Notice of Meeting and Agenda
Infrastructure, Land and Environment Policy Board 
Date Time  Venue
Wednesday, 28 August
2024
10:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN 
MARK CONAGHAN
Head of Corporate Governance 
Membership 
Councillor Michelle Campbell (Convener):     Councillor Audrey Doig (Depute Convener):    
Councillor Jennifer Adam:  Councillor Stephen Burns:  Councillor Jacqueline Cameron: 
Councillor Carolann Davidson:  Councillor Eddie Devine:  Councillor Chris Gilmour: 
Councillor John Gray:  Councillor James MacLaren:  Councillor Janis McDonald: 
Councillor Iain McMillan:  Councillor John McNaughtan:  Councillor Kevin Montgomery: 
Councillor Iain Nicolson:  Councillor John Shaw:  Councillor Andy Steel:   
Further Information 
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior
to the meeting at the Customer Service Centre, Renfrewshire House, Cotton Street,
Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk 
Members of the Press and Public 
Members of the press and public wishing to attend the meeting should report to the
customer service centre where they will be met and directed to the meeting. 
Hybrid Meeting 
Please note that this meeting is scheduled to be held in the Council
Chambers.  However, it is a hybrid meeting and arrangements have been made for
members to join the meeting remotely should they wish.
Page 1 of 123

Page 2

Webcasting of Meeting 
This meeting will be filmed for live or subsequent broadcast via the Council’s internet
site – at the start of the meeting the Convener will confirm if all or part of the meeting
is being filmed.  To find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home 
Page 2 of 123

Page 3

Apologies 
Apologies from members. 
Declarations of Interest and Transparency Statements 
Members are asked to declare an interest or make a
transparency statement in any item(s) on the agenda and to
provide a brief explanation of the nature of the interest or the
transparency statement. 
1 Revenue and Capital Budget Monitoring 2024/25 at 21
June 2024 
Joint report by the Directors of Environment, Housing &
Infrastructure and Finance & Resources. 
6 - 16 
2 Service Update Report 
Report by the Director of Environment, Housing &
Infrastructure. 
17 - 25 
3 Waste and Recycling Performance Update 
Report by the Director of Environment, Housing &
Infrastructure. 
26 - 29 
4 Renfrewshire’s Local Heat and Energy Efficiency
Delivery Plan 
Report by the Director of Environment, Housing &
Infrastructure. 
30 - 69 
5 Lease of land for a substation – Paisley Grammar
School Community Campus 
Report by the Chief Executive. 
70 - 75 
6 Shop at 4 Blackford Road, Paisley 
Report by the Chief Executive. 
76 - 79 
7 Unit 7 Abercorn Street, Paisley 
Report by the Chief Executive.     
80 - 83   
Page 3 of 123

Page 4

8 Unit 8 Abercorn Street, Paisley 
Report by the Chief Executive.
84 - 87 
9 Unit 12 Abercorn Street, Paisley 
Report by the Chief Executive. 
88 - 91 
10  Unit 15 Abercorn Street, Paisley 
Report by the Chief Executive. 
92 - 95 
11  Shop premises at 51/53 Ivanhoe Road, Paisley 
Report by the Chief Executive. 
96 - 99 
12  Shop Premises at 9 & 11 Stoddard Square, Elderslie 
Report by the Chief Executive. 
100 - 103 
13  41 Hallhill Road, Johnstone 
Report by the Chief Executive. 
104 - 107 
14  25 Graham Street, Johnstone 
Report by the Chief Executive. 
108 - 111 
15  232 Paisley Road, Renfrew 
Report by the Chief Executive. 
112 - 115 
16  238 Paisley Road, Renfrew 
Report by the Chief Executive. 
116 - 119 
17  58-60 High Street, Renfrew 
Report by the Chief Executive. 
120 - 123  
EXCLUSION OF PRESS AND PUBLIC 
The Board may by resolution exclude the press and public
from the meeting during consideration of the following
items of business as it is likely, in view of the nature of the
business to be transacted, that if members of the press and
public are present, there could be disclosure to them of
exempt information as defined in paragraph 9 of Part I of
Schedule 7A of the Local Government (Scotland) Act, 1973.   
Page 4 of 123

Page 5

18 Proposed Sale of former Houston Village Hall, Main
Street, Houston 
Report by the Chief Executive. 
19  Proposed Sale of Industrial Unit at 45 Kilpatrick Drive
Erskine 
Report by the Chief Executive. 
Page 5 of 123

Page 6

___________________________________________________________________
To: Infrastructure Land & Environment Policy Board
On: 28 August 2024
___________________________________________________________________ 
Report by: Director of Finance and Resources
Director of Environment, Housing & Infrastructure
___________________________________________________________________
Heading: Revenue and Capital Budget Monitoring 2024/25 at 21 June 2024
___________________________________________________________________
1. Summary
1.1 At the close of reporting Period 3 on 21 June 2024, the projected revenue
outturn at 31 March 2025 for those services reporting to the Infrastructure,
Land and Environment Policy Board is an overspend position of £0.736m
(2.4%) against the revised budget for the year. 
1.2 The projected capital outturn at 31 March 2025 for projects reporting to the
Infrastructure, Land and Environment Policy Board is a break-even position. 
1.3 This is summarised over the relevant services in the table below and further
analysis is provided in the report and appendices. 
Revised
Annual
Budget
£000
Projected
Outturn
£000
Budget
Variance
(Adv)/Fav
£000
Budget
Variance
%
Revenue        
Environment & Infrastructure 30,330 31,147 (0.736) (2.4%)
Capital        
Environment & Infrastructure 18,722 18.722 0.000 0.0% 
2. Recommendations
2.1 Members are requested to: 
a) Note the projected Revenue outturn overspend position of £0.736m;
b) Note the projected Capital outturn break-even position; 
Item 1
Page 6 of 123

Page 7

c) Agree to homologate the budget adjustments detailed at section 6.3 and
6.4;
d) Note the budget adjustments detailed at section 6.5; and 
e) Approve the budget adjustments detailed at section 6.6. 
3. Revenue Budget Projection – overspend of £0.736m by 31 March 2025
3.1     The tables in Appendix 1 and 2 present the projected year-end position for all
services reporting to this board, by both objective analysis (which division is
spending the budget – appendix 1) and subjective analysis (what the budget
is spent on – appendix 2). Significant variances affecting the projected
position are analysed further below. 
3.2       It should be noted that the projected outturn position reported here is based on
the latest information available, which is subject to change during the financial
year. The impact of any change on this projection will be updated at each
board cycle until the close of reporting Period 10. Budget holders are obliged
to seek mitigating action to minimise significant budget variances. 
4. Objective Analysis – Significant Variances
Environment, Housing and Infrastructure – (£0.736m) overspend 
4.1 Waste Services – (£0.356m) overspend by 31 March 2025 
This reflects the financial position for Refuse Collection, Refuse Disposal and
Household Waste Recycling Centres. 
The overspend for Refuse Collection, in the main relates to an under-recovery
of income (£445k) with the estimated under recovery for trade waste equating
to £316k. In addition to an overspend in transport costs. Similar to other areas
within the services, the impact of inflationary increases for goods and services
remains a contributing factor to the overspend currently projected for this
service area. For example: 
• Increase non-fair wear and tear costs as a result of the increased cost of
replacement parts. 
• A reduction in demand for trade waste uplifts, resulting in an under-
recovery of £315k being reported.
• A reduction in the volume of bin sales, resulting in an under-recovery of
£110k.
Page 7 of 123

Page 8

The current anticipated underspend for Refuse Disposal (£0.050m) mainly
relates to the over-recovery of recyclate income, offset by higher contractor
costs. In addition, the service will contribute around £66k of expenditure to
take forward the Recycling Improvement Fund grant, as some activities
undertaken are not covered by the conditions of grant. These costs will be
funded by the Change Fund in 2024 with the aim of improving our recycling
and reducing disposal costs to the Council in future years. 
4.2 Fleet Services – (£0.140m) overspend by 31 March 2025 
The current anticipated overspend forecast in Fleet Services reflects the
impact of inflation on material and contractor costs. 
4.3 Infrastructure and Assets – (£0.162m) overspend by 31 March 2025 
The projected overspend represents an under-recovery in income of £100k.
These income streams include construction consents, scaffolding permits, etc,
which by their nature are demand-led, meaning they are difficult to predict. 
the remainder of the overspend is driven by inflationary pressures, in areas
such as work by contractors and software costs. However, this forecast will
continue to be closely monitored throughout the financial year. 
5. Subjective Analysis - Significant Variances 
5.1 Employee Costs - £0.443m underspend by 31 March 2025 
The underspend in the main relates to the current vacancies that the services
areas are carrying. However, as highlighted in the Budget Monitoring report
presented to this board at Period 10 2023/24, the service has taken significant
steps to reduce overtime levels, including a review undertaken by the Finance
team, which has resulted in a budget transfer adding £320k being actioned to
account for pay settlements, and this is reflected in the projected underspend. 
5.2 Transport Related – (£0.455m) overspend by 31 March 2025 
The projected overspend (7.9%) is largely a result of significant increases in
relation to vehicle hire (£107k), the cost of replacement parts for vehicles and
specialist contractors (£300k). 
5.3 Supplies and Services – (£0.822m) overspend by 31 March 2025 
This projected overspend (6.2%) predominantly sits within Infrastructure and
Assets and Refuse Disposal. The Infrastructure and Assets overspend (£84k)
relates to increased software and work by contractor costs and within Refuse
Disposal this relates to contractor related disposal costs.
Page 8 of 123

Page 9

5.4 Support Services – (£0.041m) overspend by 31 March 2025 
This overspend relates software costs for the fleet management systems. 
5.5 Income – £0.164m over-recovery by 31 March 2025 
The projected over-recovery relates to recharge income within Roads
operations, predominately offset by an anticipated under-recovery for trade
waste income, as mentioned in note 4.1.  
6. Revenue Budget Virements
6.1 Under the Council’s financial regulations, Directors and their nominated
officers, in consultation with the Director of Finance and Resources, have
certain delegated authority to transfer sums between subjective budget
headings within a service division to enable budget management throughout
the financial year. This is known as budget virement. 
6.2 Transfers between divisions of the same service / department in excess of
£100,000, and transfers between services / departments must be authorised
by the respective service Director and the Director of Finance and Resources
for submission to the relevant policy board for approval. 
6.3 Since the budget approval in February 2024, the Director now seeks
homologation from the Board for the following affected virements: 
Revenue Budget Adjustments
Service
Subjective
Heading  Amount
(£m) Reason
Environment &
Infrastructure
Third Party
Payments
0.027 SPT - 24/25 inflationary increase
from Miscellaneous Services
Environment &
Infrastructure
Employee
Costs
0.300 Motion - Environmental Task
Force and Team Up to Clean Up
from reserves
Environment &
Infrastructure
Employee
Costs
0.320 Overtime inflationary increase
from Miscellaneous Services
Total  0.647   
6.4 Also, due to the service undertaking a restructure in 2023/24 an exercise was
carried out to realign budgets to reflect the new departmental structure. Again,
the Director now seeks homologation from the Board for the following affected
virements: 
Revenue Budget Adjustments
Page 9 of 123

Page 10

Service Subjective
Heading
Amount
(£m) Reason
Environment &
Infrastructure
Employee
Costs
0.326 Budget Re-alignment
Environment &
Infrastructure
Transport
Costs
(0.248) Budget Re-alignment 
6.5 The following budget adjustments reflect allocations of agreed pay
settlements, and changes to superannuation rates for employers and are
therefore for noting only: 
Revenue Budget Adjustments
Service Subjective
Heading
Amount
(£m) Reason
Environment &
Infrastructure
Employee
Costs 
(1.841) Contribution to reserves re
reduction in employer's
superannuation
Environment &
Infrastructure
Employee
Costs
1.609 Pay award 2023/24, including
additional public holiday 
7. Capital Budget Projection – break-even position by 31 March 2025
7.1 The Capital Investment Programme 2024/25 to 2028/29 was approved by the
Council on 29 February 2024. For Infrastructure Land & Environment the
revised capital spend for 2024/25 is £18.722m. 
7.2 The in-year Capital budget is forecast to break-even by 31 March 2025
however, this will be monitored as the projects progress. Further details of the
programme can be found in the Capital Monitoring report at Appendix 2. 
7.3 A number of budget adjustments between years have taken place, to reflect
revised programming of some capital projects. Details of these adjustments,
which amount to £6.839m, are as follows: 
Project Amount (£m)
Budget increase due to grant award from Transport Scotland
Active Travel Funding Tier 1 0.496
Total SPT - People in Place Fund 0.050
People and Place: Local Authority Direct Award (LADA) 0.049
Budget increase due to grant award from Scottish
Government 
Road Safety  0.272
Budget carried forward from 2023/24 into 2024/25 to reflect updated timing
Roads/Footways Upgrade Programme 2.707
Vehicle Replacement Programme 1.179
Lighting Columns Replacement 0.873
Page 10 of 123

Page 11

Traffic Management 0.274
Core pathways & cycle network 0.037
Parks Improvement Programme 0.003
Improvements to Outdoor Access and Play Area Programme 0.035
Total Active Travel Transformation Fund  0.301
Flooding  0.205
Multi-Purpose Bins 0.110
Parks - Multi Use Games Area 0.107
Nature Restoration Fund 0.056
Lawn Tennis Association 0.056
Strathclyde Partnership Transport 0.165
Budget accelerated from 2024/25 into 2023/24 to reflect updated timing
Bridge Assessment/Strengthening (0.056)
Renewal of Play Parks (0.080)
Total 6.839 
Implications of the Report
1. Financial
The projected budget outturn position for the Infrastructure, Land and
Environment Revenue budget is an overspend of £0.736m. Income and
expenditure will continue to be monitored closely for the rest of the financial
year and as far as possible, steps will be taken to mitigate any overspend.   
The projected outturn position for the Infrastructure, Land and Environment
Capital budget is a break-even position. 
2. HR & Organisational Development 
While staffing budgets form a significant proportion of the service’s revenue
budgets, there are no direct implications arising from the recommendations in
this report. 
3. Community/Council Planning 
Community Plan
Our Renfrewshire is thriving The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Our Renfrewshire is well 
Our Renfrewshire is fair 
Our Renfrewshire is safe
Council Plan
Reshaping our place, our
economy and our future
The Council’s revenue and capital spend
ensures that its facilities are fit for
Page 11 of 123

Page 12

Building strong, safe and resilient
communities
purpose and safe for the community, to
maximise accessibility.
Tackling inequality, ensuring
opportunities for all
Creating a sustainable
Renfrewshire for all to enjoy
Ongoing revenue and capital budget
monitoring is a tool to enable good
financial management so that the Council
has resources now and in the future for
continued service delivery.
Working together to improve
outcomes 
4. Legal 
There are no direct implications arising from the recommendations in this
report. 
5. Property/Assets 
The capital expenditure noted in this report will result in lifecycle maintenance
improvements to existing properties and replacement of ICT assets and
infrastructure. 
6. Information Technology 
There are no direct implications arising from the recommendations in this
report. 
7. Equality & Human Rights 
There are no direct implications arising from the recommendations in this
report. 
8. Health & Safety 
There are no direct implications arising from the recommendations in this
report. 
9. Procurement 
While Procurement is an important consideration prior to the Council incurring
any revenue or capital spend, there are no direct implications arising from this
report. 
10. Risk 
The potential risk that the Council will overspend its approved budgets for the
year will be managed at a Council-wide level by the Chief Executive and
Directors. 
11. Privacy Impact 
Page 12 of 123

Page 13

There are no direct implications arising from the recommendations in this
report. 
12. Cosla Policy Position 
N/a 
13. Children’s Rights
There are no direct implications arising from the recommendations in this
report. 
14. Climate Change
The Council aims to reduce its carbon and other emissions to net zero by 2030,
however there are no direct implications arising from the recommendations in
this report. 
List of Background Papers
The Capital Investment Programme 2024/25 to 2028/29, Council 28 February 2024 
Author:           Lisa Dickie, Finance Business Partner, 
Gordon McNeil, Director of Environment, Housing & Infrastructure and
Linsey McGregor, Senior Accountant (Capital) 
Page 13 of 123

Page 14

Appendix 1
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2024/25
1 April 2024 to 21 June 2024       
POLICY BOARD : INFRASTRUCTURE, LAND AND ENVIRONMENT       
Objective Summary
Approved
Annual
Budget 
Budget
Adjustments
Revised
Annual
Budget at
Period 3
Projected
Outturn
Budget Variance 
(Adverse) or Favourable 
£000 £000 £000 £000 £000 %
Directorate and Service Development 1,216 79 1,295 1,329 (34) (2.6%)
Refuse Collection 4,812 (39) 4,773 5,263 (490) (10.3%)
Household Waste Recycling Centres 934 84 1,018 934 84 8.2%
Refuse Disposal 7,569 (26) 7,543 7,493 50 0.7%
Neighbourhood Services 7,283 (1,031) 6,252 6,210 42 0.7%
Fleet Services (35) (223) (258) (118) (140) (54.3%)
Social Transport  1,279 (152) 1,127 1,136 (9) (0.8%)
Roads Operations 3,065 37 3,102 3,102 0 0.00%
Infrastructure and Assets 1,728 (182) 1,546 1,708 (162) (10.4%)
Transportation & Active Travel 1,037 (569) 468 473 (5) (1.0%)
Parking of Vehicles (695) 42 (653) (599) (54) (8.2%)
Street Lighting Maintenance Work 552 (32) 520 517 3 0.7%
Energy Management Unit 335 (3) 332 332 (0) (0.1%)
Strathclyde Partnership for Transport Requisition 3,238 27 3,265 3,287 (22) (0.7%)
NET EXPENDITURE 32,318 (1,988) 30,330 31,147 (736) (2.4%) 
Page 14 of 123

Page 15

Appendix 2 
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2024/25
1 April 2024 to 21 June 2024       
POLICY BOARD : INFRASTRUCTURE, LAND AND ENVIRONMENT       
Subjective Summary
Approved
Annual Budget 
Budget
Adjustments
Revised Annual
Budget at
Period 3
Projected
Outturn
Budget Variance 
(Adverse) or
Favourable  
£000 £000 £000 £000 £000 %
Employees 23,617 (968) 22,649 22,206 443 2.0%
Premises Related 1,227 (2) 1,225 1,238 (13) (1.1%)
Transport Related 5,998 (248) 5,750 6,205 (455) (7.9%)
Supplies and Services 13,692 (357) 13,335 14,157 (822) (6.2%)
Third Party Payments 3,271 27 3,298 3,292 6 0.2%
Transfer Payments 114 36 150 168 (18) (11.8%)
Support Services 34 0 34 75 (41) (120.8%)
Depreciation and Impairment Losses 0 0 0 0 0 0.0%
GROSS EXPENDITURE 47,953 (1,512) 46,441 47,341 (900) (1.9%)
Income (15,635) (476) (16,111) (16,275) 164 1.0%
NET EXPENDITURE 32,318 (1,988) 30,330 31,066 (736) (2.4%) 
Page 15 of 123

Page 16

Approved  Budget Revised Projected
Budget Adjustments Budget Outturn Total Approved Projected
2024-25 in 2024-25 2024-25 2024-25 Budget Outurn
Project Title to 31-Mar-27 to 31-Mar-27
£000 £000 £000 £000 £000 £000
ENVIRONMENT & INFRASTRUCTURE
Active Travel Funding Tier 1 809 496 1,305 1,305 0 0% 4,142 4,142 0 0%
LADA 0 49 49 49 0 0% 49 49 0 0%
Roads/Footways Upgrade Programme 5,000 2,707 7,707 7,707 0 0% 102,385 102,385 0 0%
Vehicle Replacement Programme 2,303 1,179 3,482 3,482 0 0% 11,582 11,582 0 0%
Bridge Assessment/Strengthening 377 (56) 321 321 0 0% 1,321 1,321 0 0%
Lighting Columns Replacement 500 873 1,373 1,373 0 0% 3,373 3,373 0 0%
Traffic Management 0 274 274 274 0 0% 274 274 0 0%
Core pathways & cycle network 0 37 37 37 0 0% 200 200 0 0%
Parks Improvement Programme 28 3 31 31 0 0% 1,204 1,204 0 0%
Improvements to Outdoor Access and Play Area Programm 81 35 116 116 0 0% 1,828 1,828 0 0%
Total Active Travel Transformation Fund 620 301 921 921 0 0% 250 250 0 0%
Total SPT - People in Place Fund 0 50 50 50 0 0% 50 50 0 0%
Flooding 0 205 205 205 0 0% 205 205 0 0%
Multi Purpose Bins 0 110 110 110 0 0% 170 170 0 0%
Road Safety 0 272 272 272 0 0% 953 953 0 0%
Renewal of Play Parks 1,580 (80) 1,500 1,500 0 0% 1,694 1,694 0 0%
Parks - Multi Use Games Area 0 107 107 107 0 0% 112 112 0 0%
Nature Restoration Fund 335 56 391 391 0 0% 472 472 0 0%
Lawn Tennis Association 0 56 56 56 0 0% 350 350 0 0%
Recycling Improvement Fund 250 0 250 250 0 0% 774 774 0 0%
Strathclyde Partnership Transport 0 165 165 165 0 0% 165 165 0 0%
TOTAL INFRASTRUCTURE, LAND & ENVIRONMENT
BOARD 11,883 6,839 18,722 18,722 0 0% 133,110 133,110 0 0%
RENFREWSHIRE COUNCIL
CAPITAL INVESTMENT STRATEGY - NON-HOUSING SERVICES
1st April to 21st June 2024
POLICY BOARD: INFRASTRUCURE, LAND & ENVIRONMENT
Current Year 2024-25 Full Programme - All years
Budget Variance (Adverse) or
Favourable
Budget Variance (Adverse) or
Favourable
Page 16 of 123

Page 17

To: Infrastructure, Land and Environment Policy Board
On: 28 August 2024 
Report by:  Director of Environment, Housing & Infrastructure 
Heading:  Service Update Report 
1. Summary 
1.1 This report provides an overview of key service activities since the last Policy Board
report on 28 May 2024 and an update on the services and key projects delivered during
this period. 
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy Board: 
2.1 Notes the content of this report, and
2.2 Note the progress made in implementing Renfrewshire Carking Strategy and instructs
officers to develop the reduced fee season pass arrangements as part of the 2024 – 2029
Car Parking Strategy implementation as per paragraphs 6.5.4 and 6.5.5 below.   
3. Background
3.1 Environment, Housing & Infrastructure provides essential services to every household in
Renfrewshire and works in partnership with the local community, other service areas and
Community Planning Partners, to deliver key Council priorities and initiatives. A progress
update on the main activities delivered by the services in respect of the areas of activity
delegated to this Policy Board, is detailed below. 
Updates for Infrastructure, Land and Environment Policy Board 
4. Climate Change 
4.1 Energy Management
Energy Efficiency Fund
4.1.1 Work is ongoing between the Energy Team and Finance with a view to securing funding
to be used towards increasing the energy efficiency of our Public Buildings. The
technologies being investigated as part of a business case include boiler control
upgrades, LED installations and installation of additional Solar Photovoltaic panels.
Item 2
Page 17 of 123

Page 18

4.1.2 Work is currently underway to reduce water consumption in our education estate through
working in conjunction with our water provide, Business Stream.
4.1.3 Survey work is planned to look at the options for upgrading the existing lights and controls
within Renfrewshire House, this will not only reduce our carbon emissions and the
associated electricity costs and will provide an improved working environment for staff
and visitors.
District Heating Network feasibilities
4.1.4 Feasibility reports are now complete looking at the options surrounding the introduction of
a District Heating Scheme in Central Paisley and an extension to the current District
Heating Network at AMIDS. Central Paisley has 49 main anchor loads with an additional
2,552 properties that could connect to the network. 
4.1.5 A funding application for each project has been submitted to the Scottish Governments
Heat Network Support Unit for matched funding to take each feasibility to an Outline
Business Case.
Local Heat & Energy Efficiency Strategy Delivery Plan
4.1.6 Renfrewshire’s LHEES strategy was approved at Board on 25th January 2024.The Energy
Team are currently working on finalising Renfrewshire’s LHEES Delivery Plan. The
delivery plan is a document setting out how a local authority proposes to support
implementation of its local heat and energy efficiency strategy.
ECO4 Flex
4.1.7 ECO4 Flex will allow the Council to approve funding to Renfrewshire’s private sector, fuel
poor households that do not meet criteria for other schemes, as well as low- income
households that are vulnerable to the effects of the cold. The scheme is part of the UK
Government Energy Company Obligation and is managed by Ofgem.
4.1.8 The qualifying criteria for ECO-Flex, as set by Ofgem, is published on our website in a
document called a Statement of Intent. Renfrewshire’s Statement of Intent can be found
here: https://www.renfrewshire.gov.uk/media/15354/ECO4-flex-statement-of-
intent/pdf/Renfrewshire_Council_Statement_of_Intent_for_ECO4_flex.pdf?m=167568
7584337ECO-flex. ECO-flex does not apply to Council Housing or Registered Social
Landlords.
4.1.9 The energy efficiency measures being installed within Renfrewshire include boilers, loft
insulation, cavity wall insulation, air source heat pumps, solar panels, heating controls,
first time central heating etc.
The table below highlights the savings ECO4 Flex has achieved to date based on
annually recurring savings: 
Financial Year Value of Grant
Funding Requested (£)
Total Annual CO2
Saving in Kg
Total Annual Cost
Saving (£)
2023/24 £3,583,940 648,617 £231,789
2024/25 £1,174,210 157,299 £60,261
Total £4,758,150 805,916 £292,050 
4.2  Biodiversity 
4.2.1 This season the service expanded its biodiversity planting, adding new sites across the
area. A review is currently ongoing on all the biodiversity sites planted over the last 3 years.
Whilst the service has received positive feedback when in flower, there are a number of
locations where the flower mix has started to become dominated by a small group of flower
species. In addition to the flower mix, the size of the panels and where located next to
roads and footways will be reviewed to ensure effective sight lines and safe walking routes
to be maintained. Updates on all of our biodiversity sites will continue to be provided at
future boards.
4.3 Carbon Literacy Training Page 18 of 123

Page 19

4.3.1 Local Authority Leadership and Management in Carbon Literacy training is being rolled
out across the Council. This training is delivered in-house and is primarily based at
Managers and Team Leaders. The training uses a toolkit produced by the Carbon
Literacy Project specifically for Local Authorities and is part of large-scale certified
education programme with nearly 97,000 individuals having undergone the training across
various sectors in total.
4.3.2 The training covers a basic overview on the climate emergency, causes and impacts and
explores why local authorities should act and the Council’s levers of influence; providing
leadership in the climate emergency; how climate action can be integrated into decision
making; co-benefits of climate action; and examples of how we can fund climate action. 
4.3.3 To date, 54 Council Officers have undertaken the training from across all Services, with
further training sessions planned after the summer.
5 Team Up to Clean Up
5.1.1 The “Bin to Win” school campaign was introduced to schools in June. The campaign was
launched during the pre-election period, as such promotion was low key. £750 worth of
Scotland Loves Local or One4all gift cards gift cards were issued to our young winners
who submitted photographs of themselves binning their litter. Greater promotion and
awareness raising is planned for pupil’s return to school in August, at this point pupils will
also learn of their peer’s winnings. This approach is designed as a nudge technique to
develop behaviour change amongst our young people.
5.1.2 Team up to Clean Up continues to engage and support Community Groups across
Renfrewshire with litterpicking kits, high vis vests and tools as required.
5.2 Environmental Taskforce
5.2.1 The Environmental Taskforce continues to deliver intervention to reduce instances of
flytipping. Key statistics for the most recent period are:
Action May-July
2024
Proactive visits to identified hotspot areas 520
Number of reports investigated 378
Tonnes of flytipping removed 49
Number of sites secured to prevent further flytipping 3
Letters to private landowners re flytipping 12
Visits to businesses to ensure Waste Disposal Arrangements in place 20
Fixed Penalty Notices Issued 22
5.2.2 Relocated cameras have been successful in securing evidence in 3 flytipping cases since
May 2024. 
5.2.3 An additional 3 flytipping hotspots have been secured with preventative measures
blocking access through support from the Environmental Taskforce.  One site, operated
by a private organisation, has erected fencing, the remaining 2, one of which is Tannahill
Road in Ferguslie, have blocked access as such reducing instances in these areas.
6 Fleet, Roads and Transportation 
6.1 Fleet Services 
6.1.1 The service are progressing the Fleet Vehicle Replacement Programme in line with the
Council’s Ren Zero Plan. 7 electric vans and 12 electric cars have been ordered and are
due for delivery by October 2024.  The Council now ha a total of 104 electric vehicles within
the core operational fleet. 
Roads & Transportation
6.2 Roads Capital Investment Programme
Page 19 of 123

Page 20

6.2.1 A number of schemes have been completed during July and August including Paisley
Town Centre one-way system including Incle Street, Old Sneddon Street and Weir Street. 
Newmains Road, Neilston Road, High Street/Leighcartside Johnstone, Abbotsinch Road,
Causeyside Street, Barochan Road, Glenpatrick Road, Main Road Elderslie and
Nethergreen Road have been completed over the Summer.  Surface dressing has also
been completed on rural roads around Lochwinnoch and Howwood.  
6.2.2 Carriageway resurfacing works are planned in September and October for A726 Greenock
Road, A726 Spectacles roundabout, Inchinnan Road Paisley, and Glenfield Road.
6.2.3 Footway resurfacing will commence in late October 2024.
6.2.4 The new River Clyde bridge from Renfrew to Yoker has been installed with the connecting
roads under construction. Recruitment for the 24-hour, 7-day week operations team has
been completed along with training on the safe operation and maintenance of the bridge
in anticipation of the bridge opening. The bridge is expected to be operational by late
2024. 
6.3 Active Travel & Infrastructure Improvement Update
6.3.1 Work to introduce pedestrian safety traffic calming measures in Renfrewshire’s villages
continues. Close collaboration with local residents is directing the design and construction
of measures to best suit local conditions. The second part of the project has started its
engagement and concept design stage in Lochwinnoch, Bishopton, Elderslie and Bridge
of Weir.
6.3.2 The new Active Travel route from Barnsford Road to Inchinnan Drive is now complete. 
We await news of the value of our award from Transport Scotland’s Active Travel
Infrastructure Fund to allow us to build the next phase of our Active Travel Network along
Inchinnan Drive this year. This connects the employment centre of Inchinnan Business
Park with Glasgow Airport, Renfrew, and Paisley with a safe, segregated active travel
path for everyday commuter journeys.
6.3.3 The tender for the construction phase of a bus turning circle at Linburn Road in Erskine
has been awarded for a construction start in August.  The project will provide a retaining
wall, bus turning loop and footway provision. Public utility diversionary works has already
been completed. SPT Capital funding announced for 2024/25 has allocated £165,000 for
this category 1 project seen by SPT as operationally essential.
6.3.4 The Paisley to Renfrew active travel route, including upgraded shared footways and
carriageway improvements at Wright Street is complete. Pedestrian crossings at Gilmour
Street and Niddry Street have been converted to Toucan crossings, the new street
lighting on the route is energised and we are in discussions with the developer on the final
surfacing of the ramp connecting Turner Drive and Wright Street.
6.3.5 Work in association with Sustrans to improve accessibility to the National Cycle Route
Network 75 has seen improved connections created at Ben Nevis Road, Canal Street and
Stow Brae. Further feasibility work at Maxwellton Road is hoped to be able to encourage
more active trips to school in future.
6.3.6 Our programme to provide more energy efficient infrastructure at Traffic Signal junctions
continues with upgrades planned at three junctions on Barrochan Road/A737, Johnstone
and Paisley Road/Oxford Road, Renfrew. Road safety improvements at the Glebe Street/
Hairst Street junction are due to follow.
6.3.7 Renfrewshire’s Local Transport Strategy has completed its data gathering stage of
widespread engagement with public, Members and stakeholders. Opinions on all aspects
of transport in Renfrewshire, what works, what doesn’t and suggestions for the future,
have been collected for consideration in the preparation of a draft strategy for further
consultation later in the year.
6.4 Elderslie for Everyone Project 
6.4.1 The Discover stage of the project is now complete, having held 11 events and meetings
and 11 one-to-one meetings with businesses, engaged with 410 people face-to-face, had
446 contributions on the project website and 224 newsletter subscribers.
6.4.2 The next stage, Develop, which will run until autumn 2024, will see the creation of Design
Objectives based on findings from the Discover stage and the early stages of developing
design solutions.  Page 20 of 123

Page 21

6.4.3 Some surveying has already been carried out (traffic speed and volume, public life study,
junction turning counts at Glenpatrick Road, video manual count of pedestrians) with
additional to follow after school holidays (pedestrian movement count at Glenpatrick
Road, junction turning count from Canal Street, queue length at Glenpatrick Road, parking
and loading survey). 
6.4.4 The latest public event took place on Thursday 15 August 2024, and featured hands-on
workshops with scale models. 
6.4.5 The project is on-track to have full concept designs by March 2025, with additional
collaborative design sessions and community consultations along the way.
6.5   Parking Strategy
6.5.1 The service has made significant progress with implementation of the Councils approved
parking Strategy with preparations well underway for the delivery of the Council’s
responsibilities in relation to pavement parking. 
6.5.2 A consultation is ongoing at present on the streets proposed to be exempt from the
regulations and the Traffic Regulation Order has been widely promoted to maximise
coverage of the issue. The outcome of the consultation and associated Traffic Regulation
Order will be brought back to the next meeting of this Policy Board for consideration on
the basis that the majority of objections, if any, can be addressed prior to the meeting of
the Board.
6.5.3 A key area of the parking strategy was the review of existing permit arrangements that are
in place across Paisley Town Centre, although residents permits will be considered at a
later point in the implementation of the strategy. Officers have met with representatives of
Paisley First and carried out a number of visits to local businesses who have made
representations through Paisley First, to identify opportunities to support business in line
with the Parking Strategy.
6.5.4 Officers have also identified the opportunity for a season pass discount scheme for those
individuals who have no option other than to bring their private car to Paisley town centre
for employment purposes. Officers intend to engage with Paisley First further to discuss
the detail of the proposals. Initial thoughts on the implementation could see a discounted
scheme in operation where around 25% of our off street parking spaces are made
available to those wishing to purchase a season pass. Work is now under way, which will
allow a scheme to offer a discount on parking of 60% on a standard daily rate. An update
will be provided to members at the next Policy Board on progress with this scheme.
6.5.5 Officers have also engaged with businesses around the potential for introduction of
additional loading bays around the town centre, with locations to be confirmed with
Paisley First as well additional signage to be located at parking machines to provide
additional information to the public.
6.6 Street lighting Capital Investment Programme
6.6.1 The new lighting installation for Prieston Road, Bridge of Weir started in early July to
replace the ageing network with new cabling in ducts, a new control panel and new
columns and lanterns.
6.6.2 Works continue to replace 144 cut down lighting columns and new cable loops to areas
where we have dark sections continues with around 60% of programme completed. 
7. Neighbourhood Services 
7.1 Grass Cutting Programme 
7.1.1  The grass cutting programme commenced on April 1st and is approaching the last month of
the cutting season. As previously advised to board the service implemented a strimming-
only procedure for all grass edges, a measure aimed at reducing pesticide usage. This new
approach led to an overall reduction in pesticide spraying by 80% and completely
eliminated grass edge spraying. Consequently, panel edges no longer appeared yellow,
enhancing the quality of the cuts. This improvement resulted in a significant reduction in the
complaints regarding grass cutting quality compared to the same period last year.
7.1.2  The introduction of the strimming procedure posed some challenges, primarily the increased
time required to complete a grass panel cut. Occasionally, the service was unable to fully
strim all panels, resulting in some inconsistency in the grass edges. However, this was
Page 21 of 123

Page 22

addressed, and form lessons learned for the service next season. With the extensive
improvements in the quality of grass cutting experienced this year, the service intends to
continue with the strimming procedure next season adapting to the lessons learned to
improve the overall service. 
7.2 Weed Management 
7.2.1  This growing season presented significant challenges in addressing an unprecedented
amount of weed growth, with the weather impacting weeds on a wider, national scale. In
response to the weed growth, the service implemented a targeted approach by forming a
dedicated weed control team. This team concentrated on strimming, scraping, sweeping
and spraying in our open spaces.
7.2.2  While the weed growth posed challenges, it also highlighted opportunities for the new
management team for continual improvement. To ensure optimal weed management for
open spaces in the future, the service has begun the tender exercise for weed
management for 2025. We plan to increase our weed management programme and initiate
our weed management efforts earlier in the season, commencing in March 25. As a further
method, service teams have redesigned the winter works programme for 2024, with a wider
emphasis on weed management. These proactive steps will help us build on this years’
experience and improve our strategies for weed control for future years.
7.3 Winter Maintenance Programme 
7.3.1 There will be a large, visible winter maintenance programme this autumn/ winter, focussing
of hedge and shrub reduction and vegetation cut back. It is recognised that it’s been a number
of years since many of our hedges and shrubs have had as significant cut back. In addition
there will be a focus with new and additional equipment to assist scraping activities which
were restarted 3 years ago to allow a larger areas of ground to be covered.  These activities
will take place within all communities and will follow the 14 day grass cutting cycle, with a
presence one day a fortnight within communities. A more detailed update will be provided in
the next board cycle. 
7.4 Bin Replacement Programme
7.4.1  Following the allocation of investment in the budget, we are in the process of procuring and
replacing around 300 litter bins. The majority of this replacement will take place in the
autumn, with some bins already being replaced. Additionally, we are undertaking a wider
review to assess the location and type of infrastructure needed across Renfrewshire
moving forward and a further update on the review will be shared at a future board. 
7.4.2 By upgrading our bin infrastructure and improving servicing methods, Neighbourhood
Services is taking significant steps to enhance the efficiency and effectiveness of waste
management in our community.
7.5  LTA Tennis Court Launch
7.5.1  The extensive improvement works on the tennis infrastructure across Renfrewshire have
been successfully completed. Refurbishment of the tennis courts at Brodie Park, Robertson
Park, and Johnstone Park Lane is now finished. These courts were reopened in July,
ahead of the school summer holidays, and have already seen increased participation
throughout the season. Our Play parks team have taken ownership of the sites and will
continue to maintain the sites across Renfrewshire. 
7.5.2  To celebrate the reopening, Renfrewshire Council offered free access to the tennis courts
for the entire month of July. A formal launch event is planned for September, coinciding
with the return of schools. This event will feature local school pupils, LTA elected members,
and a coaching professional. Details of the formal launch will be communicated soon, and
we anticipate continued success and community engagement at our tennis courts.
7.6 Tree and Woodlands Management
7.6.1  The new Tree and Woodlands structure has nearly completed its recruitment cycle, with all
key positions filled except one. We have welcomed our new Tree and Woodlands
Supervisor, who joins us from the Forestry Commission. This supervisor will oversee the
council's proactive tree management efforts.
7.6.2 The redesigned structure aims to enhance our proactive tree management, thereby
improving the service delivered to the residents of Renfrewshire. With the additional
resources, we are able to support the ever-increasing demand of managing, enhancing, Page 22 of 123

Page 23

and expanding our tree assets. Currently, the team is addressing several complex tree
enquiries, and the new team structure is expected to increase our efficiency and
responsiveness in managing tree and woodland issues.
7.7 Clyde Muirshiel 
7.7.1 Castle Semple and Clyde Muirshiel Country Parks are operating on summer opening hours,
with walks and trails accessible all day, every day. The outdoor activity programme has
also commenced successfully following a successful recruitment period for outdoor
instructors.
8 Memorial Safety and Cemetery Management 
8.1.1 Memorial Safety is nearing the completion of its inspection programs and is preparing to
begin re-inspections. In preparation, the service is currently reviewing its policies and
procedures and a revised cemetery policy will be presented to a future board for approval.
Additionally, to enhance communication with the public, the service is evaluating a new
digital platform. This platform aims to centralise all cemetery-related information, offering a
comprehensive and easily accessible resource for all cemetery operations. 
9.  Waste Services 
9.1  Waste Collection Method Update 
9.1.1  As agreed at Infrastructure, Land and Environment Policy Board at it’s meeting of May
2024, phase 1 of decoupling the grey bins from the recycling bins for all areas with a
Saturday collection will be rolled out from the beginning of October. This extra time has
allowed additional work on route data to be completed to ensure a smooth transition.
9.1.2 Additionally, Phase 1 will now be implemented in 3 stages. 
Stage 1 Alignment of recycling collections so that the same recycling stream is collected
on the same day. Residents will receive a new collection calendar
informing them which colour recycling bins to present on collection day.
The grey bins collections will remain on Saturday at this stage. 
Stage 2 Align the difficult to service properties with the standard collection frequencies
and expanding recycling provision by providing them with a brown bin.
Stage 3 Decouple the grey bins so that they are collected on a different day from
recycling bins. E.g. recycling will be collected on a Saturday and
residual grey bins collected on a Monday. 
9.1.3 Ward Elected Members for this area will be provided with notice and further information in
advance of communications being sent to households. 
9.2 Circular Economy Bill update 
9.2.1 The Circular Economy (Scotland) Bill was passed by Scottish Parliament on 26th June
2024. The Bill brings forward legislation to introduce measures including a circular economy
strategy, circular economy and recycling targets, and changes to the Climate Change
(Scotland) Act 2009. For local authority environmental services, relevant changes include
the introduction of a householder’s duty of care with authority to issue fixed penalty notices
for those who fail to comply, and changes to the code of practice on household waste
recycling. The bill also includes measures to restrict the disposal of unsold consumer goods
and the imposing of a civil penalty for littering from a vehicle.
9.2.2 In parallel, Scottish Government are developing a circular economy route map to take
forward circular economy measures from the Bill and others that don’t require
legislation.  This has been consulted on and the final version is expected before the end of
2024.  
9.2.3 The Waste Service are engaging with Scottish Government and Zero Waste Scotland to
keep up to date with developments in relation to both the Circular Economy (Scotland) Bill
and Circular Economy Route Map.  Further updates will be provided when more information
becomes available. 
9.3 Household Waste Recycling Centres – Health and Safety 
Page 23 of 123

Page 24

9.3.1 The vast majority of people who access our Household Recycling Centre’s for disposal of
their waste and recycling follow the site rules and if they are unsure of anything will ask our
site staff for assistance. Unfortunately, on a small number of occasions our site staff have
experienced aggressive behaviour and abuse from site users, and this is not acceptable. 
9.3.2 The safety of our staff is of the upmost importance to us, and this is reflected in the
Council’s policy on Violence and Aggression at Work.  Following discussions with site staff
and trade union representatives the Waste Service will introduce Body Worn Cameras for
our recycling centre staff. The use of body worn cameras within HWRCs is common within
local authorities and this technology is in addition to the existing health and safety
measures on site.  
9.3.3 It is anticipated that the presence of the cameras will discourage interactions from
escalating and capture evidence if it does. The use of body worn cameras at our
Household Recycling Centres will be clearly communicated to site users via signage at the
site entrance and also within the sites. The Council’s website will also be updated with this
information. The data recorded by the camera system will be held in accordance with the
General Data Protection Regulations (GDPR) 2018.   
9.4 Route Optimisation Software and In-Cab Technology 
9.4.1 The service is procuring a route management system to support delivery of the frontline
waste and recycling collection service. The route management system aims to deliver a
number of benefits including route optimisation and in-cab technology to maximise the
efficiency of the collection routes and reducing fuel consumption and carbon emissions. 
The procurement of the system is underway, and the service aims to bring a paper for
approval to the November board cycle.
10 #YouDecide
10.1.1 Forty one out of the 50 successful #YD Projects are now complete. Most recently seating
in Renfrew Town Centre was completed along with play area refurbishments at South
Candren Village Green and Station Road Park, Langbank.
10.1.2 Lighting works are complete in Howwood Park, Inchinnan Park, Spateston Park
Johnstone, Ferguslie Gardens Paisley, and Miller Street path Johnstone. Columns have
been installed and awaiting Scottish Power connections for Ellerslie Street Johnstone,
Kintyre Park Linwood, Barshaw Park Paisley, Millfield View path, Erskine, Kilbarchan
Park and Lochwinnoch Park. These connections are anticipated in September 2024. The
Wallace monument is due to be illuminated in late August 2024.
10.1.3 Consultations for the wheeled sport areas for Kintyre Park, Linwood and Moss Road
Park, Bridge Of Weir took place during May and June 2024. Final designs have been
confirmed with works anticipated to start in late August at Kintyre Park with each park
taking approximately 10-12 weeks to complete.
10.1.4 Consultation on designs for Barrangary and Chestnut roundabouts in Bishopton took
place from June to August 2024.  The designs chosen are being progressed through our
procurement process with an aim to complete landscape works in 2025. Consultation on
designs for Easwald Bank roundabout, Kilbarchan, Renfrew Road/Arkleston Road and
Glasgow Road/Kings Inch Road, Renfrew roundabouts to start September 2024.
10.1.5 Work to improve paths and signage in Gleniffer country park is ongoing as are the
information and interpretation boards for the villages of Inchinnan and Kilbarchan.
These projects should be complete by Spring 2025. 
Implications of the Report 
1. Financial – Any financial elements referenced in this report will be
progressed through the Council’s financial & budget planning process. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – The report details a range of activities which reflect
local community and council planning themes. 
Page 24 of 123

Page 25

4. Legal – None 
5. Property/Assets – None 
6. Information Technology –None 
7. Equality & Human Rights - The recommendations contained within this report have
been assessed in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’ human rights have
been identified arising from the recommendations contained in the report. If required
following implementation, the actual impact of the recommendations and the mitigating
actions will be reviewed and monitored, and the results of the assessment will be
published on the Council’s website. 
8. Health & Safety – None 
9. Procurement – None 
10. Risk – None 
11. Privacy Impact – None 
12. COSLA Policy Position – None 
13. Climate Change – there are a range of actions and activities throughout the
Service Update Report which support the Council’s Plan for Net Zero. 
14. Children’s Rights - None 
List of Background Papers: None 
Author: Gordon McNeil, Director of Environment, Housing & Infrastructure
Page 25 of 123

Page 26

To:  Infrastructure, Land and Environment Policy Board 
On:   28th August 2024 
Report by: Director of Environment, Housing & Infrastructure 
Heading: Waste and Recycling Performance Update 
1. Summary 
1.1 The Council’s application to the Recycling Improvement Fund (RIF) to fund a
package of recycling improvements measures across Renfrewshire has been
successful. The Council has received an offer of £756,942 to deliver this project. 
1.2 The Council agreed at the Infrastructure, Land and Environment Policy Board
meeting of 29th May 2024 to authorise the Director of Environment, Housing and
Infrastructure in conjunction with the Convener of the Infrastructure Land and
Environment policy board and the Head of Corporate Governance to accept an offer
from the Recycling Improvement Fund (RIF) to cover the cost of the capital
infrastructure required to implement the package of recycling improvement measures
outlined within the report, should an offer be made. 
1.3 This report will provide an update on the application submitted to the Recycling
Improvement Fund, project delivery plan and timescales for implementing the
recycling improvement measures. 
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy Board: 
2.1 Notes acceptance of the funding offer from the Recycling Improvement Fund to cover
the cost of the capital infrastructure required to implement the package of recycling
improvement measures noted at the Infrastructure, Land and Environment Policy
Board on 29th May 2024 
2.2 Notes the proposed delivery plan and timescales for implementing the recycling
improvement measures.   
3.  Background 
3.1 The Council has identified a range of recycling improvement measures that aim to
improve the quality and quantity of recycling and optimise the performance of the
Item 3
Page 26 of 123

Page 27

waste collection service. The recycling improvement measures were outlined and
noted at the Infrastructure, Land and Environment Policy Board on 29th May 2024. 
3.2 The cost of implementing the recycling improvement measures is significant and an
application was made to the Recycling Improvement Fund in April 2024 to cover the
capital infrastructure costs required to implement the recycling improvement
measures. 
3.3  The Council agreed at the meeting on 29th May 2024 to authorise the Director of
Environment, Housing and Infrastructure in conjunction with the Convener of the
Infrastructure Land and Environment policy board and the Head of Corporate
Governance to accept an offer from the Recycling Improvement Fund, should an
offer be made. 
4. Recycling Improvement Fund Application Update 
4.1 The Council received an offer of £756,942 from the RIF to fund the capital
infrastructure required to implement the range of recycling improvement measures. 
4.2 The Recycling Improvement Fund Board has attached conditions to the funding. This
includes the development of a monitoring programme for each strand of the project
and a maintenance programme for the communal food waste infrastructure. 
4.3 The award of funding was accepted by the Director of Environment, Housing and
Infrastructure in conjunction with the Convener of the Infrastructure, Land and
Environment Policy Board and the Head of Corporate Governance in July 2024.   
5. Project Delivery 
5.1 Implementation of the recycling improvement measures will commence from October
2024 and will be completed in 3 Phases. These are estimated timescales based on
current supplier delivery times and are subject to change. This is slightly later than
originally planned. Further detail on the recycling improvement measures are detailed
within the Waste and Recycling Performance paper considered at the ILE meeting of
29th May 2024. 
Phase  Timeline 
Phase 1: 
Increase participation and recycling of food waste and divert
food waste from the residual stream by placing an A6 size
‘no food waste’ sticker on the residual waste bin of all
standard kerbside properties. 
From October /2024 
Phase 2:
Communal Recycling – Distribution of communal food waste
recycling infrastructure including, bins, sacks, food liners and
indoor caddies to all communal properties.
Recycling infrastructure for plastics, cans and glass and
paper and card will to be reviewed to ensure all communal
areas have the correct recycling capacity. 
From January 2025
Phase 3:
Expand recycling to Difficult to Access Properties - Enhance  From March 2025
Page 27 of 123

Page 28

recycling provision at properties that do not currently have
access to the full range of recycling services by extending
the brown bin collection service to include these properties. 
5.2 A comprehensive communication plan has been developed to encourage
participation and engagement in recycling and support delivery of the recycling
improvement measures. The communication plan is tailored to different audiences
and specific to each phase of the project. A briefing for Councillors will be shared
prior to the launch of Phase 1. 
5.3 Further updates will be included within the service update report. 
Implications of the Report 
1. Financial – The Council will contribute £66k of expenditure to take forward the
Recycling Improvement Fund grant, as some of activities undertaken are not covered
by the conditions of grant. These costs will be funded by the Change Fund in
2024/25. 
2. HR & Organisational Development – None 
3. Community Planning – None 
4. Legal –  Renfrewshire Council are committed to a contract for grant funding of the
capital infrastructure costs. 
5. Property/Assets – This project will include significant investment in recycling
infrastructure including containers, stickers, food liners, indoor caddies and sacks. 
6. Information Technology – None 
7. Equality & Human Rights - 
The recommendations contained within this report have been assessed in relation to
their impact on equalities and human rights. No negative impacts on equality groups
or potential for infringement of individuals’ human rights have been identified arising
from the recommendations contained in the report. If required following
implementation, the actual impact of the recommendations and the mitigating actions
will be reviewed and monitored, and the results of the assessment will be published
on the Council’s website. 
8. Health & Safety - Staff are trained on handling and manoeuvring of waste and
recycling containers.   
9. Procurement – Existing Framework contracts will be utilised. 
10. Risk –  Risk Register and project management arrangements will support the
programme of measures to manage and mitigate risks. 
11. Privacy Impact - None 
12. Cosla Policy Position – None 
Page 28 of 123

Page 29

13. Climate Change – – These interventions aim to improve recycling and support
Renfrewshire’s progress towards net zero. 
14. Children’s Rights – None 
List of Background Papers - None 
Author:   Gavin Hutton, Head of Operations and Service Development
Email:      Gavin.Hutton@renfrewshire.gov.uk
Page 29 of 123

Page 30

___________________________________________________________________
To:  Infrastructure, Land and Environment Policy Board
On:  28 August 2024
___________________________________________________________________
Report by: Director of Environment, Housing, and Infrastructure
___________________________________________________________________
Heading: Renfrewshire’s Local Heat and Energy Efficiency Delivery Plan
___________________________________________________________________    
1. Summary 
1.1 Reducing Carbon Emissions is one of the principal measures to address climate
change and is a key priority for all Local Authorities. Renfrewshire Council recognises
that climate change will have far reaching effects on Renfrewshire’s economy, its
people and its environment and is determined to lead by example in tackling the
causes of climate change. 
1.2 Renfrewshire Council declared a climate emergency in June 2019 and approved the
Plan for Net Zero in August 2022, which committed to working towards net zero by
2030 for both the Renfrewshire area as a whole and Renfrewshire Council as an
organisation.  This challenging target covers all aspects of energy use within the
Renfrewshire wide area. Homeowners can help achieve these targets by ensuring
their home is energy efficient. In doing so, there are many long-term benefits, such as
carbon savings, reducing energy bills and by supporting the local economy. 
1.3 In 2022, the Scottish Parliament passed The Local Heat and Energy Efficiencies
(Scotland) Order 2022. This places a statutory duty on Local authorities to publish a
Local Heat and Energy Efficiency Strategy (LHEES) and Delivery Plan (LHEEDP),
and for these to be updated at intervals of no more than 5 years. 
1.4 LHEEDP are designed to be local authority-led, however stakeholder engagement
and partnership working are key as the plan addresses all building stock at a local
authority wide level (Council, public, private, 3rd sector and all tenures of residents). 
1.5 It is hoped that LHEEDP will also act as a prospectus for government funding and
external investment using a robust evidence base and place-based approach. 
1.6 Renfrewshire’s Local Heat and Energy Efficiency Strategy (LHEES) was approved by
the members of the Infrastructure, Land and Environment Policy Board on 24
January 2024. 
___________________________________________________________________
Item 4
Page 30 of 123

Page 31

2.  Recommendations 
It is recommended that members of the Infrastructure, Land and Environment Policy
Board:
2.1 Approves the proposed Local Heat and Energy Efficiency Delivery Plan 
2.2 Notes the high-level information available at this time on Renfrewshire’s Local Heat
and Energy Efficiency Delivery Plan 
2.3 Notes that updates will be provided to the relevant Policy Boards outlining potential
opportunities and proposed projects, activities, and interventions. 
___________________________________________________________________    
3.  Background 
3.1 In addition to Scotland’s net zero targets, there are strategic national targets relating
to lowering emissions from our buildings through the decarbonisation of heat.   
These targets are: 
• improving energy efficiency in domestic and non-domestic building stock;
• removing poor energy efficiency as a driver for fuel poverty; and 
• in 2040, as far as reasonably practicable, no household is in fuel poverty. 
Clean Energy is one of the 5 focus areas as approved within Renfrewshire’s Plan for
Net Zero which aligns with these targets at a local level.     
3.2 Development of Renfrewshire’s LHEEDP includes identifying: 
• a range of projects and actions to be developed, with outline costs and
carbon savings associated with the proposed interventions.
• an assessment of potential large-scale heat supply – not just looking at new
infrastructure but also using existing infrastructure and assets (such as water
sources) and innovative methods of waste heat recovery, such as those used
in the Advanced Manufacturing Innovation District Scotland (AMIDS) district
heating network in Renfrewshire.
• opportunities for partnership working and engaging with all key stakeholders
throughout the process. 
__________________________________________________________________     
4.  Next Steps 
4.1 Following approval of the LHEEDP, progression of the plan’s actions can be made. 
This will also allow feasibility studies and outline business cases to be carried out
and to seek appropriate funding on conclusion of the studies if/where potential
delivery area opportunities are identified.   
4.2 Continued engagement and collaboration are critical in the successful delivery of
LHEES to understand the views, opportunities, and constraints. Stakeholders were
identified through a range of engagement activities during the preparation of the
Strategy which was approved January 2024 as noted in section 1.6 of this report.  All
stakeholders have been mapped out in an action plan to support the delivery.  This
will provide a good understanding of the level of engagement required for each
stakeholder. 
Page 31 of 123

Page 32

4.3 The Delivery Plan is a living document and is expected to be updated in line with
policy and target development using version control. 
__________________________________________________________________     
Implications of the Report 
1. Financial – No current implications.  The Scottish Government committed to a
funding package of £75,000 per annum for each Local Authority from 2023 to 2027. 
Delivery of the LHEES will have resource implications for the Council and includes a
commitment to working collaboratively to ensure best value for our approach. As the
full extent of the resource implications for Renfrewshire Council emerge, reports will
be brought to the relevant future Policy Boards.    
2. HR & Organisational Development – No current implications. 
3. Community/Council Planning – No current implications.  However, delivery of
Renfrewshire’s LHEES will require engagement and collaboration with local
residents, businesses, partners and communities on the climate emergency agenda. 
The Delivery Plan will highlight the continued activities which support the key
priorities set out in the Council and Community Plans to tackle inequality and widen
opportunity.   
4. Legal - No current implications. However, future actions may have some level of
implication. 
5. Property/Assets - No current implications. However, delivery of Renfrewshire’s
LHEES may have significant implications for property and assets given the nature of
the work involved. 
6. Information Technology – No implications. 
7. Equality and Human Rights - The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in the
report because it is for noting only. If required following implementation, the actual
impact of the recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the Council’s
website.     
8. Health and Safety – No implications. 
9.  Procurement – No current implications. However, delivery of Renfrewshire’s LHEES
will have significant procurement implications given the nature of the work involved. 
10. Risk – No current implications. 
11.  Privacy Impact – No current implications. 
12. COSLA Policy Position – Renfrewshire’s LHEES aligns with COSLA’s current work
alongside the Scottish Government in response to the climate emergency. 
13. Climate Risk – as noted in para 3.1, Renfrewshire’s LHEES aligns with
Renfrewshire’s Plan for Net Zero, specifically the Clean Energy theme. 
14. Childrens Rights – No implications. 
___________________________________________________________________
Page 32 of 123

Page 33

List of Background Papers:  None 
Author:  Ryan Cameron, Local Heat and Energy Efficiency Strategy Officer
Environment, Housing, and Infrastructure 
Page 33 of 123

Page 34

Table of Contents 
RENFREWSHIRE’S 
LOCAL HEAT & ENERGY EFFICIENCY DELIVERY PLAN (LHEEDP) 
Environment, Housing & Infrastructure 
Page 34 of 123

Page 35

2 
Table of Contents 
Page No
1.  Introduction to Local Heat and Energy Efficiency Delivery Plan 03
2.  Approach to Delivery Plan 04 
2.1  Local Heat and Energy Efficiency Strategy Priorities 04 
2.2  Renfrewshire Priorities 04
3.  Action Plan 05
4.  Summary of Actions 07
5.  Actions in Detail 10
6.  Renfrewshire Examples 17 
6.1  Pilot Project 17 
6.2  Housing-led Regeneration Programme 18 
6.3  New Build Homes Programme 19 
6.4  Eco Flex 4  19 
6.5  Energy Advocacy Advice 20
7.  Feasibility Studies 21 
7.1  Paisley East/West/Central 21 
7.2  Paisley North 22 
7.3  Johnstone 22 
7.4  Foxbar 23  
Appendix 1 – Glossary of Terms 24  
Appendix 2 – Stakeholders 28  
Appendix 3 – National Policies 32  
Appendix 4 – Local Policies 34 
Page 35 of 123

Page 36

3 
1.   Introduction To Local Heat & Energy Efficiency Delivery Plan (LHEEDP) 
This document is the Delivery Plan for the Renfrewshire Local Heat and Energy Efficiency Strategy (LHEES).  It should be read in
conjunction with the Renfrewshire LHEES itself. 
The Delivery Plan sets out how Renfrewshire LHEES is to be implemented, with a focus on actions over the period 2024 to 2029.   
The plan proposes to support Renfrewshire Council and our partners to work towards delivery of the changes and opportunities
identified in the Strategy. This is intended as a 5 year term delivery of actions, based on local priorities, LHEES considerations and
stakeholder engagement.   This helps understand what actions can currently be delivered, given the changing policy landscape as well
as understanding that new future policies and programmes will be developed alongside new technologies being adopted as they
become viable. 
Continuing engagement with both internal and external stakeholders will be critical to support the delivery of LHEES and embed LHEES
within the local governance structures and processes, not just of the Council but our Community Planning Partners and all stakeholders,
in order to identify and optimise new opportunities, including collaboration and partnership working opportunities as they arise.   
The high-level LHEES Delivery Plan is a living document and is subject to change when the Council and partner organisations start
delivering LHEES and/or large-scale renewables projects as well as new developments and the emergence of new technologies.  It is
expected to be updated in line with local and national policy and target developments, with a statutory obligation to update at intervals
of no more than 5 years. 
Page 36 of 123

Page 37

4 
2.  Approach to Delivery Plan
2.1 LHEES Priorities
The purpose of this Delivery Plan is to detail the specific opportunities and delivery mechanisms for Renfrewshire to reduce our energy
emissions and decarbonise our heating systems through large-scale projects, such as developing local heat network portfolios (both
new network developments and expansion of existing networks).  Also by installing measures at individual building level through
improving energy efficiency to reduce energy costs and alleviate fuel poverty.
This covers short and medium goals within a 5-year timeframe and longer-term aspirational actions; thus the plan focuses on
opportunities and approaches for this first phase of the LHEES, with the next Delivery Plan scheduled to be published no later than
December 2028.
2.2 Renfrewshire Priorities
Renfrewshires two key themes to guide the development of this Delivery Plan are intended to maximise the effectiveness of LHEES
delivery are:
1. Maximising and exploring in detail the potential for heat networks beginning with the 6 first phase heat network zones identified
in the Renfrewshire LHEES. 
2. Investigating the outline costs of installation and potential savings (carbon and cost savings) of identified solutions on an area by
area basis, with the alleviation of fuel poverty as a priority. 
Page 37 of 123

Page 38

5 
3. Action Plan
Officers have identified a mixture of high level actions which are set out in the summary of actions in section 4 and these will be
incorporated and developed in more detail on a project by project basis to ensure benefits are optimised and will include specific
details relating to timescales, inputs and desired outcomes.  Through a monitoring and evaluation process we will work towards targets
set throught the delivery plan and from this we can identify more specific projects within the Renfrewshire area. 
These actions in a Local Heat and Energy Efficiency Strategy (LHEES) delivery plan are crucial for its success. This involves a
comprehensive approach to communication, education, awareness raising and collaboration with all stakeholders. 
Heat Networks:  This involves creating infrastructure for distributing heat efficiently across multiple buildings. Heat networks (or district
heating systems) provide centralised heat from a single source or a combination of sources to multiple end-users via buried pipework
leading to more sustainable, efficient, and cost-effective heating solutions when compared with individual carbon-intense heating
systems within each building and through the optimisation of low carbon heat sources and waste heat recovery. 
Funding:  This is a critical component for the successful delivery of a Local Heat and Energy Efficiency Strategy (LHEES). Securing
adequate funding ensures that all phases of the project, from planning to implementation and maintenance, are carried out effectively
ensuring sustainable and impactful energy solutions for the community.  LHEES is also an opportunity for private investment
opportunities attracting private sector-led projects, public sector exemplar opportunities, and external funding; coordinating and
collaborating on joint ventures; and identifying innovative delivery models to turn sectoral ambitions into investable projects. 
Page 38 of 123

Page 39

6 
Skills and Jobs:  LHEES is an opportunity to upskill and reskill the local workforce and create significant sustainable jobs opportunities
across various sectors, from design and contruction through to operation and maintenance, as well as local supply chain and
manufacturing opportunities.  By developing these skills and creating related job opportunities, the delivery of a Local Heat and Energy
Efficiency Strategy can effectively contribute to both environmental sustainability and local economic growth. 
Awareness and engagement:  This involves a comprehensive approach to communication, education, awareness raising and
collaboration with various stakeholders.  Within the Plan for Net Zero, Renfrewshires LHEES is a key thread where the proposed
solutions reflect local needs and priorities of our communities and extensive engagement will ensure that the needs of all groups are
considered with a focus on addressing inequalities and fuel poverty.   
Building Level:  This involves a series of steps to improve the energy performance of individual buildings, whether residential,
commercial, or public. This plan ensures that each building within the target area benefits from improved heating systems, enhanced
energy efficiencies/savings, and reduced carbon emissions leading to enhanced living conditions.  It is important to consider the whole
building as a system when understanding retrofit works and associated costs.  The ‘fabric-first’ approach considers what is required,
prioritising repairs, insulation, draught-proofing and ventilation as key first measures to ensure energy conservation, reducing the
amount of energy needed and reducing energy waste in our buildings. 
Page 39 of 123

Page 40

7 
4. Summary of Actions
It should be noted that the actions along with stakeholders within the delivery plan will be updated and amended as projects are
identified and feasibility studies are concluded. 
Heat Networks
• Conduct feasibility studies to explore heat network
opportunities, including expansion of existing networks to
meet heat decarbonisation targets. 
• Ensure that the Delivery Plan aligns with new and existings
plans for example the new Local Development Plan.
• Engage with key internal and external stakeholders in
relation to heat network potential.
• Further develop heat network portfolio of projects
identified in the Strategy.
• Engage with non-domestic properties within heat network
zones that have high suitability for heat network
connection and/or anchor load potential.
• Explore collaboration opportunities with neighbouring
Local Authorities, including potential cross-boarder heat
networks.
• Building Assessment Reports (BARs) including, identifying
the best approach to implementation in partnership with
Scottish Government and all 32 Scottish Local Authorities. 
Funding
• Identify and review existing funding programmes and schemes for
energy efficiency and heat decarbonisation.
• Consider national and local levels on available opportunities for
different housing stocks. 
• Engage with the Scottish Government to report the funding gap,
as identified by this LHEES and further analysis, for energy
efficiency measures of regional building stock (domestic and non-
domestic).
• Explore innovative delivery models, including regional approaches,
joint ventures and public-private partnerships.
• Outline Business Case Development has been successful for
accessing both Council and external funding.
• Outline Business Case (OBC) Council and Scottish Government
matched funding has been successful for Paisley North (AMIDS)
and Paisley Central – progress to next steps developing the OBC. 
Page 40 of 123

Page 41

8 
Skills and Jobs
• National and regional co-ordination of skills and jobs
baseline to identify and address the skills gap and develop
the skills transition. 
• Support the development of new and existing supply
chains to encourage growth of local skills and reduce the
risk of local skill shortages.
• We will produce a proposed pipeline of our major
infrastructure projects in order to link with skills transition
and local employment opportunities and identify skills
gaps, shortages and requirements ahead of time. This
proposed pipeline will build on work that is already
underway to encourage investment in local areas; enable
local supply chain and manufacturing opportunities to be
identified; de-risk private sector investment; and bring
about regeneration of local areas.
• We will work with colleges, schools, universities, local
training providers, apprenticeships and staff training, to
ensure that the courses and training opportunities exist for
the stable and sustainable, quality jobs that will be created
to ensure every person is able to reskill and upskill. 
Awareness and Engagement
• Work collaborativly to improve data with a focus on non-domestic
buildings in order to gather information on energy consumption,
carbon emissions, building types, and existing infrastructure that
may be incorporated into a network. 
• Community surveys and stakeholder consultations to understand
local energy needs and behaviors.
• Use media channels to promote and educate about energy
efficiency, as well as providing energy advice and support.  
• Host workshops and training sessions to spread awareness of the
Local Heat and Energy Efficiency Strategy.  
• Provide details of funding opportunities and financial support
schemes available to residents and businesses.
• Continue with internal working group for discussing LHEES delivery
with relevant people/organisations.
• Engagement with Scottish Power to identify existing grid capacity
to meet heat decarbonisations requirements and identify
innovative solutions to local grid constraints. 
Page 41 of 123

Page 42

9 
Building Level
• Further work to understand the scale and costings of the
specific energy efficiency retrofit works and heat
decarbonisation measures required across Renfrewshire for
domestic and non-domestic building stock.
• Set out planned projects to decarbonise heating within
buildings and housing stock.
• Set out planned projects to improve energy efficiency
within buildings and housing stock.
• Align with Historic Environment Scotlands ‘Historic and
Traditional Buildings’ report to ensure traditional
contruction buildings specific needs and characteristics are
taken into account.
General
• Ongoing data collation and verification to inform projects and
identify high certainty actions and low regret measures and ensure
the most current information is being used.
• Continue to review methodology to inform future iterations of the
Strategy and the Delivery Plan. 
Table 01 - Summary of actions 
Page 42 of 123

Page 43

10 
5. Actions in detail
Please see Appendix 2 which sets out the various stakeholder groups that are referenced in the tables below. The Delivery Plan is a live
document and details of funding, timeframes and progress will be included as they become available.
Heat Networks 
Actions Lead Stakeholders Timeframe
01 Conduct feasibility studies to explore heat network
opportunities, including expansion of existing
networks to meet heat decarbonisation targets.
Energy Management
Unit
• Internal 
• External 01
2023-2024
02 Ensure that the Delivery Plan aligns with new and
existings plans for example the new Local
Development Plan.
LHEES Working Group • Internal
• External 01
2024
03 Engage with key internal and external stakeholders in
relation to heat network potential.
Climate Team N/A 2024-2029
04 Further develop heat network portfolio of projects
identified in the Strategy.
Energy Management
Unit
• Internal
• All External
2024-2029
05 Engage with non-domestic properties within heat
network zones that have high suitability for heat
network connection and/or anchor load potential.
Climate Team • Internal 2024-2029
Page 43 of 123

Page 44

11 
06 Explore collaboration opportunities with neighbouring
Local Authorities, including potential cross-boarder
heat networks.
Climate Team • Internal Ongoing
07 Building Assessment Reports (BARs) including,
identifying the best approach to implementation in
partnership with Scottish Government and all 32
Scottish Local Authorities.
Building Standards • Internal 2024-2029 
Funding 
Actions Lead Stakeholders Timeframe
01 Identify and review existing funding programmes and
schemes for energy efficiency and heat
decarbonisation.
Energy Management
Unit/Housing Investing
Team/ Climate Team
• Internal Ongoing
02 Consider national and local levels on available
opportunities for different housing stocks
Energy Management
Unit/Housing Investing
Team
• Internal
• All External
Ongoing
03 Engage with the Scottish Government to report the
funding gap, as identified by this LHEES and further
analysis, for energy efficiency measures of regional
building stock (domestic and non-domestic).
Energy Management
Unit/Housing Investing
Team
• Internal  Ongoing
Page 44 of 123

Page 45

12 
04 Explore innovative delivery models, including regional
approaches, joint ventures and public-private
partnerships.
Energy Management
Unit/Housing Investing
Team/ Climate Team
• Internal
• All External
2024-2029
05 Outline Business Case (OBC) Council and Scottish
Government matched funding has been successful for
Paisley North (AMIDS) and Paisley Central – progress to
next steps developing the OBC.
Energy Management
Unit
• Internal 2024-2025 
Skills and Jobs 
Actions Lead Stakeholders Timeframe
01 National and regional co-ordination of skills and jobs
baseline to identify and address the skills gap and
develop the skills transition.
Climate Team • Internal
• All External
Ongoing
02 Support the development of new and existing supply
chains to encourage growth of local skills and reduce
the risk of local skill shortages.
Climate Team • Internal
• All External
Ongoing
03 We will produce a proposed pipeline of our major
infrastructure projects in order to link with skills
transition and local employment opportunities and
identify skills gaps, shortages and requirements
ahead of time. This proposed pipeline will build on
Climate Team • Internal
• All External
2024-2029
Page 45 of 123

Page 46

13 
work that is already underway to encourage
investment in local areas; enable local supply chain
and manufacturing opportunities to be identified; de-
risk private sector investment; and bring about
regeneration of local areas.
04 We will work with colleges, schools, universities, local
training providers, apprenticeships and staff training,
to ensure that the courses and training opportunities
exist for the stable and sustainable, quality jobs that
will be created to ensure every person is able to
reskill and upskill.
Climate Team • Internal
• All External
Ongoing 
Awareness and Engagement 
Actions Lead Stakeholders Timeframe
01 Work collaborativly to improve data with a focus on
non-domestic buildings in order to gather
information on energy consumption, carbon
emissions, building types, and existing infrastructure
that may be incorporated into a network. 
Energy Management
Unit
• Internal
• All External
2024-2029
Page 46 of 123

Page 47

14 
02 Community surveys and stakeholder consultations to
understand local energy needs and behaviors.
Climate Team • Internal
• All External
Ongoing
03 Use media channels to promote and educate about
energy efficiency, as well as providing energy advice
and support.   
Energy Management
Unit/Communications
Team
• Internal Ongoing
04 Host workshops and training sessions to spread
awareness of the Local Heat and Energy Efficiency
Strategy.   
Climate Team • Internal Ongoing
05 Provide details of funding opportunities and financial
support schemes available to residents and
businesses.
Climate Team • Internal
• External 01
Ongoing
06 Continue with internal working group for discussing
LHEES delivery with relevant people/organisations.
Energy Management
Unit
• Internal 2023-2029
07 Engagement with Scottish Power Energy Networks
(SPEN) to identify existing grid capacity to meet heat
decarbonisations requirements and identify
innovative solutions to local grid constraints.
Energy Management
Unit
• Internal
• External 02
Ongoing 
Page 47 of 123

Page 48

15 
Building Level 
Actions Lead Stakeholders Timeframe
01 Further work to understand the scale and costings of
the specific energy efficiency retrofit works and heat
decarbonisation measures required across
Renfrewshire for domestic and non-domestic
building stock.
Energy Management
Unit/Housing Investing
Team/ Climate Team
• Internal  2024-2029
02 Set out planned projects to decarbonise heating
within buildings and housing stock. 
Energy Management
Unit/Housing Investing
Team/Planning/Buildin
g Stanadards
• Internal  Ongoing
03 Set out planned projects to improve energy efficiency
within buildings and housing stock. 
Energy Management
Unit/Housing Investing
Team
• Internal  Ongoing
04 Align with Historic Environment Scotlands ‘Historic
and Traditional Buildings’ report to ensure traditional
contruction buildings specific needs and
characteristics are taken into account.
Climate Team/Planning • Internal
• External 01
2023-2029 
Page 48 of 123

Page 49

16 
General 
Actions Lead Stakeholders Timeframe
01 Ongoing data collation and verification to
inform projects and identify high certainty
actions and low regret measures and ensure the
most current information is being used. 
Energy Management Unit • Internal  2023-2029
02 Continue to review methodology to inform
future iterations of the Strategy and the Delivery
Plan. 
Climate Team • Internal
• External 01
Ongoing 
Page 49 of 123

Page 50

17 
6. Renfrewshire Examples
6.1 Projects 
Housing Investment Team - pilot project where insulation works and fabric improvements have been carried out in conjunction with an
Air Source Heat Pump.  The project will assess whether the heat demand has been reduced sufficiently to allow a heat pump to run at
lower or at least equal costs for the tenant as a gas combi boiler (Wenlock Road, Paisley).
Renfrewshire are also working on various work programmes outwith the regeneration programme which is detailed below in section 6.2.  
The Council were granted funding from the Social Housing Net Zero Heat Fund (SHNZHF).  The project will aim to deliver energy
efficiency measures and low emission heating and will allow the Council to assess whether this is something which can feasibly be rolled
out to the wider housing stock.
To achieve a sufficient reduction in heat loss and heat demand, designs using passive house principles will be produced and then the
homes will be retrofitted with a package of energy efficiency improvements which will include external wall insulation, loft insulation,
roof replacement with integrated Solar PV arrays, new energy efficient windows and doors and other related works such as Mechanical
Ventilation with Heat Recovery (MVHR) systems. Individual Air Source Heat Pumps will then be installed to replace existing Gas
Combination Boilers.
Of the 12,000 properties within the housing stock, around 10,000 of these have gas combi boilers installed, and currently these are the
cheapest, most controllable systems for tenants.  It is important to note the risk that changing to lower carbon heating systems before
reducing the demand, could put tenants into fuel poverty.  Over a period of time the boilers will have a replacement programme but it is
important to find the balance between meeting carbon targets and fuel poverty.
Page 50 of 123

Page 51

18 
Various capital programmes will include returning to properties where external wall insultation and new roofs over the last 10 years were
installed, to now install PV panels, top up loft insulation and install new windows.  A large scale window replacement programme of all
our housing stock will also be progressing.
6.2 Housing-led Regeneration Programme 
Our Housing Regeneration and Renewal Programme will improve the quality of housing in eight areas across Renfrewshire.  We are
taking forward a £100m ten-year investment programme to help improve council housing within Renfrewshire by creating modern,
affordable, high-quality, energy-efficient council homes. Phase 1 will focus on eight areas across Paisley, Renfrew and Johnstone. 
The programme will make major improvements to existing buildings, but it is about much more than that - we will also consider how to
improve the wider environment, including outside and communal areas, and how to keep fuel bills down by making homes more
energy-efficient. As well as improvements to existing homes, we are building around 350 new council homes across four of the areas.
Residents were consulted in summer 2021 on the initial plans for their area, and changes were made to the plans based on the
responses to that. 
This will in most cases include measures such as: 
• new roofs, including new roof trims, gutters and rainwater pipes, and the addition of solar panels;
• external wall insulation; 
• new close doors, repainted closes and repairs to stair treads;
• (in some cases) new windows; 
Further details of the programme can be found on our website at:  Housing-led Regeneration Programme 
Page 51 of 123

Page 52

19 
6.3  New Build Homes Programme 
70 new build affordable homes will be delivered as part of the Howwood Road Area regeneration in Johnstone with a further 60
affordable homes to be constructed at Gallowhill, Paisley. These homes will be delivered to Gold Aspects 1 – 8 of the Scottish Technical
Standards (domestic) in terms of sustainability with Air Source Heat Pumps being the primary source of heating complimented
mechanical ventilation heat recovery and solar panels. These homes will also be digitally enabled. 
The Council’s new build housing specification requires that our new build homes meet Gold Aspects 1 – 8 of the Scottish Technical
Standards (Domestic) as a minimum with the primary source of heating provided by Air Sourced Heat Pumps. Where suitable Ground
Sourced Heat Pumps and district heating systems will be used.
6.4  ECO Flex 4 
Renfrewshire’s Energy Management Unit manage the ECO Flex 4 funding scheme.  The Energy Company Obligation (ECO Flex 4) is a
scheme where funding is available to make eligible homes more energy efficient.  It applies to: 
• private housing in Renfrewshire
• fuel-poor households that do not meet criteria for other schemes
• low-income or vulnerable households that are vulnerable to the effects of the cold
• energy inefficient homes who may benefit from heating and energy saving measures. 
The scheme does not apply to Council Housing or Registered Social Landlords. 
Further details of the scheme can be viewed on our website at:  Funding to make homes more energy efficient (ECO4 Flex) 
Page 52 of 123

Page 53

20 
6.5  Energy Advocacy Advice 
Renfrewshire Council have been providing Energy Advocacy since 2012.  The energy advocates support residents of all tenure within
Renfrewshire.  This includes fuel debt, supplier disputes, priority service provision, supplier switching and energy usage. 
The advocates partner with a wide range of external partners in order to offer an integrated, more comprehensive and efficient service to
the advantage of our clients. Renfrewshire Council has provided Energy support to its residents for over 25 years and continues to be
very successful at providing invaluable assistance to the local community. Considering recent and expected rises on fuel costs, the
service is destined to become even more essential than ever before. 
Further details on Renfrewshire’s energy advice service can be viewed on our website at:   Renfrewshire Energy Advice 
Page 53 of 123

Page 54

21 
7. Feasibility Studies 
Renfrewshire Council obtained funding to carry out feasibility studies at a number of locations across Renfrewshire which are detailed
below.  These initial areas were identified through data analysis during the preparation of the Local Heat and Energy Efficiecy Strategy
identifying as having the high heat demand, being close to an energy source and in the presence of public buildings as potential achor
loads.  The areas not currently within the first phase heat network zone will be looked at in closer detail to identify opportunities for
smaller scale networks or communal heat sources. 
7.1 Paisley East/Paisley West/Paisley Central
East 
There is an opportunity for a new heat network around the Abbey in Paisley, making use of air source heat pumps at an energy centre,
with electric boiler top up. Thermal storage at the energy centre can maximise the annual heat demand to be provided by heat pumps
while backup/top-up electric boilers provide resilience and can facilitate meeting peak demands.
West 
There is an opportunity for a new heat network in West Paisley, making use of wastewater (sewer) source heat pumps and air source
heat pumps at an energy centre adjacent to George Court, with electric boiler top up. Thermal storage at the energy centre can
maximise the annual heat demand to be provided by heat pumps while back-up/top-up electric boilers provide resilience and can
facilitate meeting peak demands.
Central 
There is an opportunity for a new network in Paisley Central, making use of waste heat recovery and wastewater source heat pumps
alongside air source heat pumps at an energy centre adjacent to Renfrewshire House, with electric boiler top up. Thermal storage at the
Page 54 of 123

Page 55

22 
energy centre can maximise the annual heat demand to be provided by heat pumps while back-up/top-up electric boilers provide
resilience and can facilitate meeting peak demands.
7.2 Paisley North – Advanced Manufacturing Innovation District Scotland (AMIDS) 
There is an opportunity for to extend the existing AMIDS wastewater heat recovery heat network to Glasgow Airport making use of water
source heat pumps at each building supplied by AMIDS as the main source of heat. Buffer vessels at each building can maximise the
annual heat demand to be provided by AMIDS while back-up/top-up electric boilers provide resilience and can facilitate meeting peak
demands. 
Following the results and findings of the Paisley Central and Paisley North (AMIDS) feasibility studies, Renfrewshire are progressing with
outline business case applications to the Heat Network Support Unit which would enable Renfrewshire Council to further develop the
opportunities which have been identified at a scale and will also enable knowledge sharing and lessons learned that can be applied
across Scotland. 
7.3 Johnstone 
The proposed location for the district heat network (DHN) was Howwood Road area, within the area several buildings were identified as
having the potential for district heat connection. The main buildings identified for the pre-feasibility report include Johnstone High
School, Johnstone Community Sports Hub, Fordbank Primary School and West Johnstone Shared Campus. In addition, it was proposed
a number of residential sites should also be considered within the DHN; two sites owned by Linstone Housing Association, one site
owned by the council near Howwood Road. 
The conclusion from the study determined that the area is not heat dense and a heat network solution may not be the most cost-
effective approach in this specific scenario. It was recommended to consider other routes to net-zero. For example, consider an options
appraisal for discrete scale, as buildings connected in a localised area, and building-level low-carbon heat such as ASHP.
Page 55 of 123

Page 56

23 
An options appraisal for routes to net zero could include considerations on the following: 
• Discrete scale heat networks and building-level low-carbon heat with low-carbon heat technologies
• Energy efficiency opportunities, including heat demand reduction measures, heating system control
• Consider complementary renewable low-carbon electricity technology (e.g. PV for on-site electricity generation)
• Building condition survey – assess heat equipment age and condition (replacement plans), opportunities to reduce heat operating
temperatures building-side, connect with survey for energy efficiency measure opportunities.
• Consider funding opportunities for discrete scale heat networks and building-level improvements – low-carbon and energy efficiency. 
Ultimately, although heat networks are an efficient means to distribute low-carbon heat, they are not the only solution to achieve low-
carbon heating. It is equally valid to consider building-level and discrete scale low-carbon heat opportunities as part of the Council’s
route to net zero.
7.4 Foxbar 
The conclusion from the study determined that the area is not heat dense and a heat network solution may not be the most cost-
effective approach in this specific scenario. It was recommended to consider other routes to net-zero. For example, consider an options
appraisal for building-level low-carbon heat technologies such as individual ASHP. 
An options appraisal for routes to net zero could include consideration of: 
• Building-level low-carbon heat with low-carbon heat technologies
• Energy efficiency opportunities, including heat demand reduction measures, and heating system control
• Consider complementary renewable low-carbon electricity technology (e.g. PV for on-site electricity generation)
• Building condition survey – assess heat equipment age and condition (replacement plans), opportunities to reduce heat operating
temperatures building-side, connect with survey for energy efficiency measure opportunities
• Funding opportunities for building-level improvements – low-carbon and energy efficiency 
Ultimately, although heat networks are an efficient means to distribute low-carbon heat, they are not the only solution to achieve low-
carbon heating. It is equally valid to consider building-level low-carbon heat opportunities as part of Renfrewshire’s route to net zero.
Page 56 of 123

Page 57

24 
Appendix 1 – Glossary of terms 
Terms Description 
Anchor Loads
Buildings with significant heat demands that are critical to making a heat network viable and have high
potential to be one of the first connected demands on a network. 
Baselining
A fixed point of reference for reference for comparison. For LHEES this is to understand at local authority or
strategic level, the current status of all building stock against the LHEES Considerations. 
Building-level Pathway
The outcome of assessment to provide the likely energy efficiency retrofit technologies, as well as the low
carbon heating system (where applicable) to support building level decarbonisation. 
Carbon Dioxide
The most abundant greenhouse gas (making up around ⅔ of greenhouse gases). It is naturally occurring but
is also a by-product of human activities such as burning fossil fuels, land-use changes and other industrial
processes and contributes to climate change and global warming. It is the reference gas against which other
greenhouse gases are measured.
Carbon Dioxide Equivalent
(CO2e)
A metric measure used to compare the emissions from various greenhouse gases based upon their global
warming potential (GWP). 
Carbon Emissions The release of carbon dioxide (CO2) into the atmosphere. 
Carbon Offsetting
The process of compensating for carbon dioxide emissions arising from activities by participating in schemes
which remove equivalent levels of carbon dioxide in the atmosphere, e.g. tree planting, carbon capture,
peat bogs. 
Climate Change
Refers to any significant change in the measures of climate lasting for an extended period of time, including
major changes in temperature, rainfall and severe weather patterns that occur over several decades or
longer.
Data Zone Output areas which have populations of around 500 to 1,000 residents. 
Page 57 of 123

Page 58

25 
Decarbonisation
The reduction or removal of carbon dioxide (CO2) into the atmosphere resulting from human activity, with
the eventual goal of minimising emissions as far as possible. 
Delivery Area
Areas at a higher granularity (higher level of detail) than Strategic Zones. These spatial zones should set out
clusters of buildings within a Strategic Zone that identify potential solution(s) at a delivery level. They will be
an important starting point for identifying a range of projects, regulation and actions to be developed in the
LHEES Delivery Plan. 
Energy Performance
Certificate (EPC)
Gives information on how energy efficient a building (including homes) is; how it could be improved; and an
environmental impact rating to show CO2 emissions. Buildings are rated on a scale of A to G, with A being
the most energy efficient. An EPC is required for new buildings/homes; when you are selling a building/home;
or when renting to a new tenant.
Fossil Fuels Non-renewable energy sources formed from fossilised plants and animals over millions of years such as
coals, oil and gas.
Fuel Poverty Defined as any household spending more than 10% of their income on energy after housing costs have been
deducted.
Greenhouse Gases Any gas that absorbs infrared radiation in the atmosphere and contribute to global warming and climate
change.
Intermediate Zone Statistical geographical areas (2,500 - 6,000 household residents) within local authorities, built up from
aggregates of data zones. 
Page 58 of 123

Page 59

26 
LHEES Considerations
The LHEES Considerations are a list of technologies, building typologies and policy priorities used to
identify and target interventions. They include:
- Heat networks
- Off-gas grid buildings
- On-gas grid buildings
- Poor building energy efficiency
- Poor building energy efficiency as a driver for fuel poverty 
- Mixed-tenure, mixed-use and historic buildings 
LHEES Delivery Plan A document setting out how a local authority proposes to support implementation of its local heat and
energy efficiency strategy. 
Linear Heat Density
A measure of heat load per meter of district heating pipework. In short, this approximates how much
revenue a branch of a network can generate for a given capital cost.
Low Temperature District
Heating Network
Reduces the amount of energy lost converting and transporting heat to buildings.
Net Zero Emissions When greenhouse gas emissions are balanced by removals over a specified period. 
Resilience
The capacity to anticipate, prepare for, respond to, absorb and recover from the stresses imposed by
climate change from significant multi- hazard threats with minimum damage to social well-being, the
economy and the environment. 
Strategic Zone
A visualisation of the potential pathways to decarbonise the building stock at a local authority level, split
out by intermediate zone or data zone. These are useful to understand the baseline performance, the
scale of potential and initial areas of focus, which could be used to inform Delivery Areas and follow on
engagement.
Page 59 of 123

Page 60

27 
Wet central heating system
A system with central heat source (usually a boiler) that produces hot water which is distributed around the
building, heating radiators and can be used for hot waters from hot taps and showers. 
Page 60 of 123

Page 61

28 
Appendix 2 – Stakeholders 
Renfrewshire Council - Internal Stakeholders
Councillors
Infrastructure, Land and Environment Policy Board 
Planning and Climate Policy Board
Housing Services
Property Services
Planning and Building Standards
Corporate Governance - Legal Services
Finance and Procurement
City Deal and Infrastructure
Regeneration and Economic Development
LHEES Officers Working Group
Climate Team
Energy Management Unit 
Page 61 of 123

Page 62

29 
Renfrewshire Council - External Stakeholders
01. National • Scottish Government
• Energy Saving Trust
• Coal Authority
• Historic Environment Scotland
• Scottish Environmental Protection Agency
• NatureScot
• National Trust for Scotland
• Zero Waste Scotland
• Viridor (Energy from Waste – Clyde Valley Waste Partnership)
• Energy Savings Trust Scotland
• Home Energy Scotland
• Scottish Futures Trust
• Community Energy Scotland
• Local Energy Scotland
• Scottish Local Authority LHEES Forum 
02. Energy/Utilities  • Scottish Power Energy Networks
• Scottish Gas Network
• Scottish Water 
03. Housing Associations • Bield
• Blackwood
• Bridgewater
• Cairn
• Ferguslie Park
• Hanover
• Horizon
• Key
Page 62 of 123

Page 63

30 
• Link
• Linstone
• Loretto
• Paisley
• Sanctuary
• Williamsburgh 
04. Community Planning Partners • OneRen
• University of the West of Scotland
• West College Scotland
• NHS
• Police Scotland
• Scottish Fire and Rescue
• Renfrewshire Health and Social Care Partnership
• Renfrewshire Chamberof Commerce
• Engage Renfrewshire
• Scottish Enterprise
• Skills Development Scotland 
• Clyde Muirshiel Regional Park Authority 
05. Skills and Supply Chains • Schools
• Colleges
• Universities 
• Training providers
• Apprenticeship providers
• Local employers 
Page 63 of 123

Page 64

31 
06. Other Key Interest Groups • Community Councils
• Community Groups
• Local Partnership Areas
• Care Homes and Nursing Homes
• Tenants Groups
• Developers
• Third Sector Organisations 
• Local Businesses
• Large Businesses (Potential Anchor Loads)
• Industry (potential Anchor Loads and Potential Waste Heat)
• Neighbouring Local Authorities 
Page 64 of 123

Page 65

32 
Appendix 3 – National Policies 
Climate Change (Emissions Reduction Targets)
(Scotland) Act 2019 Sets a 2045 net zero emissions target and interim targets: 75% by 2030; and 90% by 2040.
Climate Change Plan: third report on
proposals and policies 2018-2032 (RPP3)
Sets out the path to a low carbon economy while helping to deliver sustainable economic growth
and secure the wider benefits to a greener, fairer, and healthier Scotland in 2032.
Draft Energy Strategy and Just Transition Plan Sets out clear policy positions and a route map of actions with a focus out to 2030 that the
Scottish Government will take and the changes that the UK Government must deliver.
Energy efficiency in social housing
Aims to improve the energy efficiency of social housing in Scotland. It will help to reduce energy
consumption, fuel poverty and the emission of greenhouse gases. It is based on the minimum
Energy Performance Certificate (EPC) rating.  All social
housing must meet, or be treated as meeting, EPC band B, or is as energy efficient as practically
possible, by December 2032.
Fuel Poverty (Targets, Definition and Strategy)
(Scotland) Act 2019
Sets targets relating to the eradication of fuel poverty; to define fuel poverty; to require the
production of a fuel poverty strategy; and to make provision about reporting on fuel poverty. 
no more than 5% of households in Scotland are in fuel poverty, 
no more than 1% of households in Scotland are in extreme fuel poverty, 
the median fuel poverty gap of households in Scotland in fuel poverty is no more than £250.
Heat Networks (Scotland) Act 2021  Regulates heat networks, supporting objectives in the Heat in Buildings Strategy to grow heat
network opportunities. This strategy helps Renfrewshire meet part of its duty within the Act by
identifying potential heat network zones.
Heat in Buildings Strategy
Sets out our vision for the future of heat in buildings, and the actions we are taking in the
buildings sector to deliver our climate change commitments, maximise economic opportunities,
and ensure a just transition, including helping address fuel poverty.
Housing to 2040
Sets out a vision for housing in Scotland to 2040 and a route map to get there. It aims to deliver
our ambition for everyone to have a safe, good quality and affordable home that meets their
needs in the place they want to be.
Page 65 of 123

Page 66

33 
National Planning Framework 4
Sets out spatial principles, regional priorities, national developments, and national planning
policy.  How Scotland will work together in the coming years to improve people’s lives by making
sustainable, liveable, and productive places. 
Central Scotland Priorities: 
To deliver sustainable places, Regional Spatial Strategies and Local Development Plans in this
area should support net zero energy solutions including extended heat networks and improved
energy efficiency, together with urban greening and improved low carbon transport. 
To deliver liveable places, Regional Spatial Strategies and Local Development Plans in this area
should pioneer low carbon, resilient urban living by rolling out networks of 20-minute
neighbourhoods, future proofing city and town centres, accelerating urban greening, investing in
net zero homes, and managing development on the edge of settlements. 
To deliver productive places, Regional Spatial Strategies and Local Development Plans in this
area should target economic investment and build community wealth to overcome disadvantage
and support a greener wellbeing economy. 
Across these priorities, there is a need for greater investment in, and development of, net zero
homes and places supporting green jobs. Local Development Plans and strategies like Local Heat
and Energy Efficiency Strategies will focus on decarbonising heat and energy networks, and the
just transition to greener, low carbon heat generation. 
Page 66 of 123

Page 67

34 
Appendix 4 – Local Policies
Council Plan – 2022-2027
"Creating a fairer Renfrewshire built on innovation, wellbeing and opportunity". The Council Plan
sets out how the Council will collaborate with partners, communities, and business to progress
our five strategic outcomes. 
There are five strategic outcomes: place, economy, fair, green, and living our values. 
Housing-led Regeneration and Renewal
Programme
A £100m ten-year Housing-led Regeneration and Renewal Programme aimed at delivering
modern, high quality, energy-efficient and affordable council housing throughout Renfrewshire,
and creating nicer places to live. 
Renfrewshire Community Plan 2017-2027
Developed together and signed up to by key public, private and third sector organisations. It
marks a shared responsibility to work together to get things right for people in Renfrewshire, and
a real commitment to addressing the inequalities that exist. 
The content of Our Renfrewshire is the result of conversations with partners and local people
about opportunities, challenges, and aspirations, informed by a comprehensive data and
evidence set. 
Renfrewshire Economic Strategy 2020-2030
Sets out the ambitions and actions to achieve sustained, inclusive growth of the Renfrewshire
economy over the next 10 years. 
Renfrewshire Local Development Plan Sets out the spatial strategy and proposals for Renfrewshire over the next 10 years. 
Renfrewshire Local Housing Strategy 2023-
2028
Sets out the strategic approach of the Council and its partners to delivering high quality housing
and housing related services across all tenures to meet identified housing need in Renfrewshire. 
Page 67 of 123

Page 68

35 
Renfrewshire’s Plan for Net Zero
Developed in collaboration with all our stakeholders, we are committed to working towards net
zero by 2030 for the whole of Renfrewshire to ensure a safer, healthier, greener, and fairer place
for everyone to live, work and spend time in. 
Renfrewshire Strategic Housing Investment
Plan
Identifies affordable housing projects which are to be supported by Scottish Government
funding and sets out how this investment will be targeted to meet the strategic priorities of
Renfrewshire’s Local Housing Strategy. 
Vacant and Derelict Land Strategy The strategy identifies actions to promote the redevelopment and/or re-use of brownfield and
previously used land to enhance places and support sustainable economic growth.
Page 68 of 123

Page 69

Environment, Housing & Infrastructure 
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR 
Page 69 of 123

Page 70

___________________________________________________________________
To:  Infrastructure, Land & Environment Policy Board
On:  28 August 2024
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Lease of land for a substation – Paisley Grammar School
Community Campus
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to seek approval to enter into a lease with
SP Distribution PLC (Registered Number SC189125) (“SPD”) for a
substation at Paisley Grammar School Community Campus, shown
outlined in red on plan 619332947-(1)-002 included as part of this
report (“the Plan”) (“the Proposed Lease”). 
___________________________________________________________________ 
2. Recommendations 
It is recommended that the Infrastructure, Land & Environment Policy Board: 
2.1 approves the Proposed Lease between the Council and SPD based on
the contents of this report;
2.2 agrees to declare the property surplus outlined in red on the Plan
included as part of this report (“the Property”);
2.3  agrees to lease the Property to SPD, along with rights for appropriate
cabling and access routes, subject to the Director of Environment,
Housing and Infrastructure agreeing their exact location and subject to
the terms and conditions detailed within the body of this report and;
Item 5
Page 70 of 123

Page 71

2.4 grants authority to the Head of Corporate Governance in conjunction with
the Director of Environment, Housing and Infrastructure to make minor
alterations including any other reasonable terms and conditions
considered necessary to the documents, (being the Offer to Lease,
Proposed Lease and the Plan to reflect the final agreed substation
orientation and rights of access and cabling routes) and to conclude
missives in respect of the Offer to Lease and sign the Proposed Lease
of the Property as detailed in this report.  
_________________________________________________________
3. Background
3.1 The Council requires to replace the existing Paisley Grammar School
and seeks to integrate the school with both the local community and
enterprise organisations to form a new Paisley Grammar School
Community Campus at 111-113 Renfrew Road, Paisley. The Council
entered into a building contract for the main works on 4th June 2024 and
works commenced on 17 June 2024 with a completion date of 12 June
2026.   
3.2 The new school will require the installation of a new electrical substation
to provide a new power connection (main supply) to the building. The
main supply will also support safety-critical systems for the operation of
the fire alarm, sprinklers, intruder alarm, emergency lighting and access
control. 
3.3 The location of the Property, being the substation site, is within land
owned by the Council and will be housed in the school service courtyard
to the west of the site.  Part of the design for Paisley Grammar School
Community Campus provided an adjacent access road and turning circle
to allow unobstructed access and maintenance rights.     
4 Provisional Terms and Conditions 
4.1  The Property is required to provide power to Paisley Grammar School
Community Campus. 
4.2 The Council will lease the land extending to 25 square metres or thereby
which is shown edged red on the Plan, together with rights for (i)
installing, maintaining and using electricity lines, telephone signalling,
fibre optic cables and ancillary equipment and other conducting media
with the conduits or pipes for containing the same within in, through and
over the Property and/or Paisley Grammar School Community Campus
along the routes shown coloured yellow on the Plan and; (ii)  access to
Page 71 of 123

Page 72

and egress from the Property over Paisley Grammar School Community
Campus with or without vehicles, machinery or apparatus along the
routes shown coloured pink on the Plan.
4.3 The rent will be £1 per annum, if demanded. 
4.4 The Proposed Lease term will be 175 years.
4.5 The date of entry is expected to be mid-October 2024 which is required
to maintain an ambitious delivery programme for Paisley Grammar
School Community Campus.
4.6 The Proposed Lease is subject to normal commercial terms including
SPD indemnifying the Council for any bodily harm or damage to the
Paisley Grammar School Community Campus and making good any
damage.
4.7  The Proposed Lease includes an obligation on the Council not to (One)
erect any building or  grow any trees (i) over the cable route or within a
lateral distance of three metres measuring from the centre line thereof or
(ii) which are likely to adversely affect the electric lines or SPD’s access
thereto and SPD shall be entitled to lop any such trees causing or likely
to cause interference to the electric lines and the Property and (Two)
alter the existing ground levels along the cable route or to obstruct in any
way SPD’s access to the Property. 
___________________________________________________________________
Implications of the Report
1. Financial - The rent will be £1 per annum, if demanded. 
2. HR & Organisational Development – Not applicable. 
3. Community/Council Planning –   
• Reshaping our place, our economy and our future - The work
from the design to the main works will create many employment
opportunities across Renfrewshire.  The Community Campus itself
will redevelop an empty space and it will provide a base for learning
and development for current and future generations.  
• Building strong, safe and resilient communities - The new
Paisley Grammar School Community Campus not only operates as
a school; it will also provide facilities for use by the community and
Page 72 of 123

Page 73

partner organisations. This will help nurture and bring communities
together. 
• Tackling inequality, ensuring opportunities for all - The work and
objectives of this project have the power to tackle inequalities that
exist in Renfrewshire throughout all communities.  It has the ability to
deliver opportunities for all, through Community Benefits and the
wider work of the project. 
• Creating a sustainable Renfrewshire for all to enjoy - The new
Paisley Grammar School Community Campus will provide a fresh
new learning base for over a thousand young people with internal
environmental quality of a high standard.  It will give back to the
communities that it serves by providing space for public use in a
sustainably designed, low energy building. 
• Working together to improve outcomes - The new Paisley
Grammar School Community Campus will deliver many outcomes
throughout its lifetime through the strengthening of the partnership
working between school and community, providing good quality
services, and new ICT developments and opportunities. 
4. Legal – The Proposed Lease of the Property as outlined in the body of
the report. 
5. Property/Assets – As per this report. 
6. Information Technology – Not applicable.  
7. Equality & Human Rights - 
The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report. 
If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website. 
8. Health & Safety – Not applicable. 
9. Procurement – None. 
Page 73 of 123

Page 74

10. Risk - The Property is leased subject to the conditions of the Proposed
Lease. Failure to agree and enter into the Proposed Lease will mean
Paisley Grammar School Community Campus will not have the
necessary power to operate the building and support safety-critical
systems.
11. Privacy Impact - None. 
12. Climate Risk- Tackling Climate Change and working towards
Renfrewshire’s plan for Net Zero have been considered throughout the
Paisley Grammar School Community Campus Project.  This will be the
first Passivhaus School in Renfrewshire, which is supporting the
Councils vision and work of becoming net zero by 2030.  
The environmental impacts considered are broad and range from the
disposal of waste generated from the works being carried out to the types
of vehicles and machinery that will be used on site.  The contractor will
be required to consider emissions from their vehicles when working on
site and to switch engines off when not in use to prevent unnecessary
emissions.   
13. Children’s Rights - Positive impact on children’s lives as the substation
is an integral part of powering Paisley Grammar School Community
Campus for the delivery of an environment which is inclusive, safe and
engenders a culture of respect based on the values and tradition of
Paisley Grammar.  
14. Cosla Policy Position – Not applicable.  
_______________________________________________________
List of Background Papers- None.   
___________________________________________________________________ 
Author:         Aileen Johnston, Estates Lead, Email: aileen.johnston@renfrewshire.gov.uk and Victoria
Willan, Senior Solicitor (Projects & Property), Email:
victoria.willan@renfrewshire.gov.uk   
Page 74 of 123

Page 75

Drg. No. Rev.
Status
A3
Check'dDrawnRev Date Appr'd
Title
ProjectAppr'd DateScaleDrawn Check'd
ScottishPower Reference:
Client
PAISLEY GRAMMAR SCHOOL
RENFREW ROAD, PAISLEY, PA3 4DY
SUBSTATION
LEASE
LEASE
619332947-(1)-002 A619332947
0m 25m 50m 75m 100m
Scale - 1:1250
SEE SUBSTATION
DETAIL
SUBSTATION DETAIL
SCALE  1:250
Page 75 of 123

Page 76

___________________________________________________________________
To: Infrastructure Land & Environment Policy Board 
On: 28 August 2024
___________________________________________________________________
Report by:   Chief Executive
___________________________________________________________________
Heading: Shop at 4 Blackford Road, Paisley 
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek approval to a new lease of 4 Blackford Road,
Paisley to TCTrading (Scotland) Ltd. 
________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Infrastructure Land & Environment Policy Board
approve a new lease of 4 Blackford Road, Paisley to TCTrading (Scotland) Ltd
based on the contents of this report.
_________________________________________________________
3. Background 
3.1 The shop at 4 Blackford Road, Paisley has been vacant since August 2023. It
was subsequently marketed as available for lease and a closing date for offers
was set on 28 June 2024. Offers of rent in the region of £9,500 per annum were
sought for this 800 square foot property. Two offers to lease were received in
accordance with the closing date arrangement. 
3.2 The two offers received have been assessed and the proposal is to conclude a
lease with TCTrading (Scotland) Ltd on the following main terms and conditions. 
o The lease shall be for a period of 15 years and shall be on the Council’s
standard full repairing and insuring lease.
Item 6
Page 76 of 123

Page 77

o The initial rent shall be £9,500 per annum, with rent reviews on a 5 yearly
cycle. 
o A 3 month rent free period shall be granted at the start of the lease in
recognition of investment works to be undertaken at the property by the
tenant.
 
o The property shall trade as a Pharmacy.
 
o The tenant is responsible for obtaining all appropriate Health Board,
planning, licensing and statutory consents required in connection with the
proposed use.
 
o The Tenant shall meet the Council’s reasonable legal expenses incurred
in concluding the lease. 
 
o If the lease is not concluded within 6 months of the date of this Board, the
property shall be remarketed for lease. 
o Any other reasonable terms and conditions considered necessary by the
Head of Corporate Governance. 
___________________________________________________________________
Implications of the Report 
1. Financial – Annual rental of £9,500 to be received. 
 
2. HR & Organisational Development – None. 
3. Community Planning – Secures long term tenancy in vacant commercial.
property. 
4. Legal – New lease required. 
 
5. Property/Assets – As per this report. 
6. Information Technology – None. 
7. Equality & Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have been
identified arising from the recommendations contained in the report because no
groups or individuals have any involvement currently at the property. If required
following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health & Safety – None.
Page 77 of 123

Page 78

9. Procurement – Not applicable. 
10. Risk – None. 
11. Privacy Impact – Not applicable. 
12. Climate Risk – Not applicable. 
13. Children’s Rights – Not applicable. 
14. Cosla Policy Position – Not applicable. 
_________________________________________________________
List of Background Papers – None. 
___________________________________________________________________ 
Author:   andrew.smith@renfrewshire.gov.uk; 07534 154048 
Page 78 of 123

Page 79

Page 79 of 123

Page 80

___________________________________________________________________
To: Infrastructure Land & Environment Policy Board 
On: 28 August 2024
___________________________________________________________________
Report by:   Chief Executive
___________________________________________________________________
Heading: Unit 7 Abercorn Street, Paisley 
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek approval to a new lease of Unit 7 Abercorn
Street, Paisley to Mr Ronald Easton. 
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Infrastructure Land & Environment Policy Board
approve a new lease of Unit 7 Abercorn Street, Paisley to Mr Ronald Easton
based on the contents of this report.
_________________________________________________________
3. Background 
3.1 Unit 7 Abercorn Street, Paisley has been vacant since March 2023. It was
subsequently marketed as available for lease and a closing date for offers was
set on 28 June 2024. Offers of rent in the region of £4,000 per annum were
sought for this 500 square foot industrial unit. Two offers to lease were received
in accordance with the closing date arrangement. 
3.2 The two offers received have been assessed and the proposal is to conclude a
lease with Mr Ronald Easton on the following main terms and conditions. 
o The lease shall be for a period of 3 years and shall be on the Council’s
standard full repairing and insuring lease.
o The initial rent shall be £4,500 per annum. 6 months rent shall be paid in
advance on the date of entry.
Item 7
Page 80 of 123

Page 81

o A 1 month rent free period shall be granted at the start of the lease in
recognition of works to be undertaken at the property by the tenant.
o The property shall be used as storage for a building company.
o The tenant is responsible for obtaining all appropriate planning and
statutory consents required in connection with the proposed use.
o The Tenant shall meet the Council’s reasonable legal expenses and
outgoings incurred in concluding the lease. 
o If the lease is not concluded within 6 months of the date of this Board,
the property shall be remarketed for lease.
o Any other reasonable terms and conditions considered necessary by the
Head of Corporate Governance. 
___________________________________________________________________
Implications of the Report
1. Financial – Annual rental of £4,500 to be received. 
 
2. HR & Organisational Development – None. 
3. Community Planning – Secures long term tenancy for vacant unit. 
4. Legal – New lease required. 
 
5. Property/Assets – As per this report. 
6. Information Technology – None.
7. Equality & Human Rights
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have
been identified arising from the recommendations contained in the report
because no groups or individuals have any involvement currently at the property.
If required following implementation, the actual impact of the recommendations
and the mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health & Safety – None.
9. Procurement – Not applicable.
10. Risk – None.
11. Privacy Impact – Not applicable.
12. Cosla Policy Position – Not applicable. 
Page 81 of 123

Page 82

13. Climate Risk – Not applicable. 
14.  Children’s Rights – Not applicable. 
________________________________________________________
List of Background Papers – None. 
___________________________________________________________________ 
Author:            andrew.smith@renfrewshire.gov.uk; 07534 154048 
Page 82 of 123

Page 83

Page 83 of 123

Page 84

___________________________________________________________________
To: Infrastructure Land & Environment Policy Board 
On: 28 August 2024
___________________________________________________________________
Report by:   Chief Executive
___________________________________________________________________
Heading: Unit 8 Abercorn Street, Paisley 
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek approval to a new lease of Unit 8 Abercorn
Street, Paisley to Rise & Grind Roasting Ltd. 
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Infrastructure Land & Environment Policy Board
approve a new lease of Unit 8 Abercorn Street, Paisley to Rise & Grind Roasting
Ltd based on the contents of this report.
_________________________________________________________
3. Background 
3.1 Unit 8 Abercorn Street, Paisley has been vacant since March 2023. It was
subsequently marketed as available for lease and a closing date for offers was
set on 28 June 2024. Offers of rent in the region of £7,500 per annum were
sought for this 1,000 square foot industrial unit. Two offers to lease were received
in accordance with the closing date arrangement. 
3.2 The two offers received have been assessed and the proposal is to conclude a
lease with Rise & Grind Roasting Ltd on the following main terms and conditions. 
o The lease shall be for a period of 3 years and shall be on the Council’s
standard full repairing and insuring lease. 
o The initial rent shall be £7,700 per annum.
Item 8
Page 84 of 123

Page 85

o A 4 month rent free period shall be granted at the start of the lease in
recognition of works to be undertaken at the property by the tenant. 
o The property shall be used as a coffee roastery & storage. 
o The tenant is responsible for obtaining all appropriate planning and
statutory consents required in connection with the proposed use. 
o The Tenant shall meet the Council’s reasonable legal expenses and
outgoings incurred in concluding the lease. 
o If the lease is not concluded within 6 months of the date of this Board, the
property shall be remarketed for lease. 
o Any other reasonable terms and conditions considered necessary by the
Head of Corporate Governance.
___________________________________________________________________
Implications of the Report 
1. Financial – Annual rental of £7,700 to be received. 
 
2. HR & Organisational Development – None. 
3. Community Planning – Secures long term tenancy for vacant commercial unit. 
4. Legal – New lease required. 
 
5. Property/Assets – As per this report 
6. Information Technology – None. 
7. Equality & Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have been
identified arising from the recommendations contained in the report because no
groups or individuals have any involvement currently at the property. If required
following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health & Safety – None. 
9. Procurement – Not applicable. 
10. Risk – None. 
11. Privacy Impact – Not applicable. 
Page 85 of 123

Page 86

12. Cosla Policy Position – Not applicable. 
13. Climate Risk – Not applicable. 
14. Children’s Rights – Not applicable.
________________________________________________________
List of Background Papers – None. 
___________________________________________________________________ 
Author:            andrew.smith@renfrewshire.gov.uk; 07534 154048 
Page 86 of 123

Page 87

Page 87 of 123

Page 88

___________________________________________________________________
To: Infrastructure Land & Environment Policy Board 
On: 28 August 2024
___________________________________________________________________
Report by:   Chief Executive
___________________________________________________________________
Heading: Unit 12 Abercorn Street, Paisley 
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek approval to a new lease of Unit 12 Abercorn
Street, Paisley to Mr Luke McGowan. 
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Infrastructure Land & Environment Policy Board
approve a new lease of Unit 12 Abercorn Street, Paisley to Mr Luke McGowan
based on the contents of this report.
_________________________________________________________
3. Background 
3.1 Unit 12 Abercorn Street, Paisley has been vacant since February 2024. It was
subsequently marketed as available for lease and a closing date for offers was
set on 28 June 2024. Offers of rent in the region of £4,000 per annum were
sought for this 500 square foot industrial unit. Two offers to lease were received
in accordance with the closing date arrangement. 
3.2 The two offers received have been assessed and the proposal is to conclude a
lease with Mr Luke McGowan on the following main terms and conditions. 
o The lease shall be for a period of 2 years and shall be on the Council’s
standard full repairing and insuring lease. 
o The initial rent shall be £3,900 per annum. 6 months rent shall be paid in
advance on the date of entry.
Item 9
Page 88 of 123

Page 89

o The property shall be used as a home furnishings company. 
o The tenant is responsible for obtaining all appropriate planning and
statutory consents required in connection with the proposed use. 
o The Tenant shall meet the Council’s reasonable legal expenses and
outgoings incurred in concluding the lease. 
o If the lease is not concluded within 6 months of the date of this Board, the
property shall be remarketed for lease. 
o Any other reasonable terms and conditions considered necessary by the
Head of Corporate Governance.
___________________________________________________________________
Implications of the Report 
1. Financial – Annual rental of £3,900 to be received. 
 
2. HR & Organisational Development – None. 
3. Community Planning – Secures new tenancy for vacant commercial unit. 
4. Legal – New lease required. 
 
5. Property/Assets – As per this report. 
6. Information Technology – None. 
7. Equality & Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have been
identified arising from the recommendations contained in the report because no
groups or individuals have any involvement currently at the property. If required
following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health & Safety – None. 
9. Procurement – Not applicable. 
10. Risk – None. 
11. Privacy Impact – Not applicable.
12. Climate Risk – Not applicable.
Page 89 of 123

Page 90

13. Children’s Rights - Not applicable.
14. Cosla Policy Position – Not applicable. 
_________________________________________________________
List of Background Papers – None. 
___________________________________________________________________ 
Author:    andrew.smith@renfrewshire.gov.uk; 07534 154048 
Page 90 of 123

Page 91

Page 91 of 123

Page 92

___________________________________________________________________
To: Infrastructure Land & Environment Policy Board 
On: 28 August 2024
___________________________________________________________________
Report by:   Chief Executive
___________________________________________________________________
Heading: Unit 15 Abercorn Street, Paisley 
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek approval to a new lease of Unit 15 Abercorn
Street, Paisley to Get Activ Coaching CIC. 
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Infrastructure Land & Environment Policy Board
approve a new lease of Unit 15 Abercorn Street, Paisley to Get Activ Coaching
CIC based on the contents of this report.
_________________________________________________________
3. Background 
3.1 Unit 15 Abercorn Street, Paisley has been vacant since February 2024. It was
subsequently marketed as available for lease and a closing date for offers was
set on 28 June 2024. Offers of rent in the region of £4,000 per annum were
sought for this 500 square foot industrial unit. Two offers to lease were received
in accordance with the closing date arrangement. 
3.2 The two offers received have been assessed and the proposal is to conclude a
lease with Get Activ Coaching CIC on the following main terms and conditions. 
o The lease shall be for a period of 10 years and shall be on the Council’s
standard full repairing and insuring lease. 
o The initial rent shall be £3,000 per annum. The rent shall be reviewed on a
5 yearly cycle.
Item 10
Page 92 of 123

Page 93

o The property shall be used as a gymnasium. 
o The tenant is responsible for obtaining all appropriate planning and
statutory consents required in connection with the proposed use. 
o The Tenant shall meet the Council’s reasonable legal expenses and
outgoings incurred in concluding the lease. 
o If the lease is not concluded within 6 months of the date of this Board, the
property shall be remarketed for lease.
 
o Any other reasonable terms and conditions considered necessary by the
Head of Corporate Governance.
___________________________________________________________________
Implications of the Report 
1. Financial – Annual rental of £3,000 to be received. 
 
2. HR & Organisational Development – None. 
3. Community Planning – Secures long term tenancy. 
4. Legal – New lease required. 
 
5. Property/Assets – As per this report. 
6. Information Technology – None. 
7. Equality & Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have been
identified arising from the recommendations contained in the report because no
groups or individuals have any involvement currently at the property. If required
following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health & Safety – None. 
9. Procurement – Not applicable. 
10. Risk – None. 
11. Privacy Impact – Not applicable. 
12. Climate Risk – Not applicable. 
Page 93 of 123

Page 94

13. Children’s Rights – Not applicable. 
14. Cosla Policy Position – Not applicable. 
_________________________________________________________
List of Background Papers – None. 
___________________________________________________________________ 
Author:            andrew.smith@renfrewshire.gov.uk; 07534 154048 
Page 94 of 123

Page 95

Page 95 of 123

Page 96

___________________________________________________________________
To: Infrastructure Land & Environment Policy Board 
On: 28 August 2024
___________________________________________________________________
Report by:   Chief Executive
___________________________________________________________________
Heading: Shop Premises at 51/53 Ivanhoe Road, Paisley 
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek approval to a new lease of 51/53 Ivanhoe
Road, Paisley to Blessing Dental Care Limited.
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Infrastructure Land & Environment Policy Board
approve a new lease of 51/53 Ivanhoe Road, Paisley to Blessing Dental Care
Limited based on the contents of this report.
_________________________________________________________
3. Background 
3.1 Blessing Dental Care Limited became the Council’s tenant at 51/53 Ivanhoe
Road, Paisley on 23 July 2024 on a short term lease at a rent of £1,250.00 per
month. 
3.2 A full, longer term lease is preferred to provide more security of tenure, and the
following terms and conditions have been provisionally agreed; 
o The existing lease shall be terminated (or amended) and the new
(amended) lease concluded at a date to be mutually agreed. 
o The lease shall be for a period of 15 years and shall be on the Council’s
standard full repairing and insuring lease.
 
Item 11
Page 96 of 123

Page 97

o The initial rent shall be £15,000 per annum, reviewable 5 yearly. 
o A 12 month rent free period shall be granted from the date of entry in the
new (amended) lease in recognition of over £100,000 of investment in
the property. 
o The property shall continue to trade as a Dental Surgery. 
o The Tenant shall meet the Council’s reasonable legal expenses incurred
in concluding the renunciation and new lease. 
o Any other reasonable terms and conditions considered necessary by the
Head of Corporate Governance.
___________________________________________________________________
Implications of the Report 
1. Financial – Annual rental of £15,000 to be received. 
 
2. HR & Organisational Development – None. 
3. Community Planning – Provides both landlord and tenant with security of tenure. 
4. Legal – New lease required. 
 
5. Property/Assets – As per this report. 
6. Information Technology – None. 
7. Equality & Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have been
identified arising from the recommendations contained in the report because no
groups or individuals have any involvement currently at the property. If required
following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health & Safety – None. 
9. Procurement – Not applicable. 
10. Risk – None. 
11. Privacy Impact – Not applicable. 
12. Cosla Policy Position – Not applicable. 
13. Climate Risk – Not applicable.
Page 97 of 123

Page 98

14. Children’s Rights – Not applicable. 
_________________________________________________________
List of Background Papers - None 
___________________________________________________________________ 
Author:            andrew.smith@renfrewshire.gov.uk; 07534 154048 
Page 98 of 123

Page 99

Page 99 of 123

Page 100

___________________________________________________________________
To: Infrastructure Land & Environment Policy Board 
On: 28 August 2024
___________________________________________________________________
Report by:   Chief Executive
___________________________________________________________________
Heading: Shop Premises at 9 & 11 Stoddard Square, Elderslie
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek approval to new leases at 9 & 11 Stoddard
Square, Elderslie in favour of the current tenant, Gavin Colquhoun. 
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Infrastructure Land & Environment Policy Board
approve new leases at 9 & 11 Stoddard Square, Elderslie in favour of the current
tenant, Gavin Colquhoun based on the contents of this report.
_________________________________________________________
3. Background 
3.1 Gavin Colquhoun has been tenant of the Coffee shop at 9 Stoddard Square,
Elderslie since December 2014. The lease is currently on a month to month
basis at an annual rent of £7,350.00. He has also leased 11 Stoddard Square
since August 2013. This is a butchers shop, is also on a short term tenancy,
and has a current annual rent of £4,775.00. 
3.2 Longer term leases have been requested to provide more security of tenure,
and the following terms and conditions have been provisionally agreed. 
o The new leases shall both be for a period of 10 years and shall be on the
Council’s full repairing and insuring lease.
Item 12
Page 100 of 123

Page 101

o To ensure current market rents are being achieved, the initial annual rent
at number 9 shall be £7,350 and shall be £6,000 at number 11. 
o The rents shall be reviewed on a 5 yearly cycle. 
o The uses shall continue as a coffee shop and butcher respectively. 
o The Tenant shall meet the Council’s reasonable legal expenses and
outgoings incurred in concluding the new leases. 
o Any other reasonable terms and conditions considered necessary by the
Head of Corporate Governance. 
___________________________________________________________________
Implications of the Report 
1. Financial – Combined annual rental of £13,350 to be received. 
 
2. HR & Organisational Development – None. 
3. Community Planning – Provides both landlord and tenant with security of tenure
and continuity of local services. 
4. Legal – New leases required. 
 
5. Property/Assets – As per this report. 
6. Information Technology – None. 
7. Equality & Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have been
identified arising from the recommendations contained in the report because no
groups or individuals have any involvement currently at the property. If required
following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health & Safety – None. 
9. Procurement – Not applicable. 
10. Risk – None. 
11. Privacy Impact – Not applicable. 
12. Cosla Policy Position – Not applicable. 
Page 101 of 123

Page 102

13. Climate Risk – Not applicable. 
14. Children’s Rights – Not applicable. 
________________________________________________________
List of Background Papers – None. 
___________________________________________________________________ 
Author:            andrew.smith@renfrewshire.gov.uk; 07534 154048 
Page 102 of 123

Page 103

Page 103 of 123

Page 104

___________________________________________________________________
To: Infrastructure Land & Environment Policy Board 
On: 28 August 2024
___________________________________________________________________
Report by:   Chief Executive
___________________________________________________________________
Heading: 41 Hallhill Road, Johnstone
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek approval for a lease extension of 41 Hallhill
Road, Johnstone to Salwan Pharmacy Limited for a period of 15 years. from 27th
February 2026. 
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Infrastructure Land & Environment Policy Board
approve a lease extension of 41 Hallhill Road, Johnstone to Salwan Pharmacy
Limited for a period of 15 years from 27th February 2026 on the contents of this
report.
_________________________________________________________
3. Background 
3.1 The property was newly constructed, and the tenants moved in and opened the
pharmacy in 2016. They are looking to extend their lease to help them secure
funding. 
3.2 They have been good tenants, and it is recommended to conclude a lease on
the following main terms and conditions. 
o The lease extension shall be for a period of15 years from 27th February
2026 and shall be on the Council’s standard full repairing and insuring
lease. 
Item 13
Page 104 of 123

Page 105

o The rent shall be £7,500 pa payable monthly in advance. 
 
o There will be a review when the lease renews on the 27th February 2026
then every 3 years thereafter. 
 
o The tenant is responsible for obtaining all appropriate planning and
statutory consents required in connection with the proposed use.
 
o The Tenant shall meet the Council’s reasonable legal expenses and outlays
incurred in concluding the lease. 
 
o Any other reasonable terms and conditions considered necessary by the
Head of Corporate Governance.
___________________________________________________________________
Implications of the Report 
1. Financial - Annual rental of £7,500 to be received. 
 
2. HR & Organisational Development - None. 
3. Community Planning - Secures long term tenancy. 
4. Legal - New lease required. 
 
5. Property/Assets - As per this report. 
6. Information Technology – None. 
7. Equality & Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have been
identified arising from the recommendations contained in the report because no
groups or individuals have any involvement currently at the property. If required
following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health & Safety - None. 
9. Procurement - Not applicable. 
10. Risk - None. 
11. Privacy Impact - Not applicable. 
12. Cosla Policy Position - Not applicable. 
13. Climate Risk – Not applicable.
Page 105 of 123

Page 106

14. Children’s Rights – Not applicable.
_________________________________________________________
List of Background Papers – None. 
_________________________________________________________________ 
Author:            anne.wilson@renfrewshire.gov.uk; 07811 056 721 
Page 106 of 123

Page 107

Page 107 of 123

Page 108

___________________________________________________________________
To: Infrastructure Land & Environment Policy Board 
On: 28 August 2024
___________________________________________________________________
Report by:   Chief Executive
___________________________________________________________________
Heading: 25 Graham Street, Johnstone
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek approval for a new lease of 25 Graham
Street, Johnstone to Paul and Beth Morris in the name of their company Callan’s
Convenient Catering. 
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Infrastructure Land & Environment Policy Board
approve a new lease of 25 Graham Street, Johnstone to Paul and Beth Morris in
the name of their company Callan’s Convenient Catering based on the contents
of this report.
_________________________________________________________
3. Background 
3.1 The property was latterly let as a convenience store and has been empty for
some time. Following a period of marketing there has been little interest in the
unit. Paul and Beth expressed interest in moving their café to the premises and
followed this up with an offer. 
3.2 The offer received was assessed and the proposal is to conclude a lease with
Paul and Beth in the name of their company Callan’s Convenient Catering. It is
recommended to conclude a lease on the following main terms and conditions. 
o The lease shall be for a period of 3 years and shall be on the Council’s
standard full repairing and insuring lease. 
Item 14
Page 108 of 123

Page 109

o The rent shall be £7,200 pa payable monthly in advance. 
o There will be 3 months rent free period for fitting out. 
o The tenant is responsible for obtaining all appropriate planning and
statutory consents required in connection with the proposed use. 
o The Tenant shall meet the Council’s reasonable legal expenses and
outlays incurred in concluding the lease. 
 
o If the lease is not concluded within 6 months of the date of this Board,
the property can be remarketed for lease.
 
o Any other reasonable terms and conditions considered necessary by the
Head of Corporate Governance.
___________________________________________________________________
Implications of the Report 
1. Financial - Annual rental of £7,200 to be received. 
 
2. HR & Organisational Development - None. 
3. Community Planning - Secures long term tenancy. 
4. Legal - New lease required. 
 
5. Property/Assets - As per this report. 
6. Information Technology – None. 
7. Equality & Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have been
identified arising from the recommendations contained in the report because no
groups or individuals have any involvement currently at the property. If required
following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health & Safety - None. 
9. Procurement - Not applicable. 
10. Risk - None. 
11. Privacy Impact - Not applicable. 
12. Cosla Policy Position - Not applicable.
Page 109 of 123

Page 110

13. Climate Risk – Not applicable. 
14. Children’s Rights – Not applicable.
_________________________________________________________
List of Background Papers – None. 
___________________________________________________________________ 
Author:            anne.wilson@renfrewshire.gov.uk; 07811 056 721 
Page 110 of 123

Page 111

Page 111 of 123

Page 112

___________________________________________________________________
To: Infrastructure Land & Environment Policy Board 
On: 28 August 2024
___________________________________________________________________
Report by:   Chief Executive
___________________________________________________________________
Heading: 232 Paisley Road, Renfrew
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek approval for a new lease of 232 Paisley
Road, Renfrew to Megan Barr.
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Infrastructure Land & Environment Policy Board
approve a new lease of 232 Paisley Road, Renfrew to Megan Barr on the
contents of this report.
_________________________________________________________
3. Background 
3.1 The property was latterly let as a convenience store and has been empty for
some time. Following a period of marketing a number of parties’ noted interest
and a closing date was set for Friday 19th June at 12 noon. Offers of rent were
invited and two offers were received in accordance with the closing date
arrangement. 
3.2 The offers received were assessed and the proposal is to conclude a lease with
Megan Barr. Megan already runs her successful beauty, aesthetics and semi-
permanent make up business in a smaller unit and is looking to expand. 
3.3 It is recommended to conclude a lease on the following main terms and
conditions. 
Item 15
Page 112 of 123

Page 113

o The lease shall be for a period of 5 years and shall be on the Council’s
standard full repairing and insuring lease. 
o The rent shall be £5,200 pa payable monthly in advance. 
o There will be 3 months rent free period for fitting out. 
o The tenant is responsible for obtaining all appropriate planning and
statutory consents required in connection with the proposed use. 
o The Tenant shall meet the Council’s reasonable legal expenses and
outlays incurred in concluding the lease. 
o If the lease is not concluded within 6 months of the date of this Board, the
property can be remarketed for lease. 
o Any other reasonable terms and conditions considered necessary by the
Head of Corporate Governance.
___________________________________________________________________
Implications of the Report
1. Financial - Annual rental of £5,200 to be received. 
 
2. HR & Organisational Development - None. 
3. Community Planning - Secures long term tenancy. 
4. Legal - New lease required. 
 
5. Property/Assets - As per this report. 
6. Information Technology – None.
7. Equality & Human Rights
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have been
identified arising from the recommendations contained in the report because no
groups or individuals have any involvement currently at the property. If required
following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health & Safety - None.
9. Procurement - Not applicable.
Page 113 of 123

Page 114

10. Risk - None.
11. Privacy Impact - Not applicable.
12. Cosla Policy Position - Not applicable.
13. Climate Risk – Not applicable.
14. Children’s Rights – Not applicable.
_________________________________________________________
List of Background Papers – None. 
___________________________________________________________________ 
Author:            anne.wilson@renfrewshire.gov.uk; 07811 056 721 
Page 114 of 123

Page 115

Page 115 of 123

Page 116

___________________________________________________________________
To: Infrastructure Land & Environment Policy Board 
On: 28 August 2024
___________________________________________________________________
Report by:   Chief Executive
___________________________________________________________________
Heading: 238 Paisley Road, Renfrew
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to seek approval for a new lease of 238 Paisley
Road, Renfrew to M & U Motor Factors Ltd. 
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Infrastructure Land & Environment Policy Board
approve a new lease of 238 Paisley Road, Renfrew to M & U Motor Factors Ltd
based on the contents of this report.
_________________________________________________________
3. Background 
3.1 The property has been leased to Mr Gordon Taylor since April 2015. Mr Taylor
is looking to assign his lease but is currently on a short term agreement. This
report is to seek approval for a new lease to Umer Riaz in his business name M
& U Motor Factors Ltd.   
3.2 It is recommended to conclude a lease on the following main terms and
conditions. 
o The lease shall be for a period of 3 years and shall be on the Council’s
standard full repairing and insuring lease. 
Item 16
Page 116 of 123

Page 117

o The rent shall be at the current level £3,300 pa payable monthly in advance
with a review at year one. 
o There will be a break option in favour of the Council at year 1.
 
o The tenant is responsible for obtaining all appropriate planning and
statutory consents required in connection with the proposed use.
 
o The Tenant shall meet the Council’s reasonable legal expenses and outlays
incurred in concluding the lease. 
 
o If the lease is not concluded within 6 months of the date of this Board, the
property can be remarketed for lease.
 
o Any other reasonable terms and conditions considered necessary by the
Head of Corporate Governance.
___________________________________________________________________
Implications of the Report
1. Financial - Annual rental of £3,300 to be received. 
 
2. HR & Organisational Development - None. 
3. Community Planning - Secures long term tenancy. 
4. Legal - New lease required. 
 
5. Property/Assets - As per this report. 
6. Information Technology – None.
7. Equality & Human Rights
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have been
identified arising from the recommendations contained in the report because no
groups or individuals have any involvement currently at the property. If required
following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health & Safety - None. 
9. Procurement - Not applicable. 
10. Risk - None. 
11. Privacy Impact - Not applicable. 
12. Cosla Policy Position - Not applicable. 
13. Climate Risk – Not applicable
Page 117 of 123

Page 118

14.  Children’s Rights – Not applicable.
_______________________________________________________
List of Background Papers – None. 
___________________________________________________________________ 
Author:            anne.wilson@renfrewshire.gov.uk; 07811 056 721 
Page 118 of 123

Page 119

Page 119 of 123

Page 120

___________________________________________________________________
To: Infrastructure Land & Environment Policy Board 
On: 28 August 2024
___________________________________________________________________
Report by:   Chief Executive
___________________________________________________________________
Heading: 58-60 High Street, Renfrew
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek approval for a new lease at 58-60 High
Street, Renfrew to Glasgow Spinal Care Ltd.  
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Infrastructure Land & Environment Policy Board
approve a new lease at 58-60 High Street, Renfrew to Glasgow Spinal Care Ltd
on the contents of this report.
_________________________________________________________
3. Background 
3.1 The property has been vacant for some time and was marketed with little interest. 
3.2 Dr Ross Currie contacted The Council’s Estates team with regards to expanding
his already successful chiropractor business. Having a presence in Glasgow and
Ayr he was looking for an additional location in Renfrewshire providing new jobs
to the area. 
3.3 Dr Ross followed this up with an offer as detailed below: 
o The lease shall be for a period of 10 years with a 5 year break option on the
Council’s standard full repairing and insuring lease. 
o The rent shall be £7,500 pa payable monthly in advance. 
 
Item 17
Page 120 of 123

Page 121

o There will be a 6-month rent free period for fitting out.  
o There will be a review every 3 years.   
o The tenant is responsible for obtaining all appropriate planning and statutory
consents required in connection with the proposed use. 
o The Tenant shall meet the Council’s reasonable legal expenses and outlays
incurred in concluding the lease. 
o Any other reasonable terms and conditions considered necessary by the
Head of Corporate Governance.
___________________________________________________________________
Implications of the Report 
1. Financial - Annual rental of £7,500 to be received. 
 
2. HR & Organisational Development - None. 
3. Community Planning - Secures long term tenancy. 
4. Legal - New lease required. 
 
5. Property/Assets - As per this report. 
6. Information Technology – None. 
7. Equality & Human Rights
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have
been identified arising from the recommendations contained in the report
because no groups or individuals have any involvement currently at the property.
If required following implementation, the actual impact of the recommendations
and the mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health & Safety - None. 
9. Procurement - Not applicable. 
10. Risk - None. 
11. Privacy Impact - Not applicable. 
12. Cosla Policy Position - Not applicable. 
13. Climate Risk – Not applicable. 
Page 121 of 123

Page 122

14. Children’s Rights – Not applicable.
_________________________________________________________
List of Background Papers – None.
___________________________________________________________________ 
Author:            anne.wilson@renfrewshire.gov.uk; 07811 056 721 
Page 122 of 123

Page 123

Page 123 of 123