Page 1

2 
___________________________________________________________________
To: Infrastructure, Land & Environment Policy Board                                                                                
Community Asset Transfer Subcommittee
On: 28 August 2024
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Community Asset Transfer Request – Calderglen Playing Fields 
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to ask the Community Asset Transfer (CAT)
Subcommittee to approve the transfer of Calderglen Playing Fields to
Calderglen Community SCIO under Part 5 of the Community Empowerment
(Scotland) Act 2015 (the Act) subject to the terms and conditions set out at
section 7 of this report. 
2. Recommendations
It is recommended that the CAT Subcommittee:-
2.1 Consider the Community Asset Transfer request, attached; 
2.2 Agree to the transfer of the asset at the discounted price of £1 offered; and
2.2 Authorise the Head of Economy and Development and the Head of Corporate
Governance to conclude the sale of the asset in accordance with the Act and
on such terms as required to protect the Council’s interest.    
3. Background
3.1 Part 5 of the Community Empowerment (Scotland) Act 2015 provides the right
for community bodies to request outright ownership, short or long term lease
or other rights over any land or property owned or leased by the Council.

Page 2

3 
3.2 The Act requires local authorities to assess requests transparently against a
specified list of criteria, and to agree the request unless there are reasonable
grounds for refusal.
3.3 The CAT Officer Panel met to consider this request on the 29th of July 2024.
In accordance with the revised Scheme of Delegation (September 2022), the
Panel agreed to recommend the request for approval to the ILE CAT Sub-
Committee.
4. The Asset - Calderglen Playing Fields
4.1 The asset being requested is the existing football pitch and adjoining playing
field extending to some 15,355sqm (1.54Ha) or thereabouts and located
within Lochwinnoch Park.
4.2 The whole of the park, extending to 3.24Ha today, passed to the ownership of
the local authority in November 1933. The land was acquired to fulfil a
statutory function to provide a park for public recreation in terms of section 24
of the Local Government (Scotland) Act 1894 and dedicated in favour of the
Carnegie Trust and Fields in Trust in November 1934.
4.3 It is not considered that the CAT request constitutes a change of use which
would require the permission of the Carnegie Trust and Fields in Trust.
4.4 The asset does not form part of the Common Good Fund.
4.5 The asset currently forms part of the lease to OneRen and is occupied by
Calderglen Football Club in an arrangement with OneRen. 
4.6 OneRen are supportive of the asset transfer which will be subject to their
renunciation of the football pitches from their lease.
4.7 As recreational land, the asset has a low or no residual value to the Council.
4.8 Site plan reference E3500 is attached to this report showing the extent of the
land to be transferred.
5. Community Transfer Body – Calderglen Community SCIO
5.1 Calderglen Community SCIO was established in 2022 essentially as a vehicle
for the asset transfer of the football pitches and with the charitable purposes
of (a) The advancement of public participation in sport; (b) The provision of
recreational facilities to the local community and other community-focused
groups; and (c) The advancement of citizenship or community development.
5.2 Prior to becoming a SCIO, the group operated as an unincorporated
constituted sports body, Calderglen Amateur Football Club which was formed
in 1950 and has always played at the Calderglen site as its home ground.
5.3 As a registered Scottish Charitable Incorporated Organisation (SCIO),
registration no. SC052056, Calderglen Community SCIO qualify as a
Community Transfer Body (CTB) under Part 5 of the Community
Empowerment (Scotland) Act 2015 and as such are entitled to seek full
ownership under the Act.

Page 3

4 
5.4 The group’s constitution has been checked as eligible under the Act and
confirmed as meeting all of the requirements of a community controlled
organisation with more than 20 members.
6. Community Asset Transfer Request  
6.1 The asset transfer request is for full ownership of the site as outlined in red on
the site plan E3500.
6.2 Calderglen Community SCIO have offered to pay £1 for the site and propose
a range of community benefits detailed below.
6.3 The group propose to maintain the football pitch for their own and wider
community use and to develop a training pitch in the bottom section of the
field.
6.4 A planning application has been granted for the erection of a 1.2 meter fence
around the site (23/0610/PP) to help protect the playing surface from vehicular
vandalism and to improve the experience of players and spectators. The
group have secured £25,000 in corporate sponsorship and landlords
permission has been granted for them to proceed with this work.
6.5  The area for the asset transfer request has been consciously designed to
leave ample space for walkers and dog walkers to continue to enjoy the
space. This includes the area of wildflowers towards the main road and
everything to the right of the cycle path.
6.6 Future developments include erecting portacabins as new changing facilities
and development of a new all-weather sports facility. 
6.7 The group have provided a four-phase development proposal and business
plan attached to this report.
Benefits
6.8 Benefits proposed include:
• Improved facilities and perception of facilities;
• Increased use by a wider range of community groups;
• Community activities to promote and support health and wellbeing; 
• Provide recreational facilities to the local community and other community-
focused groups
• Maintain space for dog walkers and other users; 
• Potential for job creation. 
6.9 The full CAT application and Business plan are attached to this report. 
Validation, Publication, Representations
6.10 The CAT request was validated on the 24th of June 2024 and published on the
Council Website. All close neighbours and interested parties were informed directly in
accordance with the CAT legislation.

Page 4

5 
6.11 Publication was open for public representations until the 26th of July during
which time no representations were received.
7 Proposed Terms and Conditions 
7.1 Community Asset Transfer subject to the renunciation of the football pitches
by OneRen from their lease with the Council not to be unduly withheld or
delayed.
7.2 Calderglen Community SCIO to be responsible for a share of the maintenance
costs for car park facility in front of the Annexe within the park. Percentage
share to be agreed with OneRen and included in the Missives. 
___________________________________________________________________
Implications of the Report
1. Financial – None.
2. HR & Organisational Development – None.
3. Community Planning 
Our Renfrewshire is well – the CAT supports the wellness and resilience of our citizens
and communities.
Our Renfrewshire is fair: addressing the inequalities that limit life chances.
4. Legal 
(a) The CAT request and CTB comply with the requirements of Part 5 of The
Community Empowerment (Scotland) Act 2015.
(b) A formal offer from the CTB must be received within 6 months of decision to
approve.
(c) Sale must be concluded within 6 months of a formal offer being submitted by
the CTB.
5. Property/Assets – As per this report. 
6. Information Technology – None.
7. Equality & Human Rights
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report because no groups or individuals have any involvement currently at
the property. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website. 
8. Health & Safety – None.

Page 5

6 
9. Procurement – Not applicable.
10. Risk – None.
11. Privacy Impact – Not applicable.
12. Cosla Policy Position – Not applicable.
_________________________________________________________
List of Background Papers 
(a)  None. 
_________________________________________________________________ 
Author:           Sandra Inrig – 0141 487 1447 or 07974 071238.
Sandra.inrig@renfrewshire.gov.uk

Page 6

No embedded text on this page.

Page 7

1 
COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015
ASSET TRANSFER REQUEST FORM 
IMPORTANT NOTES:
This is a standard asset transfer request form which can be used to make a
request to Renfrewshire Council. For assets owned by other relevant
authorities, please refer to that authority’s own website. 
You do not need to use this form to make an asset transfer request but using a
form will help you to make sure you include all the required information.
You should read the asset transfer guidance provided by the Scottish
Government before making a request.  All forms and guidance documents are
available to download from the Council’s Website
You are strongly advised to discuss your proposals with the Council before
making an asset transfer request.  You can do this by contacting the CAT
Single Point of Contact at communityassettransfer@renfrewshire.gov.uk.
When completed, this form must be sent to: - 
The CAT Single Point of Contact
Regeneration and Place
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1TT 
Or submitted by email to: communityassettransfer@renfrewshire.gov.uk

Page 8

2 
This is an asset transfer request made under Part 5 of the Community Empowerment
(Scotland) Act 2015 in relation to property owned, leased or managed by Renfrewshire
Council.           
Section 1: Information about the community transfer body (CTB) making the
request
1.1 Name of the CTB making the asset transfer request  
Calderglen Community SCIO
1.2 CTB address.  This should be the registered address (if you have one) or main
correspondence address.  
Postal address: Auchinsale, Well Road, Kilbarchan, PA10 2LZ 
1.3 Contact details.  Please provide the name and contact address to which
correspondence in relation to this asset transfer request should be sent.
Contact name: Billy Mackay
Postal address: Auchinsale, Well Road, Kilbarchan
Postcode: PA10 2LZ 
Email: billy.mackay@ajbell.co.uk
Telephone: 07525236580
X We agree that correspondence in relation to this asset transfer request may be sent by
email to the email address given above.  (Please tick to indicate agreement).
You can ask the relevant authority to stop sending correspondence by email, or change the
email address, by telling them at any time, as long as 5 working days’ notice is given.  
Renfrewshire Council takes the privacy of your personal data very seriously. For more
information see our Privacy Policy. (Please tick to indicate agreement).
X We agree that information provided in this asset transfer request, including contact
details, may ONLY be forwarded to relevant officers within Renfrewshire Council for the
purposes of assessment and/or in order to provide specialist support to further the asset
transfer request as appropriate. Contact details will only be forwarded with your consent for
an explicit purpose. (Please tick to indicate agreement).

Page 9

3 
1.4 Please mark an “X” in the relevant box to confirm the type of CTB and its official
number, if it has one. 
Company (with no fewer than 20 members) and its
company number is   
Scottish Charitable Incorporated Organisation
(SCIO) (with no fewer than 20 members) and its
charity number is 
SC052056 
Community Benefit Society (BenCom), (with no
fewer than 20 members) and its registered number
is 
Unincorporated organisation (no number) 
Please attach a copy of your constitution, Articles of Association or registered rules.
1.5 Has the organisation been individually designated as a community transfer body by
the Scottish Ministers? 
No    X
Yes   ☐ 
Please give the title and date of the designation order: 
1.6 Does the organisation fall within a class of bodies which has been designated as
community transfer bodies by the Scottish Ministers (i.e. those listed above at 1.4)?  
No    X
Yes   ☐ 
If yes what class of bodies does it fall within?

Page 10

4 
Section 2: Information about the land and rights requested
2.1 Please identify the land / property to which this asset transfer request relates.  
You should provide a street address or grid reference and any name by which the land or
building is known.  If you have identified the land on the relevant authority’s register of land,
please enter the details listed there.  
It may be helpful to provide one or more maps or drawings to show the boundaries of the land
requested.  If you are requesting part of a piece of land, you must attach a map and give a
full description of the boundaries of the area to which your request relates.  If you are
requesting part of a building, please make clear what area you require.  A drawing may be
helpful.
Details of Property: - Area marked in red on the attached plan (full copy also attached)

Page 11

5 
Address: - Lochwinnoch Public Park, Lochlip Road, Lochwinnoch
Postcode:- PA12 4AE
Community Area:- Johnstone North-Kilbarchan-Howwood and Lochwinnoch
2.2 Please provide the UPRN (Unique Property Reference Number), if known. 
If the property has a UPRN you will find it in the relevant authority’s register of land. 
UPRN:- 123097746

Page 12

6

Page 13

7 
Section 3: Type of request, payment and conditions
3.1 Please tick what type of request is being made:
for ownership (under section 79(2)(a)) - go to section 3A 
for lease (under section 79(2)(b)(i)) – go to section 3B 
for other rights (section 79(2)(b)(ii)) - go to section 3C 
3A – Request for ownership
What price are you prepared to pay for the land requested: 
Proposed price: -  £1 
Please attach a note setting out any other terms and conditions you wish to apply to the
request. 
3B – request for lease
What is the length of lease you are requesting? 
How much rent are you prepared to pay? Please make clear whether this is per year or per
month.
Proposed rent:                       per year (delete as appropriate) 
Please attach a note setting out any other terms and conditions you wish to be included in
the lease, or to apply to the request in any other way. 
X

Page 14

8 
3C – request for other rights
What are the rights you are requesting?  
1. To erect a spectators railing to protect the pitch from vehicular vandalism and to
enhance the experience for players and spectators. Permission sought and granted
from One Ren. Planning consent confirmed (Ref:23/0610/PP.)
2. To install portacabins for changing and storage; planning consent confirmed        
(Ref: 23/0610/PP)
Do you propose to make any payment for these rights?  
Yes   ☐
No     X
If yes, how much are you prepared to pay?  Please make clear what period this would cover,
for example per week, per month, per day?
Proposed payment:  £               
Please attach a note setting out any other terms and conditions you wish to apply to the
request.

Page 15

9 
Section 4: Community Proposal 
4.1 Please set out the reasons for making the request and how the land or building will
be used.
This should explain the objectives of your project, why there is a need for it, any development
or changes you plan to make to the land or building, and any activities that will take place
there.  
4.1.1 Objectives of the Project:
Full details of our proposed project are included in the attached powerpoint presentation. 
A short summary of our organisation's purposes are: (a)The advancement of public
participation in sport by: organising community football teams across multiple age groups
and skill levels, promoting community participation in football events and by arranging
coaching and teaching sessions for adults and children alike, regardless of ability. (b) The
provision of recreational facilities to the local community and other community-focused
groups.  
It goes without saying but if we are to be able to do this, access to facilities that are fit for
purpose will be crucial. 
The objective of the asset transfer is to bring the sports and recreation area of the public
park into our control so that we can ensure that we facilitate investment to create and then
maintain facilities that the village can be proud of. The charity will have the capacity to raise
investment in the facilities that simply will not be achieved or realised through council
ownership. The charity has the appetite and financial capacity to deliver improvements in the
facilities with real benefits to the community in terms of increased sports participation, health
promotion and social cohesion. 
4.1.2 Why there is a need for your Project
Sports and recreation facilities in the village of Lochwinnoch are in a state of disrepair. The
general level and quality of facilities will rank amongst the worst in the Renfrewshire council
area. The current economic conditions and financial capacity/scope within Renfrewshire
Council leave very little scope and hope for improvement in the short to medium term. The
Lochwinnoch Community SCIO has a plan to change that for the better. 
4.1.3 Development / changes / modifications required
The attached powerpoint presentation explains a 4-phase plan that will see facilities
improved for the benefit of all in the village and surrounding areas. In summary, the four
phases will deliver: 
Phase 1 - provide the charity with the appropriate foundation to fully maintain all aspects of
the recreational ground. This will see us seek planning permission for installation of a sports
container, changing rooms and perimeter sports fence for the pitch. We will also source and
buy all ground maintenance equipment needed (tractor/mowers). Subject to installation of
the new fence is pending subject to approval from One Ren - phase 1 is now complete. 
Phase 2 – apply for the asset transfer of the main recreational sport area within
Lochwinnoch public park
Phase 3 - raise the funds needed to then instal new changing facilities

Page 16

10 
Phase 4 – raise the funds needed to then instal new all-weather sports facilities   
4.1.4 Activities that will take place
Seek planning permission for installation of a container, changing rooms & permitter
fencing.
Source a 40 ft container to securely hold ground maintenance equipment.
Buy a ride on lawnmower. 
Buy a small tractor with grass tyres (the charity already has its own grass roller).
Fence off the main pitch area with spectator fencing to protect the surface from future
damage.
Arrange our asset transfer application. 
Seek funding by means of fund raising, appeals to corporate supporters and charitable
grants.
Source and instal new changing facilities. 
Instal new all weather facilities.  
All items highlighted in bold have either already been completed or are pending One Ren
approval.   
4.1.5 If the asset is to be used by the public it would be helpful if you could provide details of
letting’s policy and opening times
Not known at this time, opening times only become a concern if we are able to get to phase
4 of the attached plan. The timeframe for that is likely to be 3-5 years as a minimum. 
4.1.6 What provision will be provided for people with disabilities?
The Lochwinnoch Community SCIO will approach all design and development of the
facilities with a keen focus on the latest building standards to ensure that facilities are
available on a fully inclusive basis to all community residents on a safety-first basis. 
4.1.7 Any other relevant information?
See attached PowerPoint presentation. 
Benefits of the proposal
4.2 Please set out the benefits that you consider will arise if the request is agreed to.
This section should explain how the project will benefit your community, and others.  Please
refer to the guidance on how the relevant authority will consider the benefits of a request.  
Please explain how the project will benefit your community by detailing how your project will
promote or improve: -

Page 17

11 
4.2.1 Economic development / income generation
The area in question has very limited use from the community due to the poor standard of
the existing facilities and the limited upkeep on an ongoing basis. Phases 1 to 3 will improve
the general quality and availability of the sports and recreation facilities. Completion of phase
4 will deliver a valuable revenue generative community asset that will be made available for
use on a not-for-profit basis to all interested community groups. Any excess revenue over
running costs will be invested back into community initiatives. 
If the charity is successful in completing all four phases of our plan, there will be employment
opportunities for at least one full time head to maintain and manage the rental of the all-
weather asset. Depending on the success of this asset, we would expect this to grow in time
with more employment opportunities possible. 
4.2.2 Regeneration
The project aims to regenerate the existing football pitches and changing facilities so that
they are preserved and available for future generations within the village and surrounding
areas. 
The current perception of this local amenity is off a poorly maintained sport and recreation
area and changing facilities that are nothing more than an eyesore.  As mentioned
previously, we have the appetite and funding capacity to change this for the benefit of many
across the community.   
4.2.3 Public Health
Many of the trustees of the Lochwinnoch Community SCIO were brought up in the village of
Lochwinnoch. The public park used to be a hub of activity with the various grassed areas
and Annexe being used extensively across the year for a wide range of activities.  As the
Annexe and central pitch area has fallen into a state of disrepair the area is used for little
more than dog walking. The plan is to change that and build and maintain facilities that
encourage people in the community to be able to focus on their wellbeing and the benefits of
being and remaining active. 
The organisation presently runs a local football club across all age groups, with access to
organised football for those of all skill levels. The club was founded in 1950 and prides itself
for providing an opportunity for locals to play football in the village. The organisation actively
encourages participation across all skill levels and in the wider running of the organisation.
There is no gender or age barrier. For example, they welcome anyone to train regardless of
skill level, to gain physical fitness and for the associated mental health benefits. The wider
public regularly watch the teams play on weekends and the organisation encourages
repeated attendance to garner further community pride and spirit in Lochwinnoch. This
includes vulnerable adults who are kept involved to aid in their socialisation. 
4.2.4 Social / Wellbeing
The SCIO will aim to provide recreational facilities to the local community and other
community-focused groups, with the object of improving the conditions of life for the persons
for whom the facilities or activities are primarily intended with a particular focus on promoting
health and well-being, diversity, and inclusion will be advanced by the activities the
organisation will carry out.

Page 18

12 
Should we succeed to the end of phase 4 of our plan, the all-weather pitch will be made
available to the wider public at large on a not-for-profit basis. People’s lives can be improved
here as the community lacks the kind of facilities or activities that are available in similar
local areas and is relatively geographically isolated. 
The facilities will be made available for use by the various community groups to include the
local Boys’ Brigade, Girls Brigade, the church, the primary school alongside other health and
wellbeing groups. The public benefit here is that this will reduce social exclusion, encourage
participation in new healthy activities and provide opportunities to learn and nurture mental
wellbeing. 
Diversity and inclusion will also be promoted by the provision of these facilities by the
organisation. The sports activities ran by the organisation will be open to all ages and
abilities. The intention is for groups specifically designed to address social issues around
diversity to be given access to the facilities, also. 
4.2.5 Environmental / Wellbeing / Environmental Benefits
Any building work carried out will be approached with the aim that we try to minimise the
potential impact on our environment.  The trustees are keen to maximise use of
environmentally friendly approaches such as solar power and rainwater collection to
minimise our impact and footprint. 
4.2.6 Does your project contribute to the reduction in equalities?  Please detail how.
Diversity and inclusion will be promoted by the provision of these facilities by the
organisation. The sports activities ran by the organisation will be open to all ages and
abilities. The activities carried out and use of the facilities will be open to all community-
focused groups and include those with a history of inclusion, such as the church, Boys’
Brigade/Girls Brigade. 
The village of Lochwinnoch is served by the poorest recreational and sport facilities in the
surrounding area. Areas such as Beith, Kilbirnie, Dalry, Johnstone, Linwood have modern
all-weather facilities available for use across the entire year. In many ways, this is an output
of the village not being considered an area of high deprivation. The community SCIO want to
change that for the better.   
4.2.7 Any other relevant information
Please see the attached PowerPoint presentation for full details of our plan.   
Restrictions on use of the land
4.3 If there are any restrictions on the use or development of the land, please explain
how your project will comply with these.  
Restrictions might include, amongst others, environmental designations such as a Site of
Special Scientific Interest (SSI), heritage designations such as listed building status, controls
on contaminated land or planning restrictions.

Page 19

13 
Not to our knowledge. 
Negative consequences
4.4 Please identify any potential risks which may occur if your request is agreed to? 
How would you propose to minimise these?
You should consider any potential negative consequences for the local economy,
environment, or any group of people and explain how you could reduce these.
Locals who currently use the public park area for dog walking may take issue with the grass
areas being improved for multi-use activities. We have consciously based our application
around the area marked in red to still leave ample space around it for walkers/dog walkers to
enjoy space. 
The area of wildflowers, bottom area towards the main road and everything to the right of the
cycle path remains available.   
Capacity to deliver
4.5 Please show how your organisation will be able to manage the project and achieve
your objectives.  
This could include the skills and experience of members of the organisation, any track record
of previous projects, whether you intend to use professional advisers, etc.

Page 20

14 
Have you / your organisation managed projects or owned / leased land previously?
Please provide details of: -
4.5.1 Skills and experience of members of the organisation
Our trustees have extensive experience operating at the highest level of business across the
financial services, travel, engineering, construction, nuclear, oil and gas sectors. See slides
8-12 for full details of the background and experience of all 7 trustees.
4.5.2 Do you intend to use professional advisors?
Where needed yes. Craig Architects has agreed to act on our behalf on all aspects of the
building and planning approval phases.  Holmes Mackillop has supported our legal work
needed to date. 
4.5.3 Do you currently lease / manage a property from Renfrewshire Council?  If yes, please
provide details
Yes, we have leased pitch area from Renfrewshire Council since the club was formed in
1950. We did originally lease the area at the back of the Lochwinnoch Annexe from the
Council prior to that being leased to a local business.  
4.5.4 Please detail how you plan to maintain the asset?
Phase 1 of the attached plan outlines how we have approached sourcing the machinery and
tools needed to maintain the grass areas. With 7 trustees and more than 100 members we
have access to a wide range of people with the necessary skills to maintain and develop all
aspects of the asset.  
4.5.5. Any other relevant information? 
Section 5: Level and nature of support
5.1 Please provide details of the level and nature of support for the request, from your
community and, if relevant, from others.  
This could include information on the proportion of your community who are involved with the
request, how you have engaged with your community beyond the members of your
organisation and what their response has been.  You should also show how you have engaged
with any other communities that may be affected by your proposals.

Page 21

15 
5.1.1 How many people are members of your organisation?  Are they in agreement with this
application?
We currently have just over 100 members, we expect this to exceed 200 in the coming
financial year. We will seek approval of the application at our upcoming AGM. 
5.1.2 How many people are members of your community as defined in your constitution /
governing rules?  Are they in agreement with this application?
5.1.3 Have you consulted with other local stakeholder groups and agencies?  Please provide
evidence.
Our current business plan was presented to the Lochwinnoch Community Council on
Tuesday 2 April. The plan was very well received with no significant challenges and a
request that we keep them up to date with future progress. 
Our next stages will see us engage with the Lochwinnoch gala day committee, publicise our
plans in the local news letter (chatter box), present our latest update to members of the
charity at our AGM and highlight our plans on the MacKillop Hall notice board. We are also
engaging with One Ren to seek permission/approval for the installation of the new pitch
permitter fence.  
5.1.4 Have you contacted local staff? If yes, please provide details of who
Officers from One Ren, planning and the Community Asset Transfer team. 
5.1.5 Have you contacted any other communities that may be affected?
No other communities are affected.  
5.1.6 Any other relevant information 
Section 6: Funding
6.1 Please outline how you propose to fund the price or rent you are prepared to pay for
the land, and your proposed use of the land.
You should show your calculations of the costs associated with the transfer of the land or
building and your future use of it, including any redevelopment, ongoing maintenance and the
costs of your activities.  All proposed income and investment should be identified, including
volunteering and donations.  If you intend to apply for grants or loans you should demonstrate
that your proposals are eligible for the relevant scheme, according to the guidance available
for applicants.
6.1.1 Please show your calculations of the costs associated with the transfer of the land or
buildings and your future use of it, including any redevelopment, ongoing maintenance and

Page 22

16 
the costs of your activities.  All proposed income and investment should be identified,
including volunteering and donations.
The charity running costs are very small (circa £2,500 pa). We raise circa £3,000 p.a. from
BAU fund raising to cover typical running costs. To get to the end of phase 3 we need to
raise an additional £100,000 (£80k cost of modular unit plus £20k ground works).  We will do
that by means of donations from trustees, corporate support and grant applications. Our
target split is £50k from donations and corporate support and £50k from grants. We would
hope to get to the end of phase three in the next 18-24 months.  We will then move straight
into fund raising mode with the new aim of raising £500k. The bulk of that fund raising
activity will happen years 3 onwards. 
As of April 2024, the work completed in phase 1 of our plan has seen us raise £30,000 worth
of funding from corporate donations/support and over £20,000 worth of personal donations
from trustees and members.  The current charity balance after completion of the phase 1
work is £12,000. 
Future targets and forecasts are:  
Year 1
Fund raising target from BAU initiatives - £3,000
Fund raising target from trustees activity and corporate support - £25,000
Fund raising target from grant support - £25,000
Year 2
Fund raising target from BAU initiatives - £3,000
Fund raising target from trustees activity and corporate support - £25,000
Fund raising target from grant support - £25,000 
Year 3 onwards 
Fund raising target from BAU initiatives - £3,000
Fund raising target from trustees activity and corporate support - £50,000
Fund raising target from grant support - £100,000      
6.1.2 Please also supply details of what funding you have received so far, and any
conditions attached.
As mentioned above, in the first 16 months of operation as a SCIO we have raised more
than £20,000 via charity donations and more than £30,000 via corporate support. 
6.1.3 Details of funding you have applied for but are still waiting on a decision / response

Page 23

17 
Additional funding will be required to complete phases 3 and 4 of our plan but we do not
intend to apply for funding until we complete the asset transfer process.  We will seek to
meet the costs of phases 3 and 4 through a combination of continuing personal donations,
corporate donation support and applications for grant support.  
6.1.4 Details of other funding i.e. voluntary donations, borrowing etc
See above re donations received to date.  
6.1.5 Any other relevant information

Page 24

18 
Section 7: Other Supporting Documentation
To enable the Council to fully consider your application, the following supporting
documentation must be submitted as part of your application:-
• A copy of your organisation’s Constitution, Articles or Association or other governing
rules as appropriate;
• A detailed business case (that is proportionate to the nature of the asset transfer
request);
• A financial projection of income and expenditure for at least three full financial years
following the date of this request;
• A copy of your organisation’s most recent audited accounts, where available (or a
financial projection covering the current financial year where the applicant has been
operating for less than one year);
• Annual reports (where these are available).
Applicants are advised to refer to the Scottish Government Community Asset Transfer
Guidance for Community Transfer Bodies for further details of what information should be
included in these supporting documents. https://www.gov.scot/publications/asset-transfer-
under-community-empowerment-scotland-act-2015-guidance-community-9781786527509/

Page 25

19 
Declaration and Signature
Two office-bearers (board members, charity trustees or committee members) of the
community transfer body must sign the form.  They must provide their full names and home
addresses for the purposes of prevention and detection of fraud.
This form and supporting documents will be made available online for any interested person
to read and comment on.  Personal information will be redacted before the form is made
available.
We, the undersigned on behalf of the community transfer body as noted at section 1,
make an asset transfer request as specified in this form.  
We declare that the information provided in this form and any accompanying
documents is accurate to the best of our knowledge.
“I understand that the details provided will be used by Renfrewshire Council for the
purpose of assessing the asset transfer request and may be shared with Council
Officers and Elected Members for the purposes of providing support in making the
application or other purposes as appropriate. Further information on how the
Council looks after personal information can be found here :
https://www.renfrewshire.gov.uk/article/2201/Privacy-policy
1. Name Billy Mackay
Address Auchinsale, Well Road, Kilbarchan, PA10 2LZ
Date  
Position Trustee
Signature 
2. Name Derrick Hodgson 
Address 41 McConnell Road, Lochwinnoch, PA12 4EB
Date  
Position Trustee
Signature

Page 26

20 
Checklist of accompanying documents
To check that nothing is missed, please list any documents which you are submitting to
accompany this form.
Section 1 – you must attach your organisation’s constitution, articles of association
or registered rules 
Section 2 – any maps, drawings or description of the land requested 
Section 3 – note of any terms and conditions that are to apply to the request 
Section 4 – about your proposals, their benefits, any restrictions on the land or
potential negative consequences, and your organisation’s capacity to deliver. 
Section 5 – evidence of community support 
Section 6 – funding 
Section 7 – Supporting Documentation

Page 27

Calderglen
Community SCIO
Business plan

Page 28

Background
• Calderglen AFC was formed as an amateur football club in 1950
• Current running costs total circa £2,500 pa
• Budget £5,000 pa to allow us to meet running costs and support other local causes
• Running costs can be supported easily from existing fund raising & donations
• Frustrated at the lack of investment in the sport & recreation facilities in Lochwinnoch we set the club up as a SCIO in October 2022
• The charity is run on a not-for-profit basis
• Our activity over the next 3-5 years is outlined in this summary 4 phase business plan:
• 1 – Be financially secure & 100% self-sufficient for groundwork/maintenance
• 2 – seek asset transfer of sports area of Lochwinnoch public park
• 3 – instal new modular changing rooms/facilities
• 4 – raise funding for all weather facilities

Page 29

Purpose
The organisation’s purposes are:
• (a) The advancement of public participation in sport by organising community
football teams across multiple age groups and skill levels, promoting community
participation in football events and by arranging coaching and teaching sessions
for adults and children alike, regardless of ability.
• (b) The provision of recreational facilities to the local community and other
community-focused groups, with the object of improving the conditions of life for
the persons for whom the facilities or activities are primarily intended with a
particular focus on promoting health and well-being, diversity and inclusion.
• (c) The advancement of citizenship or community development through the
promotion of civic responsibility and rural regeneration by providing educational,
pastoral, sporting and training facilities for community groups.

Page 30

Structure of our SCIO
• 7 Trustees
• Trustees with a wide variety of business, recreation & sport
backgrounds
• We are a membership-based Scottish Charitable Incorporated
Organisation (SCIO)
• 100 members

Page 31

Current facilities
• The changing facilities used were built in the 1970s & now in an
extreme state of disrepair
• Leased by One Ren to a local business on a pepper corn basis there is
very limited scope for investment in improvements to the facility
• The football pitch is at the back end of the public park and regularly
experiences damage by cars, motorbikes and horses

Page 32

No embedded text on this page.

Page 33

No embedded text on this page.

Page 34

Calderglen
Community SCIO
Trustees

Page 35

Trustees
Billy Mackay
• Billy is Managing Director of FTSE 250 firm AJ
Bell plc. In a financial services career spanning
37 years, he has built experience across a
wide range of business strategy, sales,
distribution & marketing roles
• From a sport perspective, Billy has experience
working in brand & sponsorship of large
sporting events such as the World Squash
Championships, London Triathlon, Leeds
Triathlon & the Great Run Series
• He has been involved as a player, manager
and committee member at Calderglen since
1985
Derrick Hodgson
• Derrick has worked for British Airways since
1990 holding a variety of positions within the
group.  He is currently Safety, Risk &
Compliance Executive for BA with
responsibility for their US and Canadian
airports
• Derrick has been involved in a variety of
committee roles with Calderglen since 1991

Page 36

Trustees
Graham Donaldson
• Graham is a Project Director leading
international engineering and construction
projects in the nuclear, oil and gas,
pharmaceutical and chemical sectors with
capital investment values in excess of £1bn
• He has significant experience in dealing with
complex stakeholder and regulatory
environments, whilst delivering positive
business outcomes for these significant
capital investments
• He has previous experience in coaching youth
football at Glennifer Thistle prior to his son
moving onto the pro youth development
environment
Jim Jamieson
• Jim has worked in the IT, Banking and oil
sectors for 30 years in a variety of network
and project management roles. For the past
decade he has worked as a project/program
manager in the Finance and Oil/Gas
industries.
• He has been actively involved in a number of
sports both playing and coaching for many
years. He has coaching experience in both
football and boxing for both adults and kids
where he held Disclosure Scotland
certification for many years

Page 37

Trustees
Alan Kearney
• Alan is a time served car mechanic who has
worked in the rail maintenance sector for the
last 19 years
• Alan has played, coached and managed at
amateur football level for more than 25 years
• He also has experience coaching youth
football having managed teams at various age
groups across three different youth teams for
more than 10 years
Alan Davis
• Alan is a time served Cooper who has worked
in the whisky industry for more than 30 years
• Alan has been a Calderglen stalwart for more
than 30 years carrying out various roles from
player, coach, treasurer to pitch and facilities
maintenance
• He also has experience coaching youth
football having managed teams at various age
groups

Page 38

Trustees
Stephen Russell
• Stephen is an Addiction Worker in North Ayrshire
Council and in the Health and Social Care Partnership
(HSCP).  He has more than 25 years of experience
working in Rehabilitation, Occupational Therapy and
Addiction Services specialising in rehabilitation of
people with physical and Mental health difficulties
• Stephen has been involved in coaching within youth
football in which he was part of a team and
committee member that was recognised as a legacy
approved club by the SYFA
• He was responsible for setting up a disability football
team through his role in rehabilitation with the team
playing throughout Scotland in many tournaments
• He has been at Calderglen for more than 15 years as a
player, coach, Team Manager and committee member

Page 39

Calderglen
Community SCIO
Phase 1
Financial security/self sufficient

Page 40

Phase 1
• Phase 1 objective is to provide the charity with the appropriate
foundation to fully maintain all aspects of the recreational ground
area highlighted in slide 18
• In practice this means:
• Seek planning permission for installation of a container, changing rooms &
permitter fencing (see slide 18)
• Source a 40 ft container to securely hold ground maintenance equipment
• Buy a ride on lawnmower
• Buy a small tractor with grass tyres (the charity already has its own grass
roller)
• Fence off the main pitch area with spectator fencing to protect the surface
from future damage

Page 41

Phase 1 - progress
• Progress to date:
• Planning permission obtained 20 December 2023 (cost £1,150)
• Container sourced & installed on back of corporate donation/support (value
£6,000)
• Ride on mower bought October 2023 (cost £2,300)
• Tractor bought December 2023 (cost £4,440)
• Perimeter fence funding secured from corporate donation/support with
installation to be planned with Alter Landscapes & completed spring 2024 –
(value £25,183.09)
• After completion of phase 1 the charity remains in a cash positive state with
an account balance of £13,457 as @ 21 February 2024

Page 42

Calderglen
Community SCIO
Phase 2
Asset transfer of sports area of
Lochwinnoch public park

Page 43

Phase 2
• March 2024 - now that phase 1 is complete we will begin the process
to apply to Renfrewshire Council for an asset transfer of the
recreational ground area outlined in red in the following slide

Page 44

2 – seek asset transfer of recreation ground

Page 45

Calderglen
Community SCIO
Phase 3
Instal new modular changing
rooms/facilities

Page 46

Phase 3
• Installing changing facilities that are fit for purpose is crucial to our plan
• Options considered include building a standalone facility & installing a
modular building similar to the units installed at Moredun playing fields in
Paisley (see slides 21, 22 & 23)
• An indicative quote for a similar installation was obtained from DB Modular
Buildings (Perth)
• Price varies according to the insulation required
• Estimated cost - £80,000 plus cost of ground work - total cost circa
£100,000.
• Funding to be raised from a combination of fund raising, grant applications
and corporate donation support
• Our aim is to complete phase 3 by spring 2025

Page 47

Phase 3 typical layout

Page 48

Phase 3
• The example shown is for
the modular building
installed at Moredun
playing fields Paisley

Page 49

Phase 3

Page 50

Calderglen
Community SCIO
Phase 4
Raise funding for all weather
facilities

Page 51

Phase 4
• Phase 4 is very much a longer-term ambition that can only be
considered after successful completion of phases 1-3
• The aim would be to install an all-weather football pitch for use by the
community
• We have two options for this phase:
• Replace the current grass pitch with an all-weather surface
• Install a slightly smaller all-weather pitch to the side of the grass pitch in the
area marked recreation ground (slide 18)
• Price varies according to the quality of the surface – a typical surface
will cost circa £500,000 plus VAT
• The time frame for this phase will be driven by the success of phases
1-3 & the challenge of raising the funds required

Page 52

Phase 4
• Successful delivery of phase 4 would change the business model of the
charity, we would then have a revenue generative asset
• A typical model for a community asset of this type involves a standard
guideline of 50 hours use per week for a 48-week year
• Typical warranty for a pitch of this nature is 8 years & 20,000 hours use
• We would seek to operate comfortably within these limits to extend
the lifetime of the surface with the pitch made available:
• for use by Calderglen & the various community groups/school etc
• By selling up to 25 hours per week on a revenue generative basis

Page 53

Phase 4
Income & expenditure
• 25 hours per week sold on a revenue generative basis of £50 per hour
provides revenue of £60,000 p.a.
• Cost of employee based on national living wage £11.50 per hour -
£15,000
• Contribution to sinking fund for pitch maintenance & eventual
replacement £30,000 p.a.
• Any balance used to support charity initiatives