Minute of Meeting
Finance, Resources and Customer Services Policy Board 
Date Time Venue
Wednesday, 15 June 2022 14:00 Teams - virtual meeting,       
Present: Councillor Fiona Airlie-Nicolson, Councillor Alison  Ann-Dowling, Councillor
Jacqueline Cameron, Provost Lorraine Cameron, Councillor Michelle Campbell, Councillor
Graeme Clark, Councillor Audrey Doig, Councillor Chris Gilmour, Councillor Neill Graham,
Councillor Bruce MacFarlane, Councillor Iain Nicolson, Councillor John Shaw   
Chair
Councillor Shaw, Convener, presided. 
In Attendance
A MacArthur, Director of Finance & Resources; L McIntyre, Head of Policy &
Commissioning, L Adamson, Communications & Public Affairs Manager, B Bradley, Senior
Procurement Specialist (Housing), B Lambert, Corporate Procurement Manager, G Beattie,
Strategic Commercial Category Manager, A Donaldson, Strategic Commercial Category
Manager, L Fingland, Service Planning & Policy Development Manager, S Ford, Senior
Procurement Specialist, L Gillan, Strategic Commercial Category Manager and R Park,
Category Manager (all Chief Executive’s); T Irvine, Homeless & Housing Support Services
Manager and R Walkinshaw, Housing Regeneration and Development Manager (both
Communities and Housing Services); D Gillies, Head of Facilities Management and G
Hutton, Head of Operations & Infrastructure (both Environment & Infrastructure); C
McCourt, Head of Finance & Business Services, M Conaghan, Head of Corporate
Governance, P Murray, Head of Digital, Transformation and Customer Services, M Boyd,
Head of People & OD, J Lynch, Head of Property Services, E Shields, Business Services
Manager, G Dickie, Partnering & Commissioning Manager, G Innes, Customer Services
Manager, S Fanning, Principal HR & OD Adviser, D Pole and J Whitehead, End User
Technicians, E Gray, R Devine and P Shiach, Senior Committee Services Officers, D
Cunningham, Assistant Committee Services Officer and K O’Neill, Assistant Democratic
Services Officer (all Finance & Resources). 
Webcasting of Meeting
Prior to the commencement of the meeting the Convener intimated that this meeting of the
Policy Board would be filmed for live or subsequent viewing via the Council's internet site.

Page 2

Apologies
Councillors Grady, McGonigle and Mullin.  
Declarations of Interest
There were no declarations of interest intimated prior to the commencement of the
meeting. 
1 Joint Consultative Board (Non-teaching)
There was submitted the Minute of the meeting of the Joint Consultative Board (Non-
teaching) held on 30 March 2022, which forms the Appendix to this Minute. 
DECIDED:  That the Minute be noted. 
2 Revenue Budget Update 2022/23 
There was submitted a Revenue Budget Update report by the Director of Finance &
Resources relative to the impact on the revenue budget as a result of decisions taken
by the Council on 3 March 2022. 
DECIDED:  That the report be noted. 
3 Business Services Performance Report 
There was submitted a report by the Director of Finance & Resources relative to the
performance of key Business Service functions including revenue collection and
benefit administration for the period ending 28 April 2022. 
The report provided an update on the funding and expenditure position for
Discretionary Housing Payments and the Scottish Welfare Fund. Appendices to the
report provided information on revenue collection and key performance indicators. 
DECIDED: That the report be noted. 
4 Chief Executive’s Service - Service Improvement Plan 2022-23 and 
Service Delivery Plan 2021-22 Outturn Report
There was submitted a report by the Chief Executive relative to the Chief Executive’s
Service Improvement Plan for the period April 2022 to 2025. 
The plan set out the priorities being addressed; the key tasks to be implemented; the
implementation timetable; and the measure of success. The Service Improvement
Plan was attached as Appendix 1 to the report.

Page 3

The report provided an overview of performance against the actions and measures
set out in the Chief Executive’s Service Delivery Plan 2021/22. A detailed outturn
report was attached as Appendix 2 to the report. A mid-year progress update on the
Improvement Plan would be submitted to this Board in November 2022. 
DECIDED: 
(a) That the Service Improvement Plan be approved; 
(b) That the progress made in delivering the Service Delivery Plan 2021/22 be noted;
and 
(c) That it be agreed that a mid-year progress report on the Service Improvement Plan
be submitted to this Policy Board in November 2022. 
5 Customer Services Performance Report
There was submitted a report by the Director of Finance & Resources relative to
performance across key Customer Services functions including call centre, face-to-
face and digital support for customers for April 2022. 
The report provided an update on the overall contact centre call handling volumes and
indicated that face-to-face services had returned in Renfrewshire House, with these
being managed on an appointment basis. 
DECIDED: That the report be noted. 
6 Finance & Resources Service Improvement Plan 2022-23 and 
Service Delivery Plan 2021-22 Outturn Report
There was submitted a report by the Director of Finance & Resources relative to the
Finance & Resources’ Service Improvement Plan for the period April 2022 to 2025. 
The plan set out the priorities being addressed; the key tasks to be implemented; the
implementation timetable; and the measure of success. The Service Improvement
Plan was attached as Appendix 1 to the report. 
The report provided an overview of performance against the actions and measures
set out in the Service Delivery Plan 2021/22. A detailed outturn report was attached
as Appendix 2 to the report. A mid-year progress update on the Improvement Plan
would be submitted to this Board in November 2022. 
DECIDED: 
(a) That the Service Improvement Plan be approved;

Page 4

(b) That the progress made in delivering the Service Delivery Plan 2021/22 be noted;
and 
(c) That it be agreed that a mid-year progress report on the Service Improvement Plan
be submitted to this Policy Board in November 2022. 
7 Environment & Infrastructure Service Improvement Plan 2022/23-
24/25 and Service Delivery Plan 2021-22 Outturn Report
There was submitted a report by the Director of Environment & Infrastructure relative
to the Environmental & Infrastructure Service Improvement Plan 2022/23-24/25 and
Service Delivery Plan 2021-22 Outturn Report. 
The Plan linked with the Council Plan, Community Plan, Risk Management Plan and
Workforce Plan to form a set of documents which provided the strategic direction for
the service. The Plan was intended to complement the Economic Recovery and
Social Renewal Plans. The Service Improvement Plan was attached as Appendix 1 to
the report. A detailed outturn report was attached as Appendix 2 to the report. A mid-
year progress update on the Improvement Plan would be submitted to this Board in
November 2022. 
The Plan was presented to this Policy Board for approval of the areas within the
Board's remit. The Plan would also be reported to the Infrastructure, Land &
Environment Policy Board for approval of areas within that Board's remit. 
DECIDED: 
(a) That the 2022/23–2024/25 Service Improvement Plan for Environment &
Infrastructure attached as Appendix 1 to the report and as specific to the activity of the
Finance, Resources & Customer Services Policy Board be approved; 
(b) That the progress being made in delivering the Service Delivery Plan 2021-22 be
noted; and 
(c) That it be agreed that progress in respect of areas of activity delegated to this
Policy Board be reported to the Finance, Resources & Customer Services Policy
Board in November 2022.  
Declaration of Interest
At this point in the meeting, Councillor N Graham declared an interest in the following
item of business for the reason that he was a member of the Lodge Paisley St Mirrins'
No 129 and would withdraw from the meeting/leave the online meeting during any
discussion and voting on the item. 
8 Civic Hospitality 
There was submitted a report by the Director of Finance & Resources relative to a
request received by the Provost for civic hospitality from Lodge Paisley St Mirrins’ No
129 to accompany their 250th Anniversary celebrations on 10 September 2022.

Page 5

DECIDED: That the Director of Finance & Resources, in consultation with the
Provost, be authorised to make the necessary arrangements for civic hospitality at the
approximate cost indicated, as follows: 
Lodge Paisley St Mirrin’s No 129 250th Anniversary celebrations - £2,000. 
9 Charitable Registration of Common Good Funds 
There was submitted a report by the Director of Finance & Resources relative to the
charitable registration of Common Good Funds. 
The report advised that at the meeting of this Policy Board held on 5 September 2018,
it was agreed that a formal application be submitted to the Office of the Scottish
Charity Regulator (OSCR) requesting the de-registration  of  the  Paisley Common
Good Fund  SCO19478, Renfrew Common Good Fund SCO19479 and Johnstone
Common Good Fund  SCO19480. The request was submitted to OSCR in 2018 and a
response was only received by the Council from OSCR in March 2022. The response
from OSCR indicated that Renfrewshire’s Common Good Funds did not meet the
charity test on two grounds as detailed in the report. 
DECIDED: 
(a) That following approval from the Board in 2018 and OSCR’s recent confirmation of
the position, that it be noted that withdrawal in accordance with the Section 30 route
be selected to progress de-registration of Renfrewshire’s Common Good Funds  from
the OSCR register; and 
(b) That authority be delegated to the Director of Finance & Resources to write to
OSCR on behalf of the Board in this regard. 
10  Oakshaw Trinity Church Tower – Urgent repairs to Common Good 
property
There was submitted a report by the Chief Executive relative to urgent repairs which
were required to Oakshaw Trinity Church Tower and a proposal to meet these costs
from a combination of the Paisley Common Good Fund and the Place Based
Investment Programme. 
The report provided details of different ownership of the Church and the Tower, the
damage and deterioration to the Tower, the work undertaken to date and funding
arrangements. 
DECIDED: 
(a) That it be agreed that the Paisley Common Good Fund meet the £11,597 costs of
recent emergency repairs to the Oakshaw Trinity Church Tower, met to date from the
Council’s Property Repairs Budget; and 
(b) That a 50% or £50,000 contribution, whichever is lower, to be matched by the
Place Based Investment Programme, from the Paisley Common Good Fund to
implement full repair works to the Church Tower be approved.

Page 6

11  Chief Executive’s Service – Annual Health and Safety Report 
2021/2022 and Action Plan 2022/2023 
There was submitted a report by the Chief Executive relative to the Chief Executive’s
Service Annual Health and Safety Report  2021/22 and Action Plan 2022/23. 
The Chief Executive’s Service Annual Health and Safety Report set out the
arrangements for the management of health, safety and wellbeing within the service,
demonstrated the service’s commitment to continuous improvement in health and
safety performance in accordance with the Corporate Health, Safety and Wellbeing
Strategy 2019-2022 and summarised the achievements from 1 April 2021 to 31 March
2022. The report provided information on the impact that the Covid-19 pandemic had
on health and safety arrangements for the Chief Executive’s Service. The Annual
Health and Safety Report was attached as Appendix 1. 
The Chief  Executive’s Service action plan for 2022/23 set  out  the  planned  actions
the  service would undertake during 2022/2023, outlining the service’s commitment to
continuous improvement  in  health  and  safety  performance  in  accordance  with 
the  Corporate Health, Safety and Wellbeing Strategy 2019-2022. The action plan
included a specific action recognising the recovery phase from the Covid-19
pandemic,  ensuring  the  continuation  of  employee  safety  and awareness. The
2022/23 Plan was attached  as  Appendix 2  to  the report. 
DECIDED: 
(a) That the content of the Annual Health and Safety Report attached as Appendix 1
to the report be noted; and 
(b) That the Chief Executive’s Service health and safety action plan for 2022/23 as
detailed in Appendix 2 to the report be approved. 
12  Revised FARS Health and Safety Policy 2022
There was submitted a report by the Director of Finance & Resources relative to the
revised Finance and Resources (FAR) Health and Safety Policy 2022. 
The revised policy had been developed to reflect service changes in recent years and
the current health and safety risk profile for the service. The aims of the policy were
detailed in the report. 
DECIDED: That the revised FARS Health and Safety Policy 2022 be approved. 
13  FARS Health and Safety Report and Plan 2022/2024 
There was submitted a report by the Director of Finance & Resources relative to the
FARS Health and Safety Report and Plan 2022/24. 
The report set out the health and safety activity within the service in the year up to 31
March 2022 taking into account the ongoing pandemic and demonstrated the
service’s commitment to continuous improvement in health and safety performance.

Page 7

The report summarised achievements to March 2022. The health and safety report for
Finance & Resources and action plan for 2022/24, detailing the actions which the
service aimed to take to consolidate and  improve health and safety practice were
appended to the report. 
DECIDED: 
(a) That the content of the report attached as Appendix 1 be noted; and 
(b) That the action plan appended to the report be approved. 
14  2021/22 Annual Report on the Health, Safety and Wellbeing 
Activities within Renfrewshire Council
There was submitted a report by the Director of Finance & Resources relative to the
2021/22 annual report on health and safety wellbeing activities within Renfrewshire
Council. 
The report outlined the Council’s commitment to ensuring the health, safety and
wellbeing of its employees during the COVID-19 pandemic and public health crisis
and took into consideration the response to the Scottish Government’s strategy
document “Coronavirus (COVID-19): Scotland’s route map through the crisis". 
The health and well-being activities supported the aims of the council’s People
Strategy: “Our People Our Future 2021-2026” document. 
DECIDED: That the report on the health, safety and wellbeing activities and health
and safety performance of the Council be be noted. 
15  Report on the Voluntary Redundancy/Early Retirements Scheme
There was submitted a report by the Director of Finance & Resources relative to the
Council’s Voluntary Redundancy/Early Retirement scheme. 
The report advised that an annual report outlining the number of employees leaving
the Council through voluntary redundancy or voluntary early retirement schemes
(VR/VER) and the associated financial implications for the Council was presented to
the Finance, Resources and Customer Services Policy Board following the end of
each financial year. 
The report provided an update for the period from 1 April 2021 to 31 March 2022,
confirming that 28 employees (24.65 FTE) had left the Council through voluntary
redundancy or early retirement. The related financial costs and savings were detailed
in Appendix 1 to the report. An assessment was carried out in each VR/VER exercise
to confirm the length of time for savings to be achieved. For the 28 individuals
released from service, the average was just under 20 months. 
DECIDED: That the report be noted.

Page 8

16  Festive Lighting
There was submitted a joint report by the Chief Executive and the Director of
Environment & Infrastructure relative to the award of a contract for Festive Lighting
(RC-CPU-21-335) to Field and Lawn Limited. 
DECIDED: 
(a) That the Head of Corporate Governance be authorised to award a contract for
Festive Lighting (RC-CPU-21-335) to Field and Lawn Limited; 
(b) That it be noted that for the service period of three years the Council would have
the option to extend the service period for up to 12 months, subject to contract
performance. The anticipated start date was 26 September 2022. The actual start
date would be confirmed in the Council’s letter of acceptance to Field and Lawn
Limited; and 
(c) That a maximum contract value of up to £650,000.00 excluding VAT plus an
additional £80,000 excluding VAT to cover re-measurable works for the four (4) year
service period be authorised. 
17  Maintenance and Refurbishment - Voids and Tenanted Properties
There was submitted a joint report by the Chief Executive and the Director of
Communities & Housing Services relative to the award of a works contract for
Maintenance and Refurbishment - Voids and Tenanted Properties (contract RC-CPU-
21-248) to City Gate Construction (Scotland) Limited. 
DECIDED: 
(a) That the Head of Corporate Governance be authorised to award a contract for the
Maintenance and Refurbishment Works – Voids and Tenanted Properties (RC-CPU-
21-248) to City Gate Construction (Scotland) Limited; 
(b) That the maximum contract value of up to £20,000,000.00 excluding VAT be
authorised; and 
(c) That the contract be authorised with a proposed start date of 18 July 2022; that the
contract period be two years with the Council having the option to extend the contract
period for up to 12 months on two separate occasions. The proposed dates would be
confirmed in the letter of acceptance. 
18  Provision of Housing Support Services for Single Homeless People
& Childless Couples who may have Complex Needs
There was submitted a joint report by the Chief Executive and the Director of
Communities & Housing Services relative to the award of a contract to Blue Triangle
(Glasgow) Housing Association Limited for the Provision of Housing Support Services
for Single Homeless People & Childless Couples who may have Complex Needs.

Page 9

DECIDED: 
(a) That the Head of Corporate Governance be authorised to award the contract for
the Provision of Housing Support Services for Single Homeless People & Childless
Couples who may have Complex Needs to Blue Triangle (Glasgow) Housing
Association Limited; 
(b) That it be noted that the award of the contract would be for a period of two years,
anticipated to commence on 1 October 2022 and end on 30 September 2024 with the
Council having the option to extend for up to 12 months on two separate occasions. If
the maximum extension option was taken up, the anticipated end date would be 30
September 2026. The exact dates would be confirmed in the Council’s letter of
acceptance; and 
(c) That the award of the contract up to a maximum value of £799,984 excluding VAT
for the entire contract period (£199,996 per annum) be approved. 
19  Supply and Delivery of 4 x 7.5Tonne Multilift XR5 Hook Lifts
There was submitted a joint report by the Chief Executive and the Director of
Environment & Infrastructure relative to the award of a contract for the supply and
delivery of 4 x 7.5Tonne Multilift XR5 Hook Lifts (Contract RC-CPU-22-016) to Lothian
Vehicle Bodybuilders Limited. 
DECIDED: 
(a) That the Head of Corporate Governance be authorised to award a contract for the
Supply and Delivery of 4 x 7.5Tonne Multilift XR5 Hook lifts (Contract RC-CPU-22-
016) to Lothian Vehicle Bodybuilders Limited made following a mini-competition under
Lot 3 Bodies for Tippers of the Scotland Excel Framework Agreement for the Supply
& Delivery of Heavy and Municipal Vehicles (schedule 03/21); 
(b) That the total contract value of £271,004.00 excluding VAT be authorised; and 
(c) That it be noted that Lothian Vehicle Bodybuilders Limited had committed to
delivering the 4 x 7.5Tonne Multilift XR5 Hook Lifts to Fleet Services, Underwood
Road, Paisley week commencing 20 March 2023. 
20  Framework Contract for Works to Roads Related Structures
There was submitted a joint report by the Chief Executive and Director of Environment
& Infrastructure relative to authorisation to enter into a framework contract with a
number of suitably qualified and experienced contractors for Works to Roads Related
Structures (Contract RC-CPU-21-427). 
DECIDED: 
(a) That the Head of Corporate Governance be authorised to enter into a framework
contract for Works to Roads Related Structures (RC-CPU-21-427) (“Framework
Contract”) with each of the suppliers shown in paragraph 3.11 of the report;

Page 10

(b) That it be noted that  the cumulative spend made under this framework contract
would be up to the maximum value of £2,000,000 excluding VAT; 
(c) That it be noted that the framework contract was intended to commence on 11 July
2022 or alternatively, the date confirmed in the Council’s letter of acceptance issued
to each supplier and would be for a period of two years with the Council having the
sole option to extend on two separate occasions for a period of up to twelve months
on each occasion; and 
(d) That it be noted that the call-off contracts made under this framework contract
would be awarded by way of a package order using the selection procedure or the
quotation procedure contained in the framework contract. Selection of the most
appropriate procedure was at the discretion of the Council and would be subject to
Council Standing Orders Relating to Contracts, the requirements of the individual
package order (call-off contract) for the works and the need to secure best value. 
21  Notification of the award of the Contract for Surface Treatment
under delegated authority granted to the Strategic Commercial and
Procurement Manager
There was submitted a joint report by the Chief Executive and the Director of
Environment & Infrastructure relative to the award of a contract for Surface Treatment
(RC-CPU-21-434) which had been approved for award under the delegated authority
for the Framework Contract for Roads Related Maintenance Works (RC-CPU-120-
172) granted to the Strategic Commercial and Procurement Manager by this Policy
Board on 2 February 2022. 
The contract was awarded following  mini-competition under Lot 5 – Surface
Treatment of Renfrewshire Council’s Framework Contract for Roads Related
Maintenance Works (RC-CPU-12-172). 
DECIDED: 
(a) That the detail in section 3 of the report which detailed the contract for Surface
Treatment, reference RC-CPU-21-434, approved for award to Kiely Bros. Limited
under delegated authority granted to the Strategic Commercial and Procurement
Manager by the Finance, Resources and Customer Services Policy Board on 2
February 2022 for the Framework Contract for Roads Related Maintenance Works,
reference RC-CPU-20-172 be noted; 
(b) That it be noted that the start date was 23 May 2022 and the completion date was
26 August 2022. These dates were confirmed in the Employer’s Acceptance; and 
(c) That it be noted that the contract sum was £745,121.31 excluding VAT. 
22  Paisley Grammar School Community Campus (PGSCC) - Principal
Contractor (PC)
There was submitted a joint report by the Chief Executive and the Director of Finance
& Resources relative to the award of a pre-construction services agreement for
Paisley Grammar School Community Campus (PGSCC) - Principal Contractor (RC-

Page 11

CPU-21-247) (the PCSA) to Galliford Try Construction Limited T/A Morrison
Construction Scotland. 
The report advised that it was intended to subsequently award a Design and Build
Works Contract for Paisley Grammar School Community Campus  Principal
Contractor (RC-CPU-21-247) to Galliford Try Construction Limited T/A Morrison
Construction Scotland on completion of the Pre-Construction Services (the D&B
Contract). 
DECIDED: 
(a) That the Head of Corporate Governance be authorised to  award a pre-
construction services agreement (PCSA) for the Paisley Grammar School Community
Campus (PGSCC) – Principal Contractor (RC- CPU-21-247) to Galliford Try
Construction Limited, T/A Morrison Construction Scotland; 
(b) That the value of the PCSA at £228,862.21 exclusive of VAT be authorised; 
(c) That it be noted that the pre-construction services were scheduled for
commencement on Monday 11 July 2022. The actual date would be confirmed in the
Council’s letter of acceptance to Galliford Try Construction Limited, T/A Morrison
Construction Scotland; and 
(d) That it be noted that, on completion of the pre-construction services, a further
report would be brought to the Finance, Resources and Customer Services Policy
Board seeking approval to enter into the Design and Build Contract with Galliford Try
Construction Limited, T/A Morrison Construction Scotland.  
Sederunt
Councillor N Graham re-joined the meeting prior to the commencement of the
following item of business. 
23  Demolition of Tannahill Road and Tannahill Terrace
There was submitted a joint report by the Chief Executive and the Director of Finance
& Resources relative to the award of a contract for the demolition of Tannahill Road
and Tannahill Terrace (Contract RC-CPU-21-229) to Caskie Limited. 
DECIDED: 
(a) That the Head of Corporate Governance be authorised to award a contract titled
Demolition of Tannahill Road and Tannahill Terrace (RC-CPU-21-229) to Caskie
Limited; 
(b) That the contract sum of £235,850.00 excluding VAT for this contract be
authorised; and 
(c) That it be noted that the works were for a period of 28 weeks, with the intention for
commencement of the works on 18 July 2022 and a date for completion of 10
February 2023. The actual date for the commencement of the works would be
confirmed in the Council’s letter of acceptance to Caskie Limited.

Page 12

24  PAS2035 Retrofit Works (Housing Investment and Regeneration
Programmes)
There was submitted a joint report by the Chief Executive and the Director of
Communities & Housing Services relative to the award of a works contract for
PAS2035 Refit Works (Housing Investment and Regeneration Programmes) (RC-
CPU-21-318) to MP Group UK Limited who were the lead contractor for a consortium
consisting of MP Group UK Limited and Bolix SA. 
DECIDED: 
(a) That the Head of Corporate Governance be authorised to award a contract for
PAS2035 Retrofit Works (Housing Investment and Regeneration Programmes) (RC-
CPU-21-088) to MP Group UK Limited, who were the lead contractor for a consortium
consisting of MP Group UK Limited and Bolix SA; 
(b) That  a maximum contract value of up to £60,000,000.00 excluding VAT for all
task orders made under this contract be authorised; 
(c) That a proposed start date of 18 July 2022 with the contract period being two
years with the Council having the option to extend for up to 12 months on two
separate occasions be authorised. The actual start date would be confirmed in the
Council’s letter of acceptance; 
(d) That it be noted that the final value of the contract would be determined by the
number of properties both Council owned and privately owned identified and subject
of Task Orders; 
(e) That it be noted that a Consortium Guarantee was required from the contractor
within two weeks of the date of the letter of acceptance; and 
(f) That it be noted the contract award was subject to MP Group UK Limited providing
the required level of Professional Indemnity insurance cover.