To: Infrastructure, Land and Environment Policy Board
On: 28 August 2024 
Report by:  Director of Environment, Housing & Infrastructure 
Heading:  Service Update Report 
1. Summary 
1.1 This report provides an overview of key service activities since the last Policy Board
report on 28 May 2024 and an update on the services and key projects delivered during
this period. 
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy Board: 
2.1 Notes the content of this report, and
2.2 Note the progress made in implementing Renfrewshire Carking Strategy and instructs
officers to develop the reduced fee season pass arrangements as part of the 2024 – 2029
Car Parking Strategy implementation as per paragraphs 6.5.4 and 6.5.5 below.   
3. Background
3.1 Environment, Housing & Infrastructure provides essential services to every household in
Renfrewshire and works in partnership with the local community, other service areas and
Community Planning Partners, to deliver key Council priorities and initiatives. A progress
update on the main activities delivered by the services in respect of the areas of activity
delegated to this Policy Board, is detailed below. 
Updates for Infrastructure, Land and Environment Policy Board 
4. Climate Change 
4.1 Energy Management
Energy Efficiency Fund
4.1.1 Work is ongoing between the Energy Team and Finance with a view to securing funding
to be used towards increasing the energy efficiency of our Public Buildings. The
technologies being investigated as part of a business case include boiler control
upgrades, LED installations and installation of additional Solar Photovoltaic panels.

Page 2

4.1.2 Work is currently underway to reduce water consumption in our education estate through
working in conjunction with our water provide, Business Stream.
4.1.3 Survey work is planned to look at the options for upgrading the existing lights and controls
within Renfrewshire House, this will not only reduce our carbon emissions and the
associated electricity costs and will provide an improved working environment for staff
and visitors.
District Heating Network feasibilities
4.1.4 Feasibility reports are now complete looking at the options surrounding the introduction of
a District Heating Scheme in Central Paisley and an extension to the current District
Heating Network at AMIDS. Central Paisley has 49 main anchor loads with an additional
2,552 properties that could connect to the network. 
4.1.5 A funding application for each project has been submitted to the Scottish Governments
Heat Network Support Unit for matched funding to take each feasibility to an Outline
Business Case.
Local Heat & Energy Efficiency Strategy Delivery Plan
4.1.6 Renfrewshire’s LHEES strategy was approved at Board on 25th January 2024.The Energy
Team are currently working on finalising Renfrewshire’s LHEES Delivery Plan. The
delivery plan is a document setting out how a local authority proposes to support
implementation of its local heat and energy efficiency strategy.
ECO4 Flex
4.1.7 ECO4 Flex will allow the Council to approve funding to Renfrewshire’s private sector, fuel
poor households that do not meet criteria for other schemes, as well as low- income
households that are vulnerable to the effects of the cold. The scheme is part of the UK
Government Energy Company Obligation and is managed by Ofgem.
4.1.8 The qualifying criteria for ECO-Flex, as set by Ofgem, is published on our website in a
document called a Statement of Intent. Renfrewshire’s Statement of Intent can be found
here: https://www.renfrewshire.gov.uk/media/15354/ECO4-flex-statement-of-
intent/pdf/Renfrewshire_Council_Statement_of_Intent_for_ECO4_flex.pdf?m=167568
7584337ECO-flex. ECO-flex does not apply to Council Housing or Registered Social
Landlords.
4.1.9 The energy efficiency measures being installed within Renfrewshire include boilers, loft
insulation, cavity wall insulation, air source heat pumps, solar panels, heating controls,
first time central heating etc.
The table below highlights the savings ECO4 Flex has achieved to date based on
annually recurring savings: 
Financial Year Value of Grant
Funding Requested (£)
Total Annual CO2
Saving in Kg
Total Annual Cost
Saving (£)
2023/24 £3,583,940 648,617 £231,789
2024/25 £1,174,210 157,299 £60,261
Total £4,758,150 805,916 £292,050 
4.2  Biodiversity 
4.2.1 This season the service expanded its biodiversity planting, adding new sites across the
area. A review is currently ongoing on all the biodiversity sites planted over the last 3 years.
Whilst the service has received positive feedback when in flower, there are a number of
locations where the flower mix has started to become dominated by a small group of flower
species. In addition to the flower mix, the size of the panels and where located next to
roads and footways will be reviewed to ensure effective sight lines and safe walking routes
to be maintained. Updates on all of our biodiversity sites will continue to be provided at
future boards.
4.3 Carbon Literacy Training

Page 3

4.3.1 Local Authority Leadership and Management in Carbon Literacy training is being rolled
out across the Council. This training is delivered in-house and is primarily based at
Managers and Team Leaders. The training uses a toolkit produced by the Carbon
Literacy Project specifically for Local Authorities and is part of large-scale certified
education programme with nearly 97,000 individuals having undergone the training across
various sectors in total.
4.3.2 The training covers a basic overview on the climate emergency, causes and impacts and
explores why local authorities should act and the Council’s levers of influence; providing
leadership in the climate emergency; how climate action can be integrated into decision
making; co-benefits of climate action; and examples of how we can fund climate action. 
4.3.3 To date, 54 Council Officers have undertaken the training from across all Services, with
further training sessions planned after the summer.
5 Team Up to Clean Up
5.1.1 The “Bin to Win” school campaign was introduced to schools in June. The campaign was
launched during the pre-election period, as such promotion was low key. £750 worth of
Scotland Loves Local or One4all gift cards gift cards were issued to our young winners
who submitted photographs of themselves binning their litter. Greater promotion and
awareness raising is planned for pupil’s return to school in August, at this point pupils will
also learn of their peer’s winnings. This approach is designed as a nudge technique to
develop behaviour change amongst our young people.
5.1.2 Team up to Clean Up continues to engage and support Community Groups across
Renfrewshire with litterpicking kits, high vis vests and tools as required.
5.2 Environmental Taskforce
5.2.1 The Environmental Taskforce continues to deliver intervention to reduce instances of
flytipping. Key statistics for the most recent period are:
Action May-July
2024
Proactive visits to identified hotspot areas 520
Number of reports investigated 378
Tonnes of flytipping removed 49
Number of sites secured to prevent further flytipping 3
Letters to private landowners re flytipping 12
Visits to businesses to ensure Waste Disposal Arrangements in place 20
Fixed Penalty Notices Issued 22
5.2.2 Relocated cameras have been successful in securing evidence in 3 flytipping cases since
May 2024. 
5.2.3 An additional 3 flytipping hotspots have been secured with preventative measures
blocking access through support from the Environmental Taskforce.  One site, operated
by a private organisation, has erected fencing, the remaining 2, one of which is Tannahill
Road in Ferguslie, have blocked access as such reducing instances in these areas.
6 Fleet, Roads and Transportation 
6.1 Fleet Services 
6.1.1 The service are progressing the Fleet Vehicle Replacement Programme in line with the
Council’s Ren Zero Plan. 7 electric vans and 12 electric cars have been ordered and are
due for delivery by October 2024.  The Council now ha a total of 104 electric vehicles within
the core operational fleet. 
Roads & Transportation
6.2 Roads Capital Investment Programme

Page 4

6.2.1 A number of schemes have been completed during July and August including Paisley
Town Centre one-way system including Incle Street, Old Sneddon Street and Weir Street. 
Newmains Road, Neilston Road, High Street/Leighcartside Johnstone, Abbotsinch Road,
Causeyside Street, Barochan Road, Glenpatrick Road, Main Road Elderslie and
Nethergreen Road have been completed over the Summer.  Surface dressing has also
been completed on rural roads around Lochwinnoch and Howwood.  
6.2.2 Carriageway resurfacing works are planned in September and October for A726 Greenock
Road, A726 Spectacles roundabout, Inchinnan Road Paisley, and Glenfield Road.
6.2.3 Footway resurfacing will commence in late October 2024.
6.2.4 The new River Clyde bridge from Renfrew to Yoker has been installed with the connecting
roads under construction. Recruitment for the 24-hour, 7-day week operations team has
been completed along with training on the safe operation and maintenance of the bridge
in anticipation of the bridge opening. The bridge is expected to be operational by late
2024. 
6.3 Active Travel & Infrastructure Improvement Update
6.3.1 Work to introduce pedestrian safety traffic calming measures in Renfrewshire’s villages
continues. Close collaboration with local residents is directing the design and construction
of measures to best suit local conditions. The second part of the project has started its
engagement and concept design stage in Lochwinnoch, Bishopton, Elderslie and Bridge
of Weir.
6.3.2 The new Active Travel route from Barnsford Road to Inchinnan Drive is now complete. 
We await news of the value of our award from Transport Scotland’s Active Travel
Infrastructure Fund to allow us to build the next phase of our Active Travel Network along
Inchinnan Drive this year. This connects the employment centre of Inchinnan Business
Park with Glasgow Airport, Renfrew, and Paisley with a safe, segregated active travel
path for everyday commuter journeys.
6.3.3 The tender for the construction phase of a bus turning circle at Linburn Road in Erskine
has been awarded for a construction start in August.  The project will provide a retaining
wall, bus turning loop and footway provision. Public utility diversionary works has already
been completed. SPT Capital funding announced for 2024/25 has allocated £165,000 for
this category 1 project seen by SPT as operationally essential.
6.3.4 The Paisley to Renfrew active travel route, including upgraded shared footways and
carriageway improvements at Wright Street is complete. Pedestrian crossings at Gilmour
Street and Niddry Street have been converted to Toucan crossings, the new street
lighting on the route is energised and we are in discussions with the developer on the final
surfacing of the ramp connecting Turner Drive and Wright Street.
6.3.5 Work in association with Sustrans to improve accessibility to the National Cycle Route
Network 75 has seen improved connections created at Ben Nevis Road, Canal Street and
Stow Brae. Further feasibility work at Maxwellton Road is hoped to be able to encourage
more active trips to school in future.
6.3.6 Our programme to provide more energy efficient infrastructure at Traffic Signal junctions
continues with upgrades planned at three junctions on Barrochan Road/A737, Johnstone
and Paisley Road/Oxford Road, Renfrew. Road safety improvements at the Glebe Street/
Hairst Street junction are due to follow.
6.3.7 Renfrewshire’s Local Transport Strategy has completed its data gathering stage of
widespread engagement with public, Members and stakeholders. Opinions on all aspects
of transport in Renfrewshire, what works, what doesn’t and suggestions for the future,
have been collected for consideration in the preparation of a draft strategy for further
consultation later in the year.
6.4 Elderslie for Everyone Project 
6.4.1 The Discover stage of the project is now complete, having held 11 events and meetings
and 11 one-to-one meetings with businesses, engaged with 410 people face-to-face, had
446 contributions on the project website and 224 newsletter subscribers.
6.4.2 The next stage, Develop, which will run until autumn 2024, will see the creation of Design
Objectives based on findings from the Discover stage and the early stages of developing
design solutions.

Page 5

6.4.3 Some surveying has already been carried out (traffic speed and volume, public life study,
junction turning counts at Glenpatrick Road, video manual count of pedestrians) with
additional to follow after school holidays (pedestrian movement count at Glenpatrick
Road, junction turning count from Canal Street, queue length at Glenpatrick Road, parking
and loading survey). 
6.4.4 The latest public event took place on Thursday 15 August 2024, and featured hands-on
workshops with scale models. 
6.4.5 The project is on-track to have full concept designs by March 2025, with additional
collaborative design sessions and community consultations along the way.
6.5   Parking Strategy
6.5.1 The service has made significant progress with implementation of the Councils approved
parking Strategy with preparations well underway for the delivery of the Council’s
responsibilities in relation to pavement parking. 
6.5.2 A consultation is ongoing at present on the streets proposed to be exempt from the
regulations and the Traffic Regulation Order has been widely promoted to maximise
coverage of the issue. The outcome of the consultation and associated Traffic Regulation
Order will be brought back to the next meeting of this Policy Board for consideration on
the basis that the majority of objections, if any, can be addressed prior to the meeting of
the Board.
6.5.3 A key area of the parking strategy was the review of existing permit arrangements that are
in place across Paisley Town Centre, although residents permits will be considered at a
later point in the implementation of the strategy. Officers have met with representatives of
Paisley First and carried out a number of visits to local businesses who have made
representations through Paisley First, to identify opportunities to support business in line
with the Parking Strategy.
6.5.4 Officers have also identified the opportunity for a season pass discount scheme for those
individuals who have no option other than to bring their private car to Paisley town centre
for employment purposes. Officers intend to engage with Paisley First further to discuss
the detail of the proposals. Initial thoughts on the implementation could see a discounted
scheme in operation where around 25% of our off street parking spaces are made
available to those wishing to purchase a season pass. Work is now under way, which will
allow a scheme to offer a discount on parking of 60% on a standard daily rate. An update
will be provided to members at the next Policy Board on progress with this scheme.
6.5.5 Officers have also engaged with businesses around the potential for introduction of
additional loading bays around the town centre, with locations to be confirmed with
Paisley First as well additional signage to be located at parking machines to provide
additional information to the public.
6.6 Street lighting Capital Investment Programme
6.6.1 The new lighting installation for Prieston Road, Bridge of Weir started in early July to
replace the ageing network with new cabling in ducts, a new control panel and new
columns and lanterns.
6.6.2 Works continue to replace 144 cut down lighting columns and new cable loops to areas
where we have dark sections continues with around 60% of programme completed. 
7. Neighbourhood Services 
7.1 Grass Cutting Programme 
7.1.1  The grass cutting programme commenced on April 1st and is approaching the last month of
the cutting season. As previously advised to board the service implemented a strimming-
only procedure for all grass edges, a measure aimed at reducing pesticide usage. This new
approach led to an overall reduction in pesticide spraying by 80% and completely
eliminated grass edge spraying. Consequently, panel edges no longer appeared yellow,
enhancing the quality of the cuts. This improvement resulted in a significant reduction in the
complaints regarding grass cutting quality compared to the same period last year.
7.1.2  The introduction of the strimming procedure posed some challenges, primarily the increased
time required to complete a grass panel cut. Occasionally, the service was unable to fully
strim all panels, resulting in some inconsistency in the grass edges. However, this was

Page 6

addressed, and form lessons learned for the service next season. With the extensive
improvements in the quality of grass cutting experienced this year, the service intends to
continue with the strimming procedure next season adapting to the lessons learned to
improve the overall service. 
7.2 Weed Management 
7.2.1  This growing season presented significant challenges in addressing an unprecedented
amount of weed growth, with the weather impacting weeds on a wider, national scale. In
response to the weed growth, the service implemented a targeted approach by forming a
dedicated weed control team. This team concentrated on strimming, scraping, sweeping
and spraying in our open spaces.
7.2.2  While the weed growth posed challenges, it also highlighted opportunities for the new
management team for continual improvement. To ensure optimal weed management for
open spaces in the future, the service has begun the tender exercise for weed
management for 2025. We plan to increase our weed management programme and initiate
our weed management efforts earlier in the season, commencing in March 25. As a further
method, service teams have redesigned the winter works programme for 2024, with a wider
emphasis on weed management. These proactive steps will help us build on this years’
experience and improve our strategies for weed control for future years.
7.3 Winter Maintenance Programme 
7.3.1 There will be a large, visible winter maintenance programme this autumn/ winter, focussing
of hedge and shrub reduction and vegetation cut back. It is recognised that it’s been a number
of years since many of our hedges and shrubs have had as significant cut back. In addition
there will be a focus with new and additional equipment to assist scraping activities which
were restarted 3 years ago to allow a larger areas of ground to be covered.  These activities
will take place within all communities and will follow the 14 day grass cutting cycle, with a
presence one day a fortnight within communities. A more detailed update will be provided in
the next board cycle. 
7.4 Bin Replacement Programme
7.4.1  Following the allocation of investment in the budget, we are in the process of procuring and
replacing around 300 litter bins. The majority of this replacement will take place in the
autumn, with some bins already being replaced. Additionally, we are undertaking a wider
review to assess the location and type of infrastructure needed across Renfrewshire
moving forward and a further update on the review will be shared at a future board. 
7.4.2 By upgrading our bin infrastructure and improving servicing methods, Neighbourhood
Services is taking significant steps to enhance the efficiency and effectiveness of waste
management in our community.
7.5  LTA Tennis Court Launch
7.5.1  The extensive improvement works on the tennis infrastructure across Renfrewshire have
been successfully completed. Refurbishment of the tennis courts at Brodie Park, Robertson
Park, and Johnstone Park Lane is now finished. These courts were reopened in July,
ahead of the school summer holidays, and have already seen increased participation
throughout the season. Our Play parks team have taken ownership of the sites and will
continue to maintain the sites across Renfrewshire. 
7.5.2  To celebrate the reopening, Renfrewshire Council offered free access to the tennis courts
for the entire month of July. A formal launch event is planned for September, coinciding
with the return of schools. This event will feature local school pupils, LTA elected members,
and a coaching professional. Details of the formal launch will be communicated soon, and
we anticipate continued success and community engagement at our tennis courts.
7.6 Tree and Woodlands Management
7.6.1  The new Tree and Woodlands structure has nearly completed its recruitment cycle, with all
key positions filled except one. We have welcomed our new Tree and Woodlands
Supervisor, who joins us from the Forestry Commission. This supervisor will oversee the
council's proactive tree management efforts.
7.6.2 The redesigned structure aims to enhance our proactive tree management, thereby
improving the service delivered to the residents of Renfrewshire. With the additional
resources, we are able to support the ever-increasing demand of managing, enhancing,

Page 7

and expanding our tree assets. Currently, the team is addressing several complex tree
enquiries, and the new team structure is expected to increase our efficiency and
responsiveness in managing tree and woodland issues.
7.7 Clyde Muirshiel 
7.7.1 Castle Semple and Clyde Muirshiel Country Parks are operating on summer opening hours,
with walks and trails accessible all day, every day. The outdoor activity programme has
also commenced successfully following a successful recruitment period for outdoor
instructors.
8 Memorial Safety and Cemetery Management 
8.1.1 Memorial Safety is nearing the completion of its inspection programs and is preparing to
begin re-inspections. In preparation, the service is currently reviewing its policies and
procedures and a revised cemetery policy will be presented to a future board for approval.
Additionally, to enhance communication with the public, the service is evaluating a new
digital platform. This platform aims to centralise all cemetery-related information, offering a
comprehensive and easily accessible resource for all cemetery operations. 
9.  Waste Services 
9.1  Waste Collection Method Update 
9.1.1  As agreed at Infrastructure, Land and Environment Policy Board at it’s meeting of May
2024, phase 1 of decoupling the grey bins from the recycling bins for all areas with a
Saturday collection will be rolled out from the beginning of October. This extra time has
allowed additional work on route data to be completed to ensure a smooth transition.
9.1.2 Additionally, Phase 1 will now be implemented in 3 stages. 
Stage 1 Alignment of recycling collections so that the same recycling stream is collected
on the same day. Residents will receive a new collection calendar
informing them which colour recycling bins to present on collection day.
The grey bins collections will remain on Saturday at this stage. 
Stage 2 Align the difficult to service properties with the standard collection frequencies
and expanding recycling provision by providing them with a brown bin.
Stage 3 Decouple the grey bins so that they are collected on a different day from
recycling bins. E.g. recycling will be collected on a Saturday and
residual grey bins collected on a Monday. 
9.1.3 Ward Elected Members for this area will be provided with notice and further information in
advance of communications being sent to households. 
9.2 Circular Economy Bill update 
9.2.1 The Circular Economy (Scotland) Bill was passed by Scottish Parliament on 26th June
2024. The Bill brings forward legislation to introduce measures including a circular economy
strategy, circular economy and recycling targets, and changes to the Climate Change
(Scotland) Act 2009. For local authority environmental services, relevant changes include
the introduction of a householder’s duty of care with authority to issue fixed penalty notices
for those who fail to comply, and changes to the code of practice on household waste
recycling. The bill also includes measures to restrict the disposal of unsold consumer goods
and the imposing of a civil penalty for littering from a vehicle.
9.2.2 In parallel, Scottish Government are developing a circular economy route map to take
forward circular economy measures from the Bill and others that don’t require
legislation.  This has been consulted on and the final version is expected before the end of
2024.  
9.2.3 The Waste Service are engaging with Scottish Government and Zero Waste Scotland to
keep up to date with developments in relation to both the Circular Economy (Scotland) Bill
and Circular Economy Route Map.  Further updates will be provided when more information
becomes available. 
9.3 Household Waste Recycling Centres – Health and Safety

Page 8

9.3.1 The vast majority of people who access our Household Recycling Centre’s for disposal of
their waste and recycling follow the site rules and if they are unsure of anything will ask our
site staff for assistance. Unfortunately, on a small number of occasions our site staff have
experienced aggressive behaviour and abuse from site users, and this is not acceptable. 
9.3.2 The safety of our staff is of the upmost importance to us, and this is reflected in the
Council’s policy on Violence and Aggression at Work.  Following discussions with site staff
and trade union representatives the Waste Service will introduce Body Worn Cameras for
our recycling centre staff. The use of body worn cameras within HWRCs is common within
local authorities and this technology is in addition to the existing health and safety
measures on site.  
9.3.3 It is anticipated that the presence of the cameras will discourage interactions from
escalating and capture evidence if it does. The use of body worn cameras at our
Household Recycling Centres will be clearly communicated to site users via signage at the
site entrance and also within the sites. The Council’s website will also be updated with this
information. The data recorded by the camera system will be held in accordance with the
General Data Protection Regulations (GDPR) 2018.   
9.4 Route Optimisation Software and In-Cab Technology 
9.4.1 The service is procuring a route management system to support delivery of the frontline
waste and recycling collection service. The route management system aims to deliver a
number of benefits including route optimisation and in-cab technology to maximise the
efficiency of the collection routes and reducing fuel consumption and carbon emissions. 
The procurement of the system is underway, and the service aims to bring a paper for
approval to the November board cycle.
10 #YouDecide
10.1.1 Forty one out of the 50 successful #YD Projects are now complete. Most recently seating
in Renfrew Town Centre was completed along with play area refurbishments at South
Candren Village Green and Station Road Park, Langbank.
10.1.2 Lighting works are complete in Howwood Park, Inchinnan Park, Spateston Park
Johnstone, Ferguslie Gardens Paisley, and Miller Street path Johnstone. Columns have
been installed and awaiting Scottish Power connections for Ellerslie Street Johnstone,
Kintyre Park Linwood, Barshaw Park Paisley, Millfield View path, Erskine, Kilbarchan
Park and Lochwinnoch Park. These connections are anticipated in September 2024. The
Wallace monument is due to be illuminated in late August 2024.
10.1.3 Consultations for the wheeled sport areas for Kintyre Park, Linwood and Moss Road
Park, Bridge Of Weir took place during May and June 2024. Final designs have been
confirmed with works anticipated to start in late August at Kintyre Park with each park
taking approximately 10-12 weeks to complete.
10.1.4 Consultation on designs for Barrangary and Chestnut roundabouts in Bishopton took
place from June to August 2024.  The designs chosen are being progressed through our
procurement process with an aim to complete landscape works in 2025. Consultation on
designs for Easwald Bank roundabout, Kilbarchan, Renfrew Road/Arkleston Road and
Glasgow Road/Kings Inch Road, Renfrew roundabouts to start September 2024.
10.1.5 Work to improve paths and signage in Gleniffer country park is ongoing as are the
information and interpretation boards for the villages of Inchinnan and Kilbarchan.
These projects should be complete by Spring 2025. 
Implications of the Report 
1. Financial – Any financial elements referenced in this report will be
progressed through the Council’s financial & budget planning process. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – The report details a range of activities which reflect
local community and council planning themes.

Page 9

4. Legal – None 
5. Property/Assets – None 
6. Information Technology –None 
7. Equality & Human Rights - The recommendations contained within this report have
been assessed in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’ human rights have
been identified arising from the recommendations contained in the report. If required
following implementation, the actual impact of the recommendations and the mitigating
actions will be reviewed and monitored, and the results of the assessment will be
published on the Council’s website. 
8. Health & Safety – None 
9. Procurement – None 
10. Risk – None 
11. Privacy Impact – None 
12. COSLA Policy Position – None 
13. Climate Change – there are a range of actions and activities throughout the
Service Update Report which support the Council’s Plan for Net Zero. 
14. Children’s Rights - None 
List of Background Papers: None 
Author: Gordon McNeil, Director of Environment, Housing & Infrastructure