Democracy Spraffa

Agenda Document Pack - Leadership Board - 23/04/2025

Renfrewshire Council · 23 April 2025
Back to Leadership Board — 23 April 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

16/04/2025 
Notice of Meeting and Agenda
Leadership Board 
Date Time Venue
Wednesday, 23 April 2025 13:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN               
Membership 
Councillor Iain Nicolson (Convener):     Councillor Jacqueline Cameron (Depute Convener):    
Councillor Alison  Ann-Dowling:  Councillor Michelle Campbell:  Councillor Graeme Clark: 
Councillor Audrey Doig:  Councillor Neill Graham:  Councillor Anne Hannigan:  Councillor Marie
McGurk:  Councillor Iain McMillan:  Councillor Kevin Montgomery:  Councillor Emma Rodden: 
Councillor John Shaw:  Councillor Andy Steel:   
Hybrid Meeting
Please note that this meeting is scheduled to be held in the Council Chambers.  However, it is a
hybrid meeting and arrangements have been made for members to join the meeting remotely
should they wish. 
Members of the Press and Public
Members of the press and public wishing to attend the meeting should report to the customer
service centre where they will be met and directed to the meeting. 
Further Information
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior to the
meeting at the Customer Service Centre, Renfrewshire House, Cotton Street, Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk 
MARK CONAGHAN
Head of Corporate Governance

Page 2

16/04/2025 
Webcasting of Meeting
This meeting will be filmed for live or subsequent broadcast via the Council’s internet site – at
the start of the meeting the Convener will confirm if all or part of the meeting is being filmed.  To
find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home

Page 3

16/04/2025 
Items of business      
Apologies
Apologies from members. 
Declarations of Interest and Transparency Statements
Members are asked to declare an interest or make a transparency
statement in any item(s) on the agenda and to provide a brief
explanation of the nature of the interest or the transparency statement. 
1 Revenue and Capital Budget Monitoring Report
Joint report by Chief Executive, Director of Finance & Resources and
Chief Financial Officer, Renfrewshire Health & Social Care Partnership 
1 - 14 
2 Fairer Renfrewshire Sub-committee
Minute of meeting of the Fairer Renfrewshire Sub-committee held on 26
March 2025 
15 - 18 
3 Fairer Renfrewshire Update
Report by Chief Executive 
19 - 28 
4 Community Planning – Six-monthly update
Report by Chief Executive 
29 - 34 
5 Renfrewshire Integration Joint Board – Development of
Refreshed Strategic Plan
Report by Chief Executive 
35 - 42 
6 Review of OneRen's Annual Business Plan for 2025/26
Report by Chief Executive 
43 - 68 
7 Funding for Engage Renfrewshire 2025/26
Report by Chief Executive 
69 - 78  
EXCLUSION OF PRESS AND PUBLIC
The Board may by resolution exclude the press and public from the
meeting during consideration of the following items of business as
it is likely, in view of the nature of the business to be transacted,
that if members of the press and public are present, there could be
disclosure to them of exempt information as defined in paragraph
14 of Part I of Schedule 7A of the Local Government (Scotland) Act,
1973.

Page 4

16/04/2025 
Exempt Item
Exempt documents are no longer available in print format.  You will
require to log in to the Leadership Board Exempt Items area on CMIS to
access documents.  Please note that access to exempt documents is
now restricted. 
8 Afghan Resettlement Programme
Report by Chief Executive

Page 5

___________________________________________________________________
To: Leadership Board
On: 23 April 2025
___________________________________________________________________
Report by: Chief Executive, Director of Finance and Resources, and Chief Finance
Officer Renfrewshire HSCP
___________________________________________________________________
Heading: Revenue and Capital Budget Monitoring as at 7 January 2025
___________________________________________________________________
1. Summary
1.1. At the close of reporting Period 10 on 7 January 2025, the projected revenue
outturn at 31 March 2025 for those services reporting to the Leadership Board
was an overspend position of £3.618m (2.8%) against the revised budget for
the year.
1.2. The projected capital outturn at 7 January 2025 for projects reporting to the
Leadership Board is a break even position against the revised budget for the
year.
1.3. This is summarised in the tables below and further analysis is provided in the
Appendices. 
Revised
Annual
Budget
£000
Projected
Outturn
£000
Budget
Variance
(Adv)/Fav
£000
Budget
Variance
%
Revenue    
Adult Services 106,810 110,476 (3,666) (3.4%)
Chief Executive’s Service 20,487 20,439 48 0.2%
Total 127,297 130,915 (3,618) (2.8%)
Capital 24,643 24,643 0 0% 
Item 1
Page 1 of 78

Page 6

2. Recommendations
2.1. Members are requested to:
a) Note the projected Revenue outturn overspend position of £3.618m;
b) Note the projected Capital outturn break-even position; 
c) Note the budget adjustments detailed at section 6.2.
_________________________________________________________
3. Revenue Budget Projection – overspend of £3.618m by 31 March 2025
3.1. The tables in Appendix 1 present the projected year-end position for all
services reporting to this board, by both subjective analysis (what the budget
is spent on) and objective analysis (which division is spending the budget).
Significant variances affecting the projected position are analysed further
below.
3.2. It should be noted that the projected outturn position reported here is based
on the latest information available, which is subject to change during the
financial year. This is the last Budget monitoring report until the outturn
position is presented to the Council in June. Budget holders are obliged to
seek mitigating action to minimise significant budget variances.
_________________________________________________________
4. Objective Analysis – Significant Variances
4.1. Adult Services - £3.666m overspend
The overspend is mainly due to external care at home packages for both
Older People and those with Physical or Sensory Difficulties. This results from
increased acuity of patients with more complex needs discharged from
hospital, meaning more intensive Care at Home packages are required to
support people to remain in their own homes. The overspend is further
impacted by inflationary increases as a result of the adult supported living
framework renewal in November 2024.  Since the last report the overspend
has reduced by £0.977m mainly due to vacancy management controls now in
place, and further recovery of payments relating to changes in package costs.
This forecast position now includes costs associated with the care at home
staff regrade. 
4.2. Chief Executive’s Services - £0.048m underspend
There are no significant variances to report for those divisions of the Chief
Executives Service reporting to this Policy Board.
_________________________________________________________ 
Page 2 of 78

Page 7

5. Subjective Analysis – Significant Variances
5.1. Employee Costs - £1.559m underspend 
This forecast underspend predominantly arises within Adult Services
(£1.512m) due to the ongoing recruitment challenges and retention issues
across all service areas due to the limited availability of the required skills mix. 
5.2. Premises Related - £0.136m overspend 
This forecast overspend within Adult Services relates to increased cleaning
costs and repairs, including the purchase of track hoists. 
5.3. Transport Related - £0.050m underspend 
This forecast underspend relates fully to Adult Services and reflects current
vehicle demand for the service and a reduction in employee travel costs. 
5.4. Third Party Payments - £4.829m overspend 
This forecast overspend relates fully to Adult Services and is mainly due to
external care at home packages. This results from increased acuity of patients
discharged from hospital, with more complex needs, meaning more intensive
Care at Home packages are required to support people to remain in their own
homes. Further overspends are forecast within adult supported living
packages and carer's respite, reflective of client needs and demand for these
services. The position is further impacted by anticipated inflationary increases
as a result of the adult supported living framework renewal in November 2024
and the agenda for change increase on the Nursing National Care Home
Contract rate.  Since the last report the overspend has reduced by £1.292m
mainly due to the ongoing review and scrutiny of third party payments. 
5.5. Transfer Payments - £0.325m overspend 
This forecast overspend arises within Adult Services due to a projected
increase to the provision for bad debts, based on current outstanding debt
levels. 
5.6. Income - £0.085m over-recovery 
Adult Services is currently reporting an expected over-recovery on income
from community alarms due to an increase in the number of service users;
this offsets community alarm contractual increases. The projected over-
recovery also relates to funds received for new charging orders registered so
far during 2024/25, and also new out-of-area placements within our care
homes allowing us to recover additional income.
_________________________________________________________
Page 3 of 78

Page 8

6. Revenue Budget Virements
6.1. Under the Council’s financial regulations, Directors and their nominated
officers, in consultation with the Director of Finance and Resources, have
certain delegated authority to transfer sums between subjective budget
headings within a service division to enable budget management throughout
the financial year. This is known as budget virement. 
Transfers between divisions of the same service / department in excess of
£100,000, and transfers between services / departments must be authorised
by the respective service Director and the Director of Finance and Resources
for submission to the relevant policy board for approval. 
6.2. The following budget adjustments are the allocation of centrally-held and
reserve budgets, and are therefore for noting only: 
Objective Heading Subjective Heading  Amount
(£m)
Reason
Adult Services Employees 0.350 Pay award inflation 24/25
transferred from centrally-
held budgets
Chief Executive’s
Service Employees  0.155 
Chief Executive’s
Service
Supplies and
Services 0.139
Pay award inflation 24/25 
for OneRen transferred from
centrally-held budgets
Chief Executive’s
Service Transfer Payments 0.066
Fairer Renfrewshire project
transferred from ringfenced
reserves
_________________________________________________________
7. Capital Budget Projection - break even position by 31 March 2025 
7.1. The Capital Investment Programme 2024/25 to 2028/29 was approved by the
Council on 29 February 2024. The Leadership Board approved capital spend
for 2024/25 was £28.034m. 
7.2. The in-year Capital budget is forecast to break even by 31 March 2025
however, this will be monitored as the projects progress. Further details of the
programme can be found in the Capital Monitoring report at Appendix 2. 
7.3. Budget adjustments totalling £3.391m since Period 8 have taken place
between years to reflect revised programming of capital projects. The revised
capital spend for 2024/25 is £24.643m, and details of these adjustments are
as follows: 
Page 4 of 78

Page 9

Capital Budget Adjustments
Project Amount
(£m)
Reason
GAIA Regeneration (3.391) Reprofiled from 2024/25 to 2025/26
to reflect expected cash flow timings.
Total (3.391) 
Implications of the Report
1. Financial 
The projected budget outturn position for the Leadership Revenue budget is an
overspend of £3.618m (2.8%) at 31 March 2025.  Income and expenditure will
continue to be monitored closely for the rest of the financial year and as far as
possible, steps will be taken by services to mitigate any overspend.  
The projected outturn position for the Leadership Capital budget is break even,
after the adjustments outlined at section 7.     
2. HR & Organisational Development 
None directly arising from this report. 
3. Community/Council Planning
Community Plan
Our Renfrewshire is thriving The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Our Renfrewshire is well 
Our Renfrewshire is fair 
Our Renfrewshire is safe 
Council Plan
Reshaping our place, our
economy and our future The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Building strong, safe and resilient
communities
Tackling inequality, ensuring
opportunities for all
Creating a sustainable
Renfrewshire for all to enjoy
Ongoing revenue and capital budget
monitoring is a tool to enable good
financial management so that the Council
has resources now and in the future for
continued service delivery.
Working together to improve
outcomes 
Page 5 of 78

Page 10

4. Legal 
There are no direct implications arising from the recommendations in this
report. 
5. Property/Assets 
The capital expenditure noted in this report will result in new assets (City Deal),
regeneration (GAIA and AMIDS) and refurbishment and improvement of leisure
and culture assets. 
6. Information Technology 
While ICT assets and revenue costs are included within these reported
budgets, there are no direct implications arising from the recommendations in
this report. 
7. Equality & Human Rights 
While certain areas of spend may impact on particular groups, any such impact
would be assessed prior to the spend being incurred, therefore there are no
direct implications arising from the recommendations in this report. 
8. Health & Safety 
The capital expenditure noted in this report will result in lifecycle maintenance
improvements to existing properties and replacement of ICT assets, which may
in some cases rectify health and safety issues. 
9. Procurement 
While Procurement is a key consideration prior to the Council incurring any
revenue or capital spend, there are no direct implications arising from the
recommendations in this report. 
10. Risk 
The potential financial risk that the Council will overspend its approved revenue
budgets for the year is managed at a Council-wide level by the Chief Executive
and Directors. 
11. Privacy Impact 
There are no direct implications arising from the recommendations in this report 
12. Cosla Policy Position 
There are no direct implications arising from the recommendations in this
report. 
Page 6 of 78

Page 11

13. Children’s Rights 
There are no direct implications arising from the recommendations in this
report. 
14. Climate Change 
The Council aims to reduce its carbon and other emissions to net zero by 2030,
however there are no direct implications arising from the recommendations in
this report. 
_________________________________________________________ 
List of Background Papers
Revenue Budget and Council Tax 2024/25, Council, 29 February 2024.
2024-25 Delegated Health and Social Care Budget, Renfrewshire Integration Joint
Board, 22 March 2024
Non-Housing Capital Investment Programme, Prudential Framework and Treasury
Management Strategy, and Capital Strategy 2024/25 – 2028/29, Council, 29
February 2024.
___________________________________________________________________ 
Authors:  Revenue - Valerie Howie, Finance Business Partner / Alison Burns,
Corporate Finance Manager
Capital – Geoff Borland, Finance Manager
Page 7 of 78

Page 12

Page 8 of 78

Page 13

Appendix 1 
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2024/25
1 April 2024 to 7 January 2025                  
POLICY BOARD :  LEADERSHIP BOARD                  
Objective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised
Annual
Budget at
Period 10
Projected
Outturn
Budget Variance 
(Adverse) or
Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Adult Services 106,460 350 106,810 110,476 (3,666) (3.4%) (4,643) 977
Chief Executive's Service 20,127 360 20,487 20,439 48 0.2% 35 13
NET EXPENDITURE 126,587 710 127,297 130,915 (3,618) (2.8%) (4,608) 990                  
Subjective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised
Annual
Budget at
Period 10
Projected
Outturn
Budget Variance 
(Adverse) or
Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Employees 41,672 2,294 43,966 42,407 1,559 3.5% 1,712 (153)
Premises Related 839 1 840 976 (136) (16.2%) (71) (65)
Transport Related 814 0 814 764 50 6.1% 51 (1)
Supplies and Services 18,395 140 18,535 18,556 (21) (0.1%) (122) 101
Third Party Payments 68,585 350 68,935 73,764 (4,829) (7.0%) (6,121) 1,292
Transfer Payments 26,354 364 26,718 27,043 (325) (1.2%) (103) (222)
Support Services 106 1 107 108 (1) (0.9%) 0 (1)
GROSS EXPENDITURE 156,765 3,150 159,915 163,618 (3,703) (2.3%) (4,654) 951
Income (30,178) (2,440) (32,618) (32,703) 85 0.3% 46 39
NET EXPENDITURE 126,587 710 127,297 130,915 (3,618) (2.8%) (4,608) 990 
Page 9 of 78

Page 14

Appendix 1 
Objective Summary
Annual Budget
at Period 8
Budget
Adjustments
Revised Annual
Budget at
Period 10
Projected
Outturn
Previous Projected
Outturn Variance
Movement
£000 £000 £000 £000 £000 % £000 £000
Older People 59,444 223 59,667 61,965 (2,298) (3.9%) (2,636) 338
Physical or Sensory Difficulties 14,347 13 14,360 15,086 (726) (5.1%) (824) 98
Learning Difficulties 27,255 98 27,353 27,181 172 0.6% (294) 466
Mental Health Needs 4,697 12 4,709 5,548 (839) (17.8%) (1,020) 181
Addiction Services 717 3 720 694 26 3.6% 131 (105)
NET EXPENDITURE 106,460                    350 106,810 110,476 (3,666) (3.4%)                      (4,643)                    977
Subjective Summary
Annual Budget
at Period 8
Budget
Adjustments
Revised Annual
Budget at
Period 10
Projected
Outturn
Previous Projected
Outturn Variance
Movement
£000 £000 £000 £000 £000 % £000 £000
Employees 38,007 2,140 40,147 38,635 1,512 3.8% 1,673 (161)
Premises Related 456 1 457 593 (136) (29.8%) (70) (66)
Transport Related 813 0 813 763 50 6.2% 51 (1)
Supplies and Services 3,671 1 3,672 3,688 (16) (0.4%) (97) 81
Third Party Payments 68,585 350 68,935 73,764 (4,829) (7.0%) (6,121) 1,292
Transfer Payments 24,389 298 24,687 25,033 (346) (1.4%) (126) (220)
Support Services 74 0 74 75 (1) (1.4%) 1 (2)
GROSS EXPENDITURE 135,995 2,790 138,785 142,551 (3,766) (2.7%)                      (4,689) 923
Income (29,535) (2,440) (31,975) (32,075) 100 0.3% 46 54
NET EXPENDITURE 106,460 350 106,810 110,476 (3,666) (3.4%)                      (4,643)                    977
Budget Variance
(Adverse) or Favourable
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2024/25
1 April 2024 to 7 January 2025
Budget Variance
(Adverse) or Favourable
POLICY BOARD:  LEADERSHIP BOARD - ADULT SERVICES
Page 10 of 78

Page 15

Appendix 1 
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2024/25
1 April 2024 to 7 January 2025                  
POLICY BOARD:  LEADERSHIP BOARD - CHIEF EXECUTIVE'S SERVICE                  
Objective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised
Annual
Budget at
Period 10
Projected
Outturn
Budget
Variance 
(Adverse) or
Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Chief Executive and Management 268 12 280 278 2 0.7% (1) 3
Policy and Commissioning 3,705 147 3,852 3,822 30 0.8% 9 21
Marketing and Communications 2,719 61 2,780 2,764 16 0.6% 27 (11)
City Deal & Infrastructure 29 0 29 29 0 0.0% 0 0
Leisure Services (incl Renfrewshire Leisure) 13,406 140 13,546 13,546 0 0.0% 0 0
NET EXPENDITURE 20,127 360 20,487 20,439 48 0.2% 35 13                  
Subjective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised
Annual
Budget at
Period 10
Projected
Outturn
Budget
Variance 
(Adverse) or
Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Employees 3,665 154 3,819 3,772 47 1.2% 39 8
Premises Related 383 0 383 383 0 0.0% (1) 1
Transport Related 1 0 1 1 0 0.0% 0 0
Supplies and Services 14,724 139 14,863 14,868 (5) 0.0% (25) 20
Third Party Payments 0 0 0 0 0 0.0% 0 0
Transfer Payments 1,965 66 2,031 2,010 21 1.0% 23 (2)
Support Services 32 1 33 33 0 0.0% (1) 1
GROSS EXPENDITURE 20,770 360 21,130 21,067 63 0.3% 35 28
Income (643) 0 (643) (628) (15) (2.3%) 0 (15)
NET EXPENDITURE 20,127 360 20,487 20,439 48 0.2% 35 13
Page 11 of 78

Page 16

Page 12 of 78

Page 17

Appendix 2 
Prior Years Approved  Budget Revised Projected
Expenditure Budget Adjustments Budget Outturn Total Approved Projected
to 31/03/2024 2024-25 since previous 2024-25 2024-25 Budget Outurn
Project Title Board report to 31-Mar-29 to 31-Mar-29
£000 £000 £000 £000 £000 £000 £000
LEISURE SERVICES
Artificial Pitches Fund 0 800 0 800 800 0 0% 800 800 0 0%
Community Halls Refurbishment 24,920 162 0 162 162 0 0% 25,751 25,751 0 0%
Linwood Running Track at On-X 4 450 0 450 450 0 0% 454 454 0 0%
Lagoon Internal Play Centre 0 0 0 0 0 0 0% 1,000 1,000 0 0%
Total Leisure Services 24,924 1,412 0 1,412 1,412 0 0% 28,005 28,005 0 0%
CHIEF EXECUTIVES
City Deal Projects
Glasgow Airport Investment Area 40,849 2,215 0 2,215 2,215 0 0% 43,064 43,064 0 0%
Clyde Waterfront & Renfrew Riverside 98,513 19,261 0 19,261 19,261 0 0% 117,824 117,824 0 0%
Airport Access 2,934 0 0 0 0 0 0% 141,992 141,992 0 0%
Economic Development
GAIA Regeneration 0 3,391 (3,391) 0 0 0 0% 3,391 3,391 0 0%
AMIDS: Public Realm Phase 1 Netheron Square 3,808 126 0 126 126 0 0% 3,933 3,933 0 0%
AMIDS: District Heating Network 6,783 311 0 311 311 0 0% 7,093 7,093 0 0%
AMIDS: South 5,432 1,318 0 1,318 1,318 0 0% 43,098 43,098 0 0%
Total Chief Executives 158,319 26,622 (3,391) 23,231 23,231 0 0% 360,395 360,395 0 0%
TOTAL LEADERSHIP BOARD 183,243 28,034 (3,391) 24,643 24,643 0 0% 388,400 388,400 0 0%
*Rolling programmes have a prior year year expenditure of £0 as the expenditure is not directly linked from one year to the next as a singular project.
RENFREWSHIRE COUNCIL
CAPITAL INVESTMENT STRATEGY - NON-HOUSING SERVICES
1st April to 7th January 2025
POLICY BOARD: LEADERSHIP
Current Year 2024-25 Full Programme - All years
Budget Variance
(Adverse) or
Favourable
Budget Variance
(Adverse) or
Favourable
Page 13 of 78

Page 18

Page 14 of 78

Page 19

Minute of Meeting
Fairer Renfrewshire Sub-committee 
Date Time Venue
Wednesday, 26 March 2025 10:00 Council Chambers (Renfrewshire), Council
Headquarters, Renfrewshire House, Cotton
Street, Paisley, PA1 1AN 
Present: Councillor Jacqueline Cameron, Councillor Graeme Clark, Councillor Anne
Hannigan, Councillor Marie McGurk, Councillor Iain Nicolson, Councillor Andy Steel 
Chair
Councillor J Cameron, Convener, presided. 
In Attendance
L McIntyre, Head of Policy & Partnerships, A Walter, Connected Communities Manager, D
Dunn, Social Renewal Lead Officer and B Jardine, Senior Planning & Policy Development
Officer (Poverty & Equalities) (all Chief Executive’s); and E Gray, Senior Committee
Services Officer and D Cunningham, Committee Services and Licensing Officer (both
Finance & Resources). 
Transparency Statement
Councillor Clark declared a connection to items 1(a) – Cost of Living Update and 1(b) -
Cost of Living Dashboard by reason that a family member was employed by Active
Communities. However, he indicated that he had applied the objective test and did not
consider he had an interest to declare and intimated that it was his intention to remain in
the meeting and to take part in any discussion or voting thereon. 
Declarations of Interest
There were no declarations of interest intimated prior to the commencement of the
meeting.  
Item 2
Page 15 of 78

Page 20

Webcasting of Meeting
Prior to the commencement of the meeting the Convener intimated that this meeting
of the Sub-committee would be filmed for live or subsequent broadcast via the
Council's internet site. 
1(a)  Cost of Living Update
There was submitted a report by the Chief Executive relative to an overview of the
key context and evidence around current pressures on household finances, both in
terms of household income and expenditure. 
The report highlighted a number of changes in economic factors which included
inflation, national living wage and tax credits. 
DECIDED: That the report be noted. 
1(b)  Cost of Living Dashboard
There was submitted a report by the Chief Executive relative to an overview of key
indicators and their movement from the last reporting period, supported by additional
statistical information, analysis and graphs which illustrated longer-term trends. 
DECIDED:  That the report be noted. 
2 Fairer Renfrewshire Programme Update
There was submitted a report by the Chief Executive relative to key projects being
progressed through the Fairer Renfrewshire Programme. 
The report provided updates on current projects, highlighted future key priorities and
gave an overview of the proposals, priorities and next steps for 2025. 
DECIDED:  That the report be noted. 
3 Fairer Renfrewshire Programme - Priorities for 25/26
There was submitted a report by the Chief Executive relative to an overview of the
proposed 2025/26 Fairer Renfrewshire programme which would be submitted to the
Leadership Board in April 2025. Key priorities for officer/partnership focus during
2025/26 and funding were outlined within the report. 
DECIDED:  That the report be noted.        
Page 16 of 78

Page 21

4  Good Food Nation
The Senior Planning & Policy Development Officer (Poverty & Equalities) gave a
presentation relative to the Good Food Nation. 
The presentation provided an overview on the legislative framework which governed
the Good Food Nation, statutory oversights which included the commencement of the
Scottish Food Commission in June 2025 and a summary of the duties placed upon
Scottish Ministers and relevant authorities. The presentation also outlined the key
priorities, stakeholder engagement consultations, a progress update on the work so
far and a draft timeline to the submission of the first Good Food Nation Plan. 
DECIDED:  That the presentation be noted. 
Page 17 of 78

Page 22

Page 18 of 78

Page 23

_____________________________________________________________________________________ 
To:  Leadership Board 
On:  23 April 2025
_____________________________________________________________________________________ 
Report by: Chief Executive 
_____________________________________________________________________________________ 
Heading: Fairer Renfrewshire Update
_______________________________________________________________________________________ 
1. Summary 
1.1 The Council and its partners continue to work together to progress the Fairer Renfrewshire
Programme, with a strong shared focus on the local response to the cost-of-living crisis and
on tackling poverty and inequality across local communities. 
1.2 This paper provides: 
• A summary of the key issues reported to the Fairer Renfrewshire sub-committee on
26 March 2025 including the cost of living update and general programme updates.
• An overview of the planned programme for 25/26, including recommendations
relating to the award of funding to partner organisations to deliver the programme. 
1.3 The programme will continue to be progressed flexibly in order to respond to emerging
needs and opportunities as these arise.  Priorities for delivery over the next quarter are set
out in Section 7 of this report.
_______________________________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that elected members: 
• Note the content of the report
• Agree to allocate £0.585m of Fairer Renfrewshire funding to support the delivery of the
25/26 programme of work outlined at Section 6 of this report.
• Agree that in line with section 6 of this report, grant funding is awarded as follows to
support the delivery of the 25/26 programme:
o £49,000 to Active Communities to deliver a programme of health and wellbeing
support across Renfrewshire’s high schools
o £50,000 to Renfrewshire Citizens Advice Bureau to support the delivery of the
Schools Advice Service for a further year.
o £45,000 to Renfrewshire Citizens Advice Bureau to support the delivery of the
Welfare Rights Service for a further year 
Item 3
Page 19 of 78

Page 24

• Agree that delegated authority to award grant funding in relation to the Summer of Fun
programme be provided to the Head of Policy and Partnerships in consultation with the
Council Leader, as outlined in section 7 of this report.
______________________________________________________________________________________ 
3. Background 
3.1 The Fairer Renfrewshire Programme was developed in order to bring together targeted
programmes of work being progressed by the Council and its partners to tackle poverty and
inequality in Renfrewshire.  As the cost of living crisis has developed, the programme has
continued to evolve in response, with activities being progressed across the 4 core themes: 
• Improving financial security
• Advancing equality of opportunity
• Building community capacity and resilience
• Listening to lived experience 
3.2 Regular updates on the programme are provided to the Fairer Renfrewshire sub-committee
and subsequently to the Leadership Board. 
4 Update from the Fairer Renfrewshire sub-committee 
4.1 At its meeting on 5 February 2025, the sub-committee considered: 
• The most recent programme update which provided information on recent statistics and
research in relation to the cost-of-living crisis, including the cost of living dashboard
developed locally.
• Progress updates in relation to advice provision, Winter Connections, Pension Credit
take up work, and the Gallowhill Community Needs Assessment.
• A presentation on the upcoming requirement for all local authorities to produce Good
Food Plans and an update on the work of the local Fair Food Partnership.
• A paper outlining proposed priorities for the 25/26 Fairer Renfrewshire work programme. 
4.2 Officers gather information from a variety of sources at both a local and national level to
inform discussion at the sub-committee.  Key statistics and information discussed at its
most recent meeting are provided in table 1 below. 
Table 1 
Key national statistics 
• The rate of inflation in February 2025 is now 2.8% but remains above the target rate
of 2% set by the UK Government for the Bank of England. 
• The Bank of England interest rate was reduced in February to 4.5% from 4.75% in
December and the Bank expects to be able to cut rates further. 
• The Energy Price Cap, originally introduced by Ofgem in January 2019 to set limits
on the underlying rates energy suppliers, is currently at £1,738 from the 1 January
until 31 March, but will rise by 6.4% to £1,849 in April 25. 
Page 20 of 78

Page 25

Cost of living research (national) 
The latest insights into the cost of living from the Office of National Statistics for the
period 8 January to 2 February 2024 found: 
• 21% of adults said they had had to borrow more money or use more credit in the last
month compared to a year ago. This is the same as the previously reported figure for
December 2024, which was 25%. 
• 56% reported that costs of living had increased compared with one month ago, while
42% stated it had stayed the same and 2% said it had decreased. This again was
consistent with the previously reported figure. 
• For those who reported an increase, costs of food shopping at 89%, (3% less than
December) energy bills at 79% (a 7% increase on December figures) and fuel at 48%
(a 7% increase) were the most commonly reported reasons. 16% also reported an
increase in rent or mortgage costs and 19% a public transport cost increase. 
• Almost 4 in 10 people are spending less on food and essentials and 61% are spending
less on non-essentials. 39% report using less fuel such as gas or electricity at home. 
• 28% have seen an increase in rent or mortgage costs in the last 6 months, and 34%
are having difficulty meeting these costs. 
Employment and income
• According to the ONS, the Claimant Count in January 2025 (which is taken from
JobcentrePlus administration systems) for those claiming unemployment-related
benefits in Renfrewshire is 3395 people – 2060 men and 1330 women aged between
16 and 64. This is a reduction from 3,670 in November 2024 and equals 2.9% of the
population aged 16-64, a slight reduction on the previous 3% figure. The Scottish
figure remains at 3.1% as in November. The Universal Credit rollout, however, affects
this figure, which is expected to rise as individuals migrate to Universal Credit. 
• Information relating to increases in the national minimum wage and national living
wage (for those aged 21 and over) from April 2025 was provided to the sub-committee. 
Food costs / insecurity
• At the end of January, the Food Foundation published its ‘Broken Plate’ report, which
looks at the trends impacting the UK's food system and the actions needed from
policymakers in order to ensure everyone can afford healthy and sustainable food.
This year's publication highlights that on average healthier foods are more than twice
as expensive per calorie as less healthy foods, as defined by the government’s
Nutrient Profile Model, averaging £8.80 per 1,000 kcal compared to £4.30 for less
healthy foods with healthier food increasing in price at twice the rate in the past two
years. 
• Furthermore, the report shows that a healthy diet is unaffordable for many people with
low incomes. To afford the government-recommended healthy diet, the most deprived
fifth of the population would need to spend 45% of their disposable income on food,
rising to 70% for those households with children, while with the least deprived fifth of
households only need to spend 11%. 
Housing
• According to the ONS, private rental prices in Renfrewshire rose to an average of £793
in January 2025, an increase of £16 per month on the last reported figure of £777 in
November 2024 and an annual increase of 8.3% from £733 in January 2024.   
Page 21 of 78

Page 26

5. Fairer Renfrewshire Programme Update 
5.1 Since the last update to Leadership Board in February 2025, a range of activities have
continued to be progressed by officers and partners.  A summary is provided in the sections
below. 
Fair Food Renfrewshire 
5.2 The Fair Food Renfrewshire Steering Group, which met initially in September 2023, has
continued to meet on a quarterly basis with the most recent meeting taking place in late
March, which covered an update on the Good Food Nation Act and Plan, the work of the
Food Support Forum and updates from key partner projects such as the Community Food
Framework and Food for Thought. A six-month plan was approved in August by the
Steering Group. The focus of the plan is on communications and marketing, re-establishing
a Food Support network forum to discuss emergency and community food, and
investigating the possibility of increasing access by local food producers to procurement
frameworks. 
5.3 Further to the establishment of the reformed Food Support Forum, a further meeting took
place on 13 February 2025. The meeting was attended by a number of organisations who
run pantries and food larders as well as Renfrewshire Foodbank. Topics discussed included
how the group can work together to avoid gaps and duplication in provision, ensuring
culturally appropriate food is available, and creating meals with emergency mainly tinned
provision from the Foodbank. 
5.4 An update was provided to the Fairer Renfrewshire Sub-Committee at its recent meeting on
Good Food Nation legislation which is being progressed by the Scottish Government. A key
aim of the legislation is to provide the foundations for Scotland to be a Good Food Nation,
where “people from every walk of life take pride and pleasure in, and benefit from, the food
they produce, buy, cook, serve, and eat each day.” 
5.5 It is anticipated that the Council will require to have a local Good Food Plan in place by
2027, with the local partnership work in this area leaving the organisation well placed to
deliver on this legislative requirement. 
Community Needs Assessment in Gallowhill 
5.6 As previously reported, late in 2023, Renfrewshire HSCP was successful in a funding bid to
NHSGGC Public Health to carry out a Community Needs Assessment (CNA) in Gallowhill,
recognising the concerning increase in Child Poverty rates in the Gallowhill and Renfrew
South Ward. The CNA, being carried out by Active Communities, commenced at the start of
July 2024 using the Place Standard Tool and 1,033 responses were submitted as part of
this consultation. 
5.7 Some of the initial findings from this stage of the process have been discussed across
partner organisations, with consideration of how to engage and communicate with local
people on the findings, and the opportunities for developing the next phase of this work in
Gallowhill.  This will be supported by Active Communities through £50,000 of funding
previously allocated by the Leadership Board in December 2024. A dedicated community
development worker has been appointed to specifically support the development and
implementation of actions emerging from the community needs assessment and continue to
improve and expand community led activity and infrastructure in the area. Wider work will
also be undertaken to develop a place-based approach based on the learning from the
CNA. 
Page 22 of 78

Page 27

School and Family Advice Provision 
5.8 Between the 1st of August 2024 and the 5th of March 2025, the School Support Service
provided by Renfrewshire Citizen’s Advice Bureau assisted 92 clients. The most popular
advice area was benefits, with the most common issues being Universal Credit and Adult
Disability Payment. The second most popular advice area was housing, with clients seeking
support regarding access to and provision of accommodation, including private sector
rented properties. 
5.9 Over this period, the School Support Service recorded financial gains totalling £195,403.34
for 54 clients. Most financial gains were achieved from benefit entitlements including Adult
Disability Payment, Child Disability Payment, and Universal Credit.  A notable trend in
service use is that 25 of the 92 clients (over a quarter) identified as having caring
responsibilities for a disabled child. By comparison, the Bureau’s overall figure for clients
with disabled children during this period was 4.5% 
5.10 Up until 7th of March 2025, for quarter 4 of 24/25, Advice Works received 48 referrals for
their Family Advice Service and completed 80 cases. For the year, this is a total of 299
referrals and 372 cases closed. The majority of these clients have received a benefit check,
with some adult disability payments applications, Scottish Child Payment and Free School
Meals and School Clothing Grant applications. The majority of these referrals came from
Health Visitor teams, with a number too from Social Work, Education and through self-
referral. 
5.11 Client Financial Gain for the year to date for Family Advice is £59,428.64, however even in
cases where a client speaks to an adviser and there is no financial gain made, the client
benefits from the reassurance of a benefit check and meeting with Advice Works opens
discussion on all financial matters that may be worrying the client, such as debts and
budgeting. 
Pension credit 
5.12 As previously reported to the board, officers have undertaken a programme of work
alongside partners to increase uptake of Pension Credit, alongside any other eligible
benefits specifically for older people. DWP data on Pension Credit applications and awards
was released in late February, but this data is only available nationally and not at a local
level. From this data, we can see there has been an 81% increase in applications and 64%
increase in awards between July 2024 and February 2025. There are still a number of
outstanding Pension Credit claims from this period, which means this is not the final
position for this period. 
5.13 Locally, between Advice Works and RCAB, 613 pension age households have been
assisted with queries, income maximisation, benefit applications and debt/housing advice
within Q3 of 2024/25. The client financial gain is over £1.1m from the advice and support
provided, and this figure will be expected to rise as and when decisions are made on
benefit claims. Further pop-up benefit take-up events are being arranged for April to be held
in various locations across Renfrewshire. 
Page 23 of 78

Page 28

Lived Experience Panel 
5.14 Elected Members have been given a number of updates relating to work of the Fairer
Renfrewshire Panel. From the end of October, for 5 weeks, the Fairer Renfrewshire Panel
worked on a piece of commissioned work for Renfrewshire HSCP, where they considered
the outcomes of the NHSGGC Public Health and Wellbeing Survey. The Panel are due to
present their findings to a special meeting of Renfrewshire’s Community Planning
Partnership Executive Group on 28th April 2025. 
5.15 As previously reported in December, the Panel heard from the HSCP around their planned
work on Cost of the Nursery day, and agreed to be involved in developing and supporting
this training which will take place in Early Learning Centres in February/March. A further
session took place with HSCP in February around this topic.  The Panel are also user
testing aspects of the new Council Website on 5 March and held a meeting with the Digital
Strategy Delivery Manager on the 12th March. 
5.16 STAR Project and a member of the Panel presented to the Child Poverty Peer Support
Network in Dundee on 18 March 2025. This meeting had a focus on Lived Experience, and
Renfrewshire is one of the 4 local authorities reporting on their work in the area. In addition
to the organised sessions to gather Panel input, the Panel took time in February to review
their priorities and evaluate their work over the year and will report back to Council officers
on these. 
6. Fairer Renfrewshire Programme – 25/26 
6.1 Officers have been developing a Fairer Renfrewshire programme for 2025/26, reviewing
existing programmes of activity across 2024/25, and informed by discussions at the Fairer
Renfrewshire Sub-Committee and relevant partnership groups. The proposed programme
also reflects the specific commitments agreed as part of the approval of the Council’s
budget on 27 March. 
6.2 At this meeting it was agreed that £0.450m of additional funding would be allocated to the
Fairer Renfrewshire programme to support the following targeted interventions: 
• A targeted programme of summer activities for children and young people from low-
income families, working across Council services and with community groups and third
sector organisations across Renfrewshire to ensure that our most vulnerable families
are able to access a range of activities and healthy food over the summer period 
• Continuation of the £50 winter school clothing payment to each school child eligible for
school clothing grant 
• Continuation of the successful Winter Connections Programme. 
6.3 It was also agreed that £0.095m would be allocated from existing Fairer Renfrewshire
funding to support the Welfare Rights Advocacy service and schools advice support
delivered by Renfrewshire Citizens Advice Bureau. 
6.4 It is proposed that an additional £0.585m of Fairer Renfrewshire programme funding
is allocated to support the delivery of the programme in 2025/26, in addition to the £0.45m
allocated by Council. This includes provision for officer resource to deliver the programme
and will allow the programme to continue to deliver targeted support across communities in
Renfrewshire in line with agreed priorities. 
Page 24 of 78

Page 29

6.5 Specifically, this additional funding will support the: 
• Continued provision of a free universal breakfast service in targeted primary schools.
The project relieves financial pressure on low-income families, but most importantly,
makes sure that children start the school day ready to learn.
• Ongoing provision of the Cost of the School Day fund, operating across all primary and
secondary schools in Renfrewshire, directly supporting families in a variety of ways
including uniforms, food, transport, extra-curricular activities and curricular expenses. 
• Ongoing delivery of the Peer Health education project in partnership with Active
Communities, working with young people in secondary schools across Renfrewshire to
identify key health priorities in their school and developing young people to lead their
own activities to improve health and wellbeing, with a focus on mental health. 
• Continued provision of the Skoobmobile, One Ren’s mobile public library service directly
to children and families in communities. The programme continues to support the
delivery of the Skoobmobile which introduces children to the benefit of reading and play
and supports the Council’s ambitions to narrow the literacy attainment gap. 
• Delivery of the Digital Champions initiative in Renfrewshire, lead by One Ren and
supporting wider partnership activities to tackle digital exclusion, which was recognised
by Audit Scotland in a national review of digital exclusion.
• Contribution of funding to support the Council’s Energy Management Unit, helping
people who need support to reduce their energy bills, manage fuel debt and improve the
energy efficiency in their homes. 
• Ongoing delivery of the Family Advice service provided by Advice Works
• Provide additional funding to RCAB to supplement core contract funding provided to
RCAB in its final year of delivery, in line with the previous decision by Council as part of
the budget in February 2024.
• Continue to support the Fairer Renfrewshire Lived Experience Panel to provide the
voice of local residents with experience of low income on Council policy and service
development 
The funding will also support wider programme and staffing costs required to co-ordinate this
programme and to progress the following priorities for 25/26: 
• Continuing to explore place based approaches to supporting low income households
informed by the learning from the community needs assessment in Gallowhill 
• Mapping the provision of money advice across Renfrewshire and linked forms of support
such as energy advice in light of the cost of living crisis. It is proposed that this is further
informed by survey and engagement work to assess the ongoing impacts of the cost of
living crisis on local households. 
• Exploration of opportunities and new developments relating to the provision of breakfast
club supports across Renfrewshire and nationally to identify best practice and learning 
• Developing our local Fair Food Renfrewshire Partnership and co-ordinating our first
Good Food Plan for Renfrewshire based on anticipated national guidance being
launched in 2025. 
• Undertaking further analysis in relation to the increasing levels of diversity across
Renfrewshire’s communities, with a particular focus on considering the supports
available to New Scots in Renfrewshire such as ESOL. Renfrewshire Council is also due
to develop and set new Equalities Outcomes in 2025, and an action plan in place to
support the delivery of these outcomes. 
• Working with partners to publish our Local Child Poverty Action Report by end of June
2025. 
6.7 These priorities were discussed at the Fairer Renfrewshire Sub-Committee on 26 March
2025.
Page 25 of 78

Page 30

7 Priorities for the next quarter to June 2025 
7.1 Subject to the approval of the 25/26 programme set out in Section 6, officers will work to
progress these activities during the next quarter, including establishing necessary
contractual or grant agreements with partner organisations. 
7.2 A core priority during the next quarter will also be the implementation of arrangements with
partners to deliver the Summer of Fun programme, following the allocation of £100,000 of
funding to deliver this year’s activities within the Council’s budget. 
7.3 It is proposed that the Summer of Fun programme is delivered through the same model
utilised in 2024, with 50% of the funding to be directed to deliver holiday camp provision,
and the remaining 50% being allocated to support the establishment of a small grants
programme which would allow third and community sector partners to deliver local, targeted
provision to low-income families across Renfrewshire.   
7.4 In order to ensure that local organisations are able to access this funding within the
necessary timescales before the summer period, it is proposed that the grants funding
programme opens in April 2025, with funding applications being reviewed by a partnership
panel.  It is proposed that delegated authority is provided to the Head of Policy and
Partnerships to consider and award grant funding of up to £3,000 per application, in
consultation with the Council Leader.  A full report detailing all funding applications and
award outcomes will be provided to the Leadership Board. 
7.5 In addition to the Summer of Fun programme, officers will also be working with partners
over the next quarter to: 
• Develop and finalised Renfrewshire’s Local Child Poverty Action report
• Work with the Lived Experience Panel to review their feedback on the work that is being
undertaken with the Council and 
• Progress the next phase of the Community Needs Assessment process with the
community and partners in Gallowhill. 
7.6 Updates on these areas of activity will be presented to future meetings of the Leadership
Board. 
Implications of the Report 
1. Financial – as outlined in the report it is proposed that £0.585m is allocated from Fairer
Renfrewshire to deliver the 25/25 programme.  This is additional to the £0.45m agreed by
Council as part of its Budget in February 2025. 
2. HR & Organisational Development – none 
3. Community/Council Planning – This report provides a summary of current partnership
activities being progressed through the Fairer Renfrewshire programme, with a key focus
on tackling the inequalities that exist in Renfrewshire. 
4. Legal - none 
5. Property/Assets - none 
6. Information Technology - none
Page 26 of 78

Page 31

7. Equality and Human Rights – The report provides an overview of key activities
undertaken as part of the Fairer Renfrewshire programme, and as such there continues to
be a high level of equalities and human rights consideration across this programme – the
activities detailed in this report are targeted specifically at advancing equality of opportunity
for a number of groups across the Renfrewshire area. 
8. Health and Safety - none 
9.  Procurement – none 
10. Risk – none 
11.  Privacy Impact – none 
12. Climate risk – none 
13. Children’s rights - the articles within UNCRC underpin the work that is being progressed in
Renfrewshire through the Fairer Renfrewshire programme, particularly in relation to rights in
relation to aspects such as life, survival and development, food, clothing and a safe home
and supporting the best interests of the child and their families.  Child poverty and family
wellbeing are key local partnership priorities. 
14. COSLA Policy Position – none 
Author: Laura McIntyre, Head of Policy and Partnerships 
Page 27 of 78

Page 32

Page 28 of 78

Page 33

___________________________________________________________________
To:  Leadership Board
On:  23 April 2025
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading:  Community Planning Six-Monthly Update
___________________________________________________________________    
1. Summary 
1.1 This report is the six-monthly update of recent activity of Renfrewshire Community
Planning Partnership, covering the period from October 2024 to March 2025.  It was
agreed at Leadership Board in September 2022 that update reports would be
provided every six months and would also include an update on progress being made
in developing the seven Local Partnerships.  The previous update report was
approved at the meeting of the Leadership Board held on 18 September 2024. 
1.2 Two meetings of the Renfrewshire Community Planning Partnership Executive Group
have taken place during the period October 2024-March 2025, on 18 November 2024
and 27 January 2025.  These meetings have focused on reviewing the performance
of community planning partners in improving outcomes and reducing inequalities on
the agreed priorities and identifying action to progress this further.  Section 4
provides further information on issues addressed by the Community Planning
Partnership Executive Group over the last six months. 
1.3 Local Partnerships are an integral part of the structure of Renfrewshire Community
Planning Partnership.  Since the last six-monthly report on development of the Local
Partnerships to the Leadership Board, there have been two rounds of Local
Partnership meetings.  These took place in November/December 2024 and February
2025.  The meetings focused on finalising and agreeing the local priorities for each of
the Local Partnerships and receiving presentations on issues that Local Partnerships
can become involved in. 
1.4 A key development in Local Partnership working was the appointment of a Local
Partnerships Development Officer, who took up post in October 2024.  This post will
provide additional capacity to develop the work of Local Partnerships, such as
Item 4
Page 29 of 78

Page 34

developing the agreed local priorities into action plans and supporting community
groups to work together towards these priorities. 
1.5 Applications from community groups for Local Partnership funding for 2025/26 were
invited from 10 February to 13 March 2025 and will be considered at meetings of the
seven Local Partnerships between 22 April and 7 May 2025.  Guidance for
community groups was revised to incorporate the revised local priorities agreed by
the Local Partnerships during 2024.   
2.  Recommendations 
2.1  It is recommended that members of the Board:
• note progress being made to improve outcomes and reduce inequalities
across the priorities of Renfrewshire Community Planning Partnership
• note steps taken to develop Local Partnership working 
3.  Background 
3.1 This paper represents the regular 6 monthly update submitted to the Leadership
Board for consideration on wider community partnership developments. This includes
both the work of Renfrewshire Community Planning Partnership Executive Group and
the development of the Local Partnerships, which are part of the community planning
structure. 
3.2 Community planning is a statutory duty placed on Councils in Scotland and defined
community planning partners under the Community Empowerment (Scotland) Act
2015. These public, private and third sector bodies are required to collaborate in
Community Planning Partnerships. There are 32 Community Planning Partnerships
in Scotland, one for each Council area. The broad aims of community planning
activity are to improve outcomes for people and communities and to reduce
inequalities in those outcomes. 
3.3 Partners are also required to develop and jointly progress a Local Outcomes
Improvement Plan. In Renfrewshire this is referred to as our local Community Plan, a
ten year plan spanning 2017-2027. At the mid term point of the plan in 2022, partners
agreed that a refresh exercise should be undertaken. This was felt to be timely due to
the impact of the COVID pandemic and also the cost of living crisis emerging at that
time. 
3.4 The vision set out within the Community Plan has remained: Working together to
make Renfrewshire a fairer, more inclusive place where all our people, communities
and businesses thrive. 
3.5 The four priorities of the Community Plan have also been retained - that
Renfrewshire is Thriving, Well, Safe and Fair. The refresh carried out in 2022
identified three main areas of focus for collaborative working through the Community
Planning Partnership. These are:
• Supporting low income families 
• Tackling health inequalities 
• Addressing the climate emergency 
Page 30 of 78

Page 35

3.6 Within each area of focus, three or four action areas have been identified to drive
improvement. 
3.7 Community Planning Partnerships are required to produce and publish each year an
Annual Report. The Annual Report sets out performance against priorities identified
by each Community Planning Partnership and reports on action taken to improve
outcomes. 
4. Community Planning Partnership Executive Group 
4.1 Renfrewshire Community Planning Partnership Executive Group met on 18
November 2024 and 27 January 2025.  The key issues discussed were as follows: 
• Renfrewshire Community Planning Partnership Annual Report 2023/24 – The
Annual Report set out highlights of activity during 2023/24 that address the
three areas of focus of Supporting Low-Income Families, Tackling Health
Inequalities and Addressing The Climate Emergency.  The Annual Report
also contained a new performance framework reporting performance against
a set of core indicators. 
• Annual Horizon Scanning Workshop – The Executive Group held a horizon
scanning workshop, based on a presentation of the latest demographic data
for Renfrewshire, followed by a discussion of the implications of this.  The
workshop focused on population change, migration, demographic structure of
Renfrewshire’s population, household size and tenure and economic
activity/non-activity. 
• Renfrewshire Community Learning and Development Partnership Plan 2024-
27 – The Executive Group considered the Community Learning and
Development Plan, setting out a partnership approach to delivering lifelong
learning in Renfrewshire during 2024-27.  The Plan sets out an action plan
with four priorities, which in turn support the Renfrewshire Community
Planning Partnership priorities. The four Community Learning and
Development priorities are to provide a programme of high-quality lifelong
learning, build strong and connected communities, deliver opportunities to
reduce barriers and tackle inequalities and strengthen the Community
Learning and Development Partnership. Renfrewshire’s newly established
partnership governance arrangements for Community Learning and
Development will report into the CPP Executive Group, as well as the
Council’s Communities and Housing Policy Board. 
• Physical Activity For Health Framework – The Executive Group considered
Scotland’s National Framework For Physical Activity, which includes everyday
activity, active recreation and sport.  The strategic outcomes of the strategy
cover provision of physical activity opportunities in health and social care,
communications to encourage activity, opportunities for sport targeted at
people and communities with low participation rates and provision of physical
activity in the workplace.  Renfrewshire’s Sports Strategy is being reviewed
by One Ren in response to the National Framework For Physical Activity.
Page 31 of 78

Page 36

• Specialist Public Health System Offer – a presentation was made to the
Executive Group regarding data and analytical support being offered to
Community Planning Partnerships by Public Health Scotland. 
4.2 A special meeting of the Community Planning Partnership Executive Group is
currently being scheduled for late April, to facilitate a discussion with the Fairer
Renfrewshire Lived Experience Panel.  The Panel have been commissioned by
Renfrewshire HSCP to explore the findings of the local health and wellbeing survey
and to make recommendations to partners on what their priorities should be in
response.   
4.3 At its next scheduled meeting, partners will also be asked to consider Renfrewshire’s
Local Child Poverty Action report and some of the initial findings of the community
needs assessment work which is being undertaken in Gallowhill. 
5. Local Partnership Review – 2024 Development Programme 
5.1 A key element in delivering the objective of strengthening Local Partnerships has
been achieved by the appointment of a Local Partnership Development Officer, who
took up post in October 2024.  The new postholder provides the capacity for closer
engagement with community groups to discuss funding applications and track
progress of funded activity and also develop actions plans based around priorities. 
This was a key element of the Local Plans, Local Priorities and Local Voices
programme to be progressed. 
5.2 Each of the seven Local Partnerships have now reviewed and agreed revised local
priorities during the October 2024- March 2025 period.  The revised set of priorities
for the Local Partnerships are set out here What the priorities are for each Local
Partnership - Renfrewshire Website. 
5.3 In response to requests to move forward the dates of the meetings to decide initial
Local Partnership grant awards, which in 2024 were held in May/June, the equivalent
meetings in 2025 have been scheduled to take place between 22 April and 7 May
2025. This will enable earlier consideration of grants relating to activity taking place
during summer 2025. 
5.4 Following agreement of the revised priorities, new guidance has been developed for
applicants to the 2025/26 Local Partnership funding round and communicated across
a range of media.  Applications for Local Partnership funding for 2025/26 was
opened on 10 February 2025 with a deadline for consideration at the April/May 2025
meetings of Local Partnerships. 
5.5       The Local Partnership Development Officer has provided additional capacity to work
more closely with applicants for funding, both during the application process itself
and after award decisions are made.  This should result in stronger relationships
developing between officers and community groups involved in the process and
Page 32 of 78

Page 37

greater awareness of the outcomes that Local Partnerships are delivering for
communities.     
Implications of the Report
1. Financial – no direct financial implications 
2. HR & Organisational Development – none. 
3. Community/Council Planning – set out in the content of this report 
4. Legal - none. 
5. Property/Assets – none. 
6. Information Technology – none. 
7. Equality and Human Rights – community planning and Local Partnership work contributes
towards the community planning outcomes for people and reducing inequalities 
8. Health and Safety – none. 
9.  Procurement – none. 
10. Risk – progressing community planning working contributes to mitigating against the risk of
poorer outcomes and increasing inequalities for people within Renfrewshire. 
11.  Privacy Impact – none. 
12. COSLA Policy Position – COSLA is supportive of community planning as an approach to
delivering outcome improvement and narrowing of inequalities in Scotland . 
13.  Children’s Rights – the three areas of focus identified in the refreshed community plan –
Supporting Low Income Families; Tackling Health Inequalities; and Addressing The Climate
Emergency – contribute to setting policy direction that supports progress in delivering
Children’s Rights. 
14. Climate Risk – the Renfrewshire Community Plan was refreshed in 2022 and one of its
three areas of focus is Addressing The Climate Emergency. The Annual Report sets out
actions being taken and tracks performance against outcomes. 
Author: Stuart Graham, Community Partnerships Manager, Chief Executive’s Service, 
0141 487 1509  
Page 33 of 78

Page 38

Page 34 of 78

Page 39

_____________________________________________________________________________________
To:  Leadership Board
On:  23 April 2025
_____________________________________________________________________________________
Report by: Chief Executive 
_____________________________________________________________________________________
Heading: Renfrewshire Integration Joint Board – Development of Refreshed Strategic Plan
_____________________________________________________________________________________
1. Summary 
1.1 In line with legislative requirements, Renfrewshire Integration Joint Board is currently
refreshing its Strategic Plan, with the current version running from 2022-2025.    The
refreshed Plan is currently subject to formal public consultation and a draft response is
required from the Council as part of this process before 30 April 2025. 
1.2 This paper provides an overview of the work that has been undertaken to refresh the
Strategic Plan, and provides an assessment of this following a review internally by officers. 
Overall the refreshed document is viewed as being a comprehensive document which sets
out clear priorities for progression by the IJB, and is closely aligned to both the Community
Plan and the Council Plan. 
1.3 An overview of the Plan and its content is provided within Section 4 of this report.  Subject
to the approval of this report, it is proposed that this is submitted as feedback to
Renfrewshire Health and Social Care Partnership as the Council’s formal response to the
draft Strategic Plan.  It is anticipated the finalised refreshed Plan will be submitted for
approval to the Integration Joint Board in June 2025.
_______________________________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that Elected Members: 
• Agree the content of the report which will be submitted to Renfrewshire Health and
Social Care Partnership, as the Council’s formal response to the draft Strategic Plan.
_______________________________________________________________________________________  
Item 5
Page 35 of 78

Page 40

3. Background 
3.1 Renfrewshire’s Integration Joint Board (IJB) is required by the Public Bodies (Joint Working)
(Scotland) Act 2014 (the ‘Act’) to produce a Strategic Plan on how community health and
social care functions delegated to it by Renfrewshire Council and NHS Greater Glasgow
and Clyde will be planned and delivered over the medium term. The current plan was
agreed in 2021 and runs from 2022-2025. 
3.2 In line with this legislative requirement, the Scottish Government’s guidance (updated in
2024) on the development of Strategic Plans states that ‘an Integration Authority is required
to review its strategic commissioning plan at least every three years’. This means that it is
not necessary to develop a new plan for every three-year period where this is not required,
subject to the completion of the required review process. 
3.3 At its meeting in June 2024, the IJB agreed that the Strategic Plan 2022-2025 should be
refreshed and extended for a further two years, in line with this national guidance and its
requirements.  It was noted that the themes previously identified within the Plan remained
valid, were aligned with national policy and that many work programmes remained ongoing
beyond 2025.  It was also recognised that the HSCP had limited capacity to develop a full
new Plan, whilst managing a range of financial and service based pressures including a
forthcoming strategic inspection at that time. 
3.4 A consultation draft was prepared by the HSCP through informal consultation with a range
of stakeholders and partners, and was presented to the IJB on 24 January 2025.  The
consultation draft was also informed by a process of reviewing local data and intelligence
through for example the Census and Health and Wellbeing survey outputs.  The Housing
Contribution statement was also specifically reviewed with input from across Council
services and by officers.   
3.5 A comprehensive consultation and engagement strategy was agreed by the IJB, with the
draft Plan now being subject to public consultation until 30 April 2025. 
4 Overview of the Refreshed Strategic Plan 
4.1 The Refreshed Strategic Plan has been reviewed by officers and has been assessed as
being a comprehensive and well written document.  It is recognised that in refreshing the
Strategic Plan, there has been a strong focus on sharpening its content and its priorities, to
ensure that these are deliverable within the resources likely to be available.   
4.2 The draft Plan was presented to the Council’s Corporate Management Team in February
2025, and the strengthened linkages to the Council and Community Plan were identified at
that time. Key amendments made to the refreshed Plan which were noted by Council
officers include: 
• An increased focus on the financial position 
• Updating the Strategic Context section, including demographic & population data 
• Revising themes from five to four - Healthier and Connected combined.
• The identification of seven supporting principles for the Plan.
Page 36 of 78

Page 41

• Refinement of objectives to a smaller number with simplified language.
• Refinement and refocus of the Housing Contribution Statement 
• An update to the Plan on a Page to reflect the wider changes. 
4.3 The four updated themes highlighted within the refreshed Plan are as follows: 
4.4 These themes are supported by officers, however as was the case when the Strategic Plan
was initially being developed, it is recommended that adult protection and keeping people
safe who are at risk of harm, are more strongly referenced within the overarching themes. 
Strategic context 
4.5 The Plan communicates the challenges faced by the IJB in terms of planning and
subsequently delivering services.  These are strongly influenced by the demographic and
financial pressures faced by local services who support vulnerable people living locally. 
The critical role that health and social care workers play in terms of delivering services,
including in relation to their health and wellbeing, is strongly referenced within the Plan. 
4.6 Our local assessment and review of the refreshed Plan has also strongly welcomed the
proposed introduction of 7 overarching principles which will guide the way in which the
Updated Themes
Our available
resources are
prioritised
effectively, and we
deliver integrated
services by working
collaboratively with
people and partners.
People can live
independently in their
own home or
community and
experience reduced
health inequalities
through early
intervention and
prevention.
Our services are
clinically safe, and
people have access to
the appropriate
specialist support to
aid them in their
recovery and
rehabilitation, where
possible.
People are empowered
to better manage their
health and conditions
and shape the support
they need at every
stage of life.
Page 37 of 78

Page 42

HSCP will work to deliver this Plan and report progress on this to the IJB itself. The
principles are helpful and provide additional context as to how the Plan will be delivered
with partners, which is an open and transparent approach to adopt. 
4.7 The Plan on a Page which has been developed to communicate the key aims and
objectives of the Plan is attached as Appendix 1 to the report. 
Resources 
4.8 The Plan contains high level information on the medium term financial planning
considerations of the IJB, and therefore the basis upon which the refreshed Strategic Plan
will be delivered.  It may be helpful to the reader if information was highlighted in terms of
the scale of these challenges and what these might mean in practice eg how much does it
costs to deliver a service intervention to a service user if the challenge is to be understood. 
It is recommended that this approach is further embedded. 
4.9 As outlined above, there is a strong commitment throughout the refreshed Plan to the
workforce, however this could be further strengthened with specific content linking this Plan
to the separate Workforce Plan that the IJB is required to prepare and publish.   
Housing 
4.10 As noted above, the Housing Contribution Statement has been drafted in conjunction with
Council officers and wider partners such as registered social landlords.  It represents a
robust assessment of current issues, and the three identified priorities are strongly
supported:
• Priority 1: Housing as a Health Issue 
• Priority 2: Homelessness Prevention 
• Priority 3: Supporting people to live independently in their own homes 
Page 38 of 78

Page 43

Digital 
4.11 The Plan recognises the importance of digital transformation as an enabler of
transformation and achieving improved outcomes.  It is recommended that digital readiness
and ambition could be more strongly represented within the plan in terms of the priorities
and objectives that will be delivered over the period. 
Monitoring 
4.12 The Plan will be outlined a range of specific objectives that will be progressed through the
delivery of the Plan, and also articulates the performance framework which will be utilised to
drive the implementation of the plan in practice. The refreshed Plan itself does not contain
SMART action plans / indicators, therefore it is not possible at this stage to comment on
these.  It is recommended therefore that further information in relation to actions and
indicators is signposted within the final version of the Plan. 
5. Next steps 
5.1 Overall the refreshed Plan has been positively assessed by officers, and it is therefore
proposed that subject to the approval of this response by the Board, formal feedback will be
submitted to the Health and Social Care Partnership and considered through the formal
consultation process. 
5.2 It is anticipated that a final draft of the Strategic Plan will then be considered by the
Renfrewshire Integration Joint Board, and thereafter published in June 2025.  Six monthly
updates on those services delegated to the IJB, will continue to be provided to the
Leadership Board.
_______________________________________________________________________________________
Implications of the Report
1. Financial – none 
2. HR & Organisational Development – none 
3. Community/Council Planning – the refreshed Strategic Plan highlights the close
partnership working arrangements which continue to operate in Renfrewshire which support
health and wellbeing in Renfrewshire. 
4. Legal - as set out in the report. 
5. Property/Assets - none 
6. Information Technology - none 
7. Equality and Human Rights – The Recommendations contained within this report have
been assessed in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’ human rights have
been identified arising from the recommendations contained in the report because it is for
noting only. If required following implementation, the actual impact of the recommendations
and the mitigating actions will be reviewed and monitored, and the results of the
Page 39 of 78

Page 44

assessment will be published on the Council’s website.  The HSCP has engaged with a
wide range of stakeholders throughout the development of the Refreshed Plan. 
8. Health and Safety - none 
9.  Procurement – none 
10. Risk – none 
11.  Privacy Impact – none 
12. Climate risk – none 
13. Children’s rights - none 
14. COSLA Policy Position – none 
Author: Laura McIntyre, Head of Policy and Partnerships 
Page 40 of 78

Page 45

Appendix 1 – Plan on a Page 
Page 41 of 78

Page 46

Page 42 of 78

Page 47

___________________________________________________________________
To:  Leadership Board 
On:  23rd April 2025
___________________________________________________________________
Report by:  Chief Executive 
___________________________________________________________________
Heading: Review of OneRen’s Annual Business Plan for 2025-2026
___________________________________________________________________
1. Summary 
1.1 OneRen submits an annual Business Plan to the Council which sets out the
charity’s priorities for the year ahead and outlines how it will deliver the
services specified in the Service Agreement. The business planning process
provides the opportunity to assess the context in which the charity is operating
and to identify and consider how to meet changes in community and customer
needs. 
1.2 OneRen’s five-year business strategy (2021-2026) is the charity’s roadmap
and forms the basis of the business plan.  It reflects the goals of key
stakeholders and aims to help support delivery of Council and Community
Planning Partnership objectives. 
1.3 In preparing the Business Plan for 2025-26, OneRen recognises the uncertain
economic environment in which the public sector is operating and identifies
the activities and actions that will be undertaken during 2025-26 to achieve
OneRen’s vision: of everyone locally living lives that are healthy, happy and
fulfilled. 
1.4 The business planning process has shaped priorities for the year ahead which
focus on strengthening communications and brand profiles, increasing
participation opportunities through an integrated approach to programming,
strengthening income generation, continuing organisational development,
supported by enhanced data, delivering quality visitor experience and
supporting Renfrewshire’s priorities for children and young people. 
Item 6
Page 43 of 78

Page 48

1.5 Officers have assessed the business plan and agree that it is fully compliant
with the conditions of the service agreement.  The implementation of Business
Plan actions and achievement of key priorities will be reviewed on a quarterly
basis by Council’s monitoring officer to assess compliance with the service
agreement and funding arrangement, with six-monthly updates on OneRen
activities provided to Leadership Board.  It is recognised that additional
activities are delivered by OneRen as a core strategic partner, over and above
those which are set out in the current Service Agreement. 
1.6 Work will be progressed during 2025 on a review of the services provided by
OneRen, as part of the wider Reshaping Renfrewshire programme, with
updates being provided to the Leadership Board on this programme on a
regular basis. 
___________________________________________________________________ 
2. Recommendations 
2.1  It is recommended that Elected Members: 
• agrees OneRen’s annual Business Plan for 2025-26 attached at Appendix
1.
• notes the monitoring arrangements in place for the Head of Policy and
Partnerships (the nominated monitoring officer for OneRen) to undertake
quarterly performance monitoring meetings with OneRen and to provide six
monthly progress reports to the Leadership Board. 
___________________________________________________________________ 
3. Background 
3.1  OneRen is responsible for the strategic management, operation and 
development of cultural, leisure and sport services in Renfrewshire.  The
charity is commissioned to provide indoor and outdoor sport and leisure, town
halls, community venues, libraries, heritage, arts, museums, sports and health
development services for the public of Renfrewshire.  It provides a range of
services that are open to all and designed to improve personal, social and
economic outcomes. 
3.3  OneRen develops a Business Plan each year which sets out the charity’s
main priorities and actions for the year ahead. The Business  Plan is
submitted to the Council in line with the terms of the Service Agreement and
reflects the priorities set out in the Council Plan where they relate specifically
to the role and remit of OneRen. 
Page 44 of 78

Page 49

4 OneRen Business Plan 25/26 
4.1 OneRen have developed an updated business plan for 25/26, which was
approved by its Board of Directors on 20th March 2025, and submitted to the
Council for approval. OneRen have indicated that this year’s business plan
builds on the approach taken over the past few years, providing continuity for
staff, directors and stakeholders. It has been based on the charity’s updated
business strategy and present operating conditions, and to ensure links are
made to its strategic objectives within the national and local strategic contexts.
A copy of the annual Business Plan is attached in an appendix to this report. 
4.2 The Plan recognises the main factors which will influence OneRen over the
next few years; particularly, the uncertain economic environment and
increasing operating cost pressures; the impact of the cost-of-living  crisis on
local communities, customers and employees; investment programmes in key
cultural and leisure venues; and working closely with the Council to review the
services currently provided as part of its service agreement as part of the
Reshaping Renfrewshire programme.   
4.3 The Plan highlights the following key areas of focus for 2025/26: 
• OneRen will strengthen its communications framework and brand profiles,
building on the early work of its internal communications review. It will
continue to build strong brand profiles for key venues and OneRen
delivery across Paisley and Renfrewshire.
• OneRen will increase participation opportunities for locals and visitors by
taking an integrated approach to programming across the region, making
effective use of resources across culture, leisure and sport. It will continue
to develop its cultural programme as it expands its portfolio of festivals. 
• OneRen will work to strengthen its income generation, through a targeted,
evidence-based approach. OneRen will continually benchmark its
performance, and pricing strategy, to ensure it provides services that
deliver best value for communities.
• OneRen will continue to focus on ongoing organisational development, in
response to operational and external socio-economic contexts, supported
by enhanced data to enable effective prioritisation of resources.
• OneRen will focus on providing a consistent quality of visitor experience,
understanding the customer journeys taking place across all services in
person and digitally and working to clear audience profiles.
• OneRen will continue to support the work of Renfrewshire’s Strategic
Children’s Partnership Plan and the priorities for children and young
people within the Fairer Renfrewshire strategy as well as embedding
learning from, and building, our role as Promise Keepers. 
4.3 The Business Plan has been reviewed by senior officers and assessed as
meeting the requirements of the service agreement.  Overall, the Business
Plan takes account of Council Plan priorities and is clearly linked to local and
national strategies and references the role OneRen plays in their delivery.  It
Page 45 of 78

Page 50

reflects the dynamic environment in which the organisation is operating and
what will be delivered through the resources available to the organisation.   
4.4 OneRen’s business plan is updated annually to reflect emerging changes and
any new priorities which may impact on the delivery of its long-term
objectives. Quarterly performance reports are provided to the Council’s
monitoring officer for OneRen.  Regular reports are also provided to OneRen’s
Board of Directors and the Council’s Leadership Board which gives an update
on the delivery of the plan and performance indicators for the services
commissioned.  It is recognised that future business plans will require to
reflect the outcome of the review of the services that the Council funds One
Ren to provide.  
5. Annual Business Plan – financial arrangements 
5.1 OneRen sets an annual budget based on the estimated resources it has
available to meet its contractual obligations under the service agreement. 
Over the last few years, the charity has continued to develop and adapt
services and take appropriate actions to remain financially stable, building up
reserves in line with audit recommendations, for a steadier financial position
than many others in the cultural and leisure sector. 
5.2 Balancing increased community need with inflationary and budget pressures
faced by all public sector organisations remains an ongoing challenge.  Over
the last few years, OneRen has absorbed significant cost pressures in the
region of £3million relating to pay related costs, energy supplies, pool
chemicals, insurance and general supplies.  The business model requires
OneRen to earn a proportion of income from its activities and with the
reopening of iconic cultural venues and recent investment in sporting facilities,
the focus for 2025/26 is very much on building the operating model to grow
income and attendance levels in these venues. 
5.3 In the short to medium term, OneRen will need to manage ongoing cost
pressures, alongside supressed income streams, whilst the cost-of-living crisis
continues to affect customers, local communities and its employees.   
5.4 In this context, a range of assumptions were built into OneRen’s financial
strategy for 2025/26 to set a budget of £23.186 million.  The service payment
for 2025-26 has been budgeted at £13.925 million plus funding set aside for
museum service costs and estimated funding for Employers National
Insurance Contribution changes.  The assumptions in the financial strategy
will be regularly reviewed and revised on a quarterly basis to reflect any
further changes in the operating environment.
___________________________________________________________________ 
Implications of the Report
1. Financial – The annual Business Plan for OneRen covers the financial year
2025-26. The budget for the provision of cultural and leisure services
Page 46 of 78

Page 51

delivered by OneRen in 2025-26 is £23.186 million.  The provisional service
payment for services is £13.925 million plus funding set aside for Museum
service costs and estimated funding for Employers National Insurance
Contribution changes. 
2. HR & Organisational Development – An organisational redesign is in
progress to realign staffing resources to achieve delivery of business plan
priorities. 
3. Community/Council Planning – Senior officers in OneRen were involved in
the development of the Council Plan and Community Plan and the key
strategic priorities in OneRen’s Business Plan are closely aligned to both of
these plans, specifically in relation to Council Plan priorities relating to tackling
inequality, health and wellbeing and cultural and economic regeneration
amongst others. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights – The recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report because for example it is for noting
only. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. Climate Risk - None 
13. Children’s Rights – None 
14. Cosla Policy Position – None. 
List of Background Papers None.
Author: Laura McIntyre, Head of Policy and Partnerships, Telephone: 0141  618  
6807 - laura.mcintyre@renfrewshire.gov.uk
Page 47 of 78

Page 52

Page 48 of 78

Page 53

Business Plan
2025-2026
Page 49 of 78

Page 54

1  Introduction: Our Shared Ambition
2  OneRen: Delivering for Renfrewshire
5  Business Planning 2025-26
12  Business Strategy
15  National Policy Context 
17  Renfrewshire Strategic Context 
18  Delivering Change: Museum Transformers
21  Activity Plan: 2025-26
Contents
32
Page 50 of 78

Page 55

OneRen delivers positive outcomes for
the people and communities we serve.
OneRen is the local charity established by
Renfrewshire Council to provide culture,
leisure and sporting opportunities to help
people enjoy active and healthy lives. We
are passionate about the part we play in
improving life-long physical and mental
health in every one of our communities.
Our charity provides a range of affordable,
accessible and ambitious services that
are open to all and designed to improve
personal, social and economic outcomes.
We are committed to our vision to ensure
that everyone locally can live lives that are
healthy, happy and fulfilled. Our mission
is to improve our community’s health and
wellbeing by working in partnership to
design and deliver a range of life-enhancing
and accessible cultural, leisure and sporting
opportunities that meet local needs and
improve life chances across the population.
These are framed around our four strategic
objectives: A Sustainable Local Economy,
A Great Place to Live , Play and Visit, A
Healthy Community and A Sustainable,
High-Performing Charity.
Introduction:
Our Shared Ambition
Our objectives are closely aligned to those
of Renfrewshire Council. Our progress is
reported to the OneRen Board of Directors
and the Council’s Leadership Board.
Quarterly performance reports to the
Council’s chief executive office are made
through the Council’s monitoring officer
for OneRen. We measure and report on
progress through performance indicators.
As a charitable trust, we have been able
to achieve significant savings, such as
relief on non-domestic rate charges,
and successfully apply for grant funding,
both of which mean greater investment
into frontline services. As a charity, every
pound spent with OneRen services, or in
our venues, is for the benefit of supporting
communities across Renfrewshire to be
healthy and active and to lead fulfilling lives.
#WeAreOneRen
Try
something
new.
1
Page 51 of 78

Page 56

We are passionate about the part we play
in improving life-long physical and mental
health in every one of our communities,
supporting their capacity to make a social
and economic contribution to Renfrewshire,
whilst generating a sense of pride and
belonging.
Our services are designed to be inclusive,
accessible, and adaptable to benefit as
many people as possible through 1) the
range of opportunities available through
the week; 2) targeted services for those
with health conditions, recovery needs,
or who have been long-term physically or
socially inactive and 3) providing additional
pathways to partners and specialist
services to ensure individuals’ particular
cultural or sporting needs and talent can
be appropriately identified and supported.
Across these three strands, we are building
our strength in relevant methodologies
such as social prescribing and co-
production, which enables us to identify
with communities how we can best support
their current health and wellbeing priorities.
Renfrewshire Council provides an annual
management fee towards the cost of
delivery - approximately 55% of our
operating costs. The rest of OneRen’s costs
have to be met through a combination
of commercial income and fundraising
activities to deliver our full range of
important community services. We do this
by offering a range of paid-for services
such as leisure memberships, charged
for events, and external hires. OneRen
recognises the impact of the cost-of-living
crisis and while the charity needs to charge
for some services, we have introduced ‘pay
what you can’ models to ensure low, or no
cost access, to programmes such as the
OneRen:
Delivering for
Renfrewshire
annual Paisley Book Festival.
As a charity, we are accountable to
Renfrewshire Council and the residents
of Renfrewshire, and to the Office of the
Scottish Charity Regulator (OSCR) and
Companies House (UK Company Act).
OneRen is the trading name of Renfrewshire
Leisure Limited, a Company Limited by
Guarantee (490998), with Charitable Status
(SCO 33898). OneRen has a Board of eleven
directors providing a wealth of experience
in business, community, cultural, leisure and
sport matters. The Board comprises of six
independent directors, two staff directors,
and three elected member Directors
appointed by Renfrewshire Council.
OneRen employs over 500 people who
deliver a year-round programme of
cultural and leisure activities and services,
supported by seasonal and casual
workforce to meet customer demand. We
also provide volunteering opportunities
for hundreds of local people each year.
We provide services across our libraries,
museums, pools, leisure centres and
outdoor pitches accessed in person or
digitally. OneRen is also responsible for
the stewardship and care of objects
and archives in Renfrewshire Council’s
Museum Collections and for Renfrewshire’s
Heritage Archives, through the provision of
Renfrewshire Museums Service.
The charity plays a key role in supporting
the economic regeneration and civic
renewal of Renfrewshire through the
development, promotion and delivery
of cultural, leisure and sporting activity
and provision. In addition to supporting
and serving local communities, OneRen’s
developing cultural portfolio is intended
to support the profile of Paisley and wider
Renfrewshire as a national and international
cultural and tourism destination.
The venues, sites and services we manage
include a network of local, cultural heritage,
leisure and sports facilities, a range of
community development and learning
services and some of the most historic
buildings in the area. We work in every
community across Renfrewshire and
provide leadership for the region’s cultural
and sports strategies.
The Council continues to address the
ongoing financial challenge that is expected
to persist over the medium term. The next
phase of the Council’s transformation,
‘Reshaping Renfrewshire’, will include a
strategic commissioning review of the
cultural and leisure services that are
currently delivered by OneRen on the
Council’s behalf and funded through a
related service payment. The review will
reassess whether the current service
outcomes set out by the Council remain
appropriate.
32
Page 52 of 78

Page 57

OneRen’s business plan is updated annually to reflect emerging changes for the region
and any new priorities which may impact on the delivery of our long-term objectives.
Progress is reported to the OneRen Board of Directors and the Council’s Leadership Board.
Quarterly performance reports to the Council’s chief executive office are made through
the Council’s monitoring officer for OneRen. We measure and report on progress through
performance indicators.
The strategic focus for 2025-26 will continue to see OneRen evolve and change, driven by
our commitment to deliver effectively for the people of Renfrewshire. That will be driven
forward in the following key areas:
#WeAreOneRen
Business
Planning
2025-26
Strengthen our communications
framework and brand profiles:
We will build on the early work of our
internal communications review. We will
continue to build strong brand profiles for
key venues and OneRen delivery across
Paisley and Renfrewshire.
Increase participation
opportunities through an
integrated approach to
programming:
We will increase participation opportunities
for locals and visitors by taking an
integrated approach to programming
across the region, making effective use of
resources across culture, leisure and sport.
Strengthen earned income to
ensure service running costs
are covered:
We will strengthen our earned income
through a targeted, evidence-based
approach. We will continually benchmark
performance and pricing to ensure services
deliver best value for our communities.
Ongoing organisational
development, supported by
enhanced data:
We will continue to develop the
organisation in response to operational
and socio-economic contexts and data
enabling us to effectively prioritise
resources.
Provide quality visitor
experience and consistent
audience profiles:
We will focus on providing a consistent
visitor experience, understanding the
customer journeys taking place across all
service in person and digitally, working to
clear audience profiles.
Support Renfrewshire’s priorities
for children and young people:
We will continue to support the work
of Renfrewshire’s Strategic Children’s
Partnership Plan and the Fairer Renfrewshire
strategy. We will embed learning from, and
build, our role as Promise Keepers.
Reach
your
goals.
54
Page 53 of 78

Page 58

The business plan for 2025-26 is set within
the context of ongoing financial challenges
faced across the public sector and the role
OneRen plays in the Council’s strategic
priorities. It recognises our continuing role
in taking forward the region’s regeneration
ambition through the return to operation of
iconic cultural venues following a once-in-
a-lifetime investment in their renewal.
The performance programme across Paisley
Town Hall, Paisley Arts Centre and Johnstone
Town Hall continues to thrive with a diverse
programme of events and experiences for
a wide range of audiences over the coming
year. A key highlight for 2025/2026 is the
development and launch of OneRen’s
four festivals; Paisley Comedy Festival,
Paisley Book Festival, Paisley Arts Festival
and OneRen Winter Festival along with
associated satellite programming with the
aim of raising the profile of Paisley, and wider
Renfrewshire, as a cultural hub in Scotland.
The development of OneRen’s festival
portfolio over the next 3 years will be
supported by a successful bid to Creative
Scotland’s Multi-Year Funding for £300k.
This support will allow OneRen to build
the festival profiles and develop further
funding and sponsorship opportunities for
a festivals programme that is financially
sustainable, supports local and national
talent and, crucially, is rooted in place.
2025 marks the sixth year of the Paisley
Book Festival, which has gained a reputation
as a festival that foregrounds bold ideas
and radical thinking, showcasing the best
in Scottish writing, platforming the voices
and stories of everyday people, and
supporting a burgeoning community of
book enthusiasts in Paisley.
Underpinned by the theme of The Lives
We Live, this year’s festival will celebrate
the very best of Scottish writing and
storytelling, celebrating so many genres of
writing, diversity and culture. Joining us will
be Trainspotting author Irvine Welsh, Belle
and Sebastian frontman Stuart Murdoch
with his debut novel, Nobody’s Empire,
Chris McQueer with his debut novel, Hermit,
alongside other big names including The
Hebridean Baker, Julie Lin, A L Kennedy and
Ewan Morrison, and champion Renfrewshire
talent including Kirstin Innes and Karen
Campbell.
We continue to work with partners and
stakeholders to shape how we best
promote and advertise Paisley as a
key destination from which the wider
Renfrewshire region can benefit.  We work
with the University of the West of Scotland
(UWS), Renfrewshire Tourism Network, Visit
Scotland and Paisley First to build and
develop the region’s profile as well as travel
trade requirements.
In Leisure, we will be actively progressing
on refreshing our fitness gym offer to
enhance existing and prospective members
experience within a number of our sites. We
will also install a new virtual exercise offer
within the Lagoon and On-X sites during
2025/26 to enhance the existing instructor
led programme. Benefits include a greater
workout flexibility; confidence boosting for
those new to exercise; and a greater variety
of programme styles such as wellbeing.
We will also create our first indoor 3G offer
at the On-X to support small-side games,
for example fun 4s and children’s football
training.
Across our outdoor sporting opportunities,
this year we are hosting the Scottish
Disability Sports National Cross Country
Championships at the newly refurbished St
James playing fields; the Paisley, Johnstone
and District Youth Football Championships
at the KGV playing fields Renfrew. Ferguslie
Sports Centre will again host the No
Substitute for Life football tournament,
which highlights the high number of young
male suicides and the support network
which is available to anyone who needs
help. The tournament will start with a poem
written by Shaun Moore, the Tannahill Makar
for Renfrewshire. Seedhill Community
Sports Complex will host the St Mirren
Charitable Foundation footballing camps
this year.
76
Page 54 of 78

Page 59

We continue to develop our four Community
Sport Hubs where a collective of progressive
sport clubs work together for the local
community. Hub membership is available
to sport clubs, physical activity groups
and non-sporting organisations who wish
to contribute towards making sport ‘a way
of life’ in Renfrewshire. This year each of
our four sport hubs will receive £1,250 to
support local clubs. Across the hubs we
have 68 Hub Clubs as current members,
representing the sports such as Athletics,
Basketball, Bowls, Badminton, Cricket,
Football, Golf, Gymnastics, Hockey, Judo,
Karate, Rugby, Swimming, Sailing, Taekwondo,
Tennis, Walking and Weightlifting. Hub
Clubs also benefit from direct contact with
OneRen’s Active Schools Team.
This year our Active Schools programmes
have been designed to offer a 50% increase
in family club opportunities, as well as
sharing more that OneRen can offer to
children with a disability, or who come from
a care experienced background or have
other protected characteristics.
Within our sports development work,
we are looking forward to the 2025
Renfrewshire School of Sport Education
graduation, where all 58 young coaches
are on track to celebrate completing the
year-long programme. Between them
they have worked through more than
3,500 volunteering hours with each pupil
achieving a mix of 15 National Governing
Body awards. Across all our sports
development programmes, we are on track
to have the highest number of volunteers
since the pandemic.
Our OneRen Bikeability programme
continues this year thanks to Cycling
Scotland’s Support Plus grant funding,
which enables us to employ a Bikeability
Coordinator to support all our schools with
training opportunities. Since its inception,
over 300 teaching staff, school staff, parent
volunteers and Active Schools’ staff have
been trained as Bikeability Instructors as
part of the programme roll out in each
school setting.
Renfrewshire Aspiring Athlete Support
Programme (RAASP) continues this year to
help talented Renfrewshire athletes access
OneRen training facilities and partner
benefits. We currently support 50 athletes
through RAASP representing 24 Sports
covering American Football, Athletics,
Badminton, Basketball, BMX Racing, Cricket,
Curling, Cycling, Disability Athletics,
Football, Golf, Hockey, Indoor Climbing, Ice
Hockey, Judo, Karate, Kickboxing, Netball,
Powerlifting, Rugby, Swimming, Transplant
Games, Wheelchair Basketball and
Volleyball.
This year we are establishing a OneRen
Health and Wellbeing working group to
create a more comprehensive health and
wellbeing pathway for the public through
greater cross service integration. We will
support this with health and wellbeing
volunteering opportunities to provide
additional support to referrals who require
a little more help and would benefit from a
health and wellbeing buddy.
Our Live Active Referral Team will continue
to be responsive to new ways of working as
referrals remain high across NHS Greater
Glasgow & Clyde. OneRen’s Health and
Wellbeing Referral Assistant will provide
additional support to the programme
in 2025. In the coming year our walking
funding will also allow us to focus on
providing entry level opportunities for
frailer participants, providing them with the
confidence and ability to progress onto
further activities over time.
Across our libraries network we are working
with Community Learning and Development
on an adult version of the Summer Reading
Challenge as a new staple in our annual
programming that supports literacy and a
love of reading, both for individuals but in
family groups too.
We are delighted for our libraries to support
Renfrewshire Council’s DigiZones initiative,
making it easier for everyone to access free
WiFi, devices or digital skills support. Our
libraries have been providing free access to
98
Page 55 of 78

Page 60

the Internet, PCs, and digital skills support
for many years, but as part of the DigiZones
network we have seen an increase in PC
reservations (+38%), Digital skills support
(+111%), and footfall (+44%) and will develop
our role further throughout the coming year.
Our major grant of £100,000 from
the Esmée Fairbairn Collection Fund
is supporting work with Jambo Radio,
Scotland’s only radio station for people
of African and Caribbean heritage, and
Pachedu, a charity which promotes diversity
and dignity for diverse communities. The
groups will consider Renfrewshire’s museum
collections from across African countries to
provide positive narratives that challenge
some of the often stigmatising perceptions
of the African continent.
Our Promise Keepers continue to support
developments within OneRen to deliver
on The Promise, including adapting
recruitment processes and working with
the Renfrewshire Language Policy around
display interpretation for the Paisley
Museum Re-Imagined Project. As last
year, we plan to continue to advocate for
care experienced people through further
changes to HR processes, as well as
evolving our public programme to provide
more support for care experienced young
people in Renfrewshire.
1110
Page 56 of 78

Page 61

Business
Strategy
Our Vision
Everyone locally living lives that are healthy,
happy, and fulfilled.
Our Mission
To improve our community’s health and
wellbeing by working in partnership to
design and deliver a range of life-enhancing
and accessible cultural, leisure and sporting
opportunities that meet local needs and
improve life chances across the population.
Our Values
Integrity
We value honesty and high ethical
standards in how we work within and
outwith our organisation; we are passionate
in our determination to always do the right
thing.
Excellence
We will work collaboratively in pursuit of our
community’s shared goals; in everything we
do, we aim to deliver a quality experience
and actively champion high standards.
Creativity
We are innovative and flexible in responding
to local needs; in meeting challenges, we
are creative thinkers, with a consistent
focus on outcomes.
Fairness
We focus on inclusion to ensure we deliver
for everyone across our community; we are
caring and kind to each other and in the
way we support the community.
Our 5-year business strategy is our roadmap and reflects the goals of key stakeholders
including Council and Community Planning Partnership objectives.
A healthy community
We aim to help everyone lead healthier,
happier and more fulfilled lives. We want
to play an active role in improving health
and well-being outcomes, addressing
inequalities and improving life chances
amongst the people of Renfrewshire. We
will work collaboratively to deploy a range
of interventions to tackle poor mental and
physical health in our community.
A sustainable local economy
We aim to play a positive role in developing
the local Renfrewshire economy. We want
to create opportunities for high quality and
sustainable jobs as well as build wider local
employability through providing positive
development pathways.  We will contribute
to the local partnership effort to build
inclusive economic growth that benefits
everyone.
A great place to live, play and visit
We aim to keep building a positive
reputation for Renfrewshire as a place
for a wide range of exceptional leisure
and cultural experiences. We want a
growing recognition for our regional leisure
opportunities, rich local heritage and
diverse cultural programme. We will help
provide a high profile platform for local
economic and civic opportunities.
A high-performing, sustainable charity
We aim to build a sustainable business
founded on fairness, providing flexible
services which enable everyone locally
to live lives which are healthy, happy and
fulfilled. We want to build on our charitable
credentials, allowing diverse funding
streams to be used to challenge inequality.
We will provide modern services based on
deep rooted values.
Strategic Objectives:
1312
Page 57 of 78

Page 62

National
Policy Context
Public services in Scotland continue to
operate in a challenging environment, due
to the impacts of the pandemic, the global
energy crisis, inflationary pressures and
more complex needs across communities.
Prior to Covid-19, the dominant trend was
one of increasing demand with diminishing
resources with leisure and culture sectors
seeing significant reductions in funding
nationally and this is expected to continue
in real terms. At the same time, there is
greater recognition of the complementary
and prevention role that culture, leisure
and sport can play in terms of health and
wellbeing and reducing demand for acute
services. OneRen’s commissioned services
for culture, leisure and sport touch on a
wide variety of national and local policy
contexts. These include:
• National Performance Framework
• Physical Activity and Health
Framework
• National Tourism Strategy
• A Cultural Strategy for Scotland
• Creative Industries
• Climate Change
• Heritage
• Learning
• Communities
• Equalities
Each of these contexts are influenced by
some, or all, of the following key policy drivers:
• A focus on outcomes and
prevention
• Co-design of services with people
using or affected by these services
• Increased efficiency, coordination
and integration
• Partnership across sectors
• Increased and improved access to
services
• Growing a digital capability
• Audience development
The main challenges influencing these
drivers are:
• Demographic shifts including an
ageing population
• Increasing social care and health
demands
• Funding pressures
• Poverty and inequality
• Improving public sector outcomes
and transformation
• Enabling sustainable economic
growth
• Economic and political issues
linked to Brexit and Covid-19
1514
Page 58 of 78

Page 63

Renfrewshire
Strategic Context
OneRen’s objectives are aligned to
Community Planning Partnership and
Council outcomes to ensure that, through
the contract for services we have with
the council and as a community planning
partner, we demonstrate how we deliver for
both residents and visitors to Renfrewshire.
In particular, as a community planning
partner, we have sought to acknowledge the
partnership’s current priorities to support
low-income families, tackle inequalities, and
address the climate emergency, which will
influence the design of our programmes
and services. working collaboratively in a
financially challenging environment.
A cross-cutting theme of ‘improving
outcomes for children and families’
runs through all five of the Council’s five
strategic outcomes.
Renfrewshire Community Planning
Partnership published a 10-year plan (2017-
27, refreshed 2023) with four community
plan themes:
• Our Renfrewshire is thriving: 
maximising economic growth that is
inclusive and sustainable.
• Our Renfrewshire is well: 
supporting the wellness and resilience
of our citizens and communities.
• Our Renfrewshire is fair: 
addressing the inequalities that limit
life chances.
• Our Renfrewshire is safe: 
protecting vulnerable people, and
working together to manage the risk of
harm. 
The Council’s plan (2023-28) outlines five
strategic outcomes:
• Place:
working together to enhance wellbeing
across communities
• Economy:
building an inclusive, green and resilient
economy
• Fair:
nurturing bright, happy and healthy
futures for all
• Green:
leading Renfrewshire to Net Zero
• Living our values:
making a difference together
1716
Page 59 of 78

Page 64

Delivering Change: Museum Transformers
is an anti-oppression programme that aims
to empower the museum workforce to
make changes to help all people to access
culture. It has been developed by Museums
Galleries Scotland and an Expert Advisory
Group. It’s funded by The National Lottery
Heritage Fund, thanks to National Lottery
players, and the Scottish Government.
The programme is about putting into action
organisation’s ideas on improving access
to culture. It will give the organisation and
their workforce the capacity, training, and
support to sustainably action and embed
these ideas into their museum. 
During the programme of coaching,
reflection, and peer-to-peer support the
participating heritage organisations will: 
• Become one of the Museum
Transformers, who are 19 organisations
leading in anti-oppression and human
rights in museums.
• Deepen community impact through
authentic relationships.
• Diversify audiences, partners and
workforce.
• Maximise the momentum of previous
diversity, equity, and inclusion work.
• Have space to make mistakes in a
supportive environment.
The programme is designed to support
participating organisations in the
following ways:
• To make decisions about their
priorities and how they use resources
in partnership with their communities.
• To take a Human Rights based
approach across all areas of their
organisation.
• To have an organisational culture
that is based on anti-oppression
principles. This will support it to be
more welcoming and inclusive for
a diverse workforce and audience,
in particular, those who have been
systemically excluded.
• Better understanding of what matters
to their community/audience, in
particular, those who have been
systemically excluded.
• To be more resilient by developing
relationships with a community who
will advocate for them and further
demonstrate their value to society.
• To be better able to research,
interpret, and share the histories of
those who have been systemically
excluded.
Although the route to this programme has
been through the work to create a new
Paisley Museum, OneRen is committed to
take the learning and frameworks across
the wider organisation. Staff from across
our organisation and structure, from
frontline colleagues to Board members,
are participating, and the first tranche
of training and development specifically
focuses on anti-racism and the legacy
of historic slavery. We do not consider
this work as an additional activity for
our business plan, but as an underlying
principle and commitment throughout it.
Delivering Change: 
Museum Transformers
1918
Page 60 of 78

Page 65

A Sustainable, High Performing Charity
We are financially sustainable and
make effective use of resources:
• We work to full cost recovery
and optimise income generating
opportunities.
• We will work to an integrated
programming strategy.
• We will progress our digital and
technology programme.
• We continue to act to reduce our
impact on the climate.
We have effective, consistent, and
transparent governance:
• We will continue to review and update
governance arrangements.
• We will review decision making forums
across the organisation.
• We will develop a strategy for internal
and external communication.
We have a clear and consistent
people strategy:
• We will continue to develop our staff
and volunteers to deliver excellent
customer service.
• We will encourage workforce agility
and promote a culture of supportive
cooperation.
• We will update recruitment processes
and pathways for service and
community needs.
• We will continue to review and update
policies.
• We will be clear about learning and
development, values, actions and
behaviours.
We will evolve the organisation to
align with operational contexts:
• We will centralise data sets to inform
targets and business decisions.
• We will work to a consistent set of
audience profiles.
• We will continue with organisational
development.
Activity Plan:
2025-26
2120
Page 61 of 78

Page 66

A Healthy Community
We communicate how we can
support whole person wellbeing:
• We clearly communicate how we
support physical, mental and emotional
health.
• We will enhance social wellbeing
through greater complimentary
programming between services.
• We utilise co-production
methodologies to ensure services are
user-designed.
• We create environments to support
children and young people.
• We will develop a clear EDI framework
and relevant policies and training to
inform our practice.
We build effective partner
engagement:
• We will communicate the breadth of
what we do to enhance what we deliver
in partnership.
• We will build effective partnerships
tailored to audience or user needs.
• We will develop our strategic
partnership with University West of
Scotland.
• We will build on sector strategies
including the Scottish Libraries and
Information Council, Museums Galleries
Scotland and Sportscotland.
We deliver targeted interventions:
• We will continue to contribute to
Renfrewshire Strategic Children’s
Partnership and Whole Family
Wellbeing.
• We will continue to contribute to Fairer
Renfrewshire.
• We will continue to contribute to the
Local Employability Partnership.
• We will build on our work as Promise
Keepers.
2322
Page 62 of 78

Page 67

A Great Place to Live, Play and Visit
We have a strong and confident
business profile:
• We clearly communicate our charity
status, USP and community benefits.
• We continue to build brand identity and
awareness for OneRen services and key
venues, festivals and national events.
• We will review our offer and products to
align with our strategic objectives.
• We clearly market and communicate
our products and services.
• We will improve bookings and sales
enquiries for improved customer
experience.
We build local pride and national
and international visitor markets:
• We will develop and implement plans
to ensure operational readiness for the
reopening of the Museum.
• We will work to a consistent set of
audience profiles.
• We will leverage the cultural proposition
for Paisley and Renfrewshire for visitors.
• We will develop a calendar of
organisational events and priorities.
• We will create and adopt a OneRen
Visitor Experience strategy.
• We communicate our achievements to
relevant markets and stakeholders.
We support local talent and sector
ecologies:
• We build beneficial corporate and
community partnerships.
• We support local artistic talent and
pathways.
• We support local literary talent and
pathways.
• We support local sporting talent and
pathways.
• We provide a range of volunteering and
placement opportunities.
We make effective use of our
products and assets:
• We will prioritise sport and leisure
facility investment to improve customer
experience and customer base.
• We will take a collective approach to
external funding across all teams.
• We will develop our retail strategy and
catering model.
• We will continue to develop our
commercial programming.
• We will work in partnership with the
Council on Renfrewshire strategies
including Physical Activity and Sport,
Pitches, Aquatics and Culture.
2524
Page 63 of 78

Page 68

A Sustainable, Local Economy
We provide skills development and
lifelong learning:
• We provide literacy and digital skills
development opportunities.
• We provide an integrated offer of both
school-based learning and public
programmes.
• We have clear volunteer and placement
policies and action plan.
• We provide coaching, and vocational
skills that promote personal self-
confidence and other life skills.
• We will offer employability pathways
and training.
We support people with their
productivity:
• We help people support their whole
person wellbeing through a range of
universal and targeted programmes.
• We will lead the approach to deliver a
Physical Activity and Sports Strategy.
• We provide volunteering and placement
opportunities.
We are a proud local employer:
• We provide positive employment
pathways linking to local schools,
colleges and UWS.
• We celebrate success and recognise
staff and volunteers in delivering
excellence.
• We support staff and volunteers with
training and development.
• We will continue to work in partnership
with the Swimming Teachers
Association.
We support local businesses and
sector development:
• We create an environment to support a
local supply chain as far as possible.
• We work to attract and retain creative,
sports and events activity across the
region.
• We leverage the cultural proposition
for Paisley and Renfrewshire as a visitor
destination.
For more information
visit www.oneren.org
2726
Page 64 of 78

Page 69

Community
A Sustainable, A Sustainable, 
Live, Play and VisitA Healthy
High Performing Charity Local Economy
A Great Place to
Everyone
locally living
lives that are
healthy, happy,
and fulfilled.
Strengthen our
Provide quality visitor 
and young people
integrated approach to program
ming
running costs are covered by enhanced data
communications frameworkexperience and consistent 
priorities for children
opportunities through an
to ensure  service development supported
and brand profiles audience profiles
Support Renfrewshire’s Increase participation
Strengthen earned income Ongoing organisational
A Sustainable,
High Performing Charity
We are financially sustainable
and make effective use of resources
We have effective, consistent,
and transparent governance
We have a clear and consistent
people strategy
We will evolve the organisation
to align with operational contexts
A Healthy
Community
We communicate how we can
support whole person wellbeing
We build effective
partner engagement
We deliver targeted interventions
A Sustainable,
Local Economy
We provide skills development
and lifelong learning
We support people with
their productivity
We are a proud local employer
We support local businesses
and sector development
A Great Place to
Live, Play and Visit
We have a strong and confident
business profile
We build local pride and national
and international visitor markets
We support local talent and
sector ecologies
We make effective use of
our products and assets
2928
Page 65 of 78

Page 70

Budget for 2025/26
The financial resources identified for 2025/26 are summarised in the table below: 
2023/24 2024/25 2025/26
Budget Heading Actual £000 Budget £000 Projection £000 Budget £000
Fees & Sales -6,387,966 -6,929,685 -5,925,976 -5,816,230
Grants & Donations -681,584 -404,008 -410,047 -296,139
Memberships -2,142,754 -2,364,396 -2,289,557 -2,596,969
Other income -5,194 0 -2,382 0
Service Level Agreement -13,125,600 -13,571,600 -13,582,584 -14,476,844
Income -22,343,098 -23,295,680 -22,210,546 -23,186,183
 
 
 
 
 
Employee costs 15,072,017 14,434,075 13,733,996 15,189,498
Supplies and services 4,045,672 4,070,640 4,098,703 4,518,906
Transport costs 2,224,943 3,234,825 2,588,028 2,455,293
Support costs 773,161 809,115 890,675 965,631
Property & Estate Costs 53,141 41,855 50,658 56,855
Total Expenditure 22,168,934 22,616,501 21,362,061 23,186,183
 
 
 
 
 
(Surplus)/Deficit -174,164 -679,179 -848,485 0
Restricted Funds -140,255 140,828 -41,026 0
Unrestricted Funds -33,909 -820,007 -807,459 0
3130
Page 66 of 78

Page 71

For further information about
OneRen, please visit our
website at: oneren.org
You can contact us:
Lagoon Leisure Centre
11 Christie Street Paisley PA1 1NB
Telephone: 0141 618 6351
OneRen, a trading name of Renfrewshire Leisure Limited
Company limited by guarantee no: 490998
Registered Charity in Scotland: SCO33898
OneRen, a trading name of Renfrewshire Leisure Trading Limited
Company limited by guarantee no: 241310
VAT Registered Company: 210 0336 83
oneren.org
#WeAreOneRen
32
Page 67 of 78

Page 72

Page 68 of 78

Page 73

___________________________________________________________________________ 
To: Leadership Board
On: 23 April 2025 
_________________________________________________________________ 
Report by: Chief Executive
___________________________________________________________________
Heading:  Funding for Engage Renfrewshire 2025/26
___________________________________________________________________
1. Summary 
1.1 This paper outlines proposals for the allocation of grant funding to Engage
Renfrewshire for 2025/26. Engage Renfrewshire is Renfrewshire’s Third
Sector Interface and this funding from the Council is provided in addition to
national funding allocated by the Scottish Government which enables Engage
Renfrewshire to fulfil this role and deliver a range of targeted activities locally. 
1.2 The quantum of funding allocated by the Council is recommended to be set at
£360,610.  This is in line with previous funding allocations and subject to
approval, will be supported through a grant funding agreement which will set
out key priorities to be delivered by Engage Renfrewshire in line with this
grant funding.  Subject to board approval, the Council’s allocation of grant
funding would continue to allow the organisation to deliver at the scale
required by local third and community sector organisations and to target the
specific additional priorities which have been identified by the Council as set
out at Section 5 of this report.  Engage Renfrewshire will be expected to
actively manage any resourcing pressures experienced over the medium
term.  As outlined in Section 6 of the report, the Connected Communities
programme currently under development will shape the Council’s future
commissioning requirements in terms of third sector and community support. 
Item 7
Page 69 of 78

Page 74

1.3 The grant funding agreement is designed to be flexible in order that new and
emerging priorities can be progressed in partnership.  In 2024, this flexibility
was evidenced following the inspection of Community Learning and
Development partnership arrangements in Renfrewshire conducted by
HMI/Education Scotland, with Engage Renfrewshire proactively working with
the Council to implement new governance and partnership working
arrangements in relation to community learning and development, with the
Chief Executive of Engage Renfrewshire now chairing a new partnership
steering group. 
1.4 The role of Engage Renfrewshire in responding to the inspection findings was
recognised by HM Inspectors as part of a recent inspection progress visit, with
Engage Renfrewshire’s leadership role recognised as a key strength within
Renfrewshire’s approach. 
1.5 Information is provided in Section 4 in relation to the activities delivered by
Engage Renfrewshire in 24/25 in relation to the grant funding allocated, whilst
section 5 highlights the priorities that will be progressed during 25/26 subject
to approval of the grant funding.  These are additional priorities which Engage
Renfrewshire will be required to deliver on over and above core priorities
identified by the organisation and its other funders, and progress against
these will be closely monitored by officers. 
1.6 As elected members will be aware, the Council is progressing its Connected
Communities programme which is being led by the Head of Policy and
Partnerships.  As part of this, work is being undertaken to map existing
mechanisms and resources for developing community capacity in
Renfrewshire, with the funding for Engage Renfrewshire included within the
scope of this review. 
1.7 Officials from Engage Renfrewshire have worked proactively with officers to
provide detailed information on the activities undertaken by the organisation. 
This is being used to inform more detailed design work being progressed to
develop the Connected Communities model.   
2. Recommendations 
2.1 It is recommended that elected members:
• approves grant funding of £360,610 to Engage Renfrewshire to deliver the
priorities outlined in section 5 of this report. 
__________________________________________________  
Page 70 of 78

Page 75

3. Background 
3.1 Engage Renfrewshire is the designated Third Sector Interface (TSI) for the
Renfrewshire Council area. The organisation provides services to support the
operation and growth of community and voluntary sector organisations (also
known as the third sector), including Social Enterprises, within the area. The
organisation: 
• supports social enterprises, community development trusts, charitable
groups, mutual aid groups and more. 
• helps groups to build capacity and to be safe, by providing information,
advice and training for everything from charitable structures to funding.
• support volunteer involving organisations with recruitment and volunteer
support, and work with individuals to find them rewarding volunteer
opportunities. They also work with local charities and public sector bodies
to promote volunteering for all. 
3.2 Engage Renfrewshire is funded to provide support to local community and
voluntary sector organisations by the Scottish Government, and to deliver
against the TSIs outcome framework for Scotland. 
3.3 Engage Renfrewshire is based in the Engage Hub in Ferguslie Park, and a
number of local organisations from both the third and public sector are tenants
within the Hub. Membership of Engage Renfrewshire is free to organisations
and individuals. 
3.4 Engage Renfrewshire also generates its own income through trading, through
the provision of financial and payroll services to individuals, organisations and
voluntary groups. 
3.5 Renfrewshire Council provides grant funding to Engage Renfrewshire to
ensure support is provided to third sector and community organisations in
Renfrewshire.  This is provided in addition to any national funding or income
generated, and has been vital in ensuring close partnership working,
particularly during COVID and the ongoing cost of living crisis.  In recent years
the quantum of funding has been retained at £360,610, requiring Engage
Renfrewshire to actively manage any resourcing pressures.  The funding
agreement which is put into place has been strengthened to ensure there is a
much stronger focus on the delivery of agreed priorities – ensuring there is a
much closer alignment between the funding allocated and the deliverables
required by the Council. 
Page 71 of 78

Page 76

4.  Key activities delivered during in 2024/25
4.1 In May 2024, Leadership Board approved the allocation of £360,610 in grant
funding to Engage Renfrewshire for 24/25 and a grant support agreement was
subsequently put into place to deliver a number of identified and agreed
priorities.  Progress against this programme of work has been regularly
monitored by officers with key activities including:
• Building capacity within the community and voluntary sector by supporting
members to access development, support and funding. Engage
Renfrewshire’s membership continues to grow and now has a
membership of 454.
• Co-ordinating the Renfrewshire Social Enterprise network, enabling over
140 members to access specialist support to develop their organisations.
For 2024/25, RenSEN members and other local community providers
secured £431,883 from Whole Family Wellbeing Support grants and
£25,750 of Community Benefits were awarded to 16 enterprising
organisations. A fully funded business mentoring programme was offered
to 10 RenSEN organisations, with 9 completing the programme.
• Co-ordinating national and local partners to provide information and
support on Community Asset Transfer.
• Chairing the Community Learning and Development (CLD) Partnership
Executive Group and supporting the CLD Partnership Forum, with this
role recognised as a key strength by HM Inspectors / Education Scotland. 
• Collaborating with Renfrewshire Council’s procurement team to pilot a
new approach to the Community Benefits menu, with a focus on raising
the importance of community engagement at a pre-tender stage 
• Supporting and promoting various local funding initiatives including
Multiply, the Winter Connections programme, Culture Arts and Health
Social Care and Cultural Heritage and Event Funding. In particular over
2024/25, Engage Renfrewshire played a key role in supporting the design
of community funding approaches as well as assisting with partnership
decision making. 
• Managing and distributing over £0.5m of funding from the Community
Mental Health and Wellbeing Fund - the overarching aim of the Fund is to
support community-based initiatives that promote and develop good
mental health and wellbeing and/or mitigate and protect against the
impact of distress and mental ill health within the adult population. This
has been confirmed for 2025/6 and 2026/7.
• Engage Renfrewshire are continuing to deliver the Renfrewshire
Wellbeing Network alongside the HSCP, with regular network meetings
and opportunities provided to network members. 
Page 72 of 78

Page 77

• Supporting the Community Planning Partnership, including chairing the
Forum for Empowering Communities, connecting Renfrewshire’s third
sector to the wider Community Planning agenda and supporting other
partnership groups and activities relating to children and young people,
employability, connectedness and mental health and wellbeing 
• Children’s Services Partnership development, providing insight and voice
of third sector and also facilitating the Our Children Network 
• Representatives on all Local Partnerships, and in particular supporting a
partnership approach to identifying appropriate community funding
sources.  In practice this means working to support applicants and to
identify new or additional funding streams which support financial
sustainability of organisations, or new initiatives. 
• Supporting local volunteering activity, promoting Volunteers Week and co-
ordinating Saltire Awards across Renfrewshire, with 553 Saltire awards
received in 24/25. There are 1,932 potential volunteers registered on
Team Kinetic system, receiving updates on volunteer opportunities from
138 providers. 
• Continuing to lead the Renfrewshire Affordable Credit Alliance, and
supporting third sector organisations to support people around affordable
credit options. 
• Establishing and growing the Renfrewshire Integration Network (IN-Ren)
and supporting wider community integration of New Scots in
Renfrewshire. 
4.2      Further information on Engage Renfrewshire’s full range of services and
activities for 2023-24 can be found within their Annual Report 1 published on
their website. 
5.        Grant funding for 2025/26
5.1 As outlined in Section 1, officers recommend that funding of £360,610 is
allocated to Engage Renfrewshire for 2025/26.  Whilst this funding is
important in terms of supporting the organisation to continue to operate at the
required scale and pace required in Renfrewshire, it is also vital to ensuring
that the correct resources are deployed to deliver on the following identified
priorities:
• Building Renfrewshire’s community and voluntary sector capacity
• Representing the third sector in the delivery of our Community Plan and
its strategic priorities 
• Providing the strategic and operational lead for volunteering in
Renfrewshire 
1 Engage Renfrewshire Annual Report 2023-2024
Page 73 of 78

Page 78

5.2      A refreshed outcomes framework will be developed to support this funding
arrangement if approved. As outlined in Section 1, this remains flexible in
order that support can be requested by the Council and community planning
partnership in relation to emerging priorities.  Particular strategic priorities for
2025/26 include supporting emerging programmes of work in relation to Fairer
Renfrewshire, Digital, Equalities, Migration, Asylum/New Scots and
Community Learning and Development.  
5.3  Appendix 1 sets out a one-page summary of Engage Renfrewshire’s Business
Plan for 2025/26, which will be used to inform monitoring of performance
during 2025/26.
5.4 Engage Renfrewshire will continue to submit a quarterly performance
monitoring report to officers in Renfrewshire Council Chief Executive’s Service
for review and agreement.
6.  Connected Communities programme
6.1 When considering funding arrangements for 24/25, elected members were
asked to note that work has commenced to formally review the funding
arrangement with Engage Renfrewshire going forward, linked to the
Connected Communities programme led by the Head of Policy and
Partnerships. 
6.2 Several areas have been identified where there may be further alignment and
efficiencies which will be explored as the Council develops and implements its
new model. These include: 
• reviewing how we support community and voluntary organisations to build
their capacity more broadly, including the balance of tasks carried out by
various Council services as well as partners such as Engage Renfrewshire
• reviewing the Council’s strategy and resources related to both its own
investment in communities, but the effectiveness and opportunities in
levering in additional external investment to support the voluntary and
community sector, 
• the potential role of the third sector interface in the transition to greater
locality-based working, particularly the support to Local Partnerships and
support and resourcing of the Local Action Plans under development.
• how the Council supports social enterprise, and connection to wider
economic development activity 
• where Engage Renfrewshire provides direct support to the delivery of key
Council services, such as the support offered in co-ordinating the
distribution of community benefits 
6.3 Officers will continue to work very closely with the Chief Executive of Engage
Renfrewshire to continue to develop and strengthen this relationship as the
Page 74 of 78

Page 79

review progresses and proposals are brought forward for consideration by
elected members.
___________________________________________________________________
Implications of the Report
1. Financial – commitment of £360,610 in grant funding to Engage
Renfrewshire which can be met from the Chief Executive’s Service
budget for 25/26. 
2. HR & Organisational Development - None 
3. Community/Council Planning – funding for the Third Sector Interface
supports the third sector contribution to all priorities detailed within both
the Council and Community Plans. 
4. Legal – None 
5. Property/Assets - None 
6. Information Technology - None   
7. Equality & Human Rights  - No negative impacts on equality groups
or potential for infringement of individuals’ human rights have been
identified arising from the recommendations contained in the report. 
Supporting the Third Sector Interface would have a positive impact on
equalities outcomes, by developing and engaging a range of diverse
voices in the community planning process and supporting the
development of equalities-led third sector organisations. 
8. Health & Safety - None
9. Procurement - None
10. Risk – Funding the Third Sector Interface mitigates risk of community
and voluntary sector organisations not being able to contribute to
community planning outcomes.
11. Privacy Impact - None
12. Cosla Policy Position – Cosla supports the principle of community
planning as a means of improving outcomes and reducing inequalities
and the importance of Third Sector Interfaces in delivering this.
13. Climate implications -  no direct implications, however Engage have
supported all partnership work in this area and encouraged active
participation across the sector.
Page 75 of 78

Page 80

14.  Children’s rights – no direct implications, however Engage
Renfrewshire are core members of the Children’s Services Partnership
in Renfrewshire, which has a key focus on involving and engaging with
children and young people, and meeting the needs of this group.
_________________________________________________________
List of Background Papers - None
___________________________________________________________________ 
Author:  Laura McIntyre, Head of Policy and Partnerships. 
Page 76 of 78

Page 81

Engage Renfrewshire – Business Plan 2025/26 
Quarterly updates prepared for Engage Renfrewshire board & Renfrewshire Council
Annual report for Scottish Government
Our aim is to help charities and community groups to be well managed, well resourced, 
well represented and well connected. 
Schedule of Monitoring
Volunteering -
key to health,
wellbeing, and
employability
Organisations
accessing
increased
amounts of
sustainable
funding
Local
organisations -
well governed
and delivering
quality services
Local
organisations
are
contributing to
a strong local
social economy
Improved
levels of cross
sector
collaboration
Community
Empowerment
central to local
governance
During 2025/26 we will:
•Strengthen strategic collaboration with the Scottish Government, Renfrewshire’s
Community Planning Partnership, and local communities to drive meaningful, long-term
change.
•Enhance cross-sector partnerships by fostering deeper collaboration across Community
Learning & Development (CLD), Drugs & Alcohol services, Whole Family Wellbeing
initiatives, and other key areas.
•Champion the Third Sector’s role in recovery by aligning with and amplifying the impact
of the National Social Enterprise Action Plan and the Volunteering Action Plan.
•Maximise the impact of the Community Mental Health & Wellbeing Fund over the next
two year by ensuring funding leads to sustainable improvements in local support
services.
•Elevate volunteering standards across our membership while positioning volunteering
as a key pathway to employment and economic participation.
•Expand social enterprise opportunities by delivering high-quality workshops and
training, empowering organisations to thrive as sustainable businesses.
•Equip partners with a deeper understanding of the Third Sector’s role, fostering
stronger, more effective collaboration.
•Scale up access to Engage Financial Services, ensuring all members and partners benefit
from tailored financial support and sustainability planning.
•Support and facilitate area-based initiatives that strengthen community assets and
build resilient local networks.
•Advance equality and inclusion by supporting the delivery of the IN-Ren Network and
advocating for systemic change.
•Maximise external funding success by providing expert guidance on funding
applications and strategic development.
•Provide rapid and informed support in response to crises, while encouraging a
compassionate Third Sector response.
•Measure and showcase the impact of volunteering, reinforcing its role in community
resilience and social cohesion.
•Drive digital engagement, by Co-chairing #DigiRen, and in turn leveraging technology to
enhance Third Sector visibility, outreach, and service delivery.
•Deliver a range of training that is fully responsive to the evolving needs of our members,
equipping them for future challenges.
•Increase financial inclusion by raising awareness and facilitating access to fair and
affordable credit solutions.
•Strengthen private sector collaboration by deepening engagement with Renfrewshire
Chamber of Commerce and other business networks.
•Champion strong financial governance as a core responsibility for local organisations
and trustees, ensuring long-term sustainability.
•Continue to support a collaborative response to the National Health & Wellbeing
Survey, shaping policy and service provision based on local insights. This will include
supporting a new role that will tackle 'smoking & vaping' cesssation.
INTELLIGENCE                           CAPACITY   CONNECT                                  VOICE     
Understanding the
needs of our network
Building a strong
culture of volunteering
Helping to strengthen
local organisations
Supporting social
enterprise start up
Providing practical and
responsive financial
support
Helping more
organisations work
collaboratively
Creating new
partnerships and new
ways of working to
bring resources into
Renfrewshire
Connecting people
and organisations,
ensuring our networks
are strong and
effective
Working with public
and private sectors to
ensure we’re making
the most of all
resources
Ensuring the voice of
our network is heard
& understood by
decision makers and
funders
Ensuring our networks
influence, engage
with, and promote
emerging social
strategies
Helping to enhance
health & promotes life
chances
Medium Term Outcomes (2025 to 2028)
Page 77 of 78

Page 82

Page 78 of 78