Page 1

_________________________________________________________________________ 
To: Infrastructure, Land and Environment Policy Board 
On: 30 August 2023
_________________________________________________________________________ 
Report by:  Director of Environment, Housing & Infrastructure
_________________________________________________________________________ 
Heading:   Operational Performance Report
_________________________________________________________________________ 
1. Summary 
1.1 This report provides an overview of key service activities since the last Policy Board
report on 24 May 2023 and an operational performance update on the services and
key projects delivered during this period. 
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy Board: 
2.1 Approves the operational performance update detailed within this report. 
3. Background 
3.1 Environment, Housing & Infrastructure provides essential services to every household
in Renfrewshire and works in partnership with the local community, other service
areas and Community Planning Partners, to deliver key Council priorities and
initiatives. A progress update on the main activities delivered by the services in
respect of the areas of activity delegated to this Policy Board, is detailed below. 
Updates for Infrastructure, Land and Environment Policy Board 
4. Fleet, Roads and Transportation 
4.1 Fleet Services 
4.1.1 Fleet services provided free Cycle Awareness Training for Renfrewshire staff; this
was provided on the 10 May within Underwood Road depot. Cycling Scotland had
developed a 1hr workshop specifically designed to support people that drive for

Page 2

business to adopt safer habits on the roads. The workshop promoted increased
hazard perception, and increased awareness of vulnerable road users, including
those on bikes. In addition to reinforcing the changes in the highway code, it aimed
to provide participants with a greater understanding of their driving needs. 
4.1.2 The Operational Services LGV drivers are undertaking their Driver Certificate of
Professional Competence (DCPC) training. This is being carried out within
Underwood Road Depot and involves around 10 drivers per day two days per week.
Drivers are required to have 35 hours of training every 5 years but due to the
training being face to face this was unable to be progressed during the pandemic. 
4.1.3 Fleet services continue to trial the alternative fuel source HVO (Hydrotreated
Vegetable Oil), to date there have been no mechanical or reliability issues so the
service have now expanded this trial by adding in additional vehicles. HVO is stable,
renewable, sustainable, high quality and significantly reduces greenhouse gas
emissions. Over 5,000 litres of HVO have been used thus far. Switching to HVO has
reduced the associated CO2 emissions for vehicles in the trial by 12.662 tonnes.
There is an average variance of £0.50 per litre between the cost of HVO and Diesel. 
4.2 Roads & Transportation
4.2.1 Roads Capital Investment Programme 
The Roads Capital Investment Programme for 2023/24 has commenced. Since
April, thirteen carriageways and two footways have been resurfaced. The
programme will also include large carriageway patching and surface dressing
schemes.
4.2.2    The Drainage Improvements Programme for 2023/24 has also commenced with 20
drainage schemes now complete.
4.2.3 Coal Tar 
Prior to the 1980’s, tarmac binder materials and surface courses of roads were
derived from coal tar which comes from a by-product during the production of coal
gas. Coal tar is a carcinogenic material and as such is now classified as a hazardous
waste material. Since the 1980’s bitumen has replaced coal tar as the material for
use where coal tar would have previously been used. 
With the changes to waste classification, the Council can no longer sustainably
dispose of coal tar where it is identified as an issue and as such has commenced a
programme of coal tar testing. We have primarily focused this testing on roads where
planned resurfacing works are taking place. 
There are a few locations where the presence of coal tar has been identified and, as
such, these resurfacing schemes have been postponed whilst an alternative
approach to dealing with this issue has been developed. Officers have engaged with
the commercial market and have identified the use of an innovative solution to recycle
the material on site whilst ensuring the road surface received treatment to address
the road defects present. 
We will be trialling this method during next year’s capital programme, with the roads
postponed from this year’s programme being treated in this manner.

Page 3

Our road operations team have also been provided with sampling equipment to
ensure the testing can take place when carrying out routine pothole maintenance.
Updates will be brought back to future meetings of the Board to highlight progress
with this issue. 
4.2.4 #YouDecide 
To date, eight projects have been completed. These have included: Resurfacing the
`footpath at Broompark Drive that leads to Inchinnan Primary, Seating installed on
pedestrian cycle route on the A8 Greenock Road and access improvements to
Glencoats Park. Community consultation surveys were issued in June to determine
which items of equipment the public would like to see in the successful park and gym
equipment projects. Community engagement is currently on going in Bishopton on
roundabout designs. 
4.2.5 Road Operations 
Within Road Operations Team, two employees have successfully passed their Site
Management Safety Training Scheme Course. Twelve employees have undertaken
tractor and dumper training and sixteen employees have been trained on the use of
the roller.  This will allow Road Operations to complete a variety of work, which was
previously carried out by a contractor, in house.
4.2.6 Roads Statutory Inspection Team 
The Statutory Team have been inspecting over 60 new developments with 6 sites
adopted so far, in this financial year, which includes 1km of roads and footways. 
From 1 April, a charge for the removal of illegal signage on street furniture was
introduced.  To date there have been 48 advisory letters and 31 fines issued.  The
team are now progressing with advisory visits to businesses to encourage the
removal of A-frames, which can block pedestrian footways making it difficult for
pedestrians to pass safely.  
Since 1 April, 185 advisory letters have been issued to properties advising them to cut
back vegetation which is encroaching on either a road or footway.
4.2.7 Street Lighting and Energy Management
From 1 September 2023, the responsibility for the delivery of the streetlighting
maintenance function will move from Building Service to the Roads Service.
Engagement has taken place with the current workforce to ensure the transition will
be as smooth as possible and it is expected that there will be no impact to current
service delivery.
In addition, the responsibilities for the Energy Management Unit that previously sat
within Facilities and Property Services has now moved over to the Climate, Public
Protection and Roads Service. Detail of the work undertaken by the team is outlined
at section 5.2 of this report.
4.3 Active Travel & Infrastructure Improvement Update
4.3.1 Smarter Choices, Smarter Places
Environment, Housing & Infrastructure Services have been successful in their funding
applications for Air Quality Improvement and Paths for All.  We are working with
schools and communities to implement new Active Travel projects as part of the
Smarter Choices, Smarter Places funding programme:

Page 4

 Beat the Street
This project aims to increase people’s activity levels and improve health.  It’s a
behavioural change initiative that is focused on a game.  During the game,
residents record their distance walked/cycled by tapping their ‘Beat the Street’ card
on Beat Boxes positioned on lamp posts at various locations.  They can view their
total distance accumulated online, creating competition whilst rediscovering their
local area and it is a game which is suitable for all ages.  The game will take place
during Autumn 2023 in Renfrew, Erskine, Bishopton, Inchinnan and Langbank. 
 School Active Travel Promotion
Up to 20 Primary Schools can engage with a year-long initiative (WOW – Walk to
School) that rewards pupils with monthly badges for travelling actively for a set
period of days.  This is particularly useful to use with schools that report persistent
congestion issues.  All 50 Primary Schools will receive materials to support a
focused Walk to School Week.  Living Streets Scotland, charity for everyday
walking, will offer support and run additional promotions throughout the year. 
 Not far, Leave the Car Campaign
Our BetterPoints initiative in now moving into its second year. The project has
reached over 1,110 users across Renfrewshire and allows participants to be
rewarded with discounts at local businesses for leaving the car and choosing
sustainable travel instead. BetterPoints will continue to support Renfrewshire
Council in becoming net-zero by 2030 and to promote healthier, more active
lifestyles for local people. Recent campaigns include National Walking Month in
May, Bike Week in June and Cycle to Work in August.
 Scootability 
This initiative is now continuing into its fourth year where all schools receive the
opportunity for their pupils in primary 3 and primary 4 to learn how to safely scoot
within their community and to encourage Active Travel to and from school.
Newmains, Kirklandneuk and St Anne’s Primary are taking part during the summer
months with more to schools enrolling. We have over 550 pupils trained in
Scootability, and those schools taking part can apply for funding to have Scooter
parking at their school. 
 School Streets
This new project allows us to work with all primary schools across Renfrewshire to
establish Junior Road Safety Officers where we can run campaigns and fun
initiatives with pupils, parents and communities to improve the safety around
schools. We want more people to use the car less and to support this, schools will
receive resources, materials and recommendations on how they can improve
Active Travel and have more people walking, cycling and wheeling to and from
school.  Various meetings with schools have taken place including St Peters,
Langcraigs, Inchinnan, Barsail and Todholm Primary. 
 Smarter Choices for Young People 
Working with the Council’s Community, Learning and Development team, we are
currently putting a new project together to target and engage with young people
aged 12 - 25 years to improve travel choices available. An example of this includes
continuing working with young people to apply for their National Entitlement Card
(NEC) or Young Scot National Entitlement Card (Young Scot NEC) so they can
access free bus travel as part of the Young Scot free Bus Pass Programme.

Page 5

4.3.2 The next phase of the Paisley to Renfrew active travel route including a pedestrian
and cycle crossing on Nethergreen Road to Kirklandneuk Primary School have been
implemented during the school summer holidays. Repairs to fencing and fly-tipping
removal on the ex-rail line section are complete and plans to energise the street
lighting on the off-road section are under way in association with Scottish Power.
4.3.3 Work continues in association with Sustrans to improve accessibility to the National
Cycle Route Network.   An application to extend active travel improvements
northwards in Jenny’s Well, parallel with Cartha Crescent, to the footbridge into the
ex-BASF housing development has been submitted with news expected in August
2023.  This would complement the recently upgraded shared pedestrian and cycle
path connecting NCN7 at Hawkhead Road through Jenny’s Well, as well as the
installations of bike shelter, bike repair station and accessible path to MUGA in
Jenny’s Well.
4.3.4 A public engagement on Bus Partnership funded interventions at the Mill
Street/Glasgow Road junction and Gauze Street/Lacy Street junction to promote bus
priority will commence in September. The consultation feedback will inform the final
design.
4.3.5 At the request of residents and Ward Members, a zebra crossing on Park Road has
been converted to a signal-controlled puffin crossing to enhance road safety.
4.3.6 The consultation phase of Southholm Roundabout improvements concluded in June
with strong support for two lane approaches for vehicles and pedestrian/cycle
connections.  Next phase of this feasibility study will be an application to Sustrans
funding for detailed design works. 
5.  Climate Change
5.1 Biodiversity 
Seeding of eleven additional wildflower areas for 2023 was completed and these
areas have flowered. We are currently finalising plans for the autumn maintenance of
these areas to reduce nutrients and prepare for the perennial plants to flourish and
flower next year. 
We are reviewing the next tranche of sites and will shortly commence preparation of
the next 11 areas in advance of the winter and have these ready for seeding.
5.2 Energy Management
5.2.1 ECO4 Flex   
The UK Government has introduced a new funding stream to help reduce carbon
emissions called ECO4 Flex which supersedes ECO3 Flex, a scheme that
Renfrewshire Council was previously signed up to. ECO4 Flex will allow the Council
to provide funding to Renfrewshire’s private sector, fuel poor households that do not
meet criteria for other schemes, as well as low-income households that are
vulnerable to the effects of the cold. The scheme is part of the UK Government
Energy Company Obligation and will be advertised in the National Press to
maximise the funds uptake.

Page 6

The qualifying criteria for ECO-Flex, as set by Ofgem, is published on our website in
a document called a Statement of Intent. ECO-flex will apply to owner occupier and
private rented accommodation. ECO-flex, does not apply to Council Housing or
Registered Social Landlords. 
The table below highlights the savings ECO4 Flex has achieved to date based on
annually recurring savings:
Financial Year
Value of Grant
Funding
Requested (£)
Total Annual
Consumption
Saving (kW)
Total Annual
CO2 Saving
in Kg
Total
Annual
Cost
Saving (£)
2023/24 £627,560           256,412         119,644  £41,385 
5.2.2 Local Heat and Energy Efficiency Strategies (LHEES)
SWECO Limited have been appointed to assist Renfrewshire Council in delivering the
LHEES strategy before the end of 2023. An LHEES Officer has been appointed to
deliver the strategy. An internal working group has been formed with key officers from
across the Council meeting every 4 weeks to help shape the strategy. 
A public stakeholder engagement event was undertaken on 28 June 2023 with
positive feedback that will feed into the core themes of the strategy.
5.2.3  Energy Advocacy
The Energy Advocacy service has been brought in-house. The 4 staff members
previously employed by The Wise Group have now been transferred over to
Renfrewshire Council and reside across both the Energy Management Unit and
Housing. This comes during a cost-of-living crisis and will help residents of all tenure
within Renfrewshire. 
6. Team Up to Clean Up
6.1 More than 300 new members joined the Team Up to Clean Up Facebook platform in
the last 3 months. As such, over 4,650 members regularly engage, and/or volunteer,
in supporting local environmental quality.  Group engagement remains high with a
160% increase in comments over the same period. This demonstrates the positive
impact and growth of the group.
6.2    To demonstrate appreciation of volunteer’s efforts, the most active volunteers were
invited to attend a Community Development Volunteer Appreciation event on Monday
5 June.  26 Team Up to Clean Up volunteers attended, receiving a certificate and a
small gift.  Volunteers were treated to tea, coffee and cake, while entertained with a
quiz featuring fun questions and photographs relating to previous group activity and
highlights.  The event presented an opportunity to thank participants for their efforts
and for them to network. Over 40 Team Up to Clean Up T-shirts were distributed at
the event.  Further opportunities to receive t-shits and Take the Lead merchandise
were offered at local sites and a supply has been delivered to local libraries to enable
volunteers to pick up at their convenience.

Page 7

6.3  The Taskforce have a focus on educating local businesses, supporting them to
reduce local flytipping where possible. Three commercial incidents have been
reported this year outside the Rannoch Road Quarry, a site of significance after
appearing on BBC1’s Dispatches.   After speaking with the Taskforce, the site owner
installed a camera as a preventative measure and agreed to share future evidence
obtained with the Team.  A Renfrewshire vehicle rental company provided evidence
for a witnessed flytipping incident which resulted in the issue of a fixed penalty Notice. 
6.4 During a meeting with SEPA (Scottish Environmental Protection Agency), the
Taskforce learned of Fixed Monetary Penalties (FMP).  This is a unique power to
SEPA who can issue fines up to £40,000 for flytipping, avoiding the need for a
submission to the Procurator Fiscal. One of the cases being prepared by the
Taskforce for submission has been requested by SEPA to take forward. The case
relates to a “white van man” operation.  SEPA have arranged for a block on all related
social media for the individual/company, so they cannot now advertise personally, or
as the company name, for business. This will be a useful tool going forward.         
6.5 The Take the Lead Campaign has so far secured over 250 Pledges from
Renfrewshire dog owners. The Campaign will continue to be promoted through Team
up to Clean Up and items for signatories, will be available from local libraries. The
Environmental Taskforce further offered branded items to volunteers and those
signing the Pledge at various drop-in sessions across the summer. 
6.6 The Scottish Government, in partnership with Keep Scotland Beautiful, Zero Waste
Scotland and the Scottish Environmental Protection Agency, released an updated
National Litter and Flytipping Strategy on 28 June 2023.  The strategy aligns future
action closely with Scotland’s circular economy and considers the positive impacts
upcoming changes in legislation will have in tackling the current throw away
culture.  The strategy further links pollution, caused by litter and flytipping, in with
climate change and biodiversity loss as recognised in the United Nations Making
Peace with Nature report.
6.7  The accompanying 2023-24 Action Plan outlines significant actions which will be
launched in the next 12 months:
 Powers to issue fixed penalty notices on the drivers of vehicles from which
litter is discarded, 
 Fixed penalty notices issued to householders who fail to take responsibility for
their household own waste, 
 Increased fixed penalty notice of £200 to £500 for flytipping, which may
increase to £1,000 in future, 
 Working with SEPA to improve their scrutiny and control over applicants for a
Waste Carriers License 
 Increased use of digital technologies to detect and disrupt unregistered or
rogue waste carriers advertising on online forums, and
 Powers to seize vehicles involved in flytipping.
6.8  It is anticipated that the Environmental Taskforce will be well placed to enforce these
new powers, in particular, the fixed penalty notices.  The Team is looking forward to
the introduction of these changes and to the benefit’s new resources such as litter
hubs and educational tools will have on communities and the Team up to Clean Up
Campaign.

Page 8

6.9  The table below offers some key statistics of the work delivered by the Taskforce over
this period: 
7. Waste and Recycling Services
7.1 Waste Services have been successful in applying for funding through Material Focus
to increase the recycling of Small Waste Electrical and Electronic Equipment (WEEE)
across Renfrewshire. This will see collection points installed for Small WEEE within
community facilities across Renfrewshire, such as libraries, with the support of
colleagues in One Ren. The main aim of this project is to increase access of small
WEEE recycling and to divert these materials from household general waste bins.
This will be managed by Waste Services and our compliance scheme partner REPIC.
The funding also includes a communications campaign to promote the service and it
is expected that this will go live in September. 
7.2 The Circular Economy (Scotland) Bill was posted on 13 June 2023. The Bill requires
Scottish Ministers to introduce measures to help develop a circular economy which
will tackle waste and increase reuse and recycling rates. 
The provisions of the Bill that affect local authorities are as follows:
 Householder’s duty of care in relation to waste: making it a criminal offence for
a householder to breach their existing duty of care under the Environmental
Protection Act 1990, in relation to the transfer of waste, and creating a new
fixed penalty regime to enforce these duties.
 Household waste: requiring local authorities to comply with a code of practice
on collection and recycling and giving local authorities a package of new
responsibilities and powers, including powers for the Scottish Ministers to set
recycling targets for local authorities.
 Littering from vehicles: establishing a new civil penalty regime that will make
the keeper of a vehicle liable to pay a civil penalty charge in respect of a
littering offence committed from that vehicle.
 Enforcement powers in respect of certain environmental offences: improving
enforcement against fly-tipping and other waste crime through a power
allowing the Scottish environment Protection Agency (SEPA) and local
authorities to seize vehicles involved in specified waste crime.
Action April – 22
June
Cumulative from
1 December
Proactive visits to identified hotspot areas 602 1281
Number of reports investigated 565 1181
Tonnes of flytipping removed 145 360
Number of sites secured to prevent further
flytipping
2 8
Letters to private landowners 31 65
Visits to businesses to ensure Waste Disposal
Arrangements in place
35 81
Fixed Penalty Notices Issued 12 47

Page 9

7.3 A call for evidence on the Circular Economy Bill was made by the Scottish
Parliament’s Net Zero, Energy and Transport Committee. However, due to the
timeframe for response, CoSLA will be providing a representation on behalf of local
authorities.
7.4 New rules to ensure packaging producers pay for the cost of recycling their
packaging are being deferred a year from October 2024 to 2025. Producers have
already started to use less packaging and adopt easier to recycle packaging formats,
ensuring that costs are not then passed onto households later on. The decision to
defer producer payments was taken jointly with the devolved administrations and will
provide industry, local authorities and waste management companies with more time
to prepare to ensure the success of the scheme, helping make sure it is best
designed to deliver on long term recycling goals while supporting households with the
immediate challenge of high prices caused by inflation.
Producers will pay authorities the full net costs of running efficient and effective
kerbside collection services for household packaging waste, Packaging EPR will
support Councils to deliver services to agreed standards. It will also act as an
incentive to producers to reduce packaging leading to lower volumes of waste to
collect and maximise the opportunities for households in the authority area to dispose
of packaging waste responsibly.
7.5 The launch of Scotland’s Deposit Return Scheme will be delayed until at least
October 2025. Discussion on a UK wide scheme to support business and the internal
market act requirements are ongoing and Council will keep involved in discussions
through networks and COSLA to understand the implications for Renfrewshire in the
years ahead. 
7.6 The Garden Waste Permit Scheme has progressed well, each household was
provided with an information pack explaining how the system would work, also, the
Waste Strategy Team arranged 14 Roadshows around the Renfrewshire area for
residents to discuss and ask questions. The scheme has received great support from
residents and communities, we have issued over 26,500 permits to households
across Renfrewshire and this number continues to grow, this is approaching a 40%
uptake across the council area, which is inline with what other councils that
implemented similar schemes achieved in the first year, and higher than projected for
Renfrewshire in the first year. When introducing the scheme some elected members
raised concerns of the possibility of fly tipping, there has been no increase in fly
tipping incidents relating to garden waste reported since the scheme was introduced
compared to the same time period of last year, with a single figure report received. 
There has been an increase in garden waste material going through the HWRC’s and
a corresponding decrease in garden waste collected from household routes.  
7.7 Train the Trainer for the new Roller packer and mobile waste compactors within the
HWRC’s has been completed by the manufacturer and training is being rolled out to
waste operatives. This new equipment was purchased with circa £370k of funding
from the Scottish Governments Recycling Investment Fund and will increase capacity
at the HWRCs and reduce the amount of vehicle movements increasing efficiency. 
7.8 Also, three members of staff within Environment, Housing and Infrastructure have
been successful in their application for a fully funded Business Management degree
at Glasgow Caledonian University.

Page 10

8. StreetScene
8.1 The Grass cutting programme has continued over the summer to complete the
cyclical fortnightly grass cutting and we are now on the second cycle of hedge cutting
in line with the grass cutting model which is due to be completed, weather dependent,
at the end of October.
8.2 Renfrewshire Council has been advised, by Scottish Forestry, of infections in Larch
tree stock on Gleniffer Braes. Subsequently, a formal Statutory Plant Health Notice
has been served on Renfrewshire Council. There is a legal requirement to remove
the 3,500 trees and works are underway to have this competed with no impact on
nesting birds. There are significant car park closures/restrictions and road
closures/restrictions during works to ensure public safety. 
9. Play Parks
9.1  Tenders for the agreed and planned refurbishment of Howwood Park Toddler /
Junior, Houston 
Public Park and Inchinnan Playing Field play areas have been awarded and work will
commence slightly later than planned in Autumn 2023. Consultation surveys were
completed late June for four play areas to be renewed as part of the #YouDecide
project. These are Jenny’s Well, Paisley; South Candren Village Green, Paisley;
Glebe Street, Renfrew and Station Road, Langbank. Installation of these sites is
estimated to begin late in 2023 / early 2024, on the basis of valid bids being received
for all contracts.
9.2  Consultation surveys were completed for a further 6 play areas late June and these
are Miller Street, Johnstone; Anne Avenue, Renfrew; Netherhill Road, Paisley; Victory
Gardens, Renfrew, Tannahill Crescent, Johnstone and Urquhart Crescent, Renfrew.
Renewal specifications were prepared using the results of the consultation surveys
and contracts for each of the play areas are currently out to competitive tender.
Installation of these sites is estimated to begin late in 2023 / early 2024, on the basis
of valid bids being received for all contracts.
9.3  Refurbishment of the Multi Use Games Area (MUGA) at Netherhill Road in Gallowhill
is scheduled and should take about 2 – 3 weeks on site to complete.
9.4  Some early works to repair a footbridge at the Durrockstock Park pond were carried
out in July. 
More extensive repairs to the masonry surrounding the pond edge were carried out in
July & August. 
9.5  Some essential repairs were carried out at Renfrew Skatepark in late May and June
and it is anticipated that some further refurbishment will be carried out in Autumn
2023. 
10.  Cemeteries
10.1  Two further road sections at Hawkhead Cemetery have been upgraded in terms of
kerbing, drainage and road surfacing works. The external railings and main entrance
gate have been painted. New upgraded seating in the baby garden has been
installed. The area has been enhanced further with the planting of new trees and we
await the installation of two memorial plaque structures so that loved ones can have
the option of a plaque dedicated to their baby.

Page 11

Implications of this report 
1.  Financial – As detailed in 4.1.3 the HVO trial comes at an average additional cost
of £0.50 per litre. 
2.  HR and Organisational Development – Training is detailed in sections 4.1.2,
4.2.5, 7.7 & 7.8 of this report.   
3. Community/Council Planning – 
Our Renfrewshire is thriving / Reshaping our place, our economy and our
future - the service is actively involved in the Invest in Renfrewshire scheme and
investing in road network to support and facilitate economic growth. 
Creating a sustainable Renfrewshire for all to enjoy - working in partnership
with the community to deliver a cleaner Renfrewshire. Promoting and encouraging
waste minimisation through reducing, reusing and recycling. Reducing carbon
emissions, through LED streetlights and electric and low emission vehicles within
the Council fleet. 
Our Renfrewshire is well - the service encourages use of our parks and open
spaces to promote a healthy and active lifestyle. 
4.  Legal – There is a legal requirement to remove 3,500 Larch trees in Gleniffer
Braes. Following the advice provided by Scottish Forestry as mentioned in section
8.2 of this report. 
5.  Property/Assets – The Council’s roads, fleet and open space infrastructure is
maintained and enhanced. 
6.  Information Technology – None 
7.  Equality & Human Rights – The recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in
the report. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored, and
the results of the assessment will be published on the Council’s website. 
8. Health and Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12.  Cosla Policy Position – None.
13.  Climate Risk – The trial of Hydrotreated Vegetable Oil in fleet vehicles has had a
positive impact on reducing the climate risk associate with fuel emissions across
the vehicles used in the ongoing trial. The reduction in CO2 will continue to be
monitored as the trial progresses. 
The provisions of the Circular Economy (Scotland) Bill published on 13 June 2023
will be considered and closely monitored to determine the impact of these
measures on climate risk.

Page 12

List of Background Papers: 
None 
Author: Gordon McNeil, Director of Environment, Housing & Infrastructure