Page 1

___________________________________________________________________
To:  Leadership Board
On:  18 June 2025
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Reshaping Renfrewshire –Transformation and Change
Programme – Update 
___________________________________________________________________    
1.  Summary
1.1  In February 2025, a comprehensive report was presented to Leadership Board giving
an overview of transformation activity to date, setting the context, and detailing the fifth
phase of Renfrewshire Council’s transformation programme, named Reshaping
Renfrewshire. 
1.2 The report noted that while Reshaping Renfrewshire would continue to have a focus
on the development of the organisation, similar to previous phases, it would also be
coupled with a strategically wider, outward-focused perspective to consider
Renfrewshire’s geography and communities. 
1.3 Key areas of emphasis for Reshaping Renfrewshire include continuing to deliver
significant  recurring financial savings and or generation of additional income to secure
longer-term financial sustainability; harnessing the rapidly changing advancements in
digital technology to transform how we deliver services in the future; building upon key
strategic partnerships and relationships, collaborating to deliver better outcomes for
communities; and continuing to shift the focus of our service provision to prevention to
help reduce future need and cost.
1.4 This report represents the first of the regular updates on the progress of the
programme. Given the scale of the programme, updates will focus on areas with
relevant and substantive progress, where options are being explored and to highlight
milestones being reached. Moving beyond the summer period there will be a
requirement for greater definition of target savings against key transformation
programmes to support the Council’s medium term financial strategy and it is
anticipated that this will be incorporated into the updated medium term financial
strategy due to be brought to full Council in September 2025.

Page 2

________________________________________________________________________
2.  Recommendations
2.1   It is recommended that the Board: 
• Note the update provided in the report on the progress of key areas within
Reshaping Renfrewshire; 
• Note the officer governance arrangements detailed at section 3.2 
• Agree the temporary arrangements proposed for Erskine Library, as detailed in
Section 12.5 
• Note the work undertaken as part of the Best Value thematic review on
transformation; and 
• Note that regular reports will continue to be brought to the Board at appropriate key
junctures as the overall programme is progressed and that there is an expectation
to establish greater definition of target saving levels across the transformation
programme to support the Council’s medium term financial strategy that is
expected to be updated at the September full Council meeting. 
_________________________________________________________________________
3.  Background
3.1  Reshaping Renfrewshire is the fifth phase of the organisation’s ongoing
transformation, to ensure a financially sustainable long-term future, while improving
outcomes for our communities. As noted above, this phase will also include a
strengthened outward focus which will support the development and delivery of
strategies that will reshape how we use our council assets, redesigning the role they
serve within our communities; drive long term economic growth and develop our
strategic partnerships to support our shared goals; and secure a digital agenda that
drives the delivery of large scale savings and also transforms how we work, how we
use data to inform our decisions, and improve our service delivery and choice for
communities.
3.2  In addition to providing regular updates to Leadership Board, and alongside existing
governance supports across strategic programmes, a Transformation Board (officer
group) has been established to provide strategic oversight of the next phase of the
programme. Chaired by the Director of Finance and Resources, this group has a
membership of senior officers across the Council and will review the progress of all
projects and programmes across the organisation, explore and manage
interdependencies, share learning and support resourcing challenges. 
3.3 As previously reported to Leadership Board in February, as part of the new Best Value
methodology, Audit Scotland have introduced an annual ‘thematic review’ which
applies to all Councils, aligned to the annual audit reporting process and carried out in
addition to the rolling programme of ‘full’ Best Value audits.

Page 3

3.4 For 2024/25, the theme is ‘Transformation’ and this thematic review is currently being
finalised. The Council engaged extensively with our external auditors, Azets, over
recent months to provide a wide range of evidence of the Council’s long term approach
to transformation, our successful and sustained track record of delivery and our future
plans. It is anticipated that the thematic report prepared by Azets will be shared with
the Council after the summer and a report will be presented to the Audit, Risk and
Scrutiny Board highlighting the key findings and any recommendations. 
3.5 As part of the Best Value Audit of Renfrewshire Council which was published earlier
this month and will be considered by Council on 25 June, the Accounts Commission
recognised Reshaping Renfrewshire as ‘central’ to addressing the Council’s budget
challenge. 
4.  Progress updates – Digital 
Digital Strategy
4.1 The organisation has made significant progress in recent years to invest in digital
technology and services, changing how we work and how our customers interact with
us. The new Digital Strategy, which was developed using customer insights and in
consultation with senior managers from across the Council, builds on the success and
learnings from our previous strategy, and recognises the need for bolder, Council-wide
digital transformation. It was approved by Finance, Resources and Customer Services
Policy Board in April 2025. 
4.2 To ensure the successful delivery of this ambitious next phase, the need for a
strengthened corporate approach has been identified. Delivering the desired change
will impact all areas of the Council and will drive a coordinated programme of work
over the next five years, built around six strategic themes in support of four strategic
objectives. It is recognised that five years is a long time, particularly in the digital world,
so a review of the strategy will be conducted after year two, to ensure our objectives
remain relevant and aligned.
4.3 The four strategic objectives are:
• Our employees and residents will be digitally capable and supported in the use of
digital solutions
• We will achieve corporate transformation with a single coordinated approach that
breaks down operational silo
• Data will become a critical asset to us and the backbone to our transformation and
future decision making
• We will be a modern organisation, where our services, people and culture are ready
to deliver for the future

Page 4

4.4 Achievement of these objectives will be managed through a programme of work built
around the following six strategic themes, which have been developed in consultation
with senior managers:
• Digital Inclusion
• Data
• Our Technology and Infrastructure
• Digitally Enabled Workforce
• Leadership and Culture
• Digital Public Services
4.5 Following approval of the strategy, in the coming months a prioritised programme of
work will be created under each of the six themes. This programme of work will report
regularly to the Digital Board, where issues and risks will be surfaced and managed,
and any barriers to delivery will be resolved. The Digital Board will continue to report
to the Corporate Management Team with regular progress updates to Finance,
Resources and Customer Service Policy Board. 
Data Strategy 
4.6 Renfrewshire Council’s Data Strategy Framework, approved in 2023, is a hub/spoke
model for data management, recognising the importance of central and consistent
governance of data practices, usage and security. It provides the flexibility required for
each Council service to develop their own data strategy based on
ambitions/requirements, but ensuring these service level plans are aligned with central
governance controls. 
4.7 The Data Advisory Group (DAG), an officer group, was created to support the adoption
of the Data Strategy Framework. It meets quarterly and provides a central governance
forum with subject matter experts and individual service representation to collectively
support the improvement of data management and exploitation across all services. 
4.8 With DAG support, each service has now developed a service strategy and action plan
relevant to operational and strategic outcomes, and high-level activities are now
embedded into Service Improvement Plans, giving visibility and accountability at
Council board level of ongoing data improvement work across all services. 
4.9 The DAG also continues to develop central resources to improve data management
and sharing opportunities, such as an online data training module, Data Catalogue,
Data Principles, Customer Engagement Tracker, central Power BI Governance model,
and is a centre of excellence for corporate data requirements and challenges. It has
provided clear responsibility for data ownership across the Council and a collective
approach to better understand the Council’s data assets and opportunities to share for
wider strategic benefit.

Page 5

4.10 The DAG will continue to: 
• Ensure strategic alignment of data activities with the Council’s Digital Strategy. 
• Identify and improve data skills gaps across services in alignment with the
Council’s People Strategy. 
• Improve data quality in key line of business systems. 
• Identify data analysis requirements to improve decision making and build
capabilities within services. 
• Push the adoption of data driven dashboards from corporate tools such as the
Council’s ERP 
• Identify cross-service data sharing opportunities and appropriate technology
solutions 
Artificial Intelligence (AI) Overview
4.11 In November 2024 the Council launched ‘Millie’, our AI driven Digital Advisor in
customer contact centres. Millie is available 24/7 to answer routine enquiries from
customers calling the main contact centre number, providing 24/7 access to customer
support and freeing up our Customer Service Advisors during existing operational
hours to focus on more complex tasks and provide customers with the personalised
support they need.  All other service call handling arrangements are unaffected by this
change. 
4.12 The Millie capability provides each caller with a personal assistant who can provide
customer support and assistance in real time, handling frequent questions and routine
tasks. It means that for a high volume of calls, customers can get instant answers and
access information at any time. Where Millie cannot answer a question, or assesses
the customer requires immediate or enhanced support, she will transfer their call to the
right service, and a Customer Service Advisor will speak with them as soon as
possible. 
4.13 Millie is an additional service enhancement that complements the other existing ways
residents can contact us, including MyAccount and face-to-face appointments. By the
end of the March 2025, Millie had answered 106,576 calls, 34% (36,468) of these calls
were successfully handled by Millie and 66% (70,108) were transferred to a CSU
adviser. This level of successful handling exceeds initial plans and is expected to
continue to improve moving forward as Milli’s capability continues to develop. The team
continue to monitor the performance of the digital advisor and make regular changes
to improve the overall effectiveness of the service. 
4.14 During the implementation of Millie it was recognised that the Council was at the
forefront of AI development in Scotland and as part of sourcing suitable partner
councils to work with, opportunities have been explored on a wider basis across the
UK. In this context, the Council officers have established productive relationships and

Page 6

regularly engaged with Derby City Council who have also launched an AI driven Digital
Advisor called ‘Darcie’ as part of a wider corporate transformation programme
underpinned by AI innovation. In December 2024, Derby City Council announced a
corporate wide AI innovation programme as a key part of their overall transformation
and financial saving programme. This programme has been underpinned by an AI
Transformation Assessment which was undertaken by the council with the help of an
external AI partner. An AI Transformation Assessment is designed to support a council
to evaluate current AI readiness, identifying opportunities for AI-driven improvements,
and developing a structured roadmap for AI adoption. Derby City Council have
welcomed establishing a working relationship with the Renfrewshire Council and have
been open and highly collaborative in sharing their journey thus far to develop their AI
capability. It is envisaged that the working partnership will provide future opportunities
to jointly share best practice as well as development capacity to support accelerated
adoption by both organisations.
4.15 Based on the success of Millie so far, and learning established from the AI innovation
being progressed by Derby City Council (and other authorities across the UK), it is
planned to progress an AI Transformation Assessment across the Council over the
coming months, and which will involve as a first step commissioning an AI partner via
an appropriate procurement route. Through a series of stakeholder engagement,
workshops, data analysis, financial validation solution demonstrations and trials, this
AI Transformation Assessment will provide the Council with a clearer understanding of
how AI solutions can enhance efficiency, reduce costs, and improve service delivery. 
4.16 This critical initial assessment stage will support the development of a full business
case that is intended to be brought back to a future Board for detailed consideration
later in the year. The business case will provide a clear understanding of the scale of
opportunity and the key priorities for building on the success of Millie and progressing
the Council’s sector leading development of AI capability. It is envisaged that this
business case is likely to set out the most significant digital transformation opportunity
for the Council over the medium term to support the delivery of both financial savings
but critically delivery of better services and outcomes but also improved ways of
working as an organisation and better supporting our workforce.
Digital Experience
4.16 The Digital Experience (DXP) programme is transforming how Renfrewshire Council
delivers services and information online. By focusing on user needs, accessibility and
modern technology, it’s making it easier for residents to access services such as
council tax, benefits and waste collection. This work is helping to reduce avoidable
contact, improve satisfaction, and create a more inclusive and efficient experience for
both residents and staff.
4.17 The programme centres on three main developments: a new Renfrewshire.gov.uk
website, a modernised staff intranet, and better communication through email, text and
WhatsApp. The first phase of the new website is expected to launch in June 2025 and
will cover the most high-demand sections. Designed with mobile device users in mind,
the site will be easy to use, accessible to all, and written in plain language. As the main
source of information, it will support better service delivery across all channels,

Page 7

including letters, calls and AI-powered systems that are increasingly being used in
everyday life by citizens.
4.18 In addition, a new communications platform has recently been introduced, integrating
fully with the new website to improve functionality and reduce costs. Planning for a
new intranet is also underway and which is set to launch in 2026. It will use the same
design and technology as the public website to ensure consistency, accessibility and
value for money across the council’s digital information and services. Delivery of the
new intranet will be a critical enabler to support a range of anticipated opportunities for
improved internal working across the Council that are expected to be identified through
the AI assessment process, which again highlights the critical inter-dependency
between a high-quality internet and intranet sites which will enable some of the
potential benefits offered by developing AI capability.  
Green Print 
4.19 The Green Print project has made significant progress over the last 2 years, completing
a comprehensive case for change and business case. The business case informed the
Invitation to Tender for a new Managed Print Service which secured Canon as the
Council’s new supplier with a 35% reduction in printer fleet rolled out in 2024. This drop
in the number of printers being leased over a 4-to-6-year period will as a result support
significant savings over the lifetime of the contract. 
4.20 Since January 2024, the Council has been working with Canon to plan the roll out of
the new printer estate, aligning with the replacement of the old Xerox printers. This
required extensive planning and testing of kit prior to deployment. The project team
successfully removed 950 old printers and deployed 555 new printers over 100
corporate sites, including the school estate and public buildings such as libraries. 
4.21 The project has been extremely successful due to the project approach taken, effective
involvement of key stakeholders from the outset and excellent partnership working with
our suppliers – Canon and Xerox. The team are continuing to closely monitor the
current print volumes for each location/department for both the Canon devices as well
as the current print jobs that are being sent to our in-house print service (Document
Solution Centre).
4.22 Other notable work includes:
• a move to recycled paper, which will reduce paper costs and impact on the
environment
• working with colleagues in Member Services and with our Elected Members to
review the process for the printing and delivery of Council board papers.  Meetings
have been taking place to understand each Member’s requirement and to agree
how we can help reduce costs and contribute to Net Zero.
Purchase to Pay and Scotland Excel Project
4.23 Purchase to Pay (P2P) is the set of processes that covers the activities of requesting,
purchasing, receiving, paying and accounting for goods, services and works.  The P2P
programme is designing and implementing a new P2P model through the Council’s
existing Business World ERP platform, coupled with enhancements in technology,

Page 8

analytics and workflow which will deliver improved processes, controls, and
compliance within all areas of the P2P cycle.  As part of the first phase of the
programme the Council will decommission its use of PECOS and launch a new
Business World Procurement Module at the end of September.
4.24 At the same time, the Council has engaged Scotland Excel to undertake a programme
of spending reviews service with a view to driving out new procurement savings. These
could arise from a change to, or rationalisation of, products or suppliers, or in some
cases a fundamental reconsideration of need. As reflected in the last transformation
report, Renfrewshire Council is recognised through the independent local authority
procurement assessment process undertaken by Scotland Excel across all councils,
to be a sector leading advanced authority across all assessment criteria. In this
context, opportunities to secure further savings from procurement activities will be
more limited than that achieved in the past. Nevertheless, the programme being
progressed in partnership with Scotland Excel is expected to identify potentially a wide
range of smaller opportunities which cumulatively will support a material contribution
to the Council’s wider savings programme.
Housing Innovations Project
4.25 The Housing Innovations Project (HIP) is replacing the current housing management
system OHMS with the new system NEC Housing. This will provide a new streamlined
system and integrate several separate existing systems into one. 
4.26 Phase 1 is planned to go live by May 2026 with Phase 2 planned to go live in July
2027. Phase 2 of the project will focus on bringing the assets and repairs services, and
homelessness into the new system and allow for greater use of customer online
services, the Internet of Things (sensor technology) and better use of data analytics,
all of which will in particular provide opportunity for significant transformation.
Smart Social Housing 
4.27 Separately but linked, is the Smart Social Housing (SSH) project which sets out an
ambition to develop a business case opportunity that would support the deployment of
free market leading fibre broadband connectivity and smart sensor assets into the
Council’s social housing units. As well as delivering a digital benefit to all tenants and
helping to significantly address inequality in access to digital and on-line services, the
project would provide the foundation to support the accelerated delivery of strategic
priorities and outcomes for the Council, the Health and Social Care Partnership, and
potentially wider partners including the NHS who are seeking to progress major service
redesigns such as Hospital at Home which is highly reliant on high quality connectivity.
This would be a first-of-type project in the UK, highly innovative that seeks to build on
and leverage the benefits of the existing digital infrastructure investments delivered by
the Council across Renfrewshire, achieved primarily through the  private investment in
connectivity infrastructure attracted by the Council’s innovative Connectivity as a
Service (CaaS) framework. 
4.28 In developing the project, the Council has established a strategic partnership with
Commsworld through their CaaS framework. The premise on which the business case
for the project is being developed,  is investment in the connectivity and environment
sensors at-scale into 10,000 social homes would be self-financed through enabling

Page 9

significant improvements that would support the pro-active management and
maintenance of the housing stock, as well as support  the HSCP and wider NHS
partners to deliver digital led redesign of services which are critical to unlock financial
savings. As well as providing high quality digital connectivity at no cost to tenants, the
investment would fundamentally deliver the foundation for deploying needs-led digital
solutions into social homes to keep people safe, well, and socially connected. 
4.29 The SSH solution is intentionally focused on targeting addressing poverty and
inequalities: “Digital exclusion can have a severe impact on people’s lives. For public
service reform to be effective it needs to make sure that digitalisation leaves no one
behind.” (Audit Scotland, ‘Tackling Digital Exclusion’, August 2024). The SSH model
is underpinned with a foundational investment in at-scale connectivity, with follow-on
invest to save cases (e.g. Housing, HSCP, NHS etc.) developed around a portfolio of
in-the-home digital solutions that can be deployed as part of an initial level of services 
with future phases / services gradually added to grow the scale of  benefits, and grow 
the scale of improvements in services and associated financial savings. 
4.30 The current focus is on testing the feasibility of an invest to save case (V2) based on
a go live bundle of super-fast broadband connectivity and Internet of Things
environment sensors, to allow the Council to consider an associated business case on
options to progress and invest or not at this stage. The development of the invest to
save case (V1) was originally funded by Glasgow City Region who had secured
investment from the Department of Science, Innovation and Technology (DSIT) to
develop a range of business cases including Smart Social Housing and Net Zero.
Since the development of the original invest to save case (V1), Renfrewshire Council
has broadened the engagement with wider stakeholders (e.g. HSCP) to identify wider
benefits (V2) from the proposed SSH investment. It is envisaged that a full business
case will be brought back to the Board in the second half of this year, which will set out
the opportunity, options and potential case to progress.
Digital Inclusion 
4.31 A critical consideration when progressing the digital transformation workstream is to
ensure progress doesn’t exclude our communities and all citizens can benefit from the
options available and opportunities emerging. Renfrewshire Council has a strong track
record of advancing digital inclusion, with work highlighted as national best practice.
As outlined below, significant progress has been made in advancing digital inclusion
across Renfrewshire, with key activities, partnerships, and outcomes helping to ensure
all residents have the skills, access, and support needed to participate fully in a digital
society. 
4.32 The Citizens Voice Forum continues to collaborate with Core Group and sub-group
members to progress key digital inclusion priorities: 
DigiZones (Q4 2024/25)
• 100,056 visits recorded 
• 236 training sessions delivered 
• 208.5 hours of Digital Champion support provided 
• 14 devices loaned via the Device Lending Library

Page 10

• 8,732 public devices accessed onsite 
• 10,748 public Wi-Fi sessions logged 
Digital Champions Programme (Q4 2024/25)
• 196 learners supported 
• 120 Digital Champion sessions delivered 
• New sessions launched at Bishopton Library, supported by a new volunteer 
• 29 SIM cards issued at drop-ins to support connectivity 
• 5 new volunteers recruited (total now 19) 
• 245.5 hours of support delivered year-to-date 
• Two new drop-ins launching soon in Ferguslie and Renfrew Library, led by trained
library supervisors 
Device Recycling
• Pachedu has nominated two team members to lead development of a community-
led device recycling project, supported by Council officers.
• Site visits to Scottish device recycling organisations underway to explore:
o Recycling processes and procedures 
o Space and resource requirements 
o Suitable device types 
DigiRen
• Ongoing cross-sector collaboration through regular meetings 
• DigiRen Directory launched to showcase local and national digital inclusion
resources 
• Partnering with SCVO to baseline digital skills across DigiRen members via the
Essential Digital Skills Survey 
• Planning underway for DigiKnowVember – a month-long programme of digital
inclusion events in November, led by a newly formed steering group 
5.  Progress update - Connected Communities 
5.1 Connected Communities is a transformative programme of work, fundamentally
shifting how the organisation works with our communities, strengthening relationships,
and making it easier for local people to access the support they need from different
services, significantly aligned with the principles of early intervention and prevention.
The workstream has been split into two phases. 
5.2 Phase 1 has involved the development of a new Connected Communities function
within the Policy and Partnerships service. This brings together the corporate focus on
community capacity, local partnerships, voice and influence and community
investment. This is progressing well, with the new service structure agreed and
communicated. The Connected Communities Management Team have been recruited
and in place and recruitment processes are being progressed for the rest of the new
service are due to be completed over the course of the summer, completing the Phase
1 stage. 
5.3 Phase 2 is a Council wide change programme to explore the opportunities for
strengthening relationships between the Council and communities. Alongside financial
savings, the programme will deliver change in the Council’s relationship with

Page 11

communities and partners and between staff; promote community empowerment,
participation and capacity; improve connections; make better use of all resources;
make every contact count; and identify opportunities to support early intervention and
prevention through integrated advice and support. 
5.4 Phase 2 has now commenced with project governance established and 3 key priority
workstreams have been identified:
• Developing early help models of advice and support
• Developing placed based approaches in terms of service delivery and development
• Progressing our making every contact count programme, and strengthening the
way in which the Council engages with local people and communities 
Updates on the progress made through the Phase 2 work programme will be provided
to future board cycles. 
6. Progress update - Consultation and Engagement 
6.1 A new Consultation and Engagement Strategy was approved by Leadership Board in
February 2025 and sets out standards and guidance for planning, conducting and
learning from public engagement. It is intended to support greater consistency in the
approach to public engagement, to promote data-sharing across the Council, and to
help build trust with communities and other stakeholders.  
6.2 An officer group is being established which will provide strategic oversight, advice and
guidance, and review new Council consultation and engagement activity. Work is also
underway to develop a framework to monitor the effectiveness of community
engagement and an action has been added to the Council Plan Performance
Framework to reflect this. Updates will be provided to the Leadership Board on a six-
monthly basis. 
6.3 The introduction of a Resident Survey in 2025 supports a pilot approach as part of the
Council’s commitment to improving our dialogue with our residents and communities.
The results of the survey will be used to help inform council budget setting and
decisions for 2026/27 and provide a greater understanding of our residents’ needs and
priorities. It will also establish a baseline of current perceptions. A technical partner
has been commissioned to undertake the research on behalf of Council.
6.4 A comprehensive, robust survey has been carried out by telephone with a
representative sample of Renfrewshire residents. A supplementary online version of
the survey was also made available. Paper copies were available to complete in
libraries. Translations and other accessible formats were also provided on request. 
6.5 Follow-up focus groups will be organised to explore any significant quantitative
findings. Members of the public will be recruited from the telephone or online survey to
participate in each group, and experienced moderators will facilitate each group. 
6.6 Following data analysis, the survey findings will be reported to the Leadership Board
later this year. Summary findings will also be published on the Council website and
promoted via Council owned channels (newsletters and social media).

Page 12

7.  Progress update - Learning Estate Strategy
7.1 The Learning Estate Strategy report, presented at the Education and Children’s
Services Policy Board last month, introduced a Business Case development
framework. This framework aligns with industry best practices outlined in the HM
Treasury Green Book and is designed to assess viable options for the 13 priority
education establishments in Renfrewshire, along with their associated timescales. To
support this, in February 2025, the Council approved a recurring budget of £2.5 million
as an initial contribution to unlock up to £170million over future years for this major
investment programme.
7.2 Work continues on site to deliver the new Paisley Grammar School Community
Campus, with completion remaining on track for the summer of 2026. A contractor is
now in place and working in partnership with the Council and a wider design team to
progress the detailed design of the extended Park Mains High School. The new
primary school in Dargavel has been officially designated Thistle Primary School,
following a vote conducted among pupils. Civil engineering works have been
progressing on site for several weeks, initiating the foundational preparations required
to support the structural load of the future building. These works are scheduled to
continue throughout the summer, concurrent with the completion of the final detailed
design phase.
8.  Progress update - Strategic Property Review
8.1 This workstream is ongoing and is interlinked to the work of the Learning Estate
Strategy, the HSCP Sustainable Futures Programme and to the OneRen review
reported in more detail to Leadership Board through a separate report on the agenda. 
8.2 In May 2025, the Infrastructure, Land and Environment Policy Board agreed the sale
of Montrose Care home to a care home provider, to continue its use as a care home.
The Community Asset Transfer (CAT) Sub-Committee have continued to make
determinations on Council property and land with a CAT application being approved
by Board for the Beechwood Community Centre to continue its use as a community
facility. 
8.3 The Renfrewshire Valuation Joint Board and OneRen Museum team have relocated
into Renfrewshire House following the sale of the Robertson Centre being concluded,
with an engineering company relocating to use as their new headquarters in Paisley. 
8.4 As part of the Strategic Property Review workstream, work continues on collecting
appropriate data and looking at suitable themes to allow strategic decisions to be
made, where possible, in relation to the wider Council portfolio of buildings.
9.  Progress update - Roads 
9.1 The roads programme consists of 53 carriageway resurfacing schemes and 31 footway
resurfacing schemes, with a number of strategic schemes which will be undertaken in
this programme. 
9.2 As part of this year’s programme there will be delivery of the first phase of the
roundabout  programme, with the aim of enhancing the infrastructure and visual appeal
of roundabout infrastructure across Renfrewshire, with an initial 21 roundabouts

Page 13

programmed for works over this financial year, as detailed in the Infrastructure, Land
and Environment Policy Board papers in May. 
9.3 Total roads investment this year is £8.5million, with almost £400,000 planned
investments associated with the roundabout infrastructure.
10.  Progress update - Net Zero 
10.1 The previous transformation update report of February 2025 set out the Council’s short
to medium term position in Renfrewshire will focus on ‘Heat and Fleet’ to transform the
approach to the provision of clean energy and sustainable travel in Renfrewshire. 
10.2 This approach was confirmed at the May 2025 Planning and Climate Change Policy
Board where a 3-year programme of activity was highlighted with planned investment
in year 1 of upwards of £1million in the areas below:
• Investment in Building Management Systems (BMS) Installation and upgrade of
BMS across the estate to maximise energy efficiency to drive efficiencies within
utility usage and have a positive impact on the Council’s emissions. 
• Solar PV (Photovoltaic) Expansion Extension of Solar PV Array across 15 existing
public buildings and installing a new system at St Fillan's Primary School to deliver
a reduction in the Council’s emissions.
• Implementation of air reduction technology across 68 properties to reduce
maintenance of heating systems and increase energy efficiency across public
buildings.
• Progressing a feasibility study to identify opportunities and benefits of a potential
largescale windfarm in Renfrewshire to bring benefits including renewable and
clean energy, cost-effectiveness and land use. 
• Progressing a feasibility study into an Investment Grade Business Case to deliver
a large-scale solar farm on Linwood Moss former landfill site. 
• Electric Vehicle (EV) Fleet Expansion through purchase of additional EVs to
expand the Council’s existing EV fleet and associated investment in fleet charging
infrastructure as well as continuing the support the City Region approach to public
charging infrastructure to ensure our fleet and travel behaviours are as sustainable
as they can be.
11.  Progress update - Workforce
11.1 Significant foundation work over the past two years has been undertaken to develop a
suite of proposals to modernise workforce terms and conditions, including ongoing
engagement with trade unions and services, data and cost analysis and benchmarking
exercises with other local authorities and public bodies where appropriate. 
11.2 Earlier this month a detailed interim update paper was reported to Finance, Resources
and Customer Services Policy Board to provide a progress update and outline the next
steps. Work on an equalities impact assessment continues and engagement is also
ongoing with trade unions to allow them to ballot their members at the appropriate point

Page 14

in the process. It is anticipated a report will be taken to the September meeting of the
Policy Board to outline recommendations for agreement on public holidays. 
12.  Progress update – Review of Cultural & Leisure Services Commissioned through
OneRen
12.1 As previously reported to the Board, officers are currently working with OneRen to
undertake a strategic review of current commissioning arrangements for cultural and
leisure services.  Three key workstreams have been identified: 
• Workstream 1 - Community and Leisure
• Workstream 2 - Culture and Libraries 
• Workstream 3 - Finance and Governance 
12.2 As specified in the February report, the review is being informed and guided by the
following principles:
• Services should be specified in a way that supports the Council’s agreed priorities,
along with a new suite of performance measures.
• Services should be sustainable and affordable.
• The Council and OneRen will work with communities to ensure that leisure and
culture services are planned and delivered in a fair and consistent way.
In line with the principles of the Council’s Strategic Property Review, there is a
presumption for the co-location of services wherever possible, and services will be
delivered from flexible, sustainable, well-designed, and high-quality spaces. 
12.3 Much of the initial focus of each workstream has been on establishing key information
relating to the activities of OneRen and associated Council services, to establish an
agreed baseline position for all OneRen services and facilities, including the financial
performance of OneRen, and business plan delivery assessments for OneRen cultural
and commercial services. In addition, work is also progressing to detail utilisation and
demand for services and the consequential impact on property/facility occupancy and
condition.
12.4 Consideration of this data will inform the development of options for future service
provision across services commissioned from OneRen which will be presented to a
future Board meeting. 
12.5 While this work is progressing, a pressing decision that has emerged in relation to
library provision within Erskine. The lease for Erskine Library expires in May 2026 and
the landlord has indicated that they would not be willing to extend the current lease
beyond that date. There is therefore a requirement to consider options to reprovision
the service beyond this date and this will be considered as part of this wider
commissioning exercise and underpinned by the principle of seeking to co-locate
services where possible. It is however acknowledged that given the timescale involved
in terms of the lease ending there is a requirement to put on place short term
reprovision arrangements whilst the wider commissioning exercise and options
appraisal progresses. In this context, a suitable temporary building, currently located

Page 15

at Renfrew Sports Centre is available and can be relocated to space available at
Erskine Sports Centre. The relocation to this site can be easily accommodated due to
all necessary utility connections being available from previous temporary buildings at
the location. Ongoing costs can be accommodated from the savings in lease
payments, and the floor space available is similar to that utilised in the current premises
which will ensure that current service arrangements can be maintained.
12.6 The move to a temporary building at the sports centre will ensure there is no loss of
provision in Erskine when the current lease expires, and it enables the Council to
consider a longer term options and solution within the context of the outcomes of the
wider service and property reviews currently underway. Elected members will be aware
that a similar modular building was sited at the Lagoon Centre, prior to the opening of
the new Paisley Central Library, and operated very successfully and the learning and
operational experience from that arrangement would be applied in this instance.
12.7 The temporary relocation of current provision from Erskine Library will also provide a
valuable opportunity for OneRen and the Council to work together with the community
to identify opportunities to strengthen the links between library provision and wider
Council and partner services, including in relation to adult and family learning, youth
work and activities which support wider community health and wellbeing. An equality
impact assessment will be developed in relation to this proposal.
13. National developments
13.1 The Council continues to engage with the national transformation programme being
progressed by SOLACE and the Improvement Service. In addition to the various
workstreams being progressed, officers will also engage with specific projects
including in relation to collaborative procurement opportunities relating to fleet, waste
and digital. This work is currently at a relatively early stage of development and more
significant updates will be expected to be provided at future board cycles.
14. Next steps 
14.1 Alongside the regular updates for each individual workstream to the relevant Policy
Boards, overview progress updates on the Reshaping Renfrewshire programme will
continue to be reported to Leadership Board alongside the financial reporting to
Council and Finance, Resources and Customer Services Policy Board. 
14.2 Following the Best Value thematic review on transformation, any relevant actions will
be added to the Corporate Improvement Plan, with progress also reported regularly to
Leadership Board. 
_________________________________________________________________________
Implications of the Report 
1. Financial – the transformation programme will continue to play a key role in supporting
the Council’s financial sustainability. The one-off costs associated with the temporary
library installation at Erskine will be met from the Service Modernisation and Reform
Fund. 
2.  HR & Organisational Development – none.

Page 16

3. Community/Council Planning – the transformation programme focuses resources on
the delivery of priority outcomes as outlined in the Council Plan. 
4.         Legal - none 
5.         Property/Assets – section 8 of the report provides an update on the Strategic Property
Review which supports the effective us of Council properties. Section 12 of the report
outlines a proposal in relation to a temporary solution for provision of library services
in Erskine. 
6.         Information Technology – section 4 notes a number of progress updates related to the
Digital and ICT agenda. 
7.         Equality and Human Rights – there are no negative impacts on equality groups or
potential for infringement of individuals’ human rights arising from the
recommendations contained in the report. The report notes an EQIA is being
undertaken on the terms and conditions workstream and will be progressed in relation
to the proposed temporary library provision options being recommended in relation to
Erskine Library as set out in 
8.         Health and Safety - none 
9.         Procurement – section 4 includes an update on the P2P and Scotland Excel projects
as part of the overall transformation programme. 
10.       Risk – the transformation programme is a key element of mitigating the medium-term
financial challenge for the Council. 
11.       Privacy Impact – none 
12.       COSLA Policy Position – none 
13. Climate Risk – section 10 of the report provides an update in relation to Net Zero. 
14. Children’s Rights – section 7 provides an update on the Learning Estate Strategy which
will directly impact children and young people. When considering any future school
provision, the impact this will have on children is a key consideration, and any work will
be based around the direct needs of children to allow their education experience to
thrive. 
Author:         Pauline Moss, Strategy, Policy and Insight Manager