Minute of Meeting
Finance, Resources and Customer Services Policy Board 
Date Time Venue
Thursday, 09 February 2023 10:00 Teams - virtual meeting, 
Present: Councillor Fiona Airlie-Nicolson, Councillor Jacqueline Cameron, Provost Lorraine
Cameron, Councillor Michelle Campbell, Councillor Graeme Clark, Councillor Audrey Doig,
Councillor Chris Gilmour, Councillor Edward Grady, Councillor Neill Graham, Councillor
Bruce MacFarlane, Councillor David McGonigle, Councillor Iain Nicolson, Councillor John
Shaw 
Chair
Councillor J Shaw, Convener, presided. 
In Attendance
A MacArthur, Director of Finance & Resources; L McIntyre, Head of Policy &
Commissioning; D McLavin, Senior Communications Officer; B Bradley, Senior
Procurement Specialist (Housing); B Lambert, Corporate Procurement Manager; G Beattie,
Strategic Commercial Category Manager; A Donaldson, Strategic Commercial Category
Manager; S Gibb, Procurement Operations Manager; R Park, Category Manager; S
Brydon, Senior Procurement Specialist; C Horn, Service Planning & Policy Development
Officer; L Bishop, Procurement Advisor (all Chief Executive’s); C Dalrymple, Head of
Facilities & Property Services; G Hutton, Head of Operations & Infrastructure; G Hannah,
Transport & Change Manager (all Environment & Infrastructure); C McCourt, Head of
Finance & Business Services; M Conaghan, Head of Corporate Governance; P Murray,
Head of ICT; M Boyd, Head of People & OD; J Lynch, Head of Property Services; A
McMahon, Chief Auditor; E Shields, Business Services Manager; G Dickie, Partnering &
Commissioning Manager; G Innes, Customer Services Manager; R Cree, OD & Workforce
Planning Manager; D Pole and I Blair, End User Technicians; C MacDonald and R Devine,
Senior Committee Services Officers; and D Cunningham, Assistant Committee Services
Officer (all Finance & Resources). 
Webcasting of Meeting
Prior to the commencement of the meeting the Convener intimated that this meeting of the
Policy Board would be filmed for live or subsequent broadcast via the Council's internet
site.

Page 2

Apologies
Councillors Alison Ann-Dowling and Sam Mullin.  
Declarations of Interest
There were no declarations of interest prior to commencement of the meeting. 
1 Investment Review Board
There was submitted the Minute of the Investment Review Board held on 16
November 2022, a copy of which forms Appendix I hereto. 
DECIDED: That the Minute be noted. 
2 Joint Consultative Board (Non-teaching)
There was submitted the Minute of the meeting of the Joint Consultative Board (Non-
teaching) held on 25 January 2023, a copy of which forms Appendix II hereto. 
DECIDED: That the Minute be noted. 
3 Revenue and Capital Budget Monitoring as at 11 November 2022
There was submitted an update report by the Director of Finance & Resources
relative to Revenue and Capital budget expenditure up to 11 November 2022 for
those services reporting to this Board. Tables 1 and 2 of the report detailed the
projected revenue outturn position. As at 31 March 2023 there was an overspend of
£1.103m (1.0%) against the revised budget for the year, and the Capital budget was
projected to break even. 
Appendices to the report provided detailed analysis of expenditure, and budget
adjustments were listed at paragraphs 4 and 6 of the report. 
DECIDED: 
(a) That the projected Revenue return position detailed in Table 1 of the report be
noted;  
(b) That the projected Capital outturn position as detailed in table 2 of the report be
noted; and 
(c) That the budget adjustments detailed in sections 4 and 6 of the report be
noted.

Page 3

4  Revenue and Capital Budget Monitoring – Council Overview as at 11
November 2022
There was submitted an update report by the Director of Finance & Resources
relative to an overview of Revenue and Capital Budget expenditure for the Council as
at 11 November 2022. Tables 1 and 2 of the report detailed that the projected
Revenue outturn position for all services as at 31 March 2023 was an overspend of
£8.233 million, and the projected Capital outturn position for all services was an
underspend of £0.100 million, split between General Fund services and the Housing
Revenue Account (HRA). 
Further analysis was detailed in the Appendices to the report and substantial risks to
the budget positions were provided at paragraph 3 of the report. 
DECIDED: 
(a) That the projected Revenue outturn position detailed in Table 1 of the report be
noted, considering that the forecast position was based on best estimates at that point
in time; 
(b) That the substantial risks to the budget position as outlined in section 3 of the
report be noted; and 
(c) That the projected Capital outturn position detailed in Table 2 of the report be
noted. 
5 Business Services Accounts for Write Off
There was submitted a report by the Director of Finance & Resources relative to a
proposed write-off of Sundry Debts and Non-Domestic Rates accounts for sums over
£10,000 where recovery was no longer viable. The value of the debt to be written off
was £437,532,71. 
DECIDED: That the sum of £437,532.71 as detailed in the report, be written off. 
6 Paisley and Renfrew Common Good Fund Budgets 2023/24
There was submitted a report by the Director of Finance & Resources relative to the
estimated funding available for disbursal during 2023/24 from the Paisley and
Renfrew Common Good Funds.  
The report indicated that income from both Common Good Funds was used to fund
ongoing projects and commitments made previously by this Board and its
predecessors. In addition, an annual allocation was to be made to the relevant Local
Partnerships with delegated authority to disburse grants to local organisations that
had applied for grant aid and/or to use the funding to support appropriate projects. A
forecast income and expenditure statement for both Common Good Funds, including
the cost of recurring projects, was attached to the report.

Page 4

DECIDED: 
(a) That the 2023/24 budget allocations to Local Partnerships be approved as follows: 
(i) Renfrew Common Good: Renfrew Local Partnership - £75,300 
(ii) Paisley Common Good: Paisley East Local Partnership - £12,400 
(iii) Paisley Common Good: Paisley North, West & Central Local Partnership -
£10,900 
(iv) Paisley Common Good: Gleniffer Local Partnership - £10,200; and 
(b) That the continued funding of recurring projects, as outlined in Appendix 1 to the
report, be approved. 
7 Business Services Performance Report
There was submitted a report by the Director of Finance & Resources relative to the
performance of key Business Service functions including revenue collection and
benefit administration for the period ending 28 December 2022. 
The report provided an update on the funding and expenditure position for
Discretionary Housing Payments and the Scottish Welfare Fund. Appendices to the
report provided information on revenue collection and key performance indicators. 
DECIDED: That the report be noted. 
8 Customer Services Performance Report
There was submitted a report by the Director of Finance & Resources relative to
performance across key Customer Services functions including Call Centre, Face-to
-Face and Digital Support for customers for December 2022. 
The report provided an update on the overall contact centre call handling volumes and
indicated that Face-to-Face services had returned in Renfrewshire House, with these
being managed on an appointment basis. 
DECIDED: That the report be noted. 
9 Facilities Management Operational Performance Report
There was submitted an update report by the Director of Environment & Infrastructure
relative to the operational performance of Facilities Management (Hard and Soft
Services, including Building Services) as delivered by Environment & Infrastructure
since the last meeting of this Policy Board. 
DECIDED: That the operational performance update be approved.

Page 5

10  Non-Domestic Rates - Empty Properties Operational Policy
There was submitted a report by the Director of Finance & Resources relative to an
operational policy for non-domestic rates relief on empty properties. 
The report proposed a policy setting out the Council’s position in relation to Empty
Property Relief for non-domestic properties that amended the 100% relief for
unoccupied Listed Buildings currently available. A copy of the proposed Non-
Domestic Rates - Empty Properties Policy was appended to the report. 
DECIDED: 
(a) That the report be noted; and 
(b) That the Non-Domestic Rates - Empty Properties Policy as appended to the report
be approved. 
11  HR & OD Policies (Revised Whistleblowing Policy)
There was submitted a report by the Director of Finance & Resources relative to the
revision of the Human Resources & Organisational Development (HR & OD)
Whistleblowing Policy. 
The revised policy would replace the current ‘Expressing Concerns Outwith Line
Management Policy’ and was part of the Council’s ongoing programme to review
HR&OD policies. The revised policy provided a mechanism for concerns about any
wrongdoing or malpractice within the Council to be reported and investigated. A copy
of the proposed Whistleblowing Policy was attached as an Appendix to the report. 
DECIDED: That the revised Whistleblowing Policy attached to the report be approved. 
12  Additional Public Holiday – Coronation of King Charles III
There was submitted a report by the Director of Finance & Resources relative to the
announcement of an additional public holiday on Monday, 8 May 2023 for one year
only to celebrate the Coronation of His Majesty King Charles III.  
The report advised that at its meeting on 9 September 2022, the Board approved a list
of 12 public holidays for 2023 and one day of no work requirement. It was proposed
that an additional public holiday on Monday, 8 May 2023 be approved for one year
only and included within a revised list of public holidays for 2023. The revised list was
appended to the report.

Page 6

DECIDED: 
(a) That an additional public holiday on Monday, 8 May 2023 for one year only, be
approved; and 
(b) That the revised list of public holidays for 2023 as appended to the report be
published. 
13  Civic Hospitality and Appointment to Outside Body
There was submitted a report by the Director of Finance & Resources relative to
consideration of (a) requests received by the Provost for civic hospitality from
organisations for specific events as detailed within the report; and (b) to consider a
request by UK & Ireland Mayors, Provosts & Leaders for Peace Chapter to appoint a
representative from the Council. 
The report proposed the type and cost of civic hospitality to be provided in respect of
each civic event and sought authorisation for the Director of Finance & Resources, in
consultation with the Provost, to make the necessary arrangements to provide civic
hospitality, or in the case of events that had already been arranged, to homologate
the action taken by the Head of Corporate Governance, in consultation with the
Provost, to provide civic hospitality. 
The report also indicated that the UK & Ireland Mayors, Provosts & Leaders for Peace
Chapter had requested the appointment of a representative from the Council and that,
previously, this had been the Provost. As part of the registration process, the
Council’s appointment was required to sign: “I hereby express my city/municipality’s
support for the abolition of nuclear weapons and desire to join the Mayors for Peace.” 
DECIDED: 
(a) That the action taken by the Head of Corporate Governance, in consultation with
the Provost, to provide civic hospitality to Renfrewshire XII Province Curling Club at a
cost of £350 be homologated; 
(b) That the Director of Finance & Resources, in consultation with the Provost, be
authorised to make the necessary arrangements for civic hospitality at the
approximate costs indicated below: 
Kilbarchan Pipe Band - £1,750 Abercorn Bowling Club - £800
Anchor Bowling Club’s Ladies Section - £2,760  
(c) That the Provost be appointed as the Council’s representative to UK & Ireland
Mayors, Provosts & Leaders for Peace Chapter with authority to sign the required
declaration. 
14  Advice Services (RC-CPU-22-223)
There was submitted a report by the Chief Executive relative to the award of a
negotiated contract for Advice Services to Renfrewshire Citizens Advice Bureau.

Page 7

DECIDED: 
(a) That the Head of Corporate Governance be authorised to award the negotiated
contract for Advice Services to Renfrewshire Citizens Advice Bureau; 
(b) That it be noted that the contract would commence on 1 July 2023 to 3 June 2025
with the option to extend for a further one year until 30 June 2026; and 
(c) That it be noted that the contract value would be £741,400 excluding VAT for the
first two years with a total contract value of £1,112,100 excluding VAT if the extension
period was utilised. 
15  Managed Print Services (RC-CPU-22-225)
There was submitted a joint report by the Chief Executive and the Director of Finance
& Resources relative to homologation of the decision by the Director of Finance &
Resources to award a negotiated contract to Xerox (UK) Limited on 22 December
2022 for the provision of Managed Print Services in order to fix pricing at the same
rates as 2022 and ensure continuity of service while providing the Council time to
review future services, re-tender and mobilise the printer estate. 
DECIDED: That the decision taken by the Director of Finance and Resources to
award a contract for Managed Print Services to Xerox (UK) Limited be homologated. 
16  Contract Authorisation Report for a Microsoft Enterprise Agreement
(RC-CPU-22-256)
There was submitted a joint report by the Chief Executive and the Director of Finance
& Resources relative to the award of a call off contract for a Microsoft Enterprise
Agreement to Phoenix Software Limited. 
DECIDED: 
(a) That the Head of Corporate Governance be authorised to award a call off
contract for a Microsoft Enterprise Agreement to Phoenix Software Limited following a
further competition under Lot 3 of the Crown Commercial Services (CCS) Framework
Agreement Technology Products and Associated Services, RM6068 in accordance
with the Framework Call-Off Award Procedure; 
(b) That it be noted that the call off contract was for a period of three years and
was envisaged to commence on 1 April 2023 and expire on 31 March 2026. The
actual call off start and expiry dates would be confirmed in the order form in
accordance with the Framework Call-Off Award Procedure; and 
(c) That it be noted that the call off contract value would not exceed £4,460,629
excluding VAT.

Page 8

17  Contract Award: Provision of a Social Care Case Management
System
There was submitted a joint report by the Chief Executive and the Director of Finance
& Resources relative to the award of a contract for the provision of a Social Care
Management System (RC-CPU-22-253) to OLM Systems Limited. 
DECIDED: 
(a) That the Head of Corporate Governance be authorised to award a Call-Off
Contract for the Provision of Support and Maintenance of a Social Care Case
Management System (RC-CPU-22-253) to OLM Systems Limited in accordance with
the award procedure under Crown Commercial Services G-Cloud 13 Framework
Agreement RM1557.13; 
(b) That a maximum Call-Off contract value of up to £643,062.60 excluding VAT,
equating to an annual contract value of £160,765.65 excluding vat be authorised; and 
(c) That it be noted that the initial contract period was for three years with the
Council having the option to extend the service period for up to 12 months. The start
date of 1 April 2023 would be confirmed in the Crown Commercial Services G-Cloud
13 Framework Agreement RM1557.13 Order Form. 
18  Contract Authorisation Report for three contracts: Provision of
Floating Support (RC-CPU-22-121); Housing First (RC-CPU-22-142)
and Housing First (WRAP) (RC-CPU-22-144)
There was submitted a joint report by the Chief Executive and the Director of
Communities & Housing Services relative to three separate contracts for the provision
of Housing First and Floating Support Services. 
DECIDED: 
(a) That the Head of Corporate Governance be authorised to enter into three 
separate contracts for the following services: 
(i) RC-CPU-22-141 Provision of Floating Support to Turning Point Scotland, for a
duration of 12 months with the Council option to extend for 12 months; with an annual
value of £177,000; 12-month extension value of £177,000; total maximum value of
£354,000; 
(ii) RC-CPU-22-142 Housing First to Turning Point Scotland, for a duration of 12
months with the Council option to extend for 12 months; with an annual value of
£177,030; 12-month extension value of £177,030; total maximum value of £354,060; 
(iii) RC-CPU-22-144 Housing First (WRAP), to Blue Triangle (Glasgow)     
Housing Association Limited, for a duration of 12 months with the Council option to
extend for 12 months; with an annual value of £137,000; 12-month extension value of
£137,000; totl maximum extension value of £274,000;

Page 9

(b) That it be noted that all three Contracts would commence on 1 April 2023 or
alternatively, the relevant date would be confirmed in the Council’s letter of
acceptance issued to the Providers identified above; and 
(c) That it be noted that the total value of the contracts was in line with the spend 
in recent years. 
19  Contract Award: Legionella Prevention, Control and Risk
Management Services
There was submitted a joint report by the Chief Executive and the Director of
Environment & Infrastructure relative to the award of a services contract for Legionella
Prevention, Control and Risk Management Services (RC-CPU-21-056) to Rock
Compliance Limited. 
DECIDED: 
(a) That the Head of Corporate Governance be authorised to award a contract for
Legionella Prevention, Control and Risk Management Services to Rock Compliance
Limited; 
(b) That a maximum contract value of up to £700,000 excluding VAT. The
anticipated annual value of this contract had been assessed as £140,000.00
excluding VAT; 
(c) That it be noted that the initial contract period was for three years with the
Council having the option to extend the service period for up to 12 months on two
separate occasions, subject to contract performance. The anticipated commencement
date was 10 March 2023. The actual date would be confirmed in the Council’s letter of
acceptance to Rock Compliance Limited; and  
(d) That it be noted that the award of the Contract was subject to the provision of a
Non-Disclosure Agreement as indicated within the tender documentation. 
20  Notification of Increase in Value for the Contract for Traffic Signals
Planned and Unplanned Inspection and Maintenance reference RC-
CPU-19-173
There was submitted a joint report by the Chief Executive and the Director of
Environment & Infrastructure relative to an increase in the value of the contract for
Traffic Signals Planned and Unplanned Inspection and Maintenance (RC-CPU-19-
173). This Board had approved the award of the contract to Dynniq UK Limited (now
known as Swarco UK & Ireland Limited) at its meeting on 25 March 2020 and as a
result of additional traffic signal improvement work instructed as unplanned
maintenance under the contract, the cost had increased from £800,000 excluding
VAT up to £1,200,000 excluding VAT. 
DECIDED: 
(a) That the requirement to notify this Board of the increase in contract value be
noted; and

Page 10

(b) As a result of additional traffic signal improvement work, an increase in the
contract value of £800,000 up to £1,200,000 excluding VAT to include for the works
detailed within the report and to allow for the current planned maintenance works to
continue until the contract was retendered, be approved. 
21  Refurbishment of 5 Signalised Sites (RC-CPU-22-135)
There was submitted a joint report by the Chief Executive and the Director of
Environment & Infrastructure relative to the award of a contract for the refurbishment
of five signalised sites to Hillhouse Quarry Group Limited t\a MacAsphalt. 
DECIDED: 
(a) That the Head of Corporate Governance be authorised to award the Contract
for the Refurbishment of 5 Signalised Sites (RC-CPU-22-135) to Hillhouse Quarry
Group Limited t/a MacAsphalt; 
(b) That it be noted that the intended starting date was 6 March 2023 with the
completion date being 31 March 2023. The actual dates would be confirmed in the
Council’s letter of acceptance; and 
(c) That it be noted that the contract value was £211,192.28 excluding VAT. The
cost of the contract would be met by funding provided by Strathclyde Partnership for
Transport and required to be spent by 31 March 2023. 
22  Paisley Town Hall Refurbishment - Furniture (RC-CPU-22-150)
There was submitted a report by the Chief Executive relative to the award of a goods
contract for the supply of furniture as part of the refurbishment of Paisley Town Hall to
Claremont Office Furniture Limited. 
DECIDED: 
(a) That the Head of Corporate Governance be authorised to award a call off
contract for Paisley Town Hall Refurbishment – Furniture (RC-CPU-22-150) to
Claremont Office Furniture Limited. 
(b) That a total contract price of £218,132.00 excluding VAT be approved; and 
(c) That it be noted that the contract would commence on 21 February 2023 or on
a date to be confirmed in the letter of acceptance, with delivery and installation
scheduled between 5 June and 21 July 2023, or as agreed with the supplier subject to
completion of the Paisley Town Hall main works contract. 
23  Paisley Town Hall Refurbishment (PTHR) - Stage Lighting and Loose
AV Equipment (RC-CPU-22-171)
There was submitted a report by the Chief Executive relative to the award of a
contract for Paisley Town Hall – Stage Lighting and Loose AV Equipment to Stage
Electrics Partnership Limited.

Page 11

DECIDED: 
(a) That the Head of Corporate Governance be authorised to award the contract
for PTHR - Stage Lighting and Loose AV Equipment (RC-CPU-22-171) to Stage
Electrics Partnership Limited; 
(b) That the total price of £309,369.76 excluding VAT for the contract be approved;
and 
(c) That it be noted that it was anticipated that the Contract would commence on 6
March 2023 or on date confirmed in the letter of acceptance. It was anticipated the
contractor would deliver and install the equipment in June 2023 however exact dates
for delivery and installation would be agreed with contractor subject to completion of
the Paisley Town Hall main works contract.