Page 1

1 
___________________________________________________________________
To:  The Infrastructure, Land and Environment Policy Board 
On:  6 November 2024
___________________________________________________________________
Report by: Director of Environment, Housing & Infrastructure
_____________________________________________________________________
Heading: Flood Operational Plan
_____________________________________________________________________
1. Summary 
1.1 As a result of climate change, both the chance and consequence of flooding
are increasing.  As sea levels rise there will be more frequent and higher storm
surges, increased winter rainfall and more intense summer rainfalls are
predicted, adding to the existing risk. 
1.2 Renfrewshire has experienced major flooding events throughout the years. In
Renfrewshire flood events are typically caused by: 
• Intense rainfall events
• Water courses exceeding peak flow capacities
• Surface water run-off from developed areas
• Lack of capacity in the sewerage system
• Tidal influence of the River Clyde 
1.3 The aim of this Plan is to ensure an informed and co-ordinated response by
Renfrewshire Council to a flooding incident, focussing on the welfare of those
effected, mitigation of property and environmental damage. 
1.4 The Code of Practice for Well Maintained Highways recommends that local
authorities should ensure drainage assets are maintained in good working
order to reduce the threat and scale of flooding.

Page 2

Roads Adoption Policy  2
_____________________________________________________________________ 
2. Recommendations
It is recommended that the Infrastructure, Land and Environment Policy Board;
2.1 Approves the Flood Operational Plan and notes that updates on the plan will
be provided to the Board through future Service Update reports. 
___________________________________________________________
3. Background 
3.1 As a Roads Authority under the Roads (Scotland) Act, Renfrewshire Council
has the overall responsibility to provide an effective Flood Management
Service in accordance with its duties.  The responsibility for the efficient and
effective delivery of flood management sits within Environment, Housing &
Infrastructure. 
3.2 Under Section 18 and 59 of the Flood Risk Management (Scotland) Act 2009
the Council has a duty to assess bodies of water for the purpose of
ascertaining whether any such body gives rise to a risk of flooding, and to carry
out a schedule of clearance and repair works to substantially reduce any such
risk. 
3.3 The Council uses a variety of measures to ensure it fulfils its statutory duties
including: 
• Flood prevention schemes,
• Regular grid cleaning,
• Cyclical maintenance of gullies,
• Gully inspections,
• Capital drainage improvements. 
3.4 During both the summer and winter seasons, the Met Office monitors weather
forecasts to help Public Sector organisations and the public prepare for
adverse weather. Where episodes of particularly hot or cold weather are
identified, they carry out a joint dynamic risk assessment and issue alerts if
necessary.
3.5   Weather Alerts usually cover a large area where severe weather conditions
could develop.  A Weather Warning happens when conditions are already
occurring or will be soon.  It’s intended goal is to provide enough time for
organisations and members of the public to prepare and activate emergency
plans.

Page 3

Roads Adoption Policy  3 
3.6  The Met Office issue weather warnings to make people aware that there is a
high chance of dangerous weather. This can be for rain, thunderstorms, wind,
snow, lightning, ice, extreme heat and fog.
3.7 The Road Operations Team along with Neighbourhood Services and the
Roadwork Coordinators play a key role in any emergency response to any
flooding alert in terms of preparing, responding, and recovering from a flooding
incident.
3.8 When a flood alert is received the following duties are carried out: 
• Inspect and maintain flood prevention schemes and pumping station;
• Priority grids cleaned;
• Gully hot spots cleaned;
• Priority sweeping routes cleaned;
• Issue communications to Elected Members and members of the public;
and
• River levels monitored where appropriate. 
If a flooding incident occurs out of hours, Roads Standby Supervisor will be
responsible for co-ordinating resources.  Resources will initially be directed to
locations which historically causes flooding and where there is a risk of road
closures and damage to properties.
3.9  Officers from Environment, Housing and Infrastructure have delivered
consultation events to members of  Local Area Partnerships and Community
Councils to enhance our knowledge of hot-spot flooding areas to add to our
priority list.   This will be an ongoing process throughout the life of the Policy.
4.0  Review
It is recognised that the environment we operate in is constantly evolving and
as a result we must continue to evolve as well.  We will review these policies
on an ongoing basis to ensure they will continue to deliver the identified
improvements for our communities.  
_____________________________________________________________
Implications of the Report
1. Financial - the nominal capital and revenue costs of implementing the policy
can be accommodated within existing budgets.

Page 4

Roads Adoption Policy  4
2. HR & Organisational Development - Delivering requirements of the Flood
Prevention Policy will be accommodated within current Road Operations
staffing levels. 
3. Community/Council Planning – 
Our Renfrewshire is Well – the development of operational planning for
flooding incidents will ensure our communities are provided with information
on how to keep them and their properties safe during these incidents 
4. Legal – N/A 
5. Property/Assets – N/A 
6. Information Technology – N/A 
7. Equality & Human Rights 
(a)      The Recommendations contained within this report have been
assessed in relation to their impact on equalities and human rights. 
Some negative impacts on equality groups or potential for
infringement of individuals’ human rights have been identified and not
all can be fully mitigated. Despite the potential for adverse impact it is
believed that it is reasonable and proportionate to take the action
recommended in the report 
A full copy of the Equality Impact Assessment undertaken is attached. 
8. Health & Safety - The primary reason for the Flood Prevention Policy is to
provide a safe and usable road network for all road users, including
emergency and refuse collection vehicles.
9. Procurement –N/A.
10. Risk - no risks have been identified in relation to the proposal.
11. Privacy Impact – N/A 
12. Climate Risk –N/A.
13. Children’s Rights – This report demonstrates compliance with Article 6 (life,
survival and development) and Article 24 (health, water, food, environment)
of the United Nations Convention on the Rights of the Child enter details or
not applicable.
14. Cosla Policy Position – N/A.
_______________________________________________________

Page 5

Roads Adoption Policy  5
List of Background Papers 
(a)  None 
___________________________________________________________________ 
Author: John Wallace 
Senior Manager, Infrastructure and Transportation 
e-mail john.p.wallace@renfrewshire.gov.uk

Page 6

Roads Adoption Policy  6 
.
Flood Operational Plan 
Environment, Housing & Infrastructure
October 2024

Page 7

Roads Adoption Policy  7
Contents
1. Introduction ....................................................................................... 8
1.1. Legal & Policy Background .................................................................... 8
2. Aim of this Plan .................................................................................. 9
3. Background ...................................................................................... 10
3.1. Role of Local Authority? ....................................................................... 10
3.2. Role of other agencies ......................................................................... 10
3.3. Weather Alerts and Weather Warnings Error! Bookmark not defined.
4. What the Council will do .................................................................. 12
5. Flood Prevention Schemes and Reservoirs ..................................... 12
6. Pumping Stations, Priority Grids and Locations .... Error! Bookmark
not defined.
7. Plan Review ...................................................................................... 14

Page 8

Roads Adoption Policy  8
1. Introduction
1.1. Legal & Policy Background
As a result of climate change, both the chance and consequence of flooding are increasing. 
As sea levels rise there will be more frequent and higher storm surges, increased winter
rainfall and more intense summer rainfalls are predicted, adding to the existing risk. 
Renfrewshire has experienced major flooding events throughout the years. In Renfrewshire
flood events are typically caused by:
• Intense rainfall events
• Water courses exceeding peak flow capacities
• Surface water run off from developed areas
• Lack of capacity in the sewerage system
• Tidal influence of the River Clyde
The aim of this Plan is to ensure an informed and co-ordinated response by Renfrewshire
Council to a flooding incident, focussing on the welfare of those effected, mitigation of
property and environmental damage. 
Under Section 18 and 59 of the Flood Risk Management (Scotland) Act 2009 the Council
has a duty to assess bodies of water for the purpose of ascertaining whether any such body
gives rise to a risk of flooding, and to carry out a schedule of clearance and repair works to
substantially reduce any such risk.
Local authorities have a duty under the Roads (Scotland) Act 1984 to maintain road
drainage systems and to clear roads of flooding.
The Code of Practice for Well Maintained Highways recommends that local authorities
should ensure drainage assets are maintained in good working order to reduce the threat
and scale of flooding.

Page 9

Roads Adoption Policy  9
2. Aim of this Plan
Renfrewshire Council shall use this plan to achieve the following outcomes:
•  To ensure that the Council’s plan is clear to both members and the public and is
communicated effectively;
•  To ensure that the Council’s plan is applied consistently, in accordance with legislation
and for the greater benefit of the Renfrewshire public;
•  To ensure public safety;
•  To provide guidance for residents on a matter that they may not even be aware of;
•  To manage expectations.

Page 10

Roads Adoption Policy  10
3. Background
3.1. Role of Local Authority
Renfrewshire Council has the overall responsibility to provide an effective Flood
Management Service in accordance with its duties.  The responsibility for the efficient and
effective delivery of flood management sits within Environment, Housing & Infrastructure.
The Council uses a variety of measures to ensure it fulfils its statutory duties including:
• Flood prevention schemes
• Regular grid cleaning
• Cyclical maintenance of gullies
• Gully inspections
• Capital drainage improvements 
3.2. Role of other agencies
Whilst local authorities have responsibilities in relation to flooding, other agencies also have
responsibilities for flooding issues. The division of responsibilities for flood prevention and
watercourse maintenance, piped water systems, flood warning and flood emergency
response requires co-operation between the respective agencies involved, principally the
local authority, SEPA, Scottish Water and the emergency services, in order to secure
appropriate action during emergency flood events.
It should also be noted that in a number of locations, the ability to clear water from a road
via the gully network is constrained by the capacity of the receiving asset, which in most
cases, is the responsibility of Scottish Water.  A good example of this is Linwood Toll, near
Fulbar Road in Paisley, which is prone to significant flooding during extreme rain events. 
The gully and gully tails at this location are regularly cleared, however, the capacity of the
combined sewer is insufficient for the surface water levels experienced.  In these
circumstances, water will back up through the gullies, and ultimately flood the road. 
Renfrewshire Council notify Scottish Water of each and every flooding event at these
locations, to allow Scottish Water to compile a case for capital funding for major asset
upgrading.

Page 11

Roads Adoption Policy  11
3.3. Weather Alerts and Weather Warnings
During both the summer and winter seasons, the Met Office monitors weather forecasts to
help Public Sector organisations and the public prepate for adverse weather. Where
episodes of particularly hot or cold weather are identified, they carry out a joint dynamic
risk assessment and issue alerts if necessary.
Weather Alerts usually cover a large area where severe weather conditions could
develop.  A Weather Warning happens when conditions are already occurring or will be
soon.  It’s intended goal is to provide enough time for organisations and members of the
public to prepare and activate emergency plans.
The Met Office issue weather warnings to make people aware that there is a high chance of
dangerous weather. This can be for rain, thunderstorms, wind, snow, lightning, ice,
extreme heat and fog.
Weather warnings are given a colour (yellow, amber or red) depending on a combination of
both the impact the weather may have and the likelihood of those impacts occurring.
Yellow and amber warnings represent a range of impact levels and likelihoods. This means
it is important to read each warning to know what level of impact you can expect for your
chosen warning area – and how likely those impacts are to occur. 
Yellow warning: yellow warnings can be issued when it is likely that the weather will cause
some low-level impacts, including some disruption to travel in a few places. Many people
may be able to continue with their daily routine, but there will be some that will be directly
impacted and so it is important to assess if you could be affected. 
Amber warning: there is an increased likelihood of impacts from severe weather, which
could potentially disrupt your plans. This means there is the possibility of travel delays,
road and rail closures and the potential risk to life. 
Red warning: dangerous weather is expected and, if you haven’t already done so, you
should take action now to keep yourself and others safe from the impact of the severe
weather. It is very likely that there will be a risk to life, with substantial disruption to travel,
you should avoid travelling, where possible, and follow the advice of the emergency
services and local authorities.

Page 12

Roads Adoption Policy  12
4. What will the Council do
The Road Operations Team along with Neighbourhood Services and the Roadwork
Coordinators play a key role in any emergency response to any flooding alert in terms of
preparing, responding, and recovering from a flooding incident.
When a flood alert is received the following duties are carried out:
• Inspect and maintain flood prevention schemes and pumping station;
• Priority grids cleaned;
• Gully hot spots cleaned;
• Priority sweeping routes cleaned;
• Issue communications to Elected Members and members of the public; and
• River levels monitored where appropriate.
If a flooding incident occurs out of hours, Roads Standby Supervisor will be responsible for
co-ordinating resources.  Resources will initially be directed to priority 1 locations.  These
are locations which historically causes flooding and where there is a risk of road closures
and damage to properties.
5. Flood Prevention Schemes and Reservoirs
There are two flood prevention schemes in Renfrewshire at Ferry Road Renfrew and
Moredun Paisley.
Renfrew Flood Prevention Scheme
If there is a tidal warning issued from SEPA for Renfrew, our defined Renfrew Flood
Prevention Protocol will be put into operation.  SEPA Flood Alerts are issued for regional
areas (in our case – West Central Scotland) and may or may not highlight possible Tidal
Flooding.  A Flood Alert requires no action at Renfrew, other than be aware that a Flood
Warning for Renfrew may follow. Alerts are issued between 2 hrs and 2 days in advance of
forecast flooding. 
SEPA Flood Warnings issued for predicted levels of 3.4mAOD (which is the level of the
top of the Renfrew Ferry Access ramp from Ferry Road) and above, and will state the
predicted maximum tide level and time. Warnings aim to be issued 3-6hrs in advance of
expected tidal flooding.  Roads Operations team will mobilise planned actions
according to predicted tide level.

Page 13

Roads Adoption Policy  13
Predicted Tide Level Actions
Below 3.6metres  No action required
3.6m to 3.89m 1) Sandbag properties on wet side of barrier.
2) Prepare to erect Spring Dam Barriers on Ferry Rd & Fishers Lane.
3) Prepare to close Ferry Rd manhole penstock.
3.9m and above 1) Sandbag properties on wet side of barrier.
2) Prepare to erect Spring Dam Barriers on Ferry Rd & Fishers Lane.
3) Erect Spring Dam Barriers on Ferry Rd & Fishers Lane.
4) Close Ferry Road manhole penstock. 
If Barrier Fails  Sandbag both the barrier areas 
Once the tide recedes below the bottom of barriers, demobilisation will take effect: 
1) Road Operations take down barriers.
2) Road Operations open Ferry Road manhole penstock.
3) Road Operations remove contaminated sandbags.
4) Before leaving site ensure all barrier paraphernalia and Ferry Road penstock key
(carriageway manhole lifting irons) are returned to green roadside cabinets. 
The barrier shall be checked and erected by Road Operations.  Maintenance of the barrier
is carried out by the private watercourse contractor and shall be undertaken 3 times per
year.
Moredun Flood Prevention Scheme
A visual check of the grids and the perimeter fencing is carried out weekly.  In addition to
the visual checks, a reservoir engineer inspects this site annually.  They also advise on
embankment safety issues.
Reservoirs
There are two main reservoirs (Thornley and Moredun Playing Fields) in Renfrewshire
which are annually inspected.  These annual inspection reports are then sent to SEPA.
6. Pumping Stations, Grids and Gullys
There are five pumping stations located at the following locations:
1. Collier Street, Johnstone
2. Rankine Street, Johnstone
3. Linwood Toll, Paisley
4. Howie Street, Paisley

Page 14

Roads Adoption Policy  14
5. Fingal Road, Renfrew
These pumping stations , are designed to raise water to a higher elevation, are routinely
maintained and inspected.  An emergency call out service is provided within 2-4 hours.  
The water grid works much like our road network, connecting sources such as dams,
reservoirs via infrastructure including pipes and pumps, and natural elements like rivers. 
When a flood alert is received the following duties are carried out:
• Inspect and maintain flood prevention schemes and pumping station;
• Priority grids cleaned;
• Gully hot spots cleaned;
A list of the grids and gully hot spots to be priority checked and cleaned following a flood
alert or warning are listed in Appendix 1. 
7. Plan Review
This plan is a living document and will be reviewed and updated if/when statute or
national standards or best practice requires it. This policy will be reviewed after 12 months
of operation and then every 3 years.

Page 15

Roads Adoption Policy  15
Appendix 1 – Grids and Gully Hotspots
Paisley
Location 
Linwood Toll Pumps (At Millerston) 
Greenhill road under railway bridge 
Murray street under bridge 
Morar Drive (at No. 89 and adjacent properties) 
Cardell Road 
Corsebar Road at 134 
Corsebar Road to front of flats and Hospital 
Craw Road (at low point near junction with Corsebar Rd) 
Nethercraigs Road grating and adjacent gullies 
Dundonald Road (at No. 54) 
Marjory Drive 
Barrhead Road (opposite Ladykirk Crescent) 
Douchray Drive 
Glasgow Road (particularly around No.s 329-343) 
Buchlyvie Road (in front of No. 42) 
Candren Road (back road to Linwood) 
Hillcrest Avenue/Caplaw Road 
Park Avenue, Stanely Road and Park Road Culvert Screens 
Millarston Culvert inlet grid on Candren Burn (behind St Andrews Timber and Building
Supplies (West) Ltd) 
Meikleriggs Drive/Rosewood Avenue/Moorhouse Avenue 
Honey Bog Hill/Kinpurnie Road (No. 51 and adjacent)

Page 16

Roads Adoption Policy  16
Johnstone 
Location 
Beith Road at Johnstone High School 
Auchengreoch Avenue 
Spateston Road at Hallhill Farm 
Beith Road at Fordbank Primary School 
Greenend Avenue 
Dundonald Avenue (to front of No. 102) 
Miller Street 
Shanks Crescent 
Stirling Drive, at Kilbarchan Road junction 
Kilbarchan Road (in front of papermill) 
Beith Road/Quarrelton Road junction 
Craigview Avenue (to front of old St David’s PS site) 
Auchengreoch Road 
Canal Road (at Main Street end) 
Quarrelton Road railway culvert grid 
Kilbarchan

Page 17

Roads Adoption Policy  17
Location 
Milliken Park Road off Tandlehill Road 
Churchill Place and Station Road 
Low Barholm/Easwald Bank   
Kibblestone Road / Bridesmilll Road junction 
Lochwinnoch 
Location 
Newton of Barr 
A760 West of The Hole (at disused r/way bridge) 
Main Street 
A760 Kilbirnie Road (between Lochs) 
Kilbirnie Road (north of Lochs where road runs parallel with the River Calder) 
Burnfoot Road near Newton of Barr 
Lochlip Road 
A760 at Kerse Farm 
Howwood
Location 
Bowfield Road 
Inchinnan

Page 18

Roads Adoption Policy  18
Location 
Georgetown Road under M8 
Old Greenock Road in front of Primary School 
Luckinsford Avenue 
Crosslee
Location 
Crosslee Park 
Renfrew
Location 
Simons Crescent 
Ferry Road/Clyde Street/London Street (mix of residential and commercial properties) 
Erskine
Location  
Erskine Harbour (roundabout at Torrance House) 
Bridgeway A726 (at Pandemonium) 
Newshot Drive, at Parkvale roundabout 
Brookfield
Location

Page 19

Roads Adoption Policy  19
Bridge of Weir Road, just west of Deafhillock roundabout 
Sandholes Road & Burnside Avenue 
Lochermill Cattery on Crosslee Road 
Bridge of Weir
Location   
Main Street (at Amaretto Italian Restaurant) 
Clevans Road (natural bowl section between Carruth Road & Horsewood Road) 
Houston Road (by Houston Dam) 
Loch Place 
POW burn through Glen 
Bishopton
Location 
Churchill Drive 
Greenock Road 
Greenock Road at Kinston Rd junction 
Formakin Bridge at The West Mill 
Linwood
Location 
Riverbank Cottage, off Candren Road (Linwood end)

Page 20

Roads Adoption Policy  20 
Environment, Housing & Infrastructure
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR