3. Robertson Centre, 16 Glasgow Road, Paisley, PA1 3QG - Report

Renfrewshire Council · 8 November 2023
Back to Infrastructure, Land and Environment Policy Board — 8 November 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

___________________________________________________________________
To: Infrastructure Land & Environment Policy Board 
On: 8 November 2023
___________________________________________________________________
Report by:   Chief Executive
___________________________________________________________________
Title: Robertson Centre, 16 Glasgow Road, Paisley, 
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek approval to extend the Renfrewshire
Valuation Joint Board lease at the Robertson Centre by one year to support
relocation negotiations and works. 
1.2 The building and associated car parking are located at 16 Glasgow Road,
Paisley, in an area of mixed use, as per the attached plan in Appendix 1.
___________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Infrastructure Land & Environment Policy Board
approve an extension of the existing lease, on the same terms, by one year until
31 March 2025.
_________________________________________________________
3. Background 
3.1 The Robertson Centre is a two storey building of traditional construction, built in
1923 as the headquarters for the Renfrewshire Education Authority.  The building
was refurbished in 2010 and has been leased out since 2011.  The building is
not listed. 
3.2 The Robertson Centre has been leased to the RVJB (Renfrewshire Valuation
Joint Board) since 2011.

Page 2

The Board will be aware that the RVJB consists of Renfrewshire, East
Renfrewshire and Inverclyde Council’s and is the body responsible for valuing
properties for Council Tax purposes and Non Domestic Rates along with
maintaining the Electoral Roll. Each Council makes a proportionate contribution
to the running costs, with Renfrewshire Council being the lead authority. 
3.3 In November 2018 authority was granted to extend the lease to the RVJB until
March 2024 and alter the area leased from the whole building to the ground floor
only.   
3.4 It was intended that the current lease would terminate in March 2024 and
approval was granted at ILE Board in May 2023 for the building to be declared
surplus and marketed. 
3.5 Post COVID the ways of working at Renfrewshire House, Council owned
headquarters building, have changed, with fewer staff working every day from
the location.  An opportunity has therefore arisen to re-locate Council staff from
leased properties and reduce property costs.  There is also an opportunity to
accommodate other tenants in the building and improve income and spread
running costs. 
3.6 There are ongoing discussions to accommodate RVJB within Renfrewshire
House, although they are at liberty to consider other locations in any of the
relevant Council areas.  The discussions have been positive however against the
background of in-house staff moves into Renfrewshire House it has proved more
complex than anticipated to assess suitable space requirements and agree
terms.  Time will also be required to undertake any facilitating works necessary. 
3.7 The timing of a move would also require to accommodate RVJB work relating to
the next General election due by January 2025. 
3.8 In order to allow further time to negotiate the optimum space, undertake any
necessary works and accommodate election work it is proposed that the existing
lease is extended by a further year on the same terms (N.B. the repayment for
capital works done in Robertson House will stop as planned). 
3.9  Work to market the Robertson Centre for sale will continue during this extended
period with the aim of agreeing a sale to coincide with the extended lease end
date at March 2025. 
___________________________________________________________________
Implications of the Report 
1. Financial – One year’s annual rental (£54,000 exclusive) to be received. 
 
2. HR & Organisational Development – None. 
3. Community Planning – None.

Page 3

4. Legal – Minute of extension (or similar) is required. 
 
5. Property/Assets – As per this report. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report because no groups or individuals have any involvement currently at
the property. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website.   
8. Health & Safety – None. 
9. Procurement – Not applicable. 
10. Risk – None. 
11. Privacy Impact – Not applicable. 
12. Cosla Policy Position – Not applicable.
_________________________________________________________
List of Background Papers – None. 
___________________________________________________________________ 
Author:           Aileen Johnson; Principal Estates Surveyor; aileen.johnson@renfrewshire.gov.uk;
07483 420781

Page 4

No embedded text on this page.