Page 1

1 
___________________________________________________________________
To: Finance, Resources and Customer Service Policy Board 
On: 15 June 2022
___________________________________________________________________ 
Report by: Chief Executive
___________________________________________________________________ 
Heading: Chief Executive’s Service - Service Improvement Plan 2022-23 and
Service Delivery Plan 2021-22 Outturn Report
___________________________________________________________________ 
1. Summary 
1.1 The attached Service Improvement Plan for the Chief Executive’s Service
covers the three-year period from April 2022 to March 2025.  The plan sets out
the priorities being addressed; the key tasks to be implemented; the
implementation timetable; and our measures of success.  The Service
Improvement Plan sits beneath the Council Plan, Community Plan, Risk
Management Plan and the Workforce Plan to form a suite of documents which
provide Renfrewshire’s strategic direction for the service.  This plan is also
intended to complement the council-wide Economic Recovery Plan and Social
Renewal Plan.  The Service Improvement Plan is included as Appendix 1 to this
report. 
1.2 This report also provides an overview of performance against the actions and
measures set out in the Chief Executive’s Service Delivery Plan 2021/22. 
Service Delivery Plans were implemented for one year only and focused on
what each service would deliver to support residents, businesses and
communities through the pandemic and into a recovery phase.  A detailed
outturn report is included as Appendix 2. 
1.3 A mid-year progress update on the Service Improvement Plan will be submitted
to the Finance, Resources and Customer Services Policy Board in November
2022. 
2. Recommendations

Page 2

2 
2.1 It is recommended that the Finance, Resources and Customer Services Policy
Board: 
(a) Approves the attached Service Improvement Plan; 
(b) Notes the progress made in delivering the Service Delivery Plan 2021/22;
and 
(c) Agrees that mid-year progress with the Service Improvement Plan be
reported to this Board in November 2022. 
3. Background 
3.1 The Chief Executive’s service is responsible for setting the strategic direction
of the organisation and for delivering cross-cutting services.  It also manages
the public profile and reputation of the Council and leads on collaboration with
national organisations and partnerships across the public, private and third
sectors.  Consisting of 218 employees, the service has four main divisions: 
Policy and Commissioning; Marketing and Communications; Economy and
Development; and City Deal and Infrastructure. 
3.2 The Service Improvement Plan is one way in which elected members can
scrutinise the work of the Chief Executive’s Service, and to consider and
decide upon policy options as necessary. Refreshing Service Improvement
Plans annually allows each service to consider the context in which they
operate, and revise plans where appropriate. 
3.3 Importantly, the Service Improvement Plan also links the Council Plan and
Community Plan priorities to strategic and operational activity within the
service, which helps employees understand how they contribute to the
Council delivering its objectives. The priority actions set out in section 5 of the
attached Service Improvement Plan detail the specific actions the service will
progress in order to support the Council’s immediate priorities and future
direction and help deliver improved outcomes for Renfrewshire’s
communities.

Page 3

3 
4. Key Achievements 2021/22 
4.1 During 2021/22, key achievements of the service included: 
• Attracting £38.7m of Levelling-Up funding from the UK Government to support
the AMIDS South project
• Continuing with the delivery of the AMIDS programme, with the National
Manufacturing Institute Scotland (NMIS) and the Medicines Manufacturing
Innovation Centre (MMIC) both scheduled to open later this year
• Progressing the TH/CARS2 programme, upgrading several prominent
buildings in Paisley Town Centre
• Supporting 1791 people into employment through our employability work with
partners
• Producing a new Local Development Plan, which sets out the Council’s vision
for Renfrewshire’s economy, environment, towns, heritage and infrastructure
over the next 10 years and will form the basis for future planning decisions
• Continuing work on the large-scale cultural investment projects in Paisley -
Paisley Museum, Paisley Town Hall and the new Paisley Learning & Cultural
Hub – which should all be completed by 2023
• Supporting Renfrewshire’s cultural sector through 43 Future Paisley grants
with a total value of £200,000 – supporting 10 cultural organisations, 24
freelance artists and creating art installations in public spaces
• Successfully delivering in-person events, including the Spree Festival and
Paisley Halloween Festival in October 2021 and About Us, the launch event
for the UK Unboxed 2022 festival in March
• Securing national funding from VisitScotland and EventScotland to support
tourism and events restart
• Implementing our social renewal plan, with a focus on financial insecurity
including the community food fund, affordable credit, hardship payments,
winter clothing grants, and work around period poverty
• Undertaking a COVID community impact assessment with the next stage of
engagement through the Public Services Panel
• Supporting people isolating or vulnerable with 517 referrals being supported
by the Neighbourhood Hubs
• Continuing to implement the recommendations of the Alcohol and Drugs
Commission; a total of 14 projects are planned with the majority now in
delivery
• Progressing actions to mitigate climate change, including establishing the
community climate fund, the climate panel, developing the net zero plan and
commissioning work to baseline carbon emissions
• Delivering 127 grants to local community groups through the Celebrating
Renfrewshire programme.

Page 4

4 
4.2 A more detailed picture of achievements is included in the Service Delivery
Plan Outturn Report included as Appendix 2. 
5. What do we want to achieve? 
5.1 As we move beyond the pandemic and its next phase, the Council and its
partners will continue to promote and deliver on actions in relation to the
impact of COVID, and to respond to emerging cost of living crisis which is
impacting local business and communities. Our local response in terms of
economic and cultural regeneration, infrastructure development, employability
support and actions to support those most vulnerable will be reflected in the
forthcoming new Council Plan, which will be brought forward for approval in
September 2022. This service will also continue to contribute to the
achievement of outcomes set in Our Renfrewshire, our 10-year Community
Plan.  The Chief Executive’s Service is the lead for delivering on Tackling
Poverty, on the Alcohol and Drugs Commission and on Climate Change.  It is
also responsible for a number of large-scale capital projects and regeneration
activity. 
5.3 During the lifetime of this plan, specific priorities for the service include: 
• Continuing to deliver an ambitious programme of regeneration, with a specific
focus on culture and heritage;
• Progressing the large-scale infrastructure projects which come under the scope
of City Deal;
• To tackle inequalities in Renfrewshire through the Fairer Renfrewshire
Programme with a particular focus on the cost of living crisis and issues such
as fuel and food insecurity; 
• Next phase of the development of our work within communities – supporting
development of locality approaches, increased participation and the next phase
of the development of Local Partnerships
• Developing Renfrewshire’s Plan for Net Zero as part of our work to mitigate the
impacts of the climate emergency;
• Progressing new strands of work related to the recommendations of the Alcohol
and Drugs Commission, specifically on trauma and stigma, and the launch of
Recovery Change Fund in summer 2022
• New Council and Community Plan to be finalised in Autumn 2022;
• Positioning Renfrewshire as a destination of choice through visitor and investor
marketing and major events; 
• Building Renfrewshire Council’s brand and driving the implementation of the
Council values – fair, helpful, collaborative and learning; and

Page 5

5 
• Workforce planning – supporting health and wellbeing of employees around
new ways of working, and seeking to address areas where we are finding it
difficult to attract, recruit and retain staff. 
5.4 Further detail on the specific actions the service will progress can be found in
Section 5 of the Service Improvement Plan included as Appendix 1. 
6. Monitoring progress 
6.1 Progress on the implementation of the Service Improvement Plan will
regularly be monitored by the Senior Management Team and will be reported
to Elected Members on a six-monthly basis. A review of progress will be
brought to this Board in Autumn 2022. 
6.2 As well as performance measures with targets, the Service Improvement Plan
also includes some management information as additional context.  This
includes those indicators which are part of the Local Government
Benchmarking Framework.  Indicators which are for information only are not
featured on the performance scorecard but will be reported on as part of the
outturn. 
Implications of the Report 
1. Financial - The Service Improvement Plan highlights resourcing pressures
arising from increasing demand for services and the current financial
environment.   
2. HR & Organisational Development – All Council services are reviewing ways of
working in light of the changes resulting from the pandemic.  Any changes will be
reflected through reports to elected members. 
3. Community/Council Planning – the report details a range of activities which
reflect local Council and community planning themes. 
4. Legal – none 
5. Property/Assets - All Council services are reviewing ways of working in light of
the changes resulting from the pandemic, and this includes how buildings are
utilised.  Any changes will be reflected through reports to elected members.

Page 6

6 
6. Information Technology – Digital resources are now key to the delivery of
services and strategies are in place to manage this. 
7. Equality & Human Rights - The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in
the report.  Workstreams and projects arising from this report will carry out impact
assessments in line with Council policy.   
8. Health & Safety – none 
9. Procurement – The report continues a number of actions impacting
procurement. 
10. Risk – Risks related to the delivery and management of services are regularly
monitored and included in Renfrewshire Council’s Corporate and Strategic Risk
Registers. 
11. Privacy Impact - none 
12. COSLA Policy Position – none. 
13. Climate Change - The report continues a number of actions directly related to
addressing the impact of climate change.  The actions detailed within the report
should contribute to an improved position. 
List of Background Papers: None
___________________________________________________________________
Author Lisa Fingland, Service Planning & Policy Development Manager,
Email: lisa.fingland@renfrewshire.gov.uk

Page 7

7 
Chief Executive’s Service 
Service Improvement Plan 2022-2025

Page 8

8 
Contents 
1. Introduction .................................................................................................................................... 9
2. What we do ................................................................................................................................... 11
3. Overview of Achievements 2021/22 ............................................................................................ 14
4. Our Strategic Context .................................................................................................................... 15
5.  Our Strategic Priorities ................................................................................................................. 22

Page 9

9 
1. Introduction 
1.1 This Service Improvement Plan for the Chief Executive’s Service covers the period
from 2022/23 to 2024/25. The plan outlines what the service intends to achieve
over the next three years based on the resources expected to be available. 
1.2 In 2021/22, in recognition of the considerable impact of the pandemic, services
produced single-year delivery plans, which were focused on actions required to
manage the response to and recovery from the coronavirus.  The country is now
moving into the next phase of the pandemic, with restrictions easing.  The Council,
like other organisations, is now working towards a ‘new normal’ and continuing to
support and promote recovery from the impact of the pandemic whilst also driving
forward its strategic objectives.   
1.3 Council services continue to operate in a challenging context.  The ongoing
recovery from the pandemic and its effects continue to be felt by individuals,
businesses, communities and the public sector.   The inequalities that existed prior
to the pandemic have continued to be exacerbated by the pandemic and the
emerging cost of living crisis.  There are numerous legislative requirements relating
to that work which are being progressed, including duties in relation to child
poverty, the public sector equality duty and community empowerment.   
1.4 External events, such as the UK’s departure from the EU and the war in Ukraine, are
also exacerbating supply chain issues and inflationary pressures and there is an
ongoing requirement to monitor any impacts in relation to the Council’s key
strategic projects.  Councils are also navigating an increasingly complex funding
landscape resulting from increased demands and increasing costs but also arising
from the introduction of new funding streams such as the UK Shared Prosperity
Fund and Levelling Up scheme. 
1.5 The Service Improvement Plan sets out the likely impact that these issues will have
on the service and our actions to address them. 
1.6 The Council Plan clearly articulates the Council’s priorities for Renfrewshire, and
along with the Community Plan, sets out an ambitious programme of work.  A new
Council Plan is developed every five years, aligned with the cycle of local
government elections.  Renfrewshire’s new Council Plan is currently being
developed and will be presented to Elected Members later this year.  It will set out
the high-level strategic outcomes the Council intends to achieve and detail the

Page 10

10 
steps needed to delivery on these.    Future Service Improvement Plans will align to
those high-level outcomes; for now, key actions are grouped under four themes: 
• Place
• People
• Sustainability
• Living Our Values 
1.7 The Community Plan is a ten-year plan, and the current Renfrewshire Plan runs
from 2017 to 2027.  It is good practice to review these plans regularly to ensure they
remain ambitious and fit for purpose.  The Renfrewshire Community Plan is
currently being reviewed and this will involve engagement with key stakeholders. 
A revised Community Plan will also be presented to Elected Members and the
Community Planning Partnership later this year.  The Partnerships and Inequalities
Team within the Chief Executive’s Service leads on community planning work for
the Council. 
1.8 Service Improvement Plans inform each service’s Workforce Plan and Risk Register
and are the overarching documents which sets the programme of development
and improvement activity within the service as well as providing context for budget
decisions.  The Chief Executive’s Service also leads on the partnership Economic
Recovery Plan, Social Renewal Plan, strategic elements of the Local Housing
Strategy, the Local Development Plan and the forthcoming Plan for Net Zero.   
1.9 A mid-year progress update on the Service Improvement Plan will be presented to
board in autumn 2022, and an outturn report in May 2023.  Early in 2023, the Chief
Executive’s Service will review this plan and produce a revised version to reflect
both progress and any changing priorities.

Page 11

11 
2. What we do 
2.1 The Chief Executive’s service is responsible for setting the strategic direction of the
organisation and for delivering cross-cutting services.  It also manages the public
profile and reputation of the Council and leads on collaboration with national
organisations and partnerships across the public, private and third sectors.  The
service has four main areas of work:  Policy and Commissioning; Marketing and
Communications;  Economy and Development; City Deal and Infrastructure. 
The Policy & Commissioning Team covers three areas – Partnerships & Inequalities;
Strategic & Commercial Procurement; and Strategy, Policy & Insight.  The team is
responsible for: 
• Providing strategic policy support to senior officers, Elected Members and the
Corporate Management Team;
• Supporting improved corporate and service level performance and public
reporting through robust performance management and effective scrutiny; 
• Working closely with community groups and organisations to strengthen
relationships and promote community empowerment;
• Co-ordinating the Council’s approach, working with partners, to tackle
inequalities which exist across Renfrewshire’s communities, for example
through the Tackling Poverty, Alcohol and Drugs and Social Renewal
programmes;
• Leading the Council’s procurement activity to deliver best value, improved
environmental sustainability and wider Council and community benefits;
• Leading the Council’s corporate and community planning processes;
• Providing a corporate data analytics and research service to support sound
knowledge management and evidence-based decision making across the
Council; and
Alan Russell
Chief Executive
Laura McIntyre
Head of Policy &
Commissioning
Louisa Mahon
Head of Marketing &
Communications
Alasdair Morrison
Head of Economy &
Development
Barbara Walker
Programme Director, City
Deal & Infrsastructure

Page 12

12 
• Leading on the development of major initiatives such as the establishment of an
Alcohol and Drugs Commission and the Climate Emergency. 
The Communications and Marketing team have five sections – Communications; Marketing;
Events; Future Paisley Cultural Regeneration and Fundraising.  They are responsible for: 
• Managing the Council’s reputation and brand and placing meaningful
communication with local people, partners and the media at the heart of its
day-to-day business;
• Supporting employee engagement through effective recognition of
achievements and the promotion of our shared organisational values;
• Delivering high quality marketing campaigns to position Renfrewshire positively
in digital and traditional media, raise awareness of Council services and policy
changes and promote positive behavioural change leading to improved lives;
• Delivering an annual programme of major events that attract visitors, deliver
positive economic impact, create volunteering opportunities and increase
cultural participation;
• Promoting Renfrewshire’s story to local, UK and international audiences and
promote Renfrewshire UK-wide as a place to live, work, invest and visit;
• Delivering the fundraising strategy and capital appeal to develop Paisley
Museum; and 
• Leading on Future Paisley, a wide-ranging programme of activity and
investment which seeks to build on Paisley’s cultural heritage as a tool for
regeneration and strengthening communities. 
The Economy and Development Team cover two main service areas – Planning and
Development, and Economy and Regeneration.  The team is responsible for: 
• Leading on the Local Development Plan;
• Providing a planning and building and development standards service to local
residents; 
• Leading on employability for Renfrewshire and supporting unemployed people
into work;
• Delivering a programme of support to Renfrewshire’s business community to
support economic growth and an increase in local jobs;
• Supporting new business start-ups across Renfrewshire and promoting
enterprise; and
• Supporting delivery of the Renfrewshire economic strategy and action plan with
assistance from the Renfrewshire economic leadership panel Representing the

Page 13

13 
Council on various groups leading on transport, economy, enterprise and skills
at Glasgow City Region and national level. 
The City Deal and Infrastructure Team are responsible for delivering a number of large-scale
projects across Renfrewshire, including those which are part of the Glasgow City Region City
Deal programme.  The team is responsible for: 
• Leading on the delivery of the Glasgow Airport Investment Area (GAIA) and the
Clyde Waterfront and Renfrew Riverside project, both of which will improve
transport links and support economic regeneration in Renfrewshire;
• Leading on the delivery of the Advanced Manufacturing Innovation District
Scotland (AMIDS) and the AMIDS South development;
• Delivering the Cultural Infrastructure Programme which includes major capital
investments at Paisley Museum (with One Ren), Paisley Town Hall, Paisley Arts
Centre, the new Paisley Learning and Cultural Hub on High Street; and
• Delivering a range of town centre and heritage-led regeneration projects across
Renfrewshire, including the Townscape Heritage/Conservation Area
Regeneration Scheme (TH/CARS2) project.

Page 14

14 
3. Overview of Achievements 2021/22 
3.1 As part of the Council’s approach to managing the pandemic response, Council
services each produced a one-year Service Delivery Plan in 2021.  These focused on
the actions necessary to manage the response and the recovery from the
pandemic.  A full outturn report details the achievements of the Chief Executive’s
service during 2021/22 and sets out progress against actions and performance
targets. 
3.2 As well as continuing to deliver core services throughout 2021/22, the Chief
Executive’s service responded flexibly to additional responsibilities arising from
the pandemic and continued to deliver on major strategic projects.  Progress to
highlight includes: 
• Significant progress on the delivery of large infrastructure projects, such as the
AMIDS site at Inchinnan, Paisley Museum and Paisley Town Hall;
• Working with partners on regeneration and investment programmes across
Renfrewshire, such as the refurbishment of Johnstone Police Station;
• Progressing the Council’s ambitions to be Net Zero by 2030, carrying out a
climate survey and establishing Renfrewshire Climate Panel;
• Implementing the recommendations of Renfrewshire’s Alcohol and Drugs
Commission, an action plan for which is now being progressed;
• Supporting 486 registered clients and an estimated 200 unregistered people
into employment;
• Delivering destination marketing and a successful local and visitor events
programme generating 789 participation opportunities and attracting 63,630
attendees;
• Supporting communities through Neighbourhood Hubs and through delivery of
our Social Renewal Plan, delivering actions which focused on supporting
people experiencing financial insecurity, particularly in relation to food and fuel
insecurity; and
• Working with businesses to manage the supply chain challenges arising from
external factors.

Page 15

15 
4. Our Strategic Context 
National policy context 
4.1 The Council has adapted the way services are delivered over the last two years and
will continue to respond to national guidance as the pandemic recovery continues. 
The impact of the pandemic on Renfrewshire’s communities, residents and
businesses has been unprecedented and no Council service was untouched by the
lockdown and associated restrictions at that time.  The operating environment has
changed frequently and often at short notice and the Council has had to be flexible
and adaptable to manage this change and adjust services accordingly.  The
recovery phase is likely to continue for some time and Council activity will reflect
this. This recovery is guided by the National COVID Recovery Strategy.  As the
recovery progresses, the Council will work with employees, residents and partners
to identify new ways of working which best meet the needs of our people and our
communities. 
4.2 The impact of the UK leaving the EU in 2020 is not yet fully apparent, given the
impact that the coronavirus has had on the economy and on day-to-day life.  A
main driver of how Renfrewshire is impacted will be in the operation of the UK
Shared Prosperity Fund, which is in a ‘pre-launch’ phase.  This fund is intended as a
replacement for previous EU funding and will be allocated to local authorities
according to a funding formula.  More detail on this is expected over the next few
months. 
4.3 One of our approaches to tackling poverty has been to support people into
employment.  From April 2022, employability partnerships will implement the next
phase of No-One Left Behind, the national framework focused on putting
inclusiveness and equalities at the heart of employability, and tackling the impact
of Covid-19 on Scotland’s economy. 
4.4 The provisions of the Planning (Scotland) Act 2019 and the associated draft
National Planning Framework 4 create a single set of policies and guidance to
govern planning policies and procedures.  This includes a new spatial strategy for
Scotland which encompasses climate change, biodiversity, building a wellbeing
economy and creating sustainable places. 
4.5 The Scottish Government has set one of the most ambitions Net Zero targets
globally, to have net zero emissions of all greenhouse gases by 2045. The Climate
Change (Emissions Reduction Targets) (Scotland) Act 2019 sets this legally binding

Page 16

16 
target, as well as amending the interim targets, requiring a 75% reduction by 2030
and 90% reduction by 2040. 
4.6 The service also leads on community planning, community asset transfers and
participatory budgeting, all key strands of the Community Empowerment
(Scotland) Act 2015.  The Community Empowerment Fund supports groups with
developing capacity to apply for a community asset transfer and progress these
applications.  The seven Local Partnerships are another mechanism by which the
council supports partnerships between services and local communities.  During the
next year, we will be progressing our participatory budgeting (PB) programme to
deliver on the target of allocating 1% of council revenue expenditure via PB. 
4.7 The Chief Executive’s service leads on issues relating to poverty and produces the
statutory annual child poverty report.   The service has led the Council’s Tackling
Poverty programme and will now develop this into the Fairer Renfrewshire
programme, bringing together work under the Social Renewal Programme and the
Alcohol and Drugs Commission under one banner or umbrella of activity.  A key
area of focus currently is the cost of living crisis and on continuing to work with
partners in the public and third sectors to address food and fuel poverty. 
4.8 COSLA and the Scottish Government are working in partnership with Councils and
other public bodies to develop a trauma-informed and trauma-responsive
workforce.  The aim is to ensure that services are delivered in ways that prevent
further harm to those who have already experienced psychological trauma and/or
adversity in their lives.  The Chief Executive’s Service leads this for Renfrewshire
Council and the role of trauma champions is to promote a consistent and joined-up
multi-agency local approach to responding to trauma. 
4.9 UK-wide resettlement activity impacts on all Councils in Scotland and there are
multiple strands to this.  All Councils are part of a National Transfer Scheme that
supports unaccompanied asylum-seeking children and many, including
Renfrewshire, also participate in refugee schemes.  More recently, the war in
Ukraine has resulted in many UK residents offering their homes to people fleeing
that conflict.  As well as supporting refugees, local authorities have specific duties
in relation to vulnerable people such as unaccompanied children or those who
have been trafficked.   The UK Government has recently announced that it will be
widening its asylum dispersal programme across the UK and that may have future
implications.

Page 17

17 
Local policy context 
4.10 In December 2020, Council approved an Economic Recovery Plan for Renfrewshire. 
It sets the direction of travel for measures to support the local economy through
coronavirus response, recovery and beyond.  The plan acknowledges the
significant impact of the pandemic on the local and national economy, and what
that means for the people, business and communities of Renfrewshire.   
4.11 The pandemic exacerbated existing inequalities and as part of the Council’s work
to determine appropriate responses, a community impact assessment was
undertaken.  That resulted in the production of a Social Renewal Plan which sets
out joint plans (with our partners) to address the inequalities which exist in
Renfrewshire, and which were made worse by the pandemic.  The Council
continues to seek views on these issues through consultation exercises and our
Public Services Panel and will revise the assessment to ensure a clear
understanding of how residents are impacted and that actions continue to meet
current needs.  Rising prices, particularly for food and fuel, may lead to more
households experiencing absolute or relative poverty, and lead to increased
demand for the supports and services the public and third sectors can offer. 
4.12 Renfrewshire Council is one of the eight Glasgow City Region councils and part of
the Glasgow City Deal programme.  Renfrewshire leads on two major infrastructure
projects – the Glasgow Airport Investment Area and the Clyde Waterfront and
Renfrew Riverside programme.   
4.13 The Future Paisley programme, paused at the start of the pandemic, is entering its
fifth year, drawing on the rich heritage and cultural strengths of Paisley and wider
Renfrewshire for social and economic change. It combines targeted, sustainable
investment in cultural infrastructure and activity with the embedding of culture in
public policy and across council services from health and social care to education
and housing.  It aims to increase community prosperity and wellbeing, create a
vibrant town centre and help build a sustainable cultural sector. It is also radically
changing Paisley’s image.  Over 30 projects, activities, partnerships and events are
helping local people to access cultural experiences that can positively change their
lives. 
4.14 Renfrewshire Council declared a climate emergency in 2019 and set a target of
achieving net zero carbon emissions in Renfrewshire by 2030. Work continues to
progress towards this, with a Plan for Net Zero currently being developed which
will map out the journey for the organisation and the area to achieve this

Page 18

18 
challenging target.  As well as Council-led projects to help tackle climate issues, a
Community Climate Fund allows local groups to bid for up to £3000 for localised
initiatives which meet their community’s needs and align to the Council’s drive
towards net zero.   
4.15 Renfrewshire’s population is predicted to grow by 2.1% by 2030, a higher rate of
growth than the Scottish average.  In common with the rest of Scotland,
Renfrewshire has an ageing population due to the combined impact of a falling
birth rate and increasing life expectancy.  There has been positive net migration
into Renfrewshire in recent years, both from within Scotland and from overseas. 
The job creation resulting from infrastructure projects and economic regeneration,
coupled with new house building, may contribute to an increase in the working age
population in the medium and long-term.  Deprivation does remain a challenge in
Renfrewshire, however, and this has considerable implications for council services
in terms of meeting current and future needs but also in undertaking work with
partners to lift people out of poverty. 
4.16 The Council’s transformation programme was paused at the start of the pandemic
and whilst some service changes already agreed were able to be implemented,
new phases of transformation will start during 2022. 
4.17 All local authorities in Scotland are subject to a Best Value Audit inspection at least
once in every Council term (i.e. every five years).  Renfrewshire’s last inspection
was in 2017 and resulted in 7 key recommendations being made.   These help
determine improvement actions within the council and each year, Audit Scotland
publish an overview report detailing progress against the audit as well as scrutiny
of council finances.  Audit Scotland will produce an updated approach to these
audits later this year, and this is likely to reflect the significant change in the
operating environment of councils. 
4.18 The Council’s risk management arrangements are well established with all
strategic, corporate and service risks being reported to the Audit, Risk and Scrutiny
Board.  Strategic risks are more outward in nature, whereas corporate ones are
more inward and often affect more than one service department.  Actions related
to corporate and strategic risks, where senior officers in the Chief Executive’s
service are owners or joint owners of the risks are shown below.

Page 19

19 
Risks Evaluations
Our strategic risks
Economy Very High
Unemployment Very High
Reducing Inequalities in Renfrewshire Very High
Climate, Sustainability and Adaptability High 
4.19 Every area of work within the Council has a role to play in promoting equality and
diversity. While this is the right thing to do and has clear advantages for the
Council, there are also legal requirements.   The Equality Act 2010 protects people
from unfair treatment and asks public bodies (including Renfrewshire Council) to
show how they make a positive difference to equality groups.  A national
consultation on the Public Sector Equality Duty is currently underway. 
4.20 In 2020, Council approved a new Internal Communication and Engagement
Strategy and a new People Strategy.  Combining to focus on three priority areas –
health and wellbeing, new ways of working, and staff communication and
engagement.  The Council’s workforce has shown considerable resilience over the
last two years and no service was left unchanged during the pandemic.  Our staff
adapted quickly to the necessary changes, whether it was a change in how
frontline delivery was handled, adopting new ways of communicating with our
customers, or switching to full-time working from home.  As the country emerges
from the pandemic, the Council, like other organisations, will seek to build on the
new ways of working and find an approach which delivers the best possible service
for residents whilst promoting a healthy work-life balance for staff. 
4.21 Workforce planning is a challenge within the Chief Executive’s Service due to
nationwide issues with recruitment and retention in specific sectors, particularly in
planning and development services and procurement.    The service is currently
reviewing the approach to workforce planning and skills development in these
areas in order to attract and retain staff to relevant roles. 
4.22   The Council has a set of values which shape the way our staff interact with
colleagues, with local communities, with partner organisations and with all
stakeholders.  The organisational changes which will be delivered as part of this
Service Improvement Plan (see Section 5.5) are aligned to one of the four values,
which are:

Page 20

20 
• We are fair, we treat each other and everyone we deal with respectfully
and work hard to build trust in Renfrewshire Council.   
• We are helpful, we care about getting things right and are always
approachable.   
• We are great collaborators; we work as one team and with people who
care about this place.   
• We value learning to help us innovate, improve and deliver better
services.  
4.23 Partnership working across the Council and beyond is vital to the delivery of
services to Renfrewshire’s communities.  The Chief Executive chairs Renfrewshire’s
Community Planning Executive Group.  The Chief Executive’s Service works with
many different partners across the public, private and third sectors including:
Engage Renfrewshire, West College Scotland, the University of the West of
Scotland, local Credit Unions, Renfrewshire Chamber of Commerce, Scottish
Enterprise, Scottish Government, Skills Development Scotland, and Visit Scotland.
The Chief Executive’s Service also leads on developing Strategic Partnership
Agreements with key third sector organisations delivering major projects in the
area.   
Our Finances 
4.24 All local authorities in Scotland have experienced a hugely challenging and
complex set of circumstances over the last two years and it is recognised that the
financial impact on Councils from COVID-19 will continue for some time.  This
includes the impact on service costs, service demands and income streams, as well
as the cost of unavoidable delays to some transformation programmes.  Councils
are also impacted by the rising costs of goods and services caused by inflationary
pressures and global supply chain issues. Renfrewshire Council actively manages
these pressures through its short- and medium-term financial planning and is
acknowledged by Audit Scotland to have sound financial arrangements in place. 
4.25 However, the Council’s financial outlook remains subject to significant
uncertainty.  The most recent analysis reported to Council on 3 March 2022
suggests that Renfrewshire Council will experience a funding deficit in the range of
£18m-£50m in the three years following 2022/23, unless mitigating action is taken. 
4.26 Budgets are approved each year for both Capital and Revenue purposes. Revenue
budgets allow for expenditure and income on day-to-day operational activities,
such as employee costs, or supplies. For 2022/23, the Revenue budget approved

Page 21

21 
for General Services on 3 March 2022 was £486m, and for the Housing Revenue
Account £55m. 
4.27 Capital budgets allow for expenditure on the creation or enhancement of assets.
The capital budget approved for General Services on 3 March 2022 was £437m for
the period 2022/23 to 2026/27, and for the Housing Revenue Account £267m for the
period 2022/23 to 2027/28. 
Chief Executive's
Service, £366,000
Policy, Partnerships &
Procurement,
£4,622,000
Communications,
Marketing and Events,
£2,918,000
Economy &
Development,
£6,242,000
Gross budget, by service area, 2022/23

Page 22

22 
5.  Our Strategic Priorities 
5.1 As noted in the introduction to this plan, Service Improvement Plans align to the
Council and Community Plans.  Actions and performance indicators are each
grouped according to the strategic outcomes set out in the Council Plan.  As that
Plan has yet to be approved, actions and indicators in this SIP are set out under
four broad themes.   
• Place:  what we do to support our economy, our infrastructure, our assets;
• People: what we do to support our communities and individual residents;
• Sustainability: what we do to address climate issues and promote sustainable
services and communities;
• Living our Values: what we do in terms of our organisational behaviours and
approaches.

Page 23

23 
5.2 Strategic Priority: Place 
What will we do? What difference will we
make?
Who is leading
this?
When will we
do it by?
Work with partners to deliver the Advanced
Manufacturing Innovation District –
Scotland (AMIDS)
Engaging with key partners
in the public, academic and
private sectors to continue
progress on delivery of a
high-quality advanced
manufacturing innovation
district (AMIDS) which aims
to deliver thousands of new
jobs. 
Establish a JV Partnership
with a development
company to aid financial
and physical delivery of
AMIDS.  
Programme
Director - City Deal
and Infrastructure 
31 March 2023
Participate fully in all aspects of the new
National Manufacturing Institute Scotland
(NMIS) Governance arrangements and
Medicine Manufacturing Innovation Centre
(MMIC) delivery.
Engaging with key partners
in the public and academic
sectors to ensure NMIS and
MMIC are established and
operational timeously
Programme
Director - City Deal
and Infrastructure 
31 March 2023
Monitor benefits of City Deal Projects,
including Glasgow Airport Investment
Area,
Clyde Waterfront and Renfrew
Riverside and City Region wide
employment programmes
Benefits will include new
jobs and training and
upskilling opportunities for
Renfrewshire residents
Programme
Director - City Deal
and Infrastructure 
31 March 2025
Participate in and Monitor progression of
the Clyde Metro in partnership with GCC,
TS and other stakeholders.
Sustainable links to AMIDS,
Glasgow Airport, Gilmour
Street Train Station,
Renfrew and Braehead will
enhance economic
potential and reduce
carbon.
Programme
Director - City Deal
and Infrastructure 
31 March 2025
Progressing the AMIDS South project to
maintain the programme requirements of
the UK Government Levelling Up Fund
award. 
Social and economic
regeneration
improvements within
Paisley North Area and
improved enabling
infrastructure
Programme
Director - City Deal
and Infrastructure 
31 December
2023
Establish a programme of engagement
work with communities on the Community
Benefits that might be derived from the
Council’s procurement activity. 
This approach will ensure
that Community Benefits
delivered under the
category of “Community
Strategic
Procurement
Manager
31 March 2023

Page 24

24 
Engagement” are
meaningful, accessible and
fair to all community
groups. Local community
groups can set out what
Community Benefits their
communities would like to
be delivered. 
Actively engage with Renfrewshire
suppliers to increase the percentage of
procurement spend 
Increasing local
procurement spend
supports local job creation
and the sustainability of
local businesses.  It
contributes to community
wealth building and post-
pandemic economic
recovery. 
Strategic
Procurement
Manager
31 March 2024
Maximise funding for regeneration of
Renfrewshire’s places through grant
submissions to external sources including
UK and Scottish Governments.
Significant funding is
currently available to
deliver and/or add value to
regeneration projects.
Accessing external funds is
essential to the delivery of
our capital programmes.
Regeneration
Manager 
31 March 2023
Develop a Strategic Property Review of
Council operational, non-operational and
surplus assets
Optimal and productive use
of property for the
operational purposes of the
Council and for the
economic and community
development of
Renfrewshire’s places is key
to the efficiency of the
Council delivering its
services and for local
development.
Principal Assets
and Estates
Surveyor
31 March 2023
Deliver on the ambitions of our town
centre strategies and specifically working
with partners to transform Paisley Town
Centre through the Paisley Town Centre
Action Plan 20162026. 
Deliver changes within the
identified key areas Outline
a clear vision for the future
of the town centres   
Regeneration and
Place Manager 
31 March 2023 
Proactively work with property owners to
bring some of the area’s most valued
assets back into use 
This work will link with the
town centre strategies to
protect, enhance and
return to use key assets 
Regeneration and
Place Manager 
31 March 2023 
Pilot and test the creation of active travel
routes between neighbourhoods, town
centres and business locations using these
to test SMART travel solutions and evaluate
There is increasing,
evidence that walking and
cycling can play a very
significant role in
Regeneration and
Place Manager 
31 March 2025

Page 25

25 
benefits to biodiversity, air quality and
access  
optimising the contribution
of transport to economic
performance, including
areas such as reducing
congestion, quality of life
and retail vitality, and
reduced absenteeism as a
result of a 
Carry out evaluation of Future Paisley and
prepare a transition plan for the
mainstreaming/external funding of
projects beyond April 2024. 
We will evidence the impact
of the Future Paisley
programme in achieving
our 15 strategic outcomes
and 5 step changes, so that
future funding decisions
can be informed on the
basis of projects delivering
greatest positive impact for
local people and the
cultural sector. 
Head of Marketing
and 
Communications
31 March 2024
Expand destination marketing to promote
Renfrewshire as a visitor and investment
destination, maximising audience and
product intelligence and ensuring brand
relevance for all of Renfrewshire.
Visitor marketing will be
aligned with the new
tourism strategy,
incorporating rural and
urban attractions.  We will
increase visitors to
Renfrewshire and attract
investment to the area,
promoting local and
regional economic growth,
supporting regeneration
and generating jobs for
local people.   
Marketing Manager  31 December
2023
Lead development of a new event strategy
for Renfrewshire, expanding programming
across Renfrewshire and undertaking work
to understand the social impact of events
for Renfrewshire communities.
Our annual events
programme will take place
across Renfrewshire and
will continue to support
sector restart, promote
local and regional
economic growth and help
address visitor seasonality.
In addition, we will examine
the impact of events on
civic pride, community
cohesion and wellness.
Events Manager  31 December
2023
Successfully delivery the Capital Appeal for
Paisley Museum Reimagined Ltd. 
We will raise 3.5m to
support the transformation
of Paisley Museum. 
Fundraising
Manager
31 March 2024

Page 26

26 
Promote a Renfrewshire Apprentice
Framework that can be rolled out across
local businesses wishing to participate
Apprenticeships offer the
opportunity to enhance
Renfrewshire’s work-based
learning system and reduce
unemployment. 
Economic
Development
Manager
31 March 2023
Support and grow supply chain
management and knowledge exchange
among manufacturing SMEs to supply
Scottish / UK businesses and global supply
chain
Support with supply chain
development opportunities
can enable larger
contractors to reduce costs
in finding appropriate, high
quality and local suppliers. 
Head of Economy
and Development
31 December
2023 
Performance Indicator Frequency  Last
update
Current
Value
Current
Target
Traffic
Light
Icon
22/23
Target
23/24
Target
24/25
Target
Number of new business
start-ups in
Renfrewshire with
Business Gateway
support
Quarterly
and Annual 
2021/2
2 272 320  320 320 320
Number of local
businesses securing
growth support, training
or grants from
Renfrewshire Council
Business Team
Quarterly
and Annual New for 2022/23; baseline to be established.
Number of local
businesses registered on
Public Contracts
Scotland
Annual New for 2022/23; baseline to be established.
Number of local
businesses bidding for
work on Public
Contracts Scotland
Annual New for 2022/23; baseline to be established.
Number of Social
Enterprises supported to
grow / develop / income
generate with Council
support
Quarterly
and Annual New for 2022/23; baseline to be established.
Number of properties on
Buildings at Risk
Register
Quarterly
and Annual
2021/2
2 27 42  27 25 23
Amount of land brought
forward for re-use and Annual 2021/2
2 28 20  20 20 20

Page 27

27 
development
contributing to
economic activity and
enhancing the built and
natural environment
Fundraising Income
Target Annual 2021/2
2 185,000 500,000  500,000 500,000 500,000
Opportunities to see or
hear something (OTSH)
positive about
Renfrewshire Council
activity
Quarterly
and Annual
2021/2
2
371,061,
673
125,000,
000 
200,000
,000
200,000,00
0
200,000,00
0
Opportunities to see or
hear something positive
about Paisley and
Renfrewshire as part of
Paisley is destination
brand
Quarterly
and Annual
2021/2
2
314,041,
621
240,000,
000 
280,000
,000
280,000,00
0
280,000,00
0
Affordable housing
completions Annual 2021/2
2 170 243 
Target will be confirmed and
reported on in mid-year
report.
Private housing
completions Annual 2020/2
1 751 500 
Target will be confirmed and
reported on in mid-year
report.
Percentage of first
reports (Building
Standards) issued within
20 days
Quarterly 2021/2
2 53.4 95  95 95 95
The proportion of
operational
accommodation in
satisfactory condition.
Annual 2020/2
1 N/A 94%  94% 95% 95%
The proportion of
operational
accommodation that is
suitable for its current
use.
Annual 2020/2
1 N/A 96%  96% 95% 95%
% of procurement spend
spent on local
enterprises
Annual 2020/2
1 19.3% Target will be developed and reported on in mid-
year report.

Page 28

28 
5.3 Strategic Priority: People 
What will we do? What difference will we
make?
Who is leading
this?
When will we
do it by?
Implement the new Fairer Renfrewshire
programme
A co-ordinated programme
of activities is in place
which targets action where
it is needed most to reduce
inequalities.
Strategic
Partnerships and
Inequalities
Manager
31 March 2025
Develop and implement the action plan for
the Trauma-Informed and Responsive
Renfrewshire Programme. 
Alcohol and drug use can
have major consequences
for individuals and
communities.   A recovery-
led approach which
recognises the trauma
caused by alcohol and drug
use can be effective in
reducing individual and
societal harms.   
Head of Policy and
Commissioning
31 March 2024
Deliver the Stigma/Language Matters
campaign in Renfrewshire 
Tackling the stigma
surrounding harmful
alcohol and drug use can
support recovery.
Head of Policy and
Commissioning /
Head of Marketing
and
Communications
31 March 2024
Progress the next phase of Local
Partnerships development
Communities are
supported to feel
empowered and able to
contribute to local
decision-making.
Strategic
Partnerships and
Inequalities
Manager
31 March 2023
Deliver a framework that ensures that 1%
of council spend is now determined
through participatory budgeting. 
Communities will feel more
empowered and involved. 
A proportion of council
spend directly reflects the
priorities identified by local
community members.
Strategic
Partnerships and
Inequalities
Manager
31 March 2023
Develop and implement targeted
interventions to supporting communities
through the cost of living crisis, with a
particular focus on food and fuel insecurity
People most impacted by
rising prices will be
supported to access
affordable products, to
maximise their incomes,
and to improve their
wellbeing.
Strategic
Partnerships and
Inequalities
Manager
31 March 2023
Develop mechanisms for supporting
individuals with lived experience of
poverty to influence policy in this area.
Policies will be developed
in partnership with those
directly affected, and
therefore be designed with
Strategic
Partnerships and
Inequalities
Manager
31 March 2024

Page 29

29 
a greater understanding of
individual experiences.
Undertake a recommissioning exercise for
the provision of independent advice
services in Renfrewshire.
Access to high-quality
advice services (including
money advice) helps build
resilience in communities
and widens access to
specialist information and
advice.
Strategic
Partnerships and
Inequalities
Manager
31 March 2023
Carry out an evaluation of the Tackling
Poverty programme and develop a
transition plan for mainstreaming this
work.
Poverty has a persistent
and pervasive impact on
communities and
individuals and it is
important to understand
the impact of policies to
tackle poverty and use that
learning to inform future
policy, so that the
maximum number of
people can be helped.
Strategic
Partnerships and
Inequalities
Manager
30 September
2023
Support local strategic activities which
facilitate the integration refugees and
asylum seekers across Renfrewshire.
Renfrewshire is a more
diverse and inclusive area. 
New Scots feel welcome.
Head of Policy and
Commissioning
31 March 2023
Develop a refreshed employability
programme for Renfrewshire (utilising
Youth Guarantee and Kickstart funding) to
reduce unemployment among young
people (18-24 yrs.) and to support local
businesses
The employability of those
currently unemployed or
who potentially face
unemployment is
addressed through
reskilling and retraining,
and improved access to
opportunities. 
Economic
Development
Manager
31 March 2023
Bring forward actions to reduce health
inequalities, improving economic
participation, more secure earnings and
greater earning power.
Employment is one means
of tackling poverty which in
turn supports better health
and wellbeing.
Economic
Development
Manager
31 March 2024
Launch a new council website –
Renfrewshire.gov.uk – and implement the
digital experience strategy, transforming
how citizens interact with the council
across digital platforms.
We will build trust with
local people and improve
our responsiveness. 
Services will be easier to
access, people will feel
more connected to the
council and will have a
greater understanding of
our functions, priorities and
the services we deliver.
Communications
and Public Affairs
Manager
31 October
2023

Page 30

30 
Performance Indicator Frequency  Last
update
Current
Value
Current
Target
Traffic
Light
Icon
22/23
Target
23/24
Target
24/25
Target
Number of trainee type
posts created for
unemployed people at
Renfrewshire Council 
Quarterly
and Annual New for 2022/23; baseline to be established.
Number of unemployed
people being supported
through Renfrewshire
Council Employability
Programme (INVEST)
Quarterly
and Annual 2021/22 859 1,100  1,100 1,100 1,100
Number of unemployed
/ low waged people
securing qualifications
through Renfrewshire
Council Employability
Programme (INVEST)
Quarterly
and Annual New for 2022/23; baseline to be established.
Number of unemployed
people moving into paid
employment through
Renfrewshire Council
Employability
Programme (INVEST)
Quarterly
and Annual
2021/2
2 686 350  350 370 400
Number of people
supported, sustained in
work at 6 Months
through Renfrewshire
Council Employability
Programme (INVEST)
Annual 2021/2
2 221 180  180 200 220
Asset Management
Transfer - number of
months from receipt of
an application to a
determination being
issued from the Council
Annual 2021/2
2 0 6  6 6 6
Measure of civic pride
relating to events  Annual  New for 2022/23 – baseline to be established 
Number of people
participating in the
events programme,
digitally or in person
Quarterly
and Annual
2021/2
2 789 300  300 1500 1500
Number of people
performing in the events
programme, digital or
live performance
Quarterly
and Annual
2021/2
2 307 100  150 250 250

Page 31

31 
Number of volunteers
supporting the
development and
delivery of the events
Quarterly
and Annual
2021/2
2 8 15  15 350 350
Number of people
viewing or attending the
events programme
Quarterly
and Annual
2021/2
2 63,630 65,000  65,000 85,000 85,000

Page 32

32 
5.4: Strategic Priority: Sustainability
What will we do? What difference will we
make?
Who is leading
this?
When will we
do it by?
Complete the District Heating Network at
AMIDS, with supplies to NMIS and MMIC.
This will contribute to
Renfrewshire’s Net Zero
ambitions and will also act
as a demonstrator site to
show the value of
sustainable energy
projects.
Programme
Director - City Deal
and Infrastructure 
31 March 2023
Develop the first stage of Renfrewshire’s
Plan for Net Zero
Working together with
communities and partner
organisations we can
support the transition to a
net zero society, ensuring
we contribute to reducing
and mitigating the impact
of climate change.  As a
large public sector
organisation, the council
has a duty to lead by
example and to influence
others.
Strategy, Policy &
Insight Manager
31 December
2022
Ensure that climate considerations are
taken into account in our procurement
strategies and tenders with a focus on
reducing emissions.    
Working together with
other services we can
support the reduction of
emissions, waste and
consumption by
challenging usage, taking
an innovative approach to
specification, better
utilising technological
solutions and promoting
the circular economy. 
Strategic 
Procurement 
Manager 
31 March 2025 
Implement a plan for managing supply
chain disruption arising from external
events
The council will have
greater resilience.
Strategic
Procurement
Manager
31 March 2023 
Performance
Indicator
Frequency  Last
update
Current
Value
Current
Target
Traffic
Light
Icon
2022/23
Target
2023/24
Target
2024/25
Target
Number of local
businesses working
with the Council to
progress the Net Zero
agenda (NEW)
Quarterly
and Annual
New for 2022/23; baseline to be established.

Page 33

33 
Number of local
businesses securing
Net Zero growth
grants from
Renfrewshire Council
Business Grants
(NEW)
Quarterly
and Annual New for 2022/23; baseline to be established.

Page 34

34 
5.5: Strategic Priority:  Living our Values
What will we do? What difference will we
make?
Who is leading
this?
When will we
do it by?
Undertake a corporate self-assessment
exercise in line with revised best value
audit methodology
Key aspects of governance
are strengthened, and an
improvement focus
remains central to the plans
and strategies of the
council.
We collaborate.
Strategy, Policy &
Insight Manager
31 March 2023
Review and refresh the Council’s
performance management framework
Robust performance mgmt.
arrangements in place
which support effective
scrutiny and decision
making.
We value learning. 
Strategy, Policy &
Insight Manager
31 March 2023
Lead implementation of the council brand,
prioritising tone of voice, inclusive
communications and audience insights 
Citizen’s trust and value the
council and we are able to
attract and retain talent. 
We are fair.
Head of Marketing
and
Communications 
31 March 2025
Deliver the Digital Experience Project,
transforming the council’s public presence
across all platforms.
Services become easier to
access, people feel more
connected to the council
and have a greater
understanding of its
functions, its priorities and
what it delivers.
Head of Marketing
and
Communications
31 March 2025
Lead implementation of strategic
communications to support the council’s
financial strategy 
Local people, communities
and partners are aware of
the financial challenges
facing public services and
understand how the council
is planning for the future. 
We are helpful.
Head of Marketing
and
Communications 
31 March 2023
Undertake a workforce planning exercise
across procurement to address challenges
in recruitment and retention
This will build capacity and
resilience and support us
being an employer of
choice in this profession.
We value learning.  
Strategic
Procurement
Manager
31 March 2023
Undertake CIPS self-assessment activity. This provides assurance
that the team continues to
deliver a high-quality
service and retains a focus
on continuous
improvement.  We value
learning.
Strategic
Procurement
Manager
31 March 2023

Page 35

35 
Ensure a service-wide focus on absence -
supporting managers with training,
embedding policies and supporting the
health and wellbeing of employees. 
We are working with our
colleagues in HR and OD to
develop and implement
further measures to
proactively manage
absences and support staff
health and wellbeing as
part of the new People
Strategy.
We are fair.
Senior
Management Team
31 December
2023
Implement the Council’s People Strategy
across the service, with a particular focus
on employee wellbeing.
Staff are one of the
council’s most valuable
assets.  Supporting them
not only makes
Renfrewshire Council a
good place to work, it helps
build resilience and support
future planning.
We are fair.
Senior
Management Team
31 December
2022 
Enhance staff engagement through
internal communications, providing equity
of access to information and developing
communication as a core management
skill.
Employees easily access
information important to
their working lives. Our
people are ‘first to know’
about changes at work.
Employee benefits are well
understood, and staff know
how to access wellbeing
services and support.
Managers at all levels are
supported to confident
communicators. This
contributes to an engaged
workforce.
We are fair.
Corporate
Communications
and Public Affairs
Manager
31 March 2023 
Performance Indicator Frequency  Last
update
Current
Value
Current
Target
Traffic
Light
Icon
22/23
Target
23/24
Target
24/25
Target
% of investigation
complaints responded
to within timescales
agreed with customer
(Chief Executive’s) 
Quarterly
and Annual
2021/2
2 77% 100%  85% 85% 85%
% of frontline resolution
complaints responded
Quarterly
and Annual
2021/2
2 46% 100%  85% 85% 85%

Page 36

36 
to within timescales
agreed with customer
(Chief 
Executive’s) 
Average number of work
days lost through
sickness absence per
employee (Chief
Executive's) (FTE) 
Quarterly
and Annual
2021/2
2 4.26 6.5  6.5 6.5 6.5
% of FOI requests in a
quarter completed
within timescale in the
Chief Executive's
Department 
Quarterly
and Annual
2021/2
2 93.5% 100%  100% 100% 100%
Time to issue a building
warrant or amendment
to warrant from receipt
of application (days)* 
Quarterly
and Annual
2021/2
2 101.2 60  60 60 60
Percentage of building
warrants or
amendments issued
within 10 days of receipt
of all satisfactory
information 
Quarterly
and Annual
2021/2
2 60.1 90  90 90 90
Average Time for
processing Planning
Applications
(Householder) 
Quarterly
and Annual
Q2
2021/2
2
6.7 8  8 8 8
Number of people
engaging with the
Council’s digital
channels (not including
website).
Quarterly
and Annual
2021/2
2 64,822 56,800  60,000 62,000 63,000
Opportunities to see or
hear something (OTSH)
positive about
Renfrewshire Council
activity
Quarterly
and Annual
2021/2
2
371,061,
673
125,000,
000 
200,00
0,000
210,000,00
0
220,000,00
0
% of staff who feel that
the information they
receive from internal
communications is
helpful
Annual 2021/2
2 85% 85%  85% 85% 85% 
5.6 Additional Management Information

Page 37

37 
As well as actions and performance measures, the Chief Executive’s Service will monitor
data trends for some operational elements of the service, including some which are part
of the Local Government Benchmarking Framework (LGBF).   
Performance Indicator Frequency  Last update Current Value
Percentage of respondents who agree
that they can influence decisions about
public services and other issues of public
interest
Annual December 2020 21.2%
Percentage of respondents who have felt
lonely some, all or most of the time Annual December 2020 47%
Percentage of respondents who agree
that this is a neighbourhood where local
people take action to help improve the
neighbourhood
Annual December 2020 49%
Percentage of respondents who agree
this is a neighbourhood where people are
kind to each other
Annual December 2020 72%
Application Approval Rate Biannual Q2 2021/22 97.1%
Percentage of applications dealt with
under delegated authority Biannual Q2 2021/22 98.5%
Cost of Economic Development &
Tourism per 1,000 population (LGBF) Annual 2020/21 £109,426
Proportion of people earning less than
the living wage (LGBF) Annual 2020/21 21.60%
Proportion of properties receiving
superfast broadband (LGBF) Annual 2020/21 96.50%
Town Vacancy Rates (LGBF) Annual 2020/21 11.72%
Gross Value Added (GVA) per capita
(LGBF) Annual 2020/21 n/a
Claimant Count as a % of Working Age
Population (LGBF) Annual 2020/21 6.30%
Claimant Count as a % of 16-24
Population (LGBF) Annual 2020/21 7.77%
Cost per planning application (LGBF) Annual 2020/21 £5,278
Average time per business and industry
planning application (weeks) (LGBF) Annual 2020/21 9.88
Number of business gateway start-ups
per 10,000 population (LGBF) Annual 2020/21 4.91
Immediately available employment land
as a % of total land allocated for
employment purposes in the local
development plan (LGBF)
Annual 2020/21 98.05%
CO2 emissions area wide per capita Annual 2019/20 4.84

Page 38

38 
CO2 emissions are wide: emissions within
scope of LA per capita  Annual 2019/20 4.09

Page 39

39 
CHIEF EXECUTIVE’S SERVICE
SERVICE DELIVERY PLAN 2021/22
OUTTURN REPORT 
1. Introduction 
1.1. As part of the council’s approach to managing the pandemic response, Council
services each produced a one-year Service Delivery Plan in 2021.  These primarily
focused on the actions necessary to manage the response and the recovery from the
pandemic whilst still seeking to deliver longer-term strategic priorities wherever

Page 40

40 
possible.  This outturn report details the achievements of Chief Executive’s Service
during 2021/22 and sets out progress against actions and performance targets. 
1.2. The country is now moving into the next phase of the pandemic, with restrictions
easing.  The Council, like other organisations, is now working towards a ‘new
normal’ and continuing to support and promote recovery from the impact of the
pandemic whilst also driving forward its strategic objectives and responding to new
challenges that have arisen through the cost of living crisis and the Ukraine war. 
This is reflected in the new Service Improvement Plan for 2022/23 to 2024/25, which
is also being presented to this Board. 
2. Background 
2.1. The Chief Executive’s service is responsible for setting the strategic direction of the
organisation and for delivering a range of strategic services and projects.  It also
manages the public profile and reputation of the Council and leads on collaboration
with national organisations and partnerships across the public, private and third
sectors.  The service has four main areas of work:  Policy and Commissioning;
Marketing and Communications; Economy and Development; City Deal and
Infrastructure. 
2.2. The Service delivers a range of provisions and activities, such as:
• Delivering a number of large-scale projects across Renfrewshire;
• Delivering on Renfrewshire’s City Deal projects, including manufacturing sites of
national importance;
• Supporting delivery of the Renfrewshire economic strategy and action plan with
assistance from the Renfrewshire Economic Leadership Panel;
• Delivering a programme of support to Renfrewshire’s business community to
support economic growth and an increase in local jobs;
• Leading on employability for Renfrewshire and supporting unemployed people
into work, including those which are part of the Glasgow City Region City Deal
programme;
• Leading the Council’s procurement activity to deliver best value, improved
environmental sustainability and wider Council and community benefits;
• Leading on Future Paisley, the council’s far reaching cultural regeneration
programme – a legacy from Paisley’s bid for UK City of Culture;
• Delivering on major cultural infrastructure projects including the new Paisley
Learning and Culture Hub and the redeveloped Paisley Museum;
• Operating Paisley Museum Reimagined Ltd, a registered Charity established to
deliver the capital appeal for Paisley Museum;

Page 41

41 
• Delivering an annual programme of major events that attract visitors, deliver
positive economic impact, and increase cultural participation;
• Promoting Renfrewshire as a place to live, work and visit;
• Co-ordinating the Council’s approach and working with partners to tackle
inequalities which exist across Renfrewshire’s communities, for example through
the Tackling Poverty and Social Renewal programmes;
• Working closely with community groups and organisations to strengthen
relationships and promote community empowerment;
• Leading on the development of major initiatives such as the establishment of an
Alcohol and Drugs Commission, and addressing the Climate Emergency;
• Managing the council’s reputation through media, marketing and crisis
management; and
• Internal communications and staff engagement. 
3. Key Achievements 2021/22 
3.1. As well as continuing to deliver core services throughout 2021/22, the Chief
Executive’s service responded flexibly to additional responsibilities arising from the
pandemic and continued to deliver on major strategic projects.  Progress to
highlight includes: 
• Significant progress on the delivery of large infrastructure projects, such as the
AMIDS site at Inchinnan, Paisley Museum and Paisley Town Hall;
• Working with partners on regeneration and investment programmes across
Renfrewshire, such as the refurbishment of Johnstone Police Station;
• Progressing the Council’s ambitions to be Net Zero by 2030, carrying out a
climate survey and establishing Renfrewshire Climate Panel;
• Implementing the recommendations of Renfrewshire’s Alcohol and Drugs
Commission, an action plan for which is under development;
• Supporting 486 registered clients and an estimated 200 unregistered people
into employment;
• Delivering a successful events programme generating 789 participation
opportunities and attracting 63,630 attendees, and promoting local outdoor
attractions;
• Supporting communities through Neighbourhood Hubs and through delivery of
our Social Renewal Plan, providing free prescription and food delivery; and
• Working with businesses to manage the supply chain challenges arising from
external factors.

Page 42

42 
3.2. The delivery of the AMIDS site at Inchinnan is progressing well, and the two anchor
facilities – the National Manufacturing Institute Scotland (NMIS) and the Medicines
Manufacturing Innovation Centre (MMIC) – are scheduled to open in 2022.  Success in
attracting £38.7m of Levelling Up funding from the UK Government (the highest
amount awarded to any Scottish bidder) will support the AMIDS South project which
in turn will support AMIDS generating benefits for more of Renfrewshire.  The large-
scale cultural investment capital projects are all well underway and construction
should be completed by 2023 on Paisley Museum, Paisley Town Hall and the new
Paisley Learning & Cultural Hub.  Several prominent buildings in Paisley town centre
have benefitted from the TH/CARS2 programme, also delivered by City Deal &
Infrastructure.   
3.3. Regeneration work across our towns has continued, with key initiatives and projects
supported by the Economy & Development teams.   The refurbishment of Johnstone
Police Station led by Active Communities, now Station 7, was completed with grant
support from the Council and the Scottish Government.  Other developments which
are being supported include a new youth theatre hub for PACE and a planning
application for the redevelopment of the Paisley Centre.   
3.4. A new Local Development Plan was adopted in December 2021 and now forms the
basis of the consideration of all planning applications across Renfrewshire.  It sets
out the council’s vision for Renfrewshire’s economy, environment, towns, heritage
and infrastructure over the next 10 years. 
3.5. The Council’s procurement teams are committed to achieving best value for the
Council but to ensuring that local communities benefit from Council contracts. 
During 2021/22, they held sessions to support local businesses to bid for Council
contracts as part of a Community Wealth Building approach that seeks to develop
local supply chains that are likely to support local employment, local businesses and
benefit the Renfrewshire economy.  The team has also worked with suppliers,
partners and other Council services to manage the supply challenges arising from
external factors such as the war in Ukraine and the UK’s departure from the EU. 
3.6. During 2021/22, the fundraising strategy for Paisley Museum continued to attract
significant additional sums and to date, £969,000 has been secured.  Despite the
impact of Covid-19 on donor cultivation, we have continued to make good progress
towards the target for Trusts and Foundations and more than half of the £1.5m
target has already been secured.

Page 43

43 
3.7. In 2021/22, 43 Future Paisley grants with a total value of £200,000 have been
awarded through Renfrewshire’s Cultural Recovery and Renewal Fund to support
Renfrewshire’s cultural sector to adapt to the impact of Covid-19. The fund has
protected 10 cultural organisations across Renfrewshire during the pandemic,
supported the livelihoods of 24 freelance artists living and working in Renfrewshire,
and animated public space with creative installations. 
3.8. Renfrewshire’s events programme was significantly impacted by restrictions due to
the pandemic with live events switching to digital, to help connect communities and
celebrate moments important to Renfrewshire. In the latter half of 2021 this evolved
to include a combination of in-person and online events including The Spree, Paisley
Halloween Festival, Christmas celebrations and Remembrance services. The return
to live events in winter 2021 attracted over 30,000 visitors and gave a combined
economic impact and local spend boost of over £450,000 to the Renfrewshire
economy. In addition, the team hosted About Us, the UK opening of Unboxed 2022,
attracting an additional 49,000 visitors to Paisley in early March 2022, attracting
national media and broadcast. Funding of £133,000 was secured from VisitScotland
and EventScotland to support tourism and events recovery. 
3.9. The Social Renewal Plan that was approved in early 2021 was updated in June 2021
and priority actions for 2021 have been delivered, coordinated by the Partnerships
and Inequalities team. This has included an initial allocation of Community Food
Funding, support for fuel poverty, hardship payments, winter clothing grants, the
establishment of a Fair Work advice service, and a money advice week which took
place following the success of the benefit take-up week. 
3.10. Through the Tackling Poverty programme, the council continues to fund projects
such as Families First, morning clubs in schools, Skoobmobile, Street Stuff and the
Cost of the School Day Fund. 
3.11. The Strategy, Policy and Insight team continues to support and implement work to
address the recommendations of the Alcohol and Drugs Commission report with
£2million of Council allocated funding to support projects.  Specific work has taken
place in schools as part of the PSE curriculum, and two crisis support projects for
adults have been established – one to provide an out-of-hours outreach service and
one to offer crisis-based mental health support. The MYLA (My Life Ahead) project
was approved by Leadership Board in December 2021 and allocated it £200k of
funding to deliver. This housing-led project will provide wraparound support, using
many of the elements of Housing First, and is due to start around the end of
April/beginning of May.

Page 44

44 
3.12. Between August and September 2021, the Council’s Strategy, Policy and Insight
team carried out a residents Climate Survey in order to understand the public’s
knowledge, views and priorities for the climate emergency. Following this, a
representative sample of respondents formed Renfrewshire’s Climate Panel, to hear
a range of views and voices and support the development of Renfrewshire’s Plan for
Net Zero. The Panel has had 4 cycles to date and further engagement has taken
place across stakeholders, including traditionally underrepresented groups, to get
everyone involved in the design and delivery of the plan. The Council also
committed to a £1million Climate Action Fund, of which £978,000 has been allocated
to support 14 projects, including expanding the Council’s electric fleet;
opportunities for a large-scale solar farm; developing a local response to ensure
resilient town centres; net zero business support; community food growing; and a
Community Climate Fund to provide awards to community organisations to develop
localised green community projects and initiatives. 
3.13. Work has been progressing to implement the priorities of the Digital Strategy with
projects to the boost digital skills and promote digital inclusion. The Council has
coordinated activity related to the Scottish Government’s Connecting Scotland
Programme and secured almost 2000 devices to support vulnerable people across
Renfrewshire. The Digital Citizen workstream is also progressing well with the
establishment of a new Citizen Voices group and proposals being developed for a
place-based digital inclusion pilot in partnership with SCVO and a Digital Champion
Network in partnership with Libraries.   
3.14. Phase 1 of the Digital Experience Programme was delivered by Marketing and
Communications, to support delivery of a new Council website, which the final
phase progressing in 2022/23. Activity relating to the Digital Strategy will be
reported through the Finance & Resources Service Improvement Plan from 2022/23. 
3.15. Over the past year, recovery from the pandemic has continued to require dedicated
marketing and communications support. A new social customer service operation
and a new sub-section of the Council website were established to provide updates
on measures to tackle pandemic impacts and ongoing support was provided for a
range of Council services. To meet the demand for enhanced staff information, the
staff section of the public website was expanded, accessible to all staff, with greater
use of social media to promote staff messaging. Communications support was
provided for NHS Test and protect, including the management of COVID-19 cases in
schools and the Government’s vaccination and testing programme.

Page 45

45 
4 Progress against performance measures 
4.1 The Chief Executive’s Service has a total of 43 performance indicators, 30 of which
are measured quarterly and 11 of which are measured annually. Twelve indicators
are for information only and have no set target. 
4.2 The Council’s Economic Development team continued to support businesses
recover from the lockdown measures of the pandemic and two measures were
included in the SDP that relate specifically to Covid-19. In 2021/22 the team received
applications from 2,750 businesses relating to Covid-19 funding streams and a total
of £9,205,650 was awarded in grants and loans to support businesses through
recovery. 
4.3 As highlighted in paragraph 3.8, the events programme in Renfrewshire was greatly
impacted by restrictions associated with the pandemic. Despite some additional
cancellations, targets for the number of people participating in events, and the
number of people performing in events were exceeded.  Additionally, the annual
target for number pf people viewing or attending council events was 65,000 which
was narrowly missed with 63,630 attending, which the cancellation of the British
Pipebands Championship greatly impacted. This figure excludes the 49,000 visitors
who attended About Us 2022 in March, hosted and supported by Renfrewshire
Council’s Events team. 
4.4 Renfrewshire’s Employability Programme has continued to successfully support
local people into employment. In 2021/22 the service supported 859 new registered
people, 432 people continued to receive support that were registered the previous
year, and around 500 additional people accessed Kickstart opportunities delivered
by the Invest in Renfrewshire team. Although the number of new registered clients
came in slightly under target, the service exceeded its target of 350 unemployed
people moving into paid employment by 96% with 686 clients. It also monitored the
number of people supported into employment that sustained work for a period of 6
months, which was 221, exceeding the set target of 180 for the year. 
4.5 The Council’s Tackling Poverty programme has been successful at maximising local
household income, building on the 2020/21 amount of £758,675.49 to reach
£1,145,918.38 for 2021/22. Partners have built on this work through the Social
Renewal programme established in response to COVID 19, with a range of targeted
actions being undertaken to support people experiencing financial insecurity in
Renfrewshire.

Page 46

46 
4.6 Some indicators did not quite meet the targets set for them in 2021.  Building
Standards has set targets regarding the time is takes to issue a building warrant or
amendment, the time to issue a first report, and the percentage of warrants or
amendments issued within 10 days. These were not quite met for 2021/22, which
can be partly attributed to vacancies on the team. Performance has however
improved from 2020/21, and performance is expected to continue to improve with
the new team members that started in March 2022. 
4.7 Performance related to complaints timescales has been low with only around half
within timescale. To address this, CaseViewer refresher training is being delivered in
June 2022, and staff will be reminded that more complicated cases should be
escalated to investigation to ensure completion within timescale.

Page 47

47 
Chief Executive's Service Development Plan 2021-2022 Action Plan 
Report Type: Actions Report 
Strategic Outcome 1: Reshaping our place, our economy and our future 
Code Title Status Assigned To Progress Due Date Latest Note
CESDP21 - 01 - 01 Coordinate the delivery of
business support grants in
relation to COVID-19 
Economic
Development
Manager
100% 31-Mar-2022 The Economic Development Team have been administering Scottish
Government Grants to businesses since the start of the COVID-19
pandemic.
The key grant programmes for Businesses are now complete. The team
will continue to deliver a new £2.654M Covid programme for business
and economically inactive people this year with support through the
Business Development and Employability Teams.
CESDP21 - 01 - 02 Develop a refreshed
employability programme
for Renfrewshire (utilising
Youth Guarantee and
Kickstart funding) to reduce
unemployment among
young people (18-24 yrs.)
and to support local
businesses 
Economic
Development
Manager
100% 31-Mar-2022 The Renfrewshire youth employment figures have been improving
monthly and a recent report from ONS and Scottish Government showed
that Renfrewshire had the second highest youth employment rate in
Scotland in 2021 at 67.4% (54.9% is Scotland average) and (by a
considerable margin) the highest youth employment growth over the last
10 years across Scotland at 21.1% (against a Scotland increase of -0.3%).
This shows the level of commitment and work on the youth employment
agenda over the years, but particularly the last year.

Page 48

48
Code Title Status Assigned To Progress Due Date Latest Note
The Kickstart scheme has now concluded and was very successful across
Renfrewshire. The Council Kickstart Gateway placed young people into
408 roles across Renfrewshire, including 71 at Renfrewshire Council. The
Renfrewshire Gateway was one of the largest in Scotland, again showing
the commitment locally to support young people into work.
The Young Persons Guarantee continues to perform well, and the Local
Employability Partnership continue to be held up as best practice across
Scotland for partnership working and commitment to improving the
opportunities of local unemployed people.
CESDP21 - 01 - 03 Support and grow supply
chain management and
knowledge exchange
among manufacturing
SMEs to supply Scottish /
UK businesses and global
supply chain 
Head of
Economy and
Development
80% 31-Mar-2022 The creation of a supply chain management programme for
manufacturing SMEs is a priority to support economic recovery in
Renfrewshire. In progressing this, partners (SE, Chamber, NMIS group and
WCS) agreed to create a new a Manufacturing Business Forum.
This work continues to progress and will be augmented by a refocus on
key growth sectors supporting the Economic Leadership Panel and
development of an account management process.
CESDP21 - 01 - 04 Develop a programme to
support work-place
wellbeing across
Renfrewshire companies
Work with NMIS (Skills
Academy) 
Regeneration
Manager
100% 31-Mar-2022 The Council, in partnership with Renfrewshire HSCP has delivered a
campaign and a bespoke training package to employers aimed at
supporting and guiding business owners and managers in their efforts to
help employees, particularly in the return-to-the-workplace phase of
Covid restrictions. The Renfrewshire Economic Leadership Panel have
supported this initiative and ambassadors of the campaign were
Renfrewshire Chamber of Commerce, the Federation of Small Businesses,
Hillington Park and Braehead.
CESDP21 - 01 - 05 Develop a productivity and
innovation programme for
Renfrewshire
manufacturing companies
(aligned to the existing
AMCF / Critical Engineer
programme) 
Head of
Economy and
Development
40% 31-Mar-2022 In order to establish and agree a delivery mechanism for a productivity
and innovation programme, a business survey of local manufacturing
companies was developed to raise awareness of NMIS and the Critical
Engineer programme.

Page 49

49
Code Title Status Assigned To Progress Due Date Latest Note
The survey has now been completed and discussions are ongoing for
next steps in terms of support for the sector.
CESDP21 - 01 - 06 We will ensure that we raise
awareness among locally
based companies of our
proposed procurement
across Renfrewshire capital
projects and purchase of
supplies and services to
enhance opportunities for
successful bids 
Economic
Development
Manager;
Strategic
Commercial and
Procurement
Manager
100% 31-Mar-2022 Our Contracts Register is published online via Renfrewshire Council’s
webpage.  This provides live accurate information relating to the current
portfolio of contracts.  The Annual Procurement Report includes a section
on upcoming opportunities and contact details are provided to allow
suppliers to contact relevant members of the team to seek further
information.
The sustainability test completed at contract strategy stage encourages
procurement officers to consider opportunities to engage with local
suppliers to deliver the contract both as main contractors and
subcontracting opportunities.
Procurement and Economic Development continue to work closely to
support a Community Wealth Building approach which includes a strong
focus on how best to engage with local businesses.  A number of local
“Meet the Buyer” events have been hosted to highlight opportunities
associated with high value strategic contracts, and the teams will work
together with the Supplier Development Programme on a series of joint
events to be hosted through the summer which will provide positive
information to suppliers about contract opportunities and how to tender.
More information to businesses will be presented by the Economic
Development team at the Renfrewshire Business to Business event later in
May (which is always well attended).
CESDP21 - 01 - 07 Bring forward actions to
reduce health inequalities,
improving economic
participation, more secure
earnings and greater
earning power 
Economic
Development
Manager
100% 31-Mar-2022 The Health Inequalities Group has met regularly and recently provided an
update report to the LEP where additional service requirements were
identified. These are now being prioritised for future funding, anticipated
later this summer.
The Employer Recruitment Incentive has now been launched, new
disability services have been contracted and are in place, and new
initiatives (with funding) are currently being identified.

Page 50

50
Code Title Status Assigned To Progress Due Date Latest Note
CESDP21 - 01 - 08 Targeted interventions for
recruitment, upskilling and
re-skilling across
Renfrewshire’s key sectors 
Economic
Development
Manager
100% 31-Mar-2022 The PACE service completed in April 2022 when funding ended. Those
facing redundancy can still receive help and support, but the funded
service has now concluded after successfully delivering support during
the height of the covid period. Staff involved have been retained and can
continue supporting anyone in need (numbers are anticipated as being
small).
CESDP21 - 01 - 09 Promote a Renfrewshire
Apprentice Framework that
can be rolled out across
local businesses wishing to
participate 
Economic
Development
Manager
90% 31-Mar-2022 The programme for ERIs has all but completed as has the City Region
Chef Academy programme.
Work with Education colleagues continues to support the marketing and
information around Foundation Apprenticeships and Modern
Apprenticeships across Renfrewshire.
CESDP21 - 01 - 10 Create a clearly defined
and publicised investment
proposition to attract more
investment and talent to the
area that will see
Renfrewshire secure its
position as the primary
location for manufacturing
(research and
development) investment in
Scotland 
Head of
Economy and
Development
100% 31-Mar-2022 The Marketing and Communications service have completed a new inward
investment section on Paisley.is. The marketing team continue to work
with Economic Development to create content in relation to growth
sectors, property search and a referrals and enquiries process. Council-
led marketing activity includes promotion of the Advanced Manufacturing
Innovation District Scotland (AMIDS), promotional information for
potential investors/locators and the development of a route for referrals
and enquiries. AMIDS is being showcased by several national and regional
partners including UK Dept of Trade & Industry, Scottish Development
International, Scottish Cities Alliance and Invest Glasgow. 
Further activity included the promotion of the procurement exercise to
recruit a Joint Venture partner for AMIDS, support of an SDI-led virtual
showcase for investors including promotion online and via trade press.
This work is ongoing and will be carried into 2022-23 as the sector
growth work develops.
CESDP21 - 01 - 11 Pilot and test the creation of
active travel routes between
neighbourhoods, town
centres and business
locations using these to test 
Regeneration
Manager
100% 31-Mar-2022 Work has advanced on a number of routes. The Renfrew-Paisley Cycleway
is on site; the network around AMIDS is nearing completion with the
phase to Inchinnan on site in 2022; LUF funding for new transport

Page 51

51
Code Title Status Assigned To Progress Due Date Latest Note
SMART travel solutions and
evaluate benefits to
biodiversity, air quality and
access
infrastructure between AMIDS and Paisley includes extensive active travel
provision. In addition, work has been commissioned to identify further
phases and designs of active travel infrastructure to economic locations
for delivery as funding becomes available.
CESDP21 - 01 - 12 Implement Year 3 action
plan as part of the
Renfrewshire Visitor Plan 
Head of
Economy and
Development
30% 31-Mar-2022 Business support continued to be critical in the face of changing business
landscapes, leveraged though both Renfrewshire Council and via Scottish
Enterprise Hotel Support Fund. 
In addition, the Communications and Marketing service were successful
in their application to VisitScotland’s Destination Marketing Fund in 2021
and developed a regional promotional campaign running into 2022. 
As of the Spring 2022 Economic Leadership Panel meeting, it was agreed
that a refreshed tourism group should become a strategic sub-group of
the Panel, underpinned by a reassessment of the tourism proposition
based on stakeholder interviews and analysis. Report due late Spring
2022.
CESDP21 - 01 - 13 Deliver on the ambitions of
our town centre strategies
and specifically working
with partners to transform
Paisley Town Centre
through the Paisley Town
Centre Action Plan 2016-
2026. 
Regeneration
Manager
50% 31-Mar-2023 The town centre action plan and the Paisley Vision for 2030, published in
2020, is catalysing new potentials for development in the town centre. A
planning application for the redevelopment of the Paisley Centre has been
approved in March 2022 with the developers intent on formalising
development agreements to be on site in 2023. Further discussions on
repurposing spaces for new uses are also underway with the owners of
the Piazza Centre and the Liberal Club.
CESDP21 - 01 - 14 Deliver Paisley Townscape
Heritage / Conservation
Area Regeneration Scheme
(TH/CARS2) Project 
Programme
Director – City
Deal and
Infrastructure
80% 30 June 2023 The TH/CARS2 project has been extended to June 2023. Seven building
repair projects have now completed on site with contracts awarded for a
further two projects. The owners of the Liberal club are continuing to
develop a grant application working towards a potential site start in
September, with Board approval for the project confirmed in February 22.
Six shopfront projects have completed, with one shopfront project
currently on site and grants allocated for a further four. Ten Small

Page 52

52
Code Title Status Assigned To Progress Due Date Latest Note
Building Repair grants have been awarded and completed to date.   Public
Realm works for the High St area pavements opposite the museum have
been tendered and approved at Board. The HETE programme of cultural
activities will complete in advance of the Building Repair/ Public Realm
works and is now drawing to a close after numerous successful heritage-
led activities and training events.
CESDP21 - 01 - 15 Proactively work with
property owners to bring
some of the area’s most
valued assets back into use 
Regeneration
Manager
100% 31-Mar-2022 Active progress has been made across several buildings. 2/3 County
Place, Paisley refurbishment has been completed; as has the
refurbishment of the former Johnstone Police Station with grant support
from the Council and Scottish Government; the Leadership Board has
approved grant support for the Liberal Club and 5 George Place in Paisley;
the Council has secured £800k from Scottish Government for PACE
theatre’s new youth theatre project. Further work is progressing on
priorities such as Forbes Place in Paisley and Renfrew's former police
station.
CESDP21 - 01 - 16 Assist delivery of approved
Town Centre Capital Grant
Fund projects and develop
project proposals for new
Scottish Government
Regeneration Capital Grant
Fund * 
Head of
Economy and
Development
100% 30-Sep-2021 The Town Centre Fund programme is complete. This ran in 2020/21 with
projects completed by September 2021. All projects and outcomes have
been reported to the Leadership Board and Scottish Government. A new
Scottish Government scheme, the Place Based Investment Fund, is now
being rolled out with projects across all Renfrewshire’s town centres
being promoted, as well as actions from the Making of Ferguslie Park
plan. Further projects are anticipated from work being finalised in early
2022 on active travel and climate change adaptation/resilience in town
centres. Funding from RCGF has been secured for PACE Theatre (Phase 2
of its 3-phase programme) as well as enhanced grants for the Paisley
Cultural and Learning Hub and the Paisley Museum project.
CESDP21 - 01 - 17 Review and development of
the Heritage Asset Strategy
for Renfrewshire ** 
Head of
Economy and
Development
100% 31-Mar-2022 The Great Place Scheme substantively concluded in March 2022 with only
one or two training programmes and the completion of the project’s
evaluation being continued until June 2022.

Page 53

53
Code Title Status Assigned To Progress Due Date Latest Note
Key funders for this work and any other heritage led regeneration activity
are HES and NLHF, both have reviewed and refreshed their grant schemes
from 2022 with work being progressed by the Regeneration and Place
team to determine future priorities.
CESDP21 - 01 - 18 Deliver the strategies within
the current Local
Development Plan (LDP) 
Head of
Economy and
Development
100% 31-Mar-2021 The Local Development Plan was adopted on 15th December 2021 and
now forms the basis of the consideration of all planning applications
across Renfrewshire.  The strategies and policies can be seen in the
determination of planning applications.
CESDP21 - 01 - 19 Develop the new LDP 2  Head of
Economy and
Development
100% 31-Dec-2021 The Local Development Plan was adopted on 15th December 2021.
CESDP21 - 01 - 20 Progress the relevant
workstreams of the Digital
Strategy including work on
smart data, and digital
participation 
Head of Policy &
Commissioning
100% 31-Mar-2022 The Service is leading on a number of workstreams. In terms of the smart
data workstream, work is currently underway to map the use of data
across the Council and to identify early opportunities to progress our
approach to data management and analysis. The Digital Citizen
workstream is progressing well with the establishment of a new Citizen
Voices group and proposals being developed include a place based digital
inclusion pilot in partnership with SCVO including the set-up of a Digital
Champion Network in partnership with Libraries. Free Online Safety
Ambassador training has been offered out to the community and staff in
partnership with GetSafeOnline. The service is a part of the Digital Skills
and Leadership workstream working towards upskilling our workforce
with plans to provide more digital skills training, self-serve resources
online and recruit staff digital champions. The service also co-ordinates
all activities relating to the Connecting Scotland programme with almost
2000 devices secured to date to support vulnerable people living across
communities. The long established DigiRen network continues to meet
bimonthly sharing resources and learning co-chaired by the service and
the CEO of Engage. We are one of 6 delivery partners in the recently

Page 54

54
Code Title Status Assigned To Progress Due Date Latest Note
awarded Life Changes Legacy Funding for Digital Skills for Care
Experienced people.
CESDP21 - 01 - 21 Implement Year 4 of the
destination marketing plan 
Marketing
Manager
100% 31-Mar-2022 Destination activity this year has focused on supporting sector restart and
encouraging people to visit and spend money in Renfrewshire, managed
in line with Government restrictions as Scotland moved through
restriction levels. Activity since December 2021 has focused on
implementing the promotional plan for the VisitScotland Destination and
Sector Marketing Fund (£40,000). The campaign aim was to encourage
visits and generate visitor spend in Paisley Town Centre and was targeted
at people outwith Renfrewshire. Implementation included: paid-for
advertising campaign, four paid-for social media campaigns, two high
profile influencers visits, the creation of a music film and the Paisley.is
calling film. Based on our success, a further £16K was awarded by
VisitScotland which will continue the activity until August 2022. The
results to date include 5.8m marketing OTSH (opportunities to see or
hear something positive about Renfrewshire) for media buy and social ads
and 7918 pages views on Paisley.is across 6734 users. In addition, the
following has been successfully implemented: Paisley.is sponsorship of
the Rocco Awards, further development of Paisley.is, regional marketing
for Spree and Halloween and support for local events. Planning for a
regional summer visitor campaign has been completed including
development of priority audience profiles, brand propositions and
campaign creative. The campaign will launch in June 2022. 
In addition, the Invest section of Paisley.is has been redeveloped to help
drive marketing of AMIDs and promote Renfrewshire’s investment
potential. This has been further supported by partnership marketing and
media. 
CESDP21 - 01 - 22 Deliver a Covid secure
events programme that
supports sector restart 
Events Manager 100% 31-Mar-2022 Renfrewshire’s major events programme was significantly impacted by
the Covid-19 pandemic. A digital programme was designed to celebrate
live events whilst restrictions around gatherings was still in place.

Page 55

55
Code Title Status Assigned To Progress Due Date Latest Note 
As restrictions eased, a hybrid programme was designed and delivered
for events (autumn/winter 2021)  with a combination of in-person and
online events Sma’ Shot Day, The Spree Festival, Paisley Halloween
Festival, Christmas celebrations and Remembrance services.
In-person events delivered in the winter season of 2021 attracted over
30,000 visitors and gave a combined economic impact and local spend
boost of over £450k to the Renfrewshire economy.
Throughout the pandemic the team has worked with Event Scotland to
ensure Renfrewshire led the event sector restart.  The Council programme
was awarded three rounds of funding totalling £77.4k for Paisley
Halloween Festival and The Spree Festival, the funding supported both
design and delivery of hybrid in-person and digital programming and the
additional costs for covid hygiene and safety measures.
A new interim events strategy was developed and approved at Leadership
Board in February 2022.  The strategy seeks to continue the rebuild of
the live major events programming whilst recognising Covid will continue
to have an impact on the industry and how events are delivered.  The 2-
year plan is to develop programming over longer time periods across
wider Renfrewshire and move away from one day mass gathering types of
events delivered pre-covid. 
The strategy will seek to develop a programming framework, that will
rebuild audience numbers achieved pre-Covid.
CESDP21 - 01 - 23 Deliver Fundraising
Strategy for Paisley
Museum 
Head of
Marketing,
Communications
and Events
75% 31-Mar-2022 The campaign to target HNWI was paused in May 2020 due to covid
restrictions and this reduced the ability to cultivate major gift donations.
Work in this area restarted in January 2022.
Despite the impact of Covid-19 on HNW donor cultivation, we have
continued to make good progress towards the target for Trusts and
Foundations with a total of £881,000 being secured against the original
£1.5m target. There are currently 5 mid-level funding applications

Page 56

56
Code Title Status Assigned To Progress Due Date Latest Note
pending and a pipeline of grant applications has been scheduled for the
remainder of 2022.
Following the relaxation of covid restrictions, three site visits took place
resulting in the following:
•         May 2021 - £100,000 pledge (Trust and Foundation) 
•         June 2021: £30,000 pledge (Coats PLC) 
•         March 2022: The Hugh Fraser Foundation adding £50,000 to their
initial pledge of £200,000 
To-date, Paisley Museum Reimagined Ltd has raised a total of £969,000
in secured and pledged income, with £185,000 of this being raised in
2021/22. 
CESDP21 - 01 - 24 Lead delivery of cultural
regeneration through Future
Paisley 
Head of
Marketing,
Communications
and Events
100% 31-Mar-2022 The Future Paisley programme was restructured to align with the
council’s cultural infrastructure programme, maintaining programme
activity to April 2024. 2021/22 saw the restart of many projects that were
paused or reformatted due to Covid19. This included the administration
of recovery funding supporting artists and cultural organisations based in
Renfrewshire. In the past year, 43 grants with a total value of £200,000
have been awarded through Renfrewshire’s Cultural Recovery and
Renewal Fund (RCRRF). In the last quarter of the year, the Future Paisley
evaluation framework and story of change model were developed to help
measure the impact of the programme and how various projects are
contributing to the revised step changes and strategic outcomes,
individually and collectively. The programme now includes 30 funded
cultural projects aimed at delivering social and economic change.  The
Future Paisley Partnership Board met in March and agreed new
membership to include VisitScotland, National Theatre of Scotland and
Arts Connection.

Page 57

57
Code Title Status Assigned To Progress Due Date Latest Note
In the last quarter of the year, a number of significant events and projects
were delivered, including The Future Paisley Exhibition, Paisley Book
Festival, and About Us Unboxed 2022.
CESDP21 - 01 - 25 Implement the marketing
strategy for Paisley
Museum 
Marketing
Manager
100% 31-Mar-2022 The marketing strategy was approved in Spring 2021 and presented to
key stakeholders including the Future Paisley Partnership Board,
Renfrewshire Leisure Ltd Board, VisitScotland and the Council’s CMT. The
marketing and PR strategy has now transferred to OneRen for
implementation and future progress updates will come from OneRen.
Paisley Museum PR continued throughout 2021/22 delivering 21m OTSH.
This action is now closed.
CESDP21 - 01 - 26 Work with partners to
deliver the Advanced
Manufacturing Innovation
District – Scotland (AMIDS) 
Programme
Director – City
Deal &
Infrastructure
15% 31-Mar-2023 The need for delivery of investment at AMIDS is recognised within the
Renfrewshire Economic Strategy 2020-2030 where AMIDS is noted as a
key component. This drive for investment continues with the anchor
facilities of NMIS & MMIC planned to open in 2022. This success, in
parallel with direct engagement with manufacturing companies and the
launch of a procurement exercise for a joint venture development partner
will see progress towards the primary outcomes for AMIDS.
Success in achieving agreement with UK Gov on 90% Levelling Up Funding
towards the AMIDS South project, will significantly aid the delivery of
AMIDS, enhance work underway in Paisley Town centre and increase
benefits for the wider area.
CESDP21 - 01 - 27 Monitor benefits of City
Deal Projects, including
Glasgow Airport Investment
Area, Clyde Waterfront and
Renfrew Riverside and City
Region wide employment
programmes 
Programme
Director – City
Deal &
Infrastructure
100% 31-Mar-2022 The monitoring of benefits associated with the City Deal Projects is
ongoing and includes new residential and commercial developments, in
the vicinity of both the GAIA and CWRR projects which has been
accelerated as a result of the significant City Deal investment. It is
estimated that circa 15% of the projected outputs and outcomes have
been realised.
CESDP21 - 01 - 28 Implement the Cultural
Infrastructure Investment
programme 
Programme
Director – City
20% 31 Oct 2023 The Cultural Infrastructure investment programme continues to progress.
The Paisley Museum Reimagined (PMR) project appointed a main works

Page 58

58
Code Title Status Assigned To Progress Due Date Latest Note
Deal &
Infrastructure
contractor in May 2021 and started on site in July 2021. The Paisley Town
Hall Refurbishment (PTHR) main works contract was awarded in March
2021 and work is progressing well; practical completion is anticipated in
March 2023. The Paisley Learning & Cultural Hub (PL&CH) main works
contract is now underway with a site start in August 2021 and completion
anticipated in early 2023. The Paisley Arts Centre refurbishment project
now has advance works contract complete with main works planned to
commence in May 2022 and complete in March 2023. The Public Realm &
Junction improvements project has restarted with the E&I team leading,
which has been re-programmed to allow effective consultation. The
Public Realm works in County Square and Abbey Quarter are being re-
programmed to align with interdependencies in these projects.
CESDP21 - 01 - 29 Actively engage with
Renfrewshire suppliers to
increase opportunities to
bid for council contracts and
improve opportunities for
local job creation 
Strategic
Procurement
Manager
50% 31-Mar-2022 Within the financial year 2022-2023 Procurement will host supplier
workshops which identify contracting opportunities for Renfrewshire
based businesses.  Workshops will include information on the
procurement pipeline and information about the web-based portals used
by the Council for tendering.
CESDP21 - 01 - 30 Carry out a full review of the
current Community Benefits
Outcome Menu to maximise
local employment
opportunities and include
an option for tenderers to
offer support for the Youth
Guarantee 
Strategic
Procurement
Manager
50% 31-Dec-2021 The Community Benefit Outcome Menu currently includes options for
creation of job opportunities for unemployed individuals from a priority
group – this includes young people16+ years of age not currently in
employment, education or training.  The outcome menu also includes
further categories for new job opportunities and skills and training
opportunities for young people both in education and those who are not
currently in education, employment or training. 
The final community benefit strategy is still undergoing review aligned to
our current Community Wealth Building project.

Page 59

59
Strategic Outcome 2: Building strong, safe and resilient communities 
Code Title Status Assigned To Progress Due Date Latest Note
CESDP21 - 02 - 01 Review Local Partnership
arrangements and
implement
recommendations as
appropriate 
Strategic
Partnerships
and Inequalities
Manager
75% 31-Mar-2022 Local Partnerships continue to operate.  Awards were made to groups for
activities for 12–25-year-olds through the Celebrating Renfrewshire
participatory budgeting process in autumn 2021.  Applications window
for funding to be allocated in June 2022 was open throughout April with a
good response. Meetings were held with Chairs and Lead Officers of Local
Partnerships as part of the review process, which is now being delivered
alongside the Right for Renfrewshire review.  The review was delayed by
the pandemic but is currently being finalised and should be complete by
the summer of 2022.
CESDP21 - 02 - 02 Deliver framework for
mainstreaming Participatory
Budgeting 
Strategic
Partnerships
and Inequalities
Manager
100% 31-Mar-2022 Framework has been developed and will now be subject to further
engagement with Corporate Management Team April 2022. Our work
with Environment & Infrastructure PB continues to be delivered; phase 1
saw just under 3000 ideas from residents. The next stage of the
#youdecide programme is being launched early autumn, whereby
residents will be given the opportunity to vote on the projects they want
to see delivered in their communities. The pilot schools PB using cost of
the school day monies has been a success, with 9 schools participating in
the programme. This round is coming to an end in June; case studies will
be developed and will be presented at the head teachers forum in August
2022.
CESDP21 - 02 - 03 Continue to deliver
Neighbourhood Hub
support in response to
COVID-19, and continue to
develop the Neighbourhood
Hub model as part of
mainstream service
delivery. 
Strategic
Partnerships
and Inequalities
Manager
100% 31-Mar-2022 Hub support has continued to date (April 2022).  Provision has centred
around prescription and free food delivery.  Next phase of the model
continuing to be developed as part of the Right for Renfrewshire
programme.

Page 60

60
Code Title Status Assigned To Progress Due Date Latest Note
CESDP21 - 02 - 04 Continue to engage with
community groups to
support the humanitarian
response effort 
Strategic
Partnerships
and Inequalities
Manager
100% 31-Mar-2022 Conversations have been ongoing with Community Groups about need
and support offered regarding community food provision, fuel and
increased costs of living, and building community resilience. Social
Renewal Funding was provided to a number of groups, including through
a Community Food Fund. The Public Services Panel exercise is being
repeated during early 2022, which will provide insight from residents
around the continued impacts of the pandemic, with a particular focus on
financial insecurity and rising cost of living pressures. 
CESDP21 - 02 - 05 Seek to proactively engage
with communities around
Community Benefits 
Strategic
Procurement
Manager
100% 31-Mar-2022 Community engagement is supported by Engage Renfrewshire who
provide a direct link to existing social enterprises and community groups
in Renfrewshire.  Procurement continues to seek further opportunities to
engage directly with communities and will develop this as part of the
ongoing Community Wealth Building project.
CESDP21 - 02 - 06 Support the delivery of the
key outcomes from the
current Local Housing
Strategy (LHS) 2016- 2021
and report progress
annually 
Head of
Economy and
Development
100% 31-Oct-2021 Good progress with the preparation of the updated Local Housing
Strategy 2022 – 2027 has been achieved. Until the approval of the next
Local Housing Strategy, the current Local Housing Strategy is relevant and
continues to set out the strategic approach of the Council and partners to
deliver high quality housing and housing related services across all
tenures to meet the identified need in Renfrewshire.
Over the year the Council, along with developing Registered Social
Landlords and the private sector, has delivered a range of new homes
across Renfrewshire to meet the housing need and demand.
A range of projects have also been successfully delivered to ensure
homes are energy efficient with the aim of ensuring that fuel poverty is
reduced. 
There continues to be a focus on providing advice and assistance to
people with the greatest housing need across Renfrewshire with the aim
of preventing homelessness.

Page 61

61
Code Title Status Assigned To Progress Due Date Latest Note
CESDP21 - 02 - 07 Support the development of
the new Local Housing
Strategy (LHS) for the next
five-year period 2021-2026 
Head of
Economy and
Development
75% 31-Mar-2022 The draft Renfrewshire Local Housing Strategy 2022 – 2027 was
presented to the Communities, Housing and Planning Policy Board on the
15 March 2022.
The updated strategy sets out the strategic priorities that the Council and
partners want to achieve and the range of actions to deliver this
ambitious strategy over the next five years, ensuring this reflects local
needs.
The Board approved the draft Local Housing Strategy for a 12-week
consultation and engagement process from 21 March 2022 until 13 June
2022.
This consultation will gather the views of local communities, residents
and tenants, housing association partners, the Health and Social Care
Partnership and Third Sector organisations across Renfrewshire.
Following the consultation period, the Local Housing Strategy 2022-2027
will be finalised and presented to this Board for approval later in 2022. 
Strategic Outcome 3: Tackling inequality, ensuring opportunities for all 
Code Title Status Assigned To Progress Due Date Latest Note
CESDP21 - 03 - 01 Implement the
recommendations of the
Renfrewshire Alcohol and
Drugs Commission 
Head of Policy &
Commissioning
50% 31-Mar-2023 The projects within the Alcohol and Drugs Change Programme are continuing
to progress, including the Trauma Informed and Responsive Renfrewshire
Programme – a partnership programme of work to ensure that recognising
and responding to trauma is part of every service we deliver. A coordinator
post has been created to lead this programme of work going forward, with
recruitment currently underway. A steering group has been established, and
engagement with the Improvement Service and other local authorities has
taken place. An initial high-level action plan is currently being developed.
Work has also progressed on the Stigma/Language Matters project with a
marketing and communications activity plan being developed, with

Page 62

62
Code Title Status Assigned To Progress Due Date Latest Note
objectives including: demonstrating leadership by ensuring the Council does
not use language that stigmatises people in public and staff communications;
supporting staff across partner organisations to understand the power of
language, be confident in their use of language and to challenge stigma by
speaking up when people make negative or wrong comments; and,
supporting national campaigns to help people in Renfrewshire understand
the power of language. A training module has also been developed with
HR/OD, which will be used to roll out to staff. 
CESDP21 - 03 - 02 Work with partners to
deliver the Social Renewal
Plan’s initial action plan 
Head of Policy &
Commissioning
100% 31-Mar-2023 A Social Renewal Lead Officer came into post in December 2021 and
officers have continued to work with partners to progress actions in the
Social Renewal Plan.
Actions include: 
• An initial allocation of Community Food Funding approved in
December 2021
• Funding for fuel supports, including financial supports provided
• Establishment of a Fair Work advice service to provide
employment advice
• A money advice week took place after the success of benefit take
up week
• Affordable credit sessions provided to a number of diverse
groups
• Funding agreed for a ‘Digital Champions’ programme. 
The Social Renewal lead officer also supported coordination of Scottish
Government Winter Support Fund to support low-income families and
individuals, in line with the Social Renewal Plan priorities. Work to engage
low-income households will be a priority in 2022.  This action is being
closed off and will be replaced with a new action in the 2022-25 Service
Improvement Plan focused on the new Fairer Renfrewshire plan.

Page 63

63
Code Title Status Assigned To Progress Due Date Latest Note
CESDP21 - 03 - 03 Implement Year 4 of the
Tackling Poverty
Programme funding, and
review and refresh the
programme in light of
COVID-19 impacts 
Strategic
Partnerships
and Inequalities
Manager
100% 31-Mar-2022 Year 4 of the Tackling Poverty programme has continued, with services
adapted as appropriate due to Covid. 
• Street Stuff has taken more activities into the community to reach
more young people. 
• Energy advice has continued 
• Morning clubs offering healthy breakfast have continued in 9
schools 
• Cost of the school day funding has been used to directly support
families, with the full allocation spent. 
Work is now taking place to form stronger links with our Social Renewal
work under a ‘Fairer Renfrewshire’ banner.
CESDP21 - 03 - 04 Work with local equalities
led community groups to
develop and publish new
equality outcomes for
Renfrewshire 
Strategic
Partnerships
and Inequalities
Manager
80% 31-Mar-2023 Following engagement, draft equality outcomes were agreed by Council
and published in March 2021. Work to further consult and develop the
draft Equality Outcomes will be developed as part of the development of
the Fairer Renfrewshire programme. The due date has been adjusted to
March 2023 to reflect this.
CESDP21 - 03 - 05 Develop and publish Local
Child Poverty Action Report 
Strategic
Partnerships
and Inequalities
Manager
100% 30-Jun-2021 The Local Child Poverty Action report was agreed by Leadership Board in
June 2021 and subsequently published. 
Child poverty has been identified as a particular area of focus for the
Community Planning Partnership, and an initial scoping session for
partners to identify next steps around child poverty was held in
September 2021.
CESDP21 - 03 - 06 Support the delivery of the
Connecting Scotland
Programme 
Strategic
Partnerships
and Inequalities
Manager
100% 31-Mar-2022 From June 2020 to December 2021 there have been six application
phases of the programme which delivers Wi-Fi enabled devices and Mi-
Fi’s providing internet connectivity to end users who are digitally
excluded. Free, unlimited data is provided for two years. End users are

Page 64

64
Code Title Status Assigned To Progress Due Date Latest Note
also provided with telephone support from their support organisation in
the form of Digital Champion support, to help them set up and use the
device. SCVO provide the online Digital Champion training. 
Successful applications were submitted across all phases by Renfrewshire
Council COVID-19 neighbourhood hubs, Children’s Services and
Communities and Housing Services, with 999 devices secured for service
users. A further 1602 devices were awarded to a wide range of
Renfrewshire public sector and community-based organisations across all
phases giving a total of 2601 for the Renfrewshire area. 
The Connecting Scotland Programme is now evaluating and redesigning,
and a new programme is still to be announced. 
Strategic Outcome 4: Creating a sustainable Renfrewshire for all to enjoy 
Code Title Status Assigned To Progress Due Date Latest Note
CESDP21 - 04 - 01 Lead and coordinate the
process of securing the
renewal of Renfrewshire’s
status as a Fairtrade Zone * 
Head of Policy &
Commissioning
0% 31-Mar-2023 Work continues to support the Fair-Trade movement in Renfrewshire,
including exploring the links between Fair Trade and the Council’s
climate programme. 
In terms of the renewal of Renfrewshire’s Fairtrade Zone status, this
action was paused due to the pandemic and further work will be
undertaken to develop a new timetable following the election.
CESDP21 - 04 - 02 Lead the coordination of
Council-wide efforts to
respond to the climate
emergency and support the
work of the Climate Change 
Head of Policy &
Commissioning
100% 31-Mar-2022 Following our residents Climate Survey, a representative sample of
respondents formed Renfrewshire’s Climate Panel, which is part of the
evidence base for the Plan for Net Zero, with 4 sessions to date (paused
for the pre-election period).  Engagement has also been undertaken

Page 65

65
Code Title Status Assigned To Progress Due Date Latest Note
Sub Committee, including
the partnership forum,
adaptation plan, citizens
engagement panel /
assembly, and community
food growing
across stakeholders, including traditionally under-represented groups,
local organisations, public, private and third sector and community
planning partners. 
The Climate Change Action Fund has been progressing at pace.  To date,
£978,000 has been allocated to support 14 projects including expanding
the Council’s electric fleet; opportunities for a large-scale solar farm;
developing a local response to ensure resilient town centres; net zero
business support; community food growing; and a Community Climate
Fund to provide awards to community organisations to develop localised
green community projects and initiatives. 
A baseline emissions inventory and trajectory to 2030 has been
completed for Renfrewshire Council as an organisation as well as
Renfrewshire area as a whole.  This will help to develop focus areas and
prioritise actions in order to reach net zero. 
Phase 1 of the Plan for Net Zero is on schedule for completion by Summer
2022.
CESDP21 - 04 - 03 Ensure that climate
considerations are taken
into account in our
procurement strategies and
tenders with a focus on
reducing emissions. 
Strategic
Procurement
Manager
75% 31-Mar-2022 This is a key objective for all procurement projects.  Tools utilised by
procurement officers at strategy stage include lifecycle impact mapping
and the Scottish Government Sustainability Test.  This helps to identify
key areas of risk and to highlight opportunities to mitigate risk and
achieve maximum value in terms of environmental benefits through
contracts. 
Strategic Outcome 5: Working together to improve outcomes

Page 66

66
Code Title Status Assigned To Progress Due Date Latest Note
CESDP21 - 05 - 01 Working with HR and OD,
develop the relevant actions
in line with the Council’s
new People Strategy 
Head of Policy &
Commissioning
100% 31-Mar-2023 The Service continues to work with HR and OD colleagues to develop
actions which fit the needs and duties of our staff. This includes ensuring
a service-wide focus on absence, supporting managers with training,
embedding policies, and supporting the health and wellbeing of
employees, particularly around the return to the office and managing this
transitional way of working.  This action is being closed and an updated
action will be included in the Service Improvement Plan 2022-25.
CESDP21 - 05 - 02 Supporting our employees’
health and wellbeing, better
understanding of service
needs and resources and
planning for the future 
CEX Senior
Management
Team
100% 31-Mar-2022 Supporting the health and wellbeing of employees across the service is a
key priority, particularly given the current working arrangements and
additional pressures that may be felt. Where it was felt to be beneficial to
team members, arrangements have been made to have additional access
to Renfrewshire House. Absence levels are closely monitored with weekly
reporting and monthly absence monitoring meetings with HR and OD
colleagues to explore what further support can be offered to employees
who are unwell such as occupational health referrals, time for talking
counselling and CBT where appropriate.
CESDP21 - 05 - 03 Work closely with suppliers,
Scotland Excel, Scottish
Government Procurement
and CoSLA to monitor the
impact of Brexit 
Strategic
Procurement
Manager
100% 31-Mar-2022 Through contract and supplier management the procurement team
continues to monitor the impacts of Brexit on supply chains, resources
and labour.  The impact of Brexit has been compounded by the Pandemic
and the current period of price volatility and inflation caused by the
conflict in Ukraine and the rapidly increasing price of oil.
CESDP21 - 05 - 04 Embed the Council's brand
values 
Head of
Marketing,
Communications
and Events
75% 31-Mar-2022 The development of the council brand model was completed in December
2021 and is currently being implemented across all marketing and
communications activity. A key deliverable will be the new council website
in 2023 (reported below CESDP21 - 05 – 07).
The service has continued to deliver staff campaigns that promote the
council’s values and provide continued support to 
HR & OD on next stage of ‘Leading Our Values’ for managers with online
training and workshops.

Page 67

67
Code Title Status Assigned To Progress Due Date Latest Note
Celebrating World Values Day in October with focused activities including
employee blogs and video case studies and facilitating two-way
discussion via the new RenTalks channel. Further development of the
employee wellbeing hub and health and wellbeing objectives including
Mental Health Awareness Day and Financial Wellbeing.
CESDP21 - 05 - 05 Implement Year 4 of the
Council’s marketing and
communication strategy to
support recovery 
Head of
Marketing,
Communications
and Events
100% 31-Mar-2022 The team has continued to provide marketing and communications
support to the organisation. This has included the visual refresh of the
Council brand following the roll out of the new Council values, supporting
the Council’s role in the delivery of a safe Scottish Parliamentary election
and planning for Local Elections process. We have continued to provide
communications to support staff and the general public as we moved
through the final stages of the pandemic, including the promotion of
national COVID-19 vaccination and community testing programme,
cascading public health messaging and Scottish Government guidance.
Communications and marketing support was also provided for key
projects including: AMIDS, major events, Future Paisley, Cultural
Infrastructure, Team Up to Clean Up Spotless September and Big Spring
Clean, Net Zero and Soft FM recruitment. 
1,133 design jobs, part of 192 projects were completed by marketing and
design. 199 media releases were issued by the communications team.
CESDP21 - 05 - 06 Implement the internal
communications and
engagement strategy to
support the Council's social,
economic, and
organisational recovery 
Communications
& Public Affairs
Manager
100% 31-Mar-2022 The internal communications team has continued to support
organisational recovery, managing the impact of Omicron on council
services, and working safely with covid. It supported the transition to
interim ways of working and the gradual reopening of Renfrewshire
House and other council buildings. The team supported ICT with the
creation and implementation of a cyber security plan and support for
training. In response to employee insights, we have increased our use of
video and most recently the profile and visibility of the new Chief
Executive, by launching ‘Ask Alan’.

Page 68

68
Code Title Status Assigned To Progress Due Date Latest Note 
The team designed and delivered two online leaders forum sessions for
senior leaders in November 2021 (97 attendees) and March 2022 (103
attendees). The team delivered Support for People Strategy objectives
including the launch of Employee Benefits ‘mylifestyle’ Hub and Cycle to
Work Scheme part 1 and 2.
CESDP21 - 05 - 07 Deliver Part 1 Digital
Experience strategy 
Communications
& Public Affairs
Manager
100% 31-Mar-2022 Part 1 (Discovery phase) of the Digital Experience programme has been
completed by our digital partners Manifesto and FutureGov. A
comprehensive report has been produced and includes findings and
recommendations on future ways of working, technology, investment,
and programme roadmap. 
This report has been shared with the Digital Board. An update will be
provided to CMT in May 2022 with an ask to approve all
recommendations. 
Following CMT approval, the Digital Experience team will implement the
next phases and start the procurement exercises required to deliver a
new Renfrewshire.gov.uk by mid-2023.
CESDP21 - 05 - 08 Develop new content
strategy 
Communications
& Public Affairs
Manager
100% 31-Mar-2022 We introduced our Social Media Content Strategy in August 2021. The
strategy was developed using the insights gathered from our Social Media
Audit and Channel Review. 
The strategy has developed our social media approach, creating new
identities for each of our channels based on their audiences and
localising and tailoring content so it is more engaging for our followers. 
The strategy has now been rolled out across all of our social media
channels and has helped increase engagement and reach. It is also
allowing us to build a better relationship with our audience as our focus

Page 69

69
Code Title Status Assigned To Progress Due Date Latest Note
is on creating engaging content which works for our audiences and
promotes the council’s objectives. 
Chief Executives Service Development Plan 2021-22 Scorecard 
Generated on: 12 May 2022 
Strategic Outcome 1: Reshaping our place, our economy and our future 
Code Performance
Indicator
Current
Status
Short
Term Long Term
2020/21 2021/22 Q1 2021/22 Q2 2021/22 Q3 2021/22 Q4 2021/22 Explanation of performance
Value Target Value Target Value Target Value Target Value Target Value Target
DHS.EMP.01
Number of new
unemployed
people being
supported through
Renfrewshire
Council
Employability
Programme
(INVEST)   
924 1,100 859 1,100 237 275 194 275 209 275 219 275
A total of 1791 people were supported
through the service. The figures are
broken down into 3 distinct groups:
•  859 new people registered with the
service for a full training / guidance
and support employability service; 
•        432 people were registered
during 20-21 and continued to get a
service during 21-22 
•        Around 500 additional people
worked with the service specifically to
access Kickstart Opportunities being
delivered by the Invest in Renfrewshire
team. 
DHS.EMP.03
Number of people
supported,
sustained in work
at 6 Months
through
Renfrewshire   
170 180 221 180 Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
At the current time 221 people have
been sustained in work after 6 months.
This number will increase substantially
as the Council and Scottish
Government have supported an
economic development initiative

Page 70

70
Code Performance
Indicator
Current
Status
Short
Term Long Term
2020/21 2021/22 Q1 2021/22 Q2 2021/22 Q3 2021/22 Q4 2021/22 Explanation of performance
Value Target Value Target Value Target Value Target Value Target Value Target
Council
Employability
Programme
(INVEST)
named “Kickstart Plus” in Renfrewshire
to provide a further 6 months support
to Kickstart trainees (with employers
also contributing) to allow them to
continue in the workplace.
CE.EMP.01
Number of
unemployed
people moving
into paid
employment
through
Renfrewshire
Council
Employability
Programme   
289 350 686 350 Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
486 registered clients of the Invest in
Renfrewshire service moved into
employment during 21-22 as a direct
result of working with the service.
In addition it is estimated than an
additional 200+ people who were not
registered clients also moved into work
via the Invest in Renfrewshire Kickstart
Programme which placed 406 young
people into work. (numbers are
estimated as the details of every
person is not yet available).
DHS.EMP.08
Number of new
business start ups
in Renfrewshire
with Business
Gateway support   
86 310 272 320 80 80 78 80 60 80 54 80
The Start Up figures have improved on
last year however the Business Team
were still working on the COVID-19
grants (sometimes intensively) during
2021-22 and so the figures are lower
than the target.                  
CEX/COVID/0
1
Number of
businesses
applied for support
relating to COVID-
19 funding
schemes   
3,728 Data
only 2,750 Data
only
Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
For COVID grant programme delivered
in the 21-22 financial year 2750
businesses successfully applied for
support. Many more would have
applied for support but not met the
eligibility criteria.
CEX/COVID/0
2
Amount of grants
and loans
approved to
businesses in
relation to COVID-
19 funding
schemes (£)   
14,703,
500
Data
only
9,205,6
50
Data
only
Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
During 21-22 the COVID business
funding awarded to local businesses
was in the region of £9,205,650 with
support to 2750 discrete businesses. 
This relates to funding announced and
administered in the period. Additional
grants may also have been paid but
related to 20-21 programmes and
would have been counted in that year.

Page 71

71
Code Performance
Indicator
Current
Status
Short
Term Long Term
2020/21 2021/22 Q1 2021/22 Q2 2021/22 Q3 2021/22 Q4 2021/22 Explanation of performance
Value Target Value Target Value Target Value Target Value Target Value Target
DHS.EMP.09
Renfrewshire
Claimant Count
(NOMIS)   
7,285 Data
only 4,180 Data
only 5,985 Data
only 5,075 Data
only 4,420 Data
only 4,180 Data
only
The claimant count has been reducing
steadily and the quarterly figures are
taken every 3 months from June 2021. 
A recent report from ONS and SG
showed that Renfrewshire had the
second highest youth employment rate
in Scotland in 2021 at 67.4% (54.9% is
Scotland average) and (by a
considerable margin) the highest youth
employment growth over the last 10
years across Scotland at 21.1%
(against a Scotland increase of -0.3%).
This shows the level of commitment
and work on the youth employment
agenda over the years, but particularly
the last year. 
This data is taken from NOMIS.
DHS.WORKP
OP
Percentage of
Renfrewshire
population working
age (16-64)   
64.2% Data
only * Data
only
Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
*This figure is taken from a national
dataset and an update for 2021/22 is
not yet available.
DHS.CP.RR01
Number of
properties on
Buildings at Risk
Register   
30 42 27 42 30 42 27 42 27 42 27 42
The Buildings at Risk Register,
prepared and managed by Historic
Environment Scotland, includes 27
Renfrewshire properties, a reduction of
three since the start of 2021.
DHS.VDL.01
Amount of land
brought forward
for re-use and
development
contributing to
economic activity
and enhancing the
built and natural
environment   
17 20 28 20 Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
28 hectares of land was developed or
brought back into use including to
support the delivery of new affordable
and private homes and the delivery of
new developments at the Advanced
Manufacturing and Innovation District
Scotland and Hillington Business Park.
CEX/EVENTS/
01
Number of people
participating in the
events
programme,
digitally or in
person   
New indicator
for 21/22 789 300 200 75 81 75 508 75 0 75
This is a new indicator with an annual
target of 300, and the baseline position
for 2020 was 150.

Page 72

72
Code Performance
Indicator
Current
Status
Short
Term Long Term
2020/21 2021/22 Q1 2021/22 Q2 2021/22 Q3 2021/22 Q4 2021/22 Explanation of performance
Value Target Value Target Value Target Value Target Value Target Value Target
789 participation opportunities were
delivered against an annual target of
300. 
Q1 events, Paisley Food and Drink
Festival and Renfrew Gala day
generated 200 participation
opportunities. 
Q2 events Sma Shot’ Day, Radical
War – Paisley Radicals and Doors
Open Days had 81 participants across
live music, poetry, dance, theatre and
ariel activities. 
The Radical War project, Paisley
Radicals, saw the culmination of the
Future Paisley funded project which
delivered over 115 hours of community
engagement with the final output of the
project an immersive walking tour app
now available for visitors. 
Q3 participation opportunities came
from The Spree, Wee Spree, Spree for
All, Halloween and the Christmas
programme across Renfrewshire -
Festive Fun. Opportunities were
available across music, dance,
costume and creative workshops,
animation, and street theatre. 
Please note there are no council
events in Q4.. 
CEX/EVENTS/
02
Number of people
performing in the
events
programme, digital
or live
performance   
New indicator
for 21/22 307 100 50 25 47 25 210 25 0 25
This is a new indicator with an annual
target of 100, and the baseline position
for 2020 was 50. 
307 performance opportunities were
created against a target of 100. 
Performance opportunities in Q1
programme were contained in the
Food and Drink Festival programme
and included film production by Art
Boss.

Page 73

73
Code Performance
Indicator
Current
Status
Short
Term Long Term
2020/21 2021/22 Q1 2021/22 Q2 2021/22 Q3 2021/22 Q4 2021/22 Explanation of performance
Value Target Value Target Value Target Value Target Value Target Value Target
Performance opportunities in Q2 -
Shot Day and Radical War Project –
Paisley Radicals. Included live music,
spoken word and poetry. Other
performance elements of the
programme including theatre and
aerial were pre-recorded and
broadcast during the digital event. 
Performance opportunities in Q3 - The
Spree programme (over 80 bands and
performers), Halloween and the
Christmas Programme. 
Please note there are no council
events in Q4.  
CEX/EVENTS/
03
Number of
volunteers
supporting the
development and
delivery of the
events   
New indicator
for 21/22 8 15 3 3.75 4 3.75 1 3.75 0 3.75
This is a new indicator with an annual
target of 15. 8 volunteering
opportunities were delivered with a
target of 15. Opportunities were limited
due to covid19 restrictions on live
events. 
Q1 events included the Paisley Food
and Drink Festival and Renfrew Gala
Day (online events) - 3 volunteers. 
Q2 volunteering opportunities - Doors
Open Days programme (4 volunteers) 
Q3 volunteering opportunity -
Lochwinnoch, a touring piece of
artwork by Cryptic – Sound Horns (1
volunteer) 
Q4 had no planned council events.  
CEX/EVENTS/
04
Number of people
viewing or
attending the
events programme   
New indicator
for 21/22 63,630 65,000 18,300 16,250 17,553 16,250 27,777 16,250 0 16,250
This is a new indicator with an annual
target of 65,000, reflecting the
restrictions on large scale outdoor
events in Q1 and 2. The cancellation
of the British Pipebands
Championships due to COVID-19
restrictions further impacted
attendance/viewing numbers. 
Total audience for 2021/22 was 63,630
against target of 65,000. 
Breakdown: 
Two digital events took place in Q1
due to covid restrictions: 17,000+

Page 74

74
Code Performance
Indicator
Current
Status
Short
Term Long Term
2020/21 2021/22 Q1 2021/22 Q2 2021/22 Q3 2021/22 Q4 2021/22 Explanation of performance
Value Target Value Target Value Target Value Target Value Target Value Target
people tuned in to watch the Food and
Drink festival programme (live cookery
demos, cooking and bake along family
sessions, interactive cocktail making,
crafts and live music) 1,000+
participated in digital Renfrew Gala
day. 
Q2 - Sma’ Shot day (2,136) , Paisley
Radicals and Doors Open Days
(15,000) online content. 
Q3 - in-person events with restricted
numbers to meet covid capacity
restrictions: The Spree programme lost
one third capacity 
Main stage mass gathering events –
Halloween and Festive events were re-
designed. Halloween festival moved to
a 5-day walking trail event. A 4-week
Festive programme was designed with
activity taking place across weekends
in Nov/Dec.  
CEX/FUND/01 Fundraising
Income Target   
New indicator
for 21/22
185,00
0
500,00
0
Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
The 2021/22 target was impacted
through the suspension of HNWI
solicitation in May 2020. This restarted
in January 2022. Despite the impact of
Covid-19 on donor cultivation we have
continued to make good progress
towards the target for Trusts and
Foundations with £881,000 being
secured against the original £1.5m
target.2021/22 highlights include: 
• May 2021 - £100,000 pledge (Trust
and Foundation) 
• June 2021: £30,000 pledge (Coats
PLC) 
• March 2022: The Hugh Fraser
Foundation adding £50,000 to their
initial pledge of £200,000 
CEX/MUS/01 Paisley Museum
PR target (OTSH)   
New indicator
for 21/22
9,197,8
15
4,000,0
00
3,300,0
00
1,000,0
00
6,665,6
79
1,000,0
00
8,643,2
63
1,000,0
00
9,197,8
15
1,000,0
00
Q4 saw increased PR through
additional coverage of the Corozal
dredger and model at Paisley Museum
story. There were a number of

Page 75

75
Code Performance
Indicator
Current
Status
Short
Term Long Term
2020/21 2021/22 Q1 2021/22 Q2 2021/22 Q3 2021/22 Q4 2021/22 Explanation of performance
Value Target Value Target Value Target Value Target Value Target Value Target
references to Paisley Museum’s
£42million transformation in UK City of
Culture bid features, after Stirling
missed out on shortlisting. There was
also a large spike in OTSH thanks to
broadcast coverage as the museum
featured in BBC 1’s Antique’s Road
Trip in February.  
CEX.OTSH.PI
Opportunities to
see or hear
something (OTSH)
positive about
Paisley and
Renfrewshire as
part of Paisley is
destination brand   
160,18
5,805
240,0
00,00
0
314,04
1,621
240,00
0,000
31,200,
000
60,000,
000
107,46
3,573
60,000,
000
109,41
0,795
60,000,
000
65,967,
253
60,000,
000
Despite the loss of some the council
events programme, which is a major
contributor to OTSH due national
marketing campaigns, we continued to
reach our annual target through visitor
marketing campaigns that specifically
targeted audiences across west-
central Scotland.   
Strategic Outcome 2: Building strong, safe and resilient communities 
Code Performance
Indicator
Current
Status
Short
Term Long Term
2020/21 2021/22 Q1 2021/22 Q2 2021/22 Q3 2021/22 Q4 2021/22 Explanation of performance
Value Target Value Target Value Target Value Target Value Target Value Target
HPSIP01 Affordable housing
completions    250 200 170 243 Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
The affordable newbuild housing
programme involves both Council and
Housing Association developments
across a range of sites in
Renfrewshire. Due to the impact of the
COVID-19 pandemic some
developments were delayed. The
Council along with the Housing
Associations active in Renfrewshire
and the Scottish Government continue
to work in partnership to deliver
affordable housing across
Renfrewshire and to ensure that
delivery exceeds the target next year.
Over 450 new affordable homes are
now expected to be completed in
2022/23.

Page 76

76
Code Performance
Indicator
Current
Status
Short
Term Long Term
2020/21 2021/22 Q1 2021/22 Q2 2021/22 Q3 2021/22 Q4 2021/22 Explanation of performance
Value Target Value Target Value Target Value Target Value Target Value Target
SOA10.10a Private housing
completions    751 500 N/A 500 Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
Private housing completions are
monitored in an annual Housing Land
Audit. The 2022 audit will be complete
in the summer which will record
completions for the period 2021/22. 
Private completions haven’t been
reported since 2019 due to the Covid
19 pandemic. Despite the pandemic,
1383 new private homes were
completed in the 2 year period from
2019 to 2021 which exceeds targets. A
range of new homes continue to be
delivered across Renfrewshire
including at Dargavel Village, the
former BASF site in Paisley and the
former Johnstone Hospital. 
CE.SDP.21.%
PSPI
Percentage of
respondents who
agree that they
can influence
decisions about
public services
and other issues
of public interest   
21.2% Data
only 21.2% Data
only
Not measured for Quarters 
In Renfrewshire’s Public Services
Panel (December 2020), respondents
were asked if they agreed that they
‘can influence decisions about public
services and other issues of public
interest’ - 21.2% agreed. Whilst not
directly comparable with the Scottish
Household Survey question, the 2019
data for ‘influencing’ showed 11% of
respondents agreeing in Renfrewshire.
CEX/LON/01
Percentage of
respondents who
have felt lonely
some, all or most
of the time   
47% Data
only * Data
only Not measured for quarters
This figure comes from Renfrewshire’s
Public Services Panel (December
2020) and compares broadly with a
similar question in a Scottish
Government National COVID-19
Survey where the figure for Scotland
was 40%. Some caution should be
exercised here as the national survey
was a telephone survey and the Public
Services Panel was a written
questionnaire so perhaps people may
be more likely to disclose sensitive
emotions such as loneliness.  
*A new survey was undertaken in
Spring 2022 and results will be
included in the mid-year report.

Page 77

77
Code Performance
Indicator
Current
Status
Short
Term Long Term
2020/21 2021/22 Q1 2021/22 Q2 2021/22 Q3 2021/22 Q4 2021/22 Explanation of performance
Value Target Value Target Value Target Value Target Value Target Value Target
CEX/NEIGH/0
1
Percentage of
respondents who
agree that this is a
neighbourhood
where local people
take action to help
improve the
neighbourhood   
49% Data
only * Data
only
Not measured for Quarters 
This figure comes from Renfrewshire’s
Public Services Panel (December
2020). 
*A new survey was undertaken in
Spring 2022 and results will be
included in the mid-year report.
CEX/NEIGH/0
2
Percentage of
respondents who
agree this is a
neighbourhood
where people are
kind to each other   
72% Data
only * Data
only
Not measured for Quarters 
This figure comes from Renfrewshire’s
Public Services Panel (December
2020) and compares broadly with a
similar question in the Scottish
Household Survey where the figure for
Scotland in 2018 was 83%. 
*A new survey was undertaken in
Spring 2022 and results will be
included in the mid-year report. 
Strategic Outcome 3: Tackling inequality, ensuring opportunities for all 
Code Performance
Indicator
Current
Status
Short
Term Long Term
2020/21 2021/22 Q1 2021/22 Q2 2021/22 Q3 2021/22 Q4 2021/22 Explanation of performance
Value Target Value Target Value Target Value Target Value Target Value Target
CEX/HUB/01
Number of
referrals
supported by the
Neighbourhood
Hub teams   
New indicator
for 21/22 517 Data
only 75 Data
only 153 Data
only 126 Data
only 163 Data
only
Neighbourhood Hubs experienced
relatively low numbers of referrals in
Q1, which corresponds to lower levels
of community transmission of COVID-
19. The majority of these requests
continue to be focussed on access to
food for those self-isolating, as well as
prescription delivery. Referrals
throughout the year have continued to
follow the patterns of community
transmission, including a significant
spike in response to the Omicron
variant over the new year period. 
CPP.INCOME
TP
Income maximised
in Tackling
Poverty projects   
758,67
5.49
Data
only
1,145,9
18.38
Data
only
340,66
2.49
Data
only
280,07
4.72
Data
only
284,48
7.31
Data
only
240,69
3.86
Data
only
Advice in 21/22 has been delivered by
telephone, online or by video call.
Numbers fluctuate per quarter

Page 78

78
Code Performance
Indicator
Current
Status
Short
Term Long Term
2020/21 2021/22 Q1 2021/22 Q2 2021/22 Q3 2021/22 Q4 2021/22 Explanation of performance
Value Target Value Target Value Target Value Target Value Target Value Target
dependent on numbers of clients
coming forward and types of issues.  
CONSCOT
Number of devices
allocated as part
of Connecting
Scotland
programmes   
New indicator
for 21/22 2601 Data
only Not measured for quarters
The status is now 100% complete as
the programme has ended and going
through a review. We await a future
announcement.
CPP.3RDSEC
TOR
Number of third
sector
organisations
engaging with
Renfrewshire
Community
Planning
Partnership   
195 130 127 134 70 134 120 134 35 134 50 134
The number of third sector
organisations engaging with
Renfrewshire Community Planning
Partnership is 127.  This includes
groups who are members or attend
community planning groups or who
have applied for Local Partnership or
Celebrating Renfrewshire grants.

Page 79

79 
Strategic Outcome 5: Working together to improve outcomes 
Code Performance
Indicator
Current
Status
Short
Term Long Term
2020/21 2021/22 Q1 2021/22 Q2 2021/22 Q3 2021/22 Q4 2021/22 Explanation of performance
Value Target Value Target Value Target Value Target Value Target Value Target
PT.DS.PPF.C
MT.06
Application
Approval Rate    96.9% Data
only * Data
only 97.4% Data
only 97.1% Data
only * Data
only * Data
only
This indicator is verified by the Scottish
Government bi-annually.  
*The next publication of data will be in
Summer 2022.
PT.DS.PPF.C
MT01
Average Time for
processing
Planning
Applications
(Householder)   
6.9 8 * 8 6.7 8 6.7 8 * 8 * 8
This indicator is verified by the Scottish
Government bi-annually. 
*The next publication of data will be in
Summer 2022.
PT.DS.PPF.C
MT.07
Percentage of
applications dealt
with under
delegated
authority   
98.1% Data
only * Data
only 97.9% Data
only 98.5% Data
only * Data
only * Data
only
This varies year on year depending the
types of applications that are
submitted.  
*The next publication of data will be in
Summer 2022.
DHS.BSTAN.1
a
Time to issue a
building warrant or
amendment to
warrant from
receipt of
application (days)   
96.9 60.0 101.2 60.0 103.3 60.0 100.8 60.0 89.5 60.0 111.0 60.0
This internal target has been set at 60
days and measures the overall time it
takes from receipt of a valid building
warrant application to issuing the
building warrant approval. This KPO
measures both building standards
officers and external agents response
times and, as a result, there are
aspects of this KPO that are out with
our control. The KPO stems from the
Building Standards Performance
Framework - KPO1, which places a
responsibility on LA verifiers to
constantly seek to reduce and minimise
turnaround times for building warrant
applications. Given current
performance and that elements of this
KPO are out with our control,
consideration should be given to
reviewing this target.
DHS.BSTAN.1
b
Time to issue a
first report (95%
issued within 20
days)   
50.8 95.0 53.4 95.0 28.2 95.0 60.4 95.0 69.5 95.0 55.5 95.0
Performance is lower than anticipated
for Q4 and primarily stems from
carrying two vacancies. Two new
Assistant Surveyors started in March

Page 80

80
Code Performance
Indicator
Current
Status
Short
Term Long Term
2020/21 2021/22 Q1 2021/22 Q2 2021/22 Q3 2021/22 Q4 2021/22 Explanation of performance
Value Target Value Target Value Target Value Target Value Target Value Target
2022 and it is anticipated that this will
lead to further performance gains in Q1
– Q2 2022/23.
DHS.BSTAN.1
c
Percentage of
building warrants
or amendments
issued within 10
days of receipt of
all satisfactory
information   
47.3 90.0 60.1 90.0 55.4 90.0 42.9 90.0 66.3 90.0 75.9 90.0
Performance has improved but is still
lower than target and this primarily
stems from carrying two vacancies.
Two new Assistant Surveyors started in
March 2022 and it is anticipated that
this will lead to further performance
gains in Q1 – Q2 2022/23
CE08
% of FOI requests
in a quarter
completed within
timescale in the
Chief Executive's
Department   
93% 100% 93.5% 100% 95% 100% 88% 100% 97% 100% 100% 100%
There were 25 single departmental
Chief Execs requests in Q4. 25 were
answered on time.  
CEX/COMP/01
% of frontline
response
complaints
responded to
within timescales
agreed with
customer (Chief
Executive’s)   
63% 100% 46% 100% 57% 100% 59% 100% 29% 100% 40% 100%
During 2021/22 the service received a
total of 41 frontline complaints of which
20 complaints were responded within
timescale.
Monitoring views have now been
established to better manage service
area complaint queues within the
Contact Us – Complaints
module.  CaseVeiwer refresher training
is being delivered in June 2022 and will
focus on staff managing active cases
and queues.  Staff will be reminded that
more complicated Frontline cases
should, where required be escalated to
Investigation (20 days) complaints to
ensure completion within timescale
CE153
% of investigation
complaints
responded to
within timescales
agreed with
customer (Chief
Executive’s)   
100% 100% 77% 100% 100% 100% 80% 100% 50% 100% 100% 100%
In Q4, the Chief Executive's Service
received 1 investigation complaint
which was completed within timescale.  
CEABS01dii
Average number
of work days lost
through sickness   
5.56 6.5 4.26 6.5 0.96 1.3 1.52 1.2 1.78 1.8 * 2.2
It has been noted that absence
performance with covid is within target
for Qtr 3 although there is an increase

Page 81

81
Code Performance
Indicator
Current
Status
Short
Term Long Term
2020/21 2021/22 Q1 2021/22 Q2 2021/22 Q3 2021/22 Q4 2021/22 Explanation of performance
Value Target Value Target Value Target Value Target Value Target Value Target
absence per
employee (Chief
Executive's) (FTE)
of 0.23 days over the same period last
year. The absence performance
without covid for this period was
reported to Board as 1.37 days.
Monitoring of absence continues
across the service. All service absence
stats are presented to CMT and
reported to Board.  
*Data not yet available
CEX/COMMS/
01
% of staff who feel
that the
information they
receive from
internal
communications is
helpful   
New indicator
for 21/22 85% 85% Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
Not measured
for Quarters
Based on results of the Smarter Ways
of Working Survey issued to all staff in
June 2021. The survey results show
that 85% feel the information they
receive from internal communications is
very helpful (26%) or helpful (59%) This
is measured annually.  
CEX.DIGCHA
NNELS
Number of people
engaging with the
Council’s digital
channels (not
including website).   
55,130 54,400 64,822 56,800 57,915 54,000 64,063 54,000 64,822 54,000 64,822 54,000
Numbers of people engaging with the
Councils digital channels – Facebook,
Twitter, Instagram, YouTube, LinkedIn
and Soundcloud. 
Our LinkedIn followers rose from 747 in
July 2021 to 6,078 in August 2021 after
the merger of our old and new account
profiles. Our followers on LinkedIn have
also increased as we have focused on
producing more content which appeals
to our target audiences on that
channel. 
Our Social Media Content Strategy,
which was introduced in August 2021,
has supported our growth in followers
by ensuring content on our channels is
tailored to meet the needs of each of
our audiences. Since it’s introduction
we have seen an improvement in our
follower figures and an increase in
reach and engagements across all
channels.  
CEX/WEB/01
Number of total
visits to council
website   
New indicator
for 21/22
3,421,2
49
3,240,0
00
703,58
0
810,00
0
941,72
0
810,00
0
822,93
7
810,00
0
953,01
2
810,00
0
This is a new indicator for 2021/22.
Target has been achieved for this year.

Page 82

82
Code Performance
Indicator
Current
Status
Short
Term Long Term
2020/21 2021/22 Q1 2021/22 Q2 2021/22 Q3 2021/22 Q4 2021/22 Explanation of performance
Value Target Value Target Value Target Value Target Value Target Value Target
CEX/WEB/02
Number of new
users visiting the
council website   
Indicator can no longer be tracked
This indicator can’t be tracked currently
due to a technical issue with the
website Content Management System
(GOSS) and issues with cookie
tracking. This is a medium-term issue.  
CEX.OTSH.RC
Opportunities to
see or hear
something
(OTSH) positive
about
Renfrewshire
Council activity   
77,513,
670
120,00
0,000
371,06
1,673
125,00
0,000
84,208,
049
30,000,
000
85,636,
716
30,000,
000
102,30
6,576
30,000,
000
98,910,
332
30,000,
000
Overall OTSH has increased compared
to previous years, this is due to
coverage returning to normal in the
pandemic recovery and a change to the
measurement of circulation figures for
online media reach.