, with interim organisational targets to 2030-31.
Identifying emissions by service area will be key in improving our understanding of how our emissions
relate to the services we provide and the reductions we need to aim for in order to adapt to delivering the
same high quality local services in a way that is fit for a resilient, net zero future
Setting an annual carbon budget will help us meet our climate targets as an organisation – showing in an easy-to-
understand way where we ‘spend’ most of our emissions and progress to net zero.  Identifying emissions (and
emissions reduction opportunities) by service area will be key in improving our understanding of how our emissions
relate to the services we provide and the reductions to aim for in order to adapt to delivering the same high quality local
services in a way that is fit for a resilient, net zero future.
Review opportunities within the
Council’s infrastructure pipeline
projects to align with the skills
transition and green skills
development for local people
31 Dec
2026
This action was new in 23-24 and will be developed following phase 2 of the Plan for Net Zero which sets out the phased
road map and costed, area-based delivery plans. Phase 2 is currently underway and the infrastructure pipeline of
projects and the identification of skills gaps will follow on once the outcomes and the phasing are known. As this work is
ongoing, the due date has been extended by one year, to 31 December 2026.
Informing, educating and upskilling our communities to support them to contribute to climate action is a key priority. A
Ren Zero community engagement programme will be developed, led by the Sustainability Lead (Stakeholder
Engagement) which is currently being recruited.
West College Scotland was recently awarded up to £100k from the Business Challenge Fund to allow
local businesses to train staff in net zero / sustainability for free to contribute to this agenda. The
programme will run financial year 24-25.

Page 51

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Green
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Explanation of performance
Value Target Value Target Value Target
CO2
Emissions
area wide per
capita (LGBF)
4.4 Data
only 4.9
Data
only * Data
only
Renfrewshire Council is below both the Scottish national average
and the Family Group average for emissions area-wide per capita.
Renfrewshire Council area saw a decrease of 3.7% compared with
previous year
*This is an LGBF indicator and 2024/25 data is not yet available.
CO2
Emissions
area wide:
emissions
within scope
of LA per
capita (LGBF)
3.8 Data
only * Data
only * Data
only
Renfrewshire Council is below both the Scottish national average
and the Family Group average for emissions area-wide within
scope of the LA per capita. Renfrewshire Council area saw a
decrease of 4.6% compared with previous year.
*This is an LGBF indicator and 2024/25 data is not yet available.
Amount of
CO2 emitted
by the public
vehicle fleet
3267 3000 3118 3000 3180 3000
Increases in transport emissions were expected coming out of the
pandemic and decreased travel during these times. Although 2022-
23 emissions show an increase from the previous year emissions
from transport are still lower in 2022-23 than pre-pandemic levels,
and Renfrewshire is below both the national average and family
group average per capita for transport emissions.
Amount of
CO2 emitted
from public
space
lighting
1138 1500 1,216 1,100 1217 1100
This performance indicator is an annual indicator and not
measured for quarters. Although not measured in quarters, the
emissions levels are anticipated to level out year on year as the
LED programme is substantially complete.

Page 52

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Green
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Explanation of performance
Value Target Value Target Value Target
Amount of CO2
emitted from
Council
buildings
New Indicator for 2023/24 12,121
.2
Data
only * Data
only
Targets are being set as part of the refreshed Carbon Management
Plan. The Council’s natural gas consumption and electricity
consumption both decreased in 2023-24. 
*Figures for 2024/25 are not yet available.
Percentage of
household
waste Recycled
(Calendar year
data) (LGBF)
53.7% 50% 44% 50% * n/a
*Figures for 2024 are not yet available and are expected in June 2025.

Page 53

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living our Values
What we will do Due
Date
Status Progress update
Implement the next phase of
transformation through the actions
arising from the Council’s financial
sustainability and improvement
workstreams and the new
Reshaping Renfrewshire
programme
31 Mar 2027
The aim of this action is that the Council is able to maintain a balanced budget by 31 March 2027 within the
context of a challenging financial environment. This has so far been achieved for the first of the three financial
years in scope. Of the savings targets set in 24/25, including residual balances from 23/24, 92%has been achieved
so far.
This action has been updated to reflected the new phase of transformation, Reshaping Renfrewshire.
Deliver improvement activity
across the organisation in line with
revised best value audit
methodology
31 Mar 2026
Following the successful delivery of the Corporate Self-Assessment programme, a corporate improvement plan
has been developed by CMT to support the Council’s approach to best value and continuous improvement.
In December 2024, Renfrewshire Council launched an innovative new approach to self-assessment focused on
organisational culture, known as Renfrewshire’s Cultural Assurance Model (CAM). The CAM was first of its kind
within the Scottish public sector and was developed in partnership with the Improvement Service and based on
the Public Service Improvement Framework.
The first phase of the assessment involved a survey element for participants which was completed in early 2025,
the results were analysed by Council and Improvement Service officers in advance of a series of workshops which
took place in late February and early March.
The findings were very encouraging, with respondents reflecting on a very positive organisational culture
alongside some constructive areas for improvement to explore further.
5 key actions were developed by CMT and have been added to the Council’s overall Corporate Improvement Plan.
The Controller of Audit Best Value Audit report for Renfrewshire Council was considered by the Accounts
Commission on 15 May 2025, with the final report, including the Commission’s findings, published on 5 June
2025. This report, alongside the Council’s response, will be considered by Council on 26 June 2025. Any agreed
actions will be incorporated into the Corporate Improvement Plan with progress reported to Leadership Board as
part of the regular ongoing updates.
This action has been updated to reflect the phase of delivering Best Value we are moving into and the focus on
our Corporate Improvement Plan actions.

Page 54

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living our Values
What we will do Due
Date
Status Progress update
Continue to develop our
approaches and activities in
relation to Equality, Diversity and
Inclusion, responding to the needs
and views of our workforce
31 Mar 2027
Key areas of progress include  new and revised HR&OD Policies written using friendly, inclusive language and
tone.  The Council is embedding our economic development employability programmes throughout our
recruitment processes ensuring barriers faced by employees and interns are removed.  Recruitment, onboarding
and pastoral support processes for overseas workers have been established, through participation in a Scottish
Government pilot programme.  Equality, Diversity and Inclusion Awareness is now one of the Council’s
mandatory training modules and all employees are being supported and encouraged to complete the training,
whether that be online or via face to face/toolbox talks. 
Our workforce received communications throughout November to encourage them to update their personal
equality monitoring information currently held by the Council. This will enable the Council under its statutory
duty to ensure the most up to date information is held and policies/strategies, etc are meeting the needs of our
people. The Council is currently revising its Equality & Diversity and Respect at Work Policies and associated
training, with a view to implementing later in 2025.  The 3 year Plan will continue to be implemented throughout
2025 and beyond
Develop new approaches to
consultation and engagement with
our communities, underpinned by
our values.
31 Mar 2025
This action is complete. A new policy (with additional checklist and toolkit) and Terms of Reference for an officer-
led engagement oversight group has been produced, responding to service engagement and feedback and
national best practice guidance. The Policy was agreed in February 2025 and work is now underway on an
implementation plan.   There is a new action focusing on monitoring the effectiveness of our engagement with
communities.

Page 55

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living our Values
What we will do Due
Date
Status Progress update
Develop a framework to monitor
the effectiveness of community
engagement
31 Mar 2027
NEW This is a new action added following the completion of the previous action and the approval of the new
Consultation and Engagement Policy by the Leadership Board in February 2025.
Lead implementation of the council
brand, ensuring council
communications are responsive,
informed, inclusive and accessible
(CF)
31 Mar 2025
This action is complete. A report was taken to Leadership Board in 2024 to update members on the outcome of
the evaluation of place brand activity over the past five years and the findings of an independent review, and to
recommend next steps for place promotion. Officers from marketing and communications will work with
regeneration and economic development colleagues and wider place partners to explore the six recommended
areas of activity to help drive the marketing of Renfrewshire in future. A further report will be taken to Leadership
Board in the autumn to update on progress.
Deliver a refreshed approach to
workforce planning and workforce
innovation, with a focus on
recruitment and retention; learning
and development; and career
pathways.
31 Mar 2027
The Workforce Planning Group are progressing the key priorities of the People Strategy, taking forward the
recommendations from the Best Value audit and will work collaboratively with the Head of People and OD on
strategic approaches to workforce planning and OD to establish new key priority areas over the next 5 years.  A bi-
annual report on our People Metrics was presented to FARS Board on 13 February 2025 for noting and monitoring.
Drive improved attendance and
reduced absence across the
organisation
31 Mar 2025
The Workforce Planning Group are progressing the key priorities of the People Strategy, taking forward the
recommendations from the Best Value audit and will work collaboratively with the Head of People and OD on
strategic approaches to workforce planning and OD to establish new key priority areas over the next 5 years.  A bi-
annual report on our People Metrics was presented to FARS Board on 13 February 2025 for noting and monitoring.

Page 56

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living our Values
What we will do Due
Date
Status Progress update
Embed our Wellbeing Strategy,
meeting the current and future
needs of our workforce
31 Mar 2025
Training for colleagues who are already mental health first aiders on how to support colleagues with specific
types of mental health conditions was rolled out on 5th December – A conversation on Anxiety.  Further sessions
planned during 2025 will be delivered on Suicide, Depression, Self-Harm and Psychosis.  We continue to raise
awareness of menopause.  An action plan of support based on findings from the Menopause Survey conducted in
November 2024 will include further RenTalks on Supporting Menopause during February, toolbox talks on
support for employees and managers and ‘Let’s Pause’ sessions, our virtual get-together.
Council officers continue to work in collaboration with RCA Trust to provide colleagues with specialist support,
training and advice on gambling addiction.  ‘Bet you can help now’ training is being rolled out during January
and February, with  focus groups consisting of line managers, People & OD and Trade Unions.
We have recently been recognised as a Breastfeeding Friendly Scotland employer.  Training will be rolled out to
the Customer Contact Centre employees initially, to provide advice and signposting people to available facilities
and Council locations outwith Renfrewshire House.  This training will be recorded and developed  as a module on
iLearn for all employees.  A Council website page is being created in the staff information section that will include
guidance around reasonable adjustments etc.  Wellbeing Support toolbox talks are being rolled out to line
managers within HSCP and EH&I.  This will also be delivered during the Head Teachers meeting in February.
Implement the new Digital Strategy 31 Mar 2030 NEW
This is a new action which has been added following the approval of the Council’s new Digital Strategy in April
2025. This action links closely to the delivery of the transformation programme, Reshaping Renfrewshire.

Page 57

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living Our Values
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Explanation of performance
Value Target Value Target Value Target
Average
number of
work days
lost through
sickness
absence per
employee
13.57 9.9 13.01 9.9 * 9.9
* Figure for 2024/25 is not yet available.

Page 58

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living Our Values
Indicator Current
Status
Short
term
trend
Long
term
trend
2021/22 2022/23 2023/24 Explanation of performance
Value Target Value Target Value Target
Percentage of posts of
the highest 5% of
earners among
employees (excl.
Teachers) who are
women  (LGBF)
58.15% Data
only 56.84% Data
only 57.59% Data only
Total number of employees = 6,406
Total number of employees in top 5% = 323
(per guidance value 320 has been increased to 323 due to
numbers on the salary point)
Total number of women in top 5% = 186 (57.59%)
This indicator is helping to measure and monitor the
percentage of women in senior posts in the Council. The
increase in this indicator from 56.84% in 2022/23 to 57.59% in
2023/24 has arisen due to turnover activity within the Council.
We will continue to monitor this indicator as part of our equality
monitoring processes to ensure that our recruitment, training,
development, and retention processes treat everyone in an
equal and consistent basis. We also now provide senior officers
with frequent statistics inclusive of attrition & retention to help
create awareness of where potential challenges may exist whilst
offering a range of interventions.
Due to a number of external factors out with the council’s
control it is difficult to predict future impact, however, based on
the council’s trends and interventions over recent years it is
anticipated that we will continue to make improvements via
recruitment and retention training and provision of statistical
information.

Page 59

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living Our Values
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Explanation of performance
Value Target Value Target Value Target
Percentage gender pay
gap between average
hourly rate of pay for
male and female
employees (LGBF)
0.48 Data
only 0.44 Data
only * Data only
The pay gaps were calculated using the difference between male and
female’s average hourly rate which excludes overtime. 
Average hourly rate of pay (Male) = £20.33
Average hourly rate of pay (Female) = £20.24
Gender Pay Gap % = 0.44%
The Council’s pay gap of 0.44% was calculated as at 31st March 2024 and
highlights the pay gaps between male and female employees.  The pay
gaps were calculated using the difference between male and female’s
average hourly rate which excludes overtime.
Whilst recruitment and turnover will have a continuous impact on the
gender pay gap due to external factors out with the council’s control, the
revised pay & grading model and service reviews together have reduced
the gap. We are embedding the final year of the pay & grading model, and
we continue to support ongoing service redesigns.
Due to a number of external factors out with the council’s control it is
difficult to predict future impact, however, based on the council’s trends
and interventions over recent years it is anticipated that we will continue
to make improvements.
*This figure is provided by the Improvement Service and the latest
available data is for 2023/24.

Page 60

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living Our Values
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Explanation of performance
Value Target Value Target Value Target
Complaints closed at
Frontline Resolution
as a percentage of all
complaints
89.2% 85% 82.8% 85% 63.5% 85%
For 2024/25, across the Council 11,980 complaints,
comments and compliments were recorded on the
complaint system. 
Of this 11,179 were closed as a frontline response complaint
and 7,100 (63.5%) were closed within 5 working days.  Target
has not been achieved for the 2024/25 reporting period.  A
refreshed approach to auditing of complaints practice has
been introduced to monitor the quality and timeliness of
responses and drive improvements.  Some changes have
been made to internal processes to ensure enquiries which
are not complaints are diverted from the complaints
process.
Percentage of FOI
requests completed
within timescale
93.6% 90% 89.9% 90% 90% 90%
90% FOI requests due in 2024/25 were completed on time. 
1528 requests were received with 1378 completed within
timescale.  Target has been achieved for this reporting
period
Percentage of LGBF
indicators
performing in the top
2 quartiles
56% n/a 50% 56% 50% 56%
This data is provided by the Improvement Service and is a
snapshot in time.  At present, half of our indicators are in the
top two quartiles.  This reflects our relative performance. 
Consideration of our actual performance shows that 74% of
indicators have Improved since the base year.

Page 61

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Improving Outcomes for Children and Families
Indicator Current
Status
Short
term
trend
Long
term
trend
2021/22 2022/23 2023/24 Explanation of performance
Value Target Value Target Value Target
Percentage Point Gap
in % Pupils Achieving
Expected Level for
their stage in Literacy
between pupils living
in 30% Most Deprived
areas and those living
in 70% Least Deprived
Areas (SIMD)
15.4 7 16 10 14 10
The size of the attainment gap has decreased since 2022/23
and is within 0.4 percentage points of the 2021/22 figures.
Attainment has improved consistently over the previous 3
years with a 5 percentage point increase in attainment in
both groups. Pupils living in most deprived areas were more
significantly impacted by the pandemic which caused these
gaps to widen. The data indicates that some progress is
being made to  decrease gaps however a significant
challenge remains.
Percentage Point Gap
in % Pupils Achieving
Expected Level for
their stage in
Numeracy between
pupils living in 30%
Most Deprived areas
and those living in
70% Least Deprived
Areas (SIMD)
13.4 6 11 9 11 9
The size of the attainment gap is in line with 2022/23 and
lower than in 2021/22. Attainment has increased for both
groups over this period, with a 3 percentage point increase
for pupils living in 30% most deprived areas and a 2
percentage point increase for those living in 70% least
deprived areas. Pupils living in most deprived areas were
more significantly impacted by the pandemic which caused
these gaps to widen. The data indicates that some progress
is being made to  decrease gaps however a significant
challenge remains.

Page 62

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Improving Outcomes for Children and Families
Indicator Current
Status
Short
term
trend
Long
term
trend
2021/22 2022/23 2023/24 Explanation of performance
Value Target Value Target Value Target
Average total tariff
score of leavers living
in SIMD 30% most
deprived areas
745 770 681 700 681 700
It is not possible to make a like for like comparison to previous
years within this measure due to the cancellation of exam diets
in 2020 and 2021. Renfrewshire’s data follows national trends
with an increase during this period which is now returning to
post-pandemic levels. Renfrewshire is consistently ahead of the
national figure in this measure but remains marginally below
the virtual comparator. The latest data is ahead of the 2018/19
leavers cohort, which was 674. Targets for this measure were set
before the pandemic.
Average total tariff
score of all school
leavers in
Renfrewshire
984 959 933 960 941 960
As above, it is not possible to make a like for like comparison to
previous years within this measure due to the cancellation of
exam diets in 2020 and 2021. Renfrewshire’s data follows
national trends with an increase during this period which is now
returning to post-pandemic levels. Renfrewshire is consistently
ahead of the national figure in this measure but remains
marginally below the virtual comparator. The latest data is
ahead of 2018/19 leavers cohort, which was 923. Targets for this
measure were set before the pandemic.

Page 63

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Improving Outcomes for Children and Families
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25 Explanation of performance
Value Target Value Target Value Target
Proportion of children
being looked after in
the community (LGBF)
91.7% 89.9% 90.9% 89.9% 91.6% 83%
The percentage of looked after children in the community has
increased by 0.7 percentage points (pp) compared with the year
end position the previous year.  The majority of all looked after
children continue to live in a community setting either with their
own family or with an alternative family.  A residential house or
school can be more suitable for a small number of children and
young people based on their needs, but the service will always
seek to have a child live in a family setting where appropriate. 
Please note, this indicator is also reported annually, and the
figure is derived from the Local Government Benchmarking
Framework indicator CHN9 'Balance of care for 'looked after
children': % of children being looked after in the community'.
The last data published for this indicator is for 2022/23; the
percentage of looked after children living with families in the
community in Renfrewshire was 91.7%, greater than the
Scotland average of 89.2%.

Page 64

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Council Plan
Six monthly progress update
June 2025
For more information, please contact:
policycefar@renfrewshire.gov.uk