Democracy Spraffa

Renfrewshire’s Local Air Quality Management Update - 2025 Air Quality Annual Progress Report - FULL REPORT

Renfrewshire Council · 5 November 2025
Back to Infrastructure, Land and Environment Policy Board — 5 November 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

PUBLIC 
___________________________________________________________________ 
To: Infrastructure, Land and Environment Policy Board 
On: 5 November 2025
___________________________________________________________________ 
Report by: Director of Environment, Housing and Infrastructure
___________________________________________________________________ 
Heading: Renfrewshire’s Local Air Quality Management Update – 
2025 Air Quality Annual Progress Report
___________________________________________________________________ 
1. Summary 
1.1 This report provides an update in relation to air quality within Renfrewshire
and details the findings of the Council’s most recent Local Air Quality
Management report, Renfrewshire’s 2025 Annual Progress Report. 
1.2 The 2025 Annual Progress Report reviewed air quality monitoring data from
2024. There were no exceedances of any air quality objectives identified
within Renfrewshire during 2024 with concentrations of nitrogen dioxide (NO2)
and particulate matter (PM) continuing to show a downward trend. 
1.3 The last exceedance of any air quality objective within Renfrewshire was in
2019. There has therefore now been six consecutive years of compliance with
statutory objective levels throughout all of Renfrewshire. This confirms the
council’s decision in March 2025 to revoke all three previous Air Quality
Management Areas which were located in Paisley, Johnstone and Renfrew.
___________________________________________________________________ 
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy Board: 
2.1 Notes the outcome of Renfrewshire’s 2025 Air Quality Annual Progress
Report and that there were no exceedances of any quality objectives
identified within Renfrewshire during 2024.

Page 2

PUBLIC
3. Background 
3.1 Air quality is directly related to a number of key Scottish Government National
Outcomes and policy priorities, notably those focussed on the environment,
sustainable places, environmental impact and healthier lives. 
3.2 Renfrewshire has seen improving levels of monitored pollutants over many
years now, with the last exceedance of any objective being experienced in
2019. With six years of compliance with air quality objectives and the
continuing downward trend in pollutant concentrations, the three Air Quality
Management Areas (Paisley, Johnstone and Renfrew) were revoked at the
Infrastructure, Land and Environment Policy Board on the 19th March 2025.   
3.3 Notwithstanding this, the Council, in accordance with the Local Air Quality
Management statutory process introduced by the Environment Act 1995, is
required to undertake a regular review and assessment of air quality within its
area and submit their findings by means of an Annual Progress Report to the
Scottish Government by the end of June each year for approval. The 2025
Annual Progress Report has now been submitted to, and approved by, the
Scottish Government and the Scottish Environment Protection Agency. 
3.4 This Annual Progress Report provides an overview of air quality within
Renfrewshire during 2024. It includes a review of 2024 pollutant monitoring
data and atmospheric emissions sources within Renfrewshire and compares
the available data to national air quality standards. 
3.5 The main pollutants of concern within Renfrewshire have historically been
NO2 and PM. These pollutants are monitored throughout Renfrewshire via
automatic monitoring sites and NO2 diffusion tube sites. 
3.6 In 2024 the Council operated three automatic monitoring sites (Cockels Loan,
Renfrew, Inchinnan Road, Renfrew and High St, Johnstone) which measured
NO2 or PM concentrations. Concentrations recorded at all automatic
monitoring sites were below the annual mean and short-term objective levels
for both pollutants. 
3.7  Monitoring of NO2 was also undertaken via a network of forty-one NO2
diffusion tube sites throughout Renfrewshire with no exceedances recorded at
any of these sites. A largely downward trend in concentrations continues to be
observed across the Council’s 2024 monitoring data, with only two NO2
diffusion tube sites experiencing an increase in annual mean NO2
concentration from 2023 to 2024, with the remaining experiencing a decrease. 
Broadly, over the past five years, the majority of the diffusion tube monitoring
sites have shown a decrease in NO2 concentrations.

Page 3

PUBLIC
Next Steps 
3.8  Having revoked the Air Quality Management Areas, the Council will ensure
that air quality retains a high public profile, with measures remaining in place
to continue to improve air quality in the area, preventing any future
deterioration towards exceedances of the air quality objectives. It is therefore
the intention of the Council to develop a Renfrewshire Council local air quality
strategy. This demonstrates the council’s commitment to improving the air
quality within the council area further, thereby positively impacting on the
health and quality of life of residents, workers and visitors to the area. The
draft Renfrewshire Council Air Quality Strategy will be brought to a future
Board for consideration and monitoring of air quality within the Renfrewshire
area will continue. 
___________________________________________________________________ 
Implications of the Report 
1. Financial – none 
2. HR & Organisational Development - none 
3. Community/Council Planning – 
• Our Renfrewshire is well - by reviewing and assessing air quality
throughout Renfrewshire and producing our annual Local Air Quality
Management report we aim to improve air quality and provide a clean and
safe environment for all of Renfrewshire’s residents, workers and visitors.  
• Creating a sustainable Renfrewshire for all to enjoy - improving air quality
will have a beneficial impact on Renfrewshire’s natural environment. 
4. Legal - none 
5. Property/Assets - none 
6. Information Technology - none 
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report. 
8. Health & Safety - none 
9. Procurement - none 
10. Risk - none 
11. Privacy Impact - none

Page 4

PUBLIC
12. Climate Risk - The interactions between air pollution and climate change are
complex which is recognised within the Scottish Government’s 2015 air
quality strategy Cleaner Air for Scotland – The Road to a Healthier Future
(CAFS). An action measure within this government strategy recommends all
Scottish local authorities which have or are currently developing a Sustainable
Energy Action Plan to ensure that air quality considerations are also covered. 
13. Children’s Rights - none 
14. COSLA Policy Position – none 
___________________________________________________________________ 
List of Background Papers 
a) Background Paper 1 - 2025 Air Quality Annual Progress Report for
Renfrewshire Council 
The foregoing background papers will be retained within Environment, Housing and
Infrastructure for inspection by the public for the prescribed period of four years from
the date of the meeting.  The contact officer within the service is Colin Hunter,
Environmental Health & Community Safety Manager, Tel: 07768831482, Email:
colin.hunter@renfrewshire.gov.uk 
___________________________________________________________________ 
Author: Colin Hunter, Environmental Health & Community Safety Manager 
Email: colin.hunter@renfrewshire.gov.uk

Page 5

Renfrewshire Council PUBLIC
Annual Progress Report (APR)

Page 6

Renfrewshire Council  PUBLIC
2025 Air Quality Annual Progress Report (APR) for Renfrewshire Council
In fulfilment of Part IV of the Environment Act 1995, as amended by the
Environment Act 2021
Local Air Quality Management
June 2025

Page 7

Renfrewshire Council  PUBLIC
Information Renfrewshire Council Details
Local Authority Officer Karen McIndoe
Department Environment, Housing and Infrastructure
Address
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley 
PA1 1BR
Telephone 0300 300 0380
E-mail e-prot.es@renfrewshire.gov.uk
Report Reference Number RenAPR2025
Date June 2025

Page 8

LAQM Annual Progress Report 2025 i
PUBLIC
Executive Summary: Air Quality in Our Area
Air Quality in Renfrewshire Council
The three Air Quality Management Areas (AQMAs) within Renfrewshire Council were
revoked in March 2025. Since the implementation of the 2019 Air Quality Action Plan
(AQAP), which was updated in April 2024, there has been a steady improvement of air
quality across the Council area. As such there have been no exceedances of any air
quality objectives since 2019. The Council is currently working on the Local Air Quality
Strategy, incorporating the measures contained within the 2024 AQAP update, to replace
the AQAP. Monitoring within the AQMA areas will continue following the revocation.
Renfrewshire Council monitor NO2, PM10 and PM2.5 at a number of locations. Automatic
(continuous) monitoring was undertaken at three locations during 2024 – REN1 (Renfrew,
Cockels Loan), REN02 (Renfrewshire, Johnstone) and REN03 (Renfrew, Inchinnan
Road). REN1 and REN03 monitor NO2 while REN02 monitors PM10 and PM2.5.
The monitored concentrations of NO2 show a large decrease compared to the previous
year following bias adjustment and application of distance correction. There were no
exceedances of the relevant air quality objectives (AQOs) reported during 2024. The bias
adjustment factor used this year (1.27) was slightly lower than the previous year (1.31),
but higher than the subsequent three years, which provides some confidence that actions
from Renfrewshire Council’s latest AQAP are having beneficial impacts to air quality.
Concentrations of the annual mean and relevant short-term objectives for PM10 and PM2.5
recorded at all automatic monitoring sites during 2024 were also below AQO levels. 
There was a total of 59 diffusion tube monitoring sites across Renfrewshire in 2024,
however, monitoring stopped at 18 monitoring locations in March 2024, reducing the
reported annual mean concentrations to 41 diffusion tube monitoring sites. 
Actions to Improve Air Quality
Throughout 2024, several measures detailed within the 2024 AQAP have been
progressed to improve air quality throughout Renfrewshire, all measures and their
progress are discussed in Section 2.2 Implementation of Air Quality Action Plan(s) and/or
measures to address air quality.

Page 9

LAQM Annual Progress Report 2025 ii
PUBLIC
In 2024, the Council developed and published a Local Heat and Energy Efficiency
Strategy (LHEES) and Delivery Plan (LHEEDP). The strategy sets out a long-term
approach to improve domestic, non-domestic and public buildings’ energy efficiency and
change to climate friendly heating. The delivery plan sets out how the LHEES will be
delivered over a 5-year period from 2024 to 2029. More information is available at: Local
Heat and Energy Efficiency Strategy and Delivery Plan - Renfrewshire Website
The Council are currently preparing a new local development plan (LDP) that will set out
the Council's strategy and policy for the use of buildings to 2038. The current stage is
evidence-gathering, and the council are scheduled to submit the LDP Evidence Report to
full Council Board in June 2025, after which it will be submitted to the Scottish Government
for review. The LDP will include areas of evidence concerning environmental matters such
as noise, air quality and contaminated land. The purpose of this is to ensure these matters
are considered at the outset to ensure the LDP avoids placing development in areas that
would be impacted by, or contribute to, noise or air quality problems. 
The Council have ongoing Climate Change projects of which some also improve air
quality. More information can be found here: Climate Change Action Fund - Renfrewshire
Website
Local Priorities and Challenges
Renfrewshire Council’s key priority following the publication of the 2025 APR is the
development and publication of the Air Quality Strategy.
Renfrewshire Council has no comment on challenges faced as air quality in the area has
been steadily improving over the years.
How to Get Involved
The general public can find further information about air quality within Renfrewshire on the
Renfrewshire Council website available at: Air quality in Renfrewshire - Renfrewshire
Website

Page 10

LAQM Annual Progress Report 2025 iii
PUBLIC
Table of Contents
Executive Summary: Air Quality in Our Area ................................................................... i
Air Quality in Renfrewshire Council .............................................................................................. i
Actions to Improve Air Quality ...................................................................................................... i
Local Priorities and Challenges ................................................................................................... ii
How to Get Involved .................................................................................................................... ii
1 Local Air Quality Management ................................................................................... 1
2 Actions to Improve Air Quality ................................................................................... 2
2.1 Air Quality Management Areas ........................................................................................ 2
2.2 Implementation of Air Quality Action Plan(s) and/or measures to address air quality ............. 3
3 Air Quality Monitoring Data and Comparison with Air Quality Objectives .......... 14
3.1 Summary of Monitoring Undertaken .................................................................................... 14 
Automatic Monitoring Sites ........................................................................................................ 14 
Non-Automatic Monitoring Sites ................................................................................................ 14 
Other Monitoring Activities ......................................................................................................... 15
3.2.1 Nitrogen Dioxide (NO2) ................................................................................................................... 21
3.2.2 Particulate Matter (PM10) ................................................................................................................ 22
3.2.3 Particulate Matter (PM2.5) ............................................................................................................... 23
3.2.4 Sulphur Dioxide (SO2) .................................................................................................................... 23
3.2.5 Carbon Monoxide, Lead and 1,3-Butadiene ................................................................................... 23
4 New Local Developments ......................................................................................... 24
4.1 Road Traffic Sources ........................................................................................................... 24
4.2 Other Transport Sources ..................................................................................................... 25
4.3 Industrial Sources ................................................................................................................ 25
4.4 Commercial and Domestic Sources ..................................................................................... 26
4.5 New Developments with Fugitive or Uncontrolled Sources .................................................. 26
5 Planning Applications ............................................................................................... 27
6 Conclusions and Proposed Actions ........................................................................ 28
6.1 Conclusions from New Monitoring Data ............................................................................... 28

Page 11

LAQM Annual Progress Report 2025 iv
PUBLIC
6.2 Conclusions relating to New Local Developments ............................................................... 28
6.3 Proposed Actions ................................................................................................................ 29
Appendix A: Monitoring Results .................................................................................... 30
Appendix B: Full Monthly Diffusion Tube Results for 2024 ......................................... 60
Appendix C: Supporting Technical Information / Air Quality Monitoring Data QA/QC
........................................................................................................................................... 68
New or Changed Sources Identified Within Renfrewshire Council During 2024 ......................... 68
Additional Air Quality Works Undertaken by Renfrewshire Council During 2024........................ 68
QA/QC of Diffusion Tube Monitoring ......................................................................................... 68
Diffusion Tube Annualisation ................................................................................................................... 69
Diffusion Tube Bias Adjustment Factors ................................................................................................. 69
NO2 Fall-off with Distance from the Road ................................................................................................ 70
QA/QC of Automatic Monitoring ................................................................................................ 71
PM10 and PM2.5 Monitoring Adjustment ................................................................................................... 71
Automatic Monitoring Annualisation ........................................................................................................ 71
NO2 Fall-off with Distance from the Road ................................................................................................ 71
Glossary of Terms ........................................................................................................... 73
References ....................................................................................................................... 75

Page 12

LAQM Annual Progress Report 2025 v
PUBLIC
List of Tables
Table 1.1 – Summary of Air Quality Objectives in Scotland ................................................. 1
Table 2.1 – Declared Air Quality Management Areas in 2024 ............................................. 2
Table 2.2 – Progress on Measures to Improve Air Quality................................................... 6 
Table A.1 – Details of Automatic Monitoring Sites ............................................................. 30
Table A.2 – Details of Non-Automatic Monitoring Sites ..................................................... 31
Table A.3 – Annual Mean NO2 Monitoring Results: Automatic Monitoring (µg/m3) ............ 39
Table A.4 – Annual Mean NO2 Monitoring Results: Non-Automatic Monitoring (µg/m3) .... 40
Table A.5 – 1-Hour Mean NO2 Monitoring Results, Number of 1-Hour Means > 200 µg/m3
........................................................................................................................................... 54
Table A.6 – Annual Mean PM10 Monitoring Results (µg/m3) .............................................. 55
Table A.7 – 24-Hour Mean PM10 Monitoring Results, Number of PM10 24-Hour Means      
> 50 µg/m3 ......................................................................................................................... 57
Table A.8 – Annual Mean PM2.5 Monitoring Results (µg/m3) ............................................. 58 
Table B.1 – NO2 2024 Monthly Diffusion Tube Results (µg/m3) ......................................... 60
Table C.1 – Bias Adjustment Factor .................................................................................. 70
Table C.2 – Diffusion Tube Annualisation Summary (concentrations presented in µg/m3) 72
Table C.3 – Local Bias Adjustment Calculations ............................................................... 72
Table C.4 – NO2 Fall off With Distance Calculations (concentrations presented in µg/m3)
............................................................................................. Error! Bookmark not defined. 
List of Figures
Figure 1. Map of Automatic Monitoring Sites ..................................................................... 16
Figure 2. Map of Non-Automatic Monitoring Sites in Renfrew ........................................... 17
Figure 3. Map of Non-Automatic Monitoring Sites in Paisley ............................................. 18
Figure 4. Map of Non-Automatic Monitoring Sites in Kilbarchan and Johnstone ............... 19
Figure 5. Map of Non-Automatic Monitoring Sites in Lochwinnoch .................................... 20

Page 13

LAQM Annual Progress Report 2025 vi
PUBLIC
Figure 6. Annual Mean NO₂ Concentrations at Automatic Monitoring Sites ...................... 47
Figure 7. Annual Mean NO2 Concentrations at Non-Automatic Monitoring Sites (Urban
Centre, Urban Background, Kerbside) ............................................................................... 48
Figure 8. Annual Mean NO2 Concentrations at Non-Automatic Monitoring Sites (Roadside
1) ....................................................................................................................................... 49
Figure 9. Annual Mean NO2 Concentrations at Non-Automatic Monitoring Sites (Roadside
2) ....................................................................................................................................... 50
Figure 10. Annual Mean NO2 Concentrations at Non-Automatic Monitoring Sites (Roadside
3) ....................................................................................................................................... 51
Figure 11. Annual Mean NO2 Concentrations at Non-Automatic Monitoring Sites (Roadside
4) ....................................................................................................................................... 52
Figure 12. Annual Mean NO2 Concentrations at Non-Automatic Monitoring Sites (Roadside
5) ....................................................................................................................................... 53
Figure 13. Annual Mean PM₁₀ Concentrations at Automatic Monitoring Sites ................... 56
Figure 14. Annual Mean PM₂.₅ Concentrations at Automatic Monitoring Sites .................. 59

Page 14

LAQM Annual Progress Report 2025 1
PUBLIC
1 Local Air Quality Management
This report provides an overview of air quality in Renfrewshire Council during 2024. It
fulfils the requirements of Local Air Quality Management (LAQM) as set out in Part IV of
the Environment Act (1995), as amended by the Environment Act (2021), and the relevant
Policy and Technical Guidance documents. 
The LAQM process places an obligation on all local authorities to regularly review and
assess air quality in their areas, and to determine whether or not the air quality objectives
are likely to be achieved. Where an exceedance is considered likely the local authority
must declare an Air Quality Management Area (AQMA) and prepare an Air Quality Action
Plan (AQAP) setting out the measures it intends to put in place in pursuit of the objectives.
This Annual Progress Report (APR) summarises the work being undertaken by
Renfrewshire Council to improve air quality and any progress that has been made.
Table 1.1 – Summary of Air Quality Objectives in Scotland
Pollutant Air Quality Objective
Concentration
Air Quality
Objective
Measured as
Date to be
Achieved
by
Nitrogen
dioxide (NO2)
200 µg/m3 not to be exceeded
more than 18 times a year 1-hour mean 31.12.2005
Nitrogen
dioxide (NO2) 40 µg/m3 Annual mean 31.12.2005
Particulate
Matter (PM10)
50 µg/m3, not to be exceeded
more than 7 times a year 24-hour mean 31.12.2010
Particulate
Matter (PM10) 18 µg/m3 Annual mean 31.12.2010
Particulate
Matter (PM2.5) 10 µg/m3 Annual mean 31.12.2021
Sulphur dioxide
(SO2)
350 µg/m3, not to be exceeded
more than 24 times a year 1-hour mean 31.12.2004
Sulphur dioxide
(SO2)
125 µg/m3, not to be exceeded
more than 3 times a year 24-hour mean 31.12.2004
Sulphur dioxide
(SO2)
266 µg/m3, not to be exceeded
more than 35 times a year 15-minute mean 31.12.2005
Benzene 3.25 µg/m3 Running annual
mean 31.12.2010
1,3 Butadiene 2.25 µg/m3 Running annual
mean 31.12.2003
Carbon
Monoxide 10.0 mg/m3 Running 8-Hour
mean 31.12.2003

Page 15

LAQM Annual Progress Report 2025 2
PUBLIC
2 Actions to Improve Air Quality
2.1 Air Quality Management Areas
Air Quality Management Areas (AQMAs) are declared when there is an exceedance or
likely exceedance of an air quality objective. After declaration, the authority must prepare,
publish and implement an Air Quality Action Plan (AQAP) within the shortest possible time
and no later than 12 months of the date of AQMA Designation Order. The AQAP must set
out measures the local authority intends to put in place in pursuit of the objectives within
the shortest possible time. Measures should be provided with milestones and a final date
for completion. The action plan itself should have a timescale for completion and for
revocation of the AQMA. Where measures to reduce air pollution may require a longer
timescale an action plan shall be reviewed and republished within five years of initial
publication and then five-yearly thereafter.
A summary of AQMAs declared by Renfrewshire Council can be found in Table 2.1 .
Further information related to declared or revoked AQMAs, including maps of AQMA
boundaries are available online at Air Quality Management Areas. 
All three AQMAs were revoked in March 2025. Since the implementation of the 2019 Air
Quality Action Plan (AQAP), which was updated in April 2024, there has been a steady
improvement of air quality across the Council. As such there have been no exceedances
of any air quality objectives since 2019. The Council is currently working on the Local Air
Quality Strategy, incorporating the measures contained within the 2024 AQAP update, to
replace the AQAP. 
Table 2.1 – Declared Air Quality Management Areas
AQMA
Name
Pollutants
and Air
Quality
Objectives
City /
Town Description Action Plan
Paisley
Town
Centre
(PTC)
Declared in
2009 for
NO2 annual
mean,
NO2 1-hour
mean &
PM10 24-
hour mean
Paisley
An area
encompassing a
large part of central
Paisley and
extending a short
distance along some
radial roads
Renfrewshire Council Air
Quality Action Plan
2019:
http://www.renfrewshire
.gov.uk/airquality

Page 16

LAQM Annual Progress Report 2025 3
PUBLIC
AQMA
Name
Pollutants
and Air
Quality
Objectives
City /
Town Description Action Plan
Johnstone
High
Street
(JHS)
Declared in
2016 for
NO2 annual
mean
Johnstone
From the junction of
High Street and
Peockland Place;
thence along High
Street to the junction
of Barrochan Road
and Napier Street
Renfrewshire Council Air
Quality Action Plan
2019:
http://www.renfrewshire
.gov.uk/airquality
Renfrew
Town
Centre
(RTC)
Declared in
2016 for
NO2 annual
mean &
NO2 1-hour
mean
Renfrew
From the junction of
Paisley Road,
Inchinnan Road,
Hairst Street and
Glebe Street; thence
along Glebe Street to
property number 4
Glebe St; thence
along Paisley Road
to the junction of
Donaldson Drive;
thence along
Inchinnan Road to
the junction of
Longcroft Drive;
thence along Hairst
Street to the junction
with Canal Street
and High Street;
thence along Canal
St to the junction with
Ferry Road
Renfrewshire Council Air
Quality Action Plan
2019:
http://www.renfrewshire
.gov.uk/airquality
2.2 Implementation of Air Quality Action Plan(s) and/or
measures to address air quality
In order to ensure that local authorities implement the measures within an action plan by
the timescales stated within that plan, the Scottish Government expects authorities to
submit updates on progress through the APR process. Renfrewshire Council has taken
forward a number of measures within the action plan during the current reporting year of
2024 in pursuit of improving local air quality and meeting the air quality objectives within
the shortest possible time. Details of all measures completed, in progress or planned are
set out in Table 2.2. More detail on these measures can be found in the Council’s Air
Quality Action Plan.

Page 17

LAQM Annual Progress Report 2025 4
PUBLIC
Key projects that were successfully delivered through the 2019 AQAP include:
• City Deals Projects - GAIA (Glasgow Airport Investment Area) works completed and
infrastructure in use;
• City Deals Projects - two AMIDS (Advanced Manufacturing Innovation District
Scotland) buildings are now complete and occupied;
• Upgrades & Improvements to the Council’s Urban Traffic Control (UTC) system – faults
identified, repairs undertaken, validation of traffic signals and updates to traffic
controllers to ensure full optimisation of traffic signals in order to reduce congestion;
• Continual improvements to the Council fleet via the annual vehicle replacement capital
programme and the increase of electric vehicles and associated charging
infrastructure;
• Introduction of Renfrewshire Council’s Corporate Sustainable Travel Planning Scheme
including the provision of staff pool cars with the majority of these (approximately 50)
being electric vehicles;
• Vehicle Idling Awareness Raising - regular targeted campaigns including a School
Parking Campaign which by August 2019, all 49 primary schools in Renfrewshire were
engaged in;
• Cycle Strategy – construction of various infrastructure projects as per the Cycle
Strategy priorities including the Paisley to Renfrew and Inchinnan Active Travel
Routes. Provision of the Cycle to Work Scheme for Council employees; and
• Upgrading of the fleet tracking telemetric system was completed 2023/24. UK
Telematics Ltd awarded contract in April 2023 with system now fully utilised and UK
Telematics is now installed in all council vehicles (including hires).
Progress on the following measures has been slower than expected: 
• The opening of the Clyde Waterfront and Renfrew Riverside (CWRR) bridge was
delayed, however, the bridge opened to the public in May 2025. 
The Council are currently preparing a new local development plan (LDP) that will set out
the Council's strategy and policy for the use of buildings to 2038. The current stage is
evidence-gathering, and the council are scheduled to submit the LDP Evidence Report to
full Council Board in June 2025, after which it will be submitted to the Scottish Government
for review. The LDP will include area of evidence concerning environmental matters such
as noise, air quality and contaminated land. The purpose of this is to ensure these matters

Page 18

LAQM Annual Progress Report 2025 5
PUBLIC
are considered at the outset to ensure the LDP avoids placing development in areas that
would be impacted by, or contribute to, noise or air quality problems. 
The Council have ongoing Climate Change projects of which some also improve air
quality. More information can be found here: Climate Change Action Fund - Renfrewshire
Website

Page 19

LAQM Annual Progress Report 2025 6
PUBLIC
Table 2.2 – Progress on Measures to Improve Air Quality
Measure
No. Measure Category Expected/Actual
Completion year
Organisations
Involved
Measure
Status
Funding
Status
Key
Milestones Progress Barriers to
implementation 
1 Glasgow City
Region City Deal
Projects
- Clyde Waterfront &
Renfrew Riverside
Project (CWRR)
- Glasgow Airport
Investment Area
Project (GAIA) 
UK Government
Levelling Up Fund
Project
- Advanced
Manufacturing
Innovation District
Scotland (AMIDS)
South 
Transport
Planning and
Infrastructure -
Active travel
Public transport
improvements
Traffic
Management -
Strategic
highway
improvements
Promoting
Travel
Alternatives -
Promotion of
cycling
Promotion of
walking 
CWRR – expected
completion end April
2025 with bridge
opening 9 May 2025 
GAIA – completed
2022 
AMIDS South –
anticipated
construction
commencing 2025
with completion 2027 
Scottish
Government, UK
Government &
Local Authorities
(LAs) across the
region. 
For the City Deal
funded projects
the decision-
making body is
the Glasgow City
Region Cabinet. 
For the UK
Government
Levelling Up
Fund project, the
decision-making
body is the UK
Gov Department
for Transport. 
Within
Renfrewshire
Council the
projects are led
by Chief
Executive
Services, City
Deal &
Infrastructure.
CWRR –
completed 
GAIA –
completed 
AMIDS South –
in progress 
Partially funded
UK Government
funding 85% of
the capital costs
of the projects.
Renfrewshire
council
contribution is
15% of costs. 
Government
funding will be
unlocked in 5
yearly Gateway
Reviews. If the
City Deal meets
agreed outputs
and outcomes at
each review, the
full £1 billion of
funding from the
UK and Scottish
Governments will
be unlocked. 
AMIDS South
Funding via the
UK Government
Levelling Up
Fund.
Funding provided
for 90% of the
CWRR
Nov 2018 –
planning consent
granted
Autumn 2019 –
tenders
published
Nov 2021 –
Contract Start
Date
April 2025 –
construction
completion
9 May 2025 –
bridge opening 
GAIA
Nov 2017 –
planning consent
granted
Spring 2019 –
tender contracts
awarded
June 2019 – start
of construction
March 2022 –
Works opened to
the public 
AMIDS South
March 2023 –
planning
consented
Nov 2022 to
2024 –
Contractor
procurement and
land acquisition
2025 - 2027 –
Construction
period 
CWRR
The CWRR
project was
completed April
2025 and open
to the public on
9 May 2025. 
GAIA
The Glasgow
Airport
Investment
Area project
was completed
in October 2022 
AMIDS South
The
Compulsory
Purchase Order
under the
Roads
(Scotland) Act
1984 and the
Acquisition of
Land
(Authorisation
Procedure)
(Scotland) Act
1947 required
to progress this
development
was granted in
early 2025. The
process is now
underway to
vest the land to
allow the
Council to take
ownership –
this is due to be
finalised in the 
.

Page 20

LAQM Annual Progress Report 2025 7
PUBLIC
capital cost with
Renfrewshire
council
contribution of
10%. 
summer of
2025.
Tender returns
for the
construction are
due at the start
of May 2025. 
2 Council Fleet
Improvements
- Continue to
improve the
standard of fleet
- Increase numbers
of electric vehicles
(EVs) & associated
charging
infrastructure
- Continue to work in
line with the Scottish
Government’s Net
Zero policy with
regards to fleet
vehicles
- EV Fleet Strategy
Feasibility Study
Promoting Low
Emission
Transport
Company
Vehicle
Procurement -
Prioritising
uptake of low
emission
vehicles
Procuring
alternative
refuelling
infrastructure to
promote low
emission
vehicles 
Ongoing.
There is an annual
vehicle replacement
programme (VRP)
whereby vehicles at
the end of their
service life are
replaced with an
improved EURO
standard or an
electric alternative.
The Council will
continue to introduce
EVs & charging
points where
opportunities and
funding permits. As
technology evolves
the Council will
extend the EV Fleet
Strategy to include
all vehicles including
HGVs and buses.
Renfrewshire
Council -
Environment,
Housing and
Infrastructure -
Fleet Solutions
and Social
Transport 
In progress
Phasing out
need for new
petrol or diesel
light commercial
vehicles by 2030
Local Authority -
Fleet
improvements
funded via the
Council’s capital
VRP.
Partial funding
towards charging
infrastructure
from Transport
Scotland’s
Switched On
Fleets funding 
The Council fleet
consists of
approx. 400
vehicles of which
>78% are of
EURO V or VI
standard.
There are
approx. 80 HGV
vehicles, 32 of
which are EURO
VI standard with
the remaining 48
being of EURO
V. The EURO V
HGVs are
prioritised for
replacement with
EURO VI
vehicles.
First Council EVs
and charging
points purchased
and installed in
2012. The
Council now
have 115 EVs
(cars/vans) in the
fleet or 27% of
overall fleet.
As of the start of
2024, there are
now 73 EV
chargers for
public usage
(146 charging
bays) and 48 EV 
In October
2021, Scottish
Futures Trust
(SFT) sought
expressions of
interest from
local authorities
to undertake a
business case
to explore
alternative
delivery models
for public EV
charging
through private
sector
investment.
Renfrewshire
Council was
successful in
their application
and received
£60k funding
towards the
development of
the business
case which was
undertaken by
a consultant
and completed
in March 2023.
The business
case sets out
how the
Glasgow City
Region partners
could work
together to
expand the EV
charging
infrastructure

Page 21

LAQM Annual Progress Report 2025 8
PUBLIC
chargers for
council fleet
vehicles (89
charging bays)
across 14 council
depots
/buildings.
Contract
awarded for
£250,000
investment in the
council’s
Underwood
Road Waste &
Fleet Depot
during 2023 with
a new 2.3MVA
power supply
and transformer
to support the
further expansion
of EV charging
infrastructure for
light vans, HGVs
and refuse
collection
vehicles.
In addition to EV
pool cars, the
council have 10
electric pool
bikes for staff to
use for business
travel as part of
the Business
Travel Hierarchy.
network to meet
projected EV
demand over
the next three
to four years.
3 Renfrewshire’s
Plan for Net Zero
Strategy
Renfrewshire
Council declared a
climate emergency
in June 2019 with a
commitment to work
towards net zero by
2030.
Policy
Guidance and
Development
Control
The Net Zero
Strategy is ongoing
until 2030 with action
measures
implemented as per
the strategy priorities
which the Council
will continue to
monitor to 2045 in
line with national
targets and beyond.
Renfrewshire
Council -
Environment,
Housing and
Infrastructure –
Climate Change 
Ongoing Not funded (from
external
sources). 
Verifying,
adopting and
updating the
emissions
modelling tool:
quantification of
the impact of the
phased actions,
to inform future
targets and
present data in
Detailed
Phased Road
Map to 2030
and Quantified
Delivery Plans
being
developed.

Page 22

LAQM Annual Progress Report 2025 9
PUBLIC
Renfrewshire’s Net
Zero Strategy was
produced and
approved in August
2022 with key
themes including:
- Sustainable
Transport
- Clean Energy
- Resilient Place
Action Measures for
these themes will
also align with
improving air quality
levels within
Renfrewshire. 
an interactive
way.
Developing a
carbon budget
for Renfrewshire
Council -
completed in
2024.
4 UTC Improvements
- Replacement of
previous Urban
Traffic Control (UTC)
system with
externally hosted
UTC-X system from
Yunex with
guaranteed updates
for the next 10
years. 
Traffic
Management
(UTC,
congestion
management,
traffic reduction)
Completed 2024 Renfrewshire
Council -
Environment,
Housing and
Infrastructure -
Roads and
Infrastructure 
Completed  Not funded (from
external sources)
Spring 2023 - 66
sites across 30
junctions
throughout the
council area
have been
upgraded to an
externally hosted
UTC system
between 2020
and 2023. This is
then followed
with a 10-year
maintenance
contract at these
sites to ensure
signals remain
as efficient as
possible
There is a 10-
year
maintenance
contract at
these sites to
ensure signals
remain as
efficient as
possible. 
5 Vehicle Fleet
Tracking System
Freight and
Delivery
Management 
UK Telematics Ltd
awarded contract in
April 2023 with
Renfrewshire
Council -
Environment,
Housing and
Completed  Not funded (from
external sources)
UK Telematics
now installed in
all council

Page 23

LAQM Annual Progress Report 2025 10
PUBLIC
- UK Telematics for
all fleet vehicles
Route
management
plans/ Strategic
routing strategy
for HGV's 
Vehicle Fleet
Efficiency
(other)
system now fully
utilised.
Infrastructure -
Fleet Solutions
and Social
Transport 
vehicles
(including hires).
Training has
been provided
for user
departments in
report writing and
system
functionality.
6 Renfrewshire’s
Local Transport
Strategy 
- Publication of a
new Local Transport
Strategy (LTS) for
the period 2025-
2035 to replace the
Council’s existing
2007 LTS. 
Policy
Guidance and
Development
Control (Other
policy)
Transport
Planning and
Infrastructure
Public transport
improvements
Traffic
Management
(various)
Promoting
Travel
Alternatives
(various) 
Summer 2025 Renfrewshire
Council -
Environment,
Housing and
Infrastructure -
Roads and
Infrastructure 
In progress Not funded (from
external sources) 
Contract
awarded in Sept
2023. 
Completion
date expected
to be summer
2025 
7 Renfrewshire
Council Cycle
Strategy & Action
Plan 2016-2025
- The strategy
contains a Cycling
Action Plan which
sets out a
programme of
activities and
Promoting
Travel
Alternatives
Promotion of
cycling
Intensive active
travel campaign
& infrastructure
The current Cycle
Strategy and Action
Plan runs for the
period 2016-2025.
Upgrades and
development of the
cycling network is
ongoing as per the
strategy priorities.
Renfrewshire
Council -
Environment,
Housing and
Infrastructure -
Roads and
Infrastructure 
In progress Measures
contained within
the action plan
will be
implemented
dependant on
funding.
Funding status
depends on each
project but can
Renfrewshire
used 49.4% of
CWSR budget in
2022/23 on new
infrastructure to
encourage
cycling. Projects
included
construction of
Paisley to
Renfrew and
There are
several other
cycling
infrastructure
projects which
are currently at
concept design
/public
consultation
design stage.

Page 24

LAQM Annual Progress Report 2025 11
PUBLIC
network
interventions for the
ten-year period,
including upgrades
and expansion of
cycle networks,
upgrading the
Council’s facilities
for cyclists and
updating the
Council’s Travel
Plan.
School Travel
Plans
Traffic
Management
Strategic
highway
improvements,
re-prioritising
road space
away from cars 
Expected completion
year is dependent on
each measure, some
are ongoing, and
some have funding
until end of 2024/25.
be fully funded /
partially funded /
not funded/
annual or
ongoing funding
required. 
Inchinnan Active
Travel Routes.
The £2 Million
Transport
Scotland Active
Travel
Transformation
Funding awarded
in 2023 for four
Renfrewshire
projects is a
significant
investment which
aims to create
high-quality
active travel
infrastructure
that will support
people to make
the switch to
more sustainable
transport
methods and
reduce
emissions. 
The routes for
these are:
1. Southolm
Roundabout
Erskine
2. Linside
Avenue
3. Hawkhead
Rd/ Glasgow
Rd junction
4. Linclive
Roundabout
5. Inchinnan
Business Park
6. Barnsford
Road, Glasgow
Airport 
8 Active Travel
Projects
- Not Far? Leave the
Car
- Beat the Street
- Living Streets
WOW Project
- School Bikeability
& Scootability
Training
-School travel Plans
- Carshare
Promoting
Travel
Alternatives
Promotion of
cycling
Promotion of
walking
Intensive active
travel campaign
& infrastructure
School Travel
Plans
Alternatives to
private vehicle
use
Dependant on
measure. Some are
ongoing and some
have funding until
end of 2024/25. 
Renfrewshire
Council -
Environment,
Housing and
Infrastructure -
Roads and
Infrastructure 
Ongoing Funding status
depends on each
project but can
be fully funded /
partially funded /
not funded/
annual or
ongoing funding
required. 
Not Far? Leave
the Car
March 2023 to
December 2023
survey results-
654 users out of
917 replaced
their last car
journey with an
active travel
option;
75.9% of
respondents
agreed they used
the car less than
usual to get from
place to place;
73% of
respondents
agreed they
would likely use
the car less to
get from place to
All Primary 5 - 7
classes across
Renfrewshire
will be invited to
undertake their
Bikeability
training
(funding
dependent).
Bikeability is
funded by
Cycling
Scotland and is
led by OneRen
within the
Renfrewshire
Council area.
Primary
Schools have
been invited to
work with the

Page 25

LAQM Annual Progress Report 2025 12
PUBLIC 
Car & lift sharing
schemes 
place in the
future;
75.2% of
respondents said
they are more
likely to walk or
cycle to get from
place to place in
the future;
66.4% of
respondents said
they are likely to
use public
transport to get
from place to
place in future;
and
76.7% of
respondents said
that the scheme
has made them
leave the car at
home 
Living Streets
WOW Project
Sept 2023 to Dec
2023 survey
results-
Number of
children engaged
in the Project:
5470
Number of
sustainable and
active travel
journeys:
121,832 (86%)
Number of
badges earned:
5,987.
Number of
Schools actively
engaged: 19.
86% of pupils
engaged are
choosing to be
active in going to
school 
Council’s Road
Safety team
and establish
Junior Road
Safety Officers
where they will
assist in
keeping the
school areas
less congested
thus resulting in
improved air
quality. 
School travel
Plans: all
schools will be
invited to
complete a
school travel
plan and work
with the
Council’s Road
Safety team
and Junior
Road Safety
Officers to
complete this.

Page 26

LAQM Annual Progress Report 2025 13
PUBLIC
Beat the Street
During 2023/24
the game took
place in
Renfrewshire
North, covering
the areas of
Paisley North,
Inchinnan,
Renfrew, Erskine
and Langbank.
Headline results
include-
7604 players
took part,
118,459 miles
covered in
Renfrewshire. 
The Council are
part of Carshare
and promote car
share journeys
for all
Renfrewshire
employees. 
9 Renfrewshire’s
Local Heat and
Energy Efficiency
Strategy
The Strategy
designates the most
appropriate energy
efficiency and heat
decarbonisation
options within
Renfrewshire
Policy
Guidance and
Development
Control
Strategy approved at
Board in January
2024.
Renfrewshire
Council -
Environment,
Housing and
Infrastructure –
Climate Change 
Ongoing Partially funded.
However, it is
hoped that the
LHEES will also
act as a
prospectus for
government
funding and
external
investment using
a robust
evidence and
place-based
approach. 
Renfrewshire’s
LHEES approved
in January 2024.
.
Delivery Plans
being
developed
throughout
2024.

Page 27

LAQM Annual Progress Report 2025  14
PUBLIC
3 Air Quality Monitoring Data and Comparison with
Air Quality Objectives
3.1 Summary of Monitoring Undertaken 
Automatic Monitoring Sites
This section sets out what monitoring has taken place and how local concentrations of the
main air pollutants compare with the objectives.
Renfrewshire Council undertook automatic (continuous) monitoring at three sites during
2024. Table A.1 in Appendix A shows the details of the sites. National monitoring results
are available at the Air Quality in Scotland website.
Two sites monitor NO2 – REN1 Renfrew Cockels Loan and REN03 Renfrew Inchinnan
Road, with the final site REN02 Renfrewshire Johnstone monitoring PM2.5 and PM10. No
exceedances of the relevant air quality objectives were recorded for any pollutant at any
automatic monitoring station in 2024. No changes occurred to Renfrewshire Council’s
automatic monitoring network in 2024.
Maps showing the location of the monitoring sites are provided in Figure 1. Further details
on how the monitors are calibrated and how the data has been adjusted are included in
Appendix C. 
Non-Automatic Monitoring Sites
Renfrewshire Council undertook non- automatic (passive) monitoring of NO2 at 59 sites
during 2024, however, 18 sites were decommissioned in March 2024, reducing the
reported annual mean concentrations to 41 sites. Table A.2 in Appendix A shows the
details of the sites.
Following bias adjustment and application of distance correction, there were no
exceedances of the NO2 annual mean air quality objective recorded in 2024.
Maps showing the location of the monitoring sites are provided in Figure 2 to Figure 5. The
figures include sites that were decommissioned in March 2024. Further details on Quality

Page 28

LAQM Annual Progress Report 2025 15
PUBLIC
Assurance/Quality Control (QA/QC) and bias adjustment for the diffusion tubes are
included in Appendix C.
The three AQMAs within Renfrewshire Council were revoked in March 2025. Since the
implementation of the 2019 Air Quality Action Plan (AQAP), which was updated in April
2024, there has been a steady improvement of air quality across the Council. As such
there have been no exceedances of any air quality objectives since 2019. 
Other Monitoring Activities
No other monitoring activities have been undertaken.

Page 29

LAQM Annual Progress Report 2025  16
PUBLIC
Figure 1. Map of Automatic Monitoring Sites

Page 30

LAQM Annual Progress Report 2025 17
PUBLIC
Figure 2. Map of Non-Automatic Monitoring Sites in Renfrew

Page 31

LAQM Annual Progress Report 2025 18
PUBLIC
Figure 3. Map of Non-Automatic Monitoring Sites in Paisley

Page 32

LAQM Annual Progress Report 2025 19
PUBLIC
Figure 4. Map of Non-Automatic Monitoring Sites in Kilbarchan and Johnstone

Page 33

LAQM Annual Progress Report 2025 20
PUBLIC
Figure 5. Map of Non-Automatic Monitoring Sites in Lochwinnoch

Page 34

LAQM Annual Progress Report 2025  21
PUBLIC
3.2 Individual Pollutants
The air quality monitoring results presented in this section are, where relevant, adjusted
for annualisation and bias. Further details on adjustments are provided in Appendix C.
3.2.1 Nitrogen Dioxide (NO2)
Table A.3 in Appendix A compares the ratified monitored NO2 annual mean concentrations
for the past five years with the air quality objective of 40 µg/m3 at automatic monitoring
sites. 
Both automatic monitoring sites recorded annual mean NO2 concentrations under the air
quality objective of 40 µg/m3. Recorded concentrations were lower than those in 2023,
Ren1 decreasing by 2.8 µg/m3 (after annualisation) and Ren03 decreasing by 3.9 µg/m3.  
Table A.4 in Appendix A compares the adjusted monitored NO2 annual mean
concentrations for the past five years with the air quality objective of 40 µg/m3 at non
automatic monitoring sites. 
For diffusion tubes, the full 2024 dataset of monthly mean values is provided in Appendix
B.
Two diffusion tubes required annualisation as their data capture was between 25% and
75% – Paisley82 and Paisley94. All diffusion tube monitoring locations in Renfrewshire
Council achieved NO2 AQO compliance in 2024. The highest concentration was 29.9
µg/m3 reported at Johnstone99.
There was an overall decrease in annual mean concentrations for the majority of
monitoring sites in 2024 following bias adjustment and application of distance correction.
Only 2 sites experienced an increase in annual mean NO2 concentration from 2023 to
2024, compared to 39 sites experiencing a decrease. The sites that experienced an
increase were Paisley43 and Paisley79. These increases were +1.1 µg/m3 at Paisley79
(20.0 µg/m3 in 2023 to 21.10 µg/m3 in 2024) to +1.3 µg/m3 at Paisley43 (15.0 µg/m3 in 2023
to 16.2 µg/m3 in 2024). The sites that experienced a decrease in NO2 ranged from -8.4
µg/m3 at Paisley94 (18.8 µg/m3 in 2023 to 10.5 µg/m3 in 2024) to -0.2 µg/m3 at Renfrew75
(16.1 µg/m3 in 2023 to 15.9 µg/m3 in 2024).

Page 35

LAQM Annual Progress Report 2025 22
PUBLIC
Despite the two increases, there were no exceedances of the air quality objective of 40
µg/m3 at any automatic or non-automatic sites in 2024. Broadly, since 2020, the majority of
the diffusion tube monitoring sites have shown a decrease in NO2 concentrations.
Table A.5 in Appendix A compares the ratified continuous monitored NO2 hourly mean
concentrations for the past five years with the air quality objective of 200 µg/m3, not to be
exceeded more than 18 times per year. 
No exceedances of the hourly mean air quality objective for NO2 were recorded at any of
the automatic monitoring sites. None of the diffuison tube monitoring sites reported
concentrations exceeding 60 µg/m3 which indicates that there are likely to be no
exceedances of the short-term air quality objective. 
3.2.2 Particulate Matter (PM10)
Table A.6 in Appendix A compares the ratified and adjusted monitored PM10 annual mean
concentrations for the past five years with the air quality objective of 18 µg/m3. 
The ratified concentration is calculated using raw data directly from the Air Quality in
Scotland Website. The ratified corrected result is calculated using the ratified result, and
then applying a correction factor as outlined in Scottish Government Guidance Note. 
The table shows the ratified data and the ratified corrected data for REN02 (Renfrewshire,
Johnstone), following the Scottish Government Guidance Note in relation to the
measurement of ambient Particulate Matter (PM) and the LAQM reporting of measured
concentrations issued in May 2023. REN02 (Renfrewshire, Johnstone) has shown
variations in concentrations ranging from 10.2 µg/m3 to 13.7 µg/m3 for the ratified data and
11.3 µg/m3 to 15.1 µg/m3 in the ratified corrected data in the past five years. The annual
mean concentration in 2024 is a decrease of 1.5 µg/m3 for the ratified and corrected data
compared to the annual mean concentration recorded in 2023. This site has not recorded
an exceedance of the annual mean AQO since at least 2018.
Table A.7 in Appendix A compares the ratified continuous monitored PM10 daily mean
concentrations for the past five years with the air quality objective of 50 µg/m3, not to be
exceeded more than seven times per year.
In 2024, REN02 (Renfrewshire Johnstone) monitor reported no instances of 24-hour mean
AQO exceedances.

Page 36

LAQM Annual Progress Report 2025 23
PUBLIC
3.2.3 Particulate Matter (PM2.5)
Table A.8 in Appendix A compares the ratified and adjusted monitored PM2.5 annual mean
concentrations for the past five years with the air quality objective of 10 µg/m3.
The ratified concentration is calculated using raw data directly from the Air Quality in
Scotland Website. The ratified corrected result is calculated using the ratified result, and
then applying a correction factor as outlined in Scottish Government Guidance Note. 
In 2024, REN02 (Renfrewshire Johnstone) recorded a concentration of 6.9 µg/m3 or a
corrected value of 7.3 µg/m3. These annual mean concentrations both show no change
compared to the concentration reported in 2023 but a reduction compared to the
concentrations in 2019 (7.9 µg/m3 for the ratified annual mean and 8.4 µg/m3 for the
corrected annual mean). The site has not recorded an exceedance of the annual mean
AQO since at least 2018.
3.2.4 Sulphur Dioxide (SO2)
No monitoring of SO2 was undertaken in 2024.
3.2.5 Carbon Monoxide, Lead and 1,3-Butadiene
No monitoring of Carbon Monoxide, Lead or 1,3-Butadiene was undertaken in 2024.

Page 37

LAQM Annual Progress Report 2025  24
PUBLIC
4 New Local Developments
4.1 Road Traffic Sources
Advanced Manufacturing Innovation District Scotland (AMIDS) South
The transport project within Paisley town centre known as AMIDS South was granted
planning approval in January 2023. The project will create new routes between Paisley
town centre and the Advanced Manufacturing Innovation District Scotland (AMIDS) and
Glasgow Airport. The project involves a road bridge crossing the White Cart and an east-
west link road, all with accompanying walking and cycling options. This is 90% funded by
the UK Government Levelling Up Fund, with the rest paid by Renfrewshire Council.
Two detailed air quality assessments were submitted with the application, a Preliminary Air
Quality Assessment relating to the construction phase of the development and an Air
Quality Addendum report for the operational phase road traffic impacts of the scheme.
Both reports were found to be satisfactory. With regards to the operational phase, the
assessment determines that there will be no exceedances of air quality objectives as a
result of the development. There will also be a beneficial effect on annual mean NO2, PM10
and PM2.5 concentrations at the majority of locations assessed.
In terms of public support for the development, more than 260 people completed a public
survey with their thoughts on the project proposals. The survey found:
• 90% would use the riverside route;
• 86% confirmed that they would be more likely to walk or cycle here following the
infrastructure improvements;
• More than two-thirds of people would use the walking and cycling route between
Gallowhill Road and Inchinnan Road; and
• 70% indicated that they would consider leaving the car at home and walk or cycle
instead.
An update to the project was recently made by adding an underpass to provide a safe
crossing of Renfrew Road, using the existing underpass. It will connect from Gallowhill
Road through the underpass beneath Renfrew Road using the disused railway line and

Page 38

LAQM Annual Progress Report 2025 25
PUBLIC
join onto the active travel route between Paisley and Renfrew. It will also create a new
safe route to school for the new Paisley Grammar School Community Campus.
The Compulsory Purchase Order under the Roads (Scotland) Act 1984 and the
Acquisition of Land (Authorisation Procedure) (Scotland) Act 1947 in order to progress this
development was granted in early 2025. The process is now underway to vest the land to
allow the Council to take ownership, this is due to be finalised in the summer of 2025.
Tender returns for the construction are due at the start of May 2025.
Further information on AMIDS South can be found at AMIDS South transport links -
Renfrewshire Website
4.2 Other Transport Sources
Clyde Metro
The former Glasgow Airport Access Project is now incorporated within a wider metro
opportunity. Clyde Metro is a fully-integrated mass transit public transport system which
could include a variety of modes.  Approved through Glasgow City Region City Deal
funding, Strathclyde Passenger Transport (SPT), with support from Glasgow City Council,
is leading on the work to develop a Case for Investment for Clyde Metro. This work will set
out a programme business case and arrangements for the initial delivery phases. It will
also take forward work to improve sustainable transport access to Glasgow Airport and
longer-term plans for future phases of Clyde Metro. 
Further information on Clyde Metro can be found at: Clyde Metro - Renfrewshire Website
4.3 Industrial Sources
There are two developments that have been submitted to SEPA with a ‘Substantial
Variation to existing Authorisation’ application type within the local authority that may affect
air quality. The following development that will affect emissions from a ‘Waste’ source is
outlined below: 
• 10/04/2024 – WCR Recycling Limited. Authorisation activity ‘Waste - Other Waste
Storage and Treatment Sites. Authorisation number: WML/L/1133375.

Page 39

LAQM Annual Progress Report 2025 26
PUBLIC
The following development that will affect emissions from a ‘PPC(B)’ source is outlined
below:
• 13/09/2024 – Vascutek Ltd. Authorisation activity ‘PPC(B) - Other Solvent Emissions.
Authorisation number: PPC/B/1179205.
No planning applications were received by Renfrewshire Council during 2024 that
identified any new or significantly changed industrial sources.
4.4 Commercial and Domestic Sources
No planning applications were received by Renfrewshire Council during 2024 that
identified any new or significantly changed commercial and domestic sources.
4.5 New Developments with Fugitive or Uncontrolled Sources
No planning applications were received by Renfrewshire Council during 2024 that
identified any new or significantly changed fugitive or uncontrolled sources.

Page 40

LAQM Annual Progress Report 2025  27
PUBLIC
5 Planning Applications
23/0283/PP
The council has received plans for the erection of a secondary school and community
campus with associated external amenities including landscaping, access, parking, and
sports pitches. This application was granted in January 2024.
An initial desk top Air Quality Assessment (AQA) was submitted which was satisfactory
and showed no risk of AQOs being exceeded, however, a detailed AQA was requested
prior to commencement of any construction works. 
The Council received the full AQA for this application in May 2024. A modelling
assessment was undertaken to investigate if there was potential for traffic emissions
associated with the development to impact upon the air quality of the existing residents in
the vicinity of the development. The assessment concluded that the magnitude of change
in air quality was negligible. Air quality was therefore not considered a constraint to
planning consent for the proposed development.
22/0569/PP
Approval of Matters Specified in Conditions 2, 4 and 6 of planning permission in principle
approval 18/0638/PP, for the erection of a residential development comprising of 180
dwellinghouses. An AQA was submitted and was deemed satisfactory, however the
planning application was refused and was appealed by the developers.
The appeal for this application was refused in 2024.

Page 41

LAQM Annual Progress Report 2025  28
PUBLIC
6 Conclusions and Proposed Actions
6.1 Conclusions from New Monitoring Data
There were no AQO exceedances identified in Renfrewshire Council during 2024. 95% of
existing diffusion tube sites with valid annual mean data recorded a decrease in annual
mean NO2 concentrations from 2023 to 2024. The remaining two sites experienced small
increases in NO2 concentrations. 
With regards to the automatic monitoring stations, PM10 annual mean concentrations at
REN02 – Renfrewshire Johnstone decreased from 2023 to 2024 by 1.4 µg/m3 for the raw
concentration and by 1.5μg/m³ for the corrected annual mean concentrations. REN02 –
Renfrewshire Johnstone also records PM2.5 and experienced no change from 2023 to
2024, both pollutants monitored at REN02 recorded concentrations below their respective
annual mean AQOs.
The three AQMAs within Renfrewshire Council were revoked in March 2025. Since the
implementation of the 2019 Air Quality Action Plan (AQAP), which was updated in April
2024, there has been a steady improvement of air quality across the Council. As such
there have been no exceedances of any air quality objectives since 2019.
6.2 Conclusions relating to New Local Developments
Any new developments that are likely to impact local air quality, or potentially introduce
new receptors into areas of poor air quality, have been adequately assessed during the
planning process.
No planning applications were received by Renfrewshire Council in 2024 that identified
any new or significantly changed industrial, commercial or domestic sources or
developments with fugitive or uncontrolled sources that had any human health concerns or
impacts on vegetation or ecosystems.
The planning application reports relating to AMIDS South project were found to be
satisfactory and the Council are currently going through the process of a Compulsory
Purchase Order under the Roads (Scotland) Act 1984 and the Acquisition of Land
(Authorisation Procedure) (Scotland) Act 1947 in order to progress this development.

Page 42

LAQM Annual Progress Report 2025 29
PUBLIC
For Clyde Metro, a Case for Investment is currently developed which includes a
programme business case and arrangements for the initial delivery phases.
The application for the erection of a school and community campus was granted in
January 2024. An initial desk top AQA was submitted which was satisfactory and showed
no risk of AQOs being exceeded, however, a detailed AQA was requested prior to
commencement of any construction works. The Council received the full AQA for this
application in May 2024. A modelling assessment was undertaken to investigate if there
was potential for traffic emissions associated with the development to impact upon the air
quality of the existing residents in the vicinity of the development. The assessment
concluded that the magnitude of change in air quality was negligible. Air quality was
therefore not considered a constraint to planning consent for the proposed development.
An AQA for a housing development site was submitted and was deemed satisfactory,
however the planning application was refused and was being appealed by the developers.
The appeal for this application was refused in 2024.
There are no AQA’s for any developments listed in Section 4.3 Industrial Sources or
Section 4.5 New Developments with Fugitive or Uncontrolled Sources.
6.3 Proposed Actions
Renfrewshire Council’s proposed actions following the publication of the 2025 APR are as
follows:
• The development and publication of the Air Quality Strategy;
• Progress with the significant new road and cycle infrastructure projects which are part
of the AMIDS South projects;
• Publication of a new Renfrewshire Local Transport Strategy and development of a
Paisley Town Centre Transport Strategy;
• Continuation with the upgrade and development of the cycling network as per the
Renfrewshire Council Cycle Strategy priorities;
• Continue with promotion of active travel measures, encouraging people to travel
actively and sustainably with a view to supporting longer term behaviour shift;
• Continue to monitor NO2, PM10 and PM2.5 at relevant locations throughout
Renfrewshire;
• Submit the 2026 Annual Progress Report.

Page 43

LAQM Annual Progress Report 2025  30
PUBLIC
Appendix A: Monitoring Results
Table A.1 – Details of Automatic Monitoring Sites
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid
Ref
Pollutants
Monitored
In
AQMA?  Which AQMA? Monitoring
Technique
Distance
to
Relevant
Exposure
(m) (1)
Distance
to kerb of
nearest
road (m)
(2)
Inlet
Height
(m)
REN1 Renfrew,
Cockels Loan Roadside 250464 665933 NO2 No N/A Chemiluminescent 5.0 18.0 2.2
REN02 Renfrewshire,
Johnstone Roadside 242984 663178 PM10,
PM2.5
Yes JHS FIDAS 200 0.5(3) 2.9 1.9
REN03
Renfrew,
Inchinnan
Road
Roadside 250567 667558 NO2 Yes RTC Chemiluminescent 7.1 3.9 1.6
Notes:
(1) 0m if the monitoring site is at a location of exposure (e.g. installed on the façade of a residential property).
(2) N/A if not applicable.
(3) The distance of 0.5 m is to the façade of the closest building, these are commercial units at ground level and residential units on the
first floor.

Page 44

LAQM Annual Progress Report 2025  31
PUBLIC
Table A.2 – Details of Non-Automatic Monitoring Sites
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid
Ref
Pollutants
Monitored
In
AQMA?
Which
AQMA?
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Tube co-
located with a
Continuous
Analyser?
Tube
Height
(m)
Paisley1 Gilmour
Street
Urban
Centre 248350 664082 NO₂ Y - PTC 70.0 68.0 No 2.7
Paisley2 Oakshaw
Street
Urban
Background 247925 664052 NO₂ Y - PTC 11.0 35.0 No 2.4
Paisley3 Lochfield
Drive
Urban
Background 249002 662138 NO₂ N 8.0 1.5 No 2.4
Renfrew8 Inchinnan
Road Kerbside 250589 667547 NO₂ Y - RTC 0.1 2.6 No 2.4
Renfrew17 Tanar Way Roadside 251524 666287 NO₂ N 0.0 28.0 No 2.3
Paisley19 Linwood
Road Roadside 245701 663603 NO₂ N 5.0 2.5 No 2.5
Johnstone20 High Street Kerbside 242675 663286 NO₂ Y - JHS 0.5 1.4 No 2.3
Paisley21 (1),
Paisley21 (2),
Paisley21 (3)
Causeyside
Street Roadside 248316 663612 NO₂ Y - PTC -6.3 9.9 No 2.3

Page 45

LAQM Annual Progress Report 2025 32
PUBLIC
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid
Ref
Pollutants
Monitored
In
AQMA?
Which
AQMA?
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Tube co-
located with a
Continuous
Analyser?
Tube
Height
(m)
Paisley 33
76
Causeyside
Street
Roadside 248277 663524 NO₂ Y - PTC 1.1 2.8 No 2.8
Paisley 35 Old Sneddon
Street Roadside 248360 664272 NO₂ Y - PTC 0.4 3.4 No 2.7
Paisley 36 Caledonia
Street Roadside 247948 664774 NO₂ Y - PTC 4.5 3.3 No 2.5
Renfrew 40  Hairst Street Roadside 250763 667631 NO₂ Y - RTC 0.3 6.2 No 2.5
Paisley 43 Smithhills
Street (East) Roadside 248481 664154 NO₂ Y - PTC 0.0 2.5 No 2.5
Paisley 44 Love Street Roadside 248209 664474 NO₂ Y - PTC 0.2 2.2 No 2.5
Renfrew45 Xscape Kerbside 251803 667365 NO₂ N 18.0 2.0 No 2.5
Renfrew48 Glen Sax
Drive Roadside 251264 666217 NO₂ N -22.0 45.0 No 2.6

Page 46

LAQM Annual Progress Report 2025 33
PUBLIC
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid
Ref
Pollutants
Monitored
In
AQMA?
Which
AQMA?
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Tube co-
located with a
Continuous
Analyser?
Tube
Height
(m)
Paisley 50 Renfrew
Road Roadside 248985 665494 NO₂ N 7.0 12.0 No 2.5
Renfrew 52 Glasgow
Road 2 Roadside 251515 666955 NO₂ N 4.0 3.0 No 2.3
Renfrew 56 Paisley
Road Roadside 250579 667488 NO₂ Y - RTC 3.5 4.5 No 2.4
Renfrew 57 Paisley
Road Roadside 250597 667473 NO₂ N 1.2 6.0 No 2.4
Johnstone 59 High Street Kerbside 242656 663281 NO₂ Y - JHS 0.1 1.7 No 2.5
Paisley 60 Underwood
Road Roadside 247525 664326 NO₂ N 7.8 0.5 No 2.4
Kilbarchan 61 High
Barholm Roadside 240584 663007 NO₂ N 0.1 1.1 No 2.4
Renfrew62
(1),
Renfrew62
(2),
Renfrew62
(3)
Cockels
Loan  Roadside 250463 665934 NO₂ N 5.0 18.0 Yes 3.0

Page 47

LAQM Annual Progress Report 2025 34
PUBLIC
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid
Ref
Pollutants
Monitored
In
AQMA?
Which
AQMA?
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Tube co-
located with a
Continuous
Analyser?
Tube
Height
(m)
Paisley 63 Renfrew
Road Roadside 249159 665710 NO₂ N 6.8 3.7 No 2.4
Kilbarchan 65 High
Barholm Roadside 240599 663000 NO₂ N 0.4 2.0 No 2.2
Kilbarchan 66 High
Barholm Roadside 240573 663021 NO₂ N 0.4 1.6 No 2.2
Kilbarchan67 High
Barholm Roadside 240512 663027 NO₂ Y - RTC 1.8 3.0 No 2.3
Renfrew68 Paisley
Road Roadside 250522 667419 NO₂ Y - RTC  0.2 3.0 No 2.3
Renfrew69 Inchinnan
Road Roadside 250537 667602 NO₂ Y - RTC 0.1 2.9 No 2.0
Renfrew70 Inchinnan
Road Roadside 250599 667561 NO₂ N 4.5 3.7 No 2.0
Renfrew71 Braille Drive Roadside 251729 666360 NO₂ Y - RTC 0.0 26.5 No 2.0

Page 48

LAQM Annual Progress Report 2025 35
PUBLIC
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid
Ref
Pollutants
Monitored
In
AQMA?
Which
AQMA?
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Tube co-
located with a
Continuous
Analyser?
Tube
Height
(m)
Johnstone72 High Street Roadside 243080 663140 NO₂ Y - JHS 0.5 3.0 No 2.3
Paisley73 Lawn Street Roadside 248566 664072 NO₂ Y - PTC 0.2 2.0 No 2.5
Paisley74 Causeyside
Street Roadside 248313 663621 NO₂ Y - PTC 0.2 3.3 No 2.2
Renfrew75 Canal Street Roadside 250853 667747 NO₂ N 0.2 5.0 No 2.5
Paisley78 Neilston
Road Roadside 248339 662576 NO₂ Y 0.2 2.6 No 2.5
Paisley79 Incle Street Roadside 248632 664212 NO₂ N 0.2 2.8 No 2.2
Paisley80 Glasgow
Road Roadside 249653 664123 NO₂ N 1.9 2.1 No 2.4
Paisley82 Well Sreet Roadside 247513 664024 NO₂ Y - PTC 0.2 2.3 No 2.4

Page 49

LAQM Annual Progress Report 2025 36
PUBLIC
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid
Ref
Pollutants
Monitored
In
AQMA?
Which
AQMA?
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Tube co-
located with a
Continuous
Analyser?
Tube
Height
(m)
Paisley83 Wellmeadow
Street Kerbside 247671 663913 NO₂ N 0.4 3.3 No 2.5
Paisley84 Ferry Village Roadside 251254 667876 NO₂ Y - PTC 18.0 0.5 No 2.4
Johnstone85 High Street Roadside 242622 663306 NO₂ Y - JHS 0.6 1.1 No 2.4
Johnstone86 High Street Roadside 242495 663358 NO₂ Y - JHS 0.1 2.7 No 2.4
Paisley 89 Abercorn
Street Roadside 248467 664303 NO₂ Y - PTC 0.1 3.5 No 2.3
Renfrew90
(1),
Renfrew90
(2),
Renfrew90
(3)
Renfrew
Monitor Roadside 250567 667558 NO₂ Y - RTC 7.0 3.9 Yes 1.6
Lochwin92 Newton of
Barr Roadside 234904 658634 NO₂ N 0.5 2.0 No 2.4
Lochwin93 Main Street,
Lochwinnoch Roadside 235280 658877 NO₂ N 0.4 1.2 No 2.6

Page 50

LAQM Annual Progress Report 2025 37
PUBLIC
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid
Ref
Pollutants
Monitored
In
AQMA?
Which
AQMA?
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Tube co-
located with a
Continuous
Analyser?
Tube
Height
(m)
Paisley94 New Street Roadside 248186 663925 NO₂ Y - PTC 2.1 0.5 No 2.4
Paisley96
McDonald's
Renfrew
Road
Roadside 248998 665204 NO₂ N 19.0 2.2 No 2.2
Renfrew97 Inchinnan
Road Kerbside 250610 667534 NO₂ Y - RTC 2.1 0.6 No 2.4
Johnstone99 High Street Roadside 242584 663307 NO₂ Y - JHS 0.5 1.3 No 2.4
Johnstone100 High Street Roadside 242643 663285 NO₂ Y - JHS 0.1 1.9 No 2.2
Renfrew101 Glebe Street Roadside 250656 667457 NO₂ N 4.5 2.5 No 2.3
Paisley102 Orchard
Street Roadside 248363 663752 NO₂ Y - PTC 0.6 2.3 No 2.1
Paisley105 Central
Road 2 Roadside 248425 664192 NO₂ Y - PTC 55.0 4.0 No 2.3

Page 51

LAQM Annual Progress Report 2025 38
PUBLIC
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid
Ref
Pollutants
Monitored
In
AQMA?
Which
AQMA?
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Tube co-
located with a
Continuous
Analyser?
Tube
Height
(m)
Paisley106 Smithills
Street Roadside 248477 664189 NO₂ Y - PTC 2.6 0.3 No 2.0
Johnstone107 High Street Roadside 242503 663335 NO₂ Y - JHS 6.0 2.8 No 2.2
Paisley108 Central
Road  Roadside 248355 664180 NO₂ Y - PTC 8.4 4.6 No 2.4
Notes:
(1) 0m if the monitoring site is at a location of exposure (e.g. installed on/adjacent to the façade of a residential property).
(2) N/A if not applicable.

Page 52

LAQM Annual Progress Report 2025  39
PUBLIC
Table A.3 – Annual Mean NO2 Monitoring Results: Automatic Monitoring (µg/m3)
Site ID X OS Grid
Ref (Easting)
Y OS Grid
Ref
(Northing)
Site Type
Valid Data Capture
for Monitoring Period
(%) (1)
Valid Data Capture
2024 (%) (2) 2020 2021 2022 2023 2024
REN1 250464 665933 Roadside 64.4 60.2 20.9 24.5 22.4 20.3 17.5
REN03 250567 667558 Roadside 89.7 89.7 19.9 19.0 19.7 23.6 18.9
Notes:
Exceedances of the NO2 annual mean objective of 40 µg/m3 are shown in bold.
NO2 annual means exceeding 60 µg/m3, indicating a potential exceedance of the NO2 1-hour mean objective are shown in bold and
underlined.
Means for diffusion tubes have been corrected for bias. All means have been “annualised” as per LAQM.TG22 if valid data capture for
the full calendar year is less than 75%. See Appendix C for details.
(1) Data capture for the monitoring period, in cases where monitoring was only carried out for part of the year.
(2) Data capture for the full calendar year (e.g. if monitoring was carried out for 6 months, the maximum data capture for the full calendar
year is 50%).

Page 53

LAQM Annual Progress Report 2025 40
PUBLIC
Table A.4 – Annual Mean NO2 Monitoring Results: Non-Automatic Monitoring (µg/m3)
Diffusion
Tube ID
X OS Grid
Ref (Easting)
Y OS Grid
Ref
(Northing)
Site Type
Valid Data Capture
for Monitoring Period
(%) (1)
Valid Data Capture
2024 (%) (2) 2020 2021 2022 2023 2024
Paisley1 248350 664082 Urban Centre 100.0 100.0 16.1 14.9 13.5 15.2 10.9
Paisley2 247925 664052 Urban
Background 100.0 100.0 10.9 9.6 11.9 10.0 8.9
Paisley3 249002 662138 Urban
Background 92.5 92.5 8.9 7.4 6.8 8.8 6.1
Renfrew8 250589 667547 Kerbside 100.0 100.0 40.2 29.8 30.2 37.7 29.8
Renfrew17 251524 666287 Roadside 100.0 100.0 26.3 22.9 23.5 22.1 20.9
Paisley19 245701 663603 Roadside 100.0 17.0 24.1 22.5 17.9 17.4 -*
Johnstone20 242675 663286 Kerbside 90.6 90.6 25.5 20.2 19.3 23.5 20.8
Paisley21 (1),
Paisley21 (2),
Paisley21 (3)
248316 663612 Roadside 100.0 17.0 25.7 21.9 18.6 19.1 -*
Paisley 33 248277 663524 Roadside 100.0 100.0 27.7 24.1 19.4 22.2 19.6
Paisley 35 248360 664272 Roadside 100.0 100.0 31.5 25.7 21.9 26.2 20.7
Paisley 36 247948 664774 Roadside 100.0 100.0 27.7 26.5 20.5 24.4 20.4

Page 54

LAQM Annual Progress Report 2025 41
PUBLIC
Diffusion
Tube ID
X OS Grid
Ref (Easting)
Y OS Grid
Ref
(Northing)
Site Type
Valid Data Capture
for Monitoring Period
(%) (1)
Valid Data Capture
2024 (%) (2) 2020 2021 2022 2023 2024
Renfrew 40  250763 667631 Roadside 100.0 100.0 21.6 18.7 16.4 18.0 16.6
Paisley 43 248481 664154 Roadside 100.0 100.0 20.4 20.5 15.0 14.9 16.2
Paisley 44 248209 664474 Roadside 100.0 100.0 16.3 16.1 15.5 17.6 15.8
Renfrew45 251803 667365 Kerbside 90.6 90.6 20.3 18.4 14.9 18.4 16.4
Renfrew48 251264 666217 Roadside 100.0 17.0 24.8 20.9 17.7 21.6 -*
Paisley 50 248985 665494 Roadside 100.0 100.0 21.8 17.9 17.3 18.7 17.8
Renfrew 52 251515 666955 Roadside 100.0 17.0 24.9 21.2 17.3 19.7 -*
Renfrew 56 250579 667488 Roadside 100.0 100.0 24.4 20.9 19.5 22.6 20.6
Renfrew 57 250597 667473 Roadside 100.0 100.0 18.1 19.0 12.9 16.8 15.1
Johnstone 59 242656 663281 Kerbside 100.0 100.0 39.5 34.4 30.9 29.9 24.8
Paisley 60 247525 664326 Roadside 100.0 100.0 30.1 24.5 22.3 25.3 22.2

Page 55

LAQM Annual Progress Report 2025 42
PUBLIC
Diffusion
Tube ID
X OS Grid
Ref (Easting)
Y OS Grid
Ref
(Northing)
Site Type
Valid Data Capture
for Monitoring Period
(%) (1)
Valid Data Capture
2024 (%) (2) 2020 2021 2022 2023 2024
Kilbarchan 61 240584 663007 Roadside 100.0 17.0 26.0 26.1 18.7 21.1 -*
Renfrew62 (1),
Renfrew62 (2),
Renfrew62 (3)
250463 665934 Roadside 100.0 100.0 30.5 25.3 21.9 24.9 22.3
Paisley 63 249159 665710 Roadside 100.0 17.0 25.2 25.2 20.9 23.5 -*
Kilbarchan 65 240599 663000 Roadside 100.0 17.0 25.8 20.9 16.9 19.4 -*
Kilbarchan 66 240573 663021 Roadside 100.0 17.0 18.1 15.9 14.1 13.8 -*
Kilbarchan67 240512 663027 Roadside 100.0 17.0 18.6 13.2 10.3 11.0 -*
Renfrew68 250522 667419 Roadside 100.0 100.0 21.0 16.4 17.4 19.5 18.9
Renfrew69 250537 667602 Roadside 100.0 100.0 25.0 32.4 25.3 35.6 27.8
Renfrew70 250599 667561 Roadside 100.0 17.0 26.9 17.4 18.1 20.6 -*
Renfrew71 251729 666360 Roadside 100.0 17.0 26.2 24.4 19.1 23.8 -*
Johnstone72 243080 663140 Roadside 92.5 92.5 20.2 19.9 13.6 17.2 15.4

Page 56

LAQM Annual Progress Report 2025 43
PUBLIC
Diffusion
Tube ID
X OS Grid
Ref (Easting)
Y OS Grid
Ref
(Northing)
Site Type
Valid Data Capture
for Monitoring Period
(%) (1)
Valid Data Capture
2024 (%) (2) 2020 2021 2022 2023 2024
Paisley73 248566 664072 Roadside 100.0 100.0 27.0 22.5 17.7 22.8 17.4
Paisley74 248313 663621 Roadside 92.5 92.5 28.6 23.0 18.7 19.3 18.6
Renfrew75 250853 667747 Roadside 100.0 100.0 21.1 20.2 13.9 16.1 15.9
Paisley78 248339 662576 Roadside 100.0 17.0 24.4 24.0 16.8 19.2 -*
Paisley79 248632 664212 Roadside 90.6 90.6 32.0 24.6 20.0 20.0 21.1
Paisley80 249653 664123 Roadside 100.0 17.0 23.7 18.4 14.9 17.2 -*
Paisley82 247513 664024 Roadside 67.9 67.9 36.1 28.1 24.3 28.3 21.4
Paisley83 247671 663913 Kerbside 100.0 100.0 25.1 22.7 21.8 21.6 18.9
Paisley84 251254 667876 Roadside 100.0 100.0 16.8 14.9 13.1 14.6 13.0
Johnstone85 242622 663306 Roadside 100.0 100.0 30.2 24.5 19.9 26.9 18.8
Johnstone86 242495 663358 Roadside 100.0 100.0 29.9 19.0 19.2 24.7 20.2

Page 57

LAQM Annual Progress Report 2025 44
PUBLIC
Diffusion
Tube ID
X OS Grid
Ref (Easting)
Y OS Grid
Ref
(Northing)
Site Type
Valid Data Capture
for Monitoring Period
(%) (1)
Valid Data Capture
2024 (%) (2) 2020 2021 2022 2023 2024
Paisley 89 248467 664303 Roadside 100.0 17.0 24.9 23.2 20.0 23.2 -*
Renfrew90 (1),
Renfrew90 (2),
Renfrew90 (3)
250567 667558 Roadside 100.0 100.0 21.4 20.1 17.2 22.8 20.1
Lochwin92 234904 658634 Roadside 100.0 17.0 14.8 14.3 13.5 13.7 -*
Lochwin93 235280 658877 Roadside 100.0 17.0 14.1 16.7 11.1 12.3 -*
Paisley94 248186 663925 Roadside 41.5 41.5 21.0 19.0 17.9 18.8 10.5
Paisley96 248998 665204 Roadside 100.0 17.0 24.2 21.2 16.9 16.7 -*
Renfrew97 250610 667534 Kerbside 100.0 100.0 - 30.5 28.5 30.9 28.3
Johnstone99 242584 663307 Roadside 100.0 100.0 - 35.4 25.7 32.7 29.9
Johnstone100 242643 663285 Roadside 100.0 100.0 - 31.8 24.3 28.8 24.4
Renfrew101 250656 667457 Roadside 100.0 100.0 - 19.5 17.8 20.0 16.3
Paisley102 248363 663752 Roadside 100.0 100.0 - - 19.1 19.6 16.7

Page 58

LAQM Annual Progress Report 2025 45
PUBLIC
Diffusion
Tube ID
X OS Grid
Ref (Easting)
Y OS Grid
Ref
(Northing)
Site Type
Valid Data Capture
for Monitoring Period
(%) (1)
Valid Data Capture
2024 (%) (2) 2020 2021 2022 2023 2024
Paisley105 248425 664192 Roadside 92.5 92.5 - - 16.6 19.9 13.0
Paisley106 248477 664189 Roadside 100.0 100.0 - - 17.7 26.5 19.9
Johnstone107 242503 663335 Roadside 100.0 100.0 - - 20.6 26.7 21.0
Paisley108 248355 664180 Roadside 100.0 17.0 - - 14.7 18.0 -*
☒ Annualisation has been conducted where data capture is <75% and >25% in line with LAQM.TG22
☒ Diffusion tube data has been bias adjusted
☒ Reported concentrations are those at the location of the monitoring site (bias adjusted and annualised, as required), i.e.
prior to any fall-off with distance correction.
Notes:
Exceedances of the NO2 annual mean objective of 40 µg/m3 are shown in bold.
NO2 annual means exceeding 60 µg/m3, indicating a potential exceedance of the NO2 1-hour mean objective are shown in bold and
underlined.
Means for diffusion tubes have been corrected for bias. All means have been “annualised” as per LAQM.TG(22) if valid data capture for
the full calendar year is less than 75%. See Appendix C for details.
* Annual mean concentrations for these sites could not be calculated as only two months (January and February) of monitoring were
undertaken before the sites were decommissioned.
(1) Data capture for the monitoring period, in cases where monitoring was only carried out for part of the year.

Page 59

LAQM Annual Progress Report 2025 46
PUBLIC
(2) Data capture for the full calendar year (e.g. if monitoring was carried out for 6 months, the maximum data capture for the full calendar
year is 50%).

Page 60

LAQM Annual Progress Report 2025 47
PUBLIC
Figure 6. Annual Mean NO₂ Concentrations at Automatic Monitoring Sites 
0
5
10
15
20
25
30
35
40
45
2020 2021 2022 2023 2024
Annual Mean NO
2
Concentration (µg/m
3 )
Year
Annual Mean Air Quality Objective REN1 REN03

Page 61

LAQM Annual Progress Report 2025 48
PUBLIC
Figure 7. Annual Mean NO2 Concentrations at Non-Automatic Monitoring Sites (Urban Centre, Urban Background, Kerbside) 
0
5
10
15
20
25
30
35
40
45
2020 2021 2022 2023 2024
Annual Mean NO
2
Concentration (µg/m
3 )
Year
Annual Mean Air Quality Objective Paisley1 Paisley2 Paisley3
Renfrew8 Johnstone20 Renfrew45 Johnstone59
Paisley83 Renfrew97

Page 62

LAQM Annual Progress Report 2025 49
PUBLIC
Figure 8. Annual Mean NO2 Concentrations at Non-Automatic Monitoring Sites (Roadside 1) 
0
5
10
15
20
25
30
35
40
45
2020 2021 2022 2023 2024
Annual Mean NO
2
Concentration (µg/m
3 )
Year
Annual Mean Air Quality Objective Renfrew17 Paisley33
Paisley35 Paisley36 Renfrew40
Paisley43 Paisley44 Paisley50

Page 63

LAQM Annual Progress Report 2025 50
PUBLIC
Figure 9. Annual Mean NO2 Concentrations at Non-Automatic Monitoring Sites (Roadside 2) 
0
5
10
15
20
25
30
35
40
45
2020 2021 2022 2023 2024
Annual Mean NO
2
Concentration (µg/m
3 )
Year
Annual Mean Air Quality Objective Renfrew56 Renfrew57 Paisley60 Renfrew62 (1), Renfrew62 (2), Renfrew62 (3)

Page 64

LAQM Annual Progress Report 2025 51
PUBLIC
Figure 10. Annual Mean NO2 Concentrations at Non-Automatic Monitoring Sites (Roadside 3) 
0
5
10
15
20
25
30
35
40
45
2020 2021 2022 2023 2024
Annual Mean NO
2
Concentrations (µg/m
3 )
Year
Annual Mean Air Quality Objective Renfrew68 Renfrew69 Johnstone72 Paisley73 Paisley74 Renfrew75 Paisley79

Page 65

LAQM Annual Progress Report 2025 52
PUBLIC
Figure 11. Annual Mean NO2 Concentrations at Non-Automatic Monitoring Sites (Roadside 4) 
0
5
10
15
20
25
30
35
40
45
2020 2021 2022 2023 2024
Annual Mean NO
2
Concentration (µg/m
3 )
Year
Annual Mean Air Quality Objective Paisley82 Renfrew84
Johnstone85 Johnstone86 Renfrew90 (1), Renfrew90 (2), Renfrew90 (3)
Paisley94

Page 66

LAQM Annual Progress Report 2025 53
PUBLIC
Figure 12. Annual Mean NO2 Concentrations at Non-Automatic Monitoring Sites (Roadside 5) 
0
5
10
15
20
25
30
35
40
45
2020 2021 2022 2023 2024
Annual Mean NO
2
Concentrations (µg/m
3 )
Year
Annual Mean Air Quality Objective Johnstone99 Johnstone100 Renfrew101
Paisley102 Paisley105 Paisley106 Johnstone107

Page 67

LAQM Annual Progress Report 2025  54
PUBLIC
Table A.5 – 1-Hour Mean NO2 Monitoring Results, Number of 1-Hour Means > 200 µg/m3
Site ID X OS Grid Ref
(Easting)
Y OS Grid Ref
(Northing) Site Type
Valid Data Capture
for Monitoring
Period (%) (1)
Valid Data Capture
2024 (%) (2) 2020 2021 2022 2023 2024
REN1 250464 665933 Roadside 64.4 60.2 0 0 0  0
(91.3) 0 (73)
REN03 250567 667558 Roadside 89.7 89.7 0 0 0  0 0
Notes:
Exceedances of the NO2 1-hour mean objective (200 µg/m3 not to be exceeded more than 18 times/year) are shown in bold.
If the period of valid data is less than 85%, the 99.8th percentile of 1-hour means is provided in brackets.
(1) Data capture for the monitoring period, in cases where monitoring was only carried out for part of the year.
(2) Data capture for the full calendar year (e.g. if monitoring was carried out for 6 months, the maximum data capture for the full calendar
year is 50%).

Page 68

LAQM Annual Progress Report 2025  55
PUBLIC
Table A.6 – Annual Mean PM10 Monitoring Results (µg/m3)
Site ID X OS Grid Ref
(Easting)
Y OS Grid Ref
(Northing) Site Type
Valid Data Capture
for Monitoring
Period (%) (1)
Valid Data Capture
2024 (%) (2) 2020 2021 2022 2023 2024
REN02 242984 663178 Roadside 100.0 100.0 10.2 13.7 12.9 13.4 12.0
REN02
Corrected 242984 663178 Roadside 98.9 98.9 11.3 15.1 14.2 14.7 13.2
Notes:
Exceedances of the PM10 annual mean objective of 18 µg/m3 are shown in bold.
All means have been “annualised” as per LAQM.TG(22), valid data capture for the full calendar year is less than 75%. See Appendix C
for details.
(1) Data capture for the monitoring period, in cases where monitoring was only carried out for part of the year.
(2) Data capture for the full calendar year (e.g. if monitoring was carried out for 6 months, the maximum data capture for the full calendar
year is 50%).

Page 69

LAQM Annual Progress Report 2025 56
PUBLIC
Figure 13. Annual Mean PM₁₀ Concentrations at Automatic Monitoring Sites 
0
2
4
6
8
10
12
14
16
18
20
2020 2021 2022 2023 2024
Annual Mean PM
10
Concentration (µg/m
3 )
Year
Annual Mean Air Quality Objective REN02 REN02 Corrected

Page 70

LAQM Annual Progress Report 2025  57
PUBLIC
Table A.7 – 24-Hour Mean PM10 Monitoring Results, Number of PM10 24-Hour Means > 50 µg/m3
Site ID X OS Grid Ref
(Easting)
Y OS Grid Ref
(Northing) Site Type
Valid Data Capture
for Monitoring
Period (%) (1)
Valid Data
Capture 2024 (%)
(2)
2020 2021 2022 2023 2024
REN02 242984 663178 Roadside 100.0 100.0  0  1 0  3  0
Notes: 
Exceedances of the PM10 24-hour mean objective (50 µg/m3 not to be exceeded more than seven times/year) are shown in bold.
If the period of valid data is less than 85%, the 98.1st percentile of 24-hour means is provided in brackets.
(1) Data capture for the monitoring period, in cases where monitoring was only carried out for part of the year.
(2) Data capture for the full calendar year (e.g. if monitoring was carried out for 6 months, the maximum data capture for the full calendar
year is 50%).

Page 71

LAQM Annual Progress Report 2025  58
PUBLIC
Table A.8 – Annual Mean PM2.5 Monitoring Results (µg/m3)
Site ID X OS Grid Ref
(Easting)
Y OS Grid Ref
(Northing) Site Type
Valid Data
Capture for
Monitoring Period
(%) (1)
Valid Data
Capture 2024 (%)
(2)
2020 2021 2022 2023 2024
REN02 242984 663178 Roadside 100.0 100.0 5.5 6.0 6.1 6.9 6.9
REN02
Corrected 242984 663178 Roadside 100.0 100.0 5.9 6.3 6.5 7.3 7.3
Notes:
Exceedances of the PM2.5 annual mean objective of 10 µg/m3 are shown in bold.
All means have been “annualised” as per LAQM.TG(22), valid data capture for the full calendar year is less than 75%. See Appendix C
for details.
(1) Data capture for the monitoring period, in cases where monitoring was only carried out for part of the year.
(2) Data capture for the full calendar year (e.g. if monitoring was carried out for 6 months, the maximum data capture for the full calendar
year is 50%).

Page 72

LAQM Annual Progress Report 2025 59
PUBLIC
Figure 14. Annual Mean PM₂.₅ Concentrations at Automatic Monitoring Sites 
0
2
4
6
8
10
12
2020 2021 2022 2023 2024
Annual Mean PM
2.5
Concentrations (µg/m
3 )
Year
Annual Mean Air Quality Objective REN02 REN02 Corrected

Page 73

LAQM Annual Progress Report 2025  60
PUBLIC 
Appendix B: Full Monthly Diffusion Tube Results for 2024
Table B.1 – NO2 2024 Monthly Diffusion Tube Results (µg/m3)
DT ID
X OS Grid
Ref
(Easting)
Y OS Grid
Ref
(Northing)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Annual
Mean:
Raw
Data
Annual Mean:
Annualised
and Bias
Adjusted
(1.27)
Annual
Mean:
Distance
Corrected
to
Nearest
Exposure
Comment
Paisley1 248350 664082 17.6 8.3 14.5 2.6 1.7 2.6 6.2 6.5 5.2 11.1 25.4 1.7 8.6 10.9  
Paisley2 247925 664052 4.9 5.2 10.3 2.7 1.5 2.3 5.9 4.2 6.3 11.0 17.7 12.3 7.0 8.9  
Paisley3 249002 662138 8.7 5.1 5.7 2.5 2.4 2.3 3.0 2.6 -  7.6 7.4 5.9 4.8 6.1  
Renfrew8 250589 667547 23.8 31.5 25.3 10.9 26.1 21.8 25.3 30.4 7.7 29.2 31.9 18.5 23.5 29.8  
Renfrew17 251524 666287 25.6 15.2 14.3 7.0 12.9 9.0 12.1 16.8 14.5 26.6 26.3 17.7 16.5 20.9  
Paisley19 245701 663603 24.1 12.8 -  - -  - - - - - - - 18.5 -*  
Johnstone20 242675 663286 17.6 12.8 16.8 11.0 -  9.5 14.9 11.2 19.5 19.6 25.2 23.0 16.5 20.8  
Paisley21 (1) 248316 663612 -  13.9 - - - - - - - - - - - -* 
Triplicate
Site with
Paisley21
(1),
Paisley21
(2) and
Paisley21
(3) - Annual
data
provided for
Paisley21
(3) only

Page 74

LAQM Annual Progress Report 2025 61
PUBLIC
DT ID
X OS Grid
Ref
(Easting)
Y OS Grid
Ref
(Northing)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Annual
Mean:
Raw
Data
Annual Mean:
Annualised
and Bias
Adjusted
(1.27)
Annual
Mean:
Distance
Corrected
to
Nearest
Exposure
Comment
Paisley21 (2) 248316 663612 14.8 12.0 - - - - - - - - - - - -* 
Triplicate
Site with
Paisley21
(1),
Paisley21
(2) and
Paisley21
(3) - Annual
data
provided for
Paisley21
(3) only
Paisley21 (3) 248316 663612 16.7 14.1 - - - - - - - - - - 14.5 -* -
Triplicate
Site with
Paisley21
(1),
Paisley21
(2) and
Paisley21
(3) - Annual
data
provided for
Paisley21
(3) only
Paisley 33 248277 663524 9.7 15.6 16.2 10.7 15.3 6.7 13.8 13.7 23.8 20.2 26.6 13.7 15.5 19.6  
Paisley 35 248360 664272 16.2 15.0 12.6 10.3 11.9 7.3 15.4 15.8 23.4 21.9 29.5 16.6 16.3 20.7  
Paisley 36 247948 664774 19.7 17.1 13.1 6.9 11.8 5.5 15.3 14.3 22.0 21.8 28.4 17.3 16.1 20.4  
Renfrew 40  250763 667631 15.5 13.5 9.5 5.8 7.5 3.9 9.7 12.6 16.7 20.0 22.5 20.3 13.1 16.6  
Paisley 43 248481 664154 26.4 8.5 8.8 4.0 4.0 29.6 11.1 6.0 11.3 12.4 19.7 12.0 12.8 16.2  
Paisley 44 248209 664474 19.5 10.8 12.3 4.3 7.1 7.5 9.8 7.9 18.9 17.9 25.3 8.4 12.5 15.8

Page 75

LAQM Annual Progress Report 2025 62
PUBLIC
DT ID
X OS Grid
Ref
(Easting)
Y OS Grid
Ref
(Northing)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Annual
Mean:
Raw
Data
Annual Mean:
Annualised
and Bias
Adjusted
(1.27)
Annual
Mean:
Distance
Corrected
to
Nearest
Exposure
Comment
Renfrew45 251803 667365 16.5 14.1 11.3 3.2 11.2 9.1 10.7 12.4 16.3 14.8 22.8 -  12.9 16.4  
Renfrew48 251264 666217 19.2 17.1 - - - - - - - - - - 18.2 -* - 
Paisley 50 248985 665494 19.6 11.6 15.1 5.8 7.9 9.3 12.4 13.0 12.5 19.5 26.6 15.6 14.1 17.8  
Renfrew 52 251515 666955 18.0 13.6 - - - - - - - - - - 15.8 -*  
Renfrew 56 250579 667488 19.9 16.4 8.8 6.1 13.6 10.7 16.0 15.5 20.5 20.1 28.3 19.5 16.3 20.6  
Renfrew 57 250597 667473 21.8 14.2 8.7 4.1 5.4 4.4 9.2 10.7 15.1 18.6 18.7 12.1 11.9 15.1  
Johnstone 59 242656 663281 24.7 16.8 12.8 10.1 15.5 8.6 23.3 19.6 24.6 25.5 34.1 19.1 19.6 24.8  
Paisley 60 247525 664326 26.2 16.4 12.7 4.3 12.1 9.4 15.2 15.1 17.8 24.7 38.3 18.0 17.5 22.2  
Kilbarchan 61 240584 663007 22.5 13.6 - - - - - - - - - - 18.1 -*  
Renfrew62 (1) 250463 665934 22.3 18.3 13.7 7.0 15.4 7.9 17.2 19.3 13.6 22.4 26.8 25.8 - - 
Triplicate
Site with
Renfrew62
(1),
Renfrew62
(2) and
Renfrew62
(3) - Annual
data
provided for
Renfrew62
(3) only

Page 76

LAQM Annual Progress Report 2025 63
PUBLIC
DT ID
X OS Grid
Ref
(Easting)
Y OS Grid
Ref
(Northing)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Annual
Mean:
Raw
Data
Annual Mean:
Annualised
and Bias
Adjusted
(1.27)
Annual
Mean:
Distance
Corrected
to
Nearest
Exposure
Comment
Renfrew62 (2) 250463 665934 19.5 21.0 13.1 7.1 16.1 8.0 15.4 18.9 19.7 24.1 28.9 14.2 - - 
Triplicate
Site with
Renfrew62
(1),
Renfrew62
(2) and
Renfrew62
(3) - Annual
data
provided for
Renfrew62
(3) only
Renfrew62 (3) 250463 665934 26.0 19.2 10.6 7.5 16.2 13.1 15.9 18.0 19.8 28.3 26.6 17.7 17.6 22.3 
Triplicate
Site with
Renfrew62
(1),
Renfrew62
(2) and
Renfrew62
(3) - Annual
data
provided for
Renfrew62
(3) only
Paisley 63 249159 665710 23.9 14.3 - - - - - - - - - - 19.1 -*  
Kilbarchan 65 240599 663000 20.2 12.4 - - - - - - - - - - 16.3 -*  
Kilbarchan 66 240573 663021 15.3 10.3 - - - - - - - - - - 12.8 -*  
Kilbarchan67 240512 663027 11.9 6.9 - - - - - - - - - - 9.4 -*  
Renfrew68 250522 667419 22.1 16.3 10.5 5.5 11.2 8.8 11.0 11.2 16.4 20.2 25.5 20.6 14.9 18.9  
Renfrew69 250537 667602 28.4 29.6 17.8 10.6 20.2 6.4 11.8 12.7 22.5 33.7 32.5 37.4 22.0 27.8

Page 77

LAQM Annual Progress Report 2025 64
PUBLIC
DT ID
X OS Grid
Ref
(Easting)
Y OS Grid
Ref
(Northing)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Annual
Mean:
Raw
Data
Annual Mean:
Annualised
and Bias
Adjusted
(1.27)
Annual
Mean:
Distance
Corrected
to
Nearest
Exposure
Comment
Renfrew70 250599 667561 24.2 19.8 - - - - - - - - - - 22.0 -*  
Renfrew71 251729 666360 21.9 14.5 - - - - - - - - - - 18.2 -*  
Johnstone72 243080 663140 10.6 12.7 10.9 7.7 10.5 - 9.9 7.6 18.3 17.7 17.2 11.0 12.2 15.4  
Paisley73 248566 664072 17.6 15.8 8.5 5.8 12.0 8.5 12.7 10.6 19.5 19.6 17.0 17.8 13.8 17.4  
Paisley74 248313 663621 15.1 17.0 10.7 5.7 10.6 - 18.2 9.0 21.0 19.8 20.0 14.2 14.7 18.6  
Renfrew75 250853 667747 18.1 15.6 7.5 7.1 7.6 7.2 11.9 8.9 11.5 16.4 21.7 17.3 12.6 15.9  
Paisley78 248339 662576 20.2 12.5 - - - - - - - - - - 16.4 -*  
Paisley79 248632 664212 28.1 16.9 19.1 7.1 9.9 8.2 10.3 9.5 15.1 - 35.1 24.1 16.7 21.1  
Paisley80 249653 664123 23.4 13.7 - - - - - - - - - - 18.6 -*  
Paisley82 247513 664024 21.5 20.8 14.2 9.5 9.4 - - 26.1 17.9 - - 16.5 17.0 21.4  
Paisley83 247671 663913 19.7 16.0 8.9 6.6 9.0 9.0 13.3 11.7 17.9 21.2 28.5 17.8 15.0 18.9

Page 78

LAQM Annual Progress Report 2025 65
PUBLIC
DT ID
X OS Grid
Ref
(Easting)
Y OS Grid
Ref
(Northing)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Annual
Mean:
Raw
Data
Annual Mean:
Annualised
and Bias
Adjusted
(1.27)
Annual
Mean:
Distance
Corrected
to
Nearest
Exposure
Comment
Paisley84 251254 667876 16.0 8.2 5.2 3.8 7.7 6.6 8.0 8.7 11.9 15.7 18.3 13.2 10.3 13.0  
Johnstone85 242622 663306 21.1 12.5 16.2 5.2 14.5 6.0 13.5 10.5 18.3 22.9 25.1 12.6 14.9 18.8  
Johnstone86 242495 663358 19.3 12.1 12.9 8.7 21.9 5.5 13.0 8.7 23.5 21.1 27.9 16.9 16.0 20.2  
Paisley 89 248467 664303 17.2 14.8 - - - - - - - - - - 16.0 -*  
Renfrew90 (1) 250567 667558 15.7 15.8 11.5 7.4 19.4 10.8 15.4 12.8 19.4 20.2 30.9 18.4 - - 
Triplicate
Site with
Renfrew90
(1),
Renfrew90
(2) and
Renfrew90
(3) - Annual
data
provided for
Renfrew90
(3) only
Renfrew90 (2) 250567 667558 18.1 13.8 12.1 7.1 20.7 9.4 14.0 12.9 17.3 22.5 22.1 - - - 
Triplicate
Site with
Renfrew90
(1),
Renfrew90
(2) and
Renfrew90
(3) - Annual
data
provided for
Renfrew90
(3) only
Renfrew90 (3) 250567 667558 15.9 14.2 11.9 6.8 18.4 10.7 14.0 11.9 17.1 23.4 30.0 13.5 15.9 20.1 
Triplicate
Site with
Renfrew90
(1),
Renfrew90
(2) and
Renfrew90
(3) - Annual
data
provided for
Renfrew90
(3) only

Page 79

LAQM Annual Progress Report 2025 66
PUBLIC
DT ID
X OS Grid
Ref
(Easting)
Y OS Grid
Ref
(Northing)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Annual
Mean:
Raw
Data
Annual Mean:
Annualised
and Bias
Adjusted
(1.27)
Annual
Mean:
Distance
Corrected
to
Nearest
Exposure
Comment
Lochwin92 234904 658634 11.3 11.6 - - - - - - - - - - 11.5 -*  
Lochwin93 235280 658877 11.9 6.4 - - - - - - - - - - 9.2 -*  
Paisley94 248186 663925 14.9 10.2 9.5 5.1 - - - - - - - 7.5 9.4 10.5  
Paisley96 248998 665204 22.9 18.0 - - - - - - - - - - 20.5 -*  
Renfrew97 250610 667534 23.3 25.7 10.0 14.0 25.2 20.9 23.2 25.7 20.2 29.4 37.1 13.2 22.3 28.3  
Johnstone99 242584 663307 29.5 29.2 19.9 10.0 24.1 21.7 25.7 22.3 21.7 29.0 29.9 20.4 23.6 29.9  
Johnstone100 242643 663285 27.3 22.7 14.8 9.4 20.7 12.7 19.7 18.3 19.7 25.8 23.1 17.4 19.3 24.4  
Renfrew101 250656 667457 22.1 15.1 8.4 3.8 10.9 9.0 10.1 10.6 13.8 18.3 22.7 9.3 12.8 16.3  
Paisley102 248363 663752 24.9 10.6 7.1 5.2 9.8 6.2 9.9 11.2 7.8 17.8 30.2 17.4 13.2 16.7  
Paisley105 248425 664192 22.4 15.3 7.3 4.2 8.7 - 9.0 5.6 12.5 15.3 3.6 9.0 10.3 13.0  
Paisley106 248477 664189 19.5 13.8 28.6 16.5 12.2 6.6 9.0 13.2 14.9 14.5 24.5 15.2 15.7 19.9

Page 80

LAQM Annual Progress Report 2025 67
PUBLIC
DT ID
X OS Grid
Ref
(Easting)
Y OS Grid
Ref
(Northing)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Annual
Mean:
Raw
Data
Annual Mean:
Annualised
and Bias
Adjusted
(1.27)
Annual
Mean:
Distance
Corrected
to
Nearest
Exposure
Comment
Johnstone107 242503 663335 24.5 20.7 13.1 10.9 10.1 11.7 13.8 14.5 16.6 20.7 27.4 14.7 16.6 21.0  
Paisley108 248355 664180 13.6 13.4 - - - - - - - - - - 13.5 -*  
☒ All erroneous data has been removed from the NO2 diffusion tube dataset presented in Table B.1.
☒ Annualisation has been conducted where data capture is <75% and >25% in line with LAQM.TG22.
☒ Local bias adjustment factor used.
☐ National bias adjustment factor used.
☒ Where applicable, data has been distance corrected for relevant exposure in the final column.
☒ Renfrewshire Council confirm that all 2024 diffusion tube data has been uploaded to the Diffusion Tube Data Entry System.
Notes: 
* Annual mean results for these sites are invalid because only two months (January and February) were captured before the sites were decommissioned.
Exceedances of the NO2 annual mean objective of 40 µg/m3 are shown in bold.
NO2 annual means exceeding 60 µg/m3, indicating a potential exceedance of the NO2 1-hour mean objective are shown in bold and underlined.
See Appendix C for details on bias adjustment and annualization.

Page 81

LAQM Annual Progress Report 2025  68
PUBLIC 
Appendix C: Supporting Technical Information / Air
Quality Monitoring Data QA/QC
New or Changed Sources Identified Within Renfrewshire
Council During 2024
Renfrewshire Council has not identified any new sources relating to air quality within the
reporting year of 2024.
Additional Air Quality Works Undertaken by Renfrewshire
Council During 2024
Renfrewshire Council has not completed any additional works within the reporting year of
2024.
QA/QC of Diffusion Tube Monitoring
The diffusion tubes for the reporting year of 2024 were supplied and analysed by Glasgow
Scientific Services (GSS) using the 20% TEA in water preparation method. All results have
been bias adjusted and annualised (where required) before being presented in Error!
Reference source not found..
GSS is a UKAS accredited laboratory and participates in the AIR-PT Scheme (a
continuation of the Workplace Analysis Scheme for Proficiency (WASP)) for NO2 tube
analysis and the Annual Field Inter-Comparison Exercise. These provide strict
performance criteria for participating laboratories to meet, thereby ensuring NO2
concentrations reported are of a high calibre.
The latest AIR-PT results were as follows:
• AIR-PT AR049 (January – February 2022) – 100%
• AIR-PT AR050 (May – June 2022) – 100% 
• AIR-PT AR052 (July – August 2022) – 100% 
• AIR-PT AR053 (September – October 2022) – 100%

Page 82

LAQM Annual Progress Report 2025 69
PUBLIC
• AIR-PT AR055 (January 2023 – February 2023) – 100%
• AIR-PT AR056 (May – June 2023) – 100%
• AIR-PT AR058 (July – August 2023) – 100%
• AIR-PT AR059 (September – October 2023) – 100%
• AIR PT AR062 (January – February 2024) – 75%
• AIR PT AR063 (April – June 2024) – 100%
• AIR PT AR065 (July – August 2024) – 100%
• AIR PT AR066 (September – October 2024) – 100%
• AIR PT AR068 (January – February 2025) – 100% 
Diffusion Tube Annualisation
Two diffusion tube monitoring locations within Renfrewshire Council required annualisation
as their data capture was less than 75% but greater than 25%: Paisley82 and Paisley94,
details are provided in Table C.2. Eighteen diffusion tube monitoring locations recorded a
data capture below 25% and therefore could not be annualised: Paisley19, Paisley21,
Renfrew48, Renfrew52, Kilbarchan61, Paisley63, Kilbarchan65, Kilbarchan66,
Kilbarchan67, Renfrew70, Renfrew71, Paisley78, Paisley80, Pailsey89, Lochwin92,
Lochwin93, Paisley96 and Paisley108. These tubes were all decommissioned in March
2024. The remainder of the sites recorded a data capture greater than 75% and therefore
did not require annualisation.
Diffusion Tube Bias Adjustment Factors
Renfrewshire Council have applied a local bias adjustment factor of 1.27 to the 2024
monitoring data. A summary of bias adjustment factors used by Renfrewshire Council over
the past five years is presented in Table C.1.
The 2024 national bias adjustment factor was taken from the National Diffusion Tube Bias
Adjustment Factor Spreadsheet (version 04/25) which reports one study analysed by
Glasgow Scientific Services in 2024 to give a national bias adjustment factor of 0.82. 
Both automatic monitoring locations with co-located diffusion tubes recorded an overall
data capture of <90% in 2024. As per the Defra Diffusion Tube Data Processing Tool v5.3,
this is determined as ‘Poor Overall Data Capture’ and warns that the local bias adjustment
factor should be treated with caution. The data from the Cockel’s Loan automatic
monitoring site was disregarded in the local bias calculations because of its very low data

Page 83

LAQM Annual Progress Report 2025 70
PUBLIC
capture (65.2%). However the data from Renfrew Inchinnan Road was considered suitable
to use, this site alone gave a local bias adjustment factor of 1.27. Following the
LAQM.TG(22) guidance, the usual procedure would be to apply the national bias
adjustment factor of 0.82 to 2024 monitoring data. However, due to the large disparity
between the local and national factors, and because the overall data capture of the
Inchinnan Road automatic monitoring site was just 0.1% under the ‘Good Overall Data
Capture’ threshold, the same procedure as in the 2024 APR was adopted. 
Prior to the publication of the previous APR, the Scottish Environment Protection Agency
(SEPA) were contacted in order to provide additional guidance for which bias adjustment
factor would be best to use, as a similar issue occurred. SEPA recommended using the
local adjustment factor, as it was much larger than the national adjustment factor and was
considered to provide a more conservative, worst-case approach; this was consistent with
the Council’s previous years’ choice of bias adjustment factors. 
Bias adjustment was carried out using the Defra Diffusion Tube Data Processing Tool v5.3
(https://laqm.defra.gov.uk/air-quality/air-quality-assessment/diffusion-tube-data-
processing-tool/).
Table C.1 – Bias Adjustment Factor
Year Local or National If National, Version of National
Spreadsheet Adjustment Factor
2024 Local - 1.27
2023 Local - 1.31
2022 Local - 1.06
2021 National 03/22 1.12
2020 Local - 1.20 
NO2 Fall-off with Distance from the Road
No diffusion tube NO2 monitoring locations within Renfrewshire Council required distance
correction during 2024.

Page 84

LAQM Annual Progress Report 2025 71
PUBLIC
QA/QC of Automatic Monitoring
Automatic monitoring of NOX, PM10 and PM2.5 is completed within Renfrewshire using
Chemiluminescence (NOX) and FIDAS 2000 (PM2.5 and PM10) analysers. Local Site
Operator (LSO) duties are carried out by an Officer from Renfrewshire Council on a
monthly basis. Automatic monitoring data is available on the Scottish Air Quality website
(https://www.scottishairquality.scot/) both in real-time and following ratification by Ricardo
Energy and Environment to AURN standards. The continuous monitoring sites are audited
every six monthly by Ricardo and are serviced every six months by ACOEM who maintain
the Service and Maintenance Contract. REN1 and REN03 NO2/NOx monitors are visited
and calibrated once a month by an LSO from Renfrewshire Council and reports from these
calibrations are sent to Ricardo to use in the QA/QC process.
PM10 and PM2.5 Monitoring Adjustment
PM10 and PM2.5 data have been corrected in line with the Scottish Government Guidance
Note in relation to the measurement of ambient Particulate Matter (PM) and the LAQM
reporting of measured concentrations, issued in May 2023. PM10 data have been
corrected by dividing the ratified data by 0.909. PM2.5 data have been corrected by
multiplying the ratified data by 1.06. Both the corrected and uncorrected values have been
reported for completeness, as per the Scottish Government Guidance Note.
Automatic Monitoring Annualisation
One automatic monitoring location within Renfrewshire Council required annualisation as
its data capture was less than 75% but greater than 25%: Ren1- Cockels Loan, details are
provided in Table C.2. 
NO2 Fall-off with Distance from the Road
No automatic NO2 monitoring locations within Renfrewshire Council required distance
correction during 2024.

Page 85

LAQM Annual Progress Report 2025  72
PUBLIC
Table C.2 – Automatic and Non-Automatic Annualisation Summary (concentrations presented in µg/m3)
Site ID
Annualisation
Factor Glasgow
Townhead
Annualisation
Factor Falkirk
Grangemouth
MC
Annualisation
Factor
Annualisation
Factor
Average
Annualisation
Factor
Raw Data
Annual Mean
Annualised
Annual Mean Comments
Ren1 1.024 1.058 - - 1.041 16.8 17.5 
Paisley82 0.9891 1.0053  - -  0.9972 17.0 16.9  
Paisley94 0.8437 0.9059  -  - 0.8748 9.4 8.3  
Table C.3 – Local Bias Adjustment Calculations 
Local Bias Adjustment
Input 1 Inchinnan Road
Local Bias Adjustment
Input 2 Renfrew
Cockels Loan
Local Bias Adjustment
Input 3
Local Bias Adjustment
Input 4
Local Bias Adjustment
Input 5
Periods used to
calculate bias 10 4   
Bias Factor A 1.27 (1.01 – 1.69) 0.83 (0.72 – 0.98)   
Bias Factor B -21% (-41% - -1%) 21% (2% - 39%)   
Diffusion Tube Mean
(µg/m3) 14.7 21.8   
Mean CV (Precision) 6.0% 6.5%   
Automatic Mean
(µg/m3) 18.6 18.1   
Data Capture 97% 100%   
Adjusted Tube Mean
(µg/m3) 19 (15 – 25) 18 (16 – 21)   
Notes:
Local bias adjustment input 2 (Renfrew Cockels Loan) has been disregarded due to a very poor diffusion tube data capture (65.2%) so a
single local bias adjustment factor (Inchinnan Road) has been used to bias adjust the 2024 diffusion tube results. The data capture was
also ‘poor’ (<90%) for Inchinnan Road but was still deemed representative. The data capture for Inchinnan Road was 89.9%.

Page 86

LAQM Annual Progress Report 2025  73
PUBLIC
Glossary of Terms
Abbreviation Description
AMIDS Advanced Manufacturing Innovation District Scotland South
APR Annual Progress Report
AQA Air Quality Assessment
AQAP
Air Quality Action Plan - A detailed description of measures,
outcomes, achievement dates and implementation methods,
showing how the LA intends to achieve air quality limit values’
AQMA
Air Quality Management Area – An area where air pollutant
concentrations exceed / are likely to exceed the relevant air
quality objectives. AQMAs are declared for specific pollutants
and objectives
AQO Air Quality Objective
AURN Automatic Urban and Rural Network (UK air quality monitoring
network)
CWRR Clyde Waterfront & Renfrew Riverside
DEFRA Department for Environment, Food and Rural Affairs
DMRB Design Manual for Roads and Bridges – Air quality screening
tool produced by Highways England
DT Diffusion Tube
EV Electric Vehicle
FDMS Filter Dynamics Measurement System
GAIA Glasgow Airport Investment Area
GSS Glasgow Scientific Services
HGV Heavy Goods Vehicle
JHS Johnstone High Street
LA Local Authority
LAQM Local Air Quality Management
LDP Local Development Plan

Page 87

LAQM Annual Progress Report 2025 74
PUBLIC
LHEEDP Local Heat and Energy Efficiency Delivery Plan
LHEES Local Heat and Energy Efficiency Strategy
LSO Local Site Operator
LTS Local Transport Strategy
NO2 Nitrogen Dioxide
NOX Nitrogen Oxides
PM10
Airborne particulate matter with an aerodynamic diameter of
10µm (micrometres or microns) or less
PM2.5
Airborne particulate matter with an aerodynamic diameter of
2.5µm or less
PTC Paisley Town Centre
QA/QC Quality Assurance and Quality Control
REN1 Renfrew Cockels Loan
REN02 Renfrewshire Johnstone
REN03 Renfrew Inchinnan Road
RTC Renfrew Town Centre
SEPA Scottish Environment Protection Agency
SFT Scottish Futures Trust
SO2 Sulphur Dioxide
SPT Strathclyde Partnership for Transport
TEA Triethanolamine
UTC Urban Traffic Control
VRP Vehicle Replacement Programme
WASP Workplace Analysis Scheme for Proficiency

Page 88

LAQM Annual Progress Report 2025  75
PUBLIC
References
Air Quality in Scotland website (2024 Monitoring data), available at
http://www.scottishairquality.co.uk/ 
AIR-PT-Rounds 49 to 68 (January 2022 to February 2025) available at
https://laqm.defra.gov.uk/diffusion-tubes/qa-qc-framework/ 
AMIDS South - https://www.renfrewshire.gov.uk/article/13472/Advanced-Manufacturing-
Innovation-District-Scotland-AMIDS-South-Compulsory-Purchase-Order-2023
Defra LAQM helpdesk – https://laqm.defra.gov.uk/ 
Diffusion Tube Data Processing Tool v5.3 available at https://laqm.defra.gov.uk/air-
quality/air-quality-assessment/diffusion-tube-data-processing-tool/
Local Air Quality Management Policy Guidance LAQM.PG(S)23. April 2023. Published by
the Scottish Government. 
Local Air Quality Management Technical Guidance LAQM.TG(22). August 2022.
Published by Defra in partnership with the Scottish Government, Welsh Assembly
Government and Department of the Environment Northern Ireland. 
National Diffusion Tube Bias Adjustment Factor Spreadsheet version 04/25 available at
https://laqm.defra.gov.uk/air-quality/air-quality-assessment/national-bias/
Renfrewshire Air Quality Action Plan 2019. 
Renfrewshire Air Quality Action Plan 2024
Renfrewshire Council (2020-2024) Annual Progress Reports. 
Scottish Government Guidance Note (May 2023) available at
https://www.scottishairquality.scot/sites/default/files/publications/2023-
05/Scottish_Government_Guidance_Note_LAQM_Reporting_of_Scottish_PM_data_v0.1.
pdf