Notice of Meeting and Agenda
Infrastructure, Land and Environment Policy Board 
Date Time Venue
Wednesday, 21 January
2026
10:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN               
Membership 
Councillor Michelle Campbell (Convener): Councillor Audrey Doig (Depute Convener):  
Councillor Jennifer Adam: Councillor Stephen Burns: Councillor Jacqueline Cameron: Councillor
Carolann Davidson: Councillor Eddie Devine: Councillor Chris Gilmour: Councillor Gillian
Graham: Councillor John Hood: Councillor James MacLaren: Councillor Janis McDonald:
Councillor Iain McMillan: Councillor John McNaughtan: Councillor Iain Nicolson: Councillor John
Shaw: Councillor Andy Steel: 
Hybrid Meeting
Please note that this meeting is scheduled to be held in the Council Chambers.  However, it is a
hybrid meeting and arrangements have been made for members to join the meeting remotely
should they wish. 
Further Information
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior to the
meeting at the Customer Service Centre, Renfrewshire House, Cotton Street, Paisley and online
at  http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk   
Members of the Press and Public
Members of the press and public wishing to attend the meeting should report to the customer
service centre where they will be met and directed to the meeting.
MARK CONAGHAN
Head of Corporate Governance
Page 1 of 69

Page 2

14/01/2026 
Webcasting of Meeting
This meeting will be filmed for live or subsequent broadcast via the Council’s internet site – at
the start of the meeting the Convener will confirm if all or part of the meeting is being filmed.  To
find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home 
Page 2 of 69

Page 3

14/01/2026 
Items of business      
Apologies
Apologies from members. 
Declarations of Interest and Transparency Statements
Members are asked to declare an interest or make a transparency
statement in any item(s) on the agenda and to provide a brief
explanation of the nature of the interest or the transparency statement. 
1 Revenue and Capital Budget Monitoring 2025/26 at 14
November 2025
Joint report by the Director of Finance & Resources and the Director of
Environment, Housing & Infrastructure. 
5 - 14 
2 Service Update Report
Report by the Director of Environment, Housing & Infrastructure. 
15 - 29 
3 Introduction of parking controls and resident only
parking permit scheme on Marchfield Avenue, Paisley
Report by the Director of Environment, Housing & Infrastructure. 
30 - 53 
4 Restoring Renfrewshire’s Rivers Project Update
Report by the Director of Environment, Housing & Infrastructure. 
54 - 59 
5 Clyde Valley Update Report
Report by the Director of Environment, Housing & Infrastructure. 
60 - 69  
EXCLUSION OF PRESS AND PUBLIC
The Board may by resolution exclude the press and public from the
meeting during consideration of the following items of business as
it is likely, in view of the nature of the business to be transacted,
that if members of the press and public are present, there could be
disclosure to them of exempt information as defined in paragraphs
6, 8 and 9 of Part I of Schedule 7A of the Local Government
(Scotland) Act, 1973. 
Exempt Items
Exempt documents are no longer available in print format. You will
require to click on this link and log in to access the documents. Please
note that access to exempt documents is now restricted.     
Page 3 of 69

Page 4

14/01/2026 
6 Sale of the Former Chivas Buildings, Renfrew Road,
Paisley
Report by the Chief Executive. 
7 Renfrewshire Council (Advanced Manufacturing
Innovation District Scotland, South) Compulsory
Purchase Order 2023
Report by the Chief Executive. 
Page 4 of 69

Page 5

PUBLIC 
___________________________________________________________________ 
To: Infrastructure Land & Environment Policy Board 
On: 21 January 2026
___________________________________________________________________ 
Report by: Director of Finance and Resources 
Director of Environment, Housing & Infrastructure
___________________________________________________________________ 
Heading: Revenue and Capital Budget Monitoring 2025/26 at 14 November
2025
___________________________________________________________________ 
1. Summary 
1.1 At the close of reporting Period 8 on 14 November 2025, the projected
revenue outturn at 31 March 2026 for those services reporting to the
Infrastructure, Land and Environment Policy Board is an overspend position of
£0.380m (1.0%) against the revised budget for the year. 
1.2 The projected capital outturn at 31 March 2026 for projects reporting to the
Infrastructure, Land and Environment Policy Board is a break-even position. 
1.3  This is summarised over the relevant services in the table below and further
analysis is provided in the report and appendices. 
Revised
Annual
Budget
£000
Projected
Outturn
£000
Budget
Variance
(Adv)/Fav
£000
Budget
Variance
%
Revenue        
Environment & Infrastructure 39,765 40,145 (380) (1.0%)
Total 39,765 40,145 (380) (1.0%)
Capital        
Environment & Infrastructure 16,625 16,625 0 0.0% 
Item 1
Page 5 of 69

Page 6

PUBLIC
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy
Board: 
2.1 Note the projected Revenue outturn overspend position of £0.380m. 
2.2 Note the projected Capital outturn break-even position. 
2.3 Note the budget adjustments in appendix 1 and 2. 
2.4 Approve the budget adjustments proposed at section 6.3. 
3. Revenue Budget Projection – overspend of £0.380m by 31 March 2026 
3.1 The tables in Appendices 1 and 2 present the projected year-end position for
all services reporting to this board, by both objective analysis (which division
is spending the budget – appendix 1) and subjective analysis (what the
budget is spent on – appendix 2). Material variances affecting the projected
position are analysed further below. 
3.2 It should be noted that the projected outturn position reported here is based
on the latest information available, which is subject to change during the
financial year. The impact of any change on this projection will be updated at
each board cycle until the close of reporting period 10. Budget holders are
obliged to seek mitigating action to minimise significant budget variances. 
4. Objective Analysis – Significant Variances 
Environment, Housing, and Infrastructure – (£0.380m) overspend 
4.1 Waste Services – (£0.342m) overspend by 31 March 2026 
4.1.1 This reflects the financial position for Refuse Collection, Refuse Disposal and
Household Waste Recycling Centres. 
4.1.2 The overspend for Refuse Collection (£276k) is primarily driven by increased
staff costs resulting from higher levels of workforce absence, which create
significant operational challenges. The increase in unplanned leave has
required additional measures to maintain service delivery, including: 
• Overtime Costs: covering essential shifts through overtime by available
staff.
• Agency Staff: engaging external resources to ensure continuity of critical
frontline services.    
Page 6 of 69

Page 7

PUBLIC
The increase in absence is significant, with an average of 25% absent per day
across the financial period. We are actively implementing measures to
mitigate these challenges, including to ensure the Councils Absence
Management Policy is applied consistently. 
4.1.3 The service continues to closely monitor the potential impact of inflationary
pressures and contractual uplifts on the projected outturn. 
4.2 Social Transport – (£0.158m) overspend by 31 March 2026 
4.2.1 The projected overspend has decreased slightly since the previous board
report. The overspend sits within employee costs due to the need to hire
agency staff to cover long-term sickness absence and vacancies. 
4.2.2 The service is adhering to the Council’s policies and procedures regarding
absence management and is actively working with HR to effectively manage
the current long-term sickness within the team. However, this situation is
impacting the financial position of the service, as there is an ongoing need to
rely heavily on agency staff to maintain service levels. 
4.2.3 Finance, as part of the annual budget process are currently reviewing the cost
to operate the service against available budget provided by Education and
HSCP to ensure that they accurately reflect the services required by
Education and HSCP (from 2026/27 onwards). 
4.3 Roads Operations – £0.111m underspend by 31 March 2026 
The reported underspend is primarily due to the projected spend relating to
work by contractors being lower than anticipated. Given the reactive nature of
the service and the potential impact of any inflationary changes, this will
continue to be closely monitored throughout the financial year.  
5. Subjective Analysis – Significant Variances 
5.1 Employee Costs – (£0.094m) overspend by 31 March 2026 
As noted in point 4.1.2, this variance is due to the cost of covering higher
levels of unplanned absence within Refuse Collection. 
5.2 Supplies and Services – (£0.757m) overspend by 31 March 2026
5.2.1 The main movement relates to a £200k increase in Bitumen costs within
Roads Operations, which has been fully offset by income as these costs were
recharged to capital. Additionally, Fleet Services has seen a £132k rise in
material costs, which has been partially offset by a £62k increase within
recharge income. Virement will be carried out to adjust both Supplies and
Services and Income budgets accordingly. 
Page 7 of 69

Page 8

PUBLIC
5.2.2 As per the previous report, the remaining balance of the overspend is
primarily driven by inflation across three key service areas: Neighbourhood
Services (£0.134m), Infrastructure and Assets (£0.070m), and Refuse
Disposal (£0.154m). The increased costs are largely due to rising prices for
contractor services, materials, and related services. 
5.3 Income – £0.523m over recovery by 31 March 2026  
As noted in point 5.2.1, income has increased by £200k for capital recharges
within Roads Operations and by £62k for recharges within Fleet Services. In
addition, Refuse Collection has seen a £128k rise in trade waste income. 
6. Revenue Budget Virements 
6.1. Under the Council’s financial regulations, Directors and their nominated
officers, in consultation with the Director of Finance and Resources, have
certain delegated authority to transfer sums between subjective budget
headings within a service division to enable budget management throughout
the financial year. This is known as ‘budget virement’. 
6.2. Transfers between divisions of the same service / department in excess of
£100,000, and transfers between services / departments must be authorised
by the respective service Director and the Director of Finance and Resources
for submission to the relevant policy board for approval. 
6.3. Budget holders are obliged to seek mitigating action to minimise significant
budget variances. The Board is therefore asked to approve the following
virements, which are not currently applied to the budget: 
Revenue Budget Adjustments for noting
Objective
Heading
Subjective
Heading
Amount
(£m)
Reason
Road Operations Supplies and
Services
0.200 Increased Bitumen costs
for capital work (see 5.2.1). 
Road Operations Income (0.200) Increased income for
recharges to capital. 
Page 8 of 69

Page 9

PUBLIC
7. Capital Budget Projection – break-even position by 31 March 2026 
7.1 The Capital Investment Programme 2025/26 to 2029/30 was approved by the
Council on 27 February 2025. For Infrastructure Land & Environment the
revised capital spend for 2025/26 is £16.625m.
7.2 The in-year Capital budget is forecast to break even by 31 March 2026
however, this will be monitored as the projects progress. Further details of the
programme can be found in the Capital Monitoring report at Appendix 3. 
7.3 A number of budget adjustments between years have taken place, to reflect
revised programming of some capital projects. Details of these adjustments,
which amount to £0.433m, are as follows: 
Project Amount
(£m)
Budget increase to reflect grant award
SPT  0.100
Scottish Government – Implementation of 20mph
speed limit 0.259
Budget carried forward into 2026/27 to reflect programming
Public Realm  (0.295)
Traffic Management (0.226)
Budget decrease to reflect programme completion 
Recycling Improvement Fund (0.271)
Total (0.433) 
Implications of the Report 
1. Financial 
The projected budget outturn position for the Infrastructure, Land and
Environment Revenue budget is an overspend of £0.380m. Income and
expenditure will continue to be monitored closely for the rest of the financial
year and as far as possible, steps will be taken to mitigate any overspend.   
The projected outturn position for the Infrastructure, Land and Environment
Capital budget is a break-even position. 
2. HR & Organisational Development 
While staffing budgets form a significant proportion of the Council’s revenue
budgets, there are no direct implications arising from the recommendations in
this report.
Page 9 of 69

Page 10

PUBLIC 
3. Community/Council Planning 
Community Plan
Our Renfrewshire is thriving The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Our Renfrewshire is well 
Our Renfrewshire is fair 
Our Renfrewshire is safe
Council Plan
Reshaping our place, our
economy, and our future The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Building strong, safe, and resilient
communities
Tackling inequality, ensuring
opportunities for all
Creating a sustainable
Renfrewshire for all to enjoy
Ongoing revenue and capital budget
monitoring is a tool to enable good
financial management so that the Council
has resources now and in the future for
continued service delivery.
Working together to improve
outcomes 
4. Legal 
There are no direct implications arising from the recommendations in this
report. 
5. Property/Assets 
The capital expenditure noted in this report will result in lifecycle maintenance
improvements to existing properties and replacement of ICT assets and
infrastructure. 
6. Information Technology 
There are no direct implications arising from the recommendations in this
report. 
7. Equality & Human Rights 
There are no direct implications arising from the recommendations in this
report. 
8. Health & Safety 
There are no direct implications arising from the recommendations in this
report. 
Page 10 of 69

Page 11

PUBLIC 
9. Procurement 
While Procurement is an important consideration prior to the council incurring
any revenue or capital spend, there are no direct implications arising from this
report. 
10. Risk 
The potential risk that the Council will overspend its approved budgets for the
year will be managed at a Council-wide level by the Chief Executive and
Directors. 
11. Privacy Impact 
There are no direct implications arising from the recommendations in this
report. 
12. Climate Change 
The Council aims to reduce its carbon and other emissions to net zero by
2030, however there are no direct implications arising from the
recommendations in this report. 
13. Children’s Rights 
There are no direct implications arising from the recommendations in this
report. 
14. Cosla Policy Position 
N/A 
List of Background Papers 
• The Capital Investment Programme 2025/26 to 2029/30, Council 27 February
2025 
Author: 
Lisa Dickie, Finance Business Partner, 
Gordon McNeil, Director of Environment, Housing & Infrastructure and Linsey
Mcgregor, Senior Accountant (Capital) 
Page 11 of 69

Page 12

PUBLIC
Appendix 1 
Appendix 2 
Objective Summary
Annual
Budget at
Period 6
Budget
Adjustments
Revised
Annual
Budget at
Period 8
Projected
Outturn
Previous
Projected
Outturn
Variance
Movement
£000 £000 £000 £000 £000 % £000
Directorate and Service Co-ordination 1,489 0 1,489 1,470 19 1.3% 11 8
Refuse Collection 6,080 52 6,132 6,408 (276) (4.5%) (96) (180)
Household Waste Recycling Centres 1,429 0 1,429 1,460 (31) (2.2%) (13) (18)
Refuse Disposal 7,624 (52) 7,572 7,607 (35) (0.5%) (131) 96
Neighbourhood Services 7,610 0 7,610 7,625 (15) (0.2%) 13 (28)
Fleet Services 361 0 361 349 12 3.3% 12 0
Social Transport 1,255 0 1,255 1,413 (158) (12.6%) (162) 4
Roads Operations 5,832 0 5,832 5,721 111 1.9% 102 9
Infrastructure and Assets 2,999 (23) 2,976 3,019 (43) (1.4%) (15) (28)
Transportation & Development 720 71 791 798 (7) (0.9%) (75) 68
Parking of Vehicles (34) 0 (34) (34) 0 0.0% 25 (25)
Street Lighting Maintenance Work 554 0 554 487 67 12.1% 101 (34)
Energy Management Unit 419 0 419 419 0 0.0% 0 0
Strathclyde Partnership for Transport
Requisition
3,379 0 3,379 3,403 (24) (0.7%) (24) 0
NET EXPENDITURE 39,717 48 39,765 40,145 (380) (1.0%) (252) (128)
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2025/26
1 April 2025 to 14 November 2025
Budget Variance
(Adverse) or Favourable
POLICY BOARD : INFRASTRUCTURE, LAND AND ENVIRONMENT
Page 12 of 69

Page 13

PUBLIC 
Appendix 3 
Subjective Summary
Annual
Budget at
Period 6
Budget
Adjustments
Revised
Annual
Budget at
Period 8
Projected
Outturn
Previous
Projected
Outturn
Variance
Movement
£000 £000 £000 £000 £000 % £000 £000
Employees 27,115 79 27,194 27,288 (94) (0.3%) 138 (232)
Premises Related 1,434 0 1,434 1,537 (103) (7.2%) (103) 0
Transport Related 8,616 (12) 8,604 8,518 86 1.0% 29 57
Supplies and Services 15,732 (19) 15,713 16,470 (757) (4.8%) (407) (350)
Third Party Payments 3,644 0 3,644 3,667 (23) (0.6%) (24) 1
Transfer Payments 169 0 169 165 4 2.4% (24) 28
Support Services 661 0 661 677 (16) (2.4%) (15) (1)
Depreciation and Impairment Losses 2,180 0 2,180 2,180 0 0.0% 0 0
GROSS EXPENDITURE 59,551 48 59,599 60,502 (903) (1.5%) (406) (497)
Income (19,834) 0 (19,834) (20,357) 523 2.6% 154 369
NET EXPENDITURE 39,717 48 39,765 40,145 (380) (1.0%) (252) (128)
Budget Variance
(Adverse) or Favourable
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2025/26
1 April 2025 to 14 November 2025
POLICY BOARD : INFRASTRUCTURE, LAND AND ENVIRONMENT
Page 13 of 69

Page 14

PUBLIC 
Prior Years Approved  Budget Revised Projected
Expenditure Budget Adjustments Budget Outturn Total Approved Projected
Project Title to 31/03/2025 2025-26 since previous 2025-26 2025-26 Budget Outurn
Board report to 31-Mar-30 to 31-Mar-30
£000 £000 £000 £000 £000 £000 £000
ENVIRONMENT & INFRASTRUCTURE
Active Travel Funding Tier 1 0 1,411 0 1,411 1,411 0 0% 4,611 4,611 0 0%
LADA 49 49 0 49 49 0 0% 98 98 0 0%
Bus Infrastructure Fund 0 105 0 105 105 0 0% 105 105 0 0%
Vehicle Replacement Programme 0 2,382 0 2,382 2,382 0 0% 12,102 12,102 0 0%
Bridge Assessment/Strengthening - 6XN004 0 347 0 347 347 0 0% 1,547 1,547 0 0%
Roads/Footways Upgrade Programme -6XN004 0 8,012 0 8,012 8,012 0 0% 59,437 59,437 0 0%
Lighting Columns Replacement - 6XN004 0 840 0 840 840 0 0% 3,240 3,240 0 0%
Traffic Management 529 236 (226) 10 10 0 0% 765 765 0 0%
Improvements to Outdoor Access and Play Area Programm 393 68 (19) 49 49 0 0% 442 442 0 0%
Total Active Travel Transformation Fund 331 90 0 90 90 0 0% 421 421 0 0%
SPT - People in Place Fund 0 110 0 110 110 0 0% 110 110 0 0%
Multi Pupose Bins 0 56 0 56 56 0 0% 56 56 0 0%
Renewal of Play Parks 0 1,167 19 1,186 1,186 0 0% 1,986 1,986 0 0%
Grant for Implementation for 20mph speed limit 0 0 259 259 259 0 0% 259 259 0 0%
Nature Restoration Fund (Biodiversity) 483 216 0 216 216 0 0% 558 558 0 0%
Nature Restoration Fund (Rivers) 95 114 0 114 114 0 0% 350 350 0 0%
Underwood Depot Improvement 12 388 0 388 388 0 0% 400 400 0 0%
Public Realm - Abbey 0 300 (295) 5 5 0 0% 300 300 0 0%
Recycling Improvement Fund 486 271 (271) 0 0 0 0% 486 486 0 0%
Road Safety 952 396 0 396 396 0 0% 1,348 1,348 0 0%
Open Spaces Infrastructure 0 200 0 200 200 0 0% 200 200 0 0%
Strathclyde Partnership Transport 0 300 100 400 400 0 0% 400 400 0 0%
TOTAL INFRASTRUCTURE, LAND & ENVIRONMENT
BOARD 3,637 17,058 (433) 16,625 16,625 0 0% 89,528 89,528 0 0%
RENFREWSHIRE COUNCIL
CAPITAL INVESTMENT STRATEGY - NON-HOUSING SERVICES
1st April to 14th November 2025
POLICY BOARD: INFRASTRUCURE, LAND & ENVIRONMENT
Current Year 2025-26 Full Programme - All years
Budget Variance
(Adverse) or Favourable
Budget Variance
(Adverse) or
Page 14 of 69

Page 15

PUBLIC 
To:    Infrastructure, Land and Environment Policy Board 
On:  21 January 2026 
Report by:  Director of Environment, Housing and Infrastructure 
Heading:  Service Update Report 
1. Summary 
1.1      This report provides an overview of key service activities since the last Policy
Board report on 5 November 2025 and an update on the services and key
projects delivered during this period. 
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy
Board: 
2.1      Notes the wide range of activities provided in the service update. 
2.2      Approves the updated Assisted Collection Service Policy outlined in Appendix
2. 
Item 2
Page 15 of 69

Page 16

PUBLIC
3. Background 
3.1 Environment, Housing & Infrastructure provides essential services to every
household in Renfrewshire and works in partnership with the local community,
other service areas and Community Planning Partners, to deliver key Council
priorities and initiatives. A progress update on the main activities delivered by
the services in respect of the areas of activity delegated to this Policy Board,
is detailed below. 
Updates for Infrastructure, Land and Environment Policy Board 
4. Community Development 
4.1  Team Up to Clean Up 
4.1.1  The Team Up to Clean Up Winter Warriors campaign continues to compliment the
#RenReady programme by providing salt and grit spreaders to community volunteers on
their request for kit. Each Winter Warriors kit includes a spreader, snow shovel, waterproof
gloves, and two 25kg bags of salt. Kits are delivered directly to volunteers along with a risk
assessment to support safe working practices. Spreaders can be replenished using grit
from community grit bins located across Renfrewshire, these locations are available to view
online. 
4.1.2  A joint initiative led in partnership with Community Learning and Development’s Youth
Services and Environment, Housing & Infrastructure’s Sustainability Team delivered high-
school presentations throughout November and December. These interactive sessions
provided pupils with information and practical advice on improving sustainable behaviours
around littering, recycling, and wider climate impacts. Feedback from both pupils and
schools has been very positive.  
Page 16 of 69

Page 17

PUBLIC
5. Fleet, Roads, and Transportation   
Fleet Services 
5.1   Fleet Investment 
5.1.1  Fleet Services has recently introduced seven new vehicles as part of the Vehicle
Replacement Programme, supporting fleet modernisation and Renfrewshire Council’s Net
Zero ambitions. The new additions include an 18-tonne Narrow Track Refuse Collection
Vehicle for Waste Services to improve access on restricted routes, three 26-tonne Refuse
Collection Vehicles replacing older and hired vehicles, a 16-tonne truck-mounted road
sweeper for Neighbourhood Services to maintain road cleanliness, and two Renault van-
mounted access platforms for Street Lighting. All vehicles are equipped with the latest Euro
6 emission engines, contributing to lower emissions and aligning with Renfrewshire
Council’s sustainability and Net Zero objectives. 
5.2  Fleet Safety Initiatives   
5.2.1 A programme of health and safety initiatives has been delivered, with a focus on driver
safety and fatigue management. Key initiatives include the installation of digital
tachographs downloaders across all 70 HGVs to monitor compliance, introduction of a
fatigue-awareness toolbox talk and online learning module, and continued Driver CPC
training covering critical topics such as First Aid and Fire Safety. Additional measures
include new tachograph and load security training, enhanced daily vehicle check
procedures. Additionally, an external audit of vehicle maintenance records confirmed high
compliance and provided positive feedback. 
Roads & Transportation 
5.3  Roads Capital Investment Programme 
5.3.1  As part of the Roads Capital investment programme, in 2025/2026 we have so far
resurfaced 47 carriageways, 12 footways and surface treated 38 carriageways.   
5.3.2  The Roads Capital team are compiling the resurfacing programme for 2026/2027 with
major resurfacing schemes at Hillington Road (Burger King Roundabout to M8 West Bound
on Slip both sides), the junctions at George Street, Canal Street, Maxwellton Street and
Lounsdale Road Paisley, and High Street Paisley scheduled for March, April and May 2026
respectively.   
5.3.3  Roundabout improvements as part of the Roads Capital programme for 2025/26 has
continued to upgrade Hurlet Road at Grahamston Road, Barrhead Road at Hawkhead
Road, Beith Road at Cochranemill Road, Newshot Drive at Parkway, Greenock Road at
India Tyres, Ferry Road Bishopton and Inchinnan Road at Sanderling Road Glasgow
Airport. The roundabout upgrade programme, which looks to transform, tired, overgrown
roundabouts, into tidy, easily maintained assets, that will enhance the road network, rather
than detracting from the road network.      
Page 17 of 69

Page 18

PUBLIC 
5.4  Ready for Winter 
5.4.1  The service commenced winter resilience arrangements on the 1 October 2025, and this
will run through until May 2026. To the 12th of January 2026, the Winter Maintenance
programme has used a cumulative total of over 1,400 tonnes of salt gritting Renfrewshire
roads. The service has gritted primary network routes 68 times and our secondary network
on 9 occasions with gritting teams working around the clock to keep Renfrewshire moving
throughout this recent winter period. The start of 2026 provided a period of particularly
challenging weather, the service has additionally carried out gritting of side streets to assist
communities during this time.     
5.4.2  In addition, the Road Operations team are principally responsible for the maintenance of
over 32,000 road gullies and ensure that the requirements of the Renfrewshire Council
Winter Maintenance and Severe Weather Plan are met. This includes the maintenance of
our flood prevention schemes and pumping stations, clearing priority grids, and monitoring
river levels. Road Operations take the lead role in our proactive and reactive maintenance
approach to dealing with drainage issues, flooding incidents and pothole repairs. 
5.4.3  When a flood alert is received of a severe rainfall event, the Road Operations team
implement the flooding operational plan and have defined duties that are carried out within
the limited time afforded by the weather alert. The principal duties are: 
• Inspection and clearance (where appropriate) of flood prevention schemes and
pumping stations,
• Grids at the priority culverts are cleared, 
• Gully hot spot locations are attended, 
• Priority sweeping routes, particularly those in high leaf fall areas are swept,
• In severe weather episodes e.g. amber or red alerts communications are issued to
elected members and the public, and
• River levels monitored where appropriate.   
5.5  Street Lighting Capital Investment Programme 
5.5.1  New street lighting installation on Main Street Lochwinnoch commenced on site in January
2026, after the festive lights were removed.   
5.5.2  New lighting installation at Cullen Erskine is scheduled to complete during January 2026. 
5.6   Festive Lighting 
5.6.1  The lighting team have supported the Renfrewshire Christmas lights switch-on events for
2025. They are responsible for the safe installation, ongoing maintenance, and removal,
while ensuring compliance with all safety regulations. Their expertise is crucial for both
visual impact and public safety. 
Page 18 of 69

Page 19

PUBLIC 
5.7  Active Travel & Infrastructure Improvement Update 
Red Smiddy, Inchinnan to Erskine Active Travel Route 
5.7.1  The Council has received £1.6million in funding from Transport Scotland for the Red
Smiddy, Inchinnan to Erskine Active Travel Route. A tender process concluded in
December 2025 with construction work due to be starting on site in the coming weeks. This
will create a shared use footway for walking and cycling expanding the network in the area.   
5.7.2  The first phase of works will be construction of 1.4km of shared footway & cycleway from
the end of the existing shared footway/ cycleway on Greenock Road, round Red Smiddy
Roundabout, north onto Southbar Road to Southholm Roundabout. There is an existing
footway at Red Smiddy Roundabout which is widened, and new construction footway on
Southbar Road. 
5.7.3  The second phase will see the construction of 0.6km of shared footway & cycleway from
Southholm Roundabout to the overbridge on the A726 on the northbound verge.
Associated relocation of street lighting columns, road signs and installation of new
drainage. The works will involve the construction of a ramp to create a connection to the
existing footway overbridge over the A726 providing direct access to Park Mains High
School and Erskine shopping area. 
5.8  Renfrew Bridge Update 
5.8.1  Since the bridge was officially opened in June 2025, there have been over 560 bridge
openings to allow the safe passage of vessels. In addition, there have been more than 1.2
million cars crossing the bridge, as well as over 30,000 cyclists and over 50,000 walkers
and runners, with the bridge becoming a vital travel link enhancing connectivity and
supporting sustainable travel across the region.   
5.9  Elderslie for Everyone Project 
5.9.1  The developed design is continuing on from the concept design stage which has been
completed. Within this stage we will continue to gather feedback on the design from the
community and prepare more technical information to inform the developed design stage.
Ongoing public communication will happen throughout the process. 
6.   Neighbourhood Services 
6.1   Arterial Routes Roundabout Programme 
6.1.1  As reported at the Infrastructure, Land and Environment Policy Board in May 2025,
Neighbourhood Services are working in partnership with Roads to improve the aesthetics
of an initial 20 identified roundabouts, with the aim of enhancing their visual appeal. To
date, works have been completed at the following roundabouts and include vegetation
clearance, weed removal and planting, also pressure cleaning and chevron enhancement.  
• Barnsford Road at Inchinnan Drive, Inchinnan 
• Hurlet Road at Grahamston Road, Paisley 
Page 19 of 69

Page 20

PUBLIC
• Barrhead Road at Hawkhead Road, Paisley 
• Beith Road at Cochranemill Road, Johnstone 
• Newshot Drive at Parkway, Erskine
• Greenock Road, Inchinnan 
• Ferry Road, Bishopton 
6.1.2  The following roundabouts are scheduled for works in January 2026: 
• Inchinnan Road at Sanderling Road, Glasgow Airport 
• A761 at John Neilston Avenue, Paisley 
6.2  Play Park Update 
6.2.1  The play park renewal programme is progressing well, and improvements are expected to
complete by late Spring 2026 for the following play areas: 
• Robertson Park (Main Play Area), Renfrew
• Stuart Road, Bishopton
• Poplar Avenue, Johnstone
• Campbell Street, Johnstone 
• East Fulton, Linwood
• Ferguslie Gardens (Bottom Play Area), Paisley 
• Red Blaes BMX track, Barshaw Park, Paisley (conversion to pump track)
• New outdoor gym at Lochwinnoch public park. 
6.2.2  Further contracts for upgrades at KGV Playing Fields and Robertson Park (Craigielea
Road) in Renfrew, a new play area at Braehead Road in Glenburn, and outdoor gym
equipment at Poplar Avenue, Johnstone are scheduled to be awarded by the end of
January 2026. 
6.3  Cemetery Update 
6.3.1 The Bereavement & Burial operational teams began their winter maintenance programme
across cemeteries at the end of October 2025, with a primary focus on Abbey Cemetery. As
one of the oldest cemeteries, its extensive tree cover and dense vegetation present
ongoing maintenance challenges. Targeted works are currently underway to deliver
noticeable improvements, including pruning back overgrown vegetation, clearing paths,
and carrying out only minor tree works where necessary. 
6.3.2 The annual St Mirin Mass, organised by St Mirin Cathedral, took place in Hawkhead
Cemetery on Sunday, 23 November. The event was attended by over 100 people. 
Page 20 of 69

Page 21

PUBLIC 
6.3.3 The Doulton War Memorial, previously removed from the walls of Hawkhead Cemetery in
2023 for extensive repair and conservation, remains under restoration due to the
specialised nature of the work required. More recently, it was discovered that a sister
memorial exists, associated with the former Royal Doulton factory in Stoke-on-Trent.
Officers are now liaising with the War Memorial Trust and counterparts in England to share
aspirations and explore collaborative approaches to restoration. 
6.3.4 Following a conservation inspection of the Glen Cinema Memorial in Hawkhead Cemetery,
several areas for enhancement were identified. A conservation specialist has been
appointed to carry out the enhancements, with work commencing in December 2025. 
6.4  Country Parks     
6.4.1  Gleniffer Braes Country Park - Paisley and District Scout Groups are contributing to the
‘Better World’ project through volunteer activity days. Supported by their leaders and park
staff, the scouts have repaired paths, cleared ditches, created habitat piles, and planted
trees and shrubs, showing great enthusiasm while learning about the environment. 
6.4.2 Castle Semple Country Park – The team are working with Economic Development to
progress the replacement of the original toilet block. Demolition was completed late last
year, and groundworks for the new building are now well underway. 
6.4.3 2025 was a busy and successful year, we have proudly hosted over 4,500 people in a
range of outdoor activities, creating memorable experiences and strengthening community
engagement.      
6.5  Weed and Detritus Removal 
6.5.1  Our Environmental Impact team have been busy working within communities across
Renfrewshire. Their efforts have included weed management, cleaning, scraping, and
detritus removal, helping to keep our open spaces clean, tidy and welcoming. To date,
improvement works have been completed at over 200 locations. We continue to prioritise
areas based on feedback from communities, staff, and councillors, and we welcome
additional requests. 
6.6 Christmas Tree Displays   
6.6.1 In November, Neighbourhood Services and Street Lighting teams delivered and installed 
16 Christmas trees and lights across various locations. The feedback was positive from
communities which is always great for the staff involved to see the work recognised but
more importantly to see how Christmas light switch of events bring communities together. 
The service did received feedback regarding Christmas trees at a couple of locations this
year. The health and safety of both staff and the public remains our highest priority. Tree
sizes must correspond to the strength of their fixings and there is a maintained consistency
across towns and villages. Additional measures are also now required to enhance staff
safety during installation, including equipment to install. 
Page 21 of 69

Page 22

PUBLIC
In the coming months, the service will review arrangements in collaboration with the Events
team, focusing on tree locations and switch-on events. We will also explore the feasibility of
planting permanent trees in suitable areas, ensuring Renfrewshire continues to provide
safe, vibrant, and welcoming festive displays for our communities to enjoy. 
7.  Waste Services 
7.1   Waste Service Website Update 
7.1.1  In November, the new online collection calendar was launched and has been well received
by residents. So far, there have been over 75,000 postcode searches, 33,000 PDF
calendar downloads, and 12,500 iCalendar downloads, providing residents with a simple,
flexible, and accessible way to access their bin collection information. The system provides
a clear four-month view of collection dates and updates in real time to reflect any changes,
such as rescheduling due to severe weather, ensuring residents have access to the most
accurate and up to date information.   
7.1.2   To support the transition, a comprehensive awareness campaign ran from 8 December to 5
January 2026. This included targeted activity across social media channels, posters, and
advertisements to ensure all residents were informed about the new tools and options
available. While residents are encouraged to access their calendars online for
environmental benefits, the service recognises that not everyone has access to digital
tools. To ensure inclusivity, paper calendars remain available for those who need them.
These can be: 
• Downloaded and printed directly from the website
• Requested via an online form
• Requested by contacting Customer Services by telephone  
7.1.3  This approach ensures that residents with limited digital access or specific accessibility
needs can still receive the information in a format that works for them. 
7.2    Assisted Collection Service  
7.2.1  There are approximately 5,467 households currently receiving the Assisted Collection
Service. As reported to the Infrastructure, Land and Environment Policy Board in November
2025, the service is undergoing a review to ensure assistance is provided only to
households that genuinely require it. This review focuses on eligibility and accessibility
requirements, bin storage locations and improving service reliability and fairness. 
7.2.2  Currently, residents are eligible for assisted collections if they meet the following criteria: 
• Have a physical or medical condition preventing them from presenting bins, with
no support from anyone to put the bins out for collection 
AND 
• Bins must be stored at an agreed location that is safe and accessible for
collection crews. 
Page 22 of 69

Page 23

PUBLIC 
7.2.3  The Waste Service has received enquiries from residents, Councillors and staff regarding
the management and eligibility criteria for the Assisted Collection Service. These enquiries
have provided an opportunity to review the current approach and identify improvements
that will enhance the service for those who need it most, and ensure the policy meets the
requirements of GDPR regulations and Council procedures. 
7.2.4 At present, residents are not required to provide evidence when applying for the Assisted
Collection Service. While this has made access straightforward, the number of requests
received has grown significantly, which has placed additional pressure on resources.
Introducing updated eligibility criteria and a clear process will help ensure the service
remains fair, consistent, and focused on supporting residents who genuinely require
assistance. A copy of the current Assisted Collection Service Policy is included as Appendix
1. 
7.2.5 To align with other Council services that provide specialist support and to ensure the
process is evidence-based and equitable, the proposed updated eligibility criteria are set
out for approval in Appendix 2. 
8.  #YouDecide 
8.1.1 Seven of the fifty successful #YouDecide projects remain. Work is ongoing and completion
reports will be submitted individually as each project reaches its conclusion. #YouDecide
projects currently in progress are: 
• Roundabout improvement schemes in Bishopton and Kilbarchan 
• Activity/Heritage trails in Inchinnan and Kilbarchan 
• Car park and path improvements at Gleniffer Braes 
• Outdoor Gym installations at Poplar Avenue, Johnstone and Lochwinnoch
Park. 
9.  Public EV Charging Infrastructure Update 
9.1.1 Renfrewshire continue to work alongside all Glasgow City Region partners to expand public
use EV charge points across each local authority partner area including Renfrewshire. The
programme will involve the migration of around 600 existing charge points in and the
installation of around 3,000 new charge points. 
9.1.2  The updated programme timeline highlights that the procurement process to appoint a
commercial Charge Point Operator has now commenced with an appointment of an
operator due to be concluded by September 2026. 
10. Biodiversity Areas Update – Main Road, Elderslie 
10.1.1 Under the Scottish Biodiversity Duty, Renfrewshire Council is legally required to further the
conservation of biodiversity when carrying out their responsibilities. 
Page 23 of 69

Page 24

PUBLIC
10.1.2 Biodiversity areas in Renfrewshire were publicly consulted on in the summer of 2020 and a
report detailing the outcomes and proposed locations approved by the Climate Change
Sub Committee on 28 October 2020. Following this, 37 biodiversity sites have been fully or
partially delivered at the agreed locations. 
10.1.3 One of the sites located at Main Road, Elderslie was only partially delivered due to internal
resource and adverse weather challenges at the time of seeding. The Council has received
some recent enquiries relating to the site with requests for it to be returned to a standard
grass panel. 
10.1.4 As the area would require investment and given that it is subject to discussion around the
Elderslie for Everyone project, it is proposed that the site is reinstated to a grass panel
whilst that project is ongoing. 
10.1.5 A more detailed update on future Biodiversity plans will be brought to a future board. 
11. Public Protection 
11.1 Environmental Health 
Radon Compliance Monitoring Programme 
11.1.1 Officers have been progressing the radon monitoring programme, as detailed within the
board paper approved at the Infrastructure, Land and Environment Policy Board on 21 May
2025. 
11.1.2 Radon monitoring kits were sent out to 290 ground floor Council housing properties, ten
Council (including OneRen) operational workplaces and five schools/early learning centres.
Kits from workplaces and educational centres have all been returned to the UK Health
Security Agency for analysis. 
11.1.3 To date, approximately 50% of kits sent to Council housing tenants have been returned to
the UKHSA for analysis and work had been undertaken by Officers to make contact with
tenants who have not returned kits to encourage their return. This resulted in a small
additional number of kits being returned. This rate of participation is higher than
experienced by other local authorities who have undertaken a similar monitoring
programme. 
11.1.4 Letters are being issued imminently to tenants with their monitoring results and those who
did not take part in the programme will also be issued with letters confirming they had been
issued with kits initially and as they have not engaged, no further action is proposed but
allowing them to come back to Officers should they decide at a future date to participate in
the programme. 
11.1.5 Overall, results to date have been positive, with all being far below the action level of 200
Becquerels per cubic metre (Bq/m3); meaning there is no requirement for any remedial
action to be taken across the Council estate at this time. 
Page 24 of 69

Page 25

PUBLIC
11.1.6 Whilst current radon test results indicate low levels, there remains an ongoing requirement
to periodically re-test properties. This is particularly important where improvement works
have been carried out to housing stock, such as upgrades to insulation, which may
increase the potential for radon accumulation. Officers are taking steps to embed this
monitoring requirement into standard business processes to ensure appropriate follow-up.
In line with UKHSA guidance, properties with low radon levels should be re-tested
approximately every 10 years. 
11.1.7 To support the ongoing requirement to monitor property for radon, the Corporate Health
and Safety team, with input from Environmental Health, is currently drafting a Radon Policy. 
Page 25 of 69

Page 26

PUBLIC 
Implications of the Report 
1.  Financial – Any financial elements referenced in this report will be progressed through the
Council’s financial & budget planning process. 
2.   HR & Organisational Development – None       
3. Community/Council Planning – The report details a range of activities which reflect local
community and council planning themes. 
4. Legal – None 
5. Property/Assets – None 
6.   Information Technology – None 
7. Equality & Human Rights - Any potential impact arising from the updated policy outlined
in Appendix 2, which requires the provision of evidential information, will be mitigated by
ensuring that all service users have equitable access to clear and comprehensive
information. Applicants who do not meet the criteria, or who may be affected by changes to
the policy, will be considered on an individual basis to ensure equity. Clear guidance will be
provided on the application form and the Council website. Waste Services will offer support
to ensure that all information is available in accessible formats, promoting inclusion and
equal opportunity for all applicants. 
8. Health & Safety – None 
9. Procurement – None 
10. Risk – None 
11.   Privacy Impact – None 
12.  Climate Change – there are a range of actions and activities throughout the Service
Update Report which support the Council’s Plan for Net Zero. 
13.  Children’s Rights – None 
14.  Cosla Policy Position – None 
List of Background Papers: None 
Author:  Gordon McNeil, Director of Environment, Housing & Infrastructure 
Email:  Gordon.mcneil@renfrewshire.gov.uk 
Page 26 of 69

Page 27

PUBLIC
APPENDIX 1 – Current Assisted Collection Service Policy 
1.1 As part of the Council’s approach to empowering our communities, residents who would
normally need this service are encouraged to ask a relative or neighbour to help with bins. 
1.2 An assisted collection service will be provided when, due to age or a physical or medical
condition, no member of a household is able to present or retrieve their own bin(s) and
have no other means of support to do this. This service is free of charge to people who
qualify for it. You may be visited by a Council Officer to check your eligibility for the
scheme. 
1.3 Bins will be collected from an agreed location within the boundary of the property. All
properties are risk assessed by a Council Officer to determine the manual handling risks
associated with uplifting bins. Should a perceived risk be identified, it may necessitate a
change to a sack uplift collection service. In instances of this nature, appropriate sacks will
be provided to the householder. 
1.4  Residents are required to ensure the bin storage area is easily accessible to the bin crews.
Gates should be unlocked and in good working condition to allow access. Dogs should be
secured elsewhere to allow staff safe access to the property. 
1.5 When moving to a new property, it is important that residents who receive an assisted
collection inform the Council so that records can be updated. 
1.6 Assisted collections will be reviewed on a regular basis and may be removed if the criteria
are no longer met. If a household’s circumstances change and, as a result, they no longer
need an assisted collection, residents must inform the council. 
1.7 Householders receiving an assisted collection service will be supplied with stickers to help
collectors identify containers that are to be collected. It is the householder’s responsibility to
affix the stickers to their bin(s). 
Page 27 of 69

Page 28

PUBLIC
APPENDIX 2: Proposed Updated Assisted Collection Service Policy 
1.1 Eligibility Requirements 
Applicants must: 
1. Permanently reside at the property
2. Have a physical or medical condition preventing them from presenting bins, with no
support from physically able persons aged 14 or over in the household who can put
the bins out for collection 
1.2 Supporting Evidence 
Applicants must provide: 
• Medical evidence or a supporting letter from a Social Worker, Paid Carer,
Health Worker, or Housing Officer 
Acceptable evidence includes: 
•   Evidence of receipt of benefits, for example: 
o Personal Independence Payment (PIP) – Mobility Element
o Disability Living Allowance (DLA) – Mobility Element
o Adult Disability Payment (ADP) – Mobility Element
o Employment and Support Allowance (ESA) (for physical/mobility health
issues)
o Universal Credit with the limited capability for work related activity element
o Pension Age Disability Payment
o Attendance Allowance 
• Hospital/GP letters detailing condition
• NHS delivery notes for support equipment
• Personal receipts for purchased support equipment 
AND: 
• Proof of Date of Birth (e.g., Birth Certificate, Passport)
• Proof of Address (e.g., Utility Bill, Hospital/GP/Dentist appointment letters) 
1.3 Exceptional Circumstances 
Applicants who do not meet the stated criteria will be assessed case-by-case by
Waste Services.    
Page 28 of 69

Page 29

PUBLIC
1.4 Review Process 
• All assisted collections will be reviewed every 2 years to confirm continued
eligibility. The service reserves the right to review this earlier if there is a change
in circumstances.
• Data will be stored and processed in compliance with GDPR regulations and in
line with Council procedures 
Page 29 of 69

Page 30

PUBLIC 
To:  Infrastructure, Land and Environment Policy Board 
On:  21 January 2026 
Report by: Director of Environment, Housing and Infrastructure 
Heading: Introduction of parking controls and resident only parking permit
scheme on Marchfield Avenue, Paisley 
1. Summary 
1.1 Residents of Marchfield Avenue, Paisley over a period of time have been in
contact with Council Officers to advise that on-street parking space is regularly
occupied by users of Glasgow Airport, denying availability to residents, their
visitors and deliveries. During site visits by officers drivers are witnessed
taking suitcases from cars and parking for long periods while they are away.
Other drivers and taxis are witnessed dropping off airport passengers or
waiting to pick them up. This activity is impacting on residents’ lives and their
ability to go about their daily business. 
1.2 Most houses on Marchfield Avenue are terraced properties with no individual
private driveways but communal car parks to the rear. Some residents do have
private driveways or have converted their front gardens to private driveway,
but most car parking spaces cannot be secured for private use and are
susceptible to misuse by airport users. 
1.3 Officers propose that parking controls be introduced on Marchfield Avenue to
prevent the use of the public road as an airport car park. Associated with these
parking controls, officers propose ‘resident only’ on-street spaces should be
made available to residents on application for a permit. 
1.4 Paisley town centre’s controlled parking zones issue permits which enable
residents to park free, without time limit in pay and display bays where they
have no alternative but to park on-street and would be disadvantaged by
having to pay for parking. 
1.5 Marchfield Avenue is different. Parking is not controlled by pay and display
meters and is not planned to be. Pay and display meters would give the
impression that parking by anyone other than residents and their visitors is
acceptable. The intention of the proposal is to provide the residents of
Marchfield Avenue with the same environment as most residential streets, not
overrun by airport users.
Item 3
Page 30 of 69

Page 31

PUBLIC 
1.6 Parking by airport users may migrate to other streets as a result of this
proposal, however the extents will not be known until its introduction. Officers
will monitor the surrounding area and propose expansion of the ‘resident only’
parking permit zone as necessary. 
1.7 This report asks the board to decide if Renfrewshire Council should introduce
a ‘resident only’ parking permit scheme which allocates on-street parking
space (but not individually allocated bays) to resident parking permit holders
only. 
1.8  It is proposed that the permits will be provided at no cost to the residents in
line with the other residential parking permit schemes in place in Renfrewshire. 
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy Board:
2.1    Approves the preparation of the necessary traffic order and associated
consultation process to proceed with a view to introducing a ‘resident only’
parking permit scheme on Marchfield Avenue, and 
2.2  Notes that the outcome of the consultation process will be reported back to a
future meeting of the Board. 
3. Background 
3.1. Officers have received 37 items of correspondence from members and the
public dating back to April 2022 complaining that people are using Marchfield
Avenue as a free car park for Glasgow Airport and adversely affecting the lives
of residents. The airport is only a 1km walk away. 
3.2. Residents highlight that on-street parking space is regularly occupied by users
of Glasgow Airport and commuters, denying availability of parking spaces to
residents, their visitors and deliveries. Drivers are witnessed taking suitcases
from cars and parking for long periods while they are away. Other drivers and
taxis are witnessed dropping off airport passengers or waiting to pick them up.
This activity is impacting on residents’ ability to go about their daily business. 
3.3. Layby parking is located at the east end of Marchfield Avenue, close to the
roundabout and access road to a small commercial estate. The commercial
estate has its own secure private car park, but demand outstrips supply, and
cars regularly spill out from the car park into the laybys. It is reported that
Airport users and nearby hotel workers also use this layby parking. Controls
proposed for here will be tailored to the legitimate needs of business visitors. 
Page 31 of 69

Page 32

PUBLIC
4. Letter drop survey 
4.1. A letter (See Appendix 1) was sent to all the residents of Marchfield Avenue on
7 June 2024 asking if they would be in favour of a permit scheme based on
pay and display machines being used. We received 38 responses, 29 in favour
and 9 objections (See Appendix 2). 
4.2. The objections fell into these broad categories: 
• The potential for a permit charge
• The limit on the number of permits
• The inconvenience of visitor permits 
4.3. Those in support suggested additional controls or requested further
information: 
• Do not use pay and display machines
• Use double yellow lines at congested locations
• Include the car parks
• Include other streets
• Ensure there are enough permits and visitor permits per household 
4.4. Based on these responses the proposal was taken forward but modified to
remove the pay and display machines. Yellow line restrictions will be included
in the associated traffic regulation order for publication and there will be no
limit on the number of permits able to be issued to a household. 
4.5. Most houses on Marchfield Avenue are in terraces with no individual private
driveways but communal car parks to the rear. Some residents do have private
driveways or have converted their front gardens to private driveway, but most
car parking spaces cannot be secured for private use and are susceptible to
misuse by airport users. 
4.6. The car parks are not adopted as public road and are owned by Housing.
Housing officers have no plans to secure the car parks for residential use. With
the permission of Housing, the proposal will include marking out parking bays
in the car parks for resident use only and their inclusion in the permit scheme. 
5.   Parking Survey results 
5.1. A 24-hour, 7-day continuous camera survey was undertaken on the whole
length of Marchfield Avenue from 11/12/24 to 17/12/24. The results were
analysed to identify the length of stay of each parking occurrence. The lengths
of stay and observed behaviours were used to estimate the purpose of each
parking occurrence. 
Page 32 of 69

Page 33

PUBLIC
5.2. The following categories of parking purpose were grouped together as ‘airport
related’:
• Airport user (witnessed putting cases in or out of the vehicle),
• Passenger pick up/ drop off,
• Driver waiting then departing (for the right time to pick someone up from
the airport),
• Parking for longer than 2 days. 
5.3. If the parking occurrence lasted one day, it was assumed to be a commuter
either working at the commercial estate or elsewhere nearby. 
5.4. Parking occurrences that did not fall into these categories were assumed to be
residents, visitors or deliveries. 
5.5. The number of parking occurrences was divided by the roadside parking
capacity to get an occupancy rate for each parking purpose. 
5.6. Figure 1 shows a visualisation of the occupancy rate of airport related and
commuter parking occurrences along the length of Marchfield Avenue. 
Figure 1 
Page 33 of 69

Page 34

PUBLIC 
5.7. Figure 2 for comparison, shows the occupancy rate of resident, visitor and
delivery parking occurrences. 
Figure 2 
5.8. A comparison of the figures shows airport related and commuter parking
regularly takes up around twice the available parking space on Marchfield
Avenue than that available for residents, their visitors and deliveries. 
6. Proposed ‘Resident only’ Permit Scheme 
6.1. Paisley town centre’s controlled parking zones issue permits which enable
residents to park free, without time limit in pay and display bays, where they
have no alternative but to park on-street and would be disadvantaged by
having to pay for parking. 
6.2. The proposal for Marchfield Avenue avoids using pay and display meters
because they would give the impression that parking by anyone other than
residents and their visitors is welcomed. The intention of the proposal is to
provide the residents of Marchfield Avenue with the same environment as
most residential streets, not overrun by airport users. 
6.3. The proposal is to split Marchfield Avenue into two distinct ends. The west
end, where white road markings would define long stay parking bays and
spaces in car parks which will be able to accommodate a number of permit
holder, visitor or delivery vehicles only. The east end, where the existing
laybys will be controlled by limited waiting, short stay parking restrictions ideal
for business users but would be no good for all-day commuter parking. 
6.4. Yellow line restrictions will prevent parking in locations where the road must
remain clear for road safety at junctions and at the end of the cul-de-sac. 
Page 34 of 69

Page 35

PUBLIC
6.5. As part of the Traffic Regulation Order process arrangements will be set out
for how the system will address the needs of visitor parking. Common methods
include providing residents with a book of vouchers to provide to visitors to
display in their windscreens. 
6.6. The success of the proposal will depend on regular enforcement. Permits in
the windscreen of residents’ vehicles will enable quick identification by Parking
Attendants and simplify the enforcement procedure. 
7. Proposed Traffic Regulation Order 
7.1. Should the ILE Board approve this new approach to a resident only permit
scheme, officers propose to promote complementary parking regulations to
prevent abuse and maintain road safety, particularly at the roundabout and
other junctions. 
7.2. Short stay parking will be concentrated at the east end, close to the
commercial estate. Resident only parking will take up the rest of the available
space. 
7.3. The proposal promotes restrictions in the car parks owned by the Council,
operated by Housing Services, for which permission will be sought. 
7.4. A draft plan is given in Appendix 3. This will be subject to change during the
course of the traffic regulation order promotion process. 
Page 35 of 69

Page 36

PUBLIC
Implications of this Report 
1. Financial – Additional costs for the administration of the permit scheme will
need to be met within existing budgets. 
2. HR and Organisational Development – none 
3. Community Planning - Residential environments free of parking congestion
encourage community cohesion.  
4. Legal – none 
5. Property/Assets – permission will be sought from Housing to implement the
scheme in its car parks. 
6. Information Technology – none 
7. Equality & Human Rights - The recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report. 
8. Health and Safety - Residential environments free of parking congestion
reduce the risk of accidents. 
9. Procurement – none. 
10. Risk – none.   
11. Privacy Impact – none. 
12. Cosla Policy Position – none. 
13. Children’s Rights – none. 
14. Climate Risk – none. 
List of Background Papers 
- none 
Author Gordon McNeil, Director of Environment, Housing & Infrastructure
e-mail: gordon.mcneil@renfrewshire.gov.uk 
Page 36 of 69

Page 37

PUBLIC 
Appendix 1 
Page 37 of 69

Page 38

OFFICIAL
Appendix 2  
Name Date Comments
1 07/07/2025  In relation to the letter I received from you on 7th June regarding Parking proposal for Marchfield Avenue, I support the
introduction of permits. However, I do not think this will fully resolve this matter as the main issue is cars are being parked
on parts of the road that are not spaces, i.e. on the corner of the roundabout which is actually blocking the road and
increasing the risk of a serious accident. There needs to be yellow lines introduced to support the permits. 
2 01/05/2025 I’ve had a call from the resident at xxxx, who was looking to speak to someone in relation to the parking issues on his street.
Mr xxx advises that holiday makers are parking all over Marchfield Avenue when going to the airport and causing issues for
residents as the street is very narrow. He says that EI have been involved in the past and put cameras on lamp posts to
monitor this but the issue is now worse as the summer approaches. Residents received letters advising about potentially
putting yellow lines on the street and introducing a parking permit scheme but he’s received no further update about this.
Mr xxxx was very unhappy so I’ve raised a complaint on his behalf but he’s looking for someone to get in contact with him
asap to discuss a resolution to this issue.
He also wanted to report that cars are parking on the pavement just further down the street on Marchfield Avenue, if
wardens could possibly investigate this.
3 22/04/2025 Mr xxx would like an update as he has been told there is going to be a residents parking permit scheme introduced for
Marchfield Avenue due to the amount of people used the street for parking before going on holiday.  Can he be given an
update to what is going to be getting done.  
4 28/03/2025 I’m getting in touch about parking issues Marchfield Avenue and the surrounding streets. The ongoing problem of airport
users parking long-term in these residential streets, blocking parking for residents and making the streets congested is not
improving. 
One of my constituents has informed me that there were traffic monitoring cameras put out on Marchfield Avenue in
December. I’m wondering what the result of that was?
I think the only long-term solution to this problem is to enact a permit scheme for residents. Is the department looking at
this option.
5 13/03/2025 Who would we be required to talk to regarding vehicles parking blocking clear view of roundabouts parking on pavements
making in difficult for pedestrians to safely travel
On them, as well as making it difficult for vehicles to get buy?
This is on marchfield avenue as is a daily
Occurnace and an accident waiting to happien.
Page 38 of 69

Page 39

OFFICIAL
6 07/03/2025 I’ve had a call from xxx, a resident in Gockston who advises that the residents of Marchfield Avenue and Abbotsburn Way
received a letter around the end of last year advising that they were going to be receiving parking permits for use in their
residents car park. They currently have an issue with people going to the airport and workers of the Travel Lodge using this
car park for their own use so they were hoping that this would help resolve this issue but they haven’t heard anything since.
Could someone possibly look into this and advise xxx? Her contact number is xxx. She’s elderly and was unable to email
herself. 
7 30/01/2025 Good evening, I’m providing evidence of a vehicle parked not just on the pavement but on a dropped kerb at Marchfield
Avenue, Paisley, I have attached the VRN with evidence supplied of both the car committing the offence and a photo of the
driver, I had to squeeze past with a pram and the driver waved me off after I complained to him, Hopefully Renfrewshire
Council can rectify this issue at hand as this happens way too often even with the new rules in place about pavement
parking.
8 09/01/2025 Glasgow Children’s Hospital Charity have its Headquarters located at 8 Marchfield Drive, Paisley, PA3 2RB: here 
Whilst the Business Park has a carpark there are not enough spaces for everyone who works there.  This inevitably leads to
people parking in the surrounding streets.  This has been met with some hostility by local residents who have continued to
harass people parking there, cone off spaces as well as erect signage to the effect that parking is not permitted. 
I have previously checked with Renfrewshire Council in the past couple of years and it was confirmed that on the road
behind our office there were no parking restrictions and on the section of the road used for parking it was not a private
road. 
I have noted below with a purple dot where we are based and the purple lines denote where staff often use the on-street
parking: a section of Marchfield Avenue and Albany Wynd. This morning a member of staff was informed by another road
user that she must move her car from Marchfield Avenue because vehicles would now be towed away if they did not have a
permit to be there?  There are some parking spaces denoted on this street with paintwork, however, the majority of cars
are simply parked on either side of the road which does not cause an obstruction to any entrance-ways, the mini-
roundabout or road use of larger vehicles such as Fire Engines. 
Can you please advise me of any new rules, restrictions or permits required in order to park on either of the sections of
roads I have outlined?  
Whilst I appreciate that some local residents might not like it, there is not actually anyone’s access being obstructed.  
9 12/12/2024 I agree with the proposal. I don’t drive but I do have family members that do and quite often stay the night so I would need
to know that I could have be allowed a parking permit and visitors passes for family events . I don’t won’t my family to have
pay £8 . 
Page 39 of 69

Page 40

OFFICIAL
10 12/12/2024 I’ve been contacted by a resident in Marchfield Avenue in Paisley complaining about the parking in the area. It’s an issue
that keeps popping up from time to time. The usual problem of badly parked cars, covering dropped kerbs, parked on
corners and airport travellers dumping their cars in the street. My constituent complains that the offices at the corner of
Marchfield Avenue have largely empty car parks and suspects that many of the staff working there simply dump their cars in
Marchfield Avenue. My constituent has a daughter who uses a wheelchair and he finds it difficult at times to get her past
some of the cars parked on the pavement. I know you’ve been out there a couple of times in the past parked cars.
I suspect some of this will be resolved once the pavement parking ban comes into place and is enforced. Do you know when
this will come into place? Maybe in the meantime sending some wardens down the street may help alleviate the problem at
least in the short term?
11 09/12/2024 Thank you for your recent communication regarding the proposed installation of cameras to monitor the activity in
Marchfield Avenue.
I am very much in favour of your proposal, however may I highlight the fact that at this time of year there is very little actual
airport parking.  I have no real issue with office workers who may park Mon-Fri 9-5.  What I do have issue with is people
leaving cars outside my house for two weeks whilst they are on holiday.  At this time there are not many holidaymakers.
One concern I do have is the limited number of passes for visitors, 10 as I understand.  I have a large family all with cars, and
I doubt very much if ten passes would last a month.
12 23/10/2024 Good morning, it's just to check when this parking scheme will be put in place as the street and pavement parking is getting
very worrying and there is going to be a serious accident as you can't even cross at the roundabout or walk on the
pavement safely as all cars are parked on pavements and even the roundabout on marchfield avenue. 
13 14/10/2024 I was wondering if you were able to confirm if there has been any further progress on the implementation of yellow lines or
permits for Marchfield Avenue?
Since the introduction of yellow lines in Inchinnan Road I am now experiencing increased parking outside of my home, with
vehicles parked on the pavement, this is now resulting in me struggling to park in my driveway easily. 
My property is xxx, where the pavement around my property is all private pavement and requires the property owner to
maintain said pavement as specified in the deeds. The issue I have now is the pavement is becoming damaged because of
the number of cars parking there on a daily basis. 
14 07/10/2024 Still finding it hopeless trying to park cars because of holidaymakers and workers parking their cars here. Would like an
update please as to how we. are progressing about getting Pay and Display Meters that were proposed earlier by R.C.C. and
giving us locals parking permits..
15 26/08/2024 I’ve received a call from a xxx who had received a letter a couple months back in regard to putting parking restrictions and
permits in place in Gockston area including Marchfield Ave for local residents due to issue with people leaving their vehicles
in the area when they go away on holiday.
Page 40 of 69

Page 41

OFFICIAL
The lady is looking for an update on it as hasn’t heard anything further about the matter following emailing over a while
back.
16 21/08/2024 Please pass onto any relevant department that can help.
Over the last year there has been an influx of workplace and airport parking within the residential area of Gockston,
specifically parking on Mosslands Road, Blocking pathways/road crossings & parking on a dangerous bend which causes bin
lorries to mount the kerb to pass. 
As of this week the council has taken positive steps on Inchinnan road with regards to workplace/airport parking to remove
cars and plan to install lineage along the road, this is excellent but this is now driving workplace cars and airport parking
even more into the residential area of Gockston. 
Each morning these workplace vehicles start to block a bad bend (Mosslands road) and make it very difficult to get round
and make it impossible for cars to pass each other on mosslands road.
This only adds to the cars that are left on this road by people going on holiday.
Can I ask if this area has already been raised with the council and what the plans are to keep the parking for residents?
I believe Marchfield Avenue is already in the spotlight with the council but the issues are now spreading to Mosslands Roads
which is adjacent to Marchfield Avenue.
Is it possible for the council to erect sign posts at several points on New Inchinnan road/mosslands road advising this is for
residents and visitors parking only and workplace and airport parking is not allowed? Or install whatever parking measures
would help the residents with parking.
Any help is appreciated 
Page 41 of 69

Page 42

OFFICIAL
17 05/07/2024 To whom is may concern 
I realise my email has fallen short of the allocated deadline however I was on holiday.
I am unsure if this email will count however I felt I had to respond all the same. 
I Live at xxx with my parents, child & husband. 
The parking issues in this street & 2 capparks off it have horrendous issues with parking that is of a constant stress to us all
& my elderly parents. 
My husband has had a transplant & is of poor health, there are times when he has to abandon his car miles away as there is
not a space.  
There has also been 3 large disabled spaces been allocated in a very small area which also then takes space away.  Likewise
the council have allowed other residents on Marchfiled avenue(council tenant) to lower the curb outside her property again
adding to the issue as yet another 2 spaces you can’t use as this person states it blocks her access.
We regularly see cars being left & people leaving for their holidays or large work vans parked for days at a time. 
I have often said I was going to write to you to complain & ask for such a scheme.
I am completely in favour of this. 
Our elderly neighbour on Marchfiled avenue has no access to technology but also stated if someone had came & spoke with
her she would have told you she was in favour.  
Can you tell me how many cars per household would receive permits? 
Also the car park on Marchfiled avenue, I’m assuming would be included as this is often the worst place for airport cars & i
fear if not included woudl just make this car park unmanageable for residents. 
18 01/07/2024 Hi, im just sending an email regarding the letter i received about the parking on marchfield avenue.
I am in favour of it becoming a permit holders only parking. 
I would also like to add that if possible double yellow lines be added around the edges of the roundabout at the start of
marchfield Avenue as the amount of cars that park on each of the corners block the road and the view when approaching
the roundabout from either side. 
I think both the permits and double yellows would make it a better and safer street for all that live here. 
Will there be a limit to amount of permits I can register per household as I have three vehicles at home? 
19 30/06/2024 As a long standing resident of this street, I very much favour the introduction of a permit scheme thanks. Parking by non
residents is becoming an ever increasing issue and needs addressed.
20 27/06/2024 I believe something should be done to sort out the parking but I'm not in favour of pay and display parking spaces maybe
more notices of residents parking only 
Page 42 of 69

Page 43

OFFICIAL
21 27/06/2024 Thanks for your letter about possibly introducing residents parking and parking bays in Marchfield Avenue.
I have no real objection to residents parking signs being installed.  However, do we need to have bays painted on the road? 
The reason I am asking is because the space outside my house has a lampost right on the kerb.  Depending on how bays
were painted, (if they are going to be marked) I may be forced to park right under the lampost which I would be unhappy
about as birds sit on the lampost and would continually defecate all over my car which damages the paintwork.   At the
moment I try to park on either side of the lampost otherwise I would be continually washing my car.
Can we have residents' parking without the bays?
xxxx
xxx  - Further email, 010724 - I know you probably won't have had time to reply to my email below so just in case I don't
hear back, I think overall I would say I am not in favour.
22 26/06/2024 I had spoke with xxx regarding Parking issues in the area.
Today alone I witnessed 4 near misses on inchinan Road due to vehicles Parked, as well as also a Truck delivering vehicles to
Europe car, may I also note same vehicles have been parked for 3-4 days. The signs up do not seem to make a difference as
no sign of parking inforcment being implemented.
Marchfield Avenue from the start right through is a nightmare cars parked on the roundabout as well as the entrance way
to new harbour way.
It is the same vehicles every day parking in this area and again have seen very near misses due to vehicles not able to get
passed or round the roundabout. 
With the new signs in place and talk of parking permits are these going to be enforced as outlined on the notices that are
up, which have been over 10 days but nothing or no cars ticketed. I guarantee if traffic wardens were around been 7:30am
and 9am each Morning the amount of folk parking for work Or offices would be caught. And a Monday and Friday with
holiday makers.
I await a response 
23 26/06/2024 To whom ever it may concern 
I  writing to confirm that I would 100 percent be in favour of a new traffic system being placed on Marchfield road. I struggle
to get my car parked at night due to holiday makers and in the day due to the staff who work near by. 
Please implement this asap. 
24 26/06/2024 Re-guarding parking proposal marchfield avenue I am not in favour  of this solution as I have lived here for many years and
the problem are occasional, it is mostly just the families have more than one car then visiting people at certain times that
can cause inconvenience that's life so not in favor
25 26/06/2024 I wholeheartedly am in favour of a parking scheme I am sick and tired of people from the offices in marchfield and people
going on holiday leaving their cars parked where we normally park which leaves us nowhere to park it is getting ridiculous
please introduce the scheme as soon as possible as tempers are getting frayed to say the least.
Page 43 of 69

Page 44

OFFICIAL
26 26/06/2024 I think it is an excellent idea so I would be in favour of this proposal. Will this take into account the car parking areas off
Marchfield Avenue as we have similar problems.
27 26/06/2024 I am a resident at Marchfield Avenue and have received the letter outlining the proposed plan to manage the number of
vehicles attempting to park in and around the area for the airport. 
I support the proposal however I’m not sure there will be a consistent traffic warden in the area to ensure this is enforced. 
28 25/06/2024 Unfortunately,  I'm not in favour of the parking permit. 
The permits are "currently" free??  this could change and we are then charged for a permit to park in our own street.
Also, the hassle of getting visitor books and giving them out to your guests.
29 25/06/2024 Hi this is excellent news there is also a problem when you come into marchfield ave at the roundabout cars are parked on
both sides  you have to give way  to traffic coming out of marchfield due to cars parked.also cars are parking on pavements
you have to walke on the road to get by.now there using the grass aswell to park up.
30 24/06/2024 I am writing in response to your letter asking for feedback on whether there should be parking restrictions brought in at
Marchfield Avenue. 
I very recently purchased a property in Marchfield Avenue and personally think it would be very detrimental to introduce
parking restrictions in the street. Although I realise parking is an issue in the street as one of 3 adults in my house who drive
and need a car for work purposes the permit situation would be unworkable for us, if it is the case that only one permit is
allowed per household. 
If you require any further information please let me know. 
31 21/06/2024 I think that some form of Parking Restrictions on Marchfield Ave would be a good idea.  Would the Parking Attendants also
be able to enforce fines for parking on the pavement as well, especially on the Roundabout.
32 21/06/2024 I have some questions about the proposed parking permits.
1. How many permits per household are allowed?
2. How often will the street be monitored?
3. Have you asked the airport and surrounding businesses if they could tell their workers to use their own car parks?
4. How many books of visitors permits do we get a year? 
5. You say currently there is no charge, which makes me assume it won't be too long before there is? 
I look forward to receiving a swift reply as I want to make an informed decision
Page 44 of 69

Page 45

OFFICIAL
33 20/06/2024 Many Thanks for your letter dated 7 June 2024, with regards to the parking proposal in Marchfield Ave.
I am not in favour of this scheme for the following reasons.
1. Due to work I sometimes have different vehicles and as such it would not be feasible to get a separate permit for each
vehicle.
2. The cost implication for visitors who are already paying in the form of Road Tax, insurance  etc to use the roads
3. the lack of flexibility
34 17/06/2024 With reference to the above subject, I would be very much in favour of your proposal.
I reside at xxx and it has always been a problem, particularly holidaymakers who leave their vehicles for weeks at a time.
35 16/06/2024 I, xxx of xxx vote in favour of this system with immediate effect.
The situation is seriously out of hand with Airport parking and local workers using our road and private road as a parking
facility.
Airport should be doing more as we have trolleys left every day from holiday makers
Westpoint business park has plenty of car parking spaces within their grounds yet work wont park in there due to different
reasons like they have to pay for a space or don't want to because it's easier for them to get out. I have had many
arguments with workers parking across my driveway and blocking roads.
We have cars parked illegally every day at junctions and roundabouts which is a road traffic act. Many have been towed
away thankfully but a lot goes unnoticed. 
My two vans have been hit due how narrow the road becomes when they all park on the road.
I have had a delivery turned away due to the truck not being able to get down the road.
We have had an ambulance blocked from getting through the road until cars were moved.
This need sorted no matter what the opinion of all residents as it only really effects the top half off marchfield avenue.
36 16/06/2024 I, xxx of xxx vote in favour of this system with immediate effect. 
37 16/06/2024 I’m definitely in favour of this proposal. I live at xxx 
Page 45 of 69

Page 46

OFFICIAL
38 16/06/2024 I, xxx of xxx vote in favour of this system with immediate effect.
The situation is seriously out of hand with Airport parking and local workers using our road and private road as a parking
facility.
Airport should be doing more as we have trolleys left every day from holiday makers
Westpoint business park has plenty of car parking spaces within their grounds yet work wont park in there due to different
reasons like they have to pay for a space or don't want to because it's easier for them to get out. I have had many
arguments with workers parking across my driveway and blocking roads.
We have cars parked illegally every day at junctions and roundabouts which is a road traffic act. Many have been towed
away thankfully but a lot goes unnoticed. 
My two vans have been hit due how narrow the road becomes when they all park on the road.
I have had a delivery turned away due to the truck not being able to get down the road.
We have had an ambulance blocked from getting through the road until cars were moved.
This need sorted no matter what the opinion of all residents as it only really effects the top half off marchfield avenue.
39 16/06/2024 I’m writing to signify my support for the new parking proposal on Marchfield Avenue PA3 as long as it makes provisions for
households with multiple vehicles.
40 15/06/2024 After receiving the letter about parking proposal on Marchfield Avenue. We are in favour of the permit scheme however
would like to make sure that even in the future residents will not need to pay for parking permits (as we know some
councils charge). 
Totally in favour as the parking around Marchfield Avenue is dangerous. People drive along the road far too fast and not
being able to see due to parked cars, there is an accident waiting to happen. 
Many thanks, 
41 14/06/2024 I am 100% in favour this will make a massive difference on people who are parking here up on pavements and on the round
about. Thank you for taking this aboard and making this difference. 
Page 46 of 69

Page 47

OFFICIAL
42 14/06/2024 In regards to the recent communication received from yourselves to do with the parking at Marchfield Avenue . I would
express strongly in favour of introducing a system to deter people from parking their vehicles on Marchfield Avenue whilst
they are at work or in some cases parking whilst they are flying from Glasgow Airport. This is not acceptable to the residents
who are impacted on a daily basis and often unable to park at their home . Vehicles are parked the whole length of the
street on both sides and also parked on pavements . This is a very inconsiderate  act caused by individuals who feel they
have the right to park in a residential street to avoid paying for parking and not caring how it’s affecting the residents who
live on the street . 
I feel it’s only a matter of time before an accident happens due to the increased amount of vehicles parked . 
I have some concerns on how you plan to implement this system ?  I would be interested in how you plan to propose the
change to the parking and make sure this is enforced ? 
I didn’t see any mention of parking meters being mentioned , is this something that will be happening ? How are you
planning to ensure there is a proper system in place and anyone parking without permit is fined ? You mention a charge of
£8 to park for a day and those parking longer will receive a parking ticket , how much is the cost of a parking ticket ? Bearing
in mind people park here on a daily basis and also for the purpose of parking whilst on holiday flying from Glasgow airport .
A “ parking ticket “ might be a cheaper option than paying for a week / 2 week parking either on-site or off sight at the
airport . I feel you have to enforce a deterrent for those that feel it’s an easy option to park on a street whilst working
nearby or travelling to the airport . I don’t feel there should be an option to park longer unless you are a resident . Residents
need to be the most important people who many are unable to park their vehicle at their home . 
I hope this is taken seriously and a suggestion of having a local residents meeting to address the concerns the residents face
on a daily basis may be beneficial to collate information from the people who are being affected daily . 
Sent on behalf of my parents who are residents of Marchfield Avenue 
43 14/06/2024 In favour
44 14/06/2024 Further to my email yesterday regarding the planned permit zone for Marchfield Avenue I would like to add my objection
for the option of non permit holders to pay £8 to park for the day on our street. This is significantly lower than any nearby
airport parking and will only encourage non residents to continue to use our street as it will be cheap, therefore, not
resolving the current issue.
E.g. iPark £30 a day, terminal multi storey £67
45 14/06/2024 I’ve received your letter regarding your proposal to impose parking restrictions on Marchield Avenue.
I am entirely opposed to any such proposal.
Additionally the letter does not clearly indicate whether the proposal includes the entirety of Marchfield Avenue or only a
part of it.
Page 47 of 69

Page 48

OFFICIAL
46 14/06/2024 I am not happy with the Parking proposal in Marchfield Avenue. First this will affect selling your house in the future and I
will not be paying for a permit to park my car in my street, as you have mention it will be "Currently" free!! then maybe in
the future it will not be free. The cost of live is hard enough without you's trying add more expenditure to our cost of living.
So my option is a big NO.
47 14/06/2024 I own and reside in xxx and I am writing to state that I am in favour of the proposed permit scheme.
48 14/06/2024 While I agree with the concerns expressed regarding inappropriate parking, I think the issue is not as clear-cut as the letter
implies.
The main area of difficulty is the stretch of Marchfield Avenue between Inchinnan Road and Number 40 Marchfield Avenue.
Here there are a number of parking bays, many used by workers (only occupied during working hours) and holidaymakers
(frequently seen loading and unloading luggage).
I understand that Marchfield Avenue features on a social media app as a source of free parking for Glasgow Airport.
The idea of permits as outlined would serve to remedy this issue.
However a more serious situation exists, which does not appear on the letter. It is common to have commercial vehicles,
vans and light lorries, parking, not in the parking bays, but straddling the kerb. These vehicles not only inhibit pedestrian
movement but encroach on the main Avenue resulting in a narrowing of the carriageway. I suspect that some of these
vehicles are in fact owned by residents.
I would suggest 
• Permits as outlined for parking bays
• No Parking restrictions where the Avenue narrows
• Enforcement of regulations pertaining to parking encroaching on pavements
49 13/06/2024 As I live on my own I need to have deliveries and calls by medical helpers and tradesmen. I should therefore prefer to keep
the present parking system which allows essential parking near my house.
50 13/06/2024 I am currently a resident xxx and absolutely delighted to hear of the planned permit scheme and would be for this. 
Could you please expand on the rules regarding the day permits e.g. family or friends visiting our home, would they be able
to have a day permit that can be used more than once?
51 13/06/2024 As a resident of xxx I am in favour of the parking proposal.
52 13/06/2024 I am in favour of introducing pay and display parking with resident permits on Marchfield Avenue.
53 13/06/2024 I am NOT in favour of this parking system. I have lived in xxx since 1972 and have always had a car. I have never found car
parking from others a major problem . At present my wife is bedbound and both my son and my daughter who live in
London travel up to see her each month to see her and support myself and need to be able to park in the street. My wife’s
brother from Beith comes 2 or 3 times a week to see her and allow me to go out for shopping,appointments etc and needs
to park.I don’t see how a parking permit system would meet my needs.
Page 48 of 69

Page 49

OFFICIAL
54 13/06/2024 I have recived letter reguarding car parking in my area. I am in favour of the council proposed scheme.
I applied for a resident permit but I was told I am not eilgible.
I have lived at xxx for over ten years. I would appeciate if you could look into this for me.
55 16/05/2024 Good morning , I am a resident at xxx, 
There has recently been a huge increase of cars being parked on both sides of the road coming into marchfield avenue and
continuing up and on the roundabout past the business centre that is on the left side . 
This is causing problems not only for residents but also for goods vehicles that are struggling to get in and out , also for
peoples safety as a lot of residents have mobility scooters or prams and are having to resort to walking on the road around
some of the pavement mounted cars , we are also constantly being used as an airport free parking zone and some vehicles
are being left for up to two or three weeks at a time causing residents that have work vehicles or visitors and family vehicles
unable to park , we have a home security system and feel safer if we can park in or around our property to keep vehicles
safe but are unable to do so when non residents are parking and leaving to go on holiday . This is extremely frustrating as
the elderly residents and people with babies and prams are having to park down the street , it has also become extremely
dangerous when leaving the street turning either left or right onto inchinnan Road as the cars are mounted everywhere
blocking from view sometimes oncoming vehicles , the cars are parked the full length of the road blocking the crossing
island at the bottom of marchfield leaving barely enough room for cars to maneuver through , I have seen a few lorries ,
trucks struggling to get through and having to try and detour as the cars are so close to the island. 
Companies on the main street are resorting to using cones to make way for work vans and being pavement mounted leaves
no room for people who need assistance in way of wheelchairs or scooters , we as residents have raised this issue many
times and recently took it to the local community meeting with signed documents about how this is causing the residents so
much distress. 
We fear the up coming holiday season will yet again be bombarded with people leaving vehicles and with no consideration
that we do have elderly residents that do require spaces and ambulances and care givers that struggle to get in and out as
the cars are constantly parked up and around the roundabout, path , grass etc ... 
If there is some other way we can report this I would be extremely grateful if you could follow on any information. 
Thank you for your time .
56 12/03/2024 Residents have been in touch to complain about the situation at Marchfield Avenue. There is a high density of non-residents
parking along the street. I’m not sure that there is anything that can be done about that, however, the residents are very
concerned about the speed at which vehicles are now travelling up and down the avenue. 
I’m wondering if a speed survey could be organised for the street to see if there is evidence to back up these concerns?
57 22/02/2024 Hi, I am a resident of xxx. Over the last year it is proving more and more difficult to drive up our road, it is constantly
blocked down to single file use when we are attempting to drive up our road. Cars, vans are continually parking on the
pavements stopping pedestrians walking on them a mother with a pushchair for instance would have to go onto the road. 
Page 49 of 69

Page 50

OFFICIAL
58 22/11/2023 Good morning, I am starting to get a little concerned of the cars parking on my street and pavement. Yesterday they were
all parked up the street on the pavement all the way and even round our mini round about and I also had a car park
opposite my drive causing me problems to get. I am worried incase emergency services need to attend as they won't get up
the street and it's a dead end at the top. I can hardly drive out incase I damage my car. My children are finding it difficult to
cross the road to get to school as theres not enough pavement to walk on and then having to stand way out on the road to
see if oncoming traffic is coming. Also I'm struggle with taking my dog a walk as I feel the same and I have a baby so need to
go out on the road with my pram. I have attached pictures for you to see if someone could urgently get back to me please. 
My address is xxx 
59 18/07/2023 I live on xxx which is now being inundated with people leaving their cars, vans, trucks ect, you can barely see along the
street when leaving and entering, there are double yellow lines at the end on the corner which people are still using to park
vehicles on as well as at the mini round-about and now vehicles are spreading out onto Inchinnan Road which is tight for 2
way traffic because of this issue. I know I'm not the only resident to complain but this is going to cause an accident.
60 26/05/2023 xxx has been in contact with numerous constituents regarding the impacts of traffic parking obstructively on the road and
paths at Marchfield Avenue. This has become worse since the TTRO at Abbotsinch Road/ Inchinnan Road has come into
force.
Although residents find the TTRO a welcome move, there is significant more prevailing matters now occurring in the housing
estate. People are having to resort to walking down the middle of the road as well as people with mobility aids also doing
this. It is common to see, not an exemption to the rule. The vehicles often block drives and also block the through way
access for emergency services. The risk of incidents is extremely high.
I was out yesterday and took a couple of pictures – although it doesn’t fully demonstrate the extent of the concerns. See
attached. 
Can you please investigate this and action measures to address this? 
61 14/02/2023 I had been in touch previously about parking on Inchinnan Road near Marchfield Avenue. Yellow lines were installed to help
address that which I’m very grateful for.
However, sadly this has had the knock-on effect of pushing the pavement parking further up Inchinnan Road. The issue is
compounded by the fact that passengers using the airport park their cars on the pavement along Inchinnan Road for free
the full time they are travelling. Residents are understandably complaining about blocking access to pavements, particularly
for prams and wheelchairs. The congested parking also makes it difficult for cars to pass each other on the road.
Could the yellow lines that were put down be further extended to try to deter this? Are there any plans to address the
parking/traffic issues as part of the AMIDS development?
Page 50 of 69

Page 51

OFFICIAL
62 18/10/2022 I’m following up on a case I raised a few months ago as it is a continual problem and an increasing number of residents have
raised it with me.
The pavement parking alongside the fact that cars can park on both sides of the road on Inchinnan road is causing major
congestion as well as rendering the pavements unusable for people with prams or wheelchairs. I understand your
comments previously about the consolidation on yellow lines across Renfrewshire, however I think there is no other option
in this situation than for yellow lines to be laid along this stretch of Inchinnan Road.
I’ve been in contact with the police about the situation and they are in agreement with me. The police told me that
compounding the problem is the fact that holiday makers are using Inchinnan road as a car park, for all intents and
purposes. The police have been issuing tickets, but more often than not it costs less money for drivers to pay the fine than
pay for parking at the airport. The police told me that they can’t see the issuing being resolved without the application on
yellow lines. They also mentioned that they think bollards/railings blocking the pavement would be helpful.
The police, residents, business owners and elected members all seem to be in agreement here. Could yellow lines please be
installed?
63 28/07/2022 I’m writing about an issue a constituent has raised with me regarding parking at Marchfield Avenue and Inchinnan Road.
The constituent reports that often the parking is so busy along the street that the road is effectively reduced to a single
track road and this increases congestion around an already busy area. I’ve attached photos that have been sent to me. You’ll
be able to see that the parking on the pavements leaves the pavement unusable, especially for people with wheelchairs,
walking aids and prams. 
Is there an approach that’s proven successful in dealing with similar issues that could be used here? 
I look forward to hearing from you.
64 25/07/2022 We are contacting you regarding concerns over parking in the area local to our business.
There are numerous cars parking on the pavements at Marchfield Avenue and Inchinnan Road.
As you are aware, Inchinnan Road is extremely busy and a main route to the Airport and Paisley Gilmour Street.
Parking on the pavement is causing congestion as it is essentially creating a single track road with larger vehicle unable to
get by.
We have been trying to encourage active travel amongst our staff, but are concerned for their safety and the safety of
others who are having to walk on the busy road to get by.
Please see below some photographs of the area taken this afternoon. Please note, while our staff member was taking these
photographs, they met a person in a wheel chair who could not get by and had to cross the road and negotiate a high kerb
on the other side.
We would be grateful if this issue could be investigated and look forward to hearing from you in the near future.
Page 51 of 69

Page 52

OFFICIAL
65 28/04/2022 I wish to report vehicles parking on the pavement at Marchfield Avenue Paisley, just of Inchinnan Road, Paisley.
When walking along this pavement, you have to step off the pavement and walk the length of the road to get round the
cars, which is dangerous as vehicles drive up and down this road all day. 
Vehicles should NOT be parked on the pavement in the first instance.
Vehicles are being parked there and its the whole car on the pavement, leaving no room for pedestrians to pass. 
This has been going on now for sometime and no-one has actually come along and done anything about it.
Many of these vehicles belong to people flying out on holiday from Glasgow Airport and leaving their cars there for 2wks. 
As a pedestrian, it would be greatly appreciated if you could please look into this matter with some urgency and have this
resolved immediately/ vehicles removed.
I await hearing from you by return. 
Page 52 of 69

Page 53

PUBLIC
Appendix 3
Draft traffic order proposal for Marchfield Avenue 
Key
Red – No waiting, no loading at anytime
Yellow – No waiting at any time
Green – Permit holders only
Blue – Short stay layby parking
Orange – Disabled bay 
Page 53 of 69

Page 54

PUBLIC 
___________________________________________________________________ 
To:   Infrastructure, Land and Environment Policy Board 
On:    21 January 2026
___________________________________________________________________ 
Report by: Director of Environment, Housing and Infrastructure 
___________________________________________________________________ 
Heading: Restoring Renfrewshire’s Rivers Project Update 
___________________________________________________________________ 
1. Summary                               
1.1 The Restoring Renfrewshire Rivers project is an ongoing nature restoration
project which was established by Renfrewshire Council in March 2024. This
paper provides an update on the progress made to date and outlines the
planned next steps for the project. 
1.2 This project has been funded through the Nature Restoration Fund where
Renfrewshire Council was awarded £350,000 from the Scottish Government. 
1.3 The purpose of this project is to map the distribution and remove invasive non-
native plant species (INNS) from 5 of Renfrewshire’s water courses; River
Calder, Locher Water, Dargavel Burn, Old Patrick Water, and Sergeantlaw Burn. 
1.4 A key aspect of the project is to embed support from a pool of volunteers, who
are offered training in pesticide application to aid in the response of removing
INNS plans. 
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy Board: 
2.1 Notes the progress made to date on the Restoring Renfrewshire’s Rivers project
and planned next steps. 
Item 4
Page 54 of 69

Page 55

PUBLIC 
3. Background 
3.1 In late 2023, Renfrewshire Council was awarded £350,000 of funding through
the Scottish Government’s Nature Restoration Fund. This funding was allocated
for the Restoring Renfrewshire’s Rivers project which has been underway since
March 2024. 
3.2 Mapping the distribution of invasive non-native plant species (INNS plants)
through surveys has been carried out along 5 water courses; River Calder,
Locher Water, Dargavel Burn, Old Patrick Water, and Sergeantlaw Burn. 
3.3 The surveys highlight where INNS plants are located and targeted removal
sessions can then be scheduled to tackle the identified species. This work is
undertaken by the biodiversity officers as well volunteers who are supported by
staff. 
3.4 This project contributes to the Council’s Plan for Net Zero and nature recovery
targets by reducing and removing INNS plants and replanting native tree and
wildflower species which help reduce erosion, stabilise riverbanks, lock up
carbon emissions, and benefit wildlife. 
4. Restoring Renfrewshire’s Rivers Project: Progress Update 
4.1 A total of 12.6km of watercourses were surveyed across 3 of the 5 project
watercourses and their associated tributaries; 8km on the River Calder, 3.7km of
Locher Water, and 0.9km of Sergeantlaw Burn. The distanced covered varied
due to terrain, identified hazards, and drainage ditches. 
4.2 Across the 5 watercourses the following INNS plants (of the 5 target species)
have been recorded so far during surveys within headwaters: 
• River Calder- Pontic Rhododendron present by the Calder at
Muirshiel Country Park 
• Locher Water- Himalayan Balsam present at East Midhouse Farm
• Dargarvel Burn- No records yet of INNS plants
• Old Parick Water- No records yet of INNS plants
• Sergeantlaw Burn- Japanese Knotwood next to Gleniffer Road.
Pontic Rhododendron present in the woodland near Nethercraigs
Road. 
4.3 The following INNS species were noted in the lower stretches of the project
watercourses out with surveys. These were recorded from visuals whilst driving
to sites, Google Streetview, or reported to the Biodiversity Officer from members
of the public: 
• River Calder- Himalayan Balsam in large quantities, Japanese
Knotweed, and American Skunk Cabbage.  
Page 55 of 69

Page 56

PUBLIC
• Locher Water- Himalayan Balsam and Japanese/Bohemian
Knotweed in large quantities.
• Dargavel Burn- Himalayan Balsam and Japanese Knotweed.
American Skunk Cabbage reported to be present within the BAE
Systems Dargavel Site.
• Old Patrick Water- Himalayan Balsam, Japanese Knotweed, Giant
Hogweed.
• Sergeantlaw Burn- Japanese Knotweed in an additional patch. 
4.4 There were two sessions during 2025 to spray Japanese Knotweed strands with
pesticide at the project watercourses. The first by the River Calder at
Lochwinnoch where an area of 35sqm of Knotweed was sprayed; the second by
the Sergeantlaw Burn at the Gleniffer Braes where an area of 40sqm of
knotweed was sprayed. 
4.5 Some sites have challenging terrain which makes surveying difficult such as
Dargavel Burn. These sites will be surveyed using the drone once staff are fully
trained on using and handling the drone. This should be in early 2026 following
practical assessment. 
5. Volunteer Progress 
5.1 There is a total of 47 volunteers signed up to the project mailing list. During
2025, a total of 187 volunteer hours were used between May and September for
Himalayan Balsam control work and site surveys. Three community / corporate
volunteer sessions took place; Renfrewshire Youth Eco Volunteers group helped
with a Himalayan Balsam control session by the River Calder at Lochwinnoch in
June; Lochwinnoch Home Education group helped with a Himalayan Balsam
control session by the River Calder at Lochwinnoch in July; Terumo Aortic did a
session in the Lochwinnoch area which involved planting tree saplings, plug
plants and a seed mix of native shade-tolerant plant species to shade out
Himalayan Balsam seedlings. 
5.2 15 Himalayan Balsam control sessions were carried out with volunteers in 2025.
In total, over 33,000 Himalayan Balsam plants were removed or cut down during
the volunteer sessions and staff visits. 
5.3 2 Rhododendron control sessions were carried out by the River Calder at
Muirshiel Country Park in early 2025 with volunteers. 19 Rhododendron bushes
and 28 Sitka Spruce were treated. 3 further sessions took place in November
and December 2025 with further sessions planned for 2026. 
6. Project Successes in 2025 
6.1 The project continued to work closely with the Council’s Countryside Rangers at
Clyde Muirshiel and Gleniffer Braes to achieve effective INNS plant control.
Continued work with RSPB at Lochwinnoch allowed for targeted surveys to be
carried out and control of Himalayan Balsam and American Skunk Cabbage
across the Calder catchment. 
Page 56 of 69

Page 57

PUBLIC 
6.2 Himalayan Balsam control work has continued with evidence of recovery of
native vegetation in areas which have had control work this year. 
6.3 Japanese Knotweed spraying was carried out in 2025 for the first time. As this is
highly impacted by the weather, it has been a success to have gotten this work
underway. 
6.4 There has been increasing promotion of the project with stronger internal
exposure and interest within the council. Two information sessions were held
over the summer period, which worked well, providing the opportunity to engage
individually with small groups. 
6.5 There has been an increase in group volunteers; Terumo Aortic and the Youth
Eco group and Lochwinnoch Home Education group. This was due to increased
exposure from the help of the Renfrewshire Climate Action Network. The aim is
to build on this further in 2026. 
6.6 Effective internal governance has helped aid the project with the establishment
of Renfrewshire Council’s Sustainability Team, which the Biodiversity Officers
are now part of. This has enabled new opportunities for promotion and input of
new ideas. 
7. Next Steps for 2026 
7.1 Initially, the Restoring Renfrewshire’s Rivers project was considered as a three-
year project. Since then, our learning has indicated that for the project to achieve
long-term effective outcomes in terms of biodiversity and habitat recovery,
sequestering carbon, training volunteers and working with project partners, it
may need to continue in some form beyond the three years. For example,
successful treatment of Japanese Knotweed will have to take up to five years of
pesticide application and subsequent monitoring to ensure it does not grow back
and to ensure recovery of the ground and of native plants. 
7.2 Therefore, the project will continue to be delivered in 2026/27, building on the
progress made so far.  A plan for the next 12 months has been developed to
support this activity. Following this period, a further review will take place to
determine future plans for this area of work. 
7.3 Continued INNS plant control work with increased Japanese Knotweed spraying
and Himalayan Balsam and Rhododendron control work. This will be
supplemented with increased biodiversity work such as tree planting and seed
sowing. 
7.4 Surveying work will continue along the project watercourses, including the
surveying to be done using the drone as this training will be completed in early
2026.  
Page 57 of 69

Page 58

PUBLIC 
7.5 Pesticide application training will continue to be organized for volunteers who
would like to participate. This includes training for stem inject of pesticide for
staff and volunteers. 
7.6 There will be a focus on increasing exposure and engagement around the
project to recruit volunteers (both internally and externally) to aid with the control
work and surveys to be carried out this year. This will also include more targeted
promotion at groups who may be interested, such as anglers. The aim is to
increase working with volunteer groups and increase the pool of volunteers for
the Restoring Renfrewshire’s Rivers projects and wider biodiversity work. 
7.7 An engagement plan will be created for the Restoring Renfrewshire’s Rivers
projects as well as wider biodiversity work. The aim is to begin with the check,
clean, dry campaign to target water users to prevent spreading of invasive
species. 
7.8 The project team will continue to strengthen collaborative working opportunities
with interested partners such as RSPB, Eadha Enterprises, other Council
departments (Neighbourhood Services, countryside rangers etc), and the Green
Action Trust. 
7.9 A future update will be brought to the ILE board at the end of year three of the
project in early 2027. 
Implications of the Report 
1. Financial – None directly arising from this report. 
2. HR & Organisational Development – None directly arising from this report. 
3. Community/Council Planning – None directly arising from this report. 
4. Legal - None directly arising from this report. 
5. Property/Assets – None directly arising from this report. 
6. Information Technology – None directly arising from this report. 
7. Equality and Human Rights - The recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the recommendations
contained in the report because it is for noting only. If required following
implementation, the actual impact of the recommendations and the mitigating
actions will be reviewed and monitored, and the results of the assessment will
be published on the Council’s website. 
Page 58 of 69

Page 59

PUBLIC
8. Health and Safety – None directly arising from this report. 
9. Procurement – None directly arising from this report. 
10. Risk – None directly arising from this report 
11. Privacy Impact – None directly arising from this report. 
12. Climate Risk – The Restoring Renfrewshire Rivers Project contributes to the
Council’s Plan for Net Zero and nature recovery targets and thus aims to
positively reduce climate related risk. 
13. Children’s Rights - None directly arising from this report. 
14. COSLA Policy Position – This work aligns with COSLA’s current work
alongside the Scottish Government in response to the climate emergency. 
List of Background Papers: None 
Authors: Danielle Leggett, Sustainability Lead Officer (Strategy) and Allan Russell,
Biodiversity Officer 
Page 59 of 69

Page 60

PUBLIC 
___________________________________________________________________ 
To: Infrastructure, Land and Environment Policy Board 
On: 21 January 2026
___________________________________________________________________ 
Report by: Director of Environment, Housing & Infrastructure
___________________________________________________________________ 
Heading: Clyde Valley Update Report
___________________________________________________________________ 
1. Summary 
1.1 This report provides an update on the first six years of the Clyde Valley Residual
Waste Contract, a 25-year partnership between East Dunbartonshire, East
Renfrewshire, North Ayrshire, North Lanarkshire, and Renfrewshire Councils for
the treatment and disposal of residual waste. 
1.2 Since its commencement, the contract has diverted over 900,000 tonnes of
waste from landfill, recovered 66,000 tonnes of plastics and metals, and
generated 110 GWh of electricity, enough to power 43,000 homes. Operational
performance has been strong, with minimal delays and KPI breaches accounting
for less than 0.03% of deliveries, ensuring compliance with Waste Scotland
Regulations and delivering significant environmental benefits. 
1.3 The contract has delivered a range of community benefits including 3
apprenticeships and 80 capacity-building workshops. Additionally, 30 pupils have
completed Net Zero Virtual Work Experience placements toward a target of 100.
Viridor has distributed £19,661 through its ‘We Share Fund’ for community
projects and introduced a Clyde Valley-specific STEM programme, providing S2
students with hands-on experience and Industrial Cadet Bronze Accreditation. 
1.4 The contract has evolved through variations to meet legislative and operational
requirements, making the current Inter-Authority Agreement (IAA) outdated.
Amendments to the IAA are required to reflect current arrangements and
obligations without changing the contract’s purpose or participating councils.
Approval is sought for the proposed amendments set out in section 4.10 of this
report. 
Item 5
Page 60 of 69

Page 61

PUBLIC
___________________________________________________________________ 
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy Board: 
2.1 Note the content of the report. 
2.2 Approve the proposed changes to the Inter-Authority Agreement. 
2.3 Approve delegated authority to the Director of Environment, Housing &
Infrastructure to sign the updated agreement on behalf of the Council. 
___________________________________________________________________ 
3. Background 
3.1 In 2009 the Scottish Government released a report by Sir John Arbuthnott in
relation to savings Councils could achieve through collaboration of Services
across the Clyde Valley Authorities, these being Glasgow, North Lanarkshire,
South Lanarkshire, Inverclyde, East Dunbartonshire, East Renfrewshire, West
Dunbartonshire and Renfrewshire Councils.  In 2010 North Lanarkshire Council
were lead on investigating the ability to collaborate on waste management
services.    
3.2 Initially all aspects of waste management were reviewed, however the project
team focused on a solution for the upcoming Landfill Ban enforced by the Waste
Scotland Regulations 2012 (this subsequently moved from 2017 to 2020 and
now to 2025). 
3.3 The Final Business case was presented to the Authorities in late 2012 and four
of the Clyde Valley Authorities (North Lanarkshire, East Renfrewshire,
Renfrewshire and East Dunbartonshire Council) and North Ayrshire gained
approval to procure a long-term solution for the treatment and disposal of
household residual waste which aligned to the Landfill Ban.    
3.4 The solution had to provide a delivery point for each Partner within their
boundary with only North Lanarkshire Council needing to provide such a facility
as all other four had existing waste transfer sites. 
3.5 Procurement for a solution took place from 2013-2016, the Contract was signed
with the preferred bidder (Viridor) in May 2016 with the Contract going live in
January 2020. 
3.6 North Lanarkshire Council continue to act as the Lead Authority for the Contract,
and all obligations are backed off through an Inter-Authority Agreement (IAA)
with the other four Partners.    
3.7 The solution provided by Viridor offered the following: 
• Contract for 25 years for the treatment of household residual waste up to a
maximum of 190K tonnes per annum: 
• Provision of 4 Waste Transfer Stations to serve East Dunbartonshire, East
Renfrewshire, Renfrewshire and North Ayrshire Councils. 
Page 61 of 69

Page 62

PUBLIC
• A purpose-built recycling and waste transfer facility at Bargeddie which would
accept and sort all waste from the above 4 facilities along with all waste
delivered direct from North Lanarkshire Council. The key purpose of this
facility would be to remove all plastics and metals from the waste resulting in
a minimum recycling rate from the residual waste of 4%. 
• The provision of an energy from waste plant at Dunbar which would accept all
waste from the Bargeddie facility which in turn would be incinerated to
produce electricity. 
3.8 The Contract commenced on 7 January 2020 and has now been live for six and
a half years.  The Contract Management Team has been in place since the
Contract was signed in May 2016 to ensure successful delivery of the Contract. 
3.9 The Inter-Authority Agreement (IAA) was signed in 2016 however as the contract
has progressed, it has been noted that there are a few practical amendments to
be made. 
4.  Report 
4.1 The first six years of the contract have been a success with over 900,000 tonnes
have been diverted from landfill and approximately 66,000 tonnes of plastic and
metal have been recycled or repurposed, when they would have otherwise gone
to landfill.  The treatment of Clyde Valley residual waste produces in the region of 
110GWh of electricity (equivalent of powering 43,000 homes) and was fed back
into the national grid. 
4.2 Operational delays have been minimal, with the 15 minute turnaround time KPI
(for RCVs delivering waste to the facilities) only being exceeded 45 times over the
first six years over the five Partner Councils, which is estimated to equate to less
than 0.03% of total deliveries for all RCVs over this time period. 
4.3 The first six years of the contract have been a success with over 900,000 tonnes 
diverted from landfill and approximately 66,000 tonnes of plastic and metal have
been recycled or repurposed, when they would have otherwise gone to
landfill.  The treatment of Clyde Valley residual waste produces in the region of
110GWh of electricity (equivalent of powering 43,000 homes) and was fed back
into the national grid. 
4.4 The tonnages have fallen gradually from the first full contract year 2020/21 to
2024/25, as the Partner Councils aim to reduce residual waste arisings by
recycling kerbside. Individual tonnages are detailed below:   
Partner  2020/21 Tonnage 2024/25 Tonnage % Difference
East Dunbartonshire 25,184.62 21,966.27 -12.78
East Renfrewshire  19,003.89 18,165.31 -4.41
North Ayrshire 28,853.6 27,897.98 -3.31
North Lanarkshire  69,550.43 66,052.96 -5.03
Renfrewshire  38,814.1 37,680.04 -2.92
Totals 181,406.64 171,762.56 -5.32  
NOTE: there was a period of time in 2020 when all waste was collected in the
residual bin due to the restrictions of the COVID19 pandemic. 
Page 62 of 69

Page 63

PUBLIC
4.5 To date, through Community Benefits, the contract has delivered 3
apprenticeships (out of a 25-year commitment of 16), 80 capacity building
workshops, and over £4.5m has been spent with SMEs and SEO at the
Bargeddie Facility. To date, a total of 30 pupils have completed work experience
with Viridor as part of the Clyde Valley Contract, and they are on track to achieve
the commitment of providing a minimum of 100 work placements across the
contract term. The pupils undertook the Net Zero Virtual Work Experience
programme in partnership with the Engineering and Development Trust (EDT). 
4.6 As part of their We Share Fund, Viridor have distributed £15, 993 from the
Bargeddie Facility, and £3,668 from the Authority Transfer Stations in 2024/25. 
This is a Corporate fund set up by Viridor which enables members of the
community to apply for funding for projects that help the environment/community.
This is not Clyde Valley specific and is additional to the requirements set out in
the Contract. 
4.7 Viridor have developed a Clyde Valley specific STEM (Science, Technology,
Engineering and Maths) programme in conjunction with the Engineering
Development Trust (EDT).  This is an annual programme open to all of the Clyde
Valley schools where teams of S2 students work together within their school
groups to gain an insight into the STEM sector and to receive an Industrial Cadet
Bronze Accreditation on completion of their challenge. 
4.8 The Contract has evolved through a number of variations and updates to suit
both legislation requirements and the logistics of actually managing the Contract. 
These are summarised in the table below. 
Contract
Variation
Number 
Date Submitted Summary of Variation Reason for Variation
1 04/07/2017
Vary Schedule Part 4
(Payment Mechanism) in
order to provide for
reconciliation of National
Non-Domestic Rates
To close the loop of
reconciliation on forecasted
tonnages
2 15/03/2023
Vary Schedule Part 4
(Payment Mechanism) in
order to reflect current
practices
To reflect current practices
3 03/11/2023
Vary Schedule Part 1
(Definitions) "ATS Site
Plans" and
"Renfrewshire ATS Site"
To remove a part of the
Linwood site at the back of the
site to give this land back to
RC.  This involves varying the
site plans and areas of
responsibility and also moving
one borehole to within this new
boundary and taking new
samples to re-establish the
baseline
4 21/10/2024
Vary Schedule Part 1
(Definitions) "ATS Site
Plans" and "East
Renfrewshire ATS Site"
Review areas of responsibility
at the ERC ATS Facility
Page 63 of 69

Page 64

PUBLIC
5 15/03/2023
Updated PA for data
protection, change in
addresses, changes to
definitions, Authority
ATS Works,
To reflect current practices
6 03/11/2023
Vary Schedule Part 1
(Definitions) "ATS Site
Plans" and
"Renfrewshire ATS Site"
Amended area of responsibility
to match fence line 
4.9 As a result, the Inter Authority Agreement (IAA) has become outdated and this
needs to be updated to reflect current Contract positions and those obligations
now being passed to the Partner Councils as well as practical matters being
updated. Although there are a number of highlighted changes, they do not
represent any fundamental change in the purpose of the contract or the
participating local authorities. 
4.10 The table below explains the substantive amendments made to the IAA and does
not include minor changes which are stylistic; or are factual updates. Definitions
used within this document are contained in either the IAA, or the Project
Agreement between North Lanarkshire Council (as Lead Authority) and Viridor. 
Relevant Clause(s) Original Drafting  New drafting 
Data Protection 
• Amended and
deleted
definitions
• Amended
Clause 18 
In line with legal position
at the time of entering into
IAA in 2016. 
Drafting updated to reflect change in legal
position including Data Protection 2018
and UK GDPR (post Brexit version of EU
GDPR). 
This is standard drafting across all Local
Authority contracts, and a similar
amendment was made to the Project
Agreement 
Clause 4 Duties of
Lead Authority and
Other Authorities –
General Duties of
All Authorities 
• Amended
Clause 4.5
• New Clauses
4.5A, 4.5B,
4.5C and
4.5D 
Original drafting in IAA
envisioned that each
Authority’s share of the
Minimum Tonnages and
Maximum Tonnages1
agreed before Services
Commencement 
(7 January 2020) would be
reviewed and agreed 5
years from Services
Commencement and
every 5 years thereafter 
New drafting reflects agreement by
Steering Group in November 2024 that
the Authority’s want the power to review
and amend (by agreement) the Minimum
and Maximum Tonnages annually. It was
agreed that experience has shown that it
is better for Authorities to have more
flexibility to make changes, and not be
locked in for 5 years. 
It was agreed that this will be based on
the tonnages provided in the previous
Contract Year and will commence from
the 1 April immediately occurring after
Steering Group approval. For example, in 
1 The Minimum Tonnage is defined in the Project Agreement as “100,000 tonnes of Contract Waste
(excluding Ad Hoc Waste) per Contract Year (pro rated for any Contract Year of less than 12 months)”
and the Maximum Tonnage is defined in the Project Agreement as “190,000 tonnes of Contract Waste
(excluding Ad Hoc Waste) per Contract Year.”  Page 64 of 69

Page 65

PUBLIC 
advance of the 5th anniversary of
Services Commencement the Steering
Group approved the relevant tonnages in
November 2024 to apply from 1 April
2025 and this was based on the tonnages
in Contract Year 2023- 24. 
The Steering Group members also have
the power to amend the metric being
used to calculate Minimum and Maximum
Tonnages 
Furthermore, the drafting states that each
year the Steering Group must make a
decision on the share of tonnages
between 1 November and 31 December. 
Additional drafting has also been inserted
placing duties on the Contract Manager
to confirm the allocation of the Authorities’
share and monitor the tonnages delivered
throughout the Contract Year and
highlight any issues to the Steering
Group. 
Where appropriate, the word
“Authorities’” (apostrophe after the ‘s’)
has been amended to “Authority’s”. 
Clauses 7.8 – 7.9
Share of CMT
Annual Budget 
• Amended
Clause 7.9 
The share of the tonnages
split between the
Authorities impacts the
share of the CMT Annual
Budget 2and the CMT
Annual Budget
Proportions3. The original
drafting envisioned that
this would be adjusted 5
years from Services
Commencement and
every 5 years thereafter. 
The position remains that share of the
tonnages split between the Authorities
impacts the share of the CMT Annual
Budget Proportions. The drafting at
clause 7.9 has been amended to reflect
the change in position relating to updating
the Minimum and Maximum Tonnages
share at clause 4 (see above).
Accordingly, the CMT Annual Budget
Proportions will also be updated annually,
instead of every 5 years. 
Clause 12
Payments 
The original drafting
placed an obligation on
each Authority to pay their 
The drafting has been amended to
change the obligation to make payment in
cleared funds within 21 days of receipt of 
2 Defined in IAA as “the sum set in accordance with Clause 7 (Contract management Team (CMT)
Annual Budget) and Schedule Part 5 (CMT Annual Budget) which represents the upper limit of the
financial threshold calculated by the Joint Steering Board for each Authority's annual contribution to the
necessary funding of the Lead Authority to discharge its functions on behalf of all the Authorities under
this Inter-Authority Agreement as managed by the Joint Steering Board, notified to the Joint Steering
Board and approved by each Authority in respect of this Project (and the Authorities acknowledge that the
CMT Annual Budget does not include the Monthly Unitary Payment made under the Project Agreement).”
3  Defined in Schedule Part 5 of IAA as “CMT Annual Budget does not include the Monthly Unitary
Payment made under the Project Agreement.” The Initial CMT Annual Budget Proportions are set out at
Schedule Part 5 and cover Contract Year 2016 – 2017.  Page 65 of 69

Page 66

PUBLIC
• Amended
Clause 12.6
monthly payment
proportion (in cleared
funds) to the Lead
Authority (NLC) by the 25th
day of the month in which
the instruction or invoice
for payment has been
served. 
an instruction for payment or invoice. This
is due to a change made to the Project
Agreement that afforded more time for
NLC to make payment, and NLC has
passed this on to other Local Authorities. 
Clause 15 Liability
of the Councils 
• Amended
Clause 15.11
• New clause
15A 
The original drafting did
not reflect how the Project
Agreement and associated
insurances work in
practice. It suggested that
the Lead Authority (NLC)
would have responsibility
for administering all
Project insurances where
not administered by
Viridor. 
Amendments have been made to reflect
how the insurance obligations work in
practice. Where the Project Agreement
requires any insurances from both the
Lead Authority (NLC) or other Authorities,
as co-insured or otherwise, there is a
responsibility to administer this in
accordance with the Project Agreement. 
A new clause 15A was inserted to narrate
the position in relation to North Ayrshire
Council ATS Site as the insurance is held
differently to all of the other ATS Sites.
North Ayrshire Council is liable to insure
the building at North Ayrshire ATS Site
under a Property Damage Policy and
include Viridor as a named party on the
relevant policy, in accordance with Part X
– Insurance of the Project Agreement. 
Clause 27 Notices 
• Amended
Clauses 27.1
and 27.2 and
corresponding
amendments
at Schedule
Part 4.   
The original drafting
allowed notices to be
served by fax, and allowed
notice by email to be
served. However, it was
not clear as to how this
would work in practice. 
The amended drafting deletes references
to notices by fax, and adds in additional
detail as to how a notice would be served
by email. 
Schedule Part 1:
Project Tasks 
The original list set out the
correct authority for certain
decisions and obligations,
either being Contract
Manager Matter, Lead
Authority Matter, Project
Director Matter, Joint
Steering Board Metter,
Matters Reserved to
Authorities and Statutory
Officer Matter. 
Additional entries have been made to
reflect the amendments made to the IAA. 
Page 66 of 69

Page 67

PUBLIC
Schedule Part 2:
Joint Steering
Board Functions
and Terms of
Reference 
• Paragraph
2.7 amended  
Paragraph 2.7 originally
required the Lead
Authority's internal audit
service to provide a
statement of assurance
annually.
Paragraph 2.7 amended to require that
that the Lead Authority's internal audit
service provides a statement of
assurance, every two years (instead of
annually). 
Schedule Part 4:
Addresses of the
Authorities   
The original list set out
addresses for each
Authority where notices
should be sent to. 
The amendments expand this list to
include email addresses for each
Authority so that notices by email can be
issued to the Head of
Service/Manager/Director acting as Joint
Steering Board member for Clyde Valley
Project, copied to Head of Legal
Services/Corporate Governance (or such
role as amended or updated) at the time
of issuing of the notice. 
Schedule Part 8:
Part 2 – Cost
Sharing Principles 
The original drafting
contained cost sharing
principles between the
Local Authorities. 
The cost sharing principles largely remain
but have been expanded to include some
detail not originally provided in relation to
the East Renfrewshire ATS Ancillary
Waste Payment. There is now a
recognition of the possibility of a payment
arising due to the East Renfrewshire ATS
Ancillary Income Share.  
The amendments make it clear that any
sum payable in respect of the East
Renfrewshire ATS Ancillary Waste
Payment shall be borne wholly by and/or
allocated wholly to East Renfrewshire
Council. This reflects the position in the
payment mechanism contained in the
Project Agreement. 
The text relating to Monthly Unitary
Charge has also been amended to reflect
the change in Minimum and Maximum
Tonnages being agreed annually instead
of every 5 years following Service
Commencement. 
4.11 The contract has been set up to be flexible to deal with the ever-changing waste
legislative environment and includes provisions for Qualifying Changes in Law if
they arise as well as specific Contractor and Authority Changes should either Party
want those as the Contract progresses. 
Page 67 of 69

Page 68

PUBLIC
5 Measures of Success 
5.1 The ongoing delivery of a public partnership model for the treatment and disposal
of residual waste which will ensure all partner local authorities comply with the
relevant legislative provisions and that the performance targets associated with
the contract are maintained.   
5.2 Community Benefits delivered as part of the Contract benefit the local
businesses and schools.  Viridor have partnered with the Education
Development Trust (EDT) to deliver a bespoke STEM programme for the schools
within the five Partner Councils. Each year this is well attended and has involved
impressive partnerships that mentor the pupils during the programme. 
5.3 The Contract Management Team manage the Contract on behalf of the Partner
Councils and have received a Substantial Assurance rating from NLC audit every
time.  In addition to this, the team continue to investigate other projects that the
Partner Councils could collaborate on to deliver savings and also look into other
waste streams that can be brought to the Contract to provide best value to the
Partner Councils.  
Page 68 of 69

Page 69

PUBLIC 
Implications of the Report 
1. Financial – none 
2. HR & Organisational Development – none 
3. Community/Council Planning – none 
4. Legal – none 
5. Property/Assets – none 
6. Information Technology - none 
7. Equality & Human Rights – none 
8. Health & Safety – none 
9. Procurement – none 
10. Risk – none 
11. Privacy Impact – none 
12. COSLA Policy Position – none 
13. Children’s Rights - none 
14. Climate Change – none 
List of Background Papers: none 
Author: Gordon McNeil, Director of Environment, Housing and Infrastructure,
Email: gordon.mcneil@renfrewshire.gov.uk
Page 69 of 69