Democracy Spraffa

CAR - Traffic Signals Refurb

Renfrewshire Council · 9 February 2023
Back to Finance, Resources and Customer Services Policy Board — 9 February 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

___________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 9 February 2023
___________________________________________________________________
Report by: The Chief Executive and the Director of Environment and
Infrastructure
___________________________________________________________________
Heading: Refurbishment of 5 Signalised Sites (RC-CPU-22-135)
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to seek the approval of the Finance,
Resources and Customer Services Policy Board to award a Contract
for the Refurbishment of 5 Signalised Sites to Hillhouse Quarry Group
Limited t/a MacAsphalt. 
1.2 The tendering procedure for this Works Contract was conducted as a
below Regulated Open Procedure in accordance with Renfrewshire
Council’s Standing Orders Relating to Contracts. 
1.3 A Contract Strategy was approved by the Head of Operations and
Infrastructure and the Strategic Commercial Category Manager in April
2022.
___________________________________________________________________ 
2. Recommendations
It is recommended that the Finance, Resources and Customer Services
Policy Board: 
2.1 Authorise the Head of Corporate Governance to award the Contract for
the Refurbishment of 5 Signalised Sites (RC-CPU-22-135) to Hillhouse
Quarry Group Limited t/a MacAsphalt;

Page 2

2.2 Note that the intended starting date is 6 March 2023 with the
completion date being 31 March 2023. The actual dates will be
confirmed in the Council’s Letter of Acceptance. 
2.3 Note that the contract value is £211,192.28 excluding VAT. The cost of
this contract will be met by funding provided by Strathclyde Partnership
for Transport. This funding must be spent by 31 March 2023.
_________________________________________________________
3. Background
3.1 Renfrewshire Council has a statutory obligation to maintain and
approve all the traffic signals in operation within the Council boundary.
Given this obligation the Council has a requirement for a suitably
qualified and experienced contractor to refurbish or upgrade traffic
signal equipment at the following junctions:
▪ Main Street/Torr Road, Bridge of Weir;
▪ Main Road/Glenpatrick Road, Elderslie;
▪ Kings Inch Drive/IKEA, Braehead;
▪ Beith Road/Hallhill Road, Elderslie; and
▪ Paisley Road/Wright Street, Renfrew. 
3.2 A contract notice was published on the Public Contracts Scotland
advertising portal on Monday, 24 October 2022 and the tender
documentation available for downloading from the Public Contracts
Scotland – Tender platform. 
3.3 During the tender period, four (4) companies expressed an interest in
the Contract. By the closing date for return of electronic tenders, 12
noon on Monday, 14 November 2022, two (2) companies submitted a
response, and two (2) failed to respond.
3.4 One (1) tender submission was a variant bid which was prohibited
under the terms of the Invitation to Tender. As a result, this bid was
rejected.
3.5 The remaining tender submission received was evaluated against a
pre-determined set of criteria in the form of the Single Procurement
Document (SPD) as required by the Council’s Standing Orders relating
to contracts 11.5 by representatives from the Corporate Procurement
Unit, Health and Safety and Risk which assessed competence,
expertise and economic and financial standing. The tenderer was
assessed as meeting the minimum criteria following the methodology
stated in the Invitation to Tender.

Page 3

3.6 The Tender Submission was then assessed against the published set
of Award Criteria which were based upon a price/quality ratio of
60%/40%.
3.7 The scores relative to the Award Criteria for the remaining Tenderer are
noted below: 
Price
(60%)
Quality
(40%)
Total
(100%)
1
Hillhouse Quarry
Group Limited t/a
Mac Asphalt
60.00% 40.00% 100.00%   
3.8 The evaluation of Tender Submissions received identified that the
submission by Hillhouse Quarry Group Limited t/a MacAsphalt was the
most economically advantageous tender. As they were the only
compliant bidder, the value for money assessment is required to ensure
there is no need to go back out to market.
3.9 The costs arising from this contract will be met by funding provided by
Strathclyde Partnership for Transport. This funding has to be spent by
31 March 2023.
3.10 Community Benefits were requested as part of the procurement
process and Hillhouse Quarry Group Limited t/a MacAsphalt have
committed to the following Community Benefits: 
Community Benefit Description No of People /
Activity
Non-Financial Support for a Community Project 2
___________________________________________________________________
Implications of the Report
1. Financial 
The cost of this contract will be met by funding provided by Strathclyde
Partnership for Transport. This funding must be spent by 31 March
2023. 
2. HR & Organisational Development 
Not applicable. 
3. Community/Council Planning –

Page 4

Reshaping our place, our economy and our future – the Contract
proposed will support the delivery of this outcome. 
4. Legal 
The tendering procedure for this Works Contract was conducted in
accordance with a below Regulated Open Procedure. 
5. Property/Assets 
This contract will improve the Council’s traffic signal infrastructure. 
6. Information Technology
No Information Technology implications have been identified or are
anticipated.
. 
7. Equality & Human Rights
The Recommendations contained within this report have been
assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report.   If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health & Safety 
Hillhouse Quarry Group Limited t/a MacAsphalt’s health and safety
credentials were evaluated by Corporate Health and Safety and met
the Council’s requirements regarding health and safety. 
9. Procurement 
The procurement procedures outlined within this report shall ensure
that the Council meets its statutory requirements in respect of
procurement procedures, efficiency and modern Government. 
10. Risk 
Hillhouse Quarry Group Limited t/a MacAsphalt have been assessed
and evaluated to confirm that they have met the minimum requirements
regarding insurable risk. 
11. Privacy Impact 
No Privacy Impact implications have been identified or are anticipated. 
12. Cosla Policy Position 
No Cosla Policy implications have arisen or are anticipated.

Page 5

13. Climate Risk 
The level of impact associated with the provision of this work has been
assessed using the Scottish Government Sustainability Test and is
considered to be low risk.
___________________________________________________________________ 
Author:           Brian Bradley, Assistant Category Manager, Corporate
Procurement Unit, 0141 487 1522,
brian.bradley@renfrewshire.gov.uk