ILE #YouDecide Evaluation Report - Full Version

Renfrewshire Council · 22 January 2025
Back to Infrastructure, Land and Environment Policy Board — 22 January 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

___________________________________________________________________
To: Infrastructure, Land and Environment Policy Board
On: 22 January 2025
___________________________________________________________________
Report by: Director of Environment, Housing and Infrastructure
___________________________________________________________________
Heading: #YouDecide Evaluation Report 
___________________________________________________________________
1. Summary 
1.1 This report provides an evaluation of the development and delivery of the
Council’s £1.2M Infrastructure and Assets Community Investment Fund,
#YouDecide, which was agreed by the Infrastructure, Land & Environment
Policy Board in August 2020. The £1.2M Community Investment Fund was
split between 16 localities, equating to £75K per area. 
1.2 This fund was used to encourage communities to have their say on what
improvements and new infrastructure that they wanted to see in their local
areas through participatory budgeting and formed part of the Council’s
commitment to allocate 1% of its budget to participatory budgeting. As well as
giving local people a key role in the decision-making process around
improving infrastructure within their local area, the Council gained a better
understanding of community priorities. 
1.3 In total, 2811 ideas were generated from residents across Renfrewshire. 
These ideas were then shortlisted to 119 projects, with nearly 5000 votes
received. Fifty successful projects were announced at a community event
which over 100 residents from across Renfrewshire attended. 
1.4 A significant communications and marketing campaign took place to promote
#YouDecide and as a result 87% of local people agreed that they had
increased knowledge of participatory budgeting, with 81% of local people
agreeing that it was a good way for the Council to identify projects and
allocate funding.

Page 2

1.5 For those who provided feedback in relation to participating in the process,
65% of people advised that they had never taken part in a Council
consultation before, demonstrating the effectiveness of the engagement
process in reaching those who had not previously engaged with the Council
and who may have been harder to reach in the past.
___________________________________________________________________
2. Recommendations
It is recommended that the Infrastructure, Land and Environment Policy Board:
2.1 Notes the content of the report, and that the learning from the approach used
will be applied to any future participatory budgeting processes in the future.
_________________________________________________________
3. Background
3.1 The Community Empowerment (Scotland) Act 2015 requires local authorities
to promote and facilitate public participation in decision-making activity within
the authority, including the allocation of resources. 
3.2  The principals of Participatory Budgeting are about addressing the needs
within communities.  It is well known that better community engagement and
participation leads to the delivery of more responsive services as well as
better outcomes for communities. 
3.3  COSLA and the Scottish Government have developed and agreed a
framework on which to take forward participatory budgeting.  The framework
acts as an enabler for active participation of communities in local decision
making and it establishes a shared expectation that Elected Members, Senior
Officers and local communities will go beyond the current arrangements for
engagement and consultation. 
3.4  A target of 1% of a local authority budget to be set by participatory budgeting
was agreed, however, this is a minimum. Renfrewshire Council aspire to go
beyond this target and for participatory budgeting principles to become
“business as usual”.  The Council is committed to this approach as it believes
it will support community involvement and lead to better decision making. 
4. Main Objectives of #YouDecide 
4.1  The campaign was a democratic innovation in Renfrewshire, which
empowered communities to shape the allocation of £1.2M for infrastructure
improvements. 
4.2 This budget was dedicated to supporting projects that align with the strengths,
needs and aspirations of local communities, allowing residents to decide on
infrastructure improvements they value most.

Page 3

4.3 The main objectives of #YouDecide were to:
• Promote awareness of participatory budgeting to communities
• Encourage local communities to play an active role in the decision-
making process, with a particular focus on those who do not normally
engage with the Council.
• Ensure successful outcomes for communities.  
5. Community Feedback
5.1 This was not a traditional Council project; therefore, a more creative strategy
was required to reach out and engage with residents who are not normally
engaged with the Council.
5.2 As a result, 65.2% of those who provided feedback stated that they had never
participated in a council consultation before, demonstrating how effective the
consultation approaches have been in reaching those who have not engaged
with consultation and who may have been harder to reach in the past.
5.3 When asked if they thought that participatory budgeting was a good way for
councils to allocate monies to projects, 81.6% of responding residents agreed
that it was a good way to allocate funding and projects.
5.4 This was further strengthened by focus groups members who all agreed this
is a good way to allocate funds as it gives the community more autonomy in
their own area. The focus group noted however, that continuity would be key
to successful relationship building with communities.
___________________________________________________________________
Implications of the Report
1. Financial – The budget for the #YouDecide campaign was met from the
Roads Capital Investment programme.  
2. HR & Organisational Development - none
3. Community/Council Planning – Better community engagement and
participation leads to the delivery of more responsive services and better
outcomes for communities. This campaign was closely aligned to the
‘sustainable and connected’ priority of the Renfrewshire Community Plan
which seeks to ‘listen and respond to the needs of communities, and
partners.’ It is also aligned with the priority of Supporting the wellness and
resilience of our citizens and communities through Enabling communities to
have their voice heard and influence the places and services that affect them.
4. Legal - none 
5. Property/Assets - none
6. Information Technology - none

Page 4

7. Equality & Human Rights - none
8. Health & Safety - none
9. Procurement - N/A
10. Risk - none
11. Privacy Impact - N/A
12. Climate Risk - N/A
13. Children’s Rights - N/A
14.  Cosla Policy Position - This initiative helps to deliver on Cosla commitments
to develop community empowerment and participatory budgeting.
_________________________________________________________
List of Background Papers
None
____________________________________________________________ 
Author: Gwyneth Heaney, Senior Manager, Climate and Public Protection.
Email: Gwyneth.heaney@renfrewshire.gov.uk

Page 5

1 
#YouDecide Evaluation Report 
Environment, Housing & Infrastructure

Page 6

2
#YouDecide Evaluation Report 
Contents
1. Introduction ....................................................................................... 3
2. Background ........................................................................................ 4
2.1. Main Objectives of #YouDecide ............................................................. 5
2.2. #YouDecide  Planning Phase ................................................................. 6
2.3. #YouDecide Ideas Stage ........................................................................ 8
2.4. #YouDecide Community Voting .......................................................... 10
2.5. #YouDecide Successful Projects .......................................................... 11
2.6. #YouDecide Community Engagement & Feedback ............................ 12
2.7. Marketing Campaign ........................................................................... 12
2.8. Conclusion .......................................................................................... 14
2.9. Appendix 1 Awarded Projects ............................................................. 15
2.10. Appendix 2 #YouDecide Steering Group Self Evaluation .................... 19

Page 7

3
#YouDecide Evaluation Report 
1. Introduction 
Environment, Housing & Infrastructure set aside £1.2M from its five year Roads Capital
Investment Programme to create an Infrastructure & Assets Community Investment
Fund.   This fund was used to encourgage communities to put forward proposals and
make decisions on investments in infrastructure and assets within their local areas
through participatory budgeting, and formed part of the Council’s commitment to
allocate 1% of its budget to participatory budgeting.  
Communities were invited to have their say on what improvements and new
infrastructure they would like to see in their area. This gave local people a key role in
the decision-making process around improving infrastructure within their area, but the
Council also gained a better understanding of community priorities.
The process was branded #YouDecide and the £1.2M was split between 16 localities
across Renfrewshire, equating to £75K per area.
Key highlights of the campaign include: 
• In total, 2,811 ideas were generated from residents across Renfrewshire.  These
ideas were then shortlisted to 119 projects, with nearly 5000 votes received.
• The successful projects were announced at a community event which over 100
residents from across Renfrewshire attended.
• A significant communications and marketing campaign took place to promote
#YouDecide and as a result 87% of local people agreed that they had increased
knowledge of participatory budgeting, with 81% of local people agreeing it was a
good way for the Council to identify projects and allocate funding.
• For those who provided feedback in relation to participating in the process, 65%
of people  advised that they had never taken part in a Council consultation before,
thus demonstrating the effectiveness of the engagement process in reaching
those who have not previously engage in consultation and who may have been
harder to reach in the past.

Page 8

4
#YouDecide Evaluation Report 
2. Background
The Community Empowerment (Scotland) Act 2015 requires local authorities to
promote and facilitate public participation in the decision making and activity of the
authority, including the allocation of resources.  
The principals of Participatory Budgeting (PB) are about addressing the needs within
communities.  It is well known that better community engagement and participation
leads to the delivery of more responsive services as well as better outcomes for
communities.  Participatory Budgeting allows communities to have their say on how a
percentage of a budget can be spent in their local area.
COSLA and Scottish Government have developed and agreed a framework on which to
take forward participatory budgeting. The framework acts as an enabler for active
participation of communities in local decision making and it establishes a shared
expectation that elected members, senior officers and local communities will go
beyond the current arrangements for consultation and engagement.  A target of 1% of a
local authority budget which has been set using participatory budgeting was agreed,
however, this is simply a minimum.  Renfrewshire Council aspire to go beyond this
target and for participatory budgeting to become ‘business as usual’.  The Council is
committed to this approach as it believes it will support more community involvement
and lead to better decision making.
Mainstream Participatory Budgeting (PB) empowers citizens to engage directly in
decisions about local budgets, resource distribution, and service planning. This
approach goes beyond allocating individual budgets, often referred to as small grants
PB, or setting aside separate funds for community engagement and consultation.
Instead, it integrates PB into the broader process of allocating existing resources across
all council services. For more details on the key principles of PB can be found in the PB
Charter for Scotland. 
PB was an important recommendation of the local government-led Commission for
Strengthening Local Democracy in 2014: 
“Democratic power should be delivered from communities up, not drip down from
above. Democratic innovations such as … participatory budgeting … should … become
the standard by which [participation in decision making] is delivered in Scotland.”
Mainstream PB can be used alongside other models of community engagement to
advance equalities, enhance democratic renewal, and progress public sector reform.

Page 9

5
#YouDecide Evaluation Report 
2.1. Main Objectives of #YouDecide  
#YouDecide was a democratic innovation in Renfrewshire, utilising participatory
budgeting to empower communities to shape the allocation of a £1.2M Community
Investment Fund. This budget was dedicated to supporting projects that align with the
strengths, needs, and aspirations of local communities, allowing residents to decide on
infrastructure improvements they value most. The initiative also enabled the Council to
better understand and respond to community priorities.
The main objectives of #YouDecide were to:
• Promote awareness of participatory budgeting
• Encourage local communities to play an active role in the decision-making
process, with a particular focus on those who do not normally engage with the
Council.
• Ensure successful outcomes for communities 
The goals of the project aligned closely with Renfrewshire Council’s strategic outcomes
of:
“Place”
• Developing our relationship with, listening to, and involving our communities in
the shaping of their future, particularly around the Council’s investment and
budgeting decision, and ensure that a wide range of voices and view are heard.
• Adopting a ‘place shaping’ approach to developing our communities – working
together to maximise or collective impact and influence across economic, social,
physical, cultural, and environmental policies and practices.
“Economy” 
• Improving lives and securing wellbeing through a stronger, inclusive, and
sustainable economy, being creative, imaginative, and linking opportunities to
enhance the benefits of Renfrewshire.
This initiative was also underpinned by Renfrewshire Council values:We are Fair; We are
helpful; We are great collaborators; and We value learning to help us innovate, improve,
and deliver better services.

Page 10

6
#YouDecide Evaluation Report 
2.2. #YouDecide  Planning Phase
#YouDecide was the first mainstream PB programme to be undertaken by Renfrewshire
Council. From the outset of the process there has been the intention to learn as we go,
with the learning to be used to inform other PB projects from both within the E&I
service and other service areas across the Council. 
From inception of the project a multi-disciplinary project team was established to
ensure a strong partnership approach.  The core group consisted of officers from: 
• Roads & Transportation, 
• Communications & Marketing, 
• Partnerships & Inequalities, 
• Data Analytics, 
• Community Learning & Development, and
• Project Management Unit. 
Expert advice was also sought from a range of other services as was required. Prior to
the planning of the process staff from the planning group engaged with both Stirling
and Dundee councils around their large scale PB programmes which they previously
delivered. This allowed the planning group to benefit from the knowledge gained from
staff who undertook these processes and gave a real insight into the scale of the work,
which was to be undertaken, allowing a realistic approach to the resources that would
be required to deliver the #Youdecide programme.
With strong links to Renfrewshire’s Community Plan 2017-2027, the project team also
worked with Community Councils and Local Partnership’s at each stage to update on
the process and gather feedback about the approaches which were being undertaken.
This allowed local people to have their say on the design of the process.
Information and training sessions were delivered to staff across the EH&I service to both
inform them about Participatory Budgeting and support their understanding as to why
the process was being undertaken. This allowed staff to understand how their existing
roles might be affected and what their involvement would be in the process. This meant
that the process was integrated within current staff roles rather than employing new
staff in difficult financial times.

Page 11

7
#YouDecide Evaluation Report 
The convenor for the Infrastructure, Land and Environment Policy Board took on the
role of PB champion, supporting the wider group of elected members to support the
process and understand their own role within it. The PB champion also supported the
planning group to understand and address the concerns of elected members about the
process. This allowed for a smooth transition to a new way of working without too
many delays to the process. 
Communities were at the heart of this project; therefore, it was important to ensure we
had conversations with communities. The brand name #YouDecide was created along
with a highly visible and successful communications and marketing strategy.  The aim
was to have as wide a representative profile of Renfrewshire’s communities as possible,
with representation from all towns, villages, and communities, using cultural activity
and creativity to make it easy to encourage residents to engage. This focussed face to
face consultation exercise approach proved very successful with a higher-than-average
response rate.

Page 12

8
#YouDecide Evaluation Report 
2.3. #YouDecide Ideas Stage 
The £1.2M Community Investment Fund was allocated across 16 localities in
Renfrewshire, providing £75,000 for each area. Residents were given the opportunity to
determine which infrastructure projects were most important to their communities.
The public engagement process occurred in two phases:
Phase 1 – Residents and workers in Renfrewshire were invited to contribute their ideas
and suggestions for infrastructure improvements in their area, creating a list of
potential projects.
Phase 2 – These suggestions were shortlisted using a matrix system that considered
several factors, including:
• Innovation and creativity. 
• Environmental and physical infrastructure improvements that would have wide
community benefits.
• The proposals would ideally cost between £5000 - £50,000 with limited ongoing
maintenance costs
• Has the work or similar work already in the pipeline or other works which could
impact
• Will additional work be required? Ideas were looked at to see what design work
was required and if it was feasible.
• It needed to be on Council land due to potential restrictions and delays around
permission processes. 
When submitting ideas individuals needed to use their postcodes to decipher which
locality the idea was being suggested for. Residents could only submit ideas for the area
in which they lived or worked. They were asked to provide as much information as
possible about the locality for the idea and they had an opportunity to provide pictures.
Details of how we engaged residents across Renfrewshire can be found in the
community engagement section of this report. 
A total of 1,982 postcodes were submitted with ideas, the number of ideas received was
2,811. The total number of postcodes directly relates to the number of individuals who
entered an idea. (Due to multiple ideas from individuals the total number of ideas
submitted was higher than postcodes submitted)

Page 13

9
#YouDecide Evaluation Report 
There were 159 Invalid postcodes in Stage 1. This equated to 8%. This meant that the
person lived outside Renfrewshire but in almost all cases were submitting an idea for
Renfrewshire. This was permitted in stage1 but was restricted to Renfrewshire residents
for the voting Stage. 
The variety of ideas submitted are outlined in the table below.
Category Percentage
Traffic and Transportation 21.77%
Roads 13.56%
Sport and Leisure facilities 13.28%
Park play equipment 10.01%
Lighting 7.98%
Litter/ Waste and dog bins/Overgrown
Vegetation 7.75%
Misc 8.49%
Environment and Planting 5.67%
Public Seating 2.68%
Local Clubs and Hubs 3.23%
Public Toilets 1.66%
Other – out with Renfrewshire etc 1.52%
CCTV 1.34%
Flooding 1.06%
Totals 100.00%

Page 14

10
#YouDecide Evaluation Report 
All ideas were subject to a screening and feasibility process as described earlier. The
final short list of 119 projects, which residents from across 16 localities were able to
vote on can be found at the end of this report in Appendix 1.
From the list of ideas, there were 168 ideas which did not meet the criteria of the fund.
Rather than disregarding these ideas they were passed on to other relevant
departments.  These other ideas have been incorporated within planned service
improvements. These include some upgrades within parks, a new footpath, dropped
kerbs and vegetation removal. 
2.4. #YouDecide Community Voting 
Engagement with residents across Renfrewshire mirrored the process carried out in
Phase 1.  Engagement with residents across Renfrewshire took place via: 
• Outdoor Promotion Tour Across Renfrewshire
• Online platforms
• Community groups
• Local Partnerships
• Leaflet drop via hubs/supermarkets/doctors
• Schools
• Libraries both in communities and school libraries
• Youth Groups 
Officers were based in outdoor locations throughout Towns and Villages on specific
dates to promote the programme and encourage members of the public to cast their
vote.
Postcards with a QR code containing details of how residents could vote for projects in
their area, were distributed through community hubs and local supermarket deliveries.
Voting took place using Survey 123 and residents had to provide a postcode ensuring
they only voted for the projects within their local area.  Arrangements for additional
support to those residents who did not have access were put in place to ensure they
were also able to cast their vote.

Page 15

11
#YouDecide Evaluation Report 
2.5. #YouDecide Successful Projects 
Fifty successful projects, all providing significant community benefits, were announced
at a dedicated community event. Over 100 attendees from across Renfrewshire joined
the celebration, which showcased these impactful initiatives. The event also featured
various stallholders promoting additional community projects and initiatives. 
At the event one resident commented:
‘I turned to my wife when our idea was successful and she had a tear in her eye, it’s
perfect’. 
He went on to say ‘You look at how many people attended the event, and they all
represent a community project that #YouDecide has helped which is amazing. There are
people walking out this building tonight with massive smiles on their faces’. 
This demonstrated that residents felt listened to and part of the decision-making
process. This was further strengthened during a focus group held with residents about
the process when it was agreed by all that they were cynical about the process at first
due to previous experiences. However, personalised feedback from the #YouDecide
team helped to alleviate their view that there were predetermined winners. This made
it feel more genuine and as though the council were genuinely willing to consider the
proposals.

Page 16

12
#YouDecide Evaluation Report 
2.6. #YouDecide Community Engagement & Feedback 
#YouDecide was the first participatory budgeting project of its kind within Renfrewshire
Council therefore it needed an alternative approach to community
engagement.  This was not traditional Council project therefore, a more creative
strategy was required to reach out and engage with residents who are not normally
engaged with the Council. 
As a result, 65.2% of those who provided feedback stated that they had never
participated in a council consultation before, demonstrating  how effective the
consultation approaches have been in reaching those who have not engaged with
consultation and who may have been harder to reach in the past.
When asked if they thought that participatory budgeting was a good way for councils to
allocate monies to projects, 81.6% of responding residents agreed that it was a good
way to allocate funding and projects.
This was further strengthened by focus groups members who all agreed this is a good
way to allocate funds as it gives the community more autonomy in their own area. The
focus group noted however, that continuity would be key to successful relationship
building with communities.
2.7. Marketing Campaign
The programme’s highly visible marketing campaign directed people to all the
information online. There was a dedicated email address, to ensure people could
direct any questions or requests for information straight to the #YouDecide planning
group. 
A video was published across all social media sites, as well as being shared directly with
a wide range of local groups’ own social media pages. Radio advertising was also used
as part of the engagement activity. Of those who provided feedback 59.9% stated that
they heard about the project through social media, indicating that there is still a place
for face-to-face consultations.

Page 17

13
#YouDecide Evaluation Report 
Alongside the highly digital presence, the project team delivered a wide range of
face- to-face roadshows in every town and village across Renfrewshire to ensure that
as many residents as possible had the opportunity to participate in the programme. 
The roadshows involved council staff and volunteers basing themselves both inside
community buildings, such as libraries and sports hubs as well as being present outside
in parks and community spaces with information and resources such as ideas postcards
to support residents to submit ideas offline.  Staff also attended council and community
events across Renfrewshire, such as the Halloween festival, local gala days, and
Christmas light events as well as having a presence in a range of supermarkets.  In
addition to this staff attended umbrella equalities groups such as the DEAR group
who then cascaded information out to their members, they also attended meetings
of community organisations supporting people with specific protected characteristics
such as older people’s groups, youth groups, women’s groups, and carers groups.
Schools and sheltered housing complexes also hosted information sessions. Of those
who provided feedback, 34.7% cited events such the Halloween Festival, local
roadshows, and community groups as places they accessed information, confirming
getting out into towns and villages to speak to people was worthwhile.
A survey was created to collect feedback from residents who participated in the
process. The survey was initially circulated at the announcement event, and then was
sent out by email to all individuals whose details were held on the system because they
either submitted and idea or voted in the process.
The response to the survey questionnaire was received from 141 residents, which
equates to 7.1% of those who participated in the process. 
A self-evaluation process was carried out by the planning group to identify want went
well and areas for improvement, which can be used to support future PB activity within
the council. The planning team used the National Standards for Community
Engagement to measure the activity against. A rating system was designed which
ranged from 1 – 6. 1 being excellent and 6 being unsatisfactory. All 7 standards were
rated individually, and the team agreed a rating of 3 or above. A copy of this evaluation
can be found in Appendix 2 at the end of this report.

Page 18

14
#YouDecide Evaluation Report 
2.8. Conclusion 
#YouDecide ensured that communities were at the heart of the process by having
conversations with them about improvements they would like to see in their local area.
The successful projects have delivered real benefits for communities.  In response to one
of the projects delivered in Queens Road Park, Elderlsie, one resident told us 
“Our village really benefitted from the #YouDecide Project. One of the successful
suggestions was to resurface the area next to the newly installed Queens Road play
park.  We are currently working with Renfrewshire Council to arrange the installation of an
outdoor gym on the newly resurfaced area, which will be used by teenagers and adults
alike to improve their fitness, health, and wellbeing.  
We are also exploring what else we can do with this new flat surface, maybe painted line
games or dedicated cycling areas for kids.  Thank you to all the Elderslie people who voted
on the project, it really is making a very positive difference to Elderslie!”
#YouDecide has demonstrated the power of participatory budgeting in fostering
meaningful community engagement, enhancing democratic processes, and delivering
tangible benefits across Renfrewshire. By empowering residents to have a direct say in
the allocation of resources, the Council has not only strengthened its relationship with
local communities but also ensured that public funds were directed toward projects
that truly reflect community priorities. The success of this initiative provides a solid
foundation for future community engagement approaches, reinforcing the Council’s
commitment to collaboration, transparency, and innovation in shaping a brighter, more
inclusive future for all.

Page 19

15
#YouDecide Evaluation Report 
2.9. Appendix 1 Awarded Projects 
BISHOPTON Engage with the local community to carryout
improvements to the appearance of
roundabouts in the Village 
BISHOPTON Install a tarmac path and seating along one
side of the grass area on Ferry Road in front of
West Porton Farm 
BISHOPTON Install outdoor exercise equipment at
Churchill Drive Park 
BROOKFIELD & BRIDGE OF WEIR Install a wheeled sports area in Moss Road
Park for sports including skateboarding,
scooters and skates for children and young
people to enjoy 
BROOKFIELD & BRIDGE OF WEIR Install speed activated signs at the entrance to
Brookfield 
ELDERSLIE Light up the Wallace Monument to make it
more of a feature 
ELDERSLIE Install outdoor exercise equipment at Old
Road Park 
ELDERSLIE Install speed activated sign on Main Road 
ELDERSLIE Install seating at Main Road near the NCR75
cycle path entry/exit 
ELDERSLIE  Upgrade the path that runs alongside the river
from Abbey Road to Wallace Avenue to tarmac 
ELDERSLIE  Upgrade the tarmac surface at Queens Road
Park 
ERSKINE Create ramps either side of existing steps at
Holms Crescent to aid pedestrians with
mobility issues, prams and bikes 
ERSKINE Upgrade the Clyde Walkway path from
Newshot Drive around to the river and create
additional seating at the waterfront

Page 20

16
#YouDecide Evaluation Report 
ERSKINE Install lighting on link path between Millfield
View and Linburn Road 
HOUSTON Install a pedestrian crossing near the bus stop
on Magnus Road/Piper Road 
HOUSTON Repair steps and ensure accessible access to
Helicopter Park (South Mound) for people with
mobility issues, prams and bicycles 
HOWWOOD Install lighting in Howwood Park connecting
Beith Road and Midtown Road 
HOWWOOD Improve the playing surface at the Howwood
Park playing field 
HOWWOOD Tarmac the perimeter path around Howwood
Park 
INCHINNAN Add two additional lighting columns to
existing lighting in Inchinnan Park to provide
lighting around the play area 
INCHINNAN Install lighting column on the path between
Braemar Road and Old Greenock Road bus
stop 
INCHINNAN Install a gate from Inchinnan playing fields car
park to allow direct access to the park and
upgrade the path as required 
INCHINNAN Resurface the footpath Broompark Drive that
leads to Inchinnan Primary 
INCHINNAN Design and install information boards at
points of interest around Inchinnan following
engagement with the local community 
INCHINNAN Install seating on the pedestrian cycle route at
the A8 Greenock Road 
JOHNSTONE Additional lighting in the park on the Ellerslie
Street area next to the play park 
JOHNSTONE Install additional lighting in Spateston Park
link path from Sheldrake Place to Spateston
Road

Page 21

17
#YouDecide Evaluation Report 
JOHNSTONE Install kickabout football goals in Spateston
Park 
JOHNSTONE Install outdoor exercise equipment at Thomas
Shanks Park 
JOHNSTONE Install new lighting columns from Miller Street
to Ritchie Park 
KILBARCHAN  Install additional lighting in Kilbarchan Park
from Well Road to Park View 
KILBARCHAN Create an activity trail around the village with
information boards 
KILBARCHAN Engage with the local community to improve
the appearance of the roundabout at the
entrance to the village (Easwald Bank) 
LANGBANK Install items of play equipment in Station Park 
LANGBANK Upgrade the path through Langbank playing
fields from Station Road to the train station 
LINWOOD Install a wheeled sports area in Kintyre Park
for sports including Skateboarding, scooters
and skates for children and young people to
enjoy 
LINWOOD Install Lighting in Kintyre Park 
LOCHWINNOCH Install lighting in Lochwinnoch Park around
surrounding path network 
LOCHWINNOCH Lighting improvements from the car park at
Lochwinnoch Park (Lochlip Road) towards the
train station 
PAISLEY EAST  Create an enclosed dog exercise area in East
End Park 
PAISLEY EAST Install lighting in Barshaw Park from Arkleston
Road entrance to car park 
PAISLEY EAST Replace all play equipment in Jennyswell play
park

Page 22

18
#YouDecide Evaluation Report 
PAISLEY GLENIFFER  Improve the paths within Gleniffer Braes
Country Park 
PAISLEY GLENIFFER Improvements to Gleniffer Braes Car Park (off
Glenfield Road) and improve the signage 
PAISLEY NORTH, WEST & CENTRAL Access improvements to Glencoats Park to aid
users with mobility issues, prams and bikes 
PAISLEY NORTH, WEST & CENTRAL Install additional play equipment in South
Candren Village Green play area 
PAISLEY NORTH, WEST & CENTRAL Install additional street lighting at the
entrance to Ferguslie Gardens opposite West
Lane 
RENFREW Improve the appearance of roundabouts and
add additional signage at the two main
entrances to the town - Glasgow Road and
Paisley Road 
RENFREW Install additional seating in Renfrew Town
Centre 
RENFREW Make improvements to the play area in Glebe
Street

Page 23

19 
2.10. Appendix 2 #YouDecide Steering Group Self Evaluation 
Engagement
Standard
Definition  Steering Group strengths / Comments Rating Evidence  Areas for
Improvement/Suggestions
for future?
Inclusion We will identify and
involve the people
and organisations
that are affected by
the focus of the
engagement
All ideas were considered and counted. 
The number of individuals who entered an idea was
1,982 (Due to multiple ideas from individuals the total
number of ideas submitted was 2, 811)   
Roadshows & Group sessions reached a wide range of
groups and individuals with protected characteristics. 
65.2% of those who provided feedback stated that
they had never participated in a council consultation
before. 
Planning engagement work to coincide with
community events was particularly helpful in ensuring
a wide reach of residents.
2 - Very
Good
• Roadshow
Calendar
• List of local &
community events
• List of Groups and
orgs who hosted
sessions.
• Visits to schools
and sheltered
housing plan.
• Targeted social
media posts 
• Consider how to include
community representation
on the steering group
• More consideration needs
to be given to ethnic
minority groups as this was
a gap in engagement.
• More consideration needs
to be given to the
geographical areas in the
plan.
• Consider capturing
equalities info in any future
exercises 
Support  We will identify and
overcome any
barriers to
participation.
The team used digital and non-digital communication
methods. A dedicated email address was supplied for
people to contact the team directly. Tablets were
taken out into communities, schools, and sheltered
housing complexes as well as a range of supermarkets,
and access was made available in local libraries to both
the 
3 - Good • Plans for sessions
with groups,
schools, and
vulnerable groups
• Video with
subtitles 
• BSL interpreter
attended event, on
request
• Consider Non digital voting
(possible tokens system)
• Consider BSL for videos and
other engagement activities
• Consider use of other
formats such as Brail, large
print & other languages and
offer on request

Page 24

20
#YouDecide Evaluation Report 
• Digital and non-
digital tools
Planning There is a clear
purpose for the
engagement, which
is based on a
shared
understanding of
community needs
and ambitions.
There was a clear purpose for the activity to be
undertaken, the Director and Convenor of the service
were both on board with from the outset. 
The team has done well to plan and deliver the project
considering the challenges of COVID restrictions at the
time of planning. 
There was a clear aspiration of the percentage of each
vote required for each area to make a project idea
selection valid. Being able to keep an eye on this figure
allowed the staff to know where engagement work
was effective or needed more activity targeted at it. 
1 -
Excellent
• Project Mandate
• Board Reports
• DPIA
• Elected Member
info Sessions
• Information
sessions to
affected staff
• Presentations to
Local Partnerships 
• Consider how to include
community representation
on the steering group
• Consider how to capitalise
on the use of supermarkets
for future engagement
• Consider a new approach to
the collection of ideas,
which requires less intense
staff time to collate
• Where possible consider
time of year and weather
Working
Together 
We will work
effectively together
to achieve the aims
of the engagement.
As well as staff from E&I, a steering group was made up
of a range of key members of staff from across the
council. 
‘I Thought the project was a great display of internal
partnership working, ……’ Steering group Member 
The steering group also worked closely with a range of
umbrella community groups and organisations to plan
events and information sessions. 
‘There were quite a few unintended outcomes
achieved, for example, being able to feedback
engagement findings to other council departments re;
the needs of communities they were working with’. 
1 -
Excellent 
• Information
session
presentation
• Meeting Notes  
• Action Plans
• Meeting
Attendance
Records
• Email Records to
and from
Community groups
and organisations 
• Consider carefully when
each service should be
brought into in the process.
• Consider involving residents
from the planning
stage/Consider a role for
them on the steering group
Communication We will
communicate
clearly and
Direct comms with elected members to raise
awareness of the project and address any issues
before the project started was helpful to the process. 
2 – Very
Good
• Board Reports
• Elected Member
info Sessions
• Consider in more detail the
format of information and
its intended audience. I.e.,

Page 25

21
#YouDecide Evaluation Report 
regularly with the
people,
organisations and
communities
affected by the
engagement
Involving an elected member as project Champion
helped raise the profile of the project with elected
members. 
E&I staff awareness sessions – to highlight the project
and prepare them for their involvement. 
Localised & branded post-cards/leaflets at the ideas
stage were effective as non-digital approaches to
information sharing 
Other corporate media activity. Including social media 
Of those who provided feedback 59.9% stated that
they heard about the project through social media 
The use of PR, using a known local athlete, Jack Carlin,
to feature in the launch press release raised the profile
of the activity & process 
Attending community groups to share information 
‘Committing the resource to in-person
communications are what’s needed to support the
digital communications and marketing’. Steering group
Member 
Significant efforts were made to identify and reach out
to community orgs via social media alongside the
corporate social media scheduling.  It has provided a
good foundation/list of contacts for future community
type projects.  
• PB Champion role
• Information
sessions to
affected staff
• Presentations to
Local Partnerships
• Roadshow staff
awareness
sessions.
• Corporate social
media schedule
• Radio info
• Video with
subtitles
• Roadshow
schedule
• Community group
session schedule 
large print copies & other
languages
• Consider an approach that
gets all schools on
board/consider someone
from education being part
of the steering group
• Consider staff capacity for
feeding back to individuals
or gathering more
information about their
ideas
• Future PB exercises from
E&I and wider council
should consider using the
existing #YD brand

Page 26

22
#YouDecide Evaluation Report 
Methods We will use
methods of
engagement that
are fit for purpose
Using all communication channels available helped
reach a wider audience including Videos for both
phases working well. 
Roadshows & In person sessions helped reach those
who are not traditionally engaged 
Postcards and boxes worked well for the ideas phase to
support a non-digitised approach 
A good comm’s & marketing plan really helped the
process to be highlighted and accessible to people 
Having a dedicated email for the project was useful to
reach people and allow them to reach us easily with
questions & Ideas. 
Use of a local celebrity helped raise the profile 
2 – Very
Good
• Comm’s plan
• Marketing plan
• Roadshow
Schedule
• Copies of
postcards and
boxes/pictures of
roadshows
• Social media
content
• Email
address/content 
• Consider voting platform for
future programmes. A range
of comments on
improvements can be found
in the #YD Review file on
TEAMS project site
• Consider having a survey
which restricts ‘free writing’ 
• Consider staff time for
managing non digitised data
• Consider the time and
expense to execute a
method against likely
benefit/reward
Impact We will assess the
impact of the
engagement and
use what we have
learned to improve
our future
community
engagement.
All outcomes were met as part of the process
All ideas were considered, and decisions are reflected
in the projects delivered (those with the most votes)
‘This truly was decided by local people’
Information shared with other services re; community
aspirations 
Learning points from process will be shared with other
services planning PB activity.
2 – Very
Good
• Engagement plan
• Board paper
• Planning
documents
• Number of ideas 
• Number of
people voting
• Feasibility
reports 
Overall
comments 
‘I Thought the project was a great display of internal partnership working, as well as an exemplar of how consultations should take place. Committing
the resource to in-person communications is what’s needed to support the digital communications and marketing’. 
At each stage of the project, we used all available communication channels to reach those who could be affected and tried to involve as many people
as possible - especially those who do not normally engage with the council. We met with people and groups in-person, visited busy local areas, and
supported people to feedback digitally via email or online.

Page 27

23 
Environment, Housing & Infrastructure 
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR