To: Infrastructure, Land & Environment Policy Board
On: 9 November 2022
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Kirklandneuk Playing Field & Pavilion
Renfrew Victoria Boys Club – CAT update
___________________________________________________________________
1. Summary 
1.1 This report updates the Board on the CAT long lease request to Renfrew
Victoria Boys Club (RVBC) for Kirklandneuk Playing Fields and Pavilion.  The
CAT request was presented to board on the 19th of March 2019, the terms of
the lease have now been agreed, subject to Board approval. 
2. Recommendations 
It is recommended that the Board:- 
2.1 Approve the agreed terms of the 25 year lease to Renfrew Victoria Boys Club
of Kirklandneuk Playing Fields and Pavilion, Ness Road, Renfrew. 
2.2 Authorise the Head of Corporate Governance to conclude the lease with RVBC,
on the Council’s standard Full Repairing & Insuring lease and on such other
terms as required to protect the Council’s interest. 
2.3 Authorise the Head of Economy and Development and the Head of Corporate
Governance to conclude a partial lease renunciation between the Council and
OneRen to allow this area to be leased to RVBC. 
2.4 Approve the request for the use of additional land to be included in the lease to
RVBC which is currently leased to OneRen as per attached plan E2867b. 
________________________________________________________

Page 2

3. Background 
3.1  Kirklandneuk Community Centre and Pavilion is an interconnected property for
which OneRen have operational management responsibility.  There is large a
car parking area at the front of the property. 
3.2     The Community Centre is a self-managed facility and the Pavilion and pitches
are leased to RVBC for which they pay an annual rent of £1,639.87.  All services
are connected to both parts of the building and each side can be accessed via
an interconnecting lockable door. This lease is managed on the Council’s behalf
by OneRen. 
3.3 RVBC submitted a Community Asset Transfer request for a long lease of 25
years for Kirklandneuk Playing fields and Pavilion and this was considered by
the board on the 19th of March 2019.  This length of tenure was required to
secure and attract funding to allow investment of the property.  It was agreed
that the property would be let at a rent of £1 if asked.  The Community Centre
Committee and OneRen confirmed there would be no objection to the lease. 
3.4    The approval was subject to RVBC taking steps to separate the services to
ensure that the Community Centre and the Pavilion could function
independently and they would be responsible for a share of the maintenance to
the car park.  There were also aspects of their constitution that needed to be
addressed in order for the group to enter into a lease.   
3.5 Officers were instructed to conclude the lease, however there were issues
around the RVBC constitution and the separation of the services of the property
which had not been investigated by RVBC. 
3.6 RVBC have now amended their constitution to allow for the club to enter into a
lease and the Council have carried out a feasibility survey to assess how the
property could be separated. 
3.7 The feasibility study concluded that a full separation of the property would be
cost prohibitive and that only a partial separation could be considered.  The
property will remain connected via an interlinked door between the Community
Centre and the Pavilion.  
3.8   Both occupiers will enter into an access agreement for the meter cupboard
which is situated on the side of the pavilion but serves the Community Centre. 
RVBC will need to arrange for a meter to be installed to facilitate their
investment proposals including solar panels.  RVBC will also require a new
water connection which shall be routed from the boiler and installed in the
Pavilion.    
3.9 The Council will meet the cost of ensuring health and safety compliance of the
property by continuing with the security and fire alarms for both sides of the
property.

Page 3

3.10  The car park maintenance responsibility has been calculated at 30% which
has been based on a percentage floor area of the overall area of the
Community Centre and the Pavilion. 
4. Proposed terms and conditions of lease; 
 The Lease shall be for a period of 25 years and shall be on the Council’s
standard Full Repairing and Insuring style of lease. 
 The initial annual rent shall be £1, if asked. 
 The property (as outlined on report plan E2867b) shall be used for
providing football pitches, changing facilities and ancillary purposes and
for no other purposes without prior consent of the Landlord. 
 The Tenant (RVBC) will be responsible for all repairs and maintenance
of the property and shall contribute 30% of the costs to maintain the car
park.   
 The Tenant shall be responsible for undertaking the work required to
separate the services and to enable to Pavilion to operate independently
of the Community Centre.  These works will include: 
o Heating and pipework to be cut and capped below the floor at
the point of entry into the Pavilion.  
o A new water mains connection to be installed in the Pavilion
originating from the boiler room and routed predominantly
within the ceiling void.  A meter shall be installed in the Pavilion
at an accessible location.  
o A separate electricity meter and consumer unit to be installed
for usage in the Pavilion.   
 The Landlord shall be responsible for extending the fire and security
alarms so that these serve both the Community Centre and the Pavilion
within the property.  The Tenant shall be responsible for a share of the
maintenance and repair of these systems. 
 The tenant shall ensure that any necessary planning, building warrants,
statutory and licensing consents that may be required are secured prior
to the date of entry. 
 The tenant and the Community Centre will enter into an access
agreement for access to the electricity cupboard which is located within
the tenant’s property.  This shall be for emergency access and repairs
and maintenance. 
 Each party shall bear their own legal costs.

Page 4

 Any other reasonable terms and conditions considered necessary to 
protect the Council’s interest. 
Implications of the Report 
1. Financial – Concessionary let to Renfrew Victoria Boys Club will continue to
support the community.   
2. HR & Organisational Development – None. 
3. Community Planning 
Our Renfrewshire is thriving – Continued support via community asset transfer
of an existing community facility. 
4. Legal – Conclusion of a new 25 year lease with Renfrew Victoria Boys Club. 
Partial Lease Renunciation of property between the Council and OneRen. 
5. Property/Assets – As per this report. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report because no groups or individuals have any involvement currently at
the property. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website. 
8. Health & Safety – None. 
9. Procurement – Not applicable. 
10. Risk – None. 
11. Privacy Impact – Not applicable. 
12. Cosla Policy Position – Not applicable.
_________________________________________________________
List of Background Papers 
(a)  Background Paper 1 – Kirklandneuk Playing Field & Pavilion Renfrew Victoria
Boys Club March 2019
_________________________________________________________________ 
Author:           Louise Le Good

Page 5

louise.legood@renfrewshire.gov.uk    
07483 335 786

Page 6

ARD ROAD
KIRKLANDS
McCLUE AVENUE
Ordnance Survey Mapping - © Crown Copyright and database right 2022. All rights reserved. Ordnance Survey Licence number 100023417.  Aerial
Photography 2009 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009 and Crown Copyright © All rights reserved. Aerial Photography
2004/6 - © 2004 Getmapping plc © 2006 Getmapping plc Aerial Photography 2001 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009
and Crown Copyright © All rights reserved. Historic Map Data - © Crown Copyright and Landmark Information Group Limited 2012. All rights reserved.
1:1,500
I
Kirklandneuk Playing Fields & Pavilion, Renfrew
Report Plan Ref. E2867b
Notes:
Date: 03/08/2022User: hocraigj1
Legend
Right of access and shared maintenance responsibility for Renfrew Victoria Boys Club
Pavilion
Area to be transferred extends to 3.4 hectares or thereby