Democracy Spraffa

250319 ILE CAT 2 Falcon Day Centre - ISSUED

Renfrewshire Council · 19 March 2025
Back to Community Asset Transfer Sub-committee — 19 March 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

2 
___________________________________________________________________
To: Infrastructure, Land & Environment Policy Board                                                                                
Community Asset Transfer Subcommittee
On: 19 March 2025
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Community Asset Transfer Request – Former Falcon Day Centre,
1 Falcon Crescent Paisley PA3 1NS 
___________________________________________________________________
1. Summary
1.1. The purpose of this report is to ask the Community Asset Transfer (CAT)
Subcommittee to approve the Transfer of the former Falcon Day Centre to
Pachedu Multi Cultural Hub Ltd under Part 5 of the Community Empowerment
(Scotland) Act 2015 (the Act).
2. Recommendations
2.1 It is recommended that the CAT Subcommittee:-
(i) Consider the Community Asset Transfer request attached;
(ii) Agree to the sale of the asset at the discounted price of £1,000
offered subject to the proposed conditions at section 8 of this report;
and
(iii) Authorise the Head of Economy and Development and the Head of
Corporate Governance to conclude the sale of the asset in
accordance with the Act and on such terms as required to protect
the Council’s interest.
3. Background
3.1. Part 5 of the Community Empowerment (Scotland) Act 2015 provides the right
for community bodies to request outright ownership, short or long term lease
or other rights over any land or property owned or leased by the Council.

Page 2

3 
3.2. The Act requires local authorities to assess requests transparently against a
specified list of criteria, and to agree the request unless there are reasonable
grounds for refusal.
3.3. The CAT Officer Panel met to consider this request on the 04/03/2025. In
accordance with the revised Scheme of Delegation (September 2022), the
Panel agreed to recommend the request be approved by the ILE CAT
Subcommittee.
4. Former Falcon Day Centre (UPRN: 123047855)
4.1. The former Falcon Day Centre is a detached single storey brick building with
pitched metal clad roofs and a continuous bank of patent glazing over an
atrium between the two sections of the building.
4.2. Constructed circa 1989, the asset has been used until recently by the Health
and Social Care Partnership (HSCP) as a day care facility for the elderly. The
building accommodates various multi-purpose rooms along with kitchens,
offices, toilets, a hair salon and plant/storage areas. The total site extends to
2651m2 (0.66 acres) with internal space of 602m2.
4.3. Owned by Renfrewshire Council, the asset is accessed from Ferguslie Park
Avenue and is adjacent to Engage Renfrewshire and the Tannahill Centre.
The site includes several parking spaces and a vehicle drop-off and turning
area. Additional public parking is available opposite and behind the facility. 
4.4. The HSCP vacated the premises last year and the site was declared surplus
by the ILE Board on 6th November 2024.
4.5. As part of the Strategic Property Review, building costs (utilities, rates and
maintenance/compliance) were recorded as circa £41,500 per annum
(2022/23). If the CAT request is successful, this represents a saving to the
Council of over £200,000 in the first 5 years.
4.6. While no recent condition survey has been undertaken, it is known that
repairs/replacement is required to all roof surfaces and that a replacement
boiler and central heating system will be required at estimated costs in excess
of £400,000.
4.7. The asset has been valued by the Estates team with a market value in its
current condition of circa £150,000.
4.8. A site plan and location map is attached to this report as Appendix 2.
5. Pachedu Multi Cultural Hub
5.1. Pachedu Multicultural Hub Limited (PMCH) is a company limited by guarantee
incorporated on 13/02/2025 (SC837581). The company has been set up to
hold and manage the assets of Pachedu Charity which has operated from the
Tannahill Centre in Paisley since 2016 and is registered and regulated by
OSCR (SC046488). 
5.2. As a company limited by guarantee, PMCH qualify as a Community Transfer
Body (CTB) under Part 5 of the Community Empowerment (Scotland) Act

Page 3

4 
2015 and as such are entitled to seek asset transfer under the Act. Their
Memorandum & Articles of Association have been checked and confirmed as
fully compliant.
5.3. The charitable objects of PMCH are listed as:
• the advancement of citizenship and community development;
• the advancement of health, both mental and physical;  
• the promotion of equality and diversity; and 
• the provision of recreational activities for the Community.
Capacity to Deliver
5.4. Pachedu Charity has operated in Paisley since 2016. In 2023/24 the
organisation recorded 587 separate engagements with individuals and
families. 
5.5. The organisation has grown steadily from 2 part time staff and about 30
service users in 2016 when it was registered to 8 paid staff members, 40
volunteers, 68 registered members and 810 service users in 2024-2025. As a
result, the charity has outgrown the 2 office areas it rents in the Tannahill
Centre and is forced to deliver some projects on a satellite basis in other parts
of Paisley and beyond.
5.6. PMCH is led by a 3-Member Board of Trustees supported by eight staff and
40 volunteers. The Chairperson of the Board is also the CEO of the West of
Scotland Regional Equality Council (WSREC) and has extensive experience
in managing and renovating business and community facilities.
5.7. The group is very-well connected and respected by a wide range of
organisations and have letters of support from both local and national
organisations.
6. Community Asset Transfer Request  
6.1. PMCH are seeking full ownership of the asset and have offered to pay £1,000
in addition to wide-ranging benefits to the local community and diverse
cultures across Renfrewshire. 
6.2. If successful, the group propose a programme of refurbishment works to bring
the building to an acceptable standard and to meet the requirements of their
myriad projects and proposed tenants.
6.3. The Falcon Centre will be used as a base for all of Pachedu’s projects and
activities. In addition, the group propose to let space to local organisations
and have a model based on anchor tenancies delivering a range of services to
the local community including, vocational training, creche facilities and cultural
events.
6.4. Proposals include:

Page 4

5 
• Celebrate cultural diversity through vibrant, educative, informative and
socially engaging events like Rediscover Africa, Africa Day, Refugee
Week and Black History Month to name a few;
• Support local economic growth by creating opportunities for entrepreneurs
and artisans through social enterprise activities like the café offering
authentic African food and other ventures narrated in the business plan; 
• Promote holistic well-being by offering mindfulness sessions, creative
arts, and music to reduce stress and improve mental health; 
• Empower youth through workshops, educational programs, and
leadership opportunities that encourage them to explore their cultural
identities and develop new skills.
• Promote inclusivity by providing accessible spaces for community events
and gatherings, ensuring equal opportunities for all members of the
community to participate and benefit.
6.5. A full copy of the CAT request and detailed business plan is attached to this
report.
Community Engagement
6.6. A community consultation exercise was carried out to determine support for
the asset transfer and proposals over November and December 2024.
6.7. PMCH propose ongoing consultation with the local and cultural communities
to ensure the hub provides the range of services which meet the community’s
needs’.
6.8. Letters of support for the hub proposal from Ferguslie Community
Development Trust, Remode Renfrewshire and See Me are attached to this
report.
Benefits, Sustainability and Best Value
6.9. The asset transfer request identifies a number of potential benefits, these
include:
• Economic Development – creation of a new social enterprise; development
of space for other organisations to grow; prospect of new employment,
training and volunteering opportunities.
• Regeneration – re-purposing of a building declared surplus and
transformation into a vibrant community space, promoting regeneration of
the area and attracting visitors and new businesses and  avoiding
environmentally costly demolition.
• Public Health – provision of mindfulness sessions, creative arts, and
community support groups promoting mental health and well-being;
encouraging physical activity and healthy eating; host health education
sessions, raising awareness about physical and mental health challenges,
especially within marginalised groups who may face cultural or linguistic
barriers to accessing mainstream services.

Page 5

6 
• Social Wellbeing – providing a gathering space for shared cultural
experiences and strengthening social connections; hosting cultural events,
art exhibitions, and shared projects bringing people together from diverse
backgrounds and fostering mutual respect, understanding, and social
harmony; provide safe spaces for groups to meet.
• Environmental Wellbeing – development of a garden space to promote
environmental awareness and sustainability including "grow-your-own"
initiatives, helping to improve food security while fostering a connection with
nature.
• Reduction in Inequalities – designed with inclusivity at its core, ensuring
people with disabilities, minorities, and disadvantaged individuals have
equal access to all services and activities; the hub will provide culturally
sensitive programs tailored to the needs of diverse ethnic communities,
empowering marginalised groups and fostering a more inclusive society.
6.10. In terms of sustainability, the asset transfer request re-purposes a surplus
asset for community benefit.
6.11. The asset transfer request meets the requirements for best value to the
council in terms of 
• Governance and Accountability – a community controlled asset and
organisation regulated by OSCR.
• Use of resources – securing the future and development of an existing
resource for future generations.
• Partnership and collaborative working – PMCH actively seek to work in
partnership with local and national organisations ant to work collaboratively
for the benefit of the local community.
• Working with Communities – PMCH has 9 years experience of working in
the Ferguslie Park area and fostering relationships for community benefit.
Validation, Representations, Responses
6.12. The CAT request was validated on 17/01/2025 and published on the Council
Website. Notices were placed on site and all close neighbours and interested
parties, including Elected Members and the Community Council, were
informed directly in accordance with the CAT legislation.
6.13. No formal representations were received.
CAT Panel Recommendation
6.14. The CAT Panel met to consider this application on 04/03/2025.
6.15. The Panel felt that a lot of thought had gone into the business plan which
demonstrated a viable business case for the asset transfer proposal.
6.16. Following discussion, the Panel understood the model of anchor tenants as
opposed to short-term lets and noted that the asset will become the centre for
Pachedu’s own projects as well as offering opportunities for other
organisations to deliver their services.

Page 6

7 
6.17. It was confirmed that the childcare provision referred to in the business plan
will be a creche facility while parents participate in other activities and will
provide cultural activities for children.
6.18. Finally, it was agreed that the CAT offered a valid purpose for the former day
centre.
6.19. Following extensive discussion, the Panel agreed to recommend approval of
the asset transfer to the CAT Subcommittee.
7. Subsidy Control
7.1. Discount conferred as a result of asset transfer constitutes as financial
assistance under the Subsidy Control Act 2022 and must be included in the
calculation for Minimal Financial Assistance (MFA).
7.2. Under the Act, financial assistance is only considered a subsidy where it
satisfies all four ‘limbs’ of the test within the regime and where the recipient
of the assistance is an enterprise (any person, or groups of persons under
common control that is engaged in an economic activity, which means,
offering goods and services on a market).
7.3. The transfer of the former Falcon Day Centre to Pachedu Multi Cultural Hub
Ltd. does not satisfy one or more of the limbs, namely 
“the financial assistance has, or is capable of having, an effect on
competition or investment within the UK, or on trade or investment between
the UK and another country or territory, or both”.
7.4. Pachedu Multi Cultural Hub Ltd is not considered an enterprise under the Act
in that it does not provide goods or services on the market.
8. Proposed Terms and Conditions 
8.1. A full title check and any associated burdens or servitudes to be fully explored
by the Council and passed to the purchaser, as required, in the Minute of
Agreement.
___________________________________________________________________
Implications of the Report
1. Financial – Asset is assessed as having a market value of £150,000. CTB is
proposing to pay a discounted price of £1,000. Discount is off-set against
wider community benefits and savings to the Council of over £41,500 per
annum plus estimated repair and maintenance costs of over £400,000.
2. HR & Organisational Development – None.
3. Community Planning 
Our Renfrewshire is well – the CAT supports the wellness and resilience of our citizens
and communities by creating a new community resource supporting our migrant and
diverse communities..

Page 7

8 
4. Legal 
(a) The CAT request and CTB comply with the requirements of Part 5 of The
Community Empowerment (Scotland) Act 2015.
(b) A formal offer from the CTB must be received within 6 months of decision to
approve.
(c) Sale must be concluded within 6 months of a formal offer being submitted by
the CTB.
5. Property/Assets – Report seeks approval to dispose of the asset reference
123047855. 
6. Information Technology – None.
7. Equality & Human Rights
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. 
8.   Health & Safety – None. 
9. Procurement – Not applicable.
10. Risk – None. 
11. Privacy Impact – Not applicable.
12. Climate Risk – Not applicable.
13. Children’s Rights - This report does not cover a new policy, function or
strategy nor a substantive change to an existing policy, function or strategy
which will have an impact on children’s rights.
14. Cosla Policy Position – not applicable.
_________________________________________________________
List of Background Papers 
(a)  None. 
_________________________________________________________________ 
Author:           Sandra Inrig – 0141 487 1447 or 07974 071238.
sandra.inrig@renfrewshire.gov.uk

Page 8

No embedded text on this page.

Page 9

1 
COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015
ASSET TRANSFER REQUEST FORM 
IMPORTANT NOTES:
This is a standard asset transfer request form which can be used to make a request to
Renfrewshire Council. For assets owned by other relevant authorities, please refer to
that authority’s own website. 
You do not need to use this form to make an asset transfer request but using a form
will help you to make sure you include all the required information.
You should read the asset transfer guidance provided by the Scottish Government
before making a request.  All forms and guidance documents are available to
download from the Council’s Website
You are strongly advised to discuss your proposals with the Council before making
an asset transfer request.  You can do this by contacting the CAT Single Point of
Contact at communityassettransfer@renfrewshire.gov.uk.
When completed, this form must be sent to: - 
The CAT Single Point of Contact
Regeneration and Place
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1TT 
Or submitted by email to: communityassettransfer@renfrewshire.gov.uk 
Received
14/01/2025

Page 10

2 
This is an asset transfer request made under Part 5 of the Community Empowerment
(Scotland) Act 2015 in relation to property owned, leased or managed by Renfrewshire
Council.          
Section 1: Information about the community transfer body (CTB) making the
request
1.1 Name of the CTB making the asset transfer request  
Pachedu Multi Cultural Hub Ltd
1.2 CTB address.  This should be the registered address (if you have one) or main
correspondence address.  
Postal address:
The Tannahill centre, 76 Blackstoun road, Paisley, PA3 1NT 
1.3 Contact details.  Please provide the name and contact address to which
correspondence in relation to this asset transfer request should be sent.
Contact name: 
Postal address: The Tannahill centre, 76 Blackstoun road, Paisley, PA3 1NT
Postcode:PA3 1NT
Email:  
Telephone: 
X We agree that correspondence in relation to this asset transfer request may be sent by
email to the email address given above.  (Please tick to indicate agreement).
You can ask the relevant authority to stop sending correspondence by email, or change the
email address, by telling them at any time, as long as 5 working days’ notice is given.  
Renfrewshire Council takes the privacy of your personal data very seriously. For more
information see our Privacy Policy. (Please tick to indicate agreement).
X We agree that information provided in this asset transfer request, including contact details,
may ONLY be forwarded to relevant officers within Renfrewshire Council for the purposes of
assessment and/or in order to provide specialist support to further the asset transfer request
as appropriate. Contact details will only be forwarded with your consent for an explicit
purpose. (Please tick to indicate agreement).

Page 11

3 
1.4 Please mark an “X” in the relevant box to confirm the type of CTB and its official
number, if it has one.
X Company (with no fewer than 20 members) and its
company number 
SC837581 
Scottish Charitable Incorporated Organisation
(SCIO) (with no fewer than 20 members) and its
charity number is 
Community Benefit Society (BenCom), (with no
fewer than 20 members) and its registered number
is 
X Unincorporated organisation (no number)
Pachedu Registered Charity
SC046488 
Please attach a copy of your constitution, Articles of Association or registered rules.
1.5 Has the organisation been individually designated as a community transfer body by
the Scottish Ministers? 
No    X
Yes   ☐ 
Please give the title and date of the designation order: 
1.6 Does the organisation fall within a class of bodies which has been designated as
community transfer bodies by the Scottish Ministers (i.e. those listed above at 1.4)?  
No    ☐
Yes   X 
If yes what class of bodies does it fall within?  
Company Limited by Guarantee

Page 12

4 
Section 2: Information about the land and rights requested
2.1 Please identify the land / property to which this asset transfer request relates.  
You should provide a street address or grid reference and any name by which the land or
building is known.  If you have identified the land on the relevant authority’s register of land,
please enter the details listed there.  
It may be helpful to provide one or more maps or drawings to show the boundaries of the
land requested.  If you are requesting part of a piece of land, you must attach a map and
give a full description of the boundaries of the area to which your request relates.  If you are
requesting part of a building, please make clear what area you require.  A drawing may be
helpful.
Details of Property: -
Address: -1 Falcon Crescent, Paisley
Postcode:- PA3 1NS
Community Area:- Ferguslie 
2.2 Please provide the UPRN (Unique Property Reference Number), if known. 
If the property has a UPRN you will find it in the relevant authority’s register of land. 
UPRN:- 123047855

Page 13

5 
Section 3: Type of request, payment and conditions
3.1 Please tick what type of request is being made:
for ownership (under section 79(2)(a)) - go to section 3A 
for lease (under section 79(2)(b)(i)) – go to section 3B 
for other rights (section 79(2)(b)(ii)) - go to section 3C 
3A – Request for ownership
What price are you prepared to pay for the land requested: 
Proposed price: - £1000 
Please attach a note setting out any other terms and conditions you wish to apply to the
request.
3B – request for lease
What is the length of lease you are requesting? 
How much rent are you prepared to pay? Please make clear whether this is per year or per
month.
Proposed rent: £                        per month / year (delete as appropriate) 
Please attach a note setting out any other terms and conditions you wish to be included in
the lease, or to apply to the request in any other way.
3C – request for other rights
What are the rights you are requesting?   
Do you propose to make any payment for these rights?  
Yes   ☐
No     ☐
If yes, how much are you prepared to pay?  Please make clear what period this would cover,
for example per week, per month, per day?
Proposed payment:  £               
Please attach a note setting out any other terms and conditions you wish to apply to the
request. 
x

Page 14

6 
Section 4: Community Proposal 
4.1 Please set out the reasons for making the request and how the land or building will
be used.
This should explain the objectives of your project, why there is a need for it, any
development or changes you plan to make to the land or building, and any activities that will
take place there. 
4.1.1 Objectives of the Project:
Pachedu has operated as an unicorporated registered charity since 2016 (SC046488). We
have set up Pachedu Multicultural Hub Ltd as a company limited by guarantee to act as the
umbrella company for all of Pachedu’s activities. Pachedu Multicultural Hub Ltd (heinafter
referred to as PMC) will own and manage assets providing accommodation for Pachedu
Charity’s myriad projects.
The primary objective of Pachedu Multicultural Hub Ltd’s (PMC’s) asset transfer request for
Falcon Day Care Centre is to establish a multi-cultural hub that serves as a cultural
connector and community focal point, fostering cultural enrichment, social cohesion,
economic development and community integration in a community that is growing more and
more culturally diverse and to provide a base for Pachedu’s registered charity to grow and
deliver its myriad projects. 
The multicultural centre will also provide opportunities to:
Celebrate cultural diversity through vibrant, educative, informative and socially engaging
events like Rediscover Africa, Africa Day, Refugee Week and Black History Month to name a
few. These sessions showcase diverse ethnic cuisine, music, and arts, which will educate
and promote intercultural understanding. The cultural activities will also increase the number
of events at the community’s disposal during the year. Strengthen community engagement
by providing a space where residents from diverse backgrounds can come together to share
experiences and build relationships.
Support local economic growth by creating opportunities for entrepreneurs and artisans
through social enterprise activities like the café offering authentic African food and other
ventures narrated in the business plan.
Promote holistic well-being by offering mindfulness sessions, creative arts, and music to
reduce stress and improve mental health.
Empower youth through workshops, educational programs, and leadership opportunities that
encourage them to explore their cultural identities and develop new skills.
Promote inclusivity by providing accessible spaces for community events and gatherings,
ensuring equal opportunities for all members of the community to participate and benefit 
4.1.2 Why there is a need for your Project
The project addresses several needs within the Ferguslie Park community and broader
Renfrewshire region: The project is essential because it addresses pressing needs within the
Ferguslie Park community in Paisley, Renfrewshire, which has been identified as Scotland's
most deprived area by the Scottish Index of Multiple Deprivation (SIMD). This ranking
underscores the severe challenges faced by residents with greater instances faced by
minority ethnic communities, including cultural isolation, economic hardship, and health
inequalities. 
The project's focus on community empowerment, inclusivity, well-being and providing
targeted interventions to address these issues.

Page 15

7 
Pachedu Charity currently operate from 2 offices inside the Tannahill centre. The
organisation has seen a steady growth from 2 part time staff and about 30 service users in
2016 when it was registered to 8 paid staff members, 40 volunteers, 68 registered members
and 810 service users in 2024-2025. As a result the organisation has outgrown the limited
space in the Tannahill centre and projects are having to resort to satellite stations like
Foxbar Youth centre for their weekly youth group gathering of between 30 to 40 teenagers.
In 2020 diverse ethnic communities accounted for 2.8% of the total population in
Renfrewshire and recent indications suggest that this percentage has significantly risen with
Renfrewshire becoming a holding point for asylum seekers, a steady increase of students
coming from abroad and families coming through Certificate of Sponsorship jobs, students
coming from abroad and being absorbed by the job market upon conclusion and refugees
who have settled after being given immigration status. 
Migrant communities residing in Renfrewshire face isolation due to cultural barriers, making
it essential to create culturally sensitive spaces where diverse ethnic groups can connect
and integrate.  
SIMD Domains show that: Renfrewshire is more deprived compared to the Scotland
average for Employment, Crime, Housing and Income. These social and economic
inequalities can impact on self-esteem, happiness and participation in local communities
and lead to poorer physical and mental health. Marginalised diverse ethnic communities
need safe spaces and platforms where they can interact amongst themselves as well as
with various other communities thereby fostering mutual understanding and reducing social
division.
The local community requires avenues for economic empowerment, especially for
marginalized groups who can benefit from small business support and social enterprise
initiatives. Last year Business gateway supported Pachedu to train 17 participants in
business startup essentials with outcomes including increased awareness, direct expert
access, and community network formation. This was well received and a lot more service
users would be interested in taking part. The Falcon Day centre would be an ideal space to
scale this up.
Upscale the culturally sensitive mindfulness and creative arts activities they offer to reduce
stress and enhance overall well-being.
Youth support in developing cultural identities and skills, especially in a society where they
face racism, stereotyping, and pressures from dual cultural experiences. Last year 2 of our
young people had the opportunity to sit on a panel answering questions at Scotland’s Duke
of Edinburgh National Conference and 6 more had the opportunity to put across their views
in a Scottish Parliamentary discussion around smoking and vaping. 
Inclusivity: There is a recognised gap in inclusive community spaces where everyone,
regardless of socioeconomic background or ethnicity, can participate in activities that
celebrate diversity and promote community empowerment. To have such a space would
affirm Renfrewshire Council’s commitment to its remit for equality and diversity.
It will foster a sense of belonging, reduces inequalities, and empower individuals to
contribute to a more cohesive and thriving community.
Pachedu Multicultural Hub will provide a dedicated space for the delivery of activities and
services designed to:
1. To reduce isolation
2. Promote cultural diversity and equality of opportunity
3. Bridge generational and diverse cultural backgrounds

Page 16

8 
4. Enhance the capacity of minority ethnic communities to advance their health and socio-
economic activities
The need for these services is reflected in the following national and regional socio-
demographic trends (see Annex 2 for further detail). 
4.1.3 Development / changes / modifications required
There are several changes and modifications that will be necessary for the successful
implementation of the cultural hub. We are going to be guided by surveyors on what to do to
achieve what we need to. Some of the changes are as follows:
Physical Space Renovation: The Falcon Day Care Centre will need modifications to create
suitable spaces for diverse cultural activities, including an artisan market, café, event space,
and rooms for workshops, counselling, and mindfulness sessions.
Accessibility Improvements: The centre should be made fully accessible to people with
disabilities and those with limited mobility to ensure inclusivity.
Technology and Equipment Upgrades: The cultural hub will require modern technological
infrastructure for hosting workshops, digital training, and community events.
Employment and Entrepreneurial Support Facilities: Spaces should be allocated for
training and mentoring local entrepreneurs, providing them with resources like internet
access, business development workshops, and networking spaces.
The interior of the Falcon Day Care Centre will require further modification/adaption to
accommodate proposed activities which include an event/exhibition space (artisan markets,
craft fairs, corporate events, and social functions), a café area, and meeting rooms suitable
for delivery of one to one and group workshops.  Internal modifications include: 
• Technology / Equipment Upgrades – To ensure the space is fit for purpose the building
will be require upgrading re: interior wiring/cabling/internet connectivity etc. 
• Cultural Adaptations – To provide a welcoming, safe space.  Signage will be required in
multiple languages and décor will reflect diverse cultures.  
• Multi-use Space – To ensure the Centre can accommodate a diverse range of activities
from health and wellbeing sessions, youth activities, training workshops and business
support, the existing lounge areas (6no.) will be refurbished as meeting
rooms/classrooms, serviced office space suitable for sub-let. 
• Kitchen and Café Space – The existing kitchen/server will be equipped to accommodate
diverse culinary needs.
Outdoor space has potential to be developed in the following ways: 
• Outdoor play area – Establishing a secure outdoor play area will provide a ‘free-flow’
space suitable for use by an on-site creche.
• Community Garden – Grounds adjacent to the building offer potential to be developed as
a community garden to encourage physical and mental well-being and promote healthy-
eating and nutrition through ‘grow-your-own’ initiatives. 
Current Condition / Falcon Day Centre – In October 2010, Renfrewshire Council
commissioned Drivers Jonas Deloitte to conduct a Building Maintenance and Condition
Survey on the Falcon Day Centre.  At the time of the survey, the following defects were
noted:

Page 17

9 
• Roof – Steel roof sheets showed evidence of surface corrosion generally 
• Entrance-ways – Front and rear entrances showed evidence of water ingress (internal
staining) where flashing required repair
• Windows – Window gaskets were of poor condition and perished and would require
replacement in the long term. 
As the Deloitte Condition Survey is now more than 10 years old, Pachedu Multicultural Hub
will commission a new Building Condition Survey and Mechanical and Electrical Survey to
identify Urgent and Necessary works required (see Phase 2 below). 
4.1.4 Activities that will take place
PCM and Pachedu Charity's projects at the Falcon Day Centre will bring a multitude of
benefits to the local community, fostering social cohesion, cultural enrichment, economic
growth, and overall well-being.
Pachedu Multicultural Hub will operate as a social enterprise, providing a dedicated space
for the delivery of activities and services designed to reduce isolation, promote cultural
diversity and equality of opportunity, bridge generational and diverse cultural backgrounds
and enhance the capacity of minority ethnic communities to advance their health and socio-
economic activities.  Evidence of need for these services is reflected in the national, regional
and local socio-demographic trends. 
Activities at the centre will include meeting room hire, event space/venue hire, serviced
office lets/co-working space, short-term lets to sole traders (crafts, hair and beauty), sub-lets
to ‘anchor’ tenants, and sensory centres. 
By offering a diverse range of cultural activities, including cuisine, music, arts, and
mindfulness practices, our cultural hub will celebrate the rich tapestry of cultural heritage
present within the community. This will not only educate and inspire residents about different
cultures but also promote intercultural understanding and appreciation.
The cultural hub will serve as a gathering place where residents from diverse backgrounds
can come together to connect, share experiences, and build meaningful relationships to
strengthen social bonds and foster a sense of belonging within the community.
The establishment of social enterprise activities within the cultural hub, such as a café or
artisan market, will create economic opportunities for local entrepreneurs and artisans. By
providing a platform for them to showcase and sell their products, we contribute to local
economic growth and support small businesses.
Our mindfulness sessions and cultural activities will promote holistic well-being by offering
residents opportunities for relaxation, self-expression, and personal growth. Engaging in
creative arts, music, and mindfulness practices can enhance mental health, reduce stress,
and improve overall quality of life for individuals in the community.
Through workshops, performances, and educational programs, the cultural hub will provide
valuable learning experiences for youth, empowering them to explore their cultural identity,
develop new skills, and pursue their passions. Additionally, the hub will offer volunteer and
leadership opportunities, promoting youth engagement and civic participation.
By providing rental space for community events and celebrations, the cultural hub empowers
residents to organise and host their own gatherings, strengthening community ties and
promoting inclusivity. 
See also : Proposed Use of The Falcon Day Centre in Development plan of Falcon Day
Centre

Page 18

10 
4.1.5 If the asset is to be used by the public it would be helpful if you could provide
details of letting’s policy and opening times
Day to Day Operation of the Pachedu Multicultural Hub – The intention is to operate the
Hub as follows:
• Hours of operation - The Hub will open weekdays between 09:00-16:00 with evening
activities (i.e. youth clubs, network meetings) taking place between 18:00-20:00. 
Weekend opening will be dependent on bookings / scheduled events. 
• Staffing – Once fully operational, Pachedu Multicultural Hub will employ staff to manage
the day-to-day operation of the facility (See Phase 3 below).  In the interim, Pachedu will
provide volunteers to carry out general duties (e.g. reception, bookings, venue hire) with
other tasks overseen by Pachedu staff and senior management team. 
• Building / Grounds Maintenance – Pachedu Multicultural Hub will contract with local
suppliers to carry out building maintenance, cleaning and grounds maintenance.
• Security / Emergency Contacts – Existing metal, roller shutters will be retained and
maintained to secure the building.  The existing alarm system will be checked and
updated as required.  Key-holders will be identified.
• Carparking – Visitor parking (including disability parking) will be re-installed (new
signage).  
• Exterior Lighting – Existing PIR security lighting will be retained/renewed to provide
additional security for staff when vacating premises afterhours.
• Community Engagement – Communication with neighbouring residents/businesses will
be maintained through regular leaflets / flyers.  Feedback from residents will be
addressed by the Board of Directors and Pachedu senior management team. 
4.1.6 What provision will be provided for people with disabilities? 
Ramped access is located either side of the building with street level access available at the
front and rear.  All exterior windows/doors are secured by metal roller shutters.  Mature
hedging and trees run along the perimeter of the site with a small, grassed area at the rear
of the building.  Disabled carparking and a vehicle turning / drop-off point is situated at the
front of the building. 
4.1.7 Any other relevant information?

Page 19

11 
Benefits of the proposal
4.2 Please set out the benefits that you consider will arise if the request is agreed
to.
This section should explain how the project will benefit your community, and others.  Please
refer to the guidance on how the relevant authority will consider the benefits of a request. 
Please explain how the project will benefit your community by detailing how your project will
promote or improve:-
4.2.1 Economic Development / Income Generation:
Key to the project’s long-term sustainability will be income generation through meeting room
hire, event space/venue hire, serviced office lets/co-working space, short-term lets to sole
traders (crafts, hair and beauty) and sub-lets to ‘anchor’ tenants.  Pachedu Charity will be
the principle tenant with funded projects paying to use the space. Please see the five-year
financial forecast which has been prepared as part of the Development Plan accompanying
this application.
The Hub will provide space to engage with more people and to grow/develop services /
activities which support New Scots in the following ways:
• Reduce isolation – The Multicultural Hub will provide a welcoming space for delivery of
activities to address social isolation, enabling residents from diverse backgrounds to
come together and share experiences/build relationships.
• Promote cultural diversity – The Hub will be developed as a venue for cultural events,
displays and exhibitions designed to promote cultural enrichment through cooking,
music, and arts.
• Advancing health and wellbeing – The Hub will provide a space for delivery of mental
health and well-being activities including mindfulness, creative arts and music to reduce
stress and improve wellbeing.
• Advancing economic growth - The Hub will support economic growth by creating
opportunities for artisans, sole traders and social entrepreneurs through networking
events, business mentoring workshops, artisan markets.    
• Bridging generational and cultural backgrounds – The Hub will provide a space for
delivering activities which empower/encourage youth from diverse backgrounds to
explore their cultural identities and develop new skills through workshops, educational
programs, and leadership opportunities. 
• Regeneration – The above outcomes will also contribute to local regeneration by turning
a vacant building into a well maintained and vibrant community-owned asset.  
• Public Health – Once acquired, the former Falcon Day Centre will become a venue for
health and wellbeing activities including neurodiversity support for families.   
• Social Wellbeing – The Hub will improve access to drop-in support services for
individuals and families to reduce social isolation and improve social wellbeing.
• Environmental benefits – As part of developing the Falcon Day Centre, an Energy Audit
will be commissioned to identify carbon reduction measures / improve use of green
technology. Refurbishment of the Centre will reflect consideration of environmental
sustainability and circular economy standards.
• Equalities, diversity and inclusion – The development of a dedicated multicultural space
will raise awareness of equalities, diversity and inclusion in Renfrewshire and beyond.

Page 20

12 
4.2.2 Regeneration:
The project will help revitalise Ferguslie Park by:
• The Falcon Centre has been declared surplus by the Council and is currently lying
empty. In this proposal, the building will be transformed into a vibrant community
space, promoting regeneration of the area and attracting visitors and new
businesses. The potential of the nursery, community restaurant and sensory are
viable propositions.
• The cultural hub will encourage local engagement and community ownership of the
project, empowering residents to participate in regeneration efforts.
• The influx of visitors to the hub, especially for cultural events and artisan markets, will
stimulate the local economy, benefiting nearby businesses and services.
4.2.3 Public Health:
The project will promote better public health by:
• Mindfulness sessions, creative arts, and community support groups will promote
mental health and well-being, helping to reduce stress, anxiety, and isolation.
Pachedu’s community crafted mental health and well-being toolkit will the pivot upon
which these initiatives will be anchored.
• The community garden, alongside wellness programs, will encourage physical
activity and healthy eating by offering gardening opportunities and nutritional
workshops. The hub will be used for the expansion of the intergenerational health
and wellbeing activities which have been held in partnership with One Ren.
• The hub will host health education sessions, raising awareness about physical and
mental health challenges, especially within marginalised groups who may face
cultural or linguistic barriers to accessing mainstream services. This will include
bespoke sessions in partnership with organisations like Prostate Scotland. 
4.2.4 Social / Well-being:
The hub will improve social cohesion and well-being through:
• By providing a gathering space for shared cultural experiences, the hub will
strengthen social connections, creating a sense of belonging and reducing feelings of
isolation within the community.
• Cultural events, art exhibitions, and shared projects will bring people from diverse
backgrounds together, fostering mutual respect, understanding, and social harmony.
Pachedu have key calendar events that include Rediscover Africa, Africa Day and
Black History month event to name a few.
• The hub will provide safe spaces for groups like the Pachedu Men's Group, women’s
empowerment programs, and youth development initiatives, allowing them to engage
meaningfully in the community and boost their confidence.
4.2.5 Environmental / Well-being / Environmental Benefits:
The project will promote environmental sustainability and well-being by:
• The development of a garden space will promote environmental awareness and
sustainability. It will provide opportunities for "grow-your-own" initiatives, helping to
improve food security while fostering a connection with nature.

Page 21

13 
• The project will help maintain and enhance green spaces, improving the area's
aesthetic appeal and contributing to residents’ physical and mental well-being.
• Through workshops and community events, the hub will educate local residents
about sustainable practices, such as recycling, gardening, and reducing food waste.
4.2.6 Does your project contribute to the reduction in inequalities? Please detail how:
Yes, the project is designed to reduce inequalities by:
• The hub will provide culturally sensitive programs tailored to the needs of diverse
ethnic communities, empowering marginalised groups and fostering a more inclusive
society.
• By offering job opportunities, business development support, and spaces for
entrepreneurs, the project will help reduce economic disparities, especially for
individuals from migrant and refugee backgrounds.
• The hub will be designed with inclusivity at its core, ensuring people with disabilities,
minorities, and disadvantaged individuals have equal access to all services and
activities.
• By offering leadership training, volunteer opportunities, and educational programs,
the project will help reduce gender and age-related inequalities, especially among
youth and women from minority communities. The project Women, Included,
Connected and Empowered (WICE) will lead on these 
4.2.7 Any other relevant information:
The project aligns with broader goals of social justice, community empowerment, and
environmental sustainability. Through strategic partnerships with organizations like the
Scottish Refugee Council and West of Scotland Regional Equality Council, the cultural hub
will address pressing social issues such as marginalization, unemployment, and health
inequities, ensuring that the community thrives both socially and economically.
Restrictions on use of the land
4.3 If there are any restrictions on the use or development of the land, please explain
how your project will comply with these.  
Restrictions might include, amongst others, environmental designations such as a Site of
Special Scientific Interest (SSI), heritage designations such as listed building status, controls
on contaminated land or planning restrictions.
No restrictions on the use or development of the land have been identified
Renfrewshire Council Planning Department will be consulted on future uses and change of
use applied for if required.
Negative consequences
4.4 Please identify any potential risks which may occur if your request is agreed to? 
How would you propose to minimise these?
You should consider any potential negative consequences for the local economy,
environment, or any group of people and explain how you could reduce these.
We do not foresee any negative consequences for the local economy, environment or any
group of people. In contrast, the transfer of Falcon Day Centre to Pachedu Multicultural
Hub is overwhelmingly positive. As detailed above, transfer of the asset makes use of an
empty building and creates a centre for community activity, integration and the celebration

Page 22

14 
of diversity as well as contributing to the local economy and promoting environmental
awareness and sustainability. 
Pachedu Multicultural Hub will dedicate itself to continued community engagement by
hosting open consultation events and regular community forums to provide opportunities
for dialogue and involvement in shaping activities and services. These efforts will ensure
that all community members feel included and valued.
The move will build on previous initiatives that successfully fostered cross-cultural
interactive activities between diverse ethnic groups and the host community. By creating a
space that is inclusive and welcoming to all, we aim to deepen community relationships
and bridge any perceived divides.
The hub will focus on delivering services and activities that benefit the entire community,
regardless of background. Key areas of focus include:
Reducing Isolation: Hosting social activities and support services that bring people
together.
Promoting Cultural Diversity and Equality of Opportunity: Offering educational
workshops and cultural exchange programs.
Bridging Generations and Cultures: Facilitating intergenerational and intercultural
dialogue through events and partnerships.
Advancing Community Health and Socioeconomic Opportunities: Providing training,
health workshops, and support for entrepreneurial initiatives.
Sustainability and Environmental Impact:
The project will adopt sustainable practices to ensure minimal negative environmental
consequences, such as promoting recycling, energy efficiency, and green spaces.
By proactively addressing potential concerns through these strategies, we are confident
that the project will not only mitigate risks but also enhance community cohesion, aligning
with Renfrewshire Council’s strategic outcomes of fostering a fairer, greener, and more
innovative community.
There is the potential for perceived competition between the Pachedu Multicultural Hub,
the Tannahill Centre and proposals to develop St Ninian’s Church Hall as a community
hub. The Tannahill Centre, currently the only community facility, is oversubscribed. We
believe that Ferguslie Park can support all three centres and will work with the
management teams of both the Tannahill Centre and St Ninians to build on and exploit the
unique offerings of each site. 
Capacity to deliver
4.5 Please show how your organisation will be able to manage the project and achieve
your objectives.  
This could include the skills and experience of members of the organisation, any track record
of previous projects, whether you intend to use professional advisers, etc.
Have you / your organisation managed projects or owned / leased land previously? Please
provide details of:
4.5.1 Skills and experience of members of the organisation 
• Pachedu Multicultural Hub is led by 3-Member Board of Trustees supported by eight
staff and 40 volunteers.

Page 23

15 
• Our board chair who is also the CEO of the West of Scotland Regional Equality
Council (WSREC) currently manages a property that they use as their office which
was acquired in her first year in the organisation. She oversaw the renovations that
were done to make the new building viable. Her experience will be very valuable in
the management of the Centre.
• During 2023-24 Pachedu recorded 587 engagements with individuals and families. 
Pachedu aims to develop a portfolio of services to attract people both within and out
with Renfrewshire.  Pachedu has successfully delivered advocacy initiatives, health
and wellbeing programmes, networking and employment support, and cultural
activities.  Funders include: National Lottery Community Fund, Corra Foundation,
OneRen and Renfrewshire Council.  The table below summarises the outputs
delivered between April 2023 and August 2024. 
4.5.2 Engagement with Professional Advisors 
Activities undertaken to date have involved the following advisor-led services: 
• Governance – Incorporation of the limited company was undertaken with support from
Arachas3 and Engage Renfrewshire (Renfrewshire’s Third Sector Interface
organisation).
• Funding – The funding strategy outlined in Section 5 has been informed by the work of
Funding and Development Officers with Engage Renfrewshire / Renfrewshire Council’s
Invest in Renfrewshire Communities Team.
• Community Asset Transfer – Advisor-led support provided by Community Ownership
Support Service (COSS) and Renfrewshire Council’s Community Asset Transfer
Programme Manager 
• Professional Services – For the development of the Falcon Day Centre we will engage a
range of professional services including:  
• Building Surveyors, Mechanical & Electrical Engineers
• Energy advisors (energy audit)
• Architectural services to RIBA Stage 2 (Royal Institute of British Architects)
• Roofing / Glazing contractors
• Green Economy – As part of reviewing the environmental impact of the CAT
proposal, Pachedu Multicultural Hub will engage with Renfrewshire Council’s Green
Economy Officer
• Financial management / procedures – Accountancy support and payroll services will be
provided by GNTax Accounting Services Ltd.
• Business Development – Moving forward, Directors recognise the need for specialist
support to develop a robust business plan.  Grant funding will be secured to commission
a business development consultant during Phase 2 (outlined above). 
4.5.3 Do you currently lease / manage a property from Renfrewshire Council?  If yes,
please provide details?
NO

Page 24

16 
4.5.4 Please detail how you plan to maintain the asset
Once fully operational, Pachedu Multicultural Hub will employ staff to manage the day-to-day
operation of the facility.  In the interim, Pachedu will provide volunteers to carry out general
duties (e.g. reception, bookings, venue hire) with other tasks overseen by Pachedu staff and
senior management team. 
Pachedu Multicultural Hub will contract with local suppliers to carry out building
maintenance, cleaning and grounds maintenance. 
4.5.5 Any other relevant information? 
Section 5: Level and nature of support
5.1 Please provide details of the level and nature of support for the request, from your
community and, if relevant, from others.  
This could include information on the proportion of your community who are involved with the
request, how you have engaged with your community beyond the members of your
organisation and what their response has been.  You should also show how you have
engaged with any other communities that may be affected by your proposals.
5.1.1 How many people are members of your organisation?  Are they in agreement
with this application?
We have about 21 members who have all been contacted regarding the application. Every
one of them agrees with this application. The 3 board members were consulted, and they
are all in agreement with this application
5.1.2 Have you consulted with other local stakeholder groups and agencies?  Please
provide evidence.
We consulted with local stakeholder groups such as The Tannahill Centre Management,
Darkwood Crew, Ferguslie Men’s Group, The Elderly Forum, The Engage Renfrewshire, and
the Ferguslie Library. We also consulted a local Councillor. Majority of those consulted are in
support with one reservation that it might bring racial divide within the community. Those
supporting the proposal in the survey mentioned that it will be great to have more
opportunities for multicultural events within the community.
We shared an online survey targeting Tannahill Centre service users and currently we have
received 26 responses, all supporting the application. We also have physical surveys
completed amounting to 90 making a total of 116 respondents of whom are from the
indigenous local population, our service users and volunteers, all supporting the proposal. A
sample of both empty form and completed physical and online forms will be added as
appendix.
5.1.3 Have you been in contact with local staff? If yes, please provide details of who
We contacted the Tannahill staff through one of the Managers, Paul Irwirn, Engage
Renfrewshire senior management staff (Iain Cunningham and Jane Hamilton). The Engage
team has been very supportive in helping us to get the best service to ensure our plan to
register as a CLG is done in a perfect and timely manner. We have been in contact with

Page 25

17 
Renfrewshire Council staff, Sandra Inrig and Tania Morlan, both of whom have been giving
us every necessary support.
5.1.4 Have you contacted any other communities that may be affected? 
The Tannahill centre is currently oversubscribed to the point that we do rent for spaces
outside the centre for some of our activities/events. The successful CAT application will
create opportunities for other users. It will as well give other groups opportunity to get
spaces in the centre.
Further consultations are still ongoing with the Ferguslie Housing Association, our landlord
and other relevant stakeholders.
5.1.5 Any other relevant information
We are still planning to contact other local councillors and continue to consult stakeholder
groups in the upcoming Renfrewshire Wellbeing Network meeting towards the end of
January

Page 26

No embedded text on this page.

Page 27

No embedded text on this page.

Page 28

No embedded text on this page.

Page 29

21 
6.1.3 Details of funding you have applied for but are still waiting on a decision /
response
Engage Renfrewshire - £30,000 for Community Mental Health and Wellbeing.
BBC Children in Need fund - £15,000
6.1.4 Details of other funding i.e. voluntary donations, borrowing etc
None
6.1.5 Any other relevant information
None 
Section 7: Other Supporting Documentation
To enable the Council to fully consider your application, the following supporting
documentation must be submitted as part of your application: -
• A copy of your organisation’s Constitution, Articles or Association or other governing
rules as appropriate;
• A detailed business case (that is proportionate to the nature of the asset transfer
request);
• A financial projection of income and expenditure for at least three full financial years
following the date of this request;
• A copy of your organisation’s most recent audited accounts, where available (or a
financial projection covering the current financial year where the applicant has been
operating for less than one year);
• Annual reports (where these are available).
Applicants are advised to refer to the Scottish Government Community Asset Transfer
Guidance for Community Transfer Bodies for further details of what information should be
included in these supporting documents. https://www.gov.scot/publications/asset-transfer-
under-community-empowerment-scotland-act-2015-guidance-community-9781786527509/

Page 30

22 
Declaration and Signature
Two office-bearers (board members, charity trustees or committee members) of the
community transfer body must sign the form.  They must provide their full names and home
addresses for the purposes of prevention and detection of fraud.
This form and supporting documents will be made available online for any interested person
to read and comment on.  Personal information will be redacted before the form is made
available.
We, the undersigned on behalf of the community transfer body as noted at section 1,
make an asset transfer request as specified in this form.  
We declare that the information provided in this form and any accompanying
documents is accurate to the best of our knowledge.
“I understand that the details provided will be used by Renfrewshire Council for the purpose
of assessing the asset transfer request and may be shared with Council Officers and
Elected Members for the purposes of providing support in making the application or other
purposes as appropriate. Further information on how the Council looks after personal
information can be found here : https://www.renfrewshire.gov.uk/article/2201/Privacy-policy
1. Name  
Address 
Date  
Position 
Signature 
2. Name  
Address 
Date  
Position 
Signature

Page 31

23 
Checklist of accompanying documents
To check that nothing is missed, please list any documents which you are submitting to
accompany this form.
Section 1 – you must attach your organisation’s constitution, articles of association
or registered rules 
Section 2 – any maps, drawings or description of the land requested 
Section 3 – note of any terms and conditions that are to apply to the request 
Section 4 – about your proposals, their benefits, any restrictions on the land or
potential negative consequences, and your organisation’s capacity to deliver. 
Section 5 – evidence of community support 
Section 6 – funding 
Section 7 – Supporting Documentation

Page 32

FALCON DAY CENTRE
DEVELOPMENT PLAN  
Prepared by 
Pachedu Multicultural Hub Ltd (SC837581)
January 2025
Contact Details: Pachedu Multicultural Hub Ltd
The Tannahill Centre, Blackstoun Road, Paisley.  
Email: info@pachedu.org

Page 33

1 | P a g e
Contents
Executive Summary ................................................................................................................................. 2
Section 1 – Overview of Pachedu Multicultural Hub Limited ................................................................. 3
Section 2 – Development Plan for Pachedu Multicultural Hub .............................................................. 4
Section 3 - Evidence of Need ................................................................................................................ 15
Section 4 - Fit with Local, Regional and National Strategies ................................................................. 17
Section 5 - Project Costs and Funding Strategy .................................................................................... 20
Section 6 – Sustainability and Income Generation ............................................................................... 24
Annex 1 – Overview of Pachedu ........................................................................................................... 29
Annex 2 – Evidence of Need ................................................................................................................. 35
Annex 3 – Fit with National Strategies .................................................................................................. 39
Annex 4 – Value Per Square Meter ....................................................................................................... 42
Annex 5 - Current Provision / Displacement ......................................................................................... 44
Annex 6 – Financial Forecast ................................................................................................................. 47

Page 34

2 | P a g e
Executive Summary 
In January 2025, Pachedu Multicultural Hub Limited (SC837581) was formed with the aim of
establishing a viable and sustainable multicultural hub to promote cultural diversity, equality
of opportunity and enhance the capacity of minority ethnic communities to advance their
health and socio-economic activities. 
The creation of a multicultural hub is the vision of Pachedu, a registered charity operating in
Ferguslie Park, Paisley.  Pachedu (which in the Shona dialect means ‘Amongst ourselves’) was
formed to promote diversity, equality, tolerance and dignity for all by increasing the capacity
of diverse minorities and other marginalised groups in Renfrewshire and beyond to be more
visible and pro-active in shaping their communities.  Between 2023-24, Pachedu reported 587
engagements with individuals and families across Renfrewshire.  Half-yearly monitoring for
2024-25 shows the number of individual engagements recorded is currently 810.  Growth in
demand for Pachedu services has increased year on year since the organisation’s formation
in 2016.   
In November and December 2024, a community consultation exercise was undertaken to
determine support for the development of the Pachedu Multicultural Hub, with the former
Falcon Day Centre in Ferguslie Park identified as a suitable asset for development.  Following
positive community feedback, Pachedu made preparations for the submission of a
Community Asset Transfer Request for the acquisition of the Falcon Day Centre (currently
owned by Renfrewshire Council) with Pachedu Multicultural Hub Limited as the eligible
Community Transfer Body. 
Pachedu Multicultural Hub will operate as a social enterprise, providing a dedicated space for
the delivery of activities and services designed to reduce isolation, promote cultural diversity
and equality of opportunity, bridge generational and diverse cultural backgrounds and
enhance the capacity of minority ethnic communities to advance their health and socio-
economic activities.  Evidence of need for these services is reflected in the national, regional
and local socio-demographic trends. 
Development of the Pachedu Multicultural Hub will be undertaken over three phases. 
• Phase 1 – Feasibility, conveyancing and survey work 
• Phase 2 – Refurbishment works to building exterior / interior 
• Phase 2/3 – Facility management and income generation 
External funding will be required to progress these activities and other forms of support will
be explored including community benefits, crowd-funding and social investment. 
Key to the project’s long-term sustainability will be income generation through meeting room
hire, event space/venue hire, serviced office lets/co-working space, short-term lets to sole
traders (crafts, hair and beauty), sub-lets to ‘anchor’ tenants.  A five-year financial forecast
has been prepared as part of this Development Plan.

Page 35

3 | P a g e
Section 1 – Overview of Pachedu Multicultural Hub Limited 
In January 2025, Pachedu Multicultural Hub Limited was established (SC837581) Limited
Company No Share Capital) in response to need identified by Pachedu for a community space
dedicated to the promotion of cultural diversity, equality of opportunity and the enhanced
health and socio-economic wellbeing of minority ethnic communities living in Renfrewshire
and beyond.   More information about the work of Pachedu (OSCR Registration SC046488) is
detailed in Annex 1. 
Demand for Pachedu services has increased year on year since the organisation’s formation
in 2016.  Pachedu (which in the Shona dialect means ‘Amongst ourselves’) aims to promote
diversity, equality, tolerance and dignity for all by increasing the capacity of diverse minorities
and other marginalised groups in the West of Scotland to be more visible and pro-active in
shaping their communities.  Between 2023-24, Pachedu reported 587 engagements with
individuals and families across Renfrewshire.  Half-yearly monitoring (December 2024) shows
the number of individual engagements recorded is currently 810.   
Pachedu Multicultural Hub - Pachedu operates from two small offices within The Tannahill
Centre in Ferguslie Park.  It is evident to the Board and senior management team that Pachedu
has outgrown these premises and requires additional space to maintain delivery of services. 
During 2024, Pachedu Senior Management Team met with Renfrewshire Council to discuss
the acquisition of the former Falcon Day Centre as a multicultural hub.   In November and
December 2024, Pachedu carried out a community consultation exercise to determine
support for this proposal.  Following a positive response, Pachedu (with support from Engage
Renfrewshire and paralegal firm Arachas3) established Pachedu Multicultural Hub Ltd to take
forward the project through Renfrewshire Council’s Community Asset Transfer Process. 
Governance and Leadership – Members of Pachedu’s current volunteer Board are the
registered Directors for Pachedu Multicultural Hub Limited.  This approach has enabled the
company to adopt Pachedu’s existing decision-making and reporting structures.  Director
meetings will follow the same structure and frequency as Pachedu Board meetings and
minutes will be available on request.  It is anticipated, additional Directors will be recruited
to support the ongoing activities of the Company.  The table below provides an overview of
the knowledge, skills and experience of each director.   
Company
Director 
Skills, Knowledge and Expertise
Ghzala Khan  Experienced Advocate for equalities and human rights for over 20 years
Currently Chief Executive of West of Scotland Regional Equality Council
(WSREC).  Instrumental in delivering activities around capacity building
of minority ethnic communities.  Experienced in building networks
involving private, public and voluntary organisations.

Page 36

4 | P a g e
Nadeem Hanif  An experienced consultant with expertise in building capacity of
voluntary sector organisations led by people with lived experience of
belonging to an ethnic minority community.  Currently commissioned by 
The Council of Ethnic Minority Voluntary Organisations (CEMVO) to
deliver capacity building 
support re: governance, funding, organisational policies and procedures. 
Previous roles include Knowledge and Learning Manager (The National
Lottery Community Fund) and Project Manager (West of Scotland
Regional Equality Council).
Dr.
Mohammed
Ishaq 
Experienced researcher / consultant specialising in Equality, Diversity
and Inclusion.  Currently an Associate Professor in Human Resource
Management at the University of the West of Scotland (UWS).  A Fellow
of the Chartered Management Institute and an Academic Fellow of the
Chartered Institute of Personnel and Development (CIPD).   Has been a
board member with PACHEDU since 2017. 
Reporting Structures – Pachedu Multicultural Hub Limited will adopt the existing reporting
structures operated by Pachedu.  Pachedu’s Operational Manager will provide regular
updates to the Board through:
• Written reports – Incl. project progress reports which review key performance indicators,
delivery timescales, project finances etc. 
• Verbal updates – Pachedu senior management team will provide verbal updates to
directors as part of day-to-day decision-making 
• Quarterly Project Progress and Financial Monitoring – Pachedu senior management team
will inform Board discussion re: project cashflow, grants secured, financial projections etc.
Pachedu senior management team will continue to provide ongoing support to this project. 
Staffing and Volunteers – At the time of writing, no staff are employed by Pachedu
Multicultural Hub Limited.  However, the Board is aware that the successful operation of the
Pachedu Multicultural Hub will require full/part-time staff.  This has been reflected in the
asset development plan and financial forecast detailed in Annex 6.  In addition, Pachedu’s
existing network of volunteers will support the day-to-day activities of the Multicultural Hub. 
It is anticipated that the new facility will create volunteering opportunities in administration,
reception, facilities management etc. 
Section 2 – Development Plan for Pachedu Multicultural Hub 
In 2024, Pachedu consulted with service-users, partner organisations and wider community
to gauge support for the creation of a multicultural hub. Consultation activities included: 
•  Survey – During November 2024, we gave questionnaires to attendees of Pachedu events
(including those attending weekly food market) to determine their support for the CAT
Application. 90 responses were received made up of members of the indigenous local
population, our service users and volunteers with Majority of those consulted supporting

Page 37

5 | P a g e
the application and one reservation that it might bring racial divide within the community.
Those supporting the proposal in the survey mentioned that it will be great to have more
opportunities for multicultural events within the community.
• Online survey – In December 2024 we shared an online survey targeting Tannahill Centre
service users and currently we have received 26 responses, all supporting the application. 
In response to feedback from the community, Pachedu senior management met with
Renfrewshire Council to discuss the acquisition of the former Falcon Day Centre as a
multicultural hub.     
The Falcon Day Centre (Location and Description) – The Falcon Day Centre is situated in the
neighbourhood of Ferguslie Park close to The Tannahill Centre, Engage Renfrewshire and
Glencoats Primary School.1  The area falls within SIMD Data Zone SO1012068 and is part of
Electoral Ward 4, Paisley North West which incorporates Castlehead, Shortroods, St Mirren
Park (an 8,000 seated stadium, home to St Mirren Football Club) and Glasgow Ailrport.
The Falcon Day Centre operated as a Renfrewshire Council adult day-care service.  However,
the COVID-19 Pandemic impacted service delivery and in March 2024, members of
Renfrewshire’s Health and Social Care Partnership Integration Joint Board agreed to
permanently close the facility.  At the time of writing, the centre is unoccupied.2 
The Falcon Centre is a single storey building (circa 1990).  The footprint of the building covers
602sqm.  A Building Condition Survey undertaken in 2010 describes the exterior / interior of
the building as follows: 
The building accommodates various lounge and dining areas, along with kitchens, offices,
toilets, bedrooms , hair salon and plant/ storage areas.  There is a ground bearing concrete
floor throughout, with cavity brick walls to the external elevations, finished in reconstituted
stone blockwork.  The roofs are pitched with a profiled metal cladding system and tiled
covering, although there is pitched continuous bank of patent glazing at the intersection. 
Rainwater gutters and downpipes are of uPVC.  The external doors are predominantly of
glazed aluminium construction, the main entrance doors are electrically powered.  The
windows are powder coated aluminium frames with single glazing.  Internally the floors are
finished in a combination of sheet carpet and sheet vinyl.  Internals walls are of masonry
construction.  Walls and ceilings have a painted and papered plasterboard finish. Internal
doors are all solid core, with a painted finish.3 
1 The Falcon Day Centre address is Darkwood Crescent, Paisley, PA3 1NS. 
2 Paisley Daily Express: Former day centre for elderly in Paisley could be declared 'surplus' to requirements -
Daily Record
3 Building Maintenance and Condition Survey, Falcon Day Centre for the Elderly. Drivers Jonas Deloitte.  March
2011.

Page 38

6 | P a g e
Figure 1 – Image courtesy of Google Maps - Falcon Day Centre (Top). 
Ramped access is located either side of the building with street level access available at the
front and rear.  All exterior windows/doors are secured by metal roller shutters.  Mature
hedging and trees run along the perimeter of the site with a small, grassed area at the rear of
the building.  Disabled carparking and a vehicle turning / drop-off point is situated at the front
of the building.  An additional overflow carpark is accessed via Darkwood Crescent. 
Figure 2 - Falcon Day Centre, Main Entrance (image courtesy of Paisley Daily Express)

Page 39

7 | P a g e
Figure 3 – Falcon Day Centre, Ramped access and Grounds 
Proposed Use of The Falcon Day Centre – Pachedu Multicultural Hub propose to develop the
Falcon Day Centre as a multicultural hub for the delivery of activities and services designed to
reduce isolation, promote cultural diversity and equality of opportunity, bridge generational
and diverse cultural backgrounds and enhance the capacity of minority ethnic communities
to advance their health and socio-economic activities. 
Key to the Hub’s sustainability will be income generation through: 
• Meeting room hire
• Event space / venue hire 
• Serviced office lets / Co-working space
• Short-term lets to sole traders (hair salon)
• Sub-lets to long-term ‘anchor’ tenants (3no.) 
The table below outlines how existing space within the Falcon Day Centre will be utilised to
accommodate activities outlined above. 
Space  Proposed Use
Main entrance  To provide street level access to building and welcoming drop-in
space 
Central circulation
space 
A multiuse space suitable for events, conferences, exhibitions and
gatherings.  Propose to open adjoining servery area to create a
large events space. 
Workshop (1no.) Will be used to extend the central circulation space for events,
displays and exhibitions. 
In-house hair salon
space
Space to be retained.  The Limited Company propose to
commercialise space by offering chair rental agreements to self-

Page 40

8 | P a g e
employed hairdressers (approx. 6no.).  Future opportunities
include delivery of hair and beauty training (in partnership with
West College Scotland) 
Toilets and Wet
Rooms (2no.)
Toilet facilities will be retained.  Proposal to renovate 1no. wet
room to provide additional storage space. 
Staff Room / Offices
(4no.) 
To be refurbished as a sensory space for delivery of Pachedu’s
Opuruiche Karungi project providing activities / support for
families with neurodiversity needs 
Lounge / Bedroom 
(Meeting Rooms)
(6no.) 
Rooms to be renovated for use by anchor tenants and general
meeting room hire/lets.  There are 4no. Large meeting rooms and
2no. Small meeting rooms.  Space will be available for sublet to
anchor tenants (including Pachedu) and community lets. 
Servery / Kitchen  To be renovated as a training kitchen and providing catering for
events, conferences, corporate events etc. 
Kitchenette / Laundry
Room
To be retained with potential to provide auxiliary services /
business development opportunities. 
Stores (8no.)  To be retained to provide secure storage of equipment throughout
the building 
Plant room (2no.) To be retained. 
Exterior Grounds Exterior space to be developed (in line with current guidelines) to
provide an out-door play space for an on-site creche

Page 41

9 | P a g e
Figure 4 - Falcon Day Centre, Floor Plan

Page 42

10 | P a g e
Day to Day Operation of the Pachedu Multicultural Hub – The intention is to operate the
Hub as follows:
• Hours of operation - The Hub will open weekdays between 09:00-16:00 with evening
activities (i.e. youth clubs, network meetings) taking place between 18:00-20:00. 
Weekend opening will be dependent on bookings / scheduled events. 
• Staffing – Once fully operational, Pachedu Multicultural Hub will employ staff to manage
the day-to-day operation of the facility (See Phase 3 below).  In the interim, Pachedu will
provide volunteers to carry out general duties (e.g. reception, bookings, venue hire) with
other tasks overseen by Pachedu staff and senior management team. 
• Building / Grounds Maintenance – Pachedu Multicultural Hub will contract with local
suppliers to carry out building maintenance, cleaning and grounds maintenance.
• Security / Emergency Contacts – Existing metal, roller shutters will be retained and
maintained to secure the building.  The existing alarm system will be checked and updated
as required.  Key-holders will be identified.
• Carparking – Visitor parking (including disability parking) will be re-installed (new signage). 
Staff will be encouraged to use parking bays accessed via Darkwood Crescent.  This
parking area will provide overspill carparking for events.  On-street parking is available
along Ferguslie Park Avenue.
• Exterior Lighting – Existing PIR security lighting will be retained/renewed to provide
additional security for staff when vacating premises afterhours.
• Community Engagement – Communication with neighbouring residents/businesses will
be maintained through regular leaflets / flyers.  Feedback from residents will be addressed
by the Board of Directors and Pachedu senior management team. 
Building Modifications and Adaptations - The interior of the Falcon Day Care Centre will
require further modification/adaption to accommodate proposed activities which include an
event/exhibition space (artisan markets, craft fairs, corporate events, and social functions), a
café area, and meeting rooms suitable for delivery of one to one and group workshops. 
Internal modifications include: 
• Technology / Equipment Upgrades – To ensure the space is fit for purpose the building
will be require upgrading re: interior wiring/cabling/internet connectivity etc. 
• Cultural Adaptations – To provide a welcoming, safe space.  Signage will be required in
multiple languages and décor will reflect diverse cultures.  
• Multi-use Space – To ensure the Centre can accommodate a diverse range of activities
from health and wellbeing sessions, youth activities, training workshops and business
support, the existing lounge areas (6no.) will be refurbished as meeting rooms/class
rooms, serviced office space suitable for sub-let. 
• Kitchen and Café Space – The existing kitchen/servery will be equipped to accommodate
diverse culinary needs.
Outdoor space has potential to be developed in the following ways: 
• Outdoor play area – Establishing a secure outdoor play area will provide a ‘free-flow’
space suitable for use by an on-site creche.

Page 43

11 | P a g e
• Community Garden – Grounds adjacent to the building offer potential to be developed as
a community garden to encourage physical and mental well-being and promote healthy-
eating and nutrition through ‘grow-your-own’ initiatives. 
Current Condition / Falcon Day Centre – In October 2010, Renfrewshire Council
commissioned Drivers Jonas Deloitte to conduct a Building Maintenance and Condition
Survey on the Falcon Day Centre.  At the time of the survey, the following defects were noted:
• Roof – Steel roof sheets showed evidence of surface corrosion generally 
• Entrance-ways – Front and rear entrances showed evidence of water ingress (internal
staining) where flashing required repair
• Windows – Window gaskets were of poor condition and perished and would require
replacement in the long term. 
As the Deloitte Condition Survey is now more than 10 years old, Pachedu Multicultural Hub
will commission a new Building Condition Survey and Mechanical and Electrical Survey to
identify Urgent and Necessary works required (see Phase 2 below). 
Figure 5 – Falcon Day Centre - Roof Corrosion (left), Perished Window Gaskets (right). 
Development Timescales – The proposal to acquire and develop the Falcon Day Centre as a
Multicultural Hub will be delivered over three phases.  An overview of the key milestones and
activities for each phase are detailed in the table below.  Sources of funding identified to cover
costs associated with each phase of delivery are detailed in Section 5 (Project Costs and
Funding Strategy).     
Phase 1 - 2025 Detail of activities to be undertaken
January - June • Incorporation completed (governance)
• CAT Request submitted to Renfrewshire Council (January
2025)
• Funding applications submitted to Sustainable
Communities Fund and Scottish Land Fund 
• Formal approval of CAT Request by Renfrewshire Council
Board (March 2025)

Page 44

12 | P a g e
• Funding secured.  Feasibility study and surveys
commissioned (Building Condition / Mechanical &
Electrical / Asbestos Report / Energy Audit)
• Solicitor appointed (conveyancing) 
Expenditure Total Cost
(incl. VAT)
Notes
Governance  £500 To cover cost of governance support incl.
Company House Registration
Surveys / Reports  £10,000 Building Condition Report (£2,500), Mechanical &
Electrical Report (£2,500), Asbestos Report
(£2,500), Energy Audit (£2,500) 
Architectural Feasibility
Study
£5,000 To identify modifications/adaptations required to
make building fit for purpose 
Conveyancing Fees  £3,000 To conclude acquisition of the Falcon Day Centre
through Community Asset Transfer
Disbursements/Consents  £1,000 As advised
SUBTOTAL £19,500 
Community Consultation
(ongoing)
£500 To inform proposals for community use of the
building. Costs to be covered by Pachedu
reserves
TOTAL £20,000 
Phase 2 - 2025 Detail of activities to be undertaken
July - December • Purchase of Falcon Day Centre from Renfrewshire Council 
• Commission business consultancy support 
• Findings from survey work addressed (Urgent/Necessary) 
• Insurances obtained
• Licences, permissions and consents obtained
• Renewal of security/fire alarm systems
• Building health and safety measures updated
• Interior space redecoration / refurbishment
• Upgrade key items of equipment 
• Telecoms / Broadband installed  
• Letting policies developed / finalised 
• 1st Anchor Tenant on site (Pachedu Charity)
• Pachedu commence delivery of services onsite
Expenditure Total Cost
(incl. VAT)
Note
Business Development
Consultant 
12,000 Specialist support re: Market Research, Business
Development, Contractual agreements, Lettings
policies

Page 45

13 | P a g e
Roof  £50,000 Urgent work identified (roof corrosion) through
Building Condition Report
Building Exterior  £10,000 Urgent / Necessary work identified (window
gaskets) through Building Condition Report
Plant  £5,000 Urgent / Necessary work identified through
Mechanical & Electrical Survey
Building Security  £2,500 Urgent / Necessary work identified through
Mechanical & Electrical Survey
Fire Alarm System  £1,000 Urgent / Necessary work identified through
Mechanical & Electrical Survey
Health & Safety
Measures
£1,000 Facilities Management Requirements
Building Interior
Modifications /
Adaptations 
£2,500  Identified through Architectural Feasibility Study
to identify modifications/adaptations based on
proposed use of building and reflecting national
care standards / commercial building
regulations, fire regulations etc.
Telecoms and
Broadband Installation
£250 
Insurances, Licences,
Permissions, Consents
£1,000  Incl. Building & Contents Insurance
Building Interior décor,
Fixtures and fittings, 
Signage 
£8,000 Incl. fixtures and fittings required for anchor
tenant(s)space, Hair Salon, Meeting Rooms, Co-
working Space, Classroom/Workshop space,
Kitchen
SUBTOTAL £93,250 
Phase 3 - 2026 Detail of activities to be undertaken
January – December  • Secure 2nd / 3rd Anchor Tenant 
• Launch hair salon and business incubation space (serviced
office space/desk-hire)
• Recruitment and selection of Facility Manager (FT @ £20k
and Business Development Manager (@ £25k pro-rata) 
Expenditure Total Cost
(incl. VAT)
Notes 
Recruitment & Selection
Costs  
£250 Admin costs associated 
Facility Officer (Full time
post) Salary + Employer
Costs 
£14,000 6 months costs covering June to December
based on annual salary (£20k)

Page 46

14 | P a g e
Business Development
Officer (Part-time post)
Salary + Employer Costs
£12,504 8 months costs covering May to December
based on annual salary (£25k pro-rata). 
Development of outdoor
space (for use by Creche)
£5,000 To ensure outdoor space is fit for purpose as an
early learning childcare space (creche outdoor
play area)
SUBTOTAL £31,879 
Project Timescales Post Phase 3 – During 2026, Pachedu Multicultural Hub will recruit
additional staff to lead / manage the day-to-day operation of the Hub.  These staff posts are
likely to include a full-time facilities manager and a part-time business development manager. 
Part-time support staff may also be recruited (admin, reception, caretaking).   
Anticipated Outcomes - The Hub will provide space to engage with more people and to
grow/develop services / activities which support New Scots in the following ways:
• Reduce isolation – The Multicultural Hub will provide a welcoming space for delivery of
activities to address social isolation, enabling residents from diverse backgrounds to come
together and share experiences/build relationships.
• Promote cultural diversity – The Hub will be developed as a venue for cultural events,
displays and exhibitions designed to promote cultural enrichment through cooking, music,
and arts.
• Advancing health and wellbeing – The Hub will provide a space for delivery of mental
health and well-being activities including mindfulness, creative arts and music to reduce
stress and improve wellbeing.
• Advancing economic growth - The Hub will support economic growth by creating
opportunities for artisans, sole traders and social entrepreneurs through networking
events, business mentoring workshops, artisan markets.    
• Bridging generational and cultural backgrounds – The Hub will provide a space for
delivering activities which empower/encourage youth from diverse backgrounds to
explore their cultural identities and develop new skills through workshops, educational
programs, and leadership opportunities. 
• Regeneration – The above outcomes will also contribute to local regeneration by turning
a vacant building into a well maintained and vibrant community-owned asset.  
• Public Health – Once acquired, the former Falcon Day Centre will become a venue for
health and wellbeing activities including neurodiversity support for families.   
• Social Wellbeing – The Hub will improve access to drop-in support services for individuals
and families to reduce social isolation and improve social wellbeing.
• Environmental benefits – As part of developing the Falcon Day Centre, an Energy Audit
will be commissioned to identify carbon reduction measures / improve use of green
technology. Refurbishment of the Centre will reflect consideration of environmental
sustainability and circular economy standards.
• Equalities, diversity and inclusion – The development of a dedicated multicultural space
will raise awareness of equalities, diversity and inclusion in Renfrewshire and beyond.

Page 47

15 | P a g e
Engagement with Professional Advisors – Activities undertaken to date have involved the
following advisor-led services: 
• Governance – Incorporation of the limited company was undertaken with support from
Arachas3 and Engage Renfrewshire (Renfrewshire’s Third Sector Interface organisation).
• Funding – The funding strategy outlined in Section 5 has been informed by the work of
Funding and Development Officers with Engage Renfrewshire / Renfrewshire Council’s
Invest in Renfrewshire Communities Team.
• Community Asset Transfer – Advisor-led support provided by Community Ownership
Support Service (COSS) and Renfrewshire Council’s Community Asset Transfer Programme
Manager has informed the development of the Community Asset Transfer Request for the
Falcon Day Centre.
• Green Economy – As part of reviewing the environmental impact of the CAT proposal,
Pachedu Multicultural Hub will engage with Renfrewshire Council’s Green Economy
Officer
• Financial management / procedures – Accountancy support and payroll services will be
provided by GNTax Accounting Services Ltd.
• Business Development – Moving forward, Directors recognise the need for specialist
support to develop a robust business plan.  Grant funding will be secured to commission
a business development consultant during Phase 2 (outlined above).
• Professional Services – The proposed development of the Falcon Day Centre will require
support from a range of professional services including:  
• Building Surveyors, Mechanical & Electrical Engineers
• Energy advisors (energy audit)
• Architectural services to RIBA Stage 2 (Royal Institute of British Architects)
• Roofing / Glazing contractors
Section 3 - Evidence of Need 
Pachedu Multicultural Hub will provide a dedicated space for the delivery of activities and
services designed to:
1. To reduce isolation
2. Promote cultural diversity and equality of opportunity
3. Bridge generational and diverse cultural backgrounds
4. Enhance the capacity of minority ethnic communities to advance their health and socio-
economic activities
Evidence of need for these services is reflected in the following national and regional socio-
demographic trends (see Annex 2 for further detail).   
National Socio-Demographics - 2022 Census data indicates Renfrewshire is now the 9th
largest local authority area in Scotland.  A high-level population estimate released in
September 2023 indicated a 5.1% increase (183,874) based on 2011 Census data (174,908).
Scottish Government analysis of 2011 and 2022 Census data indicates broader demographic

Page 48

16 | P a g e
changes likely to increase demand for activities delivered across the four themes identified
above.  
• Number of people living alone – Across Scotland, the number of people living alone
increased by over 100,000 compared to 2011 Census data.  With older people more likely
to live alone than young people.  
• Mental Health – Across Scotland, the number of people reporting a mental health
condition increased from 4.4% in 2011 to 11.3% in 2022.  Young people were more likely
to report a mental health condition than older people.  Of the 11.3% of people reporting
a mental health condition, 17.5% were aged 25-30 and 15.4% were aged 16-24. 
• Migration – Almost half of people born overseas had been living in the UK for more than
10 years.  Countries of birth of people born outside the UK were commonly Poland, India
and Pakistan. An extract from Scotland’s Census 2022 - Demography and migration |
Scotland's Census) indicated ‘Countries in the top ten that saw the biggest increase in
people since 2011 were Poland (up 20,100), India (up 14,200) and Nigeria (up 11,800)’.4 
Figure 6 - Scotland's 2022 Census - The most common country of birth of people born outside
the UK (Scottish Government - Scotland’s Census 2022 - Demography and migration |
Scotland's Census) 
Local Area Profile – At a local level, 2022 Census data for Paisley Northwest indicates the
following:
• Total Population – The 2022 Census reported 19,944 individuals living in Paisley
Northwest
• Households – A total of 10,231 households were recorded.  The total number of 
one-person households was 5,035.
• General Health – 14,964 individuals reported having very good or good general health. 
The number of individuals reporting their general health as bad or very bad was 1,868.  
• Health conditions - 4,084 individuals reported having a long-term health condition.  3,056
individuals reported having a mental health condition.  2,223 individuals reported having
a physical disability. 
4 Scotland’s Census 2022 - Demography and migration | Scotland's Census)

Page 49

17 | P a g e
• Economic Activity – The number of people identified as economically active (excluding full
time students) was 9,585.  The number of people identified as economically inactive was
6,125 of which 44% were retired and 21% were long term sick or disabled.
• Country of birth – Census data shows the number of individuals reported their country of
birth as follows: EU Country (1,397) Non-EU Country (39), Africa (724), Middle East and
Asia (687), Americas and Caribbean (121), Antartica and Oceania (25) 
In summary, it is anticipated national, regional and local socio-demographic trends
highlighted above will increase demand for services and activities which address social
isolation, improve physical and mental health and wellbeing in ways which reflect the needs
of diverse communities.  The development of a Multicultural Hub in Renfrewshire will
respond to this need. 
Section 4 - Fit with Local, Regional and National Strategies
Pachedu Multicultural Hub will have a positive impact on Renfrewshire Council’s strategic
aims and ambitions.  Annex 3 provides further detail of fit with Scottish Government
strategies including National Strategy for Economic Transformation, Culture Strategy and
New Scots Refugee Integration Strategy.
Renfrewshire Council Plan 2022-27 – The local authority’s strategic plan for Renfrewshire
aims to create ‘a fairer Renfrewshire built on innovation, wellbeing and opportunity."5 
5 Renfrewshire Council Plan 2022-27

Page 50

18 | P a g e
Underpinning each strategic area is the vision to improve outcomes for children and families. 
The Plan identifies 5 strategic outcomes: place, economy, fair, green, and living our values. 
Pachedu Multicultural Hub will contribute towards these priorities in the following ways: 
Place – Working together to enhance wellbeing across our communities 
Outline “We want everyone to have access to nature, transport links, good shops
and places to eat, exercise, healthcare and cultural, play and learning
opportunities within their local communities”6
Hub The Hub will provide a dedicated space for delivery of health and wellbeing
activities, cultural activities and activities to support learning and skills
development.
Economy – A stronger, inclusive and sustainable economy 
Outline “Creating sustainable employment opportunities…ensuring that all people
can benefit from the inclusive growth in Renfrewshire” 7
Hub The Hub will create business development opportunities, provide support
for start-ups, sole traders and facilitate the development of early-stage
social enterprise activities. 
Fair – Nurturing bright, happy, and healthy futures for all
Outline “Nobody should be scared about their futures, their safety, their health, or
their wellbeing. Where you live shouldn't determine how long you live”.8
Hub The Hub will provide safe and secure space for delivering activities which
encourage physical health and wellbeing and support active lives of service
users and the wider community.  The Hub will also off space for cultural and
social events which bring the wider community together, increase social
inclusion, connectedness and wellbeing. 
Green – Leading Renfrewshire to Net Zero
Outline “We want to end Renfrewshire's contribution to climate change within a
generation.  We are committed to working towards net zero by 2030 for
the whole of Renfrewshire to ensure a safer, healthier, greener, and fairer
place for everyone to live, work and spend time in”.9
Hub Consideration will be given to the environmental impact of proposed
development.  An energy audit will be commissioned to identify green
energy options which support Renfrewshire’s 2030 net zero target. 
Renfrewshire Health and Social Care Partnership Plan 2022-25 – The table below sets out
the key themes for Renfrewshire’s Health and Social Care Partnership.
RHSCP Themes Fit with Pachedu Services / Activities 
6 Renfrewshire Council Plan 2022-27
7 Renfrewshire Council Plan 2022-27
8 Renfrewshire Council Plan 2022-27
9 Renfrewshire Council Plan 2022-27

Page 51

19 | P a g e
Healthier Futures
Prevention and Early
Intervention 
The Hub will host health education sessions, raising awareness
about physical and mental health challenges, especially within
marginalized groups who may face cultural or linguistic barriers to
accessing mainstream services.
Connected Futures 
Community Support,
Mental Health 
The Hub will provide space for activities which promote good
mental health and reduce stress, anxiety, and isolation e.g.
creative arts, music and mindfulness sessions
Enabled Futures
Access to clinically
safe and specialist
services
With inclusivity at its core, the Hub will provide an accessible space
for individuals to access to outreach services and activities.
Empowered Futures 
Healthy and Active
Living 
The Hub will provide space for delivery of activities which support
healthy and active living e.g. use of outdoor space for community
gardening, use of kitchen for food nutrition classes. 
Renfrewshire Economic Strategy 2020-2030 -
https://www.renfrewshire.gov.uk/media/10488/Renfrewshires-Economic-Strategy-2020-
2030/pdf/Renfrewshires_Economic_Strategy_2020-2030.pdf?m=1568663422430 Pachedu
Multicultural Hub will help to address challenges identified in Renfrewshire Council's
Economic Strategy (2020-2030).   
Challenge   Response
Retaining /
attracting
people to live,
learn and work
in
Renfrewshire
The Hub will address this by:
Supporting Community Empowerment and Inclusivity - Providing rental
space for community events, gatherings and celebrations to strengthen
community ties.  
Facilitating Community Engagement and Social Cohesion – Providing
space to connect, promote shared cultural experiences and build
relationships. 
A strong and
inclusive
economy  
The Hub will contribute to a strong and inclusive economy by:
Creating Economic Opportunities - The establishment of social enterprise
activities within the cultural hub, such as a café or artisan market, will
create economic opportunities for local entrepreneurs and artisans.
Economic Empowerment – Through employment and volunteering
opportunities.  Provision of business development support and space for
start-ups and sole traders. 
Skills Development – Providing space for leadership training, volunteer
opportunities, and educational programmes which reduce gender and
age-related inequalities, especially among youth and women from
minority communities.

Page 52

20 | P a g e
Foster new
business 
The Hub will Foster Entrepreneurship - The Space will be used to foster
new business development, incubate start-ups and develop sole trader
opportunities.   
The Making of Ferguslie Plan – ‘The Making of Ferguslie is a plan that sets out a vision for the
future of Ferguslie Park over the next 5 to 10 years. Developed in partnership with the local
community, the plan sets out a range of actions to reimagine underused land, improve
greenspaces, and support community initiatives’.10  
The priorities, ambitions and aspirations of the local community outlined in the plan were
gathered through a series of engagement events with local people over 2020 and 2021’11. 
The table below outlines how the Pachedu Multicultural Hub will contribute to the
community’s vision for Ferguslie Park.
Principle  Cultural Hub – Fit with Five Principles (Making of Ferguslie Park) 
Enhanced
Environment
Reimagining vacant and underused land / improving local environment
Reviving a Vacant Building - The vacant Falcon Day Care Centre will be
revitalised as a community space, promoting regeneration, attracting
visitors and new business to the area.
Outdoor space - The outdoor space will be developed with potential to
include a community garden to promote environmental awareness,
sustainability, connection with nature.
Environmental Education - Through workshops and community events,
the Hub will provide space to learn about sustainable practices, such as
recycling, gardening, and reducing food waste.
Community
Empowerment
Community Asset Transfer – As a community asset, the Hub will
contribute to local regeneration activities. 
Cultures,
Heritage,
Social Values
Stimulating Local Economy – The Hub will provide space for cultural
events and artisan markets which will support the local economy. 
Section 5 - Project Costs and Funding Strategy  
Activities to develop the Pachedu Multicultural Hub will be undertaken over three phases. 
• Phase 1 – Feasibility, conveyancing and survey Work 
• Phase 2 – Refurbishment works to building exterior / interior (scale of works to be
informed by findings from survey work undertaken in Phase 1)
• Phase 3 – Facility Management / Income generation (incl. creation of new staff posts) 
10 Renfrewshire Council, Making of Ferguslie Plan
11 Renfrewshire Council, Making of Ferguslie Report

Page 53

21 | P a g e
Phase 1 – Conveyancing / Survey Work - The table below details cost of Phase 1 activities and
sources of funding identified.  In January 2025, Pachedu held preparatory discussions with
the Scottish Land Fund (SLF).  Based on feedback from SLF, Pachedu Multicultural Hub will
apply to the Scottish Land Fund for a Stage 1 Technical Grant to contribute towards the
activities/costs detailed below.  The average Technical Grant award of £10k to support eligible
activity e.g. feasibility studies, business plans, valuations and surveys.  In addition to the
Scottish Land Fund, a Revenue application will be submitted to Renfrewshire Council’s
Sustainable Communities Fund.  The acquisition value has not been detailed below, as this
will be covered by a Scottish Land Fund Stage 2 Grant. 
Phase 1 Expenditure Total Cost Funding Source
Building Condition Report  £2,500 Scottish Land Fund Technical Grant
/ National Lottery Community Fund 
Sustainable Communities Fund /
Renfrewshire Council
Mechanical & Electrical Report  £2,500 As above
RIBA Stage 2 Architectural Feasibility
Study
£5,000  As above
Energy Audit £2,500  As above
Asbestos Report  £2,500 As above
Conveyancing Fees  £3,000 As above
Permissions/Consents  £2,000 As above
Ongoing Community Engagement
Activities
/ Costs to be covered by Pachedu
SUBTOTAL £20,000 
Phase 2 – Refurbishment Works - The table below details cost of Phase 2 activities and
sources of funding identified.  It is anticipated the outcome of Phase 1 will identify Urgent /
Necessary works required to ensure the asset (former Falcon Day Centre) is fit for purpose.  It
is also assumed that aspects of the building fabric identified as being of concern in 2010 (i.e.
roof corrosion, water ingress, perished window gaskets) are now likely to require urgent
replacement/repair.  Pachedu Multicultural Hub will seek estimates from local contractors to
help with detailed calculation of Phase 2 costings.  Where possible, Pachedu Multicultural
Hub will cover the cost of Phase 2 activities through grant funding.  Therefore, during Phase
2, a second application to support building repair / refurbishment works will be submitted to
the Sustainable Communities Fund.  However, the organisation is aware of the need to
mitigate against the risk of funding not being secured.  To ensure the project does not stall at
this stage, Pachedu Multicultural Hub has approached Foundation Scotland to discuss fit with
their Social Investment Fund.  The fund can invest between £10,000 and £250,000 per

Page 54

22 | P a g e
organisation and up to 25% of this can be in the form of a non-repayable grant (with the
remainder as a repayable loan).     
Phase 2 Expenditure Total Cost Sources of Funding
Roof - Urgent / Necessary works  £50,000 Sustainable Communities Fund
(Renfrewshire Council)
Building Exterior – Urgent /
Necessary works
£10,000 Sustainable Communities Fund 
Plant – Urgent / Necessary works  £5,000 Energy Business Scotland
Building Security – Urgent /
Necessary works 
£2,500 Sustainable Communities Fund 
Fire Alarm System – Urgent /
Necessary works 
£1,000 Sustainable Communities Fund 
Health & Safety Measures £1,000 Facilities Management Requirements
Building Interior Necessary
Refurbishment works
Modifications / Adaptations 
£2,500  FCC Scottish Action Fund
Telecoms and Broadband
Installation
£250 Pachedu contribution (Reserves)
Insurance (Building & Content
Licences, Permissions, Consents) 
£1,000  Pachedu contribution (Reserves)
Scottish Land Fund Technical Grant
Interior décor and signage
(Circulation Area, Sensory Room,
Meeting rooms) 
Fixtures/Fittings: Sensory Room
£8,000 Awards for All – National Lottery
Community Fund
Regular Grant / The Garfield Weston
Foundation 
Millward Charitable Trust (UK)
Business Development
Consultant - Market Research,
Income Generation, Paralegal
Support (preparing sublet
agreements/letting policy)
12,000 Scottish Land Fund 
National Lottery Community Fund
Sustainable Communities Fund 
SUBTOTAL £93,250.00 
Phase 3 – Facility Management / Business Incubator Space - The table below details cost of
Phase 3 activities.  During this phase, Pachedu Multicultural Hub plan to:
• Recruit staff to support day to day management of the facility
• Develop space to accommodate 2-3 start-up social enterprises (anchor tenant space),
sole-trader opportunities (hairdressing salon) and co-working space.  At time of writing,
the organisation is in discussion with two potential anchor tenants (a creche provider
and a constructions skills academy).

Page 55

23 | P a g e
At the time of writing, Pachedu Multicultural Hub anticipate staffing costs will be incurred
part-way through Phase 3 with costs covered by a combination of income generation and
grants secured.  
Phase 3 - Expenditure Total
Cost
Sources of funding 
Recruitment & Selection
Costs - Facilities
Manager
£250 Pachedu contribution (Reserves)
Salary + Employer Costs
– Facilities Manager (6
months)
£14,000 Income generation activities
Awards for All – National Lottery Community Fund
Regular Grant / The Garfield Weston Foundation 
Millward Charitable Trust (UK)
Business Development
Officer (Part-time post)
Salary + Employer Costs
£12,504 Scottish Land Fund
Income generation activities
Regular Grant / The Garfield Weston Foundation 
Millward Charitable Trust (UK)
Development of outdoor
space (for use by Creche)
£5,000 FCC Scottish Action Fund
Regular Grant / The Garfield Weston Foundation 
Millward Charitable Trust (UK) 
SUBTOTAL £31,879 
Funding Sources – Further detail about the funding sources identified is provided below:
• Pachedu – The registered charity will become the first anchor tenant to occupy space
within the Hub.  This will enable the Company to generate income from the outset.  
• Sustainable Communities Fund – Intermediate awards between £10k-£25k for feasibility
studies or business plans for property developments or community asset transfers and
project management costs.  Submission dates for 2025 applications to be confirmed.
• Scottish Land Fund Technical Grant – Stage One funding between £2.5k-£30k (average
grant award is £10,000).  Grant will cover 100% of costs relating to specialist advice and/or
professional fees including the preparation of feasibility studies and business plans,
valuations and surveys as well as some costs towards community engagement.  Scottish
Land Fund operates a rolling submission process.
• FCC Scottish Action Fund - Grants from £2k to £40k.  To support environmental and
community-based projects that are within 10 miles of any landfill site or transfer station
in Scotland and are for the benefit of the public.  This fund supports refurbishment of an
existing community building i.e. Internal fitting costs (kitchens; toilets; floor coverings;
decorating; lighting; heating; renewable energy technology).  The next application round
opens 26th February 2025 and closes 14th May 2025.  Last Round opens 3rd September
2025 and closes 19th November 2025.  Applicants will be notified of outcome within 2
weeks of the Board Meeting.

Page 56

24 | P a g e
• Millward Charitable Trust (UK) - Applications can be submitted at any time. Millward
Charitable Trust makes grants to organisations involved with community buildings,
facilities and open spaces, social welfare projects, including the performing arts. 
Other sources of funding/support – Pachedu Multicultural Hub will also explore funding /
support available through the following:
• Crowdfunding / Fundraising – Fundraising will provide flexibility to meet unexpected costs
associated with the project.  
• Social Investment – As the project progresses, Directors will review social investment
options.  Potential sources of social investment include Foundation Scotland’s Social
Investment Fund and Social Investment Scotland
• Community Benefits – Once trading as a social enterprise, the organisation will be eligible
to apply for financial and in-kind support through Renfrewshire’s community benefits
programme facilitated by Engage Renfrewshire and will register for support through NHS
Scotland’s Community Benefit Portal.   
Section 6 – Sustainability and Income Generation 
Pachedu Multicultural Hub will generate income through meeting room hire, event space /
venue hire, serviced office lets/co-working space, short-term lets to sole traders/freelance
hair and beauty practitioners and longer-term sub-lets to ‘anchor’ tenants.  Ongoing
discussions with community groups, sole traders and start-up social enterprises will inform
the development of these income streams.   
Meeting Room and Venue Hire (Community / Corporate) – The table below details the
projected income (Year 2) from lettable space within the Hub suitable for meeting room hire.   
Space  Usage Projected
Income (Yr2)
Central
circulation
space (incl.
kitchen servery)
A multiuse space suitable for events, conferences,
exhibitions and gatherings, offering half day and full
day hire to community groups and corporates 
£4,800
Classroom
(G19) 
A classroom with AV and WiFi suitable for use as a
workshop / training room available for hire by
community groups and corporates.  Will also
provide additional breakout space for large events /
conferences.
£5,900 
Events, Exhibitions & Displays – The Hub will provide space for Pachedu to extend its current
programme of cultural events, artisan markets and food fairs with income generated though
stall hire, ticket sales and kitchen sales.

Page 57

25 | P a g e
Space  Usage Projected
Income (Yr2)
Central
circulation
space (incl.
kitchen servery)
A multiuse space suitable for indoor ticketed events
e.g. hosting artisan markets (price per stall holder),
evening events (arts, music, culture)
£4,100 
Serviced office lets / Co-working space – The table below details the projected income from
lettable space within the Hub suitable for desk-hire/serviced office space (telephone /
photocopying / secure storage)
Space  Usage Projected
Income (Yr2)
Lounge areas
(G34, G35) 
To be developed as co-working space providing
serviced office accommodation.  Half day and full
day desk hire 
£5,000 
Supporting Sole Traders (Hair and Beauty / Hairdressing Salon) - As shown on the floorplan
above, the Falcon Day Centre includes an on-site hair salon.  This space will be retained to
provide freelance hairdressers/barbers with an opportunity to rent a chair on a half-day (4hr)
or full-day (7hr) basis.  There is potential to accommodate up to four chairs with two basins
for hair washing.  It is anticipated the salon will be open 5-days a week between 10:00 to
16:00. (Half day / Full day hours reflect set-up and clear-up of salon space).  Opportunities to
provide hair and beauty training in collaboration with West College Scotland will be explored. 
The table below details the projected income from this activity. 
Space  Usage Projected
Income (Yr2)
In-house hair
salon space 
Space to be retained to offer freelance
hairdressers/barbers half-day / full day chair rental 
£6,700 
Anchor Tenants – There is scope to sub-let space to support the growth of local social
enterprises.  Pachedu Multicultural Hub has received expressions of interest from a creche-
provider and a constructions skills training provider.  Further work is required to assess the
financial viability of these proposals. 
• Anchor Tenant#1 (Pachedu) – Accommodation within the Hub will be sub-let to Pachedu
(Charity).  The table below reflects current estimates based on current estimates re: value
per square meter.

Page 58

26 | P a g e
Space  Usage Annual Rental
(Yr2)
Room (G15) Room to be refurbished as a sensory space for
delivery of Pacedu’s Opuruiche Karungi project
providing activities / support for families with
neurodiversity needs 
£12,700 
Room (G19)  To be used for delivery of Pachedu projects:
• Pachedu Men’s Group
• JEANS Employability Project
• WICE (Women Included Connected &
Empowered)
• Kodzero Youth Group
• Connected & Empowered Network
(Daily charge @ £18) 
Circulation Area
(G20) 
To be used as a general drop-in space / networking
area to support delivery of: 
• WICE (Women Included Connected &
Empowered)
• Kodzero Youth Group
• Connected & Empowered
(Daily Charge @ £57) 
Staff Room
(G20) and
Office (G34) 
For use by Pachedu staff
(Daily charge @ £8 / £18) 
• Anchor Tenant#2 (Creche) – The table below reflects projected income from space
available for sub-let as a creche.  Pachedu Multicultural Hub is aware that a successful
sub-let will be dependent on identifying the level of demand for childcare within the local
community.  Projected income is based on value per sqm (see Annex 4 for more detail).      
Space  Usage Annual Rental
(Yr2)
Lounges (G13,
G14)
Rooms to be refurbished for use by an anchor tenant. 
This space would be suitable for sublet as a creche
space. 
£12,000 
Toilet Block and
Storage Room
(G11, G10, G12,
G09, G08)
Toilets to be refurbished to provide suitable space for
use by creche. Lockable storage space to be provided 
Outdoor Space  Outdoor space to rear of Hub to be developed as an
out-door play space in line with National Care
Standards for Early Learning & Childcare
Subject to an
additional
service charge 
• Anchor Tenant#3 (Training Centre) – The table below identifies space suitable for sub-let
to a third anchor tenant.  An early-stage social enterprise (Ethnic Construction Skills

Page 59

27 | P a g e
Development) has expressed interest in leasing space within the Hub to develop a
construction skills training centre.  Further discussion is required to determine the viability
of this proposal.   Projected income from sublet is based on value per sqm (see Annex 4
for more detail). 
Space  Usage Annual Rental
(Yr2) 
Offices, (G41,
G43, G37) 
Rooms (3no.) to be refurbished for use by anchor
tenant (Ethnic Construction Skills Development) as
offices and training/workshop space.  
£13,200 
Circulation
Space (G42)
To be retained to provide separate access to anchor
tenant space.  Will enable anchor tenant to operate
out with opening hours of the Hub.  Access point
leads to additional carparking area (Darkwood
Crescent). 
Storerooms
(incl. laundry
space) (G39,
G40, G42a,
G38)
Storage rooms (4no.) to be retained for use by
anchor tenant 
Toilet (G37a) Toilet facility to be retained for use by anchor tenant
with general access to main toilet block adjacent to
central area for training course participants. 
Classroom
(G19) 
Available for half-day / full-day hire by anchor
tenant as required (charged at community rate) 
Shop / Kitchen
Servery 
Training participants will have access to light
refreshments available to purchase via the
shop/kitchen servery. 
5-year Financial Forecast – A 5-year financial forecast is detailed in Annex 5 and outlined
below.  The organisation will continue to update the financial forecast as costs are confirmed. 
Pachedu Multicultural Hub will engage a business development professional (see Phase 2
above) to assist with development of a robust business plan (incl. costing and pricing, income
generation/maximisation).   
Table: Summary / Financial Projections – Pachedu Multicultural Hub 
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6
Income £129,673 £75,583 £84,801 £88,703 £92,909 £102,200
Expenditure £130,118 £70,505 £86,580 £89,177 £91,852 £94,608
Balance -£445 £5,078 -£1,779 -£474 £1,057 £7,592 
Key considerations – The organisation is mindful that these financial projections require more
detailed consideration as outlined below:

Page 60

28 | P a g e
• Value Per Square Meter – As a first step to assessing the financial viability of the proposal,
the organisation has sought to identify the value per square meter of lettable space.12 
Annex 4 details current calculations.  Figures are based on 552sqm of lettable space. This
exercise has helped the organisation to consider how internal space can be best used to
generate income.  This exercise will be repeated as the project develops.  
• Architectural Feasibility Study – As indicated above, maximising space available for lets
will contribute towards the financial viability of the Hub.   Therefore, an architectural
feasibility study is required.  This will help the organisation to ensure the asset is fit for
purpose. 
• Existing Floor Plan / Use of Circulation Space (G02) – The Value Per Square Meter analysis
demonstrates further work is required to identify how the Circulation Space (G02) can be
better utilised to generate income.  As part of the architectural feasibility study, a
measured survey will be undertaken to inform sqm calculations. 
End. 
12 Community Ownership Support Service Community Hubs Handbook

Page 61

29 | P a g e
Annex 1 – Overview of Pachedu 
Pachedu (which in the Shona dialect means ‘Amongst ourselves’) was formed in 2016 to
promote diversity, equality, tolerance and dignity for all by increasing the capacity of diverse
minorities and other marginalised groups in the West of Scotland to be more visible and pro-
active in shaping their communities.  The organisation was established following a
conversation between friends about the challenges and barriers experienced by migrant
communities from the global south who found themselves marginalised in their new
communities of settlement.  The organisation now delivers a range of community-based
activities designed to support the needs of diverse minority ethnic communities living in
Renfrewshire and beyond.  Core services relate to health and wellbeing, employability,
cultural awareness, and support for families.  
Legal Form and Governance – Pachedu is registered with OSCR as an Unincorporated
Association (OSCR Registration Number SC046488).  
Constitution – Pachedu’s Constitution (updated / signed in 2021) sets out the objects of the
organisation, which are: 
• To reduce isolation 
• To promote cultural diversity and equality of opportunity 
• To bridge generational and diverse cultural backgrounds 
• To enhance the capacity of minority ethnic communities to advance their health and
socio-economic activities 
Current Delivery – Pachedu currently operates from hired office space within The Tannahill
Centre, Blackstoun Road, Paisley.  The Tannahill Centre is owned / managed by Ferguslie Park
Housing Association.  Pachedu office hours are 09:00 to 16:00 and activity is delivered over
weekdays and weekends.   The table below provides an overview of Pachedu’s current
programme of activities:
Activity Summary
School of
African
Cultures 
• To address stigma and stereotyping about Africa and African people
• Support children and young people from African backgrounds to
connect with, learn about and take pride in their African heritage,
history and culture
• Activities delivered through weekly sessions/homework clubs aimed
at children/young people 
Rediscover
Africa
• Pachedu’s flagship annual summer event (June) and forms part of
Scottish Refugee Council’s annual “Refugee Festival Scotland”. 
• The event is an opportunity to foster integration, bring together the
African diaspora community and the local indigenous community,
breakdown barriers and change the narrative around Africa and
Africans. 
• The event includes cultural performances and speaker events and
inter-community activities designed to challenge/change the Africa
narrative

Page 62

30 | P a g e
Strategic Partners / Stakeholders / Funders include: Scottish Refugee
Council, Arnold Clark, Inspiring Families Network, Renfrewshire Council 
WICE (Women
Included
Connected &
Empowered) 
• Aims to support women by tackling barriers and increasing
engagement in a culturally sensitive and appropriate environment. 
• Activities include a weekly sewing classes (Stitches of Unity) 
• Host Business Development workshops to foster entrepreneurship
and self-employment opportunities
Strategic Partners / Stakeholders / Funders include: West of Scotland
Regional Equality Council, CEMVO Scotland, Business Gateway, Engage
Renfrewshire 
Kodzero Youth
Group 
• Supporting young people from diverse minority communities through
building self-esteem and pride in their dual identities to ensure
successful, sustainable and enduring integration rather than
assimilation/loss of cultural identity.  
• Addressing challenges from racism, prejudice and stereotyping
• Mentoring to inspire, inform, support young people through
teambuilding, goal setting and sharing experiences 
• Access to development and training opportunities e.g. The Duke of
Edinburgh’s Award, The King’s Trust Scotland (formerly The Prince’s
Trust Scotland), modern apprenticeships etc.
Strategic Partners / Stakeholders / Funders include: The Duke of
Edinburgh’s Award, Prince’s Trust Scotland, National Lottery Community
Fund, Celebrating Renfrewshire Fund 
Pachedu’s
Men’s Group 
• Safe space for men from diverse minority communities to
discuss/share challenges and opportunities faced. 
• Point of contact/engagement with male asylum seekers currently
housed in hotel accommodation in Renfrewshire.
• Online and face-to-face support, information sharing and signposting
sessions tackling physical and mental health challenges
• Weekly drop-ins and social activities (e.g. football, bowling etc.) 
Strategic Partners / Stakeholders / Funders include: Scottish Refugee
Council, West of Scotland Regional Equality Council, Renfrewshire
Refugee Employment Support Coordination Group, Prostate Cancer UK
JEANS
Employment &
Employability
Project 
• Named in memory of a Pachedu member who passed away in 2022,
this initiative provides: 
• New Scots and others from diverse minority backgrounds in
Renfrewshire with employability advice, support and signposting.  
• Raises employer awareness of skills, knowledge and experience
available among diverse minority communities.

Page 63

31 | P a g e
• Offers support with writing CVs, cover letters and job applications, job
search, signposting to training/upskilling opportunities, 
• Hosts Business Development workshops to foster
entrepreneurship/self-employment opportunities. 
Strategic Partners / Stakeholders / Funders include: Business Gateway,
Princes Trust Scotland, CEMVO Scotland, The WiseGroup, NHS24, West of
Scotland Regional Equality Council, Scottish Refugee Council,
Renfrewshire Refugee Employment Support Coordination Group 
Advocacy &
Support Group 
• Engagement with local/national government to challenge the “deficit
model” narrative around diverse minority communities
• Support integration of New Scots, including refugees and asylum
seekers
• Advice on accessing benefits, housing, education, employment,
health services
• Reporting hate crimes 
• Signposting (immigration status, visas, etc.)
Strategic Partners / Stakeholders / Funders include: Scottish Refugee
Council,  West of Scotland Regional Equality Council, Renfrewshire
Citizen’s Advice Bureau, Renfrewshire Council. 
Connected &
Empowered
(One to one
support / 
Mental Health
Toolkit /
Community
Garden)
• Online and face-to-face information sharing and signposting sessions
addressing physical and mental health challenges, e.g. diabetes,
prostrate cancer, menopause, breast cancer.
• Pachedu Mental Health Toolkit - Resource for individuals and health
practitioners providing culturally appropriate and sensitive advice and
guidance on mental health.
• Pachedu Community Garden – located at Sherwood Greenlaw, the
garden provides opportunities for members to grow familiar non-
native plants and vegetables which can contribute to a healthier,
more traditional diet. Fosters community engagement through
sharing recipes and food related stories and traditions.
Strategic Partners / Stakeholders / Funders include - ENGAGE
Renfrewshire, Renfrewshire Health and Social Care Partnership,
Renfrewshire Anti-Stigma Alliance, West of Scotland Regional Equality
Council, Scottish Refugee Council, See-Me Scotland, RAMH (Recovery
Across Mental Health) 
Family Support • Neurodivergence support for families through provision of culturally
sensitive/linguistically appropriate services to diverse ethnic families
with children diagnosed with neurodiversity.

Page 64

32 | P a g e
• Empowering families through knowledge, skills, and resources to
improve the overall wellbeing 
• Foster community engagement and awareness about Neurodiversity
and related challenges within diverse ethnic communities 
Track Record - Pachedu is led by three volunteer Board members supported by eight staff and
40 volunteers.  During 2023-24 Pachedu recorded 587 engagements with individuals and
families.  Pachedu aims to develop a portfolio of services to attract people both within and
out with Renfrewshire.  Pachedu has successfully delivered advocacy initiatives, health and
wellbeing programmes, networking and employment support, and cultural activities.  Funders
include: National Lottery Community Fund,  Corra Foundation, OneRen and Renfrewshire
Council.  The table below summarises the outputs delivered between April 2023 and August
2024. 
Core Activity No. 
supported
Details 
Employability 17 Individuals supported to attend Business Gateway
Training 
Employability 15 Young persons supported in our mentorship
program 
Employability 9 People received support with job search, cv writing
and interview skills. 
Employability 2 Trained on Food hygiene with certificate as
community chefs 
Employability 5  Student offered placement, 4 finished June 23, 1 to
finish June 24. 
Employability 14  New volunteers were recruited within the year, while
13 volunteers and 6 staff have participated in various
trainings on capacity building, management, funding,
volunteering, mental health, employment,
education 
Employability 30  Young people (The visionaries) 
Health & Wellbeing 4 People attended in Trauma Informed Care and
Practice Training. 
Health and Wellbeing 116  Participated in3 health & wellbeing physical activity
(social football) 
Health & Wellbeing 173  Participated in 8 diverse topics on mental health
awareness sessions. 
Health & Wellbeing 12  Participated in our gardening training and therapy
activities. 
Health & Wellbeing 25  Attended the launch of Mental Health Toolkit for
ethnic minority toolkit- 
Health & Wellbeing 180  Culturally diverse Mental health awareness sessions

Page 65

33 | P a g e
Health & Wellbeing 50 Gardening activities 
Promoting Cultural
Diversity 
200  Attended Rediscover Africa event that offered a
varied programme of activities, such as African
drumming, the African Culture and History Quiz 
Promoting Cultural
Diversity
250  Africa day event 
Promoting Cultural
Diversity
305  Rediscover Africa event 
Reduce social
isolation
8 People supported during the stitches of unity project
(sewing) 
Reduce social
isolation
12  Participated in the Get Sense Media Literacy
workshop. 
Total  1,427 
Governance and Leadership – Pachedu is led by three volunteer Board members.  A profile
of their skills and experience is outlined in the table below.  Board meetings are held regularly
and discussion follows an agreed agenda.  Board minutes are available on request.  In
accordance with the organisation’s signed Constitution, an AGM is held in XX each year.
Board Member Skills, Knowledge and Expertise
Ghzala Khan
Chair 
Experienced Advocate for equalities and human rights for over 20 years
Currently Chief Executive of West of Scotland Regional Equality Council
(WSREC).  Instrumental in delivering activities around capacity building
of minority ethnic communities.  Experienced in building networks
involving private, public and voluntary organisations.
Nadeem Hanif 
Vice Chair
An experienced consultant with expertise in building capacity of
voluntary sector organisations led by people with lived experience of
belonging to an ethnic minority community.  Currently commissioned
by 
The Council of Ethnic Minority Voluntary Organisations (CEMVO) to
deliver capacity building 
support re: governance, funding, organisational policies and
procedures.  Previous roles include Knowledge and Learning Manager
(The National Lottery Community Fund) and Project Manager (West of
Scotland Regional Equality Council).
Dr. Mohammed
Ishaq 
Board Member 
Experienced researcher / consultant specialising in Equality, Diversity
and Inclusion.  Currently an Associate Professor in Human Resource
Management at the University of the West of Scotland (UWS).  A Fellow
of the Chartered Management Institute and an Academic Fellow of the
Chartered Institute of Personnel and Development (CIPD).   Has been a
board member with PACHEDU since 2017.

Page 66

34 | P a g e
Staffing and Volunteers – Day to day activities of the organisation are delivered by 8 staff
supported by a core team of 40 volunteers. The table below provides an outline of key
staff/volunteer roles and responsibilities:
Staff/Volunteer
Role
Remit and Responsibilities Reporting to
Johannes Gonani Operations Manager Board
Sandrine Manoka Office and Admin Manager Operations Manager
Ogechi Agboror Human Resources and
Training Support 
Office and Admin Manager / 
Programme Officer Youth Work
Kate Eboh IT and Marketing  Office and Admin Manager / 
Programme Officer Youth Work
Regine Bews Director, School of African
Studies
Operations Manager
Syvia Tambunan
(Volunteer)
Programme Officer, School
of African Studies
Director, School of African Studies
Bisola Adedeji
(Volunteer)
Programme Officer, School
of African Studies
Director, School of African Studies
Chinenye Anameje Health and Wellbeing
Officer and Volunteer
Coordinator
Operations Manager
Ramatu Umar Bako
(Volunteer)
WICE Programme Officer:
Engagement & Participation
Health and Wellbeing Officer and
Volunteer Coordinator
Charity Garba
(Volunteer)
WICE Programme Officer:
Women & Advocacy
Health and Wellbeing Officer and
Volunteer Coordinator
Japhet Chapo
(Volunteer)
Men’s Club Coordinator Health and Wellbeing Officer and
Volunteer Coordinator
Gregor D Smart Project Lead – Jean’s Job
Club
Operations Manager
Adefunke Bakare Programme Officer – Youth
Work
Operations Manager
Chinedu Achunine Opuruiche Karungi
Programme Officer,
Neurodiversity
Operations Manager

Page 67

35 | P a g e
Annex 2 – Evidence of Need
National Socio-Demographics - 2022 Census data indicates Renfrewshire is now the 9th
largest local authority area in Scotland.  A high-level population estimate released in
September 2023 indicated a 5.1% increase (183,874) based on 2011 Census data (174,908).
Scottish Government analysis of 2011 and 2022 Census data indicates broader demographic
changes likely to increase demand for activities delivered across the four themes identified
above.  
• Number of people living alone – Across Scotland, the number of people living alone
increased by over 100,000 compared to 2011 Census data.  With older people more likely
to live alone than young people.  
• Mental Health – Across Scotland, the number of people reporting a mental health
condition increased from 4.4% in 2011 to 11.3% in 2022.  Young people were more likely
to report a mental health condition than older people.  Of the 11.3% of people reporting
a mental health condition, 17.5% were aged 25-30 and 15.4% were aged 16-24. 
• Migration – Almost half of people born overseas had been living in the UK for more than
10 years.  Countries of birth of people born outside the UK were commonly Poland, India
and Pakistan.  ‘Countries in the top ten that saw the biggest increase in people since 2011
were Poland (up 20,100), India (up 14,200) and Nigeria (up 11,800)’. 
Figure 7 - Scotland's 2022 Census - The most common country of birth of people born outside the UK (Scottish Government -
Scotland’s Census 2022 - Demography and migration | Scotland's Census)

Page 68

36 | P a g e
Renfrewshire Socio-Demographics - For Renfrewshire, national socio-demographic trends
reported in the 2022 Census are reflected as follows:
• Households – The number of households in Renfrewshire increased by 7.2% compared
with 2011 Census data.  The total number of households recorded were 86,721 of which
33,851 were one person households.  The percentage of households in Renfrewshire with
dependent children was 23.6%.
• General Health – 40,028 people in Renfrewshire reported having a long-term health
condition.  The number of people reporting their general health as bad or very bad totalled
13,967.  
• Economic Activity – 2022 Census data showed 89,877 people in Renfrewshire were
economically active.  77,897 people were employed either full or part-time.  10% of those
identified as being economically active were self-employed. Employment by industry
sector indicated the top three sectors were Human Health and Social Work, Retail, and
Public Administration.  37% of people who reported being in employment the week
before the Census were employed in these three sectors.
• Ethnic Group Classifications – Totals per ethnic group classification were: 
o 173,839 - White
o 4,982 - Asian, Asian Scottish, Asian British
o 2,162 - African  
o 1,131 – Other Ethnic Groups 
Figure 8 - 2022 Census - Local Authority Area (Renfrewshire) Country of Birth.  Source Scottish Government,
SuperWEB2(tm) - Table View 
Renfrewshire Health and Wellbeing - The Diversity & Equality Alliance in Renfrewshire
(DEAR) group and Renfrewshire Council have undertaken more detailed analysis of 2022
Census data in relation to health and wellbeing trends in Renfrewshire.  
Nationally, 7.6% of the population report having bad or very bad health.  In Renfrewshire, 19
areas report rates above the national average.  Areas reporting the highest number of
44%
2%18%
27%
7%2%
2022 Census Country of Birth
(Renfrewshire)
EU Country
Non EU Country
Africa
Middle East and Asia
Americas and Carribean
Antartica and Oceania

Page 69

37 | P a g e
individuals with bad / very bad health were Johnstone North West (12.7%), Linwood South
(12.4%), Paisley Gallowhill and Hillington (11.4%), Paisley Ferguslie (11.0%).  
Across the Glasgow City Region (comprising eight local authority areas), Renfrewshire’s
neighbouring local authority areas, Inverclyde and Glasgow, rank highest for % of population
reporting long-term health conditions, physical disability and mental health.  The table below
provides a further detail.
Neighbouring Local
Authority Areas 
% Long-term
Illness, disease,
condition
% Mental
Health
condition
% Physical
Disability
% Blind or
partially vision
impaired
East Renfrewshire 19.7% 7.5% 7.8% 2.3%
Glasgow 20.1% 14.4% 10.6% 2.4%
Inverclyde 23.9% 13.1% 12.7% 3.1% 
Local Area Profile / – The Falcon Day Centre is in Electoral Ward 4, Paisley North West.   
2022 Census data for Paisley North West indicates the following socio-demographic
characteristics: 
• Total Population – The 2022 Census reported 19,944 individuals living in Paisley Northwest
• Households – A total of 10,231 households were recorded.  The total number of 
one-person households was 5,035.
• General Health – 14,964 individuals reported having very good or good general health. 
The number of individuals reporting their general health as bad or very bad was 1,868.  
• Health conditions - 4,084 individuals reported having a long-term health condition.  3,056
individuals reported having a mental health condition.  2,223 individuals reported having
a physical disability.
• Economic Activity – The number of people identified as economically active (excluding full
time students) was 9,585.  The number of people identified as economically inactive was
6,125 of which 44% were retired and 21% were long term sick or disabled.
• Country of birth – Census data shows the number of individuals reported their country of
birth as follows: EU Country (1,397) Non-EU Country (39), Africa (724), Middle East and
Asia (687), Americas and Caribbean (121), Antartica and Oceania (25)

Page 70

38 | P a g e
Impact on Pachedu Services – In summary national, regional and local socio-demographic
trends highlighted above are likely to generate increased demand for services and activities
which address social isolation, improve physical and mental health and wellbeing in ways
which reflect the needs of diverse communities.  The development of a Cultural Hub in
Renfrewshire will enable Pachedu to respond to this growing need.

Page 71

39 | P a g e
Annex 3 – Fit with National Strategies
National Strategy for Economic Transformation (NSET) - The diagram below sets the Vision,
Ambition and five Programmes for Action for Scotland's economic transformation by 2032. 13 
This proposal fits with a Fairer, Wealthier and Greener Scotland and will contribute towards
the achievement of all five Programmes for Action in the following ways:
• Entrepreneurial people and culture – The Multicultural Hub will provide a dedicated
space for sole traders to establish and develop their business.  The Hair Salon will provide
up to 40 chair rentals per month enabling freelance hair and beauty practitioners to
develop their customer base.  The Co-working space will provide desk hire to support
entrepreneurial growth and artisan markets will support those in the creative sector.  The
Hub will accommodate longer-term sublets to social enterprises which will promote the
culture and values of social entrepreneurship within the local community.
• New Market Opportunities – The Hub will provide a culturally sensitive space to develop
services which meet the need of emerging markets, for example health and wellbeing
initiatives which target older people.  
• Skilled Workforce – The Hub will support delivery of employability initiatives including
Pachedu’s Job Club, networking events and youth training activities.
• Fairer and More Equal Society – events hosted within the Multicultural Hub will raise
awareness of cultural diversity and promote equality of opportunity. 
Culture Strategy for Scotland (February 2020) – This Scottish Government strategy sets out
three main ambitions:
• Strengthening culture
• Transforming through culture
• Empowering through culture 
13 Source – Scotland’s National Strategy for Economic Transformation

Page 72

40 | P a g e
This project will contribute to these ambitions in the following way:
• Strengthening culture – Space to accommodate a diverse range of cultural activities,
including cuisine, music, arts, and mindfulness practices,.  The Hub will celebrate the rich
tapestry of cultural heritage present within the community. This will not only educate and
inspire residents about different cultures but also promote intercultural understanding
and appreciation.
• Transforming through culture – Provision of rental space for community events and
celebrations, the cultural hub empowers residents to organize and host their own
gatherings, strengthening community ties and promoting inclusivity. The Hub will be
accessible to all members of the community, regardless of background or socioeconomic
status, ensuring that everyone has the opportunity to participate and benefit from its
offerings.
• Empowering through culture - Through workshops, performances, and educational
programs, the Hub will provide valuable learning experiences for youth, empowering
them to explore their cultural identity, develop new skills, and pursue their passions.
Additionally, the Hub will create volunteer and leadership opportunities, promoting youth
engagement and civic participation. 
New Scots Refugee Integration Strategy 2024 – The New Scots Strategy reflects Scottish
Government’s ambition for a fair and equal Scotland, where people’s rights are respected and
protected, and everyone is empowered to reach their full potential’.14 The table below sets
out how the development of a Cultural Hub will contribute the achievement of the Scottish
Government’s six strategic outcomes: 
New Scots Integration Strategic
Outcomes 
How will Pachedu Cultural Hub contribute towards
these outcomes 
New Scots live in safe, welcoming
communities
Fostering Social Bonds - By providing a gathering
space for shared cultural experiences, the Hub will
strengthen social connections, creating a sense of
belonging and reducing feelings of isolation within
the community. 
New Scots access well co-ordinated
services
Coordinated Services - The Hub will provide a space
for coordinated service delivery to engage New Scots
living in Renfrewshire.
New Scots understand their rights
and responsibilities
Empowering Marginalized Groups - The Hub will
provide safe spaces for groups such as Pachedu’s
Men's Group, women’s empowerment
programmess, and youth development initiatives,
allowing them to engage meaningfully in the
community and boost their confidence. 
14 New Scots Refugee Integration Strategy

Page 73

41 | P a g e
Supporting Intercultural
Integration 
Celebrating Diversity - Cultural events, art
exhibitions, and shared projects will bring people
from diverse backgrounds together, fostering mutual
respect, understanding, and social harmony.
Promoting Cultural Inclusivity - The hub will provide
culturally sensitive programs tailored to the needs of
diverse ethnic communities, empowering
marginalized groups and fostering a more inclusive
society.

Page 74

42 | P a g e
Annex 4 – Value Per Square Meter 
The table below details the current cost per day of each room based on annual running costs
of £71k.  A full analysis is provided in Appendix 1. 
Space15  Usage Cost per day 
Central
circulation
space
(Room G02) 
A multiuse space suitable for events, conferences,
exhibitions and gatherings, offering half day and full
day hire to community groups and corporates 
£57
Kitchen /
Servery
For delivery of cooking classes and catering space for
events, workshops, conferences
£11
Workshop /
Class Room
(G19) 
A classroom with AV and WiFi suitable for use as a
workshop / training room available for hire by
community groups and corporates.  Can also provide
additional breakout space for large events /
conferences.
£18 
Co-working
space (Rooms
G34, G35) 
To be developed as co-working space providing
serviced office accommodation.  Half day and full
day desk hire 
£13-£18
In-house hair
salon space
(Rooms G03,
G05 and toilet
G04) 
Space to be retained to offer freelance
hairdressers/barbers half-day / full day chair rental 
£8-£11 
Space  Usage – Anchor Tenant #1 / Pachedu  Cost per day 
Anchor Tenant
#1 / Rooms
G15, G34, G20
with use of
toilet block and
storage (Rooms
G21, G22)
Rooms to be refurbished for use for use by Pachedu
for delivery of activities.   
£8-£18 
Space  Usage – Anchor Tenant #2 Cost per day 
Rooms G13,
G14
Rooms to be refurbished for use by an anchor
tenant.  This space would be suitable for sublet as a
creche. 
£15-£18 
15 Room numbers are detailed on the floorplan for the Falcon Day Centre – See Annex

Page 75

43 | P a g e
Toilet Block and
Storage Room
(Rooms G11,
G10, G12, G09,
G08)
Toilets to be refurbished to provide suitable space
for use by creche with baby changing facility.
Lockable storage space to be provided
£10
Outdoor Space  Outdoor space to rear of Hub to be developed as an
out-door play space in line with National Care
Standards for Early Learning & Childcare
Will reflect
grounds
maintenance
costs 
Space  Usage – Anchor Tenant #3 Cost per day 
Offices 
(Rooms G41,
G43, G37) 
Rooms (3no.) to be refurbished for use by anchor
tenant as offices and training/workshop space.  
£13-£18
Circulation
Space (G42)
To be retained to provide separate access to anchor
tenant space.  Will enable anchor tenant to operate
out with opening hours of the Hub.  Access point
leads to additional carparking area (Darkwood
Crescent).
£7
Storerooms
(incl. laundry
space) (G39,
G40, G42a,
G38) Toilet
(G37a) 
Storage rooms (4no.) to be retained for use by
anchor tenant.  Toilet facility to be retained for use
by anchor tenant with general access to main toilet
block adjacent to central area for training course
participants.
Cleaning to be undertaken by anchor tenant.
£3-£6

Page 76

44 | P a g e
Annex 5 - Current Provision / Displacement 
Current Provision - The table below sets out the current facilities located within / close by
the community of Ferguslie Park, Paisley.  This assessment of current provision identifies a
gap in provision for a dedicated multicultural hub delivering a varied programme of events,
conferences, training as well as targeted provision of support to individuals and families
from diverse minority communities. 
Facility Description Activities / Services
Delivered
Tannahill Centre    Address: 76 Blackstoun Road, Paisley PA3
1NT.  Operated by Ferguslie Park Housing
Association.  Opening Hours are 10:00 -
16:30 weekdays.  Facilities include: 
Community Kitchen available
Community Room hire
Large Hall hire
Ferguslie Library (see below)
Pricing structure 
Volunteering
opportunities, 
Community events
programme (seasonal) 
St Ninian’s Church
Hall
This asset is subject of a Community Asset
Transfer request submitted by Ferguslie
Community Development Trust (FCDT)
Pachedu understands FCDT propose to
develop the facility as a community centre
providing space for event hire / meeting
room hire.  Target market will be
community groups based in Ferguslie Park
and surrounding areas
Building is not currently
in use  
Ferguslie Library  Located within the Tannahill Centre and
operated by OneRen.  The facility is open 6
days a week from 09:15 to 17:00pm with
late night opening on Tuesday (20:00).
Internet access, Printing
and photocopying, 
Ferguslie Sports
Centre 
Address: 106 Blackstoun Road, Paisley PA3
1EX.  The Ferguslie Sports Centre is
operated by OneRen and is open weekday
evenings and weekend for bookings only. 
Fitness for Ferguslie
operate a volunteer-run
fitness gym within the
facility between 09:30-
11:30 and 18:30-20:30
Monday to Friday.
The Sculpture
House 
Address: 6 Blackstoun Road, Paisley PA3
1NB.  Building is owned by OneRen and
leased to The Sculpture House Artist
Collective.  5no. artists in residence.
Delivery includes evening classes and arts-
based events
1 no. meeting room
available for hire by
community groups /
Available on request.

Page 77

45 | P a g e
Ferguslie Dye Gardeners – meet
fortnightly (free drop-in session)
Glencoats
Primary School 
Address: Falcon Crescent, Paisley. PA3 1NS
Non-Denominational Primary School.
Families First operates from Glencoats
Primary School.  Service provides
information and support to parents with
children aged 0 to 8 years.  Areas include
employment, financial advice and energy
advice, cooking on a budget, baby
massage.  
Activities also delivered
in the Tannahill Centre. 
St Fergus’
Primary School 
Address: 1 Bankfoot Road, Paisley.  PA3 1LA
Denominational Primary school 
Open during term time
Glencoats Park
Glencoats Drive,
Paisley PA3 1
Green space managed by Renfrewshire
Council. 
Location of events
organised by Pals of the
Privies
Engage
Renfrewshire 
Address: 10 Falcon Crescent, Paisley PA3
1NS.  Engage Renfrewshire is the Third
Sector Interface organisation for
Renfrewshire (OSCR Registration
SC018453).
Meeting room is
available for hire 
RAMH (Recovery
Across Mental
Health) 
Address: 41 Blackstoun Road, Paisley PA3
1LU.  This is the registered office for
RAMH (SC010430).
Board Room available
on request 
Potential for Displacement – The organisation foresees limited impact on current provision
as the result of developing the Pachedu Multicultural Hub: 
• The Tannahill Centre – Whilst the Centre also provides short and long-term meeting-room
lets, the asset operates as a community centre hosting community-based recreational
activities.  In contrast, Pachedu Multicultural Hub will accommodate service-delivery
agencies. 
• St Ninian’s Church Hall – The organisation is supportive of Ferguslie Community
Development Trust’s proposal to develop St Ninian’s Church Hall as a community facility. 
The organisation will consult with the Trust to ensure plans for the Multicultural Hub are
complementary to the development of St Ninian’s as a community-managed asset.
• Support for minority communities in Renfrewshire – The impact of this project on current
support for minority communities in Renfrewshire has also been considered.  The
organisation and foresees the Multicultural Hub will complement the following activities:
o In-REN (Integration Network Renfrewshire) – In-REN is a forum ensuring that
ethnically diverse communities’ voices are being heard and involved in local
services and decisions. IN-Ren has also been informed by the Black Lives Matter
movement and health inequalities highlighted by the pandemic.  The forum is
hosted by Engage Renfrewshire.  As a member of In-REN, Pachedu is keen to

Page 78

46 | P a g e
ensure the Multicultural Hub supports the aim and objective of the forum and its
members.
o DEAR Group (Diversity, Equality Alliance in Renfrewshire) – Membership includes
22 public and voluntary sector organsations interested in all things Diversity and
Equality.  As a member of the DEAR Group, Pachedu contributes to the
development of the DEAR agenda within Renfrewshire. 
o REEM (Renfrewshire Effort to Empower Minorities) – A registered charity
(SC042438) operating in Paisley.  How are activities similar / different to Pachedu?
o Sewing2gether All Nations (SCIO) – Originally a project delivered by Mossvale
Church, Sewing2gether All Nations is now a registered SCIO offering creative
upcycling workshops, language cafe, life skill training and practical support to
refugees and asylum seekers who wish to practise English and build new
friendships.  Opportunities for collaboration will be explored.
o Association of African Communities in Renfrewshire / African Heritage Centre
Scotland - Desk research suggests these groups are no longer active in
Renfrewshire.

Page 79

47 | P a g e
Annex 6 – Financial Forecast 
See Excel Spreadsheet ‘Pachedu Financial Forecast’

Page 80

SUMMARY - PACHEDU MULTICULTURAL HUB
YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 YEAR6
INCOME £129,673 £75,583 £84,801 £88,703 £92,909 £102,200
EXPENDITURE £130,118 £70,505 £86,580 £89,177 £91,852 £94,608
BALANCE -£445 £5,078 -£1,779 -£474 £1,057 £7,592

Page 81

Financial Forecast PACHEDU MULTICULTURAL HUB MIDPOINT MIDPOINT
Notes YEAR 1 Annual Income (estimated) from full opening MONTH1 MONTH2 MONTH3 MONTH4 MONTH5 MONTH6 MONTH7 MONTH8 MONTH9 MONTH10 MONTH11 MONTH12 YR1 SUBTOTAL MONTH13 MONTH14 MONTH15 MONTH16 MONTH17 MONTH18 MONTH19 MONTH20 MONTH21 MONTH22 MONTH23 MONTH24 YR2 SUBTOTAL YEAR3 YEAR3 NOTES YEAR4 YEAR4 NOTES YEAR5 YEAR5 NOTES YEAR6 YEAR6 NOTES
Fundraising / Donations 84£                84£                      84£                   84£                          84£                   84£                      84£                   84£                        84£                        84£                        84£                        84£                         £                   1,008 84£                        84£                        84£                        84£                        84£                        84£                        84£                        84£                        84£                        84£                        84£                      84£                      1,008£                                      1,108.80£                1,219.68£                1,341.65£                1,475.81£               
Event Space - Community Hire @ £70 per half day / evening -£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            70£                        70£                        140£                      140£                       £                      420 210£                      210£                      210£                      210£                      210£                      210£                      210£                      210£                      280£                      280£                      280£                    280£                    2,800£                                      3,360.00£                 Growth at 20% 4,032.00£                 Growth at 20% 4,838.40£                 Growth at 20% 5,322.24£                 Growth at 10%
Kitchen (Café) - Community Group Hire @ £25 per half day / evening -£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            50£                        50£                        50£                        50£                         £                      200 75£                        75£                        75£                        75£                        100£                      100£                      100£                      100£                      100£                      100£                      100£                    100£                    1,100£                                      1,320.00£                 Growth at 20% 1,584.00£                 Growth at 20% 1,900.80£                 Growth at 20% 2,090.88£                 Growth at 10%
Event Space - Corporate Hire @ £100 per half day / evening -£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            100£                      -£                            -£                            100£                       £                      200 -£                            -£                            -£                            100£                      -£                            100£                      -£                            -£                            200£                      -£                            200£                    -£                         600£                                         720.00£                    Growth at 20% 864.00£                    Growth at 20% 1,036.80£                 Growth at 20% 1,140.48£               
Event Space with Kitchen (Café) - Corporate Hire @ £50 per half day /
evening
-£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            50£                        -£                            -£                            50£                         £                      100 -£                            -£                            -£                            50£                        -£                            50£                        -£                            -£                            100£                      -£                            100£                    -£                         300£                                         360.00£                    Growth at 20% 432.00£                    Growth at 20% 518.40£                    Growth at 20% 570.24£                  
Artisan Markets @ £10.00 per stall / Minimum 10 stalls (Circulation
space plus kitchen/café half-day rate @ £95)
-£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            -£                            -£                            -£                            100£                       £                      100 100£                      100£                      100£                      100£                      100£                      100£                      200£                      200£                      200£                      300£                      300£                    300£                    2,100£                                      2,520.00£                 Growth at 20% 2,898.00£                 Growth at 15% 3,332.70£                 Growth at 20% 3,665.97£               
Ticketed Events - Cultural Events, Displays, Exhibitions @ £5.00 per
ticket
-£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            -£                            250£                      -£                            -£                             £                      250 -£                            250£                      -£                            250£                      -£                            -£                            -£                            250£                      -£                            250£                      -£                         -£                         1,000£                                      1,200.00£                 Growth at 20% 1,380.00£                1,518.00£                1,669.80£               
Ticketed Event - Café Income (average £5 sale) -£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            -£                            250£                      -£                            -£                             £                      250 -£                            250£                      -£                            250£                      -£                            -£                            -£                            250£                      -£                            250£                      -£                         -£                         1,000£                                      1,200.00£                 Growth at 20% 1,380.00£                 Growth at 15% 1,518.00£                 Growth at 10% 1,669.80£                 Growth at 10%
Classroom / Workshop - Community Group Hire @£40 per half day -£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            320£                      320£                      320£                      320£                       £                   1,280 320£                      320£                      320£                      320£                      320£                      480£                      480£                      480£                      480£                      480£                      480£                    480£                    4,960£                                      5,952.00£                 Growth at 20% 6,547.20£                 Growth at20% 7,201.92£                 Growth at 10% 7,922.11£                 Growth at 10%
Classroom / Workshop - Corporate Hire @£50 per half day -£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            50£                        -£                            50£                        50£                         £                      150 -£                            50£                        50£                        -£                            -£                            50£                        50£                        50£                        100£                      100£                      100£                    100£                    650£                                         780.00£                    Growth at 20% 858.00£                    Growth at 10% 943.80£                    Growth at 10% 1,038.18£                 Growth at 10%
Classroom / Workshop with Kitchen/Catering - Corporate Hire @
£2.50 per delegate minimum 10 delegates = £25.00
-£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            25£                        -£                            -£                            25£                         £                         50 -£                            25£                        25£                        -£                            -£                            25£                        25£                        25£                        50£                        50£                        50£                      50£                      325£                                         390.00£                    Growth at 20% 429.00£                   471.90£                   519.09£                  
Co-working Space - Community Hire @ £20 per half day desk x 4
desks (10 half days x 4 desks = 40 bookable slots per week)
-£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            160£                      160£                      160£                      160£                       £                      640 320£                      320£                      320£                      320£                      320£                      320£                      480£                      480£                      480£                      480£                      480£                    480£                    4,800£                                      5,760.00£                 Growth at 20% 6,912.00£                7,603.20£                 Growth at 10% 8,363.52£                 Growth at 10%
Co-working Space - Provision of Admin Services @ £5 per month. 
Services include photocopying, printing, access to desk and IT,
support with social media word processing etc
-£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            10£                        10£                        10£                        10£                         £                         40 10£                        10£                        15£                        15£                        15£                        15£                        20£                        20£                        20£                        20£                        20£                      20£                      200£                                         240.00£                    Growth at 20% 288.00£                    Growth at 20% 316.80£                    Growth at 10% 348.48£                    Growth at 10%
Tenant#1 Pachedu Monthly Rental @ £1,065 per month -£                   -£                         -£                      -£                             -£                      1,065£                1,065£             1,065£                   1,065£                   1,065£                   1,065£                   1,065£                    £                   7,455 1,065£                   1,065£                   1,065£                   1,065£                   1,065£                   1,065£                   1,065£                   1,065£                   1,065£                   1,065£                   1,065£                1,065£                12,780£                                    14,058.00£             15,463.80£             17,010.18£             18,711.20£            
Tenant#2 - Monthly Rental @ £1,000 per month -£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            -£                            -£                            1,000£                   1,000£                    £                   2,000 1,000£                   1,000£                   1,000£                   1,000£                   1,000£                   1,000£                   1,000£                   1,000£                   1,000£                   1,000£                   1,000£                1,000£                12,000£                                    13,200.00£              Growth at 10% 14,520.00£              Growth at 10% 15,972.00£              Growth at 10% 17,569.20£              Growth at 10%
Tenant#3 - Monthly Rental @ £1,100 per month -£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            -£                            -£                            1,100£                   1,100£                    £                   2,200 1,100£                   1,100£                   1,100£                   1,100£                   1,100£                   1,100£                   1,100£                   1,100£                   1,100£                   1,100£                   1,100£                1,100£                13,200£                                    14,520.00£              Growth at 10% 15,972.00£              Growth at 10% 17,569.20£              Growth at 10% 19,326.12£              Growth at 10%
Hairdressing Salon / 2no. Chair Rentals @ £20 per day (maximum 40
days per month)
-£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            -£                            240£                      240£                      240£                       £                      720 320£                      320£                      320£                      320£                      320£                      320£                      360£                      360£                      360£                      360£                      360£                    360£                    4,080£                                      4,896.00£                 Growth at 10% 5,385.60£                 Growth at 10% 5,924.16£                 Growth at 10% 6,516.58£                 Growth at 10%
Hairdressing Salon / 2no. Chairs Rental @ £10 per half-day (maximum
80 half days per month)
-£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            -£                            120£                      120£                      120£                       £                      360 160£                      160£                      160£                      200£                      200£                      200£                      200£                      200£                      300£                      300£                      300£                    300£                    2,680£                                      3,216.00£                 Growth at 10% 3,537.60£                 Growth at 10% 3,891.36£                 Growth at 10% 4,280.50£                 Growth at 10%
GRANTS / SCOTTISH LAND FUND TECHNICAL GRANT (Phase 1) -£                   -£                         19,000£           -£                             -£                      -£                         -£                      -£                            -£                            -£                            -£                            -£                             £                 19,000 -£                            -£                            -£                            -£                            -£                            -£                            -£                            -£                            -£                            -£                            -£                         -£                         -£                                               -£                          -£                          -£                          -£                         
GRANTS / SUSTAINABLE COMMUNITIES FUND (Phase 2) -£                   -£                         -£                      93,250£                 -£                      -£                         -£                      -£                            -£                            -£                            -£                            -£                             £                 93,250 -£                            -£                            -£                            -£                            -£                            -£                            -£                            -£                            -£                            -£                            -£                         -£                         -£                                               -£                          -£                          -£                          -£                         
GRANTS / NATIONAL LOTTERY COMMUNITY FUND (Phase 3) -£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            -£                            -£                            -£                            -£                             £                            - -£                            -£                            10,000£                -£                            -£                            -£                            -£                            -£                            -£                            -£                            -£                         -£                         10,000£                                    10,000.00£             5,000.00£                -£                          -£                         
GRANTS / OTHER -£                   -£                         -£                      -£                             -£                      -£                         -£                      -£                            -£                            -£                            -£                            -£                             £                            - -£                            -£                            -£                            -£                            -£                            -£                            -£                            -£                            -£                            -£                            -£                         -£                         -£                                               -£                          -£                          -£                          -£                         
TOTAL INCOME -£                -£                     19,084£        93,334£              84£                1,149£             1,149£          1,149£               1,984£               2,619£               4,339£               4,614£               129,673£           4,764£               5,339£               14,844£             5,459£               4,834£               5,219£               5,374£               5,874£               5,919£               6,219£               6,019£             5,719£             75,583£                             84,800.80£          88,702.88£          92,909.27£          102,200.19£

Page 82

GENERAL RUNNING COSTS PACHEDU MULTICULTURAL HUB MIDPOINT
YEAR 1 Expenditure
Pachedu Multicultural Hub Phase 1 (Jan-Jun 2025) MONTH1 MONTH2 MONTH3 MONTH4 MONTH5 MONTH6 MONTH7 MONTH8 MONTH9 MONTH10 MONTH11 MONTH12 YR1TOTAL MONTH13 MONTH14 MONTH15 MONTH16 MONTH17 MONTH18 MONTH19 MONTH20 MONTH21 MONTH22 MONTH23 MONTH24 YR2 SUBTOTAL YEAR3 YEAR3 NOTES YEAR4 YEAR4 NOTES YEAR5 YEAR5 NOTES YEAR6 YEAR6 NOTES
Governance -£                 -£                      -£                    500£                    -£                 -£                   -£                 -£                     -£                     -£                     -£                     -£                      £                   500 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Architectural Feasibility Study -£                 -£                      -£                    5,000£                 -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                5,000 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Community Engagement Events -£                 -£                      -£                    500£                    -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                   500 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Building Condition Report -£                 -£                      -£                    2,500£                 -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                2,500 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Energy Audit -£                 -£                      -£                    2,500£                 -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                2,500 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Mechanical & Electrical -£                 -£                      -£                    2,500£                 -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                2,500 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Asbestos Report -£                 -£                      -£                    3,000£                 -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                3,000 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Conveyancing -£                 -£                      -£                    3,000£                 -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                3,000 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
SUBTOTAL - PHASE1 -£              -£                   -£                 19,500£            -£                 -£                   -£                 -£                     -£                     -£                     -£                     -£                      £           19,500 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                       -£                       -£                       -£                      
Pachedu Multicultural Hub Phase 2 (Jul-Dec 2025) MONTH1 MONTH2 MONTH3 MONTH4 MONTH5 MONTH6 MONTH7 MONTH8 MONTH9 MONTH10 MONTH11 MONTH12 YR1TOTAL MONTH13 MONTH14 MONTH15 MONTH16 MONTH17 MONTH18 MONTH19 MONTH20 MONTH21 MONTH22 MONTH23 MONTH24 YR2TOTAL YEAR3 YEAR4 YEAR5 YEAR6
Permissions / Licences / Consents -£                 -£                      -£                    -£                         -£                    1,000£              -£                    -£                        -£                        -£                        -£                        -£                         £                1,000 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Building Health and Safety Measures -£                 -£                      -£                    -£                         -£                    -£                      -£                    1,000£                -£                        -£                        -£                        -£                         £                1,000 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Building Condition / Roof Repair and Window Replacement -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        60,000£              -£                        -£                        -£                         £              60,000 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Mechanical & Electrical / Plant Upgrade -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        5,000£                -£                        -£                        -£                         £                5,000 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Mechanical & Electrical / Fire and Security System Upgrade -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        3,500£                -£                        -£                        -£                         £                3,500 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Architectural Feasibility / Adaptations & Modifications -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        2,500£                -£                        -£                        -£                         £                2,500 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Telecom Installation Fee -£                 -£                      -£                    -£                         -£                    -£                      -£                    250£                   -£                    -£                        -£                        -£                         £                   250 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Fixtures and Fittings - Sensory Room -£                 -£                      -£                    -£                         -£                    -£                      -£               -£                        1,000£                -£                        -£                        -£                         £                1,000 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Fixtures and Fittings - Creche -£                 -£                      -£                    -£                         -£                    -£                      -£               -£                        1,000£                -£                        -£                        -£                         £                1,000 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Fixtures and Fittings - Coworking Space & Classroom -£                 -£                      -£                    -£                         -£                    -£                      -£               -£                        1,000£                -£                        -£                        -£                         £                1,000 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Fixtures and Fittings - Anchor Tenant Space -£                 -£                      -£                    -£                         -£                    -£                      -£               -£                        1,000£                -£                        -£                        -£                         £                1,000 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Internal decoration -£                 -£                      -£                    -£                         -£                    -£                      -£               -£                        1,000£                -£                        -£                        -£                         £                1,000 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Fixtures and Fittings - Hair Salon -£                 -£                      -£                    -£                         -£                    -£                      -£               -£                        1,000£                -£                        -£                        -£                         £                1,000 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Kitchen Equipment / Café Space -£                 -£                      -£                    -£                         -£                    -£                      -£               -£                        1,000£                -£                        -£                        -£                         £                1,000 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Internal decoration -£                 -£                      -£                    -£                         -£                    -£                      -£               -£                        1,000£                -£                        -£                        -£                         £                1,000 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
Business Development Consultant -£                 -£                      -£                    -£                         12,000£         -£                      -£                    -£                        -£                        -£                        -£                        -£                         £              12,000 -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                           -£                           -£                           -£                          
SUBTOTAL - PHASE2 -£              -£                   -£                 -£                      12,000£       1,000£           -£                 1,250£             79,000£           -£                     -£                     -£                     93,250£            -£                     -£                     -£                     -£                     -£                     -£                     -£                     -£                     -£                     -£                     -£                   -£                   -£                            -£                       -£                       -£                       -£                      
Pachedu Multicultural Hub Phase 3 (Jan-Jun 2026) MONTH1 MONTH2 MONTH3 MONTH4 MONTH5 MONTH6 MONTH7 MONTH8 MONTH9 MONTH10 MONTH11 MONTH12 YR1TOTAL MONTH13 MONTH14 MONTH15 MONTH16 MONTH17 MONTH18 MONTH19 MONTH20 MONTH21 MONTH22 MONTH23 MONTH24 TOTAL YEAR3 YEAR4 YEAR5 YEAR6
Admin Costs - HR / Recruitment for Hub staff -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - -£                        -£                        250£                   -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      250£                       -£                           -£                           -£                           -£                      
Hub Staff - Facilities Officer / Salary (full-time) -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - -£                        -£                        -£                        -£                        -£                        1,667£                1,667£                1,667£                1,667£                1,667£                1,667£              1,667£              11,669£                   20,000.00£           20,600.00£            increase of 3% 21,218.00£            Increase of 3% 21,854.54£          
Hub Staff - Facilities Operative / Employer costs -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - -£                        -£                        -£                        -£                        -£                        333£                   333£                   333£                   333£                   333£                   333£                 333£                 2,331£                     3,996.00£              4,115.88£               increase of 3% 4,239.36£               Increase of 3% 4,366.54£             
Hub Staff - Business Development Officer / Salary (Part-time) -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - -£                        -£                        -£                        -£                        1,250£                1,250£                1,250£                1,250£                1,250£                1,250£                1,250£              1,250£              10,000£                  15,000.00£           15,450.00£           15,913.50£           16,390.91£          
Hub Staff - Business Development Officer / Employer costs -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - -£                        -£                        -£                        -£                        313£                   313£                   313£                   313£                   313£                   313£                   313£                 313£                 2,504£                    4,992.00£              5,141.76£              5,296.01£              5,454.89£             
Secure Outdoor Play Area - Installation -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - -£                        -£                        -£                        -£                        5,000£                -£                        -£                        -£                        -£                        -£                        -£                      -£                      5,000£                    -£                       -£                       -£                       -£                      
SUBTOTAL - PHASE 3 -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                        -£                         -£                        -£                        250£                   -£                        6,563£                3,563£                3,563£                3,563£                3,563£                3,563£                3,563£              3,563£              31,754£               43,988.00£         45,307.64£         46,666.87£         48,066.88£        
EXPENDITURE - PHASE 4 (FULL OPERATION) YR1TOTAL YEAR3 YEAR4 YEAR5 YEAR6
Premises Office Rental (Tannahill Centre @ £500 per month) 500£            500£                 500£               500£                    500£               500£                 500£               -£                        -£                        -£                        -£                         £                3,500
Admin Costs - HR / Recruitment (Chief Executive / Facilities
Operative#2)
-£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - -£                        150£                   -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        150£                 -£                      300£                       309.00£                  Increase of 3% 318.27£                  Increase of 3% 327.82£                  Increase of 3% 337.65£                
Admin Costs - Indemnities & Insurance -£                 -£                      -£                    -£                         -£                    -£                      100£               100£                   100£                   100£                   100£                   100£                    £                   600 100£                   100£                   100£                   100£                   100£                   100£                   100£                   100£                   100£                   100£                   100£                 100£                 1,200£                    1,236.00£               Increase of 3% 1,273.08£               Increase of 3% 1,311.27£               Increase of 3% 1,350.61£             
Volunteer Costs -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                        Increase of 3% -£                        Increase of 3% -£                        Increase of 3% -£                      
Admin Costs - Printing, post and stationery @ £50 per quarter 50£              -£                      -£                    50£                      -£                    -£                      50£                 -£                        -£                        50£                     -£                        -£                         £                   200 50£                     -£                        -£                        50£                     -£                        -£                        50£                     -£                        -£                        50£                     -£                      -£                      200£                       206.00£                  Increase of 3% 212.18£                  Increase of 3% 218.55£                  Increase of 3% 225.10£                
Admin Costs - Membership of Associations / Affiliations (Detail here) -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                        Increase of 3% -£                        Increase of 3% -£                        Increase of 3% -£                      
Admin Costs - Telephone and Broadband  (Monthly) -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        194£                   194£                   194£                   194£                    £                   776 194£                   194£                   194£                   194£                   194£                   194£                   194£                   194£                   194£                   194£                   194£                 194£                 2,328£                    2,397.84£               Increase of 3% 2,469.78£               Increase of 3% 2,543.87£               Increase of 3% 2,620.18£             
Admin Costs - Website -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                        Increase of 3% -£                        Increase of 3% -£                        Increase of 3% -£                      
Admin Costs - Card Machine (Café) (Worldpay) -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - 20£                     20£                     20£                     20£                     20£                     20£                     20£                     20£                     20£                     20£                     20£                   20£                   240£                       247.20£                  Increase of 3% 254.62£                  Increase of 3% 262.25£                  Increase of 3% 270.12£                
Pachedu Kitchen Supplies 10£              10£                   10£                 10£                      10£                 10£                   25£                 25£                     25£                     25£                     25£                     25£                      £                   210 25£                     25£                     25£                     10£                     10£                     10£                     25£                     25£                     25£                     25£                     25£                   25£                   255£                       262.65£                  Increase of 3% 270.53£                  Increase of 3% 278.65£                  Increase of 3% 287.00£                
Utilities (£21K / 12 = £1,750pm) -£                 -£                      -£                    -£                         -£                    -£                      -£                    1,750£                1,750£                1,750£                1,750£                1,750£                 £                8,750 1,750£                1,750£                1,750£                1,750£                1,750£                1,750£                1,750£                1,750£                1,750£                1,750£                1,750£              1,750£              21,000£                  21,630.00£            Increase of 3% 22,278.90£            Increase of 3% 22,947.27£            Increase of 3% 23,635.69£          
Water -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                        Increase of 3% -£                        Increase of 3% -£                        Increase of 3% -£                      
Vehicle - Running Costs -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                        Increase of 3% -£                        Increase of 3% -£                        Increase of 3% -£                      
Professional Fees / Services - Accountancy / Legal (based on monthly
invoice amount)
261£            261£                 261£               261£                    261£               261£                 261£               261£                   261£                   261£                   261£                   261£                    £                3,132 261£                   261£                   261£                   261£                   261£                   261£                   261£                   261£                   261£                   261£                   261£                 261£                 3,132£                    3,225.96£               Increase of 3% 3,322.74£               Increase of 3% 3,422.42£               Increase of 3% 3,525.09£             
Professional Services - Building Maintenance -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                        -£                         -£                        -£                        100£                   100£                   100£                   100£                   100£                   100£                   100£                   100£                   100£                 100£                 1,000£                    1,236.00£               Increase of 3% 1,273.08£               Increase of 3% 1,311.27£               Increase of 3% 1,350.61£             
Professional Services - Grounds Maintenance -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        100£                   -£                        100£                   -£                        200£                    100£                   100£                   100£                   100£                   100£                   100£                   100£                   100£                   100£                   100£                   100£                 100£                 1,200£                    1,236.00£               Increase of 3% 1,273.08£               Increase of 3% 1,311.27£               Increase of 3% 1,350.61£             
Professional Services - Cleaning -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - -£                        -£                        -£                        -£                        -£                        -£                        400£                   400£                   400£                   400£                   400£                 400£                 2,400£                    4,944.00£               Increase of 3% 5,092.32£               Increase of 3% 5,245.09£               Increase of 3% 5,402.44£             
Compliance Testing (£5500 / 12 = £458pm) Year 1 costs covered by
works/upgrades detailed in Phase 2 (see above)
-£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - 458£                   458£                   458£                   458£                   458£                   458£                   458£                   458£                   458£                   458£                   458£                 458£                 5,496£                    5,660.88£               Increase of 3% 5,830.71£               Increase of 3% 6,005.63£               Increase of 3% 6,185.80£             
Banking Charges -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                        Increase of 3% -£                        Increase of 3% -£                        Increase of 3% -£                      
Social Investment Loan Repayments -£                 -£                      -£                    -£                         -£                    -£                      -£                    -£                        -£                        -£                        -£                        -£                         £                        - -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                        -£                      -£                      -£                            -£                        Increase of 3% -£                        Increase of 3% -£                        Increase of 3% -£                      
SUBTOTAL - PHASE4 821£         771£              771£            821£                 771£            771£              936£            2,136£             2,430£             2,380£             2,430£             2,330£             17,368£            2,958£             3,058£             3,008£             3,043£             2,993£             2,993£             3,458£             3,408£             3,408£             3,458£             3,558£           3,408£           38,751£               42,592£              43,869£              45,185£              46,541£             
TOTAL EXPENDITURE 821£         771£              771£            20,321£            12,771£       1,771£           936£            3,386£             81,430£           2,380£             2,430£             2,330£             130,118£          2,958£             3,058£             3,258£             3,043£             9,556£             6,556£             7,021£             6,971£             6,971£             7,021£             7,121£           6,971£           70,505£               86,580£              89,177£              91,852£              94,608£

Page 83

Pachedu Multicultural Hub
Worked example of pricing space
Centre opening (weeks per annum) 50
Centre opening (days per annum) 5
Centre opening Total number of days 250
Building - Total Space SQM 602
Unlettable - G07 Toilet Block 10
Unlettable - G16 Plant Room 10
Unlettable - G17 Plant Room 10
Unlettabe - G25, G26, G24, G27, G28, G29,
G30 - Kitchen Auxiliary Rooms
20
Total Unlettable Space 50
Building - Total Lettable Space SQM 552
Running Costs - Total Per Annum 70,505£   
Total Costs divided by Total Lettable Space 127.73£    Each sqm meter of lettable
space costs Pachedu this
amount per year
USAGE Lettable Space / Rooms SQM Total Cost Per Annum Cost Per Day (Total Cost / Total
No. of Days)
General Notes
PACHEDU G15 Lounge (Sensory Room) 35 4,470.43£                              17.88£                                           
PACHEDU G20 Staff Room 15 1,915.90£                              7.66£                                             
PACHEDU G21 Toilet 5 638.63£                                  2.55£                                             
PACHEDU G22 Toilet 5 638.63£                                  2.55£                                             
PACHEDU G20 Store 5 638.63£                                  2.55£                                              YR2 SUBLETS
PACHEDU G34 Lounge 35 4,470.43£                              17.88£                                            PACHEDUTOTAL 12,772.64£    £12,780.00
ANCHOR#1CRECHE G14 Lounge (Creche) 35 4,470.43£                              17.88£                                           
ANCHOR#1CRECHE G13 Lounge (Creche) 30 3,831.79£                              15.33£                                           
ANCHOR#1CRECHE G12, G11, 10, G09 Toilet Block (Creche) 20 2,554.53£                              10.22£                                            ANCHOR#1TOTAL 10,856.75£    £12,000.00
HIRE G02 Circulation Space 110 14,049.91£                            56.20£                                           
HIRE G19 Classroom / Workshop 35 4,470.43£                              17.88£                                           
HIRE G33 Kitchen and G31, G32 Servery 20 2,554.53£                              10.22£                                            HIRETOTAL 21,074.86£   
HAIRSALON G03 Hair Salon 20 2,554.53£                              10.22£                                           
HAIRSALON G05 Store (Salon Waiting Room) 15 1,915.90£                              7.66£                                             
HAIRSALON G04 Toilet adjacent to Hair Salon 5 638.63£                                  2.55£                                              HAIRSALONTOTAL 5,109.06£      £6,760.00
COWORKING G35 Lounge 35 4,470.43£                              17.88£                                           
COWORKING G36 Office 25 3,193.16£                              12.77£                                            COWORKINGTOTAL 7,663.59£      £5,000.00
ANCHOR#2TRAINING G37 Visiting Services / Office 10 1,277.26£                              5.11£                                             
ANCHOR#2TRAINING G43 Office 35 4,470.43£                              17.88£                                           
ANCHOR#2TRAINING G41 Bedroom 25 3,193.16£                              12.77£                                           
ANCHOR#2TRAINING G39 Storage Room 5 638.63£                                  2.55£                                             
ANCHOR#2TRAINING G40 Storage Room 5 638.63£                                  2.55£                                             
ANCHOR#2TRAINING G38 Laundry Room 10 1,277.26£                              5.11£                                             
ANCHOR#2TRAINING G42 Circulation Space 12 1,532.72£                              6.13£                                              ANCHOR#2TOTAL 13,028.10£    £13,200.00
TOTAL LETTABLE SPACE (SQM) 552 70,505.00£                           
HAIRSALON Workings Out
Annual Cost Per SQM £                                                            5,109.06
Monthly Cost  £                                                               425.75
Weekly Cost £                                                               106.44
No. of Chairs 4
Cost per Chair per week £                                                                 26.61
Cost per Chair per day £                                                                    5.32
No. of full days per week 20 2 10
No. of full days per mont 80 2 40
No. of half days per week 40 2 20
No. of half days per mont 160 2 80

Page 84

WHO WHAT DESCRIPTION EQUIPMENT AVAILABLE PRICE per hour
Station Seven, Johnstone Main Hall Ground floor / Seats up
to 80 delegates / 90m2
multi-purpose space
Cinema screen / sound
system / various table
layout options and chairs
Standard £40
Partner £30
Community £20
Muster Room Ground floor / Board
room style meeting room
seats up to 10 people.
Flat screen TV monitor /
AV setup / large windows
Standard £30
Partner £25
Community £15
Old Cell Room Ground floor / Meeting
space for two people
suitable for one to one
interviews / counselling
sessions etc.
No AV equipment Standard £25
Partner £20
Community £10
The Wing First floor / seats 20
people.  Suitable as a
training space
TV and AV set up Standard £40
Partner £30
Community £20
The Nurture Room First floor.  Private office
space.  Seats 2-3 people.
Suitable for interviews,
counselling sessions, one
to one meetings, office
space
No AV equipment Standard £25
Partner £20
Community £10
The Shed External space in
outbuilding.  Seats
groups up to 20 people
Has its own facilities re:
toilets / kitchen
Standard £40
Partner £30
Community £20
Thornhill Athletic
Academ, Johnstone
Adult Hall Hire Rate £32
Youth Hall Hire Rate £27
Indoor Fusbal Rate £27-£32
Badminton Rate £15
Birthday Party Package
(Children / Basic)
Rate £150
Birthday Party Main Hall
Hire (Children)
Rate £30 per hour
(minimum 3 hours)
Youth party Main Hall
Hire
Rate £30 per hour
(minimum 3 hours)
Tannahill Centre Glass Room Commercial £30
Social Enterprise £10
Community £5
Hall / + 1no. Glass Room Commercial £45
Social Enterprise £15
Community £8
Hall / + 1no. Glass Room Weekend Commercial £200
Weekend Community £100
Hall / + 2no. Glass Rooms Commercial £70
Social Enterprise £20
Community £12
Hall / + 2no. Glass Rooms Weekend Commercial £250
Weekend Community £150
Board Room /
Community Room
Commercial £30
Social Enterprise £20
Community £15

Page 85

Without
Anchor
Tenants
WEEKDAYS / DAYTIME
(10:00 - 17:00)
WEEKDAYS / EVENING (17:00-
21:00)
WEEKEND (By appointment /
10:00-21:00)
Room Hours available per Week
(7 hours x 5 days)
Bookings @
60%
Hourly Rate
Community
Group Price
Total per
week
Total per
month
Subtotal per
annum
Max availability per Week (4
hours x 5 days)
Bookings @
60%
Community
Group Price
Total per
week
Total per
month
Subtotal per
annum
Max availability per Weekend (11
hours x 2 days)
Bookings @
60%
Community
Group Price
Total per
week
Total per
month
Subtotal 
per annum
Total per annum
Room G37 35 21 £10 £210 £840 £10,080 20 12 £10 £120 £480 £5,760 22 13.2 £10 £132 £528 £6,336 £22,176
Room G41 35 21 £10 £210 £840 £10,080 20 12 £10 £120 £480 £5,760 22 13.2 £10 £132 £528 £6,336 £22,176
Room G43 35 21 £10 £210 £840 £10,080 20 12 £10 £120 £480 £5,760 22 13.2 £10 £132 £528 £6,336 £22,176
Store G39 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 £0
Store G40 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 £0
Laundry / Sto 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 £0
£630 £2,520 £30,240 £360 £1,440 £17,280 £396 £1,584 £19,008 £66,528
Without
Anchor
Tenants
WEEKDAYS / DAYTIME
(10:00 - 17:00)
WEEKDAYS / EVENING
(17:00-21:00)
WEEKEND (By appointment /
10:00-21:00)
Room Hours available per Week
(7 hours x 5 days)
Bookings @
50%
Hourly Rate
Community
Group Price
Total per
week
Total per
month
Subtotal per
annum
Max availability per Week (4
hours x 5 days)
Bookings @
50%
Community
Group Price
Total per
week
Total per
month
Subtotal per
annum
Max availability per Weekend (11
hours x 2 days)
Bookings @
50%
Community
Group Price
Total per
week
Total per
month
Subtotal 
per annum
Total per annum
Room G37 35 17.5 £10 £175 £700 £8,400 20 10 £10 £100 £400 £4,800 22 11 £10 £110 £440 £5,280 £18,480
Room G41 35 17.5 £10 £175 £700 £8,400 20 10 £10 £100 £400 £4,800 22 11 £10 £110 £440 £5,280 £18,480
Room G43 35 17.5 £10 £175 £700 £8,400 20 10 £10 £100 £400 £4,800 22 11 £10 £110 £440 £5,280 £18,480
Store G39 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 £0
Store G40 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 £0
Laundry / Sto 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 £0
£525 £2,100 £25,200 £300 £1,200 £14,400 £330 £1,320 £15,840 £55,440
Without
Anchor
Tenants
WEEKDAYS / DAYTIME
(10:00 - 17:00)
WEEKDAYS / EVENING (17:00-
21:00)
WEEKEND (By appointment /
10:00-21:00)
Room Hours available per Week
(7 hours x 5 days)
Bookings @
40%
Hourly Rate
Community
Group Price
Total per
week
Total per
month
Subtotal per
annum
Max availability per Week (4
hours x 5 days)
Bookings @
40%
Community
Group Price
Total per
week
Total per
month
Subtotal per
annum
Max availability per Weekend (11
hours x 2 days)
Bookings @
40%
Community
Group Price
Total per
week
Total per
month
Subtotal 
per annum
Total per annum
Room G37 35 14 £10 £140 £560 £6,720 20 8 £10 £80 £320 £3,840 22 8.8 £10 £88 £352 £4,224 £14,784
Room G41 35 14 £10 £140 £560 £6,720 20 8 £10 £80 £320 £3,840 22 8.8 £10 £88 £352 £4,224 £14,784
Room G43 35 14 £10 £140 £560 £6,720 20 8 £10 £80 £320 £3,840 22 8.8 £10 £88 £352 £4,224 £14,784
Store G39 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 0 0 £10 £0 £0 £0 £0
Store G40 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 0 0 £10 £0 £0 £0 £0
Laundry / Sto 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 £0
£420 £1,680 £20,160 £240 £960 £11,520 £264 £1,056 £12,672 £44,352
Without
Anchor
Tenants
WEEKDAYS / DAYTIME
(10:00 - 17:00)
WEEKDAYS / EVENING (17:00-
21:00)
WEEKEND (By appointment /
10:00-21:00)
Room Hours available per Week
(7 hours x 5 days)
Bookings @
30%
Hourly Rate
Community
Group Price
Total per
week
Total per
month
Subtotal per
annum
Max availability per Week (4
hours x 5 days)
Bookings @
30%
Community
Group Price
Total per
week
Total per
month
Subtotal per
annum
Max availability per Weekend (11
hours x 2 days)
Bookings @
30%
Community
Group Price
Total per
week
Total per
month
Subtotal 
per annum
Total per annum
Room G37 35 10.5 £10 £105 £420 £5,040 20 6 £10 £60 £240 £2,880 22 6.6 £10 £66 £264 £3,168 £11,088
Room G41 35 10.5 £10 £105 £420 £5,040 20 6 £10 £60 £240 £2,880 22 6.6 £10 £66 £264 £3,168 £11,088
Room G43 35 10.5 £10 £105 £420 £5,040 20 6 £10 £60 £240 £2,880 22 6.6 £10 £66 £264 £3,168 £11,088
Store G39 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 £0
Store G40 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 £0
Laundry / Sto 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 £0
£315 £1,260 £15,120 £180 £720 £8,640 £198 £792 £9,504 £33,264
Without
Anchor
Tenants
WEEKDAYS / DAYTIME
(10:00 - 17:00)
WEEKDAYS / EVENING (17:00-
21:00)
WEEKEND (By appointment /
10:00-21:00)
Room Hours available per Week
(7 hours x 5 days)
Bookings @
10-20%
Hourly Rate
Community
Group Price
Total per
week
Total per
month
Subtotal per
annum
Max availability per Week (4
hours x 5 days)
Bookings @
10-20%
Community
Group Price
Total per
week
Total per
month
Subtotal per
annum
Max availability per Weekend (11
hours x 2 days)
Bookings @
10-20%
Community
Group Price
Total per
week
Total per
month
Subtotal 
per annum
Total per annum
Room G37 35 3.5 £10 £35 £140 £1,680 20 0 £10 £0 £0 £0 22 0 £10 £0 £0 £0 £1,680
Room G41 35 3.5 £10 £35 £140 £1,680 20 2 £10 £20 £80 £960 22 2.2 £10 £22 £88 £1,056 £3,696
Room G43 35 7 £10 £70 £280 £3,360 20 4 £10 £40 £160 £1,920 22 4.4 £10 £44 £176 £2,112 £7,392
Store G39 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 £0
Store G40 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 £0
Laundry / Sto 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 0 0 £0 £0 £0 £0 £0
£140 £560 £6,720 £60 £240 £2,880 £66 £264 £3,168 £12,768

Page 86

Ferguslie Community Development Trust 
51 Glencoats Drive 
Paisley 
PA3 1RP 
John.Mcintyre@FCDT.org.uk 
07388344495 
Date:  10/02/2025 
To Whom It May Concern, 
I am writing on behalf of the Ferguslie Community Development Trust (FCDT) to express our strong 
support for Pachedu Amongst Ourselves' application for the asset transfer of the Falcon Day Care 
Centre through Renfrewshire Council's Asset Transfer Programme. This letter serves to endorse the 
proposal to transform the Falcon Day Care Centre into a vibrant multi-cultural community hub, 
centrally located in the heart of the Ferguslie Park Housing Estate. 
Ferguslie Park is a community rich in diversity and resilience, yet it faces significant socio-economic 
challenges. The establishment of a multicultural centre within the Falcon Day Care Centre is a 
visionary initiative that aligns with our mission to foster community cohesion, inclusivity, and 
empowerment. This new hub will not only serve the immediate residents of Ferguslie Park but will 
also extend its benefits to the wider Renfrewshire area. 
The Falcon Day Care Centre has long been a cornerstone of our community, providing essential 
services and support to our elderly population. Its transformation into a multicultural hub will build on

Page 87

this legacy, creating a space where people from all backgrounds can come together to share 
experiences, celebrate diversity, and access a range of services and activities. This initiative is 
particularly timely as it addresses the growing need for inclusive spaces that promote cross-cultural 
understanding and collaboration. 
Pachedu Amongst Ourselves has demonstrated a commendable commitment to community 
development and cultural integration. Their proposal for the Falcon Day Care Centre includes a 
comprehensive plan to offer a variety of programs and services, such as educational workshops, 
cultural events, health and wellness activities, and support services for marginalized groups. These 
initiatives will significantly enhance the social fabric of our community, providing opportunities for 
personal growth, social interaction, and mutual support. 
Furthermore, the collaboration between FCDT and Pachedu Amongst Ourselves exemplifies the 
spirit of partnership and mutual support that is essential for the success of community projects. We 
are confident that this asset transfer will lead to a thriving community hub that will serve as a model 
for other communities facing similar challenges. 
In conclusion, Ferguslie Community Development Trust wholeheartedly supports Pachedu Amongst 
Ourselves' asset transfer application for the Falcon Day Care Centre. We believe that this project will 
have a profound and positive impact on our community, fostering a sense of belonging and unity 
among all residents. 
Thank you for considering this application. We look forward to the successful realization of this 
important community initiative. 
Yours sincerely, 
John McIntyre 
Chairperson 
Ferguslie Community Development Trust

Page 88

Kelly Espindola
Project manager
Remode Renfrewshire
20/01/2025
To Whom It May Concern,
I am writing to offer my strong support for Pachedu's application for an asset transfer.
Remode has had the privilege of working alongside Pachedu on several occasions, and
we’ve always been impressed by the welcoming and inclusive atmosphere they create within
the community.
Each event we've attended or partnered with Pachedu has been a success, thanks to the
genuine connection they foster with the people they serve. Their events are not only
well-attended but also reflect the heart of the community, offering a space where everyone
feels valued and included.
We believe that if Pachedu were to have their own dedicated community space, it would
allow them to significantly expand the incredible work they’re already doing. With a
permanent space, they could provide even more programmes and resources to the
community, reaching even more individuals and creating a lasting positive impact.
For these reasons, we wholeheartedly support their application. If you would like any further
details or information, please don’t hesitate to get in touch.
Best regards,
Kelly Espindola
kelly@remodeyouth.org

Page 89

Monique Campbell 
Programme Manager
See Me 
17/02/2025 
To whomsoever it may concern, 
I am writing to express my strong support for Pachedu’s application for an asset
transfer. See Me has had the privilege to work with Pachedu over the last two years and
have witnessed their outstanding work and commitment to promote diversity, tolerance
and dignity for humanity. 
Pachedu has demonstrated community strength, resilience and continues to impact
people’s lives positively. Through their events, meetings and workshops which are very
well-attended and loved by participants, they have created a meaningful change in the
community. 
We believe, if Pachedu is granted this asset transfer, they would be able to make a
bigger impact. This opportunity would not only benefit them but the wider community,
and it would ensure that the services are available for future generations. I would
support this application and urge you to consider the positive impact it would bring. 
Yours sincerely, 
Monique Campbell
Programme Manager
See Me