To: Infrastructure, Land and Environment Policy Board
On: 6 November 2024 
Report by:  Director of Environment, Housing & Infrastructure 
Heading:  Service Update Report 
1. Summary 
1.1 This report provides an overview of key service activities since the last Policy Board
report on 28 August 2024 and an update on the services and key projects delivered
during this period. 
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy Board: 
2.1 Notes the content of this report 
2.2 Approve the introduction of the policy dealing with persistent offenders of unpaid Penalty
Charge Notices (PCN) as detailed in section 6.5.5 of this report. 
3. Background
3.1 Environment, Housing & Infrastructure provides essential services to every
household in Renfrewshire and works in partnership with the local community, other
service areas and Community Planning Partners, to deliver key Council priorities and
initiatives. A progress update on the main activities delivered by the services in
respect of the areas of activity delegated to this Policy Board, is detailed below. 
Updates for Infrastructure, Land and Environment Policy Board 
4. Climate Change 
4.1 Energy Management 
District Heating Network feasibilities 
4.1.1 Feasibility reports are now complete looking at the options surrounding the introduction of a
District Heating Scheme in Central Paisley and an extension to the current District Heating
Network at AMIDS. Central Paisley has 49 main anchor loads with an additional 2,552
properties that could connect to the network.
4.1.2 Renfrewshire have been successful in securing matched grant funding from the Scottish

Page 2

Governments Heat Network Support Unit to undertake an Outline Business Case for both
AMIDS and Paisley Central. 
Local Heat & Energy Efficiency Strategy Delivery Plan 
4.1.3 Renfrewshire’s LHEES Delivery Plan was approved at Board in January 2024. The delivery
plan is a document setting out how a local authority proposes to support implementation of
its local heat and energy efficiency strategy.
ECO4 Flex
4.1.4 ECO4 Flex will allow the Council to approve funding to Renfrewshire’s private sector, fuel
poor households that do not meet criteria for other schemes, as well as low- income
households that are vulnerable to the effects of the cold. The scheme is part of the UK
Government Energy Company Obligation and is managed by Ofgem.
4.1.5 The qualifying criteria for ECO-Flex, as set by Ofgem, is published on our website in a
document called a Statement of Intent. Renfrewshire’s Statement of Intent can be found
here: https://www.renfrewshire.gov.uk/media/15354/ECO4-flex-statement-of-
intent/pdf/Renfrewshire_Council_Statement_of_Intent_for_ECO4_flex.pdf?m=167568
7584337ECO-flex. ECO-flex does not apply to Council Housing or Registered Social
Landlords.
4.1.6 The energy efficiency measures being installed within Renfrewshire include boilers, loft
insulation, cavity wall insulation, air source heat pumps, solar panels, heating controls, first
time central heating etc.
The table below highlights the savings ECO4 Flex has achieved to date based on annually
recurring savings: 
Financial
Year
Value of Grant
Funding
Requested (£)
Total Annual
Consumption
Saving (kW)
Total Annual
CO2
Saving in
Kg
Total Annual Cost
Saving (£)
2023/24 £3,583,940 1,310,162 648,617 £231,789
2024/25 £1,645,263  719,225 225,984 £87,358
Total £5,229,203  2,029,387 874,601 £319,147 
4.2 Carbon Literacy Training 
4.2.1 Local Authority Leadership and Management in Carbon Literacy training is being rolled out
across the Council. This training is delivered in-house and is primarily based at Managers
and Team Leaders. The training uses a toolkit produced by the Carbon  Literacy Project
specifically for Local Authorities and is part of large-scale certified education programme with
nearly 97,000 individuals having undergone the training across various sectors in total. 
4.2.2 The training covers a basic overview on the climate emergency, causes and impacts and
explores why local authorities should act and the Council’s levers of influence; providing
leadership in the climate emergency; how climate action can be integrated into decision
making; co-benefits of climate action; and examples of how we can fund climate action. 
4.2.3 To date, 70 Council Officers have undertaken the training from across all Services, with
further training sessions planned to the end of 2025 and 23 officers confirmed to attend
during October. 
5 Team Up to Clean Up 
5.1.1 Spotless September 2024 was delivered with a focus on schools, educating young people

Page 3

on the values of civic pride for their communities, local wildlife and biodiversity. 
5.1.2 Secondary schools are each receiving visited to promote participation in “Bin to Win.”  Pupils
are being encouraged to take part, reducing the impact of lunch time litter and improving the
appearance of local neighbourhoods 
5.2 Environmental Taskforce 
5.2.1 The Environmental Taskforce continues to deliver intervention to reduce instances of fly
tipping. Key statistics for the most recent period are: 
Action May-July 2024 August – September 2024
Proactive visits to identified
hotspot areas
520 312
Number of reports investigated 378 381
Tonnes of fly tipping removed 49 52
Number of sites secured to
prevent further fly tipping
3 1
Letters to private landowners re fly
tipping
12 11
Visits to businesses to ensure
Waste Disposal Arrangements in
place
20 14
Fixed Penalty Notices Issued 22 6 
5.2.2 Partnership working with SEPA resulted in the delivery of a Day of Action on 23 October.
The joint working event was delivered by Officers from the Environmental Taskforce, Police
Scotland and SEPA and saw transit van type vehicles being stopped and a check caried out
on their load, as well as the intended destination. Education was a key part of this activity
ensuring relevant licenses and paperwork were in place and waste carriers were aware of
the obligations. 
5.2.3 The Environmental Taskforce will continue their work to reduce fly tipping in Renfrewshire
however will be relocated into Environment and Infrastructure’s Public Protection Team. The
Taskforce will benefit from the support of Public Health who are well-experienced in many
related issues. 
6 Fleet, Roads and Transportation
6.1 Fleet Services 
6.1.1 The service has now joined the DVLA Fleet Scheme, this is a programme for organisations
or companies with 50 or more vehicles that helps reduce the administrative burden of
managing a large fleet. The scheme is fully digitalised and provides services like bulk
reminders, taxing of vehicles and dispatch of documentation and, electronic storage of V5’s
etc. This brings an additional layer of governance and compliance around the management
of the council’s fleet. 
6.1.2 The service has taken delivery of 7 electric vans and 12 electric cars in October, increasing
our electric vehicle fleet to 104 vehicles across the core operational fleet. In addition, 3 new
Scania Refuse Collection Vehicles with the latest Euro 6 engines fitted were received in
September. These vehicles have lower emissions and can use HVO fuel if required. 
6.1.3 The Fleet Service has coordinated one year HGV apprenticeships for 15 members of staff

Page 4

across operational services. This provides valuable up-skilling opportunities for staff and
improves service resilience. 
Roads & Transportation 
6.2 Roads Capital Investment Programme 
6.2.1 There continues to be a focus on maintaining the strategic road network in Renfrewshire,
and the department will not shy away from schemes due to challenges relating to onerous
traffic management or engineering difficulties.  This year we have completed a number of
high-profile resurfacing schemes including Neilston Road, Old Sneddon Street, Greenock
Road Paisley, Beith Road, Main Street Elderslie, A726 spectacles roundabout Erskine,
Causeyside Street, and Inchinnan Road Paisley.   
6.2.2 To date we have resurfaced 36 carriageways, with 6 roads remaining to be completed by
the end of November (Mill Street, New Street, Avondale Drive, Bargarran Road, Newton of
Barr and Balgonie Avenue). 
6.2.3 In addition, there are 4 locations due for resurfacing, where coal tar was detected during
testing (Bonar Crescent, Montrose Road, Floorsburn Crescent and Ivanhoe Road).  These
locations will be treated using a re-tread method where the existing surface is broken down
and mixed with retread emulsion, prior to compaction.  These schemes will be completed in
March 2024. 
6.2.4 The footway resurfacing programme will commence in November 2024 and will run to
March 2025.  There are 12 footways included in the programme (Lochfield Drive, Lochfiled
Road, Rowan Street, Netherhill Way, Ben Ledi Avenue, Bruce Road, Lansbury Gardens,
Corseford Drive, Endrick Drive, Ballater Drive and Thornly Park Drive). 
Winter Resilience Update 
6.2.5 The service commenced winter resilience arrangements on the 1st October 2024, and this
will run through until May 2025.  Our winter gritting network routes have been reviewed
during Autumn 2024 using route management software to deliver a number of benefits
including route optimisation and in-cab satnav technology.  This has allowed us to
rationalise our routes, reducing fuel consumption and associated carbon emissions. Our
540 grit bins have been re-filled for the start of the season and will continue to be
replenished as and when required 
6.2.6 In addition, the Road Operations team are responsible for ensuring that the requirements of
The Flood Operation Plan are met.  This includes the maintenance of over 32,000 road
gullies, inspecting and maintaining our flood prevention schemes and pumping stations,
clearing priority grids, and monitoring river levels.  Road Operations take the lead role in
our proactive and reactive maintenance approach to dealing with drainage issues, flooding
incidents and pothole repairs. 
6.3 Active Travel & Infrastructure Improvement Update 
6.3.1 Work to introduce pedestrian safety traffic calming measures in Renfrewshire’s villages
continues. Consultation with Kilbarchan Community Council and local residents, following
implementation of gateway measures, has flagged up a number of issues, which we are
currently working to resolve. Gateway features have also been implemented in Howwood. 
6.3.2 The second phase of the project has commenced its engagement with the Community
Councils and residents, and we are working on concept designs for Lochwinnoch,
Bishopton, Elderslie and Bridge of Weir. An online survey and workshops have gathered
information to inform of the issues being experienced in these villages, assisting with the
design of potential measures.  The draft designs will be shared with the Community
Councils for comment prior to progression to final design. 
6.3.3 The new Active Travel route from Barnsford Road to Inchinnan Drive, which links
residential areas such as Bishopton and Erskine to Glasgow Airport, is now complete. The
next phase of our Active Travel network is anticipated to be the link between Barnsford

Page 5

Road and Greenock via Inchinnan Drive.  However, progress on this phase will be
dependent on the award of Transport Scotland’s Active Travel Infrastructure Fund, which is
currently delayed.  Wider aspirations include an extension of the current Active Travel
network out to Erskine. 
6.3.4 The construction phase of a bus turning circle at Linburn Road in Erskine commenced on
the 16 September 2024, with works anticipated to last for 12 weeks. The project involves
the construction of a retaining wall, to facilitate a bus turning loop and footway.  This will
significantly improve the turnaround for bus services in this area, resulting in greater public
transport efficiencies for the community.  Public utility diversionary works associated with
this project have previously been completed 
6.3.5 SPT Capital funding, announced for 2024/25, has allocated £165,000 for this Category 1
project, seen by SPT as operationally essential. 
6.3.6 The Paisley to Renfrew active travel route, including upgraded shared footways and
carriageway improvements at Wright Street, is now complete. Discussions with the housing
developer on the final surfacing of the ramp connecting Turner Drive and Wright Street are
ongoing and should conclude in the coming weeks. 
6.3.7 We are undertaking feasibility work at Maxwellton Road, with the aim to encourage more
active trips to school in the future, by combining use of the national cycle route 75 with the
possibility of a safe pedestrian/cycle crossing.  Options are currently being examined. 
6.3.8 Our programme to upgrade existing Traffic Signal junctions  to energy efficient technologies
continues with an upgrade to the Inchinnan Rd/North Lodge Rd, Renfrew, pedestrian
crossing.  Further upgrades are planned for Barrochan Road/A737, Johnstone and Paisley
Road/Oxford Road, Renfrew.  A right turn arrow has been installed at Hawkhead
Road/Glasgow Road to assist with peak hour traffic. 
6.3.9 Road safety improvements to the Glebe Street/ Hairst Street, Renfrew junction are
programmed for the coming months. 
6.3.10 Design work on the Bishopton to West Ferry shared cycle/foot path will shortly be issued for
consultation, with stakeholders inputting to the finalised design prior to completion of the
tender package.  This will be issued to market next financial year, funding permitting. 
6.3.11 Works have now completed on the replacement of the dilapidated steps at Locherburn
Water in Houston.  This will ensure that the pedestrian link from the Fulton Drive area of
Houston to Houston Village is maintained. 
6.4 Elderslie for Everyone Project 
6.4.1 The Elderslie for Everyone Project provides an opportunity to re-imagine Main Road, making
it a more vibrant, accessible and welcoming place for people to spend time in and travel
through. We are working in partnership with Sustrans and the local community to put the
people who use the space at the heart of designing the solution. 
6.4.2 The public event on August 15th saw strong attendance with 60 members of the public, plus
senior leadership from Sustrans and Renfrewshire Council. Project information and a copy of
the survey was available on the project website for those unable to attend the in-person
events (Paper copies and return post envelopes were also available). 
6.4.3 To date, design objectives have been defined, with input from the community and
Renfrewshire Council, which will inform the concept design. The project team is collaborating
with the Renfrewshire Villages Safe Walking Initiative to ensure alignment and avoid
duplication.  Stakeholder engagement focused on businesses and people with protected
characteristics is ongoing. 
6.4.4 Draft concept designs will be completed by December, and this will be followed by approval
from Renfrewshire Council, elected members, community advisory group, and stakeholders.
Public consultation on the concept designs is scheduled for February 2025.

Page 6

6.4.5 The project is on-track to have full concept designs completed by March 2025, with
additional collaborative design sessions and community consultations held along the way. 
6.5 Parking Strategy 
6.5.1 As part of our ongoing commitment to the Parking Strategy, we have developed a Season
Ticket scheme for those who visit Paisley town centre for employment purposes who have
no option but to bring their private car. This will offer the chance to buy a season ticket in any
of Paisley’s car parks for a reduced annual fee.  A scheme which allows for discounted
season passes will be introduced at a cost of £15 per week (equating to £3 per day).  The
passes will be available on a monthly, 3 monthly, 6 monthly and annual basis. 
6.5.2 Work continues on the Pavement Parking ban, and the Exemption Order identifying where
parking will be allowed on the footway has undergone its consultation process. Objections
have been received and accommodations have been made. A report will subsequently be
submitted to board to decide on the making of the order. An additional proposed order to
accommodate the additional requests for exemptions from the consultation will follow. 
6.5.3 Parking restrictions in Renfrewshire keep road users and pedestrians safe, prevent danger
on our roads and disruption to public transport and emergency vehicles.  It is vital that
drivers comply with the road regulations to help reduce congestion and ensure limited road
space is shared as equitably as possible. The vast majority of people see the sense in
sticking to these rules, but there is a minority that believe they can do as they please on the
public road network. 
6.5.4 Since January 2020, Renfrewshire Council has recorded over 1,500 vehicles with three or
more unpaid penalty charges notices for breaching parking rules that support the efficiency
of the road network and promote road safety. 
6.5.5 The council would like to address this, and is seeking approval to introduce a policy and
associated charge which will see vehicles with three or more penalty charge notices
outstanding be removed from the road network if parked in one of our on street or off-street
locations. The owner will have to pay a £175 release fee and a £20 daily storage charge (to
cover costs to Renfrewshire Council) along with all outstanding fines before the vehicle will
be released. 
6.6 Street lighting Capital Investment Programme 
6.6.1 New lighting installations for Prieston Road, Bridge of Weir and Bridge of Weir Road,
Linwood have completed, and works are due to commence this month to replace all the
bespoke lighting units in Renfrew Town Centre 
6.6.2 A procurement tender exercise for a new street lighting installation on Easwald Bank,
Kilbarchan has been completed with works expected to commence on site in early 2025. 
6.7 Festive Parking 
6.7.1 To support visitors and festive arrangements in Paisley Town Centre, a temporary traffic
regulation order will be put in place from the 1st of December 2024 to the 3rd of January
2025 to extend the period of free parking from 1 hour to 2 hours in Renfrewshire Council Car
parks only. This initiative being undertaken to support and encourage visitors in to Paisley
over the festive period, and evaluation will take place of this initiative to consider festive
arrangements for future years. 
7. Neighbourhood Services
7.1 Biodiversity 
7.1.1 In September 2024, biodiversity officers conducted a comprehensive review of all

Page 7

biodiversity sites. The assessment covered species diversity, accessibility, safety, site
maintenance, aesthetics, integration with the surrounding environment, educational value,
and overall resilience, including contributions to local biodiversity. This review has been
instrumental in shaping the strategy for the upcoming 2025 season, with a focus on
enhancing and developing existing sites where possible. Additionally, the annual autumn
"cut and lift" process for biodiversity areas began in October and is underway across
Renfrewshire. 
7.1.2 The annual Autumn cut and lift across all biodiversity areas was successfully completed. Weed
Management 
7.2 Winter Maintenance Programme 
7.2.1 The service has revised its winter maintenance programme and adopted a 14-day cycle similar
to the summer grass-cutting schedule. This new approach ensures that every community in
Renfrewshire is visited over a two-week period, focusing on crucial winter preparation tasks
such as hedge cutting, tree maintenance, vegetation removal, and targeted interventions for
parks and open spaces. 
7.2.2 A key priority will be weed removal and control, including detritus removal, which will set the
groundwork for a smoother summer season in 2025. Additionally, the programme will place a
strong emphasis on sweeping arterial routes and roundabouts, alongside continued
commitment to sweeping in town centres and communities. Increased sweeping efforts during
the winter months will help manage leaf fall and support weed reduction strategies. 
7.2.3 In addition, the service has invested in mechanical weed control equipment, including new
tools for both the Multi Hog and pedestrian-operated weed brushes. These machines are
specifically designed to tackle weeds along paths, kerb edges, and other problematic areas,
providing a more efficient alternative to the traditional, labour-intensive manual scraping. By
shifting towards mechanical weed control, the service aims to improve coverage, deliver a
higher standard of work and increase efficiency. 
7.2.4 The winter maintenance programme will run until the start of the grass-cutting schedule in April
2025 ensuring continuous and proactive management of Renfrewshire’s outdoor spaces
throughout the year. 
7.3 Street Litter Bin Programme and Service Review 
7.3.1 Neighbourhood Services has recently completed the renewal of over 330 street litter bins,
marking a significant improvement in the area's litter management infrastructure to
enhancing both the safety and appearance of public spaces in local communities. 
7.3.2 In addition, the service will conduct a review of our street litter bin estate utilising both
internal and external resources. The review aims to reduce littering, ensure fairness and
accessibility, improve operational efficiencies and modernise asset management through
digital solutions. 
7.4 LTA Tennis Court Launch 
7.4.1 On 12 September, ‘Celebration of Tennis’ events were held at both Robertson Park,
Renfrew and Park Road, Johnstone to officially launch the refurbished courts. Elected
Members and guests from the Lawn Tennis Association (LTA) were welcomed along with
approximately 30 Primary 6/ 7 pupils from local schools. The weather conditions on the day
were good and the school children enjoyed a professional coaching session led by guest
coach, Luke Quigley. 
7.4.2 All of the refurbished courts are fully operational and available to book through the LTA’s
Club Spark online booking system. 
7.4.3 Participation across all sites has been good. Total number of bookings made across all three
sites since opening (excluding cancellations) is 1,494. With the total hours booked across all
three sites since opening of 1,837 hours.

Page 8

7.5 Tree and Woodlands Management 
7.5.1 Neighbourhood Services began tree works to comply with the Statutory Plant Health Notice
Larch works order at Gleniffer Braes. This work commenced in October and will take
approximately 4-6 weeks to complete and will include the removal of SPHN-identified larch
trees, with the service implementing a more sustainable approach of selective thinning rather
than clear felling. This method, supported by Scottish Forestry, targeted specific species for
removal while preserving the existing and surrounding spruce woodland. 
7.5.2 In addition, the Trees & Woodlands team will now conduct annual inspections of educational
facilities starting in November. This rolling programme of inspections will result in a healthier
tree stock by identifying and treating issues earlier. 
7.5.3 Renfrewshire Council is also taking steps to align with industry best practices through its
membership with the Forestry Industry Safety Accord (FISA). This partnership will bring
expert guidance to improve the council's approach to safety in tree management, an area
identified by FISA as needing further support within local authorities. 
7.6 Clyde Muirshiel 
7.6.1 Castle Semple and Clyde Muirshiel centres had a successful summer period with both day
visitors and organised groups taking part in outdoor activity and learning. The autumn period
has also been busy so far with school groups and care services. 
7.6.2 The countryside ranger and estate teams are working on ongoing path and grounds
maintenance, working with regular volunteer groups who assist with this work. 
7.6.3 A new programme of the successful Dark Sky Viewing Nights is being planned for Winter
2024/25 and will be advertised soon. 
7.7 Fly Tipping 
7.7.1 In collaboration with Digital Services and the Customer Contact Centre, the service has
developed a new, streamlined system for reporting fly-tipping across Renfrewshire.
Designed internally, this process-driven platform enhances the way customers can report
incidents of fly-tipping, making the system more interactive, user-friendly, and customer-
centric. The goal is to simplify the reporting process while ensuring that customers have an
efficient and intuitive way to engage with the service. 
7.7.2 The system was launched in early October and rates of reported cases have been steady
and further information will be shared at a future board. 
7.8 Renewal of Play Areas 
7.8.1 Reports were previously submitted to the Infrastructure, Land & Environment Board in 2021
and 2023 setting out the planned investment programme to the improvements of play areas.
As part of the Scottish Government’s 2024/25 capital allocation for renewal of playparks, the
service is currently working through the tendering process for the following three playparks:
Barshaw Park, Laura’s Playpark, Paisley; Braids Road, Paisley; and Elm Drive/Maple Drive,
Johnstone. 
7.8.2 This investment will involve a full renewal of each play area, including new surfacing and
play equipment. We anticipate all three play area renewals to be completed early in 2025. 
8 Memorial Safety and Cemetery Management 
8.1.1 The first pass of Memorial Safety inspections has now been completed across all 9
operational cemeteries and 12 churchyards in Renfrewshire. To ensure staff knowledge is
kept updated and current with best industry practices, a full update and refresher training
programme for all staff involved in memorial safety will be completed by the end of the year.

Page 9

8.1.2 Staff continue to send advisory letters to lair holders, where addresses are available, and
have also been working with colleagues in Communications to improve the Memorial Safety
information available on the Council website. This information will be replicated on cemetery
signage to ensure consistent messaging across the service. 
8.1.3  Minor road repairs have been completed in recent months in Arkleston, Kilbarchan,
Bishopton and Inchinnan cemeteries. 
8.1.4 Following feedback and review of our Cemetery and Memorial Safety operating procedures
the service has refreshed the Cemetery Management Policy in line with Scottish
Government guidance. The policy is currently being reviewed in line with the Councils policy
review procedures and the service aims to bring the policy to a future board for approval 
9. Waste Services
9.1 Waste Collection Method Update 
9.1.1 Phase 1 of decoupling the grey bins from the recycling bins for all areas with a Saturday
collection begun on the 5 October 2024. 
9.1.2 Communications were issued to ward elected members and those households affected
within this phase. 
9.1.3 Phase 1 is being implemented in 3 stages 
Stage 1 Alignment of recycling collections so that the same recycling stream is collected
on the same day. Residents will receive a new collection calendar informing
them which colour recycling bins to present on collection day. The grey bin
collections will remain on Saturday at this stage – This is now complete (5th
October 2024)
Stage 2 Align the difficult to service properties with the standard collection frequencies
and expanding recycling provision by providing them with a brown bin.
Stage 3 Decouple the grey bins so that they are collected on a different day from
recycling bins. E.g. recycling will be collected on a Saturday and residual
grey bins collected on a Monday.
9.1.4 The waste service is currently planning for delivery of Stage 2 of the bin decoupling. It is
anticipated roll out will commence early in 2025 and further updates will be provided at a
future board. 
9.2  Recycling Improvement Fund Update 
9.2.1 Phase 1 of the Recycling Improvement Fund (RIF) aims to increase participation and
recycling of food waste by applying a ‘no food waste’ sticker to grey bins and delivery of an
annual supply of food waste liners. Roll out of phase 1 to 80,468 households began on
Monday 21 October and is planned to be completed by December. 
9.2.2 Households were provided with an instructional leaflet on week commencing Monday 21
October highlighting how to use their food waste service and how to order an indoor caddy
free of charge online if one is required. 
9.2.3 Planning for RIF project phase 2 and 3 is on track with projects beginning from late January
2025. Further updates will be provided at a future board. information becomes available. 
9.3 Route Optimisation Software and In-Cab Technology 
9.3.1 Procurement of Waste Services route management system is in progress. The Invitation To
Tender (ITT) for the new system was issued in September to potential suppliers. These were

Page 10

returned and evaluated during October, with demonstrations being held to validate the
submissions on 10 and 11 October. We remain on-track to submit the recommendation to
appoint the preferred supplier at the Finance, Resources and Customer Services Policy
Board to be held on 21st November 
9.4 Scottish Government - Consultation on Charging for Single-Use Disposable Cups 
9.4.1 The Scottish Government have launched a consultation on Charging for Single-use
Disposable Cups. 
9.4.2 The consultation is asking for feedback on the proposals that a minimum charge of 25p will
apply to all single-use beverage cups when purchased with hot and cold beverages.
Exemptions to the charge are expected to apply in some circumstances. From a Local
Authority perspective, this should lead to a reduction in disposable cups being fly tipped and
being disposed of in on-street bins. 
9.4.3 It is also proposed that Local Authorities will be responsible for enforcement, issuing Fixed
Penalty Notices to suppliers and premises not complying with the scheme. 
9.4.4 Waste Services have responded to the consultation document and will continue to engage
with the Scottish Government, industry, and other partners as this progresses. Further
updates will be provided following the publication of the consultation results when it closes
later this month. 
9.5 Defra Waste Compositional Analysis Study 
9.5.1 Renfrewshire Council were selected to take part in a composition analysis for waste ‘as
received’ at local authority-associated waste management facilities, commissioned by The
Department for Environment, Food and Rural Affairs (Defra). 
9.5.2 The purpose of this project is to provide up-to-date quantitative data on the composition of
Local Authority derived household municipal waste at the major points of treatment, transfer,
and disposal across the United Kingdom (including England and the Devolved
Administrations). The findings will be used as a baseline for packaging Extended Producer
Responsibility (pEPR) modelling. 
9.5.3 Renfrewshire Council refuse and recycling loads were sampled from our contracted waste
facilities between 2 September and 13 September. It is anticipated that DEFRA will be in a
position to share the waste compositional analysis data in December. 
9.6 Festive Working Arrangements 
9.6.1 The festive collection arrangements are in place for the forthcoming year, these will be set
out in the annual recycling & waste collection calendars which will be arriving with
households in November. The Councils five Household Waste Recycling Centres will close
at 4pm on Christmas Eve & New Years Eve, reopening at 8am on 26 December and 2
January 2025. 
9.7 Small Waste Electrical and Electronic Equipment (WEEE) Recycling 
9.7.1 In 2023, Waste Services successfully applied for funding from Material Focus to install
several Recycling Banks to increase the recycling of Small Waste Electrical and Electronic
Equipment (WEEE) across Renfrewshire. Material Focus is an independent not-for-profit
organisation whose funding comes from UK WEEE Regulations Compliance Fees. 
9.7.2 Funding of £10,823 was received to deliver the project which will launch on 31 October 2024
within the Council’s 12 library locations, with support of colleagues from OneRen and our
compliance scheme partner, REPIC. 
9.7.3 The aim of this project is to expand the access of Small WEEE Recycling from our
Household Waste Recycling Centre’s, and to divert these materials from household general
waste bins.

Page 11

10 #YouDecide 
10.1.1 Forty four out of the 50 successful #YD Projects are now complete. Most recently Wallace
monument has been illuminated and wheeled sport areas for Kintyre Park, Linwood has
been completed. Works for wheeled sports area have started at Moss Road Park, Bridge of
Weir. 
11 Educational Achievements 
11.1.1 As part of our approach to workforce development, we support staff who wish to undertake
further education courses which will enhance the service areas they work in and also form
part of their own professional development. These courses require a significant study
commitment from staff in their own time and the service supports this by providing
reasonable time for employees to attend classes and complete the study. 
11.1.2 Recently, three members of the service successfully completed their Graduate
Apprenticeship in BA (Hons) Business Management and to provide additional support,
employees were supported by a workplace mentor throughout the duration of their studies.
The graduation ceremony will take place later in November. 
Implications of the Report 
1. Financial – Any financial elements referenced in this report will be
progressed through the Council’s financial & budget planning process. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – The report details a range of activities which reflect
local community and council planning themes.
4. Legal – None 
5. Property/Assets – None 
6. Information Technology –None 
7. Equality & Human Rights - The recommendations contained within this report have
been assessed in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’ human rights have
been identified arising from the recommendations contained in the report. If required
following implementation, the actual impact of the recommendations and the mitigating
actions will be reviewed and monitored, and the results of the assessment will be
published on the Council’s website. 
8. Health & Safety – None 
9. Procurement – None 
10. Risk – None 
11. Privacy Impact – None 
12. COSLA Policy Position – None 
13. Children’s Rights - None 
14. Climate Change – there are a range of actions and activities throughout the
Service Update Report which support the Council’s Plan for Net Zero.

Page 12

List of Background Papers: None 
Author: Gordon McNeil, Director of Environment, Housing & Infrastructure