To:  Finance, Resources and Customer Services Policy Board 
On:  8 June 2023 
Report by: Director of Environment, Housing & Infrastructure 
Heading: Environment & Infrastructure Service Improvement Plan 2022/23-24/25
Outturn Report 
1. Summary 
1.1 The Service Improvement Plan links to the Council Plan and Community Plan,
alongside the Risk Management Plan and Workforce Plan to form a set of documents
which provide the strategic direction for the service. This plan is also intended to
complement the council-wide Economic Recovery Plan and Social Renewal Plan.   
1.2 A mid-year progress update on the Service Improvement Plan was submitted to the
Finance, Resources and Customer Services Policy Board in November 2022. 
1.3 This outturn report, attached in Appendix 1, is presented to the Finance, Resources
and Customer Services Policy Board for noting of the areas within this Board’s remit
only.  The plan and covering report will also be submitted to the Infrastructure, Land
and Environment Policy Board for the areas within that Board’s remit.

Page 2

2 
2. Recommendations
It is recommended that the Finance, Resources and Customer Services Policy
Board: 
2.1 Notes the progress made in delivering the 2022/23 – 24/25 Service Improvement
Plan for Environment & Infrastructure attached as Appendix 1 and as specific to the
areas of activity delegated to this Policy Board. 
3. Background 
3.1   Environment & Infrastructure has remained aspirational throughout 2022/23 
continuing to implement improvement through the service priorities, key tasks,
actions and performance indicators. 
3.2  This Service Improvement Plan outturn report for Environment & Infrastructure
covers the year 2022/23.  The priority actions set out in the attached Service
Improvement Plan Outturn report (Appendix 1) detail the outcome of specific actions
the service has progressed. These have and continue to be in support of the
Council’s immediate priorities and future direction, helping deliver improved
outcomes for Renfrewshire’s communities.   
4. Key Achievements 2022/23 
4.1 Despite the challenging financial operating environment, the service has been able to
deliver its services and a wide range of achievements across the service. 
4.2 A more detailed picture of achievements is included in the Service Improvement Plan
outturn is appended to this report. The achievements relevant to the remit of this
Board include: 
4.2.1 Strategic Outcome 1: Place 
Building Services 
Building Services continues to work with colleagues in Communities and Housing to
provide a full repairs and emergency service to the council house residents of
Renfrewshire. 
Support Services 
Support Services continue to work with all sectors across the wider Renfrewshire
corporate estate and carry out repairs and compliance checks across all of
Renfrewshire’s Public Buildings. The COVID-19 catch up programme is almost
complete with the service returning to business as usual.

Page 3

3 
4.2.2 Council Plan Strategic Outcome 2: Economy 
Creating employment opportunities – Environment & Infrastructure has delivered a
range of services and projects that has created job opportunities for Renfrewshire’s
young people and vulnerable people, actively preparing and supporting them for the
world of work. They include: 
• Soft FM have been working with Project Search and provided placements for 3
students across the service. 
• One of the Project Search students completed a second 10-week work
experience and is now actively looking for permanent employment.
• An apprentice taken on in 21/22 has successfully progressed to full time
employment within the service. 
• One apprentice was taken on during 22/23.
• Building Services has recruited and started 3 youth apprentices.
• Support Service has recruited a clerical/admin apprentice. 
4.2.3 Council Plan Strategic Outcome 3: Fair 
School Meals
• The expansion of the universal school meal provision was extended in August
2022 and now includes all pupils in P1 – P5 and all pupils in ASN schools.
• Capital funding has been invested in expansion of school kitchen facilities. An
additional 13 cooking kitchens in schools and established kitchens have been
modernised by upgrading/replacing equipment.  
• The Soft FM service serves approximately 8,500 healthy school meals every day
that are fully compliant with the Nutritional Requirements for Food and Drink in
Schools (Scotland) Regulations 2020. 
Street Stuff
Working alongside Street Stuff, evening meals have been provided 6 days a week
since November 2022 to over 200 residents throughout Renfrewshire. 
Period Products (Free provision) (Scotland) Bill 
Free sanitary products have been made readily available in Renfrewshire’s schools. 
The service has also been working with schools to promote the use of more
environmentally friendly and re-usable products. 
4.2.4 Council Plan Strategic Outcome 4: Green 
Supporting the Council’s pledge to be carbon neutral by 2030 – Environment &
Infrastructure activities continue to make a critical contribution towards Renfrewshire
being carbon neutral by 2030. It has an active role in this process and already
delivers a number of programmes to help mitigate climate change.

Page 4

4 
4.2.5 Council Plan Strategic Outcome 5: Living our values 
Better use of technology – The service has developed and expanded the use of
digital technology in 2022/23. 
Continued development and focus on data analytics and performance information
has been used to enhance service management information and encourage service
improvement. 
4.2.6  Council Plan Strategic Outcome 6: Improving Outcomes for Children and
Families 
Over 1,300 responses have been received from a survey sent to parents and pupils
for feedback on menus. There has been positive feedback to the new menu resulting
in the recent increase in uptake. Taster sessions were organised with schools and
engagement with schools on an individual basis to focus on uptake, is ongoing. 
Together with Children’s Services, evening cooking classes have been taking place in
Primary schools. Children learn about food hygiene, kitchen safety, food regulations
and allergies through the opportunity to cook healthy meals. 
5. Monitoring progress
5.1 Areas where actions have been reviewed or delayed 
• Work Hub
Work to fully implement and integrate the Work Hub system remains on-going.
Manual financial transactions were completed for the end of the 2022/23 financial
year and the Service remains in discussions with the supplier to try and ensure full
automation of the job management system. 
5.2 The remaining actions have been progressing in line with anticipated timescales.  
6. Progress against service scorecard 
6.1 The performance scorecard contains 11 indicators. 7 are performing strongly, 3 are
slightly short of target and need monitoring and one value remains to be confirmed. 
6.2 The full performance scorecard is included as part of Appendix 1 of this report. 
6.3 Some highlights of service performance and outcomes, with specific relevance to this
Policy Board, include: 
• Uptake of free school meals in Primary schools was 53.4%, exceeding the
target of 52%.

Page 5

5 
• Uptake of free school meals in secondary schools also exceeded the target of
35%. 39.1% of secondary school pupils eligible for a free school meal benefited
from the provision in 2022/23.
• Elected Member enquiry response rate of 92.6% continues to exceed the
current 85% target;
• Frontline resolutions response rate of 87% exceeds the 85% target for 2022/23;
• Complaint investigation response rate of 93% exceeds the 85% target. 
• Scrutiny of complaints data and performance is a key priority for the service.
This focus continues to have a positive impact with response rates improving. 
6.5 A few of the performance indicators are currently unavailable in the service scorecard
and require monitoring:
• % of Overall repairs completed within time by Building Services.
• Average length of time taken to complete non-emergency repairs
• Percentage of compliance tasks undertaken per year – statutory compliance for
public buildings
• Average number of work-days lost through sickness absence per employee (days
lost) (cumulative) 
Implications of the Report 
1. Financial - The Service Improvement Plan highlights resourcing pressures arising from
increasing demand for services and the current financial environment.   
2. HR & Organisational Development – none 
3. Community/Council Planning – the report details a range of activities which reflect
local council and community planning themes. 
4. Legal – As detailed in the report. 
5. Property/Assets – none 
6. Information Technology – Service developments relating to information technology are
key enablers of service improvement and modernisation and support service-level and
corporate objectives. 
7. Equality & Human Rights - The recommendations contained within this report have
been assessed in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’ human rights have
been identified arising from the recommendations contained in the report. If required
following implementation, the actual impact of the recommendations and the mitigating
actions will be reviewed and monitored, and the results of the assessment will be
published on the Council’s website.

Page 6

6 
8. Health & Safety – none 
9. Procurement – none. 
10. Risk – Risks related to the delivery and management of services are regularly monitored
and included in Renfrewshire Council’s Corporate and Strategic Risk Registers. 
11. Privacy Impact - none 
12. COSLA Policy Position – none. 
13. Climate Risk – The priorities and actions outlined within the report will make a positive
contribution to tackling climate change. 
List of Background Papers:  Service Improvement Plan 2022/23 – 2025/26 
Author:  Gordon McNeil, Director of Environment, Housing & Infrastructure 
e-mail:  Gordon.mcneil@renfrewshire.gov.uk

Page 7

1

Page 8

Appendix 1
2
Actions 2022-25 
Priority Action: Place Actions
Code Action Status  Progress  Due Date Update
01 Continuing to deliver repairs
and emergency out of hours
repair service to 12,500
Council housing properties
within Renfrewshire  
31-Mar-2023
Building Services continues to work with colleagues in
Communities and Housing to provide a full repairs and
emergency service to the council house residents of
Renfrewshire. 
02 Continuing to deliver
compliance services to public
buildings in Renfrewshire
including schools   
31-Mar-2023
Support Services continues to work with all sectors
across the wider Renfrewshire corporate estate and
carry out repairs and compliance checks across all of
Renfrewshire’s Public Buildings. The COVID-19 catch
up programme is almost complete with the service
returning to business as usual. Compliance and
compliance follow-ons will continue to be the priority
and general repairs carried out within budget
limitations. 
Status 
Cancelled 
Delayed 
In Progress 
Completed

Page 9

Appendix 1
3
Priority Action: Economy Actions
Code Action Status  Progress  Due Date Update
01 Provide employment, training
and apprenticeship
opportunities for identified
groups of young people in
Renfrewshire 
31-Mar-2023
Work is ongoing across to ensure the service provides
employment, training and apprenticeship opportunities:
- Soft FM has been working with Project Search and
has provided 10-week work experience placements
for 3 students across the service. 
- One of the Project Search students who completed
a second 10-week work experience is now actively
looking for permanent employment.
- The apprentice taken on in 2021/22 successfully
progressed to full time employment within the
service. 
- 1 apprentice was taken on during 2022/23.
- In August 2022, Building Services recruited 3 youth
apprentices from within the Renfrewshire area and
one adult within the Council workforce.
- Support Service recruited a clerical/admin
apprentice.

Page 10

Appendix 1
4
Priority Action: Fair Actions
Code Action Status  Progress  Due Date Update
01 Provide healthy meals that meet the
requirements of the Nutritional
Requirements for Food and Drink in
Schools (Scotland) Regulations
2020 by analysing the school
menus to comply  
31-Mar-2023
All school menus are analysed and are fully
compliant with the Nutritional Requirements for
Food and Drink in Schools (Scotland)
Regulations 2020. The Soft FM service serves
approximately 8,500 healthy school meals every
day.
02 Work in partnership with Community
Learning and Development Team
as an integral part of the holiday
programme through the provision
and delivery of healthy meals  
31-Mar-2023
The service has been working closely with
colleagues from the Communities and Housing
Service to deliver targeted provision of
accessible activities, childcare and food for
primary school children from low-income
families. 
Since November 2022, working alongside Street
Stuff, evening meals now provided 6 days a
week to over 200 residents throughout
Renfrewshire.
03 Deliver the expansion of free school
meals to all P1 – P5 children and to
all ASN pupils   31-Aug-2022
The expansion of the universal school meal
provision was extended in August 2022 and now
includes all pupils in P1 – P5 and all pupils in
ASN schools.

Page 11

Appendix 1
5
Priority Action: Fair Actions
Code Action Status  Progress  Due Date Update
04 Carry out capital improvements in
school kitchens, in line with Scottish
Government capital funding, to
maintain the delivery of free school
meals to all P1 – P5 pupils and all
ASN pupils.   
31-Aug-2022
The service has established interim working
arrangements to ensure the ongoing delivery of
this service.  This involves preparing and
cooking additional meals from a number of
school kitchens across the school estate. Meals
are then delivered to those schools which do not
have the facilities to cook onsite. 
Capital funding for 2022-23 was received and
has resulted in an additional 13 cooking kitchens
in schools. Established kitchens have been
modernised by upgrading/replacing equipment.
A further 3 kitchens are being fully refurbished
and will be functional by October 2023.
05 Work with the Scottish Government
to deliver the further expansion of
free school meals to all P6/P7 pupils
and to deliver a free breakfast
service for all primary school pupils   
31-Mar-2026
06 Continue to work with CoSLA to
ensure the provision of free sanitary
products within education premises
across Renfrewshire as part of the
of the Period Products (Free
Provision) (Scotland) Bill  
31-Mar-2023
The Period Products (Free Provision) (Scotland)
Act 2021 has been in force since 15th August
2022.  The Soft FM service continues to work
with colleagues across the authority to ensure
that free sanitary products are always available
in Renfrewshire’s schools.  The service has
worked with schools to promote the use of more
environmentally friendly and re-usable products.

Page 12

Appendix 1
6
Priority Action: Living our Values Actions
Code Action Status  Progress  Due Date Update
01 Provide our employees with the
appropriate support to manage their
attendance, health and wellbeing 
31-Mar-2023
Absence management has been a key focus for the
service during 2022/23. The service has also
invested in mental health first aid training and the
creation of mental health champions.
Environment & Infrastructure continues to support
delivery of the Corporate Health and Well Being
Strategy.
02 Implement the Council’s People’s Strategy    31-Mar-2023 Environment & Infrastructure supported the
development of this key Council priority.
03 Active participation in Council’s Right for
Renfrewshire Transformational Programme  
31-Mar-2023
Operations & Infrastructure is participating in service
reviews as part of the Right for Renfrewshire
transformation programme. The service has been
fully engaged in supporting the Council’s strategy for
financial sustainability through the portfolio approach
which will be delivered alongside the main
transformation programme and reviews undertaken
by individual services. 
04 Better use of data and technology to
improve services performance and delivery   31-Mar-2023
The use of data analytics and technology
developments has continued, throughout 2022/23, to

Page 13

Appendix 1
7
Priority Action: Living our Values Actions
Code Action Status  Progress  Due Date Update
be employed to support service improvement across
each service area. 
05 Provide an integrated FM service across
the Council for public building and housing
repairs and compliance  
31-Mar-2023
Close working relationships established to ensure an
Integrated FM service across public building and
housing repairs and compliance. Work underway for
Property Services to be realigned and brought into
the Service in mid-2023. Regular scheduled
meetings in place between management and staff
across all facilities management teams to ensure
integrated work. 
06 Support the Council to implement the
Business World system   31-Mar-2023
Environment & Infrastructure has continued to
participate and engage in the implementation of
Business World.
07 Embed new approaches to staff
communication and engagement across all
areas of the service   
31-Mar-2023
A review of the approach to staff engagement and
enhanced staff panels has been ongoing throughout
2022/23.
08 Ensure robust and up to date business
continuity arrangements are in place   
31-Mar-2023
The Environment & Infrastructure, Resilience
Management Team continue to hold quarterly
meetings, to review recent incidents and lessons
learned, business continuity exercises and any
training required, throughout 2022/23.

Page 14

Appendix 1
8
Priority Action: Living our Values Actions
Code Action Status  Progress  Due Date Update
09 Review Health & Safety and Risk
Assessments    31-Mar-2023
The review of Health & Safety and Risk
Assessments process is complete, adopted and is
being rolled out across the service.
10 Ensure robust financial monitoring is in
place to support the COVID-19 recovery  
31-Mar-2023
The Senior Leadership Team and service managers
met on a period-by-period basis with finance
colleagues to monitor budgets and to ensure the
service was provided with the most up to date
information to ensure robust financial systems were
in place to support the service.

Page 15

Appendix 1
9
Priority Action: Improving Outcomes for
Children and Families
Actions
Code Action Status  Progress  Due Date Update
01 Deliver a programme of
engagement with schools,
parents and pupils, encouraging
participation in the development
of school meal menus 
31-Mar-2023
Work is ongoing to meet with pupil groups to encourage
participation around the creation of new school menus. 
This also provides opportunity to provide further
explanation of the Nutritional Guidelines. A new Menu and
Nutrition Officer has been appointed and this will be a main
priority of their role. Sampling session are being planned
now that face to face parents’ evenings are recommencing.
Surveys were sent to parents and pupils for feedback on
menus and received over 1300 responses. New menu
options have been created and taster sessions carried out
in schools for further input. New menu being implemented
in June 2023.
Together with Children’s Services, evening cooking classes
are taking place in Primary schools. The children get the
opportunity to cook healthy meals and learn about food
hygiene, kitchen safety, food regulations and allergies.

Page 16

Appendix 1
10 
Priority Theme: Place Performance Indicators
Code Performance
Indicator
Current
Status
2020/21 2021/22 2022/23 2023/24 Explanation of Performance
Value Target Value Target Value Target Target
01 % of reported
street lighting
faults which were
attended within
the 7-day
timescale 
98% 95% 99.9% 95% 99.2% 95% N/A During 2022/23, 99.2% of reported street lighting faults which
were attended within the 7-day timescale. This exceeds the
annual target of 95%.
02 % of Overall
repairs completed
within time by
building services 
95% 95% 93.6% 95% Not
currently
available
80% 90% Work continues with regards to the new information management
system. Therefore, whilst easily accessible, reliable information
isn’t currently provided for this update for two Building Services’
indicators. 
Scorecard 
PI Status 
Alert  Unknown 
Warning  Data Only 
OK   
Long Term Trends 
Improving 
No Change 
Getting Worse 
Short Term Trends 
Improving 
No Change 
Getting Worse

Page 17

Appendix 1
11 
Priority Theme: Place Performance Indicators
Code Performance
Indicator
Current
Status
2020/21 2021/22 2022/23 2023/24 Explanation of Performance
Value Target Value Target Value Target Target
03 average length of
time taken to
complete non-
emergency
repairs – public
buildings 
10.7 15 17.24 15 Not
currently
available
15 15 
Phase 1 of the new system was almost complete before issues
raised by supplier. Discussions with the supplier remains on-going
to try and ensure full automation of the job management system.
04 % of compliance
tasks undertaken
per year –
Statutory
compliance for
public buildings 
77% 90% 72% 90% 82% 80% 90% Compliance of tasks undertaken for statutory compliance in public
buildings is performing at 82%. This is above the annual target of
80%.
The service continues to meet statutory requirements for planed
preventative maintenance using Building Services and contractors
to undertake work. Regular meetings with contractors to challenge
poor performance and ensure programmes are on-target.
Recruitment exercise undertaken to replace Facilities Manager
position to again strengthen the team and ensure full compliance
wherever possible.

Page 18

Appendix 1
12 
Priority Theme: Fair Performance Indicators
Code Performance
Indicator
Current
Status
2020/21 2021/22 2022/23 2023/24 Explanation of Performance
Value Target Value Target Value Target Target
01 % uptake of free
school meals in
primary schools 
47.2% 75% 49.3% 75% 53.4% 52% 60% Uptake of free school meals in both primary and secondaries saw
improvements in performance compared to the previous financial year.
Primaries rising from 49.3% to 53.4% in 2022/23. This is above the target
of 52%. Secondary performance increased from 32.3% to 39.1% (above
the target of 35%) in the same time period. 
There has been positive feedback to the new menu resulting in the recent
increase in uptake. Taster sessions were organised with schools and
engagement with schools on an individual basis to focus on uptake, is
ongoing. 
02 % uptake of free
school meals in
secondary schools 
49.6% 49% 32.3% 49% 39.1% 35% 42%

Page 19

Appendix 1
13 
Priority Theme: Living Our Values Performance Indicators
Code Performance
Indicator
Current
Status
2020/21 2021/22 2022/23 2023/24 Explanation of Performance
Value Target Value Target Value Target Target 
01 Average number of
work days lost
through sickness
absence per
employee (FTE)
(cumulative) 
17.02 13.7 15.5 13.7 11.2 (to
quarter 3)
13.7 13.7 Data only available up until 31 December 2022 (end of Quarter 3).  
In Q1 the average number of work-days lost per FTE was 3.5,
meeting the quarter 1 target of 3.5. 
In Q2 the average number of work-days lost per FTE was 3.6 which
exceeded the quarter 2 target of 3.
In Q3 the average number of work-days lost per FTE was 4.1 which
exceeded the quarter 3 target of 3.7.
Q4 figures have not yet been finalised.
02 % of members
enquiries
completed within
timescale by E&I 
86.4% 85% 86.7% 85% 92.6% 85% 85% Scrutiny of complaints data and performance is a key priority for the
service and continues to be carried out on a regular basis at
management team meetings. It and has been supported by
improvements in both data analytics and access to management
information.  This investment and focus has had a positive impact
with response rates improving.  
Environment & Infrastructure received 5,282 members enquiries in
2022/23, of which 92.6% were responded to within timescale. 
Environment & Infrastructure dealt with 349 Freedom of Information
requests in 2022/23, of which 343 (98.5%) were responded to within
03 % of FOI requests
completed within
timescale by E&I 
96% 100% 99% 100% 98.5% 100%  100%
04 % of front line
resolutions dealt 
75% 100% 80.8% 85% 87% 85% 85%

Page 20

Appendix 1
14 
Priority Theme: Living Our Values Performance Indicators
Code Performance
Indicator
Current
Status
2020/21 2021/22 2022/23 2023/24 Explanation of Performance
Value Target Value Target Value Target Target 
with within
timescale by E&I
timescale. 117 of these requests were cross departmental and 232
were departmental. 
Environment & Infrastructure received 6,025 front line resolutions in
2022/23, of which 87% were responded to within timescale. 
05 % of complaint
investigations
completed within
timescale by E&I 
58% 95% 64.8% 95% 93% 85% 85% In 2022/23, the service dealt with 433 complaint investigations,
93% of which were dealt with within the agreed timescale.