To: Infrastructure, Land and Environment Policy Board 
On: 15 March 2023 
Report by: Director of Environment & Infrastructure 
Heading: Operational Performance Report 
1. Summary 
1.1 This report provides an overview of key service activities since the last Policy Board
report on 25 January 2023 and an operational performance update on the services and
key projects delivered during this period. 
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy Board: 
2.1 Approves the operational performance update detailed within this report. 
3. Background 
3.1 Environment & Infrastructure provides essential services to every household in
Renfrewshire and works in partnership with the local community, other service areas
and Community Planning Partners, to deliver key Council priorities and initiatives. A
progress update on the main activities delivered by the services within Environment &
Infrastructure, in respect of the areas of activity delegated to this Policy Board, is
detailed below.

Page 2

3.2 For Operational Services while most of the COVID-19 restrictions have now been
removed, Covid related absences continue to be a challenge to service delivery. In
addition, whilst assisting the services to continue to operate last year, staff accrued
annual leave which they have now been using this year. 
Updates for Infrastructure Land and Environment Policy Board 
4. Fleet, Roads and Transportation 
4.1 Fleet Services - Employee Upskilling 
Following a full training program, 9 operatives from Roads, Streetscene and Waste
Services have successfully passed their LGV driving test. This offers an
opportunity for employees to further their career and provides a welcome increase
in the number of LGV drivers available across the service. The service is planning
to run a similar LGV training program in the new financial year. 
4.2 Roads Capital Investment Program
The carriageways program for 2022/23 is substantially complete with 78 of the
programed 90 now complete.  Four additional resurfacing schemes (Broomlands Street,
Paisley; Maxwellton Road, Paisley; Neilston Road, Paisley and Torr Road, Bridge of
Weir) will be completed on a phased approach with the first due to start week
commencing on 3 April. Completion of these works will take the scheme to 82. The
remaining 8 were unable to progress due to conflicts within the Scottish Road Works
Register and will be rescheduled into next year’s program.   
4.2.1 The large area patching program, the surface treatment and pre-patching in advance of
next year’s surface dressing contract are now complete. 
4.2.3 The carriageway reconstruction contract (Old Greenock Road Inchinnan, Brick Lane and
William Street Paisley) will commence on site in March and complete by the end of April.   
4.2.4 The service is currently reviewing the capital investment program for 2023/24, this
revised program will take cognisance of the additional £3m allocated from the capital
budget taking the total Capital Investment to £6.7m, this includes £700k of CWSR
funding. The schemes delayed in 2022/23 including many of the originally programed
footways, will be delivered from funds carried forward from the current program. 
4.2.5 In January 2020 the ILE Policy board increased fees and charges in relation to roads
and infrastructure related services. The increased charges were designed to ensure
there was a fiscal incentive to utility companies and contractors working on our road
network, as it would be to their financial benefit to carry out work in Renfrewshire in a
timely fashion, minimising disruption to road users and communities in Renfrewshire. 
Appendix 1 to this report sets out the new fees proposed for the financial year
2023/2024 for road related fees and charges.   
4.3 Winter Maintenance 
To the 27 February 2023, the Winter Maintenance program has used a cumulative total
of 3,823 tons of salt gritting Renfrewshire roads. The service has gritted primary network

Page 3

routes 79 times and our secondary network on 20 occasions. Grit bin stocks continue to
be replenished as and when required. 
4.4 #YouDecide 
The successful #YouDecide projects were announced at an event held at the start of
February.  The event was well attended with over 90 people from communities across
Renfrewshire. Following the announcement, officers have attended each Local
Partnership meeting to give an update on progress and advise on next steps. 
4.5 20mph Zones 
The Council is progressing its plans for the roll out of 20mph zones across
Renfrewshire. This work is being carried out over two phases. 
4.5.1 The first phase is the conversion of previous advisory 20mph zones to permanent
mandatory 20mph zones. The Traffic Regulation Order has been put through its 1st
phase consultation and will be due to go to 2nd stage consultation by the end of March
2023. 
4.5.2 Transport Scotland have also provided funding for Council’s to assess their remaining
road network for other areas that may be suitable for 20mph zones, and this work is
progressing well. The Council has to return the information back to Transport Scotland
by the end of March 2023 to allow an overall national position to be reviewed prior to
moving forward with implementation plans. 
4.6 Active Travel & Infrastructure Improvement Update 
Renfrewshire Council Environment & Infrastructure have been awarded £1,485,000 SPT
Capital funding for 2023/24 for bus corridor improvements, traffic signal upgrades, new
pedestrian crossing installations, Paisley to Renfrew active travel route, Linburn Road
bus turning circle construction and Milliken Park Rail Station drop off / pick up zone
design. 
4.7 Renfrewshire Council and City Deal Teams applied to Transport
Scotland’s Active Travel Transformation Fund on Friday 27 January. The
application covered a range of Capital Infrastructure funding for construction ready
projects in 2023/24 including Clyde Waterfront River Regeneration, AIMDS South
Gallowhill link to existing Paisley to Renfrew active travel route and Erskine (Red
Smiddy to Southholm roundabouts) active travel links. 
4.8 Environment & Infrastructure have been working with Peel Ports maritime group, 
Siemens, Scottish Power and haulage contractors to facilitate the safe
transportation of long trailer with a new 300 Ton electrical transformer from King
George V Docks near Braehead to the Scottish Power substation in Gleniffer
Braes, this is scheduled for 21 March 2023.  To allow safe use of the road network
there are planned activities with Police Scotland including the temporary removal
of traffic lights and street furniture on the route of Grahamston Road, Caplethill
Road, Glenburn Road and Gleniffer Road. These will be reinstated once the safe
transportation has been completed.

Page 4

5. Parks Investment 
5.1 The complete renewal of the Elm Drive & Sycamore Avenue play area in Johnstone
was successfully completed at the end of February 2023 and reopened to the
public. 
5.2 Refurbishment of the play equipment and safer surface at Moss Road Park in
Bridge of Weir was completed on schedule in January 2023. 
5.3 Further planned refurbishment of Howwood Park Toddler / Junior, Houston Public Park
and Inchinnan Playing Field play areas will advance to the Procurement phase in late
March / April 2023 with the works anticipated in early summer. 
5.4 A joint bid from the Council, working in partnership with OneRen, has been submitted for
the funding of refurbishment of two sets of tennis courts within Renfrewshire. The Lawn
Tennis Association have agreed to the bids for Robertson Park and Brodie Park in
principle, with a third bid for Johnstone being considered in the next tranche.  The bids
approval will be subject to formal internal approvals to ensure that the courts are
transferred to the One Ren portfolio to manage.    
6. Climate Change 
6.1 Electric Vehicle Charge Points 
Installation of Electric Vehicle Chargers, providing 18 EV charging bays, have been
completed at Gallowhill Community Centre, Hunterhill Community Centre, Hawkhead
Road, Williamsburgh Court, Arkleston Road and Barochan Road Children’s Homes. 
Works have been fully funded by Energy Savings Trust for Fleet Charging Infrastructure. 
6.2 Electric Vehicle Charging Infrastructure Study
Renfrewshire Council have been awarded £60,000 and partnered up with Glasgow City
Region partners to establish a regional feasibility study on the future EV charging
requirements over the next 5-10 years.  The interim report concluded in February 2023
providing projected numbers of EV Chargers required and the associated costs.  This
report will be submitted to Transport Scotland for future funding. 
6.3 Biodiversity
Engagement on the next phase of Biodiversity sites was completed in January 2023.
Following the engagement, storyboards have been enhanced to reflect feedback. 
6.4 Preparation of the wildflower corridors / areas has commenced and will continue
throughout April; this involves treating the grasses and pervasive weeds which out
compete the wildflowers. Following these works, seeding will commence when the
ambient temperature rises, which is expected to be early May. 
6.5 For ease of reference for Elected Members, the next tranche of sites as agreed through
the Climate Change Board are at the following locations with a link to the storyboard
(Biodiversity link): 
• Mill Lade, Linwood

Page 5

• Shaw Place, Linwood
• Knockhill Park, Renfrew
• Cunningham Road, Kilbarchan
• Woodside Park, Paisley 
• Nursery Area at Oldhall Road, Ralston 
• Station Road Playing Fields, Langbank
• Erskine Pool Area (rear of), Erskine
• Auchenlodment Road, Johnstone
• Barscube Terrace to Ladykirk Crescent, Paisley
• Arkleston Road, Renfrew 
7. Team Up to Clean Up 
7.1 Team Up to Clean Up member numbers and engagement levels continue to steadily
grow, there are currently 4,168 group members.  Volunteers, previously unknown to one
another, are meeting through the group to join forces in clearing large open spaces.  In
February, 65 bags of litter and some flytipping were removed from Lawn Street Car Park
by 5 volunteers. This resulted in the land being secured to prevent further litter and
flytipping, as well as a donation of £500 to Renfrewshire Food Bank from the private
landowner who is working in partnership with Renfrewshire Council to regenerate the
site. 
7.2 The Environmental Taskforce have had a focus on creating connections with local
Housing Associations, ensuring the responsibility and limitations of each organisation
are understood and the appropriate contacts are identified.  The Housing Associations
have further raised awareness of the partnership, the Environmental Taskforce, and the
issues of flytipping, through their social media. 
7.3 Meetings have further taken place with 4 private landowners who cleared their land of
flytipping as instructed, and have installed, or are installing, measures on site to prevent
further instances. 
7.4 As well as daily patrols to local hotspots, the Taskforce have invested in a suite of CCTV
cameras to deter and detect flytipping. Overt cameras, already onsite, offer automatic
number plate recognition, zoom high resolution images up to 150 metres, 360 view and
stream to laptops and mobile phones.   These have proven an effective deterrent in
large open spaces prone to heavy flytipping from commercial organisations.  Smaller
cameras have been deployed to deter/detect flytipping at garages, lockups and
residential areas.  Investigations are ongoing to establish an appropriate solution for
rural roads with no power source.  The Taskforce are working alongside one mobile
phone provider to trial a suitable solution. 
7.5 The Taskforce has met with one of the Procurator Fiscal’s at Paisley Sheriff Court and
Scotland’s Environmental & Wildlife Procurator Fiscal who have both been updated on
the creation of the Taskforce and its role.  SEPA are further aware of the Taskforce and
have been providing guidance and support.

Page 6

*Figures below detail work from the period 1 December 2022 to 31 January 2023 
8. Waste and Recycling Services 
8.1 New skips, compactors and roller packers purchased using the award from the
Recycling Improvement Fund (RIF) have been delivered to the HWRC sites, these will
be operational by the end of March. The new equipment will allow us to remove soil
and turf and hard plastics from the mixed waste, also they will provide us with
additional capacity for cardboard. In addition, we have implemented the recycling of
paint across all sites. All of these will bring an enhanced offering to residents and
allow them to recycle more material on-site increasing the quantity & quality of the
material and reduce the cost of extracting it from the mixed waste. The site staff will
be on hand to advise site users of the correct location for each material.   
8.2 The Council agreed to introduce a garden waste permit scheme.  Implementation
planning is underway and this will be supported by a full communications campaign.
Drop-in elected member awareness sessions will be arranged in due course. 
8.3 The Council currently provides a free waste collection and disposal service to around 75
churches across Renfrewshire and from 100 charities as part of the Council’s
commercial waste service. This service provision varies greatly from weekly uplifts of a
240l bin to multiple uplifts of bins up to the 1280l capacity.  The Council currently levies
no charge on churches or charities for collecting their waste. 
8.4 Under the Waste Scotland Regulations, Councils are obliged to provide churches with a
free waste collection service in the same way they do for the majority of household
collections.  Under the Waste Scotland Regulations, Council are allowed to charge for
collection of charities waste, but not the processing of their waste.   
8.5 The Council propose to provide churches with a free household collection and disposal
services where the general waste bin is collected every 3 weeks and the recycle bins
are collected every 4 weeks. If churches generate food waste this will be collected
fortnightly and if garden waste is generated by a church, the church can choose to
participate in the garden permit scheme.  Where a church wishes to receive a more
frequent service and/ or a larger volume of waste collected, the church will be offered
this commercial service on the same basis it is proposed for charities as set out in the
next paragraph 
8.6 A charge levied at 55% of the commercial waste charge, is proposed for charities
collections, on the basis that we will be charging for collection only. The cost will reflect
Action  
Proactive visits to identified hotspot areas 226
Number of reports investigated  292
Tonnes of flytipping removed  42
Number of sites secured to prevent further
flytipping
4
Letters to private landowners 14
Visits to businesses to ensure Waste Disposal
Arrangements in place
23

Page 7

the volume and frequency of waste collections undertaken, this will be effective from 1
April 2023. 
8.7 The Council’s waste advisors will work with churches and charities to support the new
arrangements over the coming months. It is expected following review of existing
arrangements there will be opportunities to increase the recycling that is presented by
both churches and charities as part of these service changes. 
8.8 Following World Mental Health Day, the waste services team have been raising
awareness and highlighting Cervical Cancer Prevention Week which took place from
23–29 February. Scotland have on average 1,700 cases per year, many of which
could be prevented by knowing how to protect yourself. Most people think cervical
cancer can only affect woman. The campaign has raised awareness throughout the
Waste Services team that Human Papillomavirus (HPV) infection can infect both men
and woman. 
9. Street Scene 
9.1 The grass cutting season commences on 27 March 2023 with the details of the program
available on the Council webpage for the public to access the information. The
recruitment of seasonal staff to assist in the grass cutting has been completed. 
9.2 A focused winter maintenance program was carried out during January, February and
will continue throughout March to enhance the appearance of the cemeteries. This
involved removal of excess detritus, scrapping paths & kerbs, edging grass areas, and
cutting back shrubbery. 
9.3 Following the motion to Council regarding grass-cutting in cemeteries and around war
memorials, the Convener of the ILE board, with the relevant officers, have engaged with
the mover and seconder. It was agreed that the new program of intense winter works
mentioned in 9.2 was extended to all 9 cemeteries ensuring that they all had a focused
winter maintenance programme, prior to the start of the grass cutting season and
continue to cut and leave the grass on the 14-day schedule. 
9.4 Memorial Safety Inspections continue and are expected to be completed by June 2023.
85% of initial inspections have been complete. A program of annual re-inspections has
commenced on memorials identified as requiring to be monitored at the initial inspection. 
9.5 To date the Council has inspected 21,305 headstones of these 1,571 were carefully laid
flat or barriered off as they were deemed to be in an unsafe condition. A further 5,047
headstones were issued with an advisory notice advising lair holders that they will
require some future work to ensure that the headstone remains safe. There have been
28 public/elected member enquiries in relation to headstones that were laid flat since the
project began in early 2020. 
10. Glyphosate 
10.1 Following the Council decision last September, StreetScene trialed a few different weed
control methods over the course of the 2022 growing season, this included the use of
hot foam, chemical products, and manual methods.

Page 8

10.2 The hot foam machine relied on a diesel boiler to heat up the water and adds to the CO2
emissions produced. The machine was very slow, difficult to maneuver and not suitable
for many areas with trailing hoses and trip hazards. The solution was deemed poor for
effective weed control.  
10.3 The chemical alternative was also deemed ineffective, having only a short duration
impact on weed control and secondary intervention was required to control growth with
additional strimming / scrapping and respraying. In particular, it was ineffective at
controlling weed growth on school blaes pitches. Following this trial, the service
proposes using glyphosate on school grounds.  Any treatments will be undertaken
during school holiday times when there are no children or adults present within the
school grounds. 
10.4 StreetScene reverted to increased manual strimming and scrapping to address the weed
growth and whilst this removes the heads, concerns remain this is not killing into the
roots and increased root growth will continue with potential damage to surfaces (break
up of assets).  Strimming and scraping to control weed growth is slow and very
expensive, with additional short-term funding being allocated to this area for 2022/23 to
deliver the change that will need to continue.   
11. Clyde Muirshiel 
11.1  In preparation of the busier summer season, winter maintenance has continued at Clyde
Murshiel and Castle Semple Country Parks.  Staff, with the help of volunteers, have
been working on paths at The Maze, removing sitka at Muirshiel and Rhododendron at
Parkhill. Camera traps have been placed in Parkhill to confirm presence of Badgers
before forthcoming clearance of larger rhododendron areas. 
11.2 Countryside Rangers continue regular sessions with schools, community network
activities, talks to local communities and Duke of Edinburgh youth groups. The sowing of
yellow rattle to improve biodiversity at Lochwinnoch meadow has been done in
partnership with local youth groups.   
11.3 Outdoor Activity staff have remained busy with groups throughout winter along with
equipment servicing in readiness for a busy 2023. Demand for outdoor activity
experiences remains very high. 2023 is nearly full, booking requests are already being
received for 2024 and 2025. 
11.4 The café and gift shop (CSCP) are fully accessible and will continue to operate ‘winter
hours’ (10am to 4pm) until the end of March. ‘Summer hours’ (10am to 5pm) begin in
April. The cafe has been supporting various ‘Warm Spaces’ activities, Men’s Shed and
community events including the ever-popular Renfrewshire Walking Network, ‘Tartan
Walk’, led by a Countryside Ranger.

Page 9

Implications of the Report 
1. Financial – There are ongoing challenges with the impact of COVID and cost of
living pressures, these are captured in the financial outturn report presented in a
separate paper to this policy board. 
2. HR & Organisational Development – None 
3. Community & Council Planning 
Our Renfrewshire is thriving / Reshaping our place, our economy and our
future - the service is actively involved in the Invest in Renfrewshire scheme and
investing in road network to support and facilitate economic growth. 
Creating a sustainable Renfrewshire for all to enjoy - working in partnership with
the community to deliver a cleaner Renfrewshire. Promoting and encouraging waste
minimisation through reducing, reusing and recycling. Reducing carbon emissions,
through LED streetlights and electric and low emission vehicles within the Council
fleet. 
Our Renfrewshire is well - the service encourages use of our parks and open
spaces to promote a healthy and active lifestyle. 
4. Legal – None 
5. Property/Assets – The Council’s roads, fleet and open space infrastructure is
maintained and enhanced. 
6. Information Technology – None 
7. Equality & Human Rights - The recommendations contained within this report have
been assessed in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the report. If
required following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the assessment
will be published on the Council’s website 
8. Health & Safety – None 
9. Procurement – None 
10. Risk – CRMG are continuing to review the Council’s risk profile in light of the
coronavirus pandemic. 
11. Privacy Impact – None

Page 10

12. CoSLA Policy Position – None 
13. Climate Risk – The Council continues to explore opportunities to secure external
funding to deliver sustainable, green infrastructure projects. 
List of Background Papers: January 2020 – Fee’s & Charges Report 
Author: Gordon McNeil, Director of Environment & Infrastructure
e-mail: gordon.mcneil@renfrewshire.gov.uk

Page 11

Appendix 1 – Roads & Infrastructure Fees & Charges 
Roads & Infrastructure Charges
Current Charges New Charges
April 2022 - March 2023 Apr 2023
Road Opening Permit - First week of
opening £315.20 £400
Road Opening Permit – First week of
opening, arterial road £682.90 £800
Road Opening Permit - Charge for each
additional week or part week thereafter £367.75 £550
Road Opening Permit – Charge for each
additional week or part week thereafter,
arterial road
£735.40 £880
Portable traffic light permits £137 £200
Road Occupation Permit £157.60 £250
Footway crossing permits and works £105.10 £230
Skip permits £52.55 £130
TTRO’s £303 £550
TTRO’s Short Term Notices £70 £350