Notice of Meeting and Agenda
Infrastructure, Land and Environment Policy Board 
Date Time Venue
Wednesday, 09 November
2022
10:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN               
Membership 
Councillor Michelle Campbell (Convener):     Councillor Stephen Burns (Depute Convener):    
Councillor Jennifer Adam:  Councillor Jacqueline Cameron:  Councillor Carolann Davidson: 
Councillor Audrey Doig:  Councillor Chris Gilmour:  Councillor John Gray:  Councillor John Hood: 
Councillor James MacLaren:  Councillor Janis McDonald:  Councillor John McNaughtan: 
Councillor Will Mylet:  Councillor Iain Nicolson:  Councillor Ben Smith:   
Hybrid Meeting
Please note that this meeting is scheduled to be held in the Council Chambers.  However, it is a
hybrid meeting and arrangements have been made for members to join the meeting remotely
should they wish. 
Webcasting of Meeting
This meeting will be filmed for live or subsequent broadcast via the Council’s internet site – at
the start of the meeting the Convener will confirm if all or part of the meeting is being filmed.  To
find the webcast please navigate to https://renfrewshire.public-i.tv/core/portal/home 
Members of the Press and Public
Members of the press and public wishing to attend the meeting should report to the customer
service centre where they will be met and directed to the meeting. 
MARK CONAGHAN
Head of Corporate Governance

Page 2

03/11/2022 
Items of business      
Apologies
Apologies from members. 
Declarations of Interest
Members are asked to declare an interest in any item(s) on the agenda
and to provide a brief explanation of the nature of the interest. 
1 Revenue and Capital Budget Monitoring as at 16
September 2022
Joint report by the Directors of Finance & Resources, Environment &
Infrastructure and Communities & Housing. 
1 - 8 
2 Operational Performance Report
Report by the Director of Environment & Infrastructure. 
9 - 16 
3 Environment & Infrastructure Service Improvement Plan
2022/25 Mid-Year Monitoring Report
Report by the Director of Environment & Infrastructure. 
17 - 53 
4 Kirklandneuk Playing Field & Pavilion Renfrew Victoria
Boys Club – CAT update
Report by the Chief Executive. 
54 - 59 
5 Disposal of Land adjacent to 123 Glencoats Drive, Paisley
Report by the Chief Executive. 
60 - 63 
6 Disposal of land at Maple Drive, Johnstone Castle –
Regeneration Phase 2
Report by the Chief Executive. 
64 - 68 
7 Surplus Status for Former Residential Properties on
Johnstone High School Grounds
Report by the Chief Executive. 
69 - 72 
8 Demolition School House, St Catherine’s, Paisley’
Report by the Chief Executive. 
73 - 76

Page 3

03/11/2022 
9 175 Year Ground Lease to Scottish Power Energy
Networks, Underwood Road Depot, Paisley
Report by the Chief Executive.
77 - 80 
10  15 Year Lease Renewal – JW Grant and Son Ltd, 70 Love
Street Paisley
Report by the Chief Executive. 
81 - 84 
11  10 Year Lease of Shop at 4-6 High Street, Renfrew
Report by the Chief Executive. 
85 - 88 
12  9 Year Lease of 9 Stoddard Square, Elderslie
Report by the Chief Executive. 
89 - 92 
13  9 Year Lease of 11 Stoddard Square, Elderslie
Report by the Chief Executive. 
93 - 96 
14  9 Year Lease of Shop at 5/2 High Street, Johnstone
Report by the Chief Executive. 
97 - 100 
15  2 Year Lease of Shop at 71/3 High Street, Johnstone
Report by the Chief Executive. 
101 - 104  
EXCLUSION OF PRESS AND PUBLIC
The Board may by resolution exclude the press and public from the
meeting during consideration of the following items of business as
it is likely, in view of the nature of the business to be transacted,
that if members of the press and public are present, there could be
disclosure to them of exempt information as defined in paragraphs
6 and 9 of Part I of Schedule 7A of the Local Government (Scotland)
Act, 1973. 
Exempt Item
Exempt documents are no longer available in print format.  You will
require to log in to CMIS and then visit the Infrastructure, Land &
Environment Exempt Items page from the list of boards to access
documents.  Please note that access to exempt documents is now
restricted. 
16  Proposed Sale of Kersland School
Report by the Chief Executive.

Page 4

To: Infrastructure, Land and Environment Policy Board
On: 9 November 2022 
Report by:  Director of Finance & Resources and Director of Environment &
Infrastructure
Heading:  Revenue and Capital Budget Monitoring as at 16 September 2022 
1. Summary of Financial Position
1.1. The projected Revenue outturn as at 31 March 2023 for Infrastructure, Land
and Environment is an overspend position of £1.696m (5.5%) against the
revised budget for the year. 
1.2. The projected Capital outturn as at 31 March 2023 for Infrastructure, Land and
Environment is a breakeven position for the year.  
1.3. This is summarised over the relevant services in the table below and further
analysis is provided in the Appendices. 
Table 1: Revenue
Division
Revised
Annual
Budget
Projected
Outturn
Budget
Variance
(Adv)/Fav
Budget
Variance  
£000 £000 £000 %
Environment & Infrastructure 30,841  32,537  (1,696) -5.5% 
Table 1: Capital
Division
Revised
Annual
Budget
Projected
Outturn
Budget
Variance
(Adv)/Fav
Budget
Variance  
£000 £000 £000 %
Environment & Infrastructure 21,579  21,579  0  0.0%
Item 1
Page 1 of 104

Page 5

2. Recommendations
Members are requested to:
2.1. Note the projected Revenue outturn position as detailed in Table 1 above,
considering that the forecast position is based on best estimates at this time;  
2.2. Note the projected Capital outturn position as detailed in Table 2 above; and
2.3. Note the Revenue and Capital budget adjustments detailed in sections 4 and
6. 
3. Revenue
3.1. The Revenue Budget Monitoring report at Appendix 1 identifies a projected
annual overspend of £1.696m (5.5% of total budget) for Infrastructure, Land
and Environment. Narrative is provided in the Appendices below to provide
context and explanation to the budget position for service areas 
3.2. The projected costs for this financial year are based on the financial information
available at the time of writing this report, and future projections and outturns
may vary depending on the operational and current market conditions.   
3.3. The forecast financial overview for the Council being reported to Finance,
Resources and Customer Services Board incorporates the overspend position
reflected in this report. 
3.4. The main reasons for the projected outturn position are indicated below, with
the tables showing both the subjective analysis (what the budget is spent on)
and the objective analysis (which division is spending the budget). The main
drivers are the loss of parking income, as has been the case since the beginning
of the pandemic and the refuse collection costs that are largely driven by
inflationary costs and absence cover as a result of annual leave being carried
forward from during the pandemic. The position also includes and an
anticipated increase in energy costs. 
4. Revenue Budget Adjustments
4.1. Budget adjustments totalled £1.531m which in the main related to Regulatory
Services, which previously reported to this board and now reports to
Communities and Housing Policy. The total budget is adjusted by £1.775m to
reflect this transfer. 
Page 2 of 104

Page 6

5. Capital      
5.1. The Capital Investment Programme 2022/23 to 2026/27 was approved by the
Council on 3 March 2022.  
5.2. The Capital Monitoring report at Appendix 2 indicates adjustments in the
approved capital programme of £3.896m, of which £0.306m have occurred
since the last board report at Period 3.  This reflects new grant funding awarded
in 2022/23.
5.3. The projected outturn at 31 March 2023 is a breakeven position. Further detail,
including reasons for significant variances, can be found at Appendix 2. 
6. Capital Budget Adjustments
6.1. Since the last report, budget changes of £0.306m have arisen which reflect the
following:   
Budget Increases in 2022/23 (£0.306m) for grant awarded in the following
projects:
• Cycle Walking Safer Routes (£0.064m); 
• Vehicle replacement Programme (£0.083m) for Transport Scotland
grant for electric vehicle charging infrastructure;
• Renewal of Playparks (£0.155m), a further £1.536m has been awarded
to Renfrewshire Council over the 3 year period 2023-24 to 2025-26. 
Implications of this report 
1.  Financial – The projected budget outturn position for Infrastructure, Land
and Environment Revenue budget is an overspend of £1.696m.   
The projected outturn position for Infrastructure, Land and Environment
Services’ Capital budget is breakeven position. The Capital programme will
continue to be monitored closely for the rest of the financial year. 
2.  HR and Organisational Development 
None directly arising from this report. 
3. Community/Council Planning
None directly arising from this report.
4.  Legal 
None directly arising from this report. 
5.  Property/Assets 
Capital projects result in lifecycle improvements and replacements to Roads
& footways network and vehicles. 
6.  Information Technology 
None directly arising from this report. 
Page 3 of 104

Page 7

7.  Equality and Human Rights 
The recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report because for example it is for noting only. If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health and Safety
None directly arising from this report. 
9. Procurement 
None directly arising from this report. 
10. Risk 
The potential risk that the Council will overspend its approved budgets for
the year will be managed at a Council-wide level by the Chief Executive and
Directors. 
11. Privacy Impact
None directly arising from this report. 
12. 
13.
Cosla Policy Position 
N/a. 
Climate Risk
None directly arising from this report.
__________________________________________________________________ 
List of Background Papers 
Revenue Budget and Council Tax Policy Board report, Council 3 March 2022 
Capital Investment Programme 2022/23 to 2026/27, Council 3 March 2022. 
___________________________________________________________________ 
Authors: Director of Finance & Resources and Director of Environment &
Infrastructure
Page 4 of 104

Page 8

Appendix 1   
Objective Summary
Annual
Budget at
Period 3
Budget
Adjustments
Revised
Annual
Budget at
Period 6
Projected
Outturn
Previous
Projected
Outturn
Variance
Movement
£000 £000 £000 £000 £000 % £000 £000
Directorate and Service Co-ordination 1,244 6 1,250 1,126 124 10.0% 0 124
Refuse Collection 5,233 159 5,392 6,968 (1,576) (29.2%) (1,399) (177)
Household Waste Recycling Centres 766 2 768 841 (73) (9.5%) (126) 53
Refuse Disposal 7,602 0 7,602 6,923 679 8.9% 152 527
Streetscene 6,039 163 6,202 6,270 (68) (1.1%) (31) (37)
Sustainability and Place 602 4 606 547 59 9.8% 29 30
Fleet Services (177) 5 (172) (257) 85 49.4% (18) 103
Social Transport 1,719 (132) 1,587 1,407 180 11.4% 120 60
Roads Operations 2,651 235 2,886 2,856 30 1.1% (101) 131
Infrastructure and Assets 1,887 (197) 1,690 1,731 (41) (2.4%) 23 (64)
Transportation & Development 994 (2) 992 1,011 (19) (1.9%) 0 (19)
Parking of Vehicles (1,131) 1 (1,130) (52) (1,078) (95.4%) (999) (79)
Strathclyde Partnership for Transport
Requisition
3,168 0 3,168 3,168 0 0.0% 0 0
Regulatory Services 1,775 (1,775) 0 0 0 0.0% 0 0
NET EXPENDITURE 32,372 (1,531) 30,841 32,537 (1,696) (5.5%) (2,350) 653
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2022/23
1 April 2022 to 16 September 2022
Budget Variance
(Adverse) or Favourable
POLICY BOARD : INFRASTRUCTURE, LAND AND ENVIRONMENT
Page 5 of 104

Page 9

Appendix 1   
Objective Heading
Refuse Collection
Household Waste Recycling Centres
Refuse Disposal
Streetscene
Social Transport
Parking of Vehicles
In the main, the overspend is in relation to transport related costs as a result of increased fuel prices and external vehicle
hires.
The current projected position relates to reduced levels of waste being disposed of and are expected to continue for the
remainder of the financial year resulting in an underspend on the Clyde Valley Waste contact. In addition, income is
expected to over recover this financial year due to income for mixed plastics, cans and glass now expected this financial
year. However, this will be closely monitored through the year.
Due to a reduction in social transport requirements, it is expected that the service will underspend this financial year.
However, it should be noted that this will monitored throughout the financial year and any changes will be reported to
future boards.
Off-street parking charges have been reintroduced for a number of months, however on and off street parking income and
fine recovery remain significantly lower than pre-pandemic levels and this Is expected to remain until the end of the
current financial year.
The over spend in the main relates to increased costs relating to fuel cost increases. There is also an expected overspend
on the supply of household bins which is partly due to increased prices and reduced demand in special uplift income. In
addition, due to high levels annual of leave carried forward as a result of the pandemic, additional overtime is being
incurred in order to cover this from an operational perspective.
Key Reasons for Projected Variance
The current projected overspend within Streetscene in the main relates to the tree management and the associated
health and safety issues such as tree inspections and monitoring tree health. As a result, the Council is incurring increased
inspection and monitoring costs in dealing with tree health issues such as Ash Dieback. This will be closely monitored
throught the remainder of the financial year.
Page 6 of 104

Page 10

Appendix 1   
Subjective Summary
Annual
Budget at
Period 3
Budget
Adjustments
Revised
Annual
Budget at
Period 6
Projected
Outturn
Previous
Projected
Outturn
Variance
Movement
£000 £000 £000 £000 £000 % £000 £000
Employees 23,079 (1,436) 21,643 22,298 (654) (3.0%) (406) (250)
Premises Related 1,089 (36) 1,053 1,466 (413) (39.2%) (101) (312)
Transport Related 6,040 (1) 6,039 7,169 (1,130) (18.7%) (1,085) (45)
Supplies and Services 12,356 52 12,408 12,543 (135) (1.1%) (514) 379
Third Party Payments 3,197 (1) 3,196 3,209 (13) (0.4%) (1) (12)
Transfer Payments 111 (7) 104 151 (47) (45.2%) (15) (32)
Support Services 39 (5) 34 7 27 79.4% (5) 32
Depreciation and Impairment Losses 0 (300) (300) 0 (300) (100.0%) 0 (300)
GROSS EXPENDITURE 45,911 (1,734) 44,177 46,842 (2,665) (6.0%) (2,127) (540)
Income (13,539) 203 (13,336) (14,305) 969 7.3% (223) 1,192
NET EXPENDITURE 32,372 (1,531) 30,841 32,537 (1,696) (5.5%) (2,350) 653
Budget Variance
(Adverse) or Favourable
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2022/23
1 April 2022 to 16 September 2022
POLICY BOARD : INFRASTRUCTURE, LAND AND ENVIRONMENT
Page 7 of 104

Page 11

Appendix 2   
Prior Years Approved  Budget Revised Projected
Expenditure Budget Adjustments Budget Outturn Total Approved Projected
to 31/03/2022* 2022-23 in 2022-23 2022-23 2022-23 Budget Outurn
Project Title to 31-Mar-27 to 31-Mar-27
£000 £000 £000 £000 £000 £000 £000
ENVIRONMENT & INFRASTRUCTURE
Cycling, Walking & Safer Routes 0 785 432 1,217 1,217 0 0% 1,467 1,467 0 0%
Roads/Footways Upgrade Programme 15,584 11,068 (28) 11,040 11,040 0 0% 39,180 39,180 0 0%
Safe Road Crossing 59 0 191 191 191 0 0% 250 250 0 0%
Vehicle Replacement Programme 0 2,257 236 2,493 2,493 0 0% 2,492 2,492 0 0%
Bridge Assessment/Strengthening 0 481 38 519 319 200 39% 520 320 200 38%
Lighting Columns Replacement 0 560 404 964 964 0 0% 964 964 0 0%
Traffic Management 0 100 83 183 183 0 0% 183 183 0 0%
Core pathways & cycle network 62 138 0 138 138 0 0% 200 200 0 0%
Parks Improvement Programme 2,142 63 97 160 160 0 0% 2,302 2,302 0 0%
Improvements to Outdoor Access and Play Area Programme 264 1,100 355 1,455 1,455 0 0% 1,718 1,718 0 0%
Multi Pupose Bins 60 20 0 20 20 0 0% 80 80 0 0%
Improvements to Cemetery Estate 1,220 141 179 320 320 0 0% 1,541 1,541 0 0%
Underwood Depot - Workshop Improvements 320 0 2 2 2 0 0% 322 322 0 0%
Clyde Mission Fund - Renfrew Riverside to Paisley TC Active
Travel Route 33 970 32 1,002 1,202 (200) -20% 1,035 1,235 -200 -19%
Renewal of Play Parks 0 0 313 313 313 0 0% 1,849 1,849 0 0%
Nature Restoration Fund 1 0 156 156 156 0 0% 157 157 0 0%
Recycle Improvement Fund 0 0 346 346 346 0 0% 346 346 0 0%
Strathclyde Partnership Transport 0 0 1,060 1,060 1,060 0 0% 1,060 1,060 0 0%
TOTAL INFRASTRUCTURE, LAND & ENVIRONMENT
BOARD 19,745 17,683 3,896 21,579 21,579 0 0% 55,666 55,666 0 0%
RENFREWSHIRE COUNCIL
CAPITAL INVESTMENT STRATEGY - NON-HOUSING SERVICES
1st April to 16th September 2022
POLICY BOARD: INFRASTRUCURE, LAND & ENVIRONMENT
Current Year 2022-23 Full Programme - All years
Budget Variance (Adverse) or
Favourable
Budget Variance (Adverse) or
Favourable
Page 8 of 104

Page 12

0 
To: Infrastructure, Land and Environment Policy Board 
On: 9 November 2022 
Report by: Director of Environment & Infrastructure 
Heading: Operational Performance Report 
1. Summary 
1.1 This report provides an overview of key service activities since the last Policy Board
report on 31 August 2022 and an operational performance update on the services and
key projects delivered during this period. 
1.2 Operational Services have continued a ‘business as usual’ basis while working
within Covid-19 restrictions. All required safety measures are in place and are now
well established. 
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy Board: 
2.1 Approves the operational performance update detailed within this report. 
3. Background 
3.1 Environment & Infrastructure provides essential services to every household in
Renfrewshire and works in partnership with the local community, other service areas
and Community Planning Partners, to deliver key Council priorities and initiatives. A
progress update on the main activities delivered by the services within Environment &
Infrastructure, in respect of the areas of activity delegated to this Policy Board, is
detailed below.
Item 2
Page 9 of 104

Page 13

2 
3.2 For Operational Services while most of the COVID-19 restrictions have now been
removed, Covid related absences continue to be a challenge to service delivery. In
addition, whilst assisting the services to continue to operate last year, staff accrued
annual leave which they have now been using this year. 
Updates for Infrastructure Land and Environment Policy Board 
4. Fleet, Roads and Transportation 
4.1 Roads Capital Investment Programme
The programme for 2022/23 continues with 69 of the programmed 90 carriageways
complete.  10 footway resurfacing schemes have been completed to date, however, the
remainder of the footway programme is delayed due to the significant increase in
contractor costs (a result of global bitumen prices) within the Roads Framework. The
service is currently reviewing the approach to delivering the footways investment
program for 2023/24 which will include those schemes delayed in 2022/23. The surface
treatment programme is now complete with all of 18 micro-surfacing dressing schemes
complete and 13 of the programmed 14 surface dressing schemes are complete (one
scheme required to be cancelled due to Scottish Water works on that particular
carriageway).  The large area patching programme is around 80% complete and will
complete in February and the pre-patching in advance of next year’s surface dressing
contract is 80% complete completing early November. 
4.2 Winter Maintenance 
Environment and Infrastructure are fully prepared for winter maintenance. Nine gritting
vehicles are ready for work and we have around 4000t of salt in stock ready to apply to
the public road network as the winter requires. The on-call rota for Winter Controllers /
supervisors has been produced and all relevant staff have completed their annual winter
training. 
As of the 21st October we have not required to grit the network, however, we have used
this period to stock up our 540 grit bins located throughout Renfrewshire. 
4.3 Paisley Town Centre Car Parking
Officers have been looking at a range of methods to introduce technology to simplify
parking in Paisley Town Centre. After a procurement process a 6-month trial period of
RingGo, a cashless parking solution, has been introduced in on and off-street parking in
Paisley. The pilot will then be evaluated before a decision made on any conversion to a
more permanent arrangement. 
4.4 Fleet Sustainable Travel - Diester Box
The automated key system for the sustainable vehicles in the pool car fleet has been
established allowing employees to book pool vehicles on-line and uplift the keys from the
facility in the car park. There are now 21 vehicles, 11 cars and 10 vans, aligned to 87
colleagues having remote access to the system. The provision of the service will
continue to increase steadily. Currently there are an average of 80 bookings a day for
sustainable pool fleet vehicles. 
Page 10 of 104

Page 14

3 
As part of the depot improvements and security arrangements, the gates at the depot /
Paisley HWRC will now close between 6.30pm and 6.30am. 
4.5 #YouDecide   
4.5.1 The engagement with the communities has been a positive experience with
communities and individuals contributing 2,843 ideas. This initial list has been
shortlisted to 117 ideas. 
4.5.2 Phase 2 will commence with extensive community engagement programme
throughout Renfrewshire, the voting period will launch on 11th November and run
for four weeks.  Residents will be able to vote online and will only be able to vote
for projects in their local area.  Officers will be available to assist anyone
requiring additional support to ensure no one is excluded from the voting
process. Prior to the engagement process commencing Elected Member drop in
sessions will take place on 10th & 11th November. 
4.5.3 The successful projects will be announced in January with works then taking
place throughout 2023. 
4.6 Active Travel Update 
4.6.1 Phase two of the Paisley to Renfrew active travel route from Turner Drive
connection southwards to the Paisley Central Retail Park off Renfrew Road is
nearing completion.  The project will provide an important active travel link from
Paisley Gilmour Street Station all the way to the river Clyde. 
4.6.2 The consultation phase of the Causeyside Street regeneration and active travel
route concluded in August.  The project will improve infrastructure and
connections between Gilmour Street and Canal Street train stations, providing
cycling infrastructure, formalising car parking arrangements to remove illegal
parking activities and to improve the streetscape and connections to amenity
areas such as Dunn Square.   The consultation identified some improvements
that have now been incorporated into the design. We will provide an update to
the Elected Members, Businesses, Residents and the public as a result of the
consultation and outline next steps in early November. 
4.6.3 Members will be aware of the Council successfully being awarded £2million from
Transport Scotland’s Bus Partnership Fund for improvements to public transport
infrastructure in Paisley Town Centre. Officers have been working up design
proposals that will be taken through a public consultation process in November
2022. The designs will be shared with elected members prior to the consultation
process taking place. 
4.6.4 Beat the Street has been completed in Paisley after a 6-week programme from
August to October. The project aimed to increase people’s activity levels,
improve health and promote behavioral change.  The service worked in
partnership with OneRen to promote the project in schools and local
communities.  Overall, we had 9,543 players take part covering 81,330 miles.
Page 11 of 104

Page 15

4 
This included schools and community groups who benefitted from being
encouraged to travel actively, therefore feel fitter and being rewarded through
vouchers for local businesses. 
4.6.5 Todholm Primary were overall school winners on total points and St Paul’s were
the top based on average points. Mary Russell took top spot for Empowered
Schools. 
4.6.6 The pilot feasibility traffic reduction studies in villages of Howwood, Kilbarchan
and Houston has been completed.  A series of engagement sessions with local
stakeholders along with assessments of traffic volumes, speeds and travel
patterns took place over several months.  The draft proposals will then be shared
with local elected members and the communities involved in the engagement for
feedback prior to a final report being prepared. 
4.6.7 New traffic calming measures have been installed on Glenburn Road and Dean
Park Road following engagement with local stakeholders to support a reduction
in speeding vehicles. 
4.6.8 The tender process for design / construction of Linburn Bus Turning Loop in
Erskine concluded in September with bids significantly over the original budget
estimates.  The tender has been subsequently revised to go out to market as
design only in 2022 with the intention to construct during 2023. 
4.6.9 New Pedestrian Crossings on Barrhead Road and Bridge of Weir Road and
junction with Greenfarm Road have been installed.  These crossings are part of a
Council and SPT funded programme to address concerns over crossing safety
and speeding at locations around schools, nurseries and key junctions in towns
and villages. 
4.6.10 The contract for the refurbishments of five signalised junctions from “old”
technology to more efficient LED systems has been awarded with installations at
Main Street/Torr Road Bridge of Weir, Beith Road/Hallhill Road Johnstone, Main
Road / Glenpatrick Road Elderslie, Paisley Road / Wright Street Renfrew and
Kings Inch Road / Ikea Renfrew.  This project is fully funded by SPT. 
4.7 Road Works Commissioner Annual Report 
4.7.1 The Office of the Scottish Road Works Commissioner (OSRWC) is the body
responsible for monitoring performance of Local Authorities and Utilities with
regards to good road works practice. The OSRWC published the Road Works
Monitoring Report for 2021/22 this month.  Renfrewshire Council were one of only
eleven Roads Authorities to receive the highest performance rating of ‘well
managed’ for our coordination of road works indicating a good performance across
all the Commissioner’s indicators.  Renfrewshire Council also recorded a very low
percentage of noticing faults for this period (1.2%).  This was the joint second
lowest figure for any Authority and confirms our commitment to ensuring that works
on our network are completed in a controlled manner with appropriate noticing
provided on the Road Works Register.
Page 12 of 104

Page 16

5 
5. Parks Investment 
5.1 The play area renewal works at East End Park were successfully completed at the
end of August and the play area reopened to the public. 
5.2 The next 6 play area renewals were all set to commence late October but at least one
will now start early in 2023. The limited availability of specialist play area installers,
combined with additional Scottish Government funding, is putting enormous pressure on
the supply chain. Some renewals will now need to be installed sequentially by a single
specialist installer. This includes: 
• Campbell Street, Renfrew
• Crags Park, Paisley
• Elm Drive & Sycamore Avenue, Johnstone
• Ardgryffe Park, Houston
• Churchill Drive, Bishopton
• Dunvegan Avenue, Elderslie 
5.3 Work continues specifying refurbishment requirements for Howwood Park Toddler /
Junior, Houston Public Park, Moss Road Park and Inchinnan Playing Field play areas. 
5.4 Due to the deterioration of the rubber safer surfacing at Moss Road Park play area,
some advance refurbishment works were successfully completed in late August to
overlay and rejuvenate the damaged surfaces. 
5.5 Work at Barshaw Park Pond work was complete by the date of the last Board, but water
levels remained low. Water levels have now returned to maximum capacity and the
Model Yacht Club has been able to enjoy sailing on the pond once again. The Friends of
Barshaw Park works on the community garden has also been completed.             
6. Climate Change 
6.1 Electric Vehicle Charge Points
EV Charging Hubs at Stow Street and Maxwell Street car parks are complete and ready
for use, with Bridge Street Car Park expected to be completed in November, this will
provide an addition of 26 charging bays for public use.   
Renfrewshire Council have been awarded £60,000 and partnered up with Glasgow City
Region to establish a regional feasibility study on the future EV charging requirements
over the next 5-10 years. 
A successful bid to Energy Savings Trust of £77,000 has been received for Fleet EV
charging infrastructure to further decarbonise our fleet vehicles. 
6.2 Biodiversity
Wildflower corridors/areas at the following areas have bloomed and we have cut these
back and removed the cuttings to reduce the nutrients and provide the best medium for
the perennial wildflowers to flourish next year. 
Page 13 of 104

Page 17

6 
• Paisley - Linwood Road
• Paisley, St James's - Greenock Road
• Erskine - A726
• Paisley - Glenburn Road
• Johnstone - Spateston 
We have commenced planning and preparation on the next tranche of sites at the
following locations as agreed through the Climate Change Board: 
• Mill Lade, Linwood
• Shaw Place, Linwood
• Knockhill Park, Renfrew
• Cunningham Road, Johnstone
• Woodside Park, Paisley 
• Nursery Area at Oldhall Road, Ralston 
• Station Road Playing Fields, Langbank
• Erskine Pool Area (rear of), Erskine
• Auchenlodment Road, Johnstone
• Barscube Terrace to Ladykirk Crescent, Paisley
• Arkleston Road, Renfrew 
7. Team Up to Clean Up 
7.1 Spotless September, despite less group events, saw 1,226 volunteers remove 2,112
bags of litter from Renfrewshire’s communities and open spaces.  World Clean Up day
was celebrated during the Campaign (16 September) which brought over 50 volunteers
from Decathlon, Braehead, to clean up Durrockstock Park in Foxbar together with Team
Up to Clean Up volunteers.   
7.2 Five secondary schools (S1, 2- and 3 year group assemblies) learned about the impact
of litter on their community, local wildlife, and the links between their litter and climate
change.  Hard hitting images and messages were presented to around 2,000 pupils,
explaining disposal options and consequences of irresponsible single use plastic
disposal.  Further presentations are planned with the remaining secondaries. “The Sea
Starts Here” stencils have been sprayed on known school lunch time route gulley’s to re-
enforce key messages. Fourteen schools received a lighter touch, interactive
presentation encouraging responsible litter disposal.  In total 23 school litter picks took
place across the Spotless September. 
7.3 October saw a further 1,417 bags of litter removed from Renfrewshire’s communities
and open spaces across 218 events. 
8.    Waste and Recycling Services 
8.1 The projects to implement a co-mingled garden and food waste service to 16,000   
households across Renfrewshire and the role out of new internal and external
recycling infrastructure across the school estate are both complete. These will see a
reduction in kilometers travelled and an improvement in recycling within these areas. 
Page 14 of 104

Page 18

7 
8.2 Orders have been placed with suppliers for the new compactors, roller packers and
skips which will be sited at Household Waste Recycling Centre’s. This is funded
through the Scottish Government’s Recycling Improvement Fund with the aim being to
recycle more materials from this source which will further enhance the Council’s
recycling performance and carbon reduction targets. 
8.3 The festive collection arrangements are in place for the forth coming year. This year
the brown bin collection will not take place between the 22nd of December and the 4th
of January. These arrangements will be set out in the annual recycling & waste
collection calendars which will be arriving with households in November. 
8.4 The new waste management system (Webaspx) has been launched. The technology
has improved work instruction capabilities and has functionality for same day
allocation of missed collections. This has improved response times through the real
time allocation to in-cab system and optimization of routing. This has enhanced
service delivery and will positively impact fuel usage and milage resulting in the
reduction of the carbon footprint relating to waste collection. 
9. Street Scene 
9.1 Street Scene have completed the rural verge cutting this year with 2 cuts to all verges on
the program and are completing the second round of path maintenance before winter. 
9.2 The Service has concluded the fortnightly grass cutting for the season although are
carrying out additional works on behalf of Communities and Housing Services, this
involves tidying gardens of the Council’s void properties to improve estate management
and appearance. 
9.3 To help tackle the issues that the autumnal leaf fall causes, the service is liaising with
the roads department to utilise the nightshift winter maintenance team to increase road
sweeping activities during milder spells of weather. This is aimed at preventing leaves
blocking the gullies and drainage systems. 
9.4  In addition, the service is undertaking an edging, weed scraping and winter shrub cutting
tasks over the winter period across Renfrewshire. They will also support the roads winter
maintenance program. 
Implications of the Report 
1. Financial – There are ongoing challenges with the impact of COVID and cost of
living pressures, these are captured in the financial outturn report presented in a
separate paper to this policy board. 
2. HR & Organisational Development – None 
3. Community & Council Planning 
Our Renfrewshire is thriving / Reshaping our place, our economy and our
future - the service is actively involved in the Invest in Renfrewshire scheme and
Page 15 of 104

Page 19

8 
investing in road network to support and facilitate economic growth. 
Creating a sustainable Renfrewshire for all to enjoy - working in partnership with
the community to deliver a cleaner Renfrewshire. Promoting and encouraging waste
minimisation through reducing, reusing and recycling. Reducing carbon emissions,
through LED streetlights and electric and low emission vehicles within the Council
fleet. 
Our Renfrewshire is well - the service encourages use of our parks and open
spaces to promote a healthy and active lifestyle. 
4. Legal – None 
5. Property/Assets – The Council’s roads, fleet and open space infrastructure is
maintained and enhanced. 
6. Information Technology – None 
7. Equality & Human Rights - The recommendations contained within this report have
been assessed in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the report. If
required following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the assessment
will be published on the Council’s website 
8. Health & Safety – None 
9. Procurement – None 
10. Risk – CRMG are continuing to review the Council’s risk profile in light of the
coronavirus pandemic. 
11. Privacy Impact – None 
12. CoSLA Policy Position – None 
13. Climate Risk – The Council continues to explore opportunities to secure external
funding to deliver sustainable, green infrastructure projects. 
List of Background Papers: none 
Author: Gordon McNeil, Director of Environment & Infrastructure
e-mail: gordon.mcneil@renfrewshire.gov.uk
Page 16 of 104

Page 20

1 
___________________________________________________________________
To: Infrastructure, Land and Environment Policy Board 
On: 9 November 2022
___________________________________________________________________ 
Report by: Gordon McNeil, Director of Environment & Infrastructure
___________________________________________________________________ 
Heading: Environment & Infrastructure Service Improvement Plan 2022/25
Mid-Year Monitoring Report
___________________________________________________________________
1. Summary 
1.1 The Environment & Infrastructure Service Improvement Plan 2022-25 was
approved by the Infrastructure, Land and Environment Policy Board on 15
June 2022. The plan sets out the priorities for the development of the service
over a three-year period.  Since the Service Improvement Plan was
developed, Council has approved a new five-year Council Plan. 
Consequently, actions and indicators in the Service Improvement Plan have
been realigned to fit the themes in that new Council Plan and refreshed
Community Plan, both approved by Council in September 2022.  These are
detailed later in the report. 
1.2 Service Improvement Plans reflect the service activity for each Council
service, rather than the themes of the Council's Policy Boards. Some aspects
of service delivery may fall within the remit of other Policy Boards. In the case
of the Environment & Infrastructure SIP, the service activity is split across both
the Infrastructure, Land and Environment Policy Board and Finance,
Resources and Customer Service Policy Board and the SIP and updates
related to it are therefore reported to both Policy Boards. This covering report
and the appendices reflect the areas that are most relevant to the remit of the
Infrastructure, Land and Environment Policy Board. 
1.3 The Service Improvement Plan sets out the actions which will ensure
continuous improvement across the service and the performance indicators
Item 3
Page 17 of 104

Page 21

2 
which ensure the impact can be measured.  These reflect the priority themes
of the Council Plan. 
1.4 This report contains details performance and achievements over the period 1
April 2022 to 30 September 2022.  The main purpose of the report is to
provide: 
• details of the key achievements of the service over the period;
• an update on changes made to the action plan and scorecard to reflect
the new Council Plan themes;
• a progress update on implementing the action plan linked to the 2022-25
Service Improvement Plan;
• an assessment of performance in relation to the service scorecard of core
performance indicators; and
• an overview of priorities for the service over the next six months. 
1.5 As detailed in section 5 of this report, over the past six months, the service
has made good progress in delivering positive outcomes for Renfrewshire and
its residents.  The list below details some of these achievements. 
• Operations & Infrastructure capital programme is delivering real   
improvements to Renfrewshire’s infrastructure; 
• Delivering key programmes to support our RenZero priorities;
• Leading the Environment and Place agenda;
• Securing funding from the Recycling Investment Fund to develop
Infrastructure in our HWRCs
• Investment in infrastructure in 6 play areas;
• Progressing the #YouDecide participatory budget programme 
2. Recommendations 
2.1 It is recommended that the Infrastructure, Land and Environment Policy Board
notes: 
a) the contents of this report;
b) the progress to date on delivering the actions contained within the
Environment & Infrastructure Service Improvement Plan;
c) the current performance of the service as measured by the scorecard
indicators. 
Page 18 of 104

Page 22

3 
3.  Background 
3.1 The Service Improvement Plan is a comprehensive statement of the
outcomes the service aims to achieve, and the actions it will take to achieve
these.  It fits within the wider planning framework of the Council by taking
account of Community Planning themes and Council priorities.  It enables
elected members to have oversight of developments within the service and to
consider and develop policy options which reflect customer need and
resource availability. 
3.2 The Service Improvement Plan also provides a mechanism by which elected
members can evaluate the performance of the service.  The appendices to the
plan contain an action plan and performance indicators against which
progress can be measured.  This mid-year monitoring report provides an
update on progress against the 2022-25 plan. 
3.3 Section 4 of this report provides a note on the newly approved Council Plan,
outlining the strategic direction the Council Plan describes and how the
Service Improvement Plan process aligns with this.  Section 5 gives details of
service activity and achievements over the period April-September 2022. 
Section 6 discusses actions delayed or cancelled since the Service
Improvement Plan, and any new actions added to reflect additional priorities
identified since the plan was approved.  Section 7 provides a narrative on
performance against the scorecard included as Appendix 2. 
3.4 An outturn report detailing full-year performance will be brought before this
board in spring 2023. 
4. New Council Plan 
4.1 Since approval of the Environment & Infrastructure Service Improvement Plan
by this Board on 15 June 2022 full Council has approved a new Council Plan,
which sets out our strategic priorities under five themes – Place, Economy,
Fair, Green, Living Our Values.  It also has a cross-cutting theme of improving
outcomes for children and families, reflecting the importance of delivering the
best possible start for children in Renfrewshire. 
4.2 The new Council Plan recognises the financial challenge that Renfrewshire,
like all local authorities, currently faces.   The scale of the challenge has been
set out for elected members and the public through a series of reports to
Council, and officers will continue to provide regular updates in this way.  In
response, Council agreed in June 2022 to a portfolio of financial sustainability
Page 19 of 104

Page 23

4 
work to be delivered alongside the main transformation programme and
reviews undertaken by individual services. The focus of this activity is also to
improve service delivery and outcomes achieved for service users; it is about
delivering modern and effective services as well as financial savings.  The
outcomes of this work may be reflected in future Service Improvement Plans
as well as the Council Plan.
Despite the scale of the challenge, Council remains committed to building on
the many strengths of our communities and delivering strong universal
services that support everyone to live well and embrace opportunities. 
4.3 The direction of the Council over the next five years will be driven by our five
key themes:
• We will encourage kind and connected communities where citizens take
pride in the place they live
• We will support a strong and flexible local economy
• We want Renfrewshire to be a fair place, where people feel safe,
supported and empowered
• We will work towards a greener future
• As an organisation, we will be driven by our values, to be fair, helpful,
collaborative and value learning.
• An additional cross cutting theme for the whole plan will be to improve
outcomes for children and families.
4.4 In order to keep Service Improvement Plans aligned with the Council Plan,
actions and performance indicators have been re-allocated to these 5 new
themes and the new cross cutting theme.   
5. Service Update and Key Achievements April-September 2022 
• Operations & Infrastructure capital programme is delivering real  
improvements to Renfrewshire’s infrastructure
• In the first 6 months of the year the following programmes were being
delivered to support our RenZero priorities:
- New active travel schemes have been launched, Beat the
Street, School Active Travel Promotion, Scootability, Not Far?
Leave the Car;
- The number of electric vehicles is 117; 25% of the Council’s
fleet;
- Several areas of biodiversity have established and have been in
bloom;
Page 20 of 104

Page 24

5 
• Leading the Environment and Place agenda, fronted by the Team Up to
Clean Up campaign, in partnership with Communities, Housing &
Planning establishment of the Environmental Task Force;
• £346,107 funding from the Recycling Investment Fund (RIF) has been 
awarded and will be used to develop infrastructure in HWRCs to
improve the quantity and quality of recyclate collected through this
waste stream;
• Implementing co-mingled garden and food waste collections for 16,000
households across the Council area;
• Continued parks investment with new equipment in 6 play areas;
- Morar Drive, Paisley;
- Durrockstock Park, Paisley;
- Ellerslie Street, Johnstone;
- Tinto Square, Renfrew;
- Ben Lawers Drive (Hawkhead Park), Paisley; and
- East End Park, Paisley.
• Continued improvements in cemeteries of main road infrastructure
including drainage and signage;
• Progression of #YouDecide participatory budget programme
consultation with local residents for improvements and project ideas in
their community; and
• Maintaining ISO 9001 accreditation. 
6. Areas where actions have been delayed or cancelled 
6.1 Due to service resource constraints and factors external to the Council some
actions have seen their target dates modified while others have been required
to be paused. 
These include: 
• Implement the requirements of the Transport (Scotland) Act 2019
including enforcement of restrictions on pavement parking - target
date has been revised to reflect changes to the deadlines in national
legislation
• Develop a new Open Space Strategy – work is progressing on the
strategy, but the target completion date has now been revised from March
2023 to March 2024
• Continue to develop a suite of digital solutions across the service –
the identification of additional digital opportunities has resulted in the target
completion date being revised from March 2023 to September 2023 
• Deliver the objectives and requirements of the Scottish Household
recycling charter, Circular Economy and Deposit Return and
Page 21 of 104

Page 25

6 
Extended Producer Responsibility schemes - the target completion date
has been revised from March 2023 to March 2024 due to delays in
implementation at the national level
• Work to meet the challenging targets set out in our carbon
management plan – through our council fleet, street lighting, public
realm, waste and consumables and Continue to develop service
delivery methods to improve customer experience and meet
demanding recycling and Net Zero targets - It is recommended that
these actions be removed, and activity be reported as part of the action,
Support of the Council’s pledge to make Renfrewshire carbon neutral by
2030
6.2  The remaining actions have been progressing in line with anticipated
timescales 
7. Progress against performance measures 
7.1 Environment & Infrastructure has 22 performance indicators in its current
scorecard.  Of these, 9 are reported quarterly and 13 are reported annually. 
This report contains data pertaining to quarter 1/2 as well as trend data. 
7.2 The full performance scorecard is included as part of Appendix 1 of this
report. 
7.3 Several performance indicators in the service scorecard are reported as part
of the Local Government Benchmarking Framework (LGBF). The
Improvement Service will release a first draft of the 2022/22 data in early
December 2022. 
7.4  Some highlights of service performance and outcomes, with specific
relevance to this Policy Board, include: 
• The percentage of the road network considered for treatment has
improved across all categories showing sustained improvement over the
last few years;
• The percentage of the vehicle fleet which uses alternative fuels, such as
electricity, at 27% has exceeded its performance target of 25% for the
first two quarters of 2022/23;
• Potholes – For the first 6 months of 2022/23 performance was 91% and
above the target of 80% for this year; 
• The 2021 household waste recycling data has now been verified by
SEPA and confirms that Renfrewshire’s recycling rate has improved to
51.7% in 2021.  Renfrewshire’s performance compares well to the
national average which was 42.7%. For the first two quarters of 2022 the
performance is estimated as 53.3% (unverified figures);
Page 22 of 104

Page 26

7 
• Elected Member enquiry response rate of 92.3% continues to exceed
the current 85% target;
• Frontline resolutions response rate of 85.3% exceeds the 85% target to
the end of September 2022 
• Complaint investigation response rate of 90.9% exceeds the 85% target.
Scrutiny of complaints data and performance is a key priority for the
service. This focus is now having a positive impact with response rates
improving 
8. Priorities over the next six months 
8.1 Financial management 
The Council has agreed to a portfolio of financial sustainability work to be
delivered alongside the main transformation programme and reviews
undertaken by individual services. Environment & Infrastructure will support
the portfolio approach and ensure that the focus of its activity will be on
improving service delivery and outcomes achieved for service users while
delivering modern and effective services as well as financial savings.  
8.2 Right for Renfrewshire
The service continues to engage with the Right for Renfrewshire programme.
The Operations & Infrastructure service area is currently under review as part
of the programme; 
8.3 COVID Recovery
Environment and Infrastructure’s key services continued to operate within
Covid-19 pandemic. Frontline operational services have experienced pressure
on resources, with annual leave and recruitment issues in some areas
stretching the resilience of services. 
8.4 Plan for RenZero
The service will continue to be at the forefront of work being done to respond
to climate change targets through RenZero. It will achieve this by building on
the positive impacts of the following key areas: 
Transition To Clean Energy - undertaking a strategic review of all the
buildings we own to ensure more efficient use: minimising energy
consumption; reducing energy waste; maximising energy efficiency; and
ensuring all public and community buildings have renewables where
technically feasible. Work towards generating the equivalent of 100% of the
Council’s public buildings’ power needs and ensure 100% of Council public
building heating requirements are carbon neutral. 
Resilient Place - Leads on the Environment and Place agenda, which
Page 23 of 104

Page 27

8 
continues to make a difference to the cleanliness of streets in Renfrewshire
and improving the local environment. 
Sustainable Travel - Removing the need for new petrol and diesel light
commercial vehicles in the Council fleet and phasing out the need for all new
petrol and diesel vehicles. New active travel schemes have been launched,
Beat the Street, School Active Travel Promotion, Scootability, Not Far? Leave
the Car. Working with public transport partners to explore options for
increasing deployment of low emission buses, including electric and hydrogen
vehicles, and improving public transport provision across the area 
Circular Economy - Continue to promote and encourage waste minimisation
through reducing, re-using and recycling. Ensuring recycling is accessible for
everyone, including non-standard properties, e.g. tenements and flats.
Working to resolve problem areas such as storage space, stairs, communal
bins, lack of participation and fly tipping through ongoing stakeholder
consultation and engagement. Ensuring that all Council buildings, including
schools, have the facilities for the full recycling collection service and work
with local businesses and commercial waste providers to identify improvement
opportunities. 
8.5 Waste Infrastructure Development
Waste collection and infrastructure review – new recycling infrastructure in
schools and implementation of the Recycling Investment Fund (RIF)
investment across HWRCs; 
8.6 Responsiveness to Freedom of Information requests & Complaints
The service will continue to build on the improvements and strong focus on
improving performance in responding to complaints, members enquiries and
FOIs; 
8.7 Use of Data and Technology
Data, process flows, and digital improvement of services continues across all
service areas, with focus on StreetScene and road operations over the next 6
months. 
Implications of the Report 
1. Financial – This report notes the financial challenges facing the local authority and the
work that will be undertaken by the service to manage this. 
2. HR & Organisational Development – The action plan included as Appendix 2 highlights
the service’s commitment to this priority area. 
Page 24 of 104

Page 28

9 
3. Community/Council Planning – Service Improvement Plans reflect the contribution of
each service to the Council and Community Plans. 
4. Legal – None 
5. Property/Assets – None 
6. Information Technology – Digital resources are now key to the delivery of services and
strategies are in place to manage this. 
7. Equality & Human Rights - The Recommendations contained within this report have
been assessed in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’ human rights have
been identified arising from the recommendations contained in the report because it is
for noting only. 
8. Health & Safety – Appendix 2 includes actions relating to employee wellbeing and
absence.
9. Procurement – None 
10. Risk – Risks related to the delivery and management of services are regularly monitored
and included in Renfrewshire Council’s Corporate and Strategic Risk Registers. 
11. Privacy Impact – None 
12. COSLA Policy Position – None 
13. Climate Change - The service will contribute to the Council’s Plan for Net Zero through
its management of council property.
___________________________________________________________________ 
List of Background Papers: 
Environment & Infrastructure Service Improvement Plan 2022 - 2025
Council Plan 2022-2027
___________________________________________________________________
Author Gordon McNeil, Director of Environment & Infrastructure
Page 25 of 104

Page 29

Appendix 1
10 
Actions 2022-25 
Priority Action: Place Actions
Code Action Status  Progress  Due Date Update
01 Deliver the 2022/23 roads
and footways capital
investment programme -
£10.984 million 
31-Mar-2023
The Roads Capital Investment programme for 2022/23 continues with 63
of the programmed 90 carriageways complete.  10 footway resurfacing
schemes have been completed to date, however, the remainder of the
footway programme is on hold for the time being due to the significant
increase in contractor costs (a result of global bitumen prices). This has
particularly affected the Footway Lot of the Roads Framework.   
The surface treatment programme is now complete with all of the 18
micro-surfacing dressing schemes complete and 13 of the programmed
14 surface dressing schemes complete (one scheme required to be
cancelled due to Scottish Water works on that particular carriageway).
The large area patching programme is around 80 % complete and will
complete in February 2023.
Status 
Cancelled 
Delayed 
In Progress 
Completed
Page 26 of 104

Page 30

Appendix 1
11 
Priority Action: Place Actions
Code Action Status  Progress  Due Date Update
02 Continue to develop and
upgrade the Council’s
traffic light infrastructure
from analogue to digital  
31-Mar-2023
The refurbishment of five signalised junctions from “old” technology to
more efficient LED systems is now complete. 
03 Update the Winter
Maintenance Policy  30-sept-2022 The new Winter Maintenance Policy for 2022-2027 was approved at the
Infrastructure, Land and Environment Policy Board in August 2022. 
04 Update Road Safety
Policy  31-Dec-2022
The approved Policy has been reviewed with no substantial changes
required at the current time. The Policy will be reviewed as part of the
implementation of the new Local Transport Strategy.
05 Develop and implement
Unadopted Roads Policy  31-Mar-2024
(Revised Target)
Initial discussions have taken place with other relevant Council services
to develop the Policy going forward. However, due to resourcing issues
within the infrastructure and transportation team this action will now be
undertaken in financial year 2023/24. 
06 Implement the
requirements of the
Transport (Scotland) Act
2019 including
enforcement of
restrictions on pavement
parking 
31-Mar-2024
(Revised target) 
Initial work in this area has focussed on implementation of 20mph zones
across Renfrewshire. Initial survey work has been carried out to look at
converting our previous advisory zones to permanent mandatory zones.
Guidance on the enforcement of pavement parking has been further
delayed due to the Scottish Government which is currently working
secondary legislation and parking standards guidance that will underpin
the enforcement of these parking prohibitions. This is not anticipated to
Page 27 of 104

Page 31

Appendix 1
12 
Priority Action: Place Actions
Code Action Status  Progress  Due Date Update
be in place until the end of 2023 with enforcement not likely to begin until
2024.
07 Continue to develop a
suite of digital solutions
across the service
including:
- develop the digital
application software
for Waste
Management system
- Grass cutting at rural
roads and path
networks
- Digital scheduling and
real time recording of
service activities
- Gully Cleaning
- Waste Collection  
30 September 2023 
(Revised Target)
The digital monitoring of gulley activities is now operational is providing
real time monitoring information. StreetScene activities are now
benefitting from digital solutions for many parts of the service with the
remainder progressing similar type applications. 
Waste Services changed supplier of Routeing software moving from
Route Smart to Webaspx in August 2022. This new software has been
installed in all refuse collection vehicles and route optimising activities
are being explored.
08 Develop a new
Cemeteries Policy   31-Mar-2023
The policy has been developed over the first six months of the financial
year with only some minor amendments being required. The revised draft
will be submitted to board for approval in 2023.
Page 28 of 104

Page 32

Appendix 1
13 
Priority Action: Place Actions
Code Action Status  Progress  Due Date Update
09 Deliver improvements in
the Council’s Cemeteries
estate 
30 Sept 2023 
(Revised Target)
Improvements have been made over the past few years in the
cemeteries main road infrastructure, including: drainage and signage.
Capital spend has been committed for this financial year with further
proposals to be submitted to board in early 2023 and will be
commissioned by March 2023. 
10 Implement schedule for
grass cutting and
vegetation cutback in
rural areas and on core
path network  
31-Mar-2023
First cut of both rural verges and paths were completed to schedule and
have now been incorporated as a mainstream activity. 
Page 29 of 104

Page 33

Appendix 1
14 
Priority Action: Economy Actions
Code Action Status  Progress  Due Date Update
01 Continue to invest in
infrastructure to support growth
– from road and rail links to
bridges, cycle and pedestrian
routes 
31-Mar-2023
The service continues to pursue design and construction
projects to fill identified gaps in the local transport
network and to improve road user provision in line with
its published strategies.
02 Develop a Local Transport
Strategy supported by revised
Active Travel and Public
Transport Strategies  31-Mar-2023
Strathclyde Partnership for Transport (SPT) has now
published the draft Regional Transport Strategy (RTS)
which is subject to final approval. The service has
commenced a scoping exercise for a new Local
Transport Strategy based on the principles included in
the draft RTS. 
Page 30 of 104

Page 34

Appendix 1
15 
Priority Action: Economy Actions
Code Action Status  Progress  Due Date Update
03 Continue to develop first phase
design proposals for
connectivity and transportation
to enable application for
external funding for project
delivery economy  
31-Mar-2023
Cycling Walking Safer Routes funding is now being used
on an annual basis to prepare designs for relevant
projects on an annual rolling programme, with design in
year 1 and implementation in year 2. This will be an
ongoing process in years ahead. 
Work in the current phase has included completion of
the construction phase of the segregated shared
pedestrian/cycle route on Greenock Road between Red
Smiddy roundabout and the Inchinnan Drive
roundabout. The next phase will include work from Red
Smiddy to Erskine and southwards along Inchinnan
Drive to Barnsford Road and the airport. It is due to be
complete in March 2023. 
04 Implementation of a revised
approach to Car Parking in our
town centres  31-Mar-2023
An initial scope for a new Car Parking Strategy has been
developed to support business, improve enforcement
and encourage public transport usage 
05 Provide employment, training
and apprenticeship
opportunities for identified 
31-Mar-2023 Work is ongoing across to ensure the service provides
employment, training and apprenticeship opportunities:
Page 31 of 104

Page 35

Appendix 1
16 
Priority Action: Economy Actions
Code Action Status  Progress  Due Date Update
groups of young people in
Renfrewshire
- A revised apprenticeship model has been adopted
within the Roads Service with a new career pathway
now including apprenticeships through to
Chargehand and Supervisor level.
- Two graduate interns have been employed in Waste
Strategy and in Parks and Open Spaces.
- Waste Operations currently have got 5 Invest
programme trainees working in frontline operations. 
- Streetscene Operations are currently in the process
of recruiting 3 Invest trainees.
06 Deliver Paisley Town Centre
junction improvements as part
of the Bus Partnership works.  
31-Mar-2023
Final designs for each of the junctions is now complete
and will be subject to a consultation exercise. 
Page 32 of 104

Page 36

Appendix 1
17 
Priority Action: Fair Actions
Code Action Status  Progress  Due Date Update
01 Implement the preferred options
from the #YouDecide participatory
budget programme for infrastructure
improvements 
31-Mar-2023
The shortlist of ideas generated from the
consultation programme will be presented
to the public in October 2022 with the
voting process commencing thereafter.
02 Continue to work with existing and
establish new ‘Friends of’ groups to
support implementation of the
Community Empowerment Bill  31-Mar-2023
In support of the Community
Empowerment (Scotland) Act 2015 the
service has been developing relationships
with community groups. New groups have
been established in relation to parks,
playparks and cemeteries. Action is
ongoing and on schedule to be complete
by the target date. 
Page 33 of 104

Page 37

Appendix 1
18 
Priority Action: Green Actions
Code Action Status  Progress  Due Date Update
01 Support of the Council’s pledge to
make Renfrewshire carbon neutral
by 2030 
31-Mar-2023
In the first 6 months of this financial year the service has
played an active role in the following focused outcome
areas of Renfrewshire’s Plan for Net Zero: 
Resilient Place 
Leads on the Environment and Place agenda, which
continues to make a difference to the cleanliness of streets
in Renfrewshire and improving the local environment. 
Sustainable Travel
New active travel schemes have been launched, Beat the
Street, School Active Travel Promotion, Scootability, Not
Far? Leave the Car.
Circular Economy
Continue to promote and encourage waste minimisation
through reducing, re-using and recycling
02 Deliver a programme of enhanced
operational environmental and
community support activities for
environment and place  31-Mar-2023
Engagement on the online platform continues to grow
with 4,000 members supporting the campaign.  
Members have benefitted from equipment including
caddies, waterproof clothing and shoes.
Greenspaces funding allocated to Team Up to Clean
Up has seen individual volunteers procure and
maintain planters in their community. The adoption of
Page 34 of 104

Page 38

Appendix 1
19 
Priority Action: Green Actions
Code Action Status  Progress  Due Date Update
green spaces in their neighbourhoods has increased
biodiversity and community engagement.
Team Up to Clean Up’s Environmental Taskforce
officers have been appointed. This taskforce
demonstrates partnership working between
Renfrewshire Wardens and StreetScene Operations.
The team will work to tackle environmental issues
throughout Renfrewshire. 
03 Continue to develop service delivery
methods to improve customer
experience and meet demanding
recycling and Net Zero targets
Now included in action above see note in update column 
Following the publication of the Plan for Ren Zero it is
recommended that these actions be removed and
reported as part of the action, Support of the
Council’s pledge to make Renfrewshire carbon
neutral by 2030, noted above.
04 Work to meet the challenging
targets set out in our carbon
management plan – through our
council fleet, street lighting, public
realm, waste and consumables 
Now included in action above see note in update column
05 Deliver the objectives and
requirements of the Scottish
Household recycling charter,
Circular Economy and Deposit  
31 March 2024 
(Revised Target)
Deposit Return Scheme was delayed further and will
be implemented 16 August 2023. Waste &
Resources Action Programme are progressing the
implementation of the legislation.
Page 35 of 104

Page 39

Appendix 1
20 
Priority Action: Green Actions
Code Action Status  Progress  Due Date Update
Return and Extended Producer
Responsibility schemes.
Specific communication has been made with services
across Renfrewshire Council to ensure awareness or
responsibilities and readiness for the implementation
of the scheme. Work is ongoing to assist with the
implementation of the scheme.
Responses on the route map proposals have been
submitted to the Circular Economy and Extended
Producer Responsibility Schemes.
Results from the consultation will inform and shape
the future of waste services in local authorities. 
06 Prepare site at Linwood for
improved bin store facility and
consideration of the infrastructure
required to fulfil the Deposit Return
Scheme and future requirements for
segregation of waste.  
31-Mar-2023
Initial preparatory works were completed in July
2022. This included the site clearance of antiquated
plant and machinery, litter, a reconfiguration of the
site layout, levelling of site and bunding put in situ for
security.
07 Develop and implement a long-term
sustainable leachate and surface
water management plan for Linwood
Moss.  
30 June 2023 
(Revised Target)
Flow rates of surface water continue to be monitored.
Data on the surface water flow rates will be collated
over a period of a year to account for seasonal
effects on the leachate levels. Once all the data has
been collated it will be submitted to SEPA, in
Page 36 of 104

Page 40

Appendix 1
21 
Priority Action: Green Actions
Code Action Status  Progress  Due Date Update
December 2022 or early January 2023, to agree next
phase of diluted direct discharge trial. 
08 Develop a new Waste Strategy
Policy   30 June 2023 
(Revised Target)
Existing policies have been updated in recent years
but it is recognised that further revision is required to
reflect the service developments and upcoming
legislative changes. 
09 Install fixed and mobile cameras to
deter or help identify fly tipping in
hotspot areas 
31-Mar-2023
Active cameras have been installed at identified fly
tipping hotspots across Renfrewshire.  
The Environmental Taskforce, expected to be in
place in October 2022, will identify further suitable
sites, gathering information on type of fly tipping
(commercial or domestic), volume and
frequency.  Cameras will be relocated periodically,
where required.
10 Development of Low Emissions /
Electrification Strategy  
31-Mar-2023
Work has been commissioned by Environment &
Infrastructure, as part of a City region wide
partnership, to develop a strategy for the region. The
successful consultant has been appointed and initial
scoping works have been undertaken. 
Page 37 of 104

Page 41

Appendix 1
22 
Priority Action: Living our Values Actions
Code Action Status  Progress  Due Date Update
01 Provide our employees with the
appropriate support to manage their
attendance, health and wellbeing 
31-Mar-2023
Absence management has been a key
focus for the service in the first six months
of 2022/23. The service has also invested
in mental health first aid training and the
creation of mental health champions.
Environment & Infrastructure continues to
support delivery of the Corporate Health
and Well Being Strategy. 
02 Implement the Council’s People’s
Strategy  31-Mar-2023
Environment & Infrastructure will support
the development of this key Council
priority.
03 Active participation in Council’s Right
for Renfrewshire Transformational
Programme 
31-Mar-2023
Operations & Infrastructure is participating
in service reviews as part of the Right for
Renfrewshire transformation programme.
The service will be fully engaged in
supporting the Council’s strategy for
financial sustainability through the portfolio
approach which will be delivered alongside
the main transformation programme and
reviews undertaken by individual services.  
Page 38 of 104

Page 42

Appendix 1
23 
Priority Action: Living our Values Actions
Code Action Status  Progress  Due Date Update
04 Better use of data and technology to
improve services performance and
delivery  31-Mar-2023
The use of data analytics and technological
developments continues to employed to
support service improvement out across
each service area.
05 Deliver agreed operational
efficiencies through fleet utilisation
and rationalisation 
31-Mar-2023
Fleet services has used data analytics from
to analyse and review vehicle utilisation
across the fleet. As a direct result of this
the core fleet has reduced year on year
since 2020 (2020 - 391, 2021 – 388 and
2022 – 353). This is a result of effective
fleet utilisation and increased use of pool
vehicles to offset core fleet and improve
utilisation and minimise cost of underused
vehicles. This will continue as we monitor
usage across departments and advise in
the forthcoming years.
06 Support the Council to implement the
Business World system   31-Mar-2023
Environment & Infrastructure continue to
participate and engage in the
implementation of Business World.
07 Embed new approaches to staff
communication and engagement
across all areas of the service  
31-Mar-2023
The Service’s approach to staff
communication and engagement was
halted due to the COVID-19 pandemic. 
Page 39 of 104

Page 43

Appendix 1
24 
Priority Action: Living our Values Actions
Code Action Status  Progress  Due Date Update
This will recommence during the remainder
of the financial year with alternative
approaches to engagement being
implemented across the service. An
enhanced approach to staff panels will be
part of that process.
08 Ensure robust and up to date
business continuity arrangements
are in place   31-Mar-2023
The Environment & Infrastructure, 
Resilience Management Team continue to
hold quarterly meetings, to review recent
incidents and lessons learned, business
continuity exercises and any training
required.
09 Review and maintain continuous
improvement frameworks   
31-Mar-2023
Operations & Infrastructure has maintained
ISO 9001 accreditation. Internal audits
schedule will continue monitor the
effectiveness of the Quality Management
system.
10 Review Health & Safety and Risk
Assessments    31-Mar-2023
The Risk Assessment Process has been
agreed and the development of an
accompanying training module is nearing
completion.
Page 40 of 104

Page 44

Appendix 1
25 
Priority Action: Living our Values Actions
Code Action Status  Progress  Due Date Update
11 Ensure robust financial monitoring is
in place to support the COVID-19
recovery 
31-Mar-2023
The Senior Leadership Team and service
managers continue to meet on a period by
period basis with finance colleagues to
monitor budgets and to ensure the service
is provided with the most up to date
information to ensure robust financial
systems are in place to support the service. 
Page 41 of 104

Page 45

Appendix 1
26 
Priority Action: Improving Outcomes for
Children and Families
Actions
Code Action Status  Progress  Due Date Update
01 Develop a new Open Space
Strategy  31-Mar-2024
(Revised Target)
Work on the new Open Space Strategy, in the first
part of the year, has been focussed on capital
investment in play park areas. The strategic
overview of the current play areas has informed a
Play Areas Strategy that will form part of the Open
Space Strategy.
02 Work with colleagues in OneRen
to improve access and
opportunities to play tennis within
Renfrewshire  
31-Mar-2023
An award, in principle, has been made for courts in
Robertson Park and Brodie Park. Further surveys
will be done on tennis courts in Johnstone.
03 Consult with local residents,
especially children, on choice of
equipment to be implemented for
playpark improvements
throughout Renfrewshire.  
31-Mar-2023
100% of this action has been carried out for this
year’s funding of play parks. 
Page 42 of 104

Page 46

Appendix 1
27 
Priority Theme: Place Performance Indicators
Code Performance
Indicator
Current
Status
Short
Term
Trend
Long
Term
Trend
2020/21 2021/22 Q1 Q2 2022/23 Explanation of Performance
Value Target Value Target Value Value Target
01 (Maintenance) Carriageway Condition: % of road network considered for treatment 
(i) A Class Roads    19.42% 22.5% 17.29% 22.5% Not measured for
Quarters
22% Local Government Benchmarking Framework
(LGBF) Indicators. This data is published by the
Improvement Service on an annual basis as part of
the LGBF. 
The figures for 2021/22 are provisional.
The first draft of the 2021/22 performance data will
not be available until December 2022. A final
release will be published in late February 2023 and
will be reported to the Audit, Risk and Scrutiny
Board in March 2023 as soon as it is available
(ii) B Class Roads    23.68% 24.5% 21.25% 24.5% Not measured for
Quarters
24.5%
(iii) C Class Roads    33.49% 36.5% 30.55% 36.5% Not measured for
Quarters
36%
(iv) Unclassified Roads    34.33% 36.5% 30.99% 36.5% Not measured for
Quarters
36% 
Scorecard 
PI Status 
Alert  Unknown 
Warning  Data Only 
OK   
Long Term Trends 
Improving 
No Change 
Getting Worse 
Short Term Trends 
Improving 
No Change 
Getting Worse 
Page 43 of 104

Page 47

Appendix 1
28 
Priority Theme: Place Performance Indicators
Code Performance
Indicator
Current
Status
Short
Term
Trend
Long
Term
Trend
2020/21 2021/22 Q1 Q2 2022/23 Explanation of Performance
Value Target Value Target Value Value Target
02 (Maintenance)
Carriageway
Condition: % of road
network considered
for treatment
Overall   
32% 32.5% 28.9%  32.5% Not measured for
Quarters
32% The figure provided in the table is provisional data
taken from SCOTS. Performance has improved to
28.9% in 2021/22 and has exceeded the target of
32.5% for 2021/22.  
The figures for 2021/22 are provisional. 
03 % of Statutory road inspections categories completed on target: 
(i) Category A     100% 100% 100% 100% Not measured for
Quarters
100% In 2021/22, 100% of the statutory road inspections
were completed for both all categories. The three
categories of statutory inspections relate to the
timing of inspections and are categorised as
follows: A – Undertaken during the progress of the
works B – Undertaken within the six months
following interim or permanent reinstatement C –
Undertaken within the three months preceding the
end of the guarantee period The inspection
procedure is designed to enable road work
authorities to monitor statutory undertakers (Gas,
electric, and telecom etc).
(ii) Category B    100% 100% 100% 100% Not measured for
Quarters
100%
(iii) Category C    100% 100% 100% 100% Not measured for
Quarters
100%
Page 44 of 104

Page 48

Appendix 1
29 
Priority Theme: Place Performance Indicators
Code Performance
Indicator
Current
Status
Short
Term
Trend
Long
Term
Trend
2020/21 2021/22 Q1 Q2 2022/23 Explanation of Performance
Value Target Value Target Value Value Target
04 % of pothole repairs
completed within
timescales   
77% 75% 83% 80% 89% 94% 80% The percentage of pothole repairs completed within
timescales was 89% in Q1 and 94% in Q2 giving
an overall performance for the first 6 months of
91%. This year’s performance is currently trending
above the annual target of 80%.  
Page 45 of 104

Page 49

Appendix 1
30 
Priority Theme: Green Performance Indicators
Code Performance
Indicator
Current
Status
Short
Term
Trend
Long
Term
Trend
2020/21 2021/22 Q1 Q2 2022/23 Explanation of Performance
Value Target Value Target Value Value Target
01 Street Cleanliness
Score - % of areas
assessed as clean   
93.6% 92% 89.6%
(Provisio
nal
figures)
92% Not measured for
Quarters
92% The percentage of Renfrewshire's streets
assessed as clean was 89.6% for 2021/22.  No
comparator figures are available for Scotland at
this time. 
NB. This figure is still to be verified. 
The cleanliness score is based on 3 sample
surveys carried out throughout the year by both
the Council and Keep Scotland Beautiful (KSB).
This score represents the percentage of areas
assessed as acceptably clean (categories A and
B) using KSB’s Local Environmental Audit and
Management System (LEAMS) methodology.
Due to covid we have seen a marginal dip in the
street cleaning indicator after a number of year’s
improvement and are putting in strategies to
address this in 2022/23. This is common across
other authorities and whilst we have not received
benchmarking data, we expect performance to be
on par or better in relation to the national picture. 
Page 46 of 104

Page 50

Appendix 1
31 
Priority Theme: Green Performance Indicators
Code Performance
Indicator
Current
Status
Short
Term
Trend
Long
Term
Trend
2020/21 2021/22 Q1 Q2 2022/23 Explanation of Performance
Value Target Value Target Value Value Target
02 Amount of CO2
emitted by the public
vehicle fleet   
2,992 3,250 3,223 3,000 Not measured for
Quarters
3,000 This Performance Indicator is not measured for
quarters.
03 % of the vehicle fleet
which uses
alternative fuels, such
as electricity   
23.7% 22% 25% 25% 26.6% 27% 25% At the end of Q1 26.6% (117 EVs against a total
fleet of 439) of the fleet used alternative fuels, just
above the annual target of 25%. The position at
the end of Q2 was 27% (117 EVs against a total
fleet of 439). 
An automated key system is now fully up and
running providing a largely automated key
management system. There are now 21 vehicles
consisting of 11 cars and 10 vans aligned to 87
colleagues having remote access to the system. 
04 Reduce the amount
of CO2 emitted from
public space lighting   
1,368 1,700 1,246 1,500 Not measured for
Quarters
1,500 This Performance Indicator is not measured for
quarters. 
Although not measured in quarters, the conversion
of the small number of previously remaining
‘conventional’ lanterns transferring to LED will
have positively impacted the reduction in amount
of CO2. It is anticipated that emissions will level
out year on year as the LED programme is
substantially complete.
Page 47 of 104

Page 51

Appendix 1
32 
Priority Theme: Green Performance Indicators
Code Performance
Indicator
Current
Status
Short
Term
Trend
Long
Term
Trend
2020/21 2021/22 Q1 Q2 2022/23 Explanation of Performance
Value Target Value Target Value Value Target
05 % of bins uplifted first
time   
99.8% 99.9% 99.8% 99.9% 99.8% 99.8% 99.8% The percentage of bins uplifted first time in Q1 and
Q2 of 2022/23 was 99.8%.
Code Performance
Indicator  
(calendar year
indicator)
Current
Status
Short
Term
Trend
Long
Term
Trend
2020 2021 Q1 Jan
- Mar
Q2 Apr
- June
2022 Explanation of Performance
Value Target Value Target Value Value Target
06 % of Household
Waste Recycled    
49.1% 54% 51.7% 50% 48.9% 57.4% 50% This data relates to the first two quarters in the
calendar year 2022, January to June. It is an
estimate which is not yet verified by SEPA. The
cumulative recycling rate for the first 2 quarters
was estimated to be 53.3%. 
07 % of Household
waste collected which
is landfilled   
12.1% 16% 8.2% 5% Not measured for
Quarters
5% This is a calendar year annual figure and will be
reported once verified by SEPA. 
Page 48 of 104

Page 52

Appendix 1
33 
Priority Theme: Living Our Values Performance Indicators
Code Performance
Indicator
Current
Status
Short
Term
Trend
Long
Term
Trend
2020/21 2021/22 Q1 Q2 2022/23 Explanation of Performance
Value Target Value Target Value Value Target
01 Average number of
work days lost
through sickness
absence per
employee (FTE)
(cumulative)   
17.02 13.7 15.5 13.7 3.5 3.6 13.7 In Q1 the average number of work-days lost per
FTE was 3.5, meeting the quarter 1 target of 3.5. 
In Q2 the average number of work-days lost per
FTE was 3.6.
02 % of members
enquiries completed
within timescale by
E&I   
86.4% 85% 86.7% 85% 95% 92% 85% Scrutiny of complaints data and performance is a
key priority for the service and continues to be
carried out on a regular basis at management team
meetings. It and has been supported by
improvements in both data analytics and access to
management information.  This investment and
focus is now having a positive impact with
response rates improving: 
Members enquiries – in the first 6 months of
2022/23, 93.3% of member enquiries were
responded to within timescale. The annual target
for 2022/23 is 85% 
In 2022/23 2,824 enquiries were received in the
first 6 months. 
03 % of FOI requests
completed within
timescale by E&I   
96% 100% 99% 100% 98% 98%  100%
04 % of front line
resolutions dealt
with within
timescale by E&I   
75% 100% 80.8% 85% 82.7% 87.7% 85%
05 % of complaint
investigations
completed within
timescale by E&I   
58% 95% 64.8% 95% 91.9% 89.7% 85%
Page 49 of 104

Page 53

Appendix 1
34 
Priority Theme: Living Our Values Performance Indicators
Code Performance
Indicator
Current
Status
Short
Term
Trend
Long
Term
Trend
2020/21 2021/22 Q1 Q2 2022/23 Explanation of Performance
Value Target Value Target Value Value Target
FOIs - in the first 6 months of 2022/23, 98% of
FOIs were responded to within timescale.. The
annual target for 2022/23 is 100%. 
In 2022/23 93 FOIs were received in the first 6
months. 
Frontline Resolutions – in the first 6 months of
2022/23, 85.3% of frontline resolutions were
responded to within timescale. The annual target
for 2022/23 is 85%. 
In 2022/23 3,142 enquiries were received in the
first 6 months. 
Investigations - in the first 6 months of 2022/23,
90.9% of complaint investigations were responded
to within timescale. 
In 2022/23 220 enquiries were received in the first
6 months. The annual target for 2022/23 is 85%. 
Page 50 of 104

Page 54

Appendix 1
35 
Priority Theme: Living Our Values Performance Indicators
Code Performance
Indicator
Current
Status
Short
Term
Trend
Long
Term
Trend
2020/21 2021/22 Q1 Q2 2022/23 Explanation of Performance
Value Target Value Target Value Value Target
06 Complete
Inspection process
for all headstones
and burial grounds   
6% 40% 38% 20% Not measured for
Quarters
65% This Performance Indicator is not measured for
quarters. 
Page 51 of 104

Page 55

Appendix 1
36 
Data Only Indicators 
Code Performance
Indicator
Current
Status
Short
Term
Trend
Long
Term
Trend
2020/21 2021/22 Q1 Q2 2022/23 Explanation of Performance
Value Target Value Target Value Value Target
01 Cost of
Maintenance per
Kilometre of roads   
£17,495 N/A Not yet
available
N/A Not measured for
Quarters
N/A This data is published by the Improvement
Service on an annual basis as part of the LGBF. 
The first draft of the 2021/22 performance data
will not be available until December 2022. A final
release will be published in late February 2023
and will be reported to the Audit, Risk and
Scrutiny Board in March 2023 as soon as it is
available. 
02 % of adults satisfied
with parks and open
spaces   
83.5% N/A Not yet
available
N/A Not measured for
Quarters
N/A
03 Cost of parks and
open spaces per
1,000 of the
population   
£28,240 N/A Not yet
available
N/A Not measured for
Quarters
N/A
04 % of adults satisfied
with refuse
collection   
70.63% N/A Not yet
available
N/A Not measured for
Quarters
N/A
05 Net cost of waste
collection per
premise   
£66.66 N/A Not yet
available
N/A Not measured for
Quarters
N/A
06 Net cost of waste
disposal per
premise   
£61.59 N/A Not yet
available
N/A Not measured for
Quarters
N/A
Page 52 of 104

Page 56

Appendix 1
37 
Data Only Indicators 
Code Performance
Indicator
Current
Status
Short
Term
Trend
Long
Term
Trend
2020/21 2021/22 Q1 Q2 2022/23 Explanation of Performance
Value Target Value Target Value Value Target
07 % of adults satisfied
with street cleaning   
52.77% N/A Not yet
available
N/A Not measured for
Quarters
N/A
08 Net cost of street
cleaning per 1,000
of the population   
£6,472 N/A Not yet
available
N/A Not measured for
Quarters
N/A 
Page 53 of 104

Page 57

___________________________________________________________________
To: Infrastructure, Land & Environment Policy Board
On: 9 November 2022
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Kirklandneuk Playing Field & Pavilion
Renfrew Victoria Boys Club – CAT update
___________________________________________________________________
1. Summary 
1.1 This report updates the Board on the CAT long lease request to Renfrew
Victoria Boys Club (RVBC) for Kirklandneuk Playing Fields and Pavilion.  The
CAT request was presented to board on the 19th of March 2019, the terms of
the lease have now been agreed, subject to Board approval. 
2. Recommendations 
It is recommended that the Board:- 
2.1 Approve the agreed terms of the 25 year lease to Renfrew Victoria Boys Club
of Kirklandneuk Playing Fields and Pavilion, Ness Road, Renfrew. 
2.2 Authorise the Head of Corporate Governance to conclude the lease with RVBC,
on the Council’s standard Full Repairing & Insuring lease and on such other
terms as required to protect the Council’s interest. 
2.3 Authorise the Head of Economy and Development and the Head of Corporate
Governance to conclude a partial lease renunciation between the Council and
OneRen to allow this area to be leased to RVBC. 
2.4 Approve the request for the use of additional land to be included in the lease to
RVBC which is currently leased to OneRen as per attached plan E2867b. 
________________________________________________________
Item 4
Page 54 of 104

Page 58

3. Background 
3.1  Kirklandneuk Community Centre and Pavilion is an interconnected property for
which OneRen have operational management responsibility.  There is large a
car parking area at the front of the property. 
3.2     The Community Centre is a self-managed facility and the Pavilion and pitches
are leased to RVBC for which they pay an annual rent of £1,639.87.  All services
are connected to both parts of the building and each side can be accessed via
an interconnecting lockable door. This lease is managed on the Council’s behalf
by OneRen. 
3.3 RVBC submitted a Community Asset Transfer request for a long lease of 25
years for Kirklandneuk Playing fields and Pavilion and this was considered by
the board on the 19th of March 2019.  This length of tenure was required to
secure and attract funding to allow investment of the property.  It was agreed
that the property would be let at a rent of £1 if asked.  The Community Centre
Committee and OneRen confirmed there would be no objection to the lease. 
3.4    The approval was subject to RVBC taking steps to separate the services to
ensure that the Community Centre and the Pavilion could function
independently and they would be responsible for a share of the maintenance to
the car park.  There were also aspects of their constitution that needed to be
addressed in order for the group to enter into a lease.   
3.5 Officers were instructed to conclude the lease, however there were issues
around the RVBC constitution and the separation of the services of the property
which had not been investigated by RVBC. 
3.6 RVBC have now amended their constitution to allow for the club to enter into a
lease and the Council have carried out a feasibility survey to assess how the
property could be separated. 
3.7 The feasibility study concluded that a full separation of the property would be
cost prohibitive and that only a partial separation could be considered.  The
property will remain connected via an interlinked door between the Community
Centre and the Pavilion.  
3.8   Both occupiers will enter into an access agreement for the meter cupboard
which is situated on the side of the pavilion but serves the Community Centre. 
RVBC will need to arrange for a meter to be installed to facilitate their
investment proposals including solar panels.  RVBC will also require a new
water connection which shall be routed from the boiler and installed in the
Pavilion.    
3.9 The Council will meet the cost of ensuring health and safety compliance of the
property by continuing with the security and fire alarms for both sides of the
property.
Page 55 of 104

Page 59

3.10  The car park maintenance responsibility has been calculated at 30% which
has been based on a percentage floor area of the overall area of the
Community Centre and the Pavilion. 
4. Proposed terms and conditions of lease; 
 The Lease shall be for a period of 25 years and shall be on the Council’s
standard Full Repairing and Insuring style of lease. 
 The initial annual rent shall be £1, if asked. 
 The property (as outlined on report plan E2867b) shall be used for
providing football pitches, changing facilities and ancillary purposes and
for no other purposes without prior consent of the Landlord. 
 The Tenant (RVBC) will be responsible for all repairs and maintenance
of the property and shall contribute 30% of the costs to maintain the car
park.   
 The Tenant shall be responsible for undertaking the work required to
separate the services and to enable to Pavilion to operate independently
of the Community Centre.  These works will include: 
o Heating and pipework to be cut and capped below the floor at
the point of entry into the Pavilion.  
o A new water mains connection to be installed in the Pavilion
originating from the boiler room and routed predominantly
within the ceiling void.  A meter shall be installed in the Pavilion
at an accessible location.  
o A separate electricity meter and consumer unit to be installed
for usage in the Pavilion.   
 The Landlord shall be responsible for extending the fire and security
alarms so that these serve both the Community Centre and the Pavilion
within the property.  The Tenant shall be responsible for a share of the
maintenance and repair of these systems. 
 The tenant shall ensure that any necessary planning, building warrants,
statutory and licensing consents that may be required are secured prior
to the date of entry. 
 The tenant and the Community Centre will enter into an access
agreement for access to the electricity cupboard which is located within
the tenant’s property.  This shall be for emergency access and repairs
and maintenance. 
 Each party shall bear their own legal costs. 
Page 56 of 104

Page 60

 Any other reasonable terms and conditions considered necessary to 
protect the Council’s interest. 
Implications of the Report 
1. Financial – Concessionary let to Renfrew Victoria Boys Club will continue to
support the community.   
2. HR & Organisational Development – None. 
3. Community Planning 
Our Renfrewshire is thriving – Continued support via community asset transfer
of an existing community facility. 
4. Legal – Conclusion of a new 25 year lease with Renfrew Victoria Boys Club. 
Partial Lease Renunciation of property between the Council and OneRen. 
5. Property/Assets – As per this report. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report because no groups or individuals have any involvement currently at
the property. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website. 
8. Health & Safety – None. 
9. Procurement – Not applicable. 
10. Risk – None. 
11. Privacy Impact – Not applicable. 
12. Cosla Policy Position – Not applicable.
_________________________________________________________
List of Background Papers 
(a)  Background Paper 1 – Kirklandneuk Playing Field & Pavilion Renfrew Victoria
Boys Club March 2019
_________________________________________________________________ 
Author:           Louise Le Good
Page 57 of 104

Page 61

louise.legood@renfrewshire.gov.uk    
07483 335 786
Page 58 of 104

Page 62

ARD ROAD
KIRKLANDS
McCLUE AVENUE
Ordnance Survey Mapping - © Crown Copyright and database right 2022. All rights reserved. Ordnance Survey Licence number 100023417.  Aerial
Photography 2009 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009 and Crown Copyright © All rights reserved. Aerial Photography
2004/6 - © 2004 Getmapping plc © 2006 Getmapping plc Aerial Photography 2001 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009
and Crown Copyright © All rights reserved. Historic Map Data - © Crown Copyright and Landmark Information Group Limited 2012. All rights reserved.
1:1,500
I
Kirklandneuk Playing Fields & Pavilion, Renfrew
Report Plan Ref. E2867b
Notes:
Date: 03/08/2022User: hocraigj1
Legend
Right of access and shared maintenance responsibility for Renfrew Victoria Boys Club
Pavilion
Area to be transferred extends to 3.4 hectares or thereby
Page 59 of 104

Page 63

___________________________________________________________________
To: Infrastructure, Land and Environment Policy Board
On: 9 November 2022
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Disposal of Land adjacent to 123 Glencoats Drive, Paisley
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to declare the area of land adjacent to 123
Glencoats Drive, Paisley, shown on the attached plan (E3257), as surplus to
requirements. This report was continued from the August 2022 meeting of the
Board due to queries raised by Board members about community engagement
in the disposal process. 
2. Recommendations
It is recommended that the Board:
2.1 Declare the area of land located adjacent to 123 Glencoats Drive, Paisley,
shown on the attached plan, as surplus to requirements, with a view to
disposing to the adjoining owner.  
2.2 Authorise the sale thereof to the adjoining owner of 123 Glencoats Drive,
Paisley, on such terms and conditions as may be negotiated by the Head of
Economy and Development utilising delegated powers.
2.3 Authorise the Head of Corporate Governance to conclude the sale
incorporating into the bargain such terms and conditions as may be deemed
necessary to protect the Council’s interest.
2.4 Note that the Chief Planning Officer will place an advert in the local press in
terms of the Town and Country Planning (Scotland) Act 1959 for the proposed
sale of an area of open space.
Item 5
Page 60 of 104

Page 64

_______ __________________________________________________
3. Background 
3.1 This area of land, which is held on the General Services Account, extends to
62 sqm or thereby and was an area of open space, having been combined with
the adjoining garden some years ago. 
3.2 The Council received a complaint that the applicant had extended their garden
into Council owned land. A site investigation was carried out which confirmed
an encroachment had taken place. 
3.3 The owner of 123 Glencoats Drive was approached regarding this
encroachment onto Council land at which point they expressed an interest in
acquiring this land to formalise their use as off-street parking. An agreed
purchase price has been reached; but this is subject to the Board declaring the
ground surplus.   
3.4 The applicant will require to obtain planning permission for a change of use. 
3.5 The purchase price of the land will be at a level upon which delegated powers
granted to the Head of Economy and Development for disposal purposes will
be utilised. 
3.6 The purchaser will be liable to meet the Council’s reasonable professional and
legal expenses incurred in processing this transaction. 
3.7 Environment and infrastructure have confirmed that this area of land has no
operational requirement and is not opposed to the land being declared surplus. 
3.8 The Chief Planning Officer will place an advert in the local press in terms of the
Town and Country Planning (Scotland) Act 1959 for the proposed sale of an
area of open space. The fact that the sale will be advertised in the Paisley Daily
Express has met the Board members’ concerns regarding community
engagement.
___________________________________________________________________
Implications of the Report 
1. Financial – The General services account will benefit from a modest capital
receipt.   
2. HR & Organisational Development – None. 
3. Community Planning – None. 
4. Legal – Conveyancing of land required. 
5. Property/Assets – As per report. 
6. Information Technology – None.
Page 61 of 104

Page 65

7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. Required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. Cosla Policy Position – Not Applicable.
_________________________________________________________
List of Background Papers
(a)  None.
___________________________________________________________________ 
Author:  Aileen Johnston, Principal Estates Surveyor  
Page 62 of 104

Page 66

L L L L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L L L L
L L L L L L L L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L L L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L L L L
L L
L L
L L L L L L
L
L
L
L
L
L
L
L
L
L
L
L L
99
111 131
81
109
GLENCOATS
DRIVE
113
161
69
133
121
123
85
105
111
125
91
141
Ordnance Survey Mapping - © Crown Copyright and database right 2022. All rights reserved. Ordnance Survey Licence number 100023417.  Aerial
Photography 2009 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009 and Crown Copyright © All rights reserved. Aerial Photography
2004/6 - © 2004 Getmapping plc © 2006 Getmapping plc Aerial Photography 2001 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009
and Crown Copyright © All rights reserved. Historic Map Data - © Crown Copyright and Landmark Information Group Limited 2012. All rights reserved.
1:735
I
123 Glencoats Drive, Paisley
Report Plan Ref: E3257
Notes:
Date: 21/07/2022User: hocraigj1
Please enter notes here
Legend
Area extends to 62 sqm or thereby.
Page 63 of 104

Page 67

___________________________________________________________________
To: Infrastructure, Land & Environment Policy Board
On: 9 November 2022
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Disposal of land at Maple Drive, Johnstone Castle – Regeneration  
Phase 2
___________________________________________________________________
1. Summary 
1.1 This report seeks the consent of the Policy Board for the disposal of land at Maple
Drive, Johnstone which currently sits on the Housing Revenue Account to Link
Group Limited (incorporating Link Housing Association), for the development of
affordable housing. 
2. Recommendations 
2.1 It is recommended that the Board:- 
(i) Authorise the Head of Economy and Development and the Head of Corporate
Governance to undertake the necessary processes to complete the disposal
of land at Maple Drive shown indicated on the attached plan E3228A to Link
Group Limited, on the terms and conditions detailed within this report.
________________________________________________________
3. Background 
3.1 Renfrewshire’s Strategic Housing Investment Plan 2023/28 was approved by the
Communities and Housing Policy Board at its meeting on 25 October 2022 and
sets out how investment in affordable housing will be targeted to achieve the
objectives of the Local Housing Strategy. This was approved following
consultation and engagement with Community Planning partners, including the
Housing Associations operating in Renfrewshire. 
Item 6
Page 64 of 104

Page 68

3.2 This report refers to an area of ground that was declared surplus by the
Communities, Housing and Planning Policy Board in August 2018 which identified
land extending to 2.02 Ha or thereby as suitable for development by a Housing
Association.  Subsequent discussions with Link Group Limited highlighted the
requirement to adjust the boundaries of the site to accommodate the planned
development layout and this revised area (as shown on drawing E3228A,
extending to 2.24 Ha or thereby) was declared surplus at the Communities and
Housing Policy Board on 16 August 2022. 
3.3 This revised site has been independently valued on behalf of by D M Hall
Chartered Surveyors at a value of £935,000. 
3.4 The site is not fully cleared, and Link will undertake demolition of the remaining
properties following land acquisition (42 flats contained within 4 No. 3 storey
blocks). Link have provided reports and quotations for the demolition works which
were assessed on behalf of the Council by Reid Associates, Chartered Quantity
Surveyors. 
3.5 Link have undertaken detailed site investigations for the cleared site and provided
reports confirming that ground conditions are such that abnormal development
costs in the region of £1,300,000 are required. These abnormal costs together
with the demolition costs negate the headline site valuation of £935,000, and
therefore it is considered appropriate that Link are looking to acquire this site at nil
cost. 
3.6 Reid Associates, Chartered Quantity Surveyors have analysed the accuracy of the
abnormal cost reports received, and although this figure has been reduced
through negotiation, extraordinary development costs greater than £1,300,000 still
exist, supporting a site transfer at nil value.   
4. Proposed terms and conditions of sale   
4.1 The purchase price payable for the land shown outlined on the attached plan,
which extends to approximately 2.24 Hectares, shall be £1.00, if asked. 
4.2 Link will complete the demolition and site clearance as per the  demolition arrant
drawing number J5235-D01 Revision A dated 17 January 2022, within 6 months
of the later of (i) date of entry and (ii) completion of the removal of all existing
meters and full-service disconnection or such other date as agreed between the
parties. It is the Council’s understanding that Link have appointed a demolition
contractor and anticipate commencing demolition as soon as practical after sale
of the land. 
4.3 The transfer of the land to Link is subject to the Housing Association obtaining
all necessary planning and statutory consents required for their proposed
development.   
4.4 Each party shall bear their own legal and professional expenses incurred in
concluding the sale with the purchaser responsible for meeting any land
transaction taxes and registration dues.
Page 65 of 104

Page 69

4.5 Any other reasonable terms and conditions considered necessary by  the Head
of Corporate Governance and the Head of Economy and Development shall be
pursued if it considered necessary to protect the Council’s interest.
___________________________________________________________________
Implications of the Report 
1. Financial – No capital receipt to be received.   
2. HR & Organisational Development – None. 
3. Community Planning 
Building strong, safe and resilient communities.   Increasing the supply of
affordable housing and regenerating communities. 
4. Legal – conveyancing work associated with the land transfer. 
5. Property/Assets – As per this report. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have
been identified arising from the recommendations contained in the report
because no groups or individuals have any involvement currently at the
property. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website. 
8. Health & Safety – None. 
9. Procurement – Not applicable. 
10. Risk – None.     
11. Privacy Impact – Not applicable. 
12. COSLA Policy Position – Not applicable. 
13. Climate Risk – None.
_________________________________________________________
List of Background Papers 
(a) Report to Communities,Housing and Planning Policy Board; 21 August 2018; Draft
Strategic Housing Investment Plan 2019/20 to 2023/24.
(b) Report to Communities and Housing Policy Board, 16 August 2022: ‘Land at Maple
Drive, Johnstone Castle – Regeneration Phase 2.’
Page 66 of 104

Page 70

(c) Report to Communities and Housing Policy Board, 25 October 2022: ‘Renfrewshire’s
Strategic Housing Investment Plan 2023/28.’ 
_________________________________________________________ 
Author:           Margaret Law, Senior Asset & Estates Surveyor
Page 67 of 104

Page 71

C C C C C
C
L
C
L
C
L
C
L
C
L L
C
L
C
L
C
L
C
L
C
L L
C
L
C
L
C
L
C
L
C
L L
C
L
C
L
C
L
C
L
C
L L
C C C
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
CEDAR
610
61.2m
8
El
175
4
1
171
153
Sports
Facility
182
Sta
63.8m
184
169
9
LARCH PLACE
170
166
68.7m
67.9m
13
139
Play Area
24
166
2
22
19
64.7m
Shelter
18
143
13
164
10a
Sub
23
17
RANNOCH ROAD
15
MAPLE DRIVE
173
ELM DRIVE
1
176
10b
Ordnance Survey Mapping - © Crown Copyright and database right 2022. All rights reserved. Ordnance Survey Licence number 100023417.  Aerial
Photography 2009 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009 and Crown Copyright © All rights reserved. Aerial Photography
2004/6 - © 2004 Getmapping plc © 2006 Getmapping plc Aerial Photography 2001 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009
and Crown Copyright © All rights reserved. Historic Map Data - © Crown Copyright and Landmark Information Group Limited 2012. All rights reserved.
1:1,250
I
Land at Johnstone Castle
Report Plan Ref. E3228A
Notes:
Date: 12/05/2022
Legend
Area extends to 2.24 hectares or thereby
JW
Page 68 of 104

Page 72

___________________________________________________________________
To: Infrastructure, Land and Environment Policy Board 
On: 9 November 2022
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Surplus Status for Former Residential Properties on Johnstone
High School Grounds
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to declare two residential properties and related
garages on Johnstone High School grounds as surplus to requirements and
thereafter progress demolition. 
___________________________________________________________________ 
2. Recommendations 
2.1  It is recommended that the Infrastructure Land & Environment Board declares
the three adjoining buildings, two former janitor’s houses, and garage, as shown
on the attached plan, are surplus to requirements and can be demolished.
_________________________________________________________
3. Background 
3.1  As the Council has modernised its working practices there is no longer a
requirement for janitorial staff to be in dedicated housing on or adjacent to the
school site. 
3.2   Due to the change in working practices two janitors’ houses with ancillary
garages at Johnstone High School have become unoccupied. 
3.3   One of the former janitor’s houses has been vacant for in excess of 10 years
and is considered derelict. 
Item 7
Page 69 of 104

Page 73

The other janitor’s house was vacated in February 2022. Its condition is
deteriorating, and it has become a target for vandalism.  The same is true of
the attached garages where there has been a recent fire. 
3.4   Due to their location deep within school grounds with the only access being
across school property they are not considered suitable for sale on the open
market.  Children’s Services has stated they have no requirement for the
properties and their deteriorating condition is becoming problematic.   It is
proposed that the board declare the properties surplus and agree that they
should be demolished.
___________________________________________________________________
Implications of the Report 
1. Financial – Funding for demolition to be identified from the lifecycle
maintenance fund. 
2. HR & Organisational Development – None. 
3. Community Planning – None. 
4.  Legal – None. 
5. Property/Assets – A project to demolish the properties will be implemented. 
6. Information Technology – None.   
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report because it is for noting only. If required following implementation, the
actual impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be published
on the Council’s website.   
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. Cosla Policy Position – None.
_________________________________________________________ 
List of Background Papers - None.
Page 70 of 104

Page 74

___________________________________________________________________ 
Author:           Aileen Johnston, Principal Estates Surveyor 
Page 71 of 104

Page 75

Page 72 of 104

Page 76

___________________________________________________________________
To: Infrastructure, Land and Environment Policy Board 
On: 9 November 2022
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Surplus Status for St Catherine’s School House, Paisley 
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to declare a residential property on school grounds
at St Catherine’s, Paisley as surplus to operational need and thereafter progress
demolition. 
___________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Infrastructure Land & Environment Board declares St
Catherine’s School house, Brabloch Crescent, Paisley, PA3 4RG, as shown on
the attached plan, as surplus to operational need and note that it will be
demolished. 
_________________________________________________________
3. Background 
3.1 As the Council modernises its working practices, there is no longer a requirement
for janitorial staff to be located in housing adjacent to the school. 
3.2   Due to these changes in working practices the school house at St Catherine’s,
Paisley is due to become vacant. 
3.3  Owing to its location within school grounds, with the only access being across
school property and no alternative being available, the house is not suitable for
sale on the open market or transfer to the housing revenue account.  
Item 8
Page 73 of 104

Page 77

Children’s Services have confirmed that there is no operational need or use for
the property and as such support that it be demolished, and the grounds brought
into the overall school campus.    
3.4  The current occupier of the property has been in regular dialogue with Officers
within the Environment & Infrastructure Service in relation to their ongoing
housing needs which can be accommodated within the Approved Common
Housing Allocation (CHA) policy.  Under this policy applicants who need
permanent re-housing because their houses are under a closing, demolition,
Housing Renewal Area or other statutory order, or part of our regeneration
programme, will be offered suitable alternative accommodation. The resident has
been fully consulted in relation to this. 
3.5 It is proposed that the board declare the property surplus to operational need and
note that it will be demolished, and the existing occupant will be rehoused. 
___________________________________________________________________
Implications of the Report 
1. Financial – Funding for demolition to be identified from the lifecycle
maintenance fund. 
2. HR & Organisational Development – None. 
3. Community Planning – None. 
4.  Legal – None. 
5. Property/Assets – A project to demolish the properties will be implemented. 
6. Information Technology – None.   
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report because it is for noting only. If required following implementation, the
actual impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be
published on the Council’s website.   
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
Page 74 of 104

Page 78

12. Cosla Policy Position – None.
_________________________________________________________ 
List of Background Papers - None. 
___________________________________________________________________ 
Author:     Aileen Johnston, Principal Estates Surveyor 
Page 75 of 104

Page 79

Page 76 of 104

Page 80

___________________________________________________________________
To: Infrastructure, Land & Environment Policy Board
On: 9 November 2022
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: 175 Year Ground Lease to Scottish Power Energy Networks,
Underwood Road Depot, Paisley  
______________________________________________________________
1. Summary 
1.1 This report advises the Board on the provisional terms and conditions agreed for
a long ground lease between the Council and Scottish Power Energy Networks
(SPEN) as shown on the plan that accompanies this report.   
2. Recommendations 
It is recommended that the Board: 
2.1 Agree to the terms and conditions that have been provisionally agreed with the
Council and SPEN and authorise the Head of Corporate Governance to conclude
the lease based on the terms and conditions detailed in this report.
_________________________________________________________
3. Background 
3.1 As part of the Council’s investment plan to convert its current fleet to being zero
emissions vehicles, SPEN have been contacted to install a new sub-station at
Underwood Road Depot. 
3.2 A feasibly study has been carried out by Renfrewshire Council and SPEN to
determine costs, the power supply required and location of the sub-station.   
Item 9
Page 77 of 104

Page 81

3.3 It has been agreed that a sub-station within the operational depot would be more
cost effective than taking this from the nearest street, Underwood Road.  The
sub-station should be sited next to the existing biomass system within the depot. 
3.4 The cost of the installation will be £137,825.59 inclusive of VAT and has been
approved by the Head of Operations and Director of Finance. 
3.5 SPEN’s contractor, Morrison Construction, will be managing the project on site
and will provide traffic management with their being limited disruption to
Underwood Road Depot. 
4. Proposed Terms and Conditions of Lease 
 The subjects shall be the land at 52 Underwood Road, Paisley, PA3 1TL
as shown on plan ESC108291-(1)-002. 
 The lease shall be for a period of 175 years or thereby, 
 Date of entry shall be on completion of missives 
 The rent shall be £1 if asked. 
 The Landlord shall grant the tenant 
o  All necessary cable and access rights required:
o  Combined access & cable servitude (highlighted in blue on the
attached plan)
o  Vehicle and personnel access (shown pink on the attached
plan)
o  3m wide cable servitude (shown yellow on the attached plan)
o  Both parties shall be responsible for their own legal expenses in
connection with this transaction.
___________________________________________________________________
Implications of the Report 
1. Financial – Cost of installation - £137,825.59. 
2. HR & Organisational Development – None. 
3. Community Planning – None. 
4. Legal – Conclusion of Lease. 
5. Property/Assets – As per report. 
6. Information Technology – None. 
Page 78 of 104

Page 82

7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. Required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. Cosla Policy Position – Not Applicable.
___________________________________________________________________
Author:          Louise Le Good 
Louise.legood@renfrewshire.gov.uk   
07483 335 786 
Page 79 of 104

Page 83

Unit 3
62
4
66
1 to 3
UNDERWOOD ROAD
Sorting Office
5 to 9
Trees
LB
55
57
El
Gas Meter
4
40
Sub Sta
Underwood Court
Works
5
49
Unit 1
House
Tanks46
Amenity Tip
Works
Disposal
Refuse
Drawn Appr'd
Scale Date
Check'dCheck'dDrawnRev Date Appr'd
Title
Project
Drg. No. Rev.
Status
A352 UNDERWOOD ROAD
PAISLEY, PA3 1TL
SUBSTATION
LEASE
LEASE
ESC108291-(1)-002 -
0m 20m 40m 60m 80m
Scale - 1:1000
SUBSTATION DETAIL
SCALE  1:200
SEE
SUBSTATION
DETAIL
Page 80 of 104

Page 84

To:                Infrastructure, Land & Environment Policy Board 
On:               9 November 2022
___________________________________________________________________ 
Report by:   Chief Executive
___________________________________________________________________ 
Heading:    15 Year Lease Renewal – JW Grant and Son Ltd, 70 Love Street
Paisley 
___________________________________________________________________
1. Summary 
1.1 The purpose of this Report is to seek authority to renew the lease of the land
and buildings at 70 Love Street, Paisley as shown on the attached plan E3268,
to the existing tenant JW Grant and Son Ltd.   
__________________________________________________________________ 
2. Recommendation 
The Board is asked to:- 
2.1 Authorise the Head of Corporate Governance to renew the lease of 70 Love
Street, Paisley to the exiting tenant for a 15 year period on the provisional terms
and conditions outlined in this report. 
2.2 This is subject to such other conditions as may be considered necessary to
protect the interests of the Council.
___________________________________________________________________ 
3. Background  
3.1 JW Grant and Sons Ltd currently lease the property at 70 Love Street, Paisley
for use as a builder’s merchants.     
3.2 The current lease commenced on the 12th of November 2006 for a 15 year term. 
The lease has been running on tacit relocation/annually since the 11th of
November 2021.  The current rent is £41,000 per annum and there have been
no reviews implemented since the start of the current lease. 
3.3 The tenant approached the Council looking to extend the lease for a further 15
year period on a reduced rent of £40,000.   
Item 10
Page 81 of 104

Page 85

3.4 After a period of negotiation, the tenant has agreed to an increased rent of
£52,000 which is in line with current market rates for similar properties and is
reflective of the length of time since the rent was reviewed.   
3.5 Provisional terms have been agreed by the tenant and are detailed below and
notice has been served to bring the existing lease to an end. 
4. Provisional Terms and Conditions
 Term – 15 years 
 Commencement Date – 12th November 2022 coinciding with the expiry of
the existing lease.
 Rent - £52,000 per annum from the commencement date exclusive
of VAT, service charge, insurance, business rates and other outgoings
payable as per the existing Lease.
 Rent Review – Every 5 years from the commencement of the lease
 Break Option – Mutual on the 10th anniversary of the commencement of
the lease. 
 Each party is responsible for their own legal costs incurred in this
transaction. 
 The tenant is responsible for any LBTT, VAT and registration dues
payable.
 The above terms are subject to the Landlord’s formal board approval and
conclusion of formal missives.
 The lease transaction shall include such other terms and conditions as
may be considered necessary by the Head of Economy and Development 
and the Head of Corporate Governance to protect the interests of the
Council.
___________________________________________________________________ 
Implications of this report 
1.  Financial Implications – Annual rental of £52,000 +VAT, Service Charge
and Insurance per annum. 
2.  HR and Organisational Development Implications - None 
3 Community Plan/Council Plan Implications 
Wealthier and Fairer – continuation of a popular and well used service.  
Smarter - None.  
Healthier – beneficial nutrition to client users. 
4.  Legal Implications – Lease extension to be concluded. 
5.  Property/Assets Implications – As per this report. 
6. Information Technology Implications - None 
7. Health and Safety Implications – None. 
Page 82 of 104

Page 86

8. Procurement Implications – None. 
9. Risk Implications – None. 
10. 
11.
Privacy Impact – None. 
Cosla Policy Position – Not Applicable. 
___________________________________________________________________
Author:      Louise Le Good 
Louise.legood@renfrewshire.gov.uk 
07483 335 786      
Page 83 of 104

Page 87

L L L
L L
L
L
L
L L
!
E
E
LOVE
STREET
7.7m
Mast
(Telecommunication)
Hotel
61
Depot
86
69
59
64
SM
2
Court
El Sub Sta
79
Games Court
71
Sports
60
66
67
75
Shelter
11
Resource
ESS
83
1
1
67
74
7.7m
51
73
57
Centre
15
91
NEW
SNEDDON
STREET
Builders Yard
NORTH STREET
53
88
72 to 80
55
Ordnance Survey Mapping - © Crown Copyright and database right 2022. All rights reserved. Ordnance Survey Licence number 100023417.  Aerial
Photography 2009 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009 and Crown Copyright © All rights reserved. Aerial Photography
2004/6 - © 2004 Getmapping plc © 2006 Getmapping plc Aerial Photography 2001 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009
and Crown Copyright © All rights reserved. Historic Map Data - © Crown Copyright and Landmark Information Group Limited 2012. All rights reserved.
1:1,000
I
Ground at 70 Love Street, Paisley
Report Plan Ref. E3268
Notes:
Date: 04/08/2022
Legend
Area to be leased to JW Grant & Son Ltd
JW
Page 84 of 104

Page 88

___________________________________________________________________
To: Infrastructure, Land & Environment Policy Board
On: 9 November 2022
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: 10 Year Lease of Shop at 4-6 High Street, Renfrew
______________________________________________________________
1. Summary 
1.1 This report advises the Board on the provisional terms and conditions agreed
for the lease of the property at 4-6 High Street, Renfrew as shown on Report
Plan E3289. 
2. Recommendations 
2.1 It is recommended that the Board: 
2.2 Agree to the terms and conditions that have been provisionally agreed with the
Council and the existing tenant Bestway National Chemist (trading as Well
Pharmacy) and authorise the Head of Corporate Governance to conclude the
lease on the basis of the terms and conditions detailed in this report.
_________________________________________________________
3. Background 
3.1 The property at 4-6 High Street, Renfrew is currently leased by Bestway
National Chemist (trading as Well Pharmacy) and is currently being used as a
pharmacy. 
3.2 The existing lease commenced on the 7th of November 2014 for a period of 8
years and 3 days. The current passing rent is £14,350 per annum. 
Item 11
Page 85 of 104

Page 89

3.3 The tenant has requested a lease renewal for a period of 10 years at the current
rent.  They have also requested a tenant only break option in the 3rd and 6th
anniversary of the lease commencement. 
3.4 Following a period of negotiations, the Council has agreed to a mutual break
option on the 5th anniversary of the lease. 
3.5 A review of the rent has been carried out and there is no justification for a rent
increase as the tenant is currently paying the market rent for the property.   
4. Proposed Terms and Conditions of Lease 
o The lease shall be for a period of 10 years and shall be on the basis of the
Council’s full repairing and insuring lease
o The rent shall be £14,350 per annum and shall be reviewed every 3 years
from the date of entry.  
o There shall be a mutual break option on the 5th anniversary of the lease by
either party providing six month notice.
o The property shall be used as a pharmacy and for no other purpose
whatsoever.
o Assignation and sub-letting is prohibited
o Each party shall bear their own legal costs. 
o Any other reasonable terms and conditions considered necessary by the
Head of Corporate Governance.
___________________________________________________________________
Implications of the Report 
1. Financial – Rent of £14,350  per annum to the Renfrew  Common Good
Account.    
2. HR & Organisational Development – None. 
3. Community Planning – None. 
4. Legal – Conclusion of Lease. 
5. Property/Assets – As per report. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. Required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website.
Page 86 of 104

Page 90

8. Health & Safety – None. 
9. Procurement – None.
10. Risk – None.
11. Privacy Impact – None.
12. Cosla Policy Position – Not Applicable.
___________________________________________________________________
Author:          Louise Le Good 
Louise.legood@renfrewshire.gov.uk   
07483 335 786 
Page 87 of 104

Page 91

4-6 HIGH STREET
11 9
Bakery9
Hall
15 13
QUEEN STREET
7
12
134
9
27
28
Cemetery
Dunlop
to
Town Hall
TCB
1
Bank
13
STREET
Dunlop Street
Crescent
26
10
1 11
7 9
97
1715
23
25
21
12
10
3
5
HallMission
51
High School
Centre
6.6m44
29 29a
30
LB
5a
PH
33 HIGH STREET
to
to
Job
PH
2
36 to 42
57
36 to 44
22
2
18
3
13 to 17
2
15 Superstore
MANSE
4
PH
37
9
56
14
60
19
1
Trinity
Hall
Cross
43
2 34
PH
3
5 to 11
PH
5
28 to 34
3
1 STREET
PH
27
41
5.4m
17
46 to 54
11
Shelter
5
to
1
18
43
HAIRST STREET
4 to 24
25
7
7
817 to 23
8
TCB
Shelter
Bank
Posts
4-6 HIGH STREET, RENFREW
REPORT PLAN
N
E
S
W
E3289
JW
1:1250
OCT 2022
CHIEF EXECUTIVE'S SERVICE
DATE
TITLE
SCALE
ASSET & ESTATES SECTION
All rights reserved.  Ordnance Survey Licence number 100023417.
Reproduced by permission of Ordnance Survey on behalf of HMSO.  © Crown copyright and database right 2022.
SHEET SIZE - A4
DRAWN BY
DRAWING No. Renfrewshire
Council
Page 88 of 104

Page 92

___________________________________________________________________
To: Infrastructure, Land & Environment Policy Board
On: 9 November 2022
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: 9 Year Lease of 9 Stoddard Square, Elderslie 
______________________________________________________________
1. Summary 
1.1 This report advises the Board on the provisional terms and conditions agreed for
the lease of the property at 9 Stoddard Square, Elderslie as shown on Report
Plan E3287. 
2. Recommendations 
It is recommended that the Board: 
2.1 Agree to the terms and conditions that have been provisionally agreed with the
Council and the proposed tenant (Mr Daniel Muir) and authorise the Head of
Corporate Governance to conclude the lease on the basis of the terms and
conditions detailed in this report.
_________________________________________________________
3. Background 
3.1 The property at 9 Stoddard Square is currently leased to Mr Gavin Colquhoun
and used as a coffee shop. 
3.2 The tenant has been in occupation of the premises since the existing lease
commenced on the 19th of September 2014.  The current passing rent is £7,350
per annum.   
Item 12
Page 89 of 104

Page 93

3.3 The tenant requested an assignation of the lease to Mr Daniel Muir to whom he
is selling the business.     
3.4 The rent has been reviewed as part of the assignation process and shall remain
the same as this is currently the market rent for the property.   
4. Proposed Terms and Conditions of Lease  
o The lease shall be for a period of 9 years and shall be on the basis of the
Council’s full repairing and insuring lease. 
o The rent shall be £7,350 per annum and shall be reviewed every 3 years
from the date of entry.  A payment of £1837.50 shall be payable on the date
of entry. 
o The property shall be used as coffee shop (café) and for no other purpose
whatsoever. 
o This lease shall be subject to the Council receiving satisfactory references
for the tenant. 
o Assignation and sub-letting is prohibited. 
o The tenant shall meet the Council’s reasonable legal expenses incurred in
concluded this lease. 
o Any other reasonable terms and conditions considered necessary by the
Head of Corporate Governance.
___________________________________________________________________
Implications of the Report
1. Financial – Rent of £7,350 per annum to the HRA account.    
2. HR & Organisational Development – None. 
3. Community Planning – None. 
4. Legal – Conclusion of Lease.   
5. Property/Assets – As per report. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. 
Page 90 of 104

Page 94

No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report. Required following implementation,
the actual impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be published
on the Council’s website. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. Cosla Policy Position – Not Applicable.
___________________________________________________________________
Author:  Louise Le Good 
Louise.legood@renfrewshire.gov.uk   
07483 335 786 
Page 91 of 104

Page 95

9 STODDARD SQUARE
Mast (telecommunication)
1a
Pavilion
25
135
STODDARD SQUARE
18
30
6
3
3
17
12Car Park
22
100
Bowling Green
133
11
14
Elderslie Village Hall
12
27
5
132
5
4
8
138 to 142
Wallace Gait
2
PH
126
103
92
Shelter
130
to
7
15
23
3a
25.8m
16
MAIN ROAD
PH
to
136
10
146
1
124
105
114
101
GLENPATRICK ROAD
16
2
Hall
9
24.5m
9 STODDARD SQUARE, ELDERSLIE
REPORT PLAN
N
E
S
W
E3287
JW
1:1250
OCT 2022
CHIEF EXECUTIVE'S SERVICE
DATE
TITLE
SCALE
ASSET & ESTATES SECTION
All rights reserved.  Ordnance Survey Licence number 100023417.
Reproduced by permission of Ordnance Survey on behalf of HMSO.  © Crown copyright and database right 2022.
SHEET SIZE - A4
DRAWN BY
DRAWING No. Renfrewshire
Council
Page 92 of 104

Page 96

___________________________________________________________________
To: Infrastructure, Land & Environment Policy Board
On: 9 November 2022
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: 9 Year Lease of 11 Stoddard Square, Elderslie 
______________________________________________________________
1. Summary 
1.1 This report advises the Board on the provisional terms and conditions agreed for
the lease of the property at 11 Stoddard Square, Elderslie as shown on Report
Plan E3288. 
2. Recommendations 
It is recommended that the Board: 
2.1 Agree to the terms and conditions that have been provisionally agreed with the
Council and the proposed tenants (Mr Mark Smyth and Mr Patrick Small) and
authorise the Head of Corporate Governance to conclude the lease on the basis
of the terms and conditions detailed in this report.
_________________________________________________________
3. Background 
3.1 The property at 11 Stoddard Square is currently leased Mr Gavin Colquhoun and
is used as a butcher shop. 
3.2 The tenant has been in occupation of the premises since the existing lease
commenced on the 13th of August 2014.  The current passing rent is £4,775 per
annum.
3.3 The tenant requested an assignation of the lease to Mr Smyth and Mr Small to
whom he is selling the business.    
Item 13
Page 93 of 104

Page 97

3.4 The rent has been reviewed as part of the assignation process and shall be
increased to £6,000 per annum which is the current market rent for the property.   
4. Proposed Terms and Conditions of Lease  
o The lease shall be for a period of 9 years and shall be on the basis of the
Council’s full repairing and insuring lease. 
o The rent shall be £6,000 per annum and shall be reviewed every 3 years
from the date of entry.  A payment of £1837.50 shall be payable on the
date of entry. 
o The property shall be used as a butcher shop and for no other purpose
whatsoever. 
o This lease shall be subject to the Council receiving satisfactory
references for the tenants. 
o Assignation and sub-letting is prohibited. 
o The tenant shall meet the Council’s reasonable legal expenses incurred
in concluded this lease. 
o Any other reasonable terms and conditions considered necessary by the
Head of Corporate Governance.
___________________________________________________________________
Implications of the Report 
1. Financial – Rent of £6,000 per annum to the HRA account.    
2. HR & Organisational Development – None. 
3. Community Planning – None. 
4. Legal – Conclusion of Lease.   
5. Property/Assets – As per report. 
6. Information Technology – None. 
7. Equality & Human Rights  
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. Required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website. 
Page 94 of 104

Page 98

8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. Cosla Policy Position – Not Applicable.
___________________________________________________________________
Author:          Louise Le Good 
Louise.legood@renfrewshire.gov.uk   
07483 335 786 
Page 95 of 104

Page 99

11 STODDARD SQUARE
Mast (telecommunication)
1a
Pavilion
25
135
STODDARD SQUARE
18
30
6
3
3
17
12Car Park
22
100
Bowling Green
133
11
14
Elderslie Village Hall
12
27
5
132
5
4
8
138 to 142
Wallace Gait
2
PH
126
103
92
Shelter
130
to
7
23
3a
25.8m
16
MAIN ROAD
PH
to
136
10
146
1
124
105
114
101
GLENPATRICK ROAD
16
2
Hall
9
24.5m
11 STODDARD SQUARE, ELDERSLIE
REPORT PLAN
N
E
S
W
E3288
JW
1:1250
OCT 2022
CHIEF EXECUTIVE'S SERVICE
DATE
TITLE
SCALE
ASSET & ESTATES SECTION
All rights reserved.  Ordnance Survey Licence number 100023417.
Reproduced by permission of Ordnance Survey on behalf of HMSO.  © Crown copyright and database right 2022.
SHEET SIZE - A4
DRAWN BY
DRAWING No. Renfrewshire
Council
Page 96 of 104

Page 100

___________________________________________________________________
To: Infrastructure, Land & Environment Policy Board
On: 9 November 2022
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: 9 Year Lease of Shop at 5/2 High Street, Johnstone 
______________________________________________________________
1. Summary 
1.1 This report advises the Board on the provisional terms and conditions agreed for
the lease of the property at 5/2 High Street, Johnstone as shown on Report Plan
E3285. 
2. Recommendations 
It is recommended that the Board: 
2.1 Agree to the Terms and Conditions that have been provisionally agreed with the
Council and the proposed tenant (Mr V Evangelista) and authorise the Head of
Corporate Governance to conclude the lease on the basis of the terms and
conditions detailed in this report.
_________________________________________________________
3. Background 
3.1 The property at 5/2 High Street is currently leased by Mr Paul Evangelista and is
being used as barber shop. 
3.2 The existing lease commenced on the 28th of May 2016 for a period of six months
however the tenant has been in occupation of the premises for over 30 years.
The current passing rent is £3,250 per annum. 
Item 14
Page 97 of 104

Page 101

3.3 The tenant requested an assignation of the lease to his son Mr Vincent
Evangelist to whom he is selling the business.     
3.4 The Council has received satisfactory references to allow the lease with Mr
Vincent Evangelista to proceed.   
3.5 The assignation request has triggered a rent review and the new rent proposed
will be £3,600 which is the current market rent for the property. 
4. Proposed Terms and Conditions of Lease  
o The lease shall be for a period of 9 years and shall be on the basis of the
Council’s full repairing and insuring lease. 
o The rent shall be £3,600 per annum and shall be reviewed every 3 years from
the date of entry.  A payment of £900 shall be payable on the date of entry. 
o The property shall be used as barber shop and for no other purpose
whatsoever. 
o Assignation and sub-letting is prohibited. 
o The tenant shall meet the Council’s reasonable legal expenses incurred in
concluded this lease. 
o Any other reasonable terms and conditions considered necessary by the Head
of Corporate Governance.
___________________________________________________________________
Implications of the Report 
1. Financial – Rent of £3,600 per annum to the HRA account.    
2. HR & Organisational Development – None. 
3. Community Planning – None. 
4. Legal – Conclusion of Lease. 
5. Property/Assets – As per report 
6. Information Technology – None. 
7. Equality & Human Rights  
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. 
Page 98 of 104

Page 102

Required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. Cosla Policy Position – Not Applicable.
___________________________________________________________________
Author:          Louise Le Good 
Louise.legood@renfrewshire.gov.uk   
07483 335 786 
Page 99 of 104

Page 103

5/2 HIGH STREET
Burnbank
Ivybank
10
6
Hanover
Court
PO
Sub
Sta
El
Sorting
Dimity
11
15
PH
16b
16a
13
10
1
HIGH STREET
CANAL AVENUE
8
Exchange
2
PH
5
9
ROAD
Peockland Burn
5
3
1
1 to 9
17
13
1
1
WALKINSHAW
STREET
3
12a
21
7
14 Office
12
Street Church
1
to 18C
16
3
GORDON MCMASTER GARDENS
2
10a
10b
6
1Hall
CANAL STREET
27
15
1
11
CANAL
7
6
17
4
3
18
8
2
BANKSIDE AVENUE
24
12
20
14
2
13.9m
4
5/2 HIGH STREET, JOHNSTONE
REPORT PLAN
N
E
S
W
E3285
JW
1:1250
OCT 2022
CHIEF EXECUTIVE'S SERVICE
DATE
TITLE
SCALE
ASSET & ESTATES SECTION
All rights reserved.  Ordnance Survey Licence number 100023417.
Reproduced by permission of Ordnance Survey on behalf of HMSO.  © Crown copyright and database right 2022.
SHEET SIZE - A4
DRAWN BY
DRAWING No. Renfrewshire
Council
Page 100 of 104

Page 104

___________________________________________________________________
To: Infrastructure, Land & Environment Policy Board
On: 9 November 2022
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: 2 Year Lease of Shop at 71/3 High Street, Johnstone 
______________________________________________________________
1. Summary 
1.1 This report advises the Board on the provisional terms and conditions agreed
for the lease of the property at 71/3 High Street, Johnstone as shown on Report
Plan E3286. 
2. Recommendations 
It is recommended that the Board: 
2.1 Agree to the terms and conditions that have been provisionally agreed with the
Council and the proposed tenant (Mr S McFarlane) and authorise the Head of
Corporate Governance to conclude the lease on the basis of the terms and
conditions detailed in this report.
_________________________________________________________
3. Background 
3.1 The property at 71/3 High Street is currently leased by Mr Toni Marshall and is
being used as delicatessen with hot food takeaway. 
3.2 The tenant has been in occupation of the premises since the 4th of September
2018 when they acquired the property by way of assignation. The lease has
been running on tacit relocation since the 28th of May 2010.  The current
passing rent of the property is £10,850 and was set when the tenant took entry. 
Item 15
Page 101 of 104

Page 105

3.3 The tenant requested an assignation of the lease to Mr Scott McFarlane to
whom he is selling the business.   
3.4 The Council has received satisfactory references to allow the lease with Mr
McFarlane to proceed.   
3.5 The assignation request has triggered a rent review and the new rent proposed
will be £11,700 which is the current market rent for the property. 
4. Proposed Terms and Conditions of Lease 
o The lease shall be for a period of 2 years and shall be on the basis of the
Council’s full repairing and insuring lease. 
o The rent shall be £11,700 per annum and shall be reviewed upon expiry
of this lease.  A payment of £900 shall be payable on the date of entry. 
o The property shall be used as delicatessen and hot food takeaway and for
no other purpose whatsoever. 
o Assignation and sub-letting is prohibited. 
o The tenant shall meet the Council’s reasonable legal expenses incurred
in concluded this lease. 
o Any other reasonable terms and conditions considered necessary by the
Head of Corporate Governance.
___________________________________________________________________
Implications of the Report 
1. Financial – Rent of £11,700 per annum to the HRA account. 
2. HR & Organisational Development – None. 
3. Community Planning  - None. 
4. Legal – Conclusion of Lease.   
5. Property/Assets – As per report. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. 
Page 102 of 104

Page 106

Required following implementation, the actual impact of the recommendations
and the mitigating actions will be reviewed and monitored, and the results of
the assessment will be published on the Council’s website. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. Cosla Policy Position – Not Applicable.
___________________________________________________________________
Author:          Louise Le Good 
Louise.legood@renfrewshire.gov.uk   
07483 335 786 
Page 103 of 104

Page 107

10
21.4m
PH
15
MACDOWALL
1 to 6
35
38 to 46
LB
Hall
Johnstone Town Hall
Car Park
Government
59 to 61
7
3
War
LB
33
4
58
C
CHURCH STREET
Bank
Centre
71
KIRKLAND GROVE
42
GEORGE STREET
20.4m
9
11
20
26
10
1 to 31
22.3m
4
3
PH
4
Posts
11
1
2
813
31
2326
27
Garage
5
6
28 to 36
2
68
Shelter
STREET
72
30
12
TCB
COLLIER STREET
ESSs
Offices
33 to 35
56
Mem
9
HIGH STREET
9
10
8
12
PH
7
65
16
1
Ho
6
71/3 HIGH STREET
71/3 HIGH STREET, JOHNSTONE
REPORT PLAN
N
E
S
W
E3286
JW
1:1250
OCT 2022
CHIEF EXECUTIVE'S SERVICE
DATE
TITLE
SCALE
ASSET & ESTATES SECTION
All rights reserved.  Ordnance Survey Licence number 100023417.
Reproduced by permission of Ordnance Survey on behalf of HMSO.  © Crown copyright and database right 2022.
SHEET SIZE - A4
DRAWN BY
DRAWING No. Renfrewshire
Council
Page 104 of 104