Democracy Spraffa

Local Transport Strategy - Travel Renfrewshire 2035 - FULL REPORT

Renfrewshire Council · 5 November 2025
Back to Infrastructure, Land and Environment Policy Board — 5 November 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

PUBLIC 
___________________________________________________________________ 
To:  Infrastructure, Land and Environment Policy Board 
On:  5 November 2025
___________________________________________________________________ 
Report by: Director of Environment, Housing and Infrastructure
___________________________________________________________________ 
Heading: Local Transport Strategy – Travel Renfrewshire 2035
___________________________________________________________________ 
1. Summary 
1.1 The role of our transport network in the movement of goods and people
means that it and our Local Transport Strategy (LTS) are integral to the
Council’s ability to deliver services for the communities and businesses
across Renfrewshire. 
1.2 The LTS provides the Council with a coherent strategic direction that aligns
both with wider local policy and regional and national strategies. It details how
we intend to meet local challenges and objectives and deliver on regional and
national objectives at a local level. It acts as an evidence-based framework to
guide decision-making and infrastructure investment. 
1.3 This report provides the Board with an update on the development of the new
LTS and presents for approval, its adoption and publication. 
1.4 The Action Plan at Appendix A of this report sets out the high level actions
that will be considered for progression over the lifetime of this plan. The action
plan is rightly ambitious and aims to deliver significant improvements to the
transport landscape within Renfrewshire with the combined funding
requirements to deliver the Action Plan likely to be in excess of £50million
over the lifetime of this LTS.

Page 2

PUBLIC
1.5 Delivery of the actions contained within the Action Plan is not for the Council
to do on its own and will require a multi organisation approach and as such
the funding to deliver the actions will also require to come from external as
well as internal sources. 
___________________________________________________________________ 
2. Recommendations 
It is recommended that the Infrastructure, Land and Environment Policy Board: 
2.1 Approves the adoption of the new Renfrewshire Council Local Transport
Strategy 2025-2035, its Action Plan and all supporting documents as set out
in the Appendices. 
2.2 Approves the publication of the new Renfrewshire Council Local Transport
Stra 2025-2035, its Action Plan and all supporting documents as set out in
Appendix A and attached links. 
2.3 Notes that the LTS Action Plan as set out in Appendix A will be used as the
basis for the development of future years’ funding bids and programming.
_________________________________________________________ 
3. Background 
2025 Policy Context 
3.1 There have been significant changes to the policy context since the LTS was
last refreshed in 2017, including publication of NTS2 in 2020, and publication
of SPT’s updated RTS in 2024. Both documents reflect a shift in policy at the
national and regional level, in particular to address climate change, with a
Climate Emergency declared by the Scottish Government in 2019 (Scotland’s
Response to The Global Climate Emergency). 
3.2 NTS2 embeds the principles of the Sustainable Travel Hierarchy (STH) and
Sustainable Investment Hierarchy (SIH). The former prioritises measures
which reduce the need to travel unsustainably, ahead of new infrastructure.
The latter prioritises active travel modes (walking, wheeling, cycling) above
less sustainable modes, with single occupancy car journeys being lowest
priority.

Page 3

PUBLIC
3.3 At a local level, Renfrewshire's Plan for Net Zero sets out how the area will
work towards net zero by 2030. Renfrewshire’s Local Development Plan 3
(LDP3) which takes cognisance of the National Planning Framework 4 (NPF4)
is currently under preparation. LDP3 will replace the current LDP2, published
in 2021. The LDP sets out the spatial strategy and proposals for Renfrewshire
over the 10-year period 2028 -2038. 
LTS Process 
3.4 Whilst there is no statutory requirement for a local authority to have an LTS in
place, it provides the Council with a coherent strategic direction and evidence
base, which in turn enable the development of the case for investment for
schemes emerging from the LTS and its Action Plan. 
3.5 Development of this strategy has been informed by Local Transport Strategy
Guidance and has also followed the principles of Scottish Transport Appraisal
Guidance (STAG). Development of the strategy has involved a robust process
to make sure the Action Plan reflects the needs of the area. Central to this
has been public consultation and stakeholder engagement. 
3.6 Preparation of the LTS commenced in October 2023 with the appointment of
transport consultants AECOM. Baseline key trends and issues were identified
through February 2024, followed by Phase 1 engagement activities through
Spring / Summer 2024. During this engagement phase, input was sought on
perceived problems, issues, opportunities and constraints, as well as potential
future options. 
3.7 Engagement with statutory environmental stakeholders took place in Summer
2024, with outcomes of all activities informing the development of the Draft
LTS, Action Plan and supporting documents in January 2025. Phase 2
engagement activities, centring on the Draft LTS, Action Plan and supporting
documents took place in Summer 2025.

Page 4

PUBLIC
3.8 Supporting documents are made up of a Strategic Environmental Assessment
(SEA) Environmental Report, Integrated Impact Assessment (IIA) and Main
Issues Report. The SEA Environmental Report captures an appraisal of the
LTS and the relative sustainability merits of reasonable alternative
approaches to the proposals. The IIA takes cognisance of the Equality Act
2010 and captures an Equality Impact Assessment, Child Rights and
Wellbeing Impact Assessment, Fairer Scotland Duty Assessment and Health
Inequalities Impact Assessment in one document. Lastly, the Main Issues
Report captures background work undertaken to inform the LTS development,
including a policy review, an analysis of transport, travel, socio-economic and
socio-demographic data and a summary of problems and opportunities
identified. 
Outcomes 
3.9 The Vision for the new LTS is for “Renfrewshire to be an attractive place to
live, work and visit, with walking, wheeling and cycling and public transport
opportunities that are inclusive, affordable, integrated and safe to use; and a
transport system which supports net zero targets, inclusive economic growth
and the health and wellbeing of all”. 
3.10 This Vision statement is supported by the following five priorities: 
 Equality and Accessibility
 Net Zero Emissions
 Inclusive Economic Growth
 Safety and Security
 Resilience and Maintenance 
3.11 Six Objectives articulate the change being sought by the LTS and form part of
the criteria against which actions will be monitored and evaluated in future
years. These are: 
 Support fair and equitable access to sustainable modes of transport in
Renfrewshire, that is integrated and easy to use for all
 Support the continued reduction in harmful transport emissions across
Renfrewshire 
 Increase the proportion of trips undertaken by walking, wheeling and
cycling and public transport for everyday journeys
 Improve transport connections within Renfrewshire and to neighbouring
local authorities to support inclusive economic growth
 Improve the safety of Renfrewshire's transport network through meeting
Scottish Government casualty reduction targets

Page 5

PUBLIC
 Provide a secure, resilient and well-maintained transport network that
meets the needs of users 
3.12 In addition to their alignment to national, regional and local policy objectives,
the LTS objectives are developed to address the problems and opportunities
identified. 
3.13 A long list of options was developed, primarily informed by stakeholder and
public consultation findings and supplemented by Renfrewshire Council
Elected Member and officer input and options identified in existing strategy /
policy documents (including the 2017 LTS). From this, eight themes were
identified as below: 
 Active Travel
 Behaviour Change
 Public Transport and Shared Mobility
 Road Safety
 Parking
 Road Network and Freight
 Environment
 Digital Technology 
3.14 Each theme informed the development of a short list of options. A high-level
appraisal of these options was then undertaken. Options were appraised
against: LTS objectives; STAG criteria (Environment; Climate Change; Health,
Safety and Wellbeing; Economy; and Equality and Accessibility); and
Deliverability criteria (risks associated with Feasibility, Affordability and Public
Acceptability). 
3.15 Following the appraisal process, some options were sifted out; this included
options related to new rail stations and rail lines, which were not retained
owing to high feasibility and affordability risks. Options retained following the
appraisal form the basis of the Action Plans as shown in Appendix A. 
3.16 Some actions will require further work to understand their impact, including
their feasibility from an operational and technical perspective and costs
associated with actions. The outcomes of this additional work, which will sit
outside of the LTS, will inform which actions are delivered. 
3.17 Renfrewshire Council’s priorities for implementation relate primarily to
measures and initiatives which promote safety, those which are required to
maintain the existing transport network to at least its present standard, and
those that promote sustainable transport and contribute to reducing
emissions.

Page 6

PUBLIC 
3.18 The Council will seek, wherever possible, to make best use of existing
infrastructure and encourage travel and access by sustainable means, in line
with the Sustainable Travel Hierarchy and the Sustainable Investment
Hierarchy. 
3.19 The full document ‘Travel Renfrewshire 2035 (Renfrewshire Council Local
Transport Strategy 2025-2035)’ and the supporting documents are provided at
this link: 
https://www1.renfrewshire.gov.uk/localtransportstrategy  
___________________________________________________________________

Page 7

PUBLIC
Appendix A Travel Renfrewshire 2035 Action Plan
Active Travel Actions
Ref. Action Delivery Partners Potential
Funding
Partners
Timescale
AT1 Design and extend the cycle path network across Renfrewshire to be
safe and accessible, in line with locations identified in the Proposed
Active Travel Network Map
Renfrewshire Council;
Sustrans; SPT
Transport
Scotland
10 years +
AT2 Work with Sustrans to implement and adopt lighting across the off-
road active travel network
Renfrewshire Council,
Sustrans
Sustrans  10 years +
AT3 Work with SPT to deliver regional and longer distance cycling
connections set out within the Regional Active Travel Strategy
Renfrewshire Council,
Sustrans, SPT,
Neighbouring Local
Authorities
Transport
Scotland
10 years +
AT4 Prioritise pedestrian safety through a review of crossing facilities on
the local road network at locations identified in the Annual Accident
Assessment and through working with local communities
Renfrewshire Council  5 to 10 years
AT5 Review cycle safety and priority at junctions, including review of on-
road infrastructure and measures for implementation of early release
signals for cyclists at locations identified in the Annual Accident
Assessment and through working with local communities
Renfrewshire Council  5 to 10 years
AT6 Create a Maintenance Plan for the active travel network, including
adoption, prioritisation and maintenance of active travel paths across
Renfrewshire, including winter maintenance and removal of
vegetation
Renfrewshire Council  0 to 5 years
AT7 Undertake a signage review and implement a signage and wayfinding
strategy to support more local journeys by walking, wheeling and
cycling
Renfrewshire Council,
Sustrans
Transport
Scotland
0 to 5 years
AT8 Review feasibility and implement the expansion of cycle training into
secondary schools and / or adult cycle training through local
providers
Renfrewshire Council, SPT,
Third Sector Active Travel
Delivery Partners
SPT 5 to 10 years
AT9 Build a monitoring and evaluation framework for the active travel
actions of the LTS in order to collect relevant baseline data and
effectively monitor progress
Renfrewshire Council  0 to 5 years

Page 8

PUBLIC
AT10 Increase the number of secure cycle parking spaces, with a focus on
locations serving local communities identified in the Proposed Active
Travel Network Map
Renfrewshire Council, SPT,
Third Sector Active Travel
Delivery Partners
SPT  5 to 10 years
AT11 Support access to bikes by working with SPT to investigate potential
for delivery of a partial / fully regional public bike hire scheme
(including e-bikes) that is available at locations which would be
served by the Proposed Active Travel Network
Renfrewshire Council, SPT,
Public/Private sectors,
Other Local Authorities
SPT 0 to 5 years
AT12 Undertake a feasibility study to create a public charging network for
electric bikes in Renfrewshire, potentially linked to Mobility Hubs
Renfrewshire Council  0 to 5 years
AT13 Support measures to make it easier for the last mile of small goods
deliveries to be undertaken by sustainable modes, such as by cargo
bikes
Renfrewshire Council,
Freight and logistics
operators 
5 to 10 years 
Behaviour Change Actions
Ref. Action Delivery Partners Potential
Funding
Partners
Timescale
B1 Provide support to parents and carers to apply for young persons'
concessionary travel entitlement card
Renfrewshire Council, SPT  5 to 10 years
B2 Work with schools on Behaviour Change initiatives with local partners Renfrewshire Council,
School Communities, SPT,
Third Sector Active Travel
Delivery Partners 
0 to 5 years
B3 Provide more opportunities for pupils leaving primary school across
Renfrewshire to receive Bikeability Levels 1 and 2 cycle training as a
minimum
Renfrewshire Council, SPT,
Cycling Scotland, Third
Sector Active Travel
Delivery Partners 
5 to 10 years

Page 9

PUBLIC
B4 Continue discussions on sustainable transport solutions and engage
with employers to promote Cycling Scotland's Adult Cycle Training,
including with employers at:
• Advanced Manufacturing Innovation District Scotland
(AMIDS)
• Inchinnan Business Park
• Westway Park
• Hillington Industrial Estate
• Braehead Retail Park
Renfrewshire Council,
Cycling Scotland, Health
Board, Employers 
0 to 5 years
B5 Encourage employers and schools to implement Travel Plans to
support a shift to sustainable travel modes
Renfrewshire Council, SPT,
Employers, Developers,
School Communities 
0 to 5 years
B6 Renfrewshire Council to update its staff Travel Plan  Renfrewshire Council  0 to 5 years
B7 Review Behaviour Change programmes currently delivered in
Renfrewshire and provide targeted, strategic support to organisations
delivering Behaviour Change within Renfrewshire through external
funding sources
Renfrewshire Council, SPT,
Health Board, Third Sector
Active Travel Delivery
Partners
Transport
Scotland
0 to 5 years 
Public Transport and Shared Mobility Actions
Ref. Action Delivery Partners Potential
Funding
Partners
Timescale
PS1 Working with partners; enhance facilities at transport hubs such as
Paisley Gilmour Street Station to improve safety, security and
dissemination of information for all users
Renfrewshire Council, SPT,
ScotRail
Network Rail 0 to 5 years
PS2 Working with SPT and operators; make buses, trains and taxis
accessible and easier for all to use, including through reducing
physical accessibility barriers and improving the accessibility of travel
information
Renfrewshire Council, SPT,
Public Transport operators
SPT, Bus
Operators
0 to 5 years
PS3 Working with SPT and operators; support measures to improve
integrated ticketing across public transport modes and operators,
including exploration of a daily price cap
Renfrewshire Council, SPT,
Public Transport operators 
0 to 5 years
PS4 Working with partners; explore opportunities to increase the
frequency and improve reliability of bus services across Renfrewshire
Renfrewshire Council, SPT,
Bus operators 
5 to 10 years

Page 10

PUBLIC
PS5 Working with Transport Scotland, ScotRail and Network Rail; improve
accessibility at all rail stations, including ramp access on all platforms
and between platforms (as applicable), including at Lochwinnoch
station
Renfrewshire Council,
Network Rail, ScotRail
Transport
Scotland, SPT
0 to 5 years
PS6 Working with partners; explore opportunities to expand network
coverage of bus services in rural areas of Renfrewshire and between
areas of deprivation and employment such as AMIDS
Renfrewshire Council, SPT,
Bus operators 
0 to 5 years
PS7 Renfrewshire Council to work with SPT, Glasgow City Council and
other partners to support development of Clyde Metro, and
Renfrewshire Council to continue advocating for options to provide a
fixed link to Glasgow Airport and AMIDS
Renfrewshire Council, SPT,
Glasgow City Council,
Other delivery partners as
relevant
Transport
Scotland
0 to 5 years
PS8 Working with partners in the short term; explore options to provide a
direct and frequent public transport service from Paisley Gilmour
Street Station to Glasgow Airport and AMIDS
Renfrewshire Council, SPT,
Bus operators, Glasgow
Airport 
0 to 5 years
PS9 Support development of the bus network through provision of bus
priority lanes on key corridors and bus priority at signalised junctions
including at:
• Glasgow Road
• Renfrew Road
• Neilston Road
Renfrewshire Council,
Glasgow City Council, SPT
Transport
Scotland
5 to 10 years
PS10 Support provision of existing and new Community Transport and
Demand Responsive Transport, with a focus on rural areas and
access to health and providing transport that is fully accessible
Renfrewshire Council, SPT,
Community Transport and
Demand Responsive
Transport operators 
5 to 10 years

Page 11

PUBLIC
PS11 Investigate the implementation of Community Bus Hubs, to enable
community operated services to connect with commercial bus routes
Renfrewshire Council, SPT  0 to 5 years
PS12 Working with SPT; continue to implement a programme of bus stop
improvements, including to provide high kerb access at bus stops in
town and village centres and in neighbourhood locations as
appropriate
Renfrewshire Council, SPT  5 to 10 years
PS13 Support SPT to establish local bus franchising within Renfrewshire
and across the Strathclyde region
Renfrewshire Council, SPT  5 to 10 years
PS14 Support measures to make public transport affordable for all,
including through actions identified in Transport Scotland’s Fair Fares
Review, where relevant
Renfrewshire Council, SPT,
Public Transport operators
Transport
Scotland
5 to 10 years
PS15 Support the expansion of car club schemes across Renfrewshire,
including clubs with electric vehicles  
Renfrewshire Council,
LEAP, Other car club
providers 
5 to 10 years
PS16 Work with partners to explore the potential for Mobility Hubs across
Renfrewshire, with a focus on existing transport hubs and town centre
locations such as Paisley Gilmour Street and Piazza Shopping
Centre  
Renfrewshire Council, SPT,
Other delivery partners as
relevant
Transport
Scotland
0 to 5 years 
Road Safety Actions
Ref. Action Delivery Partners Potential
Funding
Partners
Timescale
RS1 Work with Transport Scotland to introduce 20 mph speed limits on
urban residential streets
Renfrewshire Council Transport
Scotland
5 to 10 years
RS2 Implement measures to reduce congestion outside school gates,
including consideration of short-term parking restrictions and work
with schools and local communities to develop measures
Renfrewshire Council,
School Communities 
0 to 5 years
RS3 Implement traffic calming measures and other road safety
interventions on local roads, where considered appropriate, following
assessment as defined by Renfrewshire's Road Safety Policy
Renfrewshire Council  5 to 10 years
RS4 Partner with Police Scotland on priorities for enforcement and
improve collaboration on road safety matters
Renfrewshire Council,
Transport Scotland, Police
Scotland 
5 to 10 years

Page 12

PUBLIC
RS5 Seek collaboration with secondary schools to promote road safety Renfrewshire Council,
School Communities 
5 to 10 years
RS6 Undertake Annual Accident Assessments to identify locations for
targeted road safety improvements
Renfrewshire Council  0 to 5 years 
Parking Actions
Ref. Action Delivery Partners Potential
Funding
Partners
Timescale
P1 Explore options to manage parking capacity issues, including at
Johnstone Rail Station, and the need for Park and Ride / mobility hub
provision where there is currently none, including at Milliken Park Rail
Station, and to serve towns and villages which do not have their own
railway station
Renfrewshire Council, SPT,
ScotRail, Network Rail
Transport
Scotland
0 to 5 years
P2 Support the private sector expansion of the publicly available electric
vehicle charging network
Renfrewshire Council,
Private sector 
5 to 10 years
P3 Increase the number of disabled parking spaces in proximity to major
trip attractors
Renfrewshire Council  0 to 5 years
P4 Implement pavement parking exemptions and enforce the national
pavement parking ban, including the offences of double parking and
parking across pedestrian dropped kerbs
Renfrewshire Council  5 to 10 years
P5 Investigate the potential for a workplace parking license and / or local
road user charging to be implemented in Renfrewshire
Renfrewshire Council Transport
Scotland
0 to 5 years

Page 13

PUBLIC
Road Network and Freight Actions
Ref. Action Delivery Partners Potential
Funding
Partners
Timescale
RNF1 Renfrewshire Council to explore the feasibility of road improvements,
including:
• Alignment / junction improvements at Arkleston Road
staggered junction 
• Seedhill Road / Hawkhead Road mini-roundabout 
• Strengthening Penilee Road Railbridge
Renfrewshire Council,
Network Rail
Transport
Scotland
0 to 5 years
RNF2 Renfrewshire Council to progress with the construction of new road
links, including at AMIDS South link road from Inchinnan Road to
Renfrew Road and Harbour Road
Renfrewshire Council Transport
Scotland
0 to 5 years
RNF3 Undertake an assessment of the road safety and environmental
effects of HGV routing through Renfrewshire’s urban road network
Renfrewshire Council,
Freight Operators,
Stakeholders 
10 years+
RNF4 Encourage developers to consider rail as an alternative to road for
moving freight, including considering the feasibility of allowing loads
heavier than the maximum gross weight for heavy goods vehicles to
use the Burnbrae Drive approach to Elderslie Railhead
Renfrewshire Council,
Transport Scotland,
Network Rail, Freight
Operators 
10 years+ 
Environment Actions
Ref. Action Delivery Partners Potential
Funding
Partners
Timescale
ENV1 Continue to monitor air quality at existing automatic monitoring
stations within Paisley, Johnstone and Renfrew
Renfrewshire Council  5 to 10 years
ENV2 Expand the decarbonisation of Renfrewshire Council’s vehicle fleet Renfrewshire Council    5 to 10 years
ENV3 Design and implement climate change adaptation and resilience
measures to strengthen and protect the transport network from
weather related events
Renfrewshire Council;
Transport Scotland;
Network Rail; ScotRail 
5 to 10 years

Page 14

PUBLIC
Digital Technology Actions
Ref. Action Delivery Partners Potential
Funding
Partners
Timescale
DT1 Working with SPT through wider processes, including Clyde Metro
and Strathclyde Regional Bus Strategy, consider opportunities to
support the development and delivery of improved integrated journey
planning app(s) that includes booking and payment functions
Renfrewshire Council, SPT  5 to 10 years
DT2 Working with SPT; continue implementation of the remaining
elements of a programme to provide Real Time Passenger
Information at bus stops on the busiest corridors and village centre
locations across Renfrewshire
Renfrewshire Council; SPT  5 to 10 years
DT3 Undertake a study to expand the UTC traffic signal network across
Renfrewshire, expanding adaptive control and bus priority at
signalised junctions on bus routes, where identified as necessary
Renfrewshire Council, SPT  0 to 5 years
DT4 Work with partners to add connections to the existing fibre network as
and when new council building development dictates, to continue to
improve digital connectivity across Renfrewshire and thus reduce the
need to travel
Renfrewshire Council;
Digital delivery partners 
5 to 10 years

Page 15

PUBLIC 
Implications of the Report 
1. Financial – Funding for LTS actions will be sought from Council and external
sources as appropriate. 
2. HR & Organisational Development – None 
3. Community/Council Planning –  
• A successful Local Transport Strategy has a positive impact across all
areas of Community and Council planning with the delivery of safe,
affordable, accessible and inclusive transport systems to support access
to employment, leisure and retail. 
Refer to the Integrated Impact Assessment which supports the Local
Transport Strategy. 
4. Legal – legal advice for LTS actions will be sought at the time, as appropriate. 
5. Property/Assets - the impact of LTS actions on the assets of the Council in
terms of the Council’s corporate asset strategy will be defined at the time. 
6. Information Technology – None. 
7. Equality & Human Rights - 
(b) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights.  Some negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report.  Mitigating actions are detailed in the supporting
Integrated Impact Assessment.  A full copy of the Equality Impact
Assessment undertaken is available at this link
https://www1.renfrewshire.gov.uk/localtransportstrategy 
The results of the assessment are published on the Council’s website. 
8. Health & Safety – LTS policies and actions are designed to reduce road
accidents. 
9. Procurement – Statutory procurement procedures will be used for LTS
policies and actions will be used to ensure that the Council meets its statutory
requirements.
10. Risk - Risks will be  identified in relation to specific LTS policies and actions
at the time of implementation. 
11. Privacy Impact – None.

Page 16

PUBLIC
12. Climate Risk – LTS policies and actions are designed to mitigate climate risk
associated with transport. 
13. Children’s Rights – The LTS does not have any significant negative impact
on children and young people. The LTS has taken into account the needs and
rights of children and young people. 
The LTS promotes a number of children’s rights under the United Nations
Convention on the Rights of the Child (UNCRC) including Article 2 (no
discrimination), Article 3 (best interests of children), Article 4 (making rights
real) and Article 31 (rest, play, culture, arts).  Further reference is made to
specific articles under the UNCRC where the LTS actions are assessed as
having an impact on children’s rights. 
Full details are contained in the supporting Integrated Impact Assessment at
this link https://www1.renfrewshire.gov.uk/localtransportstrategy. 
14. Cosla Policy Position – N/A.
___________________________________________________________________ 
Author:          Andrew Diansangu, Lead Officer, Traffic and Road Safety
Email: andrew.diansangu@Renfrewshire.gov.uk

Page 17

1
PUBLIC 
Travel Renfrewshire 2035 
Renfrewshire Council Local Transport
Strategy 2025-2035

Page 18

Renfrewshire Local Transport Strategy 2025-2035   2
PUBLIC
Table of Contents
Glossary of Terms ......................................................................................... 4
Acronyms ...................................................................................................... 7
1. Introduction ....................................................................................... 9
2. Policy Context .................................................................................. 13
3. Data, Transport and Travel Context................................................. 17
4. Engagement and Consultation ........................................................ 27
5. Problems and Opportunities ........................................................... 28
6. LTS Vision, Priorities and Objectives................................................ 31
7. Roles and Responsibilities ............................................................... 36
8. Development of Actions and Appraisal ........................................... 45
9. Active Travel ..................................................................................... 49
10. Behaviour Change............................................................................ 59
11. Public Transport and Shared Mobility ............................................. 65
12. Road Safety ...................................................................................... 76
13. Parking ............................................................................................. 82
14. Road Network and Freight ............................................................... 88
15. Environment .................................................................................... 94

Page 19

Renfrewshire Local Transport Strategy 2025-2035   3
PUBLIC
16. Digital Technology ......................................................................... 100
17. Monitoring and Evaluation ............................................................ 104
18. Interdependencies, Funding and Priorities ................................... 111

Page 20

Renfrewshire Local Transport Strategy 2025-2035   4
PUBLIC
Glossary of Terms
Active Travel - Active travel relates to making journeys by physically active means,
including walking, cycling, using a wheelchair, skateboarding or scooting.
Bus Priority Lane - Provision of dedicated road space for buses to reduce journey times
and improve service reliability. The aim of bus priority lanes is to encourage people to
change from cars to buses and thus reduce traffic congestion.
Cargo Bike - A cargo bike is a bicycle designed for transporting goods or heavy loads. Cargo
bikes may be used in a cycle logistics network and may also be used by individuals to
move personal goods and people, for example, food shopping and taking children to
school.
Community Transport - Community transport are community-led transport solutions
developed in response to unmet local transport needs, and often represent the only
means of transport for many vulnerable and isolated people, often older people or people
with disabilities. Most are demand responsive, taking people from door to door, but a
growing number are scheduled services along fixed routes where conventional bus
services are not available.
Demand Responsive Transport (DRT) - Any programme or scheme that offers
individualised passenger service based on passenger locations and particular needs. 
Common examples include Dial-a-Bus, Ring-and-Ride and Dial-a-Taxi.
E-bike - An E-bike is a motorised bicycle with an integrated electric motor used to assist the
rider and help move the bike forward. Also known as e-bike, electric bike or electric bicycle.
Junior Road Safety Officer Scheme - Road safety initiative encouraging pupils to take
responsibility for promoting road safety within their school.  The scheme is aimed at P6
and P7 pupils.
Light Goods Vehicle - A Light Goods Vehicle (LGV) is a commercial motor vehicle, such as a
van, with a total gross weight of 3,500kg or less. The main purpose of a goods vehicle is for
the carriage and transportation of commercial goods.
Local Development Plan - Document prepared and adopted by the Planning Authority to
detail policies and proposals for the future development of land use in the area.
National Cycle Network - A strategic network of cycle routes throughout the UK.

Page 21

Renfrewshire Local Transport Strategy 2025-2035   5
PUBLIC
Peak Period - Peak period refers to times of the day when there is the heaviest demand on
the transport network, often in the mornings and after work in the early evenings.  
Real-Time Passenger Information - A method of giving passengers information on live
times when their public transport service is due to arrive. 
Road User Charging - A system of charging drivers a fee for the use of a defined length of
road.
Shared Transport / Shared Mobility - Transport services and resources that are shared
among users, either at the same time or one after another. Shared modes of transport
include car clubs and other forms of car sharing; bike share schemes; trip sharing and on
demand bus or demand-responsive transport (DRT).
Strathclyde Partnership for Transport (SPT) - The statutory regional transport partnership
for the West of Scotland.
Sustainable Transport - Transport modes that are low or zero emission, including walking,
wheeling, cycling and public transport. 
Traffic Regulation Order (TRO) - Legislation which allows restrictions to be placed on roads
and car parks specifying places and times when vehicles can / cannot park, wait, load and
unload.  Can also be used to restrict vehicle movements, manoeuvres at junctions,
introduce one-way streets and implement speed restrictions.
Transport Scotland - The national transport agency for Scotland.
Travel Plan - A package of measures and initiatives that aim to reduce the number of car
journeys made, by encouraging the use of sustainable transport modes and providing
people with greater transport choices.
Ultra Low Emission Vehicle - Any road vehicle that emits less than 75g of carbon dioxide
per kilometre. These include battery electric vehicles, hybrid electric vehicles, range-
extended electric vehicles, and hydrogen fuel cell vehicles.
Walking, Wheeling and Cycling - Walking is foot-based personal mobility and includes use
of mobility aids such as canes, sticks and assistance animals. Wheeling is the equivalent of
foot-based mobility for people who use wheeled mobility aids such as wheelchairs, and
mobility scooters. Cycling is personal mobility incorporating a pedal-powered vehicle
which may include electric-assistance.

Page 22

Renfrewshire Local Transport Strategy 2025-2035   6
PUBLIC
Workplace Parking Licensing - A charge on employers who provide workplace parking. This
is used as a demand management tool that aims to motivate employers to discourage the
provision of free car parking and car commuting and to raise new funds to support the
improvement of alternative modes of transport.

Page 23

Renfrewshire Local Transport Strategy 2025-2035   7
PUBLIC
Acronyms 
AMIDS – Advanced Manufacturing Innovation District Scotland 
AQMA – Air Quality Management Area 
BSIP – Bus Service Improvement Partnership 
DVLA – Driver and Vehicle Licensing Agency 
GVA - Gross Value Added 
HES - Historic Environment Scotland 
IIA - Integrated Impact Assessment 
LDP – Local Development Plan 
LTS - Local Transport Strategy
MACS – Mobility and Access Committee in Scotland 
NPF – National Planning Framework 
NTS2 – Second National Transport Strategy 
ORR – Office of Rail and Road 
PCN – Penalty Charge Notice
RTPI - Real-Time Passenger Information
RTS - Regional Transport Strategy
RUC – Road User Charging 
SCTS – Strathclyde Concessionary Travel Scheme 
SEA – Strategic Environmental Assessment 
SHS – Scottish Household Survey 
SIMD – Scottish Index of Multiple Deprivation 
SOOPIR – Strengthening Opportunities for Older People in Renfrewshire 
SPT – Strathclyde Partnership for Transport 
STAG – Scottish Transport Appraisal Guidance

Page 24

Renfrewshire Local Transport Strategy 2025-2035   8
PUBLIC
TRO – Traffic Regulation Order
ULEV – Ultra Low Emission Vehicle
WPL – Workplace Parking Licensing

Page 25

Renfrewshire Local Transport Strategy 2025-2035   9
PUBLIC
1. Introduction
1.1. Purpose 
Travel Renfrewshire 2035 is Renfrewshire’s new Local Transport Strategy (LTS). It sets the
future direction of transport and travel across the council area and covers the period 2025
to 2035. This strategy follows on from a 2017 refresh of an earlier LTS and reflects recent
policy changes and targets, including net zero targets set by the Scottish Government and
Renfrewshire Council (to be achieved by 2045 and 2030 respectively) and an increasing
focus on the need to provide opportunities for sustainable modes of travel. 
This LTS has been developed following publication of the Second National Transport
Strategy (NTS2), Strathclyde Partnership for Transport’s Regional Transport Strategy (RTS)
and publication of Renfrewshire’s Plan for Net Zero, which sets out how the area will work
towards net zero by 2030. These documents provide the context for transport policy and
priorities across Scotland, the Strathclyde region and within Renfrewshire and underline
the importance of transport’s role in tackling climate change. NTS2 and the RTS also
identify other priorities related to economic growth, improved safety and accessibility and
health and wellbeing. 
The LTS sets out a Vision for transport and travel in Renfrewshire across a ten-year period
and identifies Priorities and Objectives, against which progress will be monitored. The LTS
establishes a new transport policy framework for the Council, which will guide partnership
working and help to influence the allocation of resources and funding in future years. At
the heart of the strategy is the identification of Action Plans by theme: Active Travel;
Behaviour Change; Public Transport and Shared Mobility; Road Safety; Parking; Road
Network and Freight; Environment; and Digital Technology. The Action Plans reflect the
problems and opportunities specific to Renfrewshire, with a view to addressing the specific
needs of the area.

Page 26

Renfrewshire Local Transport Strategy 2025-2035   10
PUBLIC 
Figure 1: Map of Renfrewshire
1.2. Process
Development of this strategy has been informed by Local Transport Strategy Guidance and
has also followed the principles of Scottish Transport Appraisal Guidance (STAG).
Development of the strategy has involved a robust process to make sure the Action Plan
reflects the needs of the area, as summarised below. Central to this has been public
consultation and stakeholder engagement. 
• Identification of problems and opportunities: Problems and opportunities were
analysed. These were informed by stakeholder and public consultation; a review
of data (for example census data, Scottish Household Survey and transport
statistics); and a review of relevant policy and strategy documents and legislation.

Page 27

Renfrewshire Local Transport Strategy 2025-2035   11
PUBLIC
• Development of Vision, Priorities and Objectives: These set the framework for the
strategy and set out what this should achieve. Objectives will be used to monitor
actions going forward. The development of the objectives was informed by the
identified problems and opportunities. 
• Option Development: Options were identified through public and stakeholder
consultation; policy / strategy review; a review of previous and ongoing studies; a
review of the 2017 LTS; and a review of best practice. Options were then refined
and sifted and similar retained options were grouped together into themes.
• Action Plans: A high-level appraisal of options was undertaken, and the retained
options form the Action Plans. 
• Local Transport Strategy: Work undertaken has been brought together to form the
LTS. The Action Plans form a central pillar of the strategy. 
• Monitoring and Evaluation: Development of a robust Monitoring and Evaluation
Plan against which actions will be monitored and evaluated in future years. 
A round of consultation was undertaken in Spring 2024 to inform the identification of
transport and travel problems and opportunities, and to generate potential options. A
second round of engagement was undertaken in Summer 2025 focusing on receiving
feedback to the Draft LTS and supporting documents. 
Sitting alongside the LTS are a Strategic Environmental Assessment (SEA) Environmental
Report, Integrated Impact Assessment (IIA) and Main Issues Report. The SEA Environmental
Report captures an appraisal of the LTS and the relative sustainability merits of reasonable
alternative approaches to the proposals. The IIA takes cognisance of the Equality Act 2010
and captures an Equality Impact Assessment, Child Rights and Wellbeing Impact
Assessment, Fairer Scotland Duty Assessment and Health Inequalities Impact Assessment
in one document. Lastly, the Main Issues Report captures background work undertaken to
inform the LTS development, including a policy review, an analysis of transport, travel,
socio-economic and socio-demographic data and a summary of problems and
opportunities identified. An overview of this information is provided in the LTS.

Page 28

Renfrewshire Local Transport Strategy 2025-2035   12
PUBLIC
1.3. Strategy Structure 
The LTS sets out the following information:
• Chapter 2 – Policy Context
• Chapter 3 – Data, Transport and Travel Context
• Chapter 4 –Engagement and Consultation
• Chapter 5 – Problems and Opportunities
• Chapter 6 – LTS Vision, Priorities and Objectives
• Chapter 7 – Roles and Responsibilities
• Chapter 8 – Development of Actions and Appraisal
• Chapters 9 – Active Travel
• Chapter 10 – Behaviour Change
• Chapter 11 – Public Transport and Shared Mobility
• Chapter 12 – Road Safety
• Chapter 13 – Parking
• Chapter 14 – Road Network and Freight
• Chapter 15 – Environment
• Chapter 16 – Digital Technology
• Chapter 17 – Monitoring and Evaluation 
• Chapter 18 – Interdependencies, Funding and Priorities

Page 29

Renfrewshire Local Transport Strategy 2025-2035   13
PUBLIC
2. Policy Context 
2.1. Overview
There have been significant changes to the policy context since the LTS was last refreshed
in 2017, including publication of NTS2 in 2020, and publication of the Strathclyde
Partnership for Transport’s updated RTS in 2024. Both documents reflect a shift in policy at
the national and regional level, in particular to address climate change, with a Climate
Emergency declared by the Scottish Government in 2019 (Scotland’s Response to The
Global Climate Emergency). As such, interventions and measures in this LTS take into
consideration their potential impact on tackling climate change. The key policy context at
the national, regional and local levels for the new LTS is shown below. 
Figure 2: Summary of Key Policy and Strategy Documents and Legislation Reviewed

Page 30

Renfrewshire Local Transport Strategy 2025-2035   14
PUBLIC
A summary of some of these key documents is presented below, with further details
available in the Main Issues Report.
NTS2 provides the national transport policy framework and sets out four key priorities:
reducing inequality; taking climate action; helping deliver inclusive economic growth; and
improving health and wellbeing. The Sustainable Investment Hierarchy is captured in
NTS2 and should be used to inform investment decisions, with investment aimed at
reducing the need to travel unsustainably sitting at the top of the hierarchy. The
Sustainable Travel Hierarchy is also captured in NTS2, which sets out how modes should
be prioritised. Walking and Wheeling sits at the top, followed by: Cycling; Public Transport;
Taxis and Shared Transport; and Private Cars.  
The Scottish Government’s Securing a Green Recovery on a Path to Net Zero: Update to
the Climate Change Plan 2018–2032 aligns strongly with the NTS2 Priority to take climate
action and reflects the ambition to reduce Scotland’s greenhouse gas emissions to net
zero by 2045; this target remains in place following the Climate Change (Emissions
Reduction Targets) (Scotland) Bill 2024. The Climate Change Plan notes how recent
transportation trends such as more widespread home working can be capitalised on to
help enable targets to be met. The Scotland-wide target to reduce car kilometres by 20%
by 2030 (against a 2019 baseline) is one of the key targets contained within the Plan. This is
separately supported by A route map to achieve a 20 per cent reduction in car kilometres
by 2030. It is noted however that while there remains a commitment to reduce reliance on
cars, a Renewed Policy Statement, published in June 2025 by Transport Scotland, sets out
that a new, longer term target for reducing car use will be developed. The Renewed Policy
Statement demonstrates a commitment to reach net-zero by 2045 and includes
conducting a ‘regulatory check’ for existing local road user charging powers under the
Transport (Scotland) Act 2001 to ensure that local authorities have all the powers they
need to make change happen (Transport Scotland).
At a regional level, the Strathclyde Partnership for Transport (SPT) RTS also has a strong
focus on tackling climate change, which is reflected in targets, including:
• By 2030 car kilometres in the region will be reduced by at least 20%;
• By 2030 transport emissions will be reduced by at least 53% from the 2019
baseline; and 
• By 2030 at least 45% of all journeys will be made by means other than private car
as the main mode.

Page 31

Renfrewshire Local Transport Strategy 2025-2035   15
PUBLIC
These targets underline the important role transport has to play in supporting climate
change. 
At the local level, Renfrewshire's Plan for Net Zero sets out how the area will work towards
net zero by 2030. 
Also at the local level, the Council’s Digital Strategy has been reviewed. An important
element of the Strategy relates to improving access for residents to services; including
through enabling access to digital public services, tackling digital inequality and creating
the opportunity for active citizenship. This is captured in one of the outcomes / benefits
outlined in the Strategy, to provide better access to information and data. Digital
innovation can have a large impact on transport, as it can impact the frequency at which
people travel or the decision to travel at all. 
Renfrewshire’s Local Development Plan has also been reviewed. This looks to facilitate
sustainable development and a low carbon economy, providing high quality new
development in the right locations. Renfrewshire Council is in the process of preparing an
updated Local Development Plan (LDP3), which will set out the long-term vision for the
area up to 2037 and beyond. The updated LDP will be strongly informed by the National
Planning Framework 4 (NPF4). This sets out a long-term spatial strategy for development
and infrastructure in Scotland. NPF4 outlines a number of key policy areas, which are
highly relevant to the development of the LTS, including: Tackling the climate and nature
crises (Policy 1); Climate mitigation and adaptation (Policy 2); Sustainable transport (Policy
13); Local Living and 20 Minute Neighbourhoods (Policy 15); and Infrastructure First (Policy
18), which supports development which provides infrastructure defined in the LDP or
mitigates the impact of development on existing infrastructure. 
Provisions set out in the Transport (Scotland) Act 2019 have also been reviewed. Provisions
of the Act have influenced several actions in this LTS, including those related to the
pavement parking ban and consideration of the workplace parking license, road user
charging and bus franchising. 
Scotland’s Road Safety Framework to 2030, refreshed in 2021, has a vision that is working
towards a road traffic system that becomes free from death and serious injury, including an
emphasis on journeys made on foot and by cycle and specific casualty reduction targets.
Improving road safety is also presented as a priority for the Council in its Road Safety
Policy of November 2021 which adopts the Government’s Safe System.

Page 32

Renfrewshire Local Transport Strategy 2025-2035   16
PUBLIC
The Glasgow City Region City Deal has also been considered. The City Deal, which was the
first in Scotland, brings £1 billion investment to the region. As part of the Deal, there are 21
key infrastructure projects, including three key projects within Renfrewshire. Since
November 2023, SPT has been acting as the lead partner for development of the Case for
Investment (CFI) for Clyde Metro. The CFI will set out the business case for the project and
arrangements for the initial delivery phases. 
The scope of the Glasgow Airport Access Project is now incorporated within a wider,
regional metro opportunity, with its approved £12.155m business case funds being
reallocated to Glasgow City Council, as the lead GCR authority to support the CFI
development. Glasgow City Council, on behalf of Glasgow City Region (GCR) is supporting
SPT in delivery of the CFI, whilst Transport Scotland is acting in a Project Assurance role.
The two remaining City Deal projects within Renfrewshire are Clyde Waterfront and
Renfrew Riverside; and Glasgow Airport Investment Area, which includes improving access
to the Advanced Manufacturing Innovation District Scotland (AMIDS) and to nearby
Westway and Inchinnan Business Parks. AMIDS is a Renfrewshire Council project to
develop a home for manufacturing innovation in Scotland. 
The area of the City Deal aligns with the Glasgow City Region, which brings together eight
local authorities, including Renfrewshire, to help improve the region. With key partners, the
Glasgow City Region aims to drive regional economic growth and improvement. The
Glasgow City Region manages a number of strategies and programmes to support the
regional economy, including the City Deal; the Regional Economic Strategy; and Clyde
Mission, which looks to use the River Clyde to drive sustainable and inclusive growth. A
Climate Adaptation Strategy and Action Plan was also developed in 2021 and covers the
region.

Page 33

Renfrewshire Local Transport Strategy 2025-2035   17
PUBLIC
3. Data, Transport and Travel Context
3.1. Introduction
Background issues and trends related to transport and travel patterns and socio-economic
and socio-demographic data within Renfrewshire provides important context against
which this LTS has been developed. Available sources have been analysed, including the
2011 and 2022 Scottish Censuses, Scottish Household Survey, Scottish Transport Statistics,
Office for National Statistics and road casualty data. The data has helped to inform the
identification of problems and opportunities, helping to shape the LTS. 
Further data is also presented in the separate thematic chapters (Chapters 9 to 16). 
3.2. Socio-Economic and Socio-Demographic Context
3.2.1. Population and Population Density 
Renfrewshire’s population has increased by an estimated 4% between 2017 and 2022, from
176,830 to 183,800. This is in contrast to the Scotland-wide population, which increased by
only 0.2% in the same period.
Areas of highest population density are located in the east of the Council area, including
around Renfrew, Paisley, Johnstone, and Erskine. This is presented in Figure 3.

Page 34

Renfrewshire Local Transport Strategy 2025-2035   18
PUBLIC 
3.2.2. Urban / Rural Geography 
The Scottish Government’s Urban Rural classifications provide a consistent way of
distinguishing urban, rural, accessible and remote areas across Scotland in six categories
based on population and accessibility. Based on this, 84% of Renfrewshire’s population
live in an urban area (‘Large Urban Area’ or ‘Other Urban area’), including Paisley,
Johnstone and Renfrew. ‘Accessible small towns’ such as Bridge of Weir comprise 9% of
the population; and ‘Accessible rural areas’ such as Lochwinnoch comprise 8% of the
population. 
Figure 3: Renfrewshire Population Density Map

Page 35

Renfrewshire Local Transport Strategy 2025-2035   19
PUBLIC 
3.2.3. Scottish Index of Multiple Deprivation 
There is a mix of areas of high and low levels of multiple deprivation across Renfrewshire;
red indicates more deprived areas and blue indicates less deprived areas (SIMD). There are
a number of more deprived pockets within urban areas in the east of the local authority
area, such as in Paisley, Renfrew and Johnstone, though some areas here also record data
zones with low levels of deprivation. Lower levels of deprivation are mostly found in the
west and north of the local authority area, such as around Bridge of Weir, Erskine and
Bishopton. 
Figure 4: Renfrewshire Urban Rural Classification

Page 36

Renfrewshire Local Transport Strategy 2025-2035   20
PUBLIC 
3.2.4. Loneliness and Health 
An analysis of 2018 data from the Scottish Household Survey Data Explorer shows the
following:
• 18% of people in Renfrewshire felt lonely “some of the time”, which is slightly
higher than the national average of 17%.
• 28% of people living in the 20% most deprived areas of Renfrewshire felt lonely
“some of the time”, which is higher than the national average of 21%. 
• Life expectancy for females is lower in Renfrewshire than the whole of Scotland at
79.89 years compared to 80.72 years nationally; the difference in life expectancy
for males is not statistically significant between Renfrewshire and Scotland
(Public Health Scotland). 
Figure 5: Scottish Index of Multiple Deprivation Map of Renfrewshire

Page 37

Renfrewshire Local Transport Strategy 2025-2035   21
PUBLIC
3.2.5. Employment and Economic Performance
Gross Value Added (GVA) is a measure of the value of goods and services produced in an
area, industry or region of an economy. GVA for Renfrewshire is grouped together with
Inverclyde and East Renfrewshire. An analysis of data from the Office for National Statistics
shows the following: 
• Since 2017, GVA per head in Inverclyde, East Renfrewshire and Renfrewshire has
grown slightly from £18,656 to £20,555 in 2022 (in April 2024 prices). 
• GVA per head in Inverclyde, East Renfrewshire and Renfrewshire in 2022 (£20,555)
was lower than the national average (£30,419) and was significantly lower the
neighbouring Glasgow City (£40,933).
3.3. Transport and Travel
3.3.1. Road and Rail Network
The major road network in Renfrewshire is shown in Figure 6 , including motorways, A
roads and B roads. The M8, M898, A898, A8T (West Ferry roundabout to Inverclyde) and
A737 are trunk roads; as such, they are maintained by Transport Scotland. Other public
roads are local and are maintained by Renfrewshire Council.

Page 38

Renfrewshire Local Transport Strategy 2025-2035   22
PUBLIC 
The rail network and rail stations within Renfrewshire are shown in Figure 7. The network
includes two rail lines from Glasgow; a rail line that terminates at Paisley Canal and a line
to Paisley Gilmour Street that splits off into the Inverclyde line via Bishopton and the Largs
/ Ardrossan / Ayr line via Johnstone. 
Figure 6: Renfrewshire Road Network

Page 39

Renfrewshire Local Transport Strategy 2025-2035   23
PUBLIC 
There is also an extensive bus network in Renfrewshire, alongside Demand Responsive and
Community Transport which operates in the area. Private operators run commercial bus
services registered with the Traffic Commissioner for Scotland. SPT manages bus stations
and bus stops and provides a range of specialist bus services within the Strathclyde region
from socially necessary bus services and Community Transport to co-ordinating school
transport. Renfrewshire Council provides infrastructure such as bus shelters, high access
kerbs and bus priority measures.
3.3.2. Travel to Work and School
Hands Up Scotland Surveys undertaken by Sustrans in 2023 had a sample size of over
19,000 pupils in Renfrewshire. The results for 2023 show that 44% of school pupils in
Renfrewshire walked to school, 4% cycled and 3% scooted or skated. By comparison,
across Scotland 41% of school pupils walked to school, 5% cycled and 3% scooted /
skated. The proportion of pupils driven to school in Renfrewshire (less than 20%) is lower
than the Scotland wide proportion of 22.5%. 
Figure 7: Renfrewshire Rail Network

Page 40

Renfrewshire Local Transport Strategy 2025-2035   24
PUBLIC
With regard to mode of travel to work, Scotland Census 2022 demonstrates that travel by
car / van (as a driver or passenger) was the most common mode of travel (71%); bus
accounted for 8% of travel to work trips; rail 5%; and walking and cycling 8% combined.
For the purpose of this analysis, it is noted that this does not include “Work from home”
figures. When “Work from home” is included, data shows that 31% of respondents in
Renfrewshire said this applied to them. 
3.3.3. Distance Travelled
2022 Transport and Travel data shows that 78% of all journeys made by Renfrewshire
residents were under 10km, which is 2 percentage points higher than the Scotland wide
average. 
64% of all journeys made by those living in Renfrewshire were under 5km, which is higher
than the Scotland-wide figure of 61%.
6% of all journeys were over 20km in 2022, which is lower than the Scotland wide figure of
12%.
Shorter journey distances may, in part, be due to large areas of Glasgow being accessible
to many residents located in the east of Renfrewshire, which are less than 10km from
Glasgow city centre. 
Figure 8: Distances Travelled in Renfrewshire and Scotland (2022)

Page 41

Renfrewshire Local Transport Strategy 2025-2035   25
PUBLIC
3.3.4. Car and Bike Availability
Access to at least one bicycle in Renfrewshire by household is in line with the Scotland
wide average, with 38% of households in Renfrewshire having access to at least one
bicycle, compared to the national average of 37.5% (Transport and Travel in Scotland
2022). With regards to car or van availability, Scotland Census 2022 data shows that 28% of
Renfrewshire households have no access to a car or van, which is slightly higher than the
Scotland-wide proportion of 25%. 
3.3.5. Transport Expenditure
The Living Costs and Food Survey collects spending patterns and cost of living data that
reflect household budgets in the UK. This includes transport expenditure for different
household types across the country. 2022 results show the following: 
79% of people in Renfrewshire spend more than 10% of their weekly household income
on transport costs. This is slightly lower than the Scotland-wide average of 84%. 
17% of people in Renfrewshire spend more than 15% of their weekly household income
on transport, which is also lower than the Scotland-wide average (24%). 
Figure 9: Bike Availability in Renfrewshire and Scotland (2022)

Page 42

Renfrewshire Local Transport Strategy 2025-2035   26
PUBLIC
3.4. Summary 
This chapter has provided an understanding of the current transport and travel network in
Renfrewshire and an understanding of the socio-economics and socio-demographics in
the area. This has identified some challenges experienced in the area, including: 
• There are areas of high deprivation across Renfrewshire. 
• Gross Value Added is lower in Renfrewshire compared to the national average. 
• Although there is an extensive rail and bus network, there are gaps; particularly in
the west of Renfrewshire. 
• Car is the main mode of travel to work, accounting for a higher proportion of
travel to work trips compared to Scotland as a whole. The proportion of walking
and cycling to work is lower in Renfrewshire compared to Scotland as a whole. 
• A large proportion of people in Renfrewshire spend more than 10% of their weekly
household income on transport costs.
Findings have helped to inform the problems and opportunities, which in turn have
shaped objectives and ultimately actions.

Page 43

Renfrewshire Local Transport Strategy 2025-2035   27
PUBLIC
4. Engagement and Consultation 
Public consultation and stakeholder engagement has been an important part of the LTS
development process and has helped to make sure that the strategy will work to address
the challenges and needs of the local area. An extensive round of consultation and
engagement was undertaken in the first instance, which focused on identifying transport
related problems and opportunities, and potential options to address these; engagement
activities are summarised in Figure 10. The engagement activities were designed to be
inclusive through both the range of methods used to receive feedback and through
specific groups consulted. 
A second round of engagement was held in Summer 2025 to receive feedback on the Draft
LTS and supporting documents. Feedback was primarily received via an online survey. 
Figure 10: Summary of Engagement Methods

Page 44

Renfrewshire Local Transport Strategy 2025-2035   28
PUBLIC
5. Problems and Opportunities
Problems and opportunities have been identified through: stakeholder engagement and
public consultation; analysis of transport and travel and data; a review of existing policies
and strategies; and input from Council Elected Members and officers. 
Problems and opportunities captured in this chapter were primarily informed by
stakeholder and public feedback. Further details are available in the Main Issues Report. 
5.1. Problems Summary
• Limited active travel infrastructure (including dedicated cycle paths) and poor
safety associated with on road cycling and shared path facilities. 
• Limited public transport frequency and provision (bus and rail) and reliability
issues.
• Limited public transport integration (timetable and ticketing) between bus and
rail services.
• Poor access to transport, including public transport access in rural areas; the cost
of public transport making it difficult to access; accessibility of transport for
people with disabilities (for example no step free access at some stations); and
difficulties accessing public transport owing to people being unable to use
timetable and ticket purchasing apps on mobile phones.
• High fares associated with public transport.
• Personal safety and security, including a lack of lighting along National Cycle
Network routes and more generally; and personal safety and security, including
safety of female users and people with disabilities on buses. 
• Road safety, including hazards related to high traffic speeds and volumes
(including outside schools).
• Limited access to public Electric Vehicle charging points.
• Maintenance issues (for example potholes), including poor maintenance of the
road and path network. 
• Parking issues, including a limited amount of parking at rail stations. 
• A forced reliance on private vehicles, contributing towards congestion; including
in town centres (particularly in rush hour and school pick-up times).

Page 45

Renfrewshire Local Transport Strategy 2025-2035   29
PUBLIC
5.2. Opportunities Summary
Unless otherwise stated, the opportunities presented below were primarily identified
through stakeholder and public feedback. Further details are available in the Main Issues
Report.
• Expansion of and improvements to walking and cycling network, including
improvements to route maintenance and expansion of cycle training courses. 
• Improvements to paths and roads (maintenance).
• Increase frequency and provision of public transport, including to work with
partners to support development of the Clyde Metro, including potential for a
fixed link between Paisley and Glasgow Airport.
• Potential for local bus franchising. 
• Improve access to public transport, including through lower fares and
consideration of integrated ticketing. 
• Improved accessibility to transport for people with disabilities to continue to be
able to access stations and stops, including through the provision of suitably
located disabled parking bays.
• Improved rail provision and potential for rail line and station expansion. 
• Increase number of Park & Ride sites / spaces.
• Increase provision of demand responsive and community transport.
• Reduced congestion on the road network through workplace parking license
and/or local road user charging.
• Climate change and adaptation: Transport Scotland’s Approach to Climate
Change Adaptation and Resilience notes the climate risks associated with
transport and that there are opportunities to protect against extreme weather
conditions caused by climate change.
• Initiatives to tackle school congestion.
• Reduce transport emissions, including through increasing the number of electric
vehicle charging points and their availability; and associated opportunities to
address air quality (noting however that a Revocation Report and associated
AQMA Revocation Orders were presented to and approved by Renfrewshire
Council’s Infrastructure, Land and Environment Policy Board in March 2025. As
such, there are no longer any AQMAs within Renfrewshire Council, with the council
meeting all air quality objectives. The Scottish Government recommends that
where AQMAs are no longer required that local authorities prepare an Air Quality
Strategy to replace the Air Quality Action Plan (which has served its purpose), with

Page 46

Renfrewshire Local Transport Strategy 2025-2035   30
PUBLIC
some of the measures from the action plan being carried forward into the
strategy. The Council are currently developing this Air Quality Strategy, which will
be approved by the Policy Board prior to publication. 
• Road safety improvements. 
• Greater use of technology, including to provide joined up travel between different
modes of public transport and to support access to information. 
• Digital connectivity: As captured in A route map to achieve a 20% reduction in car
kilometres by 2030, there are opportunities associated with strengthening and
enhancing digital connectivity, including to reduce the need to travel. It is noted
that while there remains a commitment to reduce reliance on cars, a Renewed
Policy Statement, published in June 2025 by Transport Scotland, sets out that a
new, longer term target for reducing car use will be developed. 
• Stronger controls and enforcement of speeding and parking regulations.
• Expansion of car clubs.
Problems and opportunities have helped to inform the development of a vision statement,
priorities, objectives, policies and actions presented in subsequent chapters.

Page 47

Renfrewshire Local Transport Strategy 2025-2035   31
PUBLIC
6. LTS Vision, Priorities and Objectives
6.1. Vision Statement
An overarching Vision for the Council with regards to transport and travel by the time the
LTS is delivered has been developed. This reflects the views and priorities expressed by the
public and stakeholders during consultation and has also been informed by a review of
problems and opportunities and by the wider policy context; in particular, the NTS2 and
RTS. Consideration has also been given to the Council’s Plan for Net Zero, which has a
commitment to maximise sustainable transport opportunities to deliver an inclusive,
affordable transport system that provides choice for all. The vision statement details what
the Council is aiming to achieve, whilst having regard for the funding challenges facing the
Council and the need to focus on core activities.
The vision is for: 
“Renfrewshire to be an attractive place to live, work and visit, with walking, wheeling
and cycling and public transport opportunities that are inclusive, affordable, integrated
and safe to use; and a transport system which supports net zero targets, inclusive
economic growth and the health and wellbeing of all”. 
6.2. Priorities
The Vision Statement is supported by a set of Priorities:
Equality and Accessibility
Net Zero Emissions
Inclusive Economic Growth
Safety and Security
Resilience and Maintenance

Page 48

Renfrewshire Local Transport Strategy 2025-2035   32
PUBLIC
The Priorities are further supported by objectives.
6.3. Objectives
The identified objectives form part of the criteria against which actions will be monitored
and evaluated in future years. 
The objectives have been developed to take into consideration the problems and
opportunities and consideration has also been given to key documents, including NTS2
priorities and outcomes, RTS objectives and themes from Renfrewshire’s second Local
Development Plan (noting that its third LDP is in the process of being prepared) and Digital
Strategy – and how these align with the objectives. 
The objectives for this LTS are as follows: 
• Objective 1: Support fair and equitable access to sustainable modes of transport
in Renfrewshire, that is integrated and easy to use for all 
• Objective 2: Support the continued reduction in harmful transport emissions
across Renfrewshire 
• Objective 3: Increase the proportion of trips undertaken by walking, wheeling and
cycling and public transport for everyday journeys 
• Objective 4: Improve transport connections within Renfrewshire and to
neighbouring local authorities to support inclusive economic growth 
• Objective 5: Improve the safety of Renfrewshire's transport network through
meeting Scottish Government casualty reduction targets 
• Objective 6: Provide a secure, resilient and well-maintained transport network
that meets the needs of users
The following tables summarise how each problem and opportunity theme has directly
informed the objectives development.

Page 49

Renfrewshire Local Transport Strategy 2025-2035   33
PUBLIC
Table 1: Problems and Objectives Alignment
Problem Objective 1
Fair access to
sustainable
modes 
Objective 2
Reduce
transport
emissions 
Objective 3
Increase
everyday
sustainable
travel trips  
Objective 4
Improve
transport
connections 
Objective 5
Improve
transport safety 
Objective 6
Maintain
transport
network 
Limited active
travel
infrastructure and
safety
     
Limited public
transport
frequency and
provision and
reliability issues
     
Limited public
transport
integration
     
High fares
associated with
public transport
ticketing
     
Poor access to
transport      
Personal safety
and security      
Road Safety      
Limited access to
public Electric
Vehicle charging
points 
    
Maintenance
issues      
Parking issues      
Reliance on private
vehicles   

Page 50

Renfrewshire Local Transport Strategy 2025-2035   34
PUBLIC
Table 2: Opportunities and Objectives Alignment
Opportunity Objective 1
Fair access to
sustainable
modes 
Objective 2
Reduce transport
emissions 
Objective 3
Increase everyday
sustainable travel
trips  
Objective 4
Improve
transport
connections 
Objective 5
Improve
transport safety 
Objective 6
Maintain
transport
network 
Expansion of and
improvements to
walking and
cycling network
     
Improvements to
paths and roads
(maintenance)     

Increase
frequency and
provision of
public transport
     
Potential for local
bus franchising      
Improve access to
public transport      
Improved
accessibility to
transport for
people with
disabilities
     
Improved rail
provision       
Increase number
of Park and Ride /
mobility hub sites
/ spaces
     
Increase provision
of demand
responsive and
community
transport
     
Reduced
congestion on the
road network 
  

Page 51

Renfrewshire Local Transport Strategy 2025-2035   35
PUBLIC
Opportunity Objective 1
Fair access to
sustainable
modes 
Objective 2
Reduce transport
emissions 
Objective 3
Increase everyday
sustainable travel
trips  
Objective 4
Improve
transport
connections 
Objective 5
Improve
transport safety 
Objective 6
Maintain
transport
network 
Climate change
adaptation and
resilience     

Tackle school
congestion      
Reduce transport
emissions      
Road safety
improvements       
Greater use of
technology      
Digital
connectivity      
Stronger controls
and enforcement
of speeding and
parking
regulations    
 
Expansion of car
clubs 

Page 52

Renfrewshire Local Transport Strategy 2025-2035   36
PUBLIC
7. Roles and Responsibilities
Renfrewshire Council is one of several organisations involved in the delivery of transport in
the area. A collaborative approach is taken to deliver transport in Renfrewshire and close
working is required across organisations, including with SPT, Transport Scotland,
neighbouring local authorities and other organisations such as bus and rail operators and
Sustrans. 
Local Transport Strategy Guidance states that there is no general statutory requirement for
a local authority to have an LTS in place, and there is no provision for Scottish Ministers to
approve an LTS. However, there are certain discretionary powers which the local authority
may only exercise if they have an LTS in place, including powers related to a workplace
parking licensing (WPL) scheme under the Transport (Scotland) Act 2019, or a road user
charging (RUC) scheme under the Transport (Scotland) Act 2001.
7.1. Responsibilities by Governance Tier
7.1.1. National 
The Scottish Government is the devolved government of Scotland and has a range of
responsibilities that include the economy, transport, education, health, justice, rural
affairs, housing, environment, equal opportunities, consumer advocacy and advice, and
some taxation. Transport Scotland is the national transport agency for Scotland, delivering
the Scottish Government's vision for transport.
At a national and strategic level Transport Scotland is responsible for the following:
• Rail projects and control of
ScotRail
• National concessionary
travel scheme
• National Transport Strategy
• Liaison with Regional
Transport Partnerships
• Sustainable transport, road
safety and accessibility
• Aviation, bus, freight and
taxi policy
• Ferries, ports and harbours
• The Blue Badge scheme for
people with disabilities
• The trunk road network
• Major trunk road and bridge
projects

Page 53

Renfrewshire Local Transport Strategy 2025-2035   37
PUBLIC
Within Renfrewshire, the following trunk roads are managed and maintained by Transport
Scotland, through its operating company, currently Amey:
• M8 motorway;  
• A8T (West Ferry to Inverclyde);
• M898 motorway and A898; and
• A737.
7.1.2. Regional
Strathclyde Partnership for Transport was formed in 2006 as part of the transport
framework created by the Scottish Government, which is comprised of Transport Scotland
and seven Regional Transport Partnerships (RTPs). SPT is the RTP for the west of Scotland
and has the aim of bringing together local authorities and other key regional stakeholders
to strengthen planning and delivery of regional transport. SPTs roles and responsibilities
also include considering, prioritising and funding certain transport provisions,
improvements and developments at a regional level and linking with transport in
neighbouring regions and beyond.
All 12 local authorities in the former Strathclyde area, including Renfrewshire Council, are
members of SPT and have elected members who sit on the Partnership Board, agreeing
policies and strategies as well as priorities for public transport and regionally strategic
transport matters. 
SPT is responsible for the development and implementation of the RTS for the west of
Scotland. The revised RTS, which covers the period 2023 to 2038, was approved in July
2023, and a summary of the Strategy is provided within Chapter 2. SPT has also developed
a Regional Active Travel Strategy and the Strathclyde Regional Bus Strategy.

Page 54

Renfrewshire Local Transport Strategy 2025-2035   38
PUBLIC 
In Renfrewshire, SPT has the following specific roles (Delivering for Renfrewshire – SPT
2022):
• The provision of socially
necessary bus services,
including the demand
responsive transport
service, MyBus, and
analysing changes in
commercial provision to
determine any additional
support requirements.
• Managing and maintaining
bus stop infrastructure and
facilitating school transport
on behalf of the Council.
• Liaison with bus operators.
• Providing travel
information, including the
maintenance of Real-Time
Passenger Information
(RTPI) displays.
• Providing the secretariat for
the Strathclyde
Concessionary Travel
Scheme (SCTS) on behalf of
local authorities and
administering ZoneCard on
behalf of participating
transport operators.
• Smartcard ticketing. 
Behaviour Change interventions, such as cycle training, health walks or providing access to
bikes, are delivered by many different organisations, including funding provided through
the People and Place programme, currently administered by SPT in the region on behalf of
Transport Scotland.
7.1.3. Local
Renfrewshire Council has a duty to manage and maintain local public roads (including
footways), footpaths, non-National Cycle Network cycleways, bridges, street lighting and
traffic signals across the Council area, and has the power to improve infrastructure as
necessary. The Council also has responsibility for road safety and flood risk management.
For financial year 2024/25, approximately 80% of the Council’s budget came from the
Scottish Government and 20% was raised through Council Tax. It is recognised that there
are financial constraints the Council is currently working within and that this will impact
upon what transport measures can be taken forward over the lifespan of this LTS.

Page 55

Renfrewshire Local Transport Strategy 2025-2035   39
PUBLIC
In the Council’s budget for 2024/25, the Council continued to invest in Renfrewshire’s
roads, with £5m invested in maintenance and improvements to roads and footpaths in the
year ahead. Further information related to funding is provided in Chapter 18. 
Business as Usual
Renfrewshire Council is responsible for maintaining more than 800 kilometres of roads and
1,200 kilometres of footpaths within Renfrewshire. The Council undertakes a range of such
business-as-usual activities. Business-as-usual activities are a mixture of those which the
Council has a statutory responsibility to undertake and others which fulfil a social need;
and are undertaken on an ongoing and continual basis. Business-as-usual activities are
not captured in the Action Plans (Chapters 9 to 16) but may support some of the actions
identified. Examples of such activities are captured below.
• Maintenance of local public
roads, bridges, and
footpaths 
• Maintenance of street
lighting and traffic signals
and responding to faults
• Winter gritting 
• Supporting community
organisations to provide
access to bikes (including
adapted bikes)
• Road safety
• Flood protection
• Monitoring air quality
• Traffic management design
and implementation
• Implementation of Traffic
Regulation Orders (TROs),
including those to control
on street parking
• Parking enforcement 
• Development management
• Fleet management
• Road works control
including abnormal load
movements and advance
warning of planned road
closures
• Traffic and transportation
engineering

Page 56

40
PUBLIC 
The Council also provides emergency response to extreme weather events and other
incidents affecting the road and active travel networks and undertakes various
improvement projects.
The Council will continue to work with partners to deliver services within the local
authority area and on cross-boundary projects where appropriate. 
In addition to those points captured above, the Council also undertakes business-as-usual
activities in other areas, which do not directly relate to transport, for example, biodiversity
schemes alongside road and active travel networks. 
Through the Planning process, Renfrewshire Council will continue to work with developers
and their agents to agree the suitability of active travel and public transport interventions
and measures to mitigate the impact of private motorised traffic arising from
developments. 
In general, the Council does not have responsibility for the provision of public transport,
however it does support and promote its use. This is done in conjunction with partners
such as SPT and Transport Scotland through, for example, improvements to bus stop
infrastructure and the funding of school buses and through contributions to community
transport efforts. 
Specific responsibilities for the delivery of public transport in Renfrewshire – and other
transport provision – are set out in subsequent chapters of this LTS.
7.2. Responsibilities by Mode and Category
7.2.1. Active Travel and Behaviour Change
The national budget for Active Travel schemes is set by the Scottish
Government, according to priorities set out in the Programme for
Government. Active travel refers to walking, wheeling and cycling, with such
infrastructure primarily delivered by local authorities, with funding from
Transport Scotland combined with allocation of Council capital funding.

Page 57

Renfrewshire Local Transport Strategy 2025-2035   41
PUBLIC
Local authorities, including Renfrewshire Council, can access Transport Scotland Active
Travel funding through a combination of non-competitive and competitive funding
streams. There is no limit to the amount that a Council can allocate to active travel, but all
Council budgets must be weighed against other local priorities. 
Renfrewshire Council also works with partners, including Sustrans, to
deliver active travel infrastructure in the area. As the local roads
authority, it is the responsibility of the Council to maintain the public
footpaths and the majority of the cycle path network within the local authority area.
However, Renfrewshire also contains a section of the National Cycle Network – NCN7 from
Paisley to Lochwinnoch and NCN75 from Johnstone to Bridge of Weir – which is owned
and maintained by Sustrans. 
Behaviour Change interventions, such as cycle training, health walks or providing access to
bikes, are delivered by many different organisations, including funding provided through
the People and Place programme, currently administered by SPT in the region on behalf of
Transport Scotland.
7.2.2. Bus
Many bus services in Scotland are operated on a commercial basis
by bus operating companies. In Renfrewshire, this currently
includes McGill’s and First Bus. Renfrewshire Council does not have
any direct control over the operation of these commercially
provided services. 
In the event where a commercial service is not in operation and is deemed socially
necessary, SPT may provide a financial subsidy in order to deliver a bus service for that
area, where funding permits. Occasionally, a planning agreement is used to compel a
developer to subsidise a bus service to a new development for a limited time to help
encourage public transport behaviours from the outset. For example, BAE Systems
currently (2025) fund a service which operates between the Dargavel development and
Braehead Shopping Centre via Bishopton Rail Station. 
It is noted that at the time of writing, SPT, through the Strathclyde Regional Bus Strategy, is
exploring ways in which to improve the bus network across the region and to address the
recent drop in bus ridership, including the potential for franchising local services.

Page 58

Renfrewshire Local Transport Strategy 2025-2035   42
PUBLIC
Renfrewshire Council supports SPT in this effort. There is potential to deliver this through
provision outlined in the Transport (Scotland) Act 2019.
7.2.3. Demand Responsive Transport and Community Transport
Demand Responsive Transport allows passengers to use services which align with their
personal requirements. It also provides flexible bus services to meet those demands. SPT
operates the MyBus service, a demand responsive transport service which helps to provide
people with access to local facilities as and when required.  
Community Transport is usually offered by locally-owned organisations or volunteers. SPT
has provided funding to support two Community Transport organisations in Renfrewshire:
Strengthening Opportunities for Older People in Renfrewshire (SOOPIR), and Renfrewshire
Community Transport based at the New Tannahill Centre. SOOPIR Bus was launched in
March 2019 and provides transport for older people and community groups in
Renfrewshire. The Council will continue to work with SPT over the lifespan of the LTS to
identify potential funding opportunities for these and other Demand Responsive and
Community Transport services.
7.2.4. Rail
Responsibility for the majority of rail powers in Scotland sits with Transport
Scotland (Office of Rail and Road). Whilst Scottish Ministers specify and
fund the outputs to be delivered by Network Rail, the organisation has
responsibilities including operating, maintaining and renewing the railway
infrastructure. 
ScotRail is owned by the Scottish Government and is overseen by Scottish Rail Holdings
Limited. ScotRail is primarily responsible for the provision of local rail services and is
responsible for the management of a large majority of stations in Scotland (including all
stations in Renfrewshire). Responsibility for safety regulation across Great Britain sits with
the Office of Rail and Road (ORR). Transport Scotland oversees the funding for rail projects
in Scotland as well as any potential projects which have to follow the Government’s
approval process as set out in the Rail Enhancements and Capital Investment Strategy. 
The Department for Transport oversees the Access for All programme, which looks to
address issues faced by passengers with disabilities and passengers facing mobility

Page 59

Renfrewshire Local Transport Strategy 2025-2035   43
PUBLIC
constraints (such as heavy luggage or pushchairs) when using railway stations in Great
Britain.
Renfrewshire Council will work with partners to support rail improvement projects. An
example of recent partnership working is improved access to Johnstone Station, which
was delivered in 2022.
7.2.5. Parking
In 2010, Renfrewshire Council obtained Decriminalised Parking Enforcement powers. This
enables the Council to enforce its own parking restrictions, including the issuing of Penalty
Charge Notices (PCNs) to vehicles parked in restricted locations such as bus stops, double
yellow lines and controlled parking zones. 
Since April 2025, the Council has had the ability to enforce the pavement parking ban.
Specifically, the Council has agreed the locations where the ban is exempted and enforces
the ban everywhere else in Renfrewshire, on parking on pavements, double parking and
parking at pedestrian dropped kerb crossing points. This follows on from provisions set out
in the Transport (Scotland) Act 2019.
The Council currently allows for one hour of free parking in Paisley town centre with
payment required for longer stays on Monday to Saturday in Zones 1 and 2 and Monday to
Friday in Zones 3 and 4. Charging tariffs encourage the use of car parks over on-street
spaces and are free on Sundays.
The Transport (Scotland) Act 2019 also has provisions for local authorities to implement a
workplace parking license, which creates a requirement to hold a licence to provide
parking at workplaces, and to charge employers for that licence based on the number of
spaces available.
7.2.6. Road
As noted previously, all trunk roads in Scotland are managed by
Transport Scotland, which for Renfrewshire includes the M8, M898, A898,
A8T (West Ferry to Inverclyde) and A737. These roads are operated by
Transport Scotland’s Trunk Road Operating Company, currently Amey.
All other public roads are managed by Renfrewshire Council as the local
roads authority. As per the Roads (Scotland) Act 1984, Renfrewshire

Page 60

Renfrewshire Local Transport Strategy 2025-2035   44
PUBLIC
Council is responsible for providing and maintaining the following: road and footway
safety measures, works to protect against natural dangers (for example drainage to protect
against flooding), street lighting and traffic management measures.
7.2.7. Other 
Many other aspects of transport and access will be taken forward in partnership with other
services within Renfrewshire Council; with Community Planning Partners, such as Police
Scotland and NHS Greater Glasgow and Clyde; as a joint regional approach with
stakeholders in the SPT area across the west of Scotland; or with developers as private
development opportunities arise.
Renfrewshire Council will work closely with partner organisations in order to effectively
deliver the new LTS.  Renfrewshire Council and its partners play a vital role in making sure
that the transport network is as sustainable, efficient, inclusive, safe and integrated as
possible.

Page 61

Renfrewshire Local Transport Strategy 2025-2035   45
PUBLIC
8. Development of Actions and Appraisal
The process undertaken to develop actions for this LTS included the following steps. The
identified problems and opportunities directly informed the development of a Vision
Statement, Priorities and Objectives as captured in Chapter 6, as well as a set of polices,
which sit above the actions and support objectives. An exercise was undertaken to make
sure objectives aligned with problems and opportunities and with priorities and objectives
captured in the NTS2 and SPT’s RTS.
The next stage was to generate a list of options, which were primarily informed by
stakeholder and public consultation findings and supplemented by Renfrewshire Council
Elected Member and officer input and options identified in existing strategy / policy
documents (including the 2017 LTS). With regard to existing strategy and policy
documents, this included particular consideration of policies such as Infrastructure First
and Local Living policies that are captured in NPF4. These policies place an emphasis on
sustainable travel and local living and in developing options, consideration has therefore
been given to options which support these policies. The process also considered policies
such as the Sustainable Travel Hierarchy and Sustainable Investment Hierarchy in NTS2,
alongside existing targets and how LTS actions could help to achieve these, for example to
reduce car kilometres by 20% by 2030 against a 2019 baseline (noting with regards to the
latter target that while there remains a commitment to reduce reliance on cars, a Renewed
Policy Statement, published in June 2025 by Transport Scotland, sets out that a new,
longer term target for reducing car use will be developed). 
Wider policies not directly related to transport have also been considered, given the close
relationship between transport and other areas, including health, the economy, reducing
inequalities and tackling climate change. For example, the Council has a Local Child
Poverty Action Plan; transport has a role to play in tackling child poverty, including through
free bus travel to support access to schools; and a Sustainability Strategy endorsed by NHS
Greater Glasgow and Clyde includes how to support safe active travel routes and low
carbon transport links. Resources produced to promote accessibility also have an
important role to make sure people can move around with ease. This includes resources
such as Scotland’s Accessible Travel Framework, which was developed with input from
organisations such as Inclusion Scotland and the Mobility and Access Committee in
Scotland (MACS). This captures outcomes to support making travel more comfortable and
safer for those with disabilities.

Page 62

Renfrewshire Local Transport Strategy 2025-2035   46
PUBLIC
The initial list of options was consolidated, and eight themes were identified: 
• Active Travel
• Behaviour Change
• Public Transport and Shared Mobility
• Road Safety
• Parking
• Road Network and Freight
• Environment
• Digital Technology
Each theme informed the development of a short list of options. A high-level appraisal of
these options was then undertaken. Options were appraised against:
• LTS objectives (see Chapter 6);
• Scottish Transport Appraisal Guidance (STAG) criteria (Environment; Climate
Change; Health, Safety and Wellbeing; Economy; and Equality and Accessibility);
and 
• Deliverability criteria (risks associated with Feasibility, Affordability and Public
Acceptability). 
Following the appraisal process, some options were sifted out; this included options
related to new rail stations and rail lines, which were not retained owing to high feasibility
and affordability risks. 
Options retained following the appraisal form the basis of the Action Plans in the
subsequent themed chapters. Sitting above actions are a set of policies for each theme,
which support the objectives. 
A Monitoring and Evaluation plan has also been developed, which will be used to monitor
the success of actions in future years, including against the objectives and indicators.
As actions are developed further in future years, additional engagement will be required,
including, but not limited to, liaising with equality groups in the design of new
infrastructure to help remove barriers to inclusive mobility. 
The process undertaken to generate options and to develop the Action Plans is presented
overleaf.

Page 63

Renfrewshire Local Transport Strategy 2025-2035   47
PUBLIC 
Identification of Problems & Opportunities
• Stakeholder and Public Consultation
• Data Review
• Policy / Strategy / Studies Review
• Renfrewshire Council Review
Development of Vision, Priorities and Objectives
• Informed by problems and opportunities and key
documents
Option Generation
• Stakeholder and Public Consultation
• Data Review
• Policy / Strategy Review
• Renfrewshire Council Review
• Review of best practice
High Level Appraisal
• Short list of options appraised against LTS objectives,
STAG criteria and deliverability criteria (feasibility,
affordability and public acceptability)
Option Cleaning / Sifting
• Initial list of options cleaned / sifted 
• Remaining options assigned a theme and sub-theme
• Sub-themes directly informed a short list of options 
Monitoring and Evaluation Plan
• Development of robust Plan against which actions will
be monitored and evaluated
Policies and Action Plans
• Policies were developed to support objectives
• Outcome of option appraisal formed the Action Plans
by theme

Page 64

Renfrewshire Local Transport Strategy 2025-2035   48
PUBLIC
The following chapters present Action Plans by theme. Alongside each action indicative
timescales are provided. 
Indicative timescales for each action have been presented in line with one of the following:
• 0 to 5 years
• 5 to 10 years
• 10 years +

Page 65

Renfrewshire Local Transport Strategy 2025-2035   49
PUBLIC
9. Active Travel 
9.1. Active Travel Overview
This Chapter represents Renfrewshire Council’s Active Travel Strategy 2025-2035 and
supersedes the Renfrewshire Cycling Strategy 2016-2025.
National, regional and local policies place an emphasis on increasing travel by active
modes (walking, wheeling and cycling) to help achieve net zero targets set out by the
Scottish Government, SPT and Renfrewshire Council. In recognition of the Scottish
Government’s declaration of a climate emergency in 2019, there was cross-party support
for a Council motion which declared a climate emergency in Renfrewshire in the same
year. One way to help achieve net zero targets and to tackle climate change is through the
delivery of dedicated infrastructure to support walking, wheeling and cycling. Behaviour
Change interventions also have an important role to play; they are captured in a separate
Behaviour Change chapter.  
At the national level, the Sustainable Investment Hierarchy, captured within NTS2, informs
the hierarchy of investment decisions, with investment aimed at reducing the need to
travel unsustainably sitting at the top of the hierarchy, and targeted infrastructure
improvements sitting at the bottom. The Sustainable Travel Hierarchy, also captured in
NTS2, places walking, wheeling and cycling at the top of the hierarchy. National policy is
therefore clear that there should be a strong focus on supporting active travel journeys in
Scotland. 
At the regional level, SPTs Regional Active Travel Strategy supports the delivery of the
Regional Transport Strategy and sets out a vision for active travel in Strathclyde. The
Strategy sets out a regional active travel network to help co-ordinate the planning and
delivery of strategic active travel routes and infrastructure in the region, including cross-
boundary connections between council areas. The Council will work with SPT and
neighbouring councils to help deliver regional and longer distance active travel routes
which are within Renfrewshire Council’s boundary.  
At a local level, the Council’s Cycling Strategy laid out a continuing commitment to support
and encourage cycling by continually improving and extending the network and providing
clear links to public transport hubs, schools, key destinations and between communities.
The Council’s Core Paths Plan also provides an up to date network of core routes which
seek to enhance connections between settlements and communities, support active travel

Page 66

Renfrewshire Local Transport Strategy 2025-2035   50
PUBLIC
use to schools and workplaces, and encourage healthy lifestyles. The Council’s Plan for Net
Zero also sets out ways in which active travel opportunities can be maximised. 
9.2. Current Status
There is an established cycle network in Renfrewshire, which includes sections of the
National Cycle Network (NCN7 from Paisley to Lochwinnoch and NCN75 from Johnstone
to Bridge of Weir), which is owned and maintained by Sustrans. There are also existing
non-NCN cycle routes, including more recently, between Bishopton and Inchinnan, the
area around Glasgow Airport and AMIDS and between Renfrew and Paisley.
Some statistics related to bicycle access and walking and cycling mode share are
presented below. 
Findings from the 2022 Scottish Household Survey shows that access rates to at least
one bicycle in Renfrewshire are in line with the national average (38% compared to
37.5%)
Analysis of Census data between 2011 and 2022 shows that active travel mode share for
travel to work remained broadly similar, at approximately 1% for cycling and 7% for
walking
In November 2023, LEAP (Local Energy Action Plan) launched an E-Bike hire scheme in
Linwood. It currently has five E-Bikes and two E-Trikes now available within close proximity
of two of LEAP’s Car Club cars. LEAP’s goal is to get more people to choose sustainable
transport options for longer journeys and to get more people to choose to walk or cycle for
short local journeys.
9.2.1. Active Travel Route Network
An Active Travel Route Network map for Renfrewshire is presented in Figure 11. This
presents the existing cycle network; proposed routes (primary and secondary), categorised
as high, medium or low priority; and other proposed routes, categorised as recreational,
local access and link route / access point. Route network categories have been informed
by Sustrans guidance.

Page 67

Renfrewshire Local Transport Strategy 2025-2035   51
PUBLIC
Primary routes link to key trip attractors and attract the highest demand for cycling and
will often be used for commuting trips. Primary routes are street lit and gritted. Primary
cycle routes will be used to form active freeways in urban areas. Active freeways are a
network of high quality, segregated routes for walking, wheeling and cycling to connect
city and town centres with residential neighbourhoods and other strategic centres and
destinations. Secondary routes link to local centres. Level of priority has only been
presented for primary and secondary routes.
Local access routes will often be used for recreation and touring purposes. 
Link path / access points are a short distance link which branches off any of the above
referenced network types and connects directly to an attraction such as school, parks,
shops and job centres, for example. 
Routes have been identified following identification of key employment and residential
areas which are considered to benefit from the creation of cycling links. Consideration was
also given to improving active travel access to public transport stops and hubs when
developing the routes. The routes presented are indicative and will be informed by future
appraisal of their feasibility.

Page 68

52
PUBLIC
Figure 11: Active Travel Route Network Map © Crown Copyright and database rights 2025. Licence number AC0000815792

Page 69

53
PUBLIC
9.3. What You Said
Public and stakeholders were engaged to inform the development of this LTS, including
identification of problems and opportunities related to active travel in Renfrewshire, and
identification of potential options. This helped to inform the development of actions for a
ten-year period. The following points provide examples of what was raised.
Problems
Issues associated with walking and cycling routes connecting town centres, stations
and along key corridors
Lack of cohesive and segregated traffic-free cycle routes
Safety concerns in relation to the active travel network
Maintenance of the active travel network
Opportunities
Improve and expand the cycle network
Improve condition of the active travel network by prioritising routes in need of
maintenance
Improve walking and cycling routes to schools
Increase provision of cycle parking, including at rail stations
9.4. Policies and Actions
Consideration has been given to the problems and opportunities identified through
discussions with stakeholders and members of the public, as well as consideration of
national, regional and local policies when developing policies and actions for this LTS, and
how strongly these help to address the objectives of this strategy. With this in mind, Active
Travel policies have been developed for Renfrewshire Council to work towards, alongside
actions.

Page 70

Renfrewshire Local Transport Strategy 2025-2035   54
PUBLIC
9.4.1. Policies
• Policy 1 (Active Travel) – Prioritise provision of walking, wheeling and cycling
infrastructure in Renfrewshire where practicable, in line with the Sustainable
Travel Hierarchy and Sustainable Investment Hierarchy, with a view to increasing
the proportion of people travelling by active modes for everyday journeys. 
• Policy 2 (Active Travel) – Deliver an active travel network and active travel
infrastructure in Renfrewshire that is safe and accessible to all users. 
• Policy 3 (Active Travel) – Support use of sustainable freight solutions, including
cargo bikes, to serve key service centres in Renfrewshire. 
• Policy 4 (Active Travel) – Maintain active travel infrastructure (including footpaths
and cycleways) to a high standard. 
• Policy 5 (Active Travel) – Monitor use of active travel infrastructure and expand our
network where new infrastructure can support modal shift.
The table below demonstrates where there is alignment between policies and objectives. 
Table 3: Active Travel Policy Alignment with LTS Objectives
Policy  Objective 1
Fair access to
sustainable
modes
Objective 2
Reduce
transport
emissions
Objective 3
Increase
everyday
sustainable
travel trips 
Objective 4
Improve
transport
connections
Objective 5
Improve
transport
safety
Objective 6
Maintain
transport
network
Policy 1 (Active
Travel)       
Policy 2 (Active
Travel)       
Policy 3 (Active
Travel)     

Page 71

Renfrewshire Local Transport Strategy 2025-2035   55
PUBLIC
Policy  Objective 1
Fair access to
sustainable
modes
Objective 2
Reduce
transport
emissions
Objective 3
Increase
everyday
sustainable
travel trips 
Objective 4
Improve
transport
connections
Objective 5
Improve
transport
safety
Objective 6
Maintain
transport
network
Policy 4 (Active
Travel)       
Policy 5 (Active
Travel)       
9.4.2. Active Travel Actions
Actions support the policies, and these have been developed to support the Vision and
Objectives of this LTS. The Active Travel Actions are set out below, alongside a high-level
indication of costs and timescales and a summary of delivery and potential funding
partners. This forms the Delivery Plan for Active Travel.
Business-as-usual measures are captured under Chapter 7; these do not form part of the
Action Plan. However, some business-as-usual activities support some of the actions
identified. The actions below are in addition to business-as-usual activities. 
AT1: Design and extend the cycle path network across Renfrewshire to be safe and
accessible, in line with locations identified in the Proposed Active Travel Network Map
Delivery Partners: Renfrewshire Council; Sustrans; SPT
Potential Funding Partners: Transport Scotland
Timescale: 10 years +

Page 72

Renfrewshire Local Transport Strategy 2025-2035   56
PUBLIC
AT2:  Work with Sustrans to implement and adopt lighting across the off-road active travel
network
Delivery Partners: Renfrewshire Council, Sustrans
Timescale: 10 years +
AT3: Work with SPT to deliver regional and longer distance cycling connections set out
within the Regional Active Travel Strategy
Delivery Partners: Renfrewshire Council, Sustrans, SPT, Neighbouring Local Authorities
Potential Funding Partners: Transport Scotland
Timescale: 10 years +
AT4: Prioritise pedestrian safety through a review of crossing facilities on the local road
network at locations identified in the Annual Accident Assessment and through working
with local communities
Delivery Partners: Renfrewshire Council
Timescale: 5 to 10 years
AT5:  Review cycle safety and priority at junctions, including review of on-road
infrastructure and measures for implementation of early release signals for cyclists at
locations identified in the Annual Accident Assessment and through working with local
communities
Delivery Partners: Renfrewshire Council
Timescale: 5 to 10 years

Page 73

Renfrewshire Local Transport Strategy 2025-2035   57
PUBLIC
AT6:  Create a Maintenance Plan for the active travel network, including adoption,
prioritisation and maintenance of active travel paths across Renfrewshire, including winter
maintenance and removal of vegetation 
Delivery Partners: Renfrewshire Council
Timescale: 0 to 5 years
AT7: Undertake a signage review and implement a signage and wayfinding strategy to
support more local journeys by walking, wheeling and cycling
Delivery Partners: Renfrewshire Council, Sustrans
Potential Funding Partners: Transport Scotland
Timescale: 0 to 5 years
AT8: Review feasibility and implement the expansion of cycle training into secondary
schools and / or adult cycle training through local providers
Delivery Partners: Renfrewshire Council, SPT, Third Sector Active Travel Delivery Partners
Timescale: 5 to 10 years 
AT9: Build a monitoring and evaluation framework for the active travel actions of the LTS
in order to collect relevant baseline data and effectively monitor progress
Delivery Partners: Renfrewshire Council
Timescale: 0 to 5 years 
AT10: Increase the number of secure cycle parking spaces, with a focus on locations
serving local communities identified in the Proposed Active Travel Network Map
Delivery Partners: Renfrewshire Council, SPT, Third Sector Active Travel Delivery Partners
Timescale: 5 to 10 years
AT11: Support access to bikes by working with SPT to investigate potential for delivery of a
partial / fully regional public bike hire scheme (including e-bikes) that is available at
locations which would be served by the Proposed Active Travel Network
Delivery Partners: Renfrewshire Council, SPT, Public/Private sectors, Other Local
Authorities

Page 74

Renfrewshire Local Transport Strategy 2025-2035   58
PUBLIC
Timescale: 0 to 5 years
AT12:  Undertake a feasibility study to create a public charging network for electric bikes in
Renfrewshire, potentially linked to Mobility Hubs
Delivery Partners: Renfrewshire Council
Timescale: 0 to 5 years 
AT13: Support measures to make it easier for the last mile of small goods deliveries to be
undertaken by sustainable modes, such as by cargo bikes 
Delivery Partners: Renfrewshire Council, Freight and logistics operators
Timescale: 5 to 10 years

Page 75

Renfrewshire Local Transport Strategy 2025-2035   59
PUBLIC
10. Behaviour Change 
10.1. Behaviour Change Overview
Transport Scotland’s Reducing Car Use for a Healthier, Fairer and Greener Scotland Route
Map underlines that modifying people’s travel behaviours will be key to meeting the 20%
reduction in car kilometres by 2030 target set out in the Climate Change Plan; it is noted
that while there remains a commitment to reduce reliance on cars, a Renewed Policy
Statement, published in June 2025 by Transport Scotland, sets out that a new, longer term
target for reducing car use will be developed. Behavioural changes identified within the
Route Map are centred around: reducing the need to travel; living well locally; switching
modes; and combining or sharing car trips. The importance of Behaviour Change within
transport was also highlighted within the Strategic Transport Projects Review 2 (STPR2)
which presented a number of recommendations within the theme of ‘Influencing Travel
Choices and Behaviour’. 
Behaviour Change interventions include those such as cycle training, health walks and
providing access to bikes, and focus on influencing people to make healthier, more
sustainable and safer travel choices through the use of marketing campaigns, travel
planning and specific programmes of events within schools, workplaces and communities.
These are delivered by many different organisations, including funding currently provided
through the People and Place programme, administered by SPT. Recently funded
Behaviour Change programmes (2023/2024) in Renfrewshire include the Beat the Street
project which was delivered across Renfrew, Bishopton and Erskine in 2023 and the Living
Street’s WOW Walk to School challenge that was provided within 20 primary schools in the
area. 
Ongoing collaboration and partnership working between national, regional and local
Government (including Renfrewshire Council) as well as public, private and third sector
partners will be central to facilitate Behaviour Change. This LTS sets out the policies and
actions the Council will deliver to support Behaviour Change initiatives in Renfrewshire
over the lifespan of the strategy.

Page 76

Renfrewshire Local Transport Strategy 2025-2035   60
PUBLIC
10.2. Current Status
Analysis of Census data shows the following changes in mode share between 2011 and
2022:
• Travel to work by car / van (as a driver or passenger) has increased from 65% in
2011 to 71% mode share in 2022 (though the absolute number of people
travelling to work by car has decreased, likely as a result of more people working
from home); 
• Bus mode share has decreased from 12% to 8%; 
• Rail mode share has decreased marginally from 6% to 5%; and 
• Cycling and walking mode shares have remained broadly similar between the
2011 Census and 2022 Census, at around 1% for cycling and 7% for walking.
The annual Hands Up Scotland Survey undertaken by Sustrans provides the most
comprehensive dataset on travel to school, with a sample size of over 19,000 pupils in
Renfrewshire in the latest survey (2023). The results for 2023 showed that:
• The proportion of pupils being driven to school is lower in Renfrewshire (19%)
compared to the whole of Scotland (23%);
• The proportion of pupils who travel to school by active travel has decreased in
Renfrewshire since the 2022 survey by 0.7 percentage points; 
• The proportion of pupils being driven to school decreased by 1.5 percentage
points; and
• There has been an increase in bus travel to school among secondary school
pupils in Renfrewshire, increasing from 29% mode share in 2021 to 33% in 2023.
Data demonstrates that car / van is the most common method of travel to work, providing
an opportunity for travel to be made by other travel modes; which can be encouraged
through Behaviour Change initiatives. Although being driven to school is not the most
common method of travel, opportunities remain to encourage mode shift. Behaviour
Change initiatives also have an important role to play, for example through the Bikeability
programme.  
Bikeability is a national cycle training programme for school children. This helps to
engender more confident cycling, which can encourage Behaviour Change. In school terms
2023 / 2024, over 2,500 pupils in Renfrewshire received this training.

Page 77

Renfrewshire Local Transport Strategy 2025-2035   61
PUBLIC
10.3. What You Said
The public and stakeholders were engaged with to inform development of this LTS,
including identification of problems and opportunities related to Behaviour Change in
Renfrewshire, and identification of potential options. This helped to inform the
development of actions for a ten-year period. The following points provide examples of
what was raised.
Problems
Information available on public transport was noted to be inadequate 
Consultation highlighted the barriers which can prevent transport users in Renfrewshire
from opting to select certain modes of transport, particularly sustainable modes. These are
captured elsewhere in the LTS under relevant chapters, illustrating the problems transport
users face when seeking to change their travel habits and use other modes of travel. 
Opportunities
Education programmes to encourage pupils to travel more sustainably to school, such
as the Better Points programme and Living Streets
Promotion of alternative travel modes such as car-pooling, car clubs and bike hire
schemes
Walking and cycling benefits awareness – including cycle training and proficiency
courses

Page 78

Renfrewshire Local Transport Strategy 2025-2035   62
PUBLIC
10.4. Policies and Actions
Consideration has been given to the problems and opportunities identified through
discussions with stakeholders and members of the public, as well as consideration of
national, regional and local policies when developing policies and actions for this LTS, and
how strongly these help to address the objectives of this strategy. With this in mind,
Behaviour Change policies have been developed for Renfrewshire Council to work
towards, alongside actions.
10.4.1. Policies
• Policy 1 (Behaviour Change) – Make it easier for people to change their travel
behaviours, by raising awareness of the benefits of sustainable travel, including
health, and improving multi-modal transport access across Renfrewshire. 
• Policy 2 (Behaviour Change) – Continue to deliver Council-led Behaviour Change
programmes – including in our schools – and engage with organisations across
Renfrewshire to assist in the promotion of sustainable transport solutions.
The table below demonstrates where there is alignment between policies and objectives.
Table 4: Behaviour Change Policy Alignment with LTS Objectives
Policy  Objective 1
Fair access
to
sustainable
modes 
Objective 2
Reduce
transport
emissions
Objective 3
Increase
everyday
sustainable
travel trips 
Objective 4
Improve
transport
connections
Objective 5
Improve
transport
safety 
Objective 6
Maintain
transport
network
Policy 1 (Behaviour
Change)       
Policy 2 (Behaviour
Change)    

Page 79

Renfrewshire Local Transport Strategy 2025-2035   63
PUBLIC
10.4.2. Behaviour Change Actions
Actions support the policies, and these have been developed to support the Vision and
Objectives of this LTS. The Behaviour Change Actions are set out below, alongside a high-
level indication of costs and timescales, and a summary of delivery partners. This forms the
Delivery Plan for Behaviour Change.
Business-as-usual measures are captured under Chapter 7; these do not form part of the
Action Plan. However, some business-as-usual activities support some of the actions
identified. The actions below are in addition to business-as-usual activities. 
B1: Provide support to parents and carers to apply for young persons' concessionary travel
entitlement card
Delivery Partners: Renfrewshire Council, SPT
Timescale: 5 to 10 years
B2:  Work with schools on Behaviour Change initiatives with local partners
Delivery Partners: Renfrewshire Council, School Communities, SPT, Third Sector Active
Travel Delivery Partners 
Timescale: 0 to 5 years
B3: Provide more opportunities for pupils leaving primary school across Renfrewshire to
receive Bikeability Levels 1 and 2 cycle training as a minimum
Delivery Partners: Renfrewshire Council, SPT, Cycling Scotland, Third Sector Active Travel
Delivery Partners
Timescale: 5 to 10 years

Page 80

Renfrewshire Local Transport Strategy 2025-2035   64
PUBLIC
B4: Continue discussions on sustainable transport solutions and engage with employers to
promote Cycling Scotland's Adult Cycle Training, including with employers at:
• Advanced Manufacturing Innovation District Scotland (AMIDS)
• Inchinnan Business Park
• Westway Park
• Hillington Industrial Estate
• Braehead Retail Park
Delivery Partners: Renfrewshire Council, Cycling Scotland, Health Board, Employers
Timescale: 0 to 5 years
B5: Encourage employers and schools to implement Travel Plans to support a shift to
sustainable travel modes
Delivery Partners: Renfrewshire Council, SPT, Employers, Developers, School Communities
Timescale: 0 to 5 years
B6: Renfrewshire Council to update its staff Travel Plan
Delivery Partners: Renfrewshire Council
Timescale: 0 to 5 years
B7: Review Behaviour Change programmes currently delivered in Renfrewshire and
provide targeted, strategic support to organisations delivering Behaviour Change within
Renfrewshire through external funding sources
Delivery Partners: Renfrewshire Council, SPT, Health Board, Third Sector Active Travel
Delivery Partners
Potential Funding Partners: Transport Scotland
Timescale: 0 to 5 years

Page 81

Renfrewshire Local Transport Strategy 2025-2035   65
PUBLIC
11. Public Transport and Shared Mobility 
11.1. Public Transport and Shared Mobility Overview
A high functioning public transport network which attracts a high mode share of users can
play a central role in the delivery of national, regional and local policies. As described in the
Council’s Economic Strategy, investment into the provision of high quality bus and rail
services within Renfrewshire can act as an enabler for economic growth and support
changes to future economic conditions. The Economic Strategy outlines the importance of
improved access by public transport to principal business locations such as Inchinnan,
Glasgow Airport, Westway and Hillington. AMIDS is also an important centre to be linked by
public transport.   
The Transport (Scotland) Act 2019 sets out new provisions which provide local authorities
with greater opportunities to provide improved and new public transport services in their
area. This includes through the implementation of Bus Service Improvement Partnerships
(BSIPs), which facilitate the creation of a statutory partnership between relevant
authorities (such as the Council) and operators; and new powers for local authorities to
franchise local services and implement new local bus services.
The latest NTS2 Delivery Plan, which covers the period 2023 to 2024 (Third Scottish
Government Delivery Plan) references national schemes which would impact upon
Renfrewshire. This includes the Fair Fares Review, which aims to support a sustainable and
integrated approach to public transport fares. 
There are a number of commercial bus operators which operate in Renfrewshire. There are
also organisations within the area that are responsible for the delivery of community
transport and demand responsive transport services; demand responsive and community
transport is particularly important for those where it is difficult to access public transport,
including older people and people with disabilities. Whilst most areas of Renfrewshire are
accessible via the bus network, there are some exceptions, particularly in rural areas. Taxis
and private hire vehicles also have a role to play and are particularly useful for certain
journeys where walking, wheeling, cycling or using public transport is difficult, for example
late at night, for those that are unable to travel by such modes or where community
transport may not operate. Access to these types of transport also help reduce the need to
own a car.

Page 82

Renfrewshire Local Transport Strategy 2025-2035   66
PUBLIC
The rail network in Renfrewshire consists of a line from Glasgow Central Station that
terminates at Paisley Canal and a line to Paisley Gilmour Street which then splits into the
Inverclyde line and the Largs / Ardrossan / Ayr line via Johnstone. An overview map is
provided in section 3.3.
Renfrewshire’s Plan for Net Zero highlights the role that community initiatives have in
delivering more sustainable transport solutions, to help meet the net zero target by 2030.
Such initiatives are diverse and wide ranging but incorporate the establishment (and
thereafter delivery) of, for example, car clubs and bike hire schemes. The success of these
community transport initiatives is reliant upon effective collaboration between
Renfrewshire Council and local communities, businesses, partners and organisations. 
11.2. Current Status
Data captured in the Strathclyde Regional Bus Strategy Case for Change shows that bus
use in the west of Scotland (which covers the SPT area and Dumfries and Galloway) has
seen sustained reductions in recent years, with a downward trajectory of annual passenger
journeys since 2008/2009. 
The Scottish Access to Bus Indicator is an analysis undertaken by the Scottish Government
which gives an indication of the availability and frequency of bus services within each data
zone across Scotland. Key results show that 30% of data zones in Renfrewshire are
amongst the 20% least accessible of all data zones in Scotland. 
Data collected on rail station entries and exits by The Office of Rail and Road (ORR) shows
that in the years preceding 2019, there had been a general trend of growth in the number
of entries and exits at Renfrewshire’s rail stations. However, as a result of the COVID-19
pandemic, there was a large fall in rail passenger numbers, with numbers in 2020-21 79%
lower than in 2017-18. Rail passenger numbers have shown a recovery since the pandemic,
but the number of entries and exits from stations remains 34% lower in 2022-23 when
compared to 2019-20.
Results from the Scottish Household Survey (SHS) show that from 2017-2022 (excluding
2020), general satisfaction rates with public transport in Renfrewshire (either very or fairly
satisfied) fell from 77% in 2017 to 49% in 2022. Levels of dissatisfaction (either fairly or very
dissatisfied) have fluctuated over the years but were at their lowest point in 2021 at 12%
and at their highest point of 23% in 2022.

Page 83

Renfrewshire Local Transport Strategy 2025-2035   67
PUBLIC
The SHS also asks respondents to indicate whether they agree with the statement “fares
are good value for money” for bus and trains; in 2021, 43% of respondents stated they
agreed with the statement for bus, and 51% stated they agreed for trains. With regards to
the statement “I feel personally safe and secure on the bus / train during the day”, 91%
stated they agreed with this statement for bus, and 90% for train. Feelings of personal
safety and security are lower during the evening for both bus and train, with 68% of bus
users agreeing with the statement “I feel personally safe and secure on the bus during the
evening” and 71% of rail users agreeing with the statement “I feel personally safe and
secure on the train during the evening”. 
With regards to Car Clubs, one such club was established by LEAP over ten years ago and
operates in limited areas across Renfrewshire. Bike hire is considered under the Active
Travel chapter. 
11.2.1. Mobility Hubs
Mobility Hubs bring together shared transport with public transport and active travel into
one space, thus helping to support multi-modal sustainable journeys. These are intended
to support more travel by sustainable modes and to make it easier to access shared
transport such as car clubs and bike hire. Mobility Hubs can differ in scale and scope and
although there are currently no formally designated mobility hubs in Renfrewshire, the
Council will seek opportunities for potential sites in the area.  
11.2.2. Clyde Metro 
Clyde Metro aims to provide a step-change in the region's transport system. It is a fully
integrated mass transit public transport system which could include a variety of modes
and aims to: help tackle social exclusion; support regeneration and investment across the
region; to provide high quality public transport links to key hubs and unserved or
underserved areas; and encourage fewer car journeys and thus reduce greenhouse gas
emissions. 
Renfrewshire Council commits to working with SPT, Glasgow City Council and other
partners to support development of the Clyde Metro. As a key area of the wider Glasgow
City Region, it is important to make sure that Renfrewshire and it’s major trip generators
and attractors are strategically connected with the wider city region. This is to make sure

Page 84

Renfrewshire Local Transport Strategy 2025-2035   68
PUBLIC
that critical assets such as Glasgow Airport, AMIDS, Braehead and Hillington, alongside
major towns such as Paisley, Renfrew and Johnstone are considered during the CFI
development process and beyond. 
11.3. What You Said
The public and stakeholders were engaged with to inform development of this LTS,
including identification of problems and opportunities related to public transport and
shared mobility in Renfrewshire, and identification of potential options. This helped to
inform the development of actions for a ten-year period. The following points provide
examples of what was raised. 
Problems
Low frequency and unreliable bus and train services – particularly in the evenings and
in rural areas
Network gaps (bus and rail) add to public transport connectivity and access problems;
including for example, to employment sites
Lack of accessible taxis
Lack of integration between different public transport modes and lack of integrated
ticketing
Limited community transport services across the Renfrewshire area
Opportunities
Support introduction of integrated ticketing across bus and train operators
Support implementation of Clyde Metro to strengthen public transport across
Renfrewshire
Support potential for expansion of demand responsive and community transport,
including to help address social isolation
Support introduction of car club schemes – including those that are community
operated

Page 85

Renfrewshire Local Transport Strategy 2025-2035   69
PUBLIC
11.4. Policies and Actions
Consideration has been given to the problems and opportunities identified through
discussions with stakeholders and members of the public, as well as consideration of
national, regional and local policies when developing policies and actions for this LTS, and
how strongly these help to address the objectives of this strategy. With this in mind, Public
Transport and Shared Mobility policies have been developed for Renfrewshire Council to
work towards, alongside actions. 
11.4.1. Policies
• Policy 1 (Public Transport and Shared Mobility) – Work with partners to support
measures to increase patronage on the bus and rail networks, by making public
transport more attractive to use through improvements to frequency, reliability,
connectivity and affordability of fares. 
• Policy 2 (Public Transport and Shared Mobility) – Work with partners to provide an
accessible, safe, sustainable and integrated public transport system that is
seamless and improves the quality of experience for users, including through
improvements to transport hub facilities, public transport infrastructure and
ticketing. 
• Policy 3 (Public Transport and Shared Mobility) – Facilitate improved access to
transport in Renfrewshire through support for the expansion of Community
Transport and Demand Responsive Transport services. 
• Policy 4 (Public Transport and Shared Mobility) – Engaging with partners, support
the roll-out of initiatives that improve the ability for Renfrewshire residents to
access shared transport options, including car club schemes and bike hire
initiatives. 
Linked to Policy 4, it is noted that opportunities for an on-demand mobility service which
brings together a cross section of transport modes into one integrated application is
captured under the Digital Technology chapter.

Page 86

Renfrewshire Local Transport Strategy 2025-2035   70
PUBLIC
The table below demonstrates where there is alignment between policies and objectives.   
Table 5: Public Transport and Shared Mobility Policy Alignment with LTS Objectives
Policy  Objective 1
Fair access to
sustainable
modes 
Objective 2
Reduce
transport
emissions
Objective 3
Increase
everyday
sustainable
travel trips
Objective 4
Improve
transport
connections
Objective 5
Improve
transport
safety
Objective 6
Maintain
transport
network
Policy 1
(Public
Transport and
Shared
Mobility) 
     
Policy 2
(Public
Transport and
Shared
Mobility) 
     
Policy 3
(Public
Transport and
Shared
Mobility) 
     
Policy 4
(Public
Transport and
Shared
Mobility) 
     

Page 87

Renfrewshire Local Transport Strategy 2025-2035   71
PUBLIC
11.4.2. Public Transport and Shared Mobility Actions 
Actions support the policies, and these have been developed in turn to support the Vision
and Objectives of this LTS. The Public Transport and Shared Mobility Actions are set out
below, alongside a high-level indication of costs and timescales, and a summary of delivery
partners. This forms the Delivery Plan for Public Transport and Shared Mobility. 
Business-as-usual measures are captured under Chapter 7; these do not form part of the
Action Plan. However, some business-as-usual activities support some of the actions
identified. The actions below are in addition to business-as-usual activities. 
It is noted that public transport is primarily operated by commercial operators within
Renfrewshire, who have ultimate responsibility and control over the implementation of
many improvement measures. However, through this LTS, the Council will collaborate with
operators to make sure improvements, particularly in traffic management infrastructure,
best meet the needs of public transport users and support the delivery of the Strategy.
PS1: Working with partners; enhance facilities at transport hubs such as Paisley Gilmour
Street Station to improve safety, security and dissemination of information for all users
Delivery Partners: Renfrewshire Council, SPT, ScotRail
Timescale: 0 to 5 years
PS2:  Working with SPT and operators; make buses, trains and taxis accessible and easier
for all to use, including through reducing physical accessibility barriers and improving the
accessibility of travel information 
Delivery Partners: Renfrewshire Council, SPT, Public Transport operators
Timescale: 0 to 5 years
PS3: Working with SPT and operators; support measures to improve integrated ticketing
across public transport modes and operators, including exploration of a daily price cap
Delivery Partners: Renfrewshire Council, SPT, Public Transport operators
Timescale: 0 to 5 years

Page 88

Renfrewshire Local Transport Strategy 2025-2035   72
PUBLIC
PS4: Working with partners; explore opportunities to increase the frequency and improve
reliability of bus services across Renfrewshire
Delivery Partners: Renfrewshire Council, SPT, Bus operators
Timescale: 5 to 10 years
PS5:  Working with Transport Scotland, ScotRail and Network Rail; improve accessibility at
all rail stations, including ramp access on all platforms and between platforms (as
applicable), including at Lochwinnoch station
Delivery Partners: Renfrewshire Council, Network Rail, ScotRail
Potential Funding Partners: Transport Scotland, SPT 
Timescale: 0 to 5 years
PS6:  Working with partners; explore opportunities to expand network coverage of bus
services in rural areas of Renfrewshire and between areas of deprivation and employment
such as AMIDS
Delivery Partners: Renfrewshire Council, SPT, Bus operators
Timescale: 0 to 5 years
PS7: Renfrewshire Council to work with SPT, Glasgow City Council and other partners to
support development of Clyde Metro, and Renfrewshire Council to continue advocating for
options to provide a fixed link to Glasgow Airport and AMIDS
Delivery Partners: Renfrewshire Council, SPT, Glasgow City Council, Other delivery partners
as relevant
Potential Funding Partners: Transport Scotland
Timescale: 0 to 5 years

Page 89

Renfrewshire Local Transport Strategy 2025-2035   73
PUBLIC
PS8: Working with partners in the short term; explore options to provide a direct and
frequent public transport service from Paisley Gilmour Street Station to Glasgow Airport
and AMIDS
Delivery Partners: Renfrewshire Council, SPT, Bus operators, Glasgow Airport
Timescale: 0 to 5 years
PS9: Support development of the bus network through provision of bus priority lanes on
key corridors and bus priority at signalised junctions including at:
• Glasgow Road
• Renfrew Road
• Neilston Road
Delivery Partners: Renfrewshire Council, Glasgow City Council, SPT
Potential Funding Partners: Transport Scotland 
Timescale: 5 to 10 years
PS10: Support provision of existing and new Community Transport and Demand
Responsive Transport, with a focus on rural areas and access to health and providing
transport that is fully accessible
Delivery Partners: Renfrewshire Council, SPT, Community Transport and Demand
Responsive Transport operators
Timescale: 5 to 10 years

Page 90

Renfrewshire Local Transport Strategy 2025-2035   74
PUBLIC
PS11:  Investigate the implementation of Community Bus Hubs, to enable community
operated services to connect with commercial bus routes
Delivery Partners: Renfrewshire Council, SPT
Timescale: 0 to 5 years
PS12: Working with SPT; continue to implement a programme of bus stop improvements,
including to provide high kerb access at bus stops in town and village centres and in
neighbourhood locations as appropriate
Delivery Partners: Renfrewshire Council, SPT
Timescale: 5 to 10 years
PS13: Support SPT to establish local bus franchising within Renfrewshire and across the
Strathclyde region
Delivery Partners: Renfrewshire Council, SPT
Timescale: 5 to 10 years
PS14: Support measures to make public transport affordable for all, including through
actions identified in Transport Scotland’s Fair Fares Review, where relevant 
Delivery Partners: Renfrewshire Council, SPT, Public Transport operators
Potential Funding Partners: Transport Scotland 
Timescale: 5 to 10 years

Page 91

Renfrewshire Local Transport Strategy 2025-2035   75
PUBLIC
PS15: Support the expansion of car club schemes across Renfrewshire, including clubs
with electric vehicles  
Delivery Partners: Renfrewshire Council, LEAP, Other car club providers
Timescale: 5 to 10 years
PS16: Work with partners to explore the potential for Mobility Hubs across Renfrewshire,
with a focus on existing transport hubs and town centre locations such as Paisley Gilmour
Street and Piazza Shopping Centre  
Delivery Partners: Renfrewshire Council, SPT, Other delivery partners as relevant
Potential Funding Partners: Transport Scotland
Timescale: 0 to 5 years

Page 92

Renfrewshire Local Transport Strategy 2025-2035   76
PUBLIC
12. Road Safety 
12.1. Road Safety Overview
The Council’s Road Safety Policy reflects the vision of Scotland’s Road Safety Framework
to 2030. This Framework sets out a vision for Scotland to have the best road safety
performance in the world and has a number of targets, including interim targets to 2030 for
a 50% reduction in people killed or seriously injured, and a 60% reduction in children killed
or seriously injured. The framework embeds the Safe System approach to road safety
delivery as set out in the NTS2 Delivery Plan, which includes; safe road use, safe vehicles,
safe speeds, safe roads and roadsides and post-crash response. 
The Council’s Road Safety Policy follows the Safe System and has key objectives to reduce
the volume of traffic on the road network; reduce the speed of the traffic on the road
network; and enhance the physical environment for those who wish to walk, wheel, cycle
or use public transport. 
12.2. Current Status
Road Casualty Statistics data – which is data collected by Police Scotland on the number
of people killed or seriously injured on Scotland’s roads – shows that the number of people
seriously injured on roads within Renfrewshire decreased from 81 people to 54 people
from 2012-2016 to 2018-2022. The number of people killed on roads in Renfrewshire during
the same period decreased slightly from five people to three people. (Reported Road
Casualty Statistics 2022)

Page 93

Renfrewshire Local Transport Strategy 2025-2035   77
PUBLIC 
Although there is an overall trend of the number of road accidents decreasing, there is
more work to be done to achieve the target set out in the Road Safety Framework of zero
serious injuries or fatalities by 2050. 
There are currently over 70 School Crossing Patrols in place across Renfrewshire, helping
to support safe travel to school. The Junior Road Safety Officer programme is also in place
in Renfrewshire and promotes road safety by encouraging pupils to raise awareness of
road safety issues at their primary school.
Renfrewshire schools have:
• 275 Junior Road Safety Officers across 23 schools in Renfrewshire
• SafeKids event run by Youth Services
• Road Safety Awareness Programme 
Figure 12: Road Casualty Statistics in Renfrewshire (5 Year Moving Average)

Page 94

Renfrewshire Local Transport Strategy 2025-2035   78
PUBLIC
12.3. What You Said
The public and stakeholders were engaged with to inform development of this LTS,
including identification of problems and opportunities related to road safety in
Renfrewshire, and identification of potential options. This helped to inform the
development of actions for a ten-year period. The following points provide examples of
what was raised.
Problems
High traffic speeds, particularly in rural areas and outside schools
Road maintenance challenges – potential safety concerns associated with potholes
Congested roads outside schools cause safety concerns
Most survey respondents stated that they agree or somewhat agree that speeding
traffic is an issue 
Opportunities
Introduction of safety measures such as traffic calming at schools
Expand initiatives such as Transport Scotland’s Junior Road Safety Officers scheme
Implement speed limit reductions (including 20mph zones)

Page 95

Renfrewshire Local Transport Strategy 2025-2035   79
PUBLIC
12.4. Policies and Actions
Consideration has been given to the problems and opportunities identified through
discussions with stakeholders and members of the public, as well as consideration of
national, regional and local policies when developing policies and actions for this LTS, and
how strongly these help to address the objectives of this strategy. With this in mind, Road
Safety policies have been developed for Renfrewshire Council to work towards, alongside
actions.
12.4.1. Policies
• Policy 1 (Road Safety) – Apply the principles of the Council’s Road Safety Policy to
create a road network that is safe for all users. 
• Policy 2 (Road Safety) – Continue to work towards Scottish Government’s road
casualty reduction targets of 50% fewer people killed and seriously injured; and
60% fewer children (aged under 16) killed or seriously injured by 2030 (against a
2014/2018 baseline) and Vision Zero serious injuries or fatalities by 2050. 
• Policy 3 (Road Safety) – Work with partners, including Police Scotland and
Transport Scotland, to identify and implement road safety initiatives on the
Renfrewshire road network. 
• Policy 4 (Road Safety) – Work with schools across Renfrewshire to promote road
safety in school environments. 
The table below demonstrates where there is alignment between policies and objectives.

Page 96

Renfrewshire Local Transport Strategy 2025-2035   80
PUBLIC
Table 6: Road Safety Policy Alignment with LTS Objectives
Policy  Objective 1
Fair access to
sustainable
modes
Objective 2
Reduce
transport
emissions
Objective 3
Increase
everyday
sustainable
travel trips
Objective 4
Improve
transport
connections
Objective 5
Improve
transport
safety
Objective 6
Maintain
transport
network
Policy 1 (Road
Safety)       
Policy 2 (Road
Safety)       
Policy 3 (Road
Safety)       
Policy 4 (Road
Safety)       
12.4.2. Road Safety Actions 
Actions support the policies, and these have been developed to support the Vision and
Objectives of this LTS. The Road Safety Actions are set out below, alongside a high-level
indication of costs and timescales, and a summary of delivery partners. This forms the
Delivery Plan for Road Safety.
Business-as-usual measures are captured under Chapter 7; these do not form part of the
Action Plan. However, some business-as-usual activities support some of the actions
identified. The actions below are in addition to business-as-usual activities. 
RS1: Work with Transport Scotland to introduce 20 mph speed limits on urban residential
streets
Delivery Partners: Renfrewshire Council 
Potential Funding Partners: Transport Scotland
Timescale: 5 to 10 years

Page 97

Renfrewshire Local Transport Strategy 2025-2035   81
PUBLIC
RS2: Implement measures to reduce congestion outside school gates, including
consideration of short-term parking restrictions and work with schools and local
communities to develop measures
Delivery Partners: Renfrewshire Council, School Communities
Timescale: 0 to 5 years
RS3: Implement traffic calming measures and other road safety interventions on local
roads, where considered appropriate, following assessment as defined by Renfrewshire's
Road Safety Policy
Delivery Partners: Renfrewshire Council
Timescale: 5 to 10 years
RS4: Partner with Police Scotland on priorities for enforcement and improve collaboration
on road safety matters
Delivery Partners: Renfrewshire Council, Transport Scotland, Police Scotland
Timescale: 5 to 10 years
RS5: Seek collaboration with secondary schools to promote road safety
Delivery Partners: Renfrewshire Council, School Communities
Timescale: 5 to 10 years
RS6: Undertake Annual Accident Assessments to identify locations for targeted road safety
improvements 
Delivery Partners: Renfrewshire Council 
Timescale: 0 to 5 years

Page 98

Renfrewshire Local Transport Strategy 2025-2035   82
PUBLIC
13. Parking 
13.1. Parking Overview
The Council’s Parking Strategy covers the period 2023 to 2028 and sets out the parking
management arrangements and enforcement model for the Council area. Prior to
publication, Renfrewshire’s parking arrangements had been in place since 2010, when
parking offences were decriminalised, and parking management largely centred around
the control of parking in and around Paisley Town Centre. Ongoing parking issues exist
across Renfrewshire, and so the new strategy was developed to address parking concerns
raised by residents, business and stakeholders. The Actions identified in this LTS
document build upon the Workstreams in the Parking Strategy. 
13.2. Current Status
Decriminalised Parking Enforcement has been in place in Renfrewshire since 2010; this
allows the Council to manage its own parking restrictions, including the issuing of Penalty
Charge Notices (PCNs). 
One hour free parking is available at all charged parking locations in Paisley town centre.
This was introduced, with a revised long stay tariff, to balance the needs of business and
shoppers with the Council’s wider efforts to encourage more travel by sustainable modes
such as walking, wheeling, cycling, bus and rail, where possible. 
Recently, provision set out in the 2019 Transport (Scotland) Act gave powers to local
authorities to enforce the national pavement parking ban. This came into effect in
Renfrewshire in April 2025, subject to limited exemptions allowed by local traffic orders. 
Statistics related to parking in Renfrewshire are set out below. 
• There are over 2,000 controlled parking spaces in car parks across Renfrewshire
and around 1,600 on-street, plus over 1,000 residential disabled parking bays.
• There are 148 Electric Vehicle charging devices within Renfrewshire (as of April
2024). 
• There are 49 Council-owned car parks across the local authority area. 
• There are approximately 650,000 parking transactions that take place in Paisley
town centre on an annual basis, split between on-street and off-street parking.

Page 99

Renfrewshire Local Transport Strategy 2025-2035   83
PUBLIC
It is noted that parking spaces are a necessity in some circumstances, including for
disabled users and those with mobility issues. 
With regards to parking charges:
• These generally apply Monday to Saturday (Monday to Friday in Zones 3 and 4). 
• All the car parks and on-street parking spaces in Paisley offer up to 1 hour free
parking, except the long stay spaces outside the Royal Alexandra Hospital in Zone
4.
• Parking is free on Sundays in Council car parks and in on-street parking spaces,
unless there are restrictions clearly marked.
Details of Renfrewshire Council’s Parking Places can be viewed on the Council’s website. 
Renfrewshire Council does not manage car parks at rail stations. The number of car park
spaces at rail stations is presented below. This demonstrates that there are a number of
stations that do not have car parking facilities. It also shows the low number of Electric
Vehicle parking spaces at stations. This data is up to date as of summer 2024 and was
obtained from information provided on the National Rail website. 
Table 7: Summary of Car Parking at Rail Stations in Renfrewshire
Station  Parking  Free
Parking?
Owner Number
of Parking
Spaces 
Number
of
disabled
parking
spaces 
Number of
Electric
Vehicle
parking
spaces
Bishopton  Yes Yes Scotrail 284 24 0
Hawkhead Yes Yes Scotrail 40 2 0
Howwood  Yes Yes Scotrail 30 2 0
Johnstone  Yes Yes Scotrail 423 13 2
Langbank No N/A N/A N/A N/A N/A
Lochwinnoch Yes Yes Scotrail 17 1 0
Milliken Park No N/A N/A N/A N/A N/A
Paisley Canal No N/A N/A N/A N/A N/A
Paisley
Gilmour Street
Yes No Scotrail 75 2 0
Paisley St
James
No  N/A N/A N/A N/A N/A

Page 100

Renfrewshire Local Transport Strategy 2025-2035   84
PUBLIC
13.3. Parking Strategy Feedback
The Parking Strategy has been reviewed as part of the LTS development. This found that
parking of vehicles affects many aspects of daily life for Renfrewshire’s residents,
businesses, and visitors. The Parking Strategy identified concerns by members of the
public and stakeholders around a lack of enforcement and poorly maintained
infrastructure which are tackled with actions in its Workstream 1. 
13.4. What You Said – LTS 
The public and stakeholders were engaged with to inform development of this LTS,
including identification of problems and opportunities related to parking in Renfrewshire,
and identification of potential options. This helped to inform the development of actions
for a ten-year period. The following points provide examples of what was raised. 
Problems
Pavement parking ban may lead to more parked cars on the carriageway, impeding live
traffic
Lack of capacity for parking at rail stations such as Milliken Park and Johnstone can
lead to over-spill parking in surrounding areas
A lack of electric vehicle charging points deters those without space at their own home
from buying electric vehicles
Car parking in village centres such as Bridge of Weir and Kilbarchan can often exceed
capacity
Opportunities
Increase the number of accessible Electric Vehicle charging points
Parking charges to continue to be balanced with economic regeneration and the needs
of local businesses
Provide more shared Park and Ride/ mobility hub sites to encourage increased travel by
bus and rail

Page 101

Renfrewshire Local Transport Strategy 2025-2035   85
PUBLIC
13.5. Policies and Actions
Consideration has been given to the problems and opportunities identified through
discussions with stakeholders and members of the public, as well as consideration of
national, regional and local policies when developing policies and actions for this LTS, and
how strongly these help to address the objectives of this strategy. With this in mind,
Parking policies have been developed for Renfrewshire Council to work towards, alongside
actions.
Policy 1 below refers to supporting Transport Scotland’s targets for reducing car
kilometres. It is noted that while there remains a commitment to reduce reliance on cars, a
Renewed Policy Statement, published in June 2025 by Transport Scotland, sets out that a
new, longer term target for reducing car use will be developed.
13.5.1. Policies
• Policy 1 (Parking) – Continue to implement Renfrewshire Council’s Parking
Strategy (2023-2028), to support Transport Scotland’s targets for reducing car
kilometres and thereby carbon emissions, and to support the economic growth
and vitality of town and village centres. 
• Policy 2 (Parking) - In line with the Sustainable Travel Hierarchy, support parking
measures which encourage sustainable travel.

Page 102

Renfrewshire Local Transport Strategy 2025-2035   86
PUBLIC
The table below demonstrates where there is alignment between policies and objectives. 
Table 8: Parking Policy Alignment with LTS Objectives
Policy  Objective 1
Fair access
to
sustainable
modes
Objective 2
Reduce
transport
emissions
Objective 3
Increase
everyday
sustainable
travel trips
Objective 4
Improve
transport
connections
Objective 5
Improve
transport
safety
Objective 6
Maintain
transport
network
Policy 1 (Parking)       
Policy 2 (Parking)       
13.5.2. Parking Actions 
Actions support the policies and these in turn have been developed to support the Vision
and Objectives of this LTS. The Parking Actions are set out below, alongside a high-level
indication of costs and timescales, and a summary of delivery partners. This forms the
Delivery Plan for Parking. 
Business-as-usual measures are captured under Chapter 7; these do not form part of the
Action Plan. However, some business-as-usual activities support some of the actions
identified. The actions below are in addition to business-as-usual activities. 
P1: Explore options to manage parking capacity issues, including at Johnstone Rail
Station, and the need for Park and Ride / mobility hub provision where there is currently
none, including at Milliken Park Rail Station, and to serve towns and villages which do not
have their own railway station
Delivery Partners: Renfrewshire Council, SPT, ScotRail, Network Rail
Potential Funding Partners: Transport Scotland 
Timescale: 0 to 5 years

Page 103

Renfrewshire Local Transport Strategy 2025-2035   87
PUBLIC
P2: Support the private sector expansion of the publicly available electric vehicle charging
network
Delivery Partners: Renfrewshire Council, Private sector
Timescale: 5 to 10 years
P3: Increase the number of disabled parking spaces in proximity to major trip attractors
Delivery Partners: Renfrewshire Council
Timescale: 0 to 5 years
P4: Implement pavement parking exemptions and enforce the national pavement parking
ban, including the offences of double parking and parking across pedestrian dropped
kerbs
Delivery Partners: Renfrewshire Council
Timescale: 5 to 10 years
P5: Investigate the potential for a workplace parking license and / or local road user
charging to be implemented in Renfrewshire
Delivery Partners: Renfrewshire Council
Potential Funding Partners: Transport Scotland
Timescale: 0 to 5 years

Page 104

Renfrewshire Local Transport Strategy 2025-2035   88
PUBLIC
14. Road Network and Freight
14.1. Road Network and Freight Overview
Renfrewshire has a road network that includes motorways, A roads and B roads. Major
roads within the area include the M8, which begins in Renfrewshire before heading east,
and is the main motorway connecting Glasgow and Edinburgh, and the M898 / A898, which
connects the M8 to the Erskine Bridge. ‘A’ roads in Renfrewshire include the A737 and the
A8T (West Ferry to Inverclyde). These roads – and the M8, M898 and A898 – form part of the
trunk road network, which is maintained by Transport Scotland. An overview map is
provided in section 3.3. 
The remaining public roads in Renfrewshire are managed and maintained by Renfrewshire
Council. For the financial year 2024 / 2025, the Council budget included a typical annual
figure of £5m investment in the Council’s road network.
Safe and sustainable transportation of freight and goods is essential for the economic
wellbeing of Renfrewshire. Freight is transported around Renfrewshire by road, rail and
water. Transporting goods by road can have a large impact on the structural integrity of
roads and bridges and can shorten the lifespan of these assets, with an associated impact
on maintenance costs. Freight transport can also have a big impact on town centres if left
unregulated. Deliveries during peak periods can cause congestion and make town centres
less attractive to shoppers and visitors. King George V Dock in Renfrew receives regular
deliveries of abnormally large loads which set off by road to destinations all over Scotland
and require specialist oversight while on Renfrewshire’s road network. 
14.2. Current Status
It is estimated that there was an increase (1.5%) in kilometres travelled on roads within
Renfrewshire between 2011 and 2021. In comparison, the change in traffic kilometres
travelled across Scotland between 2011 and 2021 was less than 1% (Scottish Transport
Statistics 2022).
Overall, across Renfrewshire in 2019, 1,624 million vehicle kilometres (Scottish Transport
Statistics 2020) were driven. This decreased slightly in 2022 to 1,610 million vehicle
kilometres (Scottish Transport Statistics 2023).

Page 105

Renfrewshire Local Transport Strategy 2025-2035   89
PUBLIC
Car / Van (driver or passenger) is the most common method of travel to work, with 71% of
people travelling by these modes according to 2022 Census data, demonstrating high
usage of the road network.   
With regards to the condition of roads maintained by the Council, 28% were categorised as
red or amber; this is lower than the Scotland wide proportion of 33% (Scottish Transport
Statistics 2023). Red indicates that the road has deteriorated to the point at which it is
likely repairs to prolong its future life should be undertaken, and amber indicates further
investigation should be undertaken to establish if treatment is required. 
NTS2 sets out that in 2018, total freight (excluding pipeline and rail) carried in Scotland was
approximately 214 million tonnes, with road freight making up the largest proportion
(69%). The number of goods vehicle trips, if left unchecked, was forecast to increase by
44% between 2014 and 2037, which would negatively impact on journey times and peak
period delays. 
Increases in the number of goods vehicle trips would also impact upon the environment.
NTS2 also sets out that in 2017, HGV emissions were 3.5% higher than in 2016 and 5.2%
above the 1990 baseline figure. LGV emissions were 6.5% more than in 2016 and 95.6%
higher than the 1990 baseline figure, the highest increase of all road transport. The
increase in emissions from light goods vehicles reflects increasing vehicle kilometres. 
In Renfrewshire, HGV emissions between 2016 and 2019 grew by 3.4% before COVID-19
caused a drop. However, emissions in 2021 were back to around 2016 levels. LGV emissions
between 2016 and 2019 dropped by 7.8%. However, by 2021 they had risen back up to
6.4% higher than the 2016 figure.
Renfrewshire Council’s Local Development Plan (2021) identifies three strategic freight
hubs:
• Glasgow Airport
• Linwood, Burnbrae 
• Hillington, Deanside
14.2.1. Journey Times and Cordon Counts
Journey time surveys are undertaken on eight routes across Renfrewshire every two years.
A comparison has been undertaken of 2019 and 2021 journey times, which shows these
decreased across all routes. Examples from two routes are presented:

Page 106

Renfrewshire Local Transport Strategy 2025-2035   90
PUBLIC 
The route between Paisley and Glasgow Airport recorded journey time reductions of
30% for the morning peak (8am to 9am) and 42% for the evening peak (5pm to 6pm) 
The route between Renfrew and Paisley recorded a 13% reduction in journey times in
the morning peak and a 17% reduction in the evening peak 
The Council also undertakes surveys to collect traffic count data. These are available for 19
sites between 2018 and 2022. The counts are broadly located at Paisley, Renfrew and
Erskine, with individual counts also undertaken in Bridge of Weir and Elderslie. A sample of
findings are presented. 
21% decrease in traffic counts at Inchinnan Road (Paisley) between 2018 and 2022 
23% increase in traffic counts at B775 Gleniffer Road (Paisley) between 2018 and 2022 
27% decrease in traffic counts at A726 Barnsford Road (Erskine) between 2018 and 2022 
18% decrease in traffic counts at A8 Inchinnan Road (Renfrew) between 2018 and 2022 
It is noted that changes in travel behaviour following the COVID-19 pandemic may have
impacted upon the journey time and cordon count results.

Page 107

Renfrewshire Local Transport Strategy 2025-2035   91
PUBLIC
14.3. What You Said
The public and stakeholders were engaged with to inform development of this LTS,
including identification of problems and opportunities related to road network and freight
in Renfrewshire, and identification of potential options. This helped to inform the
development of actions for a ten-year period. The following points provide examples of
what was raised.
Problems
Road maintenance challenges – potential safety concerns associated with potholes 
Opportunities
Encouraging developers to consider rail as an alternative to road for moving freight was
ranked number one the most often in the LTS survey, when respondents were asked
how important actions related to the movement of freight were
14.4. Policies and Actions
Consideration has been given to the problems and opportunities identified through
discussions with stakeholders and members of the public, as well as consideration of
national, regional and local policies when developing policies and actions for this LTS, and
how strongly these help to address the objectives of this strategy. With this in mind, Road
Network and Freight policies have been developed for Renfrewshire Council to work
towards, alongside actions.
14.4.1. Policies
• Policy 1 (Road Network and Freight) – Prioritise making better use of the existing
road network above infrastructure improvements, but where new road
infrastructure is required, this will be introduced through developer contributions
to support economic growth and development opportunities, facilitate the
efficient movement of people and goods and reduce congestion.

Page 108

Renfrewshire Local Transport Strategy 2025-2035   92
PUBLIC
• Policy 2 (Road Network and Freight) – Support improvements in freight transport
facilities to facilitate a sustainable, efficient, resilient and reliable freight transport
network.
The table below demonstrates where there is alignment between policies and objectives. 
Table 9: Road Network and Freight Policy Alignment with LTS Objectives
Policy  Objective 1
Fair access
to
sustainable
modes
Objective 2
Reduce
transport
emissions
Objective 3
Increase
everyday
sustainable
travel trips
Objective 4
Improve
transport
connections
Objective 5
Improve
transport
safety
Objective 6
Maintain
transport
network
Policy 1 (Road
Network and
Freight) 
  
Policy 2 (Road
Network and
Freight) 
  
14.4.2. Road Network and Freight Actions 
Actions support the policies and these in turn have been developed to support the Vision
and Objectives of this LTS. The Road Network and Freight Actions are set out below,
alongside a high-level indication of costs and timescales, and a summary of delivery
partners. This forms the Delivery Plan for Road Network and Freight.
Business-as-usual measures are captured under Chapter 7; these do not form part of the
Action Plan. However, some business-as-usual activities support some of the actions
identified. The actions below are in addition to business-as-usual activities.

Page 109

Renfrewshire Local Transport Strategy 2025-2035   93
PUBLIC
RNF1: Renfrewshire Council to explore the feasibility of road improvements, including:
• Alignment / junction improvements at Arkleston Road staggered junction 
• Seedhill Road / Hawkhead Road mini-roundabout 
• Strengthening Penilee Road Railbridge
Delivery Partners: Renfrewshire Council, Network Rail
Potential Funding Partners: Transport Scotland
Timescale: 0 to 5 years
RNF2: Renfrewshire Council to progress with the construction of new road links, including
at AMIDS South link road from Inchinnan Road to Renfrew Road and Harbour Road
Delivery Partners: Renfrewshire Council
Potential Funding Partners: Transport Scotland
Timescale: 0 to 5 years
RNF3: Undertake an assessment of the road safety and environmental effects of HGV
routeing through Renfrewshire’s urban road network
Delivery Partners: Renfrewshire Council, Freight Operators, Stakeholders
Timescale: 10 years+ 
RNF4: Encourage developers to consider rail as an alternative to road for moving freight,
including considering the feasibility of allowing loads heavier than the maximum gross
weight for heavy goods vehicles to use the Burnbrae Drive approach to Elderslie Railhead
Delivery Partners: Renfrewshire Council, Transport Scotland, Network Rail, Freight
Operators
Timescale: 10 years+

Page 110

Renfrewshire Local Transport Strategy 2025-2035   94
PUBLIC
15. Environment
15.1. Environment Overview
Each of the Council’s climate change-related policies and documents aim to contribute to
the overarching end goal of ending Renfrewshire’s contribution to climate change within a
generation; this includes Renfrewshire’s Plan for Net Zero; Air Quality Action Plan; Local
Heat and Energy Efficiency Strategy and Delivery Plan; Community Climate Fund; and
Climate Change Action Fund. 
The first phase of Renfrewshire’s Plan for Net Zero sets out how the area will work towards
net zero by 2030. The Plan draws on independent research which shows that transport is
responsible for 34% of the area’s emissions. To reach the target of becoming net zero by
2030, the Council introduced the Ren Zero campaign which looks to take a collaborative
approach with communities, businesses, partners and organisations working together to
make the required changes.
The Plan for Net Zero developed five key themes and actions: 
• Clean energy: minimising energy demand, maximising energy efficiency and
sustainable energy generation, alleviating fuel poverty, increasing energy security
and resilience;
• Sustainable transport: maximising active travel opportunities, increase public
transport patronage alongside a reduction in car miles, enable modal shift to
Ultra Low Emission Vehicles (ULEVs), alleviate transport poverty and facilitate
local carbon offsetting to make every trip in the Renfrewshire area net zero
carbon;
• Circular economy: reducing waste at source, maximising reuse, repair and
recovery, development of sustainable waste management, supporting
communities to reduce waste and offsetting disposal with local offsetting of
associated emissions to compensate;
• Connected communities: a comprehensive and ongoing engagement, with
particular focus on supporting community initiatives and partnership working, as
well as the development of socio-economic impact benefits, whilst focusing on
children and young people and providing support and advice; and

Page 111

Renfrewshire Local Transport Strategy 2025-2035   95
PUBLIC
• Resilient place: ensuring resilience, protecting, restoring and enhancing existing
habitats and species. This would be carried out alongside initiatives to help
nature locally, as well as improving air quality and sequestration. 
An updated Renfrewshire Air Quality Action Plan was published in 2019. The Plan set out
measures the Council were to take forward to help improve air quality throughout
Renfrewshire. Priorities included tackling emissions caused by congestion, promoting low
emission transport and encouraging active travel alternatives.
15.2. Current Status
Air Quality Management Areas (AQMAs) are defined areas where the air quality does not
meet Government objectives and must therefore be subject to additional actions to ensure
improvement to air quality. As of late-2024, Renfrewshire had three AQMAs: Paisley town
centre, Johnstone High Street and Renfrew town centre. However, Scottish Government
and SEPA, on the basis of monitoring data from 2023 confirming there continue to be no
air quality exceedances in Renfrewshire, approved a report in November 2024 to revoke all
three of Renfrewshire’s Air Quality Management Areas i.e. Paisley town centre, Johnstone
High Street and Renfrew town centre. 
A Revocation Report and associated AQMA Revocation Orders have since been approved
by Renfrewshire Council’s Infrastructure, Land and Environment Policy Board in March
2025. As such, there are no longer any AQMAs within Renfrewshire Council, with the council
meeting all air quality objectives. The Scottish Government recommends that where
AQMAs are no longer required that local authorities prepare an Air Quality Strategy to
replace the Air Quality Action Plan (which has served its purpose), with some of the
measures from the action plan being carried forward into the strategy. The Council is
currently developing this Air Quality Strategy which will be presented to the Policy Board
for approval, prior to publication.
To support the preparation of this LTS, a Strategic Environmental Assessment (SEA) was
undertaken to set out the identification, reporting and mitigation of potential
environmental impacts associated with the LTS within the Renfrewshire area. A summary
of key baseline indicators from the SEA are outlined below:

Page 112

Renfrewshire Local Transport Strategy 2025-2035   96
PUBLIC
Biodiversity, Flora and Fauna, and Geodiversity: Within Renfrewshire, there is one Ramsar
site (a wetland site designated of international importance), three Special Protection
Areas, eleven sites of Special Scientific Interest, three Local Nature Reserves, one
Geological Conservation Review Site and three Country Parks. 
Climatic Factors: Expectations of warmer, wetter winters and hotter, drier summers with
more extreme events, for example increased risk of flooding. Changes to the climate could
damage transportation infrastructure, affect reliability of transportation systems and likely
increase the cost of transportation. 
Air Quality and Noise Pollution: Renfrewshire had three AQMAs, which were revoked in
March 2025 following approval of a Revocation Report and associated AQMA Revocation
Orders by Renfrewshire Council’s Infrastructure, Land Environment Policy Board. The main
source of noise pollution within the Renfrewshire area is from Glasgow Airport and the
strategic road network – predominantly the A737 and M8.
Soil and Water Resources: Water resources located within Renfrewshire include a network
of main rivers, lochs, lakes, streams, dams, and drainage ditches. 
Cultural Heritage: the Historic Environment Scotland (HES) search tool identified 603
heritage assets in Renfrewshire. HES identified 568 listed buildings, 34 scheduled
monuments and one garden and designed landscape. There are also eight conservation
areas within Renfrewshire and 28 Buildings at Risk.   
Landscape: The Renfrewshire Local Development Plan Landscape Assessments Main
Issues Report (2011) identifies seven Regional Landscape Character Types in Renfrewshire.
Additionally, there are no Local Landscape Areas in Renfrewshire, but there is one Wild
Land Area. 
Material Assets: Renfrewshire’s geology has extensive volcanic rock formations from the
Lower Carboniferous period and significant coalfields north of the volcanic area, extending
from Houston to the eastern local authority border near Rutherglen. 
Renfrewshire Council continues to decarbonise its vehicle fleet. A pool of electric cars and
vans is used exclusively for site visits and council duties and trials of four out of 24 waste
trucks are being undertaken to assess the benefit of biofuel powered engines.

Page 113

Renfrewshire Local Transport Strategy 2025-2035   97
PUBLIC
15.3. What You Said
The public and stakeholders were engaged with to inform development of this LTS,
including identification of problems and opportunities related to environment in
Renfrewshire, and identification of potential actions. This helped to inform the
development of actions for a ten-year period. The following points provide examples of
what was raised. 
Problems
Idling cars outside schools
Limited progress to address the large contribution transport makes towards carbon
emissions
A limited active travel network prevents modal shift, which has a negative impact on
transport emissions 
Opportunities
Reduce the number of vehicles in congested town centres
Actions can be taken to protect transport infrastructure against extreme weather
conditions caused by climate change
15.4. Policies and Actions
Consideration has been given to the problems and opportunities identified through
discussions with stakeholders and members of the public, as well as consideration of
national, regional and local policies when developing policies and actions for this LTS, and
how strongly these help to address the objectives of this strategy. With this in mind,
Environmental policies have been developed for Renfrewshire Council to work towards,
alongside actions.

Page 114

Renfrewshire Local Transport Strategy 2025-2035   98
PUBLIC
15.4.1. Policies 
• Policy 1 (Environment) – Support measures to create a healthier and greener
environment, including to support priorities and actions captured in our Plan for
Net Zero. 
• Policy 2 (Environment) – Adapt the transport network to be resilient in response
to climate change.
The table below demonstrates where there is alignment between policies and objectives.  
Table 10: Environment Policy Alignment with LTS Objectives
Policy  Objective 1
Fair access
to
sustainable
modes
Objective 2
Reduce
transport
emissions
Objective 3
Increase
everyday
sustainable
travel trips
Objective 4
Improve
transport
connections
Objective 5
Improve
transport
safety
Objective 6
Maintain
transport
network
Policy 1
(Environment)       
Policy 2
(Environment)        
15.4.2. Environment Actions
Actions support the policies, and these have been developed to support the Vision and
Objectives of this LTS. The Environment Actions are set out below, alongside a high-level
indication of costs and timescales, and a summary of delivery partners. This forms the
Delivery Plan for Environment. 
Business-as-usual measures are captured under Chapter 7 and include elements such as
biodiversity schemes, flood management and measures related to street lighting. These do
not form part of the Action Plan. However, some business-as-usual activities support some
of the actions identified. The actions below are in addition to business-as-usual activities.

Page 115

Renfrewshire Local Transport Strategy 2025-2035   99
PUBLIC
ENV1: Continue to monitor air quality at existing automatic monitoring stations within
Paisley, Johnstone and Renfrew
Delivery Partners: Renfrewshire Council
Timescale: 5 to 10 years
ENV2: Expand the decarbonisation of Renfrewshire Council’s vehicle fleet
Delivery Partners: Renfrewshire Council  
Timescale: 5 to 10 years
ENV3: Design and implement climate change adaptation and resilience measures to
strengthen and protect the transport network from weather related events 
Delivery Partners: Renfrewshire Council; Transport Scotland; Network Rail; ScotRail
Timescale: 5 to 10 years

Page 116

Renfrewshire Local Transport Strategy 2025-2035   100
PUBLIC
16. Digital Technology
16.1. Digital Technology Overview
Digital innovation and technology can have a large impact on transport, as they can
impact the frequency at which people travel and decisions to travel at all. The Council’s
Digital Strategy sets out a digital vision and references a SMART place plan, which
embraces innovation and technology to secure economic and environmental advantages.
An important element of the Strategy relates to improving access for residents to services;
through enabling access to digital public services, tackling digital inequality and creating
the opportunity for active citizenship. This captures one of the benefits outlined in the
strategy, to provide better access to information and data. 
As part of Scotland’s Full Fibre Charter, Renfrewshire has rolled-out  fibre digital
infrastructure to all the council buildings in its towns and villages. This infrastructure
enables broadband and 5G services to connect homes and businesses, as well as schools,
hospitals and GP surgeries to the most up-to-date and reliable internet service technology.
The opportunity was also taken to connect the Council’s Urban Traffic Control signal
junctions to their hosted control centre via the fibre network.
Other technologies can also be used to support transport, including through the provision
of Real Time Passenger Information (RTPI), which provides live public transport timetable
information at bus stops. Measures to support public transport ticketing are captured
under the Public Transport and Shared Mobility chapter (Chapter 11) and Electric Vehicle
charging infrastructure is captured under the Parking chapter (Chapter 13). Technology is
constantly evolving and the Council will adapt and utilise technological innovations to
support transport where practicable to do so. 
16.2. Current Status
Renfrewshire Council and SPT work together to implement RTPI at bus stops. SPT
supports the continued the roll-out of RTPI across Renfrewshire and the Council works
closely with SPT to achieve this. A total of around 50 RTPI displays have been installed at
bus stops- on major bus corridors across the Renfrewshire Council area since 2018. 
Through a remote hosting agreement, the Council has upgraded and expanded its urban
traffic control system. Replacements and upgrades have been carried out to 66 signal-

Page 117

Renfrewshire Local Transport Strategy 2025-2035   101
PUBLIC
controlled junction sites across Renfrewshire.  This new system uses on-street detectors to
optimise the flow of traffic at signalised junctions to reduce delays to drivers. Furthermore,
the system supports real-time adaptive control at 30 junctions, with the potential for the
introduction of bus priority signalling in future. 
• As outlined above, the roll-out of Full Fibre communications infrastructure is
complete, with the result that 98% of premises within Renfrewshire have access to
broadband. 
• 82% of premises within Renfrewshire have access to full fibre broadband; and 
• All Council owned buildings have access to full fibre broadband.
16.3. What You Said
The public and stakeholders were engaged with to inform development of this LTS,
including identification of problems and opportunities related to Digital Technology in
Renfrewshire, and identification of potential options. This helped to inform the
development of actions for a ten-year period. The following points provide examples of
what was raised. 
Problems
Lack of Real Time Passenger Information outside of urban areas
Difficulties accessing information (for example where people are unable to use apps)
Concerns related to reliability of buses (which may be impacted by congestion at traffic
lights) 
Opportunities
Provide further Real Time Passenger Information at bus stops and in town centres
Technology to be used to provide integrated travel within the same mode and with
other modes of travel

Page 118

Renfrewshire Local Transport Strategy 2025-2035   102
PUBLIC
16.4. Policies and Actions
Consideration has been given to the problems and opportunities identified through
discussions with stakeholders and members of the public, as well as consideration of
national, regional and local policies when developing policies and actions for this LTS, and
how strongly these help to address the objectives of this strategy. With this in mind, Digital
Technology policies have been developed for Renfrewshire Council to work towards,
alongside actions. 
16.4.1. Policies 
• Policy 1 (Digital Technology) – Work with partners to explore digital and
technological innovations to reduce the need to travel, or where travel is required,
support more sustainable travel and the efficient movement of people and goods. 
The table below demonstrates where there is alignment between policies and objectives.  
Table 11: Digital Technology Policy Alignment with LTS Objectives
Policy  Objective 1
Fair access
to
sustainable
modes
Objective 2
Reduce
transport
emissions
Objective 3
Increase
everyday
sustainable
travel trips
Objective 4
Improve
transport
connections
Objective 5
Improve
transport
safety
Objective 6
Maintain
transport
network
Policy 1 (Digital
Technology)        
16.4.2. Digital Technology Actions
Actions support the policies and these in turn have been developed to support the Vision
and Objectives of this LTS. The Digital Technology Actions are set out below, alongside a
high-level indication of costs and timescales, and a summary of delivery partners. This
forms the Delivery Plan for Digital Technology.

Page 119

Renfrewshire Local Transport Strategy 2025-2035   103
PUBLIC
Business-as-usual measures are captured under Chapter 7; these do not form part of the
Action Plan. However, some business-as-usual activities support some of the actions
identified. The actions below are in addition to business-as-usual activities. 
DT1: Working with SPT through wider processes, including Clyde Metro and Strathclyde
Regional Bus Strategy, consider opportunities to support the development and delivery of
improved integrated journey planning app(s) that includes booking and payment
functions 
Delivery Partners: Renfrewshire Council, SPT
Timescale: 5 to 10 years
DT2: Working with SPT; continue implementation of the remaining elements of a
programme to provide Real Time Passenger Information at bus stops on the busiest
corridors and village centre locations across Renfrewshire
Delivery Partners: Renfrewshire Council; SPT
Timescale: 5 to 10 years 
DT3: Undertake a study to expand the UTC traffic signal network across Renfrewshire,
expanding adaptive control and bus priority at signalised junctions on bus routes, where
identified as necessary
Delivery Partners: Renfrewshire Council, SPT
Timescale: 0 to 5 years
DT4: Work with partners to add connections to the existing fibre network as and when new
council building development dictates, to continue to improve digital connectivity across
Renfrewshire and thus reduce the need to travel 
Delivery Partners: Renfrewshire Council; Digital delivery partners
Timescale: 5 to 10 years

Page 120

Renfrewshire Local Transport Strategy 2025-2035   104
PUBLIC
17. Monitoring and Evaluation
17.1. Introduction
To effectively monitor the success of the LTS against its objectives, determining indicators
ahead of the strategy’s implementation is critical to make sure the correct data is
collected, targets are measurable, and progress can be monitored on an ongoing basis.
Indicators are assigned to LTS objectives and can be derived from existing data sources to
generate efficiencies and to support consistency across the period of the strategy. 
Indicators developed take cognisance of the NTS2 Monitoring and Evaluation Framework
indicators and those contained within the Active Travel Framework where applicable.
Additional bespoke indicators can also be established where relevant to this LTS.
Indicators are presented in this chapter. 
Progress against objectives contained within the LTS will be monitored at appropriate
intervals to determine whether actions are on track to be achieved. A final review towards
the end of the ten-year period will determine to what extent actions have been achieved,
lessons learnt from their implementation, and whether actions should be carried forward
into future LTSs.  
17.2. Data Sources
The data sources used in the Monitoring and Evaluation framework are listed below:
• Scottish Household Survey (2022)
• Scotland Census 2022
• Scottish Transport Statistics (2023)
• Scottish Access to Bus Indicator (2019)
• Scottish Index of Multiple Deprivation – Geographic Access To Services Indicators
(2018)
• Air Quality in Scotland Annual Statistic Reports (2023)
• ChargePlace Scotland Monthly Charge Point Performance (July 2024)
• Sustrans Hands Up Survey (2023)
• National Monitoring Framework – All Mode Traffic Surveys (May 2024)
• Office of Rail and Road, Estimates of Station Usage (2022-23)

Page 121

Renfrewshire Local Transport Strategy 2025-2035   105
PUBLIC
• Office for National Statistics, UK Small Area Gross Value Added (GVA) Estimates
(2022)
• Business Register and Employment Survey (2022)
• Department for Transport Road Traffic Statistics
• Living Cost and Food Survey
• Cycling Scotland
• Driver and Vehicle Licensing Agency (DVLA)
• Renfrewshire Council Internal Datasets
A source commonly used for several indicators is the Scottish Household Survey (SHS).
This is an annual survey, where respondents answer questions based on all journeys made
on the previous day through a travel diary. Across Scotland the sample size is typically
around 10,000 households, with Renfrewshire having 270 household responses in 2022.
The size of the Renfrewshire sub-sample means certain disaggregation of the SHS,
including by personal characteristics and some journey characteristics, is not possible. 
Noting the limitations of the SHS, alternative data sources could include the Scotland
Census as those outputs become available. 
With regards to other sources, Sustrans collects and publishes the annual Hands Up Survey
of school pupils which asks what mode of transport pupils use to travel to school.

Page 122

Renfrewshire Local Transport Strategy 2025-2035   106
PUBLIC
17.3. Indicators
This section summarises potential indicators for each objective, alongside the indicator
source and a baseline of data. This information will be used to inform monitoring and
evaluation in future years.
Table 12: Objective Indicators
Objective Indicator Source Baseline
Objective 1:
Support fair and
equitable access
to sustainable
modes of
transport in
Renfrewshire, that
is integrated and
easy to use for all
Bus Accessibility
Scottish
Access to Bus
Indicator 
Proportion of Renfrewshire data
zones in top 50% in Scotland for
access to bus (2019): Over 60%
(Weekday: 67%, Weekend: 68%)
Access to Bicycle
Scottish
Household
Survey (Table
LA8)
Households with access to one
or more bicycles (2022): 38%
Proximity to
Infrastructure
Renfrewshire
Council
Proportion of population within
800m of a cycle facility in 2023
Cycle Parking
and Storage
Renfrewshire
Council
Number of cycle parking
facilities in Renfrewshire in 2023
Transport
Expenditure
Living Cost
and Food
Survey
Proportion of households
spending more than 10% of
income on transport (2021):
79%
Perception of
Public Transport
Affordability
Scottish
Household
Survey (Table
LA14)
Percentage agreeing to the
statement “the fares are good
value” for bus and train (2021):
bus: 43%, rail: 51%
Bikeability
Training
Cycling
Scotland
Proportion of Renfrewshire
Schools offering Bikeability
Scotland Level 2 training: 84%
Social Inclusion
Scottish
Household
Survey  (Table
2.39)
Proportion of Renfrewshire
residents experiencing
loneliness (some or most of the
time) (2018): 18%
Objective 2:
Support the
continued
reduction in
harmful transport
NO2 Exceedances Renfrewshire
Council
Concentration exceedances at
Monitoring Points (2020): Zero
PM10
Exceedances
Renfrewshire
Council
Concentration exceedances at
Monitoring Points (2020): Zero

Page 123

Renfrewshire Local Transport Strategy 2025-2035   107
PUBLIC
Objective Indicator Source Baseline
emissions across
Renfrewshire
Number of
Electric Vehicle
Charging Points
Renfrewshire
Council data
Number of Electric Vehicle
Charge Points in Renfrewshire
(April 2024): 148
Ultra Low
Emission Vehicle
Registrations
Department for
Transport
(available via
the RTS CfC)
Registration of ULEVs (Q3 2020):
5,020
Number of new
Petrol / Diesel
vehicles in the
Council’s fleet
Renfrewshire
Council
Number of newly registered
petrol or diesel vehicles in
Council’s fleet in 2023: 19
Objective 3:
Increase the
proportion of trips
undertaken by
walking, wheeling
and cycling and
public transport
for everyday
journeys
Proportion of
Journeys Under
2 Miles by
walking
Scottish
Household
Survey (Table
LA21)
Walking % (2022): 48%
Proportion of
Journeys Under
5 Miles by cycle
Scottish
Household
Survey (Table
LA22)
Cycling % (2022): <1% 
Travel to Work
Mode Share 2022 Census
Car / Van Drive travel to work %
(2022): 71%
Public Transport (bus and rail)
travel to work % (2022): 13%
Walking travel to work % (2022):
7%
Cycling travel to work% (2022):
1%
Travel to School
Mode Share
Sustrans
Hands Up
Survey
Walking % (2023 – All School
Type excluding nursery): 44%
Cycling/Scooter/Skate % (2023
– All School Type excluding
nursery): 7%
Driven % (2023 – All School Type
excluding nursery): 19%
Number of
cyclists and
pedestrians
Cycling
Scotland Open
Data Hub
Annual daily average of counts
from working counters across
Renfrewshire (Cycling Scotland
website shows there are nine
counters)

Page 124

Renfrewshire Local Transport Strategy 2025-2035   108
PUBLIC
Objective Indicator Source Baseline
Car Kilometres
Scottish
Transport
Statistics
Table 5.4
1,643 million vehicle km on
Renfrewshire roads (2019)
Frequency of
Driving
Scottish
Household
Survey (Table
LA5)
% of people driving everyday
(2022): 29%
Frequency of
Walking
Scottish
Household
Survey (Table
LA9)
% of adults walking as transport
one or more days per week
(2021): 61%
Frequency of
Using Public
Transport
Scottish
Household
Survey (Table
LA11) 
% of adults who use local bus
services at least once a week
(2022): 22% 
% of adults who use rail services
at least once a week (2022): 14%
Cordon Counts
(24-hour average
total flow)
Renfrewshire
Council
Paisley Cordon: A741 Renfrew
Road (2022): 29,992
Paisley Cordon: A761 Ferguslie
(2022): 28,238
Renfrew Cordon: A8 Glasgow
Road (2022): 19,717
Erskine Cordon: A726 Southbar
Road (2022): 16,454
Rail Patronage
Office of Rail
and Road,
Estimates of
Station Usage 
(Table 1410) 
4,862,320 total entries and exits
at Renfrewshire stations in 2022-
23
Objective 4:
Improve transport
connections
within
Renfrewshire and
to neighbouring
local authorities
to support
GVA per head
Office for
National
Statistics,
Regional
Gross Value
Added (GVA) 
GVA per head of Inverclyde, East
Renfrewshire and Renfrewshire
(2022): £20,555
Number of jobs
Business
Register and
Employment
Number of part time and full-
time employees in Renfrewshire
(2022): 84,000

Page 125

Renfrewshire Local Transport Strategy 2025-2035   109
PUBLIC
Objective Indicator Source Baseline
inclusive
economic growth
Survey: Open
Access 
Employment
levels  2022 Census 
Proportion of Renfrewshire
residents economically active in
employment: 73.8% (2023/24)
Average Journey
Times 
Routes
monitored are:
Paisley to
Glasgow
International
Airport, Erskine
to Motorway
(M8), Renfrew to
Paisley, Bridge of
Weir to Red
Smiddy
Roundabout
(A8), Paisley to
A8, A8/M8
Junction 31 to
Glasgow, Bridge
of Weir to
Glasgow,
Johnstone to
RAH Paisley
Renfrewshire
Council 
Average AM and PM peak
journey times across eight
monitored routes (2021).
Journey times for the AM and
PM peak periods are presented
below:
• Paisley to Glasgow
International Airport: 7 mins
54 secs and 8 mins 12 secs;
• Erskine to the Motorway (M8
Junction 29): 8 mins 57 secs
and 10 mins 1 sec;
• Renfrew to Paisley: 18 mins
31 secs and 18 mins 6 secs;
• Bridge of Weir to Red Smiddy
Roundabout (A8): 8 mins 55
secs and 8 mins 57 secs; 
• Paisley to the A8 (Glasgow):
16 mins 4 secs and 16 mins
58 secs;
• A8 (M8 Junction 31) to
Glasgow: 35 mins 19 secs and
36 mins 33 secs;
• Bridge of Weir to Glasgow 56
mins 29 secs and 58 mins 53
secs;
• Johnstone to Royal
Alexandra Hospital (Paisley):
11 mins 36 secs and 12 mins
25 secs. 
Objective 5:
Improve the
safety of
Renfrewshire's
transport network
through meeting
Road Safety
Transport
Scotland
Reported
Road Casualty
Statistics
Number of People Killed in
Road Traffic Collisions (2014-
2018 Annual Average): Four
Number of People Seriously
Injured in Road Traffic Collisions
(2014-2018 Annual Average): 75

Page 126

Renfrewshire Local Transport Strategy 2025-2035   110
PUBLIC
Objective Indicator Source Baseline
Scottish
Government
casualty
reduction targets
Number of Children (0-15) Killed
in Road Traffic Collisions (2014-
2018 Annual Average): 0.2
Number of Children (0-15)
Seriously Injured in Road Traffic
Collisions (2014-2018): Eight 
Number of
20mph Zones
Renfrewshire
Council
Number of 20mph Zones in
Renfrewshire: One (Dargavel)
Perception of
Personal Safety
on Public
Transport
Scottish
Household
Survey (Table
LA14)
Percentage agreeing to the
statement “I feel personally safe
and secure on the bus/train
during the day” (2021): Bus:
91%, Train: 90% 
Percentage agreeing to the
statement “I feel personally safe
and secure on the bus/train
during the evening” (2021): Bus:
68%, Train: 71%
Objective 6:
Provide a secure,
resilient and well-
maintained
transport network
that meets the
needs of users
Active Travel
Infrastructure
Delivered
Renfrewshire
Council
Active travel infrastructure
delivered between 2017 and
2023 (kms): 18km
Lighting
columns
Renfrewshire
Council
Proportion of active travel
network with streetlights (2023):
28%
Road Condition
Scottish
Transport
Statistics
Table 4.6a 
Proportion of local authority
roads categorised as red or
amber, indicating repairs are
required (2023): 28% 
The successful delivery of the LTS will also require close engagement with communities
across Renfrewshire to understand their needs and to develop measures that are tailored
to them. This can be achieved through bespoke data collection conducted by Renfrewshire
Council including surveys, focus groups and consultation with stakeholders, including
established groups within the area such as Fairer Renfrewshire. This will allow the Council
to gauge how successfully it is achieving the LTS objectives through listening to people’s
perceptions of transport and access across Renfrewshire.

Page 127

Renfrewshire Local Transport Strategy 2025-2035   111
PUBLIC
18. Interdependencies, Funding and Priorities
18.1. Interdependencies
There are several factors which influence the extent to which Renfrewshire Council is able
to successfully implement actions captured in this LTS. This includes the following:
• Funding availability; 
• Alignment of the LTS with national, regional and local strategies / policies;
• Strong working relationships with delivery partners;
• Outcomes of public consultation and stakeholder engagement; and
• The outcomes of transport-related appraisals and other studies.
The Action Plans presented in Chapters 9 to 16 set out the likely delivery partners an action
is considered to align with. Whilst each of the identified actions have an important role to
play in helping the Council to achieve the Vision, Priorities and Objectives identified, it is
noted that actions cannot necessarily be delivered quickly, as indicated by the timescales
provided in Chapters 9 to 16; also noting the factors above which will impact upon their
delivery.  
It is also highlighted that many of the actions require close working with at least one
delivery partner such as (but not limited to) SPT, Transport Scotland, Sustrans, Cycling
Scotland, bus and rail operators and Police Scotland. Delivery of actions is therefore
dependent on support from relevant partners. 
The Council is currently working within financial constraints, and this has the potential to
have a significant impact on which actions can be progressed. Additional financial support
from partners will therefore be required to successfully implement measures. 
Some actions will require further work to understand their impact, including their
feasibility from an operational and technical perspective and costs associated with
actions. The outcomes of this additional work, which will sit outside of the LTS, will inform
which actions are delivered.
18.2. Funding
Renfrewshire Council and services operated within the local authority area receive funding
from the UK Government and Scottish Government, Council Tax, and a range of sources,

Page 128

Renfrewshire Local Transport Strategy 2025-2035   112
PUBLIC
including: SPT; other Government-supported organisations such as Sustrans, Cycling
Scotland; and through developer contributions. Funding is often stipulated for specific
purposes, or, in some cases, can only be spent on specific projects, for example if the
Council has applied for funding to support a specific scheme. 
It is noted that funding amounts for future years is not guaranteed and is generally
determined on a year-by-year basis. 
Renfrewshire Council has received City Deal Funding, which has been used to support the
Clyde Waterfront and Renfrew Riverside Project; and Glasgow Airport Investment Area. City
Deal Funding is now discontinued.
The Council’s budget consists of capital and revenue streams. Capital relates to what is
spent on physical infrastructure and assets, for example to construct a new path, and
Revenue is the day-to-day running costs to provide services and includes maintenance of
the transport network. Approximately 80% of the Council’s funding comes from the
Scottish Government and 20% is raised through Council Tax.
For the financial year 2025 / 2026, the Council budget has been set at £571,512,000.
Included within this is a £90m investment in the Council’s transport network over a ten-
year period. The Council is currently working under financial constraints, which will directly
impact which actions identified in this LTS will be possible to take forward. 
18.3. Priorities 
Renfrewshire Council’s priorities for implementation relate primarily to measures and
initiatives which promote safety, those which are required to maintain the existing
transport network to at least its present standard, and those that promote sustainable
transport and contribute to reducing emissions.
The Council will seek, wherever possible, to make best use of existing infrastructure and
encourage travel and access by sustainable means, in line with the Sustainable Travel
Hierarchy and the Sustainable Investment Hierarchy.

Page 129

Renfrewshire Local Transport Strategy 2025-2035   113
PUBLIC 
Environment, Housing and Infrastructure
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR

Page 130

1
PUBLIC 
Travel Renfrewshire 2035 
Renfrewshire Council Local Transport
Strategy 2025-2035
Integrated Impact Assessment (IIA)

Page 131

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  2
PUBLIC
Table of Contents
1. Introduction ....................................................................................... 3
2. Legislation and Policy Review............................................................ 7
3. Summary of LTS ............................................................................... 15
4. Evidence Review .............................................................................. 19
5. Key Issues and Evidence .................................................................. 35
6. Consultation .................................................................................... 42
7. Assessment of Impacts .................................................................... 46
8. Conclusions and Recommendations .............................................. 75
Appendix A Evaluation of LTS Actions ........................................................ 79

Page 132

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  3
PUBLIC
1. Introduction
1.1. Purpose 
AECOM has been commissioned by Renfrewshire Council (‘the Council’) to provide an
Integrated Impact Assessment (IIA) of the Renfrewshire Local Transport Strategy (LTS). The
IIA will combine an Equality Impact Assessment (EqIA), Child Rights and Wellbeing Impact
Assessment (CRWIA), Fairer Scotland Duty Impact Assessment (FSDA) and Health
Inequalities Impact Assessment (HIIA).
An IIA is a systematic assessment of the effects of plans, policies or proposals on groups
with protected characteristics as defined by the Equality Act 2010, including children and
young people, as well as socio-economically disadvantaged groups. The purpose of this IIA
is to consider how the Renfrewshire LTS contributes to the realisation of equality effects on
the local community and visitors to the area affected by the strategy.
This IIA will combine the four impact assessments to support the Council to fulfil its
equality duties in relation to the Public Sector Equality Duty (PSED), Fairer Scotland Duty
and UN Conventions on the Rights of the Child Act. As a public sector organisation, the
Council has a duty under the Equality Act 2010 and the associated PSED to have due
regard to the need to prevent unlawful discrimination (direct and indirect) and to advance
equality of opportunity and foster good relations between those with a protected
characteristic and all others in the implementation of the Local Transport Strategy (LTS).
Protected characteristics are defined under the Equality Act 2010 as age, disability, gender
reassignment, pregnancy and maternity, race, religion or belief, sex, sexual orientation and
marriage/civil partnership. An EqIA is often used by public sector organisations to
demonstrate how this duty has been discharged. EqIAs are undertaken to help meet the
PSED and to make sure disadvantaged groups are not further disadvantaged by Council
policy and strategy (see Renfrewshire Council website). 
The Council also has a duty under the United Nations Conventions on the Rights of the
Child (Scotland) Act (2024) to complete a CRWIA to ensure that the LTS actions are
compatible with the rights set out in the UN Convention on the Rights of the Child.
In addition, under the Fairer Scotland Duty, there is a legal responsibility for the Council to
consider how they can reduce inequalities of outcome caused by socio-economic
disadvantage which is demonstrated by the completion of the FSDA.

Page 133

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  4
PUBLIC
A HIIA is not explicitly required by law, however the PSED mandates that public bodies
asses the impacts of proposed policies which often includes health inequalities. Therefore,
it is good practice to include an HIIA.
This IIA provides consideration of potential direct and indirect impacts (both adverse and
beneficial) associated with the LTS actions. The approach draws on evidence from
secondary data sources as well as feedback from consultation and engagement processes
and information from design and assessment work undertaken for the project.
1.2. Context 
The previous Renfrewshire LTS was published in 2007 and later refreshed in February 2017.
Since then, there have been significant updates to the policy context, including the
publication of the second National Transport Strategy in 2020 and the publication of the
Strathclyde Partnership for Transport’s (STP) updated Regional Transport Strategy in 2024.
Both documents reflect a shift in policy at the national level, in particular to address
climate change. In 2019, the Scottish Government declared a Climate Emergency, and as
such, there is an expectation that any interventions or measures take cognisance of the
potential impact on tackling climate change.
The new LTS will set the future direction of transport and travel within Renfrewshire across
a ten-year period up to 2035. It will develop a Vision, Priorities and Objectives and will set
out an Action Plan in which to achieve these. 
In line with the recently published Local Transport Strategy Guidance from Transport
Scotland, in developing an LTS, local authorities may wish to refer to the principles of
Scottish Transport Appraisal Guidance (STAG). The development of the LTS follows STAG
principles, which includes: transport related problems and opportunities identification
informed by a review of transport and socio-economic data to set the wider context and
provide background information on the study area; an extensive round of stakeholder
engagement and public consultation to further inform problems and opportunities, as well
as to identify potential options; development of a Vision, Priorities and Objectives; and
ultimately development of an Action Plan. Following STAG principles helps to make sure
that a robust process has been followed and that meaningful actions which address the
needs of the area are identified.

Page 134

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  5
PUBLIC
1.3. Renfrewshire Local Transport Strategy 
The most recent Renfrewshire LTS was refreshed in 2017 and set out a vision to help
improve people’s health and travel to their destination within a set timetable using all
modes, including walking, cycling, public transport or car for essential trips. It also set out
an aim to allow businesses to operate effectively and efficiently, creating prosperity and
job opportunities; attract visitors to enjoy the tourism and leisure facilities and to achieve
this without compromising the future environment.
The previous LTS set out five key objectives to be delivered through actions within the
strategy:
• Regenerate the local economy wherever possible;
• Extend opportunities for all by:
o Combating poverty and promoting equality including supporting behaviour
change;
o Encouraging healthier lifestyles;
o Encouraging a choice of transport options;
o Improving access for all, including the mobility impaired.
• Ensure a healthy and sustainable environment;
• Improve community safety and security, both real and perceived and increase
connectivity between settlement and services;
• Encourage integration of services and an integrated approach by public bodies
whilst achieving best value.
This IIA assesses the Renfrewshire Council LTS which covers the period 2025 to 2035.
Chapter 3 ‘Summary of LTS’ provides further detail on the LTS objectives and actions.
1.4. Report Structure 
Following on from this introduction section, the remainder of the report is structured as
follows: 
• Chapter 2: Policy and Legislation Review – providing context through review of
relevant policy and legislation associated with equalities and transport; 
• Chapter 3: Summary of LTS – an overview of the LTS, including Vision, Priorities,
Objectives and Actions being considered;

Page 135

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  6
PUBLIC
• Chapter 4: Evidence Review– using secondary data sources such as Census 2022
data to form a population baseline and wider literature to consider the key
evidence and issues related to protected characteristic groups and transport; 
• Chapter 5: Key Issues and Evidence – an overview of the key issues and evidence
around children and young people (CRWIA), other protected characteristic groups
(EqIA), socio-economic disadvantaged groups (FSDA) and health (HIIA).
• Chapter 6: Consultation – a summary of consultation undertaken to date and
feedback received by the Council;
• Chapter 7: Assessment of Impacts – an appraisal of impacts and equality effects of
the LTS Actions using the evidence gathered. 
• Chapter 8: Conclusions and Recommendations - conclusion of equality impacts
and the Council’s due regard to the PSED. This section also contains continued
actions recommended for enhancing positive equality impacts and minimising
potential negative impacts based on available evidence to date.

Page 136

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  7
PUBLIC
2. Legislation and Policy Review 
2.1. Legislation 
2.1.1. Equality Act 2010 and the Public Sector Equality Duty (PSED)
The Equality Act 2010 legally protects people from discrimination both in the workplace
and in wider society. It ensures that individuals with the following nine protected
characteristics are not indirectly or directly discriminated against:
• Age: This refers to persons defined by either a particular age or a range of ages;
• Disability: A person with a disability is someone who has a physical or mental
impairment (lasting more than a year) that has a substantial adverse effect on their
ability to carry out normal day-to-day activities;
• Gender Reassignment: This refers to a person who is proposing to undergo, is
undergoing, or has undergone a process for the purpose of reassigning their gender
identity;
• Marriage and Civil Partnership: Marriage can be between a man and a woman or
between two people of the same sex. Civil partners must not be treated less
favourably than married couples;
• Pregnancy and Maternity: Pregnancy is the condition of being pregnant and
expecting a baby. Maternity refers to the period after the birth. In the non-work
context, protection against maternity discrimination is for 26 weeks after giving
birth;
• Race: Under the Equality Act 2010 race includes colour, nationality (including
citizenship) and ethnic or national origins;
• Religion or Belief: Religion means any religion and a reference to religion includes a
reference to a lack of religion. Belief means any religious or philosophical belief and
a reference to belief includes a reference to a lack of belief;
• Sex: This refers to a man or to a woman, or to a group of people of the same sex;
and,
• Sexual Orientation: this means a person's sexual orientation towards persons of the
same sex, persons of the opposite sex, or persons of either sex.
Section 149 of the Act sets out the PSED. Those subject to the PSED must, in the exercise of
their functions, have due regard to the need to:

Page 137

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  8
PUBLIC
• Eliminate discrimination, harassment, victimisation and any other conduct that is
prohibited by or under this Act;
• Advance equality of opportunity between persons who share a relevant protected
characteristic and persons who do not share it; and 
• Foster good relations between persons who share a relevant protected
characteristic and persons who do not share it.
The three aims of the duty apply to all protected characteristics provided for in section
149(7). Although marriage and civil partnership is a protected characteristic under the
Equality Act, it is not covered by the PSED and is therefore not considered as part of this
appraisal. The Equality Act 2010 explains that having due regard to the second aim
involves:
• Removing or minimising disadvantages affecting people due to their protected
characteristics;
• Taking steps to meet the needs of people with certain protected characteristics
where these are different from the needs of other people; and
• Encouraging people with certain protected characteristics to participate in public
life or in other activities where their participation is disproportionately low.
The PSED requires public bodies to take proactive measures to address inequality and
help contribute to the government’s commitment to tackle disadvantage and
discrimination, advance equality of opportunity and encourage good relations between all
people.
2.1.2. Fairer Scotland Duty (2010)
Part 1 of the Equality Act 2010, the ‘Fairer Scotland Duty’, places a legal responsibility on
the relevant authorities to actively consider how they can reduce inequalities of outcome
caused by socio-economic disadvantage. When making decisions of a strategic nature
about how to exercise its functions, Renfrewshire Council must have due regard to the
desirability of exercising them in a way that is designed to reduce the inequalities of
outcome which result from socio-economic disadvantage. This differs from the PSED
under Section 149 of the Equality Act which considers only reducing inequalities of
opportunity.

Page 138

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  9
PUBLIC
Public bodies may wish to publish a written assessment under the Fairer Scotland Duty,
demonstrating how they have considered inequalities of outcome when making any major
strategic decision.  
‘The Fairer Scotland Duty - Guidance for Public Bodies’ identifies a need to consider both
‘communities of place’ and ‘communities of interest’ in terms of people who share an
experience and are particularly impacted by socio-economic disadvantage.  
2.1.3. Children and Young People (Scotland) Act (2014)
In Section 1 of the Children and Young People (Scotland) Act (2014), Scottish Ministers
have committed to keep under consideration whether there are any steps they could take
which would further effect in Scotland the United Nations Convention on the Rights of the
Child (UNCRC) requirements. Completion of the CRWIA feeds into this consideration and
review process. The ‘wellbeing of children and young people’ is defined at section 96(2) of
the 2014 Act. The general principles of the Act (as identified by UNICEF 2019) are:  
• Non-discrimination; 
• Best interest of the child; 
• Right to survival and life development; and 
• Right to be heard. 
The UNCRC considers a child as any human being below 18 years old, unless majority is
attained earlier under the law applicable to the child. As per the UN General Assembly on
the Convention on the Rights of the Child, in Scotland, a minor is a person under the age of
18 in most circumstances.
Part 9 of the Children and Young People (Scotland) Act on corporate parenting is relevant
to certain public bodies, including Renfrewshire Council. Through corporate parenting,
duties were introduced for the relevant public bodies to support certain children and
young people. The responsibilities of every corporate parent are: 
a. to be alert to matters which, or which might, adversely affect the wellbeing of children
and young people to whom this Part applies;
b. to assess the needs of those children and young people for services and support it
provides; 
c. to promote the interests of those children and young people;

Page 139

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  10
PUBLIC
d. to seek to provide those children and young people with opportunities to participate in
activities designed to promote their wellbeing; 
e. to take such action as it considers appropriate to help those children and young
people:
i. to access opportunities, it provides in pursuance of paragraph (d); and 
ii. to make use of services, and access support, which it provides; and 
f. to take such other action as it considers appropriate for the purposes of improving the
way in which it exercises its functions in relation to those children and young people.
2.1.4. United Nations Convention on the Rights of the Child (Scotland) Act
(2024)
The United Nations Convention on the Rights of the Child (Scotland) Act (2024) Act builds
upon the Children and Young People Act by incorporating the rights and obligations
established by the UN Convention on the Rights of the Child (UNCRC) into Scots law. This
ensures that public authorities act in a way which is compatible with the rights set out in
UNCRC. 
The Act also mandates the creation of a Children’s Rights Scheme to outline how the
Government will give effect to the rights and obligations under the UNCRC and provides for
judicial remedies for children and their representatives to bring proceedings in court if
public authorities fail to comply with the requirements under the UNCRC.
The Act also requires public authorities to conduct a child rights and wellbeing impact
assessment to report their compliance with the UNCRC. It also includes provisions for
guidance to be issued on its implementation.
2.2. National Policy
There is a range of national policy which is relevant to the development of the
Renfrewshire LTS, which is summarised within the LTS document. This section outlines
policies which contain provisions directly relevant to the IIA. 
The Main Issues report provides further details of wider national policy.

Page 140

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  11
PUBLIC
2.2.1. Best start, Bright Futures: Tackling Child Poverty Delivery Plan 2022 to
2026 (2022)
Best Start, Bright Futures was published by Scottish Government in 2022, outlining the
strategy to tackle child poverty in Scotland. The role of transport is underlined throughout
the document, pointing towards the importance of affordability, and providing
connections to essential services, employment centres and schools. For example, the
document outlined that a community bus fund is planned, aimed at improving public
transport availability, as well as expanding the concessionary fares offer to deliver free bus
travel for all children and young people under the age of 22 (the latter has since been
implemented). The Delivery Plan notes that a review of Demand Responsive Transport
options will be undertaken to establish how they can help low-income families.
2.2.2. The National Walking Strategy Action Plan (2016-2026)
The National Walking Strategy was one of the first of its kind to be introduced across the
world. The Strategy has been included in this section due to the potential mental
wellbeing and physical health impacts for protected characteristic groups. It outlines a
vision for Scotland ‘where everyone benefits from walking as part of their everyday
journeys, enjoys walking in the outdoors and where places are well designed to encourage
walking’. The document sits within a wider strategy context of the National Performance
Framework, with walking a key component on aiding the delivery of outcomes within the
framework. 
The aims of the strategy are: to create a culture of walking where everyone walks more
often as part of everyday travel and for recreation and wellbeing, and secondly, to achieve
better quality walking environments with attractive, well designed and managed built and
natural spaces and places for everyone. In order for everyone to be able to walk and enjoy
local walking environments, they must be accessible for all.
2.2.3. Local Transport Strategy Guidance (2024)
In 2024 Transport Scotland published their guidance for Local Transport Strategies. The
guidance aims to support local authorities in creating transport strategies for their area.
The Guidance refers to a target to reduce car kilometres by 20% by 2030 against a 2019
baseline (this target is in the process of being reviewed as of April 2025, pending receipt of

Page 141

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  12
PUBLIC
advice from experts at the Climate Change Committee, expected in Spring 2025), with
reduction of overall car use seen as essential to meeting Scotland’s statutory emission
targets. Reducing the dominance of private cars also aims to address existing inequalities,
as those on low incomes, women, people with a disability, and people of non-white
Scottish or British ethnicities are less likely to have access to or use a car, while negative
effects of car use – air and noise pollution, road danger, community severance and
congestion - fall disproportionately on those groups. 
2.3. Regional and Local Policy 
Regional and local policy relevant to the IIA is set out below. The Main Issues Report sets
out further details of wider regional and local policy.  
2.3.1. The Regional Transport Strategy for the West of Scotland (2023)
In July 2023, Strathclyde Partnership for Transport (SPT) published its Regional Transport
Strategy (RTS) covering the period 2023 to 2038. The RTS sets a vision for the West of
Scotland to be “an attractive, resilient and well-connected place with active, liveable
communities and accessible, vibrant centres facilitated by high quality, sustainable and
low carbon transport shaped by the needs of all.” 
The Strategy supports and follows the principles of the Sustainable Travel Hierarchy and
aims to tackle key issues in the region: active living, access for all, quality of public
transport, transport emissions, and regional connectivity. The RTS outlines policies in
order to achieve the following objectives: 
• To improve accessibility, affordability, availability and safety of the transport
system, ensuring everyone can get to town centres, jobs, education, healthcare and
other everyday needs; 
• To reduce carbon emissions and other harmful pollutants from transport in the
region; 
• To enable everyone to walk, cycle or wheel and for these to be the most popular
choices for short, everyday journeys; 
• To make public transport a desirable and convenient travel choice for everyone;
and

Page 142

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  13
PUBLIC
• To improve regional and inter-regional connections to key economic centres and
strategic transport hubs for passenger and freight. 
• In addition, the RTS establishes targets that are aligned with the national climate
change targets, setting out the transformational change in behaviours that are
required to achieve the Strategy’s vision:  
• By 2030, car kilometres in the region will be reduced by at least 20%; 
• By 2030, transport emissions will be reduced by at least 53% from the 2019
baseline; and 
• By 2030, at least 45% of all journeys will be made by means other than private car
as the main mode. 
2.3.2. Renfrewshire’s Local Development Plan (2021)
The Local Development Plan spatial strategy focuses on placemaking and development
within existing built-up areas and key redevelopment sites, aiming to facilitate sustainable
development and a low carbon economy providing high quality new development in the
right locations.  
The policies and proposals outlined within the plan aim to provide a balance between the
need to protect and enhance the environment in Renfrewshire as well as promoting
development activity, new investment and sustainable and inclusive economic growth.   
The key areas of relevance in the current LDP for the IIA include the focus on inclusive
growth, green infrastructure and positive contribution to safe environments, sustainable
transport and urban development.
Renfrewshire Council is in the process of preparing an updated Local Development Plan
(LDP3), which will set out the long term vision for the area up to 2037 and beyond. This will
reflect updated policies, including those captured in National Planning Framework 4. The
aim is to deliver a place-based, people-centred and delivery focused plan for Renfrewshire
which will set out an ambitious vision for the areas places, and the LDP will sit alongside
and be influenced by community-led Local Place Plans and a Regional Spatial Strategy
(RSS) for the Glasgow city region. The LDP will also support connections to new
developments.

Page 143

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  14
PUBLIC
2.3.3. Renfrewshire Community Plan (2017-2027) 
The Community Plan outlines the vision for a community that aims to have people
‘working together to make Renfrewshire a fairer, more inclusive place where all our people,
communities and businesses thrive’.   
The four key themes to help achieve this aim are acknowledged by the Plan and are
highlighted below:   
• Thriving: Maximising economic growth, which is inclusive and sustainable  
• Well: Supporting the wellness and resilience of our citizens and communities  
• Fair: Addressing the inequalities which limit life chances  
• Safe: Protecting vulnerable people, and working together to manage the risk of
harm

Page 144

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  15
PUBLIC
3. Summary of Local Transport Strategy
The Renfrewshire LTS has been developed following identification of problems and
opportunities and identification of potential options, which in part were informed by
public and stakeholder consultation. This chapter summarises the Vision, Priorities,
Objectives and actions of the LTS. 
3.1. Vision
The Vision Statement for the Renfrewshire LTS is as follows:
‘Renfrewshire to be an attractive place to live, work and visit, with walking, wheeling and
cycling and public transport opportunities that are inclusive, affordable, integrated and safe
to use; and a transport system which supports net zero targets, inclusive economic growth
and the health and wellbeing of all’.
The Vision Statement has been informed by the wider policy context in particular the
National Transport Strategy 2 and the Regional Transport Strategy, both of which place a
strong emphasis on addressing the climate emergency and in supporting sustainable
economic growth, the health and wellbeing of the local population and equality, safety
and security for all. It was also developed with consideration for the Council’s Plan for Net
Zero which commits to maximise sustainable transport opportunities and delivering
inclusive, affordable transport systems.
3.2. Priorities
The Vision Statement is supported by a set of priorities informed by the same factors as the
Vision Statement:
• Equality and Accessibility
• Net Zero Emissions
• Inclusive Economic Growth
• Safety and Security
• Resilience and Maintenance

Page 145

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  16
PUBLIC
3.3. Local Transport Strategy Objectives
The objectives take cognisance of SMART principles so they can be monitored and
evaluated against future years (Specific, Measurable, Achievable, Relevant, Time-bound).
The objectives also balance the need to be both aspirational whilst realistic and attainable.
The objectives are as follows: 
• TPO1: Support fair and equitable access to sustainable modes of transport in
Renfrewshire, that is integrated and easy to use for all 
• TPO2: Support the continued reduction in harmful transport emissions across
Renfrewshire  
• TPO3: Increase the proportion of trips undertaken by walking, wheeling and cycling
and public transport for everyday journeys 
• TPO4: Improve transport connections within Renfrewshire and to neighbouring
local authorities to support inclusive economic growth 
• TPO5: Improve the safety of Renfrewshire's transport network through meeting
Scottish Government casualty reduction targets 
• TPO6: Provide a secure, resilient and well-maintained transport network that meets
the needs of users 
3.4. Local Transport Strategy Actions
Following the development of the Vision, Priorities and Objectives, options were generated
and a short list of options developed. An appraisal was undertaken of the short-list, scoring
each option against the objectives, STAG criteria and deliverability criteria in qualitative
terms. Options retained following the appraisal form the Action Plans. 
The full list of actions is available in Appendix A. The actions forming the LTS have been
grouped into eight themes as set out below. It is noted that many of the actions will require
working with partners to allow delivery and are subject to funding availability.

Page 146

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  17
PUBLIC
Table 3-1: Overview of LTS Themes
LTS theme Description
Active Travel The actions included within this theme focus on active travel, including:
extending cycle networks, improving safety across active travel
infrastructure (including lighting), access to hire bikes, secure cycle
parking and public charging stations for e-bikes, improving signage and
wayfinding, improving maintenance of the active travel network,
exploring mobility hubs as part of wider measures and cycle training.
Behaviour
Change
The actions included within this theme focus on Behaviour Change
initiatives, including: initiatives within schools and with employers to
encourage mode shift, Bikeability training 1 and 2 to primary school
children, adult cycle training, travel plans for employers (including
Renfrewshire Council) and increased support for applying for
concessionary travel cards.
Public
Transport
and Shared
Mobility 
The actions under Public Transport and Shared Mobility include
integrated ticketing to support affordability of public transport and
working with partners to improve frequency and reliability of bus
services. There is also a focus on improving physical accessibility of
stops, stations and transportation. In addition, actions include improved
links to Glasgow Airport, AMIDS and other strategic locations, bus priority
measures, bus stop improvements, consideration of the potential for
mobility hubs and support to establish local bus franchising. This theme
also considers community transport and demand responsive transport,
particularly for rural areas.
Road safety  Actions on road safety include reducing speed limits and introducing
traffic calming measures, particularly around urban residential areas and
schools. Actions also include targeted measures to reduce causalities
and to improve road safety by partnering with Police Scotland.
Parking This theme includes actions to examine the need for expansion of park
and ride / mobility hub sites where there are capacity issues and provide
provision where there currently is none. There are also actions to support
private sector expansion of publicly available electric vehicle charging
network, to increase the number of disabled parking spaces in proximity

Page 147

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  18
PUBLIC
to trip attractors, implementation of pavement parking exemptions and
to investigate the potential for a workplace parking license. 
Road
Network and
Freight 
Road Network and Freight actions include actions to progress with
construction of targeted new road links and to explore the feasibility of
targeted road improvements, to undertake an assessment of the road
safety and environmental effects of HGV routeing through Renfrewshire’s
urban road network and to encourage developers to consider rail as an
alternative to road for moving freight. 
Environment Environment actions include a continuation of monitoring air quality in
the Council area, expanding decarbonisation of the Council’s vehicle
fleet and implementing climate change adaptation and resilience
measures.
Digital
Technology
Digital Technology actions include those related to supporting an
integrated journey planning app, provision of Real Time Passenger
Information at targeted bus stops, undertaking a study to expand the
Urban Traffic Control network and measures to support the fibre
network.

Page 148

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  19
PUBLIC
4. Evidence Review 
4.1. Introduction 
A baseline profile of the population living in Renfrewshire is necessary to enable an
assessment of the potential impacts the LTS may have on groups with protected
characteristics as well as those experiencing socio-economic disadvantage.
This chapter outlines the social and equalities baseline relevant to the LTS. This includes
analysis of data and datasets from the National Records of Scotland (NRS) including mid-
year population estimates as well as the results of Scottish Surveys Core Questions (SSCQ),
Scottish Index of Multiple Deprivation and Census 2001, 2011 and 2022 data where
appropriate. The most recently available data is presented at two geographical levels:
Renfrewshire and Scotland. 
4.2. Population Baseline
4.2.1. Population
According to the 2022 Scottish Census, the population of Renfrewshire is 183,874. Between
2001 and 2022, the population has grown by 6.4% which is slightly lower than the national
figure (+7.4% growth). 
The population projection between 2018 and 2028, predicts overall population growth of
2.5%, compared to a projection of 1.8% for Scotland as a whole (National Records for
Scotland). 
In 2022, Renfrewshire had the 9th highest population out of all 32 council areas in Scotland
and by 2028 Renfrewshire is predicted to have the 10th highest population.

Page 149

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  20
PUBLIC
Table 4-1: Population for Renfrewshire and Scotland (2001 Census, 2011 Census, 2022
Census)
Year Renfrewshire Scotland
2001 172,867 5,062,011
2011 174,908 5,295,403
2022 183,874 5,436,600
Percentage Change (2001-
2022) +6.4% +7.4% 
The data zone within Renfrewshire with the largest population increase was Rural North
and Langbank, where there was a 138% increase in population between 2017 and 2021
(likely owing to Dargavel development in Bishopton being built in this period). This is the
biggest population increase of any data zone in Renfrewshire during this period. 
Paisely North 01 data zone also recorded a large population growth in this period (70%)
while Paisley Ferguslie data zones 06 and 07 recorded the biggest decrease in population
between 2017 and 2021 of -13% and -14% respectively.
4.2.2. Urban / Rural Geography
The Scottish Government’s Urban Rural classifications provide a consistent way of
distinguishing urban, rural, accessible and remote areas across Scotland in six categories
based on population and accessibility. Based on this, 84% of Renfrewshire’s population
live in an urban area (‘Large Urban Area’ or ‘Other Urban area’), including Paisley,
Johnstone and Renfrew. ‘Accessible small towns’ such as Bridge of Weir comprise 9% of
the population; and ‘Accessible rural areas’ such as Lochwinnoch comprise 8% of the
population.

Page 150

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  21
PUBLIC
Figure 4-1: Renfrewshire population urban rural classifications (Scottish Government 2020)
4.3. Protected Characteristic Groups
4.3.1. Age
The age breakdown for 2011 and 2022 is similar across both geographies, as shown in
table 4-2 below. In 2022, 16.1% of the Renfrewshire population were aged between 0-15
compared to 16.4% in Scotland, while 19.5% of the Renfrewshire population were over the
age of 65 compared to 20% nationally. 
Renfrewshire and Scotland have an ageing population with those over the age of 65
forming a larger proportion of the population in 2022 compared to 2011. 
Table 4-2: Age breakdown (%) by geographical area (2011 Census and 2022 Census)
Age range (years)
2011 2022
Renfrewshire (%) Scotland (%) Renfrewshire (%) Scotland (%)
0-15 17.6 17.3 16.1 16.4
16-64 65.5 65.9 64.4 63.6
65 and over 16.9 16.8 19.5 20.0

Page 151

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  22
PUBLIC
4.3.2. Sex
There is a slightly higher proportion of females across both geographies (51.7% female in
Renfrewshire compared to 51.1% in Scotland).
Table 4-3: Sex breakdown (%) by geographical areas (2022 Census)
Sex Renfrewshire (%) Scotland (%)
Female 51.7 51.4
Male 48.3 48.6
4.3.3. Disability
Table 4-4 shows that in Renfrewshire, 24.7% of the population have a disability or long-
term health condition that limits daily activities. This compares to 24.1% in Scotland as a
whole. Of these, 11.7% of the Renfrewshire population have a disability or health
conditions that limits daily activities ‘a lot’, which is slightly higher than the national figure
(10.8%).
Table 4-4: Disability or long-term health condition breakdown (%) by geographical area
(2022 Census) 
4.3.4. Race
The largest ethnic group in Renfrewshire is White Scottish, forming 85.6% of the population
(compared with 77.7% in Scotland as a whole). The largest minority ethnic group is ‘African
Other’ forming 1.1% of the population which is similar to the figure for Scotland (1%).
Overall, a slightly smaller proportion of the Renfrewshire population represent non-White
groups (5.5%) compared to Scotland as a whole (6.1%).
Disability Renfrewshire (%) Scotland (%)
Day-to-day activities limited a lot 11.7 10.8
Day-to-day activities limited a little 13.0 13.3
Day-to-day activities not limited 75.2 75.9

Page 152

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  23
PUBLIC
Table 4-5: Ethnic group breakdown (%) by geographical area (2022 Census)
Ethnic group Renfrewshire
(%)
Scotland
(%)
White
Scottish 85.6 77.7
Other British 4.8 9.4
Irish 1.0 1.0
Gypsy or Traveller <0.1 0.1
Polish 1.3 1.7
Other 1.8 3.0
Mixed or Multiple Ethnic Groups Mixed or Multiple
Ethnic Groups 0.9 1.7
Asian, Asian Scottish or Asian British
Indian, Indian
Scottish/British 0.9 1.0
Pakistani,
Pakistani
Scottish/British
0.9 1.3
Bangladeshi,
Bangladeshi
Scottish/British
<0.0 0.1
Chinese, Chinese
Scottish/British 0.4 0.9
Other Asian 0.4 0.6
African
African, African
Scottish/British 0.1 0.1
Other African 1.1 1.0
Caribbean or Black
Caribbean,
Caribbean
Scottish/British
<0.1 <0.1

Page 153

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  24
PUBLIC
Ethnic group Renfrewshire
(%)
Scotland
(%)
Black, Black
Scottish/British <0.1 <0.1
Other Ethnic Groups
Arab, Arab
Scottish/British 0.3 0.4
Other 0.3 0.5 
4.3.5. Religion or Belief
The largest religious group in Renfrewshire is Church of Scotland, forming 20.8% of the
population, followed by Roman Catholic, forming 19.1% of the population. Nationally,
20.4% of the population report Church of Scotland as their religion whilst 13.3% report
Roman Catholic.
The largest minority religious group is Muslim, comprising 1.4% of the Renfrewshire
population. This is lower than the figure for Scotland as a whole (2.2%). The second largest
religious group is Sikh, representing 0.5% of the Renfrewshire population, which is slightly
higher than the national figure (0.2%).
Table 4-6: Religion breakdown (%) across geographical areas (2022 Census)
Religion Renfrewshire (%) Scotland (%)
Church of Scotland 20.8 20.4
Roman Catholic 19.1 13.3
Other Christian 4.1 5.1
Buddhist 0.2 0.3
Hindu 0.3 0.6
Jewish <0.1 0.1
Muslim 1.4 2.2

Page 154

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  25
PUBLIC
Religion Renfrewshire (%) Scotland (%)
Sikh 0.5 0.2
Pagan 0.3 0.4
Other religion 0.2 0.2
No religion 47.2 51.1
Religion not stated 5.9 6.2
4.3.6. Sexual Orientation
As shown in the table below, the proportion of the population who identify as gay or
lesbian, bisexual or another sexual orientation is similar across both geographies (3.7% in
Renfrewshire and 4.1% nationally).
Table 4-7 Sexual orientation breakdown (%) across geographies (2022 Census)
4.3.7. Gender Reassignment
According to the 2022 Census, the proportion of the population who identify as a trans
man, trans woman, non-binary or another trans status (or unspecified) is 0.5% in both
Renfrewshire and Scotland as a whole. 
Sexual orientation Renfrewshire (%) Scotland (%)
Heterosexual/Straight 88.8 87.8
Gay or Lesbian 1.8 1.8
Bisexual 1.5 1.8
Other Sexual Orientation 0.4 0.5
Not answered 7.5 8.2

Page 155

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  26
PUBLIC
Table 4-8 Gender reassignment breakdown (%) across geographies (2022 Census) 
4.3.8. Pregnancy and Maternity
In 2023, there were 1,663 births in Renfrewshire which was a 5.2% decrease from 1,754
births in 2022. The standardised birth rate was 8.8 per 1,000 population (National Records
for Scotland). 
The most common age group of mothers was 30 to 34 (628 births) while the least common
age group of mothers was 0 to 19 (35 births). This age group (0-19 years) has seen the
largest percentage decrease in births since 2003 (-76.4%) whilst the over 40 age group has
seen the largest percentage increase in births (+56.1%) (National Records for Scotland). 
4.3.9. Marriage and Civil Partnership
The legal partnership status of the Renfrewshire and Scottish populations are very similar.
In Renfrewshire, 38.4% of the population have never been married (compared with 38.1%
in Scotland) and 43% are married or in a civil partnership, compared with 44% of the
Scottish population, whilst 8.4% of the population in both geographies are divorced or had
their civil partnership dissolved.  
Gender reassignment Renfrewshire (%) Scotland (%)
Not trans and does not have a trans history 93.9 93.6
Trans man 0.1 0.1
Trans woman 0.1 0.1
Non-binary 0.2 0.2
Trans status or history (not specified) 0.1 0.1
Other trans status or history <0.1 <0.1
Not answered 5.8 5.9

Page 156

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  27
PUBLIC
Table 4-9 Legal partnership status breakdown (%) by geographical area (2022 Census)
Legal partnership status Renfrewshire
(%)
Scotland
(%)
Never married 38.4 38.1
Married/Civil Partnership 43.0 44.0
Separated but still legally married or in civil partnership 2.7 2.4
Divorced or civil partnership dissolved 8.4 8.4
Widowed 7.5 7.0
4.4. Socio-economic Disadvantage
The Scottish Index of Multiple Deprivation (SIMD) is a Scottish Government tool which
splits the country into over 6,000 data zones. The tool takes data from several different
indicators to give each data zone an overall ranking. This data can then be used to show
which areas record high levels of deprivation. The data zones are split into ten deciles (10%
increments), where Decile 1 indicates high levels of deprivation and Decile 10 indicates low
levels.  
The figure overleaf shows the deprivation deciles for Renfrewshire, with red indicating
higher levels of deprivation and blue showing lower levels of deprivation.
As shown, levels of deprivation vary across Renfrewshire Council area. There are multiple
areas of high deprivation within urban areas in the east, such as Paisley, Renfrew and
Johnstone (although some areas here also have data zones with low levels of deprivation).
Lower levels of deprivation are primarily recorded in the west and north of the local
authority area, such as around Bridge of Weir, Erskine and Bishopton.

Page 157

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  28
PUBLIC
Figure 4 2: Renfrewshire Scottish Index of Multiple Deprivation deciles 
Table 4-10 shows the split of data zones across the deciles. Renfrewshire has a higher
proportion of data zones (15%) in the 10% most deprived category. Overall, 25% of data
zones fall in the top 20% of deprived category in Renfrewshire, which is higher than the
percentage for Scotland, whilst the proportion in the least deprived 20% mirrors the
Scotland-wide average.
Table 4-10 Scottish Index of Multiple Deprivation deciles for Scotland and Renfrewshire
(SIMD 2020)
Scottish Index of Multiple Deprivation 2020 All Deciles
  
1 2 3 4 5 6 7 8 9 10
Scotland 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%
Renfrewshire 15% 10% 10% 11% 9% 8% 6% 10% 12% 8%

Page 158

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  29
PUBLIC
4.5. Employment
The Labour Market Profile of Renfrewshire for the period July 2023 to June 2024 shows that
73.8% of Renfrewshire’s working age population were economically active and in
employment. This is slightly lower than the national figure (74.5%). Across both
geographies, the proportion of the population who are economically active in employment
has increased since 2011. Unemployment rate in the same period was 3.5% of the
economically active population for both Renfrewshire and Scotland.
Table 4-11 Economic Activity Status (%) across geographies, 2011, 2023-2024 (NOMIS)
Economic Activity Status 2011 2023-2024
Renfrewshire
(%)
Scotland
(%)
Renfrewshire
(%)
Scotland
(%)
Economically active: 
in employment
66.9 70.5 73.8 74.5
Table 4-12 provides a breakdown of people who are economically inactive. For some
categories, data is unavailable at the council level and therefore not included.
Renfrewshire has a larger proportion of retired residents compared to Scotland as a whole
(23.9% compared to 14.5% respectively). 20.1% of the Renfrewshire population look after
the family / home compared to 16.3% in Scotland, and 31.9% are long-term sick, which is
similar to the national figure (32.7%).
Table 4-12 Economic inactivity categories (%) across geographies, April 2023-March 2024
(NOMIS)
Economic inactivity Renfrewshire (%) Scotland (%)
Student 23.3 24.8
Looking after family/home 20.1 16.3
Temporary sick N/A 2.5
Long-term sick 31.9 32.7
Retired 23.9 14.5
Other N/A 8.9

Page 159

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  30
PUBLIC
As shown in Table 4-13, the largest employment sector in Renfrewshire is ‘professional
occupations’ (24.6%) although this is slightly lower than the figure for Scotland. Overall,
47.1% of the Renfrewshire population are employed in the major employment groups 1-3
(managers, directors, senior officials, professional occupations and associate professional
and technical occupations), compared with 50.5% of the Scottish population. A larger
proportion of the Renfrewshire population work in sales and customer occupations
(13.4%) compared with Scotland as a whole (6.4%).
Table 4-13 Employee jobs by broad sector group (%) across different geographical areas,
2023-2024 (NOMIS)
Occupation Renfrewshire (%) Scotland (%)
Managers, directors, senior
officials 5.3 8.0
Professional occupations 24.6 26.4
Associate professional & technical
occupations 17.2 16.1
Administrative & secretarial
occupations 12.4 9.5
Skilled trades occupations 8.5 9.3
Caring, leisure & other service
occupations 5.1 9.0
Sales & customer service
occupations 13.4 6.4
Process plant / machine
operatives 5.8 5.5
Elementary occupations 7.7 9.7
4.6. Education
Table 4-14 provides a breakdown of educational attainment in Renfrewshire and Scotland.
In Renfrewshire, 30.5% of the population have degree level qualifications and above, which

Page 160

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  31
PUBLIC
is similar to the figure for Scotland (32.5%). 16.7% of both geographies have no
qualifications and a similar proportion have lower school qualifications (18.6% in
Renfrewshire and 18.9% in Scotland) and upper school qualifications (10.7% in
Renfrewshire and 11.1% in Scotland).
Table 4-14 Educational attainment (%) by different geographical area (2022 Census)
Educational attainment Renfrewshire (%) Scotland (%)
No qualifications 16.7 16.7
Lower school qualifications 18.6 18.9
Upper school qualifications 10.7 11.1
Apprenticeship qualifications 8.4 7.6
Further education and sub-degree
higher education 15.1 13.2
Degree level qualifications and
above 30.5 32.5
4.7. Health
Table 4-15 shows the life expectancy for males and females in Renfrewshire and Scotland.
As shown, life expectancy for both males and female in Renfrewshire is slightly lower on
average compared to Scotland as a whole.
Table 4-15 Life expectancy across geographies, 2019-2021 (National Records for Scotland)
Life Expectancy Renfrewshire (%) Scotland (%)
Life expectancy males (2019-2021) 75.5 76.5
Life expectancy females (2019-2021) 80.0 80.8 
Healthy life expectancy refers to the average number of years a person can expect to live in
full health (without significant illnesses or injuries) compared with normal life expectancy,
which counts the average total lived years regardless of health status (World Health
Organisation). Although life expectancy for females is higher than males, in the period

Page 161

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  32
PUBLIC
2019-2021, the healthy life expectancy for males was 59; females was lower at 58.4. This
compares to 61.1 for females and 60.4 for males in Scotland (ScotPHO). 
As reported by the Renfrewshire Health & Social Car Partnership (HSCP), the Renfrewshire
Strategic Planning Group’s Health and Wellbeing Priorities highlight that some of the key
health priorities to address within Renfrewshire include:
• Helping people feel connected to their communities and addressing loneliness and
social isolation.
• Addressing low-level mental health issues by developing appropriate support.
• Reducing health inequalities by improving health outcomes for particularly
affected groups (minority ethnic groups and people in lower socio-economic
groups).
• Developing support for children in their early years and vulnerable families
impacted by inequalities that can lead to poorer health, developmental and
educational outcomes.
• Recognising the importance that housing plays in people’s health and wellbeing
and prevent homelessness.
Renfrewshire is part of NHS Greater Glasgow and Clyde Health Board. There is limited data
available specific to this health board on health issues such as obesity. However, national
data finds that 67% of adults are overweight, with 29% of those obese. In addition, a third
of children (33%) are at risk of being overweight/obese. Between 2022/23, 13.9% of
children in the most deprived quintile were at risk of obesity which was more than double
the rate of children in the least deprived quintile (6.8%) (Obesity Action Scotland). 
Engagement will be undertaken with targeted stakeholders on the final themes and also to
gauge further detail on health and obesity in Renfrewshire and the likely health impacts of
the LTS.
4.8. Access to Transport Options
Table 4-16 provides data on the mode of travel for work for all people aged 16 and over in
employment. The most common mode of travel is ‘driving a car or van’ (48.9%) which is
slightly higher than the national figure (45.9%). A smaller proportion of the Renfrewshire
population travel to work on foot (4.8%) compared to Scotland as a whole (7.3%). The
same is true for cycling, with 0.7% of the Renfrewshire population travelling to work on a
cycle compared to 1.4% of the Scottish population.

Page 162

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  33
PUBLIC
30.8% of the population work mainly at or from home which is similar to the Scottish figure
(31.6%). There has been an increase nationally in the proportion of the population who
work from home following the Covid-19 pandemic. This has been identified as opportunity
for reducing the number of cars on the road, particularly during rush hour.
Table 4-16 Mode of travel to work (%) across geographies (2022 Census)
Travel to work Renfrewshire (%) Scotland (%)
Work mainly at or from home 30.8 31.6
Driving a car or van 48.9 45.9
Passenger in car or van 3.9 3.6
Taxi or private hire 0.9 0.6
Motorcycle, scooter or moped 0.2 0.2
On foot 4.8 7.3
Bicycle 0.7 1.4
Bus, minibus or coach 5.3 5.7
Train 3.5 2.3
Underground, subway or train 0.1 0.2
Other 0.9 1.3 
In terms of car ownership, Renfrewshire has the highest vehicle ownership per head than
any other local authority in Scotland. However, it is noted that Renfrewshire accounted for
25% of all company cars registered, compared to only 5% of all cars, which will impact
these figures (Scotland Transport Statistics 2021).
4.9. Road, Rail and Bus
The road network in Renfrewshire includes motorways, A roads and B roads. The M8, M898,
A898, A8T (West Ferry roundabout to Inverclyde) and A737 form part of the trunk road
network, which are maintained by Transport Scotland. Other roads are local and are
maintained by the Council.

Page 163

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  34
PUBLIC
The rail network in Renfrewshire includes two rail lines from Glasgow; a rail line that
terminates at Paisley Canal and a line to Paisley Gilmour Street that splits off into the
Inverclyde line via Bishopton and the Largs / Ardrossan / Ayr line via Johnstone.
There is also an extensive bus network in Renfrewshire, alongside Demand Responsive and
Community Transport which operates in the area. Private operators run commercial bus
services registered with the Traffic Commissioner for Scotland. SPT manages bus stations
and bus stops and provides a range of specialist bus services within the Strathclyde region
from socially necessary bus services and Community Transport to co-ordinating school
transport. Renfrewshire Council provides infrastructure such as bus shelters, high access
kerbs and bus priority measures.
Further details are available in the Main Issues Report.

Page 164

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  35
PUBLIC
5. Key Issues and Evidence 
The information below highlights some of the key issues and evidence around children
and young people (CRWIA), other protected characteristic groups (EqIA), socio-economic
disadvantaged groups (FSDA) and health (HIIA). It refers specifically to Renfrewshire and
nationally. This will be used to assess the impacts of the LTS.
5.1. Children and Young People (CRWIA)
• Across Scotland, the Young Scot National Entitlement Card (NEC) is available for
free for anyone aged 11 to 25 living in Scotland. The card provides free bus travel for
those under the age of 22 and for those aged 16, 17 or 18, cheaper train and ferry
fares. The uptake in Renfrewshire was 70.9%, which was slightly higher than the
national figure of 68.3%, ranking Renfrewshire the eight highest usage of Scotland’s
local authorities (Transport Scotland, 2021).
• Young people are more likely to rely on public transport to access education, public
services, economic opportunities and social activities (Transport Scotland, 2021).
Renfrewshire has 50 primary schools, 11 secondary schools and two additional
support needs schools educating more than 23,000 young people (Paisley Live).
Children living in more rural parts of Renfrewshire may be particularly impacted by
a lack of frequent and well-connected bus services and this poses a barrier to
accessing educational and social opportunities. As such, children and young
people are likely to benefit from increased investment into public transport and
active travel, particularly in rural areas.
• Just under a quarter of children in Renfrewshire are living in poverty and child
poverty is rising. Poverty in childhood has a severe limiting effect on the prospects
for a child both at present and later in life. Employment is not always a barrier for
poverty as two thirds of children living in poverty in Renfrewshire are living in a
household where at least one person is working (Renfrewshire’s Community
Learning and Development Strategy 2021-2024).
• According to the Scottish Health Survey, in 2019, 16% of children were at risk of
obesity. Access to active travel and transport systems that encourage active living,
and regular physical activity is an important factor in combating obesity, as well as
having beneficial impacts on mental health and wellbeing.

Page 165

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  36
PUBLIC
• Reports into the effects of road traffic noise and behavioural problems in children
(Hjorteberg, D. et al 2015) state that traffic-related noise is correlated more broadly
with lower health-related quality of life in children and they are more vulnerable to
the effects of poor air quality compared to the overall population. 
• In 2022, there were 294 child pedestrian casualties recorded across Scotland, which
accounted for 33% of all pedestrian casualties (Transport Scotland). Children from
deprived areas and certain ethnic groups are also more at risk. 
• As reported in the Scottish Governments School Transport Guidance 2021, a key
safety issue for children is school transport. A journey home from school in the
afternoon has more risks than the journey to school in the morning, especially
when walking or cycling. 
• The School Streets Initiative promotes the introduction of School Streets (a
temporary restriction on motorised traffic on roads outside schools during drop-off
and pick-up times). This is a potential solution to tackle air pollution and road
danger for children attending schools.
• The LTS does not have any significant negative impact on children and young
people.  The LTS has taken into account the needs and rights of children and young
people.
• The LTS promotes a number of children’s rights under the UNCRC including Article
2 (no discrimination), Article 3 (best interests of children), Article 4 (making rights
real) and Article 31 (rest, play, culture, arts).  Further reference is made to specific
articles under the UNCRC where the LTS actions are assessed as having an impact
on children’s rights.
5.2. Protected Characteristic Groups (EqIA)
5.2.1. Age: Older People
• 19.5% of the Renfrewshire population are over the age of 65 and the population is
ageing - a trend reflected across Scotland (2022 Census). Therefore, the needs of
older people and the likely impacts of the LTS on older people should be
considered inclusively. It is also likely that as the proportion of older people
increases, there is likely to be an increase in age-related disabilities. This can lead

Page 166

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  37
PUBLIC
to increased pressures on local health service provision and requirements for
increased accessible provision of public services.
• Older people are more likely to rely on public transport to access services such as
shops, post offices, healthcare centres and visiting friends and relatives. Older
people may be less likely to drive due to medical problems, therefore having access
to public transport supports elderly people to engage in meaningful activities and
is therefore beneficial for their wellbeing.
• As bus accessibility is reduced in more rural areas, older people may benefit from
the introduction of community buses or Demand Reactive Transport (DRT) in these
regions.
• Across Scotland, people over the age of 60 are eligible for free bus travel through
the National Entitlement Card (Transport Scotland). 
• Reports into the association of road traffic noise and increased cardiovascular
morbidity (Halonen, J. et al 2015) states that both noise and poor air quality has
increased health risks for the elderly. 
5.2.2. Sex
• Women are more likely to use public transport to make multi-stop and multi-
purpose trips combining travel to work with trips for other purposes, such as taking
children to school, looking after family members or shopping (Sustrans). Their
reliance on public transport makes them more vulnerable to changes to transport
services than men.
• Women’s concerns when traveling on public transport largely relate to gender-
based violence and assault, including sexual harassment when travelling. Safety
concerns could be heightened where public transport facilities are understaffed
and when they are located in remote areas. As such, the impact of the LTS on both
perceived and actual safety for women using active travel or public transport
should be considered.
• Research into factors that affect pedestrians’ perceptions of safety, comfort and
pleasantness (Trop, T., Shoshany Tavory, S., & Portnov, B. A. 2023) states that a key
factor for women’s perceptions of safety is street lighting, with women planning
journeys to avoid routes without street lighting at night.

Page 167

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  38
PUBLIC
• Women are underrepresented in cycling figures. A 2018 report from Sustrans found
that 73% of women living in seven major UK cities ‘never ride a bike’ for local
journeys, despite having a positive perception of cycling.
• Data from the Scottish Household Survey (SHS) suggests that women are less likely
to meet the recommended levels pf physical activity than men. In 2021, the SHS
found that 73% of men met the guidelines for moderate or vigorous physical
activity compared to 65% of women. Therefore, improvements made to encourage
active travel methods could increase the number of women walking, wheeling and
cycling and increase the number of women who meet the recommended levels of
physical exercise.
5.2.3. Sexual Orientation and Gender Reassignment
• LGBTQIA+ people may have concerns regarding their security and safety on public
transport. Whilst data is not available at the local authority level, across Scotland
there was a 10% increase in the number of hate crimes based on sexual orientation
in 2021-22 compared to the previous year. In 2021-22, 27% of hate crimes had a
sexual orientation aggravator (Scottish Government, 2023). 
• Across Scotland there was an 87% rise in hate crime charges based on transgender
identity in 2021-22 compared to the previous year (Scottish Government, 2023).
• As LGBTQIA+ people make up a small proportion of the Renfrewshire population,
they may travel to nearby cities (such as Glasgow) to reach LGBTQIA+ friendly
venues and gender affirming healthcare clinics. Therefore, links to the city centre
could be particularly important to this group.
5.2.4. Pregnancy and Maternity
• Pregnant women are mobility restricted, particularly at later stages of pregnancy
and may have concerns or issues with regards to accessibility and safety as well as
needing to access facilities whilst feeling nauseous or ill whilst travelling. 
• Research into acute effects of air pollutants on spontaneous pregnancy loss (Leiser,
C. et al (2019) found pregnant women are also more vulnerable to poor air quality,
which increases the risk of miscarriage, premature births, and low birth rates.

Page 168

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  39
PUBLIC
5.2.5. Disability
• 11.8% of the Renfrewshire population have a disability or health condition that
limits daily activity ‘a lot’. In addition, the number of age-related conditions is likely
to increase due to the ageing population.
• The Disability Resource Centre is a day centre in Paisley which provides services for
physically disabled and sensory impaired people living in Renfrewshire. Whilst the
Centre can arrange accessible transport for visitors, due to limited spaces, many
people make their own way there by accessible taxi or MyBus service.
• Across Scotland, the National Entitlement Card provides free travel on local buses
for people with qualifying disabilities. However, there are still concerns regarding
additional costs associated with accessible transport options. The cost of vehicle
and service adaptations for passengers with a disability could potentially be met by
service providers rather than passed on to users. 
• Cycling rates amongst the disabled population are lower than those who are not
disabled. Furthermore, of the people with a disability who do cycle, 75% use their
cycle as a mobility aid. Findings from the Office for National Statistics found that
people with a disability cite inaccessible infrastructure, the cost of non-standard
cycles and the inability to cycle in places where a mobility scooter would be
allowed as the biggest barrier of cycling (European Heart Journal).
• People with a disability may be disproportionately impacted by traffic-related
emissions, as well as dust and emissions created through construction and
maintenance of transport infrastructure (Science of the Total Environment).
• For some people with disabilities, such as learning disabilities, wayfinding can be
more difficult when travelling. Clear signposting and improved wayfinding
strategies are necessary to make it easier for people with a diverse range of
disabilities to navigate towns.
• Research from Transport Scotland indicates that generally, people with a disability
are slightly less positive about their experiences using public transport than people
who are not disabled, although differences were small for most aspects. The area
where the difference was highest was whether individuals ‘felt safe and secure on
the [bus or train] at night’ – 58% of people with a disability said they felt safe and
secure compared to 73% of non-disabled people (Disability and Transport,
Transport Scotland).

Page 169

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  40
PUBLIC
5.3. Socio-economically Disadvantaged (FSDA)
• Data from the SMID shows that 25% of data zones in Renfrewshire are in the 20%
most deprived data zones nationally. Reporting from Renfrewshire Health & Social
Care Partnership notes that between 2019-2020, 23.1% of children in Renfrewshire
were living in poverty after housing costs.
• People with a disability tend to have higher costs of living than non-disabled
people. On average, disabled adults face extra costs of £583 per month. Having one
disabled child costs an average family an extra £528 per month and for almost a
quarter of families with disabled children, extra costs amount to over £1,000 per
month (Glasgow Social Recovery Taskforce).
• 79% of people in Renfrewshire spend more than 10% of their weekly household
income on transport and 17% of people pay more than 15% of their weekly
household income on transport (although this is lower than the national figures,
84% and 24% respectively).
• A 2019 NatCen Study found that there are three underlying factors that influence
the relationship between transport and inequality: the way people are distributed
geographically and across social classes, the way opportunities are distributed
(including jobs and education) and how accessible the transport system is in terms
of cost, geographic accessibility and the time and reliability of different transport
options.
• People living in deprived areas tend to live in more hazardous environments, with
greater proximity to high volumes of fast-moving traffic and high levels of on-street
parking. As such, people living in more deprived neighbourhoods have higher levels
of exposure to road traffic risk and negative health impacts associated with air
pollution (Government Office for Science).
• 9% of the Renfrewshire population live in ‘accessible small towns’ and 8% live in
‘accessible rural areas’. Across Scotland, rural households are more likely to have
access to a personal vehicle (96%) than households in urban areas (72%). Research
into forced car ownership (Mattioli, 2017) found that rural households may be
forced into forced car ownership despite financial constraints due to a lack of
public transport options in rural areas and the connection between transport and
social exclusion which can result in cutting household expenditure, limited travel
activity and increasing vulnerability to fuel price fluctuations.

Page 170

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  41
PUBLIC
• Transport cost increases can disproportionately affect socio-economically
disadvantaged groups, contributing to broader societal inequities because of the
price and availability of transportation choices. Many low-income people may
therefore be less able to maintain social relationships or to access health
appointments, work or training possibilities that could improve their standard of
living.
• A 2023 report by the Social Market Foundation found that 5 million people in the
UK are in transport poverty (8% of the UK population). This was calculated by
measuring the number of households that would move out of poverty if their
transport costs were eliminated (Social Market Foundation). In the year ending
March 2020, the average UK household spent £106 on motoring per week. Most of
these costs come from areas outside of the government’s direct control (new
vehicles, maintenance, and the global price of oil).
• Sustrans research found that poor cycle parking stops people on lower incomes
from cycling, but that residential cycle parking provision can benefit low-income
households who may not have a secure place to park a cycle at home (particularly
people living in flats rather than houses).
5.4. Health (HIIA)
• In Renfrewshire, 28.9% of residents are in the 20% most deprived areas nationally
for health indicators (Renfrewshire Health & Social Care Partnership). 
• With an ageing population, age-related health conditions are likely to increase over
the next decade in Renfrewshire.
• People with a disability are twice as likely to face isolation, and 71% of people with
a disability have difficulty in taking part in things locally (Renfrewshire Health &
Social Care Partnership).
• Across Scotland, people living in the most deprived areas are nine times more likely
to have an alcohol-related admission to hospital and 18 times more likely to have a
drug related death than people in least deprived areas. The gap in life expectancy
(19 years for males and 13.9 years for females) between people in the most and
least deprived areas has increased since 2008 (Renfrewshire Health & Social Care
Partnership).

Page 171

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  42
PUBLIC
6. Consultation 
6.1. Introduction and Overview
A round of consultation was undertaken in spring 2024. The purpose of this was to
understand transport problems and opportunities in Renfrewshire and potential options
to address these to support the development of the LTS.
The consultation was open to receive feedback on all modes of transport across
Renfrewshire and ran from Thursday 16th May to Thursday 27th June. There were several
methods of contribution for this consultation, including:
• Online survey (paper copies were also available upon request and were placed in
libraries);
• Online interactive map;
• Online workshops with Elected Members and stakeholders;
• In person events at five supermarkets; and
• In person engagement events with the local community, including people living
with disabilities and people with lived experience of poverty. 
6.2. Findings
The key findings from the consultation which are of relevance to the Integrated Impact
Assessment have been summarised below. They are categorised as points relating to
socio-economic disadvantage, children and young people, and disability. Additional
feedback, relevant across multiple population groups, is also summarised.
6.2.1. Socio-economic Disadvantage (FSDA)
• 12.8% of survey responses said that the cost of public transport was one of the
biggest negatives faced in relation to transport in Renfrewshire. Cost of public
transport was identified as the third largest barrier (following provision and
frequency).
• Respondents commented on the need for new bus and rail services, particularly in
rural areas such as Langbank, and that integrated ticketing should be introduced
between operators and modes.

Page 172

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  43
PUBLIC
• It was suggested that parking should be made free, as users could previously park
in town for 3 hours for free.
• It was raised that it is more difficult for residents who live outside of urban
settlements such as Paisely, Johnstone and Renfrew to access areas outside of the
local authority due to gaps in the bus network. Public transport needs to be well
connected to employment sites such as Glasgow International Airport, Hillington
Industrial Estate and the Royal Alexandra Hospital.
6.2.2. Children and Young People (CRWIA / EqIA)
• Some responses highlighted the need to reduce vehicle speeds to improve safety
for all, including outside of schools and in residential areas.
• School congestion was highlighted, and it was suggested there be greater
emphasis on walking and cycling to school to prevent traffic congestion outside the
school gate.
6.2.3. Disabled People (EqIA)
An engagement session was held with people with disabilities and people with sensory
impairments. The key challenges raised were as follows:
• Buses: Buses can be unreliable, with times changing and limited services in rural
areas; wheelchair and pushchair spaces are often full; there is a lack of audio and
visual announcements; ramps are not universally available; drivers can pull away
too quickly; payment systems can be confusing; and buses can be overcrowded
and feel unsafe.
• Community Transport: Some services are often cancelled and have become too
unreliable to use but there is still a need for community transport.
• Rail: Understaffed stations; difficulty getting on and off trains; not all stations have
ramps; unlit stations; lifts at stations do not always work; and some services are
regularly cancelled.
• Taxis: Lack of accessible taxis; cost of taxis compared to other modes of travel
which is a barrier for those who cannot use bus or rail.
• Walking/wheeling: Parked cars can obstruct walkways; lack of dropped kerbs
extends walking distances; uneven pavements, puddles and bins can be
dangerous.

Page 173

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  44
PUBLIC
• Other: High cost of adaptive cars.
Key opportunities and suggestions raised included:
• Raised kerbs at bus stops;
• More space on public transport for wheelchair users;
• Increased number of buses in MyBus fleet;
• Better integration of public transport, including an app to plan journeys;
• Travel buddy schemes;
• More buses should have a tail lift;
• Taxi operators should have a minimum number of accessible taxis;
• More frequent buses with direct routes; and
• All train platforms and stations should be accessible, with universal ramp provision
for trains and buses.
6.2.4. Additional feedback
• Across the different consultation workshops and surveys, there was feedback on
Demand Responsive and Community Transport, which suggested that this should
be explored in areas with limited bus routes.
• The biggest barrier for transport was identified as the transport provision and
frequency within Renfrewshire and connecting to other areas. The most frequently
selected survey response for the action which would have the biggest positive
impact was improved public transport provision within Renfrewshire (32.9%) and
connecting Renfrewshire to other areas (31.1%). 20.5% of survey respondents
selected that improvements to the local bus network was the most important thing
to be included in the LTS; this was the most popular survey response for this
question. Overall, the feedback was in favour of more frequent and better
connected public transport.
• Poor support for vulnerable groups was mentioned a number of times, as was a
lack of options for those without alternative private modes of transport, which can
have socially isolating effects.
• Personal safety concerns were raised, with feedback generally in favour of speed
limit reduction, traffic calming measures and the need to repair potholes. Lack of
lighting was also identified as a problem and anti-social behaviour on bus

Page 174

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  45
PUBLIC
networks. In addition, 73.2% of survey respondents agreed that more priority needs
to be given to the gritting of pavements and footpaths and 67% agreed that
speeding traffic is an issue. 
• Congestion in town centres (particularly in rush hour and during school times) was
highlighted as a problem. Johnstone town centre was identified as an area where
congestion can be an issue, in part owing to on street parking on narrow roads.
• Speed bumps were discussed at a workshop as being ineffective and
uncomfortable for people with chronic pain issues (as are potholes). Alternatives
could be used (e.g. speed cameras) to address this issue. 
• To encourage active travel, more accessible provision is required, such as
additional space for adaptive cycles and more traffic-free active travel routes for
leisure. 
• Some feedback stated there should be walking and cycling benefit awareness
campaigns, cycling proficiency courses and the introduction of a minimum
standard for cyclists (such as reflectors, bells, and insurance cover).
• The online map received a large number of comments focused on improving the
safety of cyclists and pedestrians.
• The lack of integrating ticketing across different public transport modes was
identified as a challenge.
6.3. Second Round Engagement
Further engagement was undertaken in summer 2025 to receive feedback on the Draft LTS
and supporting documents, including the Draft Integrated Impact Assessment. As part of
this second round engagement, a workshop was undertaken with stakeholders in the
health sector to provide further insights into health inequalities and potential impacts.
Comments raised during the workshop include the following: 
• Broad support for active travel actions that encourage walking, wheeling and
cycling and the potential to improve access to health and social care support;
• The cost-of-living-crisis can pose a challenge for residents participating in active
travel.
• Consideration should be given to how people can access mobility hubs.

Page 175

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  46
PUBLIC
• Consideration should be given to people with sensory loss and how they can
access public transport. 
• There is potential for actions to benefit groups such as older people and women,
who are more likely to use public transport. 
• For people with learning disabilities, accessibility of public transport is dependent
on the quality and availability of transport. Improvements to public transport could
support the independence of people with learning disabilities.
• Increased digitisation can raise the risk of digital exclusion; this should be taken
into consideration.
• The cost-of-living crisis poses a challenge, as not everyone has access to digital
devices. 
Feedback from the workshop has been used to inform the LTS and IIA. 
7. Assessment of Impacts
7.1. Introduction
This IIA assesses the potential indirect and direct impacts of the LTS actions included
within each of the eight themes (active travel, behaviour change, public transport and
shared mobility, parking, road safety, road network and freight, environment and digital
technology) against the requirements of the EqIA, CRWIA, FSDA, and HIIA:
• The EqIA addresses how different protected characteristic groups (age, disability,
gender reassignment, pregnancy and maternity, race, religion or belief and sex)
may be disproportionately or differentially impacted by the LTS actions.
• The CRWIA considers the impact of the LTS actions on children and young people’s
rights and wellbeing.
• The FSDA assesses the socio-economic impacts of the LTS actions and whether
they are likely to exacerbate or reduce inequalities caused by socio-economic
disadvantage to ensure the LTS contributes to a fairer society.
• The HIIA evaluates potential health impacts of the LTS actions and how the actions
may affect health inequalities.

Page 176

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  47
PUBLIC
7.2. Assessment Framework
Socio-economic, health impacts and impacts on protected characteristic groups, including
children, are assessed on magnitude and sensitivity. These consist of:
• Magnitude of impact: the extent to which the impact would affect protected
characteristic groups/households of lower economic status or extent of health
impact by considering the numbers or proportion that would experience the
impact. 
• Sensitivity to the impact: this considers how those impacted might respond and
their ability to adapt (where negatively impacted). If the impacted group has no
alternatives, they would be considered highly sensitive, whereas if the group are
able to function as normal, the sensitivity of the impact would be considered low. 
Table 7-1: Impact rating matrix 
Magnitude of impact
No change Low Medium High
Sensitivity
to impact
High Neutral Minor or
moderate
Moderate or
major Major
Medium Neutral Minor Moderate Moderate or
major
Low Neutral Neutral or minor Minor or
moderate
Minor or
moderate 
Following the assessment of actions included within each theme, they are categorised as
having an overall positive, negative or neutral impact for each of the impact assessment
criteria. A 7-point scale is used in the assessment as indicated below:

Page 177

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  48
PUBLIC
Table 7-2 Summary of 7-point scale
Major positive impact 
The action provides a major contribution to the achievement of the Public Sector Equality
Duty/supports the UNCRC/reduces inequality of socioeconomic or health outcomes.
Moderate positive impact 
The proposed action contributes significantly to the achievement of the Public Sector
Equality Duty/supports the UNCRC/reduces inequality of socioeconomic or health
outcomes.
Minor positive impact  
The proposed action contributes to the achievement of the Public Sector Equality Duty/
supports the UNCRC/reduces inequality of socioeconomic or health outcomes, but not
significantly. 
Neutral impact 
The proposed action is related to, but does not have any impact on, the achievement of,
the Public Sector Equality Duty/the UNCRC or impact health or socioeconomic
inequalities.
Minor negative impact 
The proposed action detracts from the achievement of the Public Sector Equality Duty/
supports the UNCRC/reduces inequality of socioeconomic or health outcomes, but not
significantly. 
Moderate negative impact 
The proposed action detracts significantly from the achievement of the Public Sector
Equality Duty/ the UNCRC/exacerbates inequality of socioeconomic or health outcomes.
Mitigation is therefore required.  
Major negative impact 
The proposed action results in a major detraction from the achievement of the Public
Sector Equality Duty/ goes against the UNCRC/significantly exacerbates socioeconomic or
health inequalities/outcomes.
An alternative option or significant mitigation is therefore required.

Page 178

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  49
PUBLIC
7.3. Assessment of Impacts
Table 7-3 provides a breakdown of the LTS actions by theme and an assessment of the
likely direct and indirect impacts of the actions for each Impact Assessment. There is also a
column for recommendations to either enhance positive impacts or mitigate negative
impacts. 
A more detailed assessment of individual actions for each impact assessment is included
in Appendix A.

Page 179

50
PUBLIC
Table 7-3: Assessment of potential impacts – EqIA, CRWIA, FSDA and HIIA
Theme Overview Assessment of impacts Recommendations
Active Travel The 13 actions under the
active travel theme include
proposals to extend the
cycle path network,
improve lighting and
crossings, improve access
to hire bikes, cycle parking,
and e-bike charging
facilities, improving
maintenance of the active
travel network, improving
wayfinding and to extend
Bikeability training.
Equality Impact Assessment – major
positive
• Action AT2, to implement and adopt
lighting across the off-road active travel
network, could have a positive impact
on women, who are more likely to feel
unsafe when walking through unlit
areas compared to men. This could
also benefit other protected
characteristic groups who could be at
risk of discrimination and abuse
(minority ethnic and religious groups,
people with a disability, transgender
and LGBTQIA+ people). If people feel
safer using active travel routes to
commute, this could have health and
wellbeing benefits. In addition, there
may be intersectional socioeconomic
impacts. For example, women not
having to rely on expensive modes of
transport like taxis to get home as they
feel safer walking.
• Actions to increase secure cycle
parking could include spaces for
adaptive cycles to be inclusive of
cyclists with a disability. 
• As cycle networks are extended,
strategic locations for protected
characteristic groups should be
identified (e.g., creating cycle routes
that go via schools, places of worship,
GP surgeries etc).
• Whilst actions to increase access to
bikes may improve access for lower-
income households, rental costs
would represent a barrier, if applied. As
the action is developed at later stages,
consideration could be given as to
whether access to bikes would be at a
low rate or free at the point of use
lower-income households. 
• Feedback during consultation
suggested more could be done to
advertise when paths for pedestrians

Page 180

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  51
PUBLIC
Theme Overview Assessment of impacts Recommendations
• Actions to extend the cycle network
(which is safe and accessible) is likely
to positively impact people with a
disability who wish to cycle. Whilst a
large proportion of people with a
disability who cycle use their bike as a
mobility aid, inaccessible
infrastructure, including unsuitable
access controls, gradients and widths,
poses a barrier. Therefore, extending
the network to be accessible could be
more inclusive and could positively
impact people with a disability.
• The mobility hubs referenced under
AT12 could increase independent
journeys for people with a disability,
and working with partners could
integrate lived experience into design
development of the hubs.
• AT7 (Undertake a signage review and
implement a signage and wayfinding
strategy) could have positive impacts
for multiple protected characteristic
groups. People with a learning
and cyclists are shared. There is
potential for this to be incorporated
into the wayfinding and signage
strategy to improve safety to shared
path users.

Page 181

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  52
PUBLIC
Theme Overview Assessment of impacts Recommendations
difficulty or a disability may find
navigating wayfinding more difficult,
older people may find navigation apps
inaccessible, and women may feel
uncomfortable using navigation apps
at night for fear of exposing
vulnerability. Clear signage is
anticipated to make streets easier to
navigate for all.
• Measures to make it easier for the last
mile of small goods deliveries to be
undertaken by sustainable modes,
such as by cargo bikes (AT13) could
indirectly positively impact groups who
are more vulnerable to air pollution
(children, pregnant people, older
people, people with a disability) as the
actions may decrease air pollution on
the road.
• However, encouraging the use of e-
bikes (AT11) could have some negative
impacts due to concern around high-
speeds and potential safety risks for

Page 182

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  53
PUBLIC
Theme Overview Assessment of impacts Recommendations
pedestrians, particularly for those with
mobility impairments.
Child Rights and Wellbeing Impact
Assessment – major positive
• Actions to improve pedestrian and
cycling safety (AT2, AT4 and AT5) are
anticipated to positively impact
children who are more at risk of
pedestrian accidents (UNCRC. Article 6
– Right to Life, Survival and
Development).
• Action AT8 is to expand cycle training
into secondary schools and adult cycle
training, which could positively impact
children by improving their knowledge
and safety on the road. It may also
encourage more children to cycle to
school which has health and wellbeing
benefits compared to being driven
(UNCRC Article 28 - Right to education).
• Actions aimed at improving
accessibility of active travel (AT8 and
AT11) could positively impact children

Page 183

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  54
PUBLIC
Theme Overview Assessment of impacts Recommendations
through encouraging uptake of active
travel and realising the health and
wellbeing benefits this brings (UNCRC
Article 24 - Health and health services)
Fairer Scotland Duty Impact Assessment –
moderate positive
• Actions to extend the cycle network
(AT1 and AT3) could improve access to
a greater number of locations across
Renfrewshire. As walking, wheeling and
cycling provides a low-cost method of
travel, this could present benefits for
low-income households who may
otherwise be excluded from
opportunities in inaccessible areas.
This may be particularly impactful in
areas which are not currently well
served by public transport (buses).
• The initial cost of purchasing a cycle
still represents a barrier for low-income
households. Actions AT11 and AT12,
which aim to provide access to public
bike hire and e-bike charging facilities

Page 184

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  55
PUBLIC
Theme Overview Assessment of impacts Recommendations
could address this barrier and increase
equality of opportunity for low income
households without a bicycle.
• Action AT10, which aims to improve
secure cycle parking could also have a
positive impact on lower-income
households, which may not have space
for storing a bicycle at home.
Health Inequalities Impact Assessment –
moderate positive
• If the actions aimed at improving
safety, accessibility, behaviour change
and access to cycles are successful in
increasing the number of people in
Renfrewshire who use active travel to
commute to work or school, there
could be positive physical health
benefits of walking, wheeling and
cycling.
• The improvements to crossings and
junctions (AT4, AT5) could have
positive health and safety impacts,
particularly for older people, people

Page 185

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  56
PUBLIC
Theme Overview Assessment of impacts Recommendations
with a disability, and children who are
at more risk of pedestrian accidents.
• There could potentially be negative
health impacts if actions encourage the
use of e-bikes (AT11), particularly for
pedestrians with limited mobility due
to the high speed of e-bikes.
Behaviour
Change
The actions included
within this theme focus on
Behaviour Change
initiatives, including:
initiatives within schools
and with employers to
encourage mode shift;
Bikeability training 1 and 2
to primary school children,
adult cycle training, travel
plans for employers
(including Renfrewshire
Council) and increased
support for applying for
concessionary travel cards.
Equality Impact Assessment – moderate
positive
• Behaviour Change initiatives could
encourage people from
underrepresented groups to
participate in cycling. Adult training
could improve the safety and
confidence for people who have not
considered cycling in the past (for
example, ethnic minorities, women
who are underrepresented in cycling
statistics). 
• During the next stages, there is
potential for Behaviour Change
programmes (action B7) to identify
specific groups underrepresented in
cycling figures, to encourage
behaviour change for groups that need
it most.

Page 186

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  57
PUBLIC
Theme Overview Assessment of impacts Recommendations
Child Rights and Wellbeing Impact
Assessment – moderate positive
• Children and young people could
benefit from behaviour change
initiatives in schools (B2) and if more
children are encouraged to participate
in active travel there would be positive
health and wellbeing impacts (UNCRC
Article 24 - Health and health services).
• Positive safety impacts for children
could be achieved through action B3,
which supports Bikeability training 1
and 2 for pupils leaving primary school
(UNCRC Article 6 – Right to Life,
Survival and Development) 
Fairer Scotland Duty Impact Assessment –
minor positive
• Actions B5 and B6 could encourage
employers (including Renfrewshire
Council) to implement travel plans to
support mode shift for travel to work.
Changing perceptions on active travel
and encouraging more people to walk,

Page 187

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  58
PUBLIC
Theme Overview Assessment of impacts Recommendations
wheel and cycle to work could increase
employment opportunities for those
without cars as low-cost active travel
methods become more common. 
• Action B1 is to support parents and
carers to apply for the young persons’
concessionary travel entitlement card.
This may have positive socioeconomic
impacts for younger people,
particularly for those from more
deprived households who may be less
likely to have access to information on
applying for the card and would
otherwise be excluded from
opportunities due to cost of travel. The
entitlement card is likely to improve
the ability to reach education and
employment opportunities which in
turn could improve economic status in
the future.

Page 188

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  59
PUBLIC
Theme Overview Assessment of impacts Recommendations
Health Inequalities Impact Assessment –
minor positive
• Behaviour change and cycle training
for adults and children could improve
safety on the road and therefore have
health and safety benefits for all
groups. 
Public
Transport
and Shared
Mobility 
The actions included
under Public Transport
and Shared Mobility,
include integrated
ticketing to support
affordability of public
transport and working
with partners to improve
frequency and reliability of
bus services. There is also
a focus on improving
physical accessibility of
stop, stations and
transportation. In addition,
actions include improved
Equality Impact Assessment – moderate
positive
• During consultation, the need for more
reliable and frequent bus services was
highlighted as a priority for residents.
Therefore, actions to expand public
transport services (PS4, PS6, PS8) are
likely to have a positive impact.
Minority ethnic groups are less likely to
have a full drivers’ licence and
therefore may be particularly benefited
by improvements to public transport.
Women are less likely to drive and
more likely to use multiple modes of
transport and make multi-stop
• If tickets are integrated, the daily price
cap could consider what is affordable
and accessible for all.
• It is suggested that it should be
possible to purchase integrated tickets
in person so that public transport is
still accessible for people who are
digitally excluded.
• In addition to making stops and
stations more accessible, increased
training for public transport drivers on
different types of disabilities and how
to assist disabled passengers would

Page 189

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  60
PUBLIC
Theme Overview Assessment of impacts Recommendations
links to Glasgow Airport,
AMIDS and other strategic
locations, bus priority
measures, bus stop
improvements,
consideration of the
potential for mobility hubs
and support to establish
local bus franchising. The
actions also consider
community transport and
demand responsive
transport, particularly for
rural areas.
journeys so are also likely to benefit
from the actions on public transport.
• Actions to make rail stations and bus
stops more accessible (PS2, PS5, PS12,
PS14) could positively impact people
with physical disabilities. For example,
during consultation, discussions found
that high kerbs at bus stops make it
easier for people with mobility
impairments to embark and disembark
from buses. Therefore, PS12, which is
to implement bus stop improvements,
is anticipated to have a positive
impact. 
• The public transport actions include
support for community transport and
demand responsive transport,
particularly for rural areas (PS10). This
could be particularly beneficial for
elderly people who may not be able to
drive and are at risk of social isolation
due to limited bus provision, as well as
disabled users reliant on community
make public transport more accessible
for people with a disability.
• During consultation, it was suggested
that taxi companies should have a
minimum number of accessible taxis
for people with a disability who are
unable to use public transport.
Regarding licensed taxis, the Council
currently has a policy that these be
wheelchair accessible, while requiring
certain private hire cars to be
wheelchair accessible.

Page 190

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  61
PUBLIC
Theme Overview Assessment of impacts Recommendations
transport options for adapted door to
door transport services. 
• The action to integrate public transport
ticketing (PS3) could make travelling
more accessible for people with
learning difficulties or disabilities who
may find purchasing multiple tickets
confusing.
• The introduction of mobility hubs
(PS16) could positively impact people
who do not have access to cars, in
particular some people with a
disability. This could increase access to
shops, services and employment
opportunities.
Child Rights and Wellbeing Impact
Assessment – moderate positive
• Children and young people are more
likely to rely on public transport as they
cannot drive and also benefit from free
under 22 bus travel. Therefore, the
actions to expand bus services is likely
to have a positive impact due to

Page 191

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  62
PUBLIC
Theme Overview Assessment of impacts Recommendations
increased connectivity and access to
educational and social opportunities
(UNCRC Article 28 - Right to education)
Fairer Scotland Duty Impact Assessment –
major positive
• There could be positive socioeconomic
impacts from integrating tickets and
exploring a daily price cap (PS3),
particularly for groups who are more
likely to use multiple modes of travel
(e.g. women).
• A number of actions support the
development of transport links, such as
between Glasgow Airport and AMIDS
and Pasiley (PS8). Improved access to
these locations via public transport
could provide employment
opportunities to households without
access to a car. 
• There may also be socioeconomic
impacts as a result of increasing public
transport links, as residents are able to
use this low-cost transport method

Page 192

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  63
PUBLIC
Theme Overview Assessment of impacts Recommendations
rather than rely on more expensive
modes of travel, such as taxi or private
car. 
• Action PS15 supports the expansion of
car clubs (including electric vehicles).
Renfrewshire has high levels of car
ownership compared to Scotland as a
whole, but a large proportion are
company cars, meaning that
unemployed people or those on lower-
paid or low-skill jobs may struggle with
access. Furthermore, low-income
households may not have access to
cars or may be forced into car
ownership due to living in rural
locations, therefore providing this
alternative could reduce the likelihood
of transport poverty for low-income
households. 
Health Inequalities Impact Assessment –
minor positive
• As discussed within the EqIA
assessment, the improvements to

Page 193

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  64
PUBLIC
Theme Overview Assessment of impacts Recommendations
accessibility of public transport are
likely to benefit groups with mobility
disabilities and health conditions.
• Actions related to improving public
transport connectivity in rural areas
could reduce social isolation, providing
positive health and wellbeing impacts,
particularly for elderly people who rely
on public transport to a greater extent.
• There may be indirect positive health
impacts where actions encourage
more people to use public transport
rather than private cars. This could
reduce air pollution and positively
impact residents vulnerable to the
health impacts (pregnant people,
people with a disability, children,
younger people).
Road Safety Actions on road safety
include reducing speed
limits and introducing
traffic calming measures,
particularly around urban
Equality Impact Assessment – moderate
positive
• Older people, children and people with
a disability could be positively
impacted by actions aimed at
• It is noted that some people rely on
cars as a mobility aid. Therefore, whilst
traffic reducing methods are likely to
have positive impacts, it is noted that
some people rely on cars out of

Page 194

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  65
PUBLIC
Theme Overview Assessment of impacts Recommendations
residential areas and
schools. Actions also
include targeted measures
to reduce causalities and
to improve road safety by
partnering with Police
Scotland.
improving road safety through speed
limit reductions (RS1), traffic calming
measures (RS3) and actions to reduce
congestion on school streets (RS2), as
these groups are at greater risk of
pedestrian accidents.
• If actions to reduce congestion and
cars on the road are successful, this
could reduce air pollution which would
benefit protected characteristics
groups at risk of the negative health
impacts of air pollution (children, older
people, pregnant people and some
people with a disability).
Child Rights and Wellbeing Impact
Assessment – moderate positive
• The focus on schools, including the
action to reduce congestion outside
school gates (RS2), is considered to
positively impact children. A reduction
of cars on the road could reduce the
risk of pedestrian casualties and air
pollution which disproportionately
necessity, for example children with a
disability being dropped at the school
gates.

Page 195

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  66
PUBLIC
Theme Overview Assessment of impacts Recommendations
impact children. (UNCRC. Article 6 –
Right to Life, Survival and
Development).
• Further, this action could encourage
more children to use active travel to
get to school safely, which could
provide positive health and wellbeing
impacts for this group (UNCRC Article
24 - Health and health services)
Fairer Scotland Duty Impact Assessment –
moderate positive
• Children are more at risk of road
accidents in deprived neighbourhoods.
Therefore, the action to reduce speed
limits to 20mph on urban residential
streets (RS1) could positively impact
children from households of lower
economic status.
Health Inequalities Impact Assessment –
moderate positive
• All of the actions included under this
theme are expected to have a positive

Page 196

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  67
PUBLIC
Theme Overview Assessment of impacts Recommendations
impact on health within Renfrewshire.
The actions aim to improve safety on
the road and reduce road accidents.
This may disproportionately reduce
health inequalities in more deprived
areas that have an increased risk of
road accidents. This is dependent on
the actions successfully improve road
safety in all neighbourhoods.
Parking Actions related to parking
include examining the
need for expansion of park
and ride / mobility hub
sites where there are
capacity issues and
provide provision where
there currently is none.
There are also actions to
support private sector
expansion of publicly
available electric vehicle
charging network, to
increase the number of
disabled parking spaces in
Equality Impact Assessment – minor
positive
• Increasing the number of disabled
parking spaces at trip attractors is
likely to have a positive impact on
people with disabilities. For some
people with mobility impairments, cars
are required as a mobility aid and
increasing the number of parking
spaces could make it easier for people
with a disability to access services.
• People with disabilities or mobility
impairments should be positively
impacted by the enforcement of
• No recommendations have been
identified to mitigate or enhance
impacts at this stage.

Page 197

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  68
PUBLIC
Theme Overview Assessment of impacts Recommendations
proximity to trip attractors,
implementation of
pavement parking
exemptions and enforcing
pavement parking bans,
and to investigate the
potential for a workplace
parking license. 
pavement parking bans. During
engagement, parked cars on
pavements was highlighted as an issue
which makes it more difficult for those
with mobility aids to walk and wheel
on pavements. Therefore, this group
should be positively impacted by
actions to address this.
Child Rights and Wellbeing Impact
Assessment – neutral/no impact
• No specific differential impacts for
children identified.
Fairer Scotland Duty Impact Assessment –
neutral/no impact
• No specific differential impacts for
children identified.
Health Inequalities Impact Assessment –
minor positive 
• Encouraging electric car use through
increased charging facilities (P2) could
have positive health impacts through a
reduction in air pollution on certain

Page 198

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  69
PUBLIC
Theme Overview Assessment of impacts Recommendations
groups (for example, pregnant people
are more sensitive to the impacts of air
pollution).
Road
Network and
Freight
Road Network and Freight
actions include actions to
progress with construction
of targeted new road links
and to explore the
feasibility of targeted road
improvements, to
undertake an assessment
of the road safety and
environmental effects of
HGV routeing through
Renfrewshire’s urban road
network and to encourage
developers to consider rail
as an alternative to road
for moving freight.
Equality Impact Assessment – neutral
• Road safety assessments could have a
positive impact for groups more at risk
of road traffic accidents (older people,
people with disabilities and children).
• There could be some negative health
impacts from increased air and noise
pollution during construction of road
improvements and new road links,
which could disproportionately impact
people with disabilities, pregnant
people, children and older people.
Overall, impacts of this theme are
considered neutral due to both
potential positive and negative health
impacts. 
• Mitigation measures should be
introduced by the contractor for
construction of new road links and
road improvements to mitigate
impacts of air and noise pollution.

Page 199

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  70
PUBLIC
Theme Overview Assessment of impacts Recommendations
Child Rights and Wellbeing Impact
Assessment – neutral
• As above, there could be minor
negative impacts for children through
increased noise and air pollution
during construction of new road links
and increased traffic.
• However, children would benefit from
road safety assessments as they are
one of the groups most at risk of road
traffic accidents.
Fairer Scotland Duty Impact Assessment –
neutral/no impact
• No impacts anticipated at this time.
Health Inequalities Impact Assessment –
minor positive
• The introduction of road safety
assessments could have positive
health impacts, particularly for groups
vulnerable to road safety accidents.

Page 200

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  71
PUBLIC
Theme Overview Assessment of impacts Recommendations
Environment Environment actions
involve continued
monitoring air quality,
decarbonising the
Council’s vehicle fleet and
implementing climate
change adaptation and
resilience measures.
Equality Impact Assessment – minor
positive
• A continuation of air quality monitoring
(ENV1) and the decarbonisation of
Renfrewshire Council’s vehicle fleet
(ENV2) could have positive impacts for
protected characteristic groups who
are particularly vulnerable to the
negative health impacts caused by air
pollution, such as people with a
disability, children, older people and
pregnant women.
Child Rights and Wellbeing Impact
Assessment – minor positive
• As above, children may be particularly
sensitive to the negative health
impacts of air pollution and therefore
may benefit from the actions
introduced under this theme. 
• No recommendations have been
identified to mitigate or enhance
impacts at this stage.

Page 201

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  72
PUBLIC
Theme Overview Assessment of impacts Recommendations
Fairer Scotland Duty Impact Assessment –
minor positive
• The actions to increase climate change
resilience for public transport could
positively impact people on lower
incomes who may be more likely to
rely on public transport to access
services, education and employment.
Health Inequalities Impact Assessment –
minor positive
• As discussed, actions to monitor air
quality and decarbonise the Council’s
vehicle fleet could have positive health
impacts relating to air pollution.
Digital
Technology
Digital Technology actions
include those related to
supporting an integrated
journey planning app,
provision of Real Time
Passenger Information at
targeted bus stops,
undertaking a study to
expand the Urban Traffic
Equality Impact Assessment – moderate
positive 
• The continued implementation of Real
Time Passenger Information at bus
stops (DT2) is likely to have a positive
impact on people who may feel
vulnerable waiting at bus stops (such
as women). This is also likely to benefit
• It is suggested that the introduction of
apps and online payment methods for
services do not replace in person
support for groups who may be
digitally excluded.

Page 202

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  73
PUBLIC
Theme Overview Assessment of impacts Recommendations
Control network and work
with partners to add
connections to the existing
fibre network as and when
new council building
development dictates. 
groups who are more likely to be
digitally excluded and find it harder to
access real time information online
(such as older people and some people
with a disability).
• The action to consider opportunities to
deliver an integrated journey planning
app (DT1) could make public transport
more streamlined for groups more
likely to use multiple modes of travel,
such as women. However, for people
who are digitally excluded, this could
pose challenges.
Child Rights and Wellbeing Impact
Assessment – minor positive
• As above, real time information at bus
stops could be beneficial for children
who may rely on buses to access
educational and recreational
opportunities.

Page 203

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  74
PUBLIC
Theme Overview Assessment of impacts Recommendations
Fairer Scotland Duty Impact Assessment –
minor positive
• The actions to improve information at
bus stops and to integrate multiple
methods of travel into one computer
app and payment system could
improve travel for people on lower
incomes who may be more likely to
rely on public transport methods.
Health Inequalities Impact Assessment –
neutral 
• The action to increase digital
connectivity and reduce the need for
residents to travel could reduce air
pollution and bring health benefits.
However, the impacts are not expected
to be notable at this time and therefore
overall impact is considered neutral.

Page 204

75
PUBLIC
8. Conclusions and Recommendations
8.1. Key Issues
The actions contained within the LTS are expected to have largely positive impacts on
protected characteristic groups, children and young people, socio-economic
disadvantaged groups and on health inequalities. Actions related to active travel,
behaviour change, road safety and public transport are anticipated to have the highest
level of impact across the EqIA, CRWIA, FSDA and HIIA assessments compared to other
themes.  
The engagement process and desk-based review have highlighted some of the key issues
relating to transport in Renfrewshire:
• People living in Renfrewshire feel that the existing provision of public transport is
not adequate and the LTS has the potential to improve this, particularly across the
local bus network:
o It can be more difficult for residents who live outside of settlements such as
Paisley, Johnstone, and Renfrew to access areas outside of the local authority
due to gaps in the bus network. 
o Improvements could be made across the public transport network to provide
better connections to employment sites (such as Glasgow Airport, Hillington
Industrial Estate and the Royal Alexandra Hospital).
o For those in more rural areas, a lack of public transport provision can result in
forced car ownership.
• Public transport is not always accessible for people with disabilities:
o Improvements could be made to stops, rail stations and vehicles, and better
training could be provided to staff to support people with disabilities.
o Some community bus services have become less reliable and so people with a
disability often rely on family and friends for transport. However, this is
reflective of the unreliability of particular services, rather than a lack of need for
community transport services.

Page 205

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  76
PUBLIC
• The cost of public transport can be a barrier. This can negatively impact people
from lower-income households when trying to access educational and
employment opportunities.
• There are safety barriers relating to travel:
o Traffic congestion can pose a safety issue, with those consulted generally in
favour of reduce speed limits and traffic calming measures, particularly in
proximity to schools.
o Shared paths for cyclists and pedestrians can cause safety concerns; there is
potential for improved signage to alert users of shared pathways. 
The actions included in the LTS are likely to address some of the key issues
identified within Renfrewshire and generate the following positive impacts:
• The LTS could improve the transport network:
o Through expanding the existing public transport network in strategic
locations (working with partners). This is anticipated to help address one
the most important barriers identified during consultation regarding lack of
public transport services.
o Actions to prioritise bus routes could also improve the reliability of public
transport services which could also improve the safety of groups who feel
vulnerable whilst waiting at bus stops.
o Actions also propose increasing the local cycle network and extending the
network to strategic locations which could benefit households of lower
economic status through improved access to services and employment
opportunities through a low-cost travel method.
• Transport is likely to become more accessible:
o Actions suggest considering new community transport, demand responsive
transport and connecting community bus hubs with commercial routes.
This could positively impact people with a disability and people in rural
areas.
o People with a disability could also be positively impacted by the action to
increase the number of disabled parking spaces.

Page 206

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  77
PUBLIC
o Suggestions to raise kerbs at bus stops could positively impact people with
mobility issues and make public transport more accessible.
o Improvements to wayfinding and signage is likely to make it easier for
people to navigate around Renfrewshire. This could benefit people who are
digitally excluded and therefore unable to use navigation apps (for example
some older people and those with learning disabilities).
• The LTS could have socio-economic benefits:
o Through actions to integrate ticketing and to support making tickets more
affordable. 
o By increasing connections to strategic locations (for example Glasgow
Airport) which could improve employment opportunities for more deprived
households who may not have access to a private car.
• The actions also focus on improving safety:
o This may be achieved through actions to reduce congestion near schools,
which could reduce the risk of traffic accidents and the negative impacts of
air pollution on children. 
o The signage and wayfinding action could reduce the risk of collisions on
shared pathways and spaces.
o Live bus information at stops could also improve the safety and security of
groups who can feel vulnerable whilst waiting at bus stops and rail stations.
• If people are encouraged to participate in active travel, there could health benefits
for residents:
o Bikeability training for children and adult cycle training could encourage
more people to participate in cycling, which is likely to have both physical
and mental health positive impacts.
o The LTS includes actions to remove some of the financial barriers for
participating in active travel (for example bike hire schemes and increased
secure cycle parking). This could result in more people from lower-income
households from participating in active travel which would have health
benefits.

Page 207

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  78
PUBLIC
• There could be wider health benefits if the LTS actions result in encouraging modes
of travel other than private cars. For example, through reduced air pollution, which
can be particularly harmful for certain protected characteristics groups. However,
actions to make road improvements and introduce new strategic roads could have
negative health impacts during construction and through increased traffic once
operational. Negative impacts during construction should be mitigated through
Construction Management Plans. 
8.2. Recommendations
The following points for the LTS are recommended to minimise any negative impacts and
to enhance any positive impacts: 
• Transport network: Future prioritisation of proposed extensions to the active travel
network should consider a higher weighting towards links to destinations that
benefit a greater number of people with protected characteristics (e.g. places of
worship, schools, GP practices).
• Accessibility: Make sure that actions around active travel are inclusive of people
with disabilities and mobility impairments (for example, that cycle parking has
space for adaptive cycles, signage on shared paths to advise of multiple users). 
o Bikeability training should be available in schools in areas of deprivation so that
cycling is accessible for children from all backgrounds
• Ticketing: Whilst recognising that ticketing changes are under the control of
operators and SPT, the LTS should support and encourage an inclusive approach
to integrating ticketing for public transport modes (for example available to buy in-
person for those who are digitally excluded).
• Behaviour Change: At the next stages of development, identify groups who are
underrepresented in active travel figures at the local level to make sure they are
included within Behaviour Change initiatives.

Page 208

79
PUBLIC
Appendix A Evaluation of LTS Actions 
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
Active
Travel
AT1 Design and extend the cycle path
network across Renfrewshire to be
safe and accessible, in line with
locations identified in the
Proposed Active Travel Network
Map 
+ + + + Increased participation in cycling for
underrepresented groups.
Accessible cycling infrastructure - for
disabled users. 
Health benefits through uptake of
active travel.
AT2 Work with Sustrans to implement
and adopt lighting across the off-
road active travel network
+ + N + Increased safety for vulnerable users,
especially women/ young people
travelling alone at night.
AT3 Work with SPT to deliver regional
and longer distance cycling
connections set out within the
Regional Active Travel Strategy
+ + + + Health benefits through uptake of
active travel.
Increased access to wider
opportunities for groups who may
otherwise be excluded through
inaccessible infrastructure/ economic
cost of transport.
AT4 Prioritise pedestrian safety
through a review of crossing
+ + + N Improved road safety for vulnerable
users such as people with a disability

Page 209

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  80
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
facilities on the local road
network at locations identified in
the Annual Accident Assessment
and through working with local
communities
and those more vulnerable to road
traffic accidents, such as children.
Children in more deprived areas are
more at risk of road traffic accidents
and so expected to also benefit from
this action.
AT5 Review cycle safety and priority at
junctions, including review of on-
road infrastructure and measures
for implementation of early
release signals for cyclists at
locations identified in the Annual
Accident Assessment and through
working with local communities
+ + + + Increased safety encouraging uptake
of cycling amongst underrepresented
groups.
Increased accessibility for cyclists
with disabilities through increased
feelings of safety.
AT6 Create a Maintenance Plan for the
active travel network, including
adoption, prioritisation and
maintenance of active travel
paths across Renfrewshire,
including winter maintenance and
removal of vegetation
N N N N No impacts are anticipated at this
stage.

Page 210

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  81
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
AT7 Undertake a signage review and
implement a signage and
wayfinding strategy to support
more local journeys by walking,
wheeling and cycling
+ N N N Main equality benefits for users with a
disability and those with health needs
(for example autism, Alzheimer’s). 
Recommendation: consultation with
user groups representing people with
disabilities in the future development
and implementation of strategy.
AT8 Review feasibility and implement
the expansion of cycle training
into secondary schools and / or
adult cycle training through local
providers
+ + + + Increased participation in cycling for
underrepresented groups.
Health benefits through uptake of
active travel.
Recommend inclusive training for
children / adults with disabilities.
AT9 Build a monitoring and evaluation
framework for the active travel
actions of the LTS in order to
collect relevant baseline data and
effectively monitor progress
N N N N Recommendation: make sure
monitoring captures equalities
groups.
AT10 Increase the number of secure
cycle parking spaces, with a focus
on locations serving local
+ N + + Increased uptake of cycling by
overcoming barrier of lack of
infrastructure. (Especially for

Page 211

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  82
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
communities identified in the
Proposed Active Travel Network
Map
underrepresented groups).
There may be financial barriers to
inclusion in cycling in more deprived
areas; the introduction of cycle
parking may help overcome this
barrier.
Recommendation: cycle spaces could
include those for adapted bicycles.
AT11 Support access to bikes by
working with SPT to investigate
potential for delivery of a partial /
fully regional public bike hire
scheme (including e-bikes) that is
available at locations which
would be served by the Proposed
Active Travel Network
+ N + N Could assist with the financial cost of
bikes for those in low-income
households - potentially a more
affordable form of transport
compared to public transport.
However, increased use of e-bikes
could pose some safety concerns due
to the potential for e-bikes to be used
at high speed. This could be
particularly concerning for people
with mobility impairments. 
Recommendation: consider for

Page 212

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  83
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
adapted bicycles to also be made
available for hire and potentially
accompanied first journeys for those
who are concerned about road safety.
AT12 Undertake a feasibility study to
create a public charging network
for electric bikes in Renfrewshire,
potentially linked to Mobility Hubs
N N + + Negligible or negative impact for
socio-economically disadvantaged
groups as unlikely to afford e-bike -
barrier of affordability and does not
advance equality of opportunity. 
Increased access to active travel
infrastructure could have health
benefits.
AT13 Support measures to make it
easier for the last mile of small
goods deliveries to be undertaken
by sustainable modes, such as by
cargo bikes
N N N + There could be minor positive health
impacts through the reduction of
congestion in busy pedestrian areas
through this action. This could benefit
groups particularly vulnerable to the
negative health impacts of air
pollution. However, the impacts are
likely to be limited at this time.

Page 213

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  84
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
Behaviour
Change
B1 Provide support to parents and
carers to apply for young persons'
concessionary travel entitlement
card
N + + N Benefit for all children and young
people, but especially those from
more deprived backgrounds who are
unlikely to have access to information
/ skills / ability to apply and would
otherwise be excluded from
opportunities due to cost of travel.
B2 Work with schools on Behaviour
Change initiatives with local
partners
N + + + Improved safety for children who use
active travel to get to school. Likely to
be health benefits if more children are
encouraged to participate. 
Recommendation: make sure schools
in more deprived areas are also
included. 
B3 Provide more opportunities for
pupils leaving primary school
across Renfrewshire to receive
Bikeability Levels 1 and 2 cycle
training as a minimum
N + + N Increased uptake of active travel and
more affordable travel options for
more deprived households –
potential to reduce obesity amongst
children. 
B4 Continue discussions on
sustainable transport solutions
+ N + N This could increase participation in
active travel for underrepresented

Page 214

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  85
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
and engage with employers to
promote Cycling Scotland's Adult
Cycle Training, including with
employers at:
- Advanced Manufacturing
Innovation District Scotland
(AMIDS)
- Inchinnan Business Park
- Westway Park
- Hillington Industrial Estate
- Braehead Retail Park 
groups, especially women at work. 
This could also increase employment
opportunities for households without
access to a car.
B5 Encourage employers and schools
to implement Travel Plans to
support a shift to sustainable
travel modes
N + + N By reducing car travel, travel plans
can improve health and wellbeing,
free up car parking space, and make a
positive contribution to the
community and the environment.
Success if subject to engagement and
willingness of employers and schools
to engage.
B6 Renfrewshire Council to update its
staff Travel Plan
N N N + Similarly to B5, the staff Travel Plan
could free up car parking space and

Page 215

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  86
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
have a positive impact on health and
wellbeing of staff if active travel
options are used instead of private
cars. There could also be a positive
contribution to the environment and
community.
B7 Review Behaviour Change
programmes currently delivered
in Renfrewshire and provide
targeted, strategic support to
organisations delivering
Behaviour Change within
Renfrewshire through external
funding sources
+ N N N This is anticipated to have a positive
impact on targeted groups. 
Recommendation: make sure there
are groups underrepresented in
cycling figures and would benefit
from the strategy. 
Public
Transport
and Shared
Mobility
PS1 Working with partners; enhance
facilities at transport hubs such as
Paisley Gilmour Street Station to
improve safety, security and
dissemination of information for
all users
+ N + N Benefits, particularly for groups
reliant on public transport.

Page 216

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  87
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
PS2 Working with SPT and operators;
make buses, trains and taxis
accessible and easier for all to
use, including through reducing
physical accessibility barriers and
improving the accessibility of
travel information 
+ N N N Recommendation: consultation with
people with disabilities as necessary
as this develops in future.
PS3 Working with SPT and operators;
support measures to improve
integrated ticketing across public
transport modes and operators,
including exploration of a daily
price cap
+ N + N Benefit for socio-economically
disadvantaged groups - overcoming
economic barrier to public transport
and opportunities.
Benefit for women who are more
likely to undertake trips via multiple
modes.
PS4 Working with partners; explore
opportunities to increase the
frequency and improve reliability
of bus services across
Renfrewshire
+ + + N This relates to a key issue raised
during engagement and is likely to
positively impact most residents. 
This could have socio-economic
benefits if services are improved and
households without access to cars are
able to reach more destinations.

Page 217

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  88
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
PS5 Working with Transport Scotland,
ScotRail and Network Rail;
improve accessibility at all rail
stations, including ramp access
on all platforms and between
platforms (as applicable),
including at Lochwinnoch station
+ + N N Overall, anticipated to positively
impact people with disabilities and
others with mobility issues (for
example pregnant people and older
people) who would benefit from ramp
access. 
Recommendation: lived experience/
consultation with people with
disabilities necessary for
implementation.
PS6 Working with partners; explore
opportunities to expand network
coverage of bus services in rural
areas of Renfrewshire and
between areas of deprivation and
employment such as AMIDS
+ N + N This could have positive socio-
economic impacts due to increased
access employment opportunities,
particularly for households without
access to a car. There could also be
positive impacts for people who are
unable to drive (for example some
older people and people with a
disability) and reduce the risks of
social isolation.

Page 218

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  89
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
PS7 Renfrewshire Council to work with
SPT, Glasgow City Council and
other partners to support
development of Clyde Metro, and
Renfrewshire Council to continue
advocating for options to provide
a fixed link to Glasgow Airport and
AMIDS
N N + N There could be positive impacts for
those who use multiple forms of
transport and/or do not have access
to a car.
PS8 Working with partners in the short
term; explore options to provide a
direct and frequent public
transport service from Paisley
Gilmour Street Station to Glasgow
Airport and AMIDS
+ + + N Improving public transport links to
Paisley Gilmour Street and Glasgow
Airport could have a differential
impact for people on lower incomes
without access to a private car. This
could provide employment
opportunities and access to services. 
PS9 Support development of the bus
network through provision of bus
priority lanes on key corridors and
bus priority at signalised junctions
including at: 
- Glasgow Road
+ + + N This is likely to improve the reliability
of buses which would positively
impact those more reliant on public
transport. This could also have
positive impacts on safety whilst
waiting at bus stops.

Page 219

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  90
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
- Renfrew Road
- Neilston Road
PS10 Support provision of existing and
new Community Transport and
Demand Responsive Transport,
with a focus on rural areas and
access to health and providing
transport that is fully accessible
+ + + + There are likely to be positive impacts
for people who live in more rural
areas, particularly those who do not
have access to a private car, such as
some older people and people with a
disability. Supporting new and
existing Community Transport and
Demand Responsive Transport is
likely to improve access to essential
services for these groups.
During engagement, groups
representing people with disabilities
highlighted that these types of
services would have a positive impact
in their lives.
PS11 Investigate the implementation of
Community Bus Hubs, to enable
community operated services to
+ N + N No impacts are anticipated at this
stage.

Page 220

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  91
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
connect with commercial bus
routes
PS12 Working with SPT; continue to
implement a programme of bus
stop improvements, including to
provide high kerb access at bus
stops in town and village centres
and in neighbourhood locations
as appropriate
+ N N N High kerb access was raised during
community engagement as being
positive. If this is extended to all bus
stops, this would improve
accessibility.
PS13 Support SPT to establish local bus
franchising within Renfrewshire
and across the Strathclyde region
+ N + N Action has the potential to give
greater public control over how
funding is used and to allow the co-
ordination of buses across the
network.
Accessibility to employment and
economic exclusion may be improved
as a result of this action.
PS14 Support measures to make public
transport affordable for all,
including through actions
+ N + N There is potential for this action to
give greater public control over how
funding is used and to allow the co-
ordination of buses with the rest of

Page 221

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  92
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
identified in Transport Scotland’s
Fair Fares Review, where relevant
the network.
Accessibility to employment and
economic exclusion may be improved
as a result of this action.
PS15 Support the expansion of car club
schemes across Renfrewshire,
including clubs with electric
vehicles  
+ N + N Action could have positive impacts by
providing an affordable alternative for
socio-economically disadvantaged
groups as an alternative to forced car
ownership.
PS16 Work with partners to explore the
potential for Mobility Hubs across
Renfrewshire, with a focus on
existing transport hubs and town
centre locations such as Paisley
Gilmour Street and Piazza
Shopping Centre  
+ N + N This could positively impact groups
without access to private cars and
improve connectivity to essential
services, particularly people with a
disability, older people and children.
There may be positive socioeconomic
impacts if this improves access to job
opportunities in town centre and
shopping locations.

Page 222

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  93
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
Road Safety RS1 Work with Transport Scotland to
introduce 20 mph speed limits on
urban residential streets
+ + N + This could positively impact children,
older people and people with a
disability (more likely to be at risk).
Particularly in more deprived areas
where road traffic accidents are more
common.
RS2 Implement measures to reduce
congestion outside school gates,
including consideration of short
term parking restrictions and
work with schools and local
communities  to develop
measures 
+ + N + Measures to reduce congestion
outside school gates could reduce
road traffic accidents, encourage
more children to use active travel to
get to school, make streets feel safer,
and reduce air pollution (which some
protected characteristic groups are
more at risk of). 
RS3 Implement traffic calming
measures and other road safety
interventions on local roads,
where considered appropriate,
following assessment as defined
by Renfrewshire's Road Safety
Policy
+ + N N Action is likely to have positive
impacts on road safety, particularly
for vulnerable road users.

Page 223

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  94
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
RS4 Partner with Police Scotland on
priorities for enforcement and
improve collaboration on road
safety matters
+ + N N Action is likely to have a positive
impact on safety, particularly for
vulnerable road users (older people,
people with a disability, children,
pregnant people)
RS5 Seek collaboration with
secondary schools to promote
road safety
+ + N N Action is likely to have positive safety
impact for children and vulnerable
road users.
RS6 Undertake Annual Accident
Assessments to identify locations
for targeted road safety
improvements
+ + N N There are anticipated to be health
benefits of undertaking Annual
Accident Assessments. This could be
particularly beneficial for older
people, children and people with
disabilities who are more at risk of
road traffic accidents.
Parking P1 Explore options to manage
parking capacity issues, including
at Johnstone Rail Station, and the
case for Park and Ride/ mobility
hub provision where there is
currently none, including at
+ N + N Action could have positive impacts for
residents where there are no railway
stations. Action could improve access
to employment opportunities and
services.

Page 224

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  95
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
Milliken Park Rail Station, and to
serve towns and villages which do
not have their own railway station
P2 Support the private sector
expansion of the publicly
available electric vehicle charging
network  
N N + + If the action encourages people to
buy electric cars, there may be health
benefits associated with fewer petrol
/ diesel cars on the road due to
decreased pollution. This could also
encourage residents who do not have
access to an electric charging port at
home to get an electric car, making
vehicles which are more sustainable
compared to petrol / diesel ones,
more accessible.
P3 Increase the number of disabled
parking spaces in proximity to
major trip attractors
+ N N + People with a disability often face
increased living costs. The
introduction of increased parking
spaces could reduce reliance on
expensive modes such as taxis. 
P4 Implement pavement parking
exemptions and enforce the
+ N N N The action is likely to have a positive
impact on people with a disability

Page 225

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  96
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
national pavement parking ban,
including the offences of double
parking and parking across
pedestrian dropped kerbs
and those with limited mobility.
During engagement, pavement
parking was highlighted as an issue
which makes it harder for people with
mobility aids to walk and wheel.
P5 Investigate the potential for a
workplace parking license and / or
local road user charging to be
implemented in Renfrewshire
- N - + There may be positive health impacts
due to a reduction of cars on the
road; this can benefit children, people
with a disability and older people in
particular, who can be at particular
risk of the negative health impacts.
However, there may be negative
impacts for people on lower incomes
who rely on private cars to get to work
(particularly if the workplace is not
well connected by public transport)
as they may be unable to afford the
additional cost of a workplace
parking license and therefore be
excluded from opportunities. Some
people (such as older people,

Page 226

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  97
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
pregnant people and people with a
disability) may rely on their cars as a
mobility aid and therefore cannot use
alternative methods to travel to work.
Recommendation: noting the action
is to investigate the potential for a
workplace parking license,
consideration could be given to
exemptions for those who require a
car as a mobility aid, if implemented. 
Road
Network
and Freight
RNF1 Renfrewshire Council to explore
the feasibility of road
improvements, including:
- Alignment / junction
improvements at Arkleston Road
staggered junction 
- Seedhill Road / Hawkhead Road
mini-roundabout 
+ + N - There could be positive impacts for
those at greater risk of traffic
accidents (older people, children,
people with a disability). 
However, there could be negative
impacts with regard to health through
increased noise and air pollution
during road improvement
construction. If the roads encourage
additional traffic, there could be
additional negative impacts

Page 227

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  98
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
- Strengthening Penilee Road
Railbridge
associated with increased traffic
pollution. This can disproportionately
impact older people, pregnant
people, children and some people
with disabilities. 
RNF2 Renfrewshire Council to progress
with the construction of new road
links, including at AMIDS South
link road from Inchinnan Road to
Renfrew Road and Harbour Road 
N - + - Improvements to road links at
strategic locations could have
positive socioeconomic impacts due
to improved access to job
opportunities. There may be positive
impacts for the reliability of bus
services through road improvements.
However, during construction there
could be disruptions to routes and
stops. Mitigation measures should be
included as appropriate to reduce
negative impacts on groups
particularly reliant on bus services
and likely to be negatively impacted
by diversion routes.

Page 228

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  99
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
The construction of additional roads
could have negative impacts for
health due to increased noise and air
pollution during construction and
increased traffic once the roads are
operational. This can have a negative
impact on groups more vulnerable to
noise and air pollution (people with
disabilities, children, pregnant people
and older people). 
RNF3 Undertake an assessment of the
road safety and environmental
effects of HGV routeing through
Renfrewshire’s urban road
network
N N N + There could be positive impacts with
regard to health through an
assessment of road safety. This could
have a differential impact for people
most at risk of road traffic accidents
(children, older people and people
with disabilities).
RNF4 Encourage developers to consider
rail as an alternative to road for
moving freight, including
considering the feasibility of
+ + N + There may be minor positive impacts
with regards to improved air and
noise pollution and potential for
fewer road accidents.

Page 229

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  100
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
allowing loads heavier than the
maximum gross weight for heavy
goods vehicles to use the
Burnbrae Drive approach to
Elderslie Railhead
Environmen
t
ENV1 Continue to monitor air quality at
existing automatic monitoring
stations within Paisley, Johnstone
and Renfrew
+ + N + There could be positive health
impacts as a result of this action,
particularly for those vulnerable to
the negative impacts of air pollution
(children, older people, people with a
disability and pregnant people).
ENV2 Expand the decarbonisation of
Renfrewshire Council’s vehicle
fleet
+ + N + There could be health benefits for
groups particularly at risk of air
pollution (older people, children,
pregnant people, people with a
disability) through the
decarbonisation of the fleet.
ENV3 Design and implement climate
change adaptation and resilience
measures to strengthen and
+ + + N Groups more reliant on public
transport are likely to be positively
impacted by the increased resilience
and protection of the transport

Page 230

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  101
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
protect the transport network
from weather related events
network. This includes lower income
households, children and older
people.
Digital
Technology
DT1 Working with SPT through wider
processes, including Clyde Metro
and Strathclyde Regional Bus
Strategy, consider opportunities
to support the development and
delivery of an improved integrated
journey planning app(s) that
includes booking and payment
functions
+ + N N By simplifying travel mode choices
and payments, this could positively
impact people who rely on public
transport, particularly those who use
multiple transport modes to
complete journeys.
Recommendation: make sure that
alternative options remain for people
who are digitally excluded, such as
older people and some people with
disabilities.
DT2 Working with SPT; continue
implementation of the remaining
elements of a programme to
provide Real Time Passenger
Information at bus stops on the
busiest corridors and village
+ + + N This action is likely to have positive
impacts for all people who use public
transport. There may be positive
safety impacts for those who feel
vulnerable when waiting at bus stops,

Page 231

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  102
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
centre locations across
Renfrewshire
such as women and girls, especially at
night.
The clear display of real time
information at stops may also benefit
people who are digitally excluded
(such as some older people and
people with disabilities) who may
have more difficulty accessing bus
time information online.
DT3 Undertake a study to expand the
UTC traffic signal network across
Renfrewshire, expanding adaptive
control and bus priority at
signalised junctions on bus
routes, where identified as
necessary
+ + + N Prioritisation of bus routes may have
positive impacts on the reliability of
services, which would benefit public
transport users. 
DT4 Work with partners to add
connections to the existing fibre
network as and when new council
building development dictates, to
continue to improve digital
+ + + N Improving digital connectivity may
reduce the need to travel and
therefore reduce associated costs and

Page 232

Renfrewshire Local Transport Strategy 2025-2035 – Integrated Impact Assessment  103
PUBLIC
Theme Ref Actions  EqIA CRWIA FSDA HIIA Comments   
+ positive impact / - negative
impact / N neutral / no impact 
connectivity across Renfrewshire
and thus reduce the need to travel
negative health impacts related to air
pollution.

Page 233

104
PUBLIC 
Environment, Housing and Infrastructure
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR

Page 234

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Draft Environmental Report 1
PUBLIC 
Strategic Environmental Assessment
(SEA) for Renfrewshire Council Local
Transport Strategy 2025-2035 
Environmental Report

Page 235

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  2
PUBLIC
Table of Contents
1. Welcome ............................................................................................ 3
2. SEA Explained .................................................................................... 8
3. Scope of the SEA .............................................................................. 11
4. Assessment of Reasonable Alternatives .......................................... 17
5. Assessment of the LTS ..................................................................... 76
6. Proposed Monitoring Programme ................................................... 88
7. Next Steps ........................................................................................ 91
Appendix A: Scoping Report ....................................................................... 92
Appendix B: Consultee Responses ............................................................. 93

Page 236

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  3
PUBLIC
1. Welcome
1.1. Background
AECOM has been commissioned to undertake a Strategic Environmental Assessment (SEA)
in support of the Renfrewshire Local Transport Strategy, also known as Travel Renfrewshire
2035, (hereafter referred to as “the LTS”) on behalf of Renfrewshire Council.  
SEA is a systematic process for evaluating the environmental consequences of proposed
plans, strategies, or programmes to ensure environmental issues are fully integrated and
addressed at the earliest appropriate stage of decision making, with a view to promoting
sustainable development.  
This Environmental Report, which is the main output of the SEA process, accompanies the
LTS. 
1.2. The Renfrewshire LTS
The former Renfrewshire LTS was published in 2007 and presented a 10-to-20-year vision
for transport in the local authority area (shown in Figure 1-1).  After ten years, an LTS
Refresh was published, which provided an update on Renfrewshire Council’s achievements
against the actions set out 2007 LTS and set out a broad direction of travel for Renfrewshire
for the next ten years.
As the former LTS was coming towards the end of its 10-to-20-year timeframe, the Council
has developed a new strategy that will cover the period 2025-2035.  
The LTS for Renfrewshire sets the future direction for the Council’s approach to the
development and upkeep of the transport infrastructure and policy within the council area. 
The LTS also sets out how the Council will contribute to the delivery of the obligations set
out in the National and Regional Transport Strategies and other key policy drivers.   To
achieve this, transport policies and actions have been developed, and indicators identified
to monitor the progress made on these actions.

Page 237

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  4
PUBLIC
A number of key tasks have been undertaken:    
• Analysis of data, undertaking a Policy Review and consultation.
• Identification of a Vision Statement, objectives and indicators.
• Generation of options and development of an Action Plan.
• Developing alternative approaches.
• Undertaking a full Strategic Environmental Assessment (SEA) and Integrated Impact
Assessment.
• Development of a LTS.
The final LTS sits alongside this report.

Page 238

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report 5
PUBLIC
Figure 1-1: Plan Area for the Renfrewshire Local Transport Strategy (Source: AECOM)

Page 239

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report 6
PUBLIC
Table 1-1: Key facts relating to the Renfrewshire LTS
Responsible
authority
Renfrewshire Council
Title of plan Renfrewshire Local Transport Strategy
Subject Transport strategy
Purpose The Renfrewshire Local Transport Strategy will provide a
strategic framework for future transport planning across
Renfrewshire. 
Timescale To 2035
Area covered by
the plan
The council area of Renfrewshire (Figure 1-1 above). 
Summary of
content
The Renfrewshire Local Transport Strategy sets strategic
transport planning policy for Renfrewshire in the next 10
years.  It sets out which transport interventions
Renfrewshire Council intends to deliver (depending on
available funding and further understanding on feasibility
of actions) during the LTS period.
1.3. Vision, Priorities and Objectives for the LTS
The following vision statement details what Renfrewshire Council is aiming to achieve with
the LTS:
‘Renfrewshire to be an attractive place to live, work and visit, with walking, wheeling and
cycling and public transport opportunities that are inclusive, affordable, integrated and safe
to use; and a transport system which supports net zero targets, inclusive economic growth
and the health and wellbeing of all.’
The LTS follows five priorities set out in the strategy: 
• Equality and Accessibility;
• Net Zero Emissions;
• Inclusive Economic Growth;
• Safety and Security; and

Page 240

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  7
PUBLIC
• Resilience and Maintenance.
The LTS captures a range of transport interventions, known as ‘actions’, under the
following themes:
• Active Travel.
• Behaviour Change.
• Public Transport and Shared Mobility.
• Road Safety.
• Parking.
• Road Network and Freight.
• Environment.
• Digital Technology. 
The following objectives form part of the criteria against which actions will be monitored
and evaluated in future years:
• Objective 1: Support fair and equitable access to sustainable modes of transport in
Renfrewshire, that is integrated and easy to use for all.
• Objective 2: Support the continued reduction in harmful transport emissions across
Renfrewshire. 
• Objective 3: Increase the proportion of trips undertaken by walking, wheeling and
cycling and public transport for everyday journeys.
• Objective 4: Improve transport connections within Renfrewshire and to neighbouring
local authorities to support inclusive economic growth.
• Objective 5: Improve the safety of Renfrewshire's transport network through meeting
Scottish Government casualty reduction targets; and
• Objective 6: Provide a secure, resilient and well-maintained transport network that
meets the needs of users.

Page 241

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  8
PUBLIC
2. SEA Explained
2.1. Introduction
This report has been prepared in accordance with the European Directive 2001/42/EC and
section 15 of the Environmental Assessment (Scotland) Act 2005 (hereafter referred to as
the “2005 Act”).
The 2005 Act requires all qualifying plans, programmes, and strategies (PPS) to undergo
SEA.  This provides a systematic process for identifying, reporting, and mitigating the
environmental impacts of an emerging PPS.
The LTS is a qualifying plan in accordance with Section 5(3) of the 2005 Act, and an SEA is
therefore required.
2.2. Key Stages of the SEA
This Environmental Report follows the process required by the SEA Regulations.  There is
guidance published by government on undertaking SEA, specifically ‘A Practical Guide to
the Strategic Environmental Assessment Directive’; the ‘Practical Guide’.  This sets out a
five-stage process for undertaking SEA.  This process, in conjunction with the SEA
Regulations, guides this assessment.  
The stages and outputs for the SEA are shown in Figure 2-1. The Environmental Report
comprises Stage 3.

Page 242

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  9
PUBLIC
Figure 2-1: The stages and outputs for the SEA 
2.3. Purpose of the Environmental Report
In line with the 2005 Act and Transport Scotland’s Guidance on Local Transport Strategies,
a report (known as the Environmental Report) must be published for consultation
alongside the Draft LTS.
Its purpose is to identify, describe and evaluate the likely significant effects on the
environment of implementing:  
• the LTS; and
• reasonable alternatives for the LTS.  
The report and consultation responses must both be considered when finalising the LTS.  
The Environmental Report is the second document to be produced as part of the SEA
process for the LTS.  The first document was the Scoping Report prepared in July 2024
(Renfrewshire Local Transport Strategy Strategic Environmental Assessment: Scoping
Report), which included information about the baseline and the ‘framework’ against which
the LTS actions have been assessed.
Stage 1
• Establish the context and baseline for the SEA
• Identify key sustainability issues for the LTS
• Develop the SEA framework
Stage 2
• Develop and refine alternatives for the LTS
• Appraise the significant effects of these
alternatives
Stage 3
• Appraise the draft LTS
• Prepare the Environmental Report
Stage 4
• Consult on the Draft LTS and the Environmental
Report
Stage 5
• Appraise updates to the LTS (if required)
• Prepare the SEA Post Adoption Statement
• Monitor the significant effects of the LTS
Scoping Report
Environmental
Report
SEA Post Adoption
Statement

Page 243

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  10
PUBLIC
2.4. Structure of the Environmental Report
2.4.1. SEA Topics
The information in this Environmental Report has been presented through eight SEA
topics, which have been informed by the issues/topics in the 2005 Act.  These are:
• Air quality and noise pollution
• Biodiversity, flora and fauna, and geodiversity
• Climatic factors
• Cultural heritage
• Landscape
• Material assets 
• Population and human health
• Soil and water resources.
2.4.2. Environmental Report Chapters
In line with the provisions of the Environmental Assessment (Scotland) Act 2005, this
Environmental Report has been structured as follows:
• Chapter 3 presents an overview of the scoping process for the SEA (Stage 1 in Figure
2-1). 
• Chapter 4 presents an assessment of a number of alternative approaches relating to
the broad principles underpinning the LTS.  These have been assessed as reasonable
alternatives (Stage 2).
• Chapter 5 presents an assessment of the LTS actions, in terms of their likely
significant environmental effects (Stage 3).  
• Chapter 6 presents proposals for monitoring the significant environmental effects of
the LTS actions, and opportunities for enhancements (linked to Stage 5). 
• Chapter 7 subsequently sets out the next steps for the LTS and accompanying SEA
process.

Page 244

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  11
PUBLIC
3. Scope of the SEA
3.1. SEA Scoping Report
The Environmental Assessment (Scotland) Act 2005 requires that: “Before deciding on the
scope and level of detail of the information to be included in the environmental report to
be prepared in accordance with section 14; the responsible authority shall send to each
consultation authority such sufficient details of the qualifying plan or programme as will
enable the consultation authority to form a view on those matters”.  In Scotland, the
consultation bodies are Historic Environment Scotland (HES), the Scottish Environmental
Protection Agency (SEPA) and NatureScot.  
These authorities were consulted on the scope of the SEA for the LTS actions through the
release of an SEA Scoping Report (prepared by AECOM) to consultees in July 2024.  
Comments from the consultation bodies were returned in August 2024 and the Scoping
Report has been provided in Appendix A. The consultee’s comments are presented in
Appendix B, alongside an overview of how they have been considered and addressed
through the ongoing development of the SEA.

Page 245

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  12
PUBLIC
3.2. Content of the Scoping Report
Reflecting the requirements of the SEA Regulations, the following information is presented
in the Scoping Report for the eight SEA topics: 
• Context review: This explored the environmental and sustainability ‘context’ for the
SEA / LTS through reviewing high level messages (e.g. internationally, from central
government and at the regional level) with a view to establishing the focus for the
SEA. 
• Baseline data: This established the baseline situation in the area in the absence of
the LTS (including the future baseline) in order to help identify the plan’s likely
significant effects. 
• Key issues: This identified particular problems or opportunities (‘issues’) that should
be a focus of the SEA.
• Considering this information, developing an SEA framework comprising SEA
objectives and assessment questions, which can then be used as a guiding
framework for the subsequent assessment.
3.3. Issues / Topics Scoped into the SEA
Scoping identified a range of environmental topics that should be a particular focus of SEA. 
In this respect, in terms of the SEA ‘issues’ suggested by Schedule 3 of the Environmental
Assessment (Scotland) Act 2005, the following were scoped in through the scoping
process:
• Air quality and noise pollution
• Biodiversity, flora and fauna, and geodiversity
• Climatic factors
• Cultural heritage
• Landscape
• Material assets
• Population and human health
• Soil and water resources
It is noted that the Environmental Assessment (Scotland) Act 2005 highlights that the
Environmental Report should present information on the likely significant effects on the
environment, including on issues such as biodiversity; population; human health; fauna;
flora; soil; water; air; climatic factors; material assets; cultural heritage, including

Page 246

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  13
PUBLIC
architectural and archaeological heritage; landscape; and the inter-relationship between
these issues. 
3.4.  SEA Framework
The key environmental issues relating to the LTS actions have been translated into an SEA
‘Framework’ of objectives and assessment questions.  The SEA Framework provides a way
in which the likely significant environmental effects of the LTS actions and alternatives can
be identified and subsequently analysed based on a structured and consistent approach.   
As discussed above, the SEA Framework and the assessment findings in this Environmental
Report have been streamlined and presented under eight SEA topics.  In this respect the
accompanying objectives and assessment questions for each topic have been refined as
appropriate in recognition of the high-level nature of the LTS actions at this stage.   
The SEA Framework is presented in Table 3-1.

Page 247

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report 14
PUBLIC
Table 3-1: SEA Framework
SEA Topic  SEA Objectives
Air Quality and Noise Pollution  Deliver improvements to air quality in Renfrewshire by supporting the use of more sustainable
modes of travel, including active travel and public transport. 
Support the achievement of air quality objectives.   
Reduce noise from transportation sources.
Biodiversity, Flora and Fauna,
and Geodiversity 
Conserve and enhance internationally, nationally, and locally designated sites for biodiversity
and geodiversity in accordance with their significance and in line with established good practice.   
Take a strategic, landscape-scale approach, focused on habitat connectivity across the transport
network and climate change resilience.  
Ensure accordance with the mitigation hierarchy (avoid, mitigate, compensate) in order to
reduce negative effects of new transport infrastructure on ecological and geological resources.
Climatic Factors  Support climate change mitigation through limiting the contribution of transport to GHG
emissions. 
Support the resilience of the transport network to the potential effects of climate change,
including flooding and extreme heat events.   
Linked to the biodiversity objective, support the restoration of natural processes, and avoid
actions that further constrain the natural environment’s ability to respond to climate change.

Page 248

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  15
PUBLIC
Cultural Heritage Conserve and enhance Renfrewshire’s historic environment, including both designated and non-
designated heritage assets.   
Protect archaeological assets from impacts as a result of the construction of new transport
infrastructure.   
Consider links to landscape and place-making and promote an understanding of the local
heritage resource.
Landscape Protect and enhance the character, quality and setting of Renfrewshire’s landscape, townscape
and villagescape features.   
Integrate high quality green infrastructure into new transport infrastructure, linking it to the
wider landscape.   
Recognise close links with other objectives, including biodiversity and heritage.
Material Assets    Promote sustainable management and design solutions that encourage the reduction, re-use
and recycling of waste and materials during the construction, maintenance, and operational
phases of transportation projects and schemes.
Population and Human Health  Improve access to key services, facilities and amenities.
Improve access to education, employment and economic opportunities.
Improve access to high quality green networks.
Promote good health by encouraging active modes of travel (for example, walking and cycling).
Improve road safety, including for vulnerable users.

Page 249

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  16
PUBLIC
Soil and Water Resources  Promote the efficient use of land, with a focus on avoiding the loss of best and most versatile
agricultural land as far as possible.   
Minimise the impact the transport network has on water quality and the physical state of water
bodies.

Page 250

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report 17
PUBLIC
4. Assessment of Reasonable Alternatives
4.1. Assessing Reasonable Alternatives in SEA 
The assessment of ‘reasonable alternatives’ is a key element of the SEA process to meet
the requirements of the 2005 Act.
A central facet of the SEA process to date has been the appraisal of reasonable alternatives
for the LTS.  The 2005 Act is not prescriptive as to what constitutes a reasonable
alternative, stating only that the Environmental Report should “identify, describe and
evaluate the likely significant effects on the environment of implementing the plan…and
reasonable alternatives to the plan… taking into account the objectives and geographical
scope of the plan…”.   
In developing reasonable alternatives for the SEA, a central consideration has been with
respect to the key choices being made relating to the provisions.  In this regard this
Environmental Report has assessed a range of options as reasonable alternatives, with a
view to exploring the options with particular potential for significant environmental effects. 
These assessments are designed to inform plan makers and stakeholders on the relative
sustainability merits of alternative approaches the LTS actions could take on various
elements associated with the proposals.   
The SEA process has therefore considered reasonable alternatives through the approach
set out above.
4.2. Development of Alternatives to Assess Through the SEA
4.2.1. Development of Options and Themes for the LTS
The process undertaken to develop actions for this LTS included a number of steps.
Subsequent to the identification of problems and opportunities for the LTS, and the
development of a Vision Statement, Priorities and Objectives, the next step was to develop
a list of options.  This was primarily informed by stakeholder engagement and public
consultation findings, supplemented by Renfrewshire Council officer input and options
identified in existing strategy / policy documents.

Page 251

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  18
PUBLIC
The long list of options was then consolidated, and grouped by eight themes, as follows:
• Active Travel
• Behaviour Change
• Public Transport and Shared Mobility
• Road Safety
• Parking
• Road Network and Freight
• Environment
• Digital Technology 
A short list of options then underwent a high-level appraisal, and options retained
following the appraisal form the basis of the Action Plans in the LTS.
To inform this process, the SEA process has considered a number of different approaches
for the eight LTS themes considered.  Rather than considering individual options,
groupings of options have been considered as reasonable alternatives.  This enables the
relative environmental merits of different strategic approaches under each theme to be
effectively considered, recognising the interplay between the different LTS options being
considered.
4.2.2. Alternatives Considered
In light of the above, the SEA has considered a series of reasonable alternatives under the
LTS themes, these are listed below. It is noted that Active Travel and Behaviour Change
have been combined for the purposes of the assessment of alternatives undertaken
through the SEA. 
Active Travel and Behaviour Change:
• Alternative AT/BC-A Do minimum: This would comprise a do minimum alternative,
which would assume that committed plans, developments and schemes will
proceed. It would also limit interventions to: minimum investment in different
schemes; maintenance works; and no commitments to larger and/or longer-term
scheme funding.

Page 252

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  19
PUBLIC
• Alternative AT/BC-B Infrastructure: This would deliver infrastructure actions designed
to enhance active travel networks across Renfrewshire. This includes for example the
delivery of extensions to the cycle path network, additional cycle parking provision,
pedestrian network improvements, enhanced lighting and public charging network
for electric bikes, potentially linked to mobility hubs. 
• Alternative AT/BC-C Behaviour change: This would focus on interventions designed
to support behaviour change to active travel modes. Actions could include, for
example: cycle training; signage and wayfinding strategies; public bike hire schemes;
support for parents, carers, schools and employers to encourage behaviour change;
the implementation of travel plans and maintenance plans; and monitoring and
evaluation frameworks for active travel modes. 
Public Transport and Shared Mobility:
• Alternative PT/ST-A Business as usual: This would comprise a do minimum
alternative, which would assume that committed plans, developments and schemes
will proceed. It would also limit interventions to: minimum investment in different
schemes; maintenance works; and no commitments to larger and/or longer-term
scheme funding.
• Alternative PT/ST-B Infrastructure: This would deliver infrastructure which enhances
public transport networks. Actions could include, for example, bus priority lanes, bus
priority at junctions, support development of Clyde Metro, and bus stop
improvements.   
• Alternative PT/ST-C Integration, Affordability and Accessibility: This alternative
would seek to improve integration between public transport modes and with other
modes of transport, and to improve accessibility. It would also seek to enhance the
affordability of public transport.  Actions would include for example the
enhancement of facilities and accessibility at transport hubs; improvements in
integrated ticketing; removal of physical accessibility barriers for public transport
modes (including at stations); and implementation of Community Bus Hubs.

Page 253

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  20
PUBLIC
• Alternative PT/ST-D Bus network, Community and Demand Responsive Transport,
and Car Club Schemes: This alternative would seek to enhance bus services across
Renfrewshire and facilitate improvements to Community and Demand Responsive
Transport. Actions captured under this alternative would include those such as
working with partners to increase the frequency and improve reliability of bus
services across Renfrewshire (including rural areas); supporting development of new
bus links; and supporting SPT to establish local bus franchising. It would also include
supporting provision of existing and new Community Transport and Demand
Responsive Transport schemes and car club schemes. 
Road Safety:
• Alternative RS-A Business as usual: This would comprise a do minimum alternative,
which would assume that committed plans, developments and schemes will
proceed. It would also limit interventions to: minimum investment in different
schemes; maintenance works; and no commitments to larger and/or longer-term
scheme funding. It would also seek to continue working towards the Scottish
Government’s casualty reduction targets.
• Alternative RS-B Infrastructure: This would deliver physical schemes to improve road
safety. Actions would include for example the implementation of 20 mph zones,
traffic calming measures on local roads and measures to reduce congestion outside
of schools.
• Alternative RS-C Enforcement and partnerships: This would focus on the
enforcement of measures which support road safety. Actions include for example
schemes such as the introduction of 20 mph speed limits on urban residential
streets, increased enforcement of speed limits and road safety measures and
improved collaborations with schools to support road safety. 
Parking:
• Alternative P-A Business as usual: This would comprise a do minimum alternative,
which would assume that committed plans, developments and schemes will
proceed. It would also limit interventions to: minimum investment in different
schemes; maintenance works; and no commitments to larger and/or longer-term
scheme funding.

Page 254

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  21
PUBLIC
• Alternative P-B Park and ride / mobility hub provision: This would facilitate the
expansion of Park and ride / mobility hub provision in Renfrewshire.
• Alternative P-C Comprehensive parking management: This would improve parking
provision for groups with specific needs (including people with disabilities and those
with access to an electric vehicle), enforce pavement parking regulations, and
investigate the potential for workplace parking licenses and / or local road user
charges in Renfrewshire. 
Road Network and Freight:
• Alternative RN-A Business as usual: This would comprise a do minimum alternative,
which would assume that committed plans, developments and schemes will
proceed. It would also limit interventions to: minimum investment in different
schemes; maintenance works; and no commitments to larger and/or longer-term
scheme funding.
• Alternative RN-B Improved operation of the road network: This alternative would
seek to deliver enhancements to the operation of the road network without the
delivery of significant new physical infrastructure. 
• Alternative RN-C Efficient freight network: This alternative would seek to support and
facilitate innovation and best practice in Renfrewshire’s freight transport network. 
This alternative would also seek to make rail a more attractive option as an
alternative to road for freight transport.
• Alternative RN-D Economic development/economic growth: This alternative would
seek to facilitate significant new physical road infrastructure, with a view to
supporting economic development and growth. Schemes would include new road
links, junction capacity upgrades and enhancements to existing road corridors. 
Environment:
• Alternative ENV-A Business as usual: This would comprise a do minimum alternative,
which would assume that committed plans, developments and schemes will
proceed. This would rely on existing national and local initiatives for climate change
mitigation and adaptation.

Page 255

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  22
PUBLIC
• Alternative ENV-B Initiate climate change mitigation and adaptation measures: This
would take a twofold approach to supporting climate change mitigation and
adaptation through Renfrewshire’s transport network.  In terms of mitigation, it
would seek to decarbonise Renfrewshire Council’s vehicle fleet.  In terms of
adaptation, it would seek to implement climate change adaptation and resilience
measures to strengthen and protect the transport network from weather related
events. 
Digital Technology:
• Alternative DT-A Business as usual: This would comprise a do minimum alternative,
which would assume that committed plans, developments and schemes relating to
digital infrastructure will continue.
• Alternative DT-B Digital technology innovations: This would seek to deliver a range of
digital technology innovations to support the transport network in Renfrewshire. 
This would include initiatives such as consideration of an integrated journey
planning app, Real Time Passenger Information at bus stops and an expansion of the
Urban Traffic Control network across the strategy area. The alternative would also
seek to work with partners to add connections to the existing fibre network in
Renfrewshire to continue to improve digital connectivity.
4.3. Assessment Findings
Table 4-1 through to Table 4-7 present assessment findings in relation to the LTS themes
introduced above.  These are organised by the eight SEA topics. 
For each SEA topic, a commentary on the likely effects is presented.  Options are also
ranked numerically reflecting their relative sustainability performance, with ‘1’ the most
favourable ranking.
It is noted that where the relative performance of the Alternatives is uncertain - such as
when the ranking depends on specific details that are not yet defined - this is indicated
with a ‘?’ in the ‘Rank of Preference’ column.

Page 256

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report 23
PUBLIC
Table 4-1: Appraisal of Reasonable Alternatives – Active Travel & Behaviour Change
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative AT/BC-A: Do minimum
Alternative AT/BC-B: Infrastructure
Alternative AT/BC-C: Behaviour change
A B C
Air Quality
and Noise
Pollution
Alternative AT/BC-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  Under
this Alternative, local air quality and noise pollution levels are still likely to improve
over the LTS period, as the country transitions its fleet to less-polluting electric
vehicles and other measures are put in place to support improved air quality. 
Alternative AT/BC-B has the potential for significant positive effects on air quality
and noise pollution.   By enhancing and expanding active travel networks, this
Alternative could reduce reliance on private vehicles, leading to lower local
emissions and noise levels.  Positive effects would be compounded if specific
interventions were delivered in and around particularly sensitive areas in
Renfrewshire.
Alternative AT/BC-C also has the potential for positive effects on air quality and
noise pollution by encouraging more people to use active travel modes.  However,
the realisation of these effects might be slower and less pronounced than
infrastructure changes, as this Alternative relies on changing public behaviour over
time and its area of influence is limited to the locations within Renfrewshire best
placed to support modal shift, including locations with good existing public
transport and active travel networks. 
3 1 2

Page 257

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  24
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative AT/BC-A: Do minimum
Alternative AT/BC-B: Infrastructure
Alternative AT/BC-C: Behaviour change
A B C
Biodiversity,
Flora and
Fauna, and
Geodiversity 
Alternative AT/BC-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  
Alternative AT/BC-B has the potential for direct adverse effects in relation to this
SEA topic due to the potential of habitat fragmentation, if not carefully planned. 
Construction activities may also lead to temporary adverse effects through the
disturbance of local fauna and flora, and road kills.  However, adverse effects can
be limited if interventions avoid Renfrewshire’s sensitive ecological/geological
locations and mitigated by following best practice construction techniques.  This
Alternative also has the potential to also have beneficial effects, if enhancement
measures are delivered alongside the infrastructure improvements.  For example,
extensions of active travel network can enhance local biodiversity through the
delivery of green corridors and environmentally designs.
Alternative AT/BC-C is likely to perform most favourably for biodiversity, flora,
fauna, and geodiversity as it focuses on promoting active travel without the need
for new infrastructure development, thereby avoiding potential disturbances to
habitats.  By encouraging behaviour changes, this Alternative can limit disturbance
on habitats and species and support conservation efforts.  Although not an adverse
effect, this Alternative precludes opportunities for positive effects for biodiversity
through the delivery of new infrastructure. 
3 2 1

Page 258

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  25
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative AT/BC-A: Do minimum
Alternative AT/BC-B: Infrastructure
Alternative AT/BC-C: Behaviour change
A B C
Climatic
Factors
Alternative AT/BC-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  This
Alternative would do less to address Renfrewshire Council’s Climate Emergency,
which aspires to make Renfrewshire a net zero council area by 2030. 
Alternative AT/BC-B supports reductions in greenhouse gas emissions through
improved active travel infrastructure.  By improving and expanding the existing
active travel network, this will likely lead to more walking and cycling journeys in
Renfrewshire, which will help the council area meet its climate targets at a faster
rate.  This Alternative has the potential to adversely impact local resilience to
climate change by adding impermeable surfaces as part of the expanded active
travel network.  However, careful design, such as using appropriate drainage
systems, can help mitigate these effects.
Alternative AT/BC-C is likely to result in positive effects in relation to climatic factors
by encouraging more sustainable travel behaviours.  However, the realisation of
these effects might be slower and less pronounced than infrastructure changes, as
this Alternative relies on changing public behaviour over time and its area of
influence is limited to the locations within Renfrewshire best placed to support
modal shift, including locations with good existing public transport and active
travel networks. 
3 =1 =1

Page 259

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  26
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative AT/BC-A: Do minimum
Alternative AT/BC-B: Infrastructure
Alternative AT/BC-C: Behaviour change
A B C
Cultural
Heritage
Alternative AT/BC-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  
Alternative AT/BC-B has the potential for positive effects on the historic
environment of Renfrewshire by incorporating aesthetic and historical
considerations into the design and location of the expanded active travel network. 
In doing so, new pathways and public spaces can be designed to complement and
better reveal the significance of Renfrewshire's historic assets.  Additionally,
improved infrastructure can increase access to heritage features, making them
more accessible and promoting local heritage tourism.  A reduction in car traffic
associated with this Alternative can also improve the setting of historic
environment assets by limiting noise and air pollution, visual impacts and other
negative impacts.  However, potential for adverse effects on local historic
environment may arise from construction activities, which could potentially
damage archaeological sites, historic buildings, or landscapes.  Mitigation for this
would be the use of best practice construction methods and sensitive planning.
Alternative AT/BC-C would have minimal direct impact on the historic environment
of Renfrewshire.  As with Alternative AT/BC-B, Alternative AT/BC-C has the potential
to result in a limitation in car usage, which can improve the setting of historic
environment assets. 
3 1 2

Page 260

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  27
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative AT/BC-A: Do minimum
Alternative AT/BC-B: Infrastructure
Alternative AT/BC-C: Behaviour change
A B C
Landscape Alternative AT/BC-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  
Alternative AT/BC-B has the potential for positive effects on the local landscape and
townscape character.  For example, new cycle paths and pedestrian areas can be
designed to blend with the natural environment and enhance the visual appeal of
the area.  Additionally, a reduction in car traffic due to improved active travel
infrastructure can improve landscape character, limiting visual, noise, and air
pollution, making the environment more pleasant and visually appealing. 
However, there is potential for both beneficial and adverse effects depending on
the design of the expanded network.  Poorly designed infrastructure could disrupt
the natural landscape and detract from its visual quality, while well-designed
infrastructure could enhance it.
Alternative AT/BC-C is likely to have minimal direct effects on the local landscape. 
However, like Alternative AT/BC-B, has the potential to result in less traffic, which
can improve landscape character by limiting visual, noise, and air pollution.   
3 1 2

Page 261

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  28
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative AT/BC-A: Do minimum
Alternative AT/BC-B: Infrastructure
Alternative AT/BC-C: Behaviour change
A B C
Material
Assets
Alternative AT/BC-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  
Alternative AT/BC-B has the potential for adverse effects on local non-renewable
material assets, such as the use of asphalt for construction of new paths and
pedestrian areas.  This can be mitigated by using renewable alternatives like bio-
asphalt.  Additionally, the maintenance of the expanded active travel network will
require additional materials, especially as increased use of these networks is
anticipated from this Alternative.  Appropriate waste management and the use of
sustainable materials can help mitigate these risks.
Like Alternative AT/BC-B, an increase in usage of the active travel network as a
result of Alternative AT/BC-C would likely result in an increase in the maintenance
of the active travel network, requiring the use of non-renewable materials like
asphalt.  However, this is unlikely to be likely to be significant.  Using sustainable
materials like bio-asphalt can also help mitigate these effects.
1 3 2
Population
and Human
Health
Alternative AT/BC-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  The
Alternative may do less to maximise the opportunities available from accessibility
and transport.   
Under Alternative AT/BC-B, expanding the active travel network could bring a range
of benefits for health and wellbeing and enhancing accessibility to services,
3 =1 =1

Page 262

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  29
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative AT/BC-A: Do minimum
Alternative AT/BC-B: Infrastructure
Alternative AT/BC-C: Behaviour change
A B C
facilities and opportunities.    Additionally, reducing reliance on private vehicles in
Renfrewshire could deliver a range of other benefits to the local communities in
several ways.  For example, households may save money on fuel and transport
costs, while fewer vehicle journeys could enhance the local environment by limiting
noise pollution and improving air quality.  Safety improvements, such as enhanced
lighting, also has the potential to reduce car accidents and crime.  
In a similar way, Alternative AT/BC-C also has the potential to deliver benefits by
enabling more people to engage with the existing active travel network.  
Soil and
Water
Resources
Alternative AT/BC-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  
Alternative AT/BC-B has the potential for adverse effects on local soil and water
resources from the expansion of the active travel network, such as the permanent
loss of high-quality agricultural land.     Additionally, construction activities could
pose risks of soil compaction and ground/water contamination if not appropriately
managed.  However, potential adverse effects can be avoided from with a sensitive
design and mitigated by best-practice construction methods. 
Alternative AT/BC-C is not likely to result in direct effects on local soil and water
resources.
1 3 1
Table 4-2: Appraisal of Reasonable Alternatives – Public Transport and Shared Mobility

Page 263

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  30
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative PT/ST-A: Business as usual
Alternative PT/ST-B: Infrastructure
Alternative PT/ST-C: Integration, Affordability and Accessibility
Alternative PT/ST-D: Bus network, Community and Demand Responsive
Transport, and Car Club Schemes
A B C D
Air Quality
and Noise
Pollution
Alternative PT/ST-A would continue to deliver committed plans,
developments and schemes.  Therefore, this Alternative is expected to
result in neutral effects.  Under this Alternative, local air quality and
noise pollution levels are still likely to improve over the LTS period, as
the country transitions its fleet to less-polluting electric vehicles and
other measures are put in place to support improved air quality.
Alternative PT/ST-B is expected to have positive effects on
Renfrewshire’s air quality and noise pollution.  By enhancing public
transport networks with bus priority lanes, bus priority at junctions, bus
stop improvements, and support development of Clyde Metro, it would
limit congestion and encourage the use of public transport, leading to
lower emissions and noise levels.  There is potential for temporary
adverse effects for this Alternative due to a temporary increase in
emissions and noise pollution during the construction of any new
infrastructure. 
Alternatives PT/ST-C and PT/ST-D are also likely to result in positive
effects on local air quality and noise pollution by improving the
4 1 =2 =2

Page 264

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  31
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative PT/ST-A: Business as usual
Alternative PT/ST-B: Infrastructure
Alternative PT/ST-C: Integration, Affordability and Accessibility
Alternative PT/ST-D: Bus network, Community and Demand Responsive
Transport, and Car Club Schemes
A B C D
accessibility of public transport, reducing the number of private
vehicles on the roads.
Biodiversity,
Flora and
Fauna, and
Geodiversity 
Alternative PT/ST-A would continue to deliver committed plans,
developments and schemes.  Therefore, this Alternative is expected to
result in neutral effects.  
Alternative PT/ST-B has the potential for mixed effects on local
biodiversity, flora and fauna, and geodiversity.  Positive effects are
anticipated as this Alternative is likely to reduce traffic congestion and
vehicle emissions, which can improve local air quality and noise levels.
This will limit the impact of human activity on natural habitats.  This
Alternative also has the potential for direct adverse effects on habitats
and species from the construction of new infrastructure.  However, this
option also has the potential to deliver positive effects for biodiversity
through new development. 
Alternative PT/ST-C and Alternative PT/ST-D have would have minimal
direct impact on biodiversity, flora and fauna, and geodiversity;
however, like Alternative PT/ST-B, these Alternatives can contribute to
3 4 =1 =1

Page 265

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  32
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative PT/ST-A: Business as usual
Alternative PT/ST-B: Infrastructure
Alternative PT/ST-C: Integration, Affordability and Accessibility
Alternative PT/ST-D: Bus network, Community and Demand Responsive
Transport, and Car Club Schemes
A B C D
an improvement in environmental quality by limiting the number of
cars on the road through an increase in public and shared transport
usage.  Although not an adverse effect, this Alternative precludes
opportunities for positive effects for biodiversity through the delivery of
new infrastructure.
Climatic
Factors
Alternative PT/ST-A would continue to deliver committed plans,
developments and schemes.  Therefore, this Alternative is expected to
result in neutral effects.  This Alternative would potentially do less to
address Renfrewshire Council’s Climate Emergency, which aspires to
make Renfrewshire a net zero council area by 2030.
Alternatives PT/ST-B, PT/ST-C, and PT/ST-D are likely to result in
positive effects in relation to climate change mitigation, by limiting the
number of private vehicles on Renfrewshire’s roads, reducing the
council area’s carbon footprint.   
Alternative PT/ST-B has the added potential benefit of being able to
improve the area’s ability to adapt to climate change related weather
events by incorporating resilient design into new public transport
4 1 =2 =2

Page 266

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  33
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative PT/ST-A: Business as usual
Alternative PT/ST-B: Infrastructure
Alternative PT/ST-C: Integration, Affordability and Accessibility
Alternative PT/ST-D: Bus network, Community and Demand Responsive
Transport, and Car Club Schemes
A B C D
infrastructure projects.  Alternative B may also further to stimulate
modal shift.
Cultural
Heritage
Alternative PT/ST-A would continue to deliver committed plans,
developments and schemes.  Therefore, this Alternative is expected to
result in neutral effects.   
Alternatives PT/ST-B, PT/ST-C, and PT/ST-D are likely to lead to positive
indirect effects on the historic environment of Renfrewshire, through a
reduction in car traffic as a result of the Alternatives promoting public
transport can improve the setting of historic environment assets by
limiting noise and air pollution, visual impacts and other negative
impacts.  Additionally, positive effects may arise from increasing
accessibility via public transport to the council area’s heritage assets. 
The increased number of physical transport infrastructure schemes
likely to be initiated through Alternative PT/ST-B have the potential to
lead to adverse effects on key heritage assets (including designated
features and areas) located in the vicinity of the locations targeted for
interventions.  The significance of effects from these interventions will
3 4 =1 =1

Page 267

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  34
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative PT/ST-A: Business as usual
Alternative PT/ST-B: Infrastructure
Alternative PT/ST-C: Integration, Affordability and Accessibility
Alternative PT/ST-D: Bus network, Community and Demand Responsive
Transport, and Car Club Schemes
A B C D
however depend on design, layout and scale of the schemes, and
mitigation and avoidance measures proposed.   It should also be noted
that well-designed schemes have the potential to lead to
enhancements to the public realm and the setting of the historic
environment.  Similarly, measures which help to relieve congestion
may support improvements to local distinctiveness and the quality of
the public realm, with benefits for the setting of the historic
environment.
Landscape Alternative PT/ST-A would continue to deliver committed plans,
developments and schemes.  Therefore, this Alternative is expected to
result in neutral effects.   
Alternatives PT/ST-B, PT/ST-C, and PT/ST-D can improve landscape
and townscape character by reducing the number of private vehicle
journeys in Renfrewshire through an increase in public transport use. 
This would likely limit traffic congestion and associated visual and
noise pollution. 
3 4 =1 =1

Page 268

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  35
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative PT/ST-A: Business as usual
Alternative PT/ST-B: Infrastructure
Alternative PT/ST-C: Integration, Affordability and Accessibility
Alternative PT/ST-D: Bus network, Community and Demand Responsive
Transport, and Car Club Schemes
A B C D
Alternative PT/ST-B, through facilitating the delivery of additional
transport infrastructure, has additional potential to lead to adverse
effects on landscape character locally.  This includes through the loss of
features of landscape value, impacts on local distinctiveness and
effects on tranquillity.   
Material
Assets
Alternative PT-ST-A would continue to deliver committed plans,
developments and schemes.  Therefore, this Alternative is expected to
result in neutral effects.  
Alternative PT/ST-B has the potential for adverse effects on local non-
renewable material assets used in the construction, and maintenance,
of new infrastructure.   These adverse effects can be avoided by using
sustainable materials and mitigated by adhering to appropriate waste
management practices.
Alternatives PT/ST-C and PT/ST-D are unlikely to result in any
significant effects on local material assets.
=1 4 =1 =1
Population
and Human
Health
Alternative PT/ST-A would continue to deliver committed plans,
developments and schemes.  Therefore, this Alternative is expected to
result in neutral effects.  The Alternative may do less to maximise the
opportunities available from accessibility and transport.  
4 1 =2 =2

Page 269

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  36
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative PT/ST-A: Business as usual
Alternative PT/ST-B: Infrastructure
Alternative PT/ST-C: Integration, Affordability and Accessibility
Alternative PT/ST-D: Bus network, Community and Demand Responsive
Transport, and Car Club Schemes
A B C D
Alternatives PT/ST-B, PT/ST-C, PT/ST-D are likely to result in positive
effects for population and human health.  For Alternative PT/ST-B, this
would be achieved by reducing traffic congestion by increasing the
number of people using public transport.  This can lead to lower
pollution levels, which benefits public health.  Additionally, a more
efficient transport network can improve travellers’ overall experience. 
This Alternative would also support accessibility to services, facilities
and opportunities, and support local vitality. 
Alternative PT/ST-C will make public transport more accessible and
affordable, encouraging more people to use it instead of private
vehicles.  Additionally, improving accessibility at transport hubs and
removing physical barriers can make public transport more inclusive,
benefiting people with specific mobility needs. 
Similarly, Alternative PT/ST-D can enhance public health by improving
bus services and community transport, making it easier for people to
access essential services and reducing the reliance on private vehicles.  
Soil and
Water
Resources
Alternative PT/ST-A would continue to deliver committed plans,
developments and schemes.  Therefore, this Alternative is expected to
result in neutral effects.  
=1 4 =1 =1

Page 270

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  37
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative PT/ST-A: Business as usual
Alternative PT/ST-B: Infrastructure
Alternative PT/ST-C: Integration, Affordability and Accessibility
Alternative PT/ST-D: Bus network, Community and Demand Responsive
Transport, and Car Club Schemes
A B C D
Alternative PT/ST-B has the potential for mixed effects in relation to soil
and water resources.  Positive effects may be delivered if the new
infrastructure can be designed to protect and enhance soil and water
resources in Renfrewshire.  For example, the implementation of bus
priority lanes could include designs to manage stormwater more
effectively.  However, there is also potential for adverse effects from
construction activities, such as soil compaction, contamination from
construction waste, and the permanent loss of high-quality agricultural
land.
Alternatives PT/ST-C and PT/ST-D would have limited direct impact on
soil and water resources in Renfrewshire.

Page 271

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report 38
PUBLIC
Table 4-3: Appraisal of Reasonable Alternatives – Road Safety
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative RS-A: Business as usual
Alternative RS-B: Infrastructure
Alternative RS-C: Enforcement and partnerships
A B C
Air Quality
and Noise
Pollution
Alternative RS-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  Under
this Alternative, local air quality and noise pollution levels are still likely to improve
over the LTS period, as the country transitions its fleet to less-polluting electric
vehicles and other measures are put in place to support improved air quality.
With regard to Alternatives RS-B and RS-C, impacts from lower speeds on air
quality and noise levels are uncertain.  In one respect, cars are more efficient and
produce fewer emissions at speeds closer to 50mph, and as such are less efficient
at 20 mph than 30 mph. However, the greater the speed of vehicles in built-up
areas, the higher is the incidence of acceleration, deceleration, and braking, all of
which increase air pollution.  Similarly, in terms of noise pollution, at speeds
below 30mph this is closely linked to the extent to which vehicles accelerate,
decelerate and brake.
In this respect effects depend on the location of speed limits in association with
other measures to enhance road safety (such as traffic calming measures), which
may have inadvertent effects on air quality if located in inappropriate locations.  It
should also be noted that indirect effects of such measures on reducing traffic
flows may also support a limitation of emissions.
The relative performance of the Alternatives is therefore uncertain.
? ? ?

Page 272

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  39
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative RS-A: Business as usual
Alternative RS-B: Infrastructure
Alternative RS-C: Enforcement and partnerships
A B C
Biodiversity,
Flora and
Fauna, and
Geodiversity 
Alternative RS-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  
Indirect beneficial effects are anticipated with Alternatives RS-B and RS-C by
making Renfrewshire’s roads safer, which will result in less disturbance on local
wildlife through a reduction in traffic collisions involving wildlife in both urban and
rural areas.  
However, for Alternative RS-B, there will likely be temporary adverse effects in
relation to this topic due to disturbance from construction activities, and potential
direct adverse effects if infrastructure results in land take from habitats. 
3 2 1
Climatic
Factors
Alternative RS-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  This
Alternative would potentially do less to address Renfrewshire Council’s Climate
Emergency, which aspires to make Renfrewshire a net zero council area by 2030.
With regard to Alternatives RS-B and RS-C, impacts from lower speeds on
greenhouse emissions are uncertain.  In one respect, cars are more efficient and
produce fewer greenhouse gas emissions at speeds closer to 50mph, and as such
are less efficient at 20 mph than 30 mph.  However, the greater the speed of
vehicles in built-up areas, the higher is the incidence of acceleration, deceleration,
and braking, all of which increase emissions. 
? ? ?

Page 273

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  40
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative RS-A: Business as usual
Alternative RS-B: Infrastructure
Alternative RS-C: Enforcement and partnerships
A B C
In this respect effects depend on the location of speed limits in association with
other measures to enhance road safety (such as traffic calming measures), which
may have inadvertent effects on emissions if located in inappropriate locations.  It
should also be noted that indirect effects of such measures on reducing traffic
flows may also support a limitation of greenhouse gas emissions. 
The relative performance of the Alternatives is therefore uncertain.
Cultural
Heritage
Alternative RS-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  
Higher speeds can impact on the fabric of the historic environment through issues
such as vibration.  Higher speeds also impact on the setting and wider significance
of heritage assets through effects on noise and visual impacts.
In this respect, beneficial effects are anticipated for Alternatives RS-B and RS-C,
through their interventions to reduce speeds in Renfrewshire. 
However, Alternative RS-B may also result in adverse effects if new the
construction of new infrastructure directly or indirectly impacts on historic
environment assets and their setting.   
3 2 1

Page 274

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  41
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative RS-A: Business as usual
Alternative RS-B: Infrastructure
Alternative RS-C: Enforcement and partnerships
A B C
Landscape Alternative RS-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.   
Higher speeds can impact on landscape and townscape character through effects
on noise quality and visual impacts.  In this respect, Alternatives RS-B and RS-C,
have potential to reduce speeds in Renfrewshire, leading to beneficial effects on
Renfrewshire’s landscape and townscape character. 
However, Alternative RS-B may also result in adverse effects if new infrastructure
does not fit in with the existing landscape.  Careful planning and the incorporation
of design features that respect the character of the local landscape can help
mitigate these impacts.
3 2 1
Material
Assets
Alternative RS-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.    
Alternative RS-B has the potential for adverse effects on local non-renewable
material assets used in the construction, and maintenance, of new infrastructure. 
These adverse effects can be avoided by using sustainable materials and
mitigated by adhering to appropriate waste management practices.  
Alternative RS-C is unlikely to result in any significant effects on local material
assets. 
2 3 1

Page 275

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  42
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative RS-A: Business as usual
Alternative RS-B: Infrastructure
Alternative RS-C: Enforcement and partnerships
A B C
Population
and Human
Health
Alternative RS-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  The
Alternative may do less to maximise the opportunities available from accessibility
and transport.  
Beneficial effects are anticipated for Alternatives RS-B and RS-C, which will
improve public health by improving road safety (with a particular focus on roads
near schools), which is likely to result in fewer road accidents and fatalities.
An additional benefit for both of these Alternatives is that increasing road safety
could encourage residents to partake in more healthier modes of travel, including
walking and cycling.  This would bring benefits to the overall health and wellbeing
of the community.   
It should also be noted uncertainties remain with regard to speed limits’ impacts
on air and noise quality.
3 =1 =1
Soil and
Water
Resources
Alternative RS-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  
Alternative RS-B has the potential for adverse effects on local soil resources,
through the permanent land take, contamination, and compaction of agricultural
soil for new infrastructure.
Alternative RS-C is unlikely to have any effects on soil and water resources.   
=1 3 =1

Page 276

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report 43
PUBLIC
Table 4-4: Appraisal of Reasonable Alternatives – Parking
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative P-A: Business as usual
Alternative P-B: Park and ride/ mobility hub provision
Alternative P-C: Comprehensive parking management
A B C
Air Quality
and Noise
Pollution
Alternative P-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  Under
this Alternative, local air quality and noise pollution levels are still likely to improve
over the LTS period, as the country transitions its fleet to less-polluting electric
vehicles and other measures are put in place to support improved air quality.
Alternative P-B is likely to have beneficial effects on Renfrewshire’s air quality and
noise pollution levels.  By expanding Park and ride/ mobility hub facilities, it
encourages the use of public transport, which will reduce the number of private
vehicles on the road.  This is likely to result in less congestion and idling, which in
turn will improve local air quality and noise pollution.  The positive benefits of this
Alternative would be compounded if they are delivered in and around
Renfrewshire’s environmentally sensitive areas.  However, adverse effects may
arise from and increase in noise and air quality issues at locations closer to the
Park and ride/ mobility hub facilities. 
Alternative P-C is also likely to result in beneficial effects by improving electric
vehicles infrastructure, which is likely to accelerate the transition of towards these
cleaner and quieter vehicles.   Additionally, should workplace parking licenses be
implemented, this may encourage commuters to switch from private cars to
modes of public / active transport.  This would lead to beneficial effects on local
air quality and noise levels.
3 2 1

Page 277

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  44
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative P-A: Business as usual
Alternative P-B: Park and ride/ mobility hub provision
Alternative P-C: Comprehensive parking management
A B C
Biodiversity,
Flora and
Fauna, and
Geodiversity 
Alternative P-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  
Alternative P-B may result in beneficial indirect effects by reducing traffic
congestion and vehicle emissions, which can improve the condition of
Renfrewshire’s environment.  New Park and ride/ mobility hub facilities have the
potential to result in adverse effects on habitats, species and networks from land
take, habitat loss and fragmentation and disturbance.  However, this Alternative
also has the potential to deliver positive effects for biodiversity through the
development of new infrastructure.  
Alternative P-C would offer no additional direct protection for biodiversity, flora,
fauna, and geodiversity.  Although not an adverse effect, this Alternative precludes
opportunities for positive effects for biodiversity through the delivery of new
infrastructure.
=1 3 =1
Climatic
Factors
Alternative P-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  This
Alternative would potentially do less to address Renfrewshire Council’s Climate
Emergency, which aspires to make Renfrewshire a net zero council area by 2030. 
3 1 2

Page 278

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  45
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative P-A: Business as usual
Alternative P-B: Park and ride/ mobility hub provision
Alternative P-C: Comprehensive parking management
A B C
Beneficial effects are anticipated for Alternative P-B, which can support climate
change adaptation in Renfrewshire by reducing the number of vehicles on the
road, which can help mitigate the impacts of extreme weather events on the
transport network.  Additionally, the new Park and ride / mobility hub facilities can
be designed with resilient infrastructure, such as sustainable drainage systems, to
withstand such events.  This Alternative may also support a reduction in
greenhouse gas emissions by encouraging the use of public transport and limiting
the number of private vehicles on the road. However, it is also possible that the
new Park and ride / mobility hub facilities would also encourage car use, with
implications for greenhouse gas emissions.  This particular effect remains
uncertain at this stage.
Beneficial effects are anticipated with Alternative P-C with regard to climate
change mitigation, which can help facilitate a shift towards cleaner electric
vehicles, thus reducing Renfrewshire’s carbon footprint.  No significant climate
change adaption effects are anticipated from this Alternative.

Page 279

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  46
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative P-A: Business as usual
Alternative P-B: Park and ride/ mobility hub provision
Alternative P-C: Comprehensive parking management
A B C
Cultural
Heritage
Alternative P-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  
Both Alternative P-B and Alternative P-C can improve the appreciation of
Renfrewshire’s historic environment by improving access to heritage sites.  In the
case of Alternative P-B, this would be through better transport connectivity, while
also potentially improving the setting of heritage sites with a reduction in the
number of cars on the roads in certain locations in Renfrewshire (including town
centres) as a result of the Park and ride/ mobility hub expansion.   For Alternative
P-C access to heritage sites would also be improved if the interventions (additional
parking options for specialist groups and electric vehicle users, and enforcement
of the national pavement parking ban) are delivered close to the heritage assets,
making them more attractive and accessible sites to visit.  Associated measures
also offer the potential to better reveal the significance of heritage assets if well
designed.  However, both of these alternatives have the potential for direct and
indirect adverse effects on the council area’s historic environment if new Park and
ride / mobility hub facilities / parking spaces impacts on historic environment
assets and their settings.  Careful planning is required to avoid these potential
adverse effects. 
3 =1 =1

Page 280

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  47
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative P-A: Business as usual
Alternative P-B: Park and ride/ mobility hub provision
Alternative P-C: Comprehensive parking management
A B C 
Landscape Alternative P-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects. 
Alternative P-B has the potential for positive effects on Renfrewshire’s landscape
and townscape character through a reduction in car traffic due to an expansion of
the Park and ride/ mobility hub facilities.  This is likely to reduce the number of
cars on the road, which limits visual and noise pollution, making the landscape
more pleasant and visually appealing.  However, there is potential for both
beneficial and adverse effects depending on the design and location of the new
Park and ride / mobility hub.  Poor location and design could disrupt the local
landscape through a loss of landscape features, impacts on local distinctiveness
and effects on tranquillity.  This may particularly be the case given that Park and
ride/ mobility hub facilities tend to be delivered at the edge of settlements on the
urban/rural fringe.
Uncertain effects are anticipated with Alternative P-C.  As with Alternative P-B,
there is potential for both beneficial and adverse effects depending on the design
of the new parking provision.   
=1 3 =1

Page 281

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  48
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative P-A: Business as usual
Alternative P-B: Park and ride/ mobility hub provision
Alternative P-C: Comprehensive parking management
A B C
Material
Assets
Alternative P-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  
Alternatives P-B and P-C have the potential for adverse effects on local non-
renewable material assets, for example, through the use of materials for
expanding Park and ride/ mobility hub provision and parking provision,
respectively.  These adverse effects can be avoided by using sustainable materials
and mitigated by adhering to appropriate waste management practices.
1 =2 =2
Population
and Human
Health
Alternative P-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.  Whilst
these will support benefits for the local population and health and wellbeing, the
Alternative may do less to maximise the opportunities available from accessibility
and transport.  
Alternative P-B is likely to result in many positive effects for population and human
health.  Public health in the council area could be improved, particularly in urban
areas where Park and ride/ mobility hub facilities serve, by replacing private
vehicle journeys with public transport.  This would lead to lower air pollution
levels through a reduction in idling time and the overall distance of cars travelled
in the council area, which would benefit public health.  Less congestion on roads,
and better accessibility to Park and ride/ mobility hub destinations, would also
improve the overall experience for travellers. 
3 =1 =1

Page 282

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  49
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative P-A: Business as usual
Alternative P-B: Park and ride/ mobility hub provision
Alternative P-C: Comprehensive parking management
A B C
Alternative P-C is also likely to generate positive effects, by providing better
parking options for groups with specific needs and promoting the use of electric
vehicles.  Improved parking provision for groups with specific needs will promote
equality and accessibility in the community, making sure that individuals with
mobility challenges can lead more independent lives.   This can improve their
quality of life and overall well-being.  Additionally, electric vehicle infrastructure is
a community asset of growing importance, so the improvement of this will benefit
those with access to an electric vehicle in Renfrewshire, making them more
convenient to use.
Soil and
Water
Resources
Alternative P-A would continue to deliver committed plans, developments and
schemes.  Therefore, this Alternative is expected to result in neutral effects.
Alternative P-B is likely to result in mixed effects in relation soil and water
resources.   Beneficial effects may arise from the more efficient use of
Renfrewshire’s transport network, limiting the need for land take for transport
infrastructure.  However, there is potential for adverse effects from construction of
new Park and ride/ mobility hub facilities, such as soil compaction, an increase in
surface runoff, and contamination from construction waste.  Additionally, through
the delivery of new physical transport infrastructure (such as Park and ride/
mobility hub facilities), Alternative P-B has the potential to lead to the
development on previously undeveloped land, including potentially productive
land classified as the best and most versatile agricultural land. 
=1 3 =1

Page 283

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  50
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative P-A: Business as usual
Alternative P-B: Park and ride/ mobility hub provision
Alternative P-C: Comprehensive parking management
A B C
Alternative P-C would have limited direct effects on soil and water resources.

Page 284

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report 51
PUBLIC
Table 4-5: Appraisal of Reasonable Alternatives – Road Network and Freight
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative RN-A: Business as usual
Alternative RN-B: Improved operation of the road network
Alternative RN-C: Efficient freight network
Alternative RN-D: Economic development/economic growth
A B C D
Air Quality
and Noise
Pollution
Alternative RN-A would continue to deliver committed plans,
developments and schemes.  Therefore, this Alternative is expected to
result in neutral effects.  Under this Alternative, local air quality and
noise pollution levels are still likely to improve over the LTS period, as
the country transitions its fleet to less-polluting electric vehicles and
other measures are put in place to support improved air quality.
Alternative RN-B has the potential for beneficial effects on local air
quality and noise pollution levels through an improvement in the
quality of the environment from the easing of congestion and idling.
Alternative RN-C is also anticipated to result in beneficial effects on
local air quality and noise pollution levels through a potential
reduction in idling and an overall reduction in the number of freight
journeys required. 
=3 =1 =1 =3

Page 285

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  52
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative RN-A: Business as usual
Alternative RN-B: Improved operation of the road network
Alternative RN-C: Efficient freight network
Alternative RN-D: Economic development/economic growth
A B C D
Alternative RN-D is anticipated to result in mixed effects in relation to
local noise and air quality.  Positive impacts are likely through
interventions that will make Renfrewshire’s roads operate more
efficiently.  This has the potential to limit congestion and improve
traffic flows, leading to lower local emissions and noise levels. 
However, there will likely be temporary adverse effects in relation to
this topic from construction activities.  Additionally, new road
infrastructure may also encourage increased vehicle use, potentially
leading to higher emissions and noise levels.  The overall impact on air
quality and noise will depend on the balance between improved
efficiency and increased traffic volumes; therefore, uncertainty
remains on this issue.
Biodiversity,
Flora and
Fauna, and
Geodiversity 
Alternative RN-A would continue to deliver committed plans,
developments and schemes.  Therefore, this Alternative is expected to
result in neutral effects.   
Alternative RN-B and Alternative RN-C are unlikely to have any
significant direct effects on local biodiversity, flora and fauna, and
2 =1 =1 4

Page 286

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  53
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative RN-A: Business as usual
Alternative RN-B: Improved operation of the road network
Alternative RN-C: Efficient freight network
Alternative RN-D: Economic development/economic growth
A B C D
geodiversity; however, indirect beneficial effects may arise through an
improvement in the quality of the environment from the easing of
congestion and idling from cars, and a more efficient freight network,
respectively.  Although not an adverse effect, these Alternatives
preclude opportunities for positive effects for biodiversity through the
delivery of new infrastructure.
RN-D will involve the construction of significant infrastructure.  Habitat
loss, fragmentation, road kill, and disturbance during construction,
have the potential for adverse effects on biodiversity, flora and fauna,
and geodiversity.  The significance of the adverse effect would be
determined by the size of the infrastructure and its location in relation
to sensitive ecological/geological sites.  Considerate planning and the
incorporation of green infrastructure, such as wildlife corridors and
eco-bridges, can help mitigate these effects. 
Climatic
Factors
Alternative RN-A would continue to deliver committed plans,
developments and schemes.  Therefore, this Alternative is expected to
result in neutral effects.  This Alternative would potentially do less to
3 =1 =1 4

Page 287

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  54
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative RN-A: Business as usual
Alternative RN-B: Improved operation of the road network
Alternative RN-C: Efficient freight network
Alternative RN-D: Economic development/economic growth
A B C D
address Renfrewshire Council’s Climate Emergency, which aspires to
make Renfrewshire a net zero council area by 2030. 
Alternatives RN-B and RN-C have the potential for beneficial effects in
relation to climate change mitigation through an improvement in the
quality of the environment from the easing of congestion and idling
from vehicles, and a more efficient freight network, respectively. 
Overall, these interventions will lead to fewer transport related
emissions in Renfrewshire.
Mixed effects are anticipated for Alternative RN-D.  Adverse effects may
arise as these two Alternatives involve the construction of significant
infrastructure.  Firstly, there will be a release of emissions during the
construction phase of new infrastructure, which would increase
Renfrewshire’s carbon footprint.  These Alternatives would also likely
lead to an increase in impermeable surfaces, which in turn has the
potential to raise local flood risk.   
This issue could be managed through good design (e.g. the use of
permeable surfaces) and sustainable drainage systems and may also
provide an opportunity to upgrade the transport network’s resilience
to weather-related events.   Potential adverse effects may also arise

Page 288

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  55
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative RN-A: Business as usual
Alternative RN-B: Improved operation of the road network
Alternative RN-C: Efficient freight network
Alternative RN-D: Economic development/economic growth
A B C D
from Alternative RN-D if new road infrastructure leads to an increase in
vehicle use, leading to higher emissions in the council area.
Cultural
Heritage
Alternative RN-A would continue to deliver committed plans,
developments and schemes.  Therefore, this Alternative is expected to
result in neutral effects.   
Alternative RN-B is likely to have positive effects on the historic
environment of Renfrewshire, as a result of a more efficient road
network.  This Alternative may lead to less congestion and idling,
which could improve the setting of historic sites.  Additionally, access
to historic sites and areas of historic interest would also improve
through better traffic management.  Associated measures also offer
the potential to better reveal the significance of heritage assets if well
designed. 
Regarding Alternative RN-C, freight movements can have a significant
impact on the fabric of the historic environment through issues such
as vibration and impacts on air quality.  Freight movements also have
an impact on the setting and wider significance of heritage assets
through noise and visual impacts.  This Alternative is therefore likely to
2 =1 =1 3

Page 289

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  56
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative RN-A: Business as usual
Alternative RN-B: Improved operation of the road network
Alternative RN-C: Efficient freight network
Alternative RN-D: Economic development/economic growth
A B C D
lead to beneficial effects through the reduction in freight traffic in
certain locations, including built up areas with greater concentrations
of heritage assets. 
Like Alternative RN-B, Alternative RN-D may improve access to heritage
assets, along new road links and junction upgrades.  However, there is
potential for adverse effects if new infrastructure directly or indirectly
impacts on historic environment assets and their setting.  Careful
planning and the incorporation of design features that respect the
historic character of the area can help mitigate these impacts.
Landscape Alternative RN-A would continue to deliver committed plans,
developments and schemes.  Therefore, this Alternative is expected to
result in neutral effects.   
Alternatives RN-B and RN-C are likely to have positive effects on
Renfrewshire’s landscape and townscape character, from a reduction
in noise and visual impacts, as a result of a more efficient road and
freight network, respectively.  The reduction of congestion is also a
potential positive effect for Alternative RN-D.
2 =1 =1 =3

Page 290

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  57
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative RN-A: Business as usual
Alternative RN-B: Improved operation of the road network
Alternative RN-C: Efficient freight network
Alternative RN-D: Economic development/economic growth
A B C D
Adverse effects on the local landscape may arise from Alternative RN-D
by proposing the development of new infrastructure, which may not
compliment the local landscape if not appropriately planned.
Material
Assets
Alternative RN-A would continue to deliver committed plans,
developments and schemes.  Therefore, this Alternative is expected to
result in neutral effects.  
Alternative RN-B and Alternative RN-C are unlikely to result in any
significant effects on local material assets.
Alternative RN-D have the potential for adverse effects on local non-
renewable material assets used in the construction, and maintenance,
of new infrastructure.  These adverse effects can be avoided by using
sustainable materials and mitigated by adhering to appropriate waste
management practices.
1 =2 =2 4
Population
and Human
Health
Alternative RN-A would continue to deliver committed plans,
developments and schemes.  Therefore, this Alternative is expected to
result in neutral effects.  Whilst these will support benefits for the local
population and health and wellbeing, the Alternative may do less to
maximise the opportunities available from accessibility and transport.  
Mixed effects are anticipated for Alternatives RN-B and RN-D.  
4 2 1 3

Page 291

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  58
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative RN-A: Business as usual
Alternative RN-B: Improved operation of the road network
Alternative RN-C: Efficient freight network
Alternative RN-D: Economic development/economic growth
A B C D
Positive effects are anticipated for Alternatives RN-B, RN-C and RN-D
through the improvement of the road and freight network, leading to a
reduction in congestion and idling, while also potentially reducing the
number of transport-related accidents.  This will improve the
experience of driving through Renfrewshire and will also improve the
quality of the local environment (through an improvement in
emissions and noise pollution).  However, in the case of Alternative
RN-B, this may also make driving a more appealing form of transport,
which could reduce the number of (healthier) active travel journeys.  
The construction of new infrastructure associated Alternative RN-D
could cause disturbance to local communities in the form of
temporary visual, air, and noise pollution.  However, they would also
help generate local income, for example, through employment of
construction workers.
Soil and
Water
Resources
Alternative RN-A would continue to deliver committed plans,
developments and schemes.  Therefore, this Alternative is expected to
result in neutral effects.  
Alternatives RN-B and RN-C are unlikely to have any effects on soil and
water resources.  
=1 =1 =1 4

Page 292

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  59
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of Preference 
Alternative RN-A: Business as usual
Alternative RN-B: Improved operation of the road network
Alternative RN-C: Efficient freight network
Alternative RN-D: Economic development/economic growth
A B C D
Alternative RN-D has the potential for adverse effects on local soil
resources, through the permanent land take, contamination, and
compaction of agricultural soil for new infrastructure projects.

Page 293

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report 60
PUBLIC
Table 4-6: Appraisal of Reasonable Alternatives – Environment
SEA  Discussion of Potential Effects and Relative Merits of Options Rank of
Preference 
Alternative ENV-A: Business as usual
Alternative ENV-B: Initiate climate change mitigation and adaptation measures
A B
Air Quality
and Noise
Pollution
Alternative ENV-A would continue to deliver committed plans, developments and schemes. 
Therefore, this Alternative is expected to result in neutral effects.  Under this Alternative, local air
quality and noise pollution levels are still likely to improve over the LTS period, as the country
transitions its fleet to less-polluting electric vehicles and other measures are put in place to
support improved air quality.
Alternative ENV-B is expected to result in beneficial effects in relation to air quality and noise
pollution in Renfrewshire.  Decarbonising Renfrewshire Council’s vehicle fleet would reduce
emissions, while climate change adaptation measures could improve the resilience of the
transport network, limiting congestion and associated air and noise pollution.  
2 1
Biodiversity,
Flora and
Fauna, and
Geodiversity 
Alternative ENV-A would continue to deliver committed plans, developments and schemes. 
Therefore, this Alternative is expected to result in neutral effects.  
Alternative ENV-B is likely to result in positive effects on biodiversity, flora and fauna, and
geodiversity.  Firstly, this Alternative could result in a cleaner vehicle fleet, which could lead to
lower levels of air pollution, with benefits for habitats and species.  Additionally, adaptation
measures to protect the transport network from weather-related events can help preserve
habitats by preventing damage from flooding and erosion and offering the opportunity for the
implementation for nature-based solutions. 
2 1

Page 294

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  61
PUBLIC
SEA  Discussion of Potential Effects and Relative Merits of Options Rank of
Preference 
Alternative ENV-A: Business as usual
Alternative ENV-B: Initiate climate change mitigation and adaptation measures
A B
Climatic
Factors
Alternative ENV-A would continue to deliver committed plans, developments and schemes. 
Therefore, this Alternative is expected to result in neutral effects.  This Alternative would
potentially do less to address Renfrewshire Council’s Climate Emergency, which aspires to make
Renfrewshire a net zero council area by 2030.
Alternative ENV-B can support climate change adaptation by implementing measures to
strengthen and protect the transport network from weather-related events.  This includes
improving infrastructure to withstand extreme weather, such as flooding and heatwaves,
thereby enhancing the resilience of the transport network.  Regarding climate change mitigation,
this Alternative seeks to decarbonise Renfrewshire Council’s vehicle fleet, which will reduce
transport emissions in the council area, and help Renfrewshire meet its climate targets at a
faster rate.
2 1
Cultural
Heritage
Alternative ENV-A would continue to deliver committed plans, developments and schemes. 
Therefore, this Alternative is expected to result in neutral effects.  
Alternative ENV-B is likely to result in mixed effects in relation to the historic environment of
Renfrewshire.  Indirect positive effects may arise from climate change adaption and resilience
measures to the local transport network, which could indirectly give some protection to
Renfrewshire’s historic assets from weather-related events.  Associated measures also offer the
potential to better reveal the significance of heritage assets if well designed.  However, there is
also potential for both direct and indirect adverse effects if new infrastructure impacts on
historic environment assets and their settings, if not planned appropriately.   
2 1

Page 295

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  62
PUBLIC
SEA  Discussion of Potential Effects and Relative Merits of Options Rank of
Preference 
Alternative ENV-A: Business as usual
Alternative ENV-B: Initiate climate change mitigation and adaptation measures
A B
Landscape Alternative ENV-A would continue to deliver committed plans, developments and schemes. 
Therefore, this Alternative is expected to result in neutral effects.  
Alternative ENV-B has the potential for mixed effects on the local landscape and townscape
character, depending on the design and implementation of the climate change adaptation and
resilience measures to strengthen and protect the transport network.  Climate change
adaptation measures can lead to less traffic, which enhances the visual appeal of the area. 
However, the design and implementation of new infrastructure should be carefully managed to
ensure it blends with the natural environment and does not detract from the landscape's visual
quality.
2 1
Material
Assets
Alternative ENV-A would continue to deliver committed plans, developments and schemes. 
Therefore, this Alternative is expected to result in neutral effects.  
Alternative ENV-B has the potential for adverse effects on local non-renewable material assets,
for example, through the use of materials for constructing physical climate change adaptation
and resilience measures.  These adverse effects can be avoided by using sustainable materials
and mitigated by adhering to appropriate waste management practices. 
1 2
Population
and Human
Health
Alternative ENV-A would continue to deliver committed plans, developments and schemes. 
Therefore, this Alternative is expected to result in neutral effects.  Whilst these will support
benefits for the local population and health and wellbeing, the Alternative may do less to
maximise the opportunities available from accessibility and transport.  
2 1

Page 296

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  63
PUBLIC
SEA  Discussion of Potential Effects and Relative Merits of Options Rank of
Preference 
Alternative ENV-A: Business as usual
Alternative ENV-B: Initiate climate change mitigation and adaptation measures
A B
Alternative ENV-B is likely to result in positive effects in relation to population and human health. 
For example, decarbonising Renfrewshire’s vehicle fleet and implementing adaptation measures
can improve visual, air, and noise quality, which benefits public health and the setting of
residential areas.  Additionally, a more resilient transport network to weather-related events will
improve the overall travel experience for travellers in Renfrewshire.
Soil and
Water
Resources
Alternative ENV-A would continue to deliver committed plans, developments and schemes. 
Therefore, this Alternative is expected to result in neutral effects.  
Alternative ENV-B is likely to result in mixed effects in relation soil and water resources.  Positive
effects are likely due to the implementation of climate change adaptation measures, which
could include strategies which prevents prevent soil erosion and manage stormwater effectively. 
However, there is potential for adverse effects from construction activities, such as soil
compaction and contamination from construction waste.  Appropriate waste management and
sustainable construction practices can help mitigate these risks.  
2 1

Page 297

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report 64
PUBLIC
Table 4-7: Appraisal of Reasonable Alternatives – Digital Technology 
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of
Preference 
Alternative DT-A: Business as usual
Alternative DT-B: Digital technology innovations
A B
Air Quality
and Noise
Pollution
Alternative DT-A would continue to deliver committed plans, developments and schemes. 
Therefore, this Alternative is expected to result in neutral effects.  Maintaining the existing digital
infrastructure without significant upgrades may continue the current trend of reliance on private
vehicles (which has associated emissions and noise issues).  Under this Alternative, local air
quality and noise pollution levels are still likely to improve over the LTS period, as the country
transitions its fleet to less-polluting electric vehicles and other measures are put in place to
support improved air quality.
Alternative DT-B is expected to result in positive effects on Renfrewshire’s air quality and noise
pollution levels through the optimisation of traffic flows, reduction of congestion, an increase in
the use of public transport and the number of people working from home.  These interventions
can lead to reduced vehicle emissions and noise levels, contributing to cleaner air and quieter
environments.  
2 1
Biodiversity,
Flora and
Fauna, and
Geodiversity 
Alternative DT-A would continue to deliver committed plans, developments and schemes. 
Therefore, this Alternative is expected to result in neutral effects.  
Alternative DT-B would result in no direct effects on local biodiversity.  Indirect beneficial effects
may arise from this Alternative if it leads to a reduction in private vehicle use (with more people
working from home, or taking public transport), which may limit traffic congestion, vehicle
emissions, and noise pollution near sensitive habitats.  However, the construction of new digital
infrastructure should be carefully planned to avoid any potential disturbances to sensitive areas.
2 1

Page 298

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  65
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of
Preference 
Alternative DT-A: Business as usual
Alternative DT-B: Digital technology innovations
A B
Climatic
Factors
Alternative DT-A would continue to deliver committed plans, developments and schemes. 
Therefore, this Alternative is expected to result in neutral effects.  This Alternative would
potentially do less to address Renfrewshire Council’s Climate Emergency, which aspires to make
Renfrewshire a net zero council area by 2030.
Alternative DT-B is likely to result in positive effects in relation to climate change adaptation and
mitigation in Renfrewshire.  Regarding adaptation, the real time information and the Urban
Traffic Control system could help mitigate impacts of future flooding events by efficiently
directing traffic in such events, thus limiting potential local congestion.  Regarding climate
change mitigation, the Alternative is likely to lead to a reduction in traffic and idling and is also
likely to increase the use of public transport (for example through the provision of Real Time
Information at bus stops – Action DT2).  Overall, this would lead to fewer transport emissions in
Renfrewshire.
2 1
Cultural
Heritage
Alternative DT-A would continue to deliver committed plans, developments and schemes. 
Therefore, this Alternative is expected to result in neutral effects.  
Alternative DT-B can enhance the historic environment of Renfrewshire by improving access to
heritage sites through better transport connectivity and information systems.  For example,
improved Real Time Passenger Information can make it easier for visitors to visit Renfrewshire’s
historic environment assets.  Additionally, a reduction in private transport vehicles as a result of
this Alternative, may improve the setting of historic assets (limiting visual and noise pollution). 
Associated measures also offer the potential to better reveal the significance of heritage assets if
well designed.  However, there is potential for both direct and indirect adverse effects if the new
2 1

Page 299

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  66
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of
Preference 
Alternative DT-A: Business as usual
Alternative DT-B: Digital technology innovations
A B
digital infrastructure directly or indirectly impacts on historic environment assets and their
settings.  Careful planning is required to avoid such impacts.
Landscape Alternative DT-A would continue to deliver committed plans, developments and schemes. 
Therefore, this Alternative is expected to result in neutral effects.  
Alternative DT-B has the potential for minor positive effects in relation to the local landscape
and townscape character by limiting traffic congestion and associated visual, noise, and air
pollution.  The implementation of digital innovations such as an integrated journey planning
app and Urban Traffic Control can lead to less traffic, which may enhance the visual appeal of
the area.  However, there is the potential for adverse effects if new digital infrastructure detracts
from the landscape's visual quality.
2 1
Material
Assets
Alternative DT-A would continue to deliver committed plans, developments and schemes. 
Therefore, this Alternative is expected to result in neutral effects.  
Alternative DT-B has the potential for adverse effects on local non-renewable material assets
and waste facilities, such as the use of materials for adding connections to the existing fibre
network.  Such effects can be mitigated by using sustainable alternatives and adhering to
appropriate waste management practices. 
1 2
Population
and Human
Health
Alternative DT-A would continue to deliver committed plans, developments and schemes. 
Therefore, this Alternative is expected to result in neutral effects.  The Alternative may do less to
maximise the opportunities available from accessibility and transport.  
2 1

Page 300

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  67
PUBLIC
SEA Topic Discussion of Potential Effects and Relative Merits of Options Rank of
Preference 
Alternative DT-A: Business as usual
Alternative DT-B: Digital technology innovations
A B
Alternative DT-B is likely to result in positive effects by improving the efficiency and reliability of
the local transport network, thus improving the overall experience of using Renfrewshire’s roads
and public transport.  For example, more efficient traffic management and real-time information
can reduce congestion on the council area’s roads and improve the overall travel experience. 
This would also benefit the environmental quality of residential areas through a reduction in air
and noise pollution.  Additionally, by improving public transport and digital connectivity, this
may save households money by offering a more attractive, and more economical, alternative to
private vehicles. 
Soil and
Water
Resources
Alternative DT-A would continue to deliver committed plans, developments and schemes. 
Therefore, this Alternative is expected to result in neutral effects.   
Alternative DT-B is likely to result in mixed effects in relation soil and water resources.  Beneficial
effects may arise from the more efficient use of Renfrewshire’s transport network, limit the need
for land take for transport infrastructure.  However, there is potential for adverse effects from
construction activities related to digital connectivity infrastructure improvements, such as soil
compaction and contamination from construction waste.  Suitable waste management and
sustainable construction practices can help mitigate these risks.
2 1

Page 301

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report 68
PUBLIC
4.4. Summary of Findings
4.4.1. Active Travel & Behaviour Change
Alternative AT/BC-B, which focuses on enhancing active travel networks, is expected to
have positive effects, particularly on air quality, noise pollution, climate change mitigation,
and population health. However, adverse effects are also anticipated on biodiversity,
climate change adaptation, material assets and soil resources due to construction
activities.  
Alternative AT/BC-C aims to encourage active travel through non-infrastructure
interventions, leading to positive effects, particularly on air quality, climate change
mitigation, and population health, with minimal direct impacts on biodiversity and soil
resources. 
Neutral effects are anticipated for Alternative AT/BC-A.
Overall, Alternative AT/BC-C performs most favourably across the SEA topics, followed by
Alternative AT/BC-B and Alternative AT/BC-A.
4.4.2. Public Transport and Shared Mobility
Alternative PT/ST-B proposes enhancements to public transport networks, which is
expected to have positive effects, particularly on air quality and noise pollution.  However,
adverse effects are also anticipated, particularly on biodiversity, climate change
adaptation, material assets and soil resources due to construction activities.  
Alternative PT/ST-C and Alternative PT/ST-D aim to improve public transport accessibility
and affordability, leading to positive effects, particularly air quality, noise pollution, climate
change mitigation, and population health.  
Neutral effects are anticipated for Alternative PT/ST-A.
Overall, Alternative PT/ST-C and Alternative PT/ST-D perform most favourably across the
SEA topics, followed by Alternative PT/ST-B and Alternative PT/ST-A.

Page 302

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  69
PUBLIC
4.4.3. Road Safety
Alternative RS-B proposes physical road safety improvements, which is expected to have
positive effects, particularly on population and human health.  However, adverse effects
are also anticipated, especially on biodiversity, climate change adaptation, material assets
and soil resources due to construction activities.  
Alternative RS-C focuses on enforcing road safety measures, leading to positive effects,
especially biodiversity and population human and health.  
Neutral effects are anticipated for Alternative RS-A.
Overall, Alternative RS-C performs most favourably across the SEA topics, followed by
Alternative RS-B and Alternative RS-A.
A summary of each topics’ assessment scores is provided in Table 4-8. 
4.4.4. Parking
Alternative P-B is expected to have positive effects, particularly on air quality, noise
pollution, and climate change mitigation, by encouraging public transport use.  
Alternative P-C aims to improve parking for people with disabilities and electric vehicle
users, while also discouraging commuters from using private vehicles, leading to positive
effects on air quality and accessibility. 
However, adverse effects for both Alternative P-B and P-C are also anticipated on
biodiversity, climate change adaptation, material assets and soil resources due to
construction activities.  
Neutral effects are anticipated for Alternative P-A.
Overall, Alternative P-B performs most favourably across the SEA topics, followed by
Alternative P-C, and then Alternative P-A.
4.4.5. Road Network and Freight
Alternative RN-B aims to enhance operation of the existing transport network, and is
expected to have positive effects, particularly on air quality, noise pollution, climate
change mitigation, and population health.

Page 303

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  70
PUBLIC
Alternative RN-C aims to make Renfrewshire’s freight network more efficient and is
expected to have positive effects, particularly on air quality, noise pollution, climate
change mitigation, and population and human health.  
Alternative RN-D focuses on new road infrastructure, which is expected to have positive
effects, particularly on population and human health.  However, adverse effects are also
anticipated, especially on biodiversity, heritage, landscape, climate change adaptation,
material assets and soil resources, due to construction activities.  
Neutral effects are anticipated for Alternative RN-A.
Overall, Alternatives RN-B and RN-C perform most favourably across the SEA topics,
followed by Alternative RN-D and Alternative RN-A.
4.4.6. Environment
Alternative ENV-B aims to create a healthier and greener environment, leading to positive
effects, particularly on biodiversity and climate change adaptation.  
Neutral effects are anticipated for Alternative DT-A.
Overall, Alternative ENV-B performs most favourably across the SEA topics, followed by
Alternative ENV-A.
4.4.7. Digital Technology
Alternative DT-B proposes implementing initiatives like on-demand mobility services and
Real Time Passenger Information, which are expected to have positive effects, especially
on air quality, noise pollution, population and human health, climate change mitigation by
optimising traffic flow and reducing congestion.  
Neutral effects are anticipated for Alternative DT-A.
Overall, Alternative DT-B performs most favourably across the SEA topics, followed by
Alternative DT-A.

Page 304

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report 71
PUBLIC
Table 4-8: Reasonable Alternative Assessment Score Summary 
Air Quality
and Noise
Pollution 
Biodiversity,
Flora
and Fauna,
and
Geodiversity
Climatic
Factors 
Cultural
Heritage
Landscape Material
Assets 
Population
and Human
Health 
Soil and
Water
Resources 
Active Travel and
Behaviour Change        
Alternative AT/BC-
A: Do minimum
3 3 3 3 3 1 3 1
Alternative AT/BC-
B: Infrastructure
1 2 =1 1 1 3 =1 3
Alternative AT/BC-
C: Behaviour
change
2 1 =1 2 2 2 =1 1

Page 305

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  72
PUBLIC
Public Transport and
Shared Mobility        
Alternative PT/ST-A:
Business as usual
4 3 4 3 3 =1 4 =1
Alternative PT/ST-B:
Infrastructure
1 4 1 4 4 4 1 4
Alternative PT/ST-C:
Integration,
Affordability and
Accessibility
=2 =1 =2 =1 =1 =1 =2 =1
Alternative PT/ST-
D: Bus network,
Community and
Demand
Responsive
Transport, and Car
Club Schemes
=2 =1 =2 =1 =1 =1 =2 =1         
Road Safety

Page 306

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  73
PUBLIC
Alternative RS-A:
Business as usual
? 3 ? 3 3 2 3 =1
Alternative RS-B:
Infrastructure
? 2 ? 2 2 3 =1 3
Alternative RS-C:
Enforcement and
partnerships
? 1 ? 1 1 1 =1 =1
Parking        
Alternative P-A:
Business as usual
3 =1 3 3 =1 1 3 =1
Alternative P-B:
Park and ride/
mobility hub
provision
2 3 1 =1 3 =2 =1 3
Alternative P-C:
Comprehensive
parking
management
1 =1 2 =1 =1 =2 =1 =1         
Road Network and
Freight

Page 307

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  74
PUBLIC
Alternative RN-A:
Business as usual
=3 2 3 2 2 1 4 =1
Alternative RN-B:
Improved operation
of the road network
=1 =1 =1 =1 =1 =2 2 =1
Alternative RN-C:
Efficient freight
network
=1 =1 =1 =1 =1 =2 1 =1
Alternative RN-D:
Economic
development/
economic growth
=3 4 4 3 3 4 3 4
Environment        
Alternative ENV-A:
Business as usual
2 2 2 2 2 1 2 2
Alternative ENV-B:
Initiate climate
change mitigation
and adaptation
measures
1 1 1 1 1 2 1 1
Digital Technology

Page 308

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  75
PUBLIC
Alternative DT-A:
Business as usual
2 2 2 2 2 1 2 2
Alternative DT-B:
Digital technology
innovations
1 1 1 1 1 2 1 1

Page 309

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report 76
PUBLIC
5. Assessment of the LTS
5.1. Introduction
This chapter presents assessment findings and recommendations in relation to the LTS.  
The chapter is structured to present:
• An outline of the LTS actions;
• An assessment of the LTS actions under the eight SEA topics identified through
scoping;
• Consideration of cumulative effects; and
• The overall conclusions at this stage and recommendations for the next stage of
plan-making.
5.2. Methodology
The assessment identifies and evaluates ‘likely significant effects’ on the baseline, drawing
on the SEA framework (see Table 3-1) identified through scoping as a methodological
guide.  
Every effort is made to predict effects accurately; however, this is inherently challenging
given the strategic nature of the LTS actions under consideration and understanding of the
baseline (now and in the future under a ‘no plan’ scenario) that is inevitably limited.  Given
uncertainties there is a need to make assumptions, e.g., in relation to LTS actions’
implementation and aspects of the baseline that might be impacted.  Assumptions are
made cautiously and explained within the text (with the aim of striking a balance between
comprehensiveness and conciseness).  In many instances, given reasonable assumptions,
it is not possible to predict ‘significant effects’, but it is possible to comment on merits (or
otherwise) of the LTS actions in more general terms.  
Finally, it is important to note that effects are predicted taking account of the criteria
presented within Schedule 2 of the 2005 Act.  As such, for example, account is taken of the
probability, duration, frequency, and reversibility of effects as far as possible.  Cumulative
effects are also considered, i.e., the potential for the Strategy to impact an aspect of the
baseline when implemented alongside other plans, programmes, and projects.  These
effect ‘characteristics’ are described within the assessment as appropriate.

Page 310

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  77
PUBLIC
5.3. Preferred Approach for the LTS
The preferred approach for the LTS has been developed through a multi-stage process.
Initially, identified problems and opportunities were used to shape a Vision Statement,
Priorities, and Objectives. These elements were supported by a set of policies that guide
actions and objectives.  An alignment exercise made sure that the objectives were
informed by the identified problems and opportunities, as well as the priorities and
objectives outlined in the National Transport Strategy 2 (NTS2) and Strathclyde
Partnership for Transport’s (SPT) Regional Transport Strategy (RTS).
The next phase involved generating a list of options.  These options were primarily
informed by stakeholder and public consultation findings, supplemented by input from
Renfrewshire Council officers and existing strategy/policy documents, including the 2017
Renfrewshire Local Transport Strategy.  Special consideration was given to policies such as
Infrastructure First and Local Living from National Planning Framework 4 (NPF4), which
emphasises sustainable travel and local living.  The process also took into account the
Sustainable Travel Hierarchy and Sustainable Investment Hierarchy in NTS2, alongside
existing targets, such as reducing car kilometres by 20% by 2030 against a 2019 baseline. It
is noted that while there remains a commitment to reduce reliance on cars, a Renewed
Policy Statement, published in June 2025 by Transport Scotland, sets out that a new,
longer-term target for reducing car use will be developed.
Additionally, wider policies not directly related to transport were considered due to the
close relationship between transport and other areas like health, the economy, reducing
inequalities, and tackling climate change. 
As discussed under the ‘reasonable alternatives’ discussion, the initial list of options was
consolidated, and eight themes were identified:
• Active Travel.
• Behaviour Change.
• Public Transport and Shared Mobility.
• Road Safety.
• Parking.
• Road Network and Freight.
• Environment.
• Digital Technology.

Page 311

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  78
PUBLIC 
The LTS takes forward policies (and accompanying actions) under the eight themes listed
above.
5.4. Approach to the Appraisal
The assessment of the policies/actions included in the LTS is presented below by SEA
topic.
5.4.1. Air Quality and Noise Pollution
Policies under the Active Travel, Behaviour Change, Public Transport & Shared Mobility,
Parking, and Digital Technology themes work to promote modal shift away from private
car use and towards cleaner modes, such as active travel (like walking, wheeling and
cycling) or public transport.  This is anticipated to lead to positive effects for this SEA topic,
through a reduction in vehicle emissions and noise pollution, which will support air and
noise quality in Renfrewshire.  However, Policies under these themes which require the
development of new infrastructure (such as Active Travel – Policy 1, and Public Transport
and Shared Mobility – Policy 2) are likely to result in minor temporary adverse effects on
local air quality and noise levels from construction activities.  Standard mitigation in a
Construction Environment Management Plan (CEMP) would help reduce these temporary
adverse effects. 
Policies that focus on the decarbonisation of vehicles in Renfrewshire (such as Road
Network and Freight – Policy 2 and Environment – Policy 1 / Action ENV1) will also help
reduce air pollution in the council area, and lead to beneficial effects.
Policies designed to make the existing road network more efficient (such as Road Network
and Freight – Policies 1 and 2) and safer (Road Safety – Policies 1 and 2) may also lead to
improvements to local air quality and noise levels through a reduction in idling traffic and
speeding.   
Finally, through Environment - Policy 1 (and Action ENV1), the LTS acknowledges the
importance of continued air quality monitoring in the council area, directly addressing air
quality issues. It is noted that the Scottish Government and SEPA, on the basis of
monitoring data from 2023 confirming there continue to be no air quality exceedances in
Renfrewshire, approved a report in November 2024 to revoke all three of Renfrewshire’s Air
Quality Management Areas in Paisley town centre, Johnstone High Street and Renfrew
town centre. A Revocation Report and associated AQMA Revocation Orders were presented

Page 312

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  79
PUBLIC
to and approved by Renfrewshire Council’s Infrastructure, Land and Environment Policy
Board in March 2025. As such, there are no longer any AQMAs within Renfrewshire Council,
with the council meeting all air quality objectives. 
The Scottish Government recommends that where AQMAs are no longer required that local
authorities prepare an Air Quality Strategy to replace the Air Quality Action Plan (which has
served its purpose), with some of the measures from the action plan being carried forward
into the strategy. The Council are currently developing this Air Quality Strategy which will
be approved by the Policy Board prior to publication.
Overall, positive significant effects are considered likely under this SEA topic.
5.4.2. Biodiversity, Flora and Fauna and Geodiversity
Several policies under a range of themes (including Active Travel, Behaviour Change,
Public Transport & Shared Mobility, Parking, and Digital Technology) work to either
promote active travel or the use of public transport.  This will help limit the number of
vehicles on the road, which would reduce disturbance from vehicles on Renfrewshire’s
fauna and flora (such as road kills, noise disturbance, and air quality improvements).  Other
Policies which support the transition from petrol/diesel vehicles to electric vehicles (such
as Environment – Policy 2, Action ENV2) are considered to also lead to similar beneficial
effects.
Policies that propose the construction of new infrastructure (such as Road Network and
Freight - Policy 1, Parking – Policy 2, and Active Travel - Policy 1) are anticipated to have
mixed direct effects on biodiversity.  The construction of new infrastructure has the
potential to result in permanent damage to habitats or geological sites through, for
example, habitat loss, severance or disturbance, depending on its location.  However, with
the appropriate implementation of LTS actions designed to deliver positive effects for
biodiversity, these policies have the potential to enhance biodiversity habitats through
their design.  These policies are also likely to result in minor temporary adverse effects on
local biodiversity through disturbance from construction activities (such as movement,
noise, and lighting).  However, standard mitigation in a Construction Environment
Management Plan (CEMP) would help to reduce these temporary adverse effects.  
Overall, the LTS is anticipated to have mixed effects on biodiversity, fauna and flora, and
geodiversity.

Page 313

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  80
PUBLIC
5.4.3. Climatic Factors
Several policies under a range of themes (including Active Travel, Behaviour Change,
Public Transport & Shared Mobility, and Parking) work to either promote active travel
modes or the use of public transport.  This is expected to lead to a reduction in the number
of private vehicles on the road.  These, alongside other policies which support the
transition from petrol/diesel vehicles to electric vehicles (such as Environment – Policy 2,
Action ENV2), and a more efficient road network (such as Digital Technology – Policy 1) will
result in beneficial effects with regard to climate change mitigation, by reducing
Renfrewshire’s transport-related carbon footprint.   
However, potential adverse effects may arise from Policies that involve the construction of
new infrastructure (such as Road Network and Freight - Policy 1, Parking – Policy 2, and
Active Travel - Policy 1).  For example, a release of emissions from construction activities
will lead to a short-term increase in greenhouse gas emissions.  Infrastructure projects are
also likely to result in an increase in impermeable surfaces, which can increase local flood
risk.  Therefore, these infrastructure projects should be designed appropriately (for
example, by avoiding areas at high risk of flooding and/or including sustainable drainage
systems in their design) to avoid /mitigate these risks.  This would align with Environment -
Policy 2 and Action ENV3, which aims to improve climate change adaptation and resilience
measures in Renfrewshire. 
Additional adverse effects on climate mitigation may arise from Road Network and Freight
- Policy 1, which focuses on improving the existing road network (and potentially
expanding it).  The Policy may stimulate induced demand for car use through making
private vehicle use more convenient, which would leading to an increase in transport-
related emissions.  This adverse effect, however, may be offset by the Policies which
promote active travel and public transport.  
Overall, the LTS is anticipated to have minor beneficial effects on climatic factors.  
5.4.4. Cultural Heritage
Several policies under a range of themes (including Active Travel, Behaviour Change,
Public Transport & Shared Mobility, and Parking) work to either promote active travel
modes or the use of public transport.  These can all enhance access to cultural heritage
sites by making them more accessible to the public.  In addition, a shift from private
vehicles to active travel / public transport would have beneficial effects on the fabric and

Page 314

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  81
PUBLIC
setting of heritage assets, by reducing noise, visual, and air pollution, and the direct effects
from transport such as vibration. 
However, there is also a potential risk that construction activities through the development
of new infrastructure associated several policies (such as Road Network and Freight -
Policy 1, Parking – Policy 2, and Active Travel - Policy 1), could lead to the destruction or
alteration of historic sites and their setting.  Careful planning and consultation with
heritage bodies are necessary to mitigate these risks.
Overall, the LTS is anticipated to have minor beneficial effects on cultural heritage.
5.4.5. Soil and Water Resources
There is potential for adverse effects from construction activities on local soil and water
resources associated with several policies that include the development of infrastructure
(such as Road Network and Freight - Policy 1, Parking – Policy 2, and Active Travel - Policy
1).  Depending on its location, new infrastructure could lead to the permanent loss of
agricultural land.  Additionally, construction activities could lead to soil compaction,
erosion, and increased runoff, and potential water contamination.  Mitigation measures,
such as using permeable surfaces, considerate construction practices, and incorporating
green infrastructure, will be important to minimise these impacts.
Positive effects are anticipated from the Policies under the Environment theme. 
Environment - Policy 1 supports measures to create a healthier and greener environment,
which includes LTS actions which will support the conservation of soil and water resources
(although no explicit reference to soil and water resources is included).  Additionally,
Environment - Policy 2 involves implementing climate change adaptation and resilience
measures, which can protect soil and water resources from extreme weather events and
associated erosion and flooding.
Overall, the LTS is anticipated to have mixed effects on soil and water resources.
5.4.6. Landscape
All Policies under the Active Travel theme are anticipated to have positive effects on local
landscape and townscape character.  This includes through the promotion of walking and
cycling, which can help to limit the number of cars on the road, and their associated noise
and visual pollution.  Additionally, actions such as extending the cycle path network

Page 315

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  82
PUBLIC
(Action AT1) have the potential to enhance the visual appeal of urban and rural areas by
providing opportunities to create green corridors that integrate with the natural landscape.
Environment - Policy 1 is also anticipated to have positive effects on the landscape, by
supporting measures to create a healthier and greener environment, which would
enhancing the visual quality of the landscape (although this is not explicitly mentioned in
the Policy or any Actions).  
There is, however, potential for adverse effects on landscape character from construction
activities associated several policies (such as Parking – Policy 2 and Active Travel - Policy
1), which could lead to the temporary visual and noise pollution.  Significant adverse
effects may also arise from the design and location of any new infrastructure, which may
not be in keeping with local or townscape landscape character.  This is especially likely for
larger infrastructure projects, such as new road links (such as Road Network and Freight -
Policy 1). 
Overall, the LTS has potential for adverse effects on landscape and townscape character
depending on the location and design of infrastructure schemes, with uncertain effects
concluded in terms of their scope and significance at this stage.
5.4.7. Material Assets
The Active Travel Policies, Public Transport and Shared Mobility Policies, Road Network
and Freight Policies, and Parking Policies all have the potential for adverse effects on
material assets.  The construction and maintenance of new infrastructure, such as cycle
paths (Action AT1), transport hubs (Action PS1), new road links (Action RNF2), and
expanded Park and ride/ mobility hub sites (Action P1), will likely require significant
amounts of non-renewable materials like concrete and asphalt.  
Minor positive effects are anticipated from the Active Travel, Parking, and Public Transport
and Shared Mobility Policies, which aim to reduce the number of cars on the road, thereby
decreasing the wear and tear on existing road infrastructure and reducing the frequency of
their maintenance and associated material use.  
Overall, the LTS is anticipated to have moderate adverse effects on material assets.

Page 316

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  83
PUBLIC
5.4.8. Population and Human Health
All the Active Travel and Behaviour Change Policies are anticipated to have positive effects
on human health by promoting walking and cycling in the council area.  For example,
extending the cycle path network (Action AT1) and prioritising pedestrian safety (Action
AT4) can make active travel more accessible and safer, which can encourage physical
activity and improve overall physical and mental health and wellbeing.  
Policies under the Public Transport and Shared Mobility, Digital Technology, and Parking
themes, will lead to an improvement in the reliability and accessibility of public transport
services across Renfrewshire.  Actions such as enhancing facilities at transport hubs (Action
PS1), examining the need for expansion of Park and ride/ mobility hub facilities (Action P1)
and improving accessibility at rail stations (Action PS5) can make public transport a more
viable option for many people, reducing reliance on private cars.  This will lead to an
overall improved experience using public transport for existing users, supporting
accessibility to services, facilities and amenities.
Additionally, with public or active transport becoming a more accessible choice for
travellers as a result of Policies in the LTS, there may be beneficial effects to locals’
financial wellbeing, through savings on fuel, maintenance, and parking associated with
private vehicle use.
Beneficial effects are also anticipated from the creation of jobs in the construction sector
due to the development of new infrastructure such as cycle paths (Action AT1), transport
hubs (Action PS1), and new road links (Action RNF2).  However, it is important to
acknowledge that construction activities may also lead to temporary adverse effects,
including noise, disruption to services, and general inconvenience for residents. 
Overall, the LTS is anticipated to have significant positive effects on population and human
health.
5.5. Cumulative Effects with Other Plans and Strategies
Adverse cumulative effects may arise from construction activities associated with new
infrastructure proposed in other plans and strategies, which could strain local resources
and infrastructure, and lead to increased traffic congestion and a temporary reduction in
the quality of life for residents.

Page 317

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  84
PUBLIC
Additionally, the cumulative effect of multiple infrastructure projects could exacerbate
local environmental degradation.  For example, increased impermeable surfaces from new
roads, parking facilities, and buildings could lead to higher runoff and potential water
contamination.  The loss of green spaces and habitats from projects delivered through
other plans/strategies alongside the LTS could also negatively impact local biodiversity
and ecosystem services.
To mitigate these adverse cumulative effects, it will be important to coordinate the
implementation of the LTS with other local plans/ strategies, and to engage with locals
through consultation events.  Additionally, promoting sustainable practices, such as using
renewable materials, coupling infrastructure development with the delivery of green
infrastructure, and encouraging low-emission transport options, can help reduce the
overall impact on the environment and communities.  With these in place, no significant
adverse cumulative effects are anticipated from the LTS. 
Positive cumulative effects across the SEA topics are anticipated as a result of the
cumulative effects of the LTS and other plans and strategies.  In this respect, many of the
Policies complement and reinforce the objectives and actions of Scotland’s NTS2, 2020
Environment Strategy for Scotland, Climate Change Plan, National Strategy for Economic
Transformation, NPF4 and other key plans and strategies nationally.
5.6. Recommendations for Implementation of the LTS
A number of recommendations can be made at this stage in relation to each of the SEA
topics.  The following table therefore highlights a number of recommendations which
should be considered during the development and implementation of schemes and LTS
actions proposed for delivery through the LTS.

Page 318

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report 85
PUBLIC
Table 5-1 : Recommendations for Consideration During the Implementation of the LTS
SEA Topic Mitigation and Enhancement Measures for Consideration During the Implementation of the LTS
Air Quality and Noise
Pollution
• Green infrastructure enhancements should be delivered alongside new infrastructure and designed to
support air quality improvements, with a view to reducing exposures of key pollutants.
• Comprehensive monitoring of emissions from transport should be undertaken where significant
changes to the transport network dictate. 
• Any significant road infrastructure changes should be assessed, if merited, by means of an air quality
assessment modelling the impact of the proposal on air quality and nearby receptors prior to
progression with the measures. The Institute of Air Quality Management’s publication titled ‘Guidance
on land-use planning and development control: Planning for air quality 2017 v1.2’, should be referred
to. This provides useful information on whether an air quality assessment is merited, depending on
the scale of the development and its potential impact on relevant receptors. The Renfrewshire Council
Environmental Improvements team should be consulted on proposed infrastructure measures and
can provide advice as to whether an AQA is required. 
Biodiversity, Flora and
Fauna, and
Geodiversity
• Potential impacts on biodiversity and habitats (including ancient woodland) should be considered
during scheme development, avoidance and mitigation measures implemented, and opportunities
for maximising for positive effects on biodiversity.
• Opportunities to enhance ecological networks through appropriate planting and green infrastructure
enhancements should be sought, supporting positive effects for biodiversity and delivering
multifunctional benefits. 
• Nature-based solutions should be incorporated into works associated with LTS actions wherever
possible.
• New and improved lighting and signage should be designed to minimise impacts on nocturnal
species.

Page 319

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  86
PUBLIC
SEA Topic Mitigation and Enhancement Measures for Consideration During the Implementation of the LTS
• Development of a programme of works to help ensure that designated sites for biodiversity
conservation, affected by significant changes to the transport network, are brought into favourable
condition.
Climatic Factors  • Comprehensive monitoring of emissions from transport should be undertaken where significant
changes to the transport network dictate.
• The use of permeable surfacing and integration of renewable energy sources (such as solar panels)
should be prioritised in scheme design.
• Transport proposals should seek to incorporate green infrastructure into scheme design.  This would
lead to beneficial effects, acting as sinks for CO2 (climate change mitigation) and can play a role in
reducing the urban heat island effects (climate change adaptation).
Cultural Heritage  • Potential impacts on the historic environment should be appropriately considered at scheme design.
• The significance of both designated and undesignated heritage assets should be a key consideration
in scheme development.
• New transport infrastructure should be designed to facilitate enhancements to the fabric and setting
of the historic environment.
• Opportunities for enhancing access to and promoting understanding of the historic environment
should be sought.
• Maintenance regimes should seek to facilitate enhancements to the fabric and setting of designated
and undesignated features and areas of historic environment interest.
• Renfrewshire’s archaeological resource should be a key consideration in the development of transport
schemes.
Soil and Water
Resources
• New infrastructure should be supported by permeable surfaces and appropriate drainage systems
where necessary, to reduce surface water run-off and maintain or improve attenuation rates.

Page 320

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  87
PUBLIC
SEA Topic Mitigation and Enhancement Measures for Consideration During the Implementation of the LTS 
• Provision of sustainable drainage systems, including through green and blue infrastructure provision
should be sought where possible alongside new transport infrastructure. 
• Implementing erosion control measures during construction can also help to protect soil and water
resources. 
Landscape  • New infrastructure should be designed to facilitate enhancements to the quality of the public realm
and landscape, townscape and villagescape character. 
• Transport infrastructure delivery should avoid the loss of existing trees and landscape features where
possible.
• Green infrastructure enhancements should be sought alongside new and enhanced transport
infrastructure provision.
• Maintenance regimes should seek to facilitate enhancements to local character.
• Low noise surfacing should be integrated in new transport provision and maintenance regimes. 
Material Assets  • Schemes associated with proposals should seek to limit waste arisings during construction.
• Schemes should seek to incorporate the use of reused and recycled materials.
• Scheme design should seek to extend project life and reduce future maintenance requirements
through the use of longer-life materials.
Population and
Human Health 
• Incorporate road safety schemes within scheme development for vulnerable road users.
• Encourage design which supports the needs of mobility-impaired and vulnerable groups.
• Opportunities to encourage inward investment and growth in areas of improved sustainable transport
access should be sought.
• Coupling new active travel infrastructure with new green infrastructure, such as parks and green
corridors, can provide additional mental health benefits by creating pleasant and stress-relieving
environments for physical activity.

Page 321

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report 88
PUBLIC
6. Proposed Monitoring Programme
6.1. Monitoring in SEA
Monitoring in SEA is a means of evaluating the environmental performance of the plan or
strategy and monitoring compliance through its implementation.  It is also a way to check
whether the effects predicted in the SEA arise as envisaged, or whether unforeseen issues
arise.   
Monitoring can help to evaluate whether a plan or strategy is fulfilling its core objective of
delivering sustainable development and providing for a high level of environmental
protection.  The gathered information provides a basis to inform the review and
preparation of subsequent iterations of plans, strategies and projects that sit within them,
thus better informing future decisions.
Measuring indicators over time can identify long-term positive or negative changes in the
environment and can build knowledge on how these trends will affect (or will be affected
by) the implementation of the plan or strategy itself.  In this respect monitoring
environmental changes occurring during the LTS’ implementation phase can help to
identify the need for additional mitigation measures or for appropriate remedial action to
be undertaken where issues are identified, as well as to inform project-level assessments.
6.2. Proposed SEA Monitoring Programme for the LTS
Schedule 2 of the 2005 Act highlights that the Environmental Report should include “a
description of the measures envisaged concerning monitoring.”  In response to this, this
Environmental Report presents a proposed draft monitoring programme for measuring the
LTS actions’ implementation.  It draws on the identified potential significant effects
identified through the assessment of the various components of the LTS actions and
suggests where monitoring is required to help ensure that the potential benefits of the
actions are effectively achieved through implementation.  This will enable appropriate
interventions to be undertaken if monitoring highlights negative or underperforming
trends relating to the actions’ implementation. 
The proposed indicators are designed to be integrated within Renfrewshire Council’s own
monitoring programme for the LTS.

Page 322

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  89
PUBLIC
Table 6-1 therefore outlines monitoring proposals for measuring the implementation of
the LTS from the SEA perspective.  It pays particular attention to the areas where the SEA
has identified potential significant effects and also suggests where monitoring is required
to help ensure that the positive effects of the LTS actions are achieved through
implementation.  It includes:
• The significant effect or environmental change to be monitored.
• The SEA topic(s) to which the monitoring proposal relates.
• The indicator to be monitored.
• The source of information and frequency of monitoring; and
• The trigger for where intervention should take place if monitoring suggests it is
required.
The proposed indicators are designed to be integrated within Renfrewshire Council’s own
monitoring programme for the LTS.
Intervention may be triggered if monitoring indicates that mitigation measures embedded
within the plan (or in subsequent transport-related projects) are not functioning as
expected.  This allows for adjustments to help prevent significant deterioration.

Page 323

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  90
PUBLIC
Table 6-1: Proposed SEA monitoring
Significant Effect/
Environmental Change
to be Monitored
SEA Topic(s) Indicator Data Source Frequency Trigger for
Intervention
Impact of LTS actions
on designated habitats
close to the transport
network
Biodiversity,
Fauna and
Flora, and
Geodiversity 
Condition
of
designated
site
assessment
findings
Renfrewshire
Council
Annual When designated
sites near to new
infrastructure
show a
deterioration in
quality
Impact of LTS actions
on water quality
Soil and
Water
Resources
Waterbody
assessment
findings
Renfrewshire
Council
Annual When an increase
in pollutants from
construction
activities, and
pollutants from
vehicles are
present in
waterbodies 
Impacts on landscape
character
Landscape Landscape
character
assessment
findings
Renfrewshire
Council
Ongoing Where landscape
character
assessment
suggests
significant change
has taken place
Impacts on carbon
emissions
Climatic
Factors
Greenhous
e gas
emission
statistics
Renfrewshire
Council
Annual Where annual
transport
emissions rise
Impacts on local air
quality 
Air Quality
and Noise
Pollution
Monitoring
at air
quality
stations in
the council
area 
Renfrewshire
Council
Annual When there is an
increase in
pollutants related
to air quality

Page 324

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  91
PUBLIC
7. Next Steps
This Environmental Report was consulted on alongside the draft version of the LTS.
Following the completion of the consultation period in Summer 2025, comments were
reviewed and analysed.  
Part 3 of the Environmental Assessment (Scotland) Act 2005 requires that a ‘statement’ be
made available to accompany the LTS, as soon as possible after their adoption.  The
purpose of the SEA Adoption Statement is to outline how the SEA process has influenced
and informed the LTS’ development process and demonstrate how consultation on the
SEA has been taken into account.  
To meet these requirements, an SEA Adoption Statement will be published to sit alongside
the adopted LTS actions.  The SEA Adoption Statement will set out: 
• the reasons for choosing the preferred LTS actions in light of other reasonable
alternatives; 
• how environmental considerations were integrated into the LTS actions’
development process;
• how consultation responses were taken into account; and
• the measures decided for monitoring the significant effects of the LTS actions.

Page 325

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  92
PUBLIC
Appendix A: Scoping Report
See accompanying documents

Page 326

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Draft Environmental Report 93
PUBLIC
Appendix B: Consultee Responses
Consultation response How the response was considered
and addressed
NatureScot 
NatureScot is content with the scope and level of detail proposed for the environmental report.  Comment noted.
Comments on the scoping report are:
• Page 11, 4.8 should read “Whinnerston – comprises two areas of unimproved natural
grassland.”
• Page 11, 4.10 “There are 96 LNRs in Scotland.”
• Page 12, 4.12 mentions Local Nature Conservation Sites.
• Page 12, there is no mention of Clyde Muirshiel Regional Park.
• Page 13, 4.16 should read “Renfrewshire’s habitat networks and opportunity areas are shown
in Figure 4-3 at the end of this chapter.”
• Page 16 Figure 4-1 shows Sites of Importance for Nature Conservation which are not
mentioned anywhere else in the report. SINCs are often referred to as Local Nature
Conservation Sites now and would naturally appear in Figure 4.2 instead.
• Page 17 Figure 4.2 does not show Clyde Muirshiel Regional Park. It maps Biodiversity Sites
which are not mentioned anywhere else in the report.
• Page 18 Figure 4-3 should be titled Habitat Networks and Opportunity Areas in Renfrewshire
and, in the legend, Habitat Networks instead of Habitat and Networks.
• Page 54 Population and human health, third bullet should read “Improve access to high
quality green networks”.
Scoping Report updated to reflect
comments. 
NatureScot notes that no period is proposed for consultation on the Environmental Report. We
would expect a minimum of 6 weeks.
Comment noted. The consultation
period will be 6 weeks.

Page 327

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  94
PUBLIC
Scottish Environment Protection Agency 
Relationship with other Plans, Policies and Strategies (PPS) 
Some of the PPS included have themselves been subject to SEA. Where this is the case, you may
find it useful to prepare a summary of the key SEA findings that may be relevant to the Transport
Strategy. This may assist you with data sources and environmental baseline information and
also ensure the current SEA picks up environmental issues or mitigation actions which may
have been identified elsewhere.
Comment noted.
Baseline information 
SEPA holds significant amounts of environmental data which may be of interest to you in
preparing the environmental baseline, identifying environmental problems, and summarising
the likely changes to the environment in the absence of the PPS, all of which are required for the
assessment. Many of these data are now readily available on SEPA’s website. 
Additional local information may also be available from our Access to Information unit
(foi@sepa.org.uk). 
Other sources of data for issues that fall within SEPA’s remit are referenced in our SEA topic
guidance notes for air, soil, water, material assets, climatic factors and human health. 
Please note that reference should be made to the SEPA Future Flood Maps, which are effectively
a spatial representation of the flood risk area, defined in NPF4 land or built form with an annual
probability of being flooded of greater than 0.5% which must include an appropriate allowance
for future climate change. We therefore recommend changing Figure 5-3. 
Comment noted. Environmental data
and guidance will be used to inform
the assessments in the Environmental
Report.

Page 328

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  95
PUBLIC
We provided the council with a list of Evidence Report Sources for the preparation of the Local
Development Plan (LDP). These can also be used for the SEA Baseline information. You can
contact your LDP colleagues to discuss. 
Environmental problems 
We consider that the environmental problems described generally highlight the main issues of
relevance for the SEA topics within our remit.
Comment noted.
Alternatives 
We note that alternatives are still being considered. Any reasonable alternatives identified
during the preparation of the plan should be assessed as part of the SEA process and the
findings of the assessment should inform the choice of the preferred option. This should be
documented in the Environmental Report.
Reasonable alternatives are assessed
in the Environmental Report (see
Chapter 4).
Scoping in / out of environmental topics 
We agree that in this instance all environmental topics should be scoped into the assessment.
Comment noted.
Methodology for assessing environmental effects 
The proposed methodology for the assessment has not been defined yet. A common method is
to use a matrix with a scoring system identifying effects which are significant positives (++),
positive (+), neutral (0), unknown (?), negative (-) or significant negative (--), or a combination of
them, as appropriate (e.g. +/-). 
Including a commentary section within the matrices in order to state, where necessary, the
reasons for the effects cited and the score given helps to fully explain the rationale behind the
Comment noted.

Page 329

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  96
PUBLIC
assessment results. This allows the Responsible Authority to be transparent and also allows the
reader to understand the rationale behind the scores given. 
Where it is expected that other plans, programmes or strategies are better placed to undertake
more detailed assessment of environmental effects this should be clearly set out in the
Environmental Report. 
We expect all aspects of the PPS which could have significant effects to be assessed.
6.5 We support the use of SEA objectives as assessment tools as they allow a systematic,
rigorous and consistent framework with which to assess environmental effects. 
When it comes to setting out the results of the assessment in the Environmental Report, please
provide enough information to clearly justify the reasons for each of the assessments presented.
It would also be helpful to set out assumptions that are made during the assessment and
difficulties and limitations encountered. 
It is helpful if the assessment matrix directly links the assessment result with proposed
mitigation measures such as in the example provided. 
We are content with the proposed SEA objectives to be used in the assessment.
Mitigation and enhancement 
We encourage you to use the assessment as a way to improve the environmental performance
of individual aspects of the final option; hence we support proposals for enhancement of
positive effects as well as mitigation of negative effects. 
It is useful to show the link between potential effects and proposed mitigation / enhancement
measures in the assessment framework. 
Comment noted.

Page 330

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  97
PUBLIC
We encourage you to be very clear in the Environmental Report about mitigation measures
which are proposed as a result of the assessment. These should follow the mitigation hierarchy
(avoid, reduce, remedy or compensate). 
One of the most important ways to mitigate significant environmental effects identified through
the assessment is to make changes to the plan itself so that significant effects are avoided. The
Environmental Report should therefore identify any changes made to the plan as a result of the
SEA. 
Where the mitigation proposed does not relate to modification to the plan itself then it would
be extremely helpful to set out the proposed mitigation measures in a way that clearly identifies:
(1) the measures required, (2) when they would be required and (3) who will be required to
implement them. The inclusion of a summary table in the Environmental Report such as that
presented below will help to track progress on mitigation through the monitoring process.
Monitoring 
Although not specifically required at this stage, monitoring is a requirement of the Act and early
consideration should be given to a monitoring approach particularly in the choice of indicators.
It would be helpful if the Environmental Report included a description of the measures
envisaged to monitor the significant environmental effects of the plan. 
Comment noted.
Consultation period 
It is not clear from the scoping report the specific time period proposed for consultation on the
Environmental Report. This period should be agreed with the Consultation Authorities at the
scoping stage. Accordingly, we would welcome further dialogue with you in order to agree an
appropriate timeframe. Typical consultation periods range from 6-12 weeks depending on the
content and nature of the plan. The consultation period must offer the Consultation Authorities
and the public an early and effective opportunity to express their views and opinions.
Comment noted. The consultation
period will be 6 weeks.

Page 331

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  98
PUBLIC
Outcomes of the Scoping exercise 
We would find it helpful if the Environmental Report included a summary of the scoping
outcomes and how comments from the Consultation Authorities were considered. 
We welcome proposals for the inclusion of a summary of how the comments provided by the
Consultation Authorities at the Scoping stage have been taken into account in the preparation
of the Environmental Report.
Comment noted. This table has been
included to capture consultee
comments.
Historic Environment Scotland 
We note that the historic environment has been scoped into the assessment, and we are
content to agree with this. In terms of the approach to the assessment, on the basis of the
information provided we are satisfied with the scope and level of detail proposed and have
given our detailed comments below.
Comment noted.
We welcome the review of the relevant historic environment plans, programmes and strategies
set out here. We would simply note that, while they are both included in this section, Our Place
in Time has now been superseded by Our Past Our Future.
Reference to Our Place in Time
removed from the Scoping Report.
We welcome the baseline provided for the historic environment and the early consideration of
the potential interactions between these assets and the policies and actions associated with the
strategy. The summary is focused on the avoidance of harm on historic environment assets and
their setting, and this is to be welcomed. However, we would also note that often elements of
our transport infrastructure are historic environment assets in themselves such as railway
stations, bridges, former branch railway lines, bridges, core paths and historic ways and often
contribute to our sense of place and active travel network. Investment and maintenance in such
assets can also be considered a benefit to the historic environment. 
In terms of other key issues noted in this section we welcome the recognition of the role that the
transport strategy can play in supporting access to the historic environment.
Comment noted.  These assets
associated with transport
infrastructure will be considered in
the Environmental Report
assessments.

Page 332

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Environmental Report  99
PUBLIC
Little detail is offered on the methodological approach for the assessment. However, we note
that SEA objectives have been developed in order to test potential strategy content against. In
considering the presented objectives for the historic environment we are satisfied that these will
provide an appropriate framework for the assessment. Where the assessment points to
potential significant effects mitigation, enhancement and monitoring proposals should be put
forward where appropriate.
Comment noted.
We note that no specific timescale has been set out for consultation on the strategy and its
associated environmental report. We would advise a minimum consultation period of 6 weeks. 
For our purposes the consultation period starts when the SEA Gateway receives the relevant
documents.
Comment noted. The consultation
period will be 6 weeks.

Page 333

SEA for Renfrewshire Local Transport Strategy 2025-2035 – Draft Environmental Report 100
PUBLIC 
Environment, Housing and Infrastructure
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR

Page 334

1 
Travel Renfrewshire 2035
Renfrewshire Council Local Transport
Strategy 2025-2035
Main Issues Report
PUBLIC

Page 335

Renfrewshire Local Transport Strategy – Main Issues Report 2
Table of Contents
1. Introduction ....................................................................................... 4
1.1. Introduction .......................................................................................... 4
1.2. Report Structure .................................................................................... 4
2. Policy Context .................................................................................... 5
2.1. Introduction .......................................................................................... 5
2.2. Policy Context........................................................................................5
2.3. Summary.............................................................................................30
3. Data, Transport and Travel Context................................................. 31
3.1. Introduction........................................................................................31
3.2. Socio Economics and Socio Demographics ....................................... 31
3.3. Travel and Transport...........................................................................40
3.4. Environmental ..................................................................................... 62
3.5. Summary ............................................................................................. 62
4. Engagement and Consultation ........................................................ 64
4.1. Online Survey ...................................................................................... 64
4.2. Interactive Map .................................................................................... 67
4.3. Supermarket Events ............................................................................ 68
PUBLIC

Page 336

Renfrewshire Local Transport Strategy – Main Issues Report 3
4.4. Elected Members Workshop ............................................................... 70
4.5. Stakeholder Workshops ...................................................................... 72
4.6. In Person Workshops ........................................................................... 75
4.7. Summary ............................................................................................. 77
5. Problems and Opportunities ........................................................... 78
5.1. Problems ............................................................................................. 78
5.2. Opportunities ...................................................................................... 80
6. Summary .......................................................................................... 84
PUBLIC

Page 337

Renfrewshire Local Transport Strategy – Main Issues Report 4
1. Introduction
1.1. Introduction
Renfrewshire’s Local Transport Strategy (LTS) is being updated and follows on from a
refresh of the previous strategy in 2017. The new LTS, also referred to as Travel
Renfrewshire 2035, will set the future direction of transport and travel within Renfrewshire
for a ten-year period up to 2035. It will develop a Vision, Priorities and Objectives and will
set out an Action Plan by which to achieve these. 
In line with recently published Local Transport Strategy Guidance, in developing an LTS,
local authorities may refer to the principles of Scottish Transport Appraisal Guidance
(STAG). The development of the LTS has followed STAG principles and includes: transport
related problem and opportunity identification, which has been informed by a review of
transport and travel data to set the wider context and to provide background information
on the study area; an extensive round of stakeholder engagement and public consultation
to further inform problems and opportunities, as well as to identify potential options;
development of a Vision, Priorities and Objectives; and ultimately development of an
Action Plan. Following STAG principles helps to make sure that a robust process has been
followed and that meaningful actions which address the needs of the area are identified. 
This Main Issues Report sets out the policy context of the LTS and provides an evidence
base for the key transport and travel related problems and opportunities in Renfrewshire,
as well as providing details of engagement that has been undertaken. This Main Issues
Report sits alongside the Draft LTS document.  
1.2. Report Structure
This report sets out background information and summarises problems and opportunities
which have been used to inform the LTS for Renfrewshire. This Main Issues Report has the
following structure:
• Chapter 2 - Policy Context
• Chapter 3 - Data, Transport and Travel Context
• Chapter 4 - Engagement
• Chapter 5 - Problems and Opportunities
• Chapter 6 - Summary
PUBLIC

Page 338

Renfrewshire Local Transport Strategy – Main Issues Report 5
2. Policy Context
2.1. Introduction
This chapter sets out the policy context in which the LTS sits.
2.2. Policy Context
The previous 2007 LTS was refreshed in 2017 and since then there have been significant
updates to the policy context, including publication of the second National Transport
Strategy (NTS2) in 2020, and publication of the Strathclyde Partnership for Transport’s
updated Regional Transport Strategy in 2024. Both documents reflect a shift in policy at
the national and regional level, in particular to address climate change, with a Climate
Emergency declared by the Scottish Government in 2019 (Scotland’s Response to The
Global Climate Emergency); as such, there is an expectation that any interventions or
measures take cognisance of the potential impact on tackling climate change.
The key policy context at the national, regional and local levels for the new LTS is shown in
Figure 1.
PUBLIC

Page 339

Renfrewshire Local Transport Strategy – Main Issues Report 6
Figure 1: Summary of Key Policy and Strategy Documents and Legislation Reviewed
PUBLIC

Page 340

Renfrewshire Local Transport Strategy – Main Issues Report   7
2.2.1. National
2.2.1.1.    National Transport Strategy 2 (NTS2) (2020) 
The second National Transport Strategy (NTS2), published by Transport Scotland in
February 2020, provides the national transport policy framework, setting out a clear vision
of a sustainable, inclusive, safe and accessible transport system which helps deliver a
healthier, fairer and more prosperous Scotland for communities, businesses and visitors. It
sets out four key priorities to support that vision: reducing inequality; taking climate action;
helping deliver inclusive economic growth; and improving health and wellbeing.
The Strategy presents the vision for Scotland’s transport system over the next 20 years,
which is: “We will have a sustainable, inclusive, safe and accessible transport system,
helping deliver a healthier, fairer and more prosperous Scotland for communities,
businesses and visitors.”
The NTS2 is set within the context of a climate emergency, with the Scottish Government
committed to transitioning the transport system to one that is net zero in carbon
emissions by 2045. Set against a backdrop of increasing amounts of travel in Scotland over
recent years, particularly vehicular travel, the NTS2 clearly articulates the need for change
in transport provision in Scotland. 
The overall vision of NTS2 is underpinned by four priorities and each priority is expressed
through a set of three outcomes, as listed below.
• Reduces inequalities
o Will provide fair access to services we need
o Will be easy to use for all
o Will be affordable for all
• Takes climate action
o Will help deliver our net zero target
o Will adapt to the effects of climate changes
o Will promote greener, cleaner choices  
PUBLIC

Page 341

Renfrewshire Local Transport Strategy – Main Issues Report   8
• Helps deliver inclusive economic growth
o Will get people and goods to where they need to get to
o Will be reliable. Efficient and high quality
o Will use beneficial innovation
• Improves our health and wellbeing
o Will be safe and secure for all
o Will enable us to make health travel choices
o Will help make our communities great places to live
The Sustainable Investment Hierarchy is also captured in NTS2 and should be used to
inform investment decisions. Investment aimed at reducing the need to travel
unsustainably sits at the top of the hierarchy, followed by: investment aimed at
maintaining and safely operating existing assets, taking due consideration of the need to
adapt to the impacts of climate change; investment promoting a range of measures,
including innovative solutions, to make better use of existing capacity, ensuring that
existing transport networks and systems are fully optimised (these may include
technology-based, regulatory, fiscal or value engineering solutions to asset renewals); and
investment involving targeted infrastructure improvements. The Sustainable Travel
Hierarchy is also captured in NTS2, which sets out how modes should be prioritised: 
• Walking and Wheeling
• Cycling; 
• Public Transport; 
• Taxis and Shared Transport; 
• Private Cars 
NTS2 is accompanied by annual Delivery Plans, the third of which covers the period 2023
to 2024. The Third Delivery Plan outlines actions to help deliver the priorities and
outcomes of NTS2 and thus supports the need for attractive, affordable and accessible
sustainable travel options. The latest delivery Plan includes references to several national
schemes which would impact upon Renfrewshire, including the Fair Fares Review, which
aims to support a sustainable and integrated approach to public transport fares, and to
help ensure appropriate roads in built up areas have a safer speed limit of 20 mph. 
PUBLIC

Page 342

Renfrewshire Local Transport Strategy – Main Issues Report   9
2.2.1.2.    Strategic Transport Projects Review 2 (STPR2) (2022)
STPR2 will be used to inform the Scottish Government’s transport investment programme
in Scotland over a 20 year period (2022-2042) and will help deliver the vision, priorities and
outcomes for transport set out in the NTS2. The outcomes will aim to: Enhance
accessibility across Scotland for residents, visitors and businesses; Create better
connectivity with sustainable, smart and cleaner transport options; and highlight the vital
contribution that transport investment can play in enabling and sustaining Scotland’s
economic growth. 45 recommendations were published in December 2022, broadly
grouped into six themes: Improving Active Travel Infrastructure; Influencing Travel Choices
and Behaviour; Enhancing Access to Affordable Public Transport; Decarbonising Transport;
Increasing Safety and Resilience on the Strategic Transport Network; and Strengthening
Strategic Connections. A Case for Change specific to the Glasgow City Region (inclusive of
Renfrewshire) was developed and is discussed under the Regional section. 
2.2.1.3.    Climate Change Plan (2018-2032)
The Scottish Government published “Securing a Green Recovery on a Path to Net Zero:
Update to the Climate Change Plan 2018–2032” in December 2020, which reflects the
ambition of new targets set in the Climate Change (Emissions Reduction Targets)
(Scotland) Act 2019. This comprises the reduction of Scotland’s greenhouse gas emissions
to net zero by 2045. 
The Plan notes how recent transportation trends such as more widespread home working
and the focus of land-use planning on 20-minute neighbourhoods can be capitalised on to
help enable targets to be met. The Plan states that: “By 2032 our roads will contain no new
petrol and diesel cars and vans; we will have decarbonised our passenger railways; and we
will have begun work to decarbonise challenging transport modes such as HGVs, ferries
and aviation. Car kilometres will have reduced by 20%, and sustainable transport will be
the instinctive first choice for people.” The target to reduce car kilometres by 20% by 2030
(against a 2019 baseline) is one of the key targets contained within the Plan. 
2.2.1.4.    Climate Change (Emissions Reduction Targets) (Scotland) Bill 2024 
The Climate Change (Emissions Reduction Targets) (Scotland) Bill 2024 was passed by the
Scottish Parliament on 05 November 2024. It amends the Climate Change (Scotland) Act
PUBLIC

Page 343

Renfrewshire Local Transport Strategy – Main Issues Report   10
2009 (subsequently amended by the Climate Change (Emissions Reduction Targets)
(Scotland) Act 2019), by introducing a system of carbon budgets, which set limits on
greenhouse gas emissions. Key features of the Bill include: 
• Carbon Budgets: These budgets will cover every year from 2026 to the net zero target
year of 2045, ensuring a structured approach to emissions reduction. 
• Net Zero Target: The Bill maintains the target of achieving net zero emissions by 2045. 
• Climate Change Plan: A new Climate Change Plan will be required, aligning with the
carbon budgets. 
• Annual Reporting: The Bill continues the requirement for annual reporting on
greenhouse gas emissions and progress towards meeting the carbon budgets.
2.2.1.5.   Reducing car use for a healthier, fairer and greener Scotland: A route map to achieve a
20 per cent reduction in car kilometres by 2030 (2022)
In January 2022, the Scottish Government and the Convention of Scottish Local Authorities
(COSLA) developed a Route Map (Reducing Car Use for a Healthier, Fairer and Greener
Scotland) to deliver the shift in travel behaviours required to meet the 20% reduction
target set out in the Climate Change Plan, recognising the need for ongoing collaboration
and partnership working between national, regional and local Government as well as
public, private and third sector partners.
The behavioural changes identified in the Route Map are centred around: reducing the
need to travel; living well locally; switching modes; and combining or sharing car trips. A
number of interventions are identified around reducing the need to travel and the route
map notes that digital transformation can help reduce the need to travel through remote
working and by enabling businesses and people to access services and networks online.
Successful implementation of the actions set out in the Route Map are expected to enable
statutory climate change targets to be met, whilst at the same time creating better ways of
living, improved health and wellbeing and the associated social and economic benefits of
a society less dominated by private cars. 
PUBLIC

Page 344

Renfrewshire Local Transport Strategy – Main Issues Report   11
2.2.1.6.    Transport Scotland’s Approach to Climate Change Adaptation & Resilience
Transport Scotland’s Approach to Climate Change Adaptation and Resilience (ACCAR)
outlines the key climate risks affecting Scotland’s transport system and sets strategic
outcomes for road, rail, aviation, and maritime networks.
The vision Transport Scotland uses for its approach to climate change adaptation
highlights the need for a transport system that “is well adapted and prepared for current
and future impacts of climate change”, whilst being resilient and reliable for everyday
journeys despite any disruptions from weather. To achieve this vision, strategic outcomes
for individual sectors of the transport system are set out. They are listed as follows:
• Trunk Roads - Trunk Roads which are well adapted and resilient to the current,
projected and unexpected impacts of climate change.
• Rail Network - Supporting the delivery of climate change adaptation and resilience for
Scotland’s Rail network.
• Aviation Network - Engaging with aviation stakeholders to support their decision
making in relation to climate change adaptation and resilience.
• Maritime Network - Contributing to safeguarding lifeline ferry services, ports, harbours
and canals in response to the threat of climate change.
2.2.1.7.    A Network Fit For The Future: Vision for Scotland’s Public Electric Vehicle Charging    
Network
A Network Fit for the Future sets out a vision that includes the key elements necessary to
create a sustainable public charging network for electric cars and vans in Scotland. It is
hoped that this will help guide action by public, private and third-party groups in the
further development of Scotland’s public electric vehicle charging network.
The vision included in the document covers different key areas which will be needed to
enhance the public electric vehicle charging network. These different components are
presented below:
• Local communities, businesses and visitors have access to a well-designed,
comprehensive and convenient network of public charge points, where these are
needed.
• The public electric vehicle charging network works for everyone regardless of age,
health, income or other needs.
PUBLIC

Page 345

Renfrewshire Local Transport Strategy – Main Issues Report   12
• Scotland has attracted private sector investment to grow and sustain the public
electric vehicle charging network.
• The public charging network is powered by clean, renewable energy and drivers benefit
from advancements in energy storage, smart tariffs and network design.
• People’s first choice wherever possible is active travel, shared or public transport with
the location of electric vehicle charge points supporting those choices.
2.2.1.8.    Let’s Get Scotland Walking The National Walking Strategy, Action Plan 2016-2026
The National Walking Strategy was one of the first of its kind to be introduced across the
world, with a vision for a “Scotland where everyone benefits from walking as part of their
everyday journeys, enjoys walking in the outdoors and where places are well designed to
encourage walking.” The document sits within a wider strategy context of the National
Performance Framework, with walking a key component on aiding the delivery of
outcomes within this framework.
The National Walking Strategy incorporates two key strategic aims which are as follows:
• Strategic Aim 1 - To deliver on creating a culture of walking where everyone walks more
often as part of their everyday travel and for recreation and wellbeing.
• Strategic Aim 2 - To achieve better quality walking environments with attractive, well
designed and managed built and natural spaces and places for everyone.
Within the outlined strategic aims sit delivery themes to aid in their consolidation. For
Strategic Aim 1 for example, delivery themes note how walking supports health and
wellbeing, along with education and communities. 
2.2.1.9.    Active Travel Framework (2023)
The Active Travel Framework is a Transport Scotland document produced with key
delivery partners, with input from Regional Transport Partnerships and local authorities. It
brings together the key policy approaches to improving the uptake of walking and cycling
in Scotland. Central to the Framework is a 2030 Vision for Scotland’s communities to be
shaped around people, with walking or cycling the most popular choice for shorter
everyday journeys. 
PUBLIC

Page 346

Renfrewshire Local Transport Strategy – Main Issues Report   13
The Framework captures a number of active travel outcomes:
• Increase the number of people choosing walking, cycling and wheeling in Scotland  
• High quality walking, cycling and wheeling infrastructure is available to all
• Walking, cycling and wheeling is safer for all
• Walking, cycling and wheeling is available to all
• Delivery of walking, cycling and wheeling is promoted and supported by a range of
partners
The outcomes have helped to inform indicators, which will be used to develop a
Monitoring and Evaluation Plan.
2.2.1.10.    Cleaner Air For Scotland 2 (2021)
In July 2021, the Scottish Government published Cleaner Air For Scotland 2: Towards A
Better Place For Everyone and an associated Delivery Plan, for achieving air quality
improvements over the five-year period to 2026, helping to ensure that the vision of
Scotland having the best air quality in Europe is achieved. 
In terms of transport, the Delivery Plan supports “a modal shift to active travel and public
transport. This will mean, amongst other objectives, providing a transport system that
facilitates active travel choices, better public transport provision and constraints upon
private vehicle use, especially in urban centres where pollution and congestion are most
acute.” The Delivery Plan is aligned to the NTS2 Sustainable Investment Hierarchy. 
2.2.1.11.    National Strategy for Economic Transformation (2022)
Scotland’s National Strategy for Economic Transformation (NSET), published by the
Scottish Government in March 2022, sets out the priorities for Scotland’s economy over the
ten-year period to 2032. It sets out a vision to create a wellbeing economy: a society that is
thriving across economic, social and environmental dimensions, and that delivers
prosperity for all Scotland’s people and places, whilst respecting environmental limits,
including climate and nature targets. It aims to deliver economic growth that significantly
outperforms the last decade, so that the Scottish economy is more prosperous, more
productive and more internationally competitive, and recognises that improved
accessibility, better connectivity and transport investment are vital factors in ensuring
economic transformation for Scotland. 
PUBLIC

Page 347

Renfrewshire Local Transport Strategy – Main Issues Report   14
2.2.1.12.    National Planning Framework 4 (2023)
National Planning Framework 4 (NPF4) was approved by the Scottish Government in
February 2023. It sets out a long-term spatial strategy for development and infrastructure
in Scotland. NPF4 sets out a need to “embrace and deliver radical change to tackle and
adapt to climate change, restore biodiversity loss, improve health and wellbeing, build a
wellbeing economy and create great places.” In this context, NPF4 recognises that places
need to be planned in a way that reduces the need to travel and is hence also aligned to
the Sustainable Investment Hierarchy and policies for cleaner air and climate change
action. 
NPF4 outlines a number of key policy areas, which are highly relevant to the development
of the LTS, including: Tackling the climate and nature crises (Policy 1), which gives
significant weight to the global climate emergency in order to ensure that it is recognised
as a priority in all plans and decisions; Climate mitigation and adaptation (Policy 2), which
will ensure that emissions from new development are minimised as far as possible;
Sustainable transport (Policy 13), which will facilitate a transition towards more
sustainable, lower emissions travel including active travel and public transport; Local
Living and 20 Minute Neighbourhoods (Policy 15), which support liveable places where
people can live better, healthier lives; and Infrastructure First (Policy 18). The Infrastructure
First policy places an emphasis on supporting more sustainable use of infrastructure and
making better use of existing assets with low-carbon infrastructure prioritised. Similarly,
Local Living and 20 Minute Neighbourhoods promotes healthy, sustainable and resilient
places that support a good quality of life and balances people’s environmental impact. It
also encourages application of the Place Principle to help create connected and compact
neighbourhoods. 
2.2.1.13.    Transport (Scotland) Act 2019
The Bill for the Transport (Scotland) Act 2019 was passed by the Scottish Parliament on
10th October 2019 and received Royal Assent on 15th November 2019. The provisions
contained within the Act include: 
• Pavement Parking Ban – which bans pavement parking, double parking and parking at
dropped kerbs, with certain exemptions designated by local authorities - for example
to ensure safe access for emergency vehicles.
PUBLIC

Page 348

Renfrewshire Local Transport Strategy – Main Issues Report   15
• Provision of bus services by local transport authorities – which facilitates an authority
(such as SPT or Renfrewshire Council) being able to provide local bus services
(potentially directly, or through a company) provided it will contribute to the
implementation of its general policy objectives; 
• Local Services Franchises – which facilitates the creation of a franchise for local bus
services by an authority (or authorities) in a specified area(s).
• Bus Service Improvement Partnerships (BSIPs) – which facilitates the creation of a
statutory partnership between a relevant authority (or authorities) and operator(s) to
improve bus services in a specified area(s); 
• Workplace Parking Levy – which facilitates a local authority (or authorities) creating a
requirement to have a licence to provide parking at workplaces, and to charge
employers for that licence based on the number of spaces available; and 
• Low Emission Zone (LEZ) schemes – which creates a system allowing local authorities
to establish, operate, amend and revoke LEZ schemes; 
2.2.1.14.    Infrastructure Investment Plan (2021)
The Infrastructure Investment Plan (IIP), published by the Scottish Government in February
2021, provides detail on expenditure from 2021-22 to 2025-26 to support the commitments
made within the Programme for Government and sets the context for future investment in
transport to deliver an effective response to the COVID-19 pandemic. 
The IIP focuses on three core strategic themes for guiding investment decisions in
Scotland:
• enabling the transition to net zero emissions and environmental sustainability;
• driving inclusive economic growth; and
• building resilient and sustainable places.
2.2.1.15.    Scotland’s Road Safety Framework to 2030
Scotland’s Road Safety Framework has a vision for Scotland to have the best road safety
performance in the world by 2030. The framework embeds the Safe System approach to
road safety delivery as set out in the NTS2 Delivery Plan which includes: safe road use, safe
vehicles, safe speeds, safe roads and roadsides, and post-crash response. The framework
states the need for targeted measures such as improving infrastructure, enhancing vehicle
PUBLIC

Page 349

Renfrewshire Local Transport Strategy – Main Issues Report   16
safety and promoting active travel options in order to help deliver its vision. Interim targets
to 2030 are set out in the Framework:
• 50% reduction in people killed
• 50% reduction in people seriously injured
• 60% reduction in children (aged <16) killed
• 60% reduction in children (aged <16) seriously injured
Intermediate outcome targets are also presented.
2.2.1.16.    Verity House Agreement
The Verity House Agreement sets out how the Convention of Scottish Local Authorities
(COSLA) and the Scottish Government will work collaboratively to ensure the shared
priorities are achieved. These priorities include tackling poverty, just transition to net zero
and sustainable public services. Whilst the agreement does not create legal obligations, it
shows a statement of intent to the principle of regular and meaningful engagement to
work together to effectively improve the lives of people in Scotland. 
2.2.2. Regional
2.2.2.1.   A Call to Action: The Regional Transport Strategy for West of Scotland 2023-38 and Draft
Case for Change (2021)
The Strathclyde Partnership for Transport (SPT) Regional Transport Strategy (RTS) was
approved in July 2023. The RTS sets a vision for the West of Scotland to be “an attractive,
resilient and well-connected place with active, liveable communities and accessible,
vibrant centres facilitated by high quality, sustainable and low carbon transport shaped by
the needs of all”.
Three priorities have been established to reflect changes in society and policy since the
previous RTS which covered the period 2008-2021. 
PUBLIC

Page 350

Renfrewshire Local Transport Strategy – Main Issues Report   17
These priorities are centred around:
• a healthier environment;
• inclusive economic growth; and
• improved quality of life.
Five Strategy objectives have been established to help tackle problems identified in the
Case for Change for the RTS. These objectives are:
to improve accessibility, affordability, availability and safety of the transport system,
ensuring everyone can get to town centres, jobs, education, healthcare and other everyday
needs;
• to reduce carbon emissions and other harmful pollutants from transport in the region;
• to enable everyone to walk, cycle or wheel and for these to be the most popular choices
for short, everyday journeys;
• to make public transport a desirable and convenient travel choice for everyone; and
• to improve regional and inter-regional connections to key economic centres and
strategic transport hubs for passengers and freight.
The RTS also lays out three key targets which will enable the objectives to be measured:
• by 2030 car kilometres in the region will be reduced by at least 20%;
• by 2030 transport emissions will be reduced by at least 53% from the 2019 baseline; and 
• by 2030 at least 45% of all journeys will be made by means other than private car as the
main mode.
These targets underline the important role transport has to play in supporting climate
change targets. Policies established in the LTS will provide support for the delivery of the
key targets captured in the RTS.
The supporting Case for Change document summarises a range of data sets, including car
ownership by proportion of households, distance of average journeys and access to bikes.
It sets out a number of key transport challenges for the region, summarised as: Transport
emissions; Access for all. Regional connectivity; Active living; and Public Transport quality
and integration. Renfrewshire specific data is also captured within the Case for Change
document. 
PUBLIC

Page 351

Renfrewshire Local Transport Strategy – Main Issues Report   18
2.2.2.2.    The Regional Active Travel Strategy for the west of Scotland 2024-2038 (Draft)
SPTs Draft Regional Active Travel Strategy is part of a coordinated approach to achieve the
Regional Transport Strategy, set out above, and sets out a strategic approach to active
travel infrastructure and behaviour change interventions. The Strategy is supported by an
Active Travel Infrastructure Delivery Plan. The Strategy outlines the current active travel
landscape across the region, the vision for active travel in Strathclyde and a proposed final
active travel network; with this being seen as a vital element of making it possible to
achieve modal shift. The final network would include primary routes, secondary routes and
cross region routes and includes a number of routes within Renfrewshire. Primary localities
are identified, which include Renfrew, Paisley, Johnstone and Glasgow Airport. 
2.2.2.3.    Glasgow City Region City Deal (2014)
The Glasgow City Region City Deal works with eight partner councils, including
Renfrewshire, to improve the Glasgow City Region. The City Deal, which was the first in
Scotland and is one of the most advanced in the UK, brings £1 billion investment to the
area. As part of the Deal, there are 21 key infrastructure projects, including three key
projects within Renfrewshire, as follows:
• Airport Access Project – Renfrewshire Council is working with Glasgow City Council and
relevant stakeholders to develop a public transport link to Glasgow Airport. An Outline
Business Case has been developed. However, the Glasgow City Region Cabinet has
agreed to pause the project whilst SPT undertakes a feasibility study on a Glasgow City
Region Metro (Clyde Metro), which would incorporate an airport link.
• Clyde Waterfront and Renfrew Riverside – The Clyde waterfront is being regenerated
with a new road bridge over the River Clyde, linking Renfrew and Yoker. This aims to
create an attractive waterfront area and further connect communities, with the Renfrew
Northern Development Road unlocking potential for regeneration by linking these
communities and the emerging Advanced Manufacturing Innovation District Scotland
(AMIDS) to the wider region.
• Glasgow Airport Investment Area - The Glasgow Airport Investment Area includes new
roads, bridges, cycling routes and pedestrian footpaths, improving access to AMIDS and
to nearby Westway and Inchinnan Business Parks. AMIDS is a Renfrewshire Council
project to develop a home for manufacturing innovation in Scotland. Elements of this
PUBLIC

Page 352

Renfrewshire Local Transport Strategy – Main Issues Report   19
project are ongoing, including AMIDS South and its east-west link road from Renfrew
Road to Inchinnan Road. 
Noting that elements of the City Deal relate to accessing Glasgow Airport, it is highlighted
that Transport Scotland separately published an Aviation Statement and Key Priorities in
2024. This sets out the strategic importance of aviation to Scotland and the specific actions
the Scottish Government will take on national and international connectivity, and on
reducing aviation emissions. Outcomes captured in the document include improving
Scotland’s international connectivity to key markets for inbound tourism, business
connectivity and export growth; and for aviation to be net zero by 2045. 
2.2.2.4.    STPR2 Initial Appraisal: Case for Change – Glasgow City Region (2021)
The Initial Appraisal: Case for Change report for the Glasgow City Region was written to
support the development of STPR2 and sets out the evidence base for problems and
opportunities linked to the strategic transport network across the Glasgow City Region.
Although the problems and opportunities are set out at the regional level, specific
references to Renfrewshire are made, including residents in some rural parts of
Renfrewshire unable to access key hospitals within under 60 minutes and that 6,200 fewer
jobs were forecast between 2017 and 2027. The key problems and opportunities identified
across the Glasgow City Region are as follows: Social Exclusion; Transport Poverty and
Affordability; Physical Activity and Health; Transport Emissions; Accessibility; Connectivity;
Low Level of Active Travel Uptake; Safety; and Capacity Constraints. The Initial Appraisal:
Case for Change report and the problems and opportunities identified within, went on to
inform the final STPR2 reporting, which set out 45 recommendations to help inform
Scottish Ministers on a programme of potential transport investment opportunities for the
period 2022-2042.
2.2.2.5.    Clydeplan Strategic Development Plan (2017)
The Glasgow and Clyde Valley Strategic Development Plan (Clydeplan), published in July
2017, is a land-use plan for Glasgow city-region that supports the Scottish Government’s
central purpose of increasing sustainable economic growth. It sets out a clear vision and
spatial strategy for the area and focuses on the key land use and development issues that
cut across the eight planning authority boundaries in the region. 
PUBLIC

Page 353

Renfrewshire Local Transport Strategy – Main Issues Report   20
Following the passing of the Planning (Scotland) Act 2019, authorities working together are
expected to adopt a Regional Spatial Strategy which should outline the needs and
priorities for strategic developments, as well as how the wider outcomes will contribute to
the areas success. A Regional Spatial Strategy will be published for the Glasgow City
Region area in due course, following the introduction of statutory Regulations by the
Scottish Government. This will provide a place-based strategy informing future
development across the Glasgow City Region.
2.2.2.6.    Glasgow City Region Economic Strategy (2021) and Action Plan (2022/23)
The Glasgow City Region Economic Strategy, published in 2021, was developed by eight
local authorities (including Renfrewshire Council), government partners and agencies and
sets out an evidence base for the economy of the region and details future challenges and
opportunities for economic development. It establishes a vision that the City Region will
have “the most innovative inclusive and resilient economy in the UK” by 2030. 
An associated Action Plan was published in August 2022 and sets out the key activities
required to deliver projects which meet the regional priorities and the three ‘Grand
Challenges’ of Inclusive Economy, Enhancing Productivity and Climate Emergency. For
transport, Clyde Metro is included within the Action Plan with actions to progress to
Outline Business Case (OBC) stage and conduct Economies for Healthier Lives Capital
Investment Health Inequalities Impact Toolkit assessments on the emerging business case.
2.2.2.7.    Glasgow City Region Climate Adaptation Strategy and Action Plan (2021)
The Glasgow City Region Climate Adaptation Strategy and Action Plan was launched in
2021 and aims to ensure the region’s economy, society and environment is prepared for
and flourishes owing to the impacts of the climate crisis. 11 interventions have been
developed for the strategy and risks and opportunities were also identified; this includes
risks to transport infrastructure from extreme heat, storms and high waves. 
PUBLIC

Page 354

Renfrewshire Local Transport Strategy – Main Issues Report   21
2.2.3. Local
2.2.3.1.    Renfrewshire’s Local Transport Strategy Refresh (2017)
Renfrewshire’s Local Transport Strategy Refresh sets out a vision to help improve people’s
health and travel to their destination within a set timescale using all modes including
walking, cycling, public transport or their car for essential trips. It also aims to allow
businesses to operate effectivity and efficiently creating prosperity and job opportunities;
attract visitors to enjoy the tourism and leisure facilities and to achieve this without
compromising the future environment.
The LTS sets out 5 key objectives to be delivered through actions within the Strategy: 
• Regenerate the local economy wherever possible;
• Extend opportunities for all by:
o Combating poverty and promoting equality including supporting behavioural
change;
o Encouraging healthier lifestyles;
o Encouraging a choice of transport options;
o Improving access for all, including the mobility impaired.
• Ensure a healthy and sustainable environment;
• Improve community safety and security, both real and perceived and increase
connectivity between settlement and services; and
• Encourage integration of services and an integrated approach by public bodies whilst
achieving best value.
The new Renfrewshire LTS will provide an update on the Council’s achievements against
the actions set out in the previous Strategy and will set out a broad direction of travel for
Renfrewshire. The progress of the current Renfrewshire LTS travel and transport
interventions will be built on by the updated Strategy. 
PUBLIC

Page 355

Renfrewshire Local Transport Strategy – Main Issues Report   22
2.2.3.2.    Renfrewshire’s Plan for Net Zero
The first phase of Renfrewshire's Plan for Net Zero sets out how the area will work towards
net zero by 2030.Though Council-led, Renfrewshire's Plan for Net Zero has been created
collaboratively with local communities through regular meetings of the Renfrewshire
Climate Panel, as well as surveying local businesses to identify how to make immediate
and future change possible for the business sector.
The Plan draws on independent research which showed transport was responsible for 34%
of the area’s current emissions and each of commercial and residential energy usage
contributed 29% respectively - meaning these three areas are responsible for 92% of
Renfrewshire’s total emissions. To reach the target of becoming net zero by 2030, the
council introduced the Ren Zero campaign. This looks to take a collaborative approach
with communities, businesses, partners and organisations working together us to make
required changes.
Using this information, the Plan developed five key themes and actions: 
• Clean energy: minimising energy demand, maximising energy efficiency and sustainable
energy generation, alleviating fuel poverty, increasing energy security and resilience;
• Sustainable transport: maximising active travel opportunities, increase public transport
patronage alongside a reduction in car miles, enable modal shift to Ultra Low Emission
Vehicles (ULEVs), alleviate transport poverty and facilitate local carbon offsetting to
make every trip in the Renfrewshire area net zero carbon;
• Circular economy: reducing waste at source, maximising reuse, repair and recovery,
development of sustainable waste management, supporting communities to reduce
waste and offsetting disposal with local offsetting of associated emissions to
compensate;
• Connected communities: a comprehensive and ongoing engagement, with particular
focus on supporting community initiatives and partnership working, as well as the
development of socio-economic impact benefits, whilst focusing on children and young
people and providing support and advice; and
• Resilient place: ensuring resilience, protecting, restoring and enhancing existing
habitats and species. This would be carried out alongside initiatives to help nature
locally, as well as improving air quality and sequestration.
PUBLIC

Page 356

Renfrewshire Local Transport Strategy – Main Issues Report   23
2.2.3.3.    Renfrewshire Local Development Plan (2021)
In line with the aspirations, vision and outcome measures of the Renfrewshire Community
Plan (2017-2027) discussed below, and the Renfrewshire Council Plan, the Local
Development Plan Spatial Strategy focuses on place making and development within
existing built-up areas and key redevelopment sites, aiming to facilitate sustainable
development and a low carbon economy providing high quality new development in the
right locations.
A large part of Renfrewshire is rural; by concentrating development in mainly urban areas
this Strategy protects many of the valuable assets and resources of Renfrewshire. The
policies and proposals outlined within the plan aim to provide a balance between the
need to protect and enhance the environment in Renfrewshire as well as promoting
development activity, new investment and sustainable and inclusive economic growth. 
The Plan highlights that new development will be supported where it aims to incorporate
the following criteria (where relevant): 
• Supports sustainable and inclusive economic growth and/or is related to the delivery of
City Deal investment;
• Contributes positively to the character, appearance and function of the place,
benefiting the amenity of the area and protecting and enhancing the natural, built and
cultural heritage and its setting, including delivering net biodiversity gain;
• Will regenerate and invest in Renfrewshire’s Network of Centres;
• To apply a placemaking approach to deliver high-quality, well-designed, sustainable
places, ensuring that the design of new development is demonstrated to benefit the
area by following the principles of ‘Renfrewshire’s Places’ Design Guidance;
• Development is supported by existing or planned infrastructure;
• Buildings and structures are designed to support the enhancement and delivery of low
carbon generating technology to reduce emissions;
• The development does not have an adverse effect on the integrity of any sites protected
as a European site (Special Areas of Conservation (SACs) and Special Protection Areas
(SPAs)); 
• Safeguard, enhance and promote access to natural heritage including open space,
green infrastructure and green networks, landscape, biodiversity and the wider
environment; and
• Locate development on sites which can be accessed sustainably to encourage a modal
shift from the private car to walking, cycling and public transport.
PUBLIC

Page 357

Renfrewshire Local Transport Strategy – Main Issues Report   24
Renfrewshire Council is in the process of preparing an updated Local Development Plan
(LDP3), which will set out the long-term vision for the area up to 2037 and beyond. This will
reflect updated policies, including those captured in National Planning Framework 4. The
aim is to deliver a place-based, people-centred and delivery focused plan for Renfrewshire
which will set out an ambitious vision for the area’s places. The LDP will sit alongside and
be influenced by community-led Local Place Plans and a Regional Spatial Strategy (RSS)
for the Glasgow City Region. The LDP will also support connections to new developments. 
2.2.3.4.    Renfrewshire Council Plan 2022-2027
The Renfrewshire Council Plan sets out how the Council will work with partners,
communities and business to progress the five strategic outcomes of place, economy, fair,
green and living the Council’s values. The Plan notes the Council’s desire for everyone to
have access to transport links. There is also an action to deliver the large-scale
infrastructure projects which come under the scope of the City Deal and Infrastructure
Programme, thus boosting employment and earnings and driving innovation and growth.
Under the “Green” theme, which relates to leading Renfrewshire to net zero, reference is
made to improvements in the transport infrastructure to make employment opportunities
easier to travel to. 
2.2.3.5.    Renfrewshire Cycling Strategy (2016-2025)
The aim of the Cycling Strategy is that by 2025, there will have been a genuine ongoing
commitment and leadership from Renfrewshire Council in supporting and encouraging
cycling. The Strategy acknowledges the commitment to continue to improve and extend
the network, according to best design guidance principles, with clear links to public
transport hubs, schools, other key destinations and between communities. The strategy
notes that employers and residents would also notice the benefits of cycling, with people
of all ages and backgrounds feeling confident using the cycle network, creating a culture of
mutual respect amongst all road users. 
PUBLIC

Page 358

Renfrewshire Local Transport Strategy – Main Issues Report   25
The Cycling Strategy outlines a range of objectives, such as: 
• By 2020, to have 3 per cent of all journeys to work being made by bicycle; and 7 per cent
by 2025;
• Keep cycling high in the agenda, through sustained and collective action, within
Renfrewshire and with its partners;
• Make cycling safe and attractive to people of all ages and backgrounds, and for a wide
range of transport and leisure journeys; and
• Promote, through a range of media and methods, everyday cycling as an attractive and
beneficial means of transport. Promotion should be aimed especially at short trips and
in particular at young people. 
2.2.3.6.    Renfrewshire Community Plan (2017-2027)
The Community Plan outlines the vision for a community that aims to have people
‘working together to make Renfrewshire a fairer, more inclusive place where all our people,
communities and businesses thrive’. 
The four key themes to help achieve this aim are acknowledged by the Plan and are
highlighted below: 
• Thriving: Maximising economic growth, which is inclusive and sustainable
• Well: Supporting the wellness and resilience of our citizens and communities
• Fair: Addressing the inequalities which limit life chances
• Safe: Protecting vulnerable people, and working together to manage the risk of harm
Each of these themes outlines key priorities to help build on the overall vision of the Plan.
The Plan also notes that Renfrewshire will work in a Fair, Sustainable, Digital and Involved
way to help achieve its overall vision. Furthermore, the Governance of the Plan will be
steered through using the Economic Leadership Panel, Health and Social Care Strategic
Planning Group, Community Protection Chief Officers Group, Improving Life Chances
Board, Forum for Empowering Communities and the Community Planning Partnership
Executive and Oversight Group.
PUBLIC

Page 359

Renfrewshire Local Transport Strategy – Main Issues Report   26
2.2.3.7.    Renfrewshire’s Economic Strategy 2020-2030
Renfrewshire’s Economic Strategy is led by Renfrewshire’s Economic Leadership Panel and
is a collaboration between Renfrewshire Council, private sector business, knowledge
institutions and public sector agencies. The Strategy takes into account the UK and
Scottish economic contexts, considers future technology and infrastructure advancements
and recognises the need for Renfrewshire’s response to be agile to the future economic
conditions. 
The Strategy notes that the Renfrewshire economy is particularly robust in manufacturing,
construction and transport and storage, with Renfrewshire-based businesses exporting
over £2 billion of goods and services across the world in 2017. However, it does raise
economic challenges in the area, such as 20% of the working population in Renfrewshire
being economically inactive, with a proportion of this owing to long-term sickness. 
The Strategy lists eight challenges, one of which is to improve the economic infrastructure
of Renfrewshire, including better public transport provision, rail and road capacity, and the
provision of new digital connectivity and networks. Interventions which underpin this
include:
• World-class digital connectivity infrastructure;
• Redevelopment of Paisley Gilmour Street Station;
• A new public transport link between Glasgow Airport/AMIDS and Glasgow via Paisley
town centre;
• A SMART place plan for Renfrewshire;
• Measures to influence travel behaviours and modal shift; and
• Host a Renfrewshire Transport Summit. 
The Strategy also highlights several transport and connectivity issues facing Renfrewshire,
including: available capacity on the transport network (road and rail); improved access to
largest job locations by public transport - for example, some of Renfrewshire’s principal
business locations such as Inchinnan, Glasgow Airport, Westway and Hillington are not
very well linked by public transport; and public transport to be used as a facilitator of
economic growth.
The Strategy notes that the Transportation and Storage sector is a very significant
employer within Renfrewshire and that the sector and the infrastructure it relies on are
vital to securing the area’s economic opportunities. The Strategy notes that the sector
turned over £1 billion per annum, employed 7,000 people and had productivity regularly
PUBLIC

Page 360

Renfrewshire Local Transport Strategy – Main Issues Report   27
greater than £70,000 GVA per head. GVA (Gross Value Added) is a measure of the value of
goods and services produced in an area, industry or region of an economy 
2.2.3.8.    Renfrewshire Core Paths Plan 2022
The Renfrewshire Core Paths Plan outlines the key active travel access routes in place
across Renfrewshire. The document reflects the requirements of the Land Reform
(Scotland) Act 2003 in providing an up to date network of core routes which are for largely
recreational usage that allow for ‘reasonable public access’. The network of core paths this
plan has identified aim to:
• Connect communities, settlements and places of interest;
• Provide opportunities for active travel, particularly to schools and places of work;
• Connect people with nature, areas of greenspace and the wider countryside; and
• Promote and encourage healthy lifestyles.
The plan enhances connections and networks at a local level, contributing to the creation
of sustainable and thriving communities, a key priority identified in the Renfrewshire
Council Plan and Renfrewshire Community Plan. It also aids in the increased connectivity
to areas outside  the local authority area and supports the expansion of the Glasgow and
the Clyde Valley Green Network.
2.2.3.9.    Centre Strategies (2016)
Renfrewshire’s Centre Strategies reflect Scottish Planning Policy in promoting a 'Town
Centre First' approach, supporting the health of town centres and delivering proposals set
out in the Renfrewshire Local Development Plan. Centre Strategies have been produced for
Erskine, Johnstone, Linwood, Renfrew and Braehead. A high level summary of each is
provided below. 
Erskine’s Centre Strategy highlights key opportunities available to unlock the potential of
underused and vacant land within the centre and to consider the future mix of uses, with
potential to enhance the quality of public spaces and the riverfront walkway. Following
consultation, the themes developed for the strategy were to support future growth in
Erskine town centre, strengthen and enhance the riverfront and to improve the
maintenance of the town. There is an action to ensure the town centre is more accessible
PUBLIC

Page 361

Renfrewshire Local Transport Strategy – Main Issues Report   28
by walking, cycling and public transport and strong transport connections to / from the
town are also noted.  
Johnstone’s Centre Strategy highlights opportunities, such as further improvements to
public spaces and pedestrian connections, as well as the ‘gateway’ entrances to the town.
Following consultation, the themes developed for the Centre Strategy include to improve
transport and parking in the town centre; this includes improving traffic management in
the town centre, delivering improvements to parking provision within the town centre and
exploring opportunities for improvements at the A737 Barochan Junction. There is also an
action to ensure the town centre is more accessible by walking, cycling and public
transport. 
Linwood’s Centre Strategy notes that the completed redevelopment of the town centre
has seen a major investment in Linwood and its future. The Strategy states that there is
potential for new investment in residential and business uses which support the centre.
With regards to transport, it is noted that the town has strong transport links with Glasgow
and the wider central belt. There is also an action to make the town centre more accessible
by walking, cycling and public transport. 
Renfrew’s Centre Strategy highlights that opportunities exist, with a new bridge as part of
the City Deal across the River Clyde likely to improve connections between Renfrewshire,
Glasgow and West Dunbartonshire; this is captured under the theme Transport and
Connections. An action identified in the Strategy includes ensuring the town centre is more
accessible by walking, cycling and public transport. Strong transport links to / from the
town are highlighted, which makes Renfrew a Core Town Centre in Renfrewshire’s 2014
Local Development Plan. 
Braehead’s Centre Strategy notes that actions to support the future development of
Braehead includes improving accessibility to the centre by public transport and delivering
new travel and transport infrastructure to support the centre and wider Renfrew Riverside
regeneration. The centre is highlighted as having strong transport links and notes
opportunities to deliver enhanced walking, cycling and public transport improvements as
well as integrating the existing road infrastructure in and around the area. A key theme
includes developing a masterplan and working with the City Deal to deliver a new river
crossing between Renfrew and Glasgow/West Dunbartonshire. 
PUBLIC

Page 362

Renfrewshire Local Transport Strategy – Main Issues Report   29
2.2.3.10.    Digital Strategy for Renfrewshire (2020) 
The Digital Strategy sets out Renfrewshire Council’s digital vision, the strategic context, the
position the Council is currently in, the outcomes it would like to achieve and the benefits
this will bring. The Strategy describes how this work will be carried out, reported and
monitored and how the Council will support people to deliver the outcomes. Although
transport does not form part of any of the Strategy themes, it is referenced in relation to
developing a SMART place plan, which embraces innovation and technology to secure
economic and environmental advantages. An important element of the Strategy relates to
improving access for residents to services; including through enabling access to digital
public services, tackling digital inequality and creating the opportunity for active
citizenship. This is captured in one of the outcomes / benefits outlined in the Strategy, to
provide better access to information and data. Digital innovation can have a large impact
on transport, as it can impact the frequency at which people travel and how they travel. 
2.2.3.11.    Renfrewshire Parking Strategy 2023-2028
The Renfrewshire Parking Strategy 2023-2028 aims to modernise and improve parking
management across Renfrewshire, addressing concerns from residents, businesses, and
public transport operators. The Strategy focuses on offering high quality and appropriately
located parking facilities in towns and villages, whilst also reducing congestion and carbon
emissions on public roads.
The Strategy states that current control of parking had been limited to the management of
parking restrictions in Paisley town centre, but notes that there are issues with parking
management which are prevalent elsewhere.
Going forward, the Strategy aims to use a modernised approach to parking, focusing on
parking enforcement and charges, technology, infrastructure and digital traffic regulation
orders. As part of this modernised approach, improvements to signing and lining are taking
place in Paisley town centre, as well as a revision of parking charges, allowing free parking
for  one hour in all charged locations. Outside of Paisley, the Strategy notes to carry out an
assessment of parking behaviours across Renfrewshire, identifying problematic business
and residential parking locations as well as reviewing village and town centre parking
arrangements.
PUBLIC

Page 363

Renfrewshire Local Transport Strategy – Main Issues Report   30
2.3. Summary
The current policy landscape has a clear focus on tackling climate change, in particular to
address the climate emergency declared by Renfrewshire Council in 2019. This is
supported by the Scotland wide target to achieve net-zero emissions of all greenhouse
gases by 2045, and Renfrewshire Council’s target to be net zero by 2030. This is also
reflected in other policies, including NPF4 which has a focus on sustainable transport
interventions and the priorities of NTS2 to achieve the 20% reduction in car kilometres by
2030 (against a 2019 baseline) to support the Climate Change Plan. NTS2 Priorities also
reference the need to improve health and wellbeing and there is also a clear need to
deliver inclusive economic growth and to reduce inequalities. 
The Sustainable Investment Hierarchy and Sustainable Travel Hierarchy are both captured
within NTS2, with the former noting that consideration should be given to reducing the
need to travel unsustainably, maintaining and safely operating existing assets, and making
better use of existing capacity, before proposing targeted infrastructure improvements;
and the latter focuses on prioritising walking, wheeling and cycling and public transport
above private cars. 
This review has set out the policy context within which to develop the next LTS for
Renfrewshire. The local policy, strategies and plans broadly align with the regional and
national policy context, including a focus on reducing transport emissions, supporting
improvements to people’s health and wellbeing, whilst also supporting sustainable
economic growth.  
PUBLIC

Page 364

Renfrewshire Local Transport Strategy – Main Issues Report   31
3. Data, Transport and Travel Context
3.1. Introduction
This Chapter provides a summary of information regarding background issues and trends
related to socio-economic and transport and travel patterns within Renfrewshire. The
summary is based on an analysis of available data sources, including Scottish Household
Survey, Scotland Census, Scottish Transport Statistics, Office for National Statistics and
road casualty data. It should be noted that where possible results have been presented or
grouped using data zones. These are small geographical areas typically containing
between 500-1,000 residents within an area. These are one of the standard geography
breakdowns used by the Scottish government in their statistical presentations. The data
presented in this Chapter will be used to inform the identification of problems and
opportunities as the study progresses. 
3.2. Socio Economics and Socio Demographics 
This section provides a summary of both socio-economic socio demographic data as
follows:
• Population and population density;
• Urban / rural geography classifications;
• Scottish Index of Multiple Deprivation;
• Loneliness and Health;
• Employment; and 
• Economic performance. 
3.2.1. Population
Figure 2 presents population data for Renfrewshire from National Records of Scotland
(NRS) Mid-Year Population Estimates (2017-2021) and 2022 Census Data. Results show that:
• Renfrewshire’s population has increased by an estimated 4% between 2017 and 2022,
from 176,830 to 183,800. This is in contrast to the Scotland wide population, which
increased by only 0.2% in the same period.
PUBLIC

Page 365

Renfrewshire Local Transport Strategy – Main Issues Report   32
• Renfrewshire Rural North and Langbank data zone recorded a 138% increase in
population from 2017 to 2021; this is likely owing to Dargavel development in Bishopton
being built in this period. This is the biggest population increase of any data zone in
Renfrewshire within this period. Paisley North 01 data zone also recorded a large
population increase of 70%.
• Paisley Ferguslie data zones 06 and 07 recorded the biggest decrease in population
between 2017 and 2021, with a -13% and -14% decrease respectively. 
Figure 2: Renfrewshire Population Estimates 2017 – 2022 (Source: National Records Scotland
Mid-Year Population Estimates and 2022 Scotland Census)
3.2.2. Population Density
Population density in Renfrewshire has been determined based on the population data
shown in Figure 3. The findings show that the most densely populated areas are in the east
of the local authority area, in close proximity to Glasgow, focused on Renfrew and Paisley
in particular. The population density generally decreases heading west across the local
authority area, where there are fewer larger settlements. 
PUBLIC

Page 366

Renfrewshire Local Transport Strategy – Main Issues Report   33 
Figure 3: Population Density in Renfrewshire
3.2.3. Urban / Rural Geography
The Scottish Government’s 6-fold Urban Rural classifications provides a consistent way of
distinguishing urban, rural and remote areas across Scotland into six categories based on
population and accessibility. Using this and the NRS population estimates from Figure 2,
Figure 4 below shows the urban and rural geographic context within Renfrewshire: 
• 84% of the population in Renfrewshire live in an urban area (Large Urban Area or Other
Urban area). This includes the largest settlements of Paisley, Johnstone and Renfrew. 
• There are ‘Accessible small towns’ (9% of the population) such as Bridge of Weir and
‘Accessible rural areas’ (8% of the population) in Renfrewshire, such as the areas of
Lochwinnoch. There are a very small number of areas categorised as ‘Remote Rural
Areas’ (0.3%) and no areas classed as ‘Remote Small Towns’ within Renfrewshire. 
PUBLIC

Page 367

Renfrewshire Local Transport Strategy – Main Issues Report   34 
Figure 4: Renfrewshire Population Urban Rural Classifications (Source: Scottish Government
Urban Rural Classifications 2020)
There are likely to be different challenges experienced in the urban and rural areas and this
will be considered as part of the Local Transport Strategy development. 
3.2.4. Scottish Index of Multiple Deprivation
The Scottish Index of Multiple Deprivation (SIMD) is a Scottish Government tool which uses
data zones. There are 6,976 of these, and data is applied from several indicators to give
each zone an overall ranking, which are then split into ten deciles. Figure 5 shows SIMD
deciles for Renfrewshire, with red indicating higher areas of deprivation and blue showing
lower levels of deprivation. 
PUBLIC

Page 368

Renfrewshire Local Transport Strategy – Main Issues Report   35 
Figure 5: Renfrewshire Scottish Index of Multiple Deprivation Deciles (Source: SIMD 2020)
There are several areas of deprivation within urban areas in the east, such as in Paisley,
Renfrew and Johnstone, though some areas here also record data zones with low levels of
deprivation. 
Lower levels of deprivation are primarily recorded in the west and north of the local
authority area, such as around Bridge of Weir, Erskine and Bishopton. 
Table 1 shows the split of data zones across the SIMD deciles for Renfrewshire. This shows
that Renfrewshire has a higher proportion of data zones in the 20% most deprived
compared to Scotland as a whole (25% of Renfrewshire data zones are in the lowest two
deciles). The proportion of data zones in the least deprived 20% in Renfrewshire mirrors
the Scotland-wide average. 
Table 1:Renfrewshire Scottish Index of Multiple Deprivation 2020 Deciles
Scottish Index of Multiple Deprivation 2020 All Deciles 
1 2 3 4 5 6 7 8 9 10
Renfrewshire 15% 10% 10% 11% 9% 8% 6% 10% 12% 8%
PUBLIC

Page 369

Renfrewshire Local Transport Strategy – Main Issues Report   36
3.2.5. Loneliness and Health
The Scottish Household Survey (SHS) collects data from households around Scotland on
an annual basis (although not all questions are asked every year). The survey provides
evidence on the composition, characteristics, attitudes and behaviour of private
households and individuals across all of Scotland’s 32 local authority areas. Although the
Scottish Household Survey provides a useful snapshot within an area, the survey has a
relatively small sample size; this is in part owing to the specificity of some questions and so
not all respondents are able to answer all questions. This presents challenges when
analysing an area such as Renfrewshire, which has a population of over 180,000 residents;
the data does however provide a useful insight into travel patterns and behaviours,
amongst other aspects.
Since 2018, respondents have been asked about feelings of loneliness within the week
preceding the survey. This question is asked on a biennial basis. 2018 results (SHS Data
Explorer) to this question by Renfrewshire respondents showed that:
• 18% of people in Renfrewshire felt lonely some of the time, which is slightly higher than
the national average of 17%, with only 1% saying they felt lonely most, almost all or all
of the time. This is slightly lower than the national average of 4%.
• 28% of people living in the 20% most deprived areas of Renfrewshire (according to
SIMD) felt lonely some of the time, which is higher than the national average of 21%.
Only 2% responded they felt lonely most, almost all or all of the time; this is lower than
the national average of 7%.
Although the data demonstrates that only a slightly higher proportion of people in
Renfrewshire experienced loneliness in the week preceding the survey, it does show that a
sizeable portion of the population experienced loneliness. This can have a wider impact,
including on mental and physical health and how often people travel and how they travel. 
With regards to health, in Renfrewshire there are some key health indicators which show
differences between Renfrewshire and the rest of Scotland; Public Health Scotland
provides data. For example, hospital admissions for coronary heart disease (CHD) are
higher in Renfrewshire at 365.85 per 100,000 population, compared to 341.63 across
Scotland. Life expectancy for females is lower in Renfrewshire than the whole of Scotland
at 79.89 years compared to 80.72 years nationally; the difference in life expectancy for
males is not statistically significant between Renfrewshire and Scotland. 
PUBLIC

Page 370

Renfrewshire Local Transport Strategy – Main Issues Report   37
3.2.6. Employment
The Business Register and Employment Survey is conducted by the Office for National
Statistics (ONS) and provides detailed estimates of employee and employment data at
detailed geographical levels. The Business Register and Employment Survey showed that
there was around 84,000 full or part time employees working in Renfrewshire in 2022. The
sector that employed the most people in Renfrewshire was Wholesale and Retail Trade;
Repair Of Motor Vehicles and Motorcycles, with approximately 13,000 people (15.5% of
employees) employed in this sector. Human Health And Social Work Activities employed
12,000 people in Renfrewshire (14.3%), and Administrative And Support Service Activities
was the third biggest employer in Renfrewshire, with roughly 11,000 employees (13.1%).
It is noted that the numbers presented above relate to people working in Renfrewshire in
2022 and include people that reside elsewhere. Origin destination data which shows where
Renfrewshire residents travel for work and how many people travel from elsewhere to work
in Renfrewshire, is available from 2011 Census data; this is the most recent origin
destination data, as the 2022 Census data is not yet available, as of October 2024. As such,
proportions may have changed, particularly since the pandemic, with more people
working from home. 
2011 Census data shows the following with regards to how many people travel from
elsewhere to work in Renfrewshire (this includes Renfrewshire residents that also work in
the local authority area); Figure 6 also presents the data. 
• Around half of people working in Renfrewshire lived within the local authority area
(52.6%, equating to 35,523 people). 
• 22,470 people (33.3%) working in Renfrewshire came from local authority areas that
border Renfrewshire (15.2% from Glasgow City, 5.6% from East Renfrewshire, 5.2% from
North Ayrshire, 4.7% from Inverclyde and 2.7% from West Dunbartonshire). 
• 8,807 people (18.3%) travel to work from outside of Renfrewshire.
• A small number of people (721, equating to 1.1%), reside elsewhere in the UK and work
in Renfrewshire. 
PUBLIC

Page 371

Renfrewshire Local Transport Strategy – Main Issues Report   38 
Figure 6: Number of People Working in Renfrewshire by Origin (Usual Place of Residence)
2011 Census data also shows where people that usually reside in Renfrewshire travel to for
work (this includes people who live in Renfrewshire and also work in the local authority
area). The data, also presented in Figure 7, shows the following: 
• Around half of people living in Renfrewshire also work within the local authority (52.4%,
equating to 35,523 people)
• 27,094 people (40.0%) living in Renfrewshire work in neighbouring local authority areas
(31.8% work in Glasgow City, 3.0% in Inverclyde, 2.0% in East Renfrewshire, 2.0% in West
Dunbartonshire and 1.1% in North Ayrshire).
• 4,670 of Renfrewshire residents (6.9%) work elsewhere in Scotland. 
• 507 people (0.7%) of Renfrewshire residents work elsewhere in the UK. 
35,523
3,777 3,152
3,480
1,815
10,246
8,807 721
Number of People Working in Renfrewshire and their
Usual Place of Residence
Renfrewshire East Renfrewshire Inverclyde
North Ayrshire West Dunbartonshire Glasgow City
Elsewhere in Scotland Elsewhere in UK
PUBLIC

Page 372

Renfrewshire Local Transport Strategy – Main Issues Report   39 
Figure 7: Number of Renfrewshire Residents by Place of Work
The data shows that a majority of people who live within Renfrewshire also work within the
local authority area. This suggests that there are more shorter trips undertaken (and this is
supported by data under the ‘Distance Travelled’ section) and thus there may be
opportunities to increase the number of trips that are undertaken by walking and cycling
(where people are able to do so).
3.2.7. Economic Performance
The ONS also provides data around GVA, which is a measure of the value of goods and
services produced in an area, industry or region of an economy. GVA for Renfrewshire is
grouped together with Inverclyde and East Renfrewshire. Since 2017, Gross Value Added
per head in Inverclyde, East Renfrewshire and Renfrewshire has grown slightly from
£18,656 to £20,555 in 2022 (in April 2024 prices).   
Gross Value Added per head in Inverclyde, East Renfrewshire and Renfrewshire in 2022
(£20,555) was lower than the national average (£30,419) and was significantly lower the
neighbouring Glasgow City (£40,933). It is noted that Renfrewshire is grouped with the
areas of Inverclyde and East Renfrewshire in terms of Gross Value Added (balanced) per
head of population at current basic prices. All prices in this section are given in April 2024
money value as pounds sterling. 
35,523
1,371 2,044
763 1,388
21,528
4,670 507
Number of Renfrewshire Residents by Place of Work
Renfrewshire East Renfrewshire Inverclyde
North Ayrshire West Dunbartonshire Glasgow City
Elsewhere in Scotland Elsewhere in UK
PUBLIC

Page 373

Renfrewshire Local Transport Strategy – Main Issues Report   40
3.3. Travel and Transport
This section provides a summary of travel and transport data, including:
• Overview of the transport network;
• Travel to work and School;
• Distance travelled;
• Car and bike availability;
• Journey Times and Cordon Counts;
• Bus routes and accessibility;
• Rail station usage;
• Transport expenditure;
• Satisfaction with Public Transport; and 
• Road Safety. 
3.3.1. Overview
Renfrewshire has a range of transport infrastructure, including an extensive road and rail
network. Figure 8 shows the major road network across the local authority area, including
motorways, A roads and B roads. This includes the M8, which begins in Renfrewshire
before heading east, and is the main motorway connecting Glasgow and Edinburgh, and
the M898 / A898, which connects the M8 to the Erskine Bridge. “A” roads in Renfrewshire
include the A737, which continues south from Paisley towards Ayrshire, and the A8 which
begins at Langbank before heading west towards Greenock. The M8, M898, A898, A8 and
A737 are trunk roads present within Renfrewshire; as such, they are maintained by
Transport Scotland rather than by Renfrewshire Council. 
In terms of traffic on all roads within Renfrewshire, based on Department for Transport
data, it is estimated that there was a slight increase (1.5%) in kilometres travelled between
2011 and 2021; though it is noted that between 2011 and 2019 (pre-pandemic), a 13%
increase was recorded. The change in traffic kilometres travelled across Scotland between
2011 and 2021 was less than 1% (Scottish Transport Statistics 2022). 
Figure 9 shows the rail network and rail stations within Renfrewshire, including a line that
terminates at Paisley Canal and a line to Paisley Gilmour Street that splits off into the
Inverclyde line and the Largs line via Johnstone. Further details of rail stations are captured
under the Rail Station Usage section. 
PUBLIC

Page 374

Renfrewshire Local Transport Strategy – Main Issues Report   41
Responsibility for the majority of rail powers in Scotland sits with the ORR (Office of Road
and Rail). Whilst Scottish Ministers specify and fund the outputs to be delivered by Network
Rail, the organisation has responsibilities including operating the network, managing
performance and allocating capacity. ScotRail is owned by the Scottish Government and is
overseen by Scottish Rail Holdings Limited; ScotRail operates rail services in Scotland.
Responsibility for safety regulation across Great Britain sits with the ORR. 
Figure 8: Road Network in Renfrewshire
PUBLIC

Page 375

Renfrewshire Local Transport Strategy – Main Issues Report   42 
Figure 9: Rail Network in Renfrewshire
3.3.2. Travel to Work and School
Census data from 2022 is available for the method of travel to work for residents of local
authorities within Scotland. 
Figure 10 compares the usual method of travel to work for Renfrewshire residents in 2022
(Scotland’s Census, 2022, Table UV701) compared to that of Scotland as whole. For the
purpose of this analysis, it is noted that “Work from home” is not presented in this figure.
This shows the following:
• Driver Car / Van is the main mode of travel in both Renfrewshire and Scotland as a
whole. However, this accounts for a higher proportion of travel in Renfrewshire
compared to Scotland as a whole (71% and 67% respectively). 
• Bus is the second most common method of travel to work in Renfrewshire at 8%; the
proportion is the same as Scotland as a whole. 
• The proportion of those walking to work is lower in Renfrewshire (7%) than the Scottish
average (11%). 
• Bicycle use in Renfrewshire is also lower than across Scotland as a whole, with 1%
mode share for travel to work, compared to 2% bicycle share for the whole of Scotland.
PUBLIC

Page 376

Renfrewshire Local Transport Strategy – Main Issues Report   43
• Rail travel to work is higher in Renfrewshire (5%) compared to Scotland as a whole (3%). 
Figure 10: Method of Travel to Work in Renfrewshire and Scotland in 2022 (Source: 2022
Census)
Separately, consideration has been given to how mode of travel to work has changed since
2011; to enable Figure 11 to be reviewed with ease, 2011 commentary is provided separate
to the graph. Analysis shows that, based on the 2011 Census data (Scotland’s Census, 2011,
Table QS701SC), Renfrewshire travel to work by car / van (as a driver or passenger) has
increased from 65% to 71% mode share in 2022 (though the absolute number of people
travelling to work by car has decreased, likely as a result of more people working from
home); Bus mode share has decreased from 12% to 8% since 2011; rail mode share has
decreased marginally from 6% to 5%, whilst bicycle and walking mode shares have
remained broadly similar. 
The 2022 Census also asks respondents about whether they work from home. Data shows
that in 2022, 31% of respondents in Renfrewshire said they worked from home, which is
marginally lower than the national Scottish average of 32%. The 2011 census reported only
8% of people working from home, highlighting a significant increase in the ten year period.
PUBLIC

Page 377

Renfrewshire Local Transport Strategy – Main Issues Report   44
This change in working habits is likely the result of the COVID-19 pandemic and a shift in
working patterns. 
With regards to mode of travel to school, the Hands Up Scotland Survey undertaken by
Sustrans provides the most comprehensive dataset on travel to school, with a sample size
of over 19,000 pupils in Renfrewshire in 2023. The results for 2023 show that 44% of school
pupils in Renfrewshire walked to school, 4% cycled and 3% scooted or skated. By
comparison, across Scotland 41% of school pupils walked to school, 5% cycled and 3%
scooted / skated. This shows that the overall proportion of pupils travelling to school by
active modes of transport is slightly higher in Renfrewshire than Scotland as a whole.
Similarly, the proportion of pupils being driven to school is lower in Renfrewshire (19%)
compared to the whole of Scotland (23%). 
Figure 11: Method of Travel to School in Renfrewshire and Scotland in 2023 (Source: Hands-
Up Survey)
The proportion of pupils who travel to school by active travel has decreased in
Renfrewshire since the 2022 survey by 0.7 percentage points; the proportion being driven
had also decreased by 1.5 percentage points. There has been an increase in bus travel to
PUBLIC

Page 378

Renfrewshire Local Transport Strategy – Main Issues Report   45
school among secondary school pupils in Renfrewshire, increasing from 29% in 2021 to
33% in 2023. 
3.3.3. Distance Travelled
Figure 12 below shows average distance travelled for all journeys by people that live in
Renfrewshire each week in 2022, compared against Scotland wide data (Transport and
Travel in Scotland 2022); this is based on Scottish Household Survey results. A summary of
2017 results (Transport and Travel in Scotland 2017) is also provided in the commentary; to
enable Figure 12 to be reviewed with ease, 2017 commentary is provided separate to the
graph. 
2022 data shows that 78% of all journeys made by Renfrewshire residents were under
10km, which is 2 percentage points higher than the Scotland wide average. The
Renfrewshire figures are an increase from 2017, when 74% of all journeys were under
10km.
2022 data shows that 64% of all journeys made by those living in Renfrewshire were under
5km, which is higher than the national average of 61%. The Renfrewshire figures are an
increase from 2017, when 57% of all journeys were under 5km. 
2022 data shows that only 6% of all journeys were over 20km in 2022, which is lower than
the national average of 12%. The Renfrewshire figures are a slight decrease from 7%
recorded in 2017.
Shorter journey distances may, in part, be due to large areas of Glasgow being accessible
to many residents located in the east of Renfrewshire, such as Renfrew and parts of Paisley,
which are less than 10km from Glasgow city centre. 
PUBLIC

Page 379

Renfrewshire Local Transport Strategy – Main Issues Report   46 
Figure 12: Distance Travelled Renfrewshire (Source: Scottish Household Survey 2022)
The main mode of transport for journeys under 2 miles (3.2km) and under 5 miles (8km)
was also asked as part of the Scottish Household Survey 2022 (noting that this question
presents distances in miles rather than kilometres). Figure 13 below summarises results
from this question in Renfrewshire. 
• Walking was the most common mode type for distances under 2 miles in Renfrewshire,
with 48% of journeys under 2 miles being made by foot. For under 5 miles, this figure
dropped to 36%. 
• Driver car or van was the second most common mode of transport for journeys under 2
miles (38%) and was most common for journeys under 5 miles (44%). 
• Bicycle was not used by any of the Renfrewshire residents surveyed for journeys under 2
miles and this was repeated for journeys under 5 miles. This may indicate that cycling is
not considered to be a viable mode of travel for many residing within the area. 
• The data shows that Rail was only used by 1% respondents for journeys under 2 and 5
miles. For bus, the data shows that 3% of respondents use bus for journeys under 2 and
5 miles respectively. 
PUBLIC

Page 380

Renfrewshire Local Transport Strategy – Main Issues Report   47 
Figure 13: Mode of Travel on Journeys Under 2 Miles and Under 5 Miles in Renfrewshire
(Source: Scottish Household Survey 2022)
These results suggest that given the high proportion of shorter trips (less than 5 miles),
there are opportunities for more short distance trips to be made by active modes (walking,
wheeling and cycling). 
3.3.4. Car and Bike Availability 
Figure 14 and Figure 15 show the proportion of households that have access to a car
and bike for Renfrewshire and Scotland as a whole in 2022 (Transport Scotland 2022 Data).
A summary of 2017 results (Transport Scotland 2017 Data) is also provided; to enable        
Figure 14 and Figure 15 to be reviewed with ease, 2017 commentary is provided separate
to the graphs. The findings are summarised as follows.
• Renfrewshire households had a slightly lower availability rate of at least one car (72%)
compared to Scotland as a whole (75%). Access to at least one car per household in
Renfrewshire, in 2022, is the same as in 2017. 
• Access rates to at least one bicycle in Renfrewshire are in line with the national average,
with 38% of households in Renfrewshire having access to at least one bicycle, compared
to the national average of 37.5%. Access to at least one bicycle per household in
PUBLIC

Page 381

Renfrewshire Local Transport Strategy – Main Issues Report   48
Renfrewshire has increased since 2017, increasing by eight percentage points from 30%
in 2017 to 38% in 2022.
• Access to two or more bicycles within households in Renfrewshire is slightly lower than
the national average (20% vs 21.5% respectively) however this has grown by 17% since
2017 where only around 17% of households in Renfrewshire had access to two or more
bikes. 
Figure 14: Car Availability in Renfrewshire and Scotland 2022 (Source: Scottish Household Survey 2022) 
Figure 15: Bike Availability in Renfrewshire and Scotland 2022 (Source: Scottish Household Survey 2022)
In terms of car ownership, Renfrewshire has the highest vehicle ownership per head than
any other local authority in Scotland at the end of 2021, with 798 vehicles per 1,000 people
aged 17+; this is higher than the rural communities of Orkney and Shetland, which
PUBLIC

Page 382

Renfrewshire Local Transport Strategy – Main Issues Report   49
recorded 782 and 775 vehicles per 1,000 people aged 17+ (Transport Scotland Data 2022).
The pattern is similar for car registrations, with Renfrewshire having the highest figure per
thousand population at 678; it is noted however, that Renfrewshire accounted for 25% of
all company cars registered in Scotland, compared to only 5% of all cars (Transport
Scotland Data 2022), which will impact these figures.
Renfrewshire is part of the Strathclyde Partnership for Transport (SPT) area, which is the
largest by population of Scotland’s seven regional transport partnerships. In 2021, SPT
published a Draft Case for Change Report in support of the Regional Transport Strategy for
the West of Scotland, which was in the process of being developed at the time. The Case
for Change report includes information on the availability of Ultra Low Emission Vehicles
within the SPT area. This information shows that Ultra Low Emission Vehicle registration
rose from 193 in 2012 Q3 to 9,928 by 2020 Q3 across the SPT region. Renfrewshire had by
far the highest Ultra Low Emission Vehicle registration of any local authority area in the
SPT region by 2020 Q3, with 5,020 registrations, compared to the second highest of
Glasgow at 1,271 registrations. This is in part explained by the high car ownership in
Renfrewshire, but also by the high number of company car fleets located in the local
authority, with a large majority of the vehicles being a company registration. It is noted that
the number of Electric Vehicle Charging Devices across Renfrewshire was 148 as of April
2024 (Data provided by Renfrewshire Council); this is an increase from 115 Electric Vehicle
Charging Devices in Renfrewshire in January 2023 (UK Government statistics). 
3.3.5. Journey Times
Renfrewshire Council carries out journey time surveys for eight routes every two years;
these are detailed below. 
• Paisley to Glasgow International Airport
• Erskine to Motorway (M8)
• Renfrew to Paisley
• Bridge of Weir to Red Smiddy Roundabout (A8)
• Paisley to A8
• A8/M8 Junction 31 to Glasgow
• Bridge of Weir to Glasgow
• Johnstone to Royal Alexandra Hospital Paisley
PUBLIC

Page 383

Renfrewshire Local Transport Strategy – Main Issues Report   50
Data is available from 2019 and 2021, allowing a comparison to be undertaken. Analysis of
the data shows that generally across all routes, journey times decreased between 2019 and
2021 across all time periods. The route with the biggest decrease in time was Paisley to
Glasgow International Airport, which saw journey time reductions of 30% for the AM peak
and 42% for the PM peak (AM peak has been defined as 8am to 9am and PM peak as 5pm
to 6pm). It is noted that, for all routes, 2021 data was collected in March, during which
COVID-19 restrictions continued to be in place; this may have impacted outputs. 
3.3.6. Cordon Counts 
Renfrewshire Council undertakes cordon counts at regular intervals, thus providing traffic
counts. Data is available from 2018 and 2022. A comparison of the data has been
undertaken to understand how the number of vehicles on the road network has changed
over the four-year period; noting this compares pre-COVID-19 lockdown and post-COVID-
19 lockdown data. Counts were undertaken at 19 sites across Renfrewshire, which are
broadly located at:
• Paisley;
• Renfrew; and
• Erskine.
Individual counts are also undertaken in Bridge of Weir and Elderslie. 
A summary of the counts from 2018 and 2022 are provided below, alongside a summary of
the change. The data presented is based on a 5-day 24-hour average total flow and were
undertaken in March 2018 and 2022. 
Table 2: Traffic Count Changes 2018 to 2022
Site 2018  2022 Change
Paisley Cordon
Arkleston Road  10,866   11,887   1,021 (+9%)
A761 Glasgow Road  12,572   12,456  -116 (-1%)
A726 Hurlet Road  29,487   26,826  -2,661 (-9%)
B774 Caplethill Road  9,777   9,093  -684 (-7%)
B775 Gleniffer Road  3,039   3,745   706 (+23%)
PUBLIC

Page 384

Renfrewshire Local Transport Strategy – Main Issues Report   51
Site 2018  2022 Change
Glenpatrick Road  3,262   3,629   367 (+11%)
A761 Ferguslie  28,710   28,238  -472 (-2%)
A726 Greenock Road  21,982   20,634  -1,348 (-6%)
Inchinnan Road  12,630   9,920  -2,710 (-21%)
A741 Renfrew Road  34,730   29,992  -4,738 (-14%)
Renfrew Cordon
A741 Paisley Road  19,879   19,263  -616 (-3%)
A8 Glasgow Road  22,286   19,717  -2,569 (-12%)
A8 Inchinnan Road  14,303   11,698  -2,605 (-18%)
Erskine Cordon
A726 Barnsford Road  18,418   13,526  -4,892 (-27%)
A8 Greenock Road  11,049   10,019  -1,030 (-9%)
A726 Southbar Road  18,696   16,454  -2,242 (-12%)
A726 Bridgeway  13,681   11,620  -2,061 (-15%)
Other 
A761 Kilmacolm Road  7,813   7,113  -700 (-9%)
B789 Main Road  18,307   16,710  -1,597 (-9%) 
The results demonstrate that most areas have recorded a decrease in traffic flows between
2018 and 2022; noting that this presents a snapshot from one week only. The biggest
percentage decreases were recorded on Inchinnan Road (Paisley cordon) at 21% and at
A726 Barnsford Road (Erskine cordon) at 27%. The largest percentage increase was
observed at B775 Gleniffer Road (Paisley cordon) at 23%.
Overall,  across Renfrewshire in 2019, 1,624 million vehicle kilometres (Scottish Transport
Statistics 2020) were driven. This decreased slightly in 2022 to 1,610 million vehicle
kilometres (Scottish Transport Statistics 2023). 
PUBLIC

Page 385

Renfrewshire Local Transport Strategy – Main Issues Report   52
With regards to the condition of local authority roads in Renfrewshire, 28% were
categorised as red or amber; this is lower than the Scotland wide proportion of 33%
(Scottish Transport Statistics 2023). Red indicates that the road has deteriorated to the
point at which it is likely repairs to prolong its future life should be undertaken, and amber
indicates further investigation should be undertaken to establish if treatment is required. 
3.3.7. Bus Routes and Accessibility
Data captured in the Strathclyde Regional Bus Strategy Case for Change shows that bus
use in the west of Scotland (which covers SPT area and Dumfries and Galloway) has seen
sustained reductions in recent years, with a downward trajectory of annual passenger
journeys since 2008/2009. an SPT Report shows that bus use in the west of Scotland (which
includes the SPT area and Dumfries & Galloway) has seen sustained reductions in recent
years. For the period between 2009/10 to 2019/20, bus patronage declined by 32% across
the region. The pandemic further enhanced this trend, with bus patronage in 2021/22
down 34% on pre-pandemic levels in 2019/20.
There are a range of bus routes that originate, terminate or pass through Renfrewshire, as
shown in Figure 16. There are a number of commercial bus operators which currently
operate in the area, including First Bus and McGills. There are also organisations within the
area that are responsible for the delivery of community transport and demand responsive
transport services. Demand responsive and community transport is particularly important
to those for whom it is difficult to access public transport, including older people and
people with disabilities. In addition to services that operate wholly within the local
authority area, there are numerous bus services that operate to neighbouring authorities,
including to Glasgow and Inverclyde. 
PUBLIC

Page 386

Renfrewshire Local Transport Strategy – Main Issues Report   53 
Figure 16: Bus Routes across Renfrewshire
The Scottish Access to Bus Indicator is an analysis undertaken by the Scottish Government
which gives an indication of the availability and frequency of bus services within each data
zone across Scotland. These have been calculated for Renfrewshire, with outputs
presented in Figure 17; outputs are presented in deciles, with 1 being poorest access and
10 being best access. The results show the following:
• Over 60% of data zones within the local authority area are amongst the 50% least
accessible of all data zones in Scotland. 
• 30% of data zones within Renfrewshire are amongst the 20% least accessible of all data
zones in Scotland. 
PUBLIC

Page 387

Renfrewshire Local Transport Strategy – Main Issues Report   54 
Figure 17: Renfrewshire Bus Accessibility, % of Data Zones in each Decile (Source: Scottish
Access to Bus Indicator 2019)
The Figure below presents which decile data zones within Renfrewshire sit within in terms
of bus accessibility. This presents the same information as captured in the figure above,
but in map format (SPT RTS Draft Case for Change). This highlights the difference between
urban areas in the east of Renfrewshire, which generally have better access to bus
compared than rural areas in the west. Lack of access to buses can act as a barrier to
encouraging people to use more sustainable modes of transport and can make it more
challenging to reach emission reduction targets. It can also make it more difficult for
people to access education, employment and leisure sites. With regards to taxi
accessibility, it is noted that 97% of licensed taxis in Renfrewshire were wheelchair
accessible in 2020, which is significantly higher than the SPT wide average of 57%. 
PUBLIC

Page 388

Renfrewshire Local Transport Strategy – Main Issues Report   55 
Figure 18: Weekday Bus Accessibility Renfrewshire by Deciles (Source: Scottish Access to
Bus Indicator 2019)
3.3.8. Rail Station Usage
The Office of Rail and Road (ORR) collects data on rail station entries and exits across all
stations in the UK. There are 10 operating rail stations in Renfrewshire. In 2022/23 there
were 4,862,320 total entries and exits at Renfrewshire’s stations. The busiest stations
across Renfrewshire in 2022/23 in terms of passenger entries / exits were: 
• Paisley Gilmour Street (2,600,030)
• Johnstone (821,436)
• Bishopton (551,566)
The three stations in Renfrewshire with the lowest number of entries and exits in 2022/23
were:
• Howwood (55,720)
• Langbank (59,348)
• Paisley St James (64,478)
PUBLIC

Page 389

Renfrewshire Local Transport Strategy – Main Issues Report   56
In the years preceding 2019, there had been a general trend of growth in the number of
entries and exits at Renfrewshire’s stations. However, as a result of the COVID-19
pandemic, there was a large fall in rail passenger numbers, with numbers in 2020-21 79%
lower than in 2017-18. Rail passenger numbers in 2022-23 have increased across
Renfrewshire since 2020/21, but the number of entries and exits from stations remains 34%
lower when compared to 2019-2020. This therefore demonstrates a longer-term challenge
to encourage people to use rail, which is compounded by more people working from home
and no longer commuting to work five days per week. It should also be highlighted that
Paisley Gilmour Street is the main origin station for journeys from Glasgow Central
(Scotland’s busiest station) with nearly 1.4 million journeys made in 2022/23 Paisley to
Glasgow Central. The figure below shows the indexed passenger entries and exits relative
to 2017 for all stations across Renfrewshire. 
Figure 19: Renfrewshire Rail Station Entries and Exits 2017-2023 (Source: Office of Rail and
Road)  
PUBLIC

Page 390

Renfrewshire Local Transport Strategy – Main Issues Report   57
With regards to access at stations, Network Rail’s Accessibility Map indicates how
accessible stations are. Of the ten stations in Renfrewshire, this shows that:
• Paisley Gilmour Street, Johnstone and Hawkhead stations have step free access; 
• Paisley Canal, Milliken Park, Howwood, Lochwinnoch, Bishopton and Langbank have
partial step free access; and
• Paisley St James has no step free access. 
Table 3 shows vehicle parking and cycle storage that is available at each rail station in
Renfrewshire (National Rail). This shows the following:
• Johnstone has the most car parking spaces (423). 
• There are four stations without any designated parking available (Langbank, Milliken
Park, Paisley Canal and Paisley St James).
• All stations in Renfrewshire, with the exception of Paisley St James, have some cycle
storage facilities available.
This shows that whilst most stations cater for cars and bikes (albeit on a far smaller scale
for bikes), there are a small number that do not. There may be opportunities to increase
the number of cycle storage spaces at stations in particular and the number of Electric
Vehicle parking spaces, which do not exist at many stations.
PUBLIC

Page 391

58
Table 3: Renfrewshire Rail Stations Car Parking and Bike Storage Facilities
Station Parking Free? Owner Number of
Parking
Spaces
Disabled
Spaces
No. Electric
Vehicle
parking
spaces
Cycle
Storage
Spaces
Storage
Type
Passenger
Entries and
Exits
2022/23
Bishopton  Yes Yes Scotrail 284 24 0 10 Stands 551,566
Hawkhead Yes Yes Scotrail 40 2 0 10 Stands 166,966
Howwood  Yes Yes Scotrail 30 2 0 10 Stands 55,720
Johnstone  Yes Yes Scotrail 423 13 2 20 Stands 821,436
Langbank No N/A N/A N/A N/A N/A 10 Stands 59,348
Lochwinnoch Yes Yes Scotrail 17 1 0 10 Stands 116,942
Milliken Park No N/A N/A N/A N/A N/A 6 Stands 161,114
Paisley Canal No N/A N/A N/A N/A N/A 10 Stands 264,720
Paisley
Gilmour
Street
Yes No Scotrail 75 2 0 10 Stands 2,600,030
Paisley St
James
No  N/A N/A N/A N/A N/A 0 Stands 64,478
PUBLIC

Page 392

59
It is noted that in 2019, about 35,000 jobs were located at Glasgow Airport and the
surrounding Investment Area, which is the largest cluster of jobs in the SPT region without
direct access to rail services. Renfrewshire Council, overall, has the lowest proportion of
jobs located within immediate proximity of the rail network (around 25%) of all council
areas in the SPT region (SPT RTS Draft Case for Change).
3.3.9. Transport Expenditure 
The Living Costs and Food Survey is a survey conducted by the Office for National Statistics
each year and collects spending patterns and cost of living data that reflect household
budgets in the UK. This includes transport expenditure for different household types across
the country. 
The Office for National Statistics publishes data on output areas (which group populations
of around 55 households together within an area) and categorises these areas using the
same household types as the Living Costs and Food Survey). Using these groups, it is
possible to merge the output area and Living Costs and Food Survey data together at a
national and local authority level to gain an insight into transport expenditure levels. This
is shown in Table 4 for Renfrewshire. The outputs show:
• 79% of people in Renfrewshire spend more than 10% of their weekly household income
on transport costs. This is slightly lower than the national average of 84%. 
• 17% of people in Renfrewshire spend more than 15% of their weekly household income
on transport, which is also lower than the Scotland wide average (24%). 
Table 4: Transport Expenditure Renfrewshire and Scotland (FYE 2021) (Source: Living Costs
and Food Survey 2022)
Transport Expenditure (% of total weekly household expenditure) Financial Year Ending 2021 
0-4% 5-9% 10-14% 15-19% 20+%
Scotland  0% 16% 60% 23% 1%
Renfrewshire  0% 20% 62% 17% 0% 
Although the proportion of people spending a higher percentage of their household
income on transport is lower than Scotland wide figures, the data nevertheless shows that
PUBLIC

Page 393

Renfrewshire Local Transport Strategy – Main Issues Report   60
a large number of people spend a significant proportion of income on transport. This can
have an adverse impact on spending for other essential items. 
3.3.10. Satisfaction with Public Transport
Within the Scottish Household Survey there are questions related to satisfaction with
public transport. The results from 2017-2022 (excluding 2020) for Renfrewshire show that
general satisfaction rates with public transport in Renfrewshire (either very or fairly
satisfied) fell from 77% in 2017 to 49% in 2022. Levels of dissatisfaction (either fairly or very
dissatisfied) has fluctuated over the years, but were at their lowest point in 2021 at 12%
and at their highest point of 23% in 2022. 
Figure 20: Public Transport Satisfaction Rates Renfrewshire (Scottish Household Survey
2017-2022)
The survey also asked respondents to indicate whether they agree with the statement
“fares are good value for money” for bus and rail; in 2021, 43% of respondents stated they
agreed with the statement for bus, and 51% stated they agreed for rail. It is noted that this
question is only asked alternate years and 2021 is the latest data available. 
With regards to the statement “I feel personally safe and secure on the bus / train during
the day”, 91% stated they agreed with this statement for bus, and 90% for train. With
regards to the statement “I feel personally safe and secure on the bus / train during the
evening”, 68% stated they agreed for bus, and 71% for train.
PUBLIC

Page 394

Renfrewshire Local Transport Strategy – Main Issues Report   61
3.3.11. Road Safety
Using Reported Road Casualty Statistics data, which collects data from Police Scotland for
people killed or seriously injured on Scotland’s roads, it is possible to gain an
understanding of the number of casualties on the road network within a local authority
area. Figure 21 shows the trend for those killed or seriously injured on the road network in
Renfrewshire from 2012 to 2022 as a moving five-year average. Using a moving average
negates the influence of large fluctuations in year-to-year data that can occur but does not
necessarily mean there is a significant road safety issue within an area. This allows longer-
term trends in road safety data to be identified. It should be noted that due to changes in
reporting by Police Scotland in 2019, more accidents are now classed as serious rather
than slight. To account for this change, adjusted figures have been used in this analysis to
allow a fair comparison for years before 2019. Results show that number of people
seriously injured decreased from 2012-2016 to 2018-2022 (81 people down to 54 people)
and that the number of people killed on roads in Renfrewshire decreased slightly in the
same period from 2012-2016 to 2018-2022, from five people down to three. 
Figure 21: Road Casualty Statistics for Renfrewshire moving 5-year Average 2012-2022
(Source: Reported Road Casualty Statistics 2022)
Renfrewshire Council’s Road Safety Policy, which reflects the vision of Scotland’s Road
Safety Framework to 2030. The Framework has a vision for Scotland to have the best road
PUBLIC

Page 395

Renfrewshire Local Transport Strategy – Main Issues Report   62
safety performance in the world and has a number of targets, including interim targets to
2030 for a 50% reduction in people killed and seriously injured, and a 60% reduction in
children killed and seriously injured. Renfrewshire Council has key objectives for its road
safety policy, to: reduce the volume of traffic on the road network; reduce the speed of the
traffic on the road network; and enhance the physical environment for those who wish to
walk, wheel, cycle or use public transport.
3.4. Environmental
This section summarises environmental statistics that are related to transport and travel.
The key findings are presented below and have been identified following review of SPT’s
RTS Draft Case for Change report, which supports the new Regional Transport Strategy. 
Across the SPT region, carbon emissions from roads transport increased year on year
between 2013 and 2017 This was followed by a slight fall in the SPT region overall between
2017 and 2018, although emissions increased in Renfrewshire between 2017 and 2018. 
There are three Air Quality Management Areas within Renfrewshire as of 2024, located at
Paisley town centre, Johnstone High Street and Renfrew town centre. However, the
expectation is for these to be revoked in 2025. 
Further environmental findings will be identified as the Local Transport Strategy is
developed, including as part of the Strategic Environmental Assessment (SEA); this will
include identification of environmental constraints.
3.5. Summary
This chapter has summarised findings following analysis of socio-economic and travel and
transport data available for Renfrewshire. A summary of the key findings is captured below:
• Renfrewshire’s population has increased by 4% between 2017 and 2022, which is higher
than the Scotland wide change over the same period (0.2%). 
• A high proportion of data zones in Renfrewshire sit in the two most deprived deciles
(25%, compared to 20% average across Scotland). This may indicate challenges,
including access to transport and proportion of income spent on transport. 
• Renfrewshire’s Gross Value Added is significantly lower compared to the Scotland wide
figure and Glasgow’s recorded Gross Value Added. 
PUBLIC

Page 396

Renfrewshire Local Transport Strategy – Main Issues Report   63
• Car is by far the most common mode of travel to work. Whilst this may present
challenges in terms of meeting net zero targets, it also presents an opportunity to
encourage a large number of people to travel by sustainable modes. 
• 31% of respondents in Renfrewshire in the 2022 Census said they worked from home;
this is a significant increase compared to the 2011 Census, when only 8% of people said
they worked from home.  
• 64% of trips made were less than 5km. This therefore presents a significant opportunity
for more of these trips to be made by active modes (for those able to do so). There are
also opportunities to increase bike availability, with only 38% of households having
access to at least one bike. 
• Whilst there is good access to bus in large parts of Renfrewshire, areas in the west in
particular have low access. This can present challenges, particularly with regards to
accessing education, employment and leisure sites. 
• Rail usage has decreased significantly since the COVID-19 pandemic. 
• Renfrewshire Council, overall, has the lowest proportion of jobs located within
immediate proximity of the rail network (around 25%) of all council areas in the SPT
region.
• Renfrewshire has the highest number of ULEVs of any local authority in Scotland. 
• The number of people seriously injured and killed on Renfrewshire’s roads has
decreased in recent years, but challenges remain to decrease these numbers further.
The findings have been used to help inform the identification of transport related
problems and opportunities as part of the LTS development. 
PUBLIC

Page 397

Renfrewshire Local Transport Strategy – Main Issues Report   64
4. Engagement and Consultation
Public consultation and stakeholder engagement is an important stage of the LTS
development process and helps to make sure that the strategy works to address the
challenges and needs of the local area. An extensive round of consultation and
engagement was undertaken in Spring 2024, which focused on identifying transport
related problems and opportunities, as well as identifying potential options to address the
problems and opportunities. The engagement activities were designed to be inclusive
through both the range of engagement methodologies and specific groups consulted with.
This round of consultation helped to shape the Vision, Priorities, Objectives and actions of
the LTS and helps to set the direction for Renfrewshire Council’s transport investment and
policy over the next ten years.
The consultation had several elements, as set out below: 
• Online Survey (paper copies were also available upon request and were placed in
libraries);
• Interactive Map;
• Supermarket Events – In-person events at five supermarkets; 
• Stakeholder and Elected Members Workshops; and
• Community Workshops - with local community groups and groups representing people
with disabilities and with lived experience of poverty.
4.1. Online Survey
A survey was available online for the period of the consultation (Thursday 16th May to
Thursday 27th June 2024). Paper copies were also available at council venues such as at
targeted libraries. The survey link was shared with stakeholders via e-mail and was shared
on relevant social media pages, for example relevant local community groups. The survey
consisted of 19 questions, including sections on About You; Mobility and Transport;
General Views on Transport; and Local Transport for Renfrewshire 2025-2035. 
A total of 289 responses were received. Those aged 45 or over (61% of respondents) made
up the biggest number of respondents by age, and a majority of respondents were female
(52% compared to 32% male); the remaining 16% of respondents selected either non-
binary, described gender in another way, preferred not to say or did not respond. 
Responses were received from residents across a range of Renfrewshire settlements, with
PUBLIC

Page 398

Renfrewshire Local Transport Strategy – Main Issues Report   65
31% of respondents from Paisley and the surrounding area, 16% from Renfrew, 8% from
Johnstone, 7% from Langbank and 5% from Bridge of Weir. 73% of respondents had
access to a car as a driver, while 28% had access to a working bike or e-bike.
Most questions were closed, whereby respondents selected a response from a list. There
was also one open question where respondents could provide additional comments.
These responses were analysed and grouped thematically. The key findings are presented
in this section.
• The following summarises the proportion of respondents that ranked the following
challenges as number one. Respondents felt that the biggest challenges facing
Renfrewshire in relation to transport were public transport provision and frequency
within Renfrewshire (25.3%) and public transport provision and frequency connecting
Renfrewshire to other areas (23.2%). This was followed by cost of public transport
(12.8%). This therefore clearly demonstrates that challenges associated with public
transport are the biggest challenge for many respondents. Areas highlighted as being
underserved by public transport included Langbank and Lochwinnoch. 
• The following summarises the proportion of respondents that ranked the following
opportunities as number one. The biggest opportunities respondents identified were
improved public transport provision and frequency within Renfrewshire (32.9%) and
improved public transport provision and frequency connecting Renfrewshire to other
areas (31.1%), thus reflecting the most common challenges identified. This was
followed by expansion of and improved access to the walking and cycling network,
albeit with a smaller share of respondents selecting this as the biggest opportunity
(7.6%).
• In response to what would encourage people to cycle more often in Renfrewshire, the
biggest proportion of people selected that this question was not applicable (22.1%).
However, of other factors that were ranked number one, the most commonly selected
were better road and path condition – for example fewer potholes (15.9%) and more
traffic free routes (14.2%). 
• In response to what would encourage people to walk or wheel more often in
Renfrewshire, the most common responses were improved walking / wheeling
provision, for example more footpaths for day to day and leisure journeys (15.6%), more
traffic free routes (13.1%) and wider paths / smoother surface (11.8%). 
• In response to what would encourage people to travel by public transport more, the
most common responses were more frequent public transport services connecting
PUBLIC

Page 399

Renfrewshire Local Transport Strategy – Main Issues Report   66
Renfrewshire to other areas (16.6%), more frequent public transport services within
Renfrewshire (14.2%) and more destinations served by public transport (11.1%). 
• Respondents felt that the most important aspect for the new Local Transport Strategy
to address is an improved local bus network (20.8%), improved maintenance of the
road network (13.8%) and improved rail provision (13.5%). 
• With regards to what people felt the least important aspect is for the new Local
Transport Strategy to address, the highest proportion of people selected do not know
(16.3%); this compares to no respondents selecting do not know when asked what the
most important thing is for the new Local Transport Strategy to address. The least
important things to address identified were expansion of the public electric vehicle
charging network (11.1%), more opportunities and facilities for cyclists for day to day
and leisure journeys (10.4%) and do more to address congestion at school gates (9.0%). 
• Respondents were asked how important actions were in relation to the movement of
freight. The action ranked number one most commonly was encourage developers to
consider rail as an alternative to road for moving freight (30.1%). This was followed by
do not know (21.5%) and integrate provision of Electric Vehicle (EV) charging with
planning requirements for any new commercial developments (10.7%). 
• With regards to statements related to the path and road network, respondents were
asked to state the extent to which they agreed / disagreed with statements. The
statements that most people strongly agreed or somewhat agreed with were: More
priority needs to be given to the gritting of pavements and footpaths (73.2%); Speeding
traffic is an issue (67.0%); and Congestion in town centres is an issue (58.7%). The
statements that most people strongly disagreed or somewhat disagreed with were
Pothole issues are addressed well (78.8%); Overall, Renfrewshire’s roads are in good
condition (78.5%); Parking spaces on the street are easy to find (56.9%); and Road
maintenance issues are responded to quickly (55.6%). 
• With regards to the open question, responses were grouped by theme. The themes
which were mentioned the most frequently are as follows: Bus service expansion, for
example new services and routes (26 mentions); Rail Network Expansion, for example
new rail stations and lines (19 mentions); Public Transport Connections and Integration,
for example improving bus and rail connections and integration between services and
settlements (19 mentions); Safety, for example a  reduction in vehicle speeds, safety
improvements for pedestrians and cyclists, HGV movements (18 mentions); and Public
Transport Reliability and Timetabling, for example improving reliability and accessibility
of bus and rail (18 mentions). 
PUBLIC

Page 400

Renfrewshire Local Transport Strategy – Main Issues Report   67
With regards to what would encourage people to walk, wheel and cycle more often, it is
noted that results show that infrastructure measures such as traffic free routes and
improved condition of existing paths were ranked number one most often. 
The survey results also indicate that people are supportive of measures to improve the bus
network, including improved coverage and frequency. 
4.2. Interactive Map 
An interactive map was available online for the period of the consultation. A link to the
map was available on a dedicated Council webpage and a link to this was shared with
stakeholders. The map provided an outline of the Renfrewshire Council area and
respondents were asked to add comments related to transport within the area. Comments
could be categorised as positive, neutral or area for improvement. Figure 22 shows the
location of comments received. 
Figure 22: Location of Online Map Comments 
A total of 120 comments were received on the interactive map. Of these, 6 were positive, 3
were neutral and 111 were areas for improvement. A further 7 points were added, but no
PUBLIC

Page 401

Renfrewshire Local Transport Strategy – Main Issues Report   68
comment was provided. It is noted that all comments received related to locations within
Renfrewshire.  Comments were grouped into themes; the three most frequently mentioned
themes are summarised below. 
• Active Travel Infrastructure and Safety (43 comments) – comments included a focus on
improving safety of cyclists and pedestrians, for example a need for new and improved
pedestrian crossings, off road cycle paths and junction improvements; expansion of the
National Cycle Network and non-NCN network; protected on road cycle paths (where
off road is not possible); and well connected and integrated cycle and foot paths.
• Road Network Safety (18 comments) – comments included speeding traffic as a
problem; speed limit reduction, including implementation of 20 mph zones; traffic
calming measures; and a need for potholes to be repaired.
• Bus Service Expansion (18 comments) – comments included new bus routes, or
extension of existing bus routes; a need for bus links to the AMIDS site and to villages;
and direct bus services to major centres are required. 
4.3. Supermarket Events
In-person events were held at five supermarkets across Renfrewshire. The purpose of the
events was to provide an opportunity for members of the public to share their thoughts on
transport related problems and opportunities and potential options. A table was set up at
each supermarket and a map of Renfrewshire was presented, alongside three sheets of
paper, each with one of the following questions upon it:
• What are the biggest challenges you face related to transport within Renfrewshire?
• What are the biggest opportunities you notice related to transport within Renfrewshire?
• What should transport and travel look like in Renfrewshire by 2035?
4.3.1. Transport Challenges / Problems
The following points summarise transport related challenges and problems, as identified
by members of the public at the supermarket events. 
• The highest volume of responses across all supermarket events related to bus services
not adequately serving local communities. Key issues raised include bus reliability and
frequency, a number of key services no longer being in operation, and up to three buses
can be required to connect users with their desired destinations (for example the Royal
PUBLIC

Page 402

Renfrewshire Local Transport Strategy – Main Issues Report   69
Alexandra Hospital). A number of responses also indicated that this is an issue relating
to the way bus services are currently operated.
• On public transport in general, a lack of integrated ticketing was noted. Furthermore,
information around public transport was noted to be inadequate, specifically relating to
the perceived and actual difficulty in raising complaints to bus operators. A number of
responses also indicated that outside of daytime peak hours, there was a drastic drop
off in service provision and that this caused a number of issues for shift workers or when
people seek to access services and facilities during off-peak hours.
• Poor support for vulnerable groups was mentioned a number of times. The lack of
options for those without alternative private modes of transport was highlighted and
the socially isolating effects that this can have. The effects of bus cancellations on users
with additional needs was also noted as something that could be particularly
disruptive. 
• The lack of high-quality active travel connections was noted, as well as the lack of
secure parking facilities.
• There were a number of responses relating to infrastructure, placemaking, and
planning. These were mainly concerned with road maintenance / repair and general
infrastructure improvements. 
• Car parking was also mentioned. A need for more parking at community centres and
libraries was noted, as well as reviewing parking charges more widely.
• The dial-a-bus service was noted as being unreliable.
4.3.2. Opportunities / Potential Options 
The following points summarise opportunities / potential options, as identified by
members of the public at the supermarket events. 
• The most frequent response again related to the operation of public transport. A large
proportion of these related to a need to have a cohesive public transport network with
regular and reliable services. A number of comments also related to the public transport
model as a whole, with examples such as introducing more competition for services,
working with SPT to regulate the market, as well as exploring public ownership of bus
services.
• Another key theme to emerge related to demand responsive / community transport
services being explored and utilised more. There were positive examples given of
community transport successes and a desire for these to be built upon. Notes were
PUBLIC

Page 403

Renfrewshire Local Transport Strategy – Main Issues Report   70
made about the importance of local small buses which run as ‘lifeline’ routes, and the
importance of these to address social isolation for people without alternative modes of
transport. It was suggested a number of times that small capacity services could be run
relatively cheaply to improve transport links to key destinations.
• There were also comments around the need to provide support for the most vulnerable
users as a priority. More support was identified as necessary to provide transport links
to those with mobility issues or impairments, for example ensuring that there are
sufficient bus stops close to homes and to amenities and to make sure that these stops
are served.
• There was a desire identified for alternative travel modes to be encouraged, for example
car-pooling, car clubs, or bike hire schemes. One such example noted that measures
such as a car-pool scheme could be particularly useful in helping carers access more
remote communities when there is no adequate public transport provision.
• More active travel routes were identified as being an option upon which to build. A
number of responses indicated that there is good quality infrastructure in place in some
areas, but that there is a lack of a wider cohesive active travel network. Comments in
this category also considered the need to have safe vehicle free routes to schools, as
well as the importance of maintaining the infrastructure.
• Another theme discussed was better integrating the public transport network. A number
of responses mentioned the need for integrated ticketing measures, for example to
integrate tickets by area rather than by operator. 
4.4. Elected Members Workshop
A workshop was held via Microsoft Teams and Renfrewshire Councillors were invited to
attend. At the workshop, an overview of the previous LTS (2017 Refresh) was provided,
alongside the purpose of the new LTS. An overview was then provided of transport
challenges / problems identified thus far and a discussion was held; following a summary
of what was raised, transport opportunities / what the new LTS should prioritise was
subsequently discussed. 
PUBLIC

Page 404

Renfrewshire Local Transport Strategy – Main Issues Report   71
4.4.1. Transport Challenges / Problems
The following points summarise transport related challenges and problems, as identified
at the Elected Member workshop. 
• Electric Vehicle charging – a lack of electric vehicle charging points deters those without
space at their own home from buying electric vehicles; conversely, it was raised that
charging points can take up a number of non-electric car parking spaces; chargers are
expensive for the Council to install.
• Parking – limited amount of parking at rail stations such as Milliken Park and Johnstone
can lead to increased parking in the surrounding areas; people continue to drive to
railway stations due to a lack of integration being in place with other types of public
transport; car parking in some town centres such as Bridge of Weir can often be over
capacity, which leads to people choosing to shop elsewhere; concerns related to the
pavement parking ban and if this would result in some people parking on the
carriageway next to the pavement and impede live traffic; parking charges need to be
balanced with economic regeneration support for local businesses.
• Active Travel – lack of joined-up and segregated traffic-free cycle routes, resulting in
some cyclists using the pavements and making pedestrians feel unsafe; cyclists
advancing through red lights is a safety concern.
• Safety and Security – traffic speeds, particularly in rural areas; kerbstones around traffic
islands not being painted clearly.
• Public Transport – lack of joined up journeys between public transport modes; a lack of
integrated ticketing; lack of public transport provision in the evenings, particularly in
rural areas; Renfrew still does not have a railway station.
• Reliance on private cars – private car still remains the most convenient choice for
people.
• Congestion – congestion in town centres, particularly in rush hour and school pick-up
times; Johnstone town centre can get congested, in part owing to on street parking on
narrow roads.
• Emissions – noted that transport emissions are not generally a problem in Renfrewshire,
with recent reporting finding that NOx emissions have been reducing and air quality
action areas were being removed; however, cars idling outside schools was noted as a
problem.
• Access to transport – frequency and reliability of public transport; the financial burden
of public transport, with it felt that concessionary passes mean that paying customers
PUBLIC

Page 405

Renfrewshire Local Transport Strategy – Main Issues Report   72
are charged more; access to transport for people with disabilities, including some rail
stations that do not have step free access.
4.4.2. Opportunities / Potential Options 
The following points summarise opportunities / potential options, as identified at the
Elected Member workshop
• School congestion – greater emphasis on the promotion of walking and cycling to
school to prevent traffic congestion outside the school gate.
• Technology – technology could be used to offer joined up travel between different
modes of public transport; real time information at bus stops should be in place more
widely.
• Working from home – although a potential option, it was felt that asking individuals /
businesses to start work at different times and work from home on different days was
impractical.
• Controls / Enforcement (speeding and parking) – stronger controls for speeding and
parking issues to improve safety; introduction of red light cameras at traffic controls;
more speed cameras (although it was understood that speed cameras are not within
the Council’s control).
• Demand Responsive and Community Transport – support for increased community
transport.
• Electric Vehicle charging – increase the number of electric vehicle charging points.
• Car Clubs – introduction of car club schemes. 
• Walking and cycling benefits awareness – cycling proficiency courses; introduction of
minimum standards for cyclists such as reflectors, bells and insurance cover.
• Active Travel – expansion of the walking and cycling network.
• Public Transport – franchising of rail and bus networks should be encouraged.
4.5. Stakeholder Workshops
Two workshops were held on Microsoft Teams and targeted stakeholders were invited to
attend. At the workshop, an overview of the previous LTS (2017 Refresh) was provided,
alongside the purpose of the new LTS. An overview was then provided of transport
challenges / problems identified thus far and a discussion was held; following a summary
PUBLIC

Page 406

Renfrewshire Local Transport Strategy – Main Issues Report   73
of what was raised, transport opportunities / what the new LTS should prioritise was
subsequently discussed. 
4.5.1. Transport Challenges / Problems
The following points summarise transport related challenges and problems, as identified
at stakeholder workshops. 
• Town centre access – poor connectivity between transport modes in town centres due
to a lack of transport hubs; any changes to town centre access must not restrict those
who rely on the use of personal vehicles such as elderly and people with disabilities;
mixed opinions on reopening Paisley Town Centre and the High Street to traffic.
• Parking – charging for parking in Paisley Town Centre is unfair, given other town centres
do not charge for parking; parking enforcement is a problem and can cause issues for
buses travelling down narrower streets and accessing raised kerbs for people with
disabilities. 
• Electric Vehicles and charging points – challenges accessing electric charging points,
particularly for those residing in flats; mixed opinion on the installation of more
charging points, with some noting that the Council’s priority should be given to modes
such as walking and cycling, with the private sector installing charging points. 
• Public Transport – public transport connectivity and accessibility issues for key
employment sites, such as Glasgow International Airport, Hillington Industrial Estate
and the Royal Alexandra Hospital; difficult for residents who live outside of settlements
such as Paisley, Johnstone and Renfrew to access areas outside of the local authority
(for example, it has become difficult to access rail services from Langbank); gaps in the
bus network; the current app to track bus services is useful, but not all bus users have
access; current provision of support to facilitate community transport is poor. 
• Demand Responsive Transport – caution around rolling DRT out on a bigger scale, as it
is expensive to run.  
• Trunk road pinch points – pinch points in areas such as A737 junction at Johnstone and
M8 Junction at Arkleston causing congestion and safety issues. 
• Safety and Security – lack of lighting along the NCN; difficult to cross certain sections of
dual carriageway for pedestrians and cyclists at locations such as the M8 and A736;
safety concerns on the bus network owing to anti-social behaviour. 
PUBLIC

Page 407

Renfrewshire Local Transport Strategy – Main Issues Report   74
• Active Travel – lack of maintenance along the NCN in the winter months; lack of walking
and cycling routes connecting town centres and stations; limited active travel routes
along corridors such as the A8 and Glasgow Road.
• Access to transport – poor access to transport in rural areas of Renfrewshire in the
evening hours.
4.5.2. Opportunities / Potential Options 
The following points summarise opportunities / potential options, as identified at
stakeholder workshops.
• Public Transport – reduction in bus fares through daily capping and integrated ticketing
across bus and train operators; eligibility for concessionary travel could be widened;
need for improved links across Renfrewshire through new train stations and to connect
existing rail stations to the wider transport network; single ticketing system applied
across the city region for all modes of public transport; implementation of Clyde Metro
to strengthen public transport across Renfrewshire.  
• Rail station access – improve access to rail stations, for example address lack of ramp
access between platforms at some stations. 
• Technology – provision of Real Time Passenger Information at bus stops and in town
centres. 
• Electric Vehicles and charging points – charging points provided at transport hubs, for
example bus and rail stations.
• Active Travel – paths most in need of maintenance should be prioritised; upgrading of
painted cycle lanes to provided better protection; walking routes to schools to be of a
high quality. 
• School congestion – traffic free zones at schools; education to encourage pupils to
travel more sustainably to school, such as the Better Points programme and Living
Streets, and Transport Scotland’s Junior Road Safety Officers scheme. 
• Air quality and congestion – remove cars from congested towns to help lower noise
levels and improve air quality; promotion of no car zones outside schools. 
• Car Clubs – provide support for insurance for car cub vehicles. 
• Parking – mechanisms to discourage car travel, such as a reduction of parking supply. 
• 2019 Transport Act – SPT is looking at opportunities through the 2019 Transport Act,
including to consider how to move forward with bus franchising.
PUBLIC

Page 408

Renfrewshire Local Transport Strategy – Main Issues Report   75
4.6. In Person Workshops
Two separate in-person workshops were held with people in the community, the focus of
which was again to identify transport related problems and opportunities and potential
options. This included engagement with people living with disabilities and those with
experience of living with poverty. Invitees to the workshops were provided by Renfrewshire
Council and these represented a cross section of organisations. The in-person workshops
were undertaken within the Renfrewshire Council area. 
4.6.1. Transport Challenges / Problems
The following points summarise transport related challenges and problems, as identified
at the workshops. 
• Public Transport – public transport was one of the main discussion points. Challenges
raised included bus and rail services getting cancelled (unreliability of services with
timetables changing); limited number of direct services and limited frequency of
services, particularly in the evenings and in rural areas; a lack of audio and visual
announcements on buses; ramps not always available to get onto / off buses; drivers
pull away quickly after people have boarded, which can be dangerous for people with
mobility impairments; some stations are unstaffed; Real Time Passenger Information is
not always available outside of urban areas; safety and security concerns on buses and
rail; lack of integration between bus and rail services; the commercial setup of the bus
network in Renfrewshire, whereby there is one main operator, presents challenges;
wheelchair and pushchair spaces are often full and there is generally a lack of spaces for
wheelchair and push chair users; payment system can be confusing; buses can be
overcrowded, making people feel unsafe; assistance to get on / off trains needs to be
booked in advance; some stations are poorly lit /unlit and unstaffed train stations can
feel dangerous, particularly for people travelling alone and for female users; some
stations only have ramp access on one side of the platform; lifts at stations do not
always work; and high cost of bus fares and accessibility issues, including to board
buses and trains and at rail platforms. 
• Safety – this was raised as a concern, including personal safety / security (for example
when walking or cycling); and traffic speeds being too high.  
• Active Travel – shared use paths can be perceived as dangerous for pedestrians; there is
a lack of walking and cycling routes and they are often disconnected; streets can be
PUBLIC

Page 409

Renfrewshire Local Transport Strategy – Main Issues Report   76
unpleasant and dangerous to walk down (for example uneven paving, puddles, litter);
bins and cars parking on pavements can obstruct walkways so that mobility impaired
people cannot get past; lack of dropped kerbs extends distances for wheelchair users;
narrow streets make it difficult to move around; and active travel infrastructure is not
always well lit. 
• Community Transport – issues with community transport were raised, including issues
with this being late or getting cancelled; some services do not have secure chairs; the
booking system can be complicated; and there is a lack of community transport
generally across Renfrewshire. 
• Taxis – lack of accessible taxis; taxis are more expensive than other modes of travel,
which is a big barrier for people who are unable to use buses and trains; and limited
number of spaces for wheelchair users.
• Parking / Private Vehicles – there is broadly a lack of car parking available, for example
in Kilbarchan, Bridge of Weir and Johnstone Rail Station; areas outside of schools are
congested at start / finish times; and private cars are dominant, but this has challenges
such as safety implications. 
• Emissions – some comments were made which highlight the large contribution
transport makes to carbon emissions, but that little progress has been made to address
this. 
• Other – other challenges raised included: purchasing an adapted car is very expensive;
and the LEZ in Glasgow means that some vehicles can no longer access the city centre.
4.6.2. Opportunities / Potential Options 
The following points summarise opportunities / potential options, as identified at the
workshop.
• Safety – measures to address safety concerns, such as traffic calming measures and
speed limit reductions (including 20 mph zones). 
• Active Travel – improve and create new cycle paths, including to / from the National
Cycle Network; have speed limits for cyclists on paths; provide cycle training, including
in schools and to make people aware of the need to ring bells, for example; and
improved marketing to highlight the benefits of active travel. 
• Community Transport and school transport – expand the use of community transport,
including potential for community ownership; increase the number of school buses and
PUBLIC

Page 410

Renfrewshire Local Transport Strategy – Main Issues Report   77
improve drop off arrangements; school buses should have minimum specification
requirements, for example emissions standards; and encourage active travel to school. 
• Public Transport – SPT / public sector should explore bus franchising / municipal bus
services; Clyde Metro to provide a link to Glasgow Airport; free travel, similar to that in
place for bus travel should also be in place for rail services; strengthen access at
stations, for example at Lochwinnoch; raised kerbs to make it easier to access buses;
buses with more spaces for wheelchair users; better integration of public transport,
including an app to help people plan journeys with ease; more buses should have a tail
lift so wheelchair users can more easily access; more frequent buses with direct routes
to more town centres; all platforms and stations should be accessible and there should
be universal ramp provision for buses and trains; and bus priority on key corridors.
• Mobility Hubs – introduce mobility hubs at key locations. 
• Road network – dualling of the A737.
• Electric Vehicle Charging – install more public chargers for electric vehicles that are
more accessible. 
• Community Transport - Increase the number of community transport vehicles; and
travel buddy scheme, whereby people with disabilities who are confident travelling
assist people who are less confident to help improve their independence. 
• Taxis - Taxi operators should have a minimum number of accessible taxis available.
• Car Clubs – expand car clubs, including those that are community run, to employment
sites (including Glasgow Airport). 
4.7. Summary
An extensive round of public consultation and stakeholder engagement was undertaken
over a 6-week period in May / June 2024. This focused on identification of transport related
problems and opportunities and potential options to address these. A wide range of
feedback was received, and this is summarised further in the following chapter.  
PUBLIC

Page 411

Renfrewshire Local Transport Strategy – Main Issues Report   78
5. Problems and Opportunities
Problems and opportunities have been identified through: stakeholder engagement and
public consultation; analysis of transport and travel and socio-economic data; a review of
existing policies and strategies; and input from Council officers.
A summary of the key problems and opportunities identified is presented below.
5.1. Problems
Below sets out the transport and travel problems identified by high level theme, with
examples provided under each bullet point. A further summary of the problems is then
provided. Unless otherwise stated, problems captured below were primarily informed by
stakeholder and public feedback.
• Active Travel Infrastructure and Safety – the lack of cohesive and segregated traffic-free
cycle routes has resulted in some cyclists using the pavements owing to safety
concerns, which in turn makes some pedestrians feel unsafe; shared use paths were
also highlighted as being dangerous for pedestrians. Walking and cycling routes
connecting town centres, stations and along key corridors were highlighted as causing
issues. Safety concerns in relation to the active travel network were also raised such as a
lack of maintenance (including a lack of gritting in winter months), paths being
dangerous due to uneven paving and safety concerns when walking to school. 
• Public Transport frequency, reliability and integration – problems were highlighted
associated with the lack of integrated journeys between different public transport
modes and operators and the lack of integrated ticketing. Frequency and reliability of
train and bus services was also highlighted as a problem, particularly in the evenings
and in rural areas; it has also been raised that services can be cancelled at short notice,
resulting in subsequent services being busy and overcrowded. Bus and rail connectivity
and accessibility was also highlighted as a problem, including for access to key
employment sites, healthcare sites and to Glasgow Airport; SABI data shows that large
geographic areas in the west of Renfrewshire are in the lowest 20% of deciles. Gaps are
also present in the public transport network, with a lack of rail stations and gaps in the
bus network, further adding to connectivity problems; the bus coverage map shows
gaps in the west on Renfrewshire in particular. A lack of direct bus routes from some
parts of Renfrewshire to centres within the local authority was raised, as was a lack of
direct buses from within Renfrewshire to neighbouring local authorities. 
PUBLIC

Page 412

Renfrewshire Local Transport Strategy – Main Issues Report   79
• Electric Vehicles and charging points – problems were highlighted associated with a
lack of access to electric vehicle charging points, which deters those without space at
their own home from buying electric vehicles, for example those who live in tenement
blocks. There is typically lower EV charger coverage in areas such as Langbank, Erskine
and Bishopton. Conversely, it was highlighted that chargers are expensive for the
Council to install, with some feedback highlighting that the Council should prioritise
funding for other modes such as walking, wheeling and cycling.
• Parking – it was highlighted by some that there is a limited amount of parking at rail
stations (see Table 3, which shows some stations have no or limited parking spaces),
which can lead to increased parking in the surrounding areas. Feedback noted that car
parking in some town centres can often be over capacity, which leads to people
choosing to shop elsewhere, whilst other concerns were noted about the charging for
parking in Paisley and the adverse impact this can have on businesses. Also noted by
stakeholders that on street parking can make it difficult for larger vehicles such as buses
to travel down narrow streets, causing delays. 
• Access to transport – poor access to transport in rural areas across the day and in the
evening hours elsewhere was highlighted as an increasing concern, as well as the
frequency and reliability of public transport across the network; poor access in the west
of Renfrewshire is shown in Figure 18. The cost of public transport is also viewed as
making it difficult to access transport, with those who do not have a concessionary pass
feeling they are charged higher fares; the percentage of total weekly household
expenditure on transport is shown in Table 4. Furthermore, accessibility of transport for
people with disabilities, particularly at rail stations where there is not always step free
access, was noted to be a problem. Difficulties accessing public transport owing to
difficulties accessing information (for example where people are unable to use apps)
was also highlighted.
• Safety and Security (including road safety and maintenance) – a range of safety and
security concerns were raised by stakeholders and the public, such as high traffic
speeds, including outside schools, and maintenance of the road network such as
potholes, which can impact upon road safety. A lack of lighting along the NCN and more
generally, including on routes to schools, and anti-social behaviour on the bus network
were also raised by stakeholders and the public. Personal safety and security have also
been highlighted, including safety of female users and people with disabilities on buses. 
• Congestion and reliance on private vehicles – congestion in town centres, particularly in
rush hour and school pick-up times. Town centres can get congested, in part due to the
reliance on private car use. There are also pinch points on the trunk road network, such
PUBLIC

Page 413

Renfrewshire Local Transport Strategy – Main Issues Report   80
as A737 junction at Johnstone and M8 Junction at Arkleston. These comments were
raised by stakeholders and the public.  
Based on the themes and examples identified above, the problems identified can thus be
summarised as follows. It is noted that these are not presented in any particular order of
priority. 
5.2. Opportunities
The below sets out the transport and travel opportunities identified by high level theme,
with examples provided under each bullet point. A further summary of the opportunities is
then provided. It is noted that opportunities captured below were primarily informed by
stakeholder and public feedback. 
• Active Travel – Opportunities to improve and expand the cycle network, through
maintenance, upgrading of on road painted cycle lanes and improvements to walking
and cycling routes to schools. There is also opportunity to expand cycle training and
Limited active
travel
infrastructure
and safety
Limited public
transport
frequency and
provision and
poor reliability
Limited public
transport
integration
High fares
associated with
public transport
Personal safety /
security
Safety e.g.
speeding traffic
Limited access to
public Electric
Vehicle charging
points
Lack of
maintenance e.g.
potholes
Parking / town
centre access 
Reliance on
private vehicles
Congestion in
town centres
PUBLIC

Page 414

Renfrewshire Local Transport Strategy – Main Issues Report   81
proficiency courses to improve safety of users. There are health benefits associated with
this opportunity. 
• Climate change adaptation and resilience – Transport Scotland’s Approach to Climate
Change Adaptation and Resilience notes the climate risks associated with transport and
there are opportunities to protect against extreme weather conditions caused by
climate change. 
• Public Transport – Opportunities to work with SPT and operators to reduce bus fares,
including through integrated ticketing across bus and train operators, as well as
opportunities to expand the eligibility of concessionary travel. Also opportunities to
consider the potential for new rail stations and to work with SPT to explore the
potential for local bus franchising (as per powers granted in the Transport (Scotland)
Act 2019). 
• Park & Ride – Support mode shift through provision of more Park & Ride sites, either
through new sites or increasing the number of parking spaces where existing sites are at
capacity. 
• Clyde Metro – Opportunities to work with partners to support development of the Clyde
Metro, including potential for a link between Paisley and Glasgow Airport.
• Rail station access – Opportunities to improve access to rail stations, including to
provide ramp access between platforms at all stations. 
• Access for people with disabilities – Opportunities to make sure people with disabilities
can continue to access sites, including through the provision of suitably located
disabled parking bays. 
• Community Transport and Demand Responsive Transport – Opportunity to expand the
use of demand responsive and community transport, including potential for community
ownership. 
• School Congestion – Increase the number of traffic free zones at schools and
opportunities to increase education around walking and cycling to school through
schemes such as the Better Points programme and Transport Scotland’s Junior Road
Safety Officers Scheme. 
• Electric Vehicle charging – Opportunities to increase the number of electric vehicle
charging points (some areas, particularly in the west, have a small number of publicly
accessible charger points), for example at transport hubs such as bus and rail stations,
as well as providing more accessible charging points for users, including those residing
in flats.  
PUBLIC

Page 415

Renfrewshire Local Transport Strategy – Main Issues Report   82
• Air quality and congestion – Opportunities to address air quality, including to reduce
the number of vehicles from congested towns centres. It is noted however that
Renfrewshire had not had any air quality exceedances within the area for several years. 
• Safety – Opportunities to address safety concerns, such as traffic calming measures and
speed limit reductions (including 20 mph zones). Although data shows that the number
of people seriously injured and killed on Roads in Renfrewshire has decreased in recent
years, incidents continue to be recorded. 
• Car Clubs – Opportunities to introduce car club schemes, including those that are
community operated, to reduce reliance on privately owned vehicles. 
• Technology – Opportunities are available so that technology could be used to provide
joined up travel between different modes of public transport, which could include the
increased use of real time information at bus stops.
• Digital connectivity – As captured in the route map to achieve a 20% reduction in car
kilometres by 2030, there are opportunities associated with strengthening and
enhancing digital connectivity, including to reduce the need to travel. 
• Controls / Enforcement (speeding and parking) – Opportunities for stronger controls
and enforcement of speeding and parking issues to improve safety. 
Based on the themes and examples identified above, the opportunities identified can thus
be summarised as follows. It is noted that these are not listed in any particular order of
priority. 
PUBLIC

Page 416

Renfrewshire Local Transport Strategy – Main Issues Report   83 
Expansion of /
improvements
to walking and
cycling network
Improve path
and road
conditions
(maintenance)
Increase
frequency and
provision of
public transport
Improve access
to public
transport,
including
through lower
fares
Improve rail
provision / rail
expansion
Increase number
of Park & Ride
sites / spaces
Increase
provision of
Demand
Responsive and
Community
Transport
Reduced 
congestion
owing to more
people working
from home
Expansion of car
clubs
Tackle school
congestion
Reduce
transport
emissions
Improve road
safety 
Greater use of
technology
Greater
enforcement
measures
Digital
connectivity
Climate change
adaptation and
resilience 
PUBLIC

Page 417

Renfrewshire Local Transport Strategy – Main Issues Report   84
6. Summary 
This Main Issues Report has set out the policy context that has informed the need for
change. This is set against a backdrop of climate change and Just Transition principles to
support local, regional and national net zero targets. Consideration has also been given to
the priorities of the NTS2 which recognise the importance of reducing inequalities and
taking climate action. This includes through the adoption of the Sustainable Travel
Hierarchy and Sustainable Investment Hierarchy to reduce the need to travel, particularly
by unsustainable modes, and to promote a shift to active and sustainable travel.
This Report has therefore identified a clear need to focus on tackling climate change at a
national, regional and local level. The need for a safe and accessible transport network and
the importance of transport to support sustainable economic growth is also captured. The
main socio-economic and travel trends have been explored, which have identified car as
the predominant mode of transport. High levels of deprivation have been identified in
parts of Renfrewshire, and there are significant differences in public transport accessibility
across the area. 
Socio-economic and transport data analysis has been supported by consultation and
engagement through a number of different methods and a range of audiences to gain a
cross-section of views and insights. This process has helped to identify transport and travel
related problems and opportunities for the LTS. Problem and Opportunity themes have
been identified, which cover those related to promoting sustainable transport modes, 
safety and security, accessibility, parking, digital technology and demand responsive and
community transport.  
Findings set out in this report have directly informed the updated Local Transport Strategy;
including the development of a Vision Statement, Priorities, Transport Planning Objectives
and subsequently the development of Action Plans to guide transport investment for
Renfrewshire over the lifetime of the LTS.
PUBLIC

Page 418

Renfrewshire Local Transport Strategy – Main Issues Report   85 
Environment, Housing and Infrastructure
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR
PUBLIC