Page 1

___________________________________________________________________
To:  Infrastructure, Land & Environment Policy Board
On:  28 August 2024
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Lease of land for a substation – Paisley Grammar School
Community Campus
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to seek approval to enter into a lease with
SP Distribution PLC (Registered Number SC189125) (“SPD”) for a
substation at Paisley Grammar School Community Campus, shown
outlined in red on plan 619332947-(1)-002 included as part of this
report (“the Plan”) (“the Proposed Lease”). 
___________________________________________________________________ 
2. Recommendations 
It is recommended that the Infrastructure, Land & Environment Policy Board: 
2.1 approves the Proposed Lease between the Council and SPD based on
the contents of this report;
2.2 agrees to declare the property surplus outlined in red on the Plan
included as part of this report (“the Property”);
2.3  agrees to lease the Property to SPD, along with rights for appropriate
cabling and access routes, subject to the Director of Environment,
Housing and Infrastructure agreeing their exact location and subject to
the terms and conditions detailed within the body of this report and;

Page 2

2.4 grants authority to the Head of Corporate Governance in conjunction with
the Director of Environment, Housing and Infrastructure to make minor
alterations including any other reasonable terms and conditions
considered necessary to the documents, (being the Offer to Lease,
Proposed Lease and the Plan to reflect the final agreed substation
orientation and rights of access and cabling routes) and to conclude
missives in respect of the Offer to Lease and sign the Proposed Lease
of the Property as detailed in this report.  
_________________________________________________________
3. Background
3.1 The Council requires to replace the existing Paisley Grammar School
and seeks to integrate the school with both the local community and
enterprise organisations to form a new Paisley Grammar School
Community Campus at 111-113 Renfrew Road, Paisley. The Council
entered into a building contract for the main works on 4th June 2024 and
works commenced on 17 June 2024 with a completion date of 12 June
2026.   
3.2 The new school will require the installation of a new electrical substation
to provide a new power connection (main supply) to the building. The
main supply will also support safety-critical systems for the operation of
the fire alarm, sprinklers, intruder alarm, emergency lighting and access
control. 
3.3 The location of the Property, being the substation site, is within land
owned by the Council and will be housed in the school service courtyard
to the west of the site.  Part of the design for Paisley Grammar School
Community Campus provided an adjacent access road and turning circle
to allow unobstructed access and maintenance rights.     
4 Provisional Terms and Conditions 
4.1  The Property is required to provide power to Paisley Grammar School
Community Campus. 
4.2 The Council will lease the land extending to 25 square metres or thereby
which is shown edged red on the Plan, together with rights for (i)
installing, maintaining and using electricity lines, telephone signalling,
fibre optic cables and ancillary equipment and other conducting media
with the conduits or pipes for containing the same within in, through and
over the Property and/or Paisley Grammar School Community Campus
along the routes shown coloured yellow on the Plan and; (ii)  access to

Page 3

and egress from the Property over Paisley Grammar School Community
Campus with or without vehicles, machinery or apparatus along the
routes shown coloured pink on the Plan.
4.3 The rent will be £1 per annum, if demanded. 
4.4 The Proposed Lease term will be 175 years.
4.5 The date of entry is expected to be mid-October 2024 which is required
to maintain an ambitious delivery programme for Paisley Grammar
School Community Campus.
4.6 The Proposed Lease is subject to normal commercial terms including
SPD indemnifying the Council for any bodily harm or damage to the
Paisley Grammar School Community Campus and making good any
damage.
4.7  The Proposed Lease includes an obligation on the Council not to (One)
erect any building or  grow any trees (i) over the cable route or within a
lateral distance of three metres measuring from the centre line thereof or
(ii) which are likely to adversely affect the electric lines or SPD’s access
thereto and SPD shall be entitled to lop any such trees causing or likely
to cause interference to the electric lines and the Property and (Two)
alter the existing ground levels along the cable route or to obstruct in any
way SPD’s access to the Property. 
___________________________________________________________________
Implications of the Report
1. Financial - The rent will be £1 per annum, if demanded. 
2. HR & Organisational Development – Not applicable. 
3. Community/Council Planning –   
• Reshaping our place, our economy and our future - The work
from the design to the main works will create many employment
opportunities across Renfrewshire.  The Community Campus itself
will redevelop an empty space and it will provide a base for learning
and development for current and future generations.  
• Building strong, safe and resilient communities - The new
Paisley Grammar School Community Campus not only operates as
a school; it will also provide facilities for use by the community and

Page 4

partner organisations. This will help nurture and bring communities
together. 
• Tackling inequality, ensuring opportunities for all - The work and
objectives of this project have the power to tackle inequalities that
exist in Renfrewshire throughout all communities.  It has the ability to
deliver opportunities for all, through Community Benefits and the
wider work of the project. 
• Creating a sustainable Renfrewshire for all to enjoy - The new
Paisley Grammar School Community Campus will provide a fresh
new learning base for over a thousand young people with internal
environmental quality of a high standard.  It will give back to the
communities that it serves by providing space for public use in a
sustainably designed, low energy building. 
• Working together to improve outcomes - The new Paisley
Grammar School Community Campus will deliver many outcomes
throughout its lifetime through the strengthening of the partnership
working between school and community, providing good quality
services, and new ICT developments and opportunities. 
4. Legal – The Proposed Lease of the Property as outlined in the body of
the report. 
5. Property/Assets – As per this report. 
6. Information Technology – Not applicable.  
7. Equality & Human Rights - 
The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report. 
If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website. 
8. Health & Safety – Not applicable. 
9. Procurement – None.

Page 5

10. Risk - The Property is leased subject to the conditions of the Proposed
Lease. Failure to agree and enter into the Proposed Lease will mean
Paisley Grammar School Community Campus will not have the
necessary power to operate the building and support safety-critical
systems.
11. Privacy Impact - None. 
12. Climate Risk- Tackling Climate Change and working towards
Renfrewshire’s plan for Net Zero have been considered throughout the
Paisley Grammar School Community Campus Project.  This will be the
first Passivhaus School in Renfrewshire, which is supporting the
Councils vision and work of becoming net zero by 2030.  
The environmental impacts considered are broad and range from the
disposal of waste generated from the works being carried out to the types
of vehicles and machinery that will be used on site.  The contractor will
be required to consider emissions from their vehicles when working on
site and to switch engines off when not in use to prevent unnecessary
emissions.   
13. Children’s Rights - Positive impact on children’s lives as the substation
is an integral part of powering Paisley Grammar School Community
Campus for the delivery of an environment which is inclusive, safe and
engenders a culture of respect based on the values and tradition of
Paisley Grammar.  
14. Cosla Policy Position – Not applicable.  
_______________________________________________________
List of Background Papers- None.   
___________________________________________________________________ 
Author:         Aileen Johnston, Estates Lead, Email: aileen.johnston@renfrewshire.gov.uk and Victoria
Willan, Senior Solicitor (Projects & Property), Email:
victoria.willan@renfrewshire.gov.uk

Page 6

Drg. No. Rev.
Status
A3
Check'dDrawnRev Date Appr'd
Title
ProjectAppr'd DateScaleDrawn Check'd
ScottishPower Reference:
Client
PAISLEY GRAMMAR SCHOOL
RENFREW ROAD, PAISLEY, PA3 4DY
SUBSTATION
LEASE
LEASE
619332947-(1)-002 A619332947
0m 25m 50m 75m 100m
Scale - 1:1250
SEE SUBSTATION
DETAIL
SUBSTATION DETAIL
SCALE  1:250