Environment & Infrastructure Service Improvement Plan 202223-202425 Outturn Report

Renfrewshire Council · 24 May 2023
Back to Infrastructure, Land and Environment Policy Board — 24 May 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 
To:  Infrastructure, Land and Environment Policy Board 
On:  24 May 2023 
Report by: Director of Environment, Housing & Infrastructure 
Heading: Environment & Infrastructure Service Improvement Plan 2022/23-2024/25
Outturn Report 
1. Summary 
1.1 The Service Improvement Plan links to the Council Plan and Community Plan,
alongside the Risk Management Plan and Workforce Plan to form a set of documents
which provide the strategic direction for the service. This plan is also intended to
complement the council-wide Economic Recovery Plan and Social Renewal Plan.   
1.2 A mid-year progress update on the Service Improvement Plan was submitted to the
Infrastructure, Land and Environment Policy Board in November 2022. 
1.3 This outturn report, attached in Appendix 1, is presented to the Infrastructure, Land
and Environment Policy Board for noting of the areas within this Board’s remit only. 
The plan and covering report will also be submitted to the Finance, Resources and
Customer Services Policy Board for the areas within that Board’s remit. 
2. Recommendations
It is recommended that the Infrastructure, Land and Environment Policy Board: 
2.1 Notes the progress made in delivering the 2022/23-2024/25 Service Improvement
Plan for Environment & Infrastructure attached as Appendix 1 and as specific to the
areas of activity delegated to this Policy Board.

Page 2

2 
3. Background 
3.1   Environment & Infrastructure has remained aspirational throughout 2022/23 
continuing to implement improvement through the service priorities, key tasks,
actions and performance indicators. 
3.2  This Service Improvement Plan outturn report for Environment & Infrastructure
covers the year 2022/23.  The priority actions set out in the attached Service
Improvement Plan Outturn report (Appendix 1) detail the outcome of specific actions
the service has progressed. These have and continue to be in support of the
Council’s immediate priorities and future direction, helping deliver improved
outcomes for Renfrewshire’s communities.   
4. Key Achievements 2022/23 
4.1 Despite the challenging financial operating environment, the service has been able to
deliver its services and a wide range of achievements across the service. 
4.2 A more detailed picture of achievements is included in the Service Improvement Plan
outturn is appended to this report. 
5. Monitoring progress 
5.1 Areas where actions have been reviewed or delayed 
• Implement the requirements of the Transport (Scotland) Act 2019 including
enforcement of restrictions on pavement parking - target date has been
revised to reflect changes to the deadlines in national legislation
• Develop a new Open Space Strategy – work continues to progress with the
completion of a Play Park Strategy outlining how funding has had a positive
impact across Renfrewshire in 2022/23. The overall strategy target completion
date has now been revised from March 2023 to March 2024
• Continue to develop a suite of digital solutions across the service – the
identification of additional digital opportunities has resulted in the target
completion date being revised from March 2023 to September 2023 
• Deliver the objectives and requirements of the Scottish Household
recycling charter, Circular Economy and Deposit Return and Extended
Producer Responsibility schemes - the target completion date has been
revised from March 2023 to March 2024 due to delays in implementation at the
national level.
5.2 The remaining actions have been progressing in line with anticipated timescales.  
6. Progress against service scorecard 
6.1 The performance scorecard contains 30 indicators, of which 8 are for information only
and have no target. Of those indicators with targets, 16 are performing strongly, 3 are

Page 3

3 
slightly short of target and need monitoring, two are currently behind target and one
value remains to be confirmed. 
6.2 The full performance scorecard is included as part of Appendix 1 of this report. 
6.3 Several performance indicators in the service scorecard are reported as part of the
Local Government Benchmarking Framework (LGBF). The Improvement Service
released the 2021/22 data in February 2023 and details can be found in the
scorecard in appendix 1. 
6.4 Some highlights of service performance and outcomes, with specific relevance to this
Policy Board, include: 
• The percentage of the road network considered for treatment has improved
across all categories showing sustained improvement over the last few years;
• The percentage of the vehicle fleet which uses alternative fuels, such as
electricity, at 27% has exceeded its performance target of 25% for 2022/23;
• Potholes - performance was 95%. This is significantly above the target of 80%
for 2022/23; 
• The 2022 household waste recycling data (not yet verified by SEPA) confirms
that Renfrewshire’s recycling rate has improved to 53.7% in 2022, increasing
from 51.7% in 2021.  
• The 2022 percentage of waste sent to landfill was 2.3% (not yet verified by
SEPA). This is a significant improvement from the 8.2% landfilled in 2021.
• Elected Member enquiry response rate of 92.6% continues to exceed the
current 85% target;
• Frontline resolutions response rate of 87% exceeds the 85% target for 2022/23;
• Complaint investigation response rate of 91% exceeds the 85% target. Scrutiny
of complaints data and performance is a key priority for the service. This focus
continues to have a positive impact with response rates improving. 
6.5 A few of the performance indicators are currently performing below target in the
service scorecard and require improvement: 
• The statutory inspections carried out on Category A and Category B roads
both fell short of target in 2022/23, performing at 83% of an expected 95%
and 86% of an expected 100% respectively. The roll out of City Fibre proved
challenging for the service to respond to the continually changing programme
with Inspectors arriving to carry out inspections and crews already moving
onto the next location. There are no issues anticipated with meeting next
year’s targets now that the City Fibre programme is complete. 
Implications of the Report 
1. Financial - The Service Improvement Plan highlights resourcing pressures arising from
increasing demand for services and the current financial environment.

Page 4

4 
2. HR & Organisational Development – none 
3. Community/Council Planning – the report details a range of activities which reflect
local council and community planning themes. 
4. Legal – none 
5. Property/Assets – none 
6. Information Technology – Service developments relating to information technology are
key enablers of service improvement and modernisation and support service-level and
corporate objectives. 
7. Equality & Human Rights - The recommendations contained within this report have
been assessed in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’ human rights have
been identified arising from the recommendations contained in the report. If required
following implementation, the actual impact of the recommendations and the mitigating
actions will be reviewed and monitored, and the results of the assessment will be
published on the Council’s website. 
8. Health & Safety – none 
9. Procurement – none. 
10. Risk – Risks related to the delivery and management of services are regularly monitored
and included in Renfrewshire Council’s Corporate and Strategic Risk Registers. 
11. Privacy Impact - none 
12. COSLA Policy Position – none. 
13. Climate Risk – The priorities and actions outlined within the report will make a positive
contribution to tackling climate change. 
List of Background Papers:   
Service Improvement Plan 2022/23 – 2024/25   
Leadership Board Report 26 April 2023 Bus Partnership Funding 
Author:  Gordon McNeil, Director of Environment, Housing & Infrastructure 
e-mail:  gordon.mcneil@renfrewshire.gov.uk

Page 5

1 
Actions 2022-25   
Priority Action: Place Actions
Code Action Status  Progress  Due Date Update
01 Deliver the 2022/23 roads
and footways capital
investment programme -
£10.984 million 
31 March 2023
82 of the original 90 projects of the 2022/23 carriageways program have
been completed.
The remaining 8 were unable to progress due to conflicts within the
Scottish Road Works Register and will be rescheduled into the 2023/24
program. 
For large area patching program, the surface treatment and pre-patching
in advance of 2023/24 surface dressing contract was also completed
during 2022/23. 
02 Continue to develop and
upgrade the Council’s
traffic light infrastructure
from analogue to digital  
31 March 2023
The refurbishment of five signalised junctions from analogue technology
to more efficient LED systems was completed during 2022/23.
03 Update the Winter
Maintenance Policy  30 September 2022 The new Winter Maintenance Policy for 2022-2027 was approved at the
Infrastructure, Land and Environment Policy Board in August 2022.  
Status 
Cancelled 
Delayed 
In Progress 
Completed

Page 6

Appendix 1
2
Priority Action: Place Actions
Code Action Status  Progress  Due Date Update
04 Update Road Safety
Policy  31 December 2022
The approved Policy has been reviewed with no substantial changes
required at the current time. The Policy will be reviewed as part of the
implementation of the new Local Transport Strategy.
05 Develop and implement
Unadopted Roads Policy  31 March 2024 The Unadopted Roads Policy has been drafted and is presented in the
agenda for this Board’s approval.
06 Implement the
requirements of the
Transport (Scotland) Act
2019 including
enforcement of
restrictions on pavement
parking   
31 March 2024 
Initial work in this area has focussed on implementation of 20mph zones
across Renfrewshire. Initial survey work has been carried out to look at
converting our previous advisory zones to permanent mandatory zones.
Funding was received from Transport Scotland to assess Renfrewshire’s
roads for conversion from 30mph to 20mph speed limits. The results
were sent to Transport Scotland on 24 March 2023.  
Scottish Government is currently working on secondary legislation and
parking standards guidance that will underpin the enforcement of these
parking prohibitions. This is not anticipated to be in place until the end of
2023 with enforcement not likely to begin until 2025.
07 Continue to develop a
suite of digital solutions
across the service
including:
- develop the digital
application software  
30 September 2023 
(Revised Target)
A fit for purpose assessment of the Council’s fleet management system
was carried out and evaluated by Information and Communication
Technology services during 2022/23. Options are being considered for a
Cloud based system that will present the operational departments with a
digital solution for vehicle defects and walk around checks.
Grass cutting at rural roads and path networks are completed and in use.

Page 7

Appendix 1
3
Priority Action: Place Actions
Code Action Status  Progress  Due Date Update
for Waste
Management system
- Grass cutting at rural
roads and path
networks
- Digital scheduling and
real time recording of
service activities
- Gully Cleaning
- Waste Collection 
The new waste management information system was fitted in all waste
vehicles during 2022/23. The majority of current routes have been
uploaded to the new system and the remainder are currently being tested
prior to going live. 
08 Develop a new
Cemeteries Policy   
31 October 2023
Following a process of consultation, the initial draft of the new policy has
been made recommendations received. Further work on clarifying the
legalities of ownership of deeds and subsequent right to bury are being
considered. Discussions are ongoing with legal services and updates will
be developed throughout 2023/24.
09 Deliver improvements in
the Council’s Cemeteries
estate   
30 September 2023 
The contract for the remainder of the 2022/23 capital spend has been
awarded. Work on this investment began on 1 May 2023. It is estimated
to finish in June 2023.

Page 8

Appendix 1
4
Priority Action: Place Actions
Code Action Status  Progress  Due Date Update
10 Implement schedule for
grass cutting and
vegetation cutback in rural
areas and on core path
network  
31 March 2023
The scheduling of grass cutting and vegetation cutback in rural areas and
core path network has been successfully implemented.

Page 9

Appendix 1
5
Priority Action: Economy Actions
Code Action Status  Progress  Due Date Update
01 Continue to invest in
infrastructure to support
growth – from road and
rail links to bridges,
cycle and pedestrian
routes 
31 March 2023
The service continues to pursue design and construction
projects to fill identified gaps in the local transport network
and to improve road user provision in line with its
published strategies.
02 Develop a Local
Transport Strategy
supported by revised
Active Travel and Public
Transport Strategies 
31 March 2024
Strathclyde Partnership for Transport (SPT) has now
published the draft Regional Transport Strategy (RTS)
which is subject to final approval. The service has
commenced a scoping exercise for a new Local Transport
Strategy based on the principles included in the draft RTS
and a tender for a consultant to take this forward is due to
be published in May 2023.

Page 10

Appendix 1
6
Priority Action: Economy Actions
Code Action Status  Progress  Due Date Update
03 Continue to develop first
phase design proposals
for connectivity and
transportation to enable
application for external
funding for project
delivery economy   
30 September 2023
Cycling Walking Safer Routes funding is now being used on an annual
basis to prepare designs for relevant projects on an annual rolling
programme, with design in year 1 and implementation in year 2. This
will be an ongoing process in years ahead. 
Work on the current phase has included completion of the construction
phase of the segregated shared pedestrian/cycle routes Designs for
the future phases were completed in April 2023. 
04 Implementation of a
revised approach to Car
Parking in our town
centres 
30 September 2023
A review of car parking in Renfrewshire has commenced with a report
due to be provided to a future policy board
05 Provide employment,
training and
apprenticeship
opportunities for
identified groups of
young people in
Renfrewshire 
31 March 2023
Work is ongoing across to ensure the service provides employment,
training and apprenticeship opportunities:
- A new career pathway has been developed for apprenticeships in
Roads.
- Three trainee roadworkers have obtained full time roadworkers
positions.  Our Invest trainee has progressed into a Foreman
position.

Page 11

Appendix 1
7
Priority Action: Economy Actions
Code Action Status  Progress  Due Date Update
- Two graduate interns have been employed in Waste Strategy and
in Parks and Open Spaces.
- Two interns from Waste Strategy and Parks and Open Spaces have
been awarded permanent positions within the Council.
- Waste Operations have had 5 Invest programme trainees working
in frontline operations. Three were successful in gaining full time
positions. 
- An Invest trainee has been placed with the StreetScene team
assisting with office-based duties. 
06 Deliver Paisley Town
Centre junction
improvements as part of
the Bus Partnership
works.  
31 March 2024 
Final designs for each of the junctions have been completed and will be
subject to a consultation exercise during 2023.

Page 12

Appendix 1
8
Priority Action: Fair Actions
Code Action Status  Progress  Due Date Update
01 Implement the preferred
options from the
#YouDecide
participatory budget
programme for
infrastructure
improvements 
31 March 2023
The successful #YouDecide projects were announced in early February
2023. Work is currently underway to deliver the 50 successful projects,
with 4 of these projects completed in 2022/23. 
02 Continue to work with
existing and establish
new ‘Friends of’ groups
to support
implementation of the
Community
Empowerment Bill   
31 March 2023
Active engagement with ‘Friends of’ groups continues to enhance the
implementation of the Community Empowerment Bill. Further work on
adoption of land and associated proposed improvements are being
considered.

Page 13

Appendix 1
9
Priority Action: Green Actions
Code Action Status  Progress  Due Date Update
01 Support of the Council’s
pledge to make
Renfrewshire carbon
neutral by 2030 
31 March 2023
During 2022/23 the service has played an active role in the following
focused outcome areas of Renfrewshire’s Plan for Net Zero: 
Resilient Place 
Leads on the Environment and Place agenda, which continues to make
a difference to the cleanliness of streets in Renfrewshire and improving
the local environment. The service has continued to prepare identified
areas for biodiversity development 
Sustainable Travel
New active travel schemes have been launched, Beat the Street, School
Active Travel Promotion, Scootability, Not Far? Leave the Car and a pilot
HVO fuel in the Council fleet.
Circular Economy
Continue to promote and encourage waste minimisation through
reducing, re-using and recycling
02 Deliver a programme of
enhanced operational
environmental and
community support
activities for
environment and place 
31 March 2023
Engagement on the online platform continues to grow with over 4,300
members actively supporting the campaign.  Team Up to Clean Up has
developed a number of umbrella projects directed by the issues raised
by those engaging on the forum.
The Environmental Taskforce, a partnership of Community Wardens and
StreetScene Operational staff, focuses solely on tackling flytipping and
business waste.  The number of Fixed Penalty Notices has seen a

Page 14

Appendix 1
10 
Priority Action: Green Actions
Code Action Status  Progress  Due Date Update
significant increase on the previous year. Cameras have been installed
to detect and deter flytipping during the financial year.
The Taskforce prioritises educating business and housing associations
in relation to their duties and responsibilities.  
In keeping with the Team Up to Clean Up model, the Taskforce offer
periodic updates to the online group on their achievements. This
engagement is positively received by the community. 
Renfrewshire’s appearance on The One Show celebrated the
uniqueness of the Taskforce and its commitment.
03 Continue to develop
service delivery methods
to improve customer
experience and meet
demanding recycling
and Net Zero targets
Now included in action above see note in update column 
Following the publication of the Plan for Ren Zero it is recommended
that these actions be removed and reported as part of the action,
Support of the Council’s pledge to make Renfrewshire carbon
neutral by 2030, noted above.
04 Work to meet the
challenging targets set
out in our carbon
management plan –
through our council fleet,
street lighting, public
Now included in action above see note in update column

Page 15

Appendix 1
11 
Priority Action: Green Actions
Code Action Status  Progress  Due Date Update
realm, waste and
consumables 
05 Deliver the objectives
and requirements of the
Scottish Household
recycling charter,
Circular Economy and
Deposit Return and
Extended Producer
Responsibility schemes.  
31 March 2024 
National policy changes may have an impact on the final objectives and
legislation in relation to the Scottish Household Recycling Charter,
Circular Economy Bill Deposit Return Scheme and Extended Producer
Responsibility schemes.
A timeframe has been requested from Scottish Government and it is
anticipated that a new route map will follow from the Circular Economy
Bill. A refreshed version of the Waste Strategy Document will be drafted
based on the outcomes from the updated legislation.
06 Prepare site at Linwood
for improved bin store
facility and consideration
of the infrastructure
required to fulfil the
Deposit Return Scheme
and future requirements
for segregation of waste.  
31 March 2023
Initial preparatory works were completed in July 2022. This included the
site clearance of antiquated plant and machinery, litter, a reconfiguration
of the site layout, levelling of site and bunding put in situ for security.
07 Develop and implement
a long-term sustainable
leachate and surface   
30 June 2023  The final dilution report has been submitted to SEPA. SEPA water
quality experts will consider qualitative and quantitative information in

Page 16

Appendix 1
12 
Priority Action: Green Actions
Code Action Status  Progress  Due Date Update
water management plan
for Linwood Moss.
the report. Following approval, there will be a directive issued to
commence direct discharge at Linwood Moss.
A period of monitoring at River Gryffe is required to ensure discharge
consent levels are adhered to. A revised Closure Restoration and
Aftercare Plan will be submitted to SEPA.
The management equipment must remain on site until the site is
deemed stable to permanently directly discharge.
08 Develop a new Waste
Strategy Policy    30 September 2023 
Existing policies have been updated in recent years, but it is recognised
that further revision is required to reflect the service developments and
upcoming legislative changes. 
A draft policy will be brought forward to this board in future.
09 Install fixed and mobile
cameras to deter or help
identify fly tipping in
hotspot areas  31 March 2023
Active cameras have been installed at identified fly tipping hotspots
across Renfrewshire.  
The Environmental Taskforce, established in November 2022, have
been identifying further suitable sites, gathering information on type of fly
tipping (commercial or domestic), volume and frequency.  Cameras have
been and will continue to be relocated periodically.

Page 17

Appendix 1
13 
Priority Action: Green Actions
Code Action Status  Progress  Due Date Update
10 Development of Low
Emissions /
Electrification Strategy   31 March 2023
Renfrewshire Council as part of the Glasgow City Region wide
partnership has worked with consultants to establish a Renfrewshire
Public Electric Vehicle Charging Business Case. This included the
identification of a new concession contract as the preferred delivery
mechanism for expansion of the public vehicle charging network. 
Priority Action: Living our Values Actions
Code Action Status  Progress  Due Date Update
01 Provide our employees
with the appropriate
support to manage their
attendance, health and
wellbeing 
31 March 2023
Absence management has been a key focus for the service during
2022/23. The service has also invested in mental health first aid training
and the creation of mental health champions.
Environment & Infrastructure continues to support delivery of the
Corporate Health and Well Being Strategy. 
02 Implement the
Council’s People’s
Strategy 
31 March 2023
Environment & Infrastructure supported the development of this key
Council priority. 
03 Active participation in
Council’s Right for   
31 March 2023 Operations & Infrastructure is participating in service reviews as part of
the Right for Renfrewshire transformation programme. The service has

Page 18

Appendix 1
14 
Priority Action: Living our Values Actions
Code Action Status  Progress  Due Date Update
Renfrewshire
Transformational
Programme 
been fully engaged in supporting the Council’s strategy for financial
sustainability through the portfolio approach which will be delivered
alongside the main transformation programme and reviews undertaken by
individual services. 
04 Better use of data and
technology to improve
services performance
and delivery   
31 March 2023
The use of data analytics and technology developments has continued,
throughout 2022/23, to be employed to support service improvement
across each service area. 
05 Deliver agreed
operational efficiencies
through fleet utilisation
and rationalisation 
31 March 2023
Fleet and Transport Services have met with other services across the
Council and discussed the type, purpose and operational requirement of
vehicles. The determination of type and purpose of vehicles, ensuring fit-
for-purpose and identification of the right vehicle for each task has
resulted in fleet rationalisation and improved utilisation across the fleet.
Cognisance of agreed operational efficiencies has included the use of
electric vehicles where appropriate, improving the sustainability of the
fleet.
06 Support the Council to
implement the
Business World system  
31 March 2023
Environment & Infrastructure has continued to participate and engage in
the implementation of Business World.

Page 19

Appendix 1
15 
Priority Action: Living our Values Actions
Code Action Status  Progress  Due Date Update
07 Embed new
approaches to staff
communication and
engagement across all
areas of the service   
31 March 2023
The service has been supporting the delivery of the corporate internal
communications action plan for 2022/23 to enhance staff engagement and
communications. 
The approach includes circulation of information, surveys, how internal
policies affect staff and contributions to Ren Talks.
08 Ensure robust and up
to date business
continuity
arrangements are in
place   
31 March 2023
The Environment & Infrastructure Resilience Management Team has
continued to hold quarterly meetings, to review recent incidents and
lessons learned, business continuity exercises and any training required,
throughout 2022/23. 
09 Review and maintain
continuous
improvement
frameworks 
31 March 2023
Operations & Infrastructure has maintained ISO 9001 accreditation.
Internal audits were employed during 2022/23 to monitor the effectiveness
of the Quality Management system.
10 Review Health & Safety
and Risk Assessments    31 March 2023
The review of Health & Safety and Risk Assessments process is
complete, adopted and is being rolled out across the service.

Page 20

Appendix 1
16 
11 Ensure robust financial
monitoring is in place to
support the COVID-19
recovery  
31 March 2023
The Senior Leadership Team and service managers met on a period-by-
period basis with finance colleagues to monitor budgets and to ensure the
service was provided with the most up to date information to ensure
robust financial systems were in place to support the service.

Page 21

Appendix 1
17 
Priority Action: Improving
Outcomes for Children and
Families
Actions
Code Action Status  Progress  Due Date Update
01 Develop a new Open
Space Strategy  
31 March 2024
Based on the Scottish Government policy of better facilities for Young
People, capital and revenue funding has been awarded and invested in
play parks across Renfrewshire. 
A report on this matter is being discussed elsewhere in this agenda and
outlines plans for 2023/24 and 2024/25. 
02 Work with colleagues in
OneRen to improve access
and opportunities to play
tennis within Renfrewshire   
30 June 2023 
A project management framework is being set up to initiate the project. A
paper will be submitted to Leadership board on 26 April seeking consent
to progress the project.
Following Leadership Board approval, the One Ren Board on 15 June
will be approached for final ratification.
03 Consult with local
residents, especially
children, on choice of
equipment to be
implemented for playpark  
31 March 2023
100% of this action has been carried out for this year’s funding of play
parks.

Page 22

Appendix 1
18 
improvements throughout
Renfrewshire.

Page 23

Appendix 1
19 
Priority Theme: Place Performance Indicators
Code Performance
Indicator
Current
Status
2020/21 2021/22 2022/23 2023/24 Explanation of Performance
Value Target Value Target Value Target Target
01 (Maintenance) Carriageway Condition: % of road network considered for treatment 
(i) A Class Roads  19.42% 22.5% 17.29% 22.5% Data for 2022/23 will
not be published
until February 2024
22% 19% Local Government Benchmarking Framework
(LGBF) Indicators. This data is published by the
Improvement Service on an annual basis as
part of the LGBF. 
A final release has been published in late
February 2023 and will be reported to the Audit,
Risk and Scrutiny Board in May 2023.
(ii) B Class Roads  23.7% 24.5% 21.25% 24.5% Data for 2022/23 will
not be published
until February 2024
24.5% 22%
(iii) C Class Roads  33.5% 36.5% 30.55% 36.5% Data for 2022/23 will
not be published
until February 2024
36% 32% 
Scorecard 
PI Status 
Alert  Unknown 
Warning  Data Only 
OK   
Long Term Trends 
Improving 
No Change 
Getting Worse 
Short Term Trends 
Improving 
No Change 
Getting Worse

Page 24

Appendix 1
20 
Priority Theme: Place Performance Indicators
Code Performance
Indicator
Current
Status
2020/21 2021/22 2022/23 2023/24 Explanation of Performance
Value Target Value Target Value Target Target
(iv) Unclassified Roads  34.3% 36.5% 30.99% 36.5% Data for 2022/23 will
not be published
until February 2024
36% 32% These are annual LGBF Indicators and relate to
financial year 2021/22. The 2022/23 data will
not be published until February 2024.
02 (Maintenance)
Carriageway
Condition: % of
road network
considered for
treatment Overall 
32% 32.5% 28.9%  32.5% TBC 32% TBC The figure provided in the table is provisional
data taken from SCOTS. Performance has
improved to 28.9% in 2021/22 and has
exceeded the target of 32.5% for 2021/22.  
The figures for 2021/22 are provisional. 
03 % of Statutory road inspections categories completed on target: 
(i) Category A   100% 100% 100% 95% 83% 95% 95% In 2022/23, 90% of the statutory road
inspections were completed for all categories.
The three categories of statutory inspections
relate to the timing of inspections and are
categorised as follows: A – Undertaken during
the progress of the works, B – Undertaken
within the six months following interim or
permanent reinstatement, C – Undertaken
within the three months preceding the end of
the guarantee period. The inspection procedure
(ii) Category B  100% 100% 100% 100% 86% 100% 100%
(iii) Category C  100% 100% 100% 100% 100% 100% 100%

Page 25

Appendix 1
21 
Priority Theme: Place Performance Indicators
Code Performance
Indicator
Current
Status
2020/21 2021/22 2022/23 2023/24 Explanation of Performance
Value Target Value Target Value Target Target
is designed to enable road work authorities to
monitor statutory undertakers (Gas, electric,
and telecom etc).
Cat A : 256 out of 308 = 83%
Cat B : 325 out of 376 = 86%
Cat C : 376 out of 376 = 100%
The roll out of City Fibre proved challenging for
the service to respond to the continually
changing programme with Inspectors arriving to
carry out inspections and crews already moving
onto the next location. There are no issues
anticipated with meeting next year’s targets
now that the City Fibre programme is complete.
04 % of pothole repairs
completed within
timescales 
77% 75% 83% 80% 95% 80% 80% Data analytics continue to improve performance
monitoring with weekly reports being used to
quickly identify and resolve issues.
Performance during 2022/23 has seen an
improvement from 83% in 2021/22 to 95% in
2022/23.

Page 26

Appendix 1
22 
Priority Theme: Green Performance Indicators
Code Performance
Indicator
Current
Status
2020/21 2021/22 2022/23 2023/24 Explanation of Performance
Value Target Value Target Value Target Target
01 Street Cleanliness
Score - % of areas
assessed as clean 
93.6% 92% 89.6%  92% Data for 2022/23 will
not be published
until February 2024
92% 92% The percentage of Renfrewshire's street assessed as clean
was 89.6% for 2021/22. This figure is provisional and is
awaiting verification by Keep Scotland Beautiful. The
cleanliness score is based on 3 sample surveys carried out
throughout the year by both the Council and Keep Scotland
Beautiful (KSB). This score represents the percentage of
areas assessed as acceptably clean (categories A and B)
using KSB’s Local Environmental Audit and Management
System (LEAMS) methodology.
02 Amount of CO2
emitted by the public
vehicle fleet 
2,992 3,250 3,223 3,000 3,267 3,000 3,000  The amount of CO2 emitted by the public vehicle fleet has
increased from 3,223 in 2021/22 to 3267 in 2022/23. This
is above target of 3,000.
Fleet Services has seen an increase over the last 12
months in operational services coming back to work. In-
turn there has been an increase in usage of vehicles in the
fleet that use fossil fuels. 
Use of electric vehicles and the trial of using Hydrotreated
Vegetable Oil in place of Diesel fuel will reduce CO2
emissions going forward.
03 % of the vehicle fleet
which uses 
23.7% 22% 25% 25% 27 % 25% 25% Renfrewshire Council have purchased 14 Electric Vehicles
to add to our zero emissions fleet of cars, light vans,
minibuses and large goods vehicles resulting in almost a
quarter of the fleet now using alternative fuel sources. We

Page 27

Appendix 1
23 
Priority Theme: Green Performance Indicators
Code Performance
Indicator
Current
Status
2020/21 2021/22 2022/23 2023/24 Explanation of Performance
Value Target Value Target Value Target Target
alternative fuels,
such as electricity
currently operate 117 electric vehicles up to and including
two 5 tonne fully electric buses. There are electric bicycles
at HQ. Pool fleet is 100% electric. 
The service continues to consider alternative fuels such as
HVO, hydrogen and hybrid technology with HVO trial
underway using a selection of vehicles.
04 Reduce the amount
of CO2 emitted from
public space lighting 
1,368 1,700 1,246 1,500 1,138 1,500 1,500 The conversion of a small number of previously remaining
‘conventional’ lanterns transferring to LED will have
positively impacted the reduction in amount of CO2. It is
anticipated that emissions will level out year on year as the
LED programme is substantially complete. 
05 % of bins uplifted
first time 
99.8% 99.9% 99.8% 99.9% 99.8% 99.9% 99.9% The percentage of bins uplifted first time in 2022/23 was
99.8%.
Code Performance
Indicator   (calendar
year indicator)
Current
Status
2020 2021 2022 2023 Explanation of Performance
Value Target Value Target Value Target Target
06 % of Household
Waste Recycled  
49.1% 54% 51.7% 50% 53.7% 
still to be verified by
SEPA
50% 50% This data relates to the calendar year 2022 (January to
December). It is an estimate which is not yet verified by
SEPA. The cumulative recycling rate for 2022 has been
estimated to be 53.7%. This rate is an increase of 2% from
2021.

Page 28

Appendix 1
24 
Priority Theme: Green Performance Indicators
Code Performance
Indicator
Current
Status
2020/21 2021/22 2022/23 2023/24 Explanation of Performance
Value Target Value Target Value Target Target
Awaiting verified Data from SEPA
07 % of Household
waste collected
which is landfilled 
12.1% 16% 8.2% 5% 2.3% 
still to be verified by
SEPA
5% 5%  This data relates to the calendar year 2022 (January to
December). It is an estimate which is not yet verified by
SEPA. The cumulative rate for waste collected and
landfilled has been estimated to be 2.3%. This rate is a
decrease of 4.9% from 2021.
Awaiting verified Data from SEPA

Page 29

Appendix 1
25 
Priority Theme: Living Our Values Performance Indicators
Code Performance
Indicator
Current
Status
2020/21 2021/22 2022/23 2023/24 Explanation of Performance
Value Target Value Target Value Target Target
01 Average number of
work days lost
through sickness
absence per
employee (FTE)
(cumulative) 
17.02 13.7 15.5 13.7 11.2 
(to Q3)
13.7 13.7 In Q1 the average number of work-days lost per FTE was 3.5, meeting
the quarter 1 target of 3.5. 
In Q2 the average number of work-days lost per FTE was 3.6.
In Q3 the average number of work-days lost per FTE was 4.1.
Q4 Figures have not yet been finalised.
02 % of members
enquiries
completed within
timescale by E&I 
86.4% 85% 86.7% 85% 93.1% 85% 85% Scrutiny of complaints data and performance is a key priority for
the service and continues to be carried out on a regular basis at
management team meetings. It and has been supported by
improvements in both data analytics and access to management
information.  This investment and focus has had a positive impact
with response rates improving. 
Environment & Infrastructure received 5,282 members enquiries
in 2022/23, of which 92.6% were responded to within timescale. 
Environment & Infrastructure dealt with 349 Freedom of
Information requests in 2022/23, of which 343 (98.5%) were
responded to within timescale. 117 of these requests were cross
departmental and 232 were departmental. 
03 % of FOI requests
completed within
timescale by E&I 
96% 100% 99% 100% 98.5% 100%  100%
04 % of front line
resolutions dealt
with within
timescale by E&I 
75% 100% 80.8% 85% 87% 85% 85%
05 % of complaint
investigations 
58% 95% 64.8% 95% 91% 85% 85%

Page 30

Appendix 1
26 
Priority Theme: Living Our Values Performance Indicators
Code Performance
Indicator
Current
Status
2020/21 2021/22 2022/23 2023/24 Explanation of Performance
Value Target Value Target Value Target Target
completed within
timescale by E&I
Environment & Infrastructure received 6,041 front line resolutions
in 2022/23, of which 87% were responded to within timescale. 
In 2022/23, the service dealt with 459 complaint investigations,
91% of which were dealt with within the agreed timescale. 
06 Complete
Inspection process
for all headstones
and burial grounds 
6% 40% 38% 20% 85% 65% 100% The inspection of memorials has been progressing. In addition to
the initial inspections being carried out we are now carrying out re-
inspections to the headstones that were identified as requiring to
be monitored annually for any deterioration at their initial
inspection.

Page 31

Appendix 1
27 
Data Only Indicators 
Code Performance
Indicator
Current
Status
2020/21 2021/22 2022/23 2023/24 Explanation of Performance
Value Target Value Target Value Target Target
01 Cost of
Maintenance per
Kilometre of roads 
£17,495 N/A £20,873 N/A Data for 2022/23
will not be
published until
February 2024
N/A N/A Local Government Benchmarking Framework (LGBF)
Indicators. This data is published by the Improvement
Service on an annual basis as part of the LGBF. 
A final release has been published in late February
2023 and will be reported to the Audit, Risk and
Scrutiny Board in May 2023.
These are annual LGBF Indicators and relate to
financial year 2021/22. The 2022/23 data will not be
published until February 2024. 
02 % of adults satisfied
with parks and open
spaces 
83.5% N/A 87.77% N/A Data for 2022/23
will not be
published until
February 2024
N/A N/A
03 Cost of parks and
open spaces per
1,000 of the
population 
£28,240 N/A £32,189 N/A Data for 2022/23
will not be
published until
February 2024
N/A N/A
04 % of adults satisfied
with refuse
collection 
70.63% N/A 66.3% N/A Data for 2022/23
will not be
published until
February 2024
N/A N/A
05 Net cost of waste
collection per
premise 
£66.66 N/A £83.08 N/A Data for 2022/23
will not be
published until
February 2024
N/A N/A

Page 32

Appendix 1
28 
Data Only Indicators 
Code Performance
Indicator
Current
Status
2020/21 2021/22 2022/23 2023/24 Explanation of Performance
Value Target Value Target Value Target Target
06 Net cost of waste
disposal per
premise 
£100.59 N/A £101.09 N/A Data for 2022/23
will not be
published until
February 2024
N/A N/A
07 % of adults satisfied
with street cleaning 
52.77% N/A 47.77% N/A Data for 2022/23
will not be
published until
February 2024
N/A N/A 
08 Net cost of street
cleaning per 1,000
of the population 
£6,472 N/A £7,197 N/A Data for 2022/23
will not be
published until
February 2024
N/A N/A