ARGYLL AND BUTE COUNCIL OBAN, LORN AND THE ISLES
AREA COMMITTEE 
CUSTOMER SUPPORT SERVICES   14 JUNE 2023 
AREA PERFORMANCE REPORT – FQ4 2022/23 
1 Background 
1.1 This paper presents the Area Performance Report for Financial Quarter 4 2022/23
(January to March 2023) and illustrates the agreed performance measures. 
1.2 The features of the Performance Report are as follows:- 
 Indicators are grouped by Corporate Outcome.
 The data table for each indicator is coded to identify the level of reporting.
o Area level measures are blue
o Council level measures are grey
o COI measures are white 
 Each indicator details the
o Target, Actual and Performance status (Green / Red / No Target) for the
current and three previous financial quarters.
o Commentary for the current financial quarter only.
o Narrative explaining the performance trend e.g. This indicator is above
Target and performance has improved since the last reporting period.
o Where appropriate a Performance Trend Line has been added.
o The name of the responsible officer.
o Where possible performance is presented at both Area and Council
level. 
1.3 The commentary for each indicator helps ‘Tell Our Story’ and enables Elected
Members to put the performance data into perspective and understand if an issue is
local in nature or should be escalated up to a Strategic Committee. 
1.4 To improve the response to performance queries, it is requested that either the
Responsible Named Officer or Sonya Thomas are contacted once the Quarterly
Performance Report is received with any queries. This should enable some
queries being resolved or clarified prior to the Area Committee meeting, and
therefore being carried forward as Actions at a subsequent meeting. 
2 Recommendations 
2.1 It is recommended that the Area Committee – 
a) Notes and considers the performance and supporting commentary as
presented.

Page 2

2 
b) Upon receipt of the Quarterly Performance Report the Area Committee
contact either the Responsible Named Officer or Sonya Thomas with any
queries. 
c) Note that work is ongoing and to respond to Sonya Thomas with requests
or comments regarding the layout and format of the Performance Report. 
3.0 IMPLICATIONS 
3.1 Policy: None
3.2 Financial: None
3.3 Legal: None
3.4 HR: None
3.5 Fairer Scotland Duty: No impact assessment required for this report. 
3.5.1 Equalities: None. If requested the Area Committee Performance Report
can be supplied in a different format.
3.5.2 Socio-economic Duty: None
3.5.3 Islands: None 
3.6 Climate Change: None
3.7 Risk: None
3.8 Customer Service: None 
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services 
Jane Fowler
Head of Customer Support Services
4 May 2023 
For further information, please contact:
Sonya Thomas
Organisation Development Officer - Performance and Improvement
Customer Support Services
01546 604454 
Appendix 1: FQ4 2022/23 OLI Performance Report

Page 3

Appendix 1
Page 1 
Performance Reporting
Performance Reporting .............................................................................................................................................................................................................................. 1
All Areas .................................................................................................................................................................................................................................................. 4
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 5
COI – Maximise distribution of Scottish Welfare Fund ................................................................................................................................................................. 5
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 6
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention ...................... 6
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 7
Number of parking penalty notices issued – Oban, Lorn and the Isles......................................................................................................................................... 7
Number of parking penalty notices issued – Argyll and Bute ....................................................................................................................................................... 7
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 8
Car parking income to date – Oban, Lorn and the Isles................................................................................................................................................................. 8
Car parking income to date – Argyll and Bute ............................................................................................................................................................................. 10
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................. 11
Dog fouling – total number of complaints – Oban, Lorn and the Isles ....................................................................................................................................... 11
Dog fouling – total number of complaints – Argyll and Bute ...................................................................................................................................................... 11
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 12
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place .... 12
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 13
COI – Provide quality meals with cost margins to all pupils ....................................................................................................................................................... 13
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all .......................................................................................................... 14
Maximise the percentage of 16-19 years olds participating in education, training or employment – Oban, Lorn and the Isles ............................................ 14
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and Bute ................ 14
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 15
Number of affordable social sector new builds completed per annum – Oban, Lorn and the Isles ......................................................................................... 15

Page 4

Appendix 1
Page 2 
Number of affordable social sector new builds completed per annum – Argyll and Bute ........................................................................................................ 15
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 17
Percentage of pre-planning application enquiries processed within 20 working days – Oban, Lorn and the Isles .................................................................. 17
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute ................................................................................ 17
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 18
Householder planning applications – average number of weeks to determine – Oban, Lorn and the Isles ............................................................................. 18
Householder planning applications – average number of weeks to determine – Argyll and Bute ........................................................................................... 18
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 20
COI – The number of new homeless applicants who required temporary accommodation this period .................................................................................. 20
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 21
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal .................................................... 21
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 22
COI – Increase the number of community benefits that are delivered through contracts we award locally ........................................................................... 22
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 23
Street lighting – percentage of faults repaired within 10 days – Oban, Lorn and the Isles ....................................................................................................... 23
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute .......................................................................................... 23
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 24
Total number of complaints regarding waste collection – Lorn ................................................................................................................................................. 24
Total number of complaints regarding waste collection – Mull ................................................................................................................................................. 24
Total number of complaints regarding waste collection – Argyll and Bute ............................................................................................................................... 25
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 26
COI – Percentage of waste recycled, composted and recovered ................................................................................................................................................ 26
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered ........................................................................................................... 26
Islands – Percentage of waste recycled, composted and recovered .......................................................................................................................................... 27
H&L – Percentage of waste recycled, composted and recovered ............................................................................................................................................... 28

Page 5

Appendix 1
Page 3 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 29
COI – The number of tonnes of waste sent to landfill ................................................................................................................................................................. 29
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 30
LEAMS (Local Environment Audit and Management System) – Lorn ......................................................................................................................................... 30
LEAMS (Local Environment Audit and Management System) – Mull ......................................................................................................................................... 30
LEAMS (Local Environment Audit and Management System) – Argyll and Bute ....................................................................................................................... 31
Making It Happen.............................................................................................................................................................................................................................. 32
Teacher sickness absence – Oban, Lorn and the Isles ................................................................................................................................................................. 32
Teacher sickness absence – Argyll and Bute ................................................................................................................................................................................ 32
Making It Happen.............................................................................................................................................................................................................................. 33
LGE staff (non-teacher) sickness absence – Oban, Lorn and the Isles ........................................................................................................................................ 33
LGE staff (non-teacher) sickness absence – Argyll and Bute ....................................................................................................................................................... 33
Making It Happen.............................................................................................................................................................................................................................. 34
COI – Increase the percentage of all self-service automated contacts ....................................................................................................................................... 34

Page 6

Appendix 1
Page 4 
All Areas 
FQ4 2022/23 Overall Performance Summary 
The information presented is a summary of the agreed measures. 
Unless stated otherwise, performance is presented at both Area and Council-wide levels. 
The measures show the performance against target for the current and previous three reporting periods with an explanation of performance trend. 
The data table for each indicator is colour coded to identify the level of reporting: 
 Area level measures are blue.
 Council level measures are grey.
 Corporate Outcome Indicators (COIs) are white. 
Where appropriate a Trend Line has been added to illustrate movement in ‘Actual’ over the reporting period.

Page 7

Appendix 1
Page 5 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Maximise distribution of Scottish Welfare Fund 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2022/23 95.3% 87.5% Red
FQ2 2022/23 95.3% 115.1% Green
FQ3 2022/23 95.3% 129.2% Green
FQ4 2022/23 95.3% 144.0% Green 
Performance in FQ4 has exceeded target and actual has increased since the last reporting period. 
FQ4 Comment 
At 31 March 2023 our total Scottish Welfare Fund (SWF) spend is £659,812.  Our 2022/23 allocation was £458,338 so this represents an overspend of £201,474.  
However the Council has earmarked reserves from the previous years’ Covid related underspend to offset this.
Responsible person: Fergus Walker

Page 8

Appendix 1
Page 6 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and
intervention 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2022/23 100% 100% Green
FQ2 2022/23 100% 100% Green
FQ3 2022/23 100% 100% Green
FQ4 2022/23 100% 95% Red 
This indicator for FQ4 is below the target and performance has decreased since the last reporting period. 
FQ4 Comment
There were no Debt Arrangement Schemes set up in this quarter.  All of the clients provided with a Personal Debt Recovery Action Plan were satisfied.  Out of 13
surveys issued 9 were returned showing 95% of clients satisfied.  2 of the 9 survey returns had comments showing their appreciation of the service and how it had
helped them.
Responsible person: Lee Roberts

Page 9

Appendix 1
Page 7 
Corporate Outcome No.2 – People live in safer and stronger communities 
Number of parking penalty notices issued – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No target 322 No target 
FQ2 2022/23 No target 240 No target
FQ3 2022/23 No target 153 No target
FQ4 2022/23 No target 391 No target 
The indicator for FQ4 shows the number of parking penalty notices has increased significantly since the last reporting period. 
FQ4 Comment
Some lining/signing issues in Oban town centre require attention.  George Street (trunk road restrictions) has been relined.
Responsible person: Hugh O’Neill 
Number of parking penalty notices issued – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No target 2,043 No target 
FQ2 2022/23 No target 2,124 No target
FQ3 2022/23 No target 1,343 No target
FQ4 2022/23 No target 1,332 No target 
This indicator for FQ4 shows the number of parking penalty notices has decreased slightly since the last reporting period. 
FQ4 Comment
Seasonal car parks remain free, various signing and lining issues throughout region.
Responsible person: Hugh O’Neill

Page 10

Appendix 1
Page 8 
Corporate Outcome No.2 – People live in safer and stronger communities 
Car parking income to date – Oban, Lorn and the Isles 
Performance is presented cumulatively for both Area and Council-wide levels.  For individual car parks, the income is presented on a quarterly basis. 
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ1 2022/23 £170,832 £84,992 Red
FQ2 2022/23  £426,247 £286,288 Red
FQ3 2022/23 £554,026 £423,730 Red
FQ4 2022/23 £677,416 £493,218 Red 
This indicator for FQ4 shows the cumulative amount of income collected is significantly lower than the cumulative target.  There is no performance trend as this
data is cumulative. 
FQ4 Comment
The figures to date show an under-recovery of £184,198.  It is difficult to ascertain the exact reasons for under-recovery in parking income however it can be
affected by such things as events, weather and commuting.  The upgrade of the remaining cash only parking meters (across the whole Council area) is due to start
in May/June 2023; this will provide multi-payment options and may deliver an increase in ticket income.
Responsible person: Hugh O’Neill 
Actual Quarterly Income collected in Oban, Lorn and Isles during FQ3 and FQ4. 
Car Park Location FQ3 Actual FQ4 Actual
Corran No.1, Oban £8,773 £1,284
North Pier, Oban £20,209 £7,343
Corran No.2, Oban £5,883 £1,113
Longsdale, Oban £2,578 £1,344
Non-trunk, Oban £50,120 £26,160
Lochavullin, Oban £5,588 £3,273
Ganavan, Oban £3,240 £1,895
Trunk, Oban £8,162 £10,028
Albany Street, Oban £3,291 £1,713

Page 11

Appendix 1
Page 9 
Car Park Location FQ3 Actual FQ4 Actual
Oban £2,987 £4,790
Tweedale Street, Oban £17,641 £6,112
Market Street, Oban £1,065 £826
Esplanade, Oban £2,305 £214
Ledaig, Tobermory £0 £0
Craignure, Mull £532 £255
Fionnphort, Mull £5,066 £3,137

Page 12

Appendix 1
Page 10 
Car parking income to date – Argyll and Bute 
Performance is presented cumulatively for both Area and Council-wide levels. 
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ1 2022/23 £250,661 £165,678 Red
FQ2 2022/23 £625,430 £491,453 Red
FQ3 2022/23 £812,919 £709,585 Red
FQ4 2022/23 £993,968 £817,788 Red 
This indicator for FQ4 shows the cumulative amount of income collected is significantly lower than the cumulative target.  There is no performance trend as this
data is cumulative. 
FQ4 Comment 
Improved income in both MAKI and OLI areas but overall there is an under-recovery in income of £176,180.  It is difficult to ascertain the exact reasons for under-
recovery in parking income however it can be affected by such things as events, weather and commuting.  The upgrade of the remaining cash only parking meters
(across the whole Council area) is due to start in May/June 2023; this will provide multi-payment options at all (RIS) on and off street parking facilities and may
deliver an increase in ticket income.
Responsible person: Hugh O’Neill

Page 13

Appendix 1
Page 11 
Corporate Outcome No.2 – People live in safer and stronger communities 
Dog fouling – total number of complaints – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 9 No Target 
FQ2 2022/23 No Target 4 No Target
FQ3 2022/23 No Target 6 No Target
FQ4 2022/23 No Target 18 No Target 
This indicator for FQ4 shows the number of dog fouling complaints has increased since the last reporting period. 
FQ4 Comment
The Mull area received only 1 complaint, this is very good.  There were 17 dog fouling complaints received for the Lorn area this quarter which is up on last
quarter, however the Warden service will continue to monitor this in an effort to resolve this problem.  
Responsible person: Tom Murphy 
Dog fouling – total number of complaints – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 61 No Target 
FQ2 2022/23 No Target 45 No Target
FQ3 2022/23 No Target 47 No Target
FQ4 2022/23 No Target 77 No Target 
This indicator for FQ4 shows the number of dog fouling complaints has increased significantly since the last reporting period. 
FQ4 Comment
The number of dog fouling complaints received this quarter is high with a total of 77; B&C: 25, H&L: 8, MAKI: 26 and OLI: 18.  The Warden service will continue to
monitor and liaise with partners in a bid to educate and reduce the numbers.
Responsible person: Tom Murphy

Page 14

Appendix 1
Page 12 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring
plans in place 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2022/23 100% 100% Green
FQ2 2022/23 100% 100% Green
FQ3 2022/23 100% 100% Green
FQ4 2022/23 100% 100% Green 
This indicator for FQ4 is on track with no change in performance since the last reporting period. 
FQ4 Comment
There is individual tracking and monitoring in place on SEEMIS in schools for care experienced children and young people.  In addition to this, the Principal Teacher
for care experienced children and young people monitors the information in SEEMIS and has subsequent conversations with staff in schools to ensure care
experienced children and young people are receiving all the support they need to achieve and that the staff in school have the right strategies in place to help the
child remain engaged with their education attainment and achievement.  Often the care experienced health and wellbeing officers are used to provide extra
support for the child and the family.  The new Virtual Head Teacher post started on 17th April 2023.
Responsible person: Louise Lawson

Page 15

Appendix 1
Page 13 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Provide quality meals with cost margins to all pupils 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 +/-5.00% 3.77% Green 
FQ2 2022/23 +/-5.00% 0.98% Green
FQ3 2022/23 +/-5.00% 6.09% Red
FQ4 2022/23 +/-5.00% -2.56% Green 
This indicator for FQ4 is within the +/-5% target variance and performance has improved since the last reporting period. 
FQ4 Comment
Total percentage variance for Argyll and Bute -2.56%.  We will continue to monitor any locations continuing to have food cost percentages over this target.
B&C -6.15%
H&L -2.00%
MAKI -2.00%
OLI -0.80%
Responsible person: Jayne Jones

Page 16

Appendix 1
Page 14 
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all 
Maximise the percentage of 16-19 years olds participating in education, training or employment – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 94.00% 95.95% Green 
FQ2 2022/23 94.00% 95.48% Green
FQ3 2022/23 94.00% 95.34% Green
FQ4 2022/23 94.00% 95.60% Green 
This indicator for FQ4 is above target however and performance has increased slightly since the last reporting period. 
FQ4 Comment
As of 20/03/2023, the participation figure for OLI was 920 pupils which equates to 95.6%.  This is 1.7% above the Argyll and Bute Participation figure for 2021/22
of 93.9%.
Responsible person: Simon Easton 
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and
Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 94.00% 94.00% Green 
FQ2 2022/23 94.00% 93.90% Red
FQ3 2022/23 94.00% 93.90% Red
FQ4 2022/23 94.00% 93.62% Red 
This indicator for FQ4 is slightly below target and performance has decreased slightly since the last reporting period. 
FQ4 Comment
The Annual Participation Measure for 2021/22 was released on 31/08/2022 which showed 93.9% of young people aged 16-19 were participating (in work, training
or education).  This figure is 0.4% above the national average. 3.8% were not participating, which is 0.2% below the national average. 2.3% were unconfirmed,
which is 1.3% below the national average.  As at 20/03/2023, the Participation figure for Argyll and Bute stood at 3,640 pupils which equates to 93.62%.
Responsible person: Simon Easton

Page 17

Appendix 1
Page 15 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Number of affordable social sector new builds completed per annum – Oban, Lorn and the Isles 
Reporting Period Target Actual Status
FQ1 2022/23 18 18 Green
FQ2 2022/23 38 38 Green
FQ3 2022/23 36 36 Green
FQ4 2022/23 27 27 Green 
This indicator for FQ4 show the number of completions has met the target for the reporting period. 
FQ4 Comment
Link Group Development at Dunbeg Phase 3; 23 General Needs (made up of 7 x 2 bed Terraced Houses, 15 x 3 bed Semi Detached/Terraced Houses, 1 x 4 bed End
Terrace House) and 4 wheelchair accessible (4 x 2 bed Wheelchair Bungalows).  All for social rent.
Responsible person: Allan Brandie 
Number of affordable social sector new builds completed per annum – Argyll and Bute 
Reporting Period Target Actual Status
FQ1 2022/23 36 36 Green
FQ2 2022/23 48 48 Green
FQ3 2022/23 37 37 Green
FQ4 2022/23 67 67 Green 
This indicator for FQ4 shows the number of completions has met the target for the reporting period. 
FQ4 Comment
B&C No units were scheduled for completion in FQ4.
H&L Loretto Housing Association (Wheatley Group) Development at Sawmill Field; 32 General Needs and 4 Amenity (made up of 8 x 1 bed Flats, 12 x 2 bed
Flats, 10 x 2 bed Houses, 6 x 3 bed Houses).  All for social rent.
MAKI Argyll Community Housing Association Development at Oakhill Tarbert; 4 General Needs (made up of 4 x 3 bed houses).  All for social rent.

Page 18

Appendix 1
Page 16 
OLI Link Group Development at Dunbeg Phase 3; 23 General Needs (made up of 7 x 2 bed Terraced Houses, 15 x 3 bed Semi Detached/Terraced Houses, 1 x 4
bed End Terrace House) and 4 wheelchair accessible (4 x 2 bed Wheelchair Bungalows).  All for social rent.
Responsible person: Alan Brandie

Page 19

Appendix 1
Page 17 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Percentage of pre-planning application enquiries processed within 20 working days – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 75.0% 75.0% Green 
FQ2 2022/23 75.0% 86.2% Green
FQ3 2022/23 75.0% 76.9% Green
FQ4 2022/23 75.0% 78.3% Green 
This indicator for FQ4 is above target and performance has increased since the last reporting period. 
FQ4 Comment
The team processed 78.3% of Pre-Applications enquiries within 20 working days – the fifth consecutive quarter of above target performance.  Given the
particularly challenging operational circumstances of this financial quarter, the team are to be commended on this achievement.
Responsible person: Peter Bain 
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 75.0% 60.5% Red 
FQ2 2022/23 75.0% 64.7% Red
FQ3 2022/23 75.0% 52.5% Red
FQ4 2022/23 75.0% 55.4% Red 
This indicator for FQ4 is below target however performance has increased since the last reporting period. 
FQ4 Comment
Performance across Development Management remains impacted by extended periods of operating with staff vacancies and a backlog of casework from the
pandemic.  The introduction of National Planning Framework 4 in February 2023 by The Scottish Government has further impacted on productivity as the
Development Management staff interpret this new policy landscape and its implications for current applications and enquiries.
Responsible person: Peter Bain

Page 20

Appendix 1
Page 18 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Householder planning applications – average number of weeks to determine – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 8.0 weeks 9.4 weeks Red 
FQ2 2022/23 8.0 weeks 8.5 weeks Red
FQ3 2022/23 8.0 weeks 7.7 weeks Green
FQ4 2022/23 8.0 weeks 9.4 weeks Red 
This indicator for FQ4 has not met the target and performance has decreased since the last reporting period. 
FQ4 Comment
This measure only relates to planning applications received for alterations to existing premises.
Performance across Development Management remains impacted by extended periods of operating with staff vacancies and a backlog of casework from the
pandemic.  The introduction of National Planning Framework 4 in February 2023 by The Scottish Government has further impacted on productivity as the
Development Management staff interpret this new policy landscape and its implications for current applications and enquiries.
Responsible person: Peter Bain 
Householder planning applications – average number of weeks to determine – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 8.0 weeks 12.4 weeks Red 
FQ2 2022/23 8.0 weeks 13.1 weeks Red
FQ3 2022/23 8.0 weeks 12.0 weeks Red
FQ4 2022/23 8.0 weeks 17.3 weeks Red 
This indicator for FQ4 has not met the target and performance has decreased significantly since the last reporting period. 
FQ4 Comment
This measure only relates to planning applications received for alterations to existing premises.

Page 21

Appendix 1
Page 19 
Performance across Development Management remains impacted by extended periods of operating with staff vacancies and a backlog of casework from the
pandemic.  The introduction of National Planning Framework 4 in February 2023 by The Scottish Government has further impacted on productivity as the
Development Management staff interpret this new policy landscape and its implications for current applications and enquiries.
Responsible person: Peter Bain 
Benchmarking
The year-end statistics from The Scottish Government were published on 31st August. FY21/22 benchmarking figures have now been updated and FY22/23 have
been forward projected in the usual way.  Readers should note that our own Pyramid data in Development Management measures is "unadjusted", whereas that
of the benchmarks (represented by the blue and green columns on the graph) is adjusted for "clock-stopping".  Clock-stopping is where The Scottish Government
allow for the removal of specific time periods for identified applications where delays were out with the control of the Local Planning Authority.

Page 22

Appendix 1
Page 20 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – The number of new homeless applicants who required temporary accommodation this period 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 32 No Target 
FQ2 2022/23 No Target 28 No Target
FQ3 2022/23 No Target 41 No Target
FQ4 2022/23 No Target 30 No Target 
This indicator for FQ4 shows the number of applicants has decreased since the last reporting period. 
FQ4 Comment
During FQ4, the housing service provided temporary accommodation for 30 new homeless households.
B&C 9
H&L 4
MAKI 1
OLI 16
Responsible Person: Morven Macintyre

Page 23

Appendix 1
Page 21 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 20.0% 13.2% Red 
FQ2 2022/23 20.0% 22.2% Green
FQ3 2022/23 20.0% 19.4% Red
FQ4 2022/23 20.0% 22.5% Green 
This indicator for FQ4 is above target and performance has increased since the last reporting period. 
FQ4 Comment
Of the 9 bids made by local contractors, 9 were awarded the contract with a total value of over £883k.  A summary of all contracts awarded in FQ4 is available. 
The Procurement, Commercial and Contract Management Team (PCCMT) continue to support local suppliers by providing useful information on the Council’s
website i.e. pre-recorded webinars on how to bid for Council contracts, hints and tips for tendering as well as our contract plan, details of upcoming supplier
development events and our category officer’s contact details all of which enable local suppliers to be able to bid for our contracts.
Responsible person: Anne MacColl-Smith

Page 24

Appendix 1
Page 22 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Increase the number of community benefits that are delivered through contracts we award locally 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2022/23 No Target - No Target
FQ2 2022/23 No Target 30 No Target
FQ3 2022/23 No Target - No Target
FQ4 2022/23 No Target 43 No Target 
This indicator for FQ4 shows the number of community benefits has increased since the last reporting period. 
FQ4 Comment
This indicator is reported in FQ2 and FQ4.
The Procurement, Commercial and Contract Management Team (PCCMT) has been working closely with their suppliers to deliver additional social, economic and
environmental value and achieved 43 community benefits through Contract Management, Contract Awards and the Request List from 1st October 2022 to 31st
March 2023.  Further details are available.
Responsible person: Anne MacColl-Smith

Page 25

Appendix 1
Page 23 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Street lighting – percentage of faults repaired within 10 days – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 75% 38% Red 
FQ2 2022/23 75% 39% Red
FQ3 2022/23 75% 25% Red
FQ4 2022/23 75% 43% Red 
This indicator for FQ4 is below target however performance has increased significantly since the last reporting period. 
FQ4 Comment
The percentage of jobs completed in FQ4 within the 10 day indicator equates to 43%, an increase from the 25% indicator in FQ3.  This represents 51 jobs
completed on time from a total of 118 completed and signed off within FQ4. The majority of these jobs were in Lorn 102 but include 16 completed on Mull.  This
again shows an increase in the overall number of jobs dealt with within the period, up a further 18 from FQ3 total of 110.
Responsible person: Tom Murphy 
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 75% 29% Red 
FQ2 2022/23 75% 48% Red
FQ3 2022/23 75% 30% Red
FQ4 2022/23 75% 32% Red 
This indicator for FQ4 is below target however performance has increased slightly since the last reporting period. 
FQ4 Comment
The total number of Street Lighting jobs completed in FQ4 was 393, similar (up 10) to the throughput of instructions in FQ3.  Of this total number of completed
jobs, 125 were completed within the 10 day timescale for dark lamps, giving a performance of 32%, again a slight increase of 2% on the performance in FQ3. 
Similar to FQ3, more jobs were completed and closed off than new ones raised, 393 vs 280, which has resulted in a continued reduction in the repairs backlog.
Responsible person: Tom Murphy

Page 26

Appendix 1
Page 24 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Total number of complaints regarding waste collection – Lorn 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 14 No Target 
FQ2 2022/23 No Target 12 No Target
FQ3 2022/23 No Target 8 No Target
FQ4 2022/23 No Target 18 No Target 
This indicator for FQ4 shows the number of waste collection complaints has increased since the last reporting period. 
FQ4 Comment
There were 18 waste collection complaints received this quarter in the Lorn area, although higher than last quarter this is still very good given the number of
properties serviced.
Responsible person: Tom Murphy 
Total number of complaints regarding waste collection – Mull 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 0 No Target 
FQ2 2022/23 No Target 0 No Target
FQ3 2022/23 No Target 0 No Target
FQ4 2022/23 No Target 0 No Target 
This indicator for FQ4 shows the number of waste collection complaints has remained the same as the last reporting period. 
FQ4 Comment
Again this quarter there were no waste collection complaints received for the Isle of Mull.  This is an excellent level of service.
Responsible person: Tom Murphy

Page 27

Appendix 1
Page 25 
Total number of complaints regarding waste collection – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 58 No Target 
FQ2 2022/23 No Target 65 No Target
FQ3 2022/23 No Target 35 No Target
FQ4 2022/23 No Target 53 No Target 
This indicator for FQ4 shows the number of waste collection complaints has increased since the last reporting period. 
FQ4 Comment
There were a total of 53 waste collection complaints received this quarter, although this may seem high, given the number of properties serviced and the
operational difficulties and staffing issues this is still a good level of service.
Responsible person: Tom Murphy

Page 28

Appendix 1
Page 26 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 45.0% 52.1% Green 
FQ2 2022/23 45.0% 50.5% Green
FQ3 2022/23 45.0% 56.7% Green
FQ4 2022/23 45.0% 52.0% Green 
This indicator for FQ4 is above target however performance has decreased since the last reporting period. 
FQ4 Comment
52% recycling/composting and recovery (40.7% recycling/composting and 11.3% recovery) in Q4.  Overall 22/23 f/year rates are 52.6% recycling/composting and
recovery (39.2% recycling/composting plus 13.4% recovery).  Recovery is higher than normal in PPP area due to a trial by Renewi (formerly Shanks), who have
taken some residual general waste for disposal mainly from their Dalinlongart (by Dunoon) waste facility to an energy from waste (EFW) plant near Edinburgh. 
Recycling and composting in PPP area has also been higher mainly due to Renewi sending stockpiled wood waste for onward recycling and green garden waste for
onward composting.  These have both helped offset the reduction in recycling and recovery from the Helensburgh and Lomond area following on from The
Scottish Government Landfill Tax Abatement Order (which commenced from 1st July 2022), whereby Barr Environmental no longer carry out any recycling or
recovery from mixed residual general waste.
Responsible person: John Blake 
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 54.4% No Target 
FQ2 2022/23 No Target 58.1% No Target
FQ3 2022/23 No Target 67.4% No Target
FQ4 2022/23 No Target 61.9% No Target

Page 29

Appendix 1
Page 27 
This indicator for FQ4 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ4 Comment
61.9% recycling/composting and recovery (44.2% recycling/composting and 17.7% recovery) in Q4.  22/23 f/year rates in PPP area are 60.4% recycling/composting
and recovery (39.7% recycling/composting plus 20.7% recovery).  Recovery is higher than normal in PPP area due to a trial by Renewi (formerly Shanks), who have
taken some residual general waste for disposal mainly from their Dalinlongart (by Dunoon) waste facility to an energy from waste (EFW) plant near Edinburgh. 
Recycling and composting in PPP area has also been higher mainly due to Renewi sending stockpiled wood waste for onward recycling and green garden waste for
onward composting.
Responsible person: John Blake 
Islands – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 33.3% No Target 
FQ2 2022/23 No Target 34.7% No Target
FQ3 2022/23 No Target 43.5% No Target
FQ4 2022/23 No Target 35.9% No Target 
This indicator for FQ4 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ4 Comment
35.9% recycling/composting and recovery (35.9% recycling/composting and 0% recovery).  22/23 f/year rates are 36.8% recycling/composting and recovery (36.5%
recycling and recovery and 0.3% recovery) which is similar to previous year.
Responsible person: John Blake

Page 30

Appendix 1
Page 28 
H&L – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 53.6% No Target 
FQ2 2022/23 No Target 41.0% No Target
FQ3 2022/23 No Target 37.5% No Target
FQ4 2022/23 No Target 34.5% No Target 
This indicator for FQ4 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ4 Comment
34.5% recycling/composting and recovery (34.3% recycling/composting and 0.2% recovery) in Q4. 22/23 f/year rates in Helensburgh and Lomond area are 41.3%
recycling/composting and recovery (39.1% recycling/composting plus 2.2% recovery).  There has been a reduction in recycling and recovery from the Helensburgh
and Lomond area following on from The Scottish Government Landfill Tax Abatement Order (which commenced from 1st July 2022), whereby Barr Environmental
no longer carry out any recycling or recovery from mixed residual general waste.
Responsible person: John Blake

Page 31

Appendix 1
Page 29 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – The number of tonnes of waste sent to landfill 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 5,850 4,546 Green 
FQ2 2022/23 5,550 4,947 Green
FQ3 2022/23 5,100 3,882 Green
FQ4 2022/23 5,000 4,610 Green 
This indicator for FQ4 is below target (lowest is best) and performance has decreased since the last reporting period. 
FQ4 Comment
Landfill tonnages within limits in Q4 and f/year.  Main reason for slight reduction in landfill during year is due to a trial by Renewi (formerly Shanks), who have
taken some residual general waste for disposal mainly from their Dalinlongart (by Dunoon) waste facility to an energy from waste (EFW) plant near Edinburgh. 
This has helped offset the reduction in recycling and recovery from the Helensburgh and Lomond area following on from The Scottish Government Landfill Tax
Abatement Order (which commenced from 1st July 2022), whereby Barr Environmental no longer carry out any recycling or recovery from mixed residual general
waste.
Responsible person: John Blake

Page 32

Appendix 1
Page 30 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
LEAMS (Local Environment Audit and Management System) – Lorn
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 73 84 Green 
FQ2 2022/23 73 86 Green
FQ3 2022/23 73 88 Green
FQ4 2022/23 73 86 Green 
This indicator for FQ4 is above target however performance has decreased slightly since the last reporting period. 
FQ4 Comment
The level of street cleanliness within the Lorn area is very good again this quarter with January 83, February 85 and March 89 all months exceeding the National
Standard of 67 and Benchmark Figure of 73.
Responsible person: Tom Murphy 
LEAMS (Local Environment Audit and Management System) – Mull
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 73 94 Green 
FQ2 2022/23 73 85 Green
FQ3 2022/23 73 88 Green
FQ4 2022/23 73 93 Green 
This indicator for FQ4 is above target and performance has increased since the last reporting period. 
FQ4 Comment
The Isle of Mull is showing a very high level of street cleanliness this quarter, January 96, February 93 and March 90.
Responsible person: Tom Murphy

Page 33

Appendix 1
Page 31 
LEAMS (Local Environment Audit and Management System) – Argyll and Bute
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 73 85 Green 
FQ2 2022/23 73 82 Green
FQ3 2022/23 73 83 Green
FQ4 2022/23 73 83 Green 
This indicator for FQ4 is above target with no change in performance since the last reporting period. 
FQ4 Comment
Again this quarter the level of street cleanliness for the whole are remains very high.  The role of the Amenity Warden has a key influence around littering to assist
in maintaining the good level of performance.
Responsible person: Tom Murphy

Page 34

Appendix 1
Page 32 
Making It Happen 
Teacher sickness absence – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 1.80 days No Target 
FQ2 2022/23 No Target 1.59 days No Target
FQ3 2022/23 No Target 1.52 days No Target
FQ4 2022/23 No Target 2.54 days No Target 
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period. 
FQ4 Comment
Teacher absence has increased by almost one day on the same quarter last year and by one day on the previous quarter.  The biggest reason for absence is stress
and the number of days related to this has increased by over 100% on the previous quarter.
Responsible person: Simon Easton 
Teacher sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 1.79 days No Target 
FQ2 2022/23 No Target 1.22 days No Target
FQ3 2022/23 No Target 1.70 days No Target
FQ4 2022/23 No Target 2.48 days No Target 
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period. 
FQ4 Comment
Overall teacher absence has increased by almost 3/4 of a day on the same quarter last year and by 3/4 of a day on the previous quarter.  The top reason for
absence is infections, followed by stress and then medical treatment.
Responsible person: Simon Easton

Page 35

Appendix 1
Page 33 
Making It Happen 
LGE staff (non-teacher) sickness absence – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 3.52 days No Target 
FQ2 2022/23 No Target 4.07 days No Target
FQ3 2022/23 No Target 4.17 days No Target
FQ4 2022/23 No Target 4.48 days No Target 
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period. 
FQ4 Comment
LGE absence has increased by a day on the same quarter last year and by 1/3 of a day on the previous quarter.  The biggest reason for absence is Stress which has
seen over a 100% increase on last quarter.  Infections is the second biggest reason and it has seen over a 200% increase on last quarter.
Responsible person: Carolyn Cairns 
LGE staff (non-teacher) sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 3.57 days No Target 
FQ2 2022/23 No Target 3.66 days No Target
FQ3 2022/23 No Target 3.65 days No Target
FQ4 2022/23 No Target 4.04 days No Target 
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period. 
FQ4 Comment
Overall LGE absence has increased by just over half a day on the same quarter last year and just under half a day on the previous quarter.  The top three reasons
for absence are stress, infections and other musculoskeletal reasons.
Responsible person: Carolyn Cairns

Page 36

Appendix 1
Page 34 
Making It Happen 
COI – Increase the percentage of all self-service automated contacts 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 70.0% 79.4% Green 
FQ2 2022/23 70.0% 75.4% Green
FQ3 2022/23 70.0% 72.5% Green
FQ4 2022/23 70.0% 72.2% Green 
This indicator for FQ4 is above target however performance has decreased slightly since the last reporting period. 
FQ4 Comment
In FQ4 there were 36,799 transactions dealt with by customer service agents (27.8%) and 95,336 automated or self-service transaction (72.2%) so the 70% target
was exceeded.  FQ4 2021/22 2022/23 Mediated 42,712 38,657 Automated 104,938 104,572.
Responsible person: Robert Miller