To: Infrastructure, Land & Environment Policy Board
On: 9 November 2022
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: 175 Year Ground Lease to Scottish Power Energy Networks,
Underwood Road Depot, Paisley  
______________________________________________________________
1. Summary 
1.1 This report advises the Board on the provisional terms and conditions agreed for
a long ground lease between the Council and Scottish Power Energy Networks
(SPEN) as shown on the plan that accompanies this report.   
2. Recommendations 
It is recommended that the Board: 
2.1 Agree to the terms and conditions that have been provisionally agreed with the
Council and SPEN and authorise the Head of Corporate Governance to conclude
the lease based on the terms and conditions detailed in this report.
_________________________________________________________
3. Background 
3.1 As part of the Council’s investment plan to convert its current fleet to being zero
emissions vehicles, SPEN have been contacted to install a new sub-station at
Underwood Road Depot. 
3.2 A feasibly study has been carried out by Renfrewshire Council and SPEN to
determine costs, the power supply required and location of the sub-station.

Page 2

3.3 It has been agreed that a sub-station within the operational depot would be more
cost effective than taking this from the nearest street, Underwood Road.  The
sub-station should be sited next to the existing biomass system within the depot. 
3.4 The cost of the installation will be £137,825.59 inclusive of VAT and has been
approved by the Head of Operations and Director of Finance. 
3.5 SPEN’s contractor, Morrison Construction, will be managing the project on site
and will provide traffic management with their being limited disruption to
Underwood Road Depot. 
4. Proposed Terms and Conditions of Lease 
 The subjects shall be the land at 52 Underwood Road, Paisley, PA3 1TL
as shown on plan ESC108291-(1)-002. 
 The lease shall be for a period of 175 years or thereby, 
 Date of entry shall be on completion of missives 
 The rent shall be £1 if asked. 
 The Landlord shall grant the tenant 
o  All necessary cable and access rights required:
o  Combined access & cable servitude (highlighted in blue on the
attached plan)
o  Vehicle and personnel access (shown pink on the attached
plan)
o  3m wide cable servitude (shown yellow on the attached plan)
o  Both parties shall be responsible for their own legal expenses in
connection with this transaction.
___________________________________________________________________
Implications of the Report 
1. Financial – Cost of installation - £137,825.59. 
2. HR & Organisational Development – None. 
3. Community Planning – None. 
4. Legal – Conclusion of Lease. 
5. Property/Assets – As per report. 
6. Information Technology – None.

Page 3

7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. Required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. Cosla Policy Position – Not Applicable.
___________________________________________________________________
Author:          Louise Le Good 
Louise.legood@renfrewshire.gov.uk   
07483 335 786

Page 4

Unit 3
62
4
66
1 to 3
UNDERWOOD ROAD
Sorting Office
5 to 9
Trees
LB
55
57
El
Gas Meter
4
40
Sub Sta
Underwood Court
Works
5
49
Unit 1
House
Tanks46
Amenity Tip
Works
Disposal
Refuse
Drawn Appr'd
Scale Date
Check'dCheck'dDrawnRev Date Appr'd
Title
Project
Drg. No. Rev.
Status
A352 UNDERWOOD ROAD
PAISLEY, PA3 1TL
SUBSTATION
LEASE
LEASE
ESC108291-(1)-002 -
0m 20m 40m 60m 80m
Scale - 1:1000
SUBSTATION DETAIL
SCALE  1:200
SEE
SUBSTATION
DETAIL