Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
28 February 2024 
NOTICE OF MEETING 
A meeting of the OBAN LORN & THE ISLES AREA COMMITTEE will be held ON A HYBRID
BASIS ON MICROSOFT TEAMS AND IN THE MCCAIG SUITE, CORRAN HALLS, OBAN on
WEDNESDAY, 6 MARCH 2024 at 10:00 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Oban, Lorn and the Isles Area Committee - 13 December 2023 (Pages 5 - 14) 
(b) Oban, Lorn and the Isles Area Community Planning Group - 7 February 2024
(Pages 15 - 24) 
(c) Special Meeting of Oban Common Good Fund - 12 December 2023 (Pages 25 -
26) 
4. PUBLIC QUESTION TIME 
5. AREA PERFORMANCE REPORT -  FQ3 2023/34 (Pages 27 - 74)  
Report by Executive Director with responsibility for Customer Support Services 
6. PRIMARY SCHOOL AREA ATTAINMENT REPORT - OBAN, LORN AND THE
ISLES (Pages 75 - 90)  
Report by Executive Director with responsibility for Education 
7. ROADS AND INFRASTRUCTURE UPDATE (Pages 91 - 94)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
8. ROADS CAPITAL RECONSTRUCTION PROGRAMME (Pages 95 - 100)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
Public Document Pack

Page 2

9. HOUSING SERVICES ACTIVITY  UPDATE - STRATEGIC HOUSING INVESTMENT
PLAN (SHIP)  - ANNUAL UPDATE (Pages 101 - 114)  
Report by Executive Director with responsibility for Development and Economic
Growth 
10. ACTIVE TRAVEL PROGRESS REPORT 2023-24 (Pages 115 - 128)  
Report by Executive Director with responsibility for Development and Economic
Growth 
11. SUPPORTING COMMUNITIES FUND - 2022-23 PROJECT MONITORING REPORT
(Pages 129 - 136)  
Report by Chief Executive 
12. AREA PLANS (Pages 137 - 150)  
Presentation by Coroporate Support Manager, Argyll and Bute Council 
13. CHARITABLE TRUSTS, BEQUESTS AND TRUST FUNDS 
(a) Distribution Arrangements (Pages 151 - 158) 
Report by Executive Director with responsibility for Legal and Regulatory Support  
(b) John of Lorn Bequest Award Recommendations (Pages 159 - 162) 
Report by Executive Director with responsibility for Legal and Regulatory Support
E1  (c) Exempt Appendix (Pages 163 - 164) 
REPORTS FOR NOTING 
14. COMMUNITY SPORTS HUB, OBAN LORNE RUGBY FOOTBALL CLUB,
GLENCRUITTEN DRIVE, OBAN (Pages 165 - 172) 
15. DRAFT OBAN, LORN AND THE ISLES AREA COMMITTEE WORKPLAN (Pages
173 - 178) 
The Committee will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraph is:- 
E1 Paragraph 6  Information relating to the financial or business affairs of  any particular
person (other than the authority). 
Oban Lorn & The Isles Area Committee 
Councillor Kieron Green (Vice-Chair) Councillor Amanda Hampsey
Councillor Willie Hume Councillor Andrew Kain (Chair)
Councillor Jim Lynch Councillor Luna Martin
Councillor Julie McKenzie Councillor Andrew Vennard

Page 3

Contact: Melissa Stewart, Governance Officer - 01546 604331 
Karen Campbell, Senior Committee Assistant - 01631 567855

Page 4

This page is intentionally left blank

Page 5

MINUTES of MEETING of OBAN LORN & THE ISLES AREA COMMITTEE held ON A HYBRID
BASIS IN THE MCCAIG SUITE, CORRAN HALLS, OBAN AND BY MICROSOFT TEAMS 
on WEDNESDAY, 13 DECEMBER 2023 
Present: Councillor Kieron Green  (Chair) 
Councillor Willie Hume
Councillor Jim Lynch 
Councillor Luna Martin (Item 4 Onwards)
Councillor Andrew Vennard 
Attending:  Melissa Stewart, Argyll and Bute Council (Clerk) 
Hugh O’Neill, Argyll and Bute Council
Sonya Thomas, Argyll and Bute Council
Michelle Mundie, Chief Executive ACHA
Seymour Adams, CHARTS 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received by Councillor Andrew Kain and Councillor Amanda
Hampsey. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated. 
3. MINUTES 
(a) Oban, Lorn and the Isles Area Committee - 13 September 2023 
The Minute of the meeting of the Oban, Lorn and the Isles Area Committee, held on
13 September 2023 was approved as a correct record. 
(b) Oban, Lorn and the Isles Area Community Planning Group - 8 November 2023 
The Minute of the meeting of the Oban, Lorn and the Isles Area Community
Planning Group held on 8 November 2023 was noted. 
(c) Oban Common Good Fund - 13 November 2023 
The minute of the Oban Common Good Fund meeting held on 13 November 2023
was noted. 
4. PUBLIC QUESTION TIME 
The first two questions were received in advance of the meeting from Luing Community
Council; 
Question 1 
The two conservation villages of Cullipool and Toberonochy experienced flooding during
the heavy rains early October, and it is the second time that flooding in Cullipool has
Page 5 Agenda Item 3a

Page 6

damaged homes. On the advice of the Community Planning Group administrator we have
emailed the Roads and Infrastructure Dept to ask if there is a possibility of obtaining
technical advice from their flooding engineers (though we are aware of how much
pressure they are under right now). It would be useful to know if this is the best route or if
there is anyone else that we can contact to obtain technical advice on how to prevent or
minimise future flooding risks. 
Hugh O’Neill advised that he had passed the query onto the Design Services, who met
with Luing Community Council on Monday and will progress their query. 
Question 2 
How does the Council know which houses are second-homes? I note that a number of
people are on the electoral register here who are second-home owners. Is this legitimate,
and might this allow them, for instance, to avoid the council tax increase for second-
homes when it is introduced, or to benefit in other ways (eg free University fees for a child
if their home is in England)? 
Fergus Walker had provided a response which was read out by the Committee Clerk.  “A
property is defined in law as a second home if it is no-one’s sole or main residence and it
is lived in for at least 25 days per annum”. 
“In terms of compliance we conduct reviews of second homes and ask for details such as
electricity/utility bills, insurance documents and other verification to support the fact that a
property is a second home. There are other tools that we use to identify sole or main
residences, ie:- where people are trying to avoid their property being classed as a second
home we would use credit referencing tools and sharing data with other local authorities to
track and trace people”. 
Question 3 – Andrew Spence BID4 Oban 
On Saturday 7th October 2023 Oban and the surrounding area experienced severe
flooding issues resulting in roads being washed away, landslides, disruption, and serious
flooding in the Lochavullin area of Oban. The deluge happened very quickly and
numerous busineses were unable to take any precautions. The impact was catastrophic
for many busineses in the area. 
Similar flooding happened in 2017 and 2018. At that time, we were told the reason for the
flooding was that pumps had failed. In 2023, the same pumps failed again. 
There has been flood impact surveys undertaken in Oban. The most recent being
published in June 2019, 33 pages, with various short-term and long-term options. To date
the only visible change has been the introduction of plastic walls along a very short length
of the Black Lyn adjacent to the Guide Hall.
Impact to business and community:
• Numerous premises flooded some to a level of over a metre.
• Huge losses to those businesses in terms of infrastructure and revenue.
• We estimate that property and equipment damage will be in excess of £2m
• Serious pollution issues with raw sewerage and oil washed out of garages.
• Some businesses unable to open effectively for a considerable period.
Page 6

Page 7

• The costs of the cleanup operation have been significant and financed by those
businesses. It should also be highlighted that many premises in the Lochavullin
area are now unable to obtain flood insurance cover and they are unable to claim
against their losses in any other way.
• Tesco lost its dot.com operation and suffered from severe flooding. This has had a
huge impact on their operation and significant impact on their customers who rely
on home delivery.
• Tesco have also suffered significant damage to is petrol station and it is still not
operational.
• M&S, Argos, Pets at Home were unable to trade for three days, and they suffered
significant losses including colleague’s cars in the carpark. 
• Homebase became an island and the only access was on foot, they remained open
as a public service but suffered significant losses.
• It should be noted that the council are the landlords for many of the flooded
premises. 
Social impact.
This time Oban nearly lost all its supermarkets to flooding and had the water level been
about 20cm higher this would have occurred causing a serious social impact to the area.
No supermarkets, no food! The owners of the businesses, staff and customers have all
suffered with some of the businesses community stating they will not be able to carry on if
there is another flood. This has had an impact on mental health.
What next?
• What have the council done to mitigate flooding in Oban over the last five years?
• What did the council do to support the business community during the most recent
flooding?
• What is the councils long term plans?
• What is the council’s contingency should we be flooded again and have no
supermarkets?
• Have the council applied for flood prevention funding for Oban?
• When will the council engage positively with the businesses and produce some
short-term plans and support to mitigate future events? 
Hugh O’Neill advised that this be taken off table for a detailed response, to which Mr
Spence agreed. 
Question 4 & 5 – Linda Robb, Dunbeg Community Council 
Linda advised that she had been in dialogue with the Council’s roads department over a
blocked drain on Meadow Road, Dunbeg, over the years.  The recent bad weather had
caused the overflow of this drain to ice over the road making it unsafe for vehicles using
the road. On reporting it again she was advised by Traffic and Development that this was
a Trunk Road and therefore the Council could not do anything about it.  Meadow Road is
not on the trunk road therefore very disappointed in the unsatisfactory response from the
Council. 
Hugh O’Neill apologised for the lack of response and asked that Ms Robb pass her details
on to the Clerk and he would pick up on this and respond directly.
Page 7

Page 8

When will the works on the proposed cycle track from Dunbeg to Connel start? 
Councillor Green advised that he had received a lengthy email in response to the cycle
track and will forward it on to Linda.  The Council has been liaising with SAMS and
Sustrans but are disappointed in the lack of engagement from Transport Scotland. 
Question 6 – Duncan Martin 
Firstly Mr Martin questioned whether the meeting was quorate due to lack of members
present? 
The Clerk advised that the quorum is 3 and confirmed the meeting was quorate. 
Mr Martin then went on to ask the Area Committee what role does it see for itself in the
future management of Oban Harbour Board and what do councillors see as their role? 
Councillor Green advised that constitutionally the Area Committee would not have direct
accountability for the Oban Harbour, the Harbour Board would have overall responsibility,
along with 4 members of the Area Committee who were also members of the Harbour
Board.  He asked the Clerk to clarify, which she did. 
Mr Martin also asked if there was any review within the Council as to how communities
are empowered and engage with Council Officers? 
Councillor Green stated there was a Scottish Government Local Democracy Review and
Consultation ongoing at the moment that would encompass community engagement and
decision making. 
Question 7,8 & 9 – Frank Roberts, Oban Community Council 
Frank also voiced his disappointment at the lack of members in attendance at the
meeting.  With concerns for the longer term development of the harbour, I have 3 simple
questions:- 
Will there be a strategic marketing plan developed and implemented, and how will the
views of townspeople be assessed and taken into account?
How will this committee be involved in this critical decision-making process on behalf
of its OLI Area constituents?
Will the development of a marketing plan and its subsequent implementation be
considered to be an operational or a policy matter?
Councillor Lynch advised that Policy decisions will be made by the Council and the
Harbour Board, that fees and charges will be the decision of the Council.  All income from
Piers and Harbours is put in a central pot.  The Clerk clarified the setting of fees and
charges was reserved to the Council.
Councillor Green addressed the concerns about members attendance stating that there
were reasons why members had had to submit their apologies, reminding the public that
Page 8

Page 9

the Council policy was to facilitate remote attendance at meetings.  He stated that if the
Council had not allowed remote participation in meetings, it would have been likely that
there would have been more absences. 
Mr Roberts then asked if there could be clarification given as to whether there would be
separate accounts published for Oban Harbour when the HRO was adopted?  There was
no finance officer present and it was agreed to raise this question with the Director of
Finance and respond after the meeting.
Question 10 – Phil Hamerton, OCHDA 
If decision making of the Oban Harbour is made at a Policy Level, at what point can the
Area Committee put forward a view to the Harbour Board, and how do you as an Area
Committee formulate your views to the Harbour Board as representatives of members of
the Community? 
The Chair advised that it would be in the form of a Motion at an Area Committee Meeting,
making recommendation to the Harbour Board.  He then asked the Clerk to clarify the
rules within the Constitution. 
Councillor Vennard stated that it was possible for non-members of the Harbour Board to
attend meetings of the Harbour Board and express views and that there would also be a
user group set up that would be chaired by the Harbour Master. 
Question 11 – John McAllister, OCHDA 
Are the Council going to start looking towards business and development of wind and tidal
power and what is the Council doing in the harbour to let businesses get involved? 
Councillor Vennard advised that there are plans to expand the North Pier, however the
Harbour Review Order has to be in place before development. 
With no representative attending from the Economic Development Team, clarification
would be sought on what all renewable plans were as this might go beyond the harbour.   
Question 12 – Neil MacIntyre 
What had Economic Development done for the town of Oban in the last 5 years and what
do the local councillors see for the future of Oban?  There was talk of a new School at
Dunbeg, due to the amount of the new housing development, the roundabout at Dunbeg
has not happened; no affordable houses within the town; £20m funding from the
Government for development and nothing is happening.  Economic Development should
be working with local businesses for an Action Plan and proper framework. 
Councillor Green advised that he had seen outline plans, that cannot be  shared at the
moment, however, he hoped to be in a position to share them with the Oban Community
Council at their next meeting in January, after wider input had been received on officer
proposals.   
Councillor Green also pointed out that Education looked at the need for a new school at
Dunbeg, the outcome being that the school that already exists within the village is fit for
Page 9

Page 10

purpose, due to the ages of the children living in the area and the phased development of
the housing. 
Councillor Green stated that he would like to see more housing in the centre of Oban but
that the gap sites within the town currently could not be developed. 
Councillor Martin advised that she had held several surgeries and not one person had
turned up to any of them to bring any points to the Council, and that she would be more
than happy to engage with the public present.  She clarified the development she would
like to see was cycle lanes, accessible and repaired pavements, parking (specifically
issues with parking at schools) and opportunities for apprentices which would increase
growth within the business community. 
Councillor Lynch commented the plan was necessary to see what can and can’t be done. 
He would also like to see development in the centre of town and accepted that the flood
risk would not just disappear.  He mentioned issues with shops not opening due to footfall
and that there was a need to look at what can be done differently in terms of innovation. 
Question 13 & 14 – Mr Ross Wilson, OCDA 
Will members of Oban, Lorn and the Isles Area Committee be attending the Public
Meeting tomorrow night (14th December) which has been set up by OCHDA and Oban
Community Council to discuss the consultation which will run from 30th November to 10th
January? 
Unfortunately, the majority of members in attendance at today’s meeting will be unable to
attend as they have prior engagements but Councillor Vennard confirmed he would
attend.  Councillor Green asked if the meeting would be available to attend virtually, to
which the response was it was not possible as the Rockfield Centre did not have that
facility, 
Mr Wilson expressed his disappointment and urged the Councillors to change their
priorities. 
Mr Wilson stated that at the last meeting Councillor Kain intimated that he would see the
business case for Oban Harbour,  he asked if anyone present could clarify if Councillor
Kain has seen the business case and if not has he chased it up? 
In Councillor Kain’s absence this could not be clarified, although Councillor Vennard
advised that the Director of Finance had given a brief up date and is now trying to finalise
the fees charged to Calmac which will be the last piece of the financial projection. 
Mr Wilson asked if, in view of the financial case not being in place, the Area Committee
would put forward a motion to the Harbour Board to stop the consultation now.  The Clerk
explained that there was no substantive item on the agenda during which it would be
possible to move such a motion, and it was not possible to move a motion as part of public
question time. 
Question 15 – Dougie Graham, Oban Community Council 
What are the exact legalities of the finances of a Harbour Authority being published.  I
understand that as it is an Act of Parliament that each Harbour Authority’s Financial
Accounts should be published?
Page 10

Page 11

Phil Hamerton of OCHDA advised that he could answer that question. Councillor Green
commented that this was question time for the Committee or officers.  Councillor Vennard
stated that it would be helpful to him if Mr Hamerton could be given the opportunity to
respond, which the Chair agreed to allow.  Mr Hamerton advised that under Section 42 of
the 1964 Harbour Act each municipal port requires every single income and expenditure
to be published on an annual basis. 
Mr Graham then questioned why the Council felt this did not apply to them? 
Councillor Green advised that this could be interpreted differently and confirmed that the
Harbour Board would receive its own legal advice. 
5. ACHA ANNUAL REPORT 
Consideration was given to a presentation by the Chief Executive of ACHA, which
provided an update on a number of areas including the investment programme for
2023/24; the Scottish Government Grant which has allowed the progression of a number
of adaptations and essential aids for the most vulnerable customers across Argyll and
Bute; the Exemplar Estates initiative; the Business, Energy, Industrial Strategy (BEIS); the
Whole House Retrofit Programme; the Net Zero and Warm Homes Funds and the
installation of air source heating pumps. Information on Welfare rights and Funding was
provided from which a number of tenants and local groups have benefited. 
Decision 
The Oban, Lorn and the Isles Area Committee considered and noted the information
provided in the presentation. 
(Reference: Presentation by Chief Executive, Argyll Community Housing Association Ltd,
submitted) 
6. CHARTS UPDATE 
The Committee gave consideration to a presentation by the Vice-Chair of the Cultural
Heritage and Arts Assembly (CHARTS) for Argyll and the Isles. The presentation included
information on the impact of partnership working on both regional and local areas and
provided highlights of key projects throughout the Oban, Lorn and the Isles area. Mr
Adams also provided information in relation to funding streams and the benefits of the
continued support received from Argyll and Bute Council. 
Decision 
The Oban, Lorn and the Isles Area Committee considered and noted the information
provided in the presentation. 
(Reference: Presentation by Vice-Chair, Cultural Heritage and Arts Assembly, submitted) 
7. AREA SCORECARD FQ2 2023/34 
Consideration was given to the Area Performance Report for financial quarter 2 of
2023/24 (July to September 2023) which illustrated the agreed performance measures for
this period.
Page 11

Page 12

Decision 
The Oban, Lorn and the Isles Area Committee: 
1. noted and considered the performance and supporting commentary as presented; 
2. noted that upon receipt of the Quarterly Performance Report the Area Committee
should contact either the Responsible Named Officer or Sonya Thomas with any
queries; and 
3. noted that work was ongoing and to respond to Sonya Thomas with requests or
comments regarding the layout and format of the Performance Report and Scorecard. 
(Reference: Report by Executive Director with responsibility for Customer Support
Services, dated 1 November 2023, submitted) 
8. PLAY PARK ENGAGEMENT - UPDATE REPORT NO 2 
The Committee gave consideration to a report providing an update on the proposed works
and estimated costs for the Tobermory play park. 
Decision 
The Oban, Lorn and the Isles Area Committee agreed to:- 
1. note the proposed works on the Tobermory Play Park.   
2. Agree a further update report will be brought back to the Area Committee after
engagement with Mull Community Council. 
9. ROADS AND INFRASTRUCTURE SERVICES UPDATE 
The Committee gave consideration to a report which provided links to the recent activities
of Roads and Infrastructure Services. 
Decision 
The Oban, Lorn and the Isles Area Committee considered and noted the contents of the
report. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services, dated November 2023, submitted) 
10. CHARITABLE TRUSTS, BEQUESTS AND TRUST FUNDS 
(a) Annual Report 
The Committee gave consideration to a report which provided details on proposals
relating to the ongoing management and proposed distribution arrangements for
Charitable Trusts, Bequests and Trust Funds for which the Oban, Lorn and the Isles
Area Committee are Trustees. 
Page 12

Page 13

Decision 
The Oban, Lorn and the Isles Area Committee: 
1. note the financial position of the Charitable Trusts, Bequests and Trust Funds as of
December 2023; 
2. agree that the charities and trust funds, that have historically been awarded to
Council Departments and Allied Partners, are awarded on the basis outlined in
paragraph 5.5 and defined within appendix 1; 
3. agree that officers submit proposals for distribution arrangements for the
Mackinnon Ledingham Bequest, Archibald Dow Bequest, Coals for Poor, Oban and
Kilmore and Kilbride for later consideration by members; and 
4. note that there remain 4 funds, Miss F Mclucas  Bequest, Mrs Mellors Bequest, 
Miss M M Camerons Bequest, and Dugald Mcphail Memorial Fund with no identified
beneficiaries and that these are subject to ongoing consideration by officers.   
(Reference: Report by Executive Director with responsibility for Legal and
Regulatory Support, dated November 2023, submitted) 
(b) JOHN OF LORN BEQUEST AWARD RECOMMENDATIONS 
The Area Committee gave consideration to a report providing information on a
number of applications received and processed for support from the John of Lorn
Bequest. 
Decision 
The Oban, Lorn and the Isles Area Committee noted the number of awards made
from the John of Lorn Bequest since August 2023. 
(Reference:  Report by Executive Director with responsibility for Legal and
Regulatory Support dated November 2023, submitted) 
11. HEALTH & SOCIAL CARE PARTNERSHIP - PERFORMANCE REPORT - FQ1
(APRIL-JUNE 2023/24) 
The Committee gave consideration to a report which provided an update on performance
against each of the service areas and the 93 supporting Key Performance Indictors, as
well as an update from the Heads of Service giving a wider context and identifying risks
and mitigations. The report also provided an update on the National Health and Wellbeing
Outcomes and Ministerial Steering Group Integration Indicators and information in relation
to delayed discharges. 
Decision 
The Oban, Lorn and the Isles Area Committee considered and noted: 
1) The performance for FQ1 (April - June 2023/24) 
Page 13

Page 14

2) The summary overview of the Heads of Service Performance update 
3) The performance update on the National Health & Wellbeing Outcomes and
Ministerial Steering Group Integration Indicators (Appendix 1)
4) The System Pressure Report for August 2023 (Appendix 2)
5) The Delayed Discharge Sitrep for August 2023 (Appendix 3) 
12. DRAFT OBAN, LORN AND THE ISLES AREA COMMITTEE WORKPLAN 
The Oban, Lorn and the Isles Area Committee workplan was before members for
information. 
Decision 
The Oban, Lorn and the Isles Committee noted the contents of the workplan. 
(Reference: Oban, Lorn and the Isles Area Committee workplan, dated 13 December
2023) 
FIELD_SUMMARY
Page 14

Page 15

MINUTES of MEETING of OBAN LORN & THE ISLES COMMUNITY PLANNING GROUP held
by TEAMS  
on WEDNESDAY, 7 FEBRUARY 2024 
Present: Colin Buchanan  (Vice Chair)
Stuart McLean, Committee Manager, Argyll and Bute Council
Robert Taylor, Scottish Fire and Rescue
Maureen Evans, Community Learning, Live Argyll 
Mary Holt, Criminal Justice, Argyll and Bute Council 
Ailie Law, Community Development, Argyll and Bute Council
Amie Dow, Community Development, Argyll and Bute Council
John McLuckie, Community Development, Argyll and Bute Council
Stuart Green, Corporate Support Manger, Argyll and Bute Council
Carol Flett, Argyll and the Islands Living Well Network
Jen Broadhurst, Argyll and Bute Citizens Advice Bureau
Theresa Bain, UHI Argyll
Jim Tolmie, Oban District Access Panel
Jane Metcalf, Coll Community Council
Sue Barnard, Oban Community Council
Catriona Petit, Hope Kitchen 
Petra Pearce, Argyll and Bute TSI
Rory Munro, Argyll and Bute HSCP
Joan Best, Crossroads
Yvonne Angus, ACHA
Seonaid Cameron, ACHA 
Attending:   
1. WELCOME AND APOLOGIES 
The Chair welcomed everyone to the meeting and general introductions were made.   
Apologies for absence were intimated on behalf of:- 
Councillor Jim Lynch, Argyll and Bute Council
Councillor Andrew Kain, Argyll and Bute Council
Councillor Willie Hume, Argyll and Bute Council
Kirsty McLuckie, Community Development Officer, Argyll and Bute Council
Jane Fowler, Head of Customer & Support Services, Argyll and Bute Council 
Inspector Lee Page, Police Scotland 
Chief Inspector Simon Shanks, Police Scotland
Michelle Mundie, ACHA
Aileen Jackson, Oban High School
George Turner, Scottish Ambulance Service 
Page 15 Agenda Item 3b

Page 16

2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated. 
3. MINUTES 
(a) Oban, Lorn and the Isles Community Planning Group 8 November
2023 
The Minutes of the Oban, Lorn and the Isles Area Community Planning
Group meeting held on 8 November 2023 were approved as a correct
record. 
4. GOVERNANCE 
(a) Area Community Planning Group Governance Arrangements 
The group gave consideration to a report which outlined the governance
arrangements of the Oban, Lorn and the Isles Area Community Planning
Group (Area CPG) specifically the Terms of Reference, membership and
future meeting dates. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group 
1. considered and adopted the Terms of Reference submitted in this
report (Appendix 1) and to agree that these be reviewed on an
annual basis to ensure their ongoing currency and appropriateness
for the work of the Area CPG as it develops over time. 
2. considered and agreed the membership of the group as attached
(Appendix 2) and to agree that the membership of the group be
reviewed on an annual basis to ensure currency and
appropriateness for the work of the group as it develops over time;
and 
3. noted the future meeting dates submitted in this report. 
(Reference: Report by, Committee Manager, Argyll and Bute Council,
dated 7 February 2024, submitted) 
(b) Appointment of Chair of the Oban, Lorn and the Isles Area
Community Planning Group 
The group gave consideration to a report providing information relating to
the appointment of Chair of the Oban, Lorn and the Isles Area Community
Planning Group and outlined the expected time commitment and
information on the role. 
Decision 
Page 16

Page 17

The Oban, Lorn and the Isles Area Community Planning Group agreed to
continue the report to the next meeting in May. 
(Reference: Report by, Committee Manager, Argyll and Bute Council,
dated 7 February 2024, submitted) 
5. COMMUNITY PLANNING PARTNERSHIP MANAGEMENT COMMITTEE
UPDATE 
The group gave consideration to a report which outlined matters discussed during a
meeting of the Community Planning Partnership (CPP) Management Committee
held on 12 January 2024. The report provided a summary of a presentation in
relation to the Council’s Area Plans, as well as information on matters arising from
previous Area Community Planning Group meetings across Argyll and Bute. The
report also included updates on a number of cross cutting themes such as Climate
Change; Financial Inclusion; Digital Communities; the Argyll and Bute Outcomes
Improvement Plan (ABOIP) for 2024-34; and Community Wealth Building. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group considered and
noted the contents of the report. 
(Reference:  Report by Committee Manager, Argyll and Bute Council, dated 31
January 2024, submitted) 
6. AREA PLANS UPDATE 
Consideration was given to a presentation by the Corporate Support Manager, Argyll
and Bute Council, in relation to the Council’s Area Plans. The presentation provided
background information in relation to the Plans, as well as details of the 8 Locality
Plans across Argyll and Bute, and the purpose and principles of the Plans. The
presentation also included context about the scope of the Plans; the importance of
community engagement and efficient use of resources in the development of the
plans; the overall approach, governance and phasing of the Plan’s development; and
the ways in which information from the development of the Plans would be utilised. 
The Corporate Support Manager noted that it was hoped that the Area Plans would
maximise the opportunities for funding for local projects. It was anticipated that the
Plans would be developed and owned by the communities, and the Area Community
Planning Groups would have an important part to play in the development of the
Plans. He emphasised that the Plans were not seeking to take ownership of projects
away from local community groups. 
The presentation provided details of how partners could assist with the Area Plans
by identifying community groups in the area; identifying physical locations suitable
for hosting consultation documents; and encouraging community partners to engage
with the development process. The Corporate Support Manager advised that he
would provide a list of currently identified community groups for circulation to the
Group following the meeting, in order to reduce duplication in identifying any
additional groups for consultation. 
Page 17

Page 18

Decision 
The Oban, Lorn and the Isles Area Community Planning Group considered and
noted the information provided. 
(Reference:  Presentation by Corporate Support Manager, Argyll and Bute Council,
submitted) 
7. INCLUDEM - YOUTH JUSTICE 
The Committee Manager advised that David Gould, Associate Researcher,
Includem, was not in a position to join the meeting. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group agreed to continue
the report to the next meeting in May. 
(Reference:  Leaflet by Includem, submitted) 
8. DRAFT ARGYLL AND BUTE COMMUNITY JUSTICE PLAN 2023-2027 
Consideration was given to a presentation which provided information in relation to
the draft Argyll and Bute Community Justice Plan 2023-27. The report provided
details in relation to the National Strategy for Community Justice; the core
membership of the Community Justice Partnership; the overall strategic context of
the Vision for Justice in Scotland and National Strategy for Community Justice; the
development of the Community Justice Outcome Improvement Plan (CJOIP); the
Community Justice Pathways Assessment process; and the timescales for the
consultation and publication of the plan. 
The Community Justice Co-Ordinator particularly highlighted work being carried out
to address the identified priorities, including collaboration with the Alcohol and Drug
Partnership; the Justice Advocacy pilot with Lomond & Argyll Advocacy Service. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group considered and
noted the information provided. 
(Reference:  Presentation by Community Justice Co-Ordinator, Argyll and Bute
Council, submitted) 
9. ARGYLL & BUTE HEALTH AND SOCIAL CARE PARTNERSHIP - PUBLIC
HEALTH 
(a) Argyll and Bute Health & Social Care Partnership - Public Health
Update 
Consideration was given to a public health update from Argyll and Bute
Health and Social Care Partnership’s Public Health Team on the ongoing
Page 18

Page 19

wellbeing and prevention activities overseen and delivered by them in
Argyll and Bute. The update provided information on the Argyll and Bute
Public Health Annual Report; the development of children and young
people’s health and wellbeing profiles; ongoing health and wellbeing
profile workshops; the Cool2Talk online support service for young people;
and the annual Director of Public Health Report, which will be presented
at the next cycle of the Area Community Planning Groups. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided. 
(Reference: Report by Health Improvement Lead, Argyll and Bute Health
and Social Care Partnership, submitted) 
(b) Presentation on Children and Young People's Health and Wellbeing
Profiles 
The group gave consideration to a presentation by Rory Munro, Argyll and
Bute Health and Social Care Partnership’s Public Health Team, on the
Children and Young People’s Health and Wellbeing Profile for the Bute
and Cowal area. The presentation provided information in relation to the
Profile themes; the purposes of the Profiles; the layout of the report and
how to navigate it; the reasons for any gaps in the Profiles; and the type of
data in the Profiles and ways in which this could be used by partners.
Decision 
The Oban, Lorn and the Isles Community Planning Group considered and
noted the information provided. 
(Reference: Presentation by Public Health Team, Argyll and Bute Health
and Social Care Partnership) 
10. PARTNERS UPDATE 
(a) Police Scotland 
Consideration was given to an update which provided information on the
ongoing work of the Service and information on yearly crime statistics;
fraud prevention and awareness, specifically relating to scam calls;
personal safety inputs provided to Lomond and Argyll Advocacy Service
staff; the continued work of the Designated Youth Engagement Officer
within Oban and in particular working in Oban High School;  Community
Police Officer visited Salen Primary School and spent time with Primaries
1 – 4; the success at the Divisional Recognition Awards 2023 and the
support on the 16 days Against Gender Based Violence campaign.
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
Page 19

Page 20

considered and noted the information provided.
(Reference: Report by Police Scotland, submitted) 
(b) Scottish Fire & Rescue Update 
The group gave consideration to a report which highlighted the
performance and activity of the Scottish Fire and Rescue Service within
the Oban, Lorn and the Isles area during financial quarter 3 of 2023/24. 
The report included information on the local firefighter training plan; local
incident statistics; unwanted fire alarm signals; road and water safety
campaigns; community engagement activities; East and West
Dunbartonshire Argyll and Bute Local Senior Officer activities and home
fire safety. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided. 
(Reference: Report by Scottish Fire and Rescue Service, submitted) 
(c) Argyll and Bute Citizens Advice Bureau 
Consideration was given to an update from Argyll and Bute Citizen’s
Advice Bureau which provided statistical information on the number of
clients who had contacted the Bureau between January and December
2023; the Volunteer Advisor training programme; the annual programme
of energy efficiency advice sessions and services that the Bureau provide;
last year the Bureau in Argyll and Bute assisted 2000 clients which
resulted in £1.5m financial gain to these clients.
Jen Broadhurst highlighted that the Bureau was in the process of updating
their Development Plan for the next 3 years and would welcome input
from elected members and community representative groups. The
Development Plan will be presented to the Board in April for final
agreement.
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided.
(Reference: Report by Argyll and Bute Citizens Advice Bureau, submitted) 
(d) Living Well Network Update 
Consideration was given to an update which provided information on the
Page 20

Page 21

ongoing work of the Living Well Network across Mull, Iona, Coll and Tiree. 
Carol Flett also advised that 3 local charities had been successful in
obtaining funding through the Third Sector Interface. 
An event has been arranged for 14 May in Rockfield Centre, Oban. The
morning session is for Living Well Network Members and the afternoon
session is open to the public where they will be able to gather information
from charities, organisations, people who provide support about the
support that is available for them.  A further day is arranged for 28th
August 2024 at An Talla, Isle of Tiree.  Mainland based organisations,
charities etc. will be welcome to come to Tiree for the day to share
information about the support they can provide to people on Tiree. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information. 
(Reference: Report by Oban, Lorn and the Islands Living Well Network,
submitted) 
(e) Oban District Access Panel 
Consideration was given to the written report submitted by Oban Access
Panel, the report provided an update on the Braille Labelling Campaign,
which has been discussed in Holyrood. The petition remains open to
anyone who has not registered their interest and can be found at:- 
http:/petitions.parliament.scot/petitions/PE1997  
In addition to the report, Jim Tolmie highlighted a discussion that took
place at the Oban Access Panel’s November meeting regarding the lack
of opticians serving Island communities and those unable to travel. Mr
Tolmie advised that none of the franchised opticians are serving much of
the locality. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group:- 
1) considered and noted the reports; and 
2) agreed that the Oban, Lorn and the Islands Living Well Network,
TSI and Crossroads would work with the Oban District Access
Panel to explore solutions to encouraging greater access to Optical
Services within the rural and island based communities. 
(Reference: Report by Oban District Access Panel, submitted) 
(f) Argyll and Bute TSI 
Page 21

Page 22

Consideration was given to an update from Argyll and Bute Third Sector Interface
(TSI), which provided an update on their recent work. The update included
information in relation to funding grants from the Communities Mental Health and
Wellbeing Fund 2023-24; the commissioning of a Community Wealth Building
strategy and action plan as part of the Argyll and Bute Community Planning
Partnership; funding available from the Argyll and Bute Climate Action Network
Fund, the deadline for the funding has been extended to 17 February 2024; future
consultation and development of a TSI Strategy for 2024-29;; future consultation and
development of a TSI Strategy for 2024-29; the launch of the new TSI website on
20th February; and work with the SCVO on a fairer funding campaign.
Decision 
The Oban, Lorn and the Isles Area Community Planning Group considered and
noted the information provided.
(Reference: Report by Argyll and Bute TSI, dated January, submitted) 
(g) UHI Argyll 
Consideration was given to an update from UHI Argyll highlighting the list
of courses which are available; UHI have also been commissioned to
deliver the UK Government’s Multiply Programme. The scheme offers free
tutoring, digital training, and flexible courses to improve adults’ numeracy
skills; a successful open day was held on 11 January at all UHI Centres
across Argyll with an additional day being planned for mid-March. 
Decision 
The Oban, Lorn and the Isles considered and noted the report. 
(Reference: Report by UHI Argyll, submitted) 
(h) Live Argyll - Community Learning Update 
The group gave consideration to a report from Live Argyll -
Community Learning. The update provided information relating to
adult literacy and numeracy provision; the HMI Community
Learning and Development Progress Visit of Argyll and Bute
Council and the newly elected Members    of the Scottish Youth
Parliament for Argyll and Bute. Partners were encouraged to look
at the Community Learning Development Review  Survey, which
can be accessed by following this link – 
https://consult.gov.scot/lifelong-learning-and-skills/community-
learning-practitioners-stakeholders/
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided.
(Reference: Report by Live Argyll Community Learning Services,
submitted)
Page 22

Page 23

(i) Opportunity for Verbal Updates 
Crossroads 
Joan Best highlighted that Crossroads are now supporting 79 carers with
around 195hrs of respite offered per week. Crossroads have also been in
discussions with key stakeholders to establish the service on Tiree with
referrals expected soon. 
Hope Kitchen 
Catriona Petit advised that the Climate Hub is open and Time for Change
hold a café within Hope Kitchen each month. Support work around alcohol
and addictions continues, focusing on recovery and reducing stigma.  
Food Poverty, Cost of Living Crisis and Mental Health support will be
delivered from the new shop space in George Street which should be
open in March. 
Community Development Team 
Ailie Law highlighted that the Supporting Communities Fund is now open
and will run until 18 March 2024. Anyone wanting further information can
contact any of the Community Development Team or follow the link:- 
https://www.argyll-bute.gov.uk/my-community/communities-and-
partnerships/supporting-communities-fund 
Skills Development Scotland 
Susan MacRae advised that a new careers advisor is now in post,
covering the High Schools in Oban, Mull, Tiree and Lochgilphead and a
School Leavers Information paper is going to the Council for
consideration.  Susan encouraged anyone on Facebook to follow the
DYW Argyll and Bute to see all the good work that is being carried out
between employers and our schools. 
11. CLIMATE CHANGE 
(a) Climate Change Working Group Update 
The group considered a report from the Climate Change Project Manager,
which provided an update on the Community Planning Partnership’s Argyll
and Bute Climate Action project. The update included information in
relation to the background and work of the Climate Change Working
Group; funding requirements to support the implementation of a Climate
Change Project Manager post; an overview of the work of the Climate
Change Project Manager to date and future plans; collaboration with the
Argyll & Bute Climate Action Network Hub; and updated governance
arrangements for the Climate Change Working Group. 
Decision 
Page 23

Page 24

The Oban, Lorn and the Isles Area Community Planning Group noted the
approach and status of the project, as outlined in the report. 
(Reference: Report by Climate Change Project Manager, ACT Now, dated
6 February 2024, submitted) 
12. DATE OF NEXT MEETING - 8 MAY 2024 
The Group noted that the next meeting of the Oban, Lorn and the Isles Area
Community Planning Group would be Wednesday, 8 May 2024. 
Page 24

Page 25

MINUTES of the SPECIAL MEETING of OBAN COMMON GOOD FUND held in the
MICROSOFT TEAMS 
on TUESDAY, 12 DECEMBER 2023 
Present: Councillor Kieron Green  (Chair) 
Councillor Kieron Green
Councillor Jim Lynch 
Councillor Luna Martin 
Attending: Melissa Stewart, Governance Officer
Marri Malloy, Observer 
1. APOLOGIES 
Apologies were received from Councillor Andrew Kain and Rev Margi Campbell. 
It was agreed that in Councillor Kain’s absence that Councillor Green would Chair
the meeting. 
2. DECLARATIONS OF INTEREST 
Marri Malloy declared an interest in Items 4c and 4d of these minutes as she is a
member of Oban Community Council, and therefore would leave the meeting whilst
these items were discussed. 
3. DRAFT ANNUAL ACCOUNTS 2022/23 
The draft annual accounts detailing the current position of investment transaction for
period 1st April 2022 to 31st March 2023 were presented by David MacGregor with
Trustees being invited to note them. 
Decision 
The Trustees noted the draft annual accounts. 
(Ref. Draft Annual Accounts 2022/23 as prepared by Simmers & Co dated 31st
March 2023)   
E1 4. ADDITIONAL SUBMISSIONS 
(a) Dunollie Preservation Trust 
Additional information was received prior to the meeting to allow the
Trustees to consider the application further.  Emma Sutcliffe, joined the
meeting to respond to any additional information the Trustees may require
to support application by the MacDougall of Dunollie Preservation Trust. 
The Trustees were satisfied with the response and therefore had no
further questions.  Ms Sutcliffe left the meeting.
Page 25 Agenda Item 3c

Page 26

The Chair, suggested that the agenda be taken out of sequence, to allow
Marri to be present for decision on the application by Dunollie
Preservation Trust to allow her leave the meeting thereafter. 
(b) Dunollie Preservation Trust 
The Trustees considered the application and the additional supporting
information from the MacDougall of Dunollie Preservation Trust. 
Decision 
The Trustees agreed to award the sum of £4750 towards the project. 
Marri Malloy left the meeting at this point. 
(c) Oban Community Council 
The Trustees heard from Laura Corbe, Sue Barnard and Elaine
Robertson, with  the additional information they requested to support the
Oban Community Council application submitted to the November meeting. 
(d) Oban Community Council 
The Trustees considered the application and additional supporting
information received from Oban Community Council. 
Decision 
The Chair advised he had a prior engagement and would have to leave
the meeting, as the meeting would then be inquorate, it was agreed the
meeting would reconvene after the Oban, Lorn and the Isles Area
Committee Meeting concluded on 13th December. 
Meeting reconvened on 13th December at 1pm by MS Teams when,
Councillors Green, Lynch and Martin were in attendance along with
Melissa Stewart, Governance Officer. 
After further discussions the Trustees agreed to award an initial sum of
£4000 towards the initial public engagement for the first phase of the
project, with the expectation being that they receive regular updates on
the progress of the project and funding obtained.  The Trustees further
agreed the application would be continued and periodically reviewed up to
31 March 2025 with the first review taking place at their meeting on 18
March 2023. 
Page 26

Page 27

1 
ARGYLL AND BUTE COUNCIL OBAN, LORN AND THE ISLES
AREA COMMITTEE 
CUSTOMER SUPPORT SERVICES   6 MARCH 2024 
AREA PERFORMANCE REPORT – FQ3 2023/24 
1.0 BACKGROUND 
1.1 This paper presents the Area Performance Report for Financial Quarter 3 2023/24
(October to December 2023) and illustrates the agreed performance measures. 
1.2 The features of the Performance Report are as follows:- 
➢ Indicators are grouped by Corporate Outcome.
➢ The data table for each indicator is coded to identify the level of reporting.
o Area level measures are blue
o Council level measures are grey
o COI measures are white 
➢ Each indicator details the
o Target, Actual and Performance status (Green / Red / No Target) for the
current and four previous financial quarters.
o Commentary for the current financial quarter only.
o Narrative explaining the performance trend e.g. This indicator is above
Target and performance has improved since the last reporting period.
o Where appropriate a Performance Trend Line has been added.
o The name of the Responsible Officer.
o Where possible performance is presented at both Area and Council
level. 
1.3 The commentary for each indicator helps ‘Tell Our Story’ and enables Elected
Members to put the performance data into perspective and understand if an issue is
local in nature or should be escalated up to a Strategic Committee. 
1.4 To improve the response to performance queries, it is requested that either the
Responsible Named Officer or Sonya Thomas are contacted once the Quarterly
Performance Report is received with any queries. This should enable some
queries being resolved or clarified prior to the Area Committee meeting, and
therefore being carried forward as Actions at a subsequent meeting. 
1.5 As part of our improvements to performance reporting and making best use of the
digital technology available to us, officers have developed new, online scorecards
for members to view performance data. If support is required to navigate the online
scorecards please contact - 
lorna.gillies@argyll-bute.gov.uk or sonya.thomas@argyll-bute.gov.uk 
Page 27 Agenda Item 5

Page 28

2 
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Area Committee – 
a) Notes and considers the performance and supporting commentary as
presented. 
b) Upon receipt of the Quarterly Performance Report the Area Committee
contact either the Responsible Named Officer or Sonya Thomas with any
queries. 
c) Note that work is ongoing and to respond to Sonya Thomas with requests
or comments regarding the layout and format of the Performance Report. 
3.0 IMPLICATIONS 
3.1 Policy All of the indicators in this report are based on 
agreed Council policy.
3.2 Financial All indicators with financial implications are actively  
managed through agreed budget monitoring 
processes.
3.3 Legal All appropriate legal implications are complied with.
3.4 HR All HR implications are actively managed    
through agreed Wellbeing and Management 
monitoring processes.
3.5 Fairer Scotland Duty See below.
3.5.1 Equalities All activities comply with Equal Opportunities/Fairer 
Scotland Duty policies and obligations.
3.5.2 Socio-economic Duty All activities comply with the council’s socio- 
economic duty.
3.5.3 Islands Duty All activities comply with the council’s islands 
duty.
3.6 Climate Change The Council is committed to working towards net 
zero.
3.7 Risk Without this information Elected Members are less  
informed of activities within their area.
3.8 Customer Service All activities with customer feedback or insight are  
rigorously monitored for improvement.
3.9 The Rights of the Child (UNCRC): This report highlights examples of how the 
Council is committed to, and working towards reducing  
child poverty and improving outcomes for every child.   
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services 
Jane Fowler
Head of Customer Support Services
Page 28

Page 29

3 
7 February 2024 
For further information, please contact:
Sonya Thomas
Organisation Development Project Officer - Customer Support Services
01546 604454 
Appendix 1: FQ3 2023/24 OLI Performance Report 
Page 29

Page 30

This page is intentionally left blank

Page 31

Appendix 1
Page 1 
All Areas 
FQ3 2023/24 Overall Performance Summary 
The information presented is a summary of the agreed measures. 
Unless stated otherwise, performance is presented at both Area and Council-wide levels. 
The measures show the performance against target for the current and previous three reporting periods with an explanation of performance trend. 
The data table for each indicator is colour coded to identify the level of reporting: 
 Area level measures are blue.
 Council level measures are grey.
 Corporate Outcome Indicators (COIs) are white. 
Where appropriate a Trend Line has been added to illustrate movement in ‘Actual’ over the reporting period.  
Page 31

Page 32

Appendix 1
Page 2 
Performance Reporting
All Areas .................................................................................................................................................................................................................................................. 1
Performance Reporting .............................................................................................................................................................................................................................. 2
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 5
COI – Maximise distribution of Scottish Welfare Fund ................................................................................................................................................................. 5
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 6
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention ...................... 6
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 7
Number of parking penalty notices issued – Oban, Lorn and the Isles ........................................................................................................................................ 7
Number of parking penalty notices issued – Argyll and Bute ....................................................................................................................................................... 8
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 9
Car parking income to date – Oban, Lorn and the Isles ................................................................................................................................................................. 9
Car parking income to date – Argyll and Bute ............................................................................................................................................................................. 11
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................. 12
Dog fouling – total number of complaints – Oban, Lorn and the Isles ....................................................................................................................................... 12
Dog fouling – total number of complaints – Argyll and Bute ...................................................................................................................................................... 13
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 14
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place .... 14
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 15
COI – Provide quality meals with cost margins to all pupils ....................................................................................................................................................... 15
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all .......................................................................................................... 16
Maximise the percentage of 16-19 years olds participating in education, training or employment – Oban, Lorn and the Isles ............................................ 16
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and Bute ................ 17
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 18
Number of affordable social sector new builds completed per annum – Oban, Lorn and the Isles ......................................................................................... 18
Page 32

Page 33

Appendix 1
Page 3 
Number of affordable social sector new builds completed per annum – Argyll and Bute ........................................................................................................ 19
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 20
Percentage of pre-planning application enquiries processed within 20 working days – Oban, Lorn and the Isles .................................................................. 20
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute ................................................................................ 21
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 22
Householder planning applications – average number of weeks to determine – Oban, Lorn and the Isles ............................................................................. 22
Householder planning applications – average number of weeks to determine – Argyll and Bute ........................................................................................... 23
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 24
COI – Number of new homeless applicants who required temporary accommodation this period ......................................................................................... 24
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 25
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal .................................................... 25
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 26
COI – Increase the number of community benefits that are delivered through contracts we award locally ........................................................................... 26
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 27
Street lighting – percentage of faults repaired within 10 days – Oban, Lorn and the Isles ....................................................................................................... 27
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute .......................................................................................... 28
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 29
Total number of complaints regarding waste collection – Lorn ................................................................................................................................................. 29
Total number of complaints regarding waste collection – Mull ................................................................................................................................................. 30
Total number of complaints regarding waste collection – Argyll and Bute ............................................................................................................................... 30
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 31
COI – Percentage of waste recycled, composted and recovered ................................................................................................................................................ 31
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered ........................................................................................................... 32
Islands – Percentage of waste recycled, composted and recovered .......................................................................................................................................... 33
H&L – Percentage of waste recycled, composted and recovered ............................................................................................................................................... 34
Page 33

Page 34

Appendix 1
Page 4 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 35
COI – The number of tonnes of waste sent to landfill ................................................................................................................................................................. 35
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 36
LEAMS (Local Environment Audit and Management System) – Lorn ......................................................................................................................................... 36
LEAMS (Local Environment Audit and Management System) – Mull ......................................................................................................................................... 37
LEAMS (Local Environment Audit and Management System) – Argyll and Bute ....................................................................................................................... 38
Making It Happen ............................................................................................................................................................................................................................. 39
Teacher sickness absence – Oban, Lorn and the Isles ................................................................................................................................................................. 39
Teacher sickness absence – Argyll and Bute ................................................................................................................................................................................ 40
Making It Happen ............................................................................................................................................................................................................................. 41
LGE staff (non-teacher) sickness absence – Oban, Lorn and the Isles ........................................................................................................................................ 41
LGE staff (non-teacher) sickness absence – Argyll and Bute ....................................................................................................................................................... 42
Making It Happen ............................................................................................................................................................................................................................. 43
COI – Increase the percentage of all self-service automated contacts ....................................................................................................................................... 43 
Page 34

Page 35

Appendix 1
Page 5 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Maximise distribution of Scottish Welfare Fund 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ3 2022/23 95.3% 129.2% Green
FQ4 2022/23 95.3% 144.0% Green
FQ1 2023/24 95.3% 112.9% Green
FQ2 2023/24 95.3% 134.3% Green
FQ3 2023/24 95.3% 138.2% Green 
Performance in FQ3 has exceeded the target and actual has increased since the last reporting period. 
FQ3 Comment 
Projected spend for the programme for 2023/24 is £670,000.  A paper will be issued to Policy & Resources in February outlining the issue around the level of spend and also asking
for support in lobbying the Scottish Government for more programme funding for future years. 
Responsible person: Fergus Walker
Page 35

Page 36

Appendix 1
Page 6 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and
intervention 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ3 2022/23 100% 100% Green
FQ4 2022/23 100% 95% Red
FQ1 2023/24 100% 100% Green
FQ2 2023/24 100% 100% Green
FQ3 2023/24 100% 100% Green 
This indicator for FQ3 has met the target with no change in performance since the last reporting period. 
FQ3 Comment 
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete returns to be received. In FQ3 2023/24,
11 survey forms were distributed to clients. 6 were returned. Of these 6 returns, 5 responded to the question relating to being better able to deal with their
financial problems. Of these 5 respondees, 5 responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive about
their experience i.e. no negative comments or responses were reported. 
Responsible person: Lee Roberts
Page 36

Page 37

Appendix 1
Page 7 
Corporate Outcome No.2 – People live in safer and stronger communities 
Number of parking penalty notices issued – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 153 No target 
FQ4 2022/23 No target 391 No target
FQ1 2023/24 No target 496 No target
FQ2 2023/24 No target 427 No target
FQ3 2023/24 No target 307 No target 
The indicator for FQ3 shows the number of parking penalty notices has decreased since the last reporting period. 
FQ3 Comment 
Free parking two weeks prior to Christmas plus two weeks for Winter Festival.  Fairground occupying Corran #1 car park (and street).  Amenity Wardens off-work
between 24 Dec to 3 Jan (non-essential staff).  Lining/signing continuing to deteriorate, which means wardens are unable to enforce. Operations have been made
aware and are looking to get the lining redone when lining teams are available and weather permitting. 
Responsible person: Hugh O’Neill 
Page 37

Page 38

Appendix 1
Page 8 
Number of parking penalty notices issued – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 1,343 No target 
FQ4 2022/23 No target 1,332 No target
FQ1 2023/24 No target 1,816 No target
FQ2 2023/24 No target 1,172 No target
FQ3 2023/24 No target 1,015 No target 
This indicator for FQ3 shows the number of parking penalty notices has decreased since the last reporting period. 
FQ3 Comment 
Free Parking around Christmas Period, amount depending on location.  Lining issues continue.  Amenity Wardens (as non-essential staff) not operating at
Christmas break. Lining/signing continuing to deteriorate, which means wardens are unable to enforce. Operations have been made aware and are looking to get
the lining redone when lining teams are available and weather permitting. 
Responsible person: Hugh O’Neill 
Page 38

Page 39

Appendix 1
Page 9 
Corporate Outcome No.2 – People live in safer and stronger communities 
Car parking income to date – Oban, Lorn and the Isles 
Performance is presented cumulatively for both Area and Council-wide levels.  For individual car parks, the income is presented on a quarterly basis. 
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ3 2022/23 £554,026 £423,730 Red
FQ4 2022/23 £677,416 £493,218 Red
FQ1 2023/24 £165,702 £151,185 Red
FQ2 2023/24 £413,592 £299,188 Red
FQ3 2023/24 £564,477 £514,847 Red 
This indicator for FQ3 is shows the cumulative amount of income collected is significantly lower the cumulative target.  There is no performance trend as this data
is cumulative. 
FQ3 Comment 
The severe weather has been a factor in reducing traffic movements in certain areas. This is most likely the reason for the drop in income seen over this quarter.
Also the free weeks of parking, 2 weeks for the Winter Festival and the two weeks before Christmas has affected income returns. 
Going forward the Committee are asked to note that the installation of electric charger installs is now complete, however the following factor will affect car
parking income in the OLI area: 
North Pier car park closures for cruise ship visits (FQ1 onwards). 
Responsible person: Hugh O’Neill 
Page 39

Page 40

Appendix 1
Page 10 
Actual Quarterly Income collected in Oban, Lorn and Isles during FQ2 and FQ3. 
Car Park Location FQ2 Actual FQ3 Actual
Corran No.1, Oban £14,632 £13,815
North Pier, Oban £19,825 £31,877
Corran No.2, Oban £11,955 £10,032
Longsdale, Oban £4,401 £6,493
Non-trunk, Oban £38,843 £64,794
Lochavullin, Oban £7,916 £12,955
Ganavan, Oban £2,845 £3,146
Trunk, Oban £2,784 £11,577
Albany Street, Oban £5,420 £7,935
Oban £21,633 £3,492
Tweedale Street, Oban £20,854 £34,182
Market Street, Oban £1,691 £3,042
Esplanade, Oban £746 £1,460
Craignure, Mull -£176 £1,052
Fionnphort, Mull -£5,367 £9,808
OLI (parking permits) £0 £0
Total £148,002 £215,660 
Page 40

Page 41

Appendix 1
Page 11 
Car parking income to date – Argyll and Bute 
Performance is presented cumulatively for both Area and Council-wide levels. 
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ3 2022/23 £812,919 £709,585 Red
FQ4 2022/23 £993,968 £817,788 Red
FQ1 2023/24 £234,056 £253,705 Green
FQ2 2023/24 £584,204 £486,151 Red
FQ3 2023/24 £797,331 £807,348 Green 
This indicator for FQ3 is shows the cumulative amount of income collected is slightly higher than the cumulative target.  There is no performance trend as this data
is cumulative. 
FQ3 Comment 
There were delays in processing income from G4S which has seen parts of the income placed into the wrong cost codes. Officers have worked with Finance to
identify this and the extra income has been pulled through into this quarter. We have also fitted new parking machines which are easier to use. This may well have
increased usage and subsequently income. 
Going forward the Committee are asked to note the following factors that will affect car parking income: 
B&C: No issues.
H&L: Glen Loin 2 has (incomplete) electric charger installs (from June), which is affecting 2 bays.  
MAKI: No issues.
OLI: North Pier car park closures for cruise ship visits (FQ1 onwards). 
Responsible person: Hugh O’Neill
Page 41

Page 42

Appendix 1
Page 12 
Corporate Outcome No.2 – People live in safer and stronger communities 
Dog fouling – total number of complaints – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 6 No target 
FQ4 2022/23 No target 18 No target
FQ1 2023/24 No target 4 No target
FQ2 2023/24 No target 9 No target
FQ3 2023/24 No target 4 No target 
This indicator for FQ3 is shows the number of dog fouling complaints has decreased since the last reporting period. 
FQ3 Comment
There were only 4 complaints received for the OLI area this quarter, these were received for the Oban area, there were no complaints received for the Isle of Mull. 
This is very good. 
Responsible person: Tom Murphy 
Page 42

Page 43

Appendix 1
Page 13 
Dog fouling – total number of complaints – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 47 No target 
FQ4 2022/23 No target 77 No target
FQ1 2023/24 No target 60 No target
FQ2 2023/24 No target 51 No target
FQ3 2023/24 No target 46 No target 
This indicator for FQ3 is shows the number of dog fouling complaints has decreased since the last reporting period. 
FQ3 Comment 
The number of dog fouling complaints this quarter has reduced from 51 to 46.  In order to reduce this further the Warden Service will continue to monitor and
patrol.  Islay was the only area this quarter to issue a dog fouling fine. 
Responsible person: Tom Murphy 
Page 43

Page 44

Appendix 1
Page 14 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring
plans in place 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ3 2022/23 100% 100% Green
FQ4 2022/23 100% 100% Green
FQ1 2023/24 100% 100% Green
FQ2 2023/24 100% 100% Green
FQ3 2023/24 100% 100% Green 
This indicator for FQ3 is has met the target with no change in performance since the last reporting period. 
FQ3 Comment 
Each care experienced child and young person enrolled in an authority school has tracking and monitoring plans in place via our SEEMIS database.  Data collated
includes attendance, exclusion, progress and attainment and wellbeing information. 
Our systems continue to be refined to ensure data is relevant and supports early intervention.  A bespoke tracking and monitoring system is in development. 
Improvements to date include: programme of data driven dialogue between Designated Managers and the Virtual Head Teacher, discreet identification of CECYP
for class teachers and appropriate data sharing with partner agencies. Raising the profile of our CECYP has led to an increased awareness of this cohort, positively
impacting on personalised support, including at transition points. 
Responsible person: Louise Chisholm 
Page 44

Page 45

Appendix 1
Page 15 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Provide quality meals with cost margins to all pupils 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ3 2022/23 +/-5.00% 6.09% Red
FQ4 2022/23 +/-5.00% -2.56% Green
FQ1 2023/24 +/-5.00% 5.00% Green
FQ2 2023/24 +/-5:00% -7.07% Red
FQ3 2023/24 +/-5:00% 4.12% Green 
This indicator for FQ3 is within the +/-5.00% target variance and performance has improved since the last reporting period. 
FQ3 Comment 
The overall food cost percentage for the authority was 4.12%. We will continue to monitor areas and individual schools that have a variance out with the +/-5%
target. 
B&C  0.54%
H&L -0.52%
MAKI -2.82%
OLI  6.92% 
Responsible person: Christine Boyle 
Page 45

Page 46

Appendix 1
Page 16 
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all 
Maximise the percentage of 16-19 years olds participating in education, training or employment – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 94.00% 95.34% Green 
FQ4 2022/23 94.00% 95.60% Green
FQ1 2023/24 94.00% 95.45% Green
FQ2 2023/24 94.00% 97.66% Green
FQ3 2023/24 94.00% 95.93% Green 
This indicator for FQ3 is above target however performance has decreased since the last reporting period. 
FQ3 Comment 
As of 1st December 2023, the Participation figure (16-19 year-olds in employment, training or education) in Oban, Lorn and the Isles was 989 young people, which
equates to 95.93%. This is 1.93% above target and 0.33% above the annual Argyll and Bute Participation figure of 95.60%, which was released by Skills
Development Scotland at the end of August 2023. The Participation figure of 95.93% for FQ3 of 2023/24 is a decrease of 1.73% on the Participation figure for FQ2
2023/24. 
Responsible person: Jennifer Crocket 
Page 46

Page 47

Appendix 1
Page 17 
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and
Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 94.00% 93.90% Red 
FQ4 2022/23 94.00% 93.62% Red
FQ1 2023/24 94.00% 93.75% Red
FQ2 2023/24 94.00% 95.94% Green
FQ3 2023/24 94.00% 94.37% Green 
This indicator for FQ3 is above target however performance has decreased since the last reporting period. 
FQ3 Comment 
As of 1st December 2023, the Participation figure (16-19 year-olds in employment, training or education) for the whole of Argyll and Bute was 3909 young people,
which equates to 94.37%. This is 0.37% above target and 1.23% below the annual Argyll and Bute Participation figure of 95.60%, which was released by Skills
Development Scotland at the end of August 2023. The Participation figure of 94.37% for FQ3 of 2023/24 is a decrease of 1.57% on the Participation figure for FQ2
2023/24. 
Responsible person: Jennifer Crocket 
Page 47

Page 48

Appendix 1
Page 18 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Number of affordable social sector new builds completed per annum – Oban, Lorn and the Isles 
Reporting Period Target Actual Status
FQ3 2022/23 36 36 Green
FQ4 2022/23 27 27 Green
FQ1 2023/24 26 26 Green
FQ2 2023/24 40 40 Green
FQ3 2023/24 0 0 Green 
This indicator for FQ3 shows the number of completions has met the target for the reporting period. 
FQ3 Comment 
No social sector new builds were due for completion in this period. 
Responsible person: Kelly Ferns 
Page 48

Page 49

Appendix 1
Page 19 
Number of affordable social sector new builds completed per annum – Argyll and Bute 
Reporting Period Target Actual Status
FQ3 2022/23 37 37 Green
FQ4 2022/23 67 67 Green
FQ1 2023/24 26 26 Green
FQ2 2023/24 40 40 Green
FQ3 2023/24 4 4 Green 
This indicator for FQ3 shows the number of completions has met the target for the reporting period. 
FQ3 Comment 
In FQ3 - 4 x particular needs units completed by ACHA in Dunoon 1x2bed, 1x3bed, 2x4bed.
B&C 4
H&L 0
MAKI 0
OLI 0 
Responsible person: Kelly Ferns 
Page 49

Page 50

Appendix 1
Page 20 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Percentage of pre-planning application enquiries processed within 20 working days – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 75.0% 76.9% Green 
FQ4 2022/23 75.0% 78.3% Green
FQ1 2023/24 75.0% 68.8% Red
FQ2 2023/24 75.0% 80.4% Green
FQ3 2023/24 75.0% 87.5% Green 
This indicator for FQ3 is above target and performance has continued to improve on the last reporting period. 
FQ3 Comment 
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Whilst vacancies across the service have now largely been filled the focus of officer remains geared
toward the resolution of statutory casework with the handling of pre-application enquiries afforded lower priority in caseload management. To assist with the
management of reduced customer expectations the target for responding to pre-app enquiries has been temporarily extended to 6 weeks. During FQ3 56 pre-apps
were responded to within OLI. 92.9% were issued within 6 weeks. This excellent performance is indicative of the more settled position of the OLI DM team. 
Responsible person: Peter Bain 
Page 50

Page 51

Appendix 1
Page 21 
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 75.0% 52.5% Red 
FQ4 2022/23 75.0% 55.4% Red
FQ1 2023/24 75.0% 47.5% Red
FQ2 2023/24 75.0% 49.1% Red
FQ3 2023/24 75.0% 55.0% Red 
This indicator for FQ3 is below target however, performance has increased since the last reporting period. 
FQ3 Comment 
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Whilst vacancies across the service have now largely been filled the focus of officer remains geared
toward the resolution of statutory casework with the handling of pre-application enquiries afforded lower priority in caseload management. To assist with the
management of reduced customer expectations the target for responding to pre-app enquiries has been temporarily extended to 6 weeks. During FQ3 120 pre-
apps were responded to across ABC. 62.5% were issued within 6 weeks. 
Responsible person: Peter Bain 
Page 51

Page 52

Appendix 1
Page 22 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Householder planning applications – average number of weeks to determine – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 8.0 weeks 7.7 weeks Green 
FQ4 2022/23 8.0 weeks 9.4 weeks Red
FQ1 2023/24 8.0 weeks 10.7 weeks Red
FQ2 2023/24 8.0 weeks 9.2 weeks Red
FQ3 2023/24 8.0 weeks 11.4 weeks Red 
This indicator for FQ3 is above target (lower is best) and performance has decreased since the last reporting period. 
FQ3 Comment
This measure only relates to planning applications received for alterations to existing premises. 
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Improving resource availability has allowed the focus of the DM Service to shift from the prioritisation of
the most significant applications to addressing the accrued backlog of older applications. The determination of a higher-than-normal volume of older cases has a
significant impact on "average time taken" performance measures as a relatively small number of older cases can skew the outcome. It is also noted that these
performance measures are based on "raw data" and as such have not been adjusted to take into account delays to determination out with the control of the
planning authority. FQ3 has seen the determination of 3 'legacy' applications and an increasing volume of newer case work. This has resulted in a significant
improvement with the average time period for determination of householder applications reducing by 3 weeks from FQ2. 87% of applications determined in FQ3
were less than 6 months old; these items were determined in an average time of 12.0 weeks. 
Responsible person: Peter Bain 
Page 52

Page 53

Appendix 1
Page 23 
Householder planning applications – average number of weeks to determine – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 8.0 weeks 12.0 weeks Red 
FQ4 2022/23 8.0 weeks 17.3 weeks Red
FQ1 2023/24 8.0 weeks 21.6 weeks Red
FQ2 2023/24 8.0 weeks 18.1 weeks Red
FQ3 2023/24 8.0 weeks 16.8 weeks Red 
This indicator for FQ3 is above target (lower is best) and performance has improved since the last reporting period. 
FQ3 Comment
This measure only relates to planning applications received for alterations to existing premises. 
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Improving resource availability has allowed the focus of the DM Service to shift from the prioritisation of
the most significant applications to addressing the accrued backlog of older applications. The determination of a higher-than-normal volume of older cases has a
significant impact on "average time taken" performance measures as a relatively small number of older cases can skew the outcome. It is also noted that these
performance measures are based on "raw data" and as such have not been adjusted to take into account delays to determination out with the control of the
planning authority. FQ3 has seen the determination of 3 'legacy' applications and an increasing volume of newer case work. This has resulted in a significant
improvement with the average time period for determination of householder applications reducing by 3 weeks from FQ2. 87% of applications determined in FQ3
were less than 6 months old; these items were determined in an average time of 12.0 weeks. 
Responsible person: Peter Bain 
Page 53

Page 54

Appendix 1
Page 24 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Number of new homeless applicants who required temporary accommodation this period 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 41 No target 
FQ4 2022/23 No target 30 No target
FQ1 2023/24 No target 32 No target
FQ2 2023/24 No target 36 No target
FQ3 2023/24 No target 26 No target 
This indicator for FQ3 shows the number of applicants has decreased since the last reporting period. 
FQ3 Comment 
During FQ3, the housing service provided temporary accommodation for 26 new homeless households.  B&C: 16 households (4 x Registered Social Landlord
Property, 1 x Private Sector Property, 8 x Serviced Accommodation, 3 x Bed & Breakfast).  H&L: 1 household (1 x Private Sector Property).  MAKI: 3 households (3 x
Private Sector Properties).  OLI: 6 households (3 x Private Sector Properties, 3 x Supported Accommodation). 
Please note: 
• The Registered Social Landlord and Private Rented Sector properties are leased by the Council and sub-let to homeless households as temporary
accommodation.
• Serviced Accommodation is available in Cowal and Helensburgh and is for single people providing an en-suite bedroom and shared kitchen facilities.
• Supported accommodation is provided in Lorn by Blue Triangle Housing Association. 
B&C: 16 
H&L: 1 
MAKI: 3 
OLI: 6 
Responsible person: Morven Macintyre 
Page 54

Page 55

Appendix 1
Page 25 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 20.0% 19.4% Red 
FQ4 2022/23 20.0% 22.5% Green
FQ1 2023/24 20.0% 10.8% Red
FQ2 2023/24 20.0% 26.5% Green
FQ3 2023/24 20.0% 27.8% Green 
This indicator for FQ3 is above target and performance has increased since the last reporting period. 
FQ3 Comment 
FQ3 has shown a further increase. From the 18 contracts awarded, 7 local suppliers submitted a bid, 5 of which were successful. The Procurement, Commercial
and Contract Management Team will continue to support local suppliers by providing useful information on the Council's website. 
Responsible person: Anne MacColl-Smith 
Page 55

Page 56

Appendix 1
Page 26 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Increase the number of community benefits that are delivered through contracts we award locally 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ3 2022/23 No target - No target
FQ4 2022/23 No target 43 No target
FQ1 2023/24 No target - No target
FQ2 2023/24 No target 37 No target
FQ2 2023/24 No target - No target 
This indicator is reported in FQ2 and FQ4. 
This indicator for FQ3 shows the number of community benefits has increased since the last reporting period. 
FQ3 Comment
Reported on a six monthly basis.  
FQ3 and FQ4 will be reported in April 2024. 
Responsible person: Anne MacColl-Smith 
Page 56

Page 57

Appendix 1
Page 27 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Street lighting – percentage of faults repaired within 10 days – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 75% 25% Red 
FQ4 2022/23 75% 43% Red
FQ1 2023/24 75% 28% Red
FQ2 2023/24 75% 41% Red
FQ3 2023/24 75% 50% Red 
This indicator for FQ3 is below target however performance has increased since the last reporting period. 
FQ3 Comment 
Overall Argyll and Bute performance figure of 46% during a period where annual leave and sickness absence have been prevalent in the small lighting team.  This is
a slight improvement on the previous quarter but it is still having a negative impact on our performance this quarter. 
Responsible person: Tom Murphy 
Page 57

Page 58

Appendix 1
Page 28 
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 75% 30% Red 
FQ4 2022/23 75% 32% Red
FQ1 2023/24 75% 37% Red
FQ2 2023/24 75% 43% Red
FQ3 2023/24 75% 46% Red 
This indicator for FQ3 is below target however performance has increased slightly since the last reporting period. 
FQ3 Comment 
We maintain 14,442 street lights throughout Argyll and Bute, including the islands.  Some street lighting faults cannot be fixed by the Street Lighting Team and we
require assistance from power suppliers (SSE or Scottish Power) or our Roads colleagues/external contractors to repair underground cable faults and power supply
issues.  These type faults are often reported as single dark lamps but following attendance/investigation they can be identified as more serious problems that will
take longer to repair.  On average throughout the year approximately 98.8% of our street lights are operating/functioning as designed.  Our Maintenance Team
comprises 3x Street Lighting Electricians, 1x Clerk of Works/Inspector and 1x Trainee Team Leader.  At present around 95% of assets have been upgraded to
Energy Efficient and more reliable LED Luminaires.  Works are continuing to convert/upgrade the rest of our inventor. 
Responsible person: Tom Murphy 
Page 58

Page 59

Appendix 1
Page 29 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Total number of complaints regarding waste collection – Lorn 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 8 No target 
FQ4 2022/23 No target 18 No target
FQ1 2023/24 No target 8 No target
FQ2 2023/24 No target 41 No target
FQ3 2023/24 No target 1 No target 
This indicator for FQ3 shows the number of waste collection complaints has decreased significantly since the last reporting period. 
FQ3 Comment 
The Lorn area only received 1 complaint this quarter regarding waste collection.  Given the number of bins serviced this is an excellent level of service. 
Responsible person: Tom Murphy 
Page 59

Page 60

Appendix 1
Page 30 
Total number of complaints regarding waste collection – Mull 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 0 No target 
FQ4 2022/23 No target 0 No target
FQ1 2023/24 No target 0 No target
FQ2 2023/24 No target 0 No target
FQ3 2023/24 No target 1 No target 
This indicator for FQ3 shows the number of waste collection complaints has increased since the last reporting period. 
FQ3 Comment
The Isle of Mull received only 1 waste collection complaint this quarter, excellent service. 
Responsible person: Tom Murphy 
Total number of complaints regarding waste collection – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 35 No target 
FQ4 2022/23 No target 53 No target
FQ1 2023/24 No target 67 No target
FQ2 2023/24 No target 101 No target
FQ3 2023/24 No target 18 No target 
This indicator for FQ3 shows the number of waste collection complaints has decreased significantly since the last reporting period. 
FQ3 Comment 
For the months of October, November and December only 18 waste collection complaints were received.  Given the number of bins serviced, domestic,
commercial, recycling, glass and food this is a very good level of service. 
Responsible person: Tom Murphy
Page 60

Page 61

Appendix 1
Page 31 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 45.0% 56.7% Green 
FQ4 2022/23 45.0% 52.0% Green
FQ1 2023/24 45.0% 47.6% Green
FQ2 2023/24 45.0% 59.8% Green
FQ3 2023/24 45.0% 49.0% Green 
This indicator for FQ3 is above target however performance has decreased since the last reporting period. 
FQ3 Comment 
49.0% recycling, composting and recovery (36.1% recycling/composting plus 12.9% recovery). Renewi sent some general waste to an energy from waste plant as
part of a trial during December 23, which has improved recovery figures and reduced landfill during the quarter. Year to date figures are 53.3% recycling,
composting and recovery (44.1% recycling/composting plus 9.2% recovery). 
Responsible person: John Blake 
Page 61

Page 62

Appendix 1
Page 32 
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 67.4% No target 
FQ4 2022/23 No target 61.9% No target
FQ1 2023/24 No target 53.0% No target
FQ2 2023/24 No target 68.7% No target
FQ3 2023/24 No target 55.3% No target 
This indicator for FQ3 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ3 Comment 
55.3% recycling, composting and recovery (33.9% recycling/composting plus 21.4% recovery). Renewi sent some general waste to and energy from waste plant as
part of a trial during December 23 which has improved recovery figures and reduced landfill during the quarter. Year to date figures are 60.9% recycling,
composting and recovery (46.5% recycling/composting plus 14.4% recovery). 
Responsible person: John Blake 
Page 62

Page 63

Appendix 1
Page 33 
Islands – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 43.5% No target 
FQ4 2022/23 No target 35.9% No target
FQ1 2023/24 No target 39.2% No target
FQ2 2023/24 No target 35.6% No target
FQ3 2023/24 No target 34.2% No target 
This indicator for FQ3 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ3 Comment 
34.2% recycling, composting and recovery. Year to date figures are 36.4% recycling, composting and recovery (36.4% recycling/composting and 0% recovery). 
Responsible person: John Blake 
Page 63

Page 64

Appendix 1
Page 34 
H&L – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 37.5% No target 
FQ4 2022/23 No target 34.5% No target
FQ1 2023/24 No target 40.1% No target
FQ2 2023/24 No target 41.6% No target
FQ3 2023/24 No target 41.5% No target 
This indicator for FQ3 shows the percentage of waste recycled has decreased slightly since the last reporting period. 
FQ3 Comment 
41.5% recycling, composting and recovery (40.8% recycling/composting plus 0.7% recovery). Year to date figures are 41.0% recycling, composting and recovery
(40.8% recycling/composting and 0.2% recovery). 
Responsible person: John Blake 
Page 64

Page 65

Appendix 1
Page 35 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – The number of tonnes of waste sent to landfill 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 5,100 3,882 Green 
FQ4 2022/23 5,000 4,610 Green
FQ1 2023/24 5,850 5,075 Green
FQ2 2023/24 5,550 5,510 Green
FQ3 2023/24 5,100 4,253 Green 
This indicator for FQ3 is below target (lowest is best). 
FQ3 Comment 
Within target. Landfill reduction of biodegradable waste tonnes to landfill is partly due to Renewi sending some general waste to an energy from waste plant as
part of a trial during December 23. This has helped reduce landfill during the quarter. 
Responsible person: John Blake 
Page 65

Page 66

Appendix 1
Page 36 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
LEAMS (Local Environment Audit and Management System) – Lorn
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 73 88 Green 
FQ4 2022/23 73 86 Green
FQ1 2023/24 73 87 Green
FQ2 2023/24 73 87 Green
FQ3 2023/24 73 86 Green 
This indicator for FQ3 is above target with a slight drop in performance since the last reporting period. 
FQ3 Comment 
A high level of street cleanliness recorded for the Oban area this quarter, October 88, November 91 and December 79. 
Responsible person: Tom Murphy 
Page 66

Page 67

Appendix 1
Page 37 
LEAMS (Local Environment Audit and Management System) – Mull
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 73 88 Green 
FQ4 2022/23 73 93 Green
FQ1 2023/24 73 95 Green
FQ2 2023/24 73 95 Green
FQ3 2023/24 73 93 Green 
This indicator for FQ3 is above target with a slight drop in performance same since the last reporting period. 
FQ3 Comment 
Excellent level of street cleanliness recorded this month on the Isle of Mull, October 91, November 94 and December 93. 
Responsible person: Tom Murphy 
Page 67

Page 68

Appendix 1
Page 38 
LEAMS (Local Environment Audit and Management System) – Argyll and Bute
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 73 83 Green 
FQ4 2022/23 73 83 Green
FQ1 2023/24 73 84 Green
FQ2 2023/24 73 83 Green
FQ3 2023/24 73 85 Green 
This indicator for FQ3 is above target and performance has increased slightly since the last reporting period. 
FQ3 Comment 
The overall level of street cleanliness this quarter is very good indeed with a score of 85.  LEAMS was originally designed to gain a measure of street cleanliness
and effectiveness of service provision, to keep land free from litter and refuse, keep roads clean, this includes weeds, graffiti, staining, flyposting and vandalism.   
Responsible person: Tom Murphy 
Page 68

Page 69

Appendix 1
Page 39 
Making It Happen 
Teacher sickness absence – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 1.52 days No target 
FQ4 2022/23 No target 2.54 days No target
FQ1 2023/24 No target 1.79 days No target
FQ2 2023/24 No target 0.53 days No target
FQ3 2023/24 No target 2.04 days No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment 
The commentary provided for sickness absence compares the data against the same period in the previous year to allow for seasonal fluctuations. 
OLI Teacher absence has risen by 0.52 day per FTE on the same quarter last year.  This half a day less than the overall difference between this years quarter and
last.  The top reasons are mental health, infections and back and neck problems.  The top reasons are consistent with the overall top 2 reasons. Quarter 2 absence
is traditionally low for Teachers as this is the summer holiday period and an increase against this quarter is traditionally seen. 
Responsible person: Wendy Brownlie 
Page 69

Page 70

Appendix 1
Page 40 
Teacher sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 1.70 days No target 
FQ4 2022/23 No target 2.48 days No target
FQ1 2023/24 No target 2.15 days No target
FQ2 2023/24 No target 1.25 days No target
FQ3 2023/24 No target 2.82 days  No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment 
The commentary provided for sickness absence compares the data against the same period in the previous year to allow for seasonal fluctuations. 
Overall Teacher absence has risen by 1.12 day per FTE on the same quarter last year.  The top 3 reasons are mental health, infections and
stomach/kidney/digestive reasons.  Infections and Stomach issues are characterised by short term absence types such as Covid, flu, cold, upset stomach, vomiting
and gastroenteritis.  The top 3 reasons are consistent with the same quarter last year albeit in higher numbers of days lost.  On the last quarter (Q2) there has
been an increase of 1.5 days. Traditionally quarter 2 has low absence rates due to the summer holiday period. 
Responsible person: Jennifer Crocket (B&C and MAK) and Wendy Brownlie (H&L and OLI) 
Page 70

Page 71

Appendix 1
Page 41 
Making It Happen 
LGE staff (non-teacher) sickness absence – Oban, Lorn and the Isles 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 4.17 days No target 
FQ4 2022/23 No target 4.48 days No target
FQ1 2023/24 No target 3.63 days No target
FQ2 2023/24 No target 3.69 days No target
FQ3 2023/24 No target 4.62 days  No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment 
The commentary provided for sickness absence compares the data against the same period in the previous year to allow for seasonal fluctuations. 
OLI LGE absence has increased by 0.45 day per FTE on the same quarter last year.  The top reasons for absence are mental health, other musculoskeletal issues
and back and neck problems.  There has been an increase in absence on the last quarter which follows the traditional pattern as Q2 contains the summer holiday
period. 
Responsible person: Carolyn Cairns 
Page 71

Page 72

Appendix 1
Page 42 
LGE staff (non-teacher) sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 3.65 days No target 
FQ4 2022/23 No target 4.04 days No target
FQ1 2023/24 No target 3.53 days No target
FQ2 2023/24 No target 3.18 days No target
FQ3 2023/24 No target 3.73 days  No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment 
The commentary provided for sickness absence compares the data against the same period in the previous year to allow for seasonal fluctuations. 
Overall absence has stayed almost the same as the same quarter last year.  It has increased slightly on FQ2 but traditionally we see this pattern with FQ2 being the
summer holiday period.  The top three reasons for absence were mental health, infections and other Musculoskeletal/back and neck problems. 
Responsible person: Carolyn Cairns 
Page 72

Page 73

Appendix 1
Page 43 
Making It Happen 
COI – Increase the percentage of all self-service automated contacts 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 70.0% 72.5% Green 
FQ4 2022/23 70.0% 72.2% Green
FQ1 2023/24 70.0% 80.7% Green
FQ2 2023/24 70.0% 72.1% Green
FQ3 2023/24 70.0% 72.7% Green 
This indicator for FQ3 is above target and performance has increased since the last reporting period. 
FQ3 Comment 
In FQ3 there was 34,254 transactions dealt with by Customer Service Agents (27.3%) and 91,264 automated or self-service transactions (72.7%) so the 70.0%
target was exceeded. 
Responsible person: Robert Miller  
Page 73

Page 74

This page is intentionally left blank

Page 75

1 
Education Service 
Primary Area Attainment Report:  
Oban, Lorn and the Isles (OLI)
March 2024 
Argyll and Bute Council 2023 - 2024    
‘Our Children, Their Future’
Page 75 Agenda Item 6

Page 76

2 
Introduction
Within the OLI area there are 25 Primary Schools (Luing Primary School, Achaleven Primary School
and Kilchrenan Primary School are currently mothballed).  There is secondary school provision in
Oban High School, Tiree High School and Tobermory High School.  Nursery provision is provided
within several of these schools and Gaelic Medium Education is provided at Bunessan Primary
School, Strath of Appin Primary School, Rockfield Primary School, Salen Primary School and Tiree
Primary School.  Our primary school rolls vary considerably ranging from 2 pupils (Kilchattan Primary
School) to 236 pupils (Rockfield Primary School). 
This report provides a range of key information about school provision from August 2023-January 2024
and reports the National collection of attainment and achievement data from June 2023. 
Additional and more detailed information about each school can be found in the schools’ Standards and
Quality Reports.  In addition each school’s Improvement Plan outlines their main priorities for
improvement.  Most schools have an active website where these documents can be accessed and
further links or information can be obtained from the Head Teacher.   
Page 76

Page 77

3 
Oban, Lorn and the Isles School Profiles 2023-2024  
Cluster Primary Schools 19/20 20/21 21/22  22/23  23/24
%
change
in Roll
over 5
years1
Achaleven Primary School (mothballed) 9 7 0 0 0 -100%
Barcaldine Primary School 10 10 13 14 3 -70%
Bunessan Primary Gaelic Unit   4 3 11 10 10 150%
Bunessan Primary School 19 21 7 10 12 -37%
Dalmally Primary School 35 31 29 37 30 -14%
Dervaig Primary School 25 22 22 19 15 -40%
Dunbeg Primary School 98 90 88 89 94 -4%
Easdale Primary School 16 17 20 25 31 94%
Iona Primary School 18 17 14 15 11 -39%
Kilchattan Primary School 6 8 2 3 2 -67%
Kilchrenan Primary School (mothballed Feb 2022) 8 12 6 0 0 -100%
Kilninver Primary School 22 29 26 23 22 0%
Lismore Primary School 12 11 11 9 6 -50%
Lochdonhead Primary School 10 10 10 12 19 90%
Lochnell Primary School 114 112 119 118 118 4%
Luing Primary School (mothballed) 7 0 0 0 0 -100%
Park Primary School 252 240 240 225 216 -14%
Rockfield Gaelic Primary School 58 61 56 50 50 -14%
Rockfield Primary School 308 276 259 250 236 -23%
Salen Gaelic Primary School 48 45 42 31 32 -33%
Salen Primary School 35 29 25 26 32 -9%
St Columba’s Primary School 103 132 148 169 172 67%
Strath of Appin Gaelic Primary School 7 11 12 13 14 100%
Strath of Appin Primary School 17 17 16 13 13 -24%
Taynuilt Primary School 69 67 70 66 55 -20%
Tiree Primary School 31 27 23 16 17 -45%
Tiree Primary School Gaelic Unit 38 36 40 38 36 -5%
Tobermory Primary School 62 62 68 76 73 18%
Ulva Primary School 8 8 16 12 9 13%
TOTAL 1449 1411 1393 1369 1328 -9%
* Data for rolls provided at Census each year 
1 Please note the % change in Roll over 5 years shows the percentage change in roll figures from 2018/19 to 2022/23
and is not an average. 
SIMD Profile 
SIMD is the Scottish Government's standard approach to identify areas of multiple deprivation in Scotland,
with SIMD 1 indicating areas of highest deprivation and SIMD 10 indicating the least deprived.  It can help
improve understanding about the outcomes and circumstances of people living in the most deprived areas
in Scotland. It can also allow effective targeting of policies and funding where the aim is to wholly or partly
tackle or take account of area concentrations of multiple deprivation.   
Page 77

Page 78

4 
Table shows percentage of pupils residing in each decile of the SIMD in each area of Argyll and Bute.
Area 1 2 3 4 5 6 7 8 9 10 Unknown
Bute and
Cowal 16.6% 12.9% 18.7% 8.9% 21.4% 16.0% 2.3% 0.0% 1.5% 0.0% 1.7%
HALCO 2.6% 6.3% 6.0% 3.2% 7.5% 13.6% 16.7% 21.9% 11.0% 8.7% 2.3%
MAKI 0.0% 6.8% 8.3% 10.4% 9.2% 42.3% 22.6% 0.0% 0.0% 0.0% 0.4%
OLI 1.3% 0.0% 0.2% 10.5% 25.9% 17.8% 27.0% 7.9% 0.0% 0.0% 9.4%
*SIMD data from September 2023 
Footwear and Clothing Grant and Free School Meal Information for AREA 
 Clothing and Footwear Grant (CFG) is not shown as a National Average as each authority set their own
criteria and therefore cannot be compared accurately. Please note that 2022-20223 data for CFG and
Free School Meals (FSM) is to date (end February 2023) and therefore may change as the year
progresses. 
 In January 2022, the Scottish Government launched the extension of free school meal universal
eligibility to include all children in primary 1-5. The above figures only show those pupils in P6 and P7. 
 In August 2021 the Scottish Government introduced a School clothing grant minimum for all authorities
set at £120 for Primary pupils and £150 for Secondary pupils. 
 During session 2020/21 the Scottish Government introduced ‘Bridging’ payments of £130 per pupil in
receipt of FSM under the National criteria (this excludes anyone eligible who receive FSM in P1 to P6
who do not qualify financially). These payments are made 4 times per year (Easter, Summer, October
and Christmas).Further information can be found at Scottish Child Payment Bridging Payments -
mygov.scot.  In addition to this anyone eligible for these payments have been paid a FSM payment
during the school holiday period. Further information School meals - mygov.scot 
Page 78

Page 79

5 
Exclusion and Attendance Information for AREA 
*2022-23 data taken from previous AC report up to Feb 2023 - Session 2022-23 under embargo by SG
**2023-24 Data up to end December 2023 
 Authorised absence includes bereavement, short – term exceptional domestic situations, religious
observance, weddings of immediate family. Unauthorised absence includes truancy, unexplained
absence and most family holidays during term time. Attendance and absence is outlined in the recently
updated Management Circular 3.03. 
 During 2020/21 there were additional attendance codes added for COVID. These codes can count as
attendance, authorised absence or unauthorised absence depending on the circumstance. 
 There have been no exclusions in primary schools in the area last session or from August –December
2023. 
 Please note that attendance & exclusion data for 2022/23 is up to 28 February and not a complete year
Due to SG Embargo. 
 Please note that attendance & exclusion data for 2023/24 is up to end December and not a complete
year. It is therefore subject to change. 
 Pupil attendance has been highlighted nationally as a concern. Significant work at authority level has
been undertaken to maximise pupil attendance. This includes the formation of a strategic group and
working party, refreshed policy and guidance, staff training, a media campaign highlighting the impact
of non-attendance and individual school attendance targets. All of these aspects are working together
to ensure a sharpened focus and emphasis on pupil attendance. 
Page 79

Page 80

6 
Additional Support needs 
Table below indicates the numbers of pupils identified as having Additional Support needs across the
Oban, Lorn and the Isles area at each stage of primary schools. 
Student Needs P1 P2 P3 P4 P5 P6 P7 Total
Autistic spectrum disorder 8 19 23 6 11 17 16 100
Bereavement   1  4   5
Communication Support Needs 4 12 30 11 4 1 5 67
Dyslexia   2 3 2 20 22 49
English as an additional language 8 6 2 7 7 3 4 37
Family Issues 6 6 7 5 7 18 13 62
Hearing impairment  2 4 5 11  6 28
Interrupted learning  3 3 1 4 9 2 22
Language or speech disorder 9 15 29 18 25 18 12 126
Learning disability 8 7 19 10 13 1 7 65
Looked after 10 2 1 1 8 7 1 30
Mental health problem  3   2   5
More able pupil      5 3 8
Not disclosed / declared  8 4  5  2 19
Other 1 1 14 1 2 11 2 32
Other moderate learning difficulty 1 2 10 17 7 36 24 97
Other specific learning difficulty (eg 
numeric) 2 3 5 6 19 33 26 94
Physical health problem 5 4 6 4 12 17 19 67
Physical or motor impairment 3 6 17 20 13 22 7 88
Social, emotional and behavioural
difficulty 7 22 25 25 30 42 36 187
Visual impairment   3 3 3 5 7 21
Young Carer    2 10 10 14 36 
Care Experienced Children and Young People
A Virtual Head Teacher took up post in April 2023. The core purpose of the role of the Virtual Head Teacher
is to be relentless in driving improvements in the educational progress and attainment/achievement of an
identified group of young people, including Care Experienced, across Argyll and Bute. The core function of
the Virtual Head Teacher in terms of planning is to ensure that all children have access to appropriate and
timely support achieved by collaborating with relevant professionals to ensure plans are of a high quality,
with impact and outcomes followed up.
The table below shows the numbers of care experienced children in our primary schools across each area
of the Council. 
Area
Previously looked
after 
Looked after at
home 
Looked after away
from home Total
B&C 20 12 25 57
H&L 12 4 9 25
MAKI 18 7 4 29
OLI 13 4 9 26 
Page 80

Page 81

7 
Attainment of Curriculum for Excellence Levels over time
Curriculum levels are national levels to describe different stages of learning and progress. For most
children the expectation is:       
Throughout the Broad General Education, children and young people are assessed and professional
judgements are made by teachers on when a child or young person has achieved learning at a particular
level. This means that they have broadly covered the experiences and achieved the expected outcomes for
that level. In making this decision, the teacher takes into account the evidence mentioned above, and
considers the benchmarks produced by Education Scotland for each level as well as diagnostic feedback
from the National Standardised Assessments (NSAs). Attainment of Curriculum for Excellence Levels
(ACEL) data is collected annually each June by the Scottish Government. The data collection collects
information on pupil performance in four areas, known as organisers. Organisers consist of Numeracy and
the three literacy components; Reading, Writing and Listening and Talking. A combined literacy measure is
also produced based on the three literacy organisers: reading, writing and listening and talking. The data is
collected for pupils at the key stages of P1, P4,P7 and S3. 
As an authority, we have made significant progress in raising attainment and closing the poverty related
attainment gap. Authority level data for literacy and numeracy demonstrating increased attainment is
displayed below. Further detail on progress towards closing the attainment gap between those residing in
Quintile 1 and those in Quintile 5 can be found on pages 10 and 11. 
Page 81

Page 82

8 
Achievement of Curriculum for Excellence Levels across OLI schools: June 2018-June 2023
NOTES:
ER English reading, EW English writing, ELT English Listening and talking N Numeracy
GR Gaelic reading, GW Gaelic writing, GLT Gaelic Listening and talking.
There was no ACEL collection during session 2019/20 due to COVID 
Page 82

Page 83

9 
In English medium by June 2023: 
 In reading, 76% of P1 pupils in the OLI area achieved early level, this is compared with
76% at authority level and 81% nationally
 In writing, 67% of P1 pupils in the OLI area achieved early level, this is compared with 72%
at authority level and 78% nationally
 In talking and listening, 81% of P1 pupils in the OLI area achieved early level, this is
compared with 83% at authority level and 87% nationally. 
 In numeracy, 75% of P1 pupils in the OLI area achieved early level, this is compared with
78% at authority level and 85% nationally. 
 In reading, 73% of P4 pupils in the OLI area achieved first level, this is compared with 77%
at authority level and 78% nationally
 In writing, 66% of P4 pupils in the OLI area achieved first level, this is compared with 70%
at authority level and 72% nationally
 In talking and listening, 80% of P4 pupils in the OLI area achieved first level, this is
compared with 85% at authority level and 87% nationally. 
 In numeracy, 71% of P4 pupils in the OLI area achieved first level, this is compared with
75% at authority level and 77% nationally. 
 In reading, 71% of P7 pupils in the OLI area achieved second level, this is compared with
78% at authority level and 81% nationally
 In writing, 60% of P7 pupils in the OLI area achieved second level, this is compared with
72% at authority level and 75% nationally
 In talking and listening, 81% of P7 pupils in the OLI area achieved second level, this is
compared with 87% at authority level and 87% nationally. 
 In numeracy, 64% of P7 pupils in the OLI area achieved second level, this is compared
with 76% at authority level and 78% nationally. 
In Gaelic medium by June 2023: 
 In reading, 70% of P1 pupils in the OLI area achieved early level, this is compared with
75% at authority level and 84% nationally
 In writing, 70% of P1 pupils in the OLI area achieved early level, this is compared with 79%
at authority level and 84% nationally
 In talking and listening, 60% of P1 pupils in the OLI area achieved early level, this is
compared with 71% at authority level and 86% nationally. 
 In reading, 65% of P4 pupils in the OLI area achieved first level, this is compared with 71%
at authority level and 72% nationally
 In writing, 48% of P4 pupils in the OLI area achieved first level, this is compared with 42%
at authority level and 64% nationally
 In talking and listening, 74 % of P4 pupils in the OLI area achieved first level, this is
compared with 76% at authority level and 76% nationally. 
 In reading, 58% of P7 pupils in the OLI area achieved second level, this is compared with
62% at authority level and 73% nationally
 In writing, 58% of P7 pupils in the OLI area achieved second level, this is compared with
62% at authority level and 69% nationally
 In talking and listening, 79% of P7 pupils in the OLI area achieved second level, this is
compared with 85% at authority level and 85% nationally. 
Page 83

Page 84

10 
Argyll and Bute Stretch Aims Session 2023-24 and onwards to 2026 (Authority Level)
The Scottish Attainment Challenge (SAC) is about achieving equity in educational outcomes, with a
particular focus on closing the poverty-related attainment gap.  SAC funding is provided to all of Scotland’s
local authorities to help tackle the attainment gap and support education recovery and improve outcomes
for children and young people most impacted by poverty. The Scottish Attainment Challenge aims to raise
the attainment of children and young people living in deprived areas, in order to close the equity gap.
Attainment Advisors within Education Scotland’s regional improvement teams work with authorities to
identify core attainment measures and specific aims (Stretch Aims) which, informed by local evidence and
data, are identified as local priority areas for improvement. The stretch aims are intended to be both
ambitious and achievable within local contexts and targets are specific to individual authorities. Progress
towards achieving the current stretch aims will be reported on later in 2024. 
The Stretch Aims are intended to support recovery from the pandemic and accelerate progress in closing
the attainment gap and include:
 Achievement of Curriculum for Excellence Levels (literacy P1/4/7 combined and numeracy P1/4/7
combined)
The stretch aims for literacy and numeracy identify the percentage of young people who achieve their
expected Curriculum for Excellence (CfE) level:
 An overall attainment target, which includes all young people 
 An attainment target for young people who live in the most deprived areas (SIMD quintile 1)
 An attainment target for young people who live in the  least deprived areas (SIMD quintile 5)
 A target to reduce the attainment gap between the most and least deprived young people 
The Argyll & Bute literacy and numeracy tables illustrate the progress against the 2022/23 stretch aims
based on ACEL collection in 2023 (published December 2023), to the stretch aim targets in place for 2024-
2026.
The year-on-year trend in ACEL data has been positive; in the two-year period between 2022 and 2023  the
overall proportions of primary school pupils achieving the expected levels in literacy had increased by 6
percentage points, while in numeracy there had been an increase of 3 percentage points.
The percentage of Quintile 1 (most deprived) young people who achieved their expected CfE level has
increased by 15pp in literacy and 8pp in numeracy between 2022 and 2023. 
Scottish Attainment Challenge - Stretch Aims 2023-24: Literacy 
In literacy, the attainment gap between young people from the most and least deprived areas of Argyll &
Bute was 33 percentage points in 2021, by 2022 this narrowed to 27 percentage points and narrowed
further to 13 percentage points by June 2023, therefore achieving our stretch aim by 8.5 percentage points.
This is 7 percentage points below the national gap of 20pp.  Argyll & Bute’s target is to reduce the
attainment gap further to 11 percentage points by June 2024 and to 10 percentage points by June 2026. 
Page 84

Page 85

11 
Scottish Attainment Challenge - Stretch Aims 2023-24: Numeracy
In numeracy, the attainment gap between young people from the most and least deprived areas of Argyll &
Bute was 29 percentage points in 2021, by 2022 this narrowed to 18 percentage points and narrowed
further to 14 percentage points by June 2023. This was 3 percentage points below the national gap of
17pp.   Argyll & Bute’s target is to reduce the attainment gap to 13.5 percentage points by 2024 and to 13
percentage points by June 2026. 
The table below outlines the National expectations of when most children and young people may achieve
each level:
Literacy (P 1/4/7 Combined) Stretch Aim 
Overall SIMD Q1 SIMD Q5 GAP (Q1-Q5)
Stretch aim
22/23
68.4% 60% 81.5% 21.5pp
Confirmed Dec
23
68% 68% 81% 13pp
Interim Stretch
Aim 2023/24
71% 70% 81% 11pp
Interim Stretch
Aim 2024/25
73.5% 72.5% 83% 10.5pp
Final Stretch
Aim 2025-26
76% 75% 85% 10pp
Numeracy (P 1/4/7 Combined) Stretch Aim 
Overall SIMD Q1 SIMD Q5 GAP (Q1-Q5)
Stretch aim 22/23 69% 58% 87% 29pp
Confirmed Dec 2023 76.19% 76% 90% 14pp
Interim Stretch Aim
2023/24
78% 76.5% 90.5% 13.50pp
Interim Stretch Aim
2024/25
81% 77.75% 91% 13.25pp
Final Stretch Aim
2025-26
83% 78.5% 91.5% 13pp
Page 85

Page 86

12 
CfE Level  Stage 
Early The final two years of early learning and
childcare before a child goes to school and
P1, or later for some. 
First To the end of P4, but earlier or later for
some. 
Second To the end of P7, but earlier or later for
some. 
Third and fourth S1-S3, but earlier or later for some. 
Further information:
National Improvement Framework for Scottish Education –
https://www.gov.scot/policies/schools/national-improvement-framework/ 
Initiatives to raise attainment and achievement 
In response to data and evidence gathered in the areas of literacy, numeracy and health and wellbeing, a
range of work has been undertaken in order to drive forward improvement and raise attainment and
achievement across the authority. 
Literacy 
Quality Improvement Approach to writing
7 new schools have taken part in the training and implementation of this approach, impacting on 11
classes. 3 practitioners from 2 schools previously involved have also been trained, implementing the
approach in a further 3 classes. 100% of participants believe or strongly believe that the approach will have
a positive impact on their pupils. Data on impact to be gathered following the conclusion of the training in
February.
9 of the 10 schools involved in the initial stages of the programme are currently implementing some degree
of school spread with the approach to reach other stages, led by internal leads and supported in some
cases by the Education Support Officer (ESO). Evaluation of process and support with reflection of impact
is currently underway. 
Talk for Writing
Since August, 2 schools have been implementing the Talk for Writing approach across the whole school,
the approach aims to improve children’s ability to articulate their ideas for writing and support them to
ensure that they can then transfer these ideas onto paper. An additional school is implementing this at early
level with a clear plan for whole school implementation in August 2024. Clear aims have been set for each
class, the achievement of which will be measured following the next tracking and monitoring period. 
Progression Frameworks
Working groups have been set up for early, 1st and 2nd level to create our own Argyll and Bute
progressions to support all staff with planning and monitoring progress. Listening and Talking have been
completed, with Reading and Writing still ongoing. These will ensure a consistency of approach across
schools and the authority and enable schools to further refine approaches to tracking progress of learners
through and across levels. 
Page 86

Page 87

13 
School Support
The ESO continues to support schools on an individual basis. This includes: discussion of current curricular
approaches, delivery of training sessions for staff, teaching of model lessons and discussion of data. The
aim of this support is to improved experiences for learners, increase staff confidence and knowledge and
ultimately lead to raised attainment. 
Numeracy
From August 2023- January 2024 the following work has been undertaken in order to raise attainment in
mathematics and numeracy. These include but are not limited to: 
 Creation of a mathematics improvement plan, setting measurable goals and benchmarks to track
progress over time. 
 Work is underway to produce a mathematics framework to support mathematics and numeracy
teaching in Argyll and Bute schools. 
 Collaboration with colleagues to design and implement a customised professional learning
programme focused on the latest pedagogical approaches, research and best practices in
mathematics education. 
 Collaboration with members of the central team to analyse assessment data and develop strategies
for improving attainment and achievement in mathematics and numeracy, focussing on 2 schools as
an initial test of change. 
 Observations in targeted schools with focussed dialogue with practitioners and senior leaders on
strengths and next steps. Follow up support is then identified within a given timescale and is
coordinated by the numeracy lead. 
Wellbeing , Rights and Relationships 
 The Glasgow Motivation and Wellbeing Profiling Tool has been introduced to schools as a way of
measuring pupil wellbeing.  Many schools have begun to use this, helping them to establish a sound
understanding of the environment created for learning. 
 
A focus on play pedagogy and outdoor learning alongside developments in the health and wellbeing
curriculum have also continued to be an important focus within school improvement plans to help
support wellbeing.
 
Through the UNICEF accredited Rights Respecting School journey, 36 schools have achieved
Bronze, 12 Silver, 6 Gold awards.  We will continue to provide support to schools to engage in this
award.  In taking a rights based approach to education, schools have been developing or
embedding pupil voice structures within their setting.
 
Food for Thought grants have been secured by two of our primary schools.  This is allowing schools
to develop enterprising and sustainable approaches to food with learners.  Both schools have
developed projects that involve a skills based approach to learning and connect our pupils to their
local community 
 Equality and diversity was a key feature of the Head Teacher conference in November.  Head
Teachers had the opportunity to engage in professional learning with Women’s Aid as part of Argyll
& Bute’s work to reduce violence against women and girls.  Education staff in a variety of roles have
also taken up the offer to participate in the Safe and Together training.   
 Time for Inclusive Education (TIE) have also delivered a session to Head Teachers to develop a
stronger understanding of what inclusive education is and raise awareness of the national
professional learning that all teaching staff have access to relating to LGBTQ+ issues. 
Page 87

Page 88

14 
 A large number of our schools are continuing on their journey to becoming a ‘Nurturing School’
supported by our Educational Psychology service through the ‘Our Children, their Nurturing
Education’ programme. 22 schools have now achieved bronze accreditation, 6 have achieved silver
and 1 school has achieved gold. 
School Contacts
School Contact Position Address Phone No. 
Barcaldine Primary Bernie McMillan Temporary shared
headship with Taynuilt
Primary
Barcaldine, Connel, PA37 1SG 01631
720391
Bunessan Primary Richard Gawthrope Head Teacher Bunessan, Isle of Mull, PA67
6DL
01681
700283
Dalmally Primary Lynn Sinclair Head Teacher  Dalmally, Argyll PA33 1BE 01838
200359
Dervaig Primary Tricia Evans Head Teacher Dervaig, Isle of Mull, PA75
6QW
01688
400227
Dunbeg Primary Marny McCulloch Head Teacher Dunbeg, Connel, PA37 1QF 01631
564781
Easdale Primary Judith Frost Head Teacher
(Joint Headship with
Luing – currently
mothballed)
Easdale, Oban, PA34 4RF 01852
300243
Iona Primary Stephen Glen- Lee Head Teacher Isle of Iona, PA76 6SJ 01681
700348
Kilchattan Primary Kim Bentley Head Teacher Isle of Colonsay, Argyll, PA61
7YR
01951
200340
Kilninver Primary Sharon Burt  Head Teacher  Kilninver, Oban, PA34 4UT 01852
316236
Lismore Primary Debbie Harris  Head Teacher Isle of Lismore, Oban, PA34
5UG
01631
760258
Page 88

Page 89

15 
Lochdonhead
Primary
Susie Carmichael  Head Teacher (Joint
Headship with Ulva
Primary)
Lochdonhead, Isle of Mull,
PA64 6AP
01680
812473
Lochnell Primary Donald Feist Acting Head Teacher Lochnell, Ledaig, Connel, Argyll
PA37 1QS
01631
720300
Park Primary Shirley Stuart  Head Teacher Kerrera Terrace, Oban, PA34
5AU
01631
563941
Rockfield Primary Caroline Fothergill Head Teacher Oban Primary Campus, 
Soroba Road, Oban, PA34
4SB
01631
568090/5680
91 
Salen Primary Mairi Maclean Head Teacher Salen, Isle of Mull, PA72 6JL 01680
300348
St Columba’s
Primary
Michaelina MacLellan Head Teacher Oban Primary Campus, 
Soroba Road, Oban, PA34
4SB
01631
568092/
568090
Strath of Appin
Primary
Natalie White Head Teacher Strath of Appin, Appin, PA38
4BG
01631
730345
Taynuilt Primary Bernie McMillan Head Teacher Taynuilt, Argyll, PA35 1JE 01866
822343
Tiree HS Primary Peter Bain  Head Teacher Isle of Tiree, PA77 6XA 01879
220383/
220790
Tobermory HS
Primary Dept.
Julien McKenzie Depute Head Teacher Tobermory, Isle of Mull, PA75
6PB
01688
302062 
Page 89

Page 90

This page is intentionally left blank

Page 91

ARGYLL AND BUTE COUNCIL                   OBAN LORN AND THE ISLES AREA            
COMMITTEE 
ROADS AND INFRASTRUCTURE      6 MARCH 2024
SERVICES                     
ROADS AND INFRASTRUCTURE SERVICES UPDATE 
1.0 INTRODUCTION 
1.1 A Roads and Infrastructure standing report was a fixture on Area Committee
agendas throughout the life of the last Council. In the first two rounds of Area
Committee meetings in the new Council feedback was sought on the value of
these updates, and their format and frequency. Generally Members felt having a
standard item was beneficial and it was acknowledged that the Roads and
Infrastructure weekly briefings issued to all members each Friday afternoon
provide for the main sources of live information on current activities. On top of
these briefings there is a bank of resources on the new Member Zone system
which include the weekly briefings, subject specific briefings, ad hoc short
briefings on issues, relevant previous committee reports, operational service
procedures, legislation and Council policies. 
1.2 In the last Council the purpose of these reports was to provide an update on
service activities but since weekly briefings these have largely superseded the
original stated purpose of these reports. 
1.3 On the basis of the above this new format has been agreed through the
December 2022 round of area committees for this standing item. This format
removes duplication for Officers and rather links to existing published
information, with additional updates only in the body of the reports if these are
specifically requested/noted from previous meetings. The report remains as a
standing item and continues to provide the opportunity for Officer engagement at
the committee meetings.   
2.0 RECOMMENDATIONS 
It is recommended that the Area Committee: 
2.1 Note and consider the contents of this report. 
Page 91 Agenda Item 7

Page 92

3.0 DETAIL 
3.1 Roads and Infrastructure Services provides Members with weekly briefings on
topical service activities which are all available here.   
3.2 As part of the resources on the new Member Zone system there are various key
documents available in an online library here. 
3.3 There are also additional online resources covering the streetlighting, footway,
surface dressing and roads reconstruction programmes available on the website
here. 
4.0 CONCLUSION 
4.1 This report provides links to existing published information on service activities
and provides for the opportunity for Officer attendance and engagement at
committee meetings. 
5.0 IMPLICATIONS 
5.1 Policy – Roads and Infrastructure work to a number of policies across the range
of service areas 
5.2 Financial – revenue and capital budgets are in place to deliver projects and
cyclic work 
5.3  Legal – Roads and Infrastructure Services work to a number of different pieces
of legislation such as the Roads Scotland Act 194 and the Environmental
Protection Act 1990 
5.4  HR – none known 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – where appropriate EqSEIAs will be
carried out to identify any implications 
5.5.2   Socio-economic Duty – where appropriate EqSEIAs will be carried out to
identify any implications 
5.5.3 Islands – where appropriate Island impacts assessments will be carried out to
identify any implications 
5.6. Climate Change – due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise 
Page 92

Page 93

5.7  Risk – risk managed through toolbox talks, safety briefings and where
appropriate risk registers – all of the above are monitored through the RIS
leadership and management teams 
5.8  Customer Service – none known 
5.9  Rights of the Child (UNCRC) – none arising from this report.   
Executive Director with responsibility for Roads and Infrastructure Services,
Kirsty Flanagan 
Policy Lead for Roads and Transport, Councillor Andrew Kain 
January 2024 
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services 
Mark Calder, Project Manager 
Page 93

Page 94

This page is intentionally left blank

Page 95

ARGYLL AND BUTE COUNCIL                                               OBAN, LORN AND THE     
ISLES AREA COMMITTEE 
ROADS AND INFRASTRUCTURE                           6 MARCH 2024
SERVICES                     
ROADS CAPITAL RECONSTRUCTION PROGRAMME 2024/25 
1.0  EXECUTIVE SUMMARY 
1.1 Attached to this report is a draft programme for roads reconstruction schemes for
2024/25 in the Oban, Lorn and the Isles area. This programme has been designed
using the current Road Condition Index (RCI) which is produced by the national
road condition survey data. In addition to the RCI data, information such as road
traffic collisions, known development, activities such as timber harvesting and skid
condition (of the carriageways surface) which is measured by a separate survey
are also considered together with information brought forward from Elected
Members during agreed Area Business Days with officers from Roads and
Infrastructure Service. This information is considered at officer level when
appropriate engineering judgement is also applied to ensure that maximum
benefit can be derived from the available investment. 
1.2 The Roads Reconstruction Programme has been structured in line with the Roads
Asset Management and Maintenance Strategy. The focus has been to arrest the
rate of decline and provide an overall improvement in condition as has been
demonstrated in the Annual Status and Options Report. In previous years this has
been achieved through the delivery of a mix of carriageway resurfacing, edge
strengthening, patching/surface dressing and in-situ road surface recycling.
These treatments have been designed to seal the road to stop the ingress of
water, improve ride quality and reduce the number of reactive repairs. This has
resulted in an overall improvement in road conditions. Without this investment and
works there would have been a significant deterioration in condition and a
detriment to the travelling public, economic opportunity and tourism. 
1.3 Following the Council’s Budget Meeting, which took place on 22nd February
2024, £8M has been confirmed for the Capital Roads Reconstruction budget.   
1.4 As per previous years any post winter deterioration may result in some adjustment
to the programme to ensure that the best rates of return in terms of whole life
costs can be achieved. 
Page 95 Agenda Item 8

Page 96

2.0  RECOMMENDATION 
2.1 It is recommended that the Oban, Lorn and the Isles Area Committee: 
• Provide comments on the draft programme that is contained in Appendix 1 of
this report.  
• Note that the programme will go forward to the Environment, Development
and Infrastructure Committee on 21 March 2024 for endorsement.   
3.0  DETAIL 
3.1  The focus of the roads reconstruction programme has been to recover the
network through the delivery of a mix of carriageway resurfacing schemes,
patching/surface dressing and in-situ road surface recycling, which follow the
principles set out within the Roads Asset Management Plan. 
3.2  This Council has approximately £122M of backlog maintenance (based on figures
produced by SCOTS) across the road network. This means that over £122M
would need to be invested to bring the road network up to an ‘A1’ standard. Most
councils are in a very similar position. During these challenging financial times, it
is very unlikely we will benefit from the level of investment required to bring the
road network up to an ‘A1’ condition. 
3.3  As in previous years, the proposed schemes have been selected using the
Councils Roads Asset database WDM Payment Management System (PMS)
using the information collected from the SCANNER Survey carried out in summer
months, other information mentioned above and engineering judgement. The
SCANNER surveys are carried out by a single contract for all 32 councils in Argyll
and Bute. Unfortunately, this year a small number of councils, including Argyll and
Bute, have not received a full network survey. In Argyll and Bute, the majority of
the islands have not been surveyed and this means that previous year’s data has
been used and qualified from safety inspection intelligence. Whilst this is not ideal,
Members should note that full network surveys are not carried out on an annual
basis, the frequency of surveys is detailed below: 
100% of the A Class roads are surveyed (in one direction)  
50% of the B Class roads  
25% of the C Class roads  
10% of the Unclassified road network  
3.4 The survey data will categorise roads from red to green, with red being in worst
condition and green not requiring attention. In-line with industry best practice,
investment is not necessarily concentrated on all the red roads but instead has
been aligned to focus on a combination of red and amber roads to arrest
deterioration. This effectively provides a stitch in time approach and ensures that
we get the best rate of return from the investment available. Red roads are roads
requiring attention currently, amber roads are roads which will require attention in
the not too distant future and green roads are roads which require no attention.
Page 96

Page 97

By progressing schemes which will provide the best rate of return, taking
consideration of the survey results and associated data, the Council is able to
deliver a programme of schemes which maximises the benefits to the travelling
public from the available investment. There is also a consideration applied that
reflects route classification and hierarchy together with the Road Condition Index. 
3.5  Surface dressing schemes are selected on the basis that, either the skid
resistance of the road surface is poor, or the road surface requires sealing before
it fails. Surface dressing can range from a standard binder with 6mm chippings
through to polymer modified binders with more than one layer of chippings. 
3.6  Following a presentation to Members in January 2023 and reports to
Environment, Development and Infrastructure Committee in June 2023, officers
carried out Members Business Days in October/November 2023 to enable an
opportunity for Members to bring forward priorities for consideration in the
2024/25 Capital Roads Programme. 
3.7  As in previous years, the roads reconstruction programme will be delivered by a
mixed economy model with the Councils in-house team delivering carriageway
reconstruction and patching works. The surface dressing element of the
programme will be delivered by an external contractor. This enables the maximum
surface area to be covered which will help to seal carriageway cracks, prevent the
ingress of water and reduce the amount of reactive maintenance for potholes. 
3.8  The table below details the total of the 2024/25 allocation following the 2023
February Budget meeting. The capital budget allocation for 2024/25 has been
split in line with the pre-agreed percentage formula which is based on road area
and population. There are a number of schemes being carried forward for various
reasons including ferry availability to transport materials. These have been shown
at the bottom of the area programmes and are in addition to the £8M funding for
2024-25. 
Area  Area Total 
OLI (35%)  £2,800,000
MAKI (31%) £2,480,000 
B&C (20%) £1,600,000 
H&L (14%) £1,120.000 
Total  £8,000,000 
3.9  In 2023/24 there was also a grant from the Strategic Timber Transport Scheme
(STTS) totaling £387k. This grant was significantly less than in previous years and
officers expect this to continue in the current frugal economic climate. This funding
was used to match fund existing schemes on the council network where timber
extraction was programmed to be carried out. It is officers’ intention to make
Page 97

Page 98

further bids to the STTS for 2024/25 which, if successful, will provide additional
investment for the road network. 
3.10  The capital programme presented is based on carriageway condition late
autumn/early winter. With the effect of winter this programme may need to be
adjusted to ensure that any investment takes into consideration any winter
deterioration. 
3.11  The programme for each of the administrative areas will be forwarded to Area
Committee Members and updates to Area Committees as the programme
progresses. The programme will also be available on the Council website with key
scheme status and dates. 
4.0  CONCLUSION 
4.1  This report provides details of the proposed roads reconstruction programme for
2024/25 and seeks comments from Elected Members on the draft programme. 
5.0  IMPLICATIONS 
5.1  Policy - works assessed and carried out under the current Roads Asset 
Management Plan. 
5.2  Financial - programme will be based on capital allocation for year 2024/25. 
5.3  Legal – None known. 
5.4  HR - reconstruction works delivered by a combination of in-house roads 
operations team and sub-contractors. 
5.5  Fairer Scotland Duty: None known. 
5.5.1  Equalities - protected characteristics – None known. 
5.5.2  Socio-economic Duty – None known. 
5.5.3  Islands – None known. 
5.6  Climate Change – due regard will be given to climate change with a view to 
minimising any climate change impact and these will be considered as and 
when they arise. 
5.7  Risk - completed works will reduce requirement to repair roads and will arrest 
the carriageway/footway deterioration. 
5.8  Customer Service - overall improvement in road surfaces and the quality of 
driven journeys.
Page 98

Page 99

5.9 The Rights of the Child (UNCRC) – the investment to improve our road network
will contribute to a safer environment for young people to thrive in. 
Executive Director with responsibility for Roads and Infrastructure: Kirsty Flanagan 
Policy Lead for Roads and Transportation: Councillor Andrew Kain 
February 2024  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Service
jim.smith@argyll-bute.gov.uk 
APPENDICES
Appendix 1 – OLI Proposed Roads Reconstruction Programme 2024/25  
Page 99

Page 100

APPENDIX 1 –  OBAN, LORN AND THE ISLES PROPOSED ROADS
RECONSTRUCTION PROGRAMME 2024/25 
OBAN, LORN AND THE ISLES SHARE OF £8M Budget  2,800,000.00£       
2024/25 draft schemes based on the historic % split of the current £8M budget
OBAN & LORN 55%
Scheme Location, Road number/Name Works Type Estimated Cost
C29 - Kilmelford-Drissaig   - Lochavich Overlay £           220,000.00
U17 McCaig Road - Oban Inlay £           112,804.00
C32 Glencruitten Road  Overlay £              63,000.00
U28 - Achnacloich - Connel Overlay £              25,459.50
U32 Craig Road - Dalmally Overlay £              16,973.00
U48 Shore Street - Oban Inlay £           116,582.40
U58 Lower Gylen to Little Horse Shoe Bay KERRERA Overlay £              84,865.00
U 76 Shore Road - Connel Overlay £              21,824.00
B845 - Glen Salach Overlays £              50,000.00
A819 - Accurrach (re-assessed  CLADDICH PH 3 North) Strategic Widening £           115,000.00
U22 Achavaich Road Major Maintenance £              55,000.00
U 51 Dunuran Road  - Oban Inlay £              25,000.00
U 135 Pulpit Drive -Oban Inlay £              45,000.00
U 45 High St - Oban inlay £              45,000.00
U 16 Laurel Road - Oban Inlay £              63,492.10
2024 laying operations -  North Shian - C27 Pt Appin SD 2024 £           200,000.00
2024 laying operations -  North Shian - U42 - Inverfolla SD 2024 £           160,000.00
U25 Musdale Road Pre-SD 2025 £              60,000.00
U14 Scammadale Road Pre-SD 2025 £              60,000.00
District Total 1,540,000.00£       
ISLES 45%
Scheme Location, Road number/Name Works Type Estimated Cost
B8073  Calgary area  -  Mull Overlay £           124,865.00
B8035 Gruline North - Mull Overlay 50,000.00£             
B8035 Gruline South - Mull Overlay 50,000.00£             
B8065 Tiree Overlay 200,000.00£           
U14 Grasspoint Overlay 50,000.00£             
U16 Croggan Road Overlay 64,148.50£             
B8073 Tobermory  - Dervaig Overlay 84,865.00£             
B 8073 Balligowan Overlay 124,865.00£           
B 8073 Killichronan Overlay 84,865.00£             
B 8073 Killiemore Overlay 50,000.00£             
C 54  Loch Buie Road Overlay 64,148.50£             
C 54 Lay-by improvement works Overlay 50,000.00£             
A848  Additional Passing Places - Salen - Gulan Dubh construction 99,243.00£             
U82 Leiter Road Overlay 25,000.00£             
U80 Java Road Inlay 18,000.00£             
C46 Glen Bellart / Glen Aros Pre-SD 2025 120,000.00£           
District Total 1,260,000.00£       
2023/24 schemes re-scheduled for delivery in 2024/25
Scheme Location, Road number/Name Works Type 2023/24 allocated
budget C/F
A816  Blaran widening Reconstruction £67,115
C 68 Breadalbane St Tobermory Widen / Wall / FW £249,304
Isle of Coll - B8027 Sorisdale Road ( ferry delays ) Overlay £247,294
Page 100

Page 101

ARGYLL AND BUTE COUNCIL  OBAN LORN AND THE ISLES AREA
COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
6th MARCH 2024 
HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) – ANNUAL UPDATE 
1.0 EXECUTIVE SUMMARY
1.1 The main purpose of this report is to update Members of Housing Services 
activity and progress with the Local Housing Strategy for the Oban, Lorn and
the Isles area. 
This report will detail the following housing activity:-
• Declaration of a Housing Emergency 
• Argyll and Bute Housing Summit
• Housing Need and Demand
• Homelessness
• Affordable Housing Supply - Strategic Housing Investment Programme
(SHIP)
• Empty Homes
• Private Sector Housing Grant Adaptations
• Private Sector Housing Grant Repairs and Improvements
• Energy Efficiency - Energy Efficiency Scotland: Area Based
Scheme(EES:ABS)
• Local Housing Strategy 
2.0 RECOMMENDATIONS
2.1 Members are asked to consider the content of the report. 
Page 101 Agenda Item 9

Page 102

ARGYLL AND BUTE COUNCIL  OBAN LORN AND THE ISLES AREA
COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
6th MARCH 2024 
HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) – ANNUAL UPDATE 
3.0 INTRODUCTION
3.1 The main purpose of this report is to update Members of Housing Services 
activity and the delivery of the Local Housing Strategy within the Oban, Lorn
and the Isles area. 
This report will detail the following housing activity:-
• Declaration of a Housing Emergency 
• Argyll and Bute Housing Summit 
• Housing Need and Demand
• Homelessness
• Affordable Housing Supply - Strategic Housing Investment Programme 
• Empty Homes
• Private Sector Housing Grant Adaptations
• Private Sector Housing Grant Repairs and Improvements
• Energy Efficiency – Energy Efficiency Programme: Area Based Scheme
• Local Housing Strategy 
4.0 RECOMMENDATIONS
4.1 Members are asked to consider the content of this report. 
5.0 DETAIL
5.1 As the Strategic Housing Authority for this area, the Council has a series of
important statutory housing functions to fulfil. A Housing Need and Demand
Assessment (HNDA) is carried out every 5 years which enables Scottish
Government funding to be brought into Argyll and Bute primarily to deliver
affordable housing. A comprehensive revision of the local HNDA was
approved as “robust and credible” by the Scottish Government’s Centre for
Housing Market Analysis in December 2021. The Council also produces a
Local Housing Strategy (LHS) every 5 years. The LHS 2022-27 was approved
Page 102

Page 103

by Full Council in December 2021. It is subject to annual updates, which are
published on the Housing Strategy pages of the Council website.   
The LHS has been developed in accordance with Scottish Government guidance
and local priorities as identified in the new HNDA. .This sets out the vision for
Argyll and Bute: “Everyone in Argyll & Bute has access to a suitable, high
quality home which is affordable and located within a vibrant, sustainable
and connected community.” This report will detail the housing activity taking
place in Oban, Lorn and the Isles. 
5.2 Declaration of a Housing Emergency 
In June 2023, following a report to the Environment, Development and
Infrastructure Committee, Argyll and Bute Council became the first local authority
to declare a housing emergency. A number of key statistics informed the
emergency: 
• In 2023 there were just under 3,300 people on social rented housing waiting
lists, representing an increase of 8% since the previous year. 
• The average housing price in 2022 was £206,000 which is 7 times the average
income level in Argyll and Bute.
• 11% of all homes are ineffective stock, with 6% second homes and 4% empty. 
• 42% of the property sales are made to people living out with the Argyll and
Bute area.
• There were 131 private house completions in the last 5 years representing
only 17% of the expected rate.
• Constructions costs have seen a 22% increase in 2022 with island
construction costs significantly higher. This trend is continuing currently. 
• 92% of residents responding to the Housing Emergency survey said that
housing shortage was having an impact on their community
• Of employers who responded to the workforce housing survey, 75% said a
shortage of housing was a barrier to recruiting or retaining staff 
5.3 Argyll and Bute Housing Emergency Summit 
An action within the committee report was to hold an Argyll and Bute Housing
Emergency Summit in response to the housing emergency, and this took place
on the 27th November 2023 at the SAMS campus in Oban. The purpose of the
Summit was to bring partners together to forge commitments aimed at tackling
housing shortage by maximising resources, pursuing innovation, coordinating
planning and targeting delivery capacity. 
An Action Plan is currently being developed and it is anticipated that this will be
refined and presented to members in the next few months. 
Page 103

Page 104

5.4 HOUSING NEED & DEMAND IN OBAN, LORN & THE ISLES 
HOMEArgyll WAITING LIST November 2023 – Active
Applicants   (excluding applicants with 0 points i.e. no
need)                                                                                                                       
Minimum Bedroom Size Required TOTAL
0/1beds 2beds 3beds 4+beds
Lorn 351 125 69 32 577
Mull & Iona 45 14 3 6 68
Coll & Tiree 14 4 3 1 22
OLI Totals 410 143 75 39 667 
In addition there was a registered demand from almost 315 applicants who
received nil points according to the Common Allocation Policy and therefore
would be deemed not to have a defined housing need. This included 258
applicants for Lorn; 48 for Mull & Iona; and 9 for Coll & Tiree. 
For the Oban Lorn and Isles area as a whole, the majority of applicants (62%)
require one bedroom and 21% require 2 bedrooms.11% require 3 bedrooms
and 6% need 4 bedrooms or more. 
However, to establish actual need, the available supply must be factored 
into this, based on the available lets within the RSL stock during a year. 
Applicants per available RSL Let (Pressure Ratios) 
HOMEArgyll
Applicants
RSL Lets 2022/23
(HOMEArgyll  only)
Pressure Ratio
Lorn 577 137 4:1
Mull & Iona 68 10 7:1
Coll & Tiree 22 3 7:1
OLI Totals 667 150 4:1 
While the pressure ratios are only one factor in determining need and
demand, they are useful indicators of areas where further analysis may
be required. 
The fully revised Argyll & Bute HNDA 2021 takes account of a wide range of
factors to determine existing need and future demand for new build housing,
and demographic projections have a critical role in this assessment. Although
the default population projections suggest a significant and continuous decline
across Argyll and Bute, and consequently minimal or zero requirement for new
build housing,  the council has developed ambitious Housing Supply Targets
based on an alternative, positive growth scenario for all areas. In this instance,
28% of the Argyll & Bute Housing requirement would be apportioned to Lorn;
4% to Mull & Iona; and around 1% to Coll & Tiree. Over the next 5 years this
could amount to at least 480 new builds across all tenures for the OLI area as
a whole. 
Page 104

Page 105

5.5 HOMELESSNESS 
Homeless applications across the area increased by 31% (90 up to 118) in the
Oban, Lorn and the Isles area during 2022/23. These applications included 1
homeless application for Mull & Iona and 1 for Coll & Tiree. 
During 2022/23 there were 103 homeless cases closed in the Oban, Lorn and
the Isles area. 102 of the cases were in the Oban and Lorn and 1 case was on
Mull. 
The figures below illustrate the number of homeless applications and cases
closed for the period from 2018/19 to 2022/23. 
The main reasons for presenting as Homeless last year were “disputes with
family/relationship breakdown – non-violent”, and ‘other action by landlord
resulting in the termination of tenancy’.
0
20
40
60
80
100
120
140
Applications Cases closed Applications Cases closed Applications Cased closed
Coll & Tiree Lorn Mull & Iona
Homeless Applications and Cases Closed
2018/19 - 2022/23
2018/19 2019/20 2020/21 2021/22 2022/23
Page 105

Page 106

Rough Sleeping 
The Oban, Lorn and Isles area experienced an increase in the incidence of rough
sleeping over the same period last year, with 13 cases (+6) in total across the area
reporting that they slept rough the night preceding their presentation and 17 (+4)
reporting that they had slept rough in the 3 months preceding their homeless
application. These were disaggregated as follows:- 
AREA Number of Rough Sleepers in 2021/22
Night Before Application 3 Months Prior to Application
Oban, Lorn area 13 17
Mull and Iona 0 0
Coll and Tiree 0 0
OLI Total 13 17
Argyll & Bute 26 36 
0 5 10 15 20 25 30 35 40 45 50
1. Termination of tenancy/mortgage due to rent…
10. Dispute with household/relationship breakdown: non-…
11. Fleeing non-domestic violence
12. Harassment
13. Overcrowding
14. Asked to leave
15. Other reason for leaving accommodation/household
2. Other action by landlord resulting in the termination of…
3. Applicant terminated secure accommodation
4. Loss of service/tied accommodation
5. Discharge from prison/hospital/care/other institution
7. Forced division and sale of matrimonial home
8. Other reasons for loss of accommodation
9. Dispute with household violent or abusive
Oban, Lorn and The Isles Combined Reasons for
Homelessness 2022/23
Page 106

Page 107

5.6 AFFORDABLE HOUSING SUPPLY 
This continues to be a very challenging period for the construction sector and
there is ongoing slippage in the new build programme due to disruption and
shortages with materials and staffing. The Strategic Housing Investment Plan
(SHIP) delivered 119 new affordable homes in Lorn in 2022/23. 
RSL PROJECT Units Funding
LINK Dunbeg Phase 3 119 £63,687,000
Oban, Lorn and the Isles Total 119  £63,944,362 
The Council recognises that households in the area have difficulty in affording
to buy property for principal occupation and in that regard the Council
encourages RSL’s to deliver Shared Equity properties in their developments.
The Shared Equity model enables eligible households to obtain mortgages
from as low as 60% of the value of the property with the Scottish Government
retaining the remaining equity in the property. 40 Shared Equity properties are
being delivered in Dunbeg as part of the LINK phase 3 development. 
Further sites/projects in the Oban, Lorn and the Isles area which are in early
stages of development and may be programmed in the SHIP include: 
ACHA Mull and Ulva (13 units – at feasibility stage)
LINK “Hospital Field”, Oban (50 units – 26/27)
Lonan Drive, Oban (44 units by 27/28)
Dunbeg, Phases 4,5 & 6 (349 units in total – 26/29)
Glencruitten, Oban (100 units – 26/27)
WHHA Tobermory, Mull Phase 3 (10 units – 25/26)
Port Appin (6 units – on site)
Port Appin phase 2/3 (24 units – 28/29)
Salen (8 units 27/28)
Lochawe phase 1 (16 units – 27/28)
Baliscate, Tobermory (12 units – 28/29)
Bunessan phase 2 (4 units – 28/29)
Craignure (24 units – 28/29) 
In addition to the projects in the table above the Council has secured planning
permission to deliver up to 12 houses for workers in Tobermory, Mull. This
project is part of the housing element of the Rural Growth Deal.
5.7 EMPTY HOMES
In 2022/23 there were 13 private empty homes brought back into use in OLI,
with the assistance of the Empty Homes Officer, amounting to 34% all the
empty homes brought back into use across Argyll and Bute last year (41).               
Page 107

Page 108

Council Tax Information on Empty Homes 
The following table breaks down the numbers of empty homes including those
subject to premium Council Tax charge across the OLI area.  The table does
not include properties which are empty and exempt from Council Tax. The
numbers of recorded empty homes can vary from day to day due to natural
changes and reported numbers are snapshot from November reports.   
Council Tax Exemptions
There are also a number of empty properties which are on the Council Tax
register which are exempt from paying council tax.  In OLI there are 212
properties which are empty and exempt from Council Tax. The categories for
empty properties include: 
• Class 4A = Properties recently occupied but now empty and unfurnished
(113);
• Class 7A = Dwellings Empty Under Statute – Closing or Demolition Order
(12);
• Class 1A = New Dwelling (1);
• Class 5A= Living/detained elsewhere (14); 
• Class 2A= Unoccupied-Renovation (2)
• Class 6A= Deceased owner (70) 
Second Homes 
As at 1st November 2023 there were 862 registered second homes in Oban,
Lorn and the Isles. This figure represents 28% of the total number of second
homes in Argyll and Bute (3,052).           
OLI
Council tax data as
at 01.11.23
Number of
properties on
Council Tax
register
Empty
Homes
Properties
subject to 200%
council tax levy
Total 
EMPTY
Lorn 9,048 126 116 242
Mull & Iona 1,963 28 44 72
Coll & Tiree 702 9 11 20
OLI TOTAL 11,839 163 171 334
Page 108

Page 109

Self-Catering Lets
As at March 2023 there were 985 self-catering lets on the Rates register in the
Oban, Lorn and the Isles area 42% of the Argyll and Bute total (2,341). 
5.8 PRIVATE SECTOR HOUSING GRANT – ADAPTATIONS 
In 2022/23, there were 17 individual adaptations installed across OLI with
PSHG aid. 
5.9 PRIVATE SECTOR HOUSING GRANT – REPAIRS AND IMPROVEMENTS
In 2022/23, there were a total of 26 PSHG repair and improvement grants
completed in OLI, (across Argyll and Bute, the total was 57). Total cost of the
works was £231,112 of which PSHG covered £96,486. 
5.10 ENERGY EFFICIENCY (ENERGY EFFICIENT SCOTLAND: AREA BASED
SCHEME (EES:ABS)) 
There were 158 energy efficiency measures installed across OLI in 2022/23 via
the EES:ABS programme. In total, 84 properties were improved across the Oban,
Lorn and the Isles area, at a total cost of £638,149. Grant aid in support of this
work amounted to £593,897. 
Current estimates of Fuel Poverty are based on Home Analytics data
(Scottish figure sourced from The Scottish Fuel Poverty Advisory Panel):-
Area Likelihood of Households in 
Fuel Poverty Extreme Fuel Poverty
Lorn 29% 23%
Mull and Iona 30% 25%
Coll and Tiree 30% 25%
OLI 
Rates data as at 01.03.23
Number of self-catering
properties
Lorn 543
Mull & Iona 354
Coll & Tiree 88
OLI TOTAL  985
PSHG ADAPTATION COMPLETIONS 2022 -2023
HMA Grant Value Works Value ADAPTATION INSTALLED      
Ramp Stairlift Access Bathroom
Adaptation Hoist Wash &
Dry Unit
External
Drainage
Connection
Lorn  £ 70,566.40 £ 83,340.20 0 0 1 12 1 3 0
TOTALS  £ 70,566.40   £ 83,340.20  0 0 1 12 1 3 0
Page 109

Page 110

Argyll and Bute 30% 25%
Scotland (SHCS) 34% 23% 
5.11 LOCAL HOUSING STRATEGY (LHS) 2022-2027 
As the strategic housing authority for Argyll and Bute, the Council has a
statutory duty to develop, implement and monitor a Local Housing Strategy over
a five-year planning cycle, based on a robust and credible Housing Need and
Demand Assessment (HNDA) for the area.  Following completion of the
previous Argyll and Bute LHS  (2016-2021) last year, a comprehensive revision
and update of the strategy has been approved by the council and formally
launched in March 2022. The planning process was based on a robust process
of consultation and stakeholder engagement, which has been acknowledged
as an exemplar model for other local authorities by the Scottish Government,
the CHMA, and the Scottish Housing Network LHS Forum.   
The revised HNDA was approved as “robust and credible” by the Scottish
Government’s CHMA in 2021, and this has informed the revised Housing
Supply Targets set out in the new LHS. These targets are based on a positive
demographic and economic growth scenario for Argyll & Bute and include
ambitious and challenging Housing Supply Targets for the Lorn, Mull & Iona,
and Coll & Tiree HMAs over the next 5 years and beyond. 
The Local Housing Strategy is subject to annual updates and the 2023 update
can be found in the Housing Strategy pages of the Council website
(https://www.argyll-bute.gov.uk/sites/default/files/2023LHSupdate ) 
6.0 CONCLUSION
6.1 This report provides the detail of the Council Housing Services team activity in the
Oban, Lorn and the Isles area and an overview of the progress achieved with the
Local Housing Strategy Action Plan. There are a variety of housing issues within
the area which are being tackled by Housing Services and partner agencies with
the aim of delivering a functioning housing system which meets the needs of the
communities we serve. The scale of the challenge is shown in statistical evidence
and the declaration of the Housing Emergency and the subsequent Housing
Emergency Summit has shown that many concerns are common across agencies
and communities.   
7.0 IMPLICATIONS
7.1 Policy - Complies with approved SHIP and Local Housing Strategy.
7.2 Financial - none arising from this report.
7.3  Legal - we have a statutory duty to deliver statutory housing functions.
7.4  HR – none.
7.5  Fairer Scotland Duty: positive in terms of delivering affordable housing. 
7.5.1  Equalities - protected characteristics – none.
Page 110

Page 111

7.5.2  Socio-economic Duty - positive in terms of delivering affordable
housing. 
7.5.3  Islands – positive in terms of delivering affordable housing on the
islands
7.6. Climate Change – the strategy and housing service deliver positive impacts for
energy efficiency and climate change.
7.7 Risk – none.
7.8  Customer Service – none.
7.9 The Rights of the Child (UNCRC) – the housing activity described in the report
will deliver affordable housing for families with children 
Kirsty Flanagan
Executive Director with the responsibility for Development and Economic
Growth 
Councillor Robin Currie 
Policy Lead for Strategic Development 
January 2024 
For further information contact: 
Douglas Whyte
Team Lead – Housing Strategy 
E-mail: douglas.whyte@argyll-bute.gov.uk
Tel: 01546 604 785 
APPENDICES  
Appendix 1 – Extract from LHS 2022 - 2027 (data as of 2021) Lorn
Appendix 2 – Extract from LHS 2022 - 2027 (data as of 2021) Mull & Iona
Appendix 3 – Extract from LHS 2022 - 2027 (data as of 2021) Coll & Tiree  
Page 111

Page 112

Appendix 1 - Extract from LHS 2022 - 2027 (data as of 2021) Lorn 
LORN HMA is centred on Oban and includes a number of the small, inner isles such as
Easdale, Luing and Lismore. Despite the influence of in-migration, it is the most self-contained
housing market in Argyll & Bute with 64% of house sales going to local residents. There was
limited interaction with neighbouring HMAs in the local authority (3%) but over 17% of demand
is from the rest of Scotland and over 13% from the UK. Overseas house purchasers have only
marginal impact in this area, at just over 1% of sales. Average house prices are comparatively
high and affordability remains an issue, with a high price-to-income ratio of 6.7 (lower quartile). 
There has been significant development activity in recent years, and the total dwelling stock
increased by 8% between 2015 and 2020, with significant new builds in development or in the
pipeline, particularly at Dunbeg. Lorn has 18% of the total housing stock in Argyll and Bute.
However, 8% of the stock comprises second/holiday homes and long-term vacant properties.
With 1,649 RSL homes in 2020 the area also has the highest provision of social rented stock
– over 19% of the authority total. Nevertheless, this area still has the largest waiting list in
Argyll and Bute by far, as well as one of the higher levels of homelessness (30% and 18%
respectively of the authority totals). In addition HNDA analysis suggests that this area has the
second greatest level of backlog need (21% of total backlog need). 
Population                                     
Households                                   
Dwellings                                       
Ineffective Stock (%)  
RSL Stock  
Waiting List Applicants  
RSL Lets (2019/20) 
Pressure Ratio  
Lower Quartile House Price 
Lower Quartile Income  
LQ Affordability Ratio 
16,053
7,648
8,604
8%
1,649
737
139
5:1
£120,000
£17,892
6.7 
Lorn
Key issues for Lorn HMA: 
Increasing the supply of affordable housing remains a critical priority for this HMA.
The provision of Housing Options advice and information; and targeted Tenancy Support
also remains important.
Fuel poverty is an issue and improving energy efficiency will be important too.
Ensuring that sufficient specialist provision (accommodation, adaptations, support
services etc.) is available to meet the requirements of the ageing population and those
with particular needs will also be key to a well-balanced, effective housing system.
Page 112

Page 113

Appendix 2 – Extract from LHS 2022 - 2027 (data as of 2021) Mull & Iona 
MULL AND IONA are combined for planning purposes as one HMA. As a housing market
area, these islands exhibit the lowest level of self-containment in the authority area apart from
Coll & Tiree, with less than 45% of house sales going to local purchasers. Around 16% of
properties are bought by persons from elsewhere in Scotland; and over a third of all sales
(34%) are to purchasers originating elsewhere in the UK, by far the highest proportion of any
HMA in Argyll and Bute. Interaction with the rest of the authority is minimal with only 1.4% of
sales originating in another local HMA. Mull & Iona have among the highest house prices in
Argyll & Bute, well above the average for the authority as a whole and 3 times higher than
Bute for example; and along with Islay, Jura & Colonsay; and Coll & Tiree, this is one of the
least affordable housing markets for local residents. This area has seen less than 1% rate of
growth in total stock, between 2015 to 2020; despite a range of RSL and community-led
projects being proposed and progressed in recent years. This still amounts to only 4% of the
total dwellings in Argyll & Bute. There is also a high proportion of ineffective stock here, with
second/holiday homes and long-term vacant properties making up 15% of the total (albeit this
is significantly lower than the last census recorded).  The social rented sector totalled 236
homes in 2020, less than 3% of the sector total for Argyll & Bute as a whole and around 13%
of the total housing stock on the two islands. There are around 6 applicants for every available
let in the area, one of the higher pressure ratios in the authority. 
Population                                     
Households                                   
Dwellings                                       
Ineffective Stock (%)  
RSL Stock  
Waiting List Applicants  
RSL Lets (2019/20) 
Pressure Ratio  
Lower Quartile House Price 
Lower Quartile Income  
LQ Affordability Ratio   
3,054
1,524
1,851
15%
236
113
20
6:1
£129,375
£18,189
7.1 
Mull & Iona
Key issues for Mull & Iona HMA: 
A small-scale targeted programme of affordable new build housing will help to sustain
remote island communities.
Tackling fuel poverty and improving energy efficiency remain key targets; and ensuring
sufficient specialist provision is available to meet the requirements of those with particular
needs will also be important.
Page 113

Page 114

Appendix 3 – Extract from LHS 2022 - 2027 (data as of 2021) Coll & Tiree 
Coll & Tiree constitute the smallest HMA in the authority, and are most affected by house
purchasers from out with the area – less than 20% of sales are to local residents, with almost
half of purchasers originating elsewhere in Scotland and a further quarter from elsewhere in
the UK. More house buyers originate from overseas (5.6%) than from the rest of Argyll & Bute
itself (1.4%). Average house prices have been among the highest in Argyll & Bute (albeit the
number of sales are very small)   and this area has been one of the least affordable to local
households with the highest price–to-income  affordability ratio of 7.7.  Since 2015, the total
number of dwellings on the islands increased by almost 8% while the number of households
increased by around 12%. Proportionately, this HMA has the highest level of ineffective stock
in Argyll & Bute, by far, with almost a third being second/holiday homes or long-term vacant
properties.  In 2020 there were 54 social rented homes, which amounts only 0.6% of the total
RSL sector in the authority. Demand for RSL properties is numerically low but given the limited
turnover in existing stock the pressure ratio remains high at 6:1 (i.e. 6 applicants per available
let). 
Population                                     
Households                                   
Dwellings                                       
Ineffective Stock (%)  
RSL Stock  
Waiting List Applicants  
RSL Lets (2019/20) 
Pressure Ratio  
Lower Quartile House Price 
Lower Quartile Income  
LQ Affordability Ratio   
753
452
680
32%
54
19
3
6:1
£128,750
£16,644
7.7 
Coll & Tiree
Key issues for Coll & Tiree HMA: 
There is evidence of unmet need on these islands and minimal new build in recent years.
Small-scale development of affordable housing for social rent could help to address the
demand. 
The requirement for some form of specialist provision, particularly on Tiree, remains a
potential gap which could be addressed by joint working between Housing and the Health &
Social Care Partnership.
Fuel poverty and energy efficiency also remain priorities for this area.
Page 114

Page 115

ARGYLL AND BUTE COUNCIL  Oban Lorn and the Isles
DEVELOPMENT AND ECONOMIC
GROWTH 
06 March 2024 
2023/24 Active Travel Progress Report 
1.0 EXECUTIVE SUMMARY 
1.1. This report provides an update to Members on the progress made in 2023/24 in
relation to active travel projects in the Oban Lorn and the Isles (OLI) Area,
informs Members of the significant changes in Scottish Government active travel
funding and seeks continued support for the projects and wider active travel
measures from Members. 
1.2. Active travel encompasses accessible, everyday Walking, Mobility Assistance
and child prams (sometime collectively termed “Wheeling”) and Cycling.  The
focus of active travel is on accessible provision including those with mobility
impairments. 
1.3. The Council’s Active Travel Team, 1.7 Full Time Equivalent employees, is part of
the Strategic Transport Team within the Development and Economic Growth
Service.  No Council funding is currently received by the Active Travel Team. All
project costs, including internal staff costs, have to be funded via successfully
securing highly competitive external challenge funds. 
1.4. The Active Travel Team work with communities, internal and external
stakeholders across Argyll and Bute to develop and deliver active travel projects
which provide new/improved accessible infrastructure (e.g. paths, cycle lanes)
and behaviour change (e.g. access to bikes, walking/cycle training, promotional
activities). 
1.5. In 2023/24 to date, the Active Travel Team secured £2.56M external funding for
the development and delivery of a total of 22 projects across Argyll and Bute. 
These include Argyll and Bute wide projects, valued at £95,000 in 23/24, and
projects specific to the OLI area, with a 23/24 value of £130,000. 
1.6. The Active Travel Team work to source and secure highly competitive funding
from a range of sources, the main of which are Transport Scotland’s Places for
Everyone (PFE) Programme (administered by Sustrans), the Scottish
Government’s Cycling, Walking and Safer Routes (CWSR) fund and Delivery
Resource Fund, Paths for All Smarter Choices Smarter Places (SCSP)
programme, Transport Scotland’s Active Travel Transformation Fund (ATTF),
Page 115 Agenda Item 10

Page 116

and HITRANS Regional Active Travel Fund.  Further funding has been secured
for some projects via local community organisations and from willing
businesses.  It is recognised at a national level that the Active Travel Team in
Argyll and Bute Council secure significantly more funding, and subsequently
deliver more projects, than similar staffed teams in other Local Authorities and/or
local authorities with similar populations. 
1.7. Transport Scotland have informed Officers that, as of 24/25, the funding model
for active travel will change.  The primary change will be the reallocation of the
significant funding currently disbursed via third-sector organisations (such as
Sustrans or Paths for All) and, to a lesser extent Transport Scotland (e.g.
CWSR), to individual Local Authority block grants and a single Transport
Scotland controlled Active Travel Infrastructure Fund (ATIF).  This will be
undertaken incrementally over a 2 year transition period. 
1.8. Transitional arrangements for infrastructure design and construction are
understood by Officers to be:
• 24/25 a proportion of the Scottish Government’s active travel funding will be
allocated to Local Authority block grants with the remainder remaining as
challenge funding, in particular in the PFE Programme (administered by
Sustrans) and Transport Scotland’s ATIF fund.  Transport Scotland have
stated that failure to expend the block grant allocation on appropriate active
travel projects will negatively affect the Council’s opportunity to secure
additional funding from the ATIF.  The Scottish Government’s budget
commits a total of £220M to active travel in 24/25.
• 25/26, those Local Authorities which chose (in 24/25) to expend the full
amount of active travel funding in their block grant on appropriate active
travel projects will receive an increase in their block grant allowance for
active travel, with a smaller percentage of the overall funding being available
via challenge funds following the closure of the PFE programme (forecast for
December 2025). The Scottish Government has set an objective of
committing 10% of the 25/26 transport budget to active travel, estimated to
be c.£320M.
• 26/27 onwards the challenge funding available will be solely focused on
assisting Local Authorities with the cost of delivering very highly ambitious
active travel projects, as active travel infrastructure funding for smaller
projects will be included within block grants of those Local Authorities which
have chosen in 24/25 and 25/26 to dedicate it to active travel. 
1.9. Transitional arrangement for behaviour change is understood by Officers to be
the transfer of the majority of the Scottish Government’s behaviour change
funding in 24/25 onwards from third sector organisations to the Regional
Transport Partnerships (RTPs).  This will enable the development and delivery
of behaviour change programmes/activities which are tailored to the specific
requirements of each RTP area.  A small element of the Scottish Government’s
behaviour change funding will be retained to continue campaigns/cycle training
Page 116

Page 117

programmes which are deemed to be most effective when delivered at a
national scale. 
1.10. Separately, Officers are working to develop an Active Travel Strategy (ATS) for
Argyll and Bute which will set out the policy and strategic context for the
development and delivery of active travel across the whole of Argyll and Bute. 
Subsequent to this, an Active Travel Delivery Plan (ATDP) will be developed
which will identify the specific projects to be developed in order to achieve the
ambition set in the ATS. 
1.11. Active Travel can offer significant benefits to the area:
• Access to essential services and employment: In OLI 21% of households
(1,873 households) do not have access to a motor vehicle and are reliant on
public transport and active travel modes.
• Health benefits: being more active reduces the risk of premature morbidity
and death, particularly from diseases related to inactivity.
• Economics: People who travel to shops by walking and/or cycling have a
higher monthly spend than people who travel to shops by private car.
• Improving safety: reduces injuries from car collisions. 
1.12. A number of active travel projects link to schools, offering the opportunity to
increase the numbers of pupils, parents and staff choosing to walk, cycle or
wheel to school.  While the main benefits are improved physical and mental
health, where new active travel infrastructure creates a safe route to school
where one did not previously exist it could reduce the requirement to provide
school transport on safety grounds, thereby creating a revenue saving to the
school transport budget. 
RECOMMENDATIONS 
1.13. It is recommended that the Oban Lorn and the Isles members: 
1.13.1. Welcome the progress made to date across a significant number of
active travel projects by the small Active Travel Team. 
1.13.2. Support the continuation of the projects and the submission of future
funding applications to external challenge funds (while these still exist)
to continue to develop design and construction stages in order to
deliver these projects. 
1.13.3. Support the allocation of the active travel funding element in the
Council’s 24/25 block grant to the development and delivery of
appropriate active travel projects, including those already underway in
OLI. 
Page 117

Page 118

1.13.4. Instruct Officers to continue to identify and develop new active travel
projects to benefit local residents, businesses and communities. 
Page 118

Page 119

ARGYLL AND BUTE COUNCIL  Oban Lorn and the Isles
DEVELOPMENT AND ECONOMIC
GROWTH 
06 March 2024 
2023/24 Active Travel Progress Report 
2.0 INTRODUCTION 
2.1. This report provides an update to Members on the progress made in 2023/24 in
relation to active travel projects in the OLI Area and seeks continued support for
the projects from Members. 
2.2. Active travel encompasses accessible, everyday Walking, Mobility Assistance
and child prams (sometime collectively termed “Wheeling”) and Cycling.  The
focus of active travel is on accessible provision including those with mobility
impairments. 
3.0 RECOMMENDATIONS 
3.1. It is recommended that the Oban Lorn and the Isles members: 
3.1.1. Welcome the progress made to date across a significant number of
active travel projects by the small Active Travel Team. 
3.1.2. Support the continuation of the projects and the submission of future
funding applications to external challenge funds (while these still exist)
to continue to develop design and construction stages in order to
deliver these projects. 
3.1.3. Support the allocation of the active travel funding element in the
Council’s 24/25 block grant to the development and delivery of
appropriate active travel projects, including those already underway in
OLI. 
3.1.4. Instruct Officers to continue to identify and develop new active travel
projects to benefit local residents, businesses and communities. 
4.0 DETAIL 
4.1. The Council’s Active Travel Team, 1.7 FTE (Full Time Equivalent employees), is
part of the Strategic Transport Team within the Development and Economic
Growth Service.  No Council funding is currently received by the Active Travel
Page 119

Page 120

Team. All project costs, including internal staff costs, have to be funded via
successfully securing highly competitive external challenge funds. 
4.2. It is recognised at a national level that the Active Travel Team in Argyll and Bute
Council secure significantly more funding, and subsequently deliver more
projects, than similar staffed teams in other Local Authorities and/or local
authorities with similar populations. 
4.3. The Active Travel Team work with communities, internal and external
stakeholders across Argyll and Bute to develop and deliver active travel projects
which provide new/improved accessible infrastructure (e.g. paths, cycle lanes)
and behaviour change (e.g. access to bikes, walking/cycle training, promotional
activities). 
4.4. In 2023/24 to date, the Active Travel Team secured £2.56M external funding for
the development and delivery of a total of 22 projects across Argyll and Bute,
including Argyll and Bute wide projects, valued at £95,000 in 23/24 and projects
specific to the OLI area, with a 23/24 value of £130,000.  Further details of these
projects is presented in Appendix 1. 
Future Funding Model 
4.5. Transport Scotland informed Officers on 23 January 2024 that, as of 24/25, the
funding model for active travel will change.  At the time of writing, Transport
Scotland have stated that they are unable to confirm the value of specific
funding streams for 24/25 as these are still subject to agreement with COSLA.  It
is understood the primary change will be the reallocation of the significant
funding currently disbursed via third-sector organisations (such as Sustrans or
Paths for All) and, to a lesser extent Transport Scotland (e.g. CWSR) to
individual Local Authority block grants and a single Transport Scotland
challenge fund, the Active Travel Infrastructure Fund (ATIF).  This will be
undertaken incrementally over a 2 year transition period. 
4.6. Provisional transitional arrangements for infrastructure design and construction
are understood by Officers to be:
• 24/25 the allocation of a proportion of the Scottish Government’s active travel
funding to Local Authority block grants with the remainder remaining as
challenge funding, in particular in the PFE Programme (administered by
Sustrans) and Transport Scotland’s ATIF.  The split of allocation the funding
is understood to still be in negation between Transport Scotland and COSLA
with Transport Scotland expecting to confirm values in early 24/25. 
Transport Scotland have also stated that failure to expend the block grant
allocation on appropriate active travel work will negatively affect the Council’s
opportunity to secure additional funding from the ATIF.
• 25/26, those Local Authorities which chose (in 24/25) to expend the full
amount of active travel funding in their block grant on appropriate active
Page 120

Page 121

travel projects will receive an increase in their block grant allowance for
active travel, with a smaller percentage of the overall funding being available
via challenge funds including the closure of the PFE programme (forecast for
December 2025).
• From 26/27 onwards the challenge funding available (e.g. ATIF) will be
solely focused on assisting Local Authorities with the cost of delivering very
highly ambitious active travel projects, as the active travel infrastructure
funding for smaller projects will be included within the block grants of those
Local Authorities which chose to dedicate it to active travel in 24/25 and
25/26. 
4.7. Behaviour change funding will be transferred from third sector organisations to
the Regional Transport Partnerships (RTPs) in 24/25 onwards.  This will enable
the development and delivery of behaviour change programmes/activities which
are tailored to the specific requirements of each RTP area.  A small element of
the Scottish Government’s behaviour change funding will be retained to continue
campaigns/programmes which are deemed to be most effective when delivered
at a national scale.  Officers have started to engage with our RTPs (HITRANS
and SPT) in order to understand and influence the future plans for the delivery of
behaviour change projects. 
Current (2023/24) Funding Model 
4.8. The Active Travel Team work to source and secure highly competitive funding
from a range of sources, the main of which are Transport Scotland’s Places for
Everyone (PFE) Programme (administered by Sustrans), the Scottish
Government’s Cycling, Walking and Safer Routes (CWSR) fund and Delivery
Resource Fund, Paths for All Smarter Choices Smarter Places (SCSP)
programme, Transport Scotland’s Active Travel Transformation Fund (ATTF),
and HITRANS Regional Active Travel Fund.  Further funding has been secured
for some projects via local community organisations and from willing
businesses.  It is recognised at a national level that the Active Travel Team in
Argyll and Bute Council secure significantly more funding, and subsequently
delivery more projects, than similar staffed teams in other Local Authorities
and/or local authorities with similar populations. 
4.9. The primary external funding route for active travel infrastructure design is
Transport Scotland’s Places for Everyone (PFE) programme (which Sustrans
are paid to administer).  The PFE Programme is a competitive challenge fund
structured around 8 project stages; with the 32 local authorities, 7 regional
transport partnerships, two national parks and numerous community groups
across Scotland competing against each other to secure the funding each
project requires.  In 23/24, the Active Travel Team secured £1.7M from the PFE
Programme.  It has been announced that the PFE Programme will by wound
down with a final closure date of December 2025. 
Page 121

Page 122

4.10. A minimum of three new competitive funding submissions are required to
complete a project using PFE funding, with competitive applications required, as
a minimum, prior to Stage 0 (Strategic Definition), Stage 3 (Developed Design)
and Stage 5 (Construction).  The full project stages are (0) Strategic Definition,
(1) Preparation and Brief, (2) Concept Design), (3) Developed Design, (4)
Technical Design, (5) Construction, (6) Handover & Close Out and (7) In Use. 
4.11. The Scottish Government Cycling, Walking and Safer Routes (CWSR) fund is
an annual ring-fenced fund which provides the opportunity for Local Authorities
to identify and deliver lower value active travel infrastructure without the level of
complexity and time required by the PFE route.  In 23/24, the Active Travel
Team secured £551,000 from the CWSR fund.  It is understood by Officers that
the CWSR fund will terminate in March 2024. 
4.12. The Smarter Choices Smarter Places (SCSP) programme is run by Paths for All
and provides funding for behaviour change projects.  Behaviour change projects
are designed to influence behaviour and choice, rather than provide new
infrastructure.  In 23/24, the Active Travel Team secured £80,000 from the
SCSP programme.  It has been announced that the SCSP programme will
terminate in March 2024.   
4.13. Transport Scotland’s Active Travel Transformation Fund (ATTF) was launched
in 23/24 and focuses on supporting Local Authorities, RTPs and National Parks
with the additional cost of constructing very ambitious, high-quality active travel
projects.  Projects must be fully construction ready prior to submission to the
ATTF.  Officers submitted two applications to the 23/24 ATTF, including for the
Bowmore – Bridgend Path on Islay, but, while these were shortlisted on the
reserve list, were unsuccessful in securing funding in 23/24.  The application
deadline for 24/25 projects to ATTF is late January 2024 and, at the time of
writing, Officers are developing submissions including resubmitting the Bowmore
– Bridgend Path project. 
4.14. HITRANS Regional Active Travel Fund has previously supported a number of
projects in OLI, including £450,000 towards Phase 1 of the Ralston Road
Cycleway project in Campbeltown (completed summer 2023).  As HITRANS
have a relatively small budget compared to the geographical area covered and
require to support five local authorities, Argyll and Bute’s 23/24 allocation was
substantially lower than in previous years at £25,000. 
Benefits of Active Travel 
4.15. 21% of households (1,873 households) in the OLI area do not have access to
any motor vehicles (2011 census) and are therefore reliant on public transport
and active travel methods to move around. 
Page 122

Page 123

4.16. Transport poverty is defined as households and individuals who spend a
significant percentage of their income to make the journeys they need (UK
Government, 2019).  In OLI, where a higher than Scottish average of the
population have low incomes (SIMD, 2020), the cost of travel is a significant
barrier to a substantial number of the community.  This is highlighted by the
higher than Scottish average number of households have multiple cars but
shorter than Scottish average journey distances to work/study (2011 census),
indicating that a significant number of households own multiple cars to travel
short distances.  Walking, wheeling (mobility aids/child prams) and cycling are
much cheaper than running a car or using public transport, and improving
opportunities to choose to walk/cycle for essential journeys can improve access
to essential services, reduce social exclusion and increase opportunities to
access education and employment. 
4.17. Health benefits of enabling individuals and communities to choose to travel more
actively are well documented and a significant body of research has identified
that having active, healthy lifestyles helps to reduce fragility and reduce falls as
individuals age, and increase social inclusion and accessibility.  In particular,
being more active reduces the risk of premature morbidity and death,
particularly from diseases related to inactivity including cardiovascular
disease, coronary heart disease, stroke, dementia, type 2 diabetes, hip
fractures and cancer.  Active travel also has significant mental health benefits
including increasing social inclusion and reducing depression. This means
those who choose to be more active are less likely to require social care
services in later life which could result in a future saving to the Council or
HSCP (DfT, 2014; CIHT, 2016; Centre for Mental Health, 2016; Scottish
Government, 2018; Dunoon Shaping Places for Wellbeing, 2022; World Health
Organisation, 2022; Public Health Scotland, 2022; Public Health Scotland,
2023). 
4.18. Economics: People who travel to shops actively by walking and/or cycling, while
they spend less per individual visit, make more visits a month and have a higher
monthly spend than people who travel to shops by private car (Pedestrian
Pound, 2018).  Improving public realm and routes to shops for pedestrians and
cyclists can increase trade by up to 40% (Pedestrian Pound, 2018).   
4.19. Improving safety through good design, in particular to protect more vulnerable
individuals, pedestrians and cyclists, reduces injuries from car collisions (Public
Health Scotland, 2022).  Where people choose to travel actively to make a
journey instead of using a private car, this reduces the number of car
movements which makes streets cleaner, improves air quality, reduces traffic
congestion and reduces demand for space to park in key hotspots. 
4.20. A number of the active travel projects link to schools, thereby offering the
opportunity to increase the numbers of pupils, parents and staff choosing to
walk, cycle or wheel to school.  While the main benefits are improved physical
Page 123

Page 124

and mental health, such provision may also generate a saving on school
transport provision.  Argyll and Bute Council provide free school transport to
some pupils on safety grounds.  This is where pupils live less than the legislative
minimum distance from school to qualify for free school transport provision, but
where there is no safe active travel route to school.  Where new active travel
infrastructure creates a safe route to school where one did not previously exist it
could reduce the requirement to provide school transport on safety grounds,
thereby creating a revenue saving. 
Design guidance 
4.21. It is understood that adherence to the latest design criteria for active travel (e.g.
Cycle by Design for cycle projects) will continue to be a requirement.  However,
the removal of national third-sector organisations from control of the main active
travel funding steams should enable Officers to apply the guidance in a more
flexible and specific manner to local circumstances.  Utilising adopted design
guidance provides a clear framework for development of designs which are
appropriate, accessible, attractive and safe. 
Active Travel Strategy (ATS) 
4.22. Separately, Officers are working to develop an Active Travel Strategy (ATS) for
Argyll and Bute which will set out the policy and strategic context for the
development and delivery of active travel across the whole of Argyll and Bute. 
Subsequent to this, an Active Travel Delivery Plan (ATDP) will be developed
which will identify the specific projects to be developed in order to achieve the
ambition set in the ATS. 
5.0 CONCLUSION 
5.1. Significant changes to the funding model in 2024/25 and 2025/26 will create
opportunities for active travel projects to focus on local priorities, rather than
projects which meet the aspirations and objectives of national organisations. 
However, continued delivery of new and improved active travel opportunities to
the residents, businesses, communities and visitors in the OLI area will require
Members to commit the additional active travel funding allocation in the 24/25
Council Block Grant to the development and delivery of active travel projects. 
6.0 IMPLICATIONS 
6.1. Policy Completion of this project will support the Council’s
SOA outcomes 2: We have infrastructure that supports
sustainable growth and 5: People live active, healthier
and independent lives. The project also supports
achievement of the Scottish Government’s objectives
set out in the Cycling Action Plan for Scotland (CAPS)
Page 124

Page 125

and Let’s Get Scotland Walking - The National
Walking Strategy.
6.2. Financial The change in approach to the provision of active
travel funding by the Scottish Government from
external challenge funding to including it within the
Council’s block grant will require Members to decide to
allocate the funding to develop and deliver active
travel projects.
Improved active travel provision could reduce the
requirement to provide school transport on safety
grounds, thereby creating a revenue saving.
There is strong evidence that people who are more
active, for example by walking or cycling, have better
physical and mental health and are less likely to
require social care services in later life which could
result in a future saving to the Council or HSCP.
6.3. Legal Continued input will be required from Legal Services to
support any land acquisition required for the creation
of active travel routes.
6.4. HR None.
6.5. Fairer Scotland
Duty: 
6.5.1 Equalities Provision of new and improved active travel
infrastructure and behaviour change options will
provide enhanced opportunities for residents and
visitors to choose to travel more sustainably and
actively by walking, wheeling and cycling.
All new active travel routes are designed to be
accessible and DDA compliant to provide a safe and
accessible route for those with mobility aids including
wheelchairs and parents/guardians with a child’s pram
or buggy.
6.5.2 Socio-
economic Duty
New and improved active travel routes will improve
access to essential services, retail, leisure and
employment opportunities for local residents, with
studies demonstrating those who travelled actively had
a higher monthly spend in local businesses than those
who travel via motorised transport.
The routes will also offer opportunities for individuals
to travel for leisure, again encouraging spend in local
businesses connected by the routes.
6.5.3 Islands A number of the active travel projects are based on
islands, thereby providing the same opportunities for
island residents/visitors to choose to travel actively as
those on the mainland.  Where visitors choose to
travel actively in leu of taking a motor vehicle this can
Page 125

Page 126

help reduce demand for the overstretched vehicle
capacity on the ferry services.
6.6. Climate Change  Active Travel is the least carbon intensive mode of
travel.  Providing the opportunity for residents and
visitors to consider an alternative to having to use a
private car to travel will help lower Argyll and Bute’s
carbon footprint.
6.7. Risk There is a reputational risk to the Council if the
projects are not completed within a reasonable
timeframe.
6.8. Customer
Services  
None.
6.9 The Rights of the     Active travel is the most accessible mode of travel to 
Child              young people, as it does not have any minimum age 
limits, does not require any form of licence, is free to 
use and is not tied to any fixed timetable. All new active 
travel infrastructure is designed to be utilised by an 
unaccompanied 12 year old. Engagement with school 
pupils indicates that the vast majority of pupils strongly 
support the provision of new active travel infrastructure,                                               
even where it would adversely impact other modes of 
transport           
Executive Director with the responsibility for Development and Economic
Growth: Kirsty Flanagan 
Policy Lead: Cllr Andrew Kain 
05 January 2024 
For further information contact:  Colin Young    
Strategic Transportation Delivery Officer    
colin.young@argyll-bute.gov.uk    
01546 604275 
Appendix 1: 2024/25 Active Travel Projects  
Page 126

Page 127

Appendix 1: 2024/25 Projects 
1.1. Active Travel Promotional Campaign
Creation of a new sustainable travel (walking, wheeling, cycling and public
transport) promotional brand “Better Journeys” and develop a promotional
campaign to raise awareness of opportunities to travel actively and
sustainably across Argyll and Bute.  External funding has been retained within
the Council by working with the Council’s Communications Team to develop
the brand, campaign materials including posters and social media clips and
prepare to launch the campaign in spring 2024. 
1.2. Smart phone app promotion
Promotional campaign to raise awareness and use of the five existing active
travel smartphone apps (Campbeltown, Dunoon, Helensburgh, Oban and
Rothesay).  The first year of the campaign in summer 2023 increased
downloads of the free to access apps by 74%. 
1.3. Pedestrian and Cycle Counters
Argyll and Bute Council operate a network of automated pedestrian and cycle
counters with 36 installed across the Council area. The data from these
counters is used to monitor changes in pedestrian/cycle numbers, including from
new routes, and by partners to support compilation of national statistics. The
data is also publicly available via a dedicated website. 
1.4. Bikes back to the community
The Bikes back to the Community bike recycling scheme is delivered in
partnership with local community group, ACT Now. While the Bikes back to
the Community scheme has focused on Mid-Argyll, it has supported a number
of Oban based pupils to access a free bicycle to enable them to learn to cycle.
The bicycles provided are safe and suitable, and follow up support from ACT
Now staff and volunteers is available to ensure the bicycle is fully utilised. The
project returned 65 bikes to the community in 2022/23 and is forecast to
exceed this in 2023/24. 
1.5. Oban Town Centre North Project
This project seeks to identify real and perceived barriers to walking, wheeling
and cycling in a key area of Oban town centre that lies to the north of where
the previous CHORD improvement works were carried out, and develop
proposals that will address these barriers, and facilitate active travel as the
most attractive and viable mode choice for everyday journeys in the town.  
The project focusses on George St and the Esplanade between North Pier
and the Corran Halls, while also undertaking a strategic review to identify
opportunities for wider active travel links throughout Oban with the aim of
making walking, wheeling and cycling the preferred mode choice in Oban
Town Centre, thereby increasing access to shops, leisure and essential
services while retaining private car access for those who require it.
The project will deliver strategies and interventions that reduce the impact of
Page 127

Page 128

the A85 in the study area by identifying opportunities, through traffic surveys
and robust business analysis of travel patters to create proposals that
optimise traffic flow and have the potential to reduce local car journeys and
non-essential travel through the study area.  It will also safeguard Oban’s
strategic transport facilities and high street business operations through
engagement with local businesses and the identification of intervention to
support increase footfall in the town centre whilst ensuring access to Oban
ferry Terminal. 
Page 128

Page 129

ARGYLL AND BUTE COUNCIL  OBAN, LORN AND THE ISLES
COMMITTEE 
COMMUNITY PLANNING AND
COMMUNITY DEVELOPMENT 
6th March 2024 
SUPPORTING COMMUNITIES FUND  - Monitoring of Projects Funded 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to provide monitoring information on the funding
given to community projects from the council’s Supporting Communities Fund. 
1.2 11 constituted, not-for-profit, community organisations were awarded funding by
the Area Committee in 2022/23.  Organisations are required to spend their
funding within 18 months and submit an End of Project Monitoring Report
outlining the project’s projected costs, actual costs and beneficiaries. 
1.3 Members are asked to consider the contents of the report showing a summary
of the information supplied by organisations in their End of Project Monitoring
Reports. 
1.4 Members are asked to note the return of unspent funds and that these and that
these are made available in future allocations of the Supporting Communities
Fund in OLI. 
Page 129 Agenda Item 11

Page 130

ARGYLL AND BUTE COUNCIL  OBAN, LORN AND THE ISLES AREA
COMMITTEE 
COMMUNITY PLANNING AND
COMMUNITY DEVELOPMENT 
6th March 2024 
SUPPORTING COMMUNITIES FUND - Monitoring of Projects Funded 
2.0 INTRODUCTION 
2.1 This report highlights the positive outcomes for communities in Oban,
Lorn and the Isles through the allocation of the Council’s Supporting
Communities Fund in 2022/23. 
2.2 A total of £24,030.29 was awarded to 11 organisations in 2022/23.
Organisations have 18 months to spend the funds, and up to two
months from the end of the project, to complete and return a project
monitoring report.   
2.3 A total of £2,617.50 total has been identified as unspent funds and
returned. This can be included in the distribution of the SCF in OLI for
2024/25. 
3.0 RECOMMENDATIONS 
It is recommended that the Area Committee: 
3.1      Note and consider the positive contribution of the Supporting
Communities Fund detailed in section 4 and the attached table. 
3.2 Note that a total of £2,617.50 in total has been returned, and agree that
this be included in the distribution of the SCF for 2024/25. 
.
4.0 DETAIL   
4.1 The funded projects supported approximately 20,311 people to
participate in a variety of activities including outdoors, sports, music and
projects positively impacting mental health. Highlights include:
• Argyll Wellbeing Hub – delivering a series of peer support sessions,
Page 130

Page 131

walking trips and events to support and develop LGBTQ+ awareness
and celebration for mental health and well-being for marginalised
communities following the pandemic.
• The Ardchattan Centre – delivered 2 intergenerational projects for a
series of history & heritage, and arts & culture workshops which were
delivered to a wide range of participants with the aim of countering the
isolation and fragmentation brought about by the pandemic.
• Mull & Iona Community Trust – ran a series of guided walks, outdoor
events, drop in events and beach cleans, developing a volunteer after
school programme and a holiday club.   
4.2 The attached table summarises information received from individual
projects. 
4.3 10 grant recipients have submitted an End of Project Monitoring
Report. 
4.4 Note that a total of £2,617.50 in total has been returned; £2,617.50 to
be included in the distribution of the SCF for 2024/25. The return of
funds is a combination of projects under budget or funds unable to be
spent.   
Page 131

Page 132

2022/23 SCF Round of Funding
No Organisation Project Funded Award End of Project Achievements
No. of people in
communities
benefitting 
1 Argyll & Bute Befrienders 57 sessions of therapeutic
and personal development
activities for young people,
covering fees for the activity
and workshop providers and
entry fees for sporting and
cultural activities
£604.00 We met the aims of the project in that we provided opportunities
for disadvantaged children and young people to experience a
range of recreational and therapeutic activities with the support of
their befriender.  The main activities undertaken were various
sports including climbing, swimming, cycling and minigolf, arts and
crafts activities such as pottery painting and felting and several of
our young people benefited from horse-riding in small groups to
build their confidence and help them learn to regulate their
emotions.  
19 (A&B wide )
2 Argyll Wellbeing Hub 24 sessions for Oban Pride
peer support meetings,
inclusion in scheduled
mental health training
sessions with refreshments,
inclusion in scheduled
weekly walking trips and two
community events at the
Hub, including the Oban
Pride event in September
2022, followed by LGBT
history month in Feburary
2023
£2,500.00 We are delighted that with the support of this grant and the
partnership working and additional support we were able to
provide to Oban Pride their capacity has grown. Oban Pride 2023
was their biggest event yet and spanned over 3 days. 
The Supporting Communities Fund and Argyll Wellbeing Hub have
played a small part in this, and we are delighted to have played
that part to help the local LGBTQ+ community develop and grow
following the negative impact on it from covid. Argyll Wellbeing
Hub works to fight stigma and discrimination every day for our
marginalised mental health community, and we are delighted to
have been able to support another community facing similar
disadvantages to ours to develop and flourish.
16,320
3 Aros Park Historic Walled
Garden
purchase of tools for
volunteers to contribute to
the repair of the stone wall
surrounding the garden,
supporting rural skills
training which will provide
dry stone wall instruction for
50 volunteers.
£2,500.00 Project not delivered – funds to be returned  
Page 132

Page 133

2022/23 SCF Round of Funding
4 Comunn Gàidhealach an
Òbain (Oban Mod
Academy)
tutors for Gaelic
conversation and Gaelic
singing, professional tuition
and towards official MOD
music and song downloads.
£1,764.20 The Mod Academy children competed in several provincial mods
and the royal national Mod in Paisley winning several 1st , 2nd and
3rd prizes. A primary child who won a 1st prize in a big
competition, when being televised said to the reporter, “I just can’t
wait until I get to the high school so that I can take Gaelic as a
subject”. They were all very encouraged to receive excellent
adjudications
40
5 Down’s Syndrome
Scotland ( Oban and Area
Positive Futures)
venue hire for 20 meetings
for 11 families.  Makaton
Training, Sensory and
educational play equipment
and outings 
£2,500.00 Offered Makaton training to all parents - huge uptake and ongoing
further training by the parents and children. ( and now pressure on
local schools to start using and learning it- much better inclusion.
Also valuable for their peers in school to have some Makaton
abilities.
We now have a good support network between the families, and
are continuing to strive to support each other. also offering
support to new families with a child with Down Syndrome, and
hopefully to some of the older adults living in the area.
45
6 Mull and Iona Community
Trust
Community ranger to work
with volunteers on path
repairs, visitor liaison and
management, a series of
community events, develop
a volunteer programme and
after school/holiday club
£2,500.00 We have run a series of guided walks and outdoor events for
specialist groups and general member of the community.(22
events).
We also held drop in sessions at both out wildlife hides on the
island being there for about 2 hours at a time sharing what them
what was to be seen from the hide and general chatter about Mull
particularly wildlife and walking opportunities. (5 events)
We have run conservation work parties for volunteers at various
sites around the island  including Calgary Bay, Tiroran Community
Forest, Bunessan Community Garden and Ardura Community
Forest, and beach cleans at several popular beach locations  and
also beaches that seem to be a magnet for rubbish.
1706
7 Oban Communities Trust
- The Rockfield Centre -
Dye Garden
54 artist sessions and the
development of a space by
volunteers for a dye garden
of plants harvested and used
in artworks.  Purchase of
seeds, compost, pots and
£2,493.90 The workshops included a 2 day natural dyeing course, for local participants to learn the process of how to use the continue to
benefit from it and pass on their new found knowledge. As part of this we offered funded places to SAMS design students. We
also held a botanical printing workshop and Tatakizome workshop (Japanese hammering method textiles). 
As part of 'Earth Month' at The Rockfield Centre: a themed programme of activity around April 22nd (Earth Day) every day,
with examples of the colours produced from our garden on display. Our lead practitioner and current volunteers techniques,
while attracting new volunteers, including those under 30. We also have a permanent display in the centre for people to view. 
264
Page 133

Page 134

2022/23 SCF Round of Funding
path surface for horticultural
activities
8 Oban Communities Trust
- The Rockfield Centre -
LEGO & Construction Club
Oban 
hall hire for 18 months,
purchase of Lego kits and
other toy kits and storage
bags
£2,412.00 The Lego Club was able to start back up after Covid and to grow it’s
numbers back up to those that it had before. The funding meant
that equipment that was getting worn down was replaced so that
both new attendees and regulars came back time again.
I have had parents tell me that the Lego Club is the only out of
school activity that their child wants to attend, that it is the activity
they always look forward to coming along to and that they feel the
environment is comfortable and welcoming.
600
9 Oban FM Community
Radio Ltd
broadcasting equipment and
specialist software, tutor
fees to train volunteers on
the equipment, volunteer
expenses and a project
worker to develop and
conduct a community survey
report
£1,764.19 Yes our project was completed and we did manage to
complete our move and construct our new studio. 
10 Oban Youth Café group activities for 5 groups
of 8 young people to have 10
free of charge creative or
outdoor sessions, planned
and coordinated by youth
workers
£2,500.00 Because all our sessions are free, it means no one is left because of
cost. That impact is massive, especially as some of our young
people are coming from low-income families.
Our projects also give our young people a chance to make new
friends, some of our young people live very remotely and don’t get
to see friends out of school. Positive social contact helps with good
mental health.
Most sessions, our young people are learning new skills and in
doing so, it boosts their self-esteem.
With our Soundsystem project, some of our young people were
very shy about performing but with encouragement from the
others, managed to perform in front of parents at a show they put
on.
With the Oban Pride sessions, having the space to talk through
LGBTQ+ issues helped with their confidence.
47
Page 134

Page 135

2022/23 SCF Round of Funding
11 The Ardchattan Centre costs of two
intergenerational family
projects: transport and
venue hire for 16 History &
Heritage workshops and 16
Arts & Culture 16 workshops 
£2,492.00 We believe so, our aim was to counter the isolation and
community-fragmentation brought by Covid (and the closure of
our school a few years previously), by engaging all age in a wide
range of activities that encouraged intergenerational and family
participation around  two strands: the rich History &  Heritage of
the area and a creative and focus on Arts & Culture. Running from
June 2022 to September 2023 (16 months) we delivered a schedule
of 69 events/activities which brought a wide range pf people into
contact with each other, and to make good use of our facilities.
1,270
Page 135

Page 136

5.0 CONCLUSION 
5.1 The project monitoring form has a section asking for comments on the
grant process.  Not all applicants have completed this section but of
those received, the comments have largely been very positive.   
6.0 IMPLICATIONS 
6.1 Policy: None 
6.2 Financial:  The report sets out the expenditure of Oban, Lorn and the
Isles 2022/23 allocation of Supporting Communities Fund 
6.3 Legal: None 
6.4 HR: None 
6.5 Fairer Scotland Duty/Equalities/Islands: Compliant with policy and noting
that 2 of the funded projects were on islands                           
6.6 Climate Change: None             
6.7 Risk: None 
6.8  Customer Service: None 
6.9 The Rights of the Child (UNCRC): None 
Chief Executive – Pippa Milne
Policy Lead - Cllr Alistair Redman
Communities and Partnership Manager – Rona Gold
31/01/2024                                                  
For further information contact: Engagement and Communities Lead Suzanne
Mason on 01436 658933 / suzanne.mason@argyll-bute.gov.uk. 
Page 136

Page 137

Area Plans Update
COMMUNITY PLANNING GROUP/ AREA
COMMITTEE
FQ4 2023/24
Stuart Green
Chief Executives Unit
Argyll and Bute Council
Page 137
Agenda Item
12

Page 138

#abplace2b
Area Plans – What, Why and How?
What?
 Creating area-based plans for all our communities,
reflecting investment opportunities and local service
prioritisation.
Why?
 Increase rate of external investment by improving how we
align with growing number of external funding streams (e.g.
government).
How?
 Through consensus, forward plan investment opportunities
that improve outcomes.
Page 138

Page 139

#abplace2b
Area Plans – Mandate
 Council Agreed Priorities – November 2022
 Corporate Plan 2023 - 2027;
 Agreed by Policy and Resources Committee – October
2023
 Number of locality plans.
 Purpose & Principles
 Approach
 Resourcing and timescales
 In addition; agreed to reflect any relevant outcomes from the
Community Planning Partnership Community Wealth Building
Review relevant to the Council in the approach to producing
area plans.
Page 139

Page 140

#abplace2b
No of
Locality
Plans
8 Areas
Page 140

Page 141

#abplace2b
Area Plans – Purpose & Principles
Purpose
 Capture community vision and aspirations for each area.
 Reflect investment opportunities
 Identify local projects.
Principles
1. The plans will be orientated towards maximising external funding.
2. The plans do not guarantee the provision of funding towards any of
the projects contained therein.
3. The plans will seek to promote proposals that are aligned with the
Council’s strategic plans and priorities. 
4. All projects delivered by the Council will be prioritised and
developed using our adopted project methodologies and
processes. 
Page 141

Page 142

#abplace2b
What is in scope?
 Projects – planned and proposed by CPP Partners and
community groups.
 Community wealth building opportunities.
 Housing; needs, demands and opportunities.
 High level summary on socio economic data.
Collating this information provides a baseline narrative and
narrative.
Page 142

Page 143

#abplace2b
Community engagement
 Important to get right.
 Sense of consultation fatigue (anecdotal).
 Scottish Government Islands Consultation
 Community Led Action Plans/ Charrettes
 ABOIP
 More to come.
 Community Planning Group Area Plans
 Local Development Plans – Local Place Plans
 Need to coordinate engagement with our communities.
Page 143

Page 144

#abplace2b
Efficient use of resources.
Area Plans
Community
Wealth
Building
CPG Area
Plans
 Clear synergies to develop in
tandem with;
 Community Planning Group
Area Plans.
 Community Wealth Building.
 Careful consideration given to;
 Efficient and optimal use of
resources.
 Co-ordinated consultation.
Page 144

Page 145

#abplace2b
Area plans - Approach
Stages Activity
1 Collation of information and data e.g. Scottish Government island
consultation data, data from ABOIP place standard consultations, existing
community led plans etc.
2 Engage community councils, development trusts and community groups
initially to test our findings and identify gaps and update maps and plans.
3 Wider public consultation on draft vision and maps and plans.
4 Publish analysis on feedback from engagement on draft vision and maps
and plans.
5 Submit vision and maps and plans to Members for consideration.
Page 145

Page 146

#abplace2b
Governance
and Flow of
Information Page 146

Page 147

#abplace2b
Phasing
 A phased but over-lapping approach is being taken to developing
the Area Plans which will allow a) most effective use of resources and
b) an iterative approach to learning from the process and identifying
optimum methodologies. The phasing will be as follows;
 Phase 1; two localities – one island(s) locality and one mainland locality.
 Phase 2; three localities – one island(s) locality, two mainland localities.
 Phase 3; three localities – one island(s) locality, two mainland localities.
 Each phase will run for 12 months from start to finish.
 Phases 2 and 3 will commence 3 months after the previous phase
starts. 
 The 3 phases will almost run concurrently with the total programme
scheduled to last 18 months (and not 36 months if run sequentially)
April 2024 to September 2025. 
 This is designed to expedite the process in the quickest time possible in
relation to the available resource. 
Page 147

Page 148

#abplace2b
How we will use the information?
 Area Plans should be viewed as a partnership document.
 Opportunity to capture all investments and aspirations for all to support
development of visions for each area.
 May support strategic partners in developing future investment decisions
and/or demonstrate community support.
 Plans will inform future opportunity for external funding.
 Effectively a ‘snap shot’ in time and does not prevent future
opportunities.
 The plans do not guarantee the provision of funding towards any of
the projects included but;
 Should provide clarity on opportunities, prioritisation, and improve
matching and opportunities with external funding (which is
significant).
Page 148

Page 149

#abplace2b
Your help please.
1. Identify all community groups in your area.
2. Identify all locations in your area suitable for individuals to see
and comment on draft proposals.  (This is to ensure individuals
that cannot or choose not to access plans digitally are not
excluded from the consultation process).  
3. Encourage Community Councils, Development Trusts and
Community Groups to participate in the process.
Page 149

Page 150

This page is intentionally left blank

Page 151

CHARITABLE TRUSTS, BEQUESTS AND TRUST FUNDS – DISTRIBUTION
ARRANGEMENTS 
1.0 EXECUTIVE SUMMARY 
1.1 The Oban Lorn and the Isles Area Committee are Trustees for a number of
Charitable Trusts, Bequests and Trust Funds. Officers continually seek to simplify
and update processes where possible to ensure ongoing compliance with the
original terms of the bequests and to reduce the administrative burden of the
management and distribution. However, there remains a number of challenges, a
number of the funds were established many years ago, and as a consequence of
changes in society over time the intended beneficiaries of the bequests are no
longer easily identified. 
1.2 This paper invites the Trustees of the MacKinnon Ledigham Bequest, Archibald
Dow Bequest, Coals for the Poor Oban and Kilmore and Kilbride Bequest to
consider distribution arrangements for each of these funds. 
2.0 RECOMMENDATIONS
2.1  The Oban Lorn and the Isles Area Committee are asked to:
1. agree the proposals for distribution arrangements for the MacKinnon
Ledigham Bequest, Archibald Dow Bequest and Coals for the Poor Oban,
outlined within this report, 
2. agree that a review of the updated distribution arrangements for the
aforementioned funds be undertaken and reported to the Area
Committee following the first 12 months of operation; and 
3. agree that the unrestricted funds held within the Kilmore and Kilbride
Bequest be made available, in their totality, immediately and that a
moratorium be placed on this fund thereafter. 
ARGYLL AND BUTE COUNCIL OBAN LORN & THE ISLES AREA
COMMITTEE 
LEGAL & REGULATORY SUPPORT 6 March 2024 
Page 151 Agenda Item 13a

Page 152

CHARITABLE TRUSTS, BEQUESTS AND TRUST FUNDS – DISTRIBUTION
ARRANGEMENT 
3.0  INTRODUCTION
3.1 The Oban Lorn and the Isles Area Committee are Trustees of a number of
Charitable Trusts, Bequests and Trust Funds.  This report invites Trustees to
consider distribution arrangements for 4 of these funds.
4.0  RECOMMENDATIONS
4.1 The Oban Lorn and the Isles Area Committee are asked to:
1. agree the proposals for distribution arrangements for the MacKinnon
Ledigham Bequest, Archibald Dow Bequest and Coals for the Poor Oban,
outlined within this report, 
2. agree that a review of the updated distribution arrangements for the
aforementioned funds be undertaken and reported to the Area
Committee following the first 12 months of operation; and 
3. agree that the unrestricted funds held within the Kilmore and Kilbride
Bequest be made available, in their totality, immediately and that a
moratorium be placed on this fund thereafter 
5.0  BACKGROUND 
5.1 Due to the restrictive nature of some funds, specifically the MacKinnon Ledigham
Bequest, Archibald Dow Bequest, Coals for the Poor Oban and Kilmore and
Kilbride Bequest, difficulties had been faced in establishing suitable distribution
arrangements. Consequently, Officers from Legal and Regulatory Support had
been in dialogue with both The Scottish Charity Regulator (OSCR) and Lord
Advocates Office in an attempt to establish appropriate methods of distributing
these funds, specifically using provisions within the Law Reform (Miscellaneous
Provisions)(Scotland ) Act 1990 and The Public Trusts (Reorganisation)
(Scotland) (No.2) Regulations to transfer the resources to charities and trusts that
are better placed to meet the terms of each of the funds. 
ARGYLL AND BUTE COUNCIL OBAN LORN & THE ISLES AREA
COMMITTEE 
LEGAL & REGULATORY SUPPORT 6 March 2024
Page 152

Page 153

5.2 Largely as a consequence of the lack of associated documentation of the funds,
despite making all reasonable enquiries, very little progress had been made in this
regard. Consequently officers are of the opinion that progress can only now be
made by preparing bespoke, council administered, distribution models for the
aforementioned funds. These arrangements have drawn upon existing models of
distribution, which have been working well in other localities, thereby ensuring
maximum community benefit. 
6.0 ARCHIBALD DOW BEQUEST 
6.1 The Archibald Dow Bequest was established to benefit the poor of Taynuilt. At
the time of the original bequest the benefactors would have been clear about
who the intended beneficiaries would be.  This is however, rather more difficult
to quantify today, and it may be useful for trustees to refer to appendix 1, which
offers some guidance and definitions of poverty which can be broader than
simply a lack of funds. 
6.2 For the avoidance of doubt only those resident in Taynuilt, specifically those
residents with the following postcodes are eligible to access this fund. 
PA351AG PA351HP PA351HR PA351HT
PA351HU PA351HW PA351HY PA351HZ
PA351JA PA351JB PA351JD PA351JE
PA351JF PA351JG PA351JH PA351JJ
PA351JL PA351JN PA351JP PA351JQ
PA351JR PA351JS PA351JT PA351JU
PA351JW PA351JX PA351JY PA351JZ
PA351LA PA351YD   
6.3 On the basis that Trustees wish to manage the resources of the Fund, Trustees
should establish eligibility criteria that must be met before applications will be
considered. 
6.4 Care needs to be taken by the Trustees to ensure that the Fund is not
unintentionally depleted by broad acceptance criteria. It is proposed that
applying ‘is in receipt of means tested benefits’ as the eligibility criteria would be
likely to have the effect of increasing both the number of applications and the
overall burden on the Fund and therefore more detailed specification is
proposed. 
6.5 The Scottish Welfare Fund which was established to assist individuals and
families on a ‘low income’ use the following indicators: 
• In receipt of a qualifying benefit (Jobseekers Allowance, Employment
Support Allowance, Income Support or Universal Credit) 
• For those people who are employed/self-employed, they must be in
receipt of some amount of Universal Credit as well (a nil payment due
to deductions for earned income would mean they do not qualify). 
Page 153

Page 154

6.6 It is proposed that the same eligibility criteria be applied to those seeking an
award from the Bequest. This would ensure that the Fund is only accessible by
those individuals and families on a low income. However, the application form
will ask for specific details as to why they are facing financial hardship at the
time of submitting the application, adding a further layer of assurance that the
terms are being fulfilled.
6.7 It is further proposed that in order to be considered eligible applicants must be
over the age of 16. 
6.8 It is proposed that awards are set at £50 for individuals and £100 for families. It
is also recommended that applicants receive a maximum of a single award
each calendar year.
6.9 As of 30/03/2023 the balance of the Archibald Dow Bequest stands at £2,049 
which comprises of £751 restricted funds and £1298 unrestricted. 
6.10 It should be noted that the level of interest gained by the Fund is low. It is
recommended that there should be no limit to the amount which can be
awarded in each calendar year providing that it does not exceed the amount
available in the unrestricted funds. This would be reviewed annually and
reported to the Area Committee.
7.0 MACKINNON LEDIGHAM BEQUEST
7.1  The Mackinnon Ledigham Bequest was established to offer relief of aged
persons in the Ross of Mull. 
7.2 It is proposed that those that are of state pension age and live within the Ross
of Mull be eligible to access this fund. i.e. those individuals that are 66 years of
and above. Please note that from 6 May 2026, the state pension age will start
increasing and will reach 67 by 6 March 2028 (affecting anyone born between 6
April 1960 and 5 April 1977). 
7.3 For the avoidance of doubt those that live within the area bounded by the north
by Loch Scridain and to the south by the Firth of Lorne, specifically those within 
Bunessan, Fionnphort, Ardtun, Camas, Carsaig, Knockan, Pennyghael and
Uisn, Knocknafenaig, Suidhe and Shiana would be eligible to access this fund. 
7.4 It is further proposed that £50 be awarded for each successful application. It is
also recommended that applicants receive a maximum of one award each
calendar year. 
7.5  As of 30/03/2023 the balance of Bequest stands at £6197 which comprises of
£2000 restricted funds and £4197 non-restricted.  
8.0 COALS FOR THE POOR OBAN 
8.1  The Coals for the Poor Oban was established following a collection by Oban
Town Council. As of 30/03/2023 the balance of the fund stands at £3378 which
comprises of £1334 restricted and £2044 non-restricted funds.
Page 154

Page 155

8.2 Given the similar nature of the this Bequest and the Archibald Dow Bequest and
to ensure a consistency in approach it is suggested that the criteria for the
Coals for the Poor Oban be the same as the Archibald Dow Bequest,
specifically applications would only be welcomed by those on a qualifying
benefit or for those people who are employed/self-employed, they must be in
receipt of some amount of Universal Credit. Applicants must be over the age of
16 with awards set at £50 for individuals and £100 for families and limited to
one award each calendar year.
8.3  To ensure that the terms of the Bequest are fulfilled applicants would also be
asked to confirm that any award made would be used specifically for the
purposes of purchasing coal. 
8.3  It is suggested that only those that are resident in the Burgh of Oban would be
eligible to access this fund, which follows the criteria established for the John of
Lorn Bequest, which has proven to be successful since its introduction in
September 2020.
9.0 KILMORE & KILBRIDE BEQUEST
9.1  The Kilmore and Kilbride Bequest was established to meet the expenses in
keeping the Kilbride Burial Ground in order.
9.2  This fund had been identified for possible transference to an external partner to
deliver. However, this approach has proven not to be possible and therefore it is
suggested that the unrestricted funds reserves (i.e. monies the fund has available
to spend without drawing on capital or restricted reserves) be made available, in
their totality, immediately to Roads and Infrastructure. Payment would only be
made once it is confirmed that the cemetery is being maintained. The capital will
remain as this cannot be distributed. This approach will essentially place a
moratorium on the distribution of monies from this fund. 
9.3  This approach will lessen the administrative burden, ensuring maximum
community benefit. This approach mirrors that of the James McKechnies Fund
(For upkeep of family headstones and lairs in Pennyfir Cemetery) and the Miss
Mary A McNivens Trust (For the maintenance of her two family lairs in Tiree burial
ground) which the Area Committee are also Trustees for.
10.0 CONCLUSION
10.1 This report has outlined the current position in terms of financial and distribution
arrangements of funds held in trust by the Area Committees. On approving the
recommendations they will provide a clear community benefit while meeting our
obligation of ensuring transparent and effective governance.
10.2 Each of the funds have been inactive for a number of years, this report seeks to
address this and ensure that it provides a clear community benefit while
meeting our obligation of ensuring transparent and effective governance.
11.0 IMPLICATIONS
Page 155

Page 156

11.1  Policy - Consideration of the questions raised will ensure that the intentions of the
original bequests are honoured. 
11.2  Financial - None, the Council acts as trustee for the Funds, it does not represent
assets of the Council. However, there is a risk that the Council would have to
repay each fund if an objection was raised as to the award/use of funds. 
11.3  Legal - Area Committees, as Trustees, must ensure that the distribution
arrangements comply with the terms of each fund, failure to do so would result in
the Council being liable. 
11.4  HR - To proceed with reorganisation, in terms of section 10 or 11 of the Law
Reform (Miscellaneous Provisions) (Scotland) Act 1990 would require the
allocation of Officer time. 
11.5  Fairer Scotland Duty - None 
11.5.1  Equalities – protected characteristics – None 
11.5.2  Socio-Economic Duty – None 
11.5.3  Islands – None 
11.6  Climate Change – None 
11.7  Risk – Recent changes to the benefit system, and low interest rates may result in
an oversubscription. If there was an objection raised as to the use of any of the
funds in a particular way, there is a risk that the Council could have to pay the
costs themselves and repay the Trust the costs. The level of risk is considered to
be acceptable. 
11.8  Customer Service – None 
11.9 The Rights of the Child (UNCRC) – None 
Douglas Hendry
Executive Director with responsibility for Legal & Regulatory Support 
January 2024 
Policy Lead - Councillor Alastair Redman
For further information contact: Stuart McLean, Committee Manager, 01436 658717,
stuart.mclean@argyll-bute.gov.uk
Appendices      
Appendix 1 – Definitions of Poverty        
Page 156

Page 157

APPENDIX 1: Definitions of Poverty 
"There are basically three current definitions of poverty in common usage: absolute
poverty, relative poverty and social exclusion. 
Absolute poverty is defined as the lack of sufficient resources with which to keep
body and soul together. Relative poverty defines income or resources in relation to
the average. It is concerned with the absence of the material needs to participate
fully in accepted daily life. 
Social exclusion is a new term used by the Government. The Prime Minister
described social exclusion as "…a shorthand label for what can happen when
individuals or areas suffer from a combination of linked problems such as
unemployment, poor skills, low incomes, poor housing, high crime environments,
bad health and family breakdown"." 
The House of Commons Scottish Affairs Committee 
The Definition of Poverty
The usual definition of relative low income are households whose
equivalised income before housing costs is below 60% of the median (
i.e. midpoint) income in the U.K. in the same year.
Income is the income from all sources for all members of the household but after
deductions for income tax, National Insurance contributions, council tax, pension
contributions and maintenance payments.
Equivalisation allows for differences in the size and composition of households, and
recognises that a family of several people requires a higher income than a single
person in order for both households to have a similar standard of living. 
It is assumed that all individuals in the household benefit equally from the combined
equivalised income of the household.
For a couple with no children the U.K. median income before housing costs in 2006-
07 was £377 per week. The relative low income level was therefore £226 per week.
The Experience of Rural Poverty in Scotland (Scottish Government 2009) 
From the definitions above, it is clear that the worst cases of absolute poverty should
never occur in Oban, and the trustees will consequently be more likely to be concerned
with applicants experiencing gradations of “relative poverty” i.e. using equivalency to
the income levels determined above. 
Using the figures above as a guide, in general, those on mean tested benefits such as
jobseekers allowance (£146 per fortnight for a single person) will be likely to fall within
the definition of relative poverty. 
Page 157

Page 158

This page is intentionally left blank

Page 159

ARGYLL AND BUTE COUNCIL  OBAN, LORN AND THE ISLES AREA
COMMITTEE 
LEGAL & REGULATORY SUPPORT 6 March 2024 XX MARCH 2021 
JOHN OF LORN BEQUEST AWARD RECOMMENDATIONS 
1.0 APPLICATIONS 
1.1 This report gives Members information regarding a number of applications that
have been received and processed for support from the John of Lorn Bequest. 
2.0 RECOMMENDATIONS 
2.1 The Oban, Lorn and the Isles Area Committee are asked to consider the
number of awards made since December 2023. 
3.0 DETAIL 
3.1 The Oban, Lorn and the Isles Area Committee on 09 September 2020 agreed
new distribution arrangements for the John of Lorn Bequest, which had been
established to support ‘poor persons resident in the Burgh of Oban’. In order to
be considered for an award applicants must: 
3.1.1 be in receipt of a qualifying benefit (Jobseekers Allowance, Employment
Support Allowance, Income Support, or Universal Credit) and for those
people who are employed/self-employed, they must be in receipt of
some amount of Universal Credit as well (a nil payment due to
deductions for earned income would mean they do not qualify); 
3.1.2 live within the Burgh of Oban; and 
3.1.3 be over the age of 16. 
3.2 Furthermore, it was agreed that successful individual applicants would receive
£50 while those applying on behalf of their family would receive £100. 
3.3 The Area Committee on 14 September 2022 agreed to delegate to the Executive
Director with responsibility for Legal and Regulatory Support or officers nominated
by him, in consultation with the Chair, the authority to make awards from the John
of Lorn Bequest using the criteria agreed in September 2020 and that reports be
submitted to subsequent Area Committees to update trustees on awards made
under this delegation. 
3.4 Prior to this delegation those in need of support could wait up to 14 weeks for
payment. Applications are now processed on receipt with payments made once
applicants submit their banking details. 
Page 159 Agenda Item 13b

Page 160

3.5 A total of 3 applications have been received since the December 2023 meeting of
the Area Committee. Officers, in consultation with the Chair have confirmed
awards for a family and one individual application, with a total of £150 being
awarded to individuals living within the Burgh. 
3.6 A single application has been refused. Applications will only be refused if the
applicant has either received a grant this calendar year or they live out with the
Burgh of Oban. Details of each application can be found at appendix 1. 
3.7 The total funds available for distribution from the John of Lorn Bequest at the time
of preparing this report is around £5.2k. 
4.0 CONCLUSION 
4.1 Members are asked to consider the applications that have received support from
the John of Lorn Bequest. 
5.0 IMPLICATIONS 
5.1 Policy None 
5.2 Financial None, the Council acts as trustee for the Fund, it
does not represent assets of the Council.
However, there is a risk that the Council would
have to repay the Trust if an objection was raised
as to the use of the funds.
5.3 Legal Area Committees, as Trustees, must ensure that
the distribution arrangements comply with the
terms of the funds, failure to do so would result in
the Council being liable. 
5.4 HR None
5.5 Fairer Scotland Duty None
5.5.1 Equalities –protected
characteristics
None
5.5.2 Socio-economic Duty None
5.5.3 Islands None
5.6 Climate change None
5.7 Risk None
5.8 Customer Service None
5.9 The Rights of the Child  
(UNCRC)
None 
Douglas Hendry - Executive Director with responsibility for Legal and
Regulatory Support 
Policy Lead – Councillor Alastair Redman 
February 2024                                                  
For further information contact: 
Page 160

Page 161

Stuart McLean, Committee Manager
Tel. No: 01436 658717
Email: Stuart.Mclean@argyll-bute.gov.uk 
APPENDICES: 
Appendix 1: Table of applications (private) 
Page 161

Page 162

This page is intentionally left blank

Page 163

Document is Restricted
Page 163 Agenda Item 13cNOT FOR PUBLICATION by virtue of paragraph(s) 6
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 164

This page is intentionally left blank

Page 165

ARGYLL AND BUTE COUNCIL                 OLI AREA COMMITTEE
COMMERCIAL SERVICES                6th MARCH 2024 
COMMUNITY SPORTS HUB, OBAN LORNE RUGBY FOOTBALL CLUB, GLENCRUITTEN
DRIVE, OBAN 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to update the Area Committee on the significant
progress in negotiations with Oban Lorn Rugby Football Club (OLRFC) following
the reports to DMT of 10th May 2023, ELT of 23rd May 2023 and DMT of 6th
November 2023 setting out their Expression of Interest in extending their current
lease and substantially redeveloping the clubhouse building and adjoining sports
grounds for both club and community use. 
1.2 OLRFC’s current 30 year lease expires on 28th February 2025, with a rent of £1
reflecting the nature of the ground and use. Heads of Terms have now been
agreed in principle for a new 50 year lease with a Purchase Option after 10 years,
if certain development and funding milestones have been achieved.  It is
envisaged that between £3.65M and £4.28M will be invested in new facilities for
the benefit of the community. 
1.3 The new lease provides for a market value rent to the Council based on a
percentage of the redeveloped Clubhouse trading profits and a multiplier
mechanism to calculate the market value purchase price, should the Purchase
Option be triggered.  The Council retains an Option to terminate the lease if
development targets have not been met. 
1.4  RECOMMENDATIONS 
That the Area Committee: 
1.4.1  Notes the significant investment planned by OLRFC in improving this
asset for the community along with the potential income and capital
receipt to the Council provisionally agreed in Heads of Terms to enable
OLRFC’s formal funding process to begin and the project to move
forward. 
1.4.2 Notes that the project is of a significant scale and if the Club meet all
their obligations, it is intended that this will result in the sale of a large
area of recreational ground to the Club, reducing the Council’s control
of the area. 
Page 165 Agenda Item 14

Page 166

ARGYLL AND BUTE COUNCIL                 OLI AREA COMMITTEE
COMMERCIAL SERVICES                                                                                  6th MARCH 2024   
COMMUNITY SPORTS HUB, OBAN LORNE RUGBY FOOTBALL CLUB, GLENCRUITTEN
DRIVE, OBAN 
2.0 INTRODUCTION 
2.1 The purpose of this report is to update the Area Committee on the significant
progress in negotiations with Oban Lorn Rugby Football Club (OLRFC) following
the reports to DMT of 10th May 2023, ELT of 23rd May 2023 and DMT of 6th
November 2023 setting out their Expression of Interest in extending their current
lease and substantially redeveloping the clubhouse building and adjoining sports
grounds for both club and community use. 
2.2 OLRFC’s current 30 year lease expires on 28th February 2025, with a rent of £1
reflecting the nature of the ground and use. Heads of Terms have now been agreed
in principle for a new 50 year lease with a Purchase Option after 10 years if certain
development and funding milestones have been achieved. It is envisaged that
between £3.65M and £4.28M will be invested in new facilities for the benefit of the
community. 
2.3 The new lease provides for a market value rent to the Council based on a
percentage of the redeveloped Clubhouse trading profits and a multiplier
mechanism to calculate the market value purchase price, should the Purchase
Option be triggered.  The Council retains an option to terminate the lease if
development targets have not been met. 
3.0 RECOMMENDATIONS
3.1 That the Area Committee:
3.1.1  Notes the significant investment planned by OLRFC in improving this
asset for the community along with the potential income and capital
receipt to the Council provisionally agreed in Heads of Terms to enable
OLRFC’s formal funding process to begin and the project to move
forward.
3.1.2 Notes that the project is of a significant scale and if the Club meet all their
obligations, it is intended that this will result in the sale of a large area of
recreational ground to the Club, reducing the Council’s control of the area. 
Page 166

Page 167

4.0 BACKGROUND 
4.1 Since 1995 OLRFC have leased ground from the Council extending to 0.237 acres
(Appendix 1 plan) upon which they constructed a clubhouse building with
associated car parking, adjacent to two Council owned grass rugby pitches. This
lease expires in February 2025. 
4.2 OLRFC have highlighted a number of serious shortcomings with the facilities which
are hampering the full participation of the community, including poor drainage and
lighting of the pitches, the absence of covered spectating areas and the lack of
disabled access to the clubhouse. The applicant seeks a new lease over an
enlarged site extending to approximately 6.6 acres which includes the pitches
(Appendix 2 plan) to allow them to secure funding for significant improvement
works. OLRFC’s proposed Works are estimated at £3.65M to £4.28M and are
detailed as to Phasing in the Heads of Terms (The redeveloped site will be known
as Oban Lorne Rugby Community Sports Hub. 
4.3 Phase 1 of the works covers the first 10 years and centres on the clubhouse and
upper pitch, obliging OLRFC to extend the clubhouse with disabled access and
parking and to build a new spectator stand with fencing and floodlights. During that
initial 10 years, and defined as Phase 2 of their works, the Club will also procure
funding and all necessary consents for a running track and wind turbines along with
flood management investigations and reports in respect of the bottom pitch. Phase
3 of the works relate principally to the bottom pitch and are dependent on the precise
extent of the available site. The bottom pitch boundary is close to the Oban
Development Road exclusion zone (Appendix 3) and the Heads have been drafted
to provide contingency for current exclusions remaining, or a future release of some
protected space, which would allow the bottom pitch to be more easily redeveloped
to SRU minimum size standards. Phase 3 envisages flood management works and
a new 4G bottom pitch along with storage units and a solar power system. The
availability of a functional bottom pitch would also allow the top pitch to be
temporarily taken out of service for the introduction of an undersoil heating and
drainage system. Further phases beyond the scope of this lease envisage the club
engaging with shinty interests in the town to improve nearby facilities for that sport. 
4.4 Per the Council Planning Department’s pre-application response to OLRFC’s
proposals the property is currently designated an Open Space Protection Area for
sports and recreation facilities in the Development Plan, a constraint on
alternative uses. It is deemed to be a community asset held in perpetuity with
very limited commercial value.   
4.5 Notwithstanding that limited commercial value, the Heads of Terms provide for a
market value rent to the Council of the redeveloped clubhouse’s trading profits
and a multiplier to calculate the market value purchase price, should the Purchase
Option be triggered. Mindful that the sale of a Council asset would be irrevocable,
the terms also provide an Option for the Council to terminate the lease after 10
years if the Tenant’s Phase 1 works to provide the planned investment in facilities
for the benefit of the community has not been completed. 
4.6 The potential sale of the land is not without risks in that the Council would lose
control over it, with the potential for restrictions on users, conflict with other clubs
or issues with maintenance. Where possible the Council will look to draft the
Page 167

Page 168

Agreement to mitigate these risks. 
4.7 It should be noted that through the community asset transfer process, OLRFC
have a right to request to buy the asset and the Council would require to have
supportable reasons if it was to refuse. Refusal of an asset transfer here would
be very difficult to justify given the level of investment envisaged. Dealing with
this request through the informal expression of interest (EOI) process has allowed
this project to be explored openly in a partnership approach. Consequently, it has
been agreed that in line with the current lease the Tenant will operate a booking
and hiring system whereby the improved facilities will be made reasonably
available to outside parties, protecting wider community interests. All existing
public rights of access abutting or through the site will also be maintained at all
times under the new lease. The Heads of Terms also include for the retention of
Amenity Services grass cutting and line-marking via a service charge. 
4.8 OLRFC have engaged architects who have held pre-planning discussions with the
Council. Their outline proposals have been positively received and visual images
can be accessed via the following link: Oban and Lorne Rugby Club 
4.9 OLRFC are aware of the Mossfield Group’s general aspirations to improve their
nearby facilities. OLRFC submit that their own proposals are significantly more
advanced and they would be happy to mentor the Mossfield Group on the funding
process once they are successfully through it. OLRFC are open to considering a
future merger if the visions and values of both groups are best delivered in that way
– but it is not pursing it at this time. OLRFC also note that they have a Committee
member on the Mossfield Group Board which for present purposes, will instil a
degree of joined up thinking. 
4.10 The instruction of solicitors would serve as the necessary ‘letter of intent’ from
the Council for OLRFC to formally engage with funding sources such as the SRU
and build real momentum in the project. Agreement of the lease would then allow
any funding secured to be released to the club. 
4.11 The Club are extremely keen to outline their vision to the wider community. They
are ready to engage with the Community Council and to release detailed
information via the local press, Facebook and other social media platforms. The
Club also intend to hold open events for the explanation of their proposals to the
widest section of the population possible. 
5.0 CONCLUSIONS 
5.1 The facilities at Glencruitten are not currently in a condition that allows for the
maximum participation of the community. OLRFC are prepared to seek funding
to invest significantly in improving the facilities and Heads of Terms have now
been agreed in principle for a long Ground Lease with Purchase Option and
Development Obligations. 
5.2 The Heads of Terms provide for a market value rent and a mechanism to
calculate the market value purchase price on a site deemed to be a community
asset held in perpetuity with very limited commercial value. 
Page 168

Page 169

5.3 In the absence of an agreed approach via the expression of interest process,
the club would likely succeed with an Asset Transfer request. The current
approach allows detailed terms to be put in place that safeguard wider
community interests. 
5.4 The Committee noting Officers will instruct Legal Services on these Heads of
Terms will enable what is expected to be a complex project to move forward. 
6.0  IMPLICATIONS
6.1 Policy – None.
6.2 Financial – Outside investment of £3 - £4+ Million in Oban community sports
facilities. Potential sale of asset used for recreational purposes with limited
commercial value.
6.3 Legal – The terms and conditions of any lease to follow are delegated to the
Executive Director of Customer Services.  
6.4 HR – None
6.5 Fairer Scotland Duty 
6.5.1 Equalities – Protected characteristics – None.
6.5.2 Socio economic Duty – None
6.5.3 Islands – Not applicable
6.6 Climate change – Allows for more intensive use of local facilities, reducing the
need for off-site trips.
6.7 Risk – Applicant may fail to procure all funding necessary for the project.
6.8 Customer Service – None.
6.9 The Rights of the Child (UNCRC) – None.
Douglas Hendry, Executive Director with responsibility for Commercial Services
Councillor Gary Mulvaney – Policy Lead, Finance and Commercial Services 
14th February 2024 
For further information contact: 
Frank Montgomery
Estates Surveyor
The Helensburgh and Lomond Civic Centre
38 East Clyde Street, Helensburgh
G84 7PG
Frank.Montgomery@argyll-bute.gov.uk 
01436 658791
Page 169

Page 170

Appendix 1 – Current Leased Area 
Page 170

Page 171

Appendix 2 – Proposed Leased (and purchase Option) Area 
Page 171

Page 172

Appendix 3 – Oban Development Road – Protected Zone 
Page 172

Page 173

Oban, Lorn and the Isles Area Committee
Workplan 2023-24 
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/consideration
Date for Reports to
Committee Services
Additional Comment
6 March 2024
6 March 2024 Primary School
Update
Wendy Brownlie, 
Head of Education
Annual Report 12 February 2024 
6 March 2024 Area Performance
Report FQ3 23/24
Improvement and
HR – Sonya
Thomas 
Quarterly Report 12 February 2024 
6 March 2024 Roads and
Infrastructure Service
Update
Development and 
Infrastructure -
Jim Smith
Quarterly Report 12 February 2024 
6 March 2024 Roads Capital
Reconstruction
Programme
Development and 
Infrastructure – 
Jim Smith
Annual Report  
6 March 2024 Housing Services
Activity Update-
Strategic Housing
investment plan
Upadate (SHIP)
Director of 
Development
and Infrastructure – 
Douglas Whyte
Annual Report 12 February 2024 
6 March 2024 Active Travel Progress
Report 2023-24
Colin Young, 
Development & 
Economic Growth
Annual Report 12 February 2024 
6 March 2024 Supporting
Communities Fund
2022/23 End of Project
Monitoring Report
Ailie Law & Kirsty
McLuckie
Annual Report 12 February 2024 
Page 173
Agenda Item
15

Page 174

Oban, Lorn and the Isles Area Committee
Workplan 2023-24
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/consideration
Date for Reports to
Committee Services
Additional Comment
6 March 2024 Area Plans Stuart Green
Chief Executive 
12 February 2024 
6 March 2024 John of Lorn
Bequest Applications
Stuart McLean
Legal & Regulatory 
Support
When required 12 February 2024 Cut off for applications
12 February 2024
6 March 2024 Charitable Trusts,
Bequests & Trust
Funds – Distribution
Arrangements
Stuart McLean,
Legal & Regulatory 
Support
One off 12 Februrary 2024 
6 March 2024 Community Sports
Hub, Oban Lorne
Rugby Football Club
David Allan,
Commercial Services
One off 12 February 2024 
6 March 2024 Area Committee
Workplan
Melissa Stewart
Legal & Regulatory
Support
For updating 12 February 2024 
12 June 2024
12 June 2024 Tobermory Play Park Development and 
Infrastructure
Hugh O’Neill
Update on one off funding 
Spend
20 May 2024 May come to June
depending on
discussions with Mull
Community Council
12 June 2024 Area Performance
Report FQ4 23/24
Improvement and
HR – Sonya
Thomas
Quarterly Report 20 May 2024 
12 June 2024 Roads and
Infrastructure Service
Update
Development and 
Infrastructure
Jim Smith
Quarterly Report 20 May 2024 
Page 174

Page 175

Oban, Lorn and the Isles Area Committee
Workplan 2023-24
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/consideration
Date for Reports to
Committee Services
Additional Comment
12 June 2024 HSCP Bi-Annual
Update Report
Health & Social Care 
Partnership – 
Charlotte Craig 
Bi-Annual Report 20 May 2024 
12 June 2024 Secondary School
Reports - Oban High
School
Head Teacher
Peter Bain
Annual Report 20 May 2024 
12 June 2024 Secondary School
Reports - Tiree High
School
Head Teacher 
Peter Bain
Annual Report 20 May 2024 
12 June 2024 Secondary School
Reports - Tobermory
High School
Head Teacher
Shelly Carmichael
Annual Report 20 May 2024 
12 June 2024 John of Lorn Bequest -
Applications
Legal and
Regulatory Support
As required 20 May 2024 Cut off for applications
20 May 2024
12 June 2024 Supporting
Communities Fund
Applications
Rona Gold/Kirsty
McLuckie
Chief Executive
Annual Report 20 May 2024 
12 June 2024 Area Committee
Workplan
Melissa Stewart 
Legal and 
Regulatory Support
For updating 20 May 2024 
11 September 2024
11 September
2024
Area Performance
Report FQ1 24/25
Performance
Management and
Improvement Officer
Quarterly Report 19 August 2024 
Page 175

Page 176

Oban, Lorn and the Isles Area Committee
Workplan 2023-24
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/consideration
Date for Reports to
Committee Services
Additional Comment
11 September
2024
Roads and
Infrastructure Service
Update
Development and 
Infrastructure
Jim Smith
Quarterly Report 19 August 2024 
11 September
2024
Annual Recycling
Performance Report
Jim Smith
Roads and
Infrastructure
Services
Annual Report 19 August 2024 
11 September
2024
Supporting
Communities Fund –
End of Project
Monitoring 22/23
Rona Gold/Ailie Law
Chief Executive 
Annual Report 19 August 2024 
11 September
2024
John of Lorn
Bequest Applications
Melissa Stewart, 
Legal & Regulatory 
As required  19 August 2024 Cut off for applications
19 August 2024
11 September
2024
Area Committee
Workplan
Melissa Stewart For updating 19 August 2024 
11 December 2024
11 December
2024
Area Performance
Report FQ2 24/25 
Performance
Management and
Improvement Officer
Quarterly report 18 November 2024 
11 December
2024
Roads and
Infrastructure Service
Update
Development and 
Infrastructure
Jim Smith
Quarterly report 18 November 2024 
11 December
2024
Charitable Trusts,
Bequests and Trust
Funds
Legal & Regulatory 
Support – Stuart
McLean 
Annual Report 18 November 2024 
Page 176

Page 177

Oban, Lorn and the Isles Area Committee
Workplan 2023-24
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/consideration
Date for Reports to
Committee Services
Additional Comment
11 December
2024
ACHA Annual Update Chief Executive
ACHA
Annual Report 18 November 2024 
11 December
2023
HSCP Bi-Annual
Update Report
Charlotte
Craig/Fiona Davies
Argyll and Bute 
HSCP 
Annual 18 November 2024 
11 December
2024
John of Lorn
Bequest Applications
Legal & Regulatory 
Support – Melissa 
Stewart
As required  18 November 2024 Cut off for applications
18 November 2024
11 December
2024
Area Committee
Workplan
Melissa Stewart For updating 18 November 2024 
Page 177

Page 178

This page is intentionally left blank