ARGYLL AND BUTE COUNCIL              OBAN, LORN AND THE ISLES AREA
COMMITTEE                                                         
ROADS & INFRASTRUCTURE           JUNE 2023 
PROPOSED ARGYLL AND BUTE COUNCIL (VARIOUS STREETS, OBAN)
(AMENDMENT) ORDER 202_ 
1.0 EXECUTIVE SUMMARY 
1.1 The report provides an update on the Oban on street restriction Traffic Regulation
Order (TRO).
1.2 Following officer engagement from 2020 via the Community Participation Request
process with Oban Community Council, local Members and local businesses, a draft
TRO was produced. The formal TRO process commenced on 30 April 2021.  An
overview of the process can be found at A Guide to Consultation on Traffic Regulation
Orders for Community Organisations (argyll-bute.gov.uk)
1.3 This report provides detail of the objections to the draft “Argyll and Bute Council
(Various Streets, Oban) (Amendment) Order 202_”TRO.   
RECOMMENDATIONS
1.4  That the Committee agree that the draft “Argyll and Bute Council (Various Streets,
Oban) (Amendment) Order 202_”TRO is made.

Page 2

ARGYLL AND BUTE COUNCIL  OBAN, LORN AND THE ISLES AREA
COMMITTEE                                                         
ROADS & INFRASTRUCTURE      JUNE 2023 
PROPOSED ARGYLL AND BUTE COUNCIL (VARIOUS STREETS, OBAN)
(AMENDMENT) ORDER 202_ 
2.0 INTRODUCTION 
2.1 This report provides an update on the Oban on street restriction Traffic Regulation
Order (TRO).
2.2 Following officer engagement via the Community Participation Request process with
Oban Community Council, local Members and local businesses, a draft TRO was
produced. The formal TRO process commenced on 30 April 2021.
2.3 This report provides detail of the objections to the draft “Argyll and Bute Council
(Various Streets, Oban) (Amendment) Order 202_”TRO.   
3.0 RECOMMENDATIONS 
3.1 That the Committee agree that the draft “Argyll and Bute Council (Various Streets, Oban)
(Amendment) Order 202_”TRO is made. 
4.0 DETAIL 
4.1 In early 2019, Officers prepared draft plans regarding the proposed implementation of
additional on street waiting restrictions in Oban.  Following comments received at
Consultation 1 & 2, the initial proposal was abandoned and a second proposal was
drafted incorporating the additional requests for waiting restrictions.
4.2 On the 2nd September 2020, prior to the second proposal being issued to the Consultation
1 & 2 consultees, a Community Participation Request (CPR) was received from Oban
Community Council (OCC). The desired improvement outcome submitted by OCC was
“An increase in the use of council car parks and on-street bays.  A decrease in
inconsiderate parking around the town and a better flow of traffic as a result.”

Page 3

4.3 Officers agreed to pause the proposed draft on-street Traffic Regulation Order (TRO) as
the CPR was expected to generate additional proposals.
4.4 The first meeting of the group was held on 6 November 2019 and included the OCC, the
local Community Development Officer, local Traffic & Development Officer and the
Assistant Network & Standards Manager.  Subsequent meetings were widened out to
include local Members. 
4.5  As part of the CPR, the OCC carried out community engagement surveys, seeking views
from local residents and businesses about parking and the need for waiting restrictions
to minimise irresponsible parking.
4.6 Officers engaged with the local public transport provider to identify ‘pinch-points’ on the
local bus routes.  This included a “ride-along” to identify where the local bus service was
at risk of being reduced or cancelled due to the narrowing of carriageways through
irresponsible parking.
4.7 The progress of the review was delayed due to the onset of the COVID-19 pandemic,
however; drawings for the proposed on-street restrictions were produced and circulated
amongst the group prior to recommencing the TRO process in 2021.
4.8 On 30 April 2021, the combined Consultation 1 & 2 letters were again issued seeking
views from parties by the 21 May 2021.  Following closure of this phase, the proposed
TRO was drafted and published on 15 July 2021 with a closing date for formal objection
by 9 August 2021.  Appendix 1 contains the draft TRO as published.  Appendix 2 provides
location plans for each of the proposed restrictions.
4.9 The draft TRO received 12 objections. Following engagement between Officers and the
Objectors, none of these objections were withdrawn. These objections are considered to
be extant and as per the TRO legislative process, the draft TRO is now referred to the
Committee for consideration.  
4.10 While there is no right for anonymity for maintained objections, it is standard practice to
withhold the names and addresses of the objectors.  Copies of the objections can be
provided on request.  The objections have been grouped together thematically in
Appendix 3 alongside the Councils response to the objections.
4.11 Objections (i-v) were submitted in relation to the proposals on the U004 Croft Road. 
Objections under (vi) were in relation to the restrictions on the U82 Kerrera Terrace.  No
other objections or views were submitted in relation to the other streets included in the
TRO.
4.12  To ensure the provision of public transport, emergency service access and in the interest
or road safety, it is the view of Officers that the Order should be made as published.
4.13 An informal Business Day meeting was held with members of the Area Committee on 10
May 2023 where a presentation was given on the proposals for the TRO followed by a
Q&A session. 
5.0 CONCLUSION

Page 4

5.1  This report provides detail of the objections to the draft “Argyll and Bute Council (Various
Streets, Oban) (Amendment) Order 202_”TRO and recommends that the TRO be made.
5.2 It is expected that the TRO will introduce improvement to road safety for all users.  The
TRO will mitigate against irresponsible and dangerous parking and ensure that the bus
service can continue providing its service across Oban town.  
5.3 The implementation of the TRO will incur costs in relation to the installation of signs and
road markings. This is deliverable within existing budgets. 
6.0 IMPLICATIONS
6.1 Policy - Parking Policy Framework 2014
6.2 Financial - Signs and lining will be funded from the car parking revenue budget.
6.3  Legal - That the TRO be implemented as modified
6.4  HR -  None known
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics – where appropriate EqSEIAs will be
carried out to identify any implications 
6.5.2   Socio-economic Duty – Public Transport (bus service) will be able to continue
to operate. 
6.5.3  Islands  - N/A
6.6 Climate Change – n/a 
6.7 Risk – Safer roads for all road users
6.8  Customer Service – in-line with Parking Policy Framework 2014 
Executive Director with responsibility for Roads and Infrastructure: Kirsty Flanagan
Head of Roads and Infrastructure: Jim Smith 
Policy Lead for Roads and Transport Councillor Andrew Kain 
May 2023                                                                                                  
For further information contact: Stuart Watson, Assistant Network & Standards Manager,
01546 604 889

Page 5

APPENDICES 
Appendix 1 – draft “Argyll and Bute Council (Various Streets, Oban) (Amendment) Order 202_”
Appendix 2 – Oban TRO Plans 
Appendix 3 – Objections - Thematic Summary