To:  Infrastructure, Land and Environment Policy Board 
On:  22 January 2025 
Report by: Director of Environment, Housing & Infrastructure 
Heading: Biodiversity Update 
1. Summary
1.1 The Council has 33 areas within it’s Open Space Estate that have been converted to
biodiversity sites over the last few years. To ensure these sites deliver maximum
environmental and community value, Neighbourhood Services undertook a thorough review
of each site. 
1.2 The proactive assessment of biodiversity sites focused on identifying opportunities to enhance
biodiversity management, improve aesthetics and strengthen biodiversity contributions in line
with the Biodiversity Action Plan. This report outlines the outcomes of the review and details
the planned enhancements for the forthcoming year. 
2. Recommendations  
It is recommended that the Infrastructure, Land and Environment Policy Board: 
2.1 Notes the outcomes from the biodiversity review and the planned enhancement works across
the biodiversity sites. 
3. Biodiversity Review
3.1 On completion of the Biodiversity review, the following key observations were identified:
3.1.1 Panelled Borders: The review has identified an opportunity to further enhance biodiversity
site presentation and aesthetics by adapting the current maintenance strategy to establish
well-defined panel boarders. This will include short mown grass along the edges of biodiversity
sites.

Page 2

3.1.2 Plant Composition and Visual Appeal: Across our biodiversity sites it has been identified
that grass mixes have become a more prominent feature than wildflowers. While grasses
support biodiversity goals, adjusting the planting balance to include more flowering plants
could achieve the dual objectives of enhancing biodiversity and creating visually appealing
spaces.
3.1.3 Public Preference for Non-Native Species: There was a strong public preference noted for
non-native flower species due to their vibrant colours, although native plants are better aligned
with Scotland’s biodiversity objectives. Exploring ways to incorporate a broader range of native
species with enhanced aesthetic appeal could address this preference while supporting
ecological goals.
3.1.4 Site Specific Challenges: Several site-specific challenges were identified:
• Salt Exposure: Plant survival was notably lower in areas exposed to excessive de-icing
salt. Introducing salt-tolerant plant species could mitigate this issue. 
• Biodiversity Connectivity: Some planting locations lacked sufficient connectivity to act
as effective biodiversity corridors. Biodiversity corridors are physical connections that
link up areas of habitat allowing wildlife to move between them. Further development
and integration of corridors across sites would align with the Biodiversity Action Plan. 
• Space Constraints: Narrow central reservations presented challenges for
maintenance. Limited space restricted the establishment of perimeter borders while
preserving habitat-rich grassland. 
3.1.5 Road Safety Considerations: In some areas, large plant mixes close to junctions posed
potential road safety concerns by reducing visibility for members of the public. Careful redesign
of planting schemes near junctions will improve safety while maintaining biodiversity benefits. 
3.2 The overall findings of the review identified opportunities for enhancement of all existing
biodiversity sites through a broader planting scheme, adapted site maintenance and alignment
with ecological priorities. Addressing these key observations will enhance site aesthetics, site
safety and ensure long-term sustainability. 
4. Next Steps
4.1  The outcomes from the review underpin the management approach for 2025 and future
seasons biodiversity management.  
4.1.1 Maintenance: The review has identified an opportunity to adapt the maintenance of existing
biodiversity panels. Moving forward, all panels will feature a perimeter "picture frame" border,
mown around the grass edge every four weeks. This will clearly distinguish biodiversity sites,
making them instantly recognisable while ensuring they remain neat and presentable. This
approach will be implemented across all identified biodiversity panels.
4.1.2 New Cutting Trial: The Service will trial a new "sway cutting" programme in Knockhill Park.
This involves cutting a deliberate shape into the biodiversity area and managing this shape to
maintain its integrity. This method reinforces a structured and intentional approach to
biodiversity management.
4.1.3 Signage (Recognising Biodiversity Sites): To improve public awareness and education, the
Service will increase signage at biodiversity sites. These signs will promote biodiversity by
providing information about the species of grasses and flowers present.
4.1.4 Trial of New Species: The Service proposes innovative trials at Linwood Road and Paisley
St. James areas, focusing on diverse planting strategies:

Page 3

• Linwood Road: The four roundabouts on Linwood Road will undergo new works starting
end of January. Grass will be removed, and colourful borders, trees, and hedges will be
planted to create a layered biodiversity landscape. The central reservation strip will
receive additional maintenance, and the Linclive Roundabout will feature a 2-meter
mown border with enhanced central planting. This approach ensures the established
meadow grassland is retained while enhancing the existing biodiversity. 
• Paisley St. James: The biodiversity grass meadow strip will be retained but enhanced
with a hybrid approach. This will involve adding colour through feature panels and
maintaining a deliberate perimeter edge cut. Small sections of colourful planting will
surround the meadow, improving the aesthetic appeal while preserving the biodiversity
habitat. 
• Plug Plants: Plug plants will be trialled at select locations as an immediate solution to
introduce vibrant native species and enhance the visual impact of biodiversity areas. The
planting of such items adds instant colour to biodiversity areas. 
4.2 Widening the Scope of Biodiversity
4.2.1 To date, efforts to enhance biodiversity have largely focused on wildflower planting and
meadow grasslands. To further advance this initiative, the service plans to adopt a more
holistic approach by incorporating a diverse mix of shrubs, trees, and flowers. This hybrid
strategy will not only guide the immediate development of future biodiversity sites but also
enhance existing ones. By diversifying planting schemes, the service aims to create more
resilient and ecologically rich environments that better support biodiversity and visual appeal.
4.2.2 Expanding the current biodiversity management approach will help inform the creation of
larger, more diverse biodiversity areas. This includes identifying new opportunities in open
spaces, parks, and other locations such as roundabouts, where hybrid planting strategies can
be implemented. By incorporating a range of plant species—trees, bushes, flowers, and
grasses—the service can foster interconnected and sustainable biodiversity networks across
varied urban and natural settings. 
Implications of the Report 
1. Financial – Any financial elements referenced in this report will be progressed through the
Council’s financial & budget planning process. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – None 
4. Legal – None 
5. Property/Assets – None 
6. Information Technology – None

Page 4

7. Equality & Human Rights - The recommendations contained within this report have been
assessed in relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report. If required following
implementation, the actual impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be published on the Council’s
website. 
8. Health & Safety – Careful redesign of planting schemes near junctions will improve safety
while maintaining biodiversity benefits. 
9. Procurement – None 
10. Risk – None 
11. Privacy Impact – None 
12. COSLA Policy Position – None 
13. Climate Change – Conserving and restoring natural biodiversity spaces is essential for
limiting emissions and adapting to climate impacts. 
14. Children’s Rights – None 
List of Background Papers: None 
Author: Gavin Hutton, Head of Operations and Service Development