To: Infrastructure, Land & Environment Policy Board
On: 9 November 2022
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Disposal of land at Maple Drive, Johnstone Castle – Regeneration  
Phase 2
___________________________________________________________________
1. Summary 
1.1 This report seeks the consent of the Policy Board for the disposal of land at Maple
Drive, Johnstone which currently sits on the Housing Revenue Account to Link
Group Limited (incorporating Link Housing Association), for the development of
affordable housing. 
2. Recommendations 
2.1 It is recommended that the Board:- 
(i) Authorise the Head of Economy and Development and the Head of Corporate
Governance to undertake the necessary processes to complete the disposal
of land at Maple Drive shown indicated on the attached plan E3228A to Link
Group Limited, on the terms and conditions detailed within this report.
________________________________________________________
3. Background 
3.1 Renfrewshire’s Strategic Housing Investment Plan 2023/28 was approved by the
Communities and Housing Policy Board at its meeting on 25 October 2022 and
sets out how investment in affordable housing will be targeted to achieve the
objectives of the Local Housing Strategy. This was approved following
consultation and engagement with Community Planning partners, including the
Housing Associations operating in Renfrewshire.

Page 2

3.2 This report refers to an area of ground that was declared surplus by the
Communities, Housing and Planning Policy Board in August 2018 which identified
land extending to 2.02 Ha or thereby as suitable for development by a Housing
Association.  Subsequent discussions with Link Group Limited highlighted the
requirement to adjust the boundaries of the site to accommodate the planned
development layout and this revised area (as shown on drawing E3228A,
extending to 2.24 Ha or thereby) was declared surplus at the Communities and
Housing Policy Board on 16 August 2022. 
3.3 This revised site has been independently valued on behalf of by D M Hall
Chartered Surveyors at a value of £935,000. 
3.4 The site is not fully cleared, and Link will undertake demolition of the remaining
properties following land acquisition (42 flats contained within 4 No. 3 storey
blocks). Link have provided reports and quotations for the demolition works which
were assessed on behalf of the Council by Reid Associates, Chartered Quantity
Surveyors. 
3.5 Link have undertaken detailed site investigations for the cleared site and provided
reports confirming that ground conditions are such that abnormal development
costs in the region of £1,300,000 are required. These abnormal costs together
with the demolition costs negate the headline site valuation of £935,000, and
therefore it is considered appropriate that Link are looking to acquire this site at nil
cost. 
3.6 Reid Associates, Chartered Quantity Surveyors have analysed the accuracy of the
abnormal cost reports received, and although this figure has been reduced
through negotiation, extraordinary development costs greater than £1,300,000 still
exist, supporting a site transfer at nil value.   
4. Proposed terms and conditions of sale   
4.1 The purchase price payable for the land shown outlined on the attached plan,
which extends to approximately 2.24 Hectares, shall be £1.00, if asked. 
4.2 Link will complete the demolition and site clearance as per the  demolition arrant
drawing number J5235-D01 Revision A dated 17 January 2022, within 6 months
of the later of (i) date of entry and (ii) completion of the removal of all existing
meters and full-service disconnection or such other date as agreed between the
parties. It is the Council’s understanding that Link have appointed a demolition
contractor and anticipate commencing demolition as soon as practical after sale
of the land. 
4.3 The transfer of the land to Link is subject to the Housing Association obtaining
all necessary planning and statutory consents required for their proposed
development.   
4.4 Each party shall bear their own legal and professional expenses incurred in
concluding the sale with the purchaser responsible for meeting any land
transaction taxes and registration dues.

Page 3

4.5 Any other reasonable terms and conditions considered necessary by  the Head
of Corporate Governance and the Head of Economy and Development shall be
pursued if it considered necessary to protect the Council’s interest.
___________________________________________________________________
Implications of the Report 
1. Financial – No capital receipt to be received.   
2. HR & Organisational Development – None. 
3. Community Planning 
Building strong, safe and resilient communities.   Increasing the supply of
affordable housing and regenerating communities. 
4. Legal – conveyancing work associated with the land transfer. 
5. Property/Assets – As per this report. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have
been identified arising from the recommendations contained in the report
because no groups or individuals have any involvement currently at the
property. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website. 
8. Health & Safety – None. 
9. Procurement – Not applicable. 
10. Risk – None.     
11. Privacy Impact – Not applicable. 
12. COSLA Policy Position – Not applicable. 
13. Climate Risk – None.
_________________________________________________________
List of Background Papers 
(a) Report to Communities,Housing and Planning Policy Board; 21 August 2018; Draft
Strategic Housing Investment Plan 2019/20 to 2023/24.
(b) Report to Communities and Housing Policy Board, 16 August 2022: ‘Land at Maple
Drive, Johnstone Castle – Regeneration Phase 2.’

Page 4

(c) Report to Communities and Housing Policy Board, 25 October 2022: ‘Renfrewshire’s
Strategic Housing Investment Plan 2023/28.’ 
_________________________________________________________ 
Author:           Margaret Law, Senior Asset & Estates Surveyor

Page 5

C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
CEDAR
610
61.2m
8
El
175
4
1
171
153
Sports
Facility
182
Sta
63.8m
184
169
9
LARCH PLACE
170
166
68.7m
67.9m
13
139
Play Area
24
166
2
22
19
64.7m
Shelter
18
143
13
164
10a
Sub
23
17
RANNOCH ROAD
15
MAPLE DRIVE
173
ELM DRIVE
1
176
10b
Ordnance Survey Mapping - © Crown Copyright and database right 2022. All rights reserved. Ordnance Survey Licence number 100023417.  Aerial
Photography 2009 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009 and Crown Copyright © All rights reserved. Aerial Photography
2004/6 - © 2004 Getmapping plc © 2006 Getmapping plc Aerial Photography 2001 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009
and Crown Copyright © All rights reserved. Historic Map Data - © Crown Copyright and Landmark Information Group Limited 2012. All rights reserved.
1:1,250
I
Land at Johnstone Castle
Report Plan Ref. E3228A
Notes:
Date: 12/05/2022
Legend
Area extends to 2.24 hectares or thereby
JW