Finance and Resources Service Improvement Plan Outturn Report 2024-25

Renfrewshire Council · 12 June 2025
Back to Finance, Resources and Customer Services Policy Board — 12 June 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

___________________________________________________________________ 
To: Finance, Resources and Customer Services Policy Board 
On: 12 June 2025
___________________________________________________________________ 
Report by: Director of Finance and Resources
___________________________________________________________________ 
Heading: Finance and Resources Service Improvement Plan Outturn Report
2024/25
___________________________________________________________________ 
1. Summary 
1.1 The Finance & Resources Service Improvement Plan 2024-27 was approved
by the Finance, Resources & Customer Services Policy Board in June 2024. 
The plan set out the priorities for the development of the service over a three
year period.  These priorities are aligned to those set out in the 2022-27 Council
Plan.  The Service Improvement Plan sets out the actions which will ensure
continuous improvement across the service and the performance indicators
which ensure the impact can be measured.  These reflect the priority themes of
the Council Plan and the refreshed Community Plan. 
1.2 This report provides a summary of the Finance & Resources service’s
performance against the actions and performance indicators agreed within the
Service Improvement Plan for 2024-27. An outturn report is included as an
appendix to this report. 
1.3 An updated Service Improvement Plan for 2025-28 is being presented to this
Board for approval, aligned to the priorities of the Council Plan. 
1.4 Over the past year, the service has made good progress in delivering positive
outcomes for Renfrewshire and its residents.  This is within an operating context
that remains complex and fast-moving.

Page 2

Economic conditions are currently changing rapidly and both households and
organisations are experiencing cost pressures and supply issues, and this is
unlikely to change in the near future.   
1.5 More detail of achievements is given in Section 4 but the list below notes some
highlights: 
 Leading on the Council’s Financial Sustainability programme;
 Delivery of the annual accounts and supporting the work of external audit;
 Implementing a leadership development programme for senior
management;
 Continuing the revising of HR policies using friendly, inclusive language and
tone; Equality, Diversity and Inclusion Awareness is now one of the
Council’s mandatory training modules and all employees are being
supported and encouraged to complete the training, whether that be online
or via face to face/toolbox talks;
 Ongoing work to support residents with the cost-of-living through the
administration of grant support, signposting to benefits and related
entitlements, and through the work of Advice Works;
 Work to deliver on the Council’s Plan for Net Zero through initiatives such
as the Green Print Strategy;
 Continuing the work with Council colleagues and partners the procurement
service delivered a Meet the Buyers Renfrewshire event, supporting local
businesses to bid for public sector contracts;
 The Business Case for Smart Social Assets has been completed with
additional work now underway to develop complementary business cases
that could further enhance the benefits of this approach;
 The Council’s new Digital Assistant “Millie” is answering 34% of all incoming
calls and continually updated to improve the effectiveness of the service
offered to customers; 
 Continuing to provide a range of strategic and operational support to other
Council services to support the delivery of financial sustainability
programmes, the Plan for Net Zero, large scale infrastructure projects and
strong universal services. 
2. Recommendations 
2.1 It is recommended that the Finance, Resources and Customer Services Policy
Board: 
a) Note the contents of this report;

Page 3

b) Note the progress to date on delivering the actions contained within the
Finance & Resources Service Improvement Plan;
c) Note the current performance of the service as measured by the scorecard
indicators. 
3. Background 
3.1 Our Service Improvement Plans are a clear statement of the outcomes each
service wants to achieve, the actions it will take to achieve this, and the
performance measures it will use to monitor progress and measure success. 
Updates on the actions and performance measures are included as an
appendix to this report. 
3.2 Service Improvement Plans fit within the wider framework provided by the
Council Plan and the Community Plan.  They allow elected members to have
oversight of developments within the service and to consider and develop policy
options which reflect customer need and resource availability. 
3.3 Section 4 of this report gives details of service activity and achievements in
2024/25.  Section 5 discusses actions delayed or cancelled since the Service
Improvement Plan, and any new actions added to reflect additional priorities
identified since the plan was approved.  Section 6 provides a narrative on
performance. 
3.4 In line with our approach of refreshing Service Improvement Plans annually to
ensure they still reflect our organisational priorities, an updated Plan covering
the period 2025 to 2028 is also being presented to this Policy Board. 
4. Key achievements in 2024/25 
4.1 As well as strategic initiatives and customer-facing work, Finance & Resources
delivers support services to all other parts of the council including: 
 Payroll;
 Support with recruitment;
 Training and organisational development;
 ICT Servicedesk;
 Provision of ICT equipment;
 Invoicing and Payments;
 Administrative, committee and elected member support;
 Project and programme management;
 Health and Safety advice and support;
 Legal and Information Governance advice;

Page 4

 Accountancy and financial services;
 Internal audit
 Risk management. 
4.2 Specific achievements in relation to the Service Improvement Plan are
highlighted below. 
Place 
4.3 The service continues to support delivery of the Council’s Cultural Infrastructure
programme with progress of Paisley Museum to move from Practical
Completion of the building to an intense exhibition fit out and operational
readiness process. 
4.4 In 2024/25 the Director of Finance and Resources highlighted, through updates
to Council, that the rate of progress in delivering financial sustainability actions
was not sufficient to fully address medium-term targets.  Further workstreams
will be developed to bring forward proposals to elected members.   
4.5 Legal and Democratic Services successfully implemented the first phase of the
Scottish Government’s new licensing regime for short-term lets. 
4.6 The Business Case for Smart Social Assets is now complete with the service
continuing to investigate potential national funding opportunities via strategic
partners such as Commsworld, CityFibre etc. In addition to this, work is now
underway to develop other business cases that would further supplement
Smart Social Assets. 
Economy 
4.7 The Procurement and Economic Development teams continue to work together
to support local businesses to bid for Council contracts and related work.  Most
recently, a ‘Meet the Buyer’ event was held in October 2024 for local
construction companies, focusing on sub-contractor opportunities for two large
Council building projects.  Guidance for Purchases Under £25,000 was
launched recommending at least 75% local Renfrewshire based suppliers are
invited to the three quote process (where possible). A RenTalk on
Understanding Procurement took place in January 2025 with over 250 Council
staff in attendance.

Page 5

Fair 
4.8 Finance and Resources have supported thousands of Renfrewshire families
with the cost of living in 2024/25 through: 
 Providing Discretionary Housing Payments to eligible residents who may be
struggling with rent payments dealing with financial hardship and those who are
affected by the benefit cap;
 Distributing the Scottish Welfare Fund, including an additional £617,000 of
funding directly provided by the Scottish Government;
 Administering the application process for free school meals and school clothing
grants for almost 7,000 children; Advice Works contacting 1,195 families
enabling them to self-serve making a claim with 56 families responding and
claims made on their behalf. 
4.9 The People and Organisation Development team continue to be closely
involved with the development of the Trauma Informed and Responsive
Renfrewshire programme, and revised HR policies have a greater focus on
wellbeing.  Two additional training courses are currently in development and it
is anticipated these courses will be rolled out in 2025.  
Green 
4.10 Work on the Green Print Strategy has progressed with the roll out of the new
Canon devices now complete.  The ‘Think Digital First’ approach will not only
reduce print costs substantially but will contribute to the reduction of carbon
emissions.  The implementation project is now complete with benefits
realisation work underway to monitor usage and reduce costs. 
Living our Values 
4.11 The Purchase to Pay (P2P) programme is making good progress and should
deliver efficiencies for making payments by the end of next year.  Key work
completed so far include the approval of the No Purchase Order, No Pay P2P
Policy by the Finance, Resources, and Customer Services Policy Board in
November 2024. 
4.12 Implementation of the new Customer Strategy has included the development
of a range of new neighbourhood services on the MyAccount platform with work 
now completed for Housing Benefit and Non Domestic Rates.

Page 6

The Council’s new Digital Assistant “Millie” answering 35% of all incoming calls
and is continually updated to improve the effectiveness of the service offered to
customers with future opportunities to expand the use of AI across the council
being investigated. 
4.13 A number of new or refreshed HR policies were approved this year written using
friendly, inclusive language and tone. These include a new Administration of
Medication and Medical Treatments Policy (April 2024), People, Performance
and Wellbeing Policy (formerly People, Performance & Talent Policy) as well
as the Revised Disciplinary Policy and Review of Records Management Policy
(June 2024). Further policies brought to board for approval during 2024/25
included Data Protection Policy (September 2024), Counter Fraud & Corruption
Policy and Renfrewshire Council No Purchase Order No Pay Policy (November
2024), Anti-Money Laundering Policy and Revised Parenting Leave and Pay
Policy (February 2025). 
4.15 The People and OD team continue to lead on workforce planning and
innovation, supported by the Workforce Planning Group. This includes
progressing key priorities of the People Strategy, taking forward the
recommendations from the Best Value audit.  The Workforce Planning Group
is working collaboratively with the Head of People and OD to develop and
implement a strategic approach to workforce planning and OD to establish new
key priority areas over the next 5 years.  A bi-annual report on our People
Metrics was presented to FARS Board on 13 February 2025 for noting and
monitoring.   
Improving Outcomes for Children and Young People 
4.16 The new recruitment strategy will include elements focused on removing
barriers to employment.  This will include the specific barriers faced by care-
experienced people, as part of the Council’s ongoing commitment to delivering
The Promise.  Promise Keepers training was delivered to officers within People
and OD in February 2025 with three officers now trained. 
5. Actions which have been delayed or cancelled 
5.1 The action under Council Plan theme Place “Support our citizens to access
affordable cross-tenure homes that are digitally enabled and meet community
needs” wording has been changed to “Develop a business case for Smart
Social Assets across Renfrewshire Council”, which better aligns with the
funding to support the development of the Business Case.

Page 7

5.2 The procurement and introduction of “Millie”, an automated assistant has been
completed meeting the requirements of our customers and providing a greater
choice in how they interact with us for routine and transactional services.  This
new digital approach to incoming calls where all calls will be answered has led
to the performance indicator “Customer Service Unit - % of calls answered” to
be removed from the performance scorecard. Increasing use of AI, including
Digital Assistants, have altered these processes such that this is no longer a
useful measure. 
5.3 The action “Develop a Community Wealth Building Plan for Renfrewshire”  was
previously a joint action shared with the Chief Executive’s service.  From
2024/25, it has been led by the Chief Executive’s Service and features in their
Service Improvement Plan only. 
6. Progress against performance measures 
6.1 Finance and Resources measured 23 performance indicators as part of the
2024/27 Service Improvement Plan.  Of these, 14 are collected quarterly and 9
are annual. 
6.2 In 2024/25, 10 indicators met or exceeded the target set, three narrowly missed
the target set, one missed the target, one has been paused and eight are still
to be updated.   
6.3 Three indicators which narrowly missed their target relate to council income –
two to the collection of council tax and one to the collection on non-domestic
rates.  The cost-of-living crisis is likely to have impacted on the collection of
council tax, which is behind target at 94.49% collected against a target of 96%
for this year.  This will also have impacted collection rates for monies owing
from previous years.  The collection of non-domestic rates is improving but still
short of the 98% target, with 97.22% collected in 2024/25. 
6.4 The percentage of procurement spend with local suppliers has improved, but
has not met the target.  A programme of work to support local suppliers has
been in place in recent years, and continues, but external factors and our duty
to achieve best value for the Council impact this measure. 
6.5 During 2024/25 93.6% of the audit plan was completed, exceeding 90%
target. 
6.6 The processing of housing benefits applications is once again exceeding
target with the current average reported as 17.93, well within the target time of
24 days.  Change of circumstances applications is also performing well with
an average of 4.3 days against a target time of 10 days.

Page 8

6.7 The processing of crisis grants continues to meet its target of a two-day
turnaround, and the processing of Scottish Welfare Fund applications is
currently averaging 10 days against a target time of 15 days.   
6.8 Complaints response times exceed targets – 91.9% of frontline complaints
were dealt with within 5 days and 97.2% of investigation complaints within 20
days.  Both indicators have a target of 85%. 
6.9 Invoice processing for small and medium sized businesses continues to be an
area of strong performance, with these dealt with in 5.3 days, on average; this
is against a target of 28 days and is a further improvement over the same
period for 2023/24.  Invoice processing indicator has exceeded its target of
96% of all invoices to be processed with 30 days.  Performance for 2024/25
was 97.83% this is also a further improvement from 2023/24 which was
reported as 96.82%; the service received almost 275,000 invoices during
2024/25. 
6.10 The measure of procurement spend on local suppliers is part of the Local
Government Benchmarking Framework.  Updates are provided by the
Improvement Service and data for 2024/25 will not be available until
December 2025. In the period 2023-2024 Renfrewshire Council recorded
direct spend of £56.4 million with businesses based Locally.  This accounted
for 19.58% of the Council’s total spend.  A further 59.38% of our spend was
with businesses located in bordering local authorities (Glasgow, Inverclyde,
North Ayrshire, East Renfrewshire and West Dunbartonshire). 
Implications of the Report 
1. Financial - The Service Improvement Plan highlights resourcing pressures
arising from increasing demand for services and the current financial
environment.  Finance & Resources will lead on work relating to financial stability
and sustainability. 
2. HR & Organisational Development – No direct implications but the report notes
work ongoing by the People and OD team. 
3. Community/Council Planning – the report details a range of activities which
reflect local council and community planning themes. 
4. Legal – No direct implications but the report notes work delivered by Legal and
Democratic Services.

Page 9

5. Property/Assets -  None 
6. Information Technology – Digital resources are now key to the delivery of
services and strategies are in place to manage this.  The report notes progress
on delivery of work in this area. 
7. Equality & Human Rights - The recommendations contained within this report do
not require an impact assessment as they are asking member to note progress
only.   
8. Health & Safety –none 
9. Procurement – There are no direct implications but the report updates on
progress for actions impacting procurement. 
10. Risk – Risks related to the delivery and management of services are regularly
monitored and included in Renfrewshire Council’s Corporate and Strategic Risk
Registers. 
11. Privacy Impact - none 
12. COSLA Policy Position – none. 
13. Children’s Rights – this report is for noting and has no direct implications on
children’s rights.   
14. Climate Risk – There are no direct implications but the report updates on
progress on actions to tackle the climate risk. 
List of Background Papers: None
___________________________________________________________________ 
Author:  Pamela McDonald, Policy Officer, pamela.mcdonald@renfrewshire.gov.uk

Page 10

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Finance and Resources
Service Improvement Plan 2024 –27
Outturn Report 2024/25

Page 11

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Outturn Report 2024/25
• This outturn report details progress on delivery of our Service Improvement Plan, highlighting areas
where we are already making progress and some areas we want to focus on more, perhaps because
performance isn’t moving in the direction we anticipated or because of other pressures or factors
that makes this even more of a priority for us.
• The following pages shine a spotlight on some great projects or practice, and highlight areas where
we’d like to improve or develop further.  At a service level, there is a stronger focus on some of the
Council Plan Strategic Outcomes than other. Towards the end of this document, you’ll find a full
update against all the actions and performance indicators we use to measure progress. 
• We report on 23 performance indicators, 9 which are reported annually and 14 reported quarterly.
In this report, annual data is provided for 2022/23, 2023/24 and 2024/25 to show recent trends.

Page 12

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place and Economy
Our procurement team continue to work with colleagues in
Economic Development and with partner organisations to host
‘Meet the Buyer’ events, making local businesses aware of how to
find out about, and bid for, public sector contracts.  Council teams
are also hosting supplier development events to support them in
the tendering process.  Our guidance on Contract Standing Orders
now states that 75% of companies invited to Quick Quote should be
Renfrewshire-based wherever possible.  Just over 20% of Council
procurement spend is with businesses registered in Renfrewshire,
and we are seeking to increase this.  A further 60% of our spend is
with businesses registered in the bordering local authorities.

Page 13

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair and Green
An important element of
our Green Print strategy is
now in place, with the roll-
out of new devices across
the corporate and learning
estate.  The next phase
will be about driving
culture changes to
minimise usage, carbon
footprint and costs.
Average time to
process a Crisis
Grant application is
2 days
Average time to
process a new
housing benefit
application is 17.93
days

Page 14

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living our Values
• Work to support employee
wellbeing in 2024/25 has included
the provision of specialist support,
training and advice on gambling
addiction, topic-specific training
for our Mental Health First Aiders,
the creation of new Menopause
Forum for staff, and our recent
accreditation as a Breastfeeding
Friendly Scotland Employer.
94.49% of Council Tax
due in 2024/25 has
been collected
91.9% of frontline
complaints were
responded to within five
days
The average time to pay
invoices to small and
medium sized businesses
was 5.27 days

Page 15

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Actions and indicators
Full list
November 2024

Page 16

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Place
Progress updateStatusDue DateWhat we will do
Paisley Town Hall is now complete, the building has opened to the public and has hosted numerous successful events, includingthe Mod
2023.
Paisley Learning & Cultural Hub is also complete and has been open to the public since 30 November 2023.
Paisley Arts Centre is now complete with the first event held on 31 May 2024.
Paisley Museum is expected to move from Practical Completion of the building during 2025 to an intense exhibition fit out andoperational
readiness process.
31 March 2026
Support delivery of the Council’s
infrastructure investment programme
The aim of this target is that the Council is able to maintain a balanced budget by 31 March 2027 within the context of a challenging
financial environment. This has so far been achieved for the first of the three financial years in scope. 31 March  2027Support delivery of the Council’s financial
sustainability work
The Service is successfully delivered services in relation to the Scottish Welfare Fund (SWF) ,  processing within target. The Service
successfully supported the processing of Discretionary Housing Payments for Financial Hardship and customers affected by the Benefit
Cap.
31 March  2027Delivering strong universal services to all
Renfrewshire citizens
As previously advised, the Council’s policy on Short Term Lets was agreed, the process for dealing with the applications established and
the date for completion of the first phase of applications extended to 30 September 2024. 128 applications were received, thevast majority
of which were received at or around the deadline. All application have now been considered and decided by officers or, where appropriate,
by Elected Members on the Regulatory Functions Board. The introduction of the licensing scheme and the initial applications stage have
now therefore been completed. Applications subsequently received for short-term let licences will be dealt with as business as usual.
30 September 
2024
Implement the first phase of the Scottish
Government’s  new licensing regime for
short-term lets

Page 17

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Place
Progress updateStatusDue DateWhat we will do
The Business Case for Smart Social Assets is now complete and has been shared internally within Renfrewshire Council
and also with Glasgow City Region (GCR). The Council continues to investigate potential national funding opportunities
via strategic partners such as Commsworld, CityFibre, etc. In addition, work is now underway with regards to the
development of other stackable business cases that would supplement Smart Social Assets.
31 March 2025
Develop a business case for Smart
Social Assets across Renfrewshire
The General Services capital budget was approved on 29th February 2024, including £147.8m for delivery in 2024/25.
Since then, projects have been reprofiled to other financial years and the revised budget is currently £97.4m (Period 10).
To date, £63.8m has been spent, representing 66% of the revised budget.
31 March 2025
Deliver Renfrewshire’s strategic capital
investment programmes, including
cultural, infrastructure, housing and
school estate, and maximise the long-
term benefits for our communities.

Page 18

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Economy
Progress updateStatusDue DateWhat we will do
Procurement and Economic Development delivered a Renfrewshire Anchor Meet the Buyer Event in October 2024 which was
delivered in partnership with NHS greater Glasgow and Clyde, University of the West of Scotland, Scotland Excel, Scottish Enterprise
and Business Gateway. This event focused on supporting local businesses to procure for public sector contracts, strengtheningthe
local supply chain. In order to encourage potential Renfrewshire suppliers to access opportunities of all levels of spend, the event
provided a 2 year look ahead on planned spend including the council’s quick quote opportunities. A PIN was published on Public
Contracts Scotland to raise awareness of the event and to encourage more local businesses to register on PCS to enable them to
search for opportunities to supply goods, works and services to the public sector.
The event was a success with 114 businesses registered to attend.  A survey was issued to all attendees at the end of the event and
most participants said they hoped to bid for a contract in the future.
The procurement team will exhibit at the Renfrewshire Chamber of Commerce annual networking event “Renfrewshire connect”. 
The event will take place on 15 May 2025 and it is expected that 300/400 delegates will attend.  In addition to this event, the
procurement team will also exhibit at the National Meet the Buyer event on 4 June 2025.
With support from Economic development and Supplier Development Programme, work continues to engage with local suppliers
at market engagement stage of new Framework and Contract developments.  A Supplier Development Programme event was
delivered to provide tender training for Care at Home suppliers, Renfrewshire based organisations were in attendance. The aimof
this action was to increase the number of local suppliers bidding for Council Framework opportunities.
CSOs require a minimum of 75% local suppliers from the Renfrewshire area to be invited to Quick Quotes (where possible).  We are
aiming to invite Renfrewshire suppliers, where possible.  A Quick Quote was issued inviting 100% local Renfrewshire suppliers to
bid, this procurement targeted the local market and invited 10 local Renfrewshire suppliers to bid.
The Interim Corporate Procurement Manager and Purchase to Pay –Programme Operational Lead delivered a RenTalkon
Understanding Procurement.  The event was a success with 266 Council staff in attendance.  This event covered engaging local
suppliers for below £25k procurements and also the Quick Quote process.  Guidance for Purchased Under £25,000 was launched
recently, this guidance recommends at least 75% local, Renfrewshire based suppliers are invited to the three quote process.
31 March 2025
Actively engage with Renfrewshire
suppliers to increase the percentage of
procurement spend
This action was assigned to both Finance & Resources and Chief Executives service, from mid year this action will be moved toChief
Executives SIP.31 March 2025
Develop a Community Wealth Building
Plan for Renfrewshire

Page 19

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Fair
Progress updateStatusDue DateWhat we will do
The Council has developed and is about to launch new Trauma Informed training across the workforce.  The
training is aligned to the Scottish Government’s  ‘Roadmap for creating trauma-informed and responsive change:
Guidance for organisations, systems and workforces in Scotland’.   2 additional training courses are currently in
development.  One aimed at employees who are likely to be coming into contact with people who may have been
affected by trauma, and the other is to support their managers.   It is anticipated these training courses will be
rolled out in 2025.  We continue to embed trauma informed through our People & OD Policies, supporting guidance
and processes.
31 March 2025
Engage and participate in trauma
informed and responsive
Renfrewshire programme
Our teams successfully delivered services in relation to the Scottish Welfare Fund (SWF) ,  processing within target.
We successfully supported the processing of Discretionary Housing Payments for Financial Hardship and customers
affected by the Benefit Cap.
Advice Works have completed all follow up requests from this year’s free school meals and clothing grant
applications, and are currently working on an updated process to support the next round of applications which will
launch in June of this year.
31 March 2025
Continue to support residents with
the cost-of-living crisis through the
provision of advice services, grants
and other funding

Page 20

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Green
Progress updateStatusDue DateWhat we will do
At strategy stage:
• A sustainability test is completed for all relevant procurements.  This identifies risks and opportunities which
ensure that climate considerations are taken into account. 
• The procurement climate emergency adviser supports the team with advice about policy and highlights
opportunities and good examples of best practice from the public sector at strategy stage.
• The evaluation methodology is agreed including whether climate should be assessed at Selection Stage or as part
of the award criteria.
Tender Stage:
• Where relevant and proportionate procurements include the new Selection Question 4C.7.1 which requires that
bidders should evidence that their organisation has taken steps to build their awareness of the climate change
emergency and how they will respond;
• Where relevant and proportionate bidders will be asked to provide responses specific to the procurement
confirming action that will be taken to mitigate climate impacts during the life of the contract;
Where relevant environmental action will be built into the service specification, requiring that these actions are
delivered as a fundamental element of the contract.
31 March 2025
Ensure that climate considerations
are taken into account in our
procurement strategies and tenders
with a focus on reducing emissions
The roll out of the new Canon devices across both the corporate and education estates is now complete. Work is
underway to investigate options to address culture change e.g. banning the printing of emails. The Council is also
investigating the use of different types of paper to reduce costs.
31 March 2025
Implement the Green Print Strategy
in order to reduce our reliance on
paper, drive down printing costs and
support the organisation’s work
towards net zero

Page 21

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Living our values
Progress updateStatusDue Date
The provisions of the new policy have been implemented.   Managing Absence guidance has been updated to
support the Policy.  Revised training will be available to staff and managers in the coming months. 31 March 2025Embed the new Managing Absence
Policy across the Council.
Training for colleagues who are already mental health first aiders on how to support colleagues with specific types of
mental health conditions was rolled out on 5th December –A conversation on Anxiety.  Further sessions planned
during 2025 will be delivered on Suicide, Depression, Self-Harm and Psychosis.  We continue to raise awareness of
menopause.  An action plan of support based on findings from the Menopause Survey conducted in November 2024
will include further RenTalkson Supporting Menopause during February, toolbox talks on support for employees and
managers and ‘Let’s Pause’ sessions, our virtual get-together.
Council officers continue to work in collaboration with RCA Trust to provide colleagues with specialist support,
training and advice on gambling addiction.  ‘Bet you can help now’ training was rolled out during January and
February, with  focus groups consisting of line managers, People & OD and Trade Unions.
We have recently been recognised as a Breastfeeding Friendly Scotland employer.  Training will be rolled out to the
Customer Contact Centre employees initially, to provide advice and signposting people to available facilities and
Council locations outwithRenfrewshire House.  This training will be recorded and developed  as a module on iLearn
for all employees.  A Council website page is being created in the staff information section that will include guidance
around reasonable adjustments etc.  Wellbeing Support toolbox talks are being rolled out to line managers within
HSCP and EH&I.  This was also delivered during the Head Teachers meeting in February.
31 March 2025Embed the Wellbeing Strategy and
support services to implement it.
The Workforce Planning Group are progressing the key priorities of the People Strategy, taking forward the
recommendations from the Best Value audit and will work collaboratively with the Head of People and OD on
strategic approaches to workforce planning and OD to establish new key priority areas over the next 5 years.  A bi-
annual report on our People Metrics was presented to FARS Board on 13 February 2025 for noting and monitoring.
31 March 2027
Deliver a refreshed approach to
workforce planning and workforce
innovation.

Page 22

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Living our values
Progress updateStatusDue Date
Launch of P2P Phase 1 and the Business World ERP.  The go-live of P2P Phase 1 has been confirmed as end of September 2025.  Mostof the
work on requirements gathering has been completed.  Data cleansing is taken place and the summer testing and training programme has
been confirmed. Regular communications are being provided to CMT, requisitioners, suppliers and the wider staff group.
31 December
2025
Deliver the Purchase to Pay programme
which will streamline payments and deliver
a more efficient process
We have exceeded our completion of the audit plan target by 3.6%.  In order to achieve this we have concentrated as much as possible on
operational work during the year as we have carried  a vacancy for part of the year and had some unplanned leave during the year. This
has resulted in us having to delay planned developmental work and some staff training   until 2025/26.
31 March 2025Deliver the Internal Audit Plan for 2024/25.

Page 23

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Living our values
Progress updateStatusDue DateWhat we will do
Housing Benefit and NDR changes have been completed on MyAccount, the team are now working on waste
collection in conjunction with the new route optimisation system.  Millie has settled well, and is answering 34% of
all incoming calls and being continually updated to improve the effectiveness of the service offered to customers. 
We are now looking at future opportunities to expand the use of AI across the Council.
31 March 2026Implement the new Customer
Strategy.
The Council continues to invest in both technical and non-technical solutions to bolster cyber resilience. This
includes a new phishing protection solution and mandatory cyber training course.
This action is complete, however, there will always be a requirement to continually review this situation, as part of
business as usual.
31 March 2025
Continue to implement a range of
technical and non-technical
measures to bolster our cyber
resilience, protecting our digital
assets
The aim of this action is that the Council is able to maintain a balanced budget by 31 March 2027 within the context
of a challenging financial environment. This has so far been achieved for the first of the three financial years in
scope.
31 March 2027
Implement the next phase of
transformation through the actions
arising from the Council’s financial
sustainability and improvement
workstreams

Page 24

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Living our values
Progress updateStatusDue DateWhat we will do
This update included key areas of progress including new and revised HR&OD Policies written using friendly,
inclusive language and tone.  The Council is embedding our economic development employability programmes
throughout our recruitment processes ensuring barriers faced by employees and interns are removed.  Recruitment,
onboarding and pastoral support processes for overseas workers have been established, through participation in a
Scottish Government pilot programme.  Equality, Diversity and Inclusion Awareness is now one of the Council’s
mandatory training modules and all employees are being supported and encouraged to complete the training,
whether that be online or via face to face/toolbox talks. 
Our workforce received communications throughout November to encourage them to update their personal
equality monitoring information currently held by the Council. This will enable the Council under its statutory duty
to ensure the most up to date information is held and policies/strategies, etc are meeting the needs of our people.
The Council is currently revising its Equality & Diversity and Respect at Work Policies and associated training, with a
view to implementing later in 2025.  The 3 year Plan will continue to be implemented throughout 2025 and beyond.
31 March 2025
Continue to develop our approaches
and activity in relation to Equality,
Diversity and Inclusion, responding
to the needs and views of our
workforce

Page 25

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Children and Young People
Progress updateStatusDue DateWhat we will do
The Council will be creating a Care Experienced Staff Network similar to our established Carers Connected Forum, a
network where others can input and share learned experiences and advice. We are currently considering a proposal
to guarantee interviews for applicants identifying as care-experienced and meet essential criteria for roles.
Evidence from other local authorities’ approaches has now been obtained, including assurances of risk mitigation. •
Work placement and shadowing opportunities for care experienced young people across services.
31 March 2026
Contribute to the Council’s
commitment to The Promise for all
care experienced people

Page 26

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Place
Explanation of performance
2024/252023/242022/23Long
term
trend
Short
term
trend
Current
StatusIndicator
TargetValueTargetValueTargetValue
The Council planned the use of earmarked
reserves to fund the budgeted deficit in
2023/24.
Not
applicabl
e
Not
availablen/a43.2%n/a49.2%
FINSUS1 Total useable
reserves as a % of council
annual budgeted revenue
Minor reduction due to use of the Uncommitted
Balance to fund emergency charity donations.
Not
applicabl
e
Not
availablen/a2.2%n/a2.4%
FINSUS2 Uncommitted
General Fund Balance as a %
of council annual budgeted
net revenue
Marginal increase due to the impact of interest
rates over the year; expected to continue over
the next 12 months.
3.47%Not
available3.47%3.13%3.47%3%
FINSUS3 Ratio of Financing
Costs to Net Revenue
Stream -General Fund
Principal loan repayments from the HRA loans
fund was also lower in 2023-24 due to older
debt being fully paid off in 2022-23.
28.59%Not
available28.59%27.7%28.59%32.5%
FINSUS4 Ratio of Financing
Costs to Net Revenue
Stream -Housing Revenue
Account
Indicator over 100 here shows an overspend
against budget. In 23/24 this was due to a
number of inflationary factors, including pay
and fuel, and increased cost of children’s
residential care. The council is expected to
overspend in 24/25 owing to HSCP pressures.
100%Not
available100%100.59%100%101.7%
FINSUS5 Actual outturn as a
percentage of budgeted
expenditure

Page 27

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Economy
Explanation of performance
2024/252023/242022/23Long
term
trend
Short
term
trend
Current
StatusIndicator
TargetValueTargetValueTargetValue
In the period 2023-2024 Renfrewshire Council recorded direct spend of £56.4 million
with businesses based Locally. A further 59.38% of our spend was with businesses
located in bordering local authorities (Glasgow, Inverclyde, North Ayrshire, East
Renfrewshire and West Dunbartonshire).
The update to our Standing Orders Relating to Contracts in June 2023 included
increasing the threshold for the use of Quick Quote for Works contracts up to £500,000
with a requirement that where possible, a minimum of 75% local businesses should
be invited to quote.  In 2024, a Quick Quote was issued inviting 100% local
Renfrewshire suppliers to bid, this procurement targeted the local market and invited
10 local Renfrewshire suppliers to bid.  In addition, to increase engagement with local
suppliers for below £25k procurements and also the Quick Quote process the Interim
Corporate Procurement Manager and Purchase to Pay –Programme Operational Lead
delivered a RenTalkon Understanding Procurement.  The event was a success with
266 Council staff in attendance.  Guidance for Purchased Under £25,000 was launched
recently, this guidance also recommends at least 75% local, Renfrewshire based
suppliers are invited to the three quote process.
23%n/a23%20.15
%23%19.3%
% of
procurement
spend spent on
local
enterprises

Page 28

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Fair
Explanation of performance
2024/252023/242022/23Long
term
trend
Short
term
trend
Current
StatusIndicator
TargetValueTargetValueTargetValue
Processing speed for New Claims was well
within target for 2024/25.2417.932418.992438.51
Time taken for
processing new housing
benefit applications up
until the posting of
notification of outcome
of the application
(cumulative)
Processing of Changes of Circumstance
was well within target for 2024/25.104.3108.081014.35
Time taken for
processing change of
circumstance housing
benefit applications up
until the posting of
notification of outcome
of the application
(cumulative)
The service continues to meet the target
for processing Crisis Grants. Average days
to process during 2024/25 was within the
2 day target.
222222
Average speed of
processing a Crisis Grant
(Scottish Welfare Fund)
in days

Page 29

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Fair
Explanation of performance
2024/252023/242022/23Long
term
trend
Short
term
trend
Current
StatusIndicator
TargetValueTargetValueTargetValue
Processing speed for Community Care Grants
was well within target for 2024/25.151015101513
Average speed of
processing a Community
Care Grant (Scottish
Welfare Fund) in days
Training has not yet been rolled out to all staff
and this indicator is cancelled for 2024/25.NEW
Percentage of Finance
and Resources staff
completing Level 1
Trauma Informed
training

Page 30

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Green
Explanation of performance
Q2 2024/252024/252023/242022/23Long
term
trend
Short
term
trend
Current
StatusIndicator
TargetValueTargetValueTargetValueTargetValue
This is a new indicator.  Baseline data will
be collected in the second half of 2024/25
once the roll-out of equipment is complete.
NEW
Print volume –number of
pages printed by council
services

Page 31

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Living our values
Explanation of performance
2024/252023/242022/23Long
term
trend
Short
term
trend
Current
StatusIndicator
TargetValueTargetValueTargetValue
2024/25 Data not currently available
11.5Not
available11.5811.57.97
Cost of collecting
council tax per
chargeable dwelling
Council Tax collection for 2024/25 was up by 0.21% on
the 2023/24 position. Recovery of Council Tax remains
challenging with continued pressure on many
household budgets. The service will continue to
maximise collection through timeous recovery activity
and utilising all tools at its disposal, including working
with our recovery agents. Collection performance may
be relatively static until the cost of living crisis eases.
96%94.49%96%94.28%96%95.31%
Percentage of Council
Tax due in the year,
collected by the end of
the year (cumulative
position to date)
Follow up continues to be run each month. Both the
current year and previous years' collection is
monitored.
97.27%97.12%97.27%97.19%97.27%97.21%
Percentage of income
due from Council Tax
for prior years
(cumulative position to
date)
Business rates collection levels for 2024/25 are up by
0.27% from the 2023/24 position. 98%97.22%98%96.95%98%95.67%
Percentage of Non
Domestic Rates due in
the year, collected by
the end of the year
(cumulative to date)

Page 32

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Living our values
Explanation of performance
2024/252023/242022/23Long
term
trend
Short
term
trend
Current
StatusIndicator
TargetValueTargetValueTargetValue
493 Complaints were received in total during
2024/25. 453 have been completed within
timescale, 33 completed outwithtimescale and a
further 7 are still being followed up outwith
timescale. Target has been achieved for this
annual reporting period.
85%91.9%85%86.6%85%86.6%F&R Front Line complaints
(Cumulative)
During 2024/25, Finance & Resources received
141 Investigation complaints of which 137 were
been completed within the required timescale
(20 days) and 3 cases completed outwith
timescale, while one case is still being
completed.  Target has been achieved for the
reporting period.
85%97.16%85%94%85%84.9%
Total % of investigation
(Stage 2) complaints
responded to within targets
by Finance & Resources 
(cumulative to date)
During 2024/25 a total of 274,106 invoices were
received of which 268,165 were processed within
30 days. Performance has met target for the
reporting year.
96%97.83%96%96.82%96%90.21%
Number of invoices paid
within 30 days of receipt, as a
percentage of all invoices
paid council wide
(cumulative)
At the end of 2024/25 (01/04/24 –15/04/25)
118,672 SME invoices were received of which
115,018 were processed within 28 days with the
average days to process an invoice reported at
5.27 days -an improvement of 2.23 days over the
reporting period for 2023/24.  Target has been
achieved for this reporting period.
285.27287.52813.06
Average days Small and
Medium sized businesses
invoices paid

Page 33

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Living our values
Explanation of performance
2024/252023/242022/23Long
term
trend
Short
term
trend
Current
StatusIndicator
TargetValueTargetValueTargetValue
There were 402 single service FOIs dealt
with by FAR in 2024/25 of which 375 were
completed within timescale. 
90%93%100%89.6%100%97.2%
% of Finance and
Resources FOI requests
completed within
timescale
We have exceeded our completion of the
audit plan target by 3.6%.  In order to
achieve this we have concentrated as much
as possible on operational work during the
year as we have carried  a vacancy for part of
the year and had some unplanned leave
during the year. This has resulted in having
to delay planned developmental work and
some staff training until 2025/26.
90%93.6%95%92%95%93.2%Percentage of Audit Plan
completed (cumulative)
Annual figure not yet available.8.5Not
available8.58.98.58.95
Average number of work
days lost through sickness
absence per employee
(F&R) (FTE)

Page 34

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Finance and Resources
Service Improvement Plan 2024 –27
Outturn Report
June 2025