ARGYLL AND BUTE COUNCIL  Oban Lorn and the Isles
DEVELOPMENT AND ECONOMIC
GROWTH 
06 March 2024 
2023/24 Active Travel Progress Report 
1.0 EXECUTIVE SUMMARY 
1.1. This report provides an update to Members on the progress made in 2023/24 in
relation to active travel projects in the Oban Lorn and the Isles (OLI) Area,
informs Members of the significant changes in Scottish Government active travel
funding and seeks continued support for the projects and wider active travel
measures from Members. 
1.2. Active travel encompasses accessible, everyday Walking, Mobility Assistance
and child prams (sometime collectively termed “Wheeling”) and Cycling.  The
focus of active travel is on accessible provision including those with mobility
impairments. 
1.3. The Council’s Active Travel Team, 1.7 Full Time Equivalent employees, is part of
the Strategic Transport Team within the Development and Economic Growth
Service.  No Council funding is currently received by the Active Travel Team. All
project costs, including internal staff costs, have to be funded via successfully
securing highly competitive external challenge funds. 
1.4. The Active Travel Team work with communities, internal and external
stakeholders across Argyll and Bute to develop and deliver active travel projects
which provide new/improved accessible infrastructure (e.g. paths, cycle lanes)
and behaviour change (e.g. access to bikes, walking/cycle training, promotional
activities). 
1.5. In 2023/24 to date, the Active Travel Team secured £2.56M external funding for
the development and delivery of a total of 22 projects across Argyll and Bute. 
These include Argyll and Bute wide projects, valued at £95,000 in 23/24, and
projects specific to the OLI area, with a 23/24 value of £130,000. 
1.6. The Active Travel Team work to source and secure highly competitive funding
from a range of sources, the main of which are Transport Scotland’s Places for
Everyone (PFE) Programme (administered by Sustrans), the Scottish
Government’s Cycling, Walking and Safer Routes (CWSR) fund and Delivery
Resource Fund, Paths for All Smarter Choices Smarter Places (SCSP)
programme, Transport Scotland’s Active Travel Transformation Fund (ATTF),

Page 2

and HITRANS Regional Active Travel Fund.  Further funding has been secured
for some projects via local community organisations and from willing
businesses.  It is recognised at a national level that the Active Travel Team in
Argyll and Bute Council secure significantly more funding, and subsequently
deliver more projects, than similar staffed teams in other Local Authorities and/or
local authorities with similar populations. 
1.7. Transport Scotland have informed Officers that, as of 24/25, the funding model
for active travel will change.  The primary change will be the reallocation of the
significant funding currently disbursed via third-sector organisations (such as
Sustrans or Paths for All) and, to a lesser extent Transport Scotland (e.g.
CWSR), to individual Local Authority block grants and a single Transport
Scotland controlled Active Travel Infrastructure Fund (ATIF).  This will be
undertaken incrementally over a 2 year transition period. 
1.8. Transitional arrangements for infrastructure design and construction are
understood by Officers to be:
• 24/25 a proportion of the Scottish Government’s active travel funding will be
allocated to Local Authority block grants with the remainder remaining as
challenge funding, in particular in the PFE Programme (administered by
Sustrans) and Transport Scotland’s ATIF fund.  Transport Scotland have
stated that failure to expend the block grant allocation on appropriate active
travel projects will negatively affect the Council’s opportunity to secure
additional funding from the ATIF.  The Scottish Government’s budget
commits a total of £220M to active travel in 24/25.
• 25/26, those Local Authorities which chose (in 24/25) to expend the full
amount of active travel funding in their block grant on appropriate active
travel projects will receive an increase in their block grant allowance for
active travel, with a smaller percentage of the overall funding being available
via challenge funds following the closure of the PFE programme (forecast for
December 2025). The Scottish Government has set an objective of
committing 10% of the 25/26 transport budget to active travel, estimated to
be c.£320M.
• 26/27 onwards the challenge funding available will be solely focused on
assisting Local Authorities with the cost of delivering very highly ambitious
active travel projects, as active travel infrastructure funding for smaller
projects will be included within block grants of those Local Authorities which
have chosen in 24/25 and 25/26 to dedicate it to active travel. 
1.9. Transitional arrangement for behaviour change is understood by Officers to be
the transfer of the majority of the Scottish Government’s behaviour change
funding in 24/25 onwards from third sector organisations to the Regional
Transport Partnerships (RTPs).  This will enable the development and delivery
of behaviour change programmes/activities which are tailored to the specific
requirements of each RTP area.  A small element of the Scottish Government’s
behaviour change funding will be retained to continue campaigns/cycle training

Page 3

programmes which are deemed to be most effective when delivered at a
national scale. 
1.10. Separately, Officers are working to develop an Active Travel Strategy (ATS) for
Argyll and Bute which will set out the policy and strategic context for the
development and delivery of active travel across the whole of Argyll and Bute. 
Subsequent to this, an Active Travel Delivery Plan (ATDP) will be developed
which will identify the specific projects to be developed in order to achieve the
ambition set in the ATS. 
1.11. Active Travel can offer significant benefits to the area:
• Access to essential services and employment: In OLI 21% of households
(1,873 households) do not have access to a motor vehicle and are reliant on
public transport and active travel modes.
• Health benefits: being more active reduces the risk of premature morbidity
and death, particularly from diseases related to inactivity.
• Economics: People who travel to shops by walking and/or cycling have a
higher monthly spend than people who travel to shops by private car.
• Improving safety: reduces injuries from car collisions. 
1.12. A number of active travel projects link to schools, offering the opportunity to
increase the numbers of pupils, parents and staff choosing to walk, cycle or
wheel to school.  While the main benefits are improved physical and mental
health, where new active travel infrastructure creates a safe route to school
where one did not previously exist it could reduce the requirement to provide
school transport on safety grounds, thereby creating a revenue saving to the
school transport budget. 
RECOMMENDATIONS 
1.13. It is recommended that the Oban Lorn and the Isles members: 
1.13.1. Welcome the progress made to date across a significant number of
active travel projects by the small Active Travel Team. 
1.13.2. Support the continuation of the projects and the submission of future
funding applications to external challenge funds (while these still exist)
to continue to develop design and construction stages in order to
deliver these projects. 
1.13.3. Support the allocation of the active travel funding element in the
Council’s 24/25 block grant to the development and delivery of
appropriate active travel projects, including those already underway in
OLI.

Page 4

1.13.4. Instruct Officers to continue to identify and develop new active travel
projects to benefit local residents, businesses and communities.

Page 5

ARGYLL AND BUTE COUNCIL  Oban Lorn and the Isles
DEVELOPMENT AND ECONOMIC
GROWTH 
06 March 2024 
2023/24 Active Travel Progress Report 
2.0 INTRODUCTION 
2.1. This report provides an update to Members on the progress made in 2023/24 in
relation to active travel projects in the OLI Area and seeks continued support for
the projects from Members. 
2.2. Active travel encompasses accessible, everyday Walking, Mobility Assistance
and child prams (sometime collectively termed “Wheeling”) and Cycling.  The
focus of active travel is on accessible provision including those with mobility
impairments. 
3.0 RECOMMENDATIONS 
3.1. It is recommended that the Oban Lorn and the Isles members: 
3.1.1. Welcome the progress made to date across a significant number of
active travel projects by the small Active Travel Team. 
3.1.2. Support the continuation of the projects and the submission of future
funding applications to external challenge funds (while these still exist)
to continue to develop design and construction stages in order to
deliver these projects. 
3.1.3. Support the allocation of the active travel funding element in the
Council’s 24/25 block grant to the development and delivery of
appropriate active travel projects, including those already underway in
OLI. 
3.1.4. Instruct Officers to continue to identify and develop new active travel
projects to benefit local residents, businesses and communities. 
4.0 DETAIL 
4.1. The Council’s Active Travel Team, 1.7 FTE (Full Time Equivalent employees), is
part of the Strategic Transport Team within the Development and Economic
Growth Service.  No Council funding is currently received by the Active Travel

Page 6

Team. All project costs, including internal staff costs, have to be funded via
successfully securing highly competitive external challenge funds. 
4.2. It is recognised at a national level that the Active Travel Team in Argyll and Bute
Council secure significantly more funding, and subsequently deliver more
projects, than similar staffed teams in other Local Authorities and/or local
authorities with similar populations. 
4.3. The Active Travel Team work with communities, internal and external
stakeholders across Argyll and Bute to develop and deliver active travel projects
which provide new/improved accessible infrastructure (e.g. paths, cycle lanes)
and behaviour change (e.g. access to bikes, walking/cycle training, promotional
activities). 
4.4. In 2023/24 to date, the Active Travel Team secured £2.56M external funding for
the development and delivery of a total of 22 projects across Argyll and Bute,
including Argyll and Bute wide projects, valued at £95,000 in 23/24 and projects
specific to the OLI area, with a 23/24 value of £130,000.  Further details of these
projects is presented in Appendix 1. 
Future Funding Model 
4.5. Transport Scotland informed Officers on 23 January 2024 that, as of 24/25, the
funding model for active travel will change.  At the time of writing, Transport
Scotland have stated that they are unable to confirm the value of specific
funding streams for 24/25 as these are still subject to agreement with COSLA.  It
is understood the primary change will be the reallocation of the significant
funding currently disbursed via third-sector organisations (such as Sustrans or
Paths for All) and, to a lesser extent Transport Scotland (e.g. CWSR) to
individual Local Authority block grants and a single Transport Scotland
challenge fund, the Active Travel Infrastructure Fund (ATIF).  This will be
undertaken incrementally over a 2 year transition period. 
4.6. Provisional transitional arrangements for infrastructure design and construction
are understood by Officers to be:
• 24/25 the allocation of a proportion of the Scottish Government’s active travel
funding to Local Authority block grants with the remainder remaining as
challenge funding, in particular in the PFE Programme (administered by
Sustrans) and Transport Scotland’s ATIF.  The split of allocation the funding
is understood to still be in negation between Transport Scotland and COSLA
with Transport Scotland expecting to confirm values in early 24/25. 
Transport Scotland have also stated that failure to expend the block grant
allocation on appropriate active travel work will negatively affect the Council’s
opportunity to secure additional funding from the ATIF.
• 25/26, those Local Authorities which chose (in 24/25) to expend the full
amount of active travel funding in their block grant on appropriate active

Page 7

travel projects will receive an increase in their block grant allowance for
active travel, with a smaller percentage of the overall funding being available
via challenge funds including the closure of the PFE programme (forecast for
December 2025).
• From 26/27 onwards the challenge funding available (e.g. ATIF) will be
solely focused on assisting Local Authorities with the cost of delivering very
highly ambitious active travel projects, as the active travel infrastructure
funding for smaller projects will be included within the block grants of those
Local Authorities which chose to dedicate it to active travel in 24/25 and
25/26. 
4.7. Behaviour change funding will be transferred from third sector organisations to
the Regional Transport Partnerships (RTPs) in 24/25 onwards.  This will enable
the development and delivery of behaviour change programmes/activities which
are tailored to the specific requirements of each RTP area.  A small element of
the Scottish Government’s behaviour change funding will be retained to continue
campaigns/programmes which are deemed to be most effective when delivered
at a national scale.  Officers have started to engage with our RTPs (HITRANS
and SPT) in order to understand and influence the future plans for the delivery of
behaviour change projects. 
Current (2023/24) Funding Model 
4.8. The Active Travel Team work to source and secure highly competitive funding
from a range of sources, the main of which are Transport Scotland’s Places for
Everyone (PFE) Programme (administered by Sustrans), the Scottish
Government’s Cycling, Walking and Safer Routes (CWSR) fund and Delivery
Resource Fund, Paths for All Smarter Choices Smarter Places (SCSP)
programme, Transport Scotland’s Active Travel Transformation Fund (ATTF),
and HITRANS Regional Active Travel Fund.  Further funding has been secured
for some projects via local community organisations and from willing
businesses.  It is recognised at a national level that the Active Travel Team in
Argyll and Bute Council secure significantly more funding, and subsequently
delivery more projects, than similar staffed teams in other Local Authorities
and/or local authorities with similar populations. 
4.9. The primary external funding route for active travel infrastructure design is
Transport Scotland’s Places for Everyone (PFE) programme (which Sustrans
are paid to administer).  The PFE Programme is a competitive challenge fund
structured around 8 project stages; with the 32 local authorities, 7 regional
transport partnerships, two national parks and numerous community groups
across Scotland competing against each other to secure the funding each
project requires.  In 23/24, the Active Travel Team secured £1.7M from the PFE
Programme.  It has been announced that the PFE Programme will by wound
down with a final closure date of December 2025.

Page 8

4.10. A minimum of three new competitive funding submissions are required to
complete a project using PFE funding, with competitive applications required, as
a minimum, prior to Stage 0 (Strategic Definition), Stage 3 (Developed Design)
and Stage 5 (Construction).  The full project stages are (0) Strategic Definition,
(1) Preparation and Brief, (2) Concept Design), (3) Developed Design, (4)
Technical Design, (5) Construction, (6) Handover & Close Out and (7) In Use. 
4.11. The Scottish Government Cycling, Walking and Safer Routes (CWSR) fund is
an annual ring-fenced fund which provides the opportunity for Local Authorities
to identify and deliver lower value active travel infrastructure without the level of
complexity and time required by the PFE route.  In 23/24, the Active Travel
Team secured £551,000 from the CWSR fund.  It is understood by Officers that
the CWSR fund will terminate in March 2024. 
4.12. The Smarter Choices Smarter Places (SCSP) programme is run by Paths for All
and provides funding for behaviour change projects.  Behaviour change projects
are designed to influence behaviour and choice, rather than provide new
infrastructure.  In 23/24, the Active Travel Team secured £80,000 from the
SCSP programme.  It has been announced that the SCSP programme will
terminate in March 2024.   
4.13. Transport Scotland’s Active Travel Transformation Fund (ATTF) was launched
in 23/24 and focuses on supporting Local Authorities, RTPs and National Parks
with the additional cost of constructing very ambitious, high-quality active travel
projects.  Projects must be fully construction ready prior to submission to the
ATTF.  Officers submitted two applications to the 23/24 ATTF, including for the
Bowmore – Bridgend Path on Islay, but, while these were shortlisted on the
reserve list, were unsuccessful in securing funding in 23/24.  The application
deadline for 24/25 projects to ATTF is late January 2024 and, at the time of
writing, Officers are developing submissions including resubmitting the Bowmore
– Bridgend Path project. 
4.14. HITRANS Regional Active Travel Fund has previously supported a number of
projects in OLI, including £450,000 towards Phase 1 of the Ralston Road
Cycleway project in Campbeltown (completed summer 2023).  As HITRANS
have a relatively small budget compared to the geographical area covered and
require to support five local authorities, Argyll and Bute’s 23/24 allocation was
substantially lower than in previous years at £25,000. 
Benefits of Active Travel 
4.15. 21% of households (1,873 households) in the OLI area do not have access to
any motor vehicles (2011 census) and are therefore reliant on public transport
and active travel methods to move around.

Page 9

4.16. Transport poverty is defined as households and individuals who spend a
significant percentage of their income to make the journeys they need (UK
Government, 2019).  In OLI, where a higher than Scottish average of the
population have low incomes (SIMD, 2020), the cost of travel is a significant
barrier to a substantial number of the community.  This is highlighted by the
higher than Scottish average number of households have multiple cars but
shorter than Scottish average journey distances to work/study (2011 census),
indicating that a significant number of households own multiple cars to travel
short distances.  Walking, wheeling (mobility aids/child prams) and cycling are
much cheaper than running a car or using public transport, and improving
opportunities to choose to walk/cycle for essential journeys can improve access
to essential services, reduce social exclusion and increase opportunities to
access education and employment. 
4.17. Health benefits of enabling individuals and communities to choose to travel more
actively are well documented and a significant body of research has identified
that having active, healthy lifestyles helps to reduce fragility and reduce falls as
individuals age, and increase social inclusion and accessibility.  In particular,
being more active reduces the risk of premature morbidity and death,
particularly from diseases related to inactivity including cardiovascular
disease, coronary heart disease, stroke, dementia, type 2 diabetes, hip
fractures and cancer.  Active travel also has significant mental health benefits
including increasing social inclusion and reducing depression. This means
those who choose to be more active are less likely to require social care
services in later life which could result in a future saving to the Council or
HSCP (DfT, 2014; CIHT, 2016; Centre for Mental Health, 2016; Scottish
Government, 2018; Dunoon Shaping Places for Wellbeing, 2022; World Health
Organisation, 2022; Public Health Scotland, 2022; Public Health Scotland,
2023). 
4.18. Economics: People who travel to shops actively by walking and/or cycling, while
they spend less per individual visit, make more visits a month and have a higher
monthly spend than people who travel to shops by private car (Pedestrian
Pound, 2018).  Improving public realm and routes to shops for pedestrians and
cyclists can increase trade by up to 40% (Pedestrian Pound, 2018).   
4.19. Improving safety through good design, in particular to protect more vulnerable
individuals, pedestrians and cyclists, reduces injuries from car collisions (Public
Health Scotland, 2022).  Where people choose to travel actively to make a
journey instead of using a private car, this reduces the number of car
movements which makes streets cleaner, improves air quality, reduces traffic
congestion and reduces demand for space to park in key hotspots. 
4.20. A number of the active travel projects link to schools, thereby offering the
opportunity to increase the numbers of pupils, parents and staff choosing to
walk, cycle or wheel to school.  While the main benefits are improved physical

Page 10

and mental health, such provision may also generate a saving on school
transport provision.  Argyll and Bute Council provide free school transport to
some pupils on safety grounds.  This is where pupils live less than the legislative
minimum distance from school to qualify for free school transport provision, but
where there is no safe active travel route to school.  Where new active travel
infrastructure creates a safe route to school where one did not previously exist it
could reduce the requirement to provide school transport on safety grounds,
thereby creating a revenue saving. 
Design guidance 
4.21. It is understood that adherence to the latest design criteria for active travel (e.g.
Cycle by Design for cycle projects) will continue to be a requirement.  However,
the removal of national third-sector organisations from control of the main active
travel funding steams should enable Officers to apply the guidance in a more
flexible and specific manner to local circumstances.  Utilising adopted design
guidance provides a clear framework for development of designs which are
appropriate, accessible, attractive and safe. 
Active Travel Strategy (ATS) 
4.22. Separately, Officers are working to develop an Active Travel Strategy (ATS) for
Argyll and Bute which will set out the policy and strategic context for the
development and delivery of active travel across the whole of Argyll and Bute. 
Subsequent to this, an Active Travel Delivery Plan (ATDP) will be developed
which will identify the specific projects to be developed in order to achieve the
ambition set in the ATS. 
5.0 CONCLUSION 
5.1. Significant changes to the funding model in 2024/25 and 2025/26 will create
opportunities for active travel projects to focus on local priorities, rather than
projects which meet the aspirations and objectives of national organisations. 
However, continued delivery of new and improved active travel opportunities to
the residents, businesses, communities and visitors in the OLI area will require
Members to commit the additional active travel funding allocation in the 24/25
Council Block Grant to the development and delivery of active travel projects. 
6.0 IMPLICATIONS 
6.1. Policy Completion of this project will support the Council’s
SOA outcomes 2: We have infrastructure that supports
sustainable growth and 5: People live active, healthier
and independent lives. The project also supports
achievement of the Scottish Government’s objectives
set out in the Cycling Action Plan for Scotland (CAPS)

Page 11

and Let’s Get Scotland Walking - The National
Walking Strategy.
6.2. Financial The change in approach to the provision of active
travel funding by the Scottish Government from
external challenge funding to including it within the
Council’s block grant will require Members to decide to
allocate the funding to develop and deliver active
travel projects.
Improved active travel provision could reduce the
requirement to provide school transport on safety
grounds, thereby creating a revenue saving.
There is strong evidence that people who are more
active, for example by walking or cycling, have better
physical and mental health and are less likely to
require social care services in later life which could
result in a future saving to the Council or HSCP.
6.3. Legal Continued input will be required from Legal Services to
support any land acquisition required for the creation
of active travel routes.
6.4. HR None.
6.5. Fairer Scotland
Duty: 
6.5.1 Equalities Provision of new and improved active travel
infrastructure and behaviour change options will
provide enhanced opportunities for residents and
visitors to choose to travel more sustainably and
actively by walking, wheeling and cycling.
All new active travel routes are designed to be
accessible and DDA compliant to provide a safe and
accessible route for those with mobility aids including
wheelchairs and parents/guardians with a child’s pram
or buggy.
6.5.2 Socio-
economic Duty
New and improved active travel routes will improve
access to essential services, retail, leisure and
employment opportunities for local residents, with
studies demonstrating those who travelled actively had
a higher monthly spend in local businesses than those
who travel via motorised transport.
The routes will also offer opportunities for individuals
to travel for leisure, again encouraging spend in local
businesses connected by the routes.
6.5.3 Islands A number of the active travel projects are based on
islands, thereby providing the same opportunities for
island residents/visitors to choose to travel actively as
those on the mainland.  Where visitors choose to
travel actively in leu of taking a motor vehicle this can

Page 12

help reduce demand for the overstretched vehicle
capacity on the ferry services.
6.6. Climate Change  Active Travel is the least carbon intensive mode of
travel.  Providing the opportunity for residents and
visitors to consider an alternative to having to use a
private car to travel will help lower Argyll and Bute’s
carbon footprint.
6.7. Risk There is a reputational risk to the Council if the
projects are not completed within a reasonable
timeframe.
6.8. Customer
Services  
None.
6.9 The Rights of the     Active travel is the most accessible mode of travel to 
Child              young people, as it does not have any minimum age 
limits, does not require any form of licence, is free to 
use and is not tied to any fixed timetable. All new active 
travel infrastructure is designed to be utilised by an 
unaccompanied 12 year old. Engagement with school 
pupils indicates that the vast majority of pupils strongly 
support the provision of new active travel infrastructure,                                               
even where it would adversely impact other modes of 
transport           
Executive Director with the responsibility for Development and Economic
Growth: Kirsty Flanagan 
Policy Lead: Cllr Andrew Kain 
05 January 2024 
For further information contact:  Colin Young    
Strategic Transportation Delivery Officer    
colin.young@argyll-bute.gov.uk    
01546 604275 
Appendix 1: 2024/25 Active Travel Projects

Page 13

Appendix 1: 2024/25 Projects 
1.1. Active Travel Promotional Campaign
Creation of a new sustainable travel (walking, wheeling, cycling and public
transport) promotional brand “Better Journeys” and develop a promotional
campaign to raise awareness of opportunities to travel actively and
sustainably across Argyll and Bute.  External funding has been retained within
the Council by working with the Council’s Communications Team to develop
the brand, campaign materials including posters and social media clips and
prepare to launch the campaign in spring 2024. 
1.2. Smart phone app promotion
Promotional campaign to raise awareness and use of the five existing active
travel smartphone apps (Campbeltown, Dunoon, Helensburgh, Oban and
Rothesay).  The first year of the campaign in summer 2023 increased
downloads of the free to access apps by 74%. 
1.3. Pedestrian and Cycle Counters
Argyll and Bute Council operate a network of automated pedestrian and cycle
counters with 36 installed across the Council area. The data from these
counters is used to monitor changes in pedestrian/cycle numbers, including from
new routes, and by partners to support compilation of national statistics. The
data is also publicly available via a dedicated website. 
1.4. Bikes back to the community
The Bikes back to the Community bike recycling scheme is delivered in
partnership with local community group, ACT Now. While the Bikes back to
the Community scheme has focused on Mid-Argyll, it has supported a number
of Oban based pupils to access a free bicycle to enable them to learn to cycle.
The bicycles provided are safe and suitable, and follow up support from ACT
Now staff and volunteers is available to ensure the bicycle is fully utilised. The
project returned 65 bikes to the community in 2022/23 and is forecast to
exceed this in 2023/24. 
1.5. Oban Town Centre North Project
This project seeks to identify real and perceived barriers to walking, wheeling
and cycling in a key area of Oban town centre that lies to the north of where
the previous CHORD improvement works were carried out, and develop
proposals that will address these barriers, and facilitate active travel as the
most attractive and viable mode choice for everyday journeys in the town.  
The project focusses on George St and the Esplanade between North Pier
and the Corran Halls, while also undertaking a strategic review to identify
opportunities for wider active travel links throughout Oban with the aim of
making walking, wheeling and cycling the preferred mode choice in Oban
Town Centre, thereby increasing access to shops, leisure and essential
services while retaining private car access for those who require it.
The project will deliver strategies and interventions that reduce the impact of

Page 14

the A85 in the study area by identifying opportunities, through traffic surveys
and robust business analysis of travel patters to create proposals that
optimise traffic flow and have the potential to reduce local car journeys and
non-essential travel through the study area.  It will also safeguard Oban’s
strategic transport facilities and high street business operations through
engagement with local businesses and the identification of intervention to
support increase footfall in the town centre whilst ensuring access to Oban
ferry Terminal.