Notice of Meeting and Agenda
Infrastructure, Land and Environment Policy Board
Date Time Venue
Wednesday, 18 March
2026
10:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN
MARK CONAGHAN
Head of Corporate Governance
Membership
Councillor Michelle Campbell (Convener):     Councillor Audrey Doig (Depute Convener):
Councillor Jennifer Adam:  Councillor Stephen Burns:  Councillor Jacqueline Cameron: 
Councillor Carolann Davidson:  Councillor Eddie Devine:  Councillor Chris Gilmour: 
Councillor Gillian Graham:  Councillor John Hood:  Councillor James MacLaren: 
Councillor Iain McMillan:  Councillor John McNaughtan:  Councillor Iain Nicolson: 
Councillor John Shaw:  Councillor Ben Smith:  Councillor Andy Steel: 
Hybrid Meeting
Please note that this meeting is scheduled to be held in the Council Chambers. 
However, it is a hybrid meeting and arrangements have been made for members to
join the meeting remotely should they wish.
Further Information
This is a meeting which is open to members of the public.
A copy of the agenda and reports for this meeting will be available for inspection prior
to the meeting at the Customer Service Centre, Renfrewshire House, Cotton Street,
Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk
Members of the Press and Public
Members of the press and public wishing to attend the meeting should report to the
customer service centre where they will be met and directed to the meeting.
Page 1 of 56

Page 2

Webcasting of Meeting
This meeting will be filmed for live or subsequent broadcast via the Council’s internet
site – at the start of the meeting the Convener will confirm if all or part of the meeting
is being filmed.  To find the webcast please navigate to
https://renfrewshire.public-i.tv/core/portal/home
Page 2 of 56

Page 3

Apologies
Apologies from members.
Declarations of Interest and Transparency Statements
Members are asked to declare an interest or make a
transparency statement in any item(s) on the agenda and to
provide a brief explanation of the nature of the interest or the
transparency statement.
1 Community Asset Transfer Sub-committee
Minutes of the meetings of the Community Asset Transfer Sub-
committee held on 5 November 2025 and 21 January 2026.
5 - 8
2 Revenue and Capital Budget Monitoring 2025/26 at 9
January 2026
Joint report by the Director of Finance & Resources and the
Director of Environment, Housing & Infrastructure.
9 - 19
3 Service Update Report
Report by Director of Environment, Housing & Infrastructure.
20 - 30
4 The Renfrewshire Council (Prohibition and restriction
of waiting, loading and parking places) (Consolidation
& Amendment Order 1006) Order 202*, Ref TRO 1006
Report by Director of Environment, Housing & Infrastructure.
31 - 44
5 Safeguarding Scotland’s Water Environment- SEPA
Consultation
Report by the Director of Environment, Housing & Infrastructure.
45 - 56
6 Surplus declaration of land at Seedhill Road, Paisley
7 39 Hallhill Road, Johnstone
EXCLUSION OF PRESS AND PUBLIC
The Board may by resolution exclude the press and public
from the meeting during consideration of the following
items of business as it is likely, in view of the nature of the
Page 3 of 56

Page 4

business to be transacted, that if members of the press and
public are present, there could be disclosure to them of
exempt information as defined in paragraphs 9 and 12 of
Part I of Schedule 7A of the Local Government (Scotland)
Act, 1973.
Exempt Item
Exempt documents are no longer available in print format. You
will require to click on this link and log in to access the
documents. Please note that access to exempt documents is
now restricted.
8 Co-mingled Food & Garden Waste Contract Settlement
Report by the Director of Finance and Resources and the
Director of Environment, Housing & Infrastructure.
9 Bridgewater Shopping Centre, Erskine – Valuation of
Ground Lease
Report by the Chief Executive.
Page 4 of 56

Page 5

Minute of Meeting
Community Asset Transfer Sub-committee
Date Time Venue
Wednesday, 05 November
2025
13:00 Microsoft Teams Meeting,
Present: Councillor Jacqueline Cameron, Councillor Michelle Campbell, Councillor Carolann
Davidson, Councillor Audrey Doig, Councillor Chris Gilmour
In Attendance
A Morrison, Head of Economy & Development, E Shearer, Regeneration & Place Manager
and S Inrig, Assistant Manager (Employability) (all Chief Executive's); and N Young,
Managing Solicitor (Litigation and Advice) and E Gray, Senior Committee Services Officer
(both Finance & Resources).
Chair
Councillor Campbell, Convener, presided.
Webcasting of Meeting
Prior to the commencement of the meeting the Convener intimated that this meeting of the
Policy Board would be filmed for live or subsequent broadcast via the Council's internet
site.
Declarations of Interest and Transparency Statements
There were no declarations of interest or transparency statements prior to the
commencement of the meeting.
Item 1
Page 5 of 56

Page 6

1 Community Asset Transfer Request – Former St Ninian’s Church
Hall
There was submitted a report by the Chief Executive relative to a Community Asset
Transfer request submitted in respect of the transfer of the former St Ninians Church
Hall under Part 5 of the Community Empowerment (Scotland) Act 2015 (the Act). The
report provided information in relation to the site, the applicant, the asset transfer
request and the consideration of the application by the Community Asset Transfer
Officer Panel which recommended that the application be approved. 
During discussion of the application members sought further information around any
progress which had been made towards securing the funding detailed within the
application and the expected impact that a failure to secure any of these revenue
streams would have on the business plan; the method used to estimate costs in future
years, whether inflation had been taken into account and, if not, the expected impact
of inflationary costs; the steps which would be taken to ensure the business plan was
achievable in the context of the applicant describing the cost estimate of £400,000 as
"challenging but achievable"; contingency plans which were in place in the event that
the business plan was not as successful as predicted; any discussions which had
taken place between the applicant and the management team at the Tannahill Centre
around collaborative working; and the outcome of any engagement which has been
undertaken with neighbouring properties and facilities.
In terms of Standing Order 59, Councillor Campbell moved that the application be
continued to a future meeting of the Sub-committee to allow officers to engage further
with the applicant around the additional information requested by members. This was
agreed unanimously.
DECIDED: That the application be continued to a future meeting of the Sub-
committee to allow officers to engage further with the applicant around the additional
information requested by members.
Page 6 of 56

Page 7

Minute of Meeting
Community Asset Transfer Sub-committee
Date Time Venue
Wednesday, 21 January
2026
13:00 Microsoft Teams Meeting,
Present: Councillor Jacqueline Cameron, Councillor Michelle Campbell, Councillor Carolann
Davidson, Councillor Chris Gilmour
Chair
Councillor Campbell, Convener, presided.
In Attendance
A Morrison, Head of Economy & Development, E Shearer, Regeneration & Place Manager
and S Inrig, Programme Manager – Community Asset Transfer and Regeneration (all Chief
Executive's); and E Gray, Senior Committee Services Officer (Finance & Resources).
Webcasting of Meeting
Prior to the commencement of the meeting the Convener intimated that this meeting of the
Sub-committee would be filmed for live or subsequent broadcast on the Council's internet
site.
Apology
Councillor Audrey Doig.
Declarations of Interest and Transparency Statements
There were no declarations of interest or transparency statements prior to the
commencement of the meeting.
Item 1
Page 7 of 56

Page 8

1 Continuation: CAT Request – Former St Ninian’s Church Hall
Under reference to item 1 of the Minute of the meeting of this Sub-committee held on
5 November 2025, there was submitted a report by the Chief Executive relative to a
Community Asset Transfer request submitted in respect of the transfer of the former
St Ninians Church Hall under Part 5 of the Community Empowerment (Scotland) Act
2015 (the Act). 
The report provided information on the application which had been considered by the
Sub-committee and advised that further information had been requested by members
to help assist in their decision making. Further information had since been provided by
the applicant and this was summarised at section 4 and set out in full at Appendix 2 of
the report.
Councillor Campbell, seconded by Councillor Davidson, moved that the application be
refused due to the lack of community support demonstrated and concerns around the
sustainability of the proposed business plan. This was agreed unanimously.
DECIDED:  That the application be refused due to the lack of community support
demonstrated and concerns around the sustainability of the proposed business plan.
Page 8 of 56

Page 9

PUBLIC 
___________________________________________________________________ 
To: Infrastructure Land & Environment Policy Board 
On: 18 March 2026
___________________________________________________________________ 
Report by: Director of Finance and Resources 
Director of Environment, Housing & Infrastructure
___________________________________________________________________ 
Heading: Revenue and Capital Budget Monitoring 2025/26 at 9 January 2026
___________________________________________________________________ 
1. Summary 
1.1 At the close of reporting Period 10 on 9 January 2026, the projected revenue
outturn at 31 March 2026 for those services reporting to the Infrastructure,
Land and Environment Policy Board is an overspend position of £0.197m
(0.5%) against the revised budget for the year. 
1.2 The projected capital outturn at 31 March 2026 for projects reporting to the
Infrastructure, Land and Environment Policy Board is a break-even position. 
1.3  This is summarised over the relevant services in the table below and further
analysis is provided in the report and appendices. 
Revised
Annual
Budget
£000
Projected
Outturn
£000
Budget
Variance
(Adv)/Fav
£000
Budget
Variance
%
Revenue        
Environment & Infrastructure 39,847 40,044 (197) (0.5%)
Total 39,847 40,044 (197) (0.5%)
Capital        
Environment & Infrastructure 18,428 18,428 0 0.0% 
Item 2
Page 9 of 56

Page 10

PUBLIC
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy
Board: 
2.1 Notes the projected Revenue outturn overspend position of £0.197m (0.5%),
which is an improvement on the Period 8 reported position of £0.380m (1.0%). 
2.2 Notes the projected Capital outturn break-even position. 
2.3 Notes the budget adjustments in appendix 1 and 2. 
3. Revenue Budget Projection – overspend of £0.197m by 31 March 2026 
3.1 The tables in Appendix 1 and 2 present the projected year-end position for all
services reporting to this board, by both objective analysis (which division is
spending the budget – appendix 1) and subjective analysis (what the budget
is spent on – appendix 2). Material variances affecting the projected position
are analysed further below. 
3.2 It should be noted that the projected outturn position reported here is based
on the latest information available, and that budget holders are obliged to
seek mitigating action to minimise significant budget variances. The final
outturn position will be reported to Council in June. 
3.3 The level of DEFRA funding referenced in the previous report to Board was
previously confirmed at £2.646m for 2025/26. Following the successful
navigation of PACK UK’s complaints procedure by the Council , this has been
revised to £4.290m and should be received in full by the end of the financial
year. 
3.4 In 2025/26, the Council has committed some of this funding to assist in the
collection, handling and disposal of packaging materials. The remaining
balance will be earmarked in reserves at 31 March 2026 to fund further such
commitments in line with the prescriptive grant conditions. 
4. Objective Analysis – Significant Variances 
Environment, Housing, and Infrastructure – (£0.197m) overspend  
Page 10 of 56

Page 11

PUBLIC 
4.1 Waste Services – (£0.210m) overspend by 31 March 2026 
4.1.1 This reflects the financial position for Refuse Collection, Refuse Disposal and
Household Waste Recycling Centres. 
4.1.2 The overspend for Refuse Collection (£125k) is primarily driven by increased
staff costs resulting from higher levels of workforce absence, which create
significant operational challenges. These additional costs have been partially
offset by an over recovery of income. 
4.1.3 The service continues to closely monitor the potential impact of inflationary
pressures and contractual uplifts on the projected outturn. 
4.2 Social Transport – (£0.189m) overspend by 31 March 2026 
4.2.1 The projected overspend has increased by £31k since the previous board
report. The overspend sits within employee costs due to the need to hire
agency staff with the appropriate driving license categorisation to cover
sickness absence. 
4.2.2 The service is adhering to the Council’s policies and procedures regarding
absence management and is actively working with HR to effectively manage
the current sickness within the team. However, this situation is impacting the
financial position of the service, as there is an ongoing need to utilise agency
staff to maintain service levels. 
4.2.3 Finance, as part of the annual budget process are currently reviewing the cost
to operate the service against available budget provided by Education and
HSCP to ensure that they accurately reflect the services required by
Education and HSCP (from 2026/27 onwards). 
4.3 Roads Operations – £0.222m underspend by 31 March 2026 
The reported underspend is primarily due to the projected spend relating to
work by contractors being lower than anticipated. Given the reactive nature of
the service and the potential impact of any inflationary changes, this will
continue to be closely monitored throughout the financial year. 
It should also be noted that the service has generated additional income by
delivering capital-related functions internally. As a result, a greater proportion
of work has been recharged to the relevant capital programme, thereby
reducing the requirement to engage with external contractors.  
Page 11 of 56

Page 12

PUBLIC 
4.4 Infrastructure and Assets – £0.085m overspend by 31 March 2026 
The projected overspend is in the main due to higher than expected work by
contractor costs for work on the new Renfrew Bridge. As this is the bridge’s
first full year in operation, running and maintenance costs have been greater
than originally forecast. 
5. Subjective Analysis – Significant Variances 
5.1 Supplies and Services – (£0.823m) overspend by 31 March 2026 
5.1.1 The movement from the previous report to this report is £0.066m. As noted in
4.4, this mostly relates to higher than expected work by contractor costs for
work on the new Renfrew Bridge. 
5.1.2 As per the previous report, the remaining balance of the overspend is
primarily driven by inflation across four key service areas: Neighbourhood
Services (£0.134m), Infrastructure and Assets (£0.169m), Fleet Services
(£0.144m) and Refuse Disposal (£0.147m). The increased costs are largely
due to rising prices for contractor services, materials, and related services. 
5.3 Income – £0.534m over recovery by 31 March 2026   
In line with Section 4.3, Roads Operations, Infrastructure and Assets, and
Transport and Development have generated additional income by delivering
capital-related dayworks internally in addition to recharging salary related
costs to the appropriate capital projects. 
Neighbourhood Services also received income for ad-hoc service requests,
generating an additional £82k over budget. In addition, Refuse Disposal is
projecting increased income from special uplifts, amounting to £61k. 
6. Capital Budget Projection – break-even position by 31 March 2026 
6.1 The Capital Investment Programme 2025/26 to 2029/30 was approved by the
Council on 27 February 2025. For Infrastructure Land & Environment the
revised capital spend for 2025/26 is £18.428m. 
6.2 The in-year Capital budget is forecast to break even by 31 March 2026
however, this will be monitored as the projects progress. Further details of the
programme can be found in the Capital Monitoring report at Appendix 3. 
6.3 A number of budget adjustments between years have taken place, to reflect
revised programming of some capital projects. Details of these adjustments,
which amount to £1.800m, are as follows: 
Page 12 of 56

Page 13

PUBLIC
Project Amount
(£m)
Budget increase to reflect grant award
Red Smiddy Roundabout to Erskin ATT2 – Transport
Scotland 1.600
Budget carried forward into 2026/27 to reflect programming
Roads/Footways Upgrade Programme (0.459)
Improvements to Outdoor Access and Play Area
Programme (0.014)
Multi-Purpose Bins (0.056)
Renewal of Play Parks (0.631)
Nature Restoration Fund (Biodiversity) (0.010)
Budget accelerated into 2025/26 
Vehicle Replacement Programme 1.320
Vehicles for Environmental Taskforce 0.050
Total (1.800) 
Page 13 of 56

Page 14

PUBLIC 
Implications of the Report 
1. Financial 
The projected budget outturn position for the Infrastructure, Land and
Environment Revenue budget is an overspend of £0.197m. Income and
expenditure will continue to be monitored closely for the rest of the financial
year and as far as possible, steps will be taken to mitigate any overspend.   
The projected outturn position for the Infrastructure, Land and Environment
Capital budget is a break-even position. 
2. HR & Organisational Development 
While staffing budgets form a significant proportion of the Council’s revenue
budgets, there are no direct implications arising from the recommendations in
this report. 
3. Community/Council Planning 
Community Plan
Our Renfrewshire is thriving The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Our Renfrewshire is well 
Our Renfrewshire is fair 
Our Renfrewshire is safe
Council Plan
Reshaping our place, our
economy, and our future The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Building strong, safe, and resilient
communities
Tackling inequality, ensuring
opportunities for all
Creating a sustainable
Renfrewshire for all to enjoy
Ongoing revenue and capital budget
monitoring is a tool to enable good
financial management so that the Council
has resources now and in the future for
continued service delivery.
Working together to improve
outcomes 
4. Legal 
There are no direct implications arising from the recommendations in this
report.  
Page 14 of 56

Page 15

PUBLIC
5. Property/Assets 
The capital expenditure noted in this report will result in lifecycle maintenance
improvements to existing properties and replacement of ICT assets and
infrastructure. 
6. Information Technology 
There are no direct implications arising from the recommendations in this
report. 
7. Equality & Human Rights 
There are no direct implications arising from the recommendations in this
report. 
8. Health & Safety 
There are no direct implications arising from the recommendations in this
report. 
9. Procurement 
While Procurement is an important consideration prior to the council incurring
any revenue or capital spend, there are no direct implications arising from this
report. 
10. Risk 
The potential risk that the Council will overspend its approved budgets for the
year will be managed at a Council-wide level by the Chief Executive and
Directors. 
11. Privacy Impact 
There are no direct implications arising from the recommendations in this
report. 
12. Climate Change 
The Council aims to reduce its carbon and other emissions to net zero by
2030, however there are no direct implications arising from the
recommendations in this report. 
13. Children’s Rights 
There are no direct implications arising from the recommendations in this
report.  
Page 15 of 56

Page 16

PUBLIC
14. Cosla Policy Position 
N/A 
List of Background Papers 
• The Capital Investment Programme 2025/26 to 2029/30, Council 27 February
2025 
Author: 
Lisa Dickie, Finance Business Partner, 
Gordon McNeil, Director of Environment, Housing & Infrastructure and Linsey
Mcgregor, Senior Accountant (Capital)
Page 16 of 56

Page 17

PUBLIC
Appendix 1 
Objective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised
Annual
Budget at
Period 10
Projected
Outturn
Previous
Projected
Outturn
Variance
Movement
£000 £000 £000 £000 £000 % £000
Directorate and Service Co-ordination 1,489 6 1,495 1,480 15 1.0% 19 (4)
Refuse Collection 6,132 (5) 6,127 6,252 (125) (2.0%) (276) 151
Household Waste Recycling Centres 1,429 0 1,429 1,475 (46) (3.2%) (31) (15)
Refuse Disposal 7,572 15 7,587 7,626 (39) (0.5%) (35) (4)
Neighbourhood Services 7,610 70 7,680 7,607 73 1.0% (15) 88
Fleet Services 361 (4) 357 395 (38) (10.6%) 12 (50)
Social Transport 1,255 0 1,255 1,444 (189) (15.1%) (158) (31)
Roads Operations 5,832 0 5,832 5,610 222 3.8% 111 111
Infrastructure and Assets 2,976 0 2,976 3,061 (85) (2.9%) (43) (42)
Transportation & Development 791 0 791 766 25 3.2% (7) 32
Parking of Vehicles (34) 0 (34) (19) (15) (44.1%) 0 (15)
Street Lighting Maintenance Work 554 0 554 525 29 5.2% 67 (38)
Energy Management Unit 419 0 419 419 0 0.0% 0 0
Strathclyde Partnership for Transport
Requisition
3,379 0 3,379 3,403 (24) (0.7%) (24) 0
NET EXPENDITURE 39,765 82 39,847 40,044 (197) (0.5%) (380) 183
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2025/26
1 April 2025 to 9 January 2026
Budget Variance
(Adverse) or Favourable
POLICY BOARD : INFRASTRUCTURE, LAND AND ENVIRONMENT
Page 17 of 56

Page 18

PUBLIC
Appendix 2 
Subjective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised
Annual
Budget at
Period 10
Projected
Outturn
Previous
Projected
Outturn
Variance
Movement
£000 £000 £000 £000 £000 % £000 £000
Employees 27,194 117 27,311 27,198 113 0.4% (94) 207
Premises Related 1,434 1 1,435 1,534 (99) (6.9%) (103) 4
Transport Related 8,604 63 8,667 8,493 174 2.0% 86 88
Supplies and Services 15,713 805 16,518 17,341 (823) (5.0%) (757) (66)
Third Party Payments 3,644 0 3,644 3,667 (23) (0.6%) (23) 0
Transfer Payments 169 0 169 224 (55) (32.5%) 4 (59)
Support Services 661 0 661 679 (18) (2.7%) (16) (2)
Depreciation and Impairment Losses 2,180 0 2,180 2,180 0 0.0% 0 0
GROSS EXPENDITURE 59,599 986 60,585 61,316 (731) (1.2%) (903) 172
Income (19,834) (904) (20,738) (21,272) 534 2.6% 523 11
NET EXPENDITURE 39,765 82 39,847 40,044 (197) (0.5%) (380) 183
Budget Variance
(Adverse) or Favourable
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2025/26
1 April 2025 to 9 January 2026
POLICY BOARD : INFRASTRUCTURE, LAND AND ENVIRONMENT
Page 18 of 56

Page 19

PUBLIC
Appendix 3 
Prior Years Approved  Budget Revised Projected
Expenditure Budget Adjustments Budget Outturn Total Approved Projected
Project Title to 31/03/2025 2025-26 since previous 2025-26 2025-26 Budget Outurn
Board report to 31-Mar-30 to 31-Mar-30
£000 £000 £000 £000 £000 £000 £000
ENVIRONMENT & INFRASTRUCTURE
Active Travel Funding Tier 1 6,873 1,411 0 1,411 1,411 0 0% 11,484 11,484 0 0%
LADA 49 49 0 49 49 0 0% 98 98 0 0%
Bus Infrastructure Fund 0 105 0 105 105 0 0% 105 105 0 0%
Red Smiddy Roundabout to Erskine Active Travel Tier 2 0 0 1,600 1,600 1,600 0 0% 1,600 1,600 0 0%
Vehicle Replacement Programme 35,804 2,382 1,320 3,702 3,702 0 0% 47,907 47,907 0 0%
Bridge Assessment/Strengthening - 6XN004 8,147 347 0 347 347 0 0% 9,694 9,694 0 0%
Roads/Footways Upgrade Programme -6XN004 84,849 8,012 (459) 7,553 7,553 0 0% 144,286 144,286 0 0%
Lighting Columns Replacement - 6XN004 3,172 840 0 840 840 0 0% 6,412 6,412 0 0%
Traffic Management 529 10 0 10 10 0 0% 765 765 0 0%
Improvements to Outdoor Access and Play Area Programm 393 49 (14) 35 35 0 0% 452 452 0 0%
SPT- People in Place Fund 0 110 0 110 110 0 0% 110 110 0 0%
Flooding - 6XN004 0 0 0 0 0 0 0% 0 0 0 0%
Multi Pupose Bins 0 56 (56) 0 0 0 0% 56 56 0 0%
Renewal of Play Parks 961 1,186 (631) 555 555 0 0% 2,946 2,946 0 0%
Grant for Implementation for 20mph speed limit 35 259 0 259 259 0 0% 294 294 0 0%
Nature Restoration Fund (Biodiversity) 483 216 (10) 206 206 0 0% 548 548 0 0%
Nature Restoration Fund (Rivers) 95 114 0 114 114 0 0% 350 350 0 0%
Underwood Depot Improvement 12 388 0 388 388 0 0% 400 400 0 0%
Public Realm - Abbey 0 5 0 5 5 0 0% 300 300 0 0%
Recycling Improvement Fund 486 0 0 0 0 0 0% 486 486 0 0%
Road Safety 0 396 0 396 396 0 0% 396 396 0 0%
Vehicles for Environmental Taskforce 0 0 50 50 50 0 0% 50 50 0 0%
Open Spaces Infrastructure 0 200 0 200 200 0 0% 200 200 0 0%
Strathclyde Partnership Transport 0 400 0 400 400 0 0% 400 400 0 0%
TOTAL INFRASTRUCTURE, LAND & ENVIRONMENT
BOARD 142,219 16,625 1,800 18,428 18,428 0 0% 229,760 229,760 0 0%
RENFREWSHIRE COUNCIL
CAPITAL INVESTMENT STRATEGY - NON-HOUSING SERVICES
1st April to 9th January 2026
POLICY BOARD: INFRASTRUCURE, LAND & ENVIRONMENT
Current Year 2025-26 Full Programme - All years
Budget Variance
(Adverse) or Favourable
Budget Variance
(Adverse) or
Page 19 of 56

Page 20

PUBLIC 
To:         Infrastructure, Land and Environment Policy Board 
On:  18 March 2026 
Report by:       Director of Environment, Housing and Infrastructure 
Heading:       Service Update Report 
1. Summary 
1.1      This report provides an overview of key service activities since the last Policy
Board report on 21 January 2026 and an update on the services and key
projects delivered during this period. 
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy
Board: 
2.1      Notes the wide range of activities provided in the service update. 
2.2      Notes the Memorandum of Understanding (MOU) process for the Paisley
Central District Heating Network Outline Business Cases outlined in section
4.1. 
Item 3
Page 20 of 56

Page 21

PUBLIC
3. Background 
3.1 Environment, Housing & Infrastructure provides essential services to every
household in Renfrewshire and works in partnership with the local community,
other service areas and Community Planning Partners, to deliver key Council
priorities and initiatives. A progress update on the main activities delivered by
the services in respect of the areas of activity delegated to this Policy Board,
is detailed below. 
Updates for Infrastructure, Land and Environment Policy Board 
4. Climate Change  
4.1 Energy Management 
District Heating Network Outline Business Cases 
4.1.1  Extensive work continues to develop the Outline Business Cases for two potential District
Heating Networks in Renfrewshire: the extension of the existing network at AMIDS through
to Glasgow Airport and the creation of a new network in the Paisley Central area. 
4.1.2  A collaborative exercise has been undertaken to explore various delivery options through
detailed review in order to identify preferred models for both networks and to inform a soft
market testing exercise. 
4.1.3 A Memorandum of Understanding (MOU) has been developed and shared with
stakeholders who have been identified as key to the development and potential prospects
of the Paisley Central Network. Partners include OneRen, the NHS and the University of
the West of Scotland (UWS). The MOU is intended as a non-legally binding agreement
between stakeholders and Renfrewshire Council, outlining the broad terms and conditions
of cooperation and providing a means to express support and commitment to the project.
These partners are key to the success of the project given the energy consumption of the
properties they are responsible for. Such agreements add weight to the potential viability of
a future network. More legally binding proceedings would take place at a later phase
through an Energy Supply Agreement (ESA) as the network connects. 
4.1.4 It is expected that the business cases will be concluded in June 2026 with further detail
presented to board members in due course. It is recommended that the board note the
MOU process outlined and the more detailed report to follow.  
Page 21 of 56

Page 22

PUBLIC
5.  Community Development 
5.1 Team Up to Clean Up 
5.1.1 Team Up to Clean Up worked in partnership with colleagues in Transport & Infrastructure
and Neighbourhood Services to support Renfrewshire’s Winter Maintenance
Campaign.  Over 60 volunteer Grit Kits were issued in response to winter resilience
requests from community volunteers. Each kit included a salt spreader, snow shovel,
gloves and a 25kg bag of salt, alongside a Team Up to Clean Up branded hi-vis vest. 
5.1.2 Volunteers were required to confirm compliance with the issued risk assessment and to
follow the care and maintenance guidance provided for the spreaders, supporting safe use
and ensuring the longevity of the equipment. 
5.1.3 In January, Team Up to Clean Up responded directly to volunteer feedback by procuring A-
frame stand-alone safety signage for use during litter-picking activity. The signage is
designed to alert passers-by, including pedestrians and motorists, that litter-picking is
taking place, improving volunteer visibility and supporting safer working practices on site. 
6. Fleet, Roads, and Transportation   
6.1   Fleet Services 
6.1.1  Fleet Services has recently added 24 new vehicles and fleet assets as part of the Council’s
ongoing Vehicle Replacement Programme. The new additions include: 
• 3 x Long Range electric cars – allocated to the Sustainable Travel Pool Car
Scheme based at Renfrewshire House.
• 17 x new L1 electric car-derived vans - Allocated across a range of Council
services to replace older or hired vehicles—helping reduce running, repair, and
fuel costs while  supporting carbon-reduction targets.
• 2 x five-seater electric cars - Delivered to Children’s Services to meet operational
needs and contribute to lower emissions.
• 1 x Luton van with extended tail lift - Provided to Waste Services to improve the
efficiency of household bin deliveries and turnaround.
• 1 x 17-seater bus - Supplied to Social Transport to replace a hired vehicle,
improving reliability and reducing costs.
• 4 x new 35-yard skips - For Underwood Road HWRC to replace damaged or
end-of-life skips. 
6.1.2 All new vehicles meet Euro 6 emissions standards or are fully electric, directly supporting
Renfrewshire Council’s sustainability and Net Zero ambitions. This investment will improve
service reliability, reduce long-term operational and maintenance costs, lower emissions
and enhance environmental performance.  
Page 22 of 56

Page 23

PUBLIC
Roads & Transportation 
6.2  Roads Capital Investment Programme 
6.2.1  As part of the Roads Capital investment programme, in 2025/2026 we have resurfaced 47
carriageways, 16 footways and surface treated 38 carriageways.   
6.2.2 The Roads Capital team are finalising the resurfacing improvement programme for
2026/2027. 
6.2.3  Major resurfacing schemes at Collier Street car park, Barnsford Road (Phase 2) to Red
Smiddy roundabout, junctions at George Street, Canal Street, Maxwellton Street Paisley,
High Street Paisley (outside museum), Fairway Avenue, Paisley and Hillington Road are
scheduled for March, April and May 2026 respectively. 
6.2.4 We recently completed the trial of an Asphalt preservation method (spray application of a
sealant treatment) at Lonend. This process is intended to prolong the life of a carriageway,
delaying the requirement for full resurfacing, which has a far greater carbon footprint. This
will be monitored in the coming year to see how it performs under traffic loadings and
officers will report back to a future Board. 
6.2.5 Roundabout improvements as part of the Roads Capital programme for 2025/26 have
continued to upgrade A761 Main Road at Station Road Paisley, Abbotsinch Road at Arran
Avenue Glasgow Airport, Inchinnan Drive, Greenock Road at Barrangary Road Bishopton. 
6.2.6 The programme of roundabout improvements for 2026/27 includes A761 Linwood Toll,
A761 Linwood Road at Barskiven Road, Bridge of Weir Road Linwood at St Benedict’s
High School, Kings Inch Road at Laymoor Avenue and Kings Inch Drive Renfrew. 
6.3  Ready for Winter 
6.3.1  The service commenced winter resilience arrangements on the 1 October 2025, and this
will run through until May 2026. To the 9 March 2026, the Winter Maintenance programme
has used a cumulative total of over 1,980 tonnes of salt gritting Renfrewshire roads. The
service has gritted primary network routes 103 times and our secondary network on 15
occasions with gritting teams working around the clock to keep Renfrewshire moving
throughout this recent winter period. In comparison with the same period for 2025 (October
to early March), the service used 3,146 tonnes of salt gritting which is a significant
decrease in gritting and milder winter. Although, the first few months of 2026 provided a
variety of challenging weather, with Environment, Housing & Infrastructure services dealing
with gritting, heavy rain and high winds. 
6.3.2 In addition, we have completed full refurbishment of Rankine Street flood pumping station
in Johnstone. This will ensure its effective use for the coming years helping to protect
adjacent properties. We intend to roll this out to Collier Street pumping station this coming
financial year.     
Page 23 of 56

Page 24

PUBLIC 
6.4  Street Lighting Capital Investment Programme 
6.4.1  A new street lighting installation, comprising of heritage columns and lanterns (with dark
skies optics) has completed on Main Street and Church Street Lochwinnoch, awaiting a
new power supply. The heritage nature of the scheme, intended to be sympathetic to the
conservation area, has been well received by residents. An application for a new power
supply has been submitted to Scottish Power and we should have an install date within the
next couple of weeks, following which, the old lighting system will be removed, disposed of
in accordance with the WEEE Regulations (Waste Electrical and Electronic Equipment) and
the footway reinstated around the old column holes. 
6.4.2 A further column and loop replacement contract is currently underway, addressing isolated
knocked down and life expired columns throughout Renfrewshire. This has led to the
replacement of 86 columns and 41 damaged loops, bringing areas in previous darkness
into light. During this contract we have continued to work closely with colleagues at Scottish
Power to expediate new supplies. 
6.5  Active Travel & Infrastructure Improvement Update 
Red Smiddy, Inchinnan to Erskine Active Travel Route 
6.5.1  The Council has received £1.6million in funding from Transport Scotland for the Red
Smiddy, Inchinnan to Erskine Active Travel Route. A tender process concluded in
December 2025 with construction work started on site in early February. This will create a
shared use footway for walking and cycling expanding the network in the area. 
6.5.2 To allow the works to take place, temporary traffic lights will continue to be in operation on
a phased basis along the route to ensure the safety of workers and road users. 
6.5.3  The first phase of works will be construction of 1.4km of shared footway & cycleway from
the end of the existing shared footway/ cycleway on Greenock Road, round Red Smiddy
Roundabout, north onto Southbar Road to Southholm Roundabout. There is an existing
footway at Red Smiddy Roundabout which is widened, and new construction footway on
Southbar Road. 
6.5.4  The second phase will see the construction of 0.6km of shared footway & cycleway from
Southholm Roundabout to the overbridge on the A726 on the northbound verge.
Associated relocation of street lighting columns, road signs and installation of new
drainage. The works will involve the construction of a ramp to create a connection to the
existing footway overbridge over the A726 providing direct access to Park Mains High
School and Erskine shopping area. 
6.6 Renfrew to Paisley Active Travel Route (Gallowhill Link) 
6.6.1 The Council received funding from Transport Scotland for the Gallowhill Active Travel
Route. This will create a shared use footway for walking, wheeling and cycling expanding
the network in the area and also provide a safe, off-road, lit, access route from Gallowhill to
the new Paisley Grammar School, under the disused railway bridge on Renfrew Road (an
essential condition of Planning for the school) and onwards to the wider cycle network.  
Page 24 of 56

Page 25

PUBLIC 
6.6.2 Works commenced in late October and included site clearance, installation of drainage,
construction of a new 600m long shared footpath with streetlighting, and landscaping
works. The works completed ahead of schedule at the beginning of March, with an official
opening on the 10th of March.   
6.7  Elderslie for Everyone Project 
6.7.1  The developed design is continuing on from the concept design stage which has been
completed. Within this stage we will continue to gather feedback on the design from the
community and prepare more technical information to inform the developed design stage.
Ongoing public communication, meetings with local businesses and elected members have
taken place and will continue throughout the project process. 
6.8 Inspection of Carriageways and Footways held in the Housing Account 
6.8.1 We have recently recruited an inspector who will work part time in the roads service and
part time in the housing service. The intention is to ensure that road infrastructure held
within the Housing Estate is managed in the same manner as the public road, with cyclical
safety inspections and a matrix for prioritising repairs against competing priorities. This will
be the first time that the Housing road asset will be managed in such a proactive manner. 
6.9 Villages Safe Walking Initiative 
6.9.1 Phase 1 of the Villages Safe Walking Initiative has concluded its second round of
consultation on the refined detailed design and location of proposed traffic calming
measures in Houston, Howwood and Kilbarchan. Detailed drawings of measures were
consulted on with the Community Councils and subsequently they were letter dropped to
directly affected residents. 
6.9.2 Comments asking for changes or objecting to elements were accepted by officers and
responses have been prepared. They explain where we have been able to accommodate
requests for change and where, due to considerations of road safety and practicality of
construction, we have not. We will be looking to meet with ward members to discuss the
conclusions of the consultations and the finalised construction drawings. Implementation of
the measures will follow in the new financial year. Officers continue to progress more
complex designs at Houston Cross, Kilbarchan Cross and Howwood Black Cart Water
Bridge. 
6.9.3 Phase 2 of the Villages Safe Walking Initiative has completed its concept design stage and,
on the basis of the support shown by responses received to the consultation, our
consultant is now developing the detail of those designs through engaging with the
communities of Bishopton, Bridge of Weir, Elderslie, and Lochwinnoch to refine the
proposals once again.  
Page 25 of 56

Page 26

PUBLIC 
6.9.4 We will also refine cost estimates and develop a proposed implementation programme
which will be contingent on the availability of future years’ funding. Based on current high
level estimates, to complete all measures outlined within the work to date would cost
around £3million. Officers will prioritise the interventions in order of impact and would then
look to explore potential funding sources to be able to deliver a prioritised list. Ward
members will be updated as this progresses. 
6.9.5 In response to requests for Langbank’s inclusion in Phase 2 of the Villages Safe Walking
Initiative, we have separately begun investigating potential measures for Langbank village.
We are preparing to consult with the community on their concerns and for feedback on
proposed potential measures. 
7.   Neighbourhood Services 
7.1   Cemetery Update 
7.1.1  A programme of seasonal winter maintenance has been completed across all sites. Teams
have undertaken intensive scraping in targeted cemetery areas, alongside hedge-pruning
activities. The service continues to monitor public feedback to identify any additional priority
areas requiring maintenance.     
7.1.2  A conservation inspection of the Glen Cinema Memorial in Hawkhead Cemetery identified
several areas requiring enhancement. A conservation specialist was appointed to carry out
these works, which commenced in December 2025. Progress is ongoing and remains
dependent on weather conditions. 
7.2  Country Parks 
7.2.1  Paisley and District Scout Groups continue to support their “Better World” project  through
organised volunteer activity days at Glennifer Braes Country Park. Under the guidance of
their leaders and the Countryside Rangers, this Spring’s programme focuses on woodland
management activities within Glen Park. 
7.2.2  Avian Flu has been confirmed within Castle Semple Country Park. All required public health
and biosecurity measures have been implemented, including the installation of appropriate
signage and updates to visitor communications. 
7.2.3 Summer opening hours will operate from April to October and will include the full  delivery
of outdoor activity sessions and environmental education programmes.        
7.3  Play Parks Update 
7.3.1 The play park renewal programme for 25/26 continues to progress with the following work
completed: 
• Tinto Square Playpark, Renfrew - An inclusive seesaw has been installed
and designed to accommodate up to two wheelchairs. This represents the
first installation of its kind to be trialled within Renfrewshire.
Page 26 of 56

Page 27

PUBLIC
• Moss Road Playpark, Bridge of Weir - A new section of link path has been
constructed outside the fenced play area, ensuring that park users can
avoid walking through the playpark itself when ground conditions are wet.
• Park Road, Johnstone - A new fenced dog exercise area has been
completed on the site of the former derelict BMX course, providing a safe
and dedicated space for dog owners. 
7.3.2 Further improvements are planned for delivery including: 
• Robertson Park (Main Play Area), Renfrew – anticipated start: April 2026
• Stuart Road, Bishopton – anticipated start: March 2026
• Campbell Street, Johnstone – programme to be confirmed
• East Fulton, Linwood – anticipated start: late April to early May
• Ferguslie Gardens (Bottom Play Area), Paisley – anticipated start: March 2026
• Red Blaes BMX Track, Barshaw Park, Paisley (conversion to pump track) –
currently at tender return stage
• New Outdoor Gym, Lochwinnoch Public Park – anticipated completion: end of
March 2026 
7.4  Seasonal Grass Cutting Programme     
7.4.1  The service has completed the recruitment process for this year’s intake of seasonal staff
to support the extensive summer grass cutting program. The grass cutting season will start
on 1 April 2026. 
7.5  Open Space 
7.5.1  Fountain Gardens, Paisley – A contract has been awarded for the conservation of the
Robert Burns statue. Due to its historical and cultural significance, the works are expected
to take several weeks once commenced. The Grand Fountain is scheduled for cleaning
and servicing in March, following the winter shut-down period. The water features will be
switched back on at the same time. 
8. Bus Service 514 
8.1 As reported to the ILE Board of August 2025, Council officers have been working with SPT
to extend the bus service connecting Dargavel to Braehead. This resulted in the proposed
end date of the contract being extended from January 2026 to May 2026. 
8.2 Due the continued low patronage levels on the route there is not going to be any possibility
to extend the service beyond the first week in May 2026. The route has been funded as
part of the Section 75 agreement with BAE, however that funding will expire in May 2026
and as such the service will come to an end. 
8.3 SPT engaged with the market to understand if there was any market interest in taking this
service forward, however given the patronage figures this service is unsustainable and SPT
have advised that they are not in a position to operate the service as a subsidised route. 
Page 27 of 56

Page 28

PUBLIC   
8.4 Council officers will continue to liaise with SPT to assess what opportunities may exist to
improve access to public transport for Dargavel residents.   
9. Waste Services 
9.1    Waste Services Website Update  
9.1.1  As part of the route optimisation software integration, the service is advancing the system’s
automated online forms. This work includes linking the Council’s existing website
processes directly into the new system making the process more efficient. The online forms
for requesting assisted collections, bin swaps, bin deliveries, and bulky uplifts have been
updated to support direct integration with the route management system. All updated forms
are live and available through the Council’s website. 
9.2 Library WEEE Banks Project (Waste Electrical and Electronic Equipment) 
9.2.1 The first year of the WEEE Bank project across Renfrewshire libraries has delivered 
excellent results. The initiative exceeded expectations, with 2.44 tonnes of small 
electrical items collected surpassing the original estimate of 2.16 tonnes. 
9.2.2 Alongside this, Waste Services recorded a significant rise in WEEE recycling 
across both the library banks and the Household Waste Recycling Centres. An
additional 75.10 tonnes of electrical items were collected for recycling, supported by a 
communications campaign highlighting the importance of recycling unwanted 
electricals. This positive first year demonstrates growing public engagement and the 
impact of making recycling more accessible to residents. 
9.3   Service Improvement 
9.3.1  The performance of bin collections is a key priority for Waste Services. To support this, a
temporary Business Improvement Officer post was created to focus on data analysis and
performance management within the service from February 2026. A core element of this
work is improving outcomes for residents who receive an Assisted Collection.  Although the
work is in its infancy, throughout February there has been improved performance with
99.84% of bins and 99.45% of assisted bins collected emptied on collection.  The team will
continue to focus on this area of work to support sustained performance both across the
service and with specific addresses that require bespoke arrangements for collections.     
9.4   Packaging & Recycling Handling Facility – Linwood 
9.4.1 The service is progressing a detailed Business Case for the construction of a packaging
and recycling handling facility at Middleton Road, Linwood. This facility would be able to
handle materials from the blue, brown and green bins, street sweepings and gulley
cleanings, bulky items from special uplifts, waste upholstered domestic seating and white
goods etc. In addition, the construction would include a new secure bin store with a wash
and repair facility. The Business Case is under review by the Councils finance section; a
further update will be brought to a future board. 
Page 28 of 56

Page 29

PUBLIC    
10.  #YouDecide 
10.1.1 Improvements works at the Barrangary and Chestnut roundabouts in Bishopton have been
completed in preparation for new public sculpture installations. A horse sculpture is planned
for Chestnut roundabout and a tree sculpture for Barrangary roundabout. Both are
scheduled for completion by the end of March 2026. 
10.1.2 An outdoor gym has been installed in Lochwinnoch Park, marking the completion of
Lochwinnoch #YouDecide projects. 
10.1.3 The access path to Glencoats Park play area has been resurfaced and this completes
#YouDecide projects for Paisley North West and Central. 
10.1.4 The following projects remain in progress. Individual completion reports will be submitted
as each project is finalised:
• Roundabout improvement schemes in Kilbarchan and Renfrew 
• Activity/Heritage trails in Inchinnan and Kilbarchan 
• Car park and path improvements at Gleniffer Braes 
• Outdoor Gym installation at Poplar Avenue, Johnstone 
11.  Public EV Charging Infrastructure Update 
11.1.1 Renfrewshire continue to work alongside all Glasgow City Region partners to expand public
use EV charge points across each local authority partner area including Renfrewshire. The
programme will involve the migration of around 600 existing charge points in and the
installation of around 3,000 new charge points. 
11.1.2 The updated programme timeline highlights that the procurement process to appoint a
commercial Charge Point Operator (CPO) has now commenced with an appointment of an
operator due to be concluded by September 2026. 
11.1.3 To allow for the prompt transfer and migration of existing EV assets to the new CPO, once
appointed, each member authority require to have authority to grant licences in place prior
to contract award. A more detailed update will be provided to the board in May. 
Page 29 of 56

Page 30

PUBLIC 
Implications of the Report 
1.  Financial – Any financial elements referenced in this report will be progressed through the
Council’s financial & budget planning process. 
2.   HR & Organisational Development – None       
3. Community/Council Planning – The report details a range of activities which reflect local
community and council planning themes. 
4. Legal – None 
5. Property/Assets – None 
6.   Information Technology – None 
7. Equality & Human Rights - The recommendations contained within this report have been
assessed in relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have been
identified arising from the recommendations contained in the report. If required following
implementation, the actual impact of the recommendations and the mitigating actions will
be reviewed and monitored. 
8. Health & Safety – None 
9. Procurement – None 
10. Risk – None 
11.   Privacy Impact – None 
12.  Climate Change – there are a range of actions and activities throughout the Service
Update Report which support the Council’s Plan for Net Zero. 
13.  Children’s Rights – None 
14.  Cosla Policy Position – None 
List of Background Papers: None 
Author:  Gordon McNeil, Director of Environment, Housing & Infrastructure 
Email:  Gordon.mcneil@renfrewshire.gov.uk 
Page 30 of 56

Page 31

PUBLIC 
___________________________________________________________________
To:  The Infrastructure, Land and Environment Policy Board 
On:  18th March 2026
___________________________________________________________________
Report by: Director of Environment, Housing & Infrastructure
___________________________________________________________________
Heading: The Renfrewshire Council (Prohibition and restriction of waiting,
loading and parking places) (Consolidation & Amendment Order
1006) Order 202*, Ref TRO 1006
___________________________________________________________________
1. Summary 
1.1 In terms of the Road Traffic Regulation Act 1984 and the Council’s Scheme of
Delegation, the making of a Traffic Regulation Order (TRO) is delegated to
the Director of Environment, Housing & Infrastructure after consultation with
the Convener of the Infrastructure, Land and Environment Policy Board and
the local ward Members. 
1.2 The proposed TRO allows Renfrewshire Council to complete its proposals to
protect the public roads around the Council area, some of which suffer from
inconsiderate, congestive and in some cases dangerous parking. 
1.3 The proposed Amendment Order is the fourth waiting, loading and parking
places consolidation and amendment digital order; the previous order being
approved by this Board on 27 August 2025. This order covers requests for
revisions and additions received since the cut-off date of that digital order’s
consultation. 
1.4 TRO 1006 was advertised for comment by 21thJanuary 2026 and proposed to
impose restrictions on the roads listed in Section 3.3. 
Item 4
Page 31 of 56

Page 32

PUBLIC 
1.5 Of the 42 separate items within the TRO 1006 proposals, there were no
objections in relation to 37 items. One objection was requested to be
withdrawn by the applicant because they had misunderstood the effect of the
proposal. One item that received 3 objections had been included in the
proposal by mistake and has been withdrawn. Of the remaining 3 proposals
that received objections, one received 2 objections while the other two
received one objection each.   
1.6 Objections were received in relation to the following items. 
472 Greenhill Crescent Elderslie 2 objections
490 Easwald Bank Kilbarchan 1 objection
478 Wallneuk Rd at end
and cul-de-sac
Paisley 1 objection 
1.7 Officers recommend; 
Greenhill Crescent 
• implementation of the restrictions as proposed because the status quo
is considered an unacceptable risk during the times specified, when
multiple young children are using the footways. There is insufficient
road space on the carriageway to allow parking on both sides while
maintaining a running lane for through traffic. 
Easwald Bank 
• Implementation of the proposed restriction to enable local business to
operate without undue difficulties with supplies, while keeping goods
vehicles out of adjacent residential streets. The objector has perceived
this as a safety issue. The proposed addition of restrictions better
manages the traffic where there was no parking restriction before. 
Wallneuk 
• Implementation of the proposed restriction at the request of adjacent
businesses having issues with access and egress for goods vehicles
due to inappropriate parking in the vicinity.  
Page 32 of 56

Page 33

PUBLIC   
1.8 In accordance with the ‘Local Authorities’ Traffic Orders (Procedures)
(Scotland) Regulations 1999’ and the Council’s procedures, the Board may
now decide how to proceed; to either make the order in full, make the order in
part, or not make the order. The Board is free to choose to 
decide on the objections itself, or, to appoint a Reporter to do so. 
1.9 A plan of the proposed TRO 1006 can be found at these links. 
https://ren.maps.arcgis.com/apps/instant/sidebar/index.html?appid=9a44e32bf3b8428baecf
ca954b78bc5d 
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy
Board; 
2.1 Considers and decides on the objections made and not upheld in relation to
The Renfrewshire Council (Prohibition and restriction of waiting, loading and
parking places) (Consolidation & Amendment Order 1006 Order 202*   at the
meeting of this Policy Board rather than appointing an independent reporter. 
2.2 Subject to recommendation 2.2 and the objections not being upheld, approves
the implementation of The Renfrewshire Council (Prohibition and restriction of
waiting, loading and parking places) (Consolidation & Amendment Order 1006
Order 202*, which includes the roads as listed at Section 3.3, and authorises
the Director of Environment, Housing & Infrastructure in conjunction with the
Convener of Infrastructure, Land & Environment Policy Board to make the
Traffic Regulation Order. 
3. Background 
3.1 The TRO 1006 proposals went through a single stage consultation process for
a 36-day period ending 21 January 2025. 
3.2 The purpose of the consultation was to satisfy the statutory consultation
process which allows residents of Renfrewshire to provide comment on the
proposals at each specific location. 
3.3 The locations are shown in the table below and on the maps at 
https://ren.maps.arcgis.com/apps/instant/sidebar/index.html?appid=9a44e32bf3b8428baecf
ca954b78bc5d 
Page 33 of 56

Page 34

PUBLIC
TRO Item No. Town Location Restriction
464 Paisley Heriot Avenue &
Woodstock Avenue,
Heriots Primary
School Keep Clear
472 Elderslie Greenhill Crescent No stopping during specified times Monday to
Friday 8.30am to 9.30am and 2.30pm to 3.30pm
473 Renfrew Fulbar Street Pedestrian Zone. Goods vehicle loading only
474 Paisley St Mirren Street Goods vehicle loading only
511 Renfrew Sandy Road opp no
57 - 61
No waiting at any time
475 Paisley Renfrew Road at
retail park
Bus lane reduction
476 Paisley Causeyside St at
Phelps Butchers
Goods vehicle loading and pay and display parking
477 Paisley Whitehaugh Avenue
at Barshaw Drive
junction
No waiting at any time 
478 Paisley Wallneuk Rd at end
and cul-de-sac
No waiting at any time 
479 Paisley Well Steet No stopping except buses
480 Paisley Storrie Street 
extend no waiting to
cover bin ramps
No waiting at any time
481 Paisley Love Street, lay-bys
on west side
Parking by motor cars only
482 Paisley Albion St and
Blythswood Dr,
length running
north-south
No waiting at any time
483 Renfrew Newmains Rd, both
sides on approach to
Broadloan
No waiting at any time
484 Bishopton The Grove on
entrance bend and
turning head
No waiting at any time
485 Bishopton Hay Avenue at
junction of Lamont
Avenue
No waiting at any time
486 Johnstone Banktop Court at
North Place
No waiting at any time, Ambulance Bay, Disabled
Bays
487 Johnstone Graham St at
Thompson St
No waiting at any time 
488 Johnstone High St at Canal St
around west corner
No waiting at any time, no loading at any time
489 Johnstone Houston Square No waiting at any time, no loading at any time,
limited waiting
490 Kilbarchan Easwald Bank at
Tandlehill Rd
Goods vehicle loading bay
491 Paisley Arkleston Rd at
Barshaw Dr junction
No waiting at any time
492 Paisley Arkleston Rd at
Whitehaugh Ave
junction
No waiting at any time
493 Paisley East Lane, access to
Bakery
No waiting at any time
494 Paisley Gilmour St under rail
bridge both sides
Limited waiting 10 min no return within 1 hour
498 WITHDRAWN  
499 Paisley Penilee Rd at
Kilpurnie Rd junction
No waiting at any time
500 Renfrew Sandyford Road
access
No waiting at any time
Page 34 of 56

Page 35

PUBLIC
501 Renfrew Renfrew Rd at
Clydesdale Ave
junction
No waiting at any time
502 Paisley Wallace St at Love St
junction
No waiting at any time
503 Paisley Lacy Street Replace Bus Stand with School Keep Clear
504 Renfrew Craigielea Rd at
Brown St
North/Murray
St/service lane to
Albert Rd
No waiting at any time
505 Renfrew Muir Street No waiting at any time, goods vehicle loading bay
506 Renfrew Paisley Road,
crescents at 206 –
222 & 224 - 248 
No waiting at any time
507 Renfrew Oxford Rd/Cragielea
Rd/Paisley Rd
staggered signal
junction
No waiting at any time
510 Kilbarchan Low Barholm at
Barrhill Cr junction
No waiting at any time
513 Renfrew Kenley Road car park
access
No waiting at any time
514 Brookfield Victoria Rd /A761
junction
No waiting at any time
515 WITHDRAWN  
517 Paisley Burnfoot Cr/
Ferenze Dr junction
No waiting at any time
518 Paisley Fauldswood Cr /
Craigfaulds Ave
junction
No waiting at any time
519 Paisley Renfrew Rd from
Wallneuk Rd to
Arkleston Rd/Paisley
Rd roundabout, both
sides
No Stopping at any time
520 Paisley Love Street Lay-by
east side
Goods Vehicle Loading Only 
3.4 The consultation details were published in the local press, on
Renfrewshire.gov.uk and via the “Tell me Scotland” website, where
information on the proposed items within the order was provided in text format
and in map form via Renfrewshire Council’s Geographic Information System
(GIS) portal. In addition, notices were placed on lampposts at each of the
specific locations where the orders were proposed. 
3.5 A total of 16 responses were received with 8 being pertinent, 7 objections and
1 acknowledgement of a request (this one did not proceed as they had
misinterpreted the effect of the order and as it primarily only affected their
frontage, was considered to be acceptable and the proposal withdrawn).  The
remaining respondents were either seeking clarification of the proposals or
seeking additional measures out-with the scope of the consultation which will
be considered in a future amendment.  
Page 35 of 56

Page 36

PUBLIC
3.6 One response in support of item 518 requesting additional measures in other
locations and 2 responses in general support of proposals in Renfrew
requesting additional measures in other locations. 5 other respondents were
seeking clarification of proposals only or requests for areas outwith the
consultation. Details of the objections and responses in support are given in
Appendix 1. 
3.7 Sustained objections were received in relation to the following items. 
Item
Road Settlement Restriction Objections
472 Greenhill
Crescent
Elderslie No stopping Mon-Fri
8.30 to 9,30 & 
2.30 to 3.30
2
478 Wallneuk Rd
at end of Cul-
de-sac
Paisley No waiting at any time 1
490 Easwald
Bank
Kilbarchan “Goods Vehicle Loading
Only”
1
498 Loundsdale
Road
Paisley Withdrawn as erroneous
description no decision
required
3
515 Woodside Rd
Turning head
Brookfield Requested withdrawn
and has been retracted.
No decision required
1
3.8 The roads authority’s duty is to ensure a safe road network for vehicle
movement. Its obligation is to keep roads clear and safe. Officers recommend
implementation of the restrictions as proposed. 
3.9 In respect of Items 506 and 510 respondents suggest that adjacent unused
land or grassed areas should be converted to parking allocated to residents.
The roads authority is not empowered to provide private parking spaces. 
4. Consideration of Objections 
4.1 The Local Authorities' Traffic Orders (Procedure) (Scotland) Regulations 1999
state that before making the order, the Council (in the form of its
Infrastructure, Land and Environment Policy Board) must consider all
objections made and not withdrawn. In this respect, the terms of the
Regulations state that the Board may consider the objections itself in
fulfilment of its statutory obligation. Alternatively, the Board may choose to
appoint an independent Reporter to hold a hearing to consider the objections. 
Page 36 of 56

Page 37

PUBLIC
4.2 If the Board decides to exercise its discretion and not appoint an independent
Reporter, then it must consider the objections and either uphold them, in
which case the proposal shall be dropped, or consider the objections and then
approve the implementation of the restrictions as advertised, as a whole or in
part, and authorise the Director of Environment, Housing & Infrastructure to
make the Order. 
4.3 If the Board decides to choose the public hearing, it should be recognised that
the Reporter’s deliberations could take approximately 15 weeks. Thereafter,
the Board has an obligation to consider the report and recommendation made
by the Reporter and to decide on whether to proceed with the order. 
4.4 The cost of arranging an independent Reporter to hold a public hearing is
estimated at £5000. Therefore, it is recommended that the Board considers
the objections itself.
_________________________________________________________ 
5. Implementation 
5.1 Should the Infrastructure, Land and Environment Policy Board approve the
implementation of The Renfrewshire Council (Prohibition and restriction of
waiting, loading and parking places) (Consolidation & Amendment Order
1006) Order 202*, officers will arrange for the required lining and signing
works to make the Order enforceable. 
___________________________________________________________________ 
Page 37 of 56

Page 38

PUBLIC
Implications of the Report 
1. Financial - the nominal capital and revenue costs of implementing and
maintaining the proposed lines and signs can be accommodated within
existing budgets. 
2. HR & Organisational Development - The restrictions marginally increase the
enforcement duties of the Council’s Parking Attendants which will be
accommodated within current staffing levels. 
3. Community/Council Planning – Our Renfrewshire is thriving / Reshaping
our place, our economy and our future – Low speed residential environments
improve living conditions for Renfrewshire’s residents. 
4. Legal - The relevant legislation is the Local Authorities' Traffic Orders
(Procedure) (Scotland) Regulations 1999. 
5. Property/Assets – N/A 
6. Information Technology – N/A 
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. Some negative impacts on equality groups or potential for infringement
of individuals’ human rights have been identified and not all can be fully
mitigated. Despite the potential for adverse impact it is believed that it is
reasonable and proportionate to take the action recommended in the report. 
A full copy of the Equality Impact Assessment undertaken is attached. 
8. Health & Safety - The primary reason for the order is to clear congestive
parking on roads to maintain general safe access. 
9. Procurement –N/A. 
10. Risk - no risks have been identified in relation to the proposal. 
11. Privacy Impact – N/A. 
12. Climate Risk – no risks have been identified in relation to the proposal. 
13. Children’s Rights – This report demonstrates compliance with Article 6 (life,
survival and development) and Article 24 (health, water, food, environment) of
the United Nations Convention on the Rights of the Child enter details or not
applicable. 
14. Cosla Policy Position – N/A.
_______________________________________________________
Author: Mark Higginbotham, Transportation and Active Travel Manager
Email: mark.higginbotham@renfrewshire.gov.uk
Page 38 of 56

Page 39

PUBLIC 
Appendix 1
Responses to the proposals. Information which could personally identify the respondents has been removed.
Responses objecting to the proposals
Item Road Settlement Objection Officers’ Review
472 Greenhill
Crescent
Elderslie No stopping during specified times Monday to Friday 8.30am to 9.30am and 2.30pm to 3.30pm.
There has been an increase in parking issues since pavement exemption order was
implemented due to inability to park on both sides of the street causing blockages and difficulty
compared to previous ability to park in both sides. (By 2 nos. respondents) 
Greenhill Crescent has wide pavements with tree lined streets which impacts on parking ability
due to encroachment of branches onto the road. It is the responsibility of Renfrewshire Council
to maintain these trees. 
The road’s function under the Road
(Scotland) Act 1984 is to act as a way
for the transportation of goods and
people and should not be considered
as a location to park vehicles when not
in use. The footway is a section of the
road set aside for the use of
pedestrians.
Pavement parking exception orders
are set by standards set in national
legislation. The location does not meet
that criteria. There is the ability to park
without the requirement to park on
the footway. Inappropriate parking
should not be considered as
acceptable and measures should not
be taken to allow it. 
The Council does pollard the trees
when requested and required. 
Page 39 of 56

Page 40

PUBLIC
The trees provide a natural pavement line in excess of that which is place for pavement
exemption order for Glenpatrick Road. ( By 2 nos. respondents) 
There are extensive puddles on Greenhill Crescent during wet weather due to lack of drains
which impacts on safe parking which has been raised previously with Renfrewshire Council
including when the road was resurfaced without replacing previous drain in this location. 
The proposal will increase issues in surrounding streets which are already at capacity through
parking pavement exemption order measures i.e. Glenpatrick Road exemption and Lexwell
Avenue. 
Detrimental impact on parents and carers dropping off at nursery and primary school who have
multiple children and buggies. School and nursery currently have different bell times to assist
with this. 
Impact on school and nursery staff and visitors parking given the small on site school parking
provision and proposed prevention of parking between 08.30-09.30 and 2.30/3.30. Greenhill
Crescent is currently used by staff and visitors including those for pre-school and aftercare
clubs which will not be permitted. 
Impact on residents on street parking as you will not be able to leave vehicles on the street
during the day. This will also greatly impact on deliveries and building contractors working
The road is designated as a “safe route
to school”. At school entry and exit
times the footway width is required to
accommodate this group of vulnerable
road users and as such there is no
potential for the consideration of
additional footway parking.
Glenpatrick Road meets the
requirements set out in the national
criteria for pavement parking
exemption orders. 
The perceived drainage issue is out-
with the context of the consultation 
It is appropriate that the adjacent local
infrastructure should absorb some of
the excess demand experienced by
Greenhill Crescent and dilute the
overall impact.
It is considered that it is the parents
and carers who are responsible for the
inappropriate parking being
experienced at Greenhill Crescent and
it is this issue that the proposal is
endeavouring to resolve. Staff should
be accommodated within the grounds
of the premises, outwith the school
premises, but, parked in accordance
Page 40 of 56

Page 41

PUBLIC
within Greenhill Crescent. The street already has signage stating Access for Residents and
Services Only which is not enforced. 
I hope you will consider these points alongside previous concerns made by residents of
Greenhill Crescent as part of the consultation for Parking Exemption Order in May 2025 which
has increased issues rather than avoiding danger to persons or other traffic. " 
with the highway code  or consider
alternative  modal choices.
The duty of the Roads Authority is to
provide clear, safe roads for travel.
Parking on the road is allowed only
where it is safe and does not congest
the road. The choice of where to park
a car is down to the individual.
Residents will still be able to leave
their vehicles on the southern side of
Greenhill Crescent without limit of
time. There will be no net detriment to
Deliveries or contractors as access is
not possible at present during these
times, whereas prior to, or outwith 
these times, access will be more
readily available The current signage is
advisory only , however, the proposed
restriction will be enforceable. There is
no signage stating access for residents
and services only.
The pavement parking exemption
relies on legislation out-with the scope
of this consultation
Pedestrians are also road users albeit
specifically more vulnerable and
specifically in such a location where
visibility is obscured by trees and as
such is considered to be the prevailing
concern in this case. 
Page 41 of 56

Page 42

PUBLIC
If there are concerns that the parking on Greenhill Cresent at school times is ""an accident
waiting to happen"", then I would only counter that to say that it hasn't (to my knowledge)
happened and I've been a resident there for 14 years. Yes it is a bit congested at these times
during school terms, however we are used to this and quite happy to accept this is the norm for
living near to a school.  Whilst there is the occasional inconsiderate driver, by far the majority
of drivers are courteous and considerate.
This proposal arises from complaints
received from local residents who are
discontent with the amount of vehicles
at the start end and of the school day
and inappropriate parking should not
be accepted as normal. 
Recommend
Implement the restrictions
490 Easwald
Bank at
Tandelhill
Rd
Kilbarchan I am writing to object to the proposal TRO 1006, proposal 490 (Easwaldbank and Tandlehill
Road) on a number of grounds.
1 - I am objecting as there is already a restricted waiting on Tandlehill Road, which is better
placed and suited to serve the businesses in the area, particularly the local shop and butchers.
This is a limited waiting Mon – Friday 9am to 5pm, 30 mins max. This is currently not enforced.
If it were, this would allow goods vehicles to deliver to the local businesses, while still allowing
customers to stop and shop. My suggestion is to enforce these existing regulations or to make
the area outside the shop on Tandlehill Road goods loading only, which would be more
appropriate and better serve the businesses.
2 – Having goods loading on Easwaldbank would actually reduce visibility at the junction, for
those approaching the Tandlehill junction from further up Easwaldbank or for those exiting the
junction from Tandlehill Road and would provide more of a hazard than there is currently. The
only current issue is when trucks are doing deliveries to the shops and park on the double
yellow lines, which is irresponsible/illegal parking by delivery drivers. Existing car parking at the
proposed location allows clearer visibility at this junction. There have been a number of
accidents at the junction of Easwaldbank and Tandlehill however, from what I have observed,
these are caused by people exiting the roundabout and not taking their left indicators off. They
continue to travel straight up Easwaldbank and people at junction think they are turning left
The respondent erroneously describes
the location as Easwald Bank and
Tandelhill Rd. The proposal is for
Easwald Bank at the Junction of
Tandelhill Rd. As such they go on to
expand on other issues within
Tandelhill Road outwith the scope of
this consultation.
Therefore item 1 cannot be considered
The location of the proposed ‘Goods
Vehicle Loading bay’ is in a location
that is currently unrestricted and
available for parking. it does not
encroach on the designed visibility
splay of the junction as there is a ‘no
waiting and no loading’ restriction
currently in place.
Page 42 of 56

Page 43

PUBLIC
into Tandlehill. These accidents are NOT caused by visibility up towards Easwaldbank and the
proposed restrictions would not alleviate this issue. 
3- Implementing these proposals would come at the expense to taxpayers, when existing
regulations are not being enforced by Renfrewshire Council. Renfrewshire Council fail to
enforce existing restrictions (at Tandlehill Road and also at Milliken Road Car Park). I would
prefer to see the Council enforce existing regulations rather than introduce new ones, at a cost.
These proposals feel like Renfrewshire Council throwing more restrictions at a problem, in
effort to fix a problem, without addressing the root cause of the problem. Car parking is an
issue in this part of Kilbarchan however, the council repeatedly fail to address the root cause.
For example, the Council went to the trouble and expense of updating signage at the Milliken
Road car park, prohibiting business use however a vehicle with a trade place has been parked
there for several weeks with no apparent action being taken, in addition to all 6 spaces being
blocked by business use. 
Renfrewshire Council’s failure to enforce its own existing regulations at Tandlehill Road (30
mins waiting) and Milliken Road car park (prohibition of business use) should be addressed
before introducing any new restrictions."
Loading and unloading is permitted on
a ‘No waiting at any time’ restriction
(double yellow lines) The Council has
no powers to determine how or when
vehicle indicators are used or
otherwise. Drivers are licenced
following testing to determine their
road safety proficiency. 
Enforcement is not within the remit of
this consultation nor are areas outwith
the identified locations as per Item
numbers within TRO 1006. However, it
is understood that signing in the car
park has recently been provided in
accordance with the traffic Signs
Regulation & General Directions 2016
and is now enforceable.
Recommend
Implement the restrictions 
Page 43 of 56

Page 44

PUBLIC
478 Walneuk Paisley These notices, as far as I can tell, have only appeared very recently and there has not been any
communication with the business affected. 
I find this very strange given the small amount of good neighbourly practice this would have
taken within a Renfrewshire Council trading estate and also my unit 
From a personal point of view I have staff and customer who use this road (despite the
shocking condition of it) to park to attend their work and for the customers to use our business. 
I wish to make an objection specifically against TRO Item 478 until such times that there is a
reasonable cause for the dead end cul-de-sac to be considered necessary for road safety and
traffic management. 
There are also other businesses within the Wallneuk Road Estate that will also be affected. 
I see from the notice that objections had to be submitted in writing by Wednesday 21st
January however with the short advertising of the notice locally, the poor siting of the notices,
and I suspect the deliberate use of dark faded paper suggesting these had been there for a
while, to be completely inappropriate.   
The consultation complies with The
Local Authorities' Traffic Orders
(Procedure) (Scotland) Regulations
1999 
The duty of the Roads Authority is to
provide clear, safe roads for travel.
Parking on the road is allowed only
where it is safe and does not congest
the road. The choice of where to park
a car is down to the individual.
This proposal was proposed following
complaints from local businesses that
they were unable to receive deliveries
from goods vehicles due to
inappropriate parking. The proposals
only seek to maintain access and
egress  
in accordance with the Roads Scotland
Act 1984
Notices and timescales comply with
above Regulations
Recommend
Implement the restrictions 
Page 44 of 56

Page 45

PUBLIC 
___________________________________________________________________
To:  Infrastructure, Land and Environment Policy Board 
On:  18 March 2026
___________________________________________________________________
Report by: Director of Environment, Housing and Infrastructure
___________________________________________________________________
Heading: Safeguarding Scotland’s Water Environment- SEPA Consultation 
___________________________________________________________________
1. Summary 
1.1 Scotland’s water environment faces intensifying pressures from climate
change, pollution, habitat modification and emerging chemical risks, with
consequences for biodiversity, public wellbeing and long‑term resilience. The
River Basin Management Plan (RBMP) framework coordinates national
evidence and targeted measures to protect and improve water quality,
habitats and sustainable water use. 
1.2 There have to date been three iterations of the RBMP and SEPA have
recently consulted on the first stage in the review and update of their RBMP
consultation here, with the intention of publishing a draft RBMP4 in December
2026, for further consultation. The recently closed consultation has detailed
the significant water management issues identified by SEPA which present
the greatest risk to the maintenance of a functioning and resilient water
environment. 
1.3 An Officer response to the recently closed consultation is detailed within
Appendix 1 to this report. 
Item 5
Page 45 of 56

Page 46

PUBLIC
___________________________________________________________________ 
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy
Board: 
2.1 Notes the consultation and homologates the submitted response, as detailed
within Appendix A. 
2.2 Notes that a future consultation on RBMP4 will be brought forward later in
2026 and that a future report will be brought to Board on this, along with a
draft response, for approval. 
_________________________________________________________
3. Background 
3.1 Scotland’s water environment is one of its most precious natural assets and
supports a rich diversity of wildlife; contributes to people’s health and well-
being; and provides for the sustainable growth of Scotland’s economy.
Protecting and improving this natural asset is fundamental to Scotland’s
efforts to build resilience to climate change and to ensure that the needs of
wildlife, people and the economy can be met and safeguarded into the future. 
3.2 The water environment exists within a complex landscape of urban
development, agriculture, forestry, industry, and other natural habitats. This
complexity of uses, each with their own demands on the water environment,
requires to be considered as a whole within a catchment-wide approach to
mitigate adverse effects and protect our water. 
3.3 River basin management planning (RBMP) is Scotland’s framework for
protecting and improving the water environment and the benefits it provides.
The RBMP sets out data on the state of the water environment in Scotland
and information on the main pressures causing impacts. 
3.4 SEPA have published three previous Plans, with RBMP3 outlining plans of
action to December 2027, many of which have been delivered; including
reducing rural diffuse pollution, removing and easing barriers to fish migration,
restoring urban rivers, mitigating impacts from hydropower generation and
other water use and investing in improved treatment for public wastewater.
Alongside this, SEPA’s understanding of the condition of the water
environment and the pressures it faces has also continued to improve.  
Page 46 of 56

Page 47

PUBLIC 
3.5 SEPA have, within the consultation document, identified a number of
significant water management issues which will form part of the next River
Basin Management Plan, RBMP4, with actions to mitigate their effects on the
natural water environment. The main issues which are identified within the
consultation include: 
• Rural diffuse pollution- arises from the farming industry
• Physical condition of rivers
• Artificial barriers to fish migration
• Sea lice from marine fish farms
• Water usage
• Wastewater and sewer networks
• Chemicals in the water environment
3.6 The water environment is considered a good barometer for the sustainability
of land use in Scotland and progress towards achieving a circular economy
which reuses materials and minimises waste. The identified significant water
management issues will require public bodies, businesses and stakeholders
to find new ways of working together to tackle these issues and put in place
the actions needed that will safeguard the water environment now and into the
future. 
3.7 SEPA are proposing to utilise the themes of climate adaptation, nature, and
health and wellbeing to present and organise information in the RBMP to
support coordination of action across sectors and within catchments. In doing
so, people from a range of sectors and policy areas will be able to access and
use the information relevant to them to inform decisions and take action.
Examples of ‘treemaps’ are provided within the consultation which shows
pressures on the water environment, taking data from RBMP3 and mapped to
these themes. 
3.8 This current consultation is the first stage in developing RBMP4 and it is noted
that when the draft Plan is published, currently proposed for December 2026,
there will be a further consultation opened for stakeholders to comment upon
the Plan. 
3.9 A future report will be brought to this Board on the draft RBMP4, along with
proposed responses to the consultation, for approval. 
Page 47 of 56

Page 48

PUBLIC
___________________________________________________________________
Implications of the Report 
1. Financial - None  
2. HR & Organisational Development - None  
3. Community/Council Planning –
• Creating a sustainable Renfrewshire for all to enjoy – supporting the broad
aims which SEPA are proposing within their strategic River Basin
Management Plan will work toward securing Scotland’s water environment
and in turn, the economy, health and wellbeing of our residents and
businesses, improving its resilience and sustainability.
4. Legal - None
5. Property/Assets – None
6. Information Technology – None
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website.  
8. Health & Safety - None
9. Procurement – None
10. Risk - None
11. Privacy Impact - None 
12. Climate Risk – failure to protect Scotland’s natural water environment will
increase the negative climate impacts already being experienced and
supporting SEPA’s River Basin Management Planning will, with partner
agencies and stakeholders, work toward mitigating risk and ensuring that
Scotland, and Renfrewshire are adapting to the climate changes.
13. Children’s Rights – None.
14. Cosla Policy Position – None.
_______________________________________________________
List of Background Papers- None
___________________________________________________________________ 
Author:           Colin Hunter, Environmental Health & Community Safety Manager
Colin.hunter@renfrewshire.gov.uk
Page 48 of 56

Page 49

PUBLIC
PUBLIC 
Respondent Information Form 
Your response
Please complete this form if you are not responding to our consultation on Safeguarding
Scotland’s Water Environment via our online consultation hub. 
Once complete, please submit this form to consultation@sepa.org.uk 
Handling your response
By submitting your response to this consultation, you give SEPA permission to analyse and
include your response in our results.
We would like to know if you are happy for your response to be made public. If you ask for your
response not to be published, it will be regarded as confidential and treated in accordance with
SEPA’s published Privacy Policy.
Why your views matter 
As Scotland’s principal environmental regulator, our purpose is to protect, improve Scotland’s
environment in ways that as far as possible also create health and well-being benefits, and
sustainable economic growth.
Our Corporate Plan sets our strategic direction and our Annual Operating Plan implements our
priorities. In delivering these priorities we engage with those who have an interest in and are
impacted by our regulations and duties. One way we engage is through consultations. 
Page 49 of 56

Page 50

Respondent Information Form 
1
PUBLIC
PUBLIC
The feedback we receive through our consultations helps us understand what matters most to
our communities and businesses, and shapes how we fulfil our duties. After the consultation
closes, we’ll take time to consider responses before sharing an update with you through the “we
asked, you said, we did” section of our consultation website.
Significant Water Management Issues
1. To what extent do you agree that we have identified the most significant water
management issues affecting Scotland’s water environment? 
☐Strongly agree
☒Agree
☐Neither agree nor disagree
☐Disagree
☐Strongly disagree
☐Don’t know
Tell us what else is important that should be included?
In addition to the most significant water management issues identified within the
consultation document, Renfrewshire Council recommends that within the Section,
Physical Condition of Rivers, removal of invasive non-native species should be included as
they cause riverbank erosion, loss of native species and can increase riverside flooding. 
It is appreciated that the Consultation refers to a high level, framework approach designed
to deliver RBMP scale of improvements. Within new/recent SEPA guidance, WAT-G-071,
there are groundwater ‘status standards’ to ‘prevent the deterioration in status’ and to
‘return groundwater bodies to good status’. It is possible therefore that significantly
Page 50 of 56

Page 51

Respondent Information Form 
2
PUBLIC
PUBLIC
contaminated land sites, may present potential risks to the water environment, on a RBMP
scale, from any contaminants when these groundwater Objectives are not met. 
It is assumed such issues will be considered within the Chemicals in the Water
Environment section in due course, as RBMP4 is developed and issued in its draft form. 
Significant Water Management Issues
Scotland’s climate is changing, and we all need to adapt to the increasing risks of flooding,
drought and rising temperatures. The water environment is also under continued and evolving
threats from pollution, loss of habitat and invasive species. Addressing these issues and
building resilience depends on strong collaboration between the public sector, industry, land
managers, community groups, and individuals. 
2. To what extent do you agree that each of the following should be a main outcome for
RBMP4? 
Strongly
agree
Agree Neither
agree
nor
disagree
Disagree Strongly
disagree
Not sure
Climate Adaptation ☒ ☐ ☐ ☐ ☐ ☐
Nature ☒ ☐ ☐ ☐ ☐ ☐
Public Health ☒ ☐ ☐ ☐ ☐ ☐
. 
If you selected “Disagree” or “Strongly disagree”, please tell us more about the reasons for your
response.
Page 51 of 56

Page 52

Respondent Information Form 
3
PUBLIC
PUBLIC 
River Basin Management Planning in Your Work,
Activities or Community
We recognise the importance of partnership working and ensuring our stakeholders, operators,
the public and communities are actively involved and engaged in what we do.  We want to open
a conversation with you around RBMP 4, restoring nature and climate resilience to deepen our
understanding of your experiences of river basin planning data and evidence.
3. In what ways is river basin management planning currently considered or applied in your
work, activities, or community?
Restoring Renfrewshire’s Rivers project which focuses on the removal and control of
invasive non-native plant species on 5 watercourses within the council area. This project
works with volunteers and the wider community to help restore native habitat along these
watercourses.
River management and development regarding flooding and the requirement for climate
adaptation measures. 
The council’s Team Up to Clean Up volunteer initiative occasionally do river clean-ups of
rivers such as the White Cart- this is a volunteer session to clear litter from the riverbank
and river itself. There have also been sessions by the Clyde in Erskine.
Peatland restoration work is being carried out in the Clyde Muirshiel Regional Park. This
is slowing the flow of water into the catchment of the River Calder by blocking the drains
Page 52 of 56

Page 53

Respondent Information Form 
4
PUBLIC
PUBLIC
to prevent/slow down the water going into the main river. This helps with mitigating
flooding downriver and improves water quality. 
As mentioned in response to Q1, Consideration of land contamination is undertaken
within the Environmental health service by Contaminated Land Officers and they work to
SEPA guidance when reviewing site investigation/RMS submitted documents under the
planning regime to support site redevelopment. This, where appropriate, includes
consideration for off-site pollution which could have the potential to impact river catchment
areas. This would also be appropriate should there be any sites under consideration for
designation as statutory contaminated land under Section 78 of the Environmental
Protection Act 1990. 
Engaging and involving stakeholders and
communities
We want to understand how best we can engage with stakeholders and communities as we
develop and deliver RBMP4
4. Please share with us examples of participation and engagement which have worked well
and could be used for river basin management planning.
Volunteer recruitment for the Rivers project. This includes training on how to remove
species which can be removed manually as well as basic training on removal using tools
such as pesticide training to tackle Japanese Knotweed etc.
Public engagement for the project is underway using information sessions (online and in
person) to provide information on how to get involved and what the project aims to do. 
Page 53 of 56

Page 54

Respondent Information Form 
5
PUBLIC
PUBLIC
Team Up to Clean Up also utilises volunteer support to help maintain rivers by cleaning-
up litter. 
Innovation
Innovative technologies, tools, finance and approaches will be important  for delivering a
resilient water environment at the pace and scale required. We are interested in understanding
what emerging ideas, methods or innovations could help strengthen RBMP4 and support more
effective delivery. 
5. Please share with us examples of where you have used innovative techniques to deliver
improvements to the water environment.
Blocking drains as part of the ongoing peatland restoration work is a cheap and innovative
way of improving water quality, reducing flooding and creating landscape resilience.
The Sustainability Team have been using drone footage to map invasive plant species on
rivers, particularly for inaccessible areas. This could also be used for future river
restoration work by identifying river features which could be altered (such as creating new
channels) so to reduce downriver flooding and create new wildlife habitat. 
6. Is there anything else you think is important for us to consider when developing RBMP4?
More education work around river basin management would be beneficial by encouraging
landowners and farmers to actively participate in management. This would also include
Page 54 of 56

Page 55

Respondent Information Form 
6
PUBLIC
PUBLIC
community education and engagement to encourage the wider community to either
volunteer or prevent river littering. 
It’s important to consider partnership working across local authorities, on river catchment
area scales, to improve the volume and quality of outcomes in rivers management. 
About You
What is your name? (Optional)
Colin Hunter 
What is your email address? (Optional)
colin.hunter@renfrewshire.gov.uk 
(a) Are you responding to this consultation on behalf of yourself, or a business or
organisation?
Organisation 
(b) If you are responding on behalf of a business or organisation, please provide the
name below:
Renfrewshire Council
Page 55 of 56

Page 56

Respondent Information Form 
7
PUBLIC
PUBLIC 
Are you happy for us to publish your response to this consultation? 
☒ Yes
☐No 
If you would like this document in an accessible format, such as large
print, audio recording or braille, please contact SEPA by
emailing equalities@sepa.org.uk 
Page 56 of 56