Page 1

Notice of Meeting and Agenda
Finance, Resources and Customer Services Policy
Board 
Date Time  Venue
Thursday, 09 February
2023
10:00 Teams - virtual meeting, 
MARK CONAGHAN
Head of Corporate Governance 
Membership 
Councillor John Shaw (Convener):     Councillor Fiona Airlie-Nicolson (Depute
Convener):    
Councillor Alison  Ann-Dowling:  Councillor Jacqueline Cameron:  Provost Lorraine
Cameron:  Councillor Michelle Campbell:  Councillor Graeme Clark:  Councillor Audrey
Doig:  Councillor Chris Gilmour:  Councillor Edward Grady:  Councillor Neill Graham: 
Councillor Bruce MacFarlane:  Councillor David McGonigle:  Councillor Sam Mullin: 
Councillor Iain Nicolson:   
Webcasting of Meeting 
This meeting will be filmed for live or subsequent broadcast via the Council’s internet
site – at the start of the meeting the Convener will confirm if all or part of the meeting
is being filmed.  To find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home 
Apologies 
Apologies from members. 
Declarations of Interest 
Members are asked to declare an interest in any item(s) on the agenda and to
provide a brief explanation of the nature of the interest.  
Page 1 of 164

Page 2

Minutes 
1 Investment Review Board 
Minute of the meeting of the Investment Review Board held on
16 November 2022.   
7 - 10 
2 Joint Consultative Board (Non-teaching) 
Minute of the meeting of the Joint Consultative Board (Non-
teaching) held on 25 January 2023.   
11 - 14 
Finance 
3 Revenue and Capital Budget Monitoring as at 11
November 2022 
Report by the Chief Executive.   
15 - 26 
4 Revenue and Capital Budget Monitoring – Council
Overview as at 11 November 2022 
Report by the Director of Finance & Resources.   
27 - 38 
5 Business Services Accounts for Write Off 
Report by the Director of Finance & Resources.   
39 - 44 
6 Paisley and Renfrew Common Good Fund Budgets
2023/24 
Report by the Director of Finance & Resources.   
45 - 50 
Performance 
7 Business Services Performance Report 
Report by the Director of Finance & Resources.   
51 - 62
Page 2 of 164

Page 3

8  Customer Services Performance Report 
Report by the Director of Finance & Resources.   
63 - 66 
9 Facilities Management Operational Performance Report 
Report by the Director of Environment & Infrastructure.   
67 - 74 
Policy 
10  Non-Domestic Rates - Empty Properties Operational
Policy 
Report by the Director of Finance & Resources.   
75 - 88 
11  HR & OD Policies (Revised Whistleblowing Policy) 
Report by the Director of Finance & Resources.   
89 - 100 
Public Holiday 
12  Additional Public Holiday – Coronation of King Charles
III 
Report by the Director of Finance & Resources.   
101 - 104 
Civic Hospitality 
13  Civic Hospitality and Appointment to Outside Body 
Report by the Director of Finance & Resources.             
105 - 108 
Page 3 of 164

Page 4

Contract Authorisation Reports 
14  Advice Services (RC-CPU-22-223) 
Report by the Chief Executive.   
109 - 114 
15  Managed Print Services (RC-CPU-22-225) 
Joint report by the Chief Executive and the Director of Finance &
Resources.   
115 - 118 
16  Contract Authorisation Report for a Microsoft
Enterprise Agreement (RC-CPU-22-256) 
Joint report by Chief Executive and Director of Finance &
Resources 
119 - 124 
17  Contract Award: Provision of a Social Care Case
Management System 
Joint report by the Chief Executive and the Director of Finance &
Resources   
125 - 128 
18  Contract Authorisation Report for three contracts:
Provision of Floating Support (RC-CPU-22-121);
Housing First (RC-CPU-22-142) and Housing First
(WRAP) (RC-CPU-22-144) 
Joint report by the Chief Executive and the Director of
Communities & Housing Services.   
129 - 136 
19  Contract Award: Legionella Prevention, Control and
Risk Management Services 
Joint report by the Chief Executive and the Director of
Environment & Infrastructure.   
137 - 142 
20  Notification of Increase in Value for the Contract for
Traffic Signals Planned and Unplanned Inspection and
Maintenance reference RC-CPU-19-173 
Joint report by the Chief Executive and the Director of
Environment & Infrastructure.   
143 - 148
Page 4 of 164

Page 5

21  Refurbishment of 5 Signalised Sites (RC-CPU-22-135) 
Joint report by the Chief Executive and the Director of
Environment & Infrastructure.   
149 - 154 
22  Paisley Town Hall Refurbishment - Furniture (RC-CPU-
22-150) 
Report by the Chief Executive.   
155 - 160 
23  Paisley Town Hall Refurbishment (PTHR) - Stage
Lighting and Loose AV Equipment (RC-CPU-22-171) 
Report by the Chief Executive.   
161 - 164 
Page 5 of 164

Page 6

Page 6 of 164

Page 7

Minute of Meeting
Investment Review Board 
Date Time Venue
Wednesday, 16 November
2022
11:00 Remotely by MS Teams, 
Present: Councillor Alison  Ann-Dowling, Councillor Jacqueline Cameron, Councillor David
McGonigle, Councillor Iain Nicolson, Councillor John Shaw 
In Attendance
C McCourt, Head of Finance & Business Services, G Borland, Principal Accountant,
Capital Accounting, E Gray, Senior Committee Services Officer and J Barron, Assistant
Committee Services Officer (all Finance & Resources). 
Also in Attendance
K Kapitan and E Price, both Investment Consultants Hymans Robertson LLP, and G
Brisbane, abrdn Capital Limited. 
Recording of Meeting
Prior to the commencement of the meeting, the Convener intimated that this meeting of this
Board would be recorded and that the recording would be available to watch on the
Council’s website.   
Declarations of Interest
There were no declarations of interest intimated prior to the commencement of the
meeting. 
Item 1
FRCS 090223 Page 7 of 164

Page 8

1  Minute of Previous Meeting
There was submitted the Minute of the meeting of the Investment Review Board held
on 22 June 2022. 
DECIDED: That the Minute be approved. 
2 Paisley and Renfrew Common Good Funds: review of investment
and income performance
There was submitted a report by the Director of Finance and Resources together with
a presentation by K Kapitan from Hymans Robertson LLP, relative to the Paisley and
Renfrew Common Good Funds, a review of investment income and the key issues
pertaining thereto. G Brisbane, Head of Charities (Scotland) abrdn (formerly
Aberdeen Standard Capital Limited) also provided a presentation relative to the
Paisley and Renfrew Common Good fund investments performance. 
The presentations referred to a review of the Investment Managers’ performance for
the six months to 30 September 2022;  an update of markets; and the current
economic climate. 
DECIDED: That the report and presentations be noted. 
3 Paisley and Renfrew Common Good Funds: review of Investment
Policy Statement
There was submitted a report by the Director of Finance & Resources relative to the
scope and content of the proposed Investment Policy Statement. 
The Council had arranged for the investments of the Paisley and Renfrew Common
Good Funds to be managed by abrdn Capital Limited, and had agreed with the
manager a number of principles which would govern decisions regarding those
investments. 
The principles covered a range of issues, such as what benchmark should be
employed against to assess the manager’s performance and any restrictions the
manager must observe in choosing sectors or classes of asset in which to invest.
These requirements were formalised in an Investment Policy Statement, which was
reviewed annually to ensure that the principles remain appropriate to the
requirements of the Common Good Funds. 
The Statement of Investment Policy was last reviewed in November 2021,and was
due for review. 
Confirmation was received that on 22 August 2022  both Paisley and Renfrew
Common Good Funds had been de-registered from the Scottish Charities Register.
The Investment Policy Statement had been updated to reflect this change. 
Page 8 of 164

Page 9

DECIDED: That the Investment Policy Statement a copy of which was appended to
the report, be approved as a replacement for the existing Statement of Investment
Principles.   
Page 9 of 164

Page 10

Page 10 of 164

Page 11

Minute of Meeting
Joint Consultative Board (Non-Teaching) 
Date Time Venue
Wednesday, 25 January
2023
15:00 Council Chambers/Hybrid Meeting, 
Present: Councillor Fiona Airlie-Nicolson, Councillor Audrey Doig, Councillor Chris Gilmour,
Councillor Lisa-Marie Hughes, Councillor Sam Mullin 
In Attendance
D Kerr, Service Co-ordination Manager (Environment & Infrastructure); and M Boyd, Head
of HR & OD, R Laouadi, HR Manager, R Cree, OD & Workforce Planning Manager, S
Fanning, Principal HR & OD Adviser, D Pole, End User Technician, E Gray, Senior
Committee Services Officer and J Barron and D Cunningham, both Assistant Committee
Services Officers (all Finance & Resources). 
Representing Trades Unions
John Boylan (UNISON) and Kirsten Muat (GMB).  
Item 2
FRCS 090223 Page 11 of 164

Page 12

1  Appointment of Chairperson
It was proposed and agreed that Councillor Audrey Doig chair the meeting. 
DECIDED: That Councillor Audrey Doig chair the meeting. 
2 Apologies
L Kilicaslan, Senior Manager for CAH Services, Renfrewshire Health and Social Care
Partnership; G Cochrane, UNITE; A Canning and G McLean (both GMB). 
3 Transparency Statement
Councillor Mullin indicated that he had a connection to items 4, 5, 6 and 7 of the
agenda as he was a member of the GMB Union. However, he indicated that he had
applied the objective test and did not consider he had an interest and intimated that it
was his intention to remain in the meeting and to take part in any discussion or voting
thereon. 
Councillor Hughes indicated that she had a connection to items 4, 5, 6 and 7 of the
agenda as she was a member of the Unison Union. However, she indicated that she
had applied the objective test and did not consider she had an interest and intimated
that it was her intention to remain in the meeting and to take part in any discussion or
voting thereon. 
Councillor Gilmour indicated that he had a connection to items 4, 5, 6  and 7 of the
agenda as he was a member of the Unite Union. However, he indicated that he
had applied the objective test and did not consider he had an interest and intimated
that it was his intention to remain in the meeting and to take part in any discussion or
voting thereon. 
4 Developments in Health, Safety and Wellbeing
There was submitted a report by the Director of Finance & Resources relative to
health, safety and wellbeing issues since the previous meeting of the Joint
Consultative Board (Non Teaching) on 15 November 2022. 
The Health & Safety Team continued to work collaboratively with key stakeholders, to
ensure risks were assessed, review policies and guidance, support front line services
in the delivery of emergency and prioritised work, evaluate contractors' and suppliers'
health and safety documentation when applying for contracts, respond to Freedom of
Information requests, produce health and wellbeing guidance to support the
workforce, and review all injury accidents occurring within the Council.   
DECIDED: That the report be noted.  
Page 12 of 164

Page 13

5  Absence Statistics
There was submitted a report by the Director of Finance & Resources relative to the
Council’s absence statistics for quarter 2, 1 July to 30 September 2022 
The report provided information in relation to absence targets and how Services and
categories of staff had performed against them. An analysis of the reasons for
absence for the period was included within the report. Information was also provided
on supporting attendance activity levels by Service and the overall number of days
lost. 
The absence statistics were broken down by service and category of staff, reasons for
absence and progress made by services in relation to their supporting attendance
action plans. 
DECIDED: That the report on absence statistics for the second quarter of 2022 be
noted. 
6 Details of Grievances
There was submitted a report by the Director of Finance & Resources relative to the
number of grievances received. 
The report provided information on grievances at both the informal and formal stages.
The report indicated that there were a total of 10 grievances as at January 2023,
which was a decrease of one case since the last meeting of this Board. 
DECIDED: That the report be noted. 
7 Agency Workers
There was submitted a report by the Director of Finance & Resources relative to the
number of agency staff employed within the Council as at December 2022 and
detailing the capacity and Services in which they were engaged. The report advised
that as at December 2022, 168 agency workers were employed across all Services,
and that this was an increase of 28 agency workers since November 2022. 
DECIDED: That the report be noted. 
8 Date of Next Meeting
DECIDED: That it be noted that the next meeting of the JCB (Non-Teaching) was
scheduled to be held at 3pm on 15 March 2023. 
Page 13 of 164

Page 14

Page 14 of 164

Page 15

To: Finance, Resources and Customer Services Policy Board
On: 9 February 2023
Report by: Director of Finance and Resources
Heading:  Revenue and Capital Budget Monitoring as at 11 November 2022 
1. Summary of Financial Position 
1.1. The projected revenue outturn at 31 March 2023 for those services reporting to
the Finance, Resources and Customer Services Policy Board is an overspend
position of £1.103m (1.0%) against the revised budget for the year. 
1.2. The projected capital outturn at 31 March 2023 for projects reporting to the
Finance, Resources and Customer Services Policy Board is a break-even
position.   
1.3. This is summarised over the relevant services in the table below and further
analysis is provided in the Appendices.
 
Table 1: Revenue
Division
Revised
Annual
Budget
£000
Projected
Annual
Outturn 
£000
Budget
Variance 
£000
Budget
Variance 
%
Finance and Resources 42,165 42,518 (353) (0.8%)
Environment and Infrastructure 20,154 20,904 (750) (3.7%)
Miscellaneous 45,871 45,871 0 0%
Total 108,190 109,293 (1,103) (1.0%)
Item 3
FRCS 090223 Page 15 of 164

Page 16

Table 2: Capital
Division
Revised
Annual
Budget
£000
Projected
Annual
Outturn 
£000
Budget
Variance 
£000
Budget
Variance 
%
Finance, Resources and
Customer Services 9,595 9,595 0 0%
 
2. Recommendations 
Members are requested to: 
2.1. Note the projected Revenue outturn position detailed in Table 1 above; 
2.2. Note the projected Capital outturn position detailed in Table 2 above; and 
2.3. Note the budget adjustments detailed at sections 4 and 6.
 
3. Revenue 
3.1. The Revenue Budget Monitoring report at Appendix 1 identifies a projected
annual overspend of £1.103m (1.0% of total budget) for all services reporting to
this Policy Board.  Detailed division service reports can be found at the end of
this report, along with an explanation of any significant projected variances.
3.2. The projected outturn is based on information currently available, and
assumptions made by service budget holders.  Any changes to these
projections will be detailed in future reports to this Board.
3.3. The main reasons for the projected outturn position are indicated below the
tables showing both the subjective analysis (what the budget is spent on) and
the objective analysis (which division is spending the budget).
 
4. Revenue Budget Adjustments 
4.1. Members are requested to note from Appendix 1 that budget adjustments
totalling £4.738m have been processed since the last report at Period 3, with
the main reasons as follows:
 + £4.646m drawdown of funding into Miscellaneous Services to fund the
2022/23 Local Government pay award; and
 + £0.177m transfer of Non-Domestic Rates budgets from Children’s Services
into Miscellaneous Services. 
 
Page 16 of 164

Page 17

5. Capital 
5.1. The Capital Investment Programme 2022/23 to 2026/27 was approved by the
Council on 3 March 2022.  For Finance, Resources and Customer Services the
approved capital spend for 2022/23 is £9.595m (£9.107m approved Capital
Plan). 
5.2. The budget movement primarily results from reprofiling in the approved capital
programme for the year, and grant awarded for kitchen refurbishment for the
expansion of school meals. Further detail can be found at Appendix 2. 
6. Capital Budget Adjustments 
6.1. Since the last report, budget changes totalling £0.437m have arisen, which
reflect the following:
 Budget carried forward into 2023/24 from 2022/23 (£0.592m): 
o ICT Infrastructure and Renewal Programme (£0.592m) to reflect expected
delivery dates in early 2023/24;
 Budget increases in 2022/23 +£0.876m: 
o Lifecycle Capital Maintenance Fund (£0.876m) for grant awarded by
Scottish Government to refurbish kitchen equipment for the provision of
school meals.
 Budget transfers in 2022/23 +£0.153m: 
o Village Improvement Fund (£0.200m) transfer in from Town Centre
Capital Fund as approved by Council in March 2022.
o Lifecycle Capital Maintenance Fund (£0.047m) transfer out to the
Community Halls Projects as per the Leadership Board, to provide funding
to increase scope of external work at Bargarran Community Nursery. 
Page 17 of 164

Page 18

_______________________________________________________________
 
Implications of this report
 
1.  Financial – The projected budget outturn position for Finance, Resources
and Customer Services’ Revenue budget is an overspend of £1.103m. 
Income and expenditure will continue to be monitored closely for the rest of
the financial year and, as far as possible, steps will be taken to mitigate any
overspend.   
The projected outturn position for Finance, Resources and Customer
Services’ Capital budget is break-even. The Capital programme will
continue to be monitored closely for the rest of the financial year and,
where necessary, steps will be taken to mitigate any overspend.   
Any changes to current projections in either Revenue or Capital budgets
will be reported to the board as early as possible, along with an explanation
for the movement. 
2.  HR and Organisational Development - None directly arising from this
report. 
3. Community/Council Planning - None directly arising from this report. 
4.  Legal - None directly arising from this report. 
5.  Property/Assets - The Capital expenditure in this board will result in
lifecycle maintenance improvements to existing properties and replacement
of ICT assets and infrastructure. 
6.  Information Technology - None directly arising from this report. 
7.  Equality and Human Rights - The recommendations contained within this
report have been assessed in relation to their impact on equalities and
human rights. No negative impacts on equality groups or potential for
infringement of individuals’ human rights have been identified arising from
the recommendations contained in the report because for example it is for
noting only.  If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website. 
8. Health and Safety - None directly arising from this report. 
Page 18 of 164

Page 19

9. Procurement - None directly arising from this report. 
10. Risk - The potential risk that the Council will overspend its approved
budgets for the year will be managed at a Council-wide level by the Chief
Executive and Directors. 
11. Privacy Impact - None directly arising from this report. 
12. Cosla Policy Position - N/a. 
13. Climate Risk - None directly arising from this report.
__________________________________________________________________ 
List of Background Papers 
Revenue Budget and Council Tax 2022/23, Council 3 March 2022. 
The Capital Investment Programme 2022/23 to 2026/27, Council 3 March 2022
__________________________________________________________________ 
Authors:        Valerie Howie / Lisa Dickie / Kevin Festorazzi / Geoff Borland 
Page 19 of 164

Page 20

APPENDIX 2 
 
 
 
 
Objective Summary
Approved 
Annual 
Budget at 
Period 6
Budget 
Adjustments
Revised 
Annual 
Budget at 
Period 8
Projected 
Outturn
Previous 
Projected 
Outturn 
Variance
Movement
 
£000 £000 £000 £000 £000 % £000 £000
Finance and Resources 42,861 (696) 42,165 42,518 (353) (0.8%) (353) 0
Environment and Infrastructure 20,112 42 20,154 20,904 (750) (3.7%) (541) (209)
Miscellaneous 40,479 5,392 45,871 45,871 0 0.0% 0 0
NET EXPENDITURE 103,452 4,738 108,190 109,293 (1,103) (1.0%) (894) (209)
Subjective Summary
Approved 
Annual 
Budget at 
Period 6
Budget 
Adjustments
Revised 
Annual 
Budget at 
Period 8
Projected 
Outturn
Previous 
Projected 
Outturn 
Variance
Movement
 
£000 £000 £000 £000 £000 % £000 £000
Employees 97,905 4,060 101,965 101,826 139 0.1% 27 112
Premises Related 8,764 1 8,765 9,542 (777) (8.9%) (420) (357)
Transport Related 1,682 0 1,682 1,722 (40) (2.4%) 23 (63)
Supplies and Services 22,053 (140) 21,913 22,193 (280) (1.3%) (337) 57
Third Party Payments 2,078 0 2,078 2,054 24 1.2% 24 0
Transfer Payments 57,954 913 58,867 58,647 220 0.4% 0 220
Support Services 2,740 0 2,740 2,691 49 1.8% 52 (3)
Depreciation and Impairment Losses 7,177 0 7,177 7,177 0 0.0% 0 0
GROSS EXPENDITURE 200,353 4,834 205,187 205,852 (665) (0.3%) (631) (34)
Income (96,901) (96) (96,997) (96,559) (438) (0.5%) (263) (175)
NET EXPENDITURE 103,452 4,738 108,190 109,293 (1,103) (1.0%) (894) (209)
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2022/23
1 April 2022 to 11 November 2022
POLICY BOARD :  FINANCE, RESOURCES & CUSTOMER SERVICES
Budget Variance 
(Adverse) or Favourable
Budget Variance 
(Adverse) or Favourable
Page 20 of 164

Page 21

APPENDIX 2 
 
 
 
 
Objective Summary
Approved 
Annual 
Budget at 
Period 6
Budget 
Adjustments
Revised 
Annual 
Budget at 
Period 8
Projected 
Outturn
Previous 
Projected 
Outturn 
Variance
Movement
 
£000 £000 £000 £000 £000 % £000 £000
Finance and Resources Directorate (353) 0 (353) (352) (1) (0.3%) 13 (14)
Audit Services 601 0 601 604 (3) (0.5%) 1 (4)
Corporate Governance 3,207 0 3,207 3,129 78 2.4% 69 9
Digital, Transformation & Customer Services 21,218 (339) 20,879 20,981 (102) (0.5%) (119) 17
Finance and Business Services 11,301 (267) 11,034 10,966 68 0.6% 68 0
Housing Benefits 4,043 0 4,043 4,046 (3) (0.1%) 0 (3)
People & Organisational Development 2,463 0 2,463 2,495 (32) (1.3%) (32) 0
Property Services (437) (90) (527) (436) (91) (17.3%) (93) 2
Social care (non‐delegated) 818 0 818 1,085 (267) (32.6%) (260) (7)
NET EXPENDITURE 42,861 (696) 42,165 42,518 (353) (0.8%) (353) 0
Objective Heading
Digital, Transformation & Customer Services
Property Services
Social care (non‐delegated)
The projected overspend reflects the one off costs of migration for the Council's telephony system over the course of the 
current financial year.
POLICY BOARD :  FINANCE, RESOURCES & CUSTOMER SERVICES
Key Reasons for Significant Projected Variances
An overspend in Premises Costs is projected. This is due to an expected increase in energy costs across operational Council 
properties.
An overspend in Premises Costs is projected. This is due to an expected increase in energy costs across Health and Social 
Care properties
Budget Variance 
(Adverse) or Favourable
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2022/23
1 April 2022 to 11 November 2022
Page 21 of 164

Page 22

APPENDIX 2 
 
 
 
 
Subjective Summary
Approved 
Annual 
Budget at 
Period 6
Budget 
Adjustments
Revised 
Annual 
Budget at 
Period 8
Projected 
Outturn
Previous 
Projected 
Outturn 
Variance
Movement
 
£000 £000 £000 £000 £000 % £000 £000
Employees 34,474 (577) 33,897 33,839 58 0.2% 63 (5)
Premises Related 2,728 0 2,728 3,071 (343) (12.6%) (353) 10
Transport Related 76 0 76 54 22 28.9% 23 (1)
Supplies and Services 9,525 (200) 9,325 9,498 (173) (1.9%) (194) 21
Third Party Payments 1,745 0 1,745 1,721 24 1.4% 24 0
Transfer Payments 55,157 (1) 55,156 55,155 1 0.0% 0 1
Support Services 694 0 694 644 50 7.2% 52 (2)
Depreciation and Impairment Losses 0 0 0 0 0 0.0% 0 0
GROSS EXPENDITURE 104,399 (778) 103,621 103,982 (361) 23.2% (385) 24
Income (61,538) 82 (61,456) (61,464) 8 0.0% 32 (24)
NET EXPENDITURE 42,861 (696) 42,165 42,518 (353) (0.8%) (353) 0
Budget Variance 
(Adverse) or Favourable
POLICY BOARD :  FINANCE, RESOURCES & CUSTOMER SERVICES ‐ FINANCE & RESOURCES
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2022/23
1 April 2022 to 11 November 2022
Page 22 of 164

Page 23

APPENDIX 2 
 
 
 
 
Objective Summary
Approved 
Annual 
Budget at 
Period 6
Budget 
Adjustments
Revised 
Annual 
Budget at 
Period 8
Projected 
Outturn
Previous 
Projected 
Outturn 
Variance
Movement
 
£000 £000 £000 £000 £000 % £000 £000
Building Services (241) 1 (240) (240) 0 0.0% (1) 1
Street Lighting Maintenance Work 376 0 376 528 (152) (40.4%) (178) 26
Public Building Repairs 3,822 44 3,866 3,866 0 0.0% (1) 1
Soft Facilities Management Services 16,155 (3) 16,152 16,750 (598) (3.7%) (361) (237)
NET EXPENDITURE 20,112 42 20,154 20,904 (750) (3.7%) (541) (209)
Objective Heading
Building Services
Soft Facilities Management Services
Street Lighting Maintenance Work
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2022/23
Budget Variance 
(Adverse) or Favourable
1 April 2022 to 11 November 2022
POLICY BOARD :  FINANCE, RESOURCES & CUSTOMER SERVICES ‐ ENVIRONMENT AND INFRASTRUCTURE
Key Reasons for Significant Projected Variances
The service is currently forecast to break even this year; however, it is recognised that costs are under considerable 
pressure from supply price increases. The position will continue to be closely monitored, with updates provided in future 
There is an anticipated under‐recovery of income, which is offset by some vacancies and an underspend in supplies and 
services across the service, and this will continue to be closely monitored throughout the financial year. Further detailed 
analysis has been completed on the outturn for the service and as a result an increase in the projected overspend is being 
reported as at period 8. 
There is a projected overspend on repairs and maintenance of street lighting columns due to increased costs of materials, 
which will be closely monitored during the financial year
Page 23 of 164

Page 24

APPENDIX 2 
 
 
 
 
Subjective Summary
Approved 
Annual 
Budget at 
Period 6
Budget 
Adjustments
Revised 
Annual 
Budget at 
Period 8
Projected 
Outturn
Previous 
Projected 
Outturn 
Variance
Movement
 
£000 £000 £000 £000 £000 % £000 £000
Employees 26,552 178 26,730 26,650 80 0.3% (36) 116
Premises Related 3,196 43 3,239 3,453 (214) (6.6%) (67) (147)
Transport Related 1,594 0 1,594 1,656 (62) (3.9%) 0 (62)
Supplies and Services 10,120 (1) 10,119 10,226 (107) (1.1%) (143) 36
Third Party Payments 0 0 0 0 0 0.0% 0 0
Transfer Payments 43 0 43 43 0 0.0% 0 0
Support Services 1,082 0 1,082 1,082 0 0.0% 0 0
Depreciation and Impairment Losses 0 0 0 0 0 0.0% 0 0
GROSS EXPENDITURE 42,587 220 42,807 43,110 (303) (0.7%) (246) (57)
Income (22,475) (178) (22,653) (22,205) (448) (2.0%) (295) (153)
NET EXPENDITURE 20,112 42 20,154 20,904 (750) (3.7%) (541) (210)
Budget Variance 
(Adverse) or Favourable
POLICY BOARD :  FINANCE, RESOURCES & CUSTOMER SERVICES ‐ ENVIRONMENT AND INFRASTRUCTURE
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2022/23
1 April 2022 to 11 November 2022
Page 24 of 164

Page 25

APPENDIX 2 
 
 
 
 
 
Subjective Summary
Approved 
Annual Budget 
at Period 6
Budget 
Adjustments
Revised Annual 
Budget at 
Period 8
Projected 
Outturn
Previous 
Projected 
Outturn 
Variance
Movement
 
£000 £000 £000 £000 £000 % £000 £000
Employees 36,878 4,460 41,338 41,338 0 0.0% 0 0
Premises Related 2,841 177 3,018 3,018 0 0.0% 0 0
Transport Related 12 0 12 12 0 0.0% 0 0
Supplies and Services 2,409 60 2,469 2,469 0 0.0% 0 0
Third Party Payments 333 0 333 333 0 0.0% 0 0
Transfer Payments 2,754 695 3,449 3,449 0 0.0% 0 0
Support Services 965 0 965 965 0 0.0% 0 0
Depreciation and Impairment Losses 7,177 0 7,177 7,177 0 0.0% 0 0
GROSS EXPENDITURE 53,369 5,392 58,761 58,761 0 0.0% 0 0
Income (12,890) 0 (12,890) (12,890) 0 0.0% 0 0
NET EXPENDITURE 40,479 5,392 45,871 45,871 0 0.0% 0 0
Subjective Heading
Budget Adjustments
Key Reasons for Significant Projected Variances
The budget transfer relates principally to the receipt of funding for the 2022/23 local government pay award, as well as the 
transfer Non‐Domestic Rates budgets from Children's Services.
Budget Variance 
(Adverse) or Favourable
POLICY BOARD :  FINANCE, RESOURCES & CUSTOMER SERVICES ‐ MISCELLANEOUS
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2022/23
1 April 2022 to 11 November 2022
Page 25 of 164

Page 26

APPENDIX 2 
 
 
 
 
Prior Years Approved   Budget  Revised  Projected 
Expenditure Budget Adjustments Budget Outturn Total Approved Projected
to 31/03/2022* 2022‐23 in 2022‐23 2022‐23 2022‐23 Budget Outurn 
Project Title to 31‐Mar‐27 to 31‐Mar‐27
£000 £000 £000 £000 £000 £000 £000
CORPORATE PROJECTS
ICT Infrastructure Maintenance & Renewal Programme 0 1,585 150 1,735 1,735 0 0% 3,927 3,927 0 0%
Strategic Asset Management Fund 0 1,800 (1,800) 0 0 0 0% 0 0 0 0%
Energy Efficiency Programme 0 102 0 102 102 0 0% 102 102 0 0%
Lifecycle Capital Maintenance (LCM) Fund 0 5,090 (257) 4,833 4,833 0 0% 12,456 12,456 0 0%
Artificial Pitch Upgrades 0 0 1,200 1,200 1,200 0 0% 1,200 1,200 0 0%
Digital Infrastructure Provision 1,546 0 390 390 390 0 0% 1,936 1,936 0 0%
Commnunity Empowerment Fund 349 293 309 602 602 0 0% 951 951 0 0%
Greenspaces and Parks 946 237 (237) 0 0 0 0% 936 936 0 0%
Villages Improvement Fund 0 0 350 350 350 0 0% 350 350 0 0%
Retail Improvement Fund 0 0 150 150 150 0 0% 150 150 0 0%
CO2 Monitors 0 0 233 233 233 0 0% 233 233 0 0%
TOTAL FINANCE, RESOURCES & CUSTOMER 
SERVICES BOARD 2,841 9,107 488 9,595 9,595 0 0% 22,241 22,241 0 0%
*Rolling programmes have a prior year year expenditure of £0 as the expenditure is not directly linked from one year to the next as a singular project.
Budget Variance (Adverse) or 
Favourable
Budget Variance (Adverse) or 
Favourable
RENFREWSHIRE COUNCIL
CAPITAL INVESTMENT STRATEGY ‐ NON‐HOUSING SERVICES
1st April to 11th November 2022
POLICY BOARD: FINANCE, RESOURCES & CUSTOMER SERVICES
Current Year 2022‐23 Full Programme ‐ All years
Page 26 of 164

Page 27

To: Finance, Resources and Customer Services Policy Board
On: 9 February 2023 
Report by:  Director of Finance and Resources
Heading:  Revenue and Capital Budget Monitoring – Council Overview as at
11 November 2022 
1. Summary of Financial Position 
1.1. The projected Revenue outturn at 31 March 2023 for all services is an overspend of
£8.244m. 
1.2. The projected Capital outturn at 31 March 2023 for all services is an underspend of
£0.100m.   
1.3. This is split between General Fund Services and the Housing Revenue Account
(HRA) in the table below, with further analysis is provided in the Appendices. 
Table 1: Revenue 
Division
Revised
Annual
Budget
Projected
Outturn
Budget
Variance
(Adv)/Fav
Budget
Variance  
£000 £000 £000 %
General Fund Services 496,779  505,023  (8,244) -1.7%
Housing Revenue Account 0  0  0  0.0%
Total 496,779  505,023  (8,244) -1.7%
 
Table 2: Capital
Division
Revised
Annual
Budget
Projected
Outturn
Budget
Variance
(Adv)/Fav
Budget
Variance  
£000 £000 £000 %
General Fund Services 114,991 114,891 100 0.0%
Housing Revenue Account  21,200 21,200 0 0.0%
Total 136,191 136,091 100 0.0%
Item 4
FRCS 090223 Page 27 of 164

Page 28

2. Recommendations 
Members are requested to: 
2.1. Note the projected Revenue outturn position detailed in Table 1 above,
considering that the forecast position is based on best estimates at this point in
time; and also note the substantial risks to this position as outlined in section 3
of the report; 
2.2. Note the projected Capital outturn position detailed in Table 2 above. 
3. Revenue Monitoring 
3.1. The Revenue Budget Monitoring report at Appendix 1 identifies a projected
annual overspend of £8.244m (1.7% of total budget) for all Services. Details for
all services can also be found here, along with an explanation of significant
projected variances. Setting aside the underspend related to adult services
(managed by Renfrewshire HSCP), the overspend is projected at £9.265m. 
3.2. The projected outturn is based on information currently available, and
assumptions made by service budget holders.  Any changes to these
projections will be detailed in future reports to this board. 
3.3. The main reasons for the projected outturn position are indicated in the
appendix showing both the subjective analysis (what the budget is spent on)
and the objective analysis (what division is spending the budget).
 
3.4. There are ongoing cost pressures within Soft Facilities Management, Roads,
Waste Services and OneRen. Information on significant variances is included
within Appendix 1. 
3.5. The projection does not currently include any variance relating to the collection
of Council Tax. Current forecasts suggest a collection level broadly in line with
2021/22; however, it is recognised that the full year impact of the cost-of-living
crisis may have a further effect on income collected. 
3.6. Members should also note that the forecast outturn position does not include
the impact of the pay settlement for 2022/23 budget, recently agreed for non-
teaching staff, but not yet agreed for Teachers or Chief Officers. Following
confirmation of the level of funding being provided by the Scottish Government,
the shortfall for 2022/23, above that already set aside, is currently estimated at
£3m. 
 
3.7. Directors and management teams are closely monitoring their costs and are
aiming to mitigate increases where possible; however, it is fully expected that
the Council will require to utilise reserve balances in order to break even at year
end. 
Page 28 of 164

Page 29

4. Capital Monitoring 
4.1. The General Services Capital Investment Programme 2022/23 to 2026/27 was
approved by the Council on 3 March 2022.  For General Fund Services the
revised capital spend for 2022/23 is £114.991m. 
4.2. The Capital Monitoring report at Appendix 2 indicates a projected underspend
of £0.100m in the approved capital programme for General Fund Services. 
4.3. The HRA Capital Investment Programme 2022/23 to 2026/27 was approved by
the Council on 3 March 2022.  For the HRA the approved capital spend for
2022/23 is £21.200m. 
4.4. The Capital Monitoring report at Appendix 2 indicates a break-even position in
the approved capital programme for the HRA for the year. It should be noted
that due to significant pressures that are emerging in construction commodities
and supply chains (in particular timber, cement, bitumen and steel) it is
anticipated that inflationary cost pressures will continue to emerge on capital
projects and there will be a requirement to use ringfenced reserves to manage
these pressures. 
5. Capital Overview 
5.1. The Council must determine and keep under review the maximum amount it
can afford to allocate to capital expenditure. In addition, the Council must also
keep under review its Capital Financing Requirement (CFR) i.e., the level of
resources that are used to fund capital expenditure over the longer term, rather
than at point of spend. It is also the duty of the Council to have regard to the
Prudential Code in setting its capital expenditure limit and its capital expenditure
requirement. 
5.2. The limit on capital expenditure that the Council has set for 2022/23 is shown
in the table below. The limit is based on the resources available to fund the
capital programmes, split between Housing and Non-Housing Services, but
excludes the Public Sector Housing Grant, as this is not considered to be capital
spend. 
Approved Plan
£m
Forecast Expenditure
£m
Non-Housing 131.755 114.891
Housing 29.995 21.200
Total 161.750 136.091 
5.3. The CFR set by the Council for 2022/23 is shown in the table below and is split
between Housing and Non-Housing Services. The projected outturn at 31
March 2023 is also shown. Any significant increase in the capital expenditure
limit that is not funded at point of spend will result in an increase in the CFR. 
Page 29 of 164

Page 30

Approved CFR to 
31 March 2023
£m
Projected CFR to 
31 March 2023
£m
Non-Housing 364 351
Housing 122 110
Total 486 461
6. Housing Services Programme 
6.1. The programme approved by the Council on 3 March 2022 totalled £29.995m.
The revised programme currently stands at £21.200m, a reduction of £8.795m
resulting from the net effect of reduced budget of £0.400m for signed contracts
being lower than estimated and £8.395m for expenditure reprofiled from
2022/23 into 2023/24. 
6.2. Capital expenditure to 11 November 2022 amounted to £7.222m and this
represents 34% of available resources, compared to 50% for the same period
in 2021/22. 
6.3. 1% of expected capital income has been received to date, compared to 59%
for the equivalent period in 2021/22. This difference relates to the timing of
receipt of Scottish Government grant funding for Council House New Build. 
6.4. The projected outturn position, after budget changes, is for the Housing
Services Programme to break even. However, inflationary impacts of delays to
work and estimates of costs complying with new guidelines are still ongoing and
may result in this being revised at a future date. 
7. Non-Housing Services Programme 
7.1. The programme approved by Council on 3 March 2022 totalled £131.755m. The
current programme totals £114.991m, a decrease of £16.764m resulting from
the net effect of: 
 budget increases of £9m, mainly as result of new grant awards for Paisley
Museum, Active Communities and Strathclyde Passenger Transport; 
 budget brought forward from 2021/22 to 2022/23 of £11m; and 
 projects re-profiled from 2022/23 to 2023/24 of (£37m). 
The projects re-profiled into 2023/24 largely relate to Paisley Museum, Paisley
Town Hall and Paisley Town Centre Infrastructure, City Deal and the new
Paisley Grammar Campus. 
7.2. Capital expenditure to 11 November 2022 totals £37.664m and represents 33%
of the available resources, compared to 34% for the equivalent period in
2021/22.
 
Page 30 of 164

Page 31

7.3. Capital income totalling £13.343m has been received to 11 November 2022.
This represents 30% of the total anticipated income, compared to 45% for the
equivalent period in 2021/22. The higher amount in 2021/22 relates to grant
received in advance for the Early Years 1,140 Hours expansion project.  
 
7.4. The projected outturn position after the budget changes is for an underspend
of £0.100m. However, as noted in 6.4, the full impact of COVID-19 on capital
costs on each project is not yet determined, with increased costs through
inflation and compliance expected to increase the risk of overspends across the
capital programme. 
8. Private Sector Housing Grant Programme 
8.1. The overall budget provision for this programme is included within the revenue
budget.  However, in order to monitor the performance of the individual
programmes, it is included within capital budget monitoring procedures. 
8.2. The Council approved expenditure up to £1.046m for 2022/23. The programme
currently stands at £1.292m, an increase in budget of £0.246m as a result of
projects re-profiled from 2021/22 into 2022/23. 
8.3. The programme is expected to fully spend by 31 March 2023 and will be
contained within the overall resources.
___________________________________________________________________
 
Implications of this report
 
1.  Financial – The projected budget outturn position for General Fund Services
Revenue budget is an overspend of £8.244m and break-even for the HRA
Revenue budget.  Income and expenditure will continue to be monitored
closely for the rest of the financial year and, where necessary, steps will be
taken to mitigate overspends.   
The projected outturn position for General Fund Services Capital budget is
an underspend of £0.100m and break-even for the HRA Capital budget. The
Capital programme will continue to be monitored closely for the rest of the
financial year and, where necessary, steps will be taken to mitigate any
overspend.   
Any changes to current projections in either Revenue or Capital budgets will
be detailed in future reports to this board. 
2.  HR and Organisational Development - None directly arising from this
report.
3. Community/Council Planning - None directly arising from this report.
Page 31 of 164

Page 32

4. Legal - None directly arising from this report.
5. Information Technology - None directly arising from this report.
6.  Equality and Human Rights - The recommendations contained within this
report have been assessed in relation to their impact on equalities and
human rights. No negative impacts on equality groups or potential for
infringement of individuals’ human rights have been identified arising from
the recommendations contained in the report because for example it is for
noting only. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website.   
7. Health and Safety - None directly arising from this report. 
8. Procurement - None directly arising from this report. 
9. Risk - The potential risk that the Council will overspend its approved
budgets for the year will be managed at a Council-wide level by the Chief
Executive and Directors. 
10. Privacy Impact - None directly arising from this report. 
11. Cosla Policy Position - N/a.
12. Climate Risk - None directly arising from this report.
 
List of Background Papers 
Revenue Budget and Council Tax 2022/23. Council, 3 March 2022.
Non-Housing Capital Investment Programme 2022/23 to 2026/27. Council, 3 March
2022.
HRA Capital Investment Programme 2022/23 to 2026/27, Council on 3 March 2022
A Prudential Framework for Capital Finance – Progress Report. Council, 16
December 2021
__________________________________________________________________
Authors:          Christine McCourt / Geoff Borland
Page 32 of 164

Page 33

Appendix 1 
 
 
 
 
Policy Board
Approved 
Annual Budget 
at Period 6
Budget 
Adjustments
Revised Annual 
Budget at 
Period 8
Projected 
Outturn
Previous 
Projected 
Outturn 
Variance
Movement
 
£000 £000 £000 £000 £000 % £000 £000
Communities and Housing Services 14,670 (152) 14,517 14,477 40 0.3% 28 12
Education and Children's Services 225,967 (202) 225,765 231,034 (5,269) (2.3%) (5,434) 165
Infrastructure, Land and Environment 30,841 (11) 30,830 32,928 (2,098) (6.8%) (1,696) (402)
Finance, Resources and Customer Services 103,452 4,738 108,190 109,293 (1,103) (1.0%) (894) (209)
Adult Services 93,607 0 93,607 92,586 1,021 1.1% 970 51
Planning  511 0 511 511 0 0.0% (150) 150
Economy and Regeneration 2,996 (0) 2,996 2,996 0 0.0% 34 (34)
Chief Executive's Service 20,349 14 20,363 21,198 (835) (4.1%) (278) (557)
GENERAL SERVICES NET EXPENDITURE 492,393 4,387 496,779 505,023 (8,244) (1.7%) (7,420) (824)
Housing Revenue Account (HRA) 0 0 0 0 0 0.0% 0 0
NET EXPENDITURE 492,393 4,387 496,779 505,023 (8,244) (1.7%) (7,420) (824)
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2022/23
1 April 2022 to 11 November 2022
Budget Variance 
(Adverse) or Favourable
POLICY BOARD :  FINANCE, RESOURCES & CUSTOMER SERVICES ‐ OVERVIEW
Page 33 of 164

Page 34

Appendix 1 
 
 
 
 
Policy Board
Education and Children's Services
Infrastructure, Land and Environment
Finance, Resources and Customer Services
Adult Services
Planning
Chief Executives
Housing Revenue Account (HRA)
Updated Planning fee and Building Warrant income now contributes to a forecast break‐even position for this service.
The projected overspend position is largely due to the costs of support to OneRen, reflecting the significant challenges the 
organisation continues to face following the pandemic and its impact on commercial income, in addition to the provisional level of 
pay award agreed for 2022/23.
Overall the HRA is projecting a break‐even position at the year‐end.  Employee costs are projected to underspend due to the 
ongoing recruitment of vacancies within the service. However, Repairs & Maintenance costs are likely to overspend by over £2m 
against budget; this is expected to be offset by reduced debt repayments at year‐end.
Key Reasons for Significant Projected Variance
The projected year‐end underspend is £1.021m, experienced within employee costs and reflecting national recruitment issues 
facing all Health & Social Care services. 
The projected year‐end overspend is £5.269m. This is mainly due to overspends within Children and Families in relation to 
Residential Accommodation placements, where the number of complex, expensive packages has increased significantly. The 
service continually reviews external placements to ensure they remain appropriate considering both costs and the specific 
support required. Additional overspends in premises costs across all schools arise from the current energy cost increase. Increase 
in transport costs in Primary and Secondary Schools due to an increase in the mainstream School Transport Contract.
The main drivers of the projected year‐end overspend are the loss of parking income, as has been the case since the beginning of 
the pandemic; refuse collection costs that are largely driven by inflationary costs and absence cover as a result of annual leave 
being carried forward from during the pandemic; and the impact of the anticipated energy increases on areas such as street and 
traffic lighting. All areas will continue to be closely monitored through the remainder of the year.
The projected year‐end overspend is £1.103m, arising from overspends in the repair and maintenance of street lighting columns 
continue due to the increased cost of materials, as well as an anticipated under‐recovery in income, offset by staff vacancies; this 
will be monitored closely throughout the rest of the year. The projected overspend in Social Care arises from energy prices 
increases affecting Social Care properties.
Page 34 of 164

Page 35

Appendix 1 
 
 
 
 
Subjective Summary
Approved 
Annual Budget 
Period 6
Budget 
Adjustments
Revised Annual 
Budget P8
Total Projected 
Outturn
Previous 
Projected 
Outturn 
Movement
£000 £000 £000 £000 £000 % £000 £000
Employees 345,646 11,888 357,534 354,471 3,063 0.9% 225 2,838
Premises Related 37,937 (1) 37,936 43,416 (5,480) (14.4%) (4,928) (553)
Transport Related 13,448 1 13,449 15,507 (2,058) (15.3%) (1,687) (371)
Supplies and Services 88,340 (4,661) 83,679 84,511 (832) (1.0%) (159) (673)
Third Party Payments 94,894 142 95,036 100,449 (5,413) (5.7%) (5,791) 378
Transfer Payments 87,915 (845) 87,070 87,751 (681) (0.8%) 753 (1,434)
Support Services 6,833 37 6,870 6,773 97 1.4% 77 20
Depreciation and Impairment Losses 27,629 0 27,629 25,508 2,121 7.7% 2,201 (80)
GROSS EXPENDITURE 702,642 6,562 709,203 718,386 (9,183) (1.3%) (9,310) 126
Income (210,249) (2,175) (212,424) (213,363) 939 0.4% 1,889 (951)
NET EXPENDITURE 492,393 4,387 496,779 505,023 (8,244) (1.7%) (7,420) (825)
Budget Variance 
(Adverse) or Favourable
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2022/23
1 April 2022 to 11 November 2022
POLICY BOARD :  FINANCE, RESOURCES & CUSTOMER SERVICES ‐ OVERVIEW
Page 35 of 164

Page 36

Appendix 2 
 
 
 
 
Prior Years Approved   Budget  Revised  Projected 
Expenditure Budget Adjustments Budget Outturn Total Approved Projected
to 31/03/2022* 2022‐23 in 2022‐23 2022‐23 2022‐23 Budget Outurn 
to 31‐Mar‐27 to 31‐Mar‐27
£000 £000 £000 £000 £000 £000 £000
EDUCATION & CHILDREN'S SERVICES
Education & Children's Services 81,011 13,359 (7,606) 5,753 5,653 100 2% 147,558 147,458 100 0%
TOTAL 81,011 13,359 (7,606) 5,753 5,653 100 2% 147,558 147,458 100 0%
COMMUNITIES, HOUSING & PLANNING
Housing(HRA) 38,415 29,995 (8,795) 21,200 21,200 0 0% 160,634 160,634 0 0%
Housing(PSHG) 0 1,046 246 1,292 1,292 0 0% 1,292 1,292 0 0%
TOTAL 38,415 31,041 (8,549) 22,492 22,492 0 0% 161,926 161,926 0 0%
INFRASTRUCTURE, LAND & ENVIRONMENT
Environment & Infrastructure 19,745 17,683 3,948 21,631 21,631 0 0% 56,118 56,118 0 0%
TOTAL 19,745 17,683 3,948 21,631 21,631 0 0% 56,118 56,118 0 0%
ECONOMY & REGENERATION
Economy and Development 29,508 45,871 (15,053) 30,818 30,818 0 0% 106,181 106,181 0 0%
TOTAL 29,508 45,871 (15,053) 30,818 30,818 0 0% 106,181 106,181 0 0%
FINANCE, RESOURCES & CUSTOMER SERVICES
Corporate Projects 2,841 9,107 488 9,595 9,595 0 0% 22,241 22,241 0 0%
TOTAL 2,841 9,107 488 9,595 9,595 0 0% 22,241 22,241 0 0%
LEADERSHIP
Leisure Services 57,861 754 1,632 2,386 2,386 0 0% 61,274 61,274 0 0%
Chief Executives 70,069 44,981 (173) 44,808 44,808 0 0% 361,646 361,646 0 0%
TOTAL 127,930 45,735 1,459 47,194 47,194 0 0% 422,920 422,920 0 0%
TOTAL ALL BOARDS 299,450 162,796 (25,313) 137,483 137,383 100 0.1% 916,944 916,844 100 0%
MADE UP OF :‐
Non-Housing Programme 261,035 131,755 (16,764) 114,991 114,891 100 0% 755,018 754,918 100 0%
Housing Programme(HRA) 38,415 29,995 (8,795) 21,200 21,200 0 0% 160,634 160,634 0 0%
Housing Programme(PSHG) 0 1,046 246 1,292 1,292 0 0% 1,292 1,292 0 0%
PROGRAMME TOTAL 299,450 162,796 (25,313) 137,483 137,383 100 0.1% 916,944 916,844 100 0%
Budget Variance (Adverse) or 
Favourable
Budget Variance (Adverse) or 
Favourable
RENFREWSHIRE COUNCIL
CAPITAL INVESTMENT STRATEGY ‐ NON‐HOUSING SERVICES
1st April to 11th November 2022
POLICY BOARD: FINANCE, RESOURCES & CUSTOMER SERVICES
Current Year 2022‐23 Full Programme ‐ All years
Page 36 of 164

Page 37

Appendix 3 
 
 
 
 
2022/23
Housing Non Housing PSHG Total
Services Services Programme
A. RESOURCES AVAILABLE TO FUND CAPITAL PROGRAMME £'000 £'000 £'000 £'000
1. Prudential Borrowing 18,370 69,406 87,776
2a General Capital Grant 16,959 600 17,559
2b. Specific Capital Grant 2,500 2,412 4,912
3. Usable Capital Receipts 330 25,753 26,083
4. Contribution From Current Revenue (CFCR) 0 461 692 1,153
5 Total Resource Availability 21,200 114,991 1,292 137,483
B. CAPITAL PROGRAMME
6. Resources Available 21,200 114,991 1,292 137,483
7. Current Programme 21,200 100% 114,991 100% 1,292 100% 137,483 100%
C. ACTUAL EXPENDITURE VS PROJECTED
8. Resource Availability 21,200 114,991 1,292 137,483
9. Cash Spent at 11 Nov 2022 7,222 34% 37,664 33% 623 48% 45,509 33%
10. Cash to be Spent by 31 March 2023 13,978 77,327 669 91,974
D. ACTUAL RECEIPTS VS PROJECTED
11. Current Programme (total receipts expected) 2,830 45,124 600 48,554
12. Actual Cash Received at 11 Nov 2022 15 1% 13,343 30% 608 101% 13,966 29%
13. Receipts to be received by 31 March 2023 2,815 31,781 -8 34,588
RENFREWSHIRE COUNCIL
2022/23 CAPITAL BUDGETS MONITORING SUMMARY REPORT TO 11 NOV 2022
Page 37 of 164

Page 38

Page 38 of 164

Page 39

1 
_________________________________________________________________ 
To: Finance, Resources and Customer Services Policy Board
On: 09 February 2023 
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Business Services Accounts for Write Off
___________________________________________________________________
1. Summary
1.1 In accordance with Financial Regulation 3.5.12 a report regarding the write-off
for sums over £10,000 due must be submitted to the Finance and Resources
Policy Board. 
1.2 The debt recovery process involves extensive effort by the Council and its
collection agents to locate the debtor and recover the debt.  During this process
a stage can be reached when it is recognised that the recovery of the sums is
no longer viable, and it is prudent to write-off the recovery of the outstanding
liability.
1.3 The Council has already pursued each of the debts summarised on the
attached Appendix through its follow up cycle and it is considered prudent to
write-off the outstanding balance.  
1.4      The approval for the write-off will enable the Council to prudently reflect within
the financial accounts an accurate representation of the collectable debt.  The
Council continues to monitor the accounts and, where the circumstances of the
debtor alter, will instigate further recovery action as appropriate.  The level of
write-off will be contained within the Council’s bad debt provision.
1.5     An analysis of the debt proposed for write-off highlighting the reason why
collection is deemed irrecoverable is shown in table 1 below:
Item 5
FRCS 090223 Page 39 of 164

Page 40

2 
Table 1
Sundry Debtors
Reason No. Debtors Value
Prescribed 1 £17,662.19
Total 1 £17,662.19 
Table 2
Non-Domestic Rates
Reason No. Debtors Value
Dissolved 6 £237,679.80
Liquidated 4 £182,190.72
Total 10 £419,870.52 
2. Recommendations
2.1 The Board is asked to authorise the write-off of the £437,532.71 as detailed
above. 
Implications of the Report
1. Financial – There has been adequate provision made for these bad debts.  
2. HR & Organisational Development - None
3. Community Planning – None
4. Legal - None
5. Property/Assets – None
6. Information Technology – None
7. Equality & Human Rights – None
8. Health & Safety - None
9. Procurement – None
10. Risk - None
11. Privacy Impact – None
12. Climate Risk – None
13. COSLA Policy Postion – N/A 
Author:           Emma Shields Senior Service Delivery Manager (Financial
Operations)
Page 40 of 164

Page 41

Finance, Resources and Customer Services Policy Board – Business Services Accounts for Write-Off 
Appendix 
1
Name Property Address Service Reason Year/Period/
Invoice Date
Amount
Debtor 1  Not Applicable  Sundry Debtors ‐ Communities, 
Housing and Planning Services 
Prescribed  2010  17662.19 
 
 
 
 
 
 
 
 
Total  £17,662.19 
A.C.A. Print Finishing & Packaging 
Solutions Ltd  
Unit 11 Northpoint, 21, Gordon Avenue, 
Hillington, Glasgow, G52 4TG 
Non‐Domestic Rates  Liquidated  2018  3093.04 
A.C.A. Print Finishing & Packaging 
Solutions Ltd  
Unit 11 Northpoint, 21, Gordon Avenue, 
Hillington, Glasgow, G52 4TG 
Non‐Domestic Rates  Liquidated  2019  5880.00 
A.C.A. Print Finishing & Packaging 
Solutions Ltd  
Unit 11 Northpoint, 21, Gordon Avenue, 
Hillington, Glasgow, G52 4TG 
Non‐Domestic Rates  Liquidated  2020  1546.62 
A.C.A. Print Finishing & Packaging 
Solutions Ltd  
Cartside Avenue, Inchinnan, PA4 9RP  Non‐Domestic Rates  Liquidated  2019  7328.00 
A.C.A. Print Finishing & Packaging 
Solutions Ltd  
Cartside Avenue, Inchinnan, PA4 9RP  Non‐Domestic Rates  Liquidated  2020  36452.68 
A.C.A. Print Finishing & Packaging 
Solutions Ltd  
Cartside Avenue, Inchinnan, PA4 9RP  Non‐Domestic Rates  Liquidated  2021  22129.24 
 
 
 
 
 
 
 
 
Total  £76,429.58 
ER Travel Services Ltd   35, Mcfarlane Street, Paisley, PA3 1SA  Non‐Domestic Rates  Dissolved  2016  2857.46 
ER Travel Services Ltd   35, Mcfarlane Street, Paisley, PA3 1SA  Non‐Domestic Rates  Dissolved  2017  3904.34 
ER Travel Services Ltd   35, Mcfarlane Street, Paisley, PA3 1SA  Non‐Domestic Rates  Dissolved  2019  4310.10 
 
 
 
 
 
 
 
 
Total  £11,071.90 
Exx.Oill Ltd   Unit 18, Xsite Braehead, King'S Inch Road, 
Renfrew, PA4 8XQ 
Non‐Domestic Rates  Dissolved  2021  12664.48 
Exx.Oill Ltd   Unit 18, Xsite Braehead, King'S Inch Road, 
Renfrew, PA4 8XQ 
Non‐Domestic Rates  Dissolved  2022  1224.19 
 
 
 
 
 
 
 
 
Total  £13,888.67 
Page 41 of 164

Page 42

Finance, Resources and Customer Services Policy Board – Business Services Accounts for Write-Off 
Appendix 
2
Name Property Address Service Reason Year/Period/
Invoice Date
Amount
New Street Promotions Ltd   Whisky Joe's, 7, New Street, Paisley, PA1 
1XU 
Non‐Domestic Rates  Dissolved  2016  3299.42 
New Street Promotions Ltd   Whisky Joe's, 7, New Street, Paisley, PA1 
1XU 
Non‐Domestic Rates  Dissolved  2017  13327.60 
New Street Promotions Ltd   Whisky Joe's, 7, New Street, Paisley, PA1 
1XU 
Non‐Domestic Rates  Dissolved  2018  13728.00 
New Street Promotions Ltd   Whisky Joe's, 7, New Street, Paisley, PA1 
1XU 
Non‐Domestic Rates  Dissolved  2019  6509.24 
 
 
 
 
 
 
 
 
Total  £36,864.26 
Paisley Fashion Limited   Unit 16 Paisley Centre, 23, High Street, 
Paisley, PA1 2AF 
Non‐Domestic Rates  Dissolved  2020  5782.44 
Paisley Fashion Limited   Unit 16 Paisley Centre, 23, High Street, 
Paisley, PA1 2AF 
Non‐Domestic Rates  Dissolved  2021  11049.50 
Paisley Fashion Limited   Unit 16 Paisley Centre, 23, High Street, 
Paisley, PA1 2AF 
Non‐Domestic Rates  Dissolved  2022  2097.74 
 
 
 
 
 
 
 
 
Total  £18,929.68 
Pound Plus Scot Ltd   Units 7a/8 Paisley Centre, 23, High Street, 
Paisley, PA1 2AF 
Non‐Domestic Rates  Dissolved  2020  12570.59 
Pound Plus Scot Ltd   Units 7a/8 Paisley Centre, 23, High Street, 
Paisley, PA1 2AF 
Non‐Domestic Rates  Dissolved  2021  15092.00 
Pound Plus Scot Ltd   Units 7a/8 Paisley Centre, 23, High Street, 
Paisley, PA1 2AF 
Non‐Domestic Rates  Dissolved  2022  2062.95 
 
 
 
 
 
 
 
 
Total  £29,725.54 
Rainbow Technology Systems 
Limited  
42, Kelvin Avenue, Hillington, Glasgow, 
G52 4LT 
Non‐Domestic Rates  Liquidated  2020  9702.00 
Page 42 of 164

Page 43

Finance, Resources and Customer Services Policy Board – Business Services Accounts for Write-Off 
Appendix 
3
Name Property Address Service Reason Year/Period/
Invoice Date
Amount
Rainbow Technology Systems 
Limited  
42, Kelvin Avenue, Hillington, Glasgow, 
G52 4LT 
Non‐Domestic Rates  Liquidated  2021  5110.77 
 
 
 
 
 
 
 
 
Total  £14,812.77 
Wilson Imports Limited   Unit 28, Wilson Business Park, 1 Queen 
Elizabeth Avenue, Hillington, Glasgow, 
G52 4NQ 
Non‐Domestic Rates  Liquidated  2019  1519.00 
Wilson Imports Limited   Unit 28, Wilson Business Park, 1 Queen 
Elizabeth Avenue, Hillington, Glasgow, 
G52 4NQ 
Non‐Domestic Rates  Liquidated  2020  874.00 
Wilson Imports Limited   Unit 5, Wilson Business Park, 1 Queen 
Elizabeth Avenue, Hillington, Glasgow, 
G52 4NQ 
Non‐Domestic Rates  Liquidated  2018  349.15 
Wilson Imports Limited   Unit 5, Wilson Business Park, 1 Queen 
Elizabeth Avenue, Hillington, Glasgow, 
G52 4NQ 
Non‐Domestic Rates  Liquidated  2019  2205.00 
Wilson Imports Limited   Unit 5, Wilson Business Park, 1 Queen 
Elizabeth Avenue, Hillington, Glasgow, 
G52 4NQ 
Non‐Domestic Rates  Liquidated  2020  1268.71 
Wilson Imports Limited   Unit 17, Wilson Business Park, 1 Queen 
Elizabeth Avenue, Hillington, Glasgow, 
G52 4NQ 
Non‐Domestic Rates  Liquidated  2019  5267.50 
Wilson Imports Limited   Unit 17, Wilson Business Park, 1 Queen 
Elizabeth Avenue, Hillington, Glasgow, 
G52 4NQ 
Non‐Domestic Rates  Liquidated  2020  3030.81 
Wilson Imports Limited   Unit 11, Wilson Business Park, 1, Queen 
Elizabeth Avenue, Hillington, Glasgow, 
G52 4NQ 
Non‐Domestic Rates  Liquidated  2020  46312.91 
Page 43 of 164

Page 44

Finance, Resources and Customer Services Policy Board – Business Services Accounts for Write-Off 
Appendix 
4
Name Property Address Service Reason Year/Period/
Invoice Date
Amount
Wilson Imports Limited   Unit 24b, Wilson Business Park, 1, Queen 
Elizabeth Avenue, Hillington, Glasgow, 
G52 4NQ 
Non‐Domestic Rates  Liquidated  2020  4011.86 
 
 
 
 
 
 
 
 
Total  £64,838.94 
Workspace Studios Limited   Warehouse Grd Flr, 1, Macdowall Street, 
Paisley, PA3 2JG 
Non‐Domestic Rates  Dissolved  2017  118.62 
Workspace Studios Limited   Warehouse Grd Flr, 1, Macdowall Street, 
Paisley, PA3 2JG 
Non‐Domestic Rates  Dissolved  2018  44528.00 
Workspace Studios Limited   Warehouse Grd Flr, 1, Macdowall Street, 
Paisley, PA3 2JG 
Non‐Domestic Rates  Dissolved  2019  35569.60 
Workspace Studios Limited   Warehouse Grd Flr, 1, Macdowall Street, 
Paisley, PA3 2JG 
Non‐Domestic Rates  Dissolved  2020  29867.75 
Workspace Studios Limited   Warehouse Grd Flr, 1, Macdowall Street, 
Paisley, PA3 2JG 
Non‐Domestic Rates  Dissolved  2021  17115.78 
 
 
 
 
 
 
 
 
Total  £127,199.75 
WWCM Ltd   Cafuffels, 17, New Street, Paisley, PA1 
1XU 
Non‐Domestic Rates  Liquidated  2021  20751.50 
WWCM Ltd   Cafuffels, 17, New Street, Paisley, PA1 
1XU 
Non‐Domestic Rates  Liquidated  2022  5357.93 
 
 
 
 
 
 
 
 
Total  £26,109.43 
 
 
 
 
 
 
 
 
Overall Total  £437,532.71 
Page 44 of 164

Page 45

__________________________________________________________________  
To: Finance, Resources and Customer Services Policy Board  
On: 9 February 2023          
___________________________________________________________________ 
Report by: Director of Finance and Resources
___________________________________________________________________ 
Heading: Paisley and Renfrew Common Good Fund Budgets 2023/24
___________________________________________________________________ 
1. Summary
1.1 The level of funding available to disburse annually from the Paisley and
Renfrew Common Good Funds is dependent upon the income received by
the Funds during the year. For each Fund, income is derived from its
respective investment portfolio and is received in the form of property rental
payments, interest payments or dividends, with the latter two being
particularly sensitive to financial market fluctuations.
1.2 The level of income available for 2023/24 has been estimated along with
existing annual commitments and assessments made of the affordability of
existing funds delegated to Local Partnerships on an annual basis.
___________________________________________________________________ 
2. Recommendations
2.1 The Board is asked to: 
i) Approve the 2023/24 budget allocations to Local Partnerships as
follows: 
Common
Good Fund
Local Partnership  Budget
2023/24
Renfrew  Renfrew £75,300
Paisley Paisley East £12,400
Paisley Paisley North, West and Central £10,900
Paisley Foxbar / Brediland and Glenburn £10,200
ii) Approve the continuing funding of project awards, as outlined in
Appendix 1. 
Item 6
FRCS 090223 Page 45 of 164

Page 46

___________________________________________________________________ 
3. Background
3.1 The Common Good Funds of both Paisley and Renfrew are used each
financial year to fund ongoing projects and commitments made by the
Finance, Resources and Customer Services Policy Board. In addition, an
annual allocation is made to relevant Local Partnerships, which have
delegated authority to disburse grants to local organisations from which they
receive bids for funding and/or to use the funding themselves to support
appropriate projects. The proposed allocations are based on the current
Local Partnership arrangements. 
3.2 Income received by the Common Good Funds is derived from rental income
from Common Good property and, principally, from dividend income and
interest payments. Subject to maintaining tenancies, rental income remains
fairly stable and predictable on a yearly basis. However, in terms of
investment income from dividends and interest, it is necessary to make an
informed estimate each year of the income that will be available to the
Common Good Funds in the following year.
3.3 Rental income receivable by both Common Good Funds is expected to
remain unchanged from the current year actual.
3.4 The investment income for 2023/24 is based on the estimated figures
provided for both the Paisley and Renfrew Common Good funds as at 31
December 2022.  The markets and anticipated sustainability of investments
will continue to be monitored by both officers and the Investment Review
Board.
3.5 Taking these projections into account, a forecast Income and Expenditure
Statement for each Common Good Fund has been prepared on a cash basis
(i.e. excluding non-cash movements, such as depreciation) and is appended
for Members’ consideration. These forecasts presume that in-year
expenditure will not exceed income. There is a requirement to ensure that
the ongoing commitments of each Common Good Fund remain affordable
and sustainable.
3.6 In August 2022 all three Common Good Funds became deregistered as
charities by the Scottish Charity Regulator (OSCR) meaning that there will
no longer be separate annual accounts from 2022/23 onwards. This means
there are no longer external audit costs for the Common Good Funds.
3.7 In light of the current economic climate, awards have generally been uplifted
by 5% inflation for 2023/24 with the exception of the award to the Cherrie
Centre, which has been held at the same level as 2022/23 pending further
discussion with the Centre with regards the level of financial support being
provided and the Centre’s overall financial position. 
Page 46 of 164

Page 47

3.8 As reported to the Leadership Board in November 2022, the Royal National
Mòd will take place in Paisley between 13 and 21 October 2023. This is the
second time that Paisley will host this prestigious and culturally significant
festival, the last visit being in 2013. The eight day event will reinforce the
profile of Paisley as a town capable of hosting national cultural events and
festivals. The local organising group are responsible for many of the
elements of the Mòd including venue decoration, town centre signage,
marketing, communications and transportation. In addition to this, they are
developing a vibrant fringe programme which will complement the traditional
elements of the festival. The costs involved are significant and – as in 2013 –
a contribution has been sought from the Paisley Common Good Fund. An
award of £15,000 is proposed to support the organising group.
3.9 
3.10 
A suitable contractor has been selected to complete the Oakshaw Church
Steeple repair and it is anticipated that work will start on this in Spring 2023
with a one-off contribution of £50,000 from the Paisley Common Good Fund
matching an equivalent contribution from the Place Based Investment Fund.
The above one-off costs result in a marginal forecast deficit position on the
Paisley Common Good Fund which will be funded from cash-backed reserve
balances accumulated from prior year surpluses. 
__________________________________________________________________ 
Implications of the Report
1. Financial – The proposed budgeted allocation is based on a general
principle of only spending the available income in each year.
2. HR & Organisational Development – None arising directly from this report.
3. Community Planning: 
Our Renfrewshire is well – Many of the projects funded by Local Partnerships
contribute to the promotion of more active pursuits for all age groups. 
Our Renfrewshire is thriving - The funding allocated from the Common Good Funds
supports local community groups and projects. 
Our Renfrewshire is safe – The community projects funded by Local Partnerships,
as well as recurring funding for events and community services supports communities
to be safer and stronger.
4. Legal – None arising directly from this report.
5. Property/Assets – None arising directly from this report. 
6. Information Technology – None arising directly from this report.
7. Equality & Human Rights – None arising directly from this report. If
required following implementation, the actual impact of the recommendations
and the mitigating actions will be reviewed and monitored and the results of
the assessment will be published on the Council’s website.   
Page 47 of 164

Page 48

8. Health & Safety – None arising directly from this report.
9. Procurement – None arising directly from this report.
10. Risk – There is a risk investment income will not be realised as forecast,
however this risk will be monitored through regular discussion with the
Council’s investment manager and adviser.  
11. Privacy Impact – None arising directly from this report.
12. COSLA Policy Position – None arising directly from this report.
13. Climate Risk – None arising directly from this report.
___________________________________________________________________ 
Author: Stuart Nibloe, Principal Accountant (Treasury)
stuart.nibloe@renfrewshire.gov.uk
0141 487 0906
Page 48 of 164

Page 49

Appendix 1 
Paisley Common Good - Income & Expenditure Forecast
Approved
Probable
Outturn Proposed
2022/23 2022/23 2023/24
£ £ £
Estimated Net Annual Income available:
Income receivable from Loans Fund (2,000) (1,000) (1,000)
Investment Income (155,000) (155,000) (155,000)
Property Rental Income (48,000) (48,800) (49,000)
(205,000) (204,800) (205,000)
Less costs:
Investment Management Fees 24,000 22,010 24,000
Council Administration Fee 15,000 14,000 14,000
External Audit Fees 2,300 0 0
Property Costs 5,500 0 1,000
Total Available for Disbursement (158,200) (168,790) (166,000)
Proposed Recurring Projects:
Christmas lights 52,340 52,340 55,000
Repair to War Memorial 430 430 500
Fireworks Display 5,000 0 0
Barshaw Gala 5,000 5,000 5,300
CCTV Operations 18,600 18,600 19,500
Total Cost of Recurring Projects 81,370 76,370 80,300
Proposed Non-recurring Projects:
Oakshaw Church Steeple Repair 0 0 50,000
Paisley Mòd 2023 Organising Committee 0 0 15,000
0 0 65,000
Proposed Local Partnership Allocations:
Paisley East, Ralston, Hawkhead/Lochfield,
Hunterhill and Charleston
11,820 11,820 12,400
Paisley North, Gallowhill, Ferguslie, Paisley West
and Central
10,380 10,380 10,900
Foxbar / Brediland and Glenburn 9,740 9,740 10,200
31,940 31,940 33,500
(Surplus)/Deficit on cash basis (44,890) (60,480) 12,800
Page 49 of 164

Page 50

Appendix 1 
Renfrew Common Good - Income & Expenditure Forecast
Approved
Probable
Outturn Proposed
2022/23 2022/23 2023/24
£ £ £
Estimated Net Annual Income available:
Income receivable from Loans Fund (18,000) (5,000) (5,000)
Investment Income (540,000) (540,000) (560,000)
Property Rental Income (260,000) (273,630) (270,000)
(818,000) (818,630) (835,000)
Less costs:
Investment Management Fees 90,000 84,130 85,000
Council Administration Fee 45,000 45,000 45,000
External Audit Fees 2,300 0 0
Renfrew Town Hall - lifecycle maintenance 8,000 8,000 8,000
Property Costs 15,000 12,000 15,000
Total Available for Disbursement (657,700) (669,500) (682,000)
Proposed Recurring Projects:
Christmas lights: operating costs 15,900 15,900 16,700
Christmas lights: switch-on event 10,000 10,000 10,000
Renfrew Pipe Band Competition 10,000 10,000 10,000
Repair to War Memorial 285 285 300
Repair to Public Clocks 205 205 220
Maintenance Benches - Robertson Park 640 640 700
Cherrie Centre Support 79,330 79,330 79,300
Renfrew Gala Week 5,000 5,000 5,300
CCTV Operations 11,000 11,000 11,600
Total Cost of Recurring Projects 132,360 132,360 134,120
Proposed Local Partnership Allocations:
Renfrew 71,740 71,740 75,300
(Surplus)/Deficit on cash basis (453,600) (465,400) (472,580)
Page 50 of 164

Page 51

_________________________________________________________________ 
To: Finance, Resources and Customer Services Policy Board
On:  9 February 2023
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Business Services Performance Report
___________________________________________________________________
1. Summary 
1.1  This report details performance across key Business Services functions
including revenue collection and benefit administration for the period ending
28 December 2022 (including an update on the funding and expenditure
position in relation to Discretionary Housing Payments (DHP) and the Scottish
Welfare Fund).  
_______________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board: 
 Note the contents of the report. 
_______________________________________________________________ 
3. Revenue Collection 
3.1 Council Tax 
3.1.1  This section details the collection performance as at 28 December 2022 for
Council Tax.  It also provides details of the total sums collected for the previous
financial year. 
3.1.2  The billable sum for 2022/23 is £94,202,701. 
Item 7
FRCS 090223 Page 51 of 164

Page 52

3.1.3   The sums collected to date for 2022/23 are £82,161,107 which is 87.22% of
the billable sum (87.26% last year). This represents a slight decrease of 0.04%
in cash collection as a proportion of net charges billed compared with the same
position for 2021/22. 
3.1.4 The Scottish Government’s Cost of Living Awards scheme payments, which
resulted in £9,376,650 being credited to Council Tax accounts earlier this year,
are reflected in the sums collected. It was anticipated that the percentage
increase previously reported would lessen over the remaining months of the
year as customers’ reduced instalments take effect. It is expected that the
ongoing cost of living crisis is likely to have an impact on the level of collection
this year. 
3.1.5  The Council Tax Reduction (CTR) awarded is £13,173,790, amounting to
12.27% of the billable sum, which is 0.93% less than at the same point last
year.  
3.1.6 The Service continues to work through a volume of outstanding CTR
applications and continues to encourage the take-up of CTR. Activities
planned for the new financial year will include close tracking of potential
applications and data matching to maximise CTR awards and support
customers, where possible. 
3.2 Non-Domestic Rates 
3.2.1  This section details the collection performance as at 28th December 2022 for
Non-Domestic Rates (NDR).  It also provides details of the total sums
collected for the last financial year. 
3.2.2  The Non-Domestic Rates (NDR) charges billed for 2022/23 amount to
£126,190,425; this is significantly higher than the levied amount of
£88,651,662 for 2021/22. Reduced take up of less generous Covid-19 reliefs
in comparison to 2021/22 largely accounts for the increase. 
3.2.3  The cash receipts to date amount to £101,397,428 which is 80.35% of the sum
billed. This is an increase in cash collection as a proportion of net charges
billed of 3.54% compared with the same position for 2021/22. 
3.2.4   Payment collection for Non-Domestic Rates commences in May each year. 
4.         Benefit administration 
 
This section details the processing performance in relation to Housing Benefit
and the Scottish Welfare Fund, as at the end of December 2022.  Also
provided is an update on the funding and expenditure position in relation to
Discretionary Housing Payments (DHP) and the Scottish Welfare Fund. 
Page 52 of 164

Page 53

4.1  Workload and Performance 
4.1.1  The Service aims to balance the varied and changing workload resulting from
the impact of the pandemic, in particular redirection of the significant
resources which were required to support Self-Isolation Support Grants in the
first quarter of the year. 
4.1.2 Work to retrieve the target position continues, due to the nature of benefits
workload it was always anticipated that, regrettably, this would take some
months. 
4.1.3 Recovery was impacted significantly by the Christmas closure, where two
weeks of processing time is lost. There is normally a dip in performance in
early January following the festive break, this is magnified this year because
of the recovery position. 
4.1.4 Recruitment and training of new team members has progressed with all posts
filled.   Training for benefits work is an extensive process, taking several weeks
for a new team member to become proficient in a single process, many months
to be fully trained in all areas and be fully productive. Intensive training support
is in place for less experienced team members. 
4.1.5 Additional temporary resources have been sourced and deployed to the
service; this will provide critical support and has already started to make an
impact in reducing volumes.  
4.1.6 The Service has a targeted plan in place with activity focussed on clearing
oldest items, balanced with addressing priority cases. 
4.1.7 As previously reported, the outstanding volume of work is following the high
volume of Self-isolation Support Grants at the start of the calendar year and
substantial changes to the Council Tax Reduction Scheme, which resulted in
significant manual intervention being required to enable processing. This
manual intervention was temporary, and the previous automated solution has
now been resumed. 
4.2 Speed of Processing – Housing/Council Tax Benefit 
4.2.1  As detailed in Table 1 below, processing speed for New Claims is outwith
target for the period. A much-improved processing time was achieved for the
period immediately following the previous board to 1 December 2022,
however as mentioned in 4.1.3 above this period has been severely impacted
by the Christmas closure. It is anticipated this this will recover quickly to
continue an improving trend over the next few periods. 
4.2.2  In relation to New Claims processed within 14 days of all information received,
this measure is also below target for the period. 
4.2.3     Processing of Changes in Circumstance (CIC) is outside of target for the
reporting period due to a continued focus on the catch up of older cases. The
temporary resource has been deployed to target this area specifically.
Page 53 of 164

Page 54

(Supplementary processing information is attached in Appendix 2 for
members’ reference) 
Table 1 – Performance Summary
Performance measure
6 Week Reporting
Period
02 December 2022
to
12 January 2023
Year to
date
position
Annual
Target
New Claims – processing time 46 40 24 days
New Claims - % processed within 14
days of all information received 65 74 92%
Changes in Circumstance –
processing time 39 13 10 days 
4.3  Discretionary Housing Payments 
4.3.1   The total budget for Discretionary Housing Payments for 2022/23 is shown in
Table 2 below; this includes an additional amount of £300k allocated by the
Council and £83.6k added from Flexible Funding for Financial Insecurity
resources, which were provided to the Council by the Scottish Government. 
4.3.2  Funding for DHP was previously provided to Local Authorities by the
Department for Work and Pensions, following the new social security powers
devolved to the Scottish Government (SG), DHP funding is now provided
entirely by SG. The total budget is detailed in Table 2 below and shows the
indicative spending spilt provided to the Council. 
4.3.3 The DHP budget has been calculated to include the full Scottish Government
estimate of the amount of funding required to fully mitigate the effect of the
Bedroom Tax.  This estimate includes a 20% reserve allocation, which will be
paid in May 2023, if required. 
4.3.4 In line with DHP Policy and DHP Regulations, the Service makes awards to
fully mitigate the effect of the Bedroom Tax and maximise spend within the
year. 
4.3.5  Table 3 shows the performance information in relation to DHPs. The table
shows that the average processing time in relation to DHP is within target. 
Table 2 – DHP Budget
Funding – indicative allocations Amount
Renfrewshire Council £300,000
Financial Insecurity Winter Funding £83,692
Financial Hardship (non-Benefit Cap) – Scottish Government £226,003
Financial Hardship (Benefit Cap) – Scottish Government £156,518
Page 54 of 164

Page 55

Bedroom Tax* – Scottish Government £2,349,931
Total budget for the year £3,156,004
*This figure represents the maximum amount required to cover the estimated shortfall of
customers impacted by the Bedroom Tax. 
Table 3 – DHP Performance Summary
Measure 1 April 2022 to 28 December 2022
Volume of DHP applications received 4,811 applications
Volume of DHP decisions made 4,618 decisions 
Number of DHP awards 4,362 awards 
Average processing time (target 29 days) 11 days
Total amount committed/paid £2,560,526 
4.4.1 The Scottish Welfare Fund 
4.4.1 The Scottish Welfare Fund (SWF) provides a safety net for vulnerable people
on low incomes through the provision of Community Care Grants and Crisis
Grants.  The Scottish Welfare Fund is a national scheme, underpinned by law
and delivered on behalf of the Scottish Government by all local councils.  The
SWF replaced elements of the Social Fund abolished by the Department for
Work and Pensions in 2013. 
4.4.2 The Service makes awards in 2022/23 in line with Scottish Government
guidance and had spent 61% of its total budget for the Scottish Welfare Fund
(SWF) by the end of December 2022. 
4.4.3 The total budget for the Scottish Welfare Fund for 2022/23 is shown in Table
4 below; this includes an additional amount of £500k allocated by the Council
and £132,954 added from Flexible Funding for Financial Insecurity resources,
which were provided to the Council by the Scottish Government. 
4.4.4   The performance data relating to the Fund is presented in Table 4 below.  The
Service has processed Crisis Grants within target for the period, however due
to an increased volume of Crisis applications, Community Care Grants were
over target for the period. 
4.4.5   From October 2020, the Scottish Government committed to providing a grant
of £500 to individuals who are in receipt of low-income benefits and who lost
income because they are required to self-isolate to prevent the spread of
COVID-19. 
4.4.6  The Scottish Welfare Fund was determined to be the legislative and delivery
mechanism for Self-Isolation Support Grants (SISGs) in the form of Crisis
Grants, as they are designed to provide occasional support to people facing
immediate financial need which poses a risk to their health and wellbeing. 
Page 55 of 164

Page 56

4.4.7   Self-Isolation Support Grants closed with effect from 5 January 2023. The
service will continue to accept applications, in line with Scottish Government
guidance, for 28 calendar days from the day the claimant was advised to stay
at home, provided they have booked a COVID-19 PCR test through the SISG
Portal on or before 5 January 2023. 
Table 4 – SWF Performance Summary (Crisis & Community Care Grants) 
Measure
1 April 2022 
to 
28 December 2022
Number of Crisis Grant applications received 7,457
Number of Crisis Grant Awards 4,934
Total amount paid for Crisis Grants £517,595
Average Processing time (2 working days
target) 2 days
Average Processing time within December 2 days
Number of Community Care Grant applications
received 1,874
Number of Community Care Grant Awards 1,130
Total amount paid for Community Care Grant £637,719
Average processing time year to date (15
working days target) 12 days
Average processing time within December 22 days
Total amount paid/committed from the fund £1,155,314
Budget from Financial Insecurity Winter
Funding £132,954
Budget from Council £500,000
Budget provided by Scottish Government £1,251,983
Total Budget £1,884,937
Table 5 – SWF Performance Summary (Self-Isolation Support Grants) (SISG) 
Measure 1 April 2022
to 
28 December 2022
Number of SISG applications received 1,528
Number of SISG Awards 1,333
Average Processing time year to date (1
working day target) 3 days
Average Processing time within December 3 days
Total amount paid/committed from the fund £541,150
Budget provided by Scottish Government £541,150
Page 56 of 164

Page 57

___________________________________________________________________ 
Implications of the Report 
1. Financial - The level of collection of Local Taxation continues to provide funding
for the delivery of Council services throughout Renfrewshire.  
 
2. HR & Organisational Development – None. 
 
3. Community/Council Planning – 
 Our Renfrewshire is fair - An effective Benefits service is vital to the quality
of life of many of our citizens as it provides vital support for low income
households to sustain tenancies and meet their rent obligations.  
 Working together to improve outcomes - An efficient and effective billing
and administrative process for the collection of local taxes is vital for
ensuring the recovery of income to the Council to support the provision of
local services. This is supported by a range of payment opportunities for
the public, including electronic and digital payments (e.g. Direct Debit,
Website and Telephone). 
 Working together to improve outcomes – Efficient and effective customer
service is vital to ensuring that citizens have equality of access to Council
services, whether this is digitally, by telephone or face to face. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - The recommendations contained within this report
in relation to performance updates has been considered in relation to its impact
on equalities and human rights. No negative impacts on equality groups or
potential for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report because it is for
consideration of performance only. 
 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11.  Privacy Impact – None. 
12.  Cosla Policy Position – None. 
13. Climate Risk – None.
_________________________________________________________
Page 57 of 164

Page 58

List of Background Papers 
None
___________________________________________________________________ 
Author:           Emma Shields, Senior Service Delivery Manager (Financial
Operations) 
Page 58 of 164

Page 59

Appendix 1
 
 
 
 
 
 
RENFREWSHIRE COUNCIL
REVENUES COLLECTION STATEMENT AS AT 28 DECEMBER 2022                    
COUNCIL TAX                      
2021/22   2022/23            
£m   £m                      
Projected Yield     98.307   100.788                                        
Gross Charges     102.352   107.376    
Less rebates     13.343   13.174                      
Net Charges Billed     89.009   94.203                      
Cash Collected     84.882   82.161    
Rebate Grant     13.343   13.174                              
98.224   95.335                      
Cash collected as % of Net Charges 95.36%   87.22%    
Income as % of Projected Yield 99.92%   94.59%                                                          
NON DOMESTIC RATES                    
2021/22   2022/23            
£m   £m                      
Projected Yield     86.879   123.667                                        
Gross Charges     145.569   148.215    
Less reliefs     56.917   22.024                      
Net Charges Billed     88.652   126.190                      
Cash Collected     84.589   101.397                      
Cash collected as % of Net Charges 95.42%   80.35%    
Cash collected as % of Projected Yield 97.36%   81.99%                    
 
Page 59 of 164

Page 60

Appendix 2                   Business Services Performance Report 
Supplementary KPIs – Finance & Resources Policy Board
 
 
 
 
 
APPEALS 
Where a claimant disputes a Benefits decision and also disputes a revision decision, they can formally make an Appeal.
The Benefits Service will prepare a detailed submission which is then considered by the Independent Tribunals Service.
Preparation of a submission is a very involved process and requires significant data gathering. 
Target processing speed
(number of days) 60     
Result: last 3 months (days) October: 236 days  November: 214  December: 94 days 
Average (12 months to date) 101 days     
Average Appeals Completed  2 Appeals per month     
Comment:- Appeals volumes are very low, which is expected due to reducing Housing Benefit caseload. Monthly targets
have been missed as older cases were processed. Additional temporary resource has been sourced to bring Appeals up
to date before the end of the financial year. 
REVISIONS 
Where a claimant disputes a benefits decision in the first instance, they can request for it to be looked at again. This
is known as a Revision. The process involves a Senior Benefit Assessor reviewing the decision thoroughly to decide
whether the decision should stand. 
Target 28 days     
Result last report July 22: 63  August 22: 77  September 22: 81 
Result Last 3 months October 22: 72  November 22: 91  December 22: 91 
Comment:-  The Service has missed target for revisions processing as a result of balancing workloads. Resources
have been focussed on reducing the outstanding volume of Revisions and bring processing up to date before the end
of the financial year. 
ACCURACY 
The Service proactively monitors the accuracy of benefits decisions made through a robust audit checking programme.
The Service targets to audit a minimum of 4% of calculations. 
Target %  Actual % 
Volume of Audits 2022/23  4%  39% 
Accuracy – December 2022  95%  77%   
Accuracy – 2022/23  95%  90% 
Comment:-  The Service continues to analyse errors and action trends/patterns by providing additional
guidance/training where needed. Targeted training has been undertaken following a dip in performance during
December. The proportion checked this period reflects a higher volume of case cleansing reviews carried out on claims
as a proportion of decisions made. Case cleansing reviews are triggered by longer processing times, so it is expected
to be higher during this recovery period. 
Page 60 of 164

Page 61

Appendix 2                   Business Services Performance Report 
Supplementary KPIs – Finance & Resources Policy Board
 
 
 
 
 
HOUSING BENEFIT OVERPAYMENTS 
The service is responsible for raising overpayments where Housing Benefit has been paid in
error. If these have resulted from errors made by claimants, the cost is partially funded by the
DWP. The service attempts to recover both newly raised and historic debts from claimants or
landlords as appropriate.     
Overpayments raised 2022/23 £972,039 
Overpayments raised and
recovered in year £314,408 
% Recovery 32.35% 
All recovery in year £828,779 
All recovery vs raised in year 85.26% 
All recovery vs all debt 10.13% 
Total debt outstanding at end of
reporting period £7,348,982 
Page 61 of 164

Page 62

Page 62 of 164

Page 63

1  
 
 
___________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 9 February 2022
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Customer Services Performance Report
___________________________________________________________________
1. Summary
1.1 This report details performance across key Customer Service functions
including Call Centre, Face to Face and Digital Support for customers for
December 2022 
___________________________________________________________________
2. Recommendations
2.1 It is recommended that the Board:
 Note the contents of the report. 
_________________________________________________________
3. Customer Service Provision
3.1 This section details the performance of the customer service for December
2022, and the current year to date position. The report provides an update on
the overall contact centre call handling volumes and service level.  
Face to Face services continue in Renfrewshire House, with these being
managed on an appointment basis. Details of customer volumes are provided
in this report.
Demand for Digital Services remains high, and this report will update members
on the level of online transactions being completed.
 
Item 8
FRCS 090223 Page 63 of 164

Page 64

2  
 
 
3.2 Telephone Call Handling
3.2.1 High level monthly summary – for the month of December, the contact centre
received 25,890 calls and answered 96% against a primary target of 90% for
the period.   
Table 1 – Customer Service Unit – Primary Target (call handling) 
Primary target  Year  Calls Received  December
Performance 
Year to Date 
90% calls
answered 
2022  25,890  96%  97%
2021  19,619  98% 97% 
3.2.2  The contact centre achieved the primary target of answering 90% of all calls.  
3.2.3  The secondary target is to respond to 70% of all calls within 40 seconds 
Table 7 – Customer Service Unit – Secondary Target (call handling) 
Secondary target  Year  December
Performance 
Year to Date 
70% calls in 40
seconds 
2022  58% 63%
2021  70% 62% 
 
3.2.4  The contact centre performance was below the secondary target of answering
70% of calls within 40 seconds, Year to date however the performance
remains higher than the same period last year.  
The main impact on performance was an extended period of severe cold
weather period experienced across the country during week commencing 12th
December.  This led to an increase in frozen pipes and heating / hot water
issues.  The call centre had to respond to this demand by extending operating
hours to 9pm each evening to support council tenants reporting issues. 
Overall, an increase of over 6,000 calls were received compared to the same
period last year. 
In addition to the telephone demand outlined above, the team continue to
manage the Free School Meal, Clothing Grant, and Bridging Payment
processes and to date the customer service team have processed 5,084
applications for Free School Meals and Clothing Grants and successfully paid
£796,830 in clothing grants for 6,371 children.   
Page 64 of 164

Page 65

3  
 
 
3.3  Face to face provision 
3.3.1  The Customer Service Centre in Paisley offers face to face support to
customers by appointment where this is required.   
3.3.2  Table 3 below shows the volume of customers who received face to face
service during the month of December 2022. 
Table 3 – Face to Face Customer Volumes 
Service  Total Customers 
Birth Registration  104
Marriage Registration  19
TOTAL  123    
3.4      Digital Services 
3.4.1  The Council continues to see a high level of requests processed through the
MyAccount online service, with a further 6,572 new users registered on the
platform since the start of the financial year. This continues the trend seen
since the start of the pandemic, with a total of 33,127 new users since March
2020. The number of users on the Council’s MyAccount service now equates
to over 99% of all households in Renfrewshire, compared to 69% of
households in March 2020. 
3.4.2  The level of online transactions for the month is slightly lower than the same
period last year but the MyAccount service still supported 10,937 requests in
December compared to 6,434 in the same period in 2019.  
3.4.3  Since the start of the financial year a total of 119,168 transactions have been
completed through the online service. 
 
 
 
___________________________________________________________________ 
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Online Transactions
2019/20 2020/21 2021/22 2022/23
Page 65 of 164

Page 66

4  
 
 
Implications of the Report
1. Financial – None 
2. HR & Organisational Development – None 
 
3. Community/Council Planning –  
 Working together to improve outcomes – An efficient and effective
Customer Services Unit is vital to ensuring citizens have equality of
access to Council services whether this is digitally, by telephone or
face to face 
4. Legal - None 
5. Property/Assets - None 
6. Information Technology - None -   
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report because it is for consideration of
performance only.   If required following implementation, the actual impact of
the recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website.   
8. Health & Safety – None 
9. Procurement - None. 
10. Risk - None 
11. Privacy Impact - None 
12. Cosla Policy Position – Non applicable. 
13. Climate Risk – none.
_________________________________________________________
List of Background Papers 
(a)  None 
___________________________________________________________________ 
Author:           Gary Innes, Senior Service Delivery Manager, Ext 6322
Page 66 of 164

Page 67

To:  Finance, Resources and Customer Services Policy Board 
On:  9 February 2023 
Report by: Director of Environment & Infrastructure 
Heading: Facilities Management Operational Performance Report 
1          Summary
1.1 Environment & Infrastructure brings together a range of Council services and 
activities, with both strategic and operational responsibilities.  This report provides an
operational performance update on Facilities Management (Hard and Soft Services - 
including Building Services) and delivered by Environment & Infrastructure since the
last Policy Board in November 2022. 
2         Recommendations 
It is recommended that the Finance, Resources and Customer Services Policy
Board: 
2.1  Approves the content of this report. 
3 Operational Update 
3.1 Supplies and Materials
Building Services continue to operate normal day to day business and our
emergency out of hours repairs.  However, the service continues to experience
delays in the provision of some resources and materials. This is being managed
within the programming of works. 
Item 9
FRCS 090223 Page 67 of 164

Page 68

3.2 Responsive Repairs 
The chart below shows the volume of responsive repairs reported by tenants on a
weekly basis for the third quarter of this year. This shows that on average 40-47% of
all repairs reported within this period are classed as ‘Emergencies’ or ‘Qualifying
repairs’ that require either a same day or next day visit. This makes planning repair
works outside of these categories challenging. 
Of the emergencies / qualifying repairs that were reported, 25-30% of these were out
of normal working hours and required a standby operative to attend. 
3.3 Service provision – weather impact
In the week beginning 13 December 2022, Renfrewshire experienced a very cold
snap of weather. Building Services attended over 1,700 emergencies reporting no
heating and hot water and colleagues in Hard FM attended calls across the public
buildings portfolio, including schools. 
As the weather warmed and thawed, the service worked 24/7, 7 days a week to keep
schools open, address heating problems and resolve plumbing issues across the
Council public building estate and housing stock. Most staff gave up planned annual
leave to help ensure every call was responded to as quickly as possible. 
1581
1708
1554 1463
1671 1621 1611
1480 1588
1790
3020
1668
658663 688 662 571 587 683 699 698 738 841
2238
864
559
160 171 151 144 116 164 160 211 193 251
522
204
343
0
500
1000
1500
2000
2500
3000
3500
WC 3-10-22
WC 10-10-22
WC 17-10-22
WC 24-10-22
WC 31-10-22
WC 07-11-22
WC 14-11-23
WC 21-11-24
WC 28-11-22
WC 5-12-22
WC 12-12-22
WC 19-12-22
WC 26-12-22
Repairs reported Quarter 3 - 2022
total number of repairs total emergencies
Page 68 of 164

Page 69

3.4  Domestic Gas Servicing 
In quarter 3 (October - December) 2022/23, the domestic gas servicing and repairs
team carried out 2,379 gas services. Of these, 189 services were not able to be
completed due to no access being granted at the time of the visit. These 189
services will move forward in the Housing Services process so the Council can gain
access to the properties prior to the 1-year anniversary of the gas service and ensure
full compliance. It should be noted that during the winter months, Officers profile to
have less gas servicing to allow the resources to realign onto responsive and
emergency calls as these calls rise substantially as the weather gets colder. The
figures for quarter 3 are in line with the same quarter last year where the Services
carried out 2,436 gas services with 287 instances of no access. 
3.5 Aids and Adaptations
In the third quarter of 2022 (October – December), Building Services completed 30
full adaptations and currently have 13 live jobs at various stages. These are currently
booked in across early February.   
3.6 Voids
3.6.1 Building Services continue to work closely with Housing Services to maximise the
number of houses that are returned to the letting pool and prioritise houses based on
current needs of those requiring housing. A total of 144 voids have been completed
and returned to the letting pool in quarter 3 of 2022/23. This makes a total of 526
voids returned to the letting pool in 2022/23 to the end of quarter three. 
3.6.2 The volume of works within void houses remains high, often due to the age of the
property or the condition that it has been left in by the vacating tenant. 
As at the 31 December, Housing Services have 170 void properties. This is a
reduction of 39 since the previous board report. 
Void Returns Quarter 3 – 2022/23
Full Void Works*
*Inclusive Gas
Central Heating
(GCH) install
*Inclusive
Asbestos
Removal 
(ASB RE)
Preliminary Works
144 19 20 126 
In addition to routine voids there is an additional SHQS programme which 
carries out more extensive works within the properties.  In the last quarter 
there has been 25 SHQS properties returned, in total 94 properties have been 
returned to housing since April 2022. In conjunction with Housing Services 
there is a collective agreement to pause SHQS properties passed to Building
Services to allow resources to be targeted at routine voids. 
Page 69 of 164

Page 70

3.7 Electrical Testing programme
As part of the on-going electrical compliance requirement of Landlords, Building
Services, and other external contractors, have been working in partnership with
Housing Services to carry out the statutory 5-year check of electrics within every
tenanted household cross Renfrewshire (approx. 12,500 houses). 
2022 - 2023
Quarter 1 - 639 
Quarter 2 - 280 
Quarter 3 – 42 
Since the beginning of 2021 a total of 3,853 houses have been fully electrical tested
by Building Services. 
Where it has not been possible to gain access to carry out the statutory checks, a
process has been implemented to ensure continued compliance standards are met.
The pilot process commenced on the 12 December 2022. 
3.8 Streetlighting 
In the third quarter of the year the Street Lighting Team performed well with 99.35%
of all reported dark lamps attended within the 7-day timescale. In addition, they
attended 123 emergencies. 
Overall, in the first 3 quarters of 2022/23, April to December, the Street Lighting team
have attended 455 emergencies. 
3.9 Capital Works across Public Building Portfolio
3.9.1 The £1.5 million extended school toilet upgrade programme is progressing well with
11 schools now completed and 2 others in progress with completion of all
programmed for February.  We are also carrying out an additional refurbishment at
Ferguslie Pre 5’s centre and works commenced in late January. 
3.9.2 Works have now been completed on the replacement of two full kitchens in the
specialist HSCP young person’s facilities in Blackhall, Paisley. 
3.9.3 Building Services have prepared quotes for the replacement of five kitchens in
Renfrewshire Health and Social Care Partnership (HSCP) care home premises.  It is
anticipated that this work will commence in mid-February 2023. 
3.10  Work Hub 
Extensive work continues implementing the new Work Hub application across
Building Services. A patch and upgrade has been applied to the system in January
2023 which will allow all operatives in Building Services to use the digital job
management system in February 2023 following appropriate testing of the system. 
Training has also been undertaken with colleagues in Housing Services on the data
information application - Info Suite. This will allow reporting to be undertaken
timeously. 
Page 70 of 164

Page 71

Work also continues to manually reconcile all invoices to the ledger to ensure
accurate financial planning for the end of the financial year. 
3.11 Energy  
Installation of LED Lighting 
The installation programme is now complete with a reduction in electricity usage
being noted at each of the completed schools. To date Renfrewshire Council has
spent £1,588,465, with the remaining balance due to be invoiced imminently. Officers
continue to work across the Council and also with colleagues in the PPP schools to
ensure systems are working at their optimal performance.
Local Heat and Energy Efficiency Strategies (LHEES)
The recruitment of an officer to implement the Local Heat and Energy Efficiency
Strategy (LHEES) for Renfrewshire is underway. The Officer will come into post and
working alongside a consultant, look to work with partners to deliver the statutory
requirement of a strategy and action plan by the end of December 2023. Funding has
been provided by the Scottish Government to allow work to be undertaken and works
will align and feed into the wider Renfrewshire Council Net Zero targets. 
CO2 Monitoring
CO2 monitoring within teaching spaces continues with 1,765 monitors installed and
monitored. The funding for the 2 monitoring officers ends in May 2023, by which point
it is expected that the process will be become part of the “business as usual” running
of the school. Discussions remain on-going between Facilities Management and
Children’s Services with a meeting being arranged with the Teaching Trade Unions in
early February to discuss the monitors. 
4 Soft FM (Facilities Management)
4.1  Project Search Placements 
Project Search is an employability programme designed specifically for young adults
with learning disabilities and/or autism. The aim being to assist young adults into full-
time employment through providing skills, coaching and work experience. Soft
Facilities Management are pleased to be working alongside Project Search to provide
work placements for candidates over a period of 10 weeks within school settings.
Project Search candidates have been undertaking tasks such as catering for school
lunches, cleaning of premises and assisting with compliance related duties. Each
candidate has been allocated an onsite mentor within Soft Facilities Management
who has been overseeing their progress and helping with their professional
development. The initial candidates have now completed their full 10-week
programme with some wishing to return to gain further experience within facilities
management. The service has been thrilled to be able assist them on this continued
journey. Soft Facilities Management staff have been excited to welcome the next
group of candidates who started their placements in January 2023. 
Page 71 of 164

Page 72

4.2 Suited Lock system 
Soft FM, in conjunction with the approved contractor, have installed a suited lock
system in all Renfrewshire schools, ELCC’s and Community Centres. The system
works using programmable keys and cylinders to help the service have increased
control of building access rights. Soft FM can update each key remotely, removing or
granting access privileges for the key holder in real time. By ensuring only those with
the necessary access rights can enter a property, this eliminates the security risks
associated with lost and stolen keys. In addition, the ability to update access rights
remotely ensures the building can be opened even if the Senior Facilities Operative
usually onsite is not available due to absence, annual leave etc. The contractor had
not considered using the system in this way and felt that this was an innovative
approach to improving the security of Council buildings. The project recently won
Security Project of the year at the Fire & Security Matters Awards. 
4.3 Recruitment of Strategic Facilities Manager (Soft FM) 
Following the above post becoming vacant, Environment & Infrastructure has
undertaken a recruitment exercise with the new Officer taking up post in late
February 2023. 
4.4 Capital Works
The Scottish Government capital funding award of £876,000 will enable full redesign
of kitchens within Barsail Primary School, Erskine, Bushes Primary school, Glenburn
and Mossvale/St James Campus, Paisley. Soft FM have been working in partnership
with Property & Technical Services and Corporate Procurement to progress the
tender award. With an end date of late 2023 for completed development, 75% of
primary schools will have returned to fully functioning production kitchens. These
developments will support the delivery of meals to the remaining school premises
and early years establishments. Further capital award funding from the Scottish
Government may provide scope to increase this number further along with further
improvements to established premises. Since the introduction of Universal Free
School Meals (UFSM) in Aug 2021, production facilities in primary schools have
increased from 12 to 23 kitchens, with a further four scheduled to be producing meals
by March 2023. The increase of production kitchens has created eleven full time
Senior Facilities Operative - Production Catering positions and 39 part time Facilities
Operatives positions throughout Renfrewshire in 2022. It is expected that further
recruitment will be required as works progress in 2023. 
Implications of the Report 
1.  Financial – Any financial elements referenced in this report will be progressed
through the Council’s financial & budget planning process. Capital funding projects
e.g. £876k for school kitchen upgrades are highlighted with the budget allocated to
be spent delivering the project, with appropriate financial monitoring in place.    
Page 72 of 164

Page 73

2.  HR & Organisational Development – None 
3. Community/Council Planning – the report details a range of activities which reflect
local community and council planning themes. 
4.  Legal – None 
5.  Property/Assets - None   
6.  Information Technology - None 
7.  Equality & Human Rights – The recommendations contained within this report have
been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in
the report. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored, and the
results of the assessment will be published on the Council’s website. 
8.  Health & Safety – Advice and guidance is being given to protect the health and
safety of employees and service users when carrying out priority services for the
Council in line with government and health guidance. 
9.  Procurement – All capital projects detailed within this report have been discussed
with Corporate Procurement to ensure compliance with national legislation and
guidance. 
10.  Risk – None 
11.  Privacy Impact – None 
12.  COSLA Policy Position – None 
13.  Climate Change – The work undertaken by the Energy Management Unit detailed in
the report assists with Renfrewshire’s Net Zero targets. Close liaison is maintained
with the Climate Emergency Lead Officer to help drive targets, actions and
outcomes. 
List of Background Papers - none 
Author: Gordon McNeil, Director of Environment & Infrastructure 
Page 73 of 164

Page 74

Page 74 of 164

Page 75

___________________________________________________________________
To: Finance and Resources Policy Board
On: 9 February 2023
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Non-domestic rates – empty properties operational policy
___________________________________________________________________
1. Summary 
1.1 Empty Property Relief was mandatory and fully funded by the Scottish
Government through the Local Government Settlement. 
1.2 During 2019/20 budget discussions, the Scottish Government committed to the
devolution of empty property relief on 1 April 2023. 
1.3 Local authorities have powers contained in section 3A of the Local Government
(Financial Provisions etc.) (Scotland) Act 1962 to award discretionary local
reliefs. 
1.4 Such reliefs are funded by councils and could be used to offer relief in full or in
part for empty properties from 1 April 2023. Local Government Revenue Funding
for 2023/24 will be adjusted reflect the devolution of Empty Property Relief. 
1.5 The purpose of this report is to present for approval a proposed policy setting out
the Council’s position in relation to Empty Property Relief for non-domestic
properties, which amends the 100% relief for unoccupied Listed Buildings
currently available. 
2. Recommendations
2.1 It is recommended that members of the Board 
 Note the contents of the report; and
Item 10
FRCS 090223 Page 75 of 164

Page 76

 Approve the Non-Domestic Rates – Empty Properties Operational Policy
attached at Appendix 1. 
3. Background 
3.1 Empty Property Relief was mandatory and fully funded by the Scottish
Government through the Local Government Settlement. As part of 2019/20
budget discussions the Scottish Government committed to the devolution of
empty property relief on 1 April 2023. 
Empty Property Relief (EPR) provides certain rates relief on unoccupied non-
domestic properties. 
Unoccupied industrial property is eligible for 100% relief for the first six months
since becoming unoccupied, and 10% thereafter. 
Other (non-industrial) unoccupied property is eligible for 50% relief for the first
three months since becoming unoccupied, and 10% thereafter. 
100% relief is provided indefinitely for unoccupied properties which meet any of
the following: 
 listed building 
 rateable value is under £1,700 
 owned by a trustee for sequestration, liquidation, or executors 
 cannot be occupied by law
 under a compulsory purchase order 
 the property has no buildings
 the owner is in administration (or subject to an administration order) 
 the owner is a company or partnership being wound up 
A summary of Unoccupied Properties in Renfrewshire is attached as Appendix
2 which outlines the position at 4 October 2022. 
3.2 Local authorities currently have powers contained in section 3A of the Local
Government (Financial Provisions etc.) (Scotland) Act 1962 to award
discretionary local reliefs. Such reliefs are funded by Councils and could be used
to offer relief in full or in part for empty properties from April 2023. 
3.3 On 15 December 2022, the Council approved the addition to the terms of
reference of the Finance, Resources and Customer Service Policy Board as
follows: 
 To determine the operation and policies of any locally determined non-
domestic rates schemes or reliefs in line with relevant legislation; and
Page 76 of 164

Page 77

 To determine the operation and policies of any locally determined council tax
schemes, discounts, or reductions in line with relevant legislation. 
3.4 It was intended that the devolution of this relief delivers greater fiscal
empowerment, enabling councils to administer any support for unoccupied
properties in a way that is tailored to local needs. 
3.5 The Scottish Government, in line with the independent Barclay Review of non-
domestic rates, supports measures that help bring empty property back into
economic use. 
3.6 Supporting the premise that the devolution of empty property relief could be used
as a vehicle to bring properties back into economic use, this was a power
previously sought by the Council during the Barclay Review period. 
4 Non Domestic Rates – Empty Properties Operational Policy 
4.1 The purpose of the Empty Properties Operational Policy is to specify that
Officers will operate the legislation detailed in section 3.2 above, aligned with
the Council approvals detailed in section 3.3. 
4.2 The policy maintains the position that Unoccupied industrial property is eligible
for 100% relief for the first six months since becoming unoccupied, and 10%
thereafter and that Other (non-industrial) unoccupied property is eligible for
50% relief for the first three months since becoming unoccupied, and 10%
thereafter. 
4.3 The Policy retains 100% relief for all unoccupied properties listed in section 3.1
above except for Listed Buildings. 
4.4 One of the main objectives of the Policy is to provide a supporting measure to
help bring empty properties back into economic use. 
4.5 With effect from 1 April 2023, Unoccupied Listed Buildings are eligible for 50%
relief for the first three months since becoming unoccupied and 10% thereafter,
the same as properties in the category Other (non-industrial) unoccupied; or
100% relief for 6 months and 10% thereafter if the property is classed as
unoccupied industrial. 
4.6 The policy will result in a charge for unoccupied properties which are classed
as listed buildings. For context, per the data presented in Appendix 2, as at 4
October 2022, this policy change would affect charges on 145 properties. 
Page 77 of 164

Page 78

4.7 To allow businesses time to prepare for this change A transitional period will
commence from 1 April 2023 for Listed Buildings who will continue have 100%
relief on that date for a period of 6 months after which time they will be eligible
for 10% relief. 
4.8 An Equality Impact Assessment has been carried out (attached as Appendix 3)
in line with the Council’s approach and no issues have been identified that
require mitigating actions. The Equality Impact Assessment will be reviewed as
data becomes available following introduction of the changes.
_________________________________________________________________
Implications of the Report
1. Financial – From 2023/24, funding related to the devolution of empty property
relief will be incorporated into the local government settlement and distributed to
Council based on historic levels of relief awarded in each respective council area.
The proposals in the report will generate a financial benefit to the Council,
however there is a risk that in future the level of grant from Scottish Government
related to EPR will be amended to reflect local policy decisions
 
2. HR & Organisational Development -  None arising directly from this report. 
3. Community Planning – None arising directly from this report. 
4. Community Care, Health & Well-being – None arising directly from this
report. 
5. Legal – None arising directly from this report. 
6. Property/Assets – None arising directly from this report. 
7. Information Technology – None arising directly from this report. 
8. Equality & Human Rights- The recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights.
No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report.  If required, following
implementation, the actual impact of the recommendations and the mitigating
actions will be reviewed and monitored, and the results of the assessment will
be published on the Council’s website 
9. Health & Safety – None arising directly from this report. 
Page 78 of 164

Page 79

10. Procurement - None arising directly from this report. 
11. Risk – None arising directly from this report. 
12. Privacy Impact - None arising directly from this report.
_________________________________________________________ 
Author:           Emma Shields – Senior Service Delivery Manager (Financial
Operations) 
Page 79 of 164

Page 80

APPENDIX 1 
RENFREWSHIRE COUNCIL 
FINANCE & RESOURCES 
NON-DOMESTIC RATES – EMPTY PROPERTIES OPERATIONAL POLICY 
1. Background 
1.1. Empty Property Relief 
1.1.1. Prior to 1 April 2023, Empty Property Relief was mandatory and fully
funded by the Scottish Government through the Local Government
Settlement. 
1.1.2. During 2019/20 budget discussions, the Scottish Government
committed to the devolution of empty property relief on 1 April 2023. 
1.1.3. Empty Property Relief (EPR) provides certain rates relief on unoccupied
non-domestic properties. 
1.1.4. Unoccupied industrial property is eligible for 100% relief for the first six
months since becoming unoccupied, and 10% thereafter. 
1.1.5. Other (non-industrial) unoccupied property is eligible for 50% relief for
the first three months since becoming unoccupied and 10% thereafter. 
1.1.6. 100% relief is provided indefinitely for unoccupied properties which meet
any of the following criteria: 
• listed building 
• rateable value is under £1,700 
• owned by a trustee for sequestration, liquidation or executors 
• cannot be occupied by law
• under a compulsory purchase order 
• the property has no buildings i.e., it comprises of empty land
• the owner is in administration (or subject to an administration order) 
• the owner is a company or partnership being wound up 
1.1.7. All empty property relief awards made under previous legislation ended
on 31 March 2023, prompting the need for a local policy.
Page 80 of 164

Page 81

APPENDIX 1 
1.2. Devolution of Empty Property Relief 
1.2.1. Local authorities have powers contained in section 3A of the Local
Government (Financial Provisions etc.) (Scotland) Act 1962 to award
discretionary local reliefs. Such reliefs are funded by councils and could
be used to offer relief in full or in part for empty properties from April
2023. 
1.2.2. On 15 December 2022 the Council approved the addition to the terms
of reference of the Finance, Resources and Customer Service Policy
Board as follows: 
 To determine the operation and policies of any locally determined
non-domestic rates schemes or reliefs in line with relevant legislation
 To determine the operation and policies of any locally determined
Council Tax schemes, discounts, or reductions in line with relevant
legislation; and 
2. Policy Purpose & Objectives 
2.1.  Purpose: 
2.1.1. The purpose of this policy is to: 
 Specify the Council’s position in relation to the awarding of relief for
empty non-domestic properties 
 Detail the appropriate reliefs applicable for all categories of empty
non-domestic properties. 
 Provide a supporting measure to help bring empty properties back
into economic use 
2.2. Policy Objectives 
2.2.1. The objectives of this policy are to: 
 To allow property owners a window to achieve reoccupation of
property without the burden of a full Non-Domestic Rates charge on
a property which has become unoccupied. 
Page 81 of 164

Page 82

APPENDIX 1 
 Offer an (immediate) incentive for owners of empty non-domestic
properties to invest in / dispose of / consider the building’s future
recurring financial liabilities for them as an owner. 
 Minimise to an optimum level the number of derelict non-domestic
properties in Renfrewshire. 
 Generate additional economic activity in Renfrewshire by
incentivising the marketing of properties to attract at rental charge
which as a minimum covers the non-domestic rates charge 
2.3. Policy Risks 
 Owners may seek to demolish their property or render it
unoccupiable as a result of not being willing / able to pay NDR. 
 Any future increase in the value of reliefs awarded may exceed
government funding, although this will be partly mitigated by the
removal of indefinite listed building relief. Additionally, any risk of
shortfall would also increase where the level of grant from Scottish
Government related to Empty Property Relief is amended to reflect
local policy decisions. 
3.     Empty Property Relief – Unoccupied Properties 
3.1. Awarding non-indefinite relief 
3.1.1. Unoccupied industrial property is eligible for 100% relief for the first six
months since becoming unoccupied, and 10% thereafter. 
3.1.2. Other (non-industrial) unoccupied property is eligible for 50% relief for
the first three months since becoming unoccupied and 10% thereafter. 
3.1.3. Any property part way through a non-indefinite period of relief as at 1
April 2023, awarded under the previous legislative framework, will
continue to receive the relief awarded until the appropriate end date is
reached i.e., six months for an industrial property and three months for
other properties. 
Page 82 of 164

Page 83

APPENDIX 1 
For example, a non-industrial property becomes empty on 1 March
2023 under the previous legislative position meaning that 50% relief
would have been awarded for the period 1 March 2023 to 31 May 2023.
Without this Policy that relief would terminate on 31 March 2023. 
3.2. Awarding indefinite 100 % Relief 
3.2.1. 100% relief is provided indefinitely for unoccupied properties which
meet any of the following criteria: 
• rateable value is under £1,700 
• owned by a trustee for sequestration, liquidation or executors 
• cannot be occupied by law
• under a compulsory purchase order 
• the property has no buildings i.e., it comprises of empty land
• the owner is in administration (or subject to an administration order) 
• the owner is a company or partnership being wound up 
3.3.   Unoccupied Properties classed as Listed Buildings 
3.3.1. With effect from 1 April 2023, Unoccupied Listed Buildings are eligible
for 50% relief for the first three months since becoming unoccupied and
10% thereafter, the same as properties in the category Other (non-
industrial) unoccupied; or 100% relief for 6 months and 10% thereafter
if the property is classed as unoccupied industrial. 
3.3.2. A transitional period will commence from 1 April 2023 for Listed
Buildings which will continue have 100% relief on that date for a period
of 6 months after which time they will be eligible for 10% relief. Listed
buildings which become unoccupied on or after 1 April 2023 will be
eligible for relief detailed in section 3.1 above. 
4. Dispute Process 
4.1. Appeals 
4.1.1. An appeal can be made on the grounds that the rates charged have
been incorrectly calculated. All appeals must be made within 28 days of
the date on the notice by writing to the Director of Finance & Resource. 
Page 83 of 164

Page 84

APPENDIX 1 
4.1.2. Where an appeal is received and is wholly in relation to the award of
relief for an unoccupied property, a Senior Officer will review the case
and respond to the appellant to explain that reliefs are non-legislative
and that a local policy is in place. 
4.1.3. If the appellant wishes to progress the appeal thereafter, a senior officer
will make a submission to the NDR Appeal Panel however will ask for
the appeal to be struck out as the change in liability is wholly in relation
level of relief awarded for an empty non-domestic property. 
4.2. Complaints 
4.2.1. Any complaints received concerning this policy will be logged,
investigated and responded to in accordance with the Council’s
Complaints Handling Procedure. 
5. Debt Recovery Action 
5.1.1. The Council’s normal recovery action will be taken, where appropriate. 
Page 84 of 164

Page 85

Appendix 2  
 
 
Empty Property Relief Awards for 2022/23 as at 04/12/2022 
 
Relief Type
2022/23
Count of
Awards
10% Empty Property Relief1 293
10% Industrial Empty Relief2 8
100% Compulsory Purchase Order3 11
100% Empty Land, No Buildings4 3
100% Industrial Property5 26
100% Insolvency6 24
100% Listed Building7 145
100% Occupation Prohibited By Law8 15
100% Rateable RV Less Than Limit9 273
100% Ratepayer Deceased10 2
50% Empty Property Relief11 70
Totals 870
 
1 Non‐Industrial properties where 10% relief is being awarded following on from 3 months relief at 
50% 
2 Industrial properties where 10% relief is being awarded following on from 6 months relief at 100% 
3 Indefinite 100% relief being awarded for empty properties which are subject to compulsory 
purchase orders 
4 Indefinite 100% relief being awarded for land without buildings 
5 Industrial properties where 100% relief is being awarded for a maximum of 6 months following the 
property becoming empty 
6 Indefinite 100% relief being awarded for empty properties where the party liable for rates is 
insolvent 
7 Indefinite 100% relief being awarded for empty properties which are listed buildings or ancient 
monuments as defined by Historic Environment Scotland 
8 Indefinite 100% relief being awarded for empty properties for which occupation is prohibited by 
law 
9 Indefinite 100% relief being awarded for empty properties which have rateable values of under 
£1700 
10 Indefinite 100% relief being awarded for an empty property which is in the possession of  the 
executor of a deceased person’s estate. The relief is only applicable to the period following death 
11 Non‐Industrial properties where 50% relief is being awarded for a maximum of 3 months following 
the property becoming empty 
 
Page 85 of 164

Page 86

Equality & Human Rights Impact Assessment Record
This documentation should be filled in on an ongoing basis as your piece of work develops.  Please
see pages 7-9 of the guidance for help in completing this record. Please complete this form
electronically, so you can expand the boxes as needed. 
Basic Information 
Currently empty commercial properties are charged reduced levels of business rates. The
reduction awarded on each property’s rates charge is governed by legislation put in place by
Scottish Government, and from 01/04/23 responsibility for all empty property reliefs will be
devolved to councils. 
Contact Details 
Name of person leading this work  Emma Shields
Job title of person leading this work  Senior Service Delivery Manager
(Financial Operations)
Email of person leading this work  emma.shields@renfrewshire.gov.uk
Name of Head of Service who will sign off the process  Christine McCourt 
Background Information 
The general rules for empty relief lead to customers receiving 3 months at 50% relief followed by
indefinite relief of 10%, but there are also various categories of 100% relief awarded. Renfrewshire
Council plans to retain every category of relief at the current level, with the exception of listed
building relief.  
An empty listed building currently receives indefinite 100% relief. This would be removed and
customers in that category will instead drop on to the standard reliefs of 3 months at 50% relief
followed by indefinite relief of 10% or, in the case of empty Industrial properties, 6 months at
100% relief followed by indefinite relief of 10%. This will bring policy for empty listed buildings in
line with non-listed empty buildings. 
Some assessment has been carried out of the current owners of empty properties and no equality
specific implications have been identified, although detailed equality information is not available
so there are limitations to this exercise. 
It is not anticipated that the proposed policy will have any adverse impacts on protected
characteristics, or that any adjustments will be required to the proposal as a result of equality
impacts. It is further noted that the policy intention is to reduce the number of vacant and derelict
commercial properties in the local area, and so it is anticipated that this approach may have a
positive impact for local communities by improving the appearance and perception of the area. 
Based on this, it is not anticipated that full Equality Impact Assessment is required at this time. 
Page 86 of 164

Page 87

Monitoring 
The policy will be monitored to assess whether unintended consequences occur for any protected
characteristics. 
Sign Off 
Page 87 of 164

Page 88

Page 88 of 164

Page 89

1  
 
 
___________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 09 February 2023
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: HR & OD Policies (Revised Whistleblowing Policy)
___________________________________________________________________
1. Summary 
1.1 The Council is committed to conducting its business with honesty and 
integrity, and it expects all employees to maintain high standards in 
accordance with the Council’s Code of Conduct for Employees.  Therefore, the
purpose of this report is to provide Elected Members with the revised HR&OD
Whistleblowing Policy attached in Appendix 1 for approval. 
1.2 The revised policy, which replaces the current ‘Expressing Concerns Out with
Line Management Policy’ is part of the Council’s ongoing programme to review
of HR&OD Policies and provides a mechanism for a concern about any
wrongdoing or malpractice within the Council to be reported and investigated.   
1.3  The policy is applicable to Local Government Employees, teachers, workers, 
officers, consultants, contractors, volunteers, casual workers and agency 
workers.  Consultation has taken place with the Trade Unions and feedback
where  applicable has informed the development of this policy. The policy has 
been modernised and updated in line with best practice, legislation and 
embeds our Council values. 
1.4  Following approval from Members, the policy will be communicated to all
managers and employees within the Council via the normal channels. 
___________________________________________________________________ 
Item 11
FRCS 090223 Page 89 of 164

Page 90

2  
 
 
2. Recommendations
2.1  Members are asked to approve the revised Whistleblowing Policy attached at
Appendix 1.
___________________________________________________________________
3.  Background
3.1  The Council strives to create an open and inclusive working environment which
enables employees to carry out their roles in a safe and supportive  way.  This
is important to maintaining health and wellbeing which remains our top priority. 
3.2 The revised policy aims to encourage the reporting of any suspected 
wrongdoing or malpractice in a confidential and secure environment, without 
fear of reprisal, and sets out a clear process for all to follow. 
3.3 Whistleblowing is a right under the Employment Rights Act 1996, the Public 
Interest Disclosure Act 1998 and the Enterprise and Regulatory Reform Act 
2013 that enables anyone who is conducting business for or on behalf of the 
Council to raise concerns over any matter of malpractice, wrongdoing, or 
dangerous activity at work.    
3.4 Once approved, training will be made available for all Council employees on the
procedures for submitting and dealing with concerns through designated
officers. This will support the fair, inclusive and consistent implementation of
this policy.
___________________________________________________________________
Implications of the Report
1.  Financial - None.
2.  HR & Organisational Development - HR & OD and Internal Audit will provide
advice and guidance to managers and employees on the interpretation and
application of this policy. 
3.  Community Planning - None
4.  Legal - The Council will meet its legislative and best practice requirements.
5.  Property/Assets - None
6.  Information Technology – None
7.  Equality & Human Rights 
The Recommendations contained within this report have been assessed in 
relation to their impact on equalities and human rights.   
Page 90 of 164

Page 91

3  
 
 
No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report.  If required following implementation,
the actual impact of the  recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be published
on the Council’s website. 
8.  Health & Safety - None
9.  Procurement – None
10.  Risk - None
11.  Privacy Impact – PIA Carried Out – No negative impact.
12. Climate Risk - None
13.  Cosla Policy Position - not applicable.
_________________________________________________________
List of Background Papers
Not applicable
___________________________________________________________________
Author: Raymond Cree, Organisational Development & Workforce Planning Manager
Email: raymond.cree@renfrewshire.gov.uk.  Tele:  01414870803 
Page 91 of 164

Page 92

Issue Number: 2                            
Issue Date: 2/23
Review Date:  2/25    
Whistleblowing Policy
For all council employees. 
This document is
available in alternative
formats on request.
Page 92 of 164

Page 93

1
CONTENTS
1.  Introduction ............................................................................................................................ 2 
2.  Purpose and Aims ................................................................................................................. 2 
3.  Scope of policy ...................................................................................................................... 2 
4.  What is whistleblowing? ......................................................................................................... 2 
5.  Procedure for Raising a Whistleblowing Concern ................................................................. 3 
6.  Raising a Whistleblowing Concern to Elected Members ....................................................... 4 
7.  Confidentiality and Anonymity ............................................................................................... 5 
8.  External disclosures ............................................................................................................... 5 
9.  Protection and Support for Whistleblowers ............................................................................ 6 
10.  False Reporting ..................................................................................................................... 6 
11.  Responsibility and Training .................................................................................................... 6 
12.  Monitoring and Review .......................................................................................................... 7 
13.  Contacts ................................................................................................................................. 7 
VERSION CONTROL
Version  Date Details of Review/Revisals made Next Review date
1 January
2023
Drafting of new policy to reflect current
legislative requirements 
[February 2025]             
Page 93 of 164

Page 94

2
1. Introduction 
1.1 The Council is committed to conducting its business with honesty and integrity,
and it expects all employees to maintain high standards in accordance with the
Council’s Employee Code of Conduct. Part of that is creating an open and
supportive working environment where employees feel able to speak up about
any suspected wrongdoing. This policy details our process for dealing with
Whistleblowing. 
1.2 This policy has been agreed and implemented following consultation with the
recognised Trade Unions. 
2. Purpose and Aims 
2.1 The purpose of this policy is to provide a mechanism for employees of the
Council, and other workers within the Council as detailed in section 3.1 of the
policy, to report a concern which they have about serious wrongdoing or
malpractice within the Council. It draws on the rights and obligations contained
within the Employment Rights Act 1996, the Public Interest Disclosure Act 1998
and the Enterprise and Regulatory Reform Act 2013. 
2.2 The aims of this policy are:
(a) To encourage employees and other workers within the Council to report
suspected wrongdoing as soon as possible, in the knowledge that their
concerns will be taken seriously and investigated as appropriate, and that
their confidentiality will be respected.
(b) To provide employees and other workers with guidance as to how to
raise those concerns.
(c) To reassure employees and other workers that they should be able to
raise genuine concerns without fear of reprisals, even if they turn out to
be mistaken. 
3. Scope of policy 
3.1 This policy covers all Council’s employees, workers, officers, consultants,
contractors, volunteers, casual workers, and agency workers. 
4. What is whistleblowing? 
4.1 Whistleblowing is the disclosure of information which relates to suspected
malpractice, wrongdoing or dangers at work. This may include:
 Criminal activity;
 Failure to comply with any legal or professional obligation or regulatory
requirements;
 Miscarriages of justice;
Page 94 of 164

Page 95

3
 Danger to health and safety;
 Damage to the environment; 
 Information tending to show any matter falling within any one of the
preceding paragraphs has been, is being or is likely to be deliberately
concealed. 
4.2 A “whistleblower” is a person who raises a genuine concern relating to any of
the above. If you have any genuine concerns related to suspected malpractice,
wrongdoing or danger affecting any of the Council’s activities (a whistleblowing
concern) you should report it under this policy. 
4.3 Whistleblowing does not cover less serious matters; such matters should be
raised by an employee to their line manager. An employee’s concerns about their
own employment which should be addressed in accordance with the relevant HR
policy, for example the Council’s Grievance Procedure or Respect at Work
Policy, as appropriate. 
4.4 If an employee or other worker is uncertain whether something is within the
scope of this policy they should seek advice from the Whistleblowing Officer,
whose contact details are at the end of this policy. 
5. Procedure for Raising a Whistleblowing Concern 
5.1 An employee or other worker wishing to raise a matter that is covered by the
categories covered in this policy should:
(a) Contact the appropriate designated officer in the employing Service in the
Council. The Designated Officers are those identified in Annex 1 to this
policy. The concern should be raised, preferably, in writing and to avoid
any doubt, should be preferably described as a “Whistleblowing
Concern”.    
(b) Call the Confidential Whistleblowing Hotline.
(c) Completing the online form at www.renfrewshire.gov.uk, search for
‘Whistleblowing Policy’. 
5.2 Employees within the Renfrewshire Health and Social Care Partnership can
access the National Whistleblowing Standards in relation to NHS Services.
Further information can be obtained from the Chief Officer and accessed here. 
5.3 Where a whistleblowing concern is made directly to a line manager, the line
manager should immediately forward details of the concern to the Designated
Officer. 
5.4 Any whistleblowing concern received in accordance with paragraph 5.1 above,
will be sent to the Designated Officer (set out in Annex 1 of this policy). If a
whistleblowing concern is made which alleges wrongdoing by a Designated
Officer, then that concern should be made directly to the Chief Executive. In the
Page 95 of 164

Page 96

4
event the whistleblowing concern relates to the Chief Executive then that concern
should be made directly to the Council’s Monitoring Officer. 
5.5 Once a whistleblowing concern has been submitted the Designated Officer (or
nominated officer in their absence) will acknowledge receipt as soon as possible
and within a maximum of 5 working days.   
5.6 At this stage of the process, it is important that confidentiality is maintained by
both parties where that is required to ensure that the matter can be dealt with in
the appropriate way, avoid prejudice and protect individual rights. 
5.7 The whistleblowing concern will then be considered, and a decision taken as to
whether, and in what way, the matter should proceed. 
5.8 Should the Designated Officer decide not to take any action you will be notified
and given the reason(s) for this decision.  
5.9 If the Designated Officer decides that further action is required based on your
whistleblowing concern, then you will be notified of this decision and the likely
timescale. 
5.10 Once the matter has been concluded and the appropriate action taken in
response to your concern, you will be informed subject to confidentiality being
maintained, as required. 
5.11 Under the terms of this policy, you may seek a progress update from the
Designated Officer regarding the status of your concern, although it has to be
understood that the response may have to be qualified in order to protect other
interests.  
5.12 Whilst the Council cannot guarantee the outcome you are seeking, the Council
will try to deal with your concern fairly and in an appropriate way.  By using this
policy, you can help the Council achieve this.    
5.13 If you are not satisfied with the way your whistleblowing concern has been dealt
with, you can raise this with the Chief Executive. 
6. Raising a Whistleblowing Concern to Elected Members 
6.1 Where an Elected Member is approached by an employee or other worker as set
out in section 3 above in connection with a whistleblowing concern covered
under this policy, the Elected Member should encourage that individual to raise
their concern in accordance with this policy. 
Page 96 of 164

Page 97

5
6.2 In cases where an Elected Member receives a whistleblowing concern, they shall
send it directly to the Whistleblowing Officer who will then process it in line with
this policy. 
6.3 Elected Members must not investigate any whistleblowing concerns themselves. 
7. Confidentiality and Anonymity 
7.1 The Council hopes that all employees and other workers will be able to raise
whistleblowing concerns openly under this policy. However, if an employee or
other worker wishes to raise their concern confidentially, the Council will try to
ensure that their identity remains anonymous. If it is necessary for anyone
investigating the employee or other worker’s concern to know their identity, then
this will be discussed directly with them. 
7.2 The Council does not encourage employees or other workers to raise concerns
anonymously. Proper investigation may be more difficult or impossible if the
Council cannot obtain further information. It is also more difficult to establish
whether any allegations are credible. Employees or other workers who are
concerned about possible consequences if their identity is revealed should raise
this with the Designated Officer and appropriate measures may be taken to
preserve confidentiality. An employee or other worker can seek advice from the
Council’s whistleblowing hotline or Protect, the independent whistleblowing
charity, who offer a confidential helpline (details are set out below). 
8. External disclosures 
8.1 The aim of this policy is to provide an internal mechanism for reporting,
investigating and remedying any wrongdoing in the workplace. It is expected that
the internal mechanisms outlined in this policy will be used and with confidence.
If, however, there is genuine cause to believe that an internal disclosure to one of
the identified officers would not be appropriate for particular reasons, it is
accepted that a disclosure to an external regulator may be protected. It will very
rarely, if ever, be appropriate to alert the media and employees and other
workers are strongly encouraged to report concerns through this policy and its
internal mechanisms. 
8.2 The independent whistleblowing charity, Protect, operates a confidential helpline.
They also have a list of prescribed regulators for reporting certain types of
concern. Their contact details are at the end of this policy. 
8.3 Whistleblowing concerns usually relate to the conduct of the Council’s
employees, but they may sometimes relate to the actions of a third party, such as
a customer, supplier or service provider. In some circumstances the law will
protect you if you raise the matter with the third party directly. However, the
Council encourages its employees and other workers to report such concerns
Page 97 of 164

Page 98

6
internally first. An employee or other worker should contact the Whistleblowing
Officer for guidance regarding this. 
9. Protection and Support for Whistleblowers 
9.1 It is understandable that whistleblowers are sometimes worried about possible
repercussions. The Council encourages openness and transparency and will
support employees and other workers who raise genuine concerns under this
policy, even if they turn out to be mistaken. Employees and other workers raising
concerns under this policy will be protected, provided that the concern is made in
the reasonable belief that it is in the public interest. 
9.2 Employees and other workers raising a concern under this policy must not suffer
any detrimental treatment as a result of raising the concern. Detrimental
treatment includes dismissal, disciplinary action, harassment, victimisation or
other unfavourable treatment connected with raising a concern. If you believe
that you have suffered any such treatment, you should inform the Whistleblowing
Officer immediately. If the matter is not remedied, you should raise it formally
using the Council’s Grievance Procedures or Respect at Work Policy.  
9.3 An employee or other worker must not threaten or retaliate in any way against
another individual raising a whistleblowing concern. Any employee or other
worker involved in such conduct may be subject to disciplinary action under the
Council’s Disciplinary Procedures. In addition, where an employee or other
worker has been subjected to a detriment by another employee, they could be
personally liable for their own conduct. 
10. False Reporting 
10.1 There may be instances when a concern is submitted, based on reasonable
belief by an employee or other worker that something is wrong at a particular
time, which is subsequently demonstrated to be false or inaccurate. In such
circumstances, employees or other workers will be informed of the discrepancy
between their concern and the facts at hand. Provided that the Council is
satisfied that the employee or other worker had a reasonable belief that such a
situation should be reported, no further action will be taken. 
10.2 If an employee or other worker has deliberately raised a concern that they know
to be untrue or unfounded this may lead to a disciplinary investigation and
disciplinary action against the employee being taken. 
11. Responsibility and Training 
11.1 Internal Audit has overall responsibility for this policy and for reviewing the
effectiveness of actions taken in response to concerns raised under this policy.
The Whistleblowing Officer will maintain a register of concerns raised and the
Page 98 of 164

Page 99

7
outcomes, as required. The Whistleblowing Officer (or other delegated officer)
will present an annual report to the Audit, Risk and Scrutiny Board detailing the
number of whistleblowing complaints received and actions taken by the Council.
This annual report will be anonymised to protect confidentiality. 
11.2 The Designated Officers must provide information regarding any concerns
received to the Whistleblowing Officer. Regular updates and information about
outcomes of any investigations must be provided to the Whistleblowing Officer to
allow them to maintain the register of concerns. 
11.3 The Designated Officers must ensure that all managers and other staff who may
deal with concerns or investigations under this policy receive regular and
appropriate training. 
12. Monitoring and Review 
12.1 This Policy will be reviewed regularly and in line with any legislative and/or
organisational changes. The recognised trade unions will be consulted on any
future changes to this policy.
13. Contacts
Whistleblowing Officer Chief Auditor (or delegated officer)
whistleblowingofficer@renfrewshire.gov.uk
Monitoring Officer Head of Corporate Governance  
mark.conaghan@renfrewshire.gov.uk
Renfrewshire Council’s external
auditors
[Gary Devlin, Partner Azets]
[01415674500]
[gary.devlin@azets.co.uk]
Whistleblowing hotline
Available Monday-Thursday from 9am to
4.45pm and Friday 9am to 3.55pm
[0300 300 1314]
[whistleblowingofficer@renfrewshire.gov.uk]
Protect
(Independent whistleblowing charity)
The Green House 
244-254 Cambridge Heath Road
London
E2 9DA
Telephone: 020 3117 2520 
Email: whistle@protect-advice.org.uk 
Website: www.protect-advice.org.uk 
Page 99 of 164

Page 100

8
Annex 1 
DESIGNATED OFFICERS TO WHOM WHISTLEBLOWING CONCERNS MAY BE
REPORTED 
Gordon McNeil – Director of Environment and Infrastructure
Alastair MacArthur – Director of Finance and Resources (to whom any concerns regarding the
Chief Executive’s Service should also be directed)
Steven Quinn – Director of Children’s Services
Christine Laverty – Chief Officer of the Renfrewshire Health and Social Care Partnership
Mary Crearie - Director of Communities and Housing 
Page 100 of 164

Page 101

___________________________________________________________________
To: Finance, Resources & Customer Services Policy Board
On: 9 February 2023
___________________________________________________________________
Report by: Director of Finance & Resources
___________________________________________________________________
Heading: Additional Public Holiday – Coronation of King Charles III
___________________________________________________________________
1. Summary 
1.1  The Prime Minister has proclaimed an additional bank holiday to mark the
Coronation of His Majesty King Charles III.  The bank holiday will take place on
Monday, 8 May 2023 following the Coronation on Saturday, 6 May 2023 and
will be for one year only. 
1.2 At its meeting on 9 September 2022, this Board approved a list of 12 public
holidays for 2023 and one day of no work requirement.  It is proposed that an
additional public holiday on Monday, 8 May 2023 be approved for one year only
and included within a revised list of public holidays for 2023.  The revised list is
appended to this report.
___________________________________________________________________ 
2. Recommendations
2.1 That an additional public holiday on Monday, 8 May 2023 be approved; and 
2.2 That the revised list of public holidays for 2023 as appended to the report be
published.
___________________________________________________________________ 
3. Background
3.1 To mark the Coronation of His Majesty King Charles III, the UK Government
and Scottish Government have announced that an additional bank holiday will
take place on Monday, 8 May 2023 for one year only.  
Item 12
FRCS 090223 Page 101 of 164

Page 102

3.2 Employees in schools and term-time establishments will have public holidays
set in accordance with the arrangements in the establishment and will be the
subject to a separate report to the Education and Children’s Services Policy
Board.
_____________________________________________________
Implications of the Report
1. Financial – The cost of the additional public holiday will be managed
within existing revenue budgets. 
2. HR & Organisational Development – As detailed in the report. 
 
3. Community/Council Planning – None 
4. Legal – None 
5. Property/Assets - None 
6. Information Technology - None
7. Equality & Human Rights 
The recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report.  If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website.   
8. Health & Safety - None
9. Procurement - None
10. Risk - None
11. Privacy Impact - None
12. Cosla Policy Position – None
13. Climate Risk – None.
List of Background Papers - None
_____________________________________________________ 
Author:           Anne McNaughton, Senior Committee Services Officer 
anne.mcnaughton@renfrewshire.gov.uk 
0141 487 1114  
Page 102 of 164

Page 103

Appendix
RENFREWSHIRE COUNCIL 
REVISED PUBLIC HOLIDAYS FOR EMPLOYEES 2023 
Holiday  2023 
New Year  Monday, 2 January 2023
Tuesday, 3 January 2023
Wednesday, 4 January 2023 
Good Friday  Friday, 7 April 2023 
Easter Monday  Monday, 10 April 202 
Early May  Monday, 1 May 2023 
Coronation of 
His Majesty King Charles III  Monday, 8 May 2023 
Spring
(formerly Queen’s Birthday) 
Monday, 29 May 2023 
Fair Holiday  Monday, 7 August 2023 
Late Autumn  Friday, 22 September 2023
Monday, 25 September 2023 
Christmas  Monday, 25 December 2023
Tuesday, 26 December 2023 
Day of no work requirement  Friday, 29 December 2023 
Non-teaching staff in schools 
Children’s Services will issue a separate list of school holidays for term time staff.
Page 103 of 164

Page 104

Page 104 of 164

Page 105

_________________________________________________________________ 
To: Finance, Resources and Customer Services Policy Board 
On: 9 February 2023
__________________________________________________________________ 
Report by: Director of Finance and Resources
__________________________________________________________________ 
Heading: Civic Hospitality and Appointment to Outside Body
__________________________________________________________________ 
1. Summary 
1.1 The purpose of this report is to consider (a) requests for civic hospitality and
(b) to consider a request by UK & Ireland Mayors, Provosts & Leaders for
Peace Chapter for a representative from the Council.   
1.2 The following requests for civic hospitality have been received for financial
year 2022/23 and 2023/24. 
1.2.1 Correspondence was received from the Renfrewshire XII Province
Curling Club in relation to the USA Men’s Curling tour to Scotland and
the first game of the tour being held locally at Greenacres. They had
suggested the possibility of a civic reception to welcome the
international visitors in the form of a lunch for 45 people at the
Greenacres Curling Club on Sunday 8th January 2023. 
Following consultation with the Provost, the Head of Corporate
Governance used his delegated authority to approve the request and
made the necessary arrangements to provide a contribution of £350
towards the civic reception. 
1.2.2 Correspondence has been received from Kilbarchan Pipe Band
suggesting the possibility of a contribution towards civic hospitality at
the Donald Malcolm Heritage Centre in Linwood on Saturday 4th March
to accompany their Ceilidh in celebration of the band’s successful 2022
season, ranking first in three major competitions and gaining the title of
Champion of Champions Band. 
Item 13
FRCS 090223 Page 105 of 164

Page 106

Following consultation with the Provost, it is proposed that the Board
agree to provide a contribution towards hospitality in the form of a buffet
for 200 people at a cost of approximately £1750 and that it be delegated
to the Director of Finance & Resources in consultation with the Provost
to make the necessary arrangements. 
1.2.3 Correspondence has been received from the Abercorn Bowling Club
Ladies Section in relation to their 25th anniversary. They have
suggested the possibility of a civic reception in the form of a buffet for
approximately 70 people to be held at their club on Thursday 13th April
2023. 
Following consultation with the Provost, it is proposed that the Board
agree to provide hospitality as detailed above at a cost of
approximately £800 and that it be delegated to the Director of Finance
& Resources in consultation with the Provost to make the necessary
arrangements. 
1.2.4 Correspondence has been received from Anchor Bowling Club’s
Ladies Section in relation to their 100th anniversary.  They have
suggested the possibility of a civic reception in the form of an evening
meal and welcome drink for approximately 120 people to be held at
their club at the opening of the season event on Tuesday 11th April
2023. 
Following consultation with the Provost, it is proposed that the Board
agree to provide hospitality as detailed above at the cost of
approximately £2760 and that it be delegated to the Director of
Finance & Resources in consultation with the Provost to make the
necessary arrangements. 
1.3  The budget provision for 2022/23 for Civic Hospitality (including international
Links) is £46,460.  Should the above be agreed, and taking account of previous
decisions, the remaining balance would be approximately £4,000.  The budget
provision for 2023/24 for civic hospitality (including International Links) has not
yet been agreed. 
1.4 Correspondence has been received from UK & Ireland Mayors, Provosts &
Leaders for Peace Chapter for a representative from the Council.   The letter
advises that Mayors for Peace was established in 1982 by the Mayor of
Hiroshima to enable Mayors across the world to join with the atom-bombed
cities of Hiroshima and Nagasaki in calling for a more peaceful and nuclear-
weapon free world.  Mayors for Peace now includes 8,063 members in 166
countries.  The Council has been represented previously on this organisation
by the Provost. 
As part of the registration process, the Council’s representative is required to
sign “I hereby express my city/municipality’s support for the abolition of nuclear
weapons and desire to join the Mayors for Peace.” 
The Council is currently a member of Nuclear Free Local Authorities
(Scotland). 
Page 106 of 164

Page 107

2 Recommendations 
2.1 That the Board agrees to: (a) provide the hospitality as detailed above for
Kilbarchan Pipe Band, Abercorn Bowling Club and Anchor Bowling Club; (b)
that it be delegated to the Director of Finance & Resources in consultation with
the Provost to make the necessary arrangements. 
2.2 That the Board note the action taken by the Head of Corporate Governance in
terms of his delegated authority in respect of the civic reception for the
Renfrewshire XII Province Bowling Club; 
2.3 That the Board considers the appointment of the Provost as the Council’s
representative to UK & Ireland Mayors, Provosts & Leaders for Peace Chapter,
and authorises her to sign the required declaration. 
Implications of the Report 
1. Financial – The costs of the request from civic hospitality will be met from the
2022/23 and 2023/24 budget provision. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – Civic receptions provide recognition of the
contributions made by individuals and organisations to the fabric of life in
Renfrewshire. 
4. Legal - None. 
5. Property/Assets - None. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report. If required following implementation, the actual
impact of the recommendations and the mitigating actions will be reviewed
and monitored, and the results of the assessment will be published on the
Council’s website. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
Page 107 of 164

Page 108

11. Privacy Impact - None. 
12. Climate Risk – None. 
13. Cosla Policy Position – Not applicable. 
__________________________________________________________________ 
List of Background Papers
(a) Background Paper 1 – Email correspondence from the Renfrewshire XII 
Province Curling Club
(b) Background Paper 2 – Email correspondence from Kilbarchan Pipe Band
(c) Background Paper 3 – Email correspondence from Abercorn Bowling Club
(d) Background Paper 4 – Correspondence from Anchor Bowling Club
(e) Background Paper 5 – letter received December 2022 from UK & Ireland
Mayors, Provosts & Leaders for Peace Chapter 
The foregoing background papers will be retained within Finance & Resources
for inspection by the public for the prescribed period of four years from the date
of the meeting. The contact officer within the service is Donna Gallagher,
Member Services Officer (Telephone – 0141 618 6794, e-mail –
donna.gallagher- pt@renfrewshire.gov.uk 
Author: Donna Gallagher – Member Services Officer. Tel: 0141 618 6794
E-mail donna.gallagher-pt@renfrewshire.gov.uk
Page 108 of 164

Page 109

___________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 9th February 2023
___________________________________________________________________
Report by: The Chief Executive 
___________________________________________________________________
Heading: Advice Services 
(RC-CPU-22-223)
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to seek the approval of the Finance,
Resources and Customer Services Policy Board to award a negotiated
contract to Renfrewshire Citizens Advice Bureau (RCAB) for Advice
Services. 
1.2 The recommendation to award this Contract follows a procurement
exercise which was conducted as a Negotiated Procedure without prior
publication in accordance with the Council’s Standing Orders Relating
to Contracts and regulation 76 of the Public Contracts (Scotland)
Regulations 2015 as amended for a Social and Other Specific Services
Contract.   
1.3 A Request to Negotiate was approved by the Head of Policy and
Commissioning on 12th January 2023.
___________________________________________________________________ 
Item 14
FRCS 090223 Page 109 of 164

Page 110

2. Recommendations
2.1 It is recommended that the Finance, Resources and Customer Services
Policy Board authorise the Head of Corporate Governance: 
2.1.1 To award the Negotiated Contract for Advice Services to
Renfrewshire Citizens Advice Bureau.  
2.1.2 The contract will commence on 1st July 2023 to 30th June 2025
with the option to extend for a further 1 year until 30th June
2026. 
2.1.3 The contract value will be £741,400 excluding VAT for the first 2
years and a total contract value of £1,112,100 excluding VAT if
the extension period is utilised.
_________________________________________________________
3. Background
3.1 Renfrewshire Council requires proactive “Advice Services” for delivery
to the residents of Renfrewshire Council.   The General Advice service
will include advice on money/debt, financial capability, welfare benefits,
housing and employment.  The Community Based Legal service will
provide advice with regards to housing, homelessness, employment,
debt, public law, community care and disability and welfare rights.
3.2 Across Renfrewshire many people are affected by debt and financial
problems. It is recognised that advice plays a key role in supporting
households through challenging financial circumstances. It is also
recognised that people usually only seek support once a crisis point is
reached and advice becomes vital to help them resolve their issues.
Renfrewshire Council wishes to commission a service that will not only
support those in crisis but encourage clients to engage earlier and
obtain advice before crisis point is reached.
3.3 The Council currently has a contract with Renfrewshire Citizens Advice
Bureau for these services.  The contract is due to expire on 30th June
2023 and discussion has taken place with RCAB prior to the issue of
the Invitation to Contract to agree the Council’s requirements and
ensure the commissioned service will cover the relevant support.
3.4 The Invitation to Contract was issued to Renfrewshire Citizens Advice
Bureau via the Public Contract Scotland Tender portal on 18th January  
2023 and a response received on 19th January 2023. 
Page 110 of 164

Page 111

3.5 The tender document included a Single Procurement Document (SPD)
as required by the Council’s Standing Orders relating to Contracts and
the tender response submitted was evaluated by representatives from
the following Council Services: Corporate Procurement Unit, Corporate
Risk and Health and Safety – all requirements were met.  The set
budget for this Contract has been agreed by Renfrewshire Citizens
Advice Bureau. 
3.6 Community Benefits were sought as part of the procurement process
and Renfrewshire Citizens Advice Service has agreed to work in
partnership with the Council to deliver a range of community benefits as
part of the contract. 
___________________________________________________________________
Implications of the Report
1. Financial – Financial costs will be met by the Chief Executive’s Services
budget and Fairer Renfrewshire programme budget as required 
2. HR & Organisational Development - None 
3. Community/Council Planning –  
• Our Renfrewshire is well – 
The aim of the advice service being delivered by the contract is to
improve quality of life for the citizens of Renfrewshire “the client”,
especially those in vulnerable groups and communities by ensuring
timely advice is available around benefits advice, income
maximisation, managing debt and other appropriate advice. The
service delivered by the contract will not only equip clients with
increased financial stability and resilience, but by working in
partnership with other advice organisations, including Advice
Works, the service will contribute to the holistic wellbeing of the
client, building their confidence and positivity about the future, their
sense of wellbeing and ability to have control over their own lives. 
• Building strong, safe and resilient communities –
By demonstrating knowledge, understanding and expertise in
approaches to engaging difficult to reach clients, the advice service
delivered through the contract will seek to specifically target priority
client groups who do not currently access, or face barriers to
accessing advice services. Furthermore, the service will be non-
Page 111 of 164

Page 112

stigmatising, responsive in their approach and work with local
communities to establish their need, empowering local people to
become more involved in the service. The service will:
• Build community capacity and resilience, empowering
individuals and organisations to support themselves and others
in a sustainable way through provision and access to robust and
effective advice and information services.
• Deliver advice which empowers communities, with an emphasis
on early intervention and prevention (spreading expertise of
different levels and complexity to intervene and reduce
difficulties, with the longer term aim of reducing the demand on
specialist advice services at an advanced level or when in crisis)
and sustainability (an implementation strategy which builds
individuals’ and communities knowledge, capacity and resilience
to resolve their own issues with the appropriate tools, training
and resources. 
• Tackling inequality, ensuring opportunities for all – 
The advice delivered through the contract will tackle inequality by
enhancing the current advice provision in Renfrewshire. The new
advice contract will ensure the advice service treats clients in a
holistic way, maximising their income and minimising outgoings
through appropriate advice. Furthermore, the service will work in
partnership with a wide variety of other relevant organisations to
help solve clients issues. The new advice contract is intended to
enhance client’s financial and other wellbeing, and we will measure
the benefits of the advice provided: specifically whether: 
• Clients are more positive about and able to deal with things in
future
• Clients have increased financial stability and resilience
• Clients report increased health and wellbeing. 
• The service meets the needs of clients.   
4. Legal – This procurement process was conducted as a contract for
Social and Other specific Services in accordance with the Council’s
Standing Orders Relating to Contracts and the Public Contracts
(Scotland) Regulations 2015, as amended. 
5. Property/Assets - None 
6. Information Technology - None
7. Equality & Human Rights - The Recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
Page 112 of 164

Page 113

for infringement of individuals’ human rights have been identified arising
from the recommendations contained in the report. If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.  
8. Health & Safety – The Renfrewshire Citizens Advice Bureau’s Health
and Safety submission has been evaluated by Corporate Health and
Safety and meets the Council’s requirements.
9. Procurement – The procurement procedures outlined within this report
shall ensure that the Council meets its statutory requirements in respect
of procurement procedures, efficiency and modern Government.
10. Risk – The Renfrewshire Citizens Advice Bureau insurances have been
assessed and evaluated and meet the minimum requirements regarding
insurable risk.
11. Privacy Impact – No Privacy Impact implications have been identified
or are anticipated
12. Cosla Policy Position –Not Applicable.
13. Climate Change – No climate change implications were noted as part of
this Contract.
_________________________________________________________
List of Background Papers
none 
___________________________________________________________________ 
Author:            Suzanne Gibb, Procurement Operations Manager, Corporate
Procurement Unit, suzanne.gibb@renfrewshire.gov.uk
Page 113 of 164

Page 114

Page 114 of 164

Page 115

___________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 9 February 2023
___________________________________________________________________
Report by: Chief Executive and the Director of Finance and Resources
___________________________________________________________________
Heading: Managed Print Services (RC-CPU-22-225)
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to request that the Finance, Resources
and Customer Services Policy Board homologate a decision of the
Director of Finance and Resources to award a negotiated contract on
22nd December 2022 for the provision of Managed Print Services
outside the board cycle in order to fix pricing at the same rates as 2022
and ensure continuity of services while providing the Council time to
review future services, re tender and mobilise the printer estate.  
1.2 This procurement exercise was conducted in accordance with The
Public Contracts (Scotland) Regulations 2015, Regulation 33 (b) (ii). 
___________________________________________________________________ 
2. Recommendations
The Finance, Resources and Customer Services Policy Board is
requested to: 
2.1 Homologate the decision taken by the Director of Finance and
Resources to award a contract for Managed Print Services to Xerox
(UK) Limited.
Item 15
FRCS 090223 Page 115 of 164

Page 116

2.2  Note the contract value will be up to £216,508.19 excluding VAT.
2.3 Note the contract will commence 1st January 2024 and will expire on
31st December 2024.
_________________________________________________________
3. Background
3.1 The Council has a requirement for a managed print service, this
includes the installation, maintenance, repairs and removal of print
devices at various locations throughout the Renfrewshire Council
estate. 
3.2 The supplier will provide the following –
• Appropriate hardware- MFD’s and printers
• Pro-active management of the hardware, just in time
consumables delivery, monitoring and management of the
devices.
• Maintenance of all the devices, backed by SLA’s, KPI’s and
service credits for under performance
• Provision and support of user management and device
management technology
• Detailed management information on which continuous
improvement decisions can be taken
3.3 The current contract for a Managed Print Service, made under the
Scottish Government Framework Agreement relating to the supply of
office equipment (reference SP-16-013) commencing 1 January 2018,
is due to expire 31st December 2023.  This will be re-tendered during
2023 due to the long mobilisation period required of up to one year.
3.4 The Digital Portfolio is currently undertaking a review of the way
Council has been printing and a Green Print Strategy will be created for
publication approx. March 2023 providing guidance on how printing
should be undertaken going forward, rationalising and reducing print, to
achieve financial savings and contribute to the Council’s Plan for Net
Zero by 2030.
3.5 This Strategy will help plan and define the requirement for the future
longer term Managed Print Service.
3.6 Xerox (UK) Limited has committed to provide the following community
benefit as part of this Negotiated Contract –
• Further education visits 
Page 116 of 164

Page 117

• School visits 
• Financial support for a community project 
• Non financial support for a community project 
__________________________________________________________________ 
Implications of the Report
1. Financial - Costs in respect of this Contract will be funded from the ICT
Capital budget. 
2. HR & Organisational Development - No TUPE implications have
arisen or are anticipated. 
3. Community/Council Planning –  
• Working together to improve outcomes – this Contract will
ensure the Council continues to provide good quality services. 
4. Legal - This procurement was carried out in accordance with The
Public Contracts (Scotland) Regulations 2015, Regulation 33 (b) (ii). 
5. Property/Assets - 
6. Information Technology – will align with the Council’s ICT Strategy.
. 
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been 
assessed in relation to their impact on equalities and human
rights.   No negative impacts on equality groups or potential for
infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report.   
8. Health & Safety – covered under the Scottish Government Framework
Agreement reference SP-16-013.
9. Procurement - The procurement procedure outlined within this report
ensure that the Council meets its statutory requirements in respect of
Page 117 of 164

Page 118

the EU regulatory requirements and the Council's Standing Orders
Relating to Contracts.    
10. Risk – Xerox (UK) Limited’s insurance policies were assessed by
Scottish Procurement as part of the evaluation for the Framework. All
suppliers on the Framework are expected to maintain the relevant
insurance policies for the duration of the Framework period.
11. Privacy Impact - No Privacy Impact Assessment requirements were
identified within this procurement.
12. Cosla Policy Position – No Cosla Policy Position implications have
arisen or are anticipated.
13. Climate Risk – The level of impact associated with provision of this
service has been assessed using the Scottish Government
Sustainability Test and is considered to be low risk.
_________________________________________________________
List of Background Papers 
none
___________________________________________________________________ 
Author:          Suzanne Gibb, Procurement Operations Manager,
Suzanne.gibb@renfrewshire.gov.uk 
Page 118 of 164

Page 119

___________________________________________________________________
To: The Finance, Resources and Customer Services Policy Board
On: 9th February 2023
___________________________________________________________________
Report by: The Chief Executive and the Director of Finance and Resources
___________________________________________________________________
Heading: Contract Authorisation Report for a Microsoft Enterprise
Agreement (RC-CPU-22-256)
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek the approval of the Finance,
Resources and Customer Services Policy Board to award a Call Off
Contract for a Microsoft Enterprise Agreement. 
1.2 The procurement exercise was conducted in accordance with the Call
Off award procedure as a further competition under the Crown
Commercial Services (CCS) Framework Agreement for Technology
Products and Associated Services RM6068 Lot 3 (Software and
Associated Service) and Renfrewshire Council’s Standing Orders
Relating to Contracts for an above Government Procurement
Agreement (GPA) Threshold contract. 
1.3 A contract strategy document was approved by the Head of ICT and
the Strategic Commercial and Procurement Manager on 15th December
2022. 
___________________________________________________________________ 
2. Recommendations
It is recommended that the Finance, Resources and Customer Services
Policy Board authorise the Head of Corporate Governance to:
Item 16
FRCS 090223 Page 119 of 164

Page 120

2.1 Award a Call-Off Contract for a Microsoft Enterprise Agreement to
Phoenix Software Limited following a further competition under Lot 3 of
the Crown Commercial Services (CCS) Framework Agreement
Technology Products and Associated Services, RM6068 in accordance
with the Framework Call-Off Award Procedure.
2.2 The Call-Off Contract is for a period of 3 years and it is envisaged that
the Call-Off Contract will commence on the 1st April 2023 and will
expire on the 31st March 2026, however the actual Call-Off Start Date
and Call-Off Expiry Date will be confirmed in the Order Form in
accordance with the Framework Call-Off Award Procedure. 
2.3 The Call-Off Contract value will not exceed £4,460,629 excluding VAT.
_________________________________________________________
3. Background
3.1 The Council has a requirement for a replacement Microsoft Enterprise
Agreement as the current contract for this requirement expires on 31st 
March 2023. This Contract will provide Microsoft licensing for all of the
Council’s current corporate and academic users.
3.2 A review of the procurement options identified that the Crown
Commercial Services (CCS) Framework Agreement Technology
Products and Associated Services RM6068 could be utilised.  The
procurement exercise for this Contract was conducted in accordance
with the Call-Off Award Procedure as a further competition under Lot 3
of the Crown Commercial Services (CCS) Framework Agreement
Technology Products and Associated Services RM6068 (“the
Framework”) and in accordance with the procedures for use of
frameworks under the Council’s Standing Orders Relating to Contracts. 
3.3 The further competition documentation was issued to 27 of the 28
suppliers on the Framework Agreement via the Public Contracts
Scotland – Tender portal on 9th January 2023 with the submission
deadline of 12 noon on the 16th January 2023. 2 responses were
received in response to this further competition.
3.4 The suppliers who did not bid were contacted to ascertain the reason
for not bidding. The main reasons provided stated that they were not
accredited to provide the Microsoft Licences or did not have the
capacity to bid.
3.5 The Supplier selection requirements contained in the SPD were already
met at the Framework Award stage.  
Page 120 of 164

Page 121

3.6 The 2 tender submissions received were evaluated against the further
competition Award Criteria of 20% Quality and 80% Price.  The scores
relative to the Award Criteria for the tender responses are noted below:
Tenderers Name Quality Score
(20%)
Price Score
(80%)
Total Score
(100%)
Phoenix Software
Limited
15.50% 78.66% 94.16%
Insight Direct (UK)
Ltd
10.00% 80.00% 90.00% 
3.7 It is recommended that the Call-Off Contract under Lot 3 of the
Framework, is awarded to Phoenix Software Limited, who based on
evaluation, have provided the most economically advantageous tender.  
The Contract will be formed under the Framework Award Procedure
using the Order Form and relevant call off and joint schedules.
3.8 The cost for this Call-Off Contract will be funded by the ICT Revenue
Budget.
3.9 Community benefits were requested as part of the Further Competition
Procedure and Phoenix Software Limited have committed to deliver the
following community benefits as part of this Call-Off Contract: 
9 X Business advice/support to an SME /Social Enterprise/ Voluntary
organisation
___________________________________________________________________
Implications of the Report
1. Financial - The financial status of Phoenix Software Limited was
assessed by Crown Commercial Services at the time of awarding a
place onto the Framework Agreement. 
2. HR & Organisational Development - No HR and Organisation
development implications for the Council have arisen or are anticipated. 
3. Community/Council Planning – Working together to improve
outcomes – This contract will provide necessary licences for Corporate
and Academic which allows the Council to operate the technology and
have a robust communication channel. 
4. Legal - The procurement for this contract was carried out in
accordance with the further competition requirements under the CCS
Page 121 of 164

Page 122

Framework Agreement for Technology Products and Associated
Services, RM6068 and Renfrewshire Council’s Standing Orders
Relating to Contracts for a Supplies contract above GPA Threshold. 
5. Property/Assets - No property/assets implications have arisen or are
anticipated. 
6. Information Technology – This contract will provide necessary
licences for Corporate and Academic which allows the Council to
operate the technology and have a robust communication channel. 
7.  Equality & Human Rights 
(a) The Recommendations contained within this report have been
assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for
infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report. If
required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed
and monitored, and the results of the assessment will be
published on the Council’s website.   
8. Health & Safety - The health and safety for Phoenix Software Limited 
was evaluated by the Council’s Health and Safety Section and met the
Council’s requirements. 
9.  Procurement – The procurement exercise was conducted in
accordance with the Call Off award procedure as a further competition
under the Crown Commercial Services (CCS) Framework Agreement 
for Technology Products and Associated Services RM6068 Lot 3
(Software and Associated Service) and Renfrewshire Council’s
Standing Orders Relating to Contracts clauses 1.5 and 29 of the
Council’s Standing Orders Relating to Contracts.  
10. Risk - Phoenix Software Limited  insurance documentations were
evaluated by Crown Commercial Service at the time of Framework
award and were deemed to meet the minimum requirements. T
11. Privacy Impact - No Privacy Impact implication has arisen or is
anticipated.  
12. Cosla Policy Position – No Cosla policy position implications have
arisen or are anticipated.
13. Climate Change - The level of impact associated with this Contract
has been assessed using the Scottish Government Sustainability Test
Page 122 of 164

Page 123

and is considered to be low risk with no climate change implications
noted as part of this Call-Off Contract.
_________________________________________________________
List of Background Papers 
None 
___________________________________________________________________ 
Author:           Gillian Gordon,  Senior Procurement Specialist, Corporate
Procurement Unit, gillian.gordon@renfrewshire.gov.uk
Page 123 of 164

Page 124

Page 124 of 164

Page 125

___________________________________________________________________
To: Finance, Resources and Customer Service Policy Board
On: 9th February 2023
___________________________________________________________________
Report by: The Chief Executive and the Director of Finance and Resources
___________________________________________________________________
Heading: Contract Award: Provision of a Social Care Case Management System 
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek the approval of the Finance, Resources
and Customer Services Policy Board to award a Contract for the Provision of
a Social Care Case Management System (RC-CPU-22-253) to OLM Systems
Limited. 
1.2 The recommendation to award the Contract follows a procurement exercise
conducted in accordance with Schedule 5: Award Procedure and Customer
Guidance issued for Lots 1-3 of the Crown Commercial Services G Cloud 13
Framework Agreement RM1557.13 and the Council’s Standing Orders
Relating to Contracts. 
1.3 A Contract Strategy was prepared by the Corporate Procurement Unit and
approved by the Head of Digital, Transformation and Customer Services and
the Strategic Commercial and Procurement Manager. 
___________________________________________________________________ 
2. Recommendations
It is recommended that the Finance, Resources and Customer Services Policy
Board:
Item 17
FRCS 090223 Page 125 of 164

Page 126

2.1 Authorise the Head of Corporate Governance to award a Call-Off Contract for
the Provision of Support and Maintenance of a Social Care Case
Management System (RC-CPU-22-253) to OLM Systems Limited in
accordance to the award procedure under Crown Commercial Services G-
Cloud 13 Framework Agreement RM1557.13.
2.2 Authorise a maximum Call-Off contract value of up to £643,062.60 excluding
VAT (an annual contract value of £160,765.65 excluding VAT).
2.3 Note the initial contract period of three years with the Council having the
option to extend the service period for up to 12 months. The start date of the
1st April 2023 will be confirmed in the Crown Commercial Services G-Cloud 13
Framework Agreement RM1557.13 Order Form.  
_________________________________________________________
3. Background 
3.1 The Council has a requirement for a contract to replace the current Software
as a service (SaaS) social care case management system which will expire on
31st March 2023 provided by OLM Systems Limited. The social care case
management software system provides case management, financial
information, and document management. The system is used by Renfrewshire
Health and Social Care Partnership, Children’s Services and Criminal Justice. 
3.2  The council identified the Crown Commercial Services as a suitable route to
market. The G-Cloud 13 Framework Agreement RM1557.13 was established
on 9 November 2022 (the “Framework”). The Framework consists of 3 Lots
and Lot 2 of this Framework offers a suite of cloud provisioned software and
associated services including services for Social Care systems. 
3.3 Following the Framework Award Procedure (Schedule 5) and the Crown
Commercial Services RM1557.13 G-Cloud 13 Lots 1-3 Customer Guidance
Buying Process the Council followed the Step process and searched terms. At
Step 3 – longlist to shortlist it was found that only one supplier provided an
offering which was suitable against the high level and further filtered short list
requirements. The filters used are detailed below -: 
Page 126 of 164

Page 127

Filters List of Filters
Used Description of Filters Used
Search
Result
(Suppliers) 
1 Care
Management
The primary purpose of the application is the assessment,
planning, implementation, and evaluation of services to
meet the specific needs of the supported people. 
1433
2 SAAS
The solution must be cloud-hosted/software-as-a-service
solution, with no reliance on Council provisioned server or
storage infrastructure.
51
3 Multi Agency 
The application must facilitate multi-agency working where
social workers work closely with other professions or
agencies to support and safeguard vulnerable people.
6
4 Open API The solution must have open APIs. This supports
flexibility, data interoperability and cost efficiency. 1 
3.4 Following Steps 1-3 the offering provided under the Framework by OLM
Services Limited has been evaluated by council officers against the Service
Description available on the Contract Award Service and the offering was
identified by council officers as meeting the Council’s requirements therefore
the council is able to progress to make a direct award under the Crown
Commercial Services G-Cloud 13 Framework Agreement RM1557.13. 
3.5  Community benefits were requested as part of the Call-Off Contract, OLM
Systems Limited will deliver three graduate job opportunities within
Renfrewshire.
___________________________________________________________________
Implications of the Report
1. Financial – Costs in respect of this Contract will be funded by the ICT Revenue
budget. 
2. HR & Organisational Development – No TUPE implications. 
3. Community/Council Planning –  
• Working together to improve outcomes – this contract will support the
Council continues to provide the services required to the residents of
Renfrewshire. 
4. Legal - The procurement was carried out in accordance with Schedule 5:
Award Procedure and Customer Guidance issued for Lots 1-3 of the Crown
Commercial Services G Cloud 13 Framework Agreement RM1577.13 and the
Page 127 of 164

Page 128

Council’s Standing Orders Relating to Contracts. The Framework allows for
Suppliers Terms to form part of this Call-off Contract. 
5. Property/Assets - None   
6. Information Technology – This contract will ensure continuation of the
council’s social care case management system, operating as a SaaS. 
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report. If required following implementation,
the actual impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be published on
the Council’s website. 
8. Health & Safety – There are no health and safety implications associated with
the award of this contract.
9. Procurement - The procurement procedure outlined within this report ensures
that the Council meets its statutory requirements in respect of procurement
procedures, efficiency and modern Government
10. Risk – The insurance held by OLM Services Limited are assessed as part of
their appointment on to the Framework and will be reviewed by the council’s
risk team.
11. Privacy Impact – OLM Systems Limited are required to agree to the conditions
of the Framework which includes provisions for Data Protection and GDPR and
will also be reviewed by the council’s information governance team as part of
the buying process through the conclusion of the order form. 
12. Cosla Policy Position – No Cosla Policy Position implications have arisen or
are anticipated.
13. Climate Risk – The level of impact associated with provision of this service has
been assessed using the Scottish Government Sustainability Test and is
considered to be low risk.
________________________________________________________________ 
Author:           Alexandra Donaldson, Strategic Commercial Category Manager,
Corporate Procurement Unit, Alexandra.donaldson@renfrewshire.gov.uk
Page 128 of 164

Page 129

___________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 09 February 2023
___________________________________________________________________
Report by: The Chief Executive and The Director of Communities and Housing
Services
___________________________________________________________________
Heading: Contract Authorisation Report for three contracts: Provision of Floating
Support (RC-CPU-22-121); Housing First (RC-CPU-22-142) and
Housing First (WRAP) (RC-CPU-22-144)
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to seek the approval of the Finance,
Resources and Customer Services Policy Board to enter into three
separate contracts for the provision of Housing First and Floating
Support services.
1.2 The procurement exercises for each of the three contracts have been
conducted in accordance with Section 12 (1) of the Procurement
Reform (Scotland) Act 2014 (as amended). 
1.3 A Contract Strategy was approved by the Head of Housing and
Communities and the Strategic Commercial and Procurement Manager
on 27 October 2022.
___________________________________________________________________
2. Recommendations
2.1 It is recommended that the Finance, Resources and Customer Services
Policy Board:
Item 18
FRCS 090223 Page 129 of 164

Page 130

2.1.1 Authorise the Head of Corporate Governance to enter into
three separate Contracts for the following Services: 
A. RC-CPU-22-141 Provision of Floating Support to
Turning Point Scotland, for a duration of 12 months
with the Council option to extend for 12 months; with an
annual value of £177,000; 12 month extension value of
£177,000; total maximum value of £354,00.
B. RC-CPU-22-142 Housing First, to Turning Point
Scotland, for a duration of 12 months with the Council
option to extend for 12 months; with an annual value of
£177,030; 12 month extension value of £177,030; total
maximum value of £354,060.
C. RC-CPU-22-144 Housing First (WRAP), to Blue
Triangle (Glasgow) Housing Association Limited, for a
duration of 12 months with the Council option to extend
for 12 months; with an annual value of £137,000; 12
month extension value of £137,000; total maximum
value of £274,000.
Any extension to an individual contract will be at the
discretion of Renfrewshire Council and subject to both
funding and satisfactory operation and performance during
the initial period of the respective contract.
2.1.2 Note that all 3 Contracts are intended to commence on 01
April 2023 or alternatively, the relevant date will be
confirmed in the Council’s Letter of Acceptance issued to the
Providers identified above.
2.1.3 Note that the total value of the contracts is in line with the
spend in recent years.
________________________________________________________________
3. Background
3.1 These three contracts will replace existing contracts all of which expire
on 31 March 2023.
3.2 The contracts cover the provision of Housing Support and Floating
Support Services across the Renfrewshire Council area.  
3.3 The respective Services will support people to maintain their tenancies,
providing stability and avoiding homelessness, 3.4 below provides a
Page 130 of 164

Page 131

more detailed summary of each service.  They will offer a range of
support appropriate to the individual and approximately 182 service
users per year will benefit from the support provided via these three
contracts.  This may include mental health support, addictions support
or other services assessed as appropriate.
3.4 The services operate broadly on the following basis: 
Floating Support Services (1 Contract)
The Provider will offer a full range of services including housing support
and practical support to meet the assessed needs and outcomes of the
service users. The services delivered will vary, being flexible and
responsive to meet the needs and outcomes of each individual service
user. 
Service users accessing the service may have a variety of support and
health needs ranging from complex needs requiring assistance in
aspects of daily living to those with no personal care needs and for
whom require minimum support. 
Housing First Service (2 Contracts)
The respective Providers will deliver similar services to the Floating
Support Services; however the services delivered under these two
contracts are designed to meet the Scottish Government homeless
policy initiative for rapid rehousing, and as such will receive funding
towards operation of these services. 
Housing First is an innovative approach to providing wrap-around
support for someone who is homeless to access and sustain settled
accommodation. 
3.5 For each of the three contracts, the Head of Policy and Commissioning
(HOPAC) approved the procedure for procurement of a negotiated
contract without competition in accordance with the Council’s Standing
Orders Relating to Contracts order 14. (Negotiated contract without
competition) for a contract made under Section 12 (1) of the
Procurement Reform (Scotland) Act 2014 (as amended).
3.6 The tenders for each of these three contracts were published on 28
October 2022 with a tender return deadline of 12 noon on 18 November
2022.
3.7 The following Providers were invited to respond to specific
opportunities:
Page 131 of 164

Page 132

A. RC-CPU-22-141 Floating Support - Turning Point Scotland;
B. RC-CPU-22-142 Housing First - Turning Point Scotland;
C. RC-CPU-22-144 Housing First (WRAP) - Blue Triangle (Glasgow)
Housing Association Limited.
3.8 Each of the Providers invited to tender, replied to the relevant contract
opportunities.
3.9 Evaluation was carried out by representatives from Communities and
Housing Services, Corporate Procurement Unit, Corporate Risk and
Corporate Health and Safety. 
3.10 In accordance with Standing Order relating to Contracts 11.5, the
tender submission for each tendered contract were evaluated against
predetermined criteria in the form of the Single Procurement Document
(SPD).
3.10.1 Tender submission for RC-CPU-22-141 Provision of Floating
Support from Turning Point Scotland is compliant with the
minimum selection criteria set out within the SPD;
3.10.2 Tender submission for RC-CPU-22-142 Housing First from
Turning Point Scotland is compliant with the minimum
selection criteria set out within the SPD;
3.10.3 Tender submission for RC-CPU-22-144 Housing First
(WRAP) from Blue Triangle (Glasgow) Housing Association
Limited is compliant with the minimum selection criteria set
out within the SPD;
3.11 Evaluation was conducted against the award criteria detailed in the
tender documentation.  These documents detailed minimum
requirements in relation to insurance provision and health and safety. 
3.12 The evaluation outcome for each contract is noted as follows:
3.12.1 Tender submission for RC-CPU-22-141 Provision of Floating
Support:
• Turning Point Scotland is considered to meet the
requirements set out in the Invitation to Contract;
• The price offered is within the budget available for the
Service; 
Page 132 of 164

Page 133

• The Council is satisfied that the tender submission is of
suitable quality to provide the Service required.
3.12.2 Tender submission for RC-CPU-22-142 Housing First:
• Turning Point Scotland is considered to meet the
requirements set out in the Invitation to Contract; 
• The price offered is within the budget available for the
Service; 
• The Council is satisfied that the tender submission is of
suitable quality to provide the Service required.
3.12.3 Tender submission for RC-CPU-22-144 Housing First
(WRAP):
• Blue Triangle (Glasgow) Housing Association Limited is
considered to meet the requirements set out in the
Invitation to Contract;
• The price offered is within the budget available for the
Service; 
• The Council is satisfied that the tender submission is of
suitable quality to provide the Service required.
3.13 Community Benefits were requested as part of these procurement
processes.  The following Community Benefits will be delivered under
the respective contract:
RC-CPU-22-141 Floating Support - Turning Point Scotland:
Community Benefit  Number Offered
S/NVQ (or equivalent) 1
Industry skill transfer to school 1
RC-CPU-22-142 Housing First - Turning Point Scotland:
Community Benefit  Number Offered
S/NVQ (or equivalent) 1
Industry skill transfer to school 1
RC-CPU-22-144 Housing First (WRAP) - Blue Triangle (Glasgow)
Housing Association Limited
Page 133 of 164

Page 134

Community Benefit  Number Offered
Business advice/support to an SME /Social
Enterprise/ Voluntary organisation 1
Industry Awareness Events 2
___________________________________________________________________
Implications of the Report
1. Financial - Using Dun & Bradstreet, Turning Point Scotland and Blue
Triangle (Glasgow) Housing Association Limited were assessed by
Corporate Procurement Unit to determine if they satisfied the Council’s
requirements in relation to financial stability:
• RC-CPU-22-141 Floating Support - Turning Point Scotland (Pass);
• RC-CPU-22-142 Housing First - Turning Point Scotland (Pass);
• RC-CPU-22-144 Housing First (WRAP) - Blue Triangle (Glasgow)
Housing Association Limited (Pass).
2. HR & Organisational Development - None.
3. Community/Council Planning –
• Our Renfrewshire is well: Supporting the wellness and resilience of
our citizens and communities.
• Our Renfrewshire is fair: Addressing the inequalities which limit life
chances.
• Our Renfrewshire is safe: Protecting vulnerable people and working
together to manage the risk of harm.
• Building strong, safe and resilient communities - “The places and
houses in which people live are fundamental to quality of life. … we
will need to do more to ensure that quality, affordable housing is
available to meet the changing needs of Renfrewshire's population.”
4. Legal - The procurement of each of these three contracts has been
conducted in accordance with Section 12 (1) of the Procurement
Reform (Scotland) Act 2014 (as amended) and the Council’s Standing
Orders relating to Contracts for individual negotiated contracts without
call for competition.
5. Property/Assets - None 
6. Information Technology - None
Page 134 of 164

Page 135

7. Equality & Human Rights - The Recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report. If required
following implementation, the actual impact of the recommendations
and the mitigating actions will be reviewed and monitored, and the
results of the assessment will be published on the Council’s website.  
8. Health & Safety – The Health and Safety submissions for each of the
three tender submissions were evaluated by Corporate Health and
Safety and all were all scored “Pass” as satisfying the Council’s
requirements:
• RC-CPU-22-141 Floating Support - Turning Point Scotland (Pass);
• RC-CPU-22-142 Housing First - Turning Point Scotland (Pass);
• RC-CPU-22-144 Housing First (WRAP) - Blue Triangle (Glasgow)
Housing Association Limited (Pass).
9. Procurement - The procurement procedures outlined within this report
shall ensure that the Council meets its statutory requirements in
respect of procurement procedures, efficiency and modern
Government. 
10. Risk - The insurances submitted with each tender submission for these
individual contracts were assessed by Renfrewshire Council’s Risk
Officer, and all were all scored “Pass” as satisfying the Council’s
requirements:
• RC-CPU-22-141 Floating Support - Turning Point Scotland (Pass);
• RC-CPU-22-142 Housing First - Turning Point Scotland (Pass);
• RC-CPU-22-144 Housing First (WRAP) - Blue Triangle (Glasgow)
Housing Association Limited (Pass). 
11. Privacy Impact All 3 contracts contain Renfrewshire Council’s General
Conditions of Contract data protection provisions. Turning Point
Scotland and Blue Triangle (Glasgow) Housing Association Limited will
be Data Controllers under the respective contracts identified in
recommendation 2.1.1 and, as such, have a legal responsibility to
comply with Data Protection legislation when collecting, processing and
storing personal data to those receiving a service under those
contracts.
Page 135 of 164

Page 136

12. Cosla Policy Position – None.
13. Climate – None. 
List of Background Papers - None
___________________________________________________________________ 
Author: Shona Brydson, Senior Procurement Specialist, Corporate
Procurement Unit – shona.brydson@renfrewshire.gov.uk
Page 136 of 164

Page 137

___________________________________________________________________
To: Finance, Resources and Customer Service Policy Board
On: 9th February 2023
___________________________________________________________________
Report by: The Chief Executive and the Director of Environment and Infrastructure
___________________________________________________________________
Heading: Contract Award: Legionella Prevention, Control and Risk Management
Services 
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek the approval of the Finance, Resources
and Customer Services Policy Board to award a Services Contract for
Legionella Prevention, Control and Risk Management Services (RC-CPU-21-
056) to Rock Compliance Limited. 
1.2 The recommendation to award the Contract follows a procurement exercise
conducted in accordance with the Public Contracts (Scotland) Regulations
2015 and the Council’s Standing Orders Relating to Contracts for an above
Threshold Services Contract using the Open Tender Procedure. 
1.3 A Contract Strategy was prepared by the Corporate Procurement Unit and
approved by the Director of Environment and Infrastructure and the Strategic
Commercial and Procurement Manager on 20th October 2022.
___________________________________________________________________ 
2. Recommendations
It is recommended that the Finance, Resources and Customer Services Policy
Board: 
Item 19
FRCS 090223 Page 137 of 164

Page 138

2.1 Authorise the Head of Corporate Governance to award a Contract for
Legionella Prevention, Control and Risk Management Services to Rock
Compliance Limited;
2.2 Authorise a maximum contract value of up to £700,000 excluding VAT. The
anticipated annual value of this contract has been assessed as £140,000.00
excluding VAT;
2.3 Note the initial contract period of three years with the Council having the
option to extend the service period for up to 12 months on two separate
occasions, subject to contract performance.  The anticipated commencement
date is 10th March 2023.  The actual date will be confirmed in the Council’s
Letter of Acceptance to Rock Compliance Limited; and 
2.4 Note the award of this Contract is subject to the provision of a Non-Disclosure
Agreement as indicated within the tender documentation. 
_________________________________________________________
3. Background
3.1 The Council as an employer and in control of premises, has a duty under the
Health and Safety at Work etc Act 1974 (the HSW Act) and the Control of
Substances Hazardous to Health Regulations 2002 (COSHH) to manage the
risk of Legionella occurring within premises by having in place a robust
management and prevention regime.  This Contract is for the appointment of
a qualified and experienced Contractor for the provision of a Legionella
Prevention, Control and Risk Management Service. 
3.2  This Contract was tendered as a SBCC Measured Term Contract for use in
Scotland 2011, MTC/Scot (2011 Edition) incorporating the Employers
Amendments and this type of contract has no guarantee of the value of the
spend as this will depend on the Orders issued by the Council. The
anticipated annual value of this Contract based on historic spend has been
assessed as £140,000 excluding VAT. The maximum spend over the five year
period was estimated as £700,000 excluding VAT based on £140,000
excluding VAT annually. 
3.3 To initiate this procurement process a contract notice was published on Find a
Tender on 25th October 2022 with the tender documentation available for
downloading from the Public Contract Scotland-Tender platform from this
date.
3.4 During the live tender period, nineteen organisations expressed an interest in
this opportunity. By the closing date (Tender Deadline) set for the return of
electronic tender submissions, 12 noon on 25th November 2022, five
organisations submitted a tender response, four organisations declined, and
ten organisations failed to respond. 
Page 138 of 164

Page 139

3.5 As part of their Tender Submission, Tenderers each completed and returned
the Single Procurement Document (SPD) . Those completed SPD
submissions were then evaluated against a pre-determined set of criteria by
representatives from Environment and Infrastructure, the Corporate
Procurement Unit, Corporate Risk and Corporate Health and Safety. One
Tenderer was excluded from the process as their submission failed to meet a
mandatory selection requirement within the SPD. As a result, their bid was not
considered further.
3.6 The four Tenderers that met the minimum selection criteria progressed to
evaluation against the published award criteria of 70% price and 30% quality. 
3.7 The scores relative to the award criteria for each of the remaining four tender
submissions are noted below: 
Price
(70%)
Quality
(30%)
Total
(100%)
1 Rock Compliance Limited 70.00% 27.50% 97.50%
2 Envirocure Limited 65.85% 23.75% 89.60%
3 Integrated Water Services Limited 53.97% 21.29% 75.26%
4 GMS Services Limited 39.40% 21.93% 61.33% 
3.8 The evaluation of tender submissions received identified that the tender
submission by Rock Compliance Limited was the most economically
advantageous tender.
3.9 This Contract is funded from the Environment and Infrastructure Public
Buildings Repair budget.
3.10 Community Benefits were requested as part of the procurement process and
Rock Compliance Limited has committed to the following:
Community Benefit Description No of People
/ Activity
Job for an unemployed individual         2
Work Experience Placement for an individual 16+ years of
age 3
Industry Awareness Events 2
Industry Skill Transfer to Schools 1 
___________________________________________________________________
Page 139 of 164

Page 140

Implications of the Report
1. Financial – The cost for this contract will be met through the Environment and
Infrastructures Public Buildings Repair budget.   
2. HR & Organisational Development – No TUPE implications. 
3. Community/Council Planning –  
• Our Renfrewshire is fair - Tenderers were assessed within this procurement
process in regard to their approach to ensuring fair working practices
throughout their organisation and supply chain i.e. payment of the living
wage, training and development opportunities. 
• Creating a sustainable Renfrewshire for all to enjoy – Rock Compliance
Limited has committed to deliver Community Benefits as detailed within
section 3.10 of this report. 
• Providing good quality services - Tenderers were assessed within this
procurement process in regard to their technical ability to ensure the
services provided were of a good quality standard. 
4. Legal - The procurement of this Services Contract has been conducted as an
above Threshold Open Procedure in accordance with the Public Contracts
(Scotland) Regulations 2015 and Renfrewshire Council’s Standing Orders
Relating to Contracts. 
5. Property/Assets - This contract will ensure that the Council’s assets are
properly maintained and safe for public use in regard to the risks posed by
Legionella.   
6. Information Technology – No Information Technology implications are
anticipated.
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report. 
Page 140 of 164

Page 141

8. Health & Safety – Rock Compliance Limited’s health and safety credentials
were evaluated by Corporate Health and Safety and met the Council’s
minimum requirements regarding health and safety.
9. Procurement - The procurement procedure outlined within this report ensures
that the Council meets its statutory requirements in respect of procurement
procedures, efficiency and modern Government.
10. Risk – Rock Compliance Limited’s insurances have been assessed and
evaluated to confirm that they meet the Council’s minimum requirements
regarding insurable risk.
11. Privacy Impact – The award of this Contract is subject to the provision of a
Non-Disclosure Agreement as indicated within the tender documentation.
12. Cosla Policy Position – No Cosla Policy Position implications have arisen or
are anticipated.
13. Climate Risk – The level of impact associated with provision of these works
has been assessed using the Scottish Government Sustainability Test. 
• Carbon – Vehicle Emissions – Vehicles will be routinely used for the
delivery of supplies and resources to the sites.  The Contractor will consider
the pollution from their vehicles when working on site and to switch off the
engine when not using to prevent unnecessary emissions. 
• Hazardous Materials/Emissions - Legionella is a water borne bacteria that
can be present in the water supply and distribution systems of buildings. The
Contractor will carry out the services in compliance with various legislation
including but not limited to: BS 8580-1:2019: Water quality – Risk
assessments for Legionella control – Code of practice to comply with ACoP
L8, COSHH and HSW Act. The Contractor is required to transport and
analyse water samples in a UKAS accredited laboratory in accordance with
BS 7592 Sampling for Legionella organisms in water and related materials
and ACoP L8, most up to date edition, to achieve statutory compliance.   
• Bio – Security - Illnesses caused by exposure to the Legionella bacteria can
be potentially fatal. The Contractor will  carry out, as requested, cleaning and
disinfection of Cold Water Storage Tanks (CWST) in accordance with Health
and Safety at Work etc Act 1974 (the HSW act), Control of Substances
Hazardous to health Regulations 2002 (COSHH), PD 855468:2015 and
Approved Code of Practice and Guidance (ACoP L8) – Legionnaires’
Disease, most up to date editions, to achieve statutory compliance.
________________________________________________________________ 
Page 141 of 164

Page 142

Author:           Kerri-Anne Ben Ammar, Senior Procurement Specialist, Corporate
Procurement Unit, kerri-anne.benammar@renfrewshire.gov.uk
Page 142 of 164

Page 143

___________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 9 February 2023
___________________________________________________________________
Report by: The Chief Executive and the Director of Environment and
Infrastructure
___________________________________________________________________
Heading: Notification of Increase in Value for the Contract for Traffic
Signals Planned and Unplanned Inspection and Maintenance
reference RC-CPU-19-173
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to notify the Finance, Resources and Customer
Services Policy Board of an increase in the value of the Contract for Traffic
Signals Planned and Unplanned Inspection and Maintenance reference RC-
CPU-19-173 as a result of additional traffic signal improvement work that was
instructed as unplanned maintenance under this contract. 
1.2 This increase in value for this contract is reported in accordance with Standing
Orders Relating to Contracts 20.3. 
1.3 Approval was given at the Finance, Resources and Customer Services Policy
Board on 25 March 2020 to award the contract for Traffic Signals Planned and
Unplanned Inspection and Maintenance reference RC-CPU-19-173, to Dynniq
UK Ltd (who subsequently changed their name to Swarco UK & Ireland Ltd)
for the value of £800,000 excluding VAT.
___________________________________________________________________ 
2. Recommendations
2.1 The Finance, Resources and Customer Services Policy Board is asked to:
Item 20
FRCS 090223 Page 143 of 164

Page 144

2.1.1 Note that this report is made in accordance with Standing Order 20.3 of the
Standing Orders Relating to Contracts 2022.
2.1.2 As a result of the additional traffic signal improvement work, authorise an
increase in the contract value from £800,000 up to £1,200,000 excluding VAT
to include for the works detailed in 3.3 below and to allow for the current
planned maintenance works to be able to continue until the contract can be
retendered. 
_________________________________________________________
3. Background
3.1 Renfrewshire Council has a statutory obligation to maintain and approve all
the traffic signals in operation within the Council area. 
3.2 Traffic signals improvement work was part of the specification requirements
under the Traffic Signals Planned and Unplanned Inspection and Maintenance
contract, reference RC-CPU-19-173. The contract was awarded to Dynniq UK
Ltd who subsequently changed their name to Swarco UK & Ireland Ltd.
3.3 The scope of the additional work was not included as part of the original
contract however additional funding was awarded to the Council to allow
traffic signal improvement work to be undertaken.  The increase in contract
value for the traffic signals improvement work is noted below:
Location Description of Works Total Amount
Penilee Rail Bridge,
Paisley
Refurbishment of existing
traffic signals
£19,441.33
Blackstoun
Road/Falcon
Crescent, Paisley
Refurbishment of existing
pedestrian crossing
£12,051.35
Hawkhead Road/St
Andrews Academy,
Paisley
Refurbishment of existing
pedestrian crossing
£12,875.35
Glasgow
Road/Kirkaig
Avenue, Renfrew
Refurbishment of existing
dual pedestrian crossing
£21,521.38
Pegasus
Avenue/Phoenix
Retail Park, Paisley
Refurbishment of existing
dual pedestrian crossing
£21,536.28
Sandy Road
Junctions, Renfrew
Design costs for 3 junctions £13,959.49
Sandy
Road/Broadloan,
Renfrew
Supply and Install new
signalised junction
£103,783.37
Sandy
Road/Newmains
Road, Renfrew
Supply and Install new
signalised junction
£125,752.69
Page 144 of 164

Page 145

Brediland
Road/Mannering
Road, Paisley
Supply and install new
signalised pedestrian
crossing
£21,620.70
Glenburn
Road/Braehead
Road, Paisley
Supply and install new
signalised pedestrian
crossing
£53,887.65
Greenock Road
near Clark Street,
Paisley
Supply and  install new
signalised pedestrian
crossing
£46,084.80
Penilee Road near
School Road,
Paisley
Supply and install new
signalised pedestrian
crossing
£35,046.00
Sandy
Road/Haining Road,
Renfrew
Supply and Install new
signalised junction
£101,941.63
Gleniffer
Road/Donaldswood
Road, Paisley
Supply and install new
signalised pedestrian
crossing
£27,665.64
B790 Houston Road
between the
roundabout and
Leeburn Avenue
Supply and install new
signalised pedestrian
crossing
£50,126.00 
3.4 The Traffic Signals Planned and Unplanned Inspection Maintenance
contract has provision for instructing this type of work. Regulation 72(1)(b)
of the Public Contracts (Scotland) Regulations 2015 allows for
modifications of contracts during their term without a new procurement
procedure: (b)to provide for additional works, supplies or services by the
original contractor that have become necessary and were not included in
the initial procurement, where a change of contractor—
(i)cannot be made for economic or technical reasons such as
requirements of interchangeability or interoperability with existing
equipment, services or installations procured under the initial
procurement; and
(ii)would cause significant inconvenience or substantial duplication of
costs for the contracting authority,
provided that any increase in price does not exceed 50% of the initial contract
value. 
3.5 A new procurement exercise for Traffic Signals Planned and Unplanned
Inspection and Maintenance is currently being prepared and is expected that
this new contract will commence July 2023. 
___________________________________________________________________
Page 145 of 164

Page 146

Implications of the Report
1. Financial 
The cost of this additional work was met by funding from Capital –
General Services and Strathclyde Partnership for Transport. 
2. HR & Organisational Development 
Not applicable 
3. Community/Council Planning –
Reshaping our place, our economy and our future – the Contract
supports the delivery of this outcome. 
4. Legal 
The work was instructed under an existing Council contract and is
subject to the Council’s Standing Orders Relating to Contracts. 
5. Property/Assets
The Contract will improve the Council’s road infrastructure. 
6. Information Technology 
No Information Technology implications have been identified or are
anticipated.
. 
7. Equality & Human Rights
The Recommendations contained within this report have been
assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report because.  
8. Health & Safety 
Swarco UK & Ireland Ltd’s health and safety credentials were
evaluated by Corporate Health and Safety and met the Council’s
requirements regarding health and safety. 
9. Procurement 
The procurement procedures outlined within this report shall ensure
that the Council meets its statutory requirements in respect of
procurement procedures, efficiency and modern Government. 
10. Risk 
Swarco UK & Ireland Ltd have been assess and evaluated to confirm
that they have met the minimum requirements regarding insurable risk. 
Page 146 of 164

Page 147

11. Privacy Impact 
No Privacy Impact implications have been identified or are anticipated. 
12. Cosla Policy Position 
No Cosla Policy implications have arisen or are anticipated. 
13. Climate Risk 
The level of impact associated with the provision of this work has been
assessed using the Scottish Government Sustainability Test and is
considered to be low risk.
_________________________________________________________
Author:          Brian Bradley, Assistant Category Manager, Corporate Procurement
Unit, Telephone 0141 487 1522, email address
brian.bradley@renfrewshire.gov.uk 
Page 147 of 164

Page 148

Page 148 of 164

Page 149

___________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 9 February 2023
___________________________________________________________________
Report by: The Chief Executive and the Director of Environment and
Infrastructure
___________________________________________________________________
Heading: Refurbishment of 5 Signalised Sites (RC-CPU-22-135)
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to seek the approval of the Finance,
Resources and Customer Services Policy Board to award a Contract
for the Refurbishment of 5 Signalised Sites to Hillhouse Quarry Group
Limited t/a MacAsphalt. 
1.2 The tendering procedure for this Works Contract was conducted as a
below Regulated Open Procedure in accordance with Renfrewshire
Council’s Standing Orders Relating to Contracts. 
1.3 A Contract Strategy was approved by the Head of Operations and
Infrastructure and the Strategic Commercial Category Manager in April
2022.
___________________________________________________________________ 
2. Recommendations
It is recommended that the Finance, Resources and Customer Services
Policy Board: 
2.1 Authorise the Head of Corporate Governance to award the Contract for
the Refurbishment of 5 Signalised Sites (RC-CPU-22-135) to Hillhouse
Quarry Group Limited t/a MacAsphalt;
Item 21
FRCS 090223 Page 149 of 164

Page 150

2.2 Note that the intended starting date is 6 March 2023 with the
completion date being 31 March 2023. The actual dates will be
confirmed in the Council’s Letter of Acceptance. 
2.3 Note that the contract value is £211,192.28 excluding VAT. The cost of
this contract will be met by funding provided by Strathclyde Partnership
for Transport. This funding must be spent by 31 March 2023.
_________________________________________________________
3. Background
3.1 Renfrewshire Council has a statutory obligation to maintain and
approve all the traffic signals in operation within the Council boundary.
Given this obligation the Council has a requirement for a suitably
qualified and experienced contractor to refurbish or upgrade traffic
signal equipment at the following junctions:
▪ Main Street/Torr Road, Bridge of Weir;
▪ Main Road/Glenpatrick Road, Elderslie;
▪ Kings Inch Drive/IKEA, Braehead;
▪ Beith Road/Hallhill Road, Elderslie; and
▪ Paisley Road/Wright Street, Renfrew. 
3.2 A contract notice was published on the Public Contracts Scotland
advertising portal on Monday, 24 October 2022 and the tender
documentation available for downloading from the Public Contracts
Scotland – Tender platform. 
3.3 During the tender period, four (4) companies expressed an interest in
the Contract. By the closing date for return of electronic tenders, 12
noon on Monday, 14 November 2022, two (2) companies submitted a
response, and two (2) failed to respond.
3.4 One (1) tender submission was a variant bid which was prohibited
under the terms of the Invitation to Tender. As a result, this bid was
rejected.
3.5 The remaining tender submission received was evaluated against a
pre-determined set of criteria in the form of the Single Procurement
Document (SPD) as required by the Council’s Standing Orders relating
to contracts 11.5 by representatives from the Corporate Procurement
Unit, Health and Safety and Risk which assessed competence,
expertise and economic and financial standing. The tenderer was
assessed as meeting the minimum criteria following the methodology
stated in the Invitation to Tender.
Page 150 of 164

Page 151

3.6 The Tender Submission was then assessed against the published set
of Award Criteria which were based upon a price/quality ratio of
60%/40%.
3.7 The scores relative to the Award Criteria for the remaining Tenderer are
noted below: 
Price
(60%)
Quality
(40%)
Total
(100%)
1
Hillhouse Quarry
Group Limited t/a
Mac Asphalt
60.00% 40.00% 100.00%   
3.8 The evaluation of Tender Submissions received identified that the
submission by Hillhouse Quarry Group Limited t/a MacAsphalt was the
most economically advantageous tender. As they were the only
compliant bidder, the value for money assessment is required to ensure
there is no need to go back out to market.
3.9 The costs arising from this contract will be met by funding provided by
Strathclyde Partnership for Transport. This funding has to be spent by
31 March 2023.
3.10 Community Benefits were requested as part of the procurement
process and Hillhouse Quarry Group Limited t/a MacAsphalt have
committed to the following Community Benefits: 
Community Benefit Description No of People /
Activity
Non-Financial Support for a Community Project 2
___________________________________________________________________
Implications of the Report
1. Financial 
The cost of this contract will be met by funding provided by Strathclyde
Partnership for Transport. This funding must be spent by 31 March
2023. 
2. HR & Organisational Development 
Not applicable. 
3. Community/Council Planning –  
Page 151 of 164

Page 152

Reshaping our place, our economy and our future – the Contract
proposed will support the delivery of this outcome. 
4. Legal 
The tendering procedure for this Works Contract was conducted in
accordance with a below Regulated Open Procedure. 
5. Property/Assets 
This contract will improve the Council’s traffic signal infrastructure. 
6. Information Technology
No Information Technology implications have been identified or are
anticipated.
. 
7. Equality & Human Rights
The Recommendations contained within this report have been
assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report.   If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health & Safety 
Hillhouse Quarry Group Limited t/a MacAsphalt’s health and safety
credentials were evaluated by Corporate Health and Safety and met
the Council’s requirements regarding health and safety. 
9. Procurement 
The procurement procedures outlined within this report shall ensure
that the Council meets its statutory requirements in respect of
procurement procedures, efficiency and modern Government. 
10. Risk 
Hillhouse Quarry Group Limited t/a MacAsphalt have been assessed
and evaluated to confirm that they have met the minimum requirements
regarding insurable risk. 
11. Privacy Impact 
No Privacy Impact implications have been identified or are anticipated. 
12. Cosla Policy Position 
No Cosla Policy implications have arisen or are anticipated.
Page 152 of 164

Page 153

13. Climate Risk 
The level of impact associated with the provision of this work has been
assessed using the Scottish Government Sustainability Test and is
considered to be low risk.
___________________________________________________________________ 
Author:           Brian Bradley, Assistant Category Manager, Corporate
Procurement Unit, 0141 487 1522,
brian.bradley@renfrewshire.gov.uk 
Page 153 of 164

Page 154

Page 154 of 164

Page 155

1 
To: Finance, Resources and Customer Service Policy Board
On: Thursday 9th February 2023
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Paisley Town Hall Refurbishment - Furniture (RC-CPU-22-150)
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek the approval of the Finance, Resources
and Customer Services Policy Board to award a Goods Contract titled Paisley
Town Hall Refurbishment - Furniture (RC-CPU-22-150) (the “Contract”) to
Claremont Office Furniture Limited.
1.2  The recommendation to award the Contract follows a mini competition in
accordance with Lot 6 of the Scotland Excel Education & Office Furniture
Framework, reference 0620 and the Council’s Standing Orders Relating to
Contracts.
1.3  A Contract Strategy was approved by the Category Manager - City Deal and
Infrastructure and the Programme Director -City Deal & Infrastructure on 16th
November 2022.
___________________________________________________________________
2. Recommendations 
2.1     It is recommended that the Finance, Resources and Customer Services Policy
Board: 
(a) Authorise the Head of Corporate Governance to award a Contract
being a Call-Off Contract made following a mini-competition under Lot
Item 22
FRCS 090223 Page 155 of 164

Page 156

2 
6 of the Scotland Excel Education and Office Furniture Framework
(0620) titled Paisley Town Hall Refurbishment - Furniture (RC-CPU-22-
150) to Claremont Office Furniture Limited. 
(b) Authorise the total price of £218,132.00 excluding VAT for this
Contract. 
(c) Note that the Contract will commence on 21st February 2023 or date
confirmed in the Letter of Acceptance. It is anticipated the Contractor
will deliver and install the furniture between 5th June 2023 and 21st July
2023 however exact dates for delivery and installation will be agreed
with the Supplier subject to completion of the Paisley Town Hall main
works contract.
_________________________________________________________
3. Background
3.1 This Procurement is to appoint a supplier to provide the Office & General
furniture requirements for all spaces in the Paisley Town Hall. Furniture to be
supplied through this contract includes banquet, conference and outdoor
chairs and tables, office desks and chairs, conference chairs and tables,
outdoor seating accessories, storage trollies and cabinets, lamps, mirrors and
decorative furnishings.  
3.2 The Paisley Town Hall is undergoing a refurbishment which is a key element
of the longer-term regeneration of Paisley Town Centre.  The lifecycle
maintenance upgrade with additional facilities will provide a modern facility
that is fit for purpose within an important historic building, supporting and
developing the regeneration of Paisley town centre.
3.3 Ahead of the opening, the Paisley Town Hall will undertake a full fit out of
Furniture, Fittings and Equipment to complete the overall look and feel of the
newly refurbished facility, whilst improving audience experience.
3.4 As part of the contract strategy it was identified that the Scotland Excel
Framework Agreement, Education & Office Furniture (0620), Lot 6: Office Full
Kit Out (the “Framework”) was best suited for this contract. This procurement
exercise was conducted as a mini-competition and was conducted in
accordance with the Framework Agreement mini competition process. 
3.5 There are thirteen (13) framework supplier who confirmed their ability to
service the Renfrewshire Council area within Lot 6 of the Framework. All
thirteen (13) suppliers were invited to tender on 17th November 2022.
3.6 By the closing date set for tender submissions, 12 noon on 7th December
2022, two (2) suppliers had submitted a response, four (4) suppliers declined
to respond and seven (7) suppliers did not respond.  
Page 156 of 164

Page 157

3 
3.7 The two (2) Framework Suppliers (hereinafter identified as Tenderers) who
submitted Tender Submissions continue to meet the requirements of the
Single Procurement Document (SPD) they completed when applying for a
place on the Scotland Excel Framework Agreement, Education & Office
Furniture (0620).
3.8 One (1) of the Tender submissions was incomplete and that Tenderer was
excluded from the tender process as it did not comply with the information and
instructions to tenderers issued with the mini competition. 
3.9 The remaining one (1) Tender Submission was evaluated against the Award
Criteria of 30% Technical/ 70% Commercial. The technical score achieved for
Lot 6 during the Framework evaluation process was carried forward as the
quality score attributable to this procurement exercise for this Contract. The
scores achieved by the Tenderer are detailed in the table below: 
Company  Technical
(30%) 
Commercial
(70%) 
Total
(100%)
Claremont Office
Furniture Limited
28.00% 70.00% 98.00% 
3.10 Standing Order 26.3 of the Council’s Standing Orders Relating to Contracts
2022 allows for the use of Post Tender Negotiations (“PTN”) to be used to
refine and improve the most economically advantageous offer. The Claremont
Office Furniture Limited tender submission was over budget, therefore using
PTN, the Council invited the Tenderer to propose alternatives which met the
specification requirements but offer improved value for money (VFM).
Claremont proposed improvements which brought the tender submission total
within the Contract budget.
3.11 Following PTN, the Tender Submission submitted by Claremont Office
Furniture Limited was identified as the most economically advantageous
tender.
3.12 Community Benefits were assessed at the Framework level, Claremont Office
Furniture Limited has confirmed the following Community Benefits would be
made available to the Council for this Contract. 
Financial Support for a Community Project 1
___________________________________________________________________  
Page 157 of 164

Page 158

4 
Implications of the Report
1. Financial - The cost for this contract will be contained within existing
resources approved in the Council’s Capital Investment Plan. 
2. HR & Organisational Development - No HR or Organisational Development
implications have arisen or are anticipated. 
3. Community/Council Planning – 
Reshaping our place, our economy and our future – This contract is part of
the refurbishment of the Paisley Town Hall and will contribute to the building
becoming one of the landmark entertainment venues in the West of Scotland. 
4. Legal - The procurement of this Contract was by Mini Competition in
accordance with the Scotland Excel Education & Office Furniture (0620)
Framework , Lot 6 and the Council’s Standing Orders Relating to Contracts
for an above Threshold Supplies Contract. 
5. Property/Assets – The furniture will be added to the Council’s asset register. 
6. Information Technology - No Information Technology implications have
arisen or are anticipated. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been
assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for
infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report. 
8. Health & Safety - Claremont Office Furniture Limited health and safety
credentials were evaluated by Corporate Health and Safety and met the
Council’s minimum requirements regarding health and safety.
9. Procurement – The procurement procedure outlined within this report
ensures that the Council complies with the Council’s Standing Orders relating
to Contracts 2022 and meets its statutory requirements in respect of
procurement procedures, efficiency and modern government.
10. Risk - Claremont Office Furniture Limited insurances were assessed and
evaluated to confirm that they meet the minimum requirements regarding
insurable risk. 
11. Privacy Impact - No Privacy implications have been identified or are
anticipated. 
Page 158 of 164

Page 159

5 
12. Cosla Policy Position No COSLA Policy Position implications have arisen or
are anticipated.
13. Climate Risk – A sustainability test was carried out and this contract was
assessed as low risk. The Scotland Excel Framework Agreement contains
specific conditions that all contractors must adhere to with regards to
sustainability.   
➢ All packaging should be kept to the minimum required to protect the
furniture and be recyclable/reusable/recycled and include recycling
instructions. 
➢ Delivery vehicles should comply with emissions standards. 
_________________________________________________________
List of Background Papers 
None. 
___________________________________________________________________ 
Author:           Louise Bishop – Procurement Advisor 
email: louise.bishop@renfrewshire.gov.uk 
Page 159 of 164

Page 160

Page 160 of 164

Page 161

___________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 09 January 2023
___________________________________________________________________
Report by: The Chief Executive
___________________________________________________________________
Heading: Paisley Town Hall Refurbishment (PTHR) - Stage Lighting and Loose
AV Equipment (RC-CPU-22-171)
___________________________________________________________________
1. Summary  
1.1 The purpose of this report is to seek the approval of the Finance,
Resources and Customer Services Policy Board to award a Supply
Contract for PTHR - Stage Lighting and Loose AV Equipment to Stage
Electrics Partnership Limited. 
1.2 The recommendation to award the Contract follows a procurement
exercise conducted using the Open procedure in accordance with the
Council’s Standing Orders Relating to Contracts and the Public
Contract (Scotland) Regulations 2015 for an above Threshold Supply
Contract. 
1.3 A contract strategy was approved by the Strategic Commercial &
Procurement Manager and the Programme Director City Deal and
Infrastructure in November 2022. 
___________________________________________________________________ 
2. Recommendations
It is recommended that the Finance, Resources and Customer Services
Policy Board authorise the Head of Corporate Governance to: 
Item 23
FRCS 090223 Page 161 of 164

Page 162

(a) Award the Contract for PTHR - Stage Lighting and Loose AV
Equipment (RC-CPU-22-171) to Stage Electrics Partnership
Limited. 
(b) Authorise the total price of £309,369.76 excluding VAT for provision
of stage lighting and loose AV equipment. 
(c) Note that it is anticipated that the Contract will commence on 6th
March 2023 or on date confirmed in the Letter of Acceptance. It is
anticipated the Contractor will deliver and install the equipment in
June 2023 however exact dates for delivery and installation will be
agreed with Contractor subject to completion of the Paisley Town
Hall main works contract. 
_________________________________________________________
3. Background
3.1 Renfrewshire Council seeks to appoint a competent and suitably
experienced contractor to supply, install and provide client training on
stage lighting and loose audio-visual equipment for the Paisley Town
Hall as part of the Paisley Town Hall Refurbishment project. 
3.2 The Paisley Town Hall aims to become a landmark venue in the West
of Scotland for performances and events. This contract is for the supply
of improved stage lighting and sound equipment needed to provide a
high-quality experience for incoming customers.   
3.3 A contract notice for this tender was dispatched to Find a Tender
Service via Public Contract Scotland advertising portal on 10 November
2022 and the tender documentation was made available or
downloading from Public Contract Scotland – Tender platform on 11
November 2022. 
3.4 During the tendering live period, fourteen (14) organisations expressed
an interest in the Contract. By the closing date set for return of
electronic tenders of 12 noon on Monday 12 December 2022, two (2)
organisations (tenderers) had submitted a response.
3.5 The two (2) Tender Submissions received, each contained a completed
Single Procurement Document (SPD) as required by the Invitation to
Tender and these were evaluated against the pre-determined set of
criteria in the Single Procurement Document (SPD) by representatives
from OneRen and the following Council services: Chief Executives
Services, the Corporate Procurement Unit, Corporate Risk and
Corporate Health and Safety. 
Page 162 of 164

Page 163

3.6 Both Tender Submissions confirmed they met the requirements of the
SPD and progressed to evaluation against the published Award Criteria
of 30% Quality / 70% Price. 
3.7  The scores relative to the Award Criteria for the two (2) Tenderers are
noted below:  
Quality
(30%)
Price
(70%)
Total
(100%)
1 Stage Electrics
Partnership Limited 19.75% 70.00% 89.75%
2 Adlib Audio Limited 11.75% 65.55% 77.30% 
3.8 The evaluation of Tender Submissions received identified that the
submission by Stage Electrics Partnership Limited was the most
economically advantageous tender. 
3.9 Community Benefits were requested as part of the procurement
however Stage Electrics Partnership Limited have not committed to any
community benefits and have been scored accordingly. 
___________________________________________________________________
Implications of the Report
1. Financial – The costs for this contract will be contained within existing
resources approved in the Council’s Capital Investment Plan. 
2. HR & Organisational Development – None 
3. Community/Council Planning –  
• Our Renfrewshire is thriving – maximising economic growth that
is inclusive and sustainable 
• Our Renfrewshire is well – supporting the wellness and resilience
of our citizens and communities  
• Our Renfrewshire is fair - addressing the inequalities that limit life
chances 
• Reshaping our place, our economy, and our future
- Delivering improvement to Paisley Town Hall 
• Creating a sustainable Renfrewshire for all to enjoy
- Keeping local places clean and attractive   
Page 163 of 164

Page 164

4. Legal – The Procurement of this Supply Contract has been conducted,
in accordance with the Council’s Standing Orders Relating to Contracts
1 January 2022 and Public Contract (Scotland) Regulations 2015 for
above GPA Threshold Supply Contract. 
5. Property/Assets – The stage lighting and audio-visual equipment will
be added to the Council’s asset register. 
6. Information Technology – No Information Technology implications
have arisen or are anticipated. 
7. Equality & Human Rights - The Recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report.   
8. Health & Safety –Stage Electrics Partnership Limited health and safety
credentials were evaluated by Corporate Health and Safety and met
the Council’s minimum requirements regarding health and safety.  
9. Procurement –The procurement procedures outlined within this report
were carried out in accordance with the Public Contracts (Scotland)
Regulations 2015 and x
10. Risk – Stage Electrics Partnership Limited insurances have been
assessed to confirm that they meet the minimum requirements
regarding insurance risk. 
11. Privacy Impact – No Privacy Impact implications have been identified
or are anticipated.  
12. Cosla Policy Position – No COSLA Policy Position implications have
arisen or are anticipated.
13. Climate Risk – The Scottish Government Sustainability was carried out
as part of the strategy for this procurement. The impact is considered
low risk. 
___________________________________________________________________ 
List of Background Papers:  None  
___________________________________________________________________ 
Author:           Rebecca Park, Category Manager – City Deal and Infrastructure, Corporate
Procurement Unit, rebecca.park@renfrewshire.gov.uk
Page 164 of 164